PERENCANAAN DAN PERHITUNGAN PENULANGAN PELAT


1. PEMBEBANAN PADA PELAT
A. Pelat Atap
Beban mati
- Berat sendiri = 0.10 m x 2400 kg/m3 = 240 kg/m2
- Berat Plafond + Rangka = 7 kg/m2 + 11 kg/m2 = 18 kg/m2
- Berat Sanitasi & Plumbing = 20 kg/m2 + 10 kg/m2 = 30kg/m2
- Berat finishing (1cm) = 21kg/m2
QD total =
309kg/m2

Beban hidup

- Berat pekerja = 100 kg/m2


- BJ Gedung (Olahraga) = 250 kg/m2
QL total = 350 kg/m2

Kombinasi beban = 1.2QD+ 1.6QL

Kombinasi beban =1.2(309)+1.6 (350) = 930 kg/m2

B. Pelat Lantai
Berat Mati
- Berat sendiri = 0.12 m x 2400 kg/m3 = 288
kg/m2
- Berat Plafond + Rangka =7 kg/m2 + 11 kg/m2 = 18 kg/m2
- Berat Sanitasi & Plumbing =20 kg/m2 + 10 kg/m2 = 30 kg/m2
- Berat finishing = 21 kg/m2
- Berat Keramik = 5 kg/m2
QD total = 362 kg/m2

Beban hidup
- Berat pekerja = 100 kg/m2
- BJ Gedung (Olahraga) = 250 kg/m2
- QL total = 350 kg/m2

Kombinasi Beban= 1.2QD + 1.6QL

Kombinasi Beban= 1.2(362)+ 1.6(350) = 994,4 kg/m2

2. PERHITUNGAN PELAT LANTAI


DATA PELAT

- Tebal Pelat lantai = 12 mm


- Selimut Beton = 20 mm
- Diameter Tulangan Rencana arah x = 12 mm
- Diameter Tulangan Rencana arah y = 6 mm
- Mutu Baja (fy) = 240 Mpa = 2400kg/cm2
- Mutu Beton (fc) = 25 Mpa = 250 kg/cm2
- dx= 120 cm – 20 – 12/2 cm = 94 mm
- dy =120 cm– 20 – 12 – ½ (6 ) = 85 mm

PERHITUNGAN

Tahapan yang digunakan dalam menentukan tulangan lentur plat adalah sebagai berikut:

1. Menentukan data-data d, fy, fc’, dan Mu


2. Menentukan batasan harga tulangan dengan menggunakan rasio tulangan yang
disyaratkan sebagai berikut :
0.85 β 1fc ' 600
ρb=
fy ( 600+fy )
ρ max=0.75 ρb

1.4
ρmin=
fy
3. Hitung rasio tulangan yang dibutuhkan :

1 2×m×Rn
ρ=
m( √
1− 1−
fy )
25MPa 58MPa

Dalam perhitungan penulangan pelat jika Ly/Lx<2 lihat PBI 1971 tabel 13.3.2 maka di
dapat rumus momen sebagai berikut:

Mlx = -0.001 . qu . Lx2 . X

Mtx = -0.001 . qu . Lx2 . X

Mly = 0.001 . qu . Ly2 . X

Mty = 0.001 . qu . Ly2 . X

Mlx = momen lentur pelat per satuan panjang di lapangan di arah bentang lx.
Mly = momen lentur pelat per satuan panjang di lapangan di arah bentang ly.
Mtx = momen lentur pelat per satuan panjang di tumpuan di arah bentang lx.
Mty = momen lentur pelat per satuan panjang di tumpuan di arah bentang ly.
3. PERHITUNGAN PENULANGAN PELAT LANTAI
DATA PELAT

- Tebal Pelat lantai = 12 mm


- Selimut Beton = 20 mm
- Diameter Tulangan Rencana arah x = 12 mm
- Diameter Tulangan Rencana arah y = 6 mm
- Mutu Baja (fy) = 240 Mpa = 2400kg/cm2
- Mutu Beton (fc) = 25 Mpa = 250 kg/cm2
- dx= 120 cm – 20 – 12/2 = 94 mm
- dy =120 cm– 20 – 12 – ½ (6 ) = 85 mm
A. PELAT LANTAI TYPE A UKURAN (4 m x 3 m)

Lx = 300 cm

Ly = 400 cm

Lx =300cm

Ly =400 cm

Ly 400
= = =1.3
Lx 300

karena β < 2 maka dikategorikan plat dua arah

h = 120 mm = 0.12 m (syarat tebal h minimum untuk plat lantai)

PBI 1971 tabel 13.3.2 didapat persamaan momen sebagai berikut :

Mlx  nilai X = 31

Mtx  nilai X = 69

Mly  nilai X = 19

Mty  nilai X = 57

Mlx = 0.001 . qu . Lx2 . X = 0.001 x 1019 x 32 x 31 = 284,31 kgm

Mtx = -0.001 . qu . Lx2 . X = -0.001 x 1019 x 32x 69 = -632,81 kgm ( + )

Mly = 0.001 . qu . Ly2 . X = 0.001 x 1019 x 42x 19 = 309,78 kgm

Mty = -0.001 . qu . Ly2 . X = -0.001 x 1019 x 42x 57 = -929,33 kgm ( + )

Batas rasio tulangan

β1 = untuk f’c  25 Mpa, digunakan β1 = 0.85


fy
240
m = 0. 85 ×f'c = 0.85 ×25 = 11,29

0. 85 f'c 600 0. 85 x 25 600


xβ 1 x x 0 .85 x
balance = fy 600+fy = 240 600+240 = 0.054

max = 0.75 x balance = 0.75 x 0.054 = 0.0405

1.4 1 .4
min = fy = 240 = 0.0058

Penulangan Pelat lantai

Penulangan arah Y

untuk daerah tumpuan dengan Mty

dx = h – s- (1/2x) = 120 – 20 – (12/2) = 94 mm

dy = h – s- (x – 1/2y) = 120 – 20 – (12 – 12/2) = 85 mm

Mty 9293300
Rny = 0. 8 x b×dy 2 = 0. 8 x 1000 ×852 = 1,61 MPa

1 2m×Rny
perlu = m
1− 1− ( √
fy )
1 2(11,29)×(1,61 )
= 11,29
( √
1− 1−
240 )
= 0.0069

