PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Kos-Kosan = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 471.912 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 804.496 kg/m2
A
250
300
PERHITUNGAN STATIKA
Lx = 5m
Ly = 5m
Ly/Lx = 1.0 ≤ 2.5 ==> Pelat 2 arah
kLx = kTx = 36 TABEL 6.4 BETON BU LINA
kLy =kTy = 36
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 724.0464 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 724.05 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kLx
= -724.046 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kLy
= -724.046 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-30
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0387
LAPANGAN X
Mu = 724.0464 kgm
Rn = Mu
ø.b.d^2
= 7240464
0.8*1000*(90^2)
= 1.117
m = fy
0,85 . F'c
= 11.765
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.765
= 0.0048
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 628 mm2
Untuk tulangan bawah digunakan ø10-125 (As= 628mm^2)
LAPANGAN Y
Mu = 724.05
Rn = Mu
ø.b.d^2
= 7240464
0.8*1000*(90^2)
= 1.117
m = fy
0,85 . F'c
= 11.765
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
11.765
= 0.0048
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 628 mm^2
Untuk tulangan bawah digunakan ø10-125 (As= 628mm^2)
TUMPUAN X
Mu = 724.0464 kgm
Rn = Mu
ø.b.d^2
= 7240464
0.8*1000*(90^2)
= 1.117 Mpa
m = fy
0,85 . F'c
= 11.765
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.765
= 0.0048
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 628 mm2
TUMPUAN Y
Mu = 724.0464 kgm
Rn = Mu
ø.b.d^2
= 7240464
0.8*1000*(90^2)
= 1.117 Mpa
m = fy
0,85 . F'c
= 11.765
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.765
= 0.0048
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 628 mm2
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 621.6 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 932.8 kg/m2
B
400
300
PERHITUNGAN STATIKA
Lx = 2m
Ly = 3.5 m
Ly/Lx = 1.8 ≤ 2 ==> Pelat 2 arah
kLx = kTx = 60 TABEL 6.4 BETON BU LINA
kLy =kTy = 35
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 223.872 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 399.94 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kLx
= -223.872 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kLy
= -399.938 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-30
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0323
LAPANGAN X
Mu = 223.872 kgm
Rn = Mu
ø.b.d^2
= 2238720
0.8*1000*(90^2)
= 0.345
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
14.118
= 0.0015
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm2
Untuk tulangan bawah digunakan ø10-125 (As= 628mm^2)
LAPANGAN Y
Mu = 399.94
Rn = Mu
ø.b.d^2
= 3999380
0.8*1000*(90^2)
= 0.617
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
14.118
= 0.0026
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm^2
Untuk tulangan bawah digunakan ø10-125 (As= 628mm^2)
TUMPUAN X
Mu = 223.872 kgm
Rn = Mu
ø.b.d^2
= 2238720
0.8*1000*(90^2)
= 0.345 Mpa
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
14.118
= 0.0015
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 524 mm2
TUMPUAN Y
Mu = 399.938 kgm
Rn = Mu
ø.b.d^2
= 3999380
0.8*1000*(90^2)
= 0.617 Mpa
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
14.118
= 0.0026
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm2
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 621.6 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 932.8 kg/m2
C
500
400
PERHITUNGAN STATIKA
Lx = 3m
Ly = 4m
Ly/Lx = 1.3 ≤ 2 ==> Pelat 2 arah
kLx = kTx = 50 TABEL 6.4 BETON BU LINA
kLy =kTy = 38
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 419.76 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 567.14 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kLx
= -419.76 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kLy
= -567.142 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-30
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0323
LAPANGAN X
Mu = 419.76 kgm
Rn = Mu
ø.b.d^2
= 4197600
0.8*1000*(90^2)
= 0.648
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
14.118
= 0.0028
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm2
Untuk tulangan bawah digunakan ø10-125 (As= 628mm^2)
LAPANGAN Y
Mu = 567.14
Rn = Mu
ø.b.d^2
= 5671424
0.8*1000*(90^2)
= 0.875
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
14.118
= 0.0037
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm^2
