# Dua Puluh Tujuh Milyar Tujuh Ratus Lima Belas Juta Tiga Ratus Lima Puluh Tiga Ribu Rupiah #
……………………..
RINCIAN
RENCANA ANGGARAN BIAYA
MASJID
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR
I. PEKERJAAN GALIAN & URUGAN
1 Pek. Pasang Papan Bouplank 80.00 m1 52,739.42 4,219,153.96
2 Pek. Galian Tanah Pondasi Plat Setempat 11.17 m3 24,400.00 272,596.80
3 Pek. Galian Tanah Sloof 25/40 26.16 m3 24,400.00 638,304.00
4 Pek. Galian Tanah Pondasi Batu kali menerus 122.53 m3 24,400.00 2,989,683.20
5 Pek. Urugan Pasir Bawah Pondasi Plat & Sloof t=10cm 3.00 m3 127,600.00 382,800.00
6 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm 2.00 m3 127,600.00 255,200.00
7 Pek. Urugan Tanah Kembali bks Galian 75.17 m3 11,710.00 880,288.13
8 Pek. Urugan Tanah Peninggian Bangunan t=40 cm(Tanah dari luar) 1.84 m3 155,740.00 286,561.60
9 Pek. Urugan Tanah Peninggian Bangunan (Tanah bks galian) 159.86 m3 11,710.00 1,871,960.60
JUMLAH - I 11,796,548.29
II. PEKERJAAN PONDASI, POER & SLOOF 63
1 Pek. Aanstamping Batukali 28.44 m3 600,240.00 17,073,226.56
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 35.00 m3 893,748.00 31,281,180.00
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 54.70 m2 109,795.28 6,005,801.82
4 Pekerjaan Beton Pondasi Plat Type P-1 (0.7X0.7X0,0)m 1.27 m3 4,790,681.10 6,103,327.72
5 Beton Sloof SL1 25/40 24.34 m3 4,078,216.72 99,247,482.10
6 Beton Sloof SL2 15/25 6.35 m3 3,526,340.47 22,385,209.30
JUMLAH - II 182,096,227.50
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN DINDING & PLESTERAN
I.a LANTAI BAWAH
1 Pasangan dinding 1/2 bata 1 : 5 79.80 m2 189,390.50 15,113,361.90
2 Pekerjaan plester dan acian dinding 1 : 5 309.80 m2 37,542.80 11,630,759.44
3 Pekerjaan plester dan acian Profil Tali air dinding 546.00 m1 6,500.00 3,549,000.00
4 Pekerjaan plester dan acian Ban-banan dinding 350.00 m1 15,000.00 5,250,000.00
5 Pekerjaan Pasang dinding Batu alam Andesit 79.80 m2 350,000.00 27,930,000.00
6 Pekerjaan Profil Umpak Pilar Batu Alam 64.00 bh 500,000.00 32,000,000.00
7 Pekerjaan Border dinding keramik 10X20 6.00 m' 25,000.00 150,000.00
SUB JUMLAH -
II.b LANTAI ATAS
1 Pasang Kusen+Pintu Type PD2 Unit 2,837,100.00 -
2 Pasang Kusen+Pintu Type P1 Unit 2,837,100.00 -
3 Pasang Kusen+Pintu Type PVC Unit 463,200.00 -
4 Pasang Kusen+jendela Type J1 Unit 2,837,100.00 -
5 Pasang Kusen+Pintu Type PVC Unit 2,837,100.00 -
Pasang Kusen+jendela Type J4 Unit 2,837,100.00 -
SUB JUMLAH -
JUMLAH - II -
SUB JUMLAH -
JUMLAH - IV 81,058,515.98
PENDOPO
I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi Site 990.00 m2 6,050.00 5,989,500.00
JUMLAH - I 78,572,629.84
II. PEKERJAAN PONDASI, POER & SLOOF 63
3
1 Pek. Aanstamping Batukali 50.00 m 600,240.00 30,012,000.00
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 199.31 m3 893,748.00 178,128,445.14
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 186.44 m2 109,795.28 20,469,683.03
4 Pekerjaan Beton Pondasi Plat Type P-1 (1.2X1.2X0,7)m 36.29 m3 4,790,681.10 173,844,235.76
