Disusun Oleh :
LEMBAR ASISTENSI
Data Perencanaan :
Fy = 2400 MPa
PELAT ATAP
𝐿𝑦 5 = 1,0 m
β = =
𝐿𝑥 5
Fy = 2400 MPa
2400
2400
5000 (0,8 + ( 1500 ) 5000 (0,8 + ( )
1500
= =
36 + (9 × 1) 36
= 266,67 mm → 27 cm = 33,33 mm → 33 cm
Dicoba 27 cm
Tulangan rencana = 10 mm
Panjang Efektif
dx =h–p–½Ø dy =h–p–½Ø-Ø
= 270 – 25 – ½ 10 = 270 – 25 – ½ 10 - 10
= 240 mm = 230 mm
Perhitungan Beban Plat
Fy = 2400 MPa
Ln = 500 cm
= 0,036 x 500
= 18 cm → 0,18 m
= 484 kg/m2
Beban Tambahan
= 755,8 kg/m2
= 7,41 kN/m2
PERHITUNGAN MOMEN (Tabel Gideon 4.3.c hal 29)
𝐿𝑦 5
= = 1,0 m < 2 m → 2 arah
𝐿𝑥 5
𝐿𝑦
= 1,0 = - 14 (Mty) ; + 17 (Mly)
𝐿𝑥
𝐿𝑦
= 1,0 = - 17 (Mty) ; + 17 (Mly)
𝐿𝑥
−56−44
Interpolasi : Mty = 44 + x ( 1,02 – 1 ) = -10,9
0,2
17−17
Mly = 17 + x ( 1,02 – 1 ) = +17
0,2
= 3,278 kN/m2
= -8,373 kN/m2
= 3,149 kN/m2
= -2,019 kN/m2
PERHITUNGAN TULANGAN ARAH X
Momen Lapangan
MLx = 3,278 kN/m2
𝑀𝑢 3,278
=
1 𝑥 0,24²
= 56,909 kN/m2
𝑏.𝑑²
𝑀𝑢 = 400 → ρ = 0,0017
𝑏.𝑑²
𝑀𝑢 = 56,909 → diinterpolasi
𝑏.𝑑²
= 0,00041
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 +2400 )
= 3,689
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 3,689 = 2,767
Syarat → ρ < ρmin Dipakai
ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 240
= 139,2 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 22 – 250 ( 1521 mm2 )
Cek Mu < ØMn
Æ𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
1521 𝑥 2400
=
0,85 𝑥 25 𝑥 1
= 171783,52
MLx = 0,001 x Wu x Lx2 x X
= 0,001 x 7,41 x 52 x 17
= 3,149 kN/m2
Mu = 314,9 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
𝑀𝑢 = 900 → ρ = 0,0018
𝑏.𝑑²
𝑀𝑢 = 145,364 → diinterpolasi
𝑏.𝑑²
= 0,00058
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 420 )
= 1,779
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 1,779 = 1,334
Syarat → ρ < ρmin
Dipakai ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 240
= 139,2 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 22 - 250 ( 1521 mm2 )
= 171,76
Mtx = -0,001 x Wu x Lx2 x X
= -0,001 x 7,41 x 52 x 45,2
= -8,373 kN/m2
Mu = 837,3 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
Momen Lapangan
𝑀𝑢 = 300 → ρ = 0,0008
𝑏.𝑑²
𝑀𝑢 = 400 → ρ = 0,0013
𝑏.𝑑²
𝑀𝑢 = 54,670 → diinterpolasi
𝑏.𝑑²
= 0,000237
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 2400 )
= 1,779
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 1,779 = 1,334
Syarat → ρ < ρmin
Dipakai ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 230
= 133,4 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 19 – 225 ( 1260 mm2 )
= 142,31
MLy = 0,001 x Wu x Lx2 x Y
= 0,001 x 7,41 x 52 x 17
= 3,149 kN/m2
Mu = 314,9 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
𝑀𝑢 = 200 → ρ = 0,0008
𝑏.𝑑²
𝑀𝑢 = 35,052 → diinterpolasi
𝑏.𝑑²
= 0,0002036
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 2400 )
= 1,770
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 1,770 = 1,327
Syarat → ρ < ρmin Dipakai
ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 230
= 133,4 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 16 – 125 ( 1608 mm2 )
= 181,60
Mty = -0,001 x Wu x Lx2 x Y
= -0,001 x 7,41 x 52 x 17
= -3,149 kN/m2
Mu = 314,9 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