ρ min < ρ perlu maka pakai ρ perlu

ρ pakai = 0.0069

As-y pasang = ρ x b x dy = 0.0058 x 1000 x 85 = 586,5 mm2

Maka, dipakai tulangan 14-250mm ( As-y = 616 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 142 = 153,86 mm2
4

As pasang 616
Jumlah yang dipakai = = = 4,004
Luas tulangan 153,86

Tulangan tumpuan arah Y = 14 – 250

Tulangan pembagi = 0.2 x As-y = 0.2 x 616 = 123,2 mm2

Maka, dipakai tulangan 8-250mm ( As-x = 201 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 82 = 50,24 mm2
4

As pasang 201
Jumlah yang dipakai = = = 4,001
Luas tulangan 50,24

Tulangan pembagi lapangan arah y = 8 – 250

Penulangan Arah X

Penulangan plat arah X untuk daerah tumpuan Mtx

Mtx 6328100
Rnx = 0. 8 x b×dx 2 = 0. 8 x 1000 ×942 = 0.89 mpa
1 2m×Rnx
perlu = m
( √
1− 1−
fy )
1 2(11,29)×(0 . 89 )
= 11,29
( √
1− 1−
240 )
= 0.0038

Karena perlu < ρ min maka pakai ρ min

ρ pakai = 0,0058

As-x pasang = ρ x b x dx = 0.0058 x 1000 x 94 = 545,2 mm2

Maka, dipakai tulangan 14-250mm ( As-x = 616 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 142 = 153,86 mm2
4

As pasang 616
Jumlah yang dipakai = = = 4,004
Luas tulangan 153,86

Tulangan tumpuan arah x = 14 – 250

Tulangan pembagi = 0.2 x As-x = 0.2 x 616 = 123,2 mm2

Maka, dipakai tulangan 8-250mm ( As-x = 201 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 82 = 50,24 mm2
4

As pasang 201
Jumlah yang dipakai = = = 4,001
Luas tulangan 50,24

Tulangan pembagi lapangan arah x = 8 – 250

Penulangan arah Y

untuk daerah lapangan dengan Mly


dx = h – s- (1/2x) = 120 – 20 – (12/2) = 94 mm

dy = h – s- (x – 1/2y) = 120 – 20 – (12 - 12/2) = 85 mm

Mly 3097800
Rny = 0. 8 x b×dy 2 = 0. 8 x 1000 ×852 = 0.53 Mpa

1 2m×Rny
perlu = m
( √
1− 1−
fy )
1 2(11,29)×(0 . 53)
= 11,29
( √
1− 1−
240 )
= 0.0022

ρ perlu < ρ min maka pakai ρ min

ρ pakai = 0,0058

As pasang = ρ x b x dy = 0.0058 x 1000 x 85 = 493 mm2

Maka, dipakai tulangan 13-250mm (As = 531 mm2)

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 132 = 132,66 mm2
4

As pasang 531
Jumlah yang dipakai = = = 4,002
Luas tulangan 132,66

Tulangan lapangan arah Y = 13 – 250

Tulangan pembagi = 0.2 x As-y = 0.2 x 531 = 106,2 mm2

Maka, dipakai tulangan 6-250 mm ( As-y = 113 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 62 = 28.26 mm2
4

As pasang 113
Jumlah yang dipakai = = = 3.998
Luas tulangan 28.26

Tulangan pembagi lapangan arah y = 6 – 250


Penulangan Arah X

Penulangan plat arah X untuk daerah lapangan Mlx

Mlx 2843100
Rnx = 0. 8 x b×dx 2 = 0. 8 x 1000 ×942 = 0.4mpa

1 2m×Rnx
perlu = m
( √
1− 1−
fy )
1 2(11,29)×(0 . 4 )
= 11,29
( √
1− 1−
240 )
= 0.0017

Karena perlu < ρ min maka pakai ρ min

As-x pasang = ρ x b x dx = 0.0058 x 1000 x 94 = 545,2 mm2

Maka, dipakai tulangan 14-250mm ( As-x = 616 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 142 = 153,86 mm2
4

As pasang 616
Jumlah yang dipakai = = = 4,003
Luas tulangan 153,86

Tulangan lapangan arah x = 14 – 250

Tulangan pembagi = 0.2 x As-x = 0.2 x 616 = 123,2 mm2

Maka, dipakai tulangan 8-250mm ( As-x = 201 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 82 = 50,24 mm2
4

As pasang 201
Jumlah yang dipakai = = = 4,001
Luas tulangan 50,24

Tulangan pembagi lapangan arah x = 8 – 250


4. PERHITUNGAN PENULANGAN PELAT ATAP
DATA PELAT

- Tebal Pelat atap = 10 mm


- Selimut Beton = 40 mm
- Diameter Tulangan Rencana arah x = 10 mm
- Diameter Tulangan Rencana arah y = 6 mm
- Mutu Baja (fy) = 240 Mpa = 2400kg/cm2
- Mutu Beton (fc) = 25 Mpa = 250 kg/cm2
- dx= 100 cm – 40 – 10/2 = 55 mm
- dy =100 cm– 40 – 10 – ½ (6) = 45 mm

B. PELAT LANTAI ATAP TYPE A UKURAN (4 m x 3 m)

Lx = 300 cm

Ly = 400 cm
Lx =300cm

Ly =400 cm

Ly 400
= = =1.3
Lx 350

karena β < 2 maka dikategorikan plat dua arah

h = 100 mm = 0.10 m (syarat tebal h minimum untuk plat atap)