5 Beton Sloof SL1 25/40 37.80 m3 4,078,216.72 154,156,592.02
6 Beton Sloof SL2 15/25 0.90 m3 3,526,340.47 3,173,706.42
JUMLAH - II 559,784,662.36
III. PEKERJAAN BETON LANTAI BAWAH
1 Pekerjaan kolom Pedistal K2-30/30,Beton K-225,tulangan 184,19 kg/m3 2.50 m3 4,538,000.00 11,345,000.00
JUMLAH - IV 414,950,376.05
SUB TOTAL STRUKTURE 655,691,792.21
B. PEKERJAAN ATAP
1 Pek. kayu Jurai Kayu Kelas II (0.08 x 0.12) m 0.96 m3 3,415,435.17 3,278,817.76
2 Pek. kayu Nok Kayu Kelas II (0.08 x 0.12) m 0.10 m3 3,415,435.17 327,881.78
3 Pek. Kayu usuk dan Reng 1,325.00 m2 78,213.93 103,633,454.02
4 Pek. Papan bawah reng 1,325.00 m2 50,497.26 66,908,869.50
5 Pek. Pasang Genteng 1,325.00 m2 102,580.00 135,918,500.00
6 Pek. Pasang Genteng wuwung 110.00 m1 97,556.80 10,731,248.00
7 Pek. Lisplang kayu kelas II uk. (3 x 30) cm 281.00 m1 72,390.10 20,341,618.10
ASRAMA
HARGA SATUAN HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(RP.) (RP.)
1 2 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pembuatan Gudang 10.00 m2 834,840.70 8,348,406.96
2 Pek. Pengadaan Air & Listrik kerja 1.00 Ls 2,500,000.00 2,500,000.00
JUMLAH - II 141,066,258.95
III. PEKERJAAN BETON LANTAI BAWAH
1 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 28.80 m3 4,538,000.00 130,694,400.00
2 Pek. Beton Balok B2 25/50 cm, Elevasi +4,95,Beton K-225,tulangan 177,78 kg/m3 16.00 m3 5,666,546.70 90,664,747.15
3 Pek.Beton Plat Dak t=12 cm , Elevasi +4,20,Beton K-225 52.00 m3 5,666,546.70 294,660,428.25
4 Pek Beton Balok Lintle Openingan, Beton K.175 53.00 m' 110,543.90 5,858,826.70
5 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 7.00 m3 110,543.90 773,807.30
0.67 m3
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
JUMLAH - III 522,652,209.41
IV. PEKERJAAN BETON LANTAI ATAS
1 Pekerjaan kolom Beton K2-30/30,Beton K-225 29.00 m3 4,538,000.00 131,602,000.00
2 Pek Kolom Praktis KP 15/15, Beton K.175 125.00 m' 93,553.18 11,694,147.50
3 Pek. Beton Balok B1 - 30/60 cm, Elevasi +8,56 22.50 m3 5,666,546.70 127,497,300.69
4 Pek. Beton Balok B3 - 20/40 cm, Elevasi +8,56 6.00 m3 5,666,546.70 33,999,280.18
5 Pek. Beton Balok BL - 10/40 cm, Elevasi +9,56 1.60 m3 4,078,216.72 6,525,146.75
6 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 9,56 m3 5,620,695.20 -
7 Pek. Beton Balok RB1 - 15/30 cm, Elevasi +10,56 5.80 m3 4,078,216.72 23,653,656.98
8 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 55.00 m' 110,543.90 6,079,914.50
JUMLAH - IV - 341,051,446.60
SUB TOTAL STRUKTURE 1,036,020,034.32
B. PEKERJAAN ATAP
1 Pek. Rangka Atap baja ringan 671.00 m2 250,000.00 167,750,000.00
2 Pek. Alumunium voil 671.00 m2 25,000.00 16,775,000.00
3 Pek. Pasang Penutup Atap 671.00 m2 102,580.00 68,831,180.00
4 Pek. Bubungan Atap 67.00 m2 97,556.80 6,536,305.60
5 Pek. Talang 30.00 100,252.29
6 Pek. Lisplang 148.00 72,390.10
RUMAH PIMPINAN
HARGA SATUAN HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(RP.) (RP.)