PELAT LANTAI B
𝐿𝑦 5 =1m
β = =
𝐿𝑥 5
Fy = 2400 MPa
2400
2400
5000 (0,8 + ( 1500 ) 5000 (0,8 + ( )
1500
= =
36 + (9 × 1) 36
= 266,67 mm → 27 cm = 33,33 mm → 33 cm
Dicoba 27 cm
Tulangan rencana = 10 mm
Tebal selimut beton = 20 mm → 𝑇e𝑏𝑎𝑙 𝑠e𝑙i𝑚𝑢𝑡 𝑝e𝑙𝑎𝑡 (SNI 3-2847-2002 pasal
9.7.1.c)
Panjang Efektif
dx =h–p–½Ø dy =h–p–½Ø-Ø
= 270 – 20 – ½ 10 = 270 – 20 – ½ 10 - 10
= 245 mm = 235 mm
Fy = 2400 MPa
Ln = 500 cm
= 0,036 x 500
= 18 cm → 0,18 m
Beban Mati (WD) (PPURG 1987)
= 531 kg/m2
= 957,2 kg/m2
= 9,572 kN/m2
PERHITUNGAN MOMEN (Tabel Gideon 4.3.c hal 29)
𝐿𝑦 5
= = 1,0 m < 2 m → 2 arah
𝐿𝑥 4,3
𝐿𝑦
= 1,0 = - 14 (Mty) ; + 17 (Mly)
𝐿𝑥
𝐿𝑦
= 1,2 = - 17 (Mty) ; + 17 (Mly)
𝐿𝑥
−56−44
Interpolasi : Mty = 44 + x ( 1,02 – 1 ) = -10,9
0,2
17−17
Mly = 17 + x ( 1,02 – 1 ) = +17
0,2
= 4,235 kN/m2
= -10,816 kN/m2
= 4,068 kN/m2
= -2,608 kN/m2
PERHITUNGAN TULANGAN ARAH X
Momen Lapangan
MLx = 4,235 kN/m2
𝑀𝑢 4,235
=
1 𝑥 0,25²
= 67,76 kN/m2
𝑏.𝑑²
𝑀𝑢 = 400 → ρ = 0,0019
𝑏.𝑑²
𝑀𝑢 = 67,76 → diinterpolasi
𝑏.𝑑²
= 0,00031
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 2400 )
= 0,00177
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00177 = 0,0013
Syarat → ρ < ρmin Dipakai
ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 245
= 141,1 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 10 – 250 ( 314 mm2 )
= 18,974
MLx = 0,001 x Wu x Lx2 x X
= 0,001 x 9,572 x 52 x 17,7
= 4,235 kN/m2
Mu = 423,5 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
𝑀𝑢 = 900 → ρ = 0,0018
𝑏.𝑑²
𝑀𝑢 = 173,056 → diinterpolasi
𝑏.𝑑²
= 0,00029
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 2400 )
= 0,00177
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00177 = 0,00133
Syarat → ρ < ρmin
Dipakai ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 245
= 142,1 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 10 – 250 ( 314 mm2 )
= 18,974
Mtx = -0,001 x Wu x Lx2 x X
= -0,001 x 9,572 x 52 x 45,2
= -10,816 kN/m2
Mu = 1081,6 kN/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
Momen Lapangan
𝑀𝑢 = 300 → ρ = 0,0008
𝑏.𝑑²
𝑀𝑢 = 400 → ρ = 0,0013
𝑏.𝑑²
𝑀𝑢 = 65,008 → diinterpolasi
𝑏.𝑑²
= 0,00025
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 2400 )
= 0,00177
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00177 = 0,00133
Syarat → ρ < ρmin Dipakai
ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 235
= 136,3 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 8 – 300 ( 168 mm2 )
= 18,974
MLy = 0,001 x Wu x Lx2 x Y
= 0,001 x 9,572 x 52 x 17
= 4,068 kN/m2
Mu = 406,8 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
𝑀𝑢 = 200 → ρ = 0,0008
𝑏.𝑑²
𝑀𝑢 = 41,728 → diinterpolasi
𝑏.𝑑²
= 0,000707
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
( 0,85 𝑥 25 𝑥 1 )𝑥 600
=
2400 (600 + 2400 )
= 0,00177
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00177 = 0,00133
Syarat → ρ < ρmin
Dipakai ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 245
= 142,1 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 8 – 300 ( 168 mm2 )
= 18,974
Mty = -0,001 x Wu x Lx2 x Y
= -0,001 x 9,572 x 52 x 17
= -4,068 kN/m2
Mu = 406,8 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
PELAT ATAP C
5
.