PBI 1971 tabel 13.3.2 didapat persamaan momen sebagai berikut :

Mlx  nilai X = 31

Mtx  nilai X = 69

Mly  nilai X = 19

Mty  nilai X = 57

Mlx = 0.001 . qu . Lx2 . X = 0.001 x 1019 x 32 x 31 = 284,31 kgm

Mtx = -0.001 . qu . Lx2 . X = -0.001 x 1019 x 32x 69 = -632,81 kgm ( + )


Mly = 0.001 . qu . Ly2 . X = 0.001 x 1019 x 42x 19 = 309,78 kgm

Mty = -0.001 . qu . Ly2 . X = -0.001 x 1019 x 42x 57 = -929,33 kgm ( + )

Batas rasio tulangan

β1 = untuk f’c  25 Mpa, gunakan β1 = 0.85

fy 240
m = 0. 85 ×f'c = 0.85 ×25 = 11,29

0. 85 f'c 600 0. 85 x 25 600


xβ 1 x x 0 .85 x
balance = fy 600+fy = 240 600+240 =0,0538

max = 0.75 x balance = 0.75 x 0.054 = 0.0405

1.4 1 .4
min = fy = 240 = 0.0058

Penulangan Pelat atap

Penulangan arah Y

Untuk daerah tumpuan dengan Mty

dx = h – s- (1/2x) = 100 – 40 – (10/2) = 55 mm

dy = h – s- (x – 1/2y) = 100 – 40 – (10 – 10/2) = 45 mm

Mty 9293300
Rny = 0. 8 x b×dy 2 = 0. 8 x 1000 ×452 = 5,7 mpa

1 2m×Rny
perlu = m
1− 1− ( √
fy )
1 2(11,29)×(5,7 )
= 11,29
( √
1− 1−
240 )
= 0.0282

max > ρ perlu > ρ min maka pakai ρ perlu

ρ pakai = 0.0282

As-y pasang = ρ x b x dy = 0.0282 x 1000 x 45 = 1269 mm2

Maka, dipakai tulangan 22-250 mm ( As-y = 1521 mm2) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 222 = 379,94 mm2
4

As pasang 1047
Jumlah yang dipakai = = = 4,003
Luas tulangan 78.5

Tulangan tumpuan arah Y = 22-250

tulangan susut = 0.25 x As-y = 0.25 x 1521 = 380,25 mm2

Maka, dipakai tulangan 12-250 mm ( As-y = 452 mm2) dari table

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 122 = 113,04 mm2
4

As pasang 352
Jumlah yang dipakai = = = 3,998
Luas tulangan 113,04

Tulangan susut arah Y = 12-250

Penulangan Arah X

Penulangan plat arah X untuk daerah tumpuan Mtx

Mtx 6328100
Rnx = 0. 8 x b×dx 2 = 0. 8 x 1000 ×55 2 = 2.6 mpa

1 2m×Rnx
perlu = m
( √
1− 1−
fy )
1 2(11,29)×(2 . 6)
= 11,29
( √
1− 1−
240 )
= 0.0116

max > ρ perlu > ρ min maka pakai ρ perlu

ρ pakai = 0,0116

As-x pasang = ρ x b x dx = 0.0116 x 1000 x 55 = 638 mm2

Maka, dipakai tulangan 16-250 mm ( As-x = 804 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 162 = 200,96 mm2
4

As pasang 804
Jumlah yang dipakai = = = 4,001
Luas tulangan 200,96

Tulangan tumpuan arah x = 16-250

tulangan susut = 0.25 x As-x = 0.25 x 804 = 201 mm2

Maka, dipakai tulangan 8-250 mm ( As-x = 201 mm2) dari table

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 82 = 50,24 mm2
4

As pasang 201
Jumlah yang dipakai = = = 4,001
Luas tulangan 50,24

Tulangan susut arah X = 8 – 250

Penulangan arah Y

untuk daerah lapangan dengan Mly

dx = h – s- (1/2x) = 100 – 40 – (10/2) = 55 mm

dy = h – s- (x – 1/2y) = 100 – 40 – (10 - 10/2) = 45 mm

Mly 3097800
Rny = 0. 8 x b×dy 2 = 0. 8 x 1000 ×452 = 1,9 Mpa
1 2m×Rny
perlu = m
( √
1− 1−
fy )
1 2(11,29)×(1,9 )
= 11,29
( √
1− 1−
240 )
= 0.0083

max > ρ perlu > ρ min maka pakai ρ perlu

ρ pakai = 0.0083

As pasang = ρ x b x dy = 0.0083 x 1000 x 45 = 373,5 mm2

Maka, dipakai tulangan 12-250 mm (As = 452 mm2)

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 122 = 113,04 mm2
4

As pasang 452
Jumlah yang dipakai = = = 3,998
Luas tulangan 113,04

Tulangan lapangan arah Y = 12 – 250

tulangan susut = 0.25 x As-y = 0.25 x 452 = 113mm2

Maka, dipakai tulangan 6-250 mm ( As-y = 113 mm2) dari table

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 62 = 28,26 mm2
4

As pasang 113
Jumlah yang dipakai = = = 3,998
Luas tulangan 28.26

Tulangan susut arah Y = 6 – 250

Penulangan Arah X

Penulangan plat arah X untuk daerah lapangan Mlx

Mlx 2843100
Rnx = 0. 8 x b×dx 2 = 0. 8 x 1000 ×55 2 = 1,2 mpa
1 2m×Rnx
perlu = m
( √
1− 1−
fy )
1 2(11,29 )×(1,2 )
= 11,29
( √
1− 1−
240 )
= 0.0051