1 2 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 617.40 m2 1,000.00 617,400.00
2 Pek. Pembersihan Lokasi Site 622.30 m2 6,050.00 3,764,915.00
3 Pek. Pembuatan Kantor Gudang 20.00 m2 200,983.20 4,019,664.00
4 Pek. Pengadaan Air & Listrik kerja 0.10 Ls 2,500,000.00 250,000.00
JUMLAH - I 31,681,423.34
II. PEKERJAAN PONDASI, POER & SLOOF 63
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
1 Pek. Aanstamping Batukali 11.40 m3 600,240.00 6,842,736.00
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 23.84 m3 893,748.00 21,302,483.58
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 1.17 m2 109,795.28 128,185.99
4 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 1.31 m3 4,790,681.10 6,287,768.94
5 Beton Sloof SL2 15/25 50.30 m3 4,078,216.72 205,134,301.02
6 Pek. Beton sloof 15 x 15 carport 1.38 m3 4,078,216.72 5,627,939.07
7 Pek. Beton rabat Carport 21.00 m3 900,078.60 18,901,650.60
JUMLAH - II 264,225,065.20
III. PEKERJAAN BETON LANTAI BAWAH
1 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 2.36 m3 6,329,700.04 14,953,916.34
2 Pek. Beton Balok B2 25/50 cm, Elevasi +4,95,Beton K-225,tulangan 177,78 kg/m3 2.57 m3 5,666,546.70 14,534,692.28
3 Pek Beton Balok Lintle Openingan, Beton K.175 16.00 m' 110,543.90 1,768,702.40
4 Pek Beton Meja Dapur t=10 cm, Beton K.175 0.20 m3 110,543.90 22,108.78
JUMLAH - I 175,127,684.18
II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES
II.a LANTAI BAWAH
1 Pasang Kusen+Pintu Type P1 1.00 Unit 4,206,395.17 4,206,395.17
2 Pasang Kusen+Pintu Type P2 3.00 Unit 5,996,595.17 17,989,785.51
3 Pasang Kusen+Pintu Type PVC 2.00 Unit 450,000.00 900,000.00
4 Pasang Kusen+jendela Type J1 4.00 Unit 3,392,245.17 13,568,980.68
5 Pasang Kusen+jendela Type J2 2.00 Unit 3,415,435.17 6,830,870.34
JUMLAH - II 43,496,031.71
III. PEKERJAAN PLAFOND
III.a LANTAI BAWAH
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 169.00 m2 100,926.00 17,056,494.00
2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 9.00 m2 45,468.50 409,216.50
3 Pekerjaan profil gipsum 15.00 m' 20,100.00 301,500.00
4 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Overstek atap) 53.46 m2 45,468.50 2,430,746.01
JUMLAH - IV 51,135,418.85
V. PEKERJAAN FINISHING & PENGECATAN
V.a LANTAI BAWAH
1 Pekerjaan Finishing Opening 46.00 m1 9,490.00 436,540.00
2 Pekerjaan pengecatan dinding Exterior Watershiel 246.00 m2 25,000.00 6,150,000.00
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 210.00 m2 17,539.30 3,683,253.00
4 Pekerjaan pengecatan plafond 160.00 m2 17,539.30 2,806,288.00
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 37.00 m2 76,447.60 2,828,561.20
SUB JUMLAH 33,246.25 15,904,642.20
SUB TOTAL ARSITEKTURE 305,861,733.45
E. PEKERJAAN MEKANIKAL & SANITARY
I PEKERJAAN INSTALASI AIR BERSIH
1. LANTAI - 1
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 16.00 m 20,592.00 329,472.00
- PPR dia 3/4 inc 14.00 m 82,323.00 1,152,522.00
- PPR dia 1 inc 8.00 m 29,502.00 236,016.00
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 1.00 unit 100,000.00 100,000.00
- Gate valve dia 1 inc 1.00 unit 160,000.00 160,000.00