5 Bentang Panjang Ly =5m
7
4.3
,
0
𝐿𝑦 5,0
β = 𝐿𝑥 = 7,0 = 0,71 m
Fy = 2400 MPa
2400
2400
7000 (0,8 + ( 1500 ) 7000 (0,8 + ( )
1500
= =
36 + (9 × 0,71) 36
= 396,32 mm → 40 cm = 466,67 mm → 47 cm
Dicoba 40 cm
Tulangan rencana = 10 mm
Panjang Efektif
dx =h–p–½Ø dy =h–p–½Ø-Ø
= 400 – 25 – ½ 10 = 400 – 25 – ½ 10 - 10
= 370 mm = 360 mm
Perhitungan Beban Plat
Fy = 2400 MPa
Ln = 700 cm
= 0,033 x 700
= 23,1 cm → 0,23 m
= 604 kg/m2
Beban Tambahan
= 899,8 kg/m2
= 8,82 kN/m2
PERHITUNGAN MOMEN (Tabel Gideon 4.3.c hal 29)
𝐿𝑦 5
= = 1,25 m < 2 m → 2 arah
𝐿𝑥 4
𝐿𝑦
= 1,0 = - 14 (Mty) ; + 17 (Mly)
𝐿𝑥
𝐿𝑦
= 1,2 = - 17 (Mty) ; + 17 (Mly)
𝐿𝑥
−56−44
Interpolasi : Mty = 44 + x ( 1,02 – 1 ) = -10,9
0,2
17−17
Mly = 17 + x ( 1,02 – 1 ) = +17
0,2
= 7,649 kN/m2
= -19,534 kN/m2
= 7,347 kN/m2
= -4.710 kN/m2
PERHITUNGAN TULANGAN ARAH X
Momen Lapangan
MLx = 7,649 kN/m2
𝑀𝑢 7,649
=
1 𝑥 0,37²
= 55,872 kN/m2
𝑏.𝑑²
𝑀𝑢 = 400 → ρ = 0,0019
𝑏.𝑑²
𝑀𝑢 = 55,872 → diinterpolasi
𝑏.𝑑²
= 0,000024
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
= 0,00126
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00126 = 0,000945
Syarat → ρ < ρmin Dipakai
ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 370
= 214,6 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 8 – 220 ( 223 mm2 )
= 25,186
MLx = 0,001 x Wu x Lx2 x X
= 0,001 x 8,82 x 72 x 17,7
= 7,649 kN/m2
Mu = 764,9 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
𝑀𝑢 = 900 → ρ = 0,0018
𝑏.𝑑²
𝑀𝑢 = 142,688 → diinterpolasi
𝑏.𝑑²
= 0,00017
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
= 0,00126
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00126 = 0,000945
Syarat → ρ < ρmin
Dipakai ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 370
= 214,6 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 8 – 220 ( 223 mm2 )
= 25,186
Mtx = -0,001 x Wu x Lx2 x X
= -0,001 x 8,82 x 72 x 45,2
= -19,534 kN/m2
Mu = 1953,4 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
Momen Lapangan
𝑀𝑢 = 300 → ρ = 0,0008
𝑏.𝑑²
𝑀𝑢 = 400 → ρ = 0,0013
𝑏.𝑑²
𝑀𝑢 = 53,666 → diinterpolasi
𝑏.𝑑²
= 0,000019
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
= 0,00126
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00126 = 0,0000945
Syarat → ρ < ρmin
Dipakai ρmin =
0,00058
As = ρ x b x d
= 0,00058 x 1000 x 360
= 208,8 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 8 – 225 ( 223 mm2 )
= 25,186
MLy = 0,001 x Wu x Lx2 x Y
= 0,001 x 8,82 x 72 x 17
= 7,347 kN/m2
Mu = 734,7 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
𝑀𝑢 = 200 → ρ = 0,0008
𝑏.𝑑²
𝑀𝑢 = 34,404 → diinterpolasi
𝑏.𝑑²
= 0,00017
• Rasio Tulangan Minimum
ρmin = 1,4 = 1,4 = 0,00058
ƒ𝑦 2400
( 0,85 𝑥 ƒ𝑐 𝑥 𝛽 )𝑥 600
ρb =
ƒ𝑦 (6 00 +ƒ 𝑦 )
= 0,00126