Karena perlu < ρ min maka pakai ρ min

ρ pakai = 0,0058

As-x pasang = ρ x b x dx = 0.0058 x 1000 x 55 = 319 mm2

Maka, dipakai tulangan 12-250mm ( As-x = 452 mm) dari tabel

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 122 = 113,04 mm2
4

As pasang 452
Jumlah yang dipakai = = = 3,998
Luas tulangan 113,04

Tulangan tumpuan arah x = 12 – 250

tulangan susut = 0.25 x As-x = 0.25 x 452 = 113 mm2

Maka, dipakai tulangan 6-250 mm ( As-x = 113 mm2) dari table

1
Luas tulangan = x π x d 2 = 0.25 x 3.14 x 62 = 28,26 mm2
4

As pasang 113
Jumlah yang dipakai = = = 3,998
Luas tulangan 28.26

Tulangan susut arah X = 6 – 250

Penulangan Balok

Balok Induk

Data-data yang diketahui sebagai berikut:

 Tinggi balok (h) = 300 mm

 Lebar balok (b) = 200 mm

 Tebal selimut beton (p) = 20 mm


 Diameter tulangan utama = 12 mm

 Diameter sengkang = 8 mm

 Mutu beton (fc’) = 25 MPa

 Mutu baja (fy) = 240 MPa

 Faktor reduksi lentur (ø) = 0,9

 penentuan tinggi efektif

d = tinggi efektif balok

h = tinggi balok

p = Tebal selimut beton

d = h – p – ½Øtul.utama - Øsengkang

= 300 – 20 – ½ (12) - 8 = 266 mm

d’ =h–d

= 300 – 266 = 34 mm

Hitungan Pembebanan :

 Beban Hidup (qL) :


Beban hidup fungsi gedung untuk gedung olahraga = 400 kg/m2
 Beban Mati (qD) / 1 m :
Berat plat sendiri = 0,12 x 2400 = 288 kg/m2
Berat keramik ( 1 cm ) = 0,01 x 1700 = 17 kg/m2
Berat Spesi ( 1 cm ) = 0,01 . 2100 = 21 kg/m2
Berat plafond + instalasi listrik = 25 kg/m2
Berat Pasir ( 1 cm ) = 0,01 . 1800 = 18 kg/m2 +
= 369 kg/m2

 Beban Ultimate (qU) :


qU = 1,2 qD + 1,6 qL
= 1,2 . 369 + 1,6 . 400
= 1082,8 kg/m2
Hitungan Momen :

Mtx = momen tumpuan maksimum per meter lebar arah x


1
Mt1 = × qU × L2
24

1
= × 1082,8× 4 2 = 721,87 kg.m
24

MIx = momen lapangan maksimum per meter lebar arah x

1
Ml = × qU × L2
11

1
= ×1082,8 × 4 2 = 1574,98 kg.m
11

1
Mt2 = × qU × L2
9

1
= × 1082,8× 4 2 = 1924,98 kg.m
9

1. Penulangan Daerah Tumpuan :


fy
m =
0,85× f ' c
240
=
0,85× 25
= 11,29
Mt 1
Rn =
ɸ× d 2 × b
7218700
=
0,9× 2662 ×200
= 0,5668
Ratio tulangan yang dibutuhkan :
1 2 m× Rn
ρ = (1− 1−
m
1
√ fy
)

2× 11,29 ×0,5668
=
11,29 √
(1− 1−
240
)

= 0,0024 = 0,24 %
1,4 1,4
ρmin= .100 %= . 100 %=0,58 %
fy 240

382,5. β 1. f ' c 382,5.0,85 .25


ρmax= . 100 %= .100 %=4,0318 %
( 600+fy ) fy (600+ 240 ) 240

ρmin> ρ

Maka dipakai ρmin = 0,58 % = 0,0058

As = ρ ×b × d

= 0,0058 ×200 ×266


= 308,56 mm2

Dipakai tulangan 8D12 (As = 904,32 mm2)

Syarat As pakai > As = 904,32 > 308,56 (OK)


Perhitungan Tulangan Tekan :
Mut−Mul
As’ =
ɸfy (d −d ' )

19,24−15,74
=
0,9× 240(266−34)

= 69,84 mm2

Dipakai tulangan 2D12 (As = 226,08 mm2)

Syarat As pakai > As = 226,08 > 69,84 (OK)

Kontrol Desain :
As . fy 904,32.240
a= = =10,2 mm
0,85. fc .b 0,85.25 .1000

Menghitung Momen Nominal :

a
ɸMn = ɸAs pakai× fy ×(d− )
2

10,2
= 0,9 × 904,32×240 ×(266− )
2

= 80962411,01 Nmm

= 80,96 Kn.m

Syarat ϕMn > Mt1 = 80,96 > 72,18 (OK)

2. Penulangan Daerah Lapangan :


fy
m =
0,85× f ' c

240
=
0,85× 25

= 11,29

Mt 2
Rn =
ɸ× d 2 × b

19249800
=
0,9× 2662 ×200

= 1,5
Ratio Tulangan yang Dibutuhkan :
1 2 m× Rn
ρ = (1− 1−
m
1
√ fy
)

2× 11,29 ×1,5
=
11,29
(1− 1−
√ 240
)

= 0,0065 = 0,65 %

1,4 1,4
ρmin= .100 %= . 100 %=0,58 %
fy 240

382,5. β 1. f ' c 382,5.0,85 .25


ρmax= . 100 %= .100 %=4,0318 %
( 600+fy ) fy (600+ 240 ) 240

ρmin ≤ ρ

Maka dipakai ρ = 0,65 % = 0,0065

As = ρ ×b × d

= 0,0065 ×200 ×266


= 345,8 mm2

Dipakai tulangan 8D12 (As = 904,32 mm2)

Syarat As pakai > As = 904,32 > 345,8 (OK)

Perhitungan Tulangan Tekan :


Mut−Mul
As’ =
ɸfy (d −d ' )
19,24−15,74
=
0,9× 240(266−34)