JUMLAH - I 1,978,010.00
II. PEKERJAAN INSTALASI AIR KOTOR
1. LANTAI - 1
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 6.00 m 44,730.00 268,380.00
- PVC dia 3 inc 20.00 m 126,806.00 2,536,120.00
- PVC dia 4 inc 12.00 m 185,450.00 2,225,400.00
JUMLAH - II 5,029,900.00
III. PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 2.00 bh 60,300.00 120,600.00
2 Kran air 1/2" 5.00 bh 51,609.93 258,049.63
3 Closet Duduk "TOTO" 1.00 bh 2,479,969.00 2,479,969.00
4 Washtafel Bulat + Accecories "TOTO" 1.00 bh 770,523.00 770,523.00
RUMAH USTADZ
SAT HARGA SATUAN TOTAL JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
(RP.) (RP.)
1 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 56.00 m2 1,000.00 56,000.00
2 Pek. Pembersihan Lokasi Site 56.00 m2 6,050.00 338,800.00
3 Pek. Pembuatan Gudang 1.00 m2 834,840.70 834,840.70
JUMLAH - I 31,681,423.34
II. PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 5.76 m3 600,240.00 3,457,382.40
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 12.96 m3 893,748.00 11,582,974.08
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 0.38 m2 109,795.28 41,173.23
4 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 0.75 m3 4,790,681.10 3,593,010.83
5 Beton Sloof SL2 15/25 1.44 m3 4,078,216.72 5,872,632.08
JUMLAH - II 24,547,172.61
III. PEKERJAAN BETON LANTAI BAWAH
1 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 0.86 m3 6,329,700.04 5,468,860.83
2 Pek. Beton Balok B2 25/50 cm, Elevasi +4,95,Beton K-225,tulangan 177,78 kg/m3 1.08 m3 5,666,546.70 6,119,870.43
3 Pek Beton Balok Lintle Openingan, Beton K.175 12.00 m' 110,543.90 1,326,526.80
4 Pek Beton Meja Dapur t=10 cm, Beton K.175 2.00 m3 110,543.90 221,087.80
JUMLAH - I 75,207,941.75
II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES
1 Pasang Kusen+Pintu Type P1 1.00 Unit 4,206,395.17 4,206,395.17
2 Pasang Kusen+Pintu Type P2 3.00 Unit 5,996,595.17 17,989,785.51
3 Pasang Kusen+Pintu Type PVC 1.00 Unit 450,000.00 450,000.00
4 Pasang Kusen+jendela Type J1 4.00 Unit 3,392,245.17 13,568,980.68
5 Pasang Kusen+jendela Type J2 1.00 Unit 3,415,435.17 3,415,435.17
JUMLAH - II 39,630,596.54
III. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 56.00 m2 100,926.00 5,651,856.00
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 2.25 m2 45,468.50 102,304.13
3 Pekerjaan profil gipsum 48.00 m' 20,100.00 964,800.00
4 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Overstek atap) 25.20 m2 45,468.50 1,145,806.20
JUMLAH - IV 51,135,418.85
V. PEKERJAAN FINISHING & PENGECATAN
1 Pekerjaan Finishing Opening 38.00 m1 9,490.00 360,620.00
2 Pekerjaan pengecatan dinding Exterior Watershiel 105.00 m2 25,000.00 2,625,000.00
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 148.00 m2 17,539.30 2,595,816.40
4 Pekerjaan pengecatan plafond 56.00 m2 17,539.30 982,200.80
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 24.00 m2 76,447.60 1,834,742.40
JUMLAH V 33,246.25 8,398,379.60
SUB TOTAL ARSITEKTURE 305,861,733.45
E. PEKERJAAN MEKANIKAL & SANITARY
I PEKERJAAN INSTALASI AIR BERSIH
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 9.00 m 20,592.00 185,328.00