Untuk tulangan bawah digunakan ø10-125 (As= 628mm^2)
TUMPUAN X
Mu = 419.76 kgm
Rn = Mu
ø.b.d^2
= 4197600
0.8*1000*(90^2)
= 0.648 Mpa
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
14.118
= 0.0028
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 524 mm2
TUMPUAN Y
Mu = 567.1424 kgm
Rn = Mu
ø.b.d^2
= 5671424
0.8*1000*(90^2)
= 0.875 Mpa
m = fy
0,85 . F'c
= 14.118
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
14.118
= 0.0037
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm2
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 592.2 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 907.6 kg/m2
PERHITUNGAN STATIKA
Lx = 4m
Ly = 6m
Ly/Lx = 1.5 ≤ 2 ==> Pelat 2 arah
kLx = 36 kTx = 76 TABEL 6.4 BETON BU LINA
kLy = 17 Kty = 57
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 522.7776 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 555.451 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kTx
= -1103.642 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kTy
= -1862.395 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-30
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0403
LAPANGAN X
Mu = 522.7776 kgm
Rn = Mu
ø.b.d^2
= 5227776
0.8*1000*(90^2)
= 0.807
m = fy r<rmin
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0034
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm2
Untuk tulangan bawah digunakan φ10-200 (As= 357mm^2)
LAPANGAN Y
Mu = 555.45
Rn = Mu
ø.b.d^2
= 5554512
0.8*1000*(90^2)
= 0.857
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
11.294
= 0.0036
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm^2
Untuk tulangan bawah digunakan φ12-200 (As= 357mm^2)
TUMPUAN X
Mu = 1103.6416 kgm
Rn = Mu
ø.b.d^2
= 11036416
0.8*1000*(90^2)
= 1.703 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0074
rmin < r < rmax => untuk analisa digunakan r
As = rmin.b.d
= 666.559202 mm2 ==> 595 mm2
TUMPUAN Y
Mu = 1862.3952 kgm
Rn = Mu
ø.b.d^2
= 18623952
0.8*1000*(90^2)
= 2.874 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.01292
rmin < r < rmax => untuk analisa digunakan r
As = r.b.d
= 1162.581 mm2 ==> 1117 mm2
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 592.2 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 907.6 kg/m2
PERHITUNGAN STATIKA
Lx = 2.5 m
Ly = 5m
Ly/Lx = 2.0 ≤ 2 ==> Pelat 2 arah
kLx = 41 kTx = 83 TABEL 6.4 BETON BU LINA
kLy = 12 kTy = 57
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 232.573 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 272.280 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kLx
= -470.818 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kLy
= -1293.330 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-20
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0403
LAPANGAN X
Mu = 232.5725 kgm
Rn = Mu
ø.b.d^2
= 2325725
0.8*1000*(90^2)
= 0.359
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0015
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm2
Untuk tulangan bawah digunakan D10-200 (As= 357mm^2)
LAPANGAN Y
Mu = 272.28
Rn = Mu
ø.b.d^2
= 2722800
0.8*1000*(90^2)
= 0.420
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
11.294
= 0.0018
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 542 mm^2
Untuk tulangan bawah digunakan D10-142 (As= 357mm^2)
TUMPUAN X
Mu = 470.8175 kgm
Rn = Mu
ø.b.d^2
= 4708175
0.8*1000*(90^2)
= 0.727 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0031
rmin < r < rmax => untuk analisa digunakan r
As = r.b.d
= 525.00 mm2 ==> 542 mm2
TUMPUAN Y
Mu = 1293.33 kgm
Rn = Mu
ø.b.d^2
= 12933300
0.8*1000*(90^2)
= 1.996 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0087
rmin < r < rmax => untuk analisa digunakan r min
As = r.b.d
= 787.352 mm2 ==> 993 mm2
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 592.2 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 907.6 kg/m2
PERHITUNGAN STATIKA
Lx = 5m
Ly = 5m
Ly/Lx = 1.0 ≤ 2 ==> Pelat 2 arah
kLx = 21 kTx = 52 TABEL 6.4 BETON BU LINA
kLy = 21 kTy = 52
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 476.490 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 476.490 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kTx
= -1179.880 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kTy
= -1179.880 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-20
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0403
LAPANGAN X
Mu = 476.49 kgm
Rn = Mu
ø.b.d^2
= 4764900
0.8*1000*(90^2)
= 0.735
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0031