= 69,84 mm2

Dipakai tulangan 2D12 (As = 226,08 mm2)

Syarat As pakai > As = 226,06 > 69,84 (OK)

Kontrol Desain :
As . fy 904,32.240
a= = =10,2 mm
0,85. fc .b 0,85.25 .1000

Menghitung Momen Nominal :

a
ɸMn = ɸAs pakai× fy ×(d− )
2

10,2
= 0,9 × 904,32×240 ×(266− )
2

= 80962411,01 Nmm

= 80,96 Kn.m

Syarat ϕMn > Mt1 = 80,96 > 72,18 (OK)

BAB IV
PERENCANAAN BALOK ANAK

4.1. PENURUNAN RUMUS

Lx

Ly

A. Beban segitiga:
P = ½  b qa
P1 = ½  b/2  P = ¼  P  b
Mmax b/2
= P1( b/2 – 1/3  b/3 )
= ( ¼ P  b ) ( b/3 )
P1 P1 P1
= ¼ P1
( ½ b qa )  b  b/3
Meq max = ⅛ × qeq × b Lx= b
qeq
Mmax = Meq-max
1/24 × qa × b2 = ⅛ × qeqLx=
× bb2
qeq = ⅓ × qa × b

qeq = ⅓ × qa × Lx

B. Beban trapesium

b/2 Ly-b b/2

P1+ P2 P1 P2 P3 P4 P1+ P2

x = (P 1 + P2)  Ly/2 – P 1 (Ly/2 - ⅔ b/2) – P 2 (Ly –


Ly

Dimana: P 1 = ½  P  b/2
P⋅( Ly−b )
P2 = 2

Meq-max= ⅛  qeq Ly2


Mmax = Meq-max

qeq = ½ × qa × Lx (1 - ⅓ Lx2/Ly2)

4.2. PERHITUNGAN PENULANGAN BALOK ANAK ATAP


50/60

Lx =400–(30/2 + 40/2) = 365 cm

666,7
30/4

40/5
40/5

0
0

Ly=666,7–(50/2+50/2)=616,7cm

400 400

A. Pembebanan Plat Atap


Dari data perhitungan pembebanan plat didapat :
qd = 381 kg/m 2
ql = 100 kg/m 2

B. Pembebanan Balok Anak Atap


 Beban mati (qd)
Berat sendiri balok= 0.30 x 0.40 x 2400 = 288 kg/m 2
Beban mati plat = 2½3814 (1 - ⅓ (3,65/6,16) 2) = 1345,64 kg/m 2
qd=1633,64 kg/m 2
 Beban hidup (ql)
Beban hidup plat = 2½  100 4 (1 - ⅓ (3,65/6,16) 2) =353,18 kg/m 2
 Beban berfaktor (qu)
qu = 1.2 x qd + 1.6 x ql
= 1.2 x 1633,64 + 1.6 x 353,18 = 2525,45 kg/m 2
C. Gaya – gaya dalam yang terjadi
 Koefisien momen dan gaya lintang ( SNI 03-2847-2002 Pasal
10.3.3.5)

-1 / 16 -1 / 10 -1 / 11 -1 / 11 -1 / 11 -1 / 11 -1 / 11 -1 / 11 -1 / 10 -1 / 11
+1 / 14 +1 / 14 +1 / 14 +1 / 14 +1 / 14
A B C D E F

 Momen
 Bentang Ujung
qu⋅l 2 1633 ,64 x 6,162
=
MA = 16 16 = 3874,34 kgm
qu⋅l2 1633 ,64 x 6 , 162
=
MA-B = 14 14 = 4427,82 kgm
qu⋅l2 1633 ,64 x 6 , 162
=
MB = 10 10 = 6198,94 kgm

 Bentang Dalam

qu⋅l2 1633 ,64 x 6 , 162


=
MB = 11 11 = 5635,40 kgm
qu⋅l2 1633 ,64 x 6 , 162
=
MB-C = 16 16 = 3874,34 kgm
qu⋅l2 1633 ,64 x 6 , 162
=
MC = 11 11 = 5635,40 kgm

 Contoh Perhitungan Balok Anak Atap :


Data-data : - b = 300 mm d = 400 – (40 + 8 + 1/2 * 12) = 346 mm
- h = 400 mm Tulangan Utama = D 12 mm
- fc’ = 35 MPa Tulangan Sengkang = D 8 mm
- fy = 300MPa
0 . 85 β 1 fc ' 600 0. 85 x 0 . 81 x 35 600
ρb=
fy (
600+fy ) = 400 600+400
=0 . 036 ( )
ρ max=0.75 ρb = 0.75 x 0.036 = 0.027
1 .4 1. 4
ρ min= =0 . 0035
fy = 400

fy 300
m= = =10 , 08
0 , 85 fc ' 0 ,85 x35

D. Perhitungan Tulangan Lentur


 Bentang Ujung
 Tumpuan A
Mu 3874,34 × 9,81 × 1000
Mn = φ = 0 .8 = 47509094,25 Nmm

Mn 47509094,25
2 2
Rn = bd = 300×347 = 1,31 N/mm2

1 2×10 ,08×1,31
perlu =
1
m ( √
1− 1−
2m×Rn
fy ) = 10 ,08
( √
1− 1−
300 )
= 0.0044
pakai = 1.33 0.0044 = 0.0057 >min dan <ρmax
Aspakai =  b  d = 0.0057300 346
= 600 mm2
Maka dipasang tulangan 6 D-12 ( 678,58 mm2 )

6-D12
400
346

2-D12

300

 Lapangan A – B
Mu 4427,82 × 9. 81 × 1000
Mn = φ = 0 .8 = 54296142,75N-mm
Mn 54296142,75
2 2
Rn = bd = 300×346 = 1,51 N/mm2
1 2×10,08×1,51
perlu =
1
m ( √
1− 1−
2m×Rn
fy ) = 10,08
1− 1− ( √
300 )
= 0.0051
pakai = 1.33  0.0051 = 0.0067<min dan >ρmax
Aspakai =  b  d = 0.0067 300  346
= 695,46 mm2
Maka dipasang tulangan 7 D-12 (791,28 mm2