- PPR dia 3/4 inc 6.00 m 82,323.00 493,938.00
- PPR dia 1 inc 4.00 m 29,502.00 118,008.00
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 1.00 unit 100,000.00 100,000.00
- Gate valve dia 1 inc 1.00 unit 160,000.00 160,000.00
JUMLAH - I 1,057,274.00
II. PEKERJAAN INSTALASI AIR KOTOR
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 4.00 m 44,730.00 178,920.00
- PVC dia 3 inc 10.00 m 126,806.00 1,268,060.00
- PVC dia 4 inc 8.00 m 185,450.00 1,483,600.00
JUMLAH - II 2,930,580.00
III. PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 2.00 bh 60,300.00 120,600.00
2 Kran air 1/2" 3.00 bh 51,609.93 154,829.78
3 Closet Duduk "TOTO" 1.00 bh 2,479,969.00 2,479,969.00
4 Washtafel Bulat + Accecories "TOTO" 1.00 bh 770,523.00 770,523.00
DAPUR
VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP.) (RP.)
1 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 247.50 m2 1,000.00 56,000.00
2 Pek. Pembersihan Lokasi Site 123.75 m2 6,050.00 338,800.00
3 Pek. Pembuatan Gudang 1.00 m2 834,840.70 834,840.70
JUMLAH - I 10,408,023.97
II. PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 15.12 m3 600,240.00 9,075,628.80
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 34.02 m3 893,748.00 30,405,306.96
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 0.17 m2 109,795.28 18,994.58
4 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 1.44 m3 4,790,681.10 6,898,580.78
5 Beton Sloof SL2 15/25 4.73 m3 4,078,216.72 19,269,574.00
JUMLAH - II 65,668,085.13
III. PEKERJAAN BETON LANTAI BAWAH
1 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 2.56 m3 6,329,700.04 16,204,032.10
2 Pek. Beton Balok B2 20/25 cm, Elevasi +4,95,Beton K-225,tulangan 177,78 kg/m3 6.30 m3 5,666,546.70 35,699,244.19
3 Pek Beton Balok Lintle Openingan, Beton K.175 12.00 m' 110,543.90 1,326,526.80
4 Pek Beton Meja Dapur t=10 cm, Beton K.175 0.58 m3 110,543.90 63,673.29
JUMLAH - I 85,407,141.40
II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES
1 Pasang Kusen+Pintu Type P1 2.00 Unit 4,206,395.17 8,412,790.34
4 Pasang Kusen+jendela Type J1 4.00 Unit 3,392,245.17 13,568,980.68
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
5 Pasang Kusen+boven angin2 2.00 Unit 3,415,435.17 6,830,870.34
JUMLAH - II 28,812,641.37
III. PEKERJAAN PLAFOND
1 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 + (Overstek atap) 277.50 m2 45,468.50 12,617,508.75
JUMLAH - IV 68,168,326.15
V. PEKERJAAN FINISHING & PENGECATAN
1 Pekerjaan Finishing Opening 28.00 m1 9,490.00 265,720.00
2 Pekerjaan pengecatan dinding Exterior Watershiel 174.00 m2 25,000.00 4,350,000.00
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 150.00 m2 17,539.30 2,630,895.00
4 Pekerjaan pengecatan plafond 277.50 m2 17,539.30 4,867,155.75
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 21.00 m2 76,447.60 1,605,399.60
JUMLAH - II 2,930,580.00
III. PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 2.00 bh 60,300.00 120,600.00
2 Kran air 1/2" 3.00 bh 51,609.93 154,829.78
3 Washtafel Bulat + Accecories "TOTO" 1.00 bh 770,523.00 770,523.00
PAUD
VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP.) (RP.)