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm2
Untuk tulangan bawah digunakan D12-200 (As= 357mm^2)
LAPANGAN Y
Mu = 476.49
Rn = Mu
ø.b.d^2
= 4764900
0.8*1000*(90^2)
= 0.735
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
11.294
= 0.0031
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm^2
Untuk tulangan bawah digunakan D12-200 (As= 357mm^2)
TUMPUAN X
Mu = 1179.88 kgm
Rn = Mu
ø.b.d^2
= 11798800
0.8*1000*(90^2)
= 1.821 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0079
rmin < r < rmax => untuk analisa digunakan r
As = r.b.d
= 714.866 mm2 ==> 808 mm2
TUMPUAN Y
Mu = 1179.88 kgm
Rn = Mu
ø.b.d^2
= 11798800
0.8*1000*(90^2)
= 1.821 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0079
rmin < r < rmax => untuk analisa digunakan r
As = r.b.d
= 714.86574358 mm2 ==> 808 mm2
7)/240))
4)/240))
7)/240))
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 240 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keramik) = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 229.320 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 596.560 kg/m2
PERHITUNGAN STATIKA
Lx = 2.5 m
Ly = 3m
Ly/Lx = 1.2 ≤ 2 ==> Pelat 2 arah
kLx = 28 kTx = 54 TABEL 6.4 BETON BU LINA
kLy = 20 kTy = 56
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 104.398 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 107.38 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kTx
= -201.339 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kTy
= -300.666 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-30
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0403
LAPANGAN X
Mu = 104.398 kgm
Rn = Mu
ø.b.d^2
= 1043980
0.8*1000*(90^2)
= 0.161
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0007
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 604 mm2
Untuk tulangan bawah digunakan D10-130 (As= 357mm^2)
LAPANGAN Y
Mu = 107.38
Rn = Mu
ø.b.d^2
= 1073808
0.8*1000*(90^2)
= 0.166
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
11.294
= 0.0007
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 604 mm^2
Untuk tulangan bawah digunakan D10-130 (As= 357mm^2)
TUMPUAN X
Mu = 201.339 kgm
Rn = Mu
ø.b.d^2
= 2013390
0.8*1000*(90^2)
= 0.311 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0013
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 604 mm2
TUMPUAN Y
Mu = 300.66624 kgm
Rn = Mu
ø.b.d^2
= 3006662.4
0.8*1000*(90^2)
= 0.464 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0020
r<rmin => untuk analisa digunakan rmin
As = r.b.d
= 525 mm2 ==> 357 mm2
7)/240))
4)/240))
7)/240))
PEMBEBANAN
Beban yang bekerja
Beban mati :
Berat sendiri beton = 2400 kg/m3 PPIUG 1983 TABEL 2.1 HAL 11
Spesi per cm tebal = 21 kg/m2 per cm tebal
Penutup lantai (keram = 24 kg/m2 per cm tebal
Berat Pasir = 1600 kg/m2
Beban Hidup
Untuk Asrama = 250 kg/m2
Beban Terfaktor
Wu1 = 1,4 W1
= 592.2 kg/m2
Wu2 = 1,2 W1 + 1,6 W2
= 907.6 kg/m2
Jadi, Wu = 907.6 kg/m2
PERHITUNGAN STATIKA
Lx = 2.5 m
Ly = 3m
Ly/Lx = 1.2 ≤ 2 ==> Pelat 2 arah
kLx = 28 kTx = 54 TABEL 6.4 BETON BU LINA
kLy = 20 Kty = 56
Menghitung Nilai Mu
Mu Lx = 0,001 . Wu . Lx^2 . kLx
= 158.83 kgm
Mu Ly = 0,001 . Wu . Ly^2 . kLy
= 163.368 kgm
Mu Tx = -0,001 . Wu . Lx^2 . kTx
= -306.315 kgm
Mu Ty = -0,001 . Wu . Ly^2 . kTy
= -457.430 kgm
PENULANGAN
Data Perencanaan
b = 1000 mm
d' = 30 mm
d = 120-30
= 90 mm
rmin = 1.4
fy
= 0.0058
rmax = 0,75 rb
= 0,75(𝛽_1 (0,85×𝑓^′ 𝑐)/𝑓𝑦×600/
(600+𝑓𝑦)
= 0,75(𝛽_1 (0,85×20)/240×600/
(600+240)
= 0.0403
LAPANGAN X
Mu = 158.83 kgm
Rn = Mu
ø.b.d^2
= 1588300
0.8*1000*(90^2)
= 0.245
m = fy r<rmin
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0010
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm2
Untuk tulangan bawah digunakan φ10-200 (As= 357mm^2)
LAPANGAN Y
Mu = 163.37
Rn = Mu
ø.b.d^2
= 1633680
0.8*1000*(90^2)
= 0.252
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,834)/240))
11.294
= 0.0011
r<rmin => untuk analisa digunakan rmin
As = rmin.b.d
= 525 mm2 ==> 565 mm^2
Untuk tulangan bawah digunakan φ12-200 (As= 357mm^2)
TUMPUAN X
Mu = 306.315 kgm
Rn = Mu
ø.b.d^2
= 3063150
0.8*1000*(90^2)
= 0.473 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.0020
rmin < r < => untuk analisa digunakan r
As = rmin.b.d
= 525 mm2 ==> 595 mm2
TUMPUAN Y
Mu = 457.4304 kgm
Rn = Mu
ø.b.d^2
= 4574304
0.8*1000*(90^2)
= 0.706 Mpa
m = fy
0,85 . F'c
= 11.294
r = 1/𝑚(1−√(1−(2×𝑚×𝑅𝑛)/𝑓𝑦)
)
= 1 (1−√(1−(2×14,118×0,617)/240))
11.294
= 0.00299
rmin < r < => untuk analisa digunakan r
As = r.b.d
= 525.000 mm2 ==> 595 mm2