2-D12
400
346

7-D12

300

 Tumpuan B
Mu 6198,94 × 9.81 × 1000
Mn = φ = 0.8 = 76007880N-mm
Mn 76007880
2 2
Rn = bd = 300×346 = 2,11 N/mm2

1 2×10,08×2,11
perlu =
1
m ( √
1− 1−
2m×Rn
fy ) = 10 ,08
1− 1−( √
300 )
= 0.0073
pakai = 1.33  0.0073 = 0.0097>min dan >ρ max
Aspakai =  b  d = 0.0097 300  346
= 1008,07 mm2
Maka dipasang tulangan 9 D-12 (1017,36mm2)
9-D12
400
346

2-D12

300
o Bentang Dalam
 Tumpuan B
Mu 5635,40 × 9,81 × 1000
Mn = φ = 0.8 = 69104092,5 Nmm
Mn 69104092,5
2 2
Rn = bd = 300×346 = 1,92 N/mm2

1 2×10,08×1 .92
perlu =
1
m( √
1− 1−
2m×Rn
fy ) = 10, 08
( √
1− 1−
300 )
= 0.0066
pakai = 1.33  0.0066 = 0.0088>min
Aspakai =  b  d = 0.0088300  346
= 914,05 mm2
Maka dipasang tulangan 9 D-12 ( 1017,36 mm2 )
9-D12
400
346

2-D12

300

 Lapangan B - C
Mu 3874,34 × 9,81 × 1000
Mn = φ = 0 .8 = 47509094,25 Nmm
Mn 47509094,25
2 2
Rn = bd = 300×347 = 1,31 N/mm2

1 2m×Rn 1 2×10 ,08×1 ,31


perlu = m ( √
1− 1−
fy ) = 10 , 08 ( √
1− 1−
300 )
= 0.0044
pakai = 1.33  0.0044 = 0.0057 >min dan <ρmax
Aspakai =  b  d = 0.0057  300  346 = 600 mm2
Maka dipasang tulangan 6 D-12 ( 678,58 mm2 )
`z s 6-D12

400
346
2-D12

300

 Tumpuan C

Mu 5635,40 × 9,81 × 1000


Mn = φ = 0.8 = 69104092,5 Nmm
Mn 69104092,5
2 2
Rn = bd = 300×346 = 1,92 N/mm2

1 2m×Rn 1 2×10 ,08×1 .92


perlu = m ( √
1− 1−
fy ) = 10, 08
1− 1−( √
300 )
= 0.0066
pakai = 1.33  0.0066 = 0.0088 >min
Aspakai =  b  d = 0.0088  300  346
= 914,05 mm2
Maka dipasang tulangan 9 D-12 ( 1017,36 mm2 )

9-D12
400
346

2-D12

300

E. Perhitungan Penulangan Geser


Langkah-langkah perhitungan :
1. Hitung Vu pada titik berjarak d dari ujung perletakan
2
2. Cek Vu ≤ φ ( Vc + 3 √ fc ' . bw . d )

Bila tidak memenuhi maka perbesaran penampang


3. Kriteria kebutuhan tulangan geser :
 Vu  0,5  Vc  Tidak perlu penguatan geser
 0,5  Vc < Vu < Vc  dipakai tulangan geser minimum
 Vc < Vu < (Vc + Vs min)  diperlukan tulangan geser
1
 f (Vc+VSmin ) < Vu 
φ( Vc+ 3 √ fc'. bw . d )  perlu tulangan geser.
1
dimana : Vc = 6 √ fc' bw . d

f'c
Vs = √ 3
bw . d

Φ = 0,6 (untukgeser)
Keterangan :
 Vc = Kekuatangeser Nominal yang diakibatkanolehBeton
 Vs = Kekuatangeser Nominal yang diakibatkanolehTulangangeser
 Vn = Kekuatan geser Nominal (Vc + Vs)
 Vu = Gaya geserBerfaktor
4. Menurut SNI 03-2847-2002 Pasal 23.3.3.4 :
Jarak maksimum antar sengkang yang tidak memerlukan sengkang tertutup tidak boleh
melebihi : (d/2)
Perhitungan Gaya Geser :
Suatu penampang beton menggunakan tulangan geser bila vu>θvc

qu = 2525,45kg/m2

- Vu = 1/2 quLn
= 1/2 x2525,45x 6,16
= 7778,386 kg 77783,86 N

- Vc = 1/6  √ fc'  bw  d
= 1/6 x √ 35 x300x346
= 102348,18 N
 Daerah tumpuan :
1 1
Vu ×( 2 Ln−d ) 77783 , 86×( 2 x 6,16−0. 346 )
1
= 1
- Vtumpu = 2
Ln 2
x 6 ,16

= 69045,80 N
Vu tump 69045,80
−Vc= −102348,18
- Vsmin = φ 0,6
= 12728,15 N
Kriteria kebutuhan tulangan geser :
1
f (Vc+VSmin ) < Vu 
φ( Vc+ 3 √ fc'. bw . d )  perlu tulangan geser.

- 0.5 Φ Vc = 30704,45 N

- Φ Vc = 61408,90 N

- Φ (Vc + Vs min) = 69045,79N


1
-
φ( Vc+ 3 √ fc'. bw . d ) = 184226,72 N
69045,79N <77783,86N 184226,72 N  perlu tulangan geser.