• Rasio Tulangan Maksimum
ρmax = 0,75 x ρb = 0,75 x 0,00126 = 0,000945
Syarat → ρ < ρmin Dipakai
ρmin = 0,00058
As = ρ x b x d
= 0,00058 x 1000 x 360
= 208,8 mm2
Dari table Gideon 2.2.a poin 2 dipakai tulangan Ø 8 – 225 ( 223 mm2 )
= 25,186
Mty = -0,001 x Wu x Lx2 x Y
= -0,001 x 8,82 x 72 x 10,9
= -4,710 kN/m2
Mu = 471,0 kg/m2
ØMn = 0,85 x As x Fy x ( d – 𝑎 )
2
d = h – p – ØS - 1ØP
2
= 500 – 25 – 8 - 110
2
= 462 mm
0,85 x 25 2 x 0,103
= (1 − √1 − )
2400 0,85 x 25
= 0,00075
Rasio Tulangan min, ρmin = 1,4 = 1,4
ƒ𝑦 2400
= 0,00058
(0,85 × fc × 𝛽) × 600
ρb =
fy (600 + fy)
= 0,0015
ρmax = 0,75 x ρb = 0,75 x 0,0015 = 0,00113
Syarat → ρ < ρmin
Dipakai ρmin = 0,00058
As perlu =ρxbxd
= 0,00058 x 200 x 462
= 53,592 mm2
As 53,59
n =1 =1 = 6,89 → digunakan 6 tulangan
𝜋D² x 3,14 x 10²
4 4
As x fy 471 x 2400
a = = = 0,265
0,85 x fc x b 0,85 x 25 x 200
Mn ada= As’ x fy ( d − 2𝑎 )
= 5220865,44 Nmm
Mn
Koefisien Tahanan, Rn = = 52255655,89 = 1224106,93
b.d² 200 x 0,462²
0,85 ƒ𝑐 2𝑅𝑛
Rasio Tulangan, ρ = (1 − √1 − )
ƒ𝑦 0,85ƒ𝑐
0,85 x 25 2 x 1224106,93
= (1 − √1 − )
2400 0,85 x 25
= 0,642
Rasio Tulangan min, ρmin = 1,4 = 1,4 = 0,00058
fy 2400
(0,85 × fc × 𝛽) × 600
ρb =
fy (600 + fy)
(0,85 × 25 × 0,85) × 600
=
2400 (600 + 2400)
= 0,0015
ρmax = 0,75 x ρb = 0,75 x 0,0015 = 0,00113
Syarat → ρ < ρmin
Dipakai ρmin= 0,00058
As perlu =ρxbxd
= 0,00058 x 200 x 462
= 53,592 mm2
As 53,59
n =1 =1 = 6,89 → digunakan 6 tulangan
\ D2 x 3,14 x 10²
4 4
Mn ada = As’ x fy ( d − 𝑎
2
)
= 5192944,65 Nmm
= 77000 N
ØVc = 0,75 x 77000 = 57750 N
1ØVc = 1 x 57750 = 28875 N
2 2
Penulangan Torsi
Dari SAP diperoleh:
Tu = 1.099.798 Nmm
Tn = Tu = 1.099.798 = 1.466.397 N
Ø 0,75
Ø √f′c Acp2
( ) < Tu
12 Pcp
Total Beban
o Beban di Lantai 2 = WD + WL + WR
= 604 kg/m2 + 100 kg/m2 + 30 kg/m2
= 734 kg/m2 → 7,34 kN/m2
o Beban di Lantai 1 = Plat B + Plat C
= ( WD + WL ) + ( WD + WL + WR )
= ( 531 + 200 ) + ( 604 + 100 + 30 )
= 1465 kg/m2 → 14,65 kN/m2
o fc 25 → K = fc x 10 x 0,83
= 25 x 10 x 0,83
= 207,5 kg/m2
325,7 cm
Dipakai ukuran 40 x 40
→ 459,4 cm
Dipakai ukuran 60 x 60
PERHITUNGAN TULANGAN KOLOM K1
Data-data Ukuran Kolom 40 x 40
Ø tul pokok (Øp) = 16 mm
Ø tul sengkang (Øs) = 10 mm
Selimut beton (p) = 40 mm (SNI 3-2847-2002 pasal 9.7.1.c)
Mutu beton (Fc) = K-300 Kg/cm 2 = 25 Mpa
Mutu baja (Fy) = 2400 Mpa
d = h – p - Øs – ½ Øp
= 400 – 40 – 10 – 8
= 342 mm
d’ = p + Øs + ½ Øp
= 40 + 10 + 8
= 58 mm
Pu = 93573,73 N
Mu1 = 28.986.530,44 Nmm
Mu2 = 13.189.721,9 Nmm
Ec = 4700 √ƒ𝑐
= 4700 √25
= 23500 MPa
= 239633,26 kg/cm2
Ig = 1
b h3
12
= 1
40 x 403
12
= 213333,3 cm4
Ec x Ig
2.5
EIk = 1+ d
239633,26 x 213333,3
2,5
=
1+0,599
= 12.788.431.305 kg/cm2
Momen Inersia Kolom