1 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 730.00 m2 1,000.00 730,000.00
2 Pek. Pembersihan Lokasi Site 365.00 m2 6,050.00 2,208,250.00
3 Pek. Pembuatan Gudang 1.00 m2 834,840.70 834,840.70
JUMLAH - I 6,897,189.49
II. PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 11.16 m3 600,240.00 6,698,678.40
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 50.22 m3 893,748.00 44,884,024.56
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 1.07 m2 109,795.28 117,920.13
4 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 0.50 m3 4,790,681.10 2,395,340.55
5 Beton Sloof SL2 15/25 3.49 m3 4,078,216.72 14,222,780.81
JUMLAH - II 68,318,744.45
III. PEKERJAAN BETON LANTAI BAWAH
1 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 4.32 m3 6,329,700.04 27,344,304.17
2 Pek. Beton Balok B2 20/25 cm, Elevasi +4.00,Beton K-225,tulangan 177,78 kg/m3 4.65 m3 5,666,546.70 26,349,442.14
3 Pek Beton Balok Lintle Openingan, Beton K.175 20.00 m' 110,543.90 2,210,878.00
JUMLAH - I 57,679,472.34
II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES
1 Pasang Kusen+Pintu Type P1 4.00 Unit 4,206,395.17 16,825,580.68
5 Pasang Kusen+Pintu PVC 1.00 Unit 463,200.00 16,825,580.68
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
JUMLAH - II 33,651,161.37
III. PEKERJAAN PLAFOND
1 Pek.Plesteran beton 1 PC : 2 Ps, tebal 15 mm 66.00 m2 50,827.90 3,354,641.40
2 Pek. Plesteran waterproof batacote, 3 lapis 66.00 m2 221,189.40 14,598,500.40
3 Pek. Kompon Gypsum (nonSNI) 66.00 m2 30,852.80 2,036,284.80
4 Pek. List gypsum board, tebal 9 mm 30.00 m' 20,100.00 603,000.00
JUMLAH - IV 19,929,481.82
V. PEKERJAAN FINISHING & PENGECATAN
1 Pekerjaan Finishing Opening 20.00 m1 9,490.00 189,800.00
2 Pekerjaan pengecatan dinding Exterior Watershiel 103.00 m2 25,000.00 2,575,000.00
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 125.00 m2 17,539.30 2,192,412.50
4 Pekerjaan pengecatan langit2 66.00 m2 17,539.30 1,157,593.80
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 26.40 m2 76,447.60 2,018,216.64
JUMLAH - I 1,539,530.00
II. PEKERJAAN INSTALASI AIR KOTOR
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 5.00 m 44,730.00 223,650.00
- PVC dia 3 inc 12.00 m 126,806.00 1,521,672.00
- PVC dia 4 inc 16.00 m 185,450.00 2,967,200.00
JUMLAH - II 4,712,522.00
III. PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 2.00 bh 60,300.00 120,600.00
2 Kran air 1/2" 2.00 bh 51,609.93 103,219.85
3 Washtafel Bulat + Accecories "TOTO" 1.00 bh 770,523.00 770,523.00
JUMLAH - I 37,063,074.23
II. PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 93.08 m3 600,240.00 55,870,339.20
2 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 5.35 m2 109,795.28 587,843.93
3 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 1.40 m3 4,790,681.10 6,706,953.54
4 Beton Sloof SL2 15/25 6.98 m3 4,078,216.72 28,470,030.92
5 Pek. Beton Pedistal Tiang Pagar lapangan, net, dan tiang basket 0.45 m3 4,790,681.10 2,155,806.50
JUMLAH - II 93,790,974.09
SUB TOTAL STRUKTURE 130,854,048.32