Direncanakan : tulangan geser =8


Kontrol jarak sengkang
Smax = ½  d = ½  346
= 173 mm
digunakan sengkang  8 – 150 mm
 Daerah lapangan :
1 1 1 1
Vu ×( 2 Ln− 4 Ln ) 77783 , 86×( 2 x6,16− 4 x 6 , 16 )
1
= 1
- Vu lap = 2
Ln 2
x 6,16 = 38891,93 N
- Vu lap > 0.5 ΦVc
- Vu lap <ΦVc
- Vu lap <Φ (Vc + Vs min)
1
- Vu lap <
φ( Vc+ 3 √ fc'. bw . d )

Vu memakai tulangan geser minimum.


Direncanakan : tulangan geser =8 Av = 100.48 mm2
Jarak sengkang minimum :
bw⋅S
Av=
3⋅fy
Av⋅3⋅fy 100 ,53 x 3 x 300
S= = =301 , 59 mm
bw 300

digunakan sengkang  8 - 500 mm

4.3. PERHITUNGAN PENULANGAN BALOK ANAK LANTAI


50/60

Lx = 400 – (40/2 + 30/2) = 365 cm


666,
30/4

40/5
40/5

Ly =666,7–(50/2+50/2)=616,7 cm
0

7
0

A. 400 400 Plat Lantai


Pembebanan
Dari data perhitungan pembebanan plat didapat :
qd = 412 kg/m 2 ; ql= 250 kg/m 2
B. Pembebanan Balok Anak Lantai
 Beban mati (qd)
Berat sendiri balok= 0.30 x 0.28 x 2400 = 201,6 kg/m2
Beban mati plat= 2½4123,65(1 - ⅓ (3.65/6,16) 2) =1327,80 kg/m 2
qd =1529,40 kg/m2

 Beban hidup (ql)


Beban hidup plat = 2  ½ 250 3,65 (1 - ⅓ (3,65/6,16) 2)
= 805,706 kg/m 2
 Beban berfaktor (qu)
qu = 1.2 x qd + 1.6 x ql
= 1.2 x 1529,40 + 1.6 x 805,706 = 3124,414 kg/m 2
C. Gaya – Gaya Dalam yang Terjadi
 Koefisien momen dan gaya lintang (sesuai SNI 03-2847-2002
Pasal 10.3.3.5)
-1 / 16 -1 / 10 -1 / 11 -1 / 11 -1 / 11 -1 / 11 -1 / 11 -1 / 11 -1 / 10 -1 / 11
+1 / 14 +1 / 14 +1 / 14 +1 / 14 +1 / 14
A B C D E F

 Momen
o Bentang ujung
2 2
qu⋅l 3124,41 x 6,16
=
MA = 16 16 = 7409,85 kgm
qu⋅l 2 3124,41 x 6,162
=
MA-B = 14 14 = 8468,40 kgm
qu⋅l 2 3124,41 x 6,162
=
MB = 10 10 = 11855,76 kgm
o Bentang Dalam

qu⋅l 2 3124,41 x 6,162


=
MB = 1 11 = 10777,96 kgm
qu⋅l 2 3124,41 x 6,162
=
MB-C = 16 16 = 7409,85 kgm
qu⋅l 2 3124,41 x 6,162
=
MB = 1 11 = 10777,96 kgm
 Contoh Perhitungan Balok Anak Lantai :
Data-data : - b = 300 mm d = 400 – (40 + 8 + 1/2*19)=342.5 mm
- h = 400 mm Tulangan Utama = D 19 mm
- fc’ = 35 MPa Tulangan Sengkang = D 10 mm
- fy = 300MPa
0 . 85 β 1 fc ' 600 0. 85 x 0 . 81 x 35 600
ρb=
fy 600+fy ( ) = 400 600+400
=0 . 036 ( )
ρ max=0.75 ρb = 0.75 x 0.036 = 0.027
1 .4 1.4
ρ min= =0 .0046
fy = 300
fy 300
m= = =10 ,08
0.85 fc ' 0.85 x35
D. Perhitungan Tulangan Lentur
o Bentang Ujung
 Tumpuan A
Mu 7409,85 × 9,81 × 1000
Mn = φ = 0.8 = 90863285,63 N-mm
Mn 90863285,63
2 2
Rn = bd = 300×342 .5 = 2,58 N/mm2

1 2×10 ,08×2, 58
perlu =
1
m( √
1− 1−
2m×Rn
fy ) = 10 ,08
1− 1−( √
300 )
= 0.009
pakai = 1.33  0.009 = 0.012>min
Aspakai =  b  d = 0.012 300  342.5
= 1231,15 mm2
Maka dipasang tulangan 5 D-19 ( 1416,92 mm2 )
5-D19
342.5
400

2-D19

300

 Lapangan A – B
Mu 8468,4 × 9.81 × 1000
Mn = φ = 0.8 = 103843755 N-mm
Mn 103843755
2 2
Rn = bd = 300×342 .5 = 2,95 N/mm2

1 2×10 ,08×2. 95
perlu =
1
m ( √
1− 1−
2m×Rn
fy ) = 10,08
( √
1− 1−
300 )
= 0.0089
pakai = 1.33  0.0089 = 0.012>min
Aspakai =  b  d = 0.012 300  342.5
= 1233 mm2
Maka dipasang tulangan 5 D-19 (1416,92 mm2 )

5-D19

342.5
400
2-D19

300

 Tumpuan B
Mu 11855,76 × 9.81 × 1000
Mn = φ = 0. 8 = 145381257 N-mm
Mn 145381257
2 2
Rn = bd = 300×342 .5 = 4,13 N/mm2

1 2×10 ,08×4 ,13


perlu =
1
m ( √
1− 1−
2m×Rn
fy ) = 10 ,08
( √
1− 1−
300 )
= 0.0148
pakai = 1.33  0.0148 = 0.0198>min
Aspakai =  b  d = 0.0198 300  342.5
= 2033,88 mm2
Maka dipasang tulangan 8 D-19 (2267,08 mm2 )