Ig = 1
b h3
12
1
= 40 x 403
12
= 213333,3 cm4
Ec x Ig
EIb = 5
1+ d
239633,26 x 213333,3
5
=
1+0,599
= 6.394.215.652 kg/cm2
A = ( EIk /Ik ) / ( EIh / Ih )
= ( 12.788.431.305 / 2,5 ) / ( 6.394.215.652 / 5 )
=4
B = 0 (terjepit pada pondasi)
Dari grafik alignment (diagram nomogram, Gideon.7.1.c) didapat k = 0,75
Panjang tekuk kolom Lc = k x Lu = 0,75 x 480 = 360 cm
Untuk kolom persegi jari-jari inersia r = 0,3h
= 0,3 x 40
= 12 cm
Rasio kelangsingan kolom = Lc / r = 360 / 12 = 30
d = h – p – Øs – ½ Øp
= 600 – 40 – 10 – 8
= 542 mm
d’ = p + Øs + ½ Øp
= 40 + 10 +8
= 58 mm
Pu = 246528,72 N
Mu1 = 30.679.376,56 Nmm
Mu2 = 20.946.507,5 Nmm
- Perhitungan Pengaruh Tekuk
WD = 1465 kg/m
WL = 734 kg/m
1,2 x WD 1,2 𝑥 1465
βd = = = 0,6 < 1
(1,2 x WD)+ (1,6 x WL) (1,2 x 1465 )+ (1,6 x 734)
Ec = 4700 √ƒ𝑐
= 4700 √25
= 23500 MPa
= 239633,26 kg/cm2
Ig = 1
b h3
12
1
= x 60 x 603
12
= 540000 cm4
Ec x Ig
2.5
EIk =
1+ d
239633,26 x 540000
2,5
EIk = = 32.350.490.100 kg/cm2
1+0,6
maka pengaruh tekuk tidak perlu ditinjau pada perhitungan penulangan kolom.
- Perhitungan Tulangan Kolom
Pu = 246528,72 N
Mu1 = 30.679.376,56 Nmm
Mu2 = 20.946.507,5 Nmm
Ag = 600 x 600 = 360000 mm2
Persyaratan eksentrisitas minimal dari kolom :
e min = (15 + 0,03 h) = 15 + 0,03 x 600 = 33 mm
Eksentrisitas beban et = Mu = 30.679.376,56 = 124,45 mm
Pu 246528,72
= 0,01 untuk mutu beton 25 Mpa, didapat = 1. Sehingga rasio tulangan pada
penampang kolom = r x = 0,01x 1= 0,01 > min = 0,00275→ = 0,01
Luas tulangan yang diperlukan AsT = x Ag = 0,01 x 360000 = 3600 mm2
As 3600
n =1 = 1 = 17,9 → digunakan 18 tulangan
\ D2 x 3,14 x 162
4 4
As = π x r2 x jumlah tulangan
= 3,14 x 82 x 18
= 3617,28 mm2
Sehingga digunakan tulangan 6D16 dengan As = 3617,28 mm2
- Tulangan Sengkang
Vu = 10755,39 N
1
Vc = 6 x √f′c x b x d
1
= 6 x √25 x 600 x 600
= 300000 N
ØVc = 0,75 x 300000 = 225000 N
½ ØVc = ½ x 225000 = 112500 N
Dari perhitungan diatas, bahwa dengan hanya menghitung kuat geser nominal
yang disumbangkan oleh beton tersebut mampu menahan kuat geser yang
bekerja pada struktur tersebut.
Jarak tulangan geser:
Av= 2 x (1/4 π D2) = 2 x (1/4 x 3,14 x 102) = 157 mm2
s = (Av x fy x d) / (Vu / 0,75) = (157 x 2400 x 600) / (10755,39 / 0,75)
=15.765,1 mm
syarat jarak maksimum tulangan geser kolom tidak boleh melebihi:
a. b/4 = 600/4 = 150 mm
b. 6D = 6 x 16 = 96 mm
c. 157 mm
Digunakan, s = 100 mm
Av x fy x d 157x 2 4 0 x 600
Vs = = = 2.260.800 N
s 100
Kontrol :
Vc + Vs = 300.000 + 2.260.800 = 2.560.800 N
Vc + Vs = 2.560.800 N > Vu/Ø = 10755,39 / 0,75 = 14.340,52 N (OK)
Dari nilai yang didapat diatas, perencanaan tulangan geser memenuhi syarat
dengan perencanaan tulangan geser Ø10 – 100.