8-D19
342.5
400

2-D19

300

o Bentang Dalam
 Tumpuan B
Mu 10777,96 × 9,81 × 1000
Mn = φ = 0. 8 = 132164734,5 N-mm
Mn 132164734,5
2 2
Rn = bd = 300×342 .5 = 3,75 N/mm2

1 2×10 ,08×3,75
perlu =
1
m( √
1− 1−
2m×Rn
fy ) = 10 ,08
1− 1−( √
300 )
= 0.0134
pakai = 1.33  0.0134 = 0.0178>min
Aspakai =  b  d = 0.0178 300  342.5
= 1831,99 mm2
Maka dipasang tulangan 7 D-19 ( 1983,69 mm2 )
7-D19
342.5
400

2-D19

300

 Lapangan B – C
Mu 7409,85 × 9.81 × 1000
Mn = φ = 0 .8 = 90863285,63 N-mm
Mn 90863285,63
2 2
Rn = bd = 300×342 .5 = 2,58 N/mm2

1 2×10,08×2, 58
perlu =
1
m ( √
1− 1−
2m×Rn
fy ) = 10,08
5-D19
( √
1− 1−
300 )
= 0.009
pakai = 1.33  0.0048 = 0.012>min
342.5
400

Aspakai =  b  d = 0.012300  342.5


= 1231,15 mm2
2-D19

300
Maka dipasang tulangan 5 D-19 (1416,92 mm2 )

 Tumpuan C

Mu 10777,96 × 9,81 × 1000


Mn = φ = 0. 8 = 132164734,5 N-mm
Mn 132164734,5
2 2
Rn = bd = 300×342 .5 = 3,75 N/mm2

1 2m×Rn 1 2×10 ,08×3,75


perlu = m ( √
1− 1−
fy ) = 10,08 ( √
1− 1−
300 )
= 0.0134
pakai = 1.33  0.0134 = 0.0178 >min
Aspakai =  b  d = 0.0178  300  342.5 = 1831,99 mm2
Maka dipasang tulangan 7 D-19 ( 1983,69 mm2 )

7-D19
342.5
400

2-D19

300

E. Perhitungan Penulangan Geser


Langkah-langkahperhitungan :
1. Hitung Vu pada titik berjarak d dari ujung perletakan
2
2. Cek Vu ≤ φ ( Vc + 3 √ fc ' . bw . d )
Bila tidak memenuhi maka perbesaran penampang
3. Kriteria kebutuhan tulangan geser :
 Vu  0,5  Vc  Tidak perlu penguatan geser
 0,5  Vc < Vu < Vc  dipakai tulangan geser minimum
 Vc < Vu < (Vc + Vs min)  diperlukan tulangan geser
1
 f (Vc+VSmin ) < Vu 
φ( Vc+ 3 √ fc'. bw . d )  perlu tulangan geser.

dimana :
1
- Vc = 6 √ fc' bw . d

f'c
- Vs = √ 3
bw . d

- Φ = 0,6 (untukgeser)
Keterangan :
 Vc = Kekuatangeser Nominal yang diakibatkan oleh Beton
 Vs = Kekuatangeser Nominal yang diakibatkan oleh Tulangan geser
 Vn = Kekuatan geser Nominal (Vc + Vs)
 Vu = Gaya geser Berfaktor

4. Menurut SNI 03-2847-2002 Pasal 23.3.3.4 :


Jarak maksimum antar sengkang yang tidak memerlukan sengkang tertutup tidak boleh
melebihi : (d/2)
Perhitungan Gaya Geser :
Suatu penampang beton menggunakan tulangan geser bila vu>θvc

qu = 3124,41kg/m2
- Vu = 1/2 quLn
= 1/2 3124,416,16
= 9623,183 kg
= 96231,83 N

- Vc = 1/6  √ fc'  bw  d

= 1/6  √ 35  300 342.5


= 101312,86 N
 Daerah tumpuan :
1 1
Vu×( 2 Ln−d ) 96231 , 83×( 2⋅6 , 16−0 ,3425 )
1
= 1
- Vtumpu = 2
Ln 2
⋅6 ,16

= 85530,72 N
Vu tump 85530,72
−Vc= −101312 ,86
- Vsmin = φ 0,6
= 41238,35 N
Kriteria kebutuhan tulangan geser :
1
Vc < Vu <
φ( Vc+ 3 √ fc'. bw . d )  diperlukan tulangan geser

- 0.5 Φ Vc = 30393,86 N
- Φ Vc = 50656,43 N
- Φ (Vc + Vs min) = 85530,72 N
1
-
φ( Vc+ 3 √ fc'. bw . d ) = 303938,59 N
- 85530,72 N <96231,83 N 303938,59 N perlu tulangan geser.
Direncanakan : tulangan geser =  10
1
0.6 x(2x π 102 )x 300 x342.5
φ⋅Av.fy .d 4
Smin = φ⋅Vs = 0.6 x 41238,35 = 391,38 mm
Kontrol jarak sengkang
Smax =½d = ½  342.5 = 171.25 mm
digunakan sengkang  10 – 150 mm
 Daerah lapangan :
Vu ×( 12 Ln− 14 Ln ) 96231,83 ×( 12 x 6,16− 14 x 6 , 16 )
1
= 1
- Vu = 2
Ln 2
x 6,16 = 48115,91
lap

N
Kriteria kebutuhan tulangan geser :
- 0.5 ΦVc = 30393,86 N
- ΦVc = 50656.43 N
- Φ (Vc + Vs min) = 85530,72 N
1
-
φ( Vc+ 3 √ fc'. bw . d ) = 303938,59 N
0,5  Vc < Vu < Vc  dipakai tulangan geser minimum
Direncanakan : tulangan geser =8 Av = 100.48 mm2
Jarak sengkang minimum :
bw⋅S
Av=
3⋅fy
Av⋅3⋅fy 100 ,53 x 3 x 300
S= = =301 , 59 mm
bw 300

digunakan sengkang  8 - 500 mm