IV. PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 55.10 m3 109,795.28 6,049,719.93
2 Lantai kerja t = 5 cm 27.55 m2 217,530.80 5,992,973.54
3 Pek. Beton bertulang untuk Lantai 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg 66.12 m2 5,620,695.20 371,640,366.31
4 Pek. Plesteran beton 1 PC : 3 Ps, tebal 15 mm 722.00 m' 50,827.90 36,697,743.80
JUMLAH - IV 420,380,803.58
V. PEKERJAAN FINISHING & PENGECATAN
1 Pek. Cat Lantai 722.00 m2 29,883.08 21,575,583.76
JUMLAH V 21,575,583.76
VI. PEKERJAAN BESI DAN ALUMUNIUM
1 Pek. Tiang ring basket+ ring 2.00 ls 5,805,645.17 11,611,290.34
2 Pek. Pagar Keliling Futsal 140.00 m2 297,962.50 41,714,750.00
JUMLAH VI 53,326,040.34
SUB TOTAL ARSITEKTURE 495,282,427.68
I. PEKERJAAN INSTALASI AIR KOTOR
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 6.00 m 44,730.00 268,380.00
- PVC dia 3 inc 6.00 m 126,806.00 760,836.00
JUMLAH - I 1,029,216.00
II. PEKERJAAN SANITARY
1 Floor drained "TOTO" 4.00 bh 60,300.00 241,200.00
JUMLAH - II 241,200.00
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY 7,246,394.85
F. PEKERJAAN ELEKTRIKAL
1. PEMASANGAN PANEL
a Input
- MCCB 3P 32 A 1.00 bh 325,000.00 325,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 1.00 set 80,500.00 80,500.00
Output
- MCB 1P 16A 2.00 bh 70,000.00 140,000.00
b SDP
- Panel box (800x600x250) mm 1.00 bh 2,750,000.00 2,750,000.00
- Busbar+Wiring Material 1.00 lot 1,950,000.00 1,950,000.00
JUMLAH - I 5,601,715.65
II. PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 2.36 m3 600,240.00 1,416,566.40
2 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 0.60 m2 109,795.28 66,151.66
3 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 0.30 m3 4,790,681.10 1,437,204.33
4 Beton Sloof SL2 15/25 2.21 m3 4,078,216.72 9,023,054.49
5 Pek. Beton Pedistal Tiang lampu lapangan, net 0.22 m3 4,790,681.10 1,034,787.12
JUMLAH - II 12,977,764.00
SUB TOTAL STRUKTURE 18,579,479.64
IV. PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 110.88 m3 109,795.28 12,174,100.65
2 Lantai kerja t = 5 cm 5.54 m2 217,530.80 1,205,990.76
3 Pek. Beton bertulang untuk Lantai 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg 13.31 m2 5,620,695.20 74,786,721.99
4 Pek. Plesteran beton 1 PC : 3 Ps, tebal 15 mm 110.88 m' 50,827.90 5,635,797.55
JUMLAH - IV 93,802,610.94
V. PEKERJAAN FINISHING & PENGECATAN
1 Pek. Cat Lantai 110.88 m2 29,883.08 3,313,435.91
JUMLAH V 21,575,583.76
VI. PEKERJAAN BESI DAN ALUMUNIUM
1 Pek. Tiang 6.00 ls 1,047,875.00 6,287,250.00
JUMLAH VI 53,326,040.34
SUB TOTAL ARSITEKTURE 495,282,427.68
I. PEKERJAAN INSTALASI AIR KOTOR
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
- PVC dia 2 inc 4.00 m 44,730.00 178,920.00
- PVC dia 3 inc 4.00 m 126,806.00 507,224.00
JUMLAH - I 686,144.00
F. PEKERJAAN ELEKTRIKAL
1. PEMASANGAN PANEL
a Input
- MCCB 3P 32 A 1.00 bh 325,000.00 325,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 1.00 set 80,500.00 80,500.00
Output
- MCB 1P 16A 2.00 bh 70,000.00 140,000.00
b SDP
- Panel box (800x600x250) mm 1.00 bh 2,750,000.00 2,750,000.00
- Busbar+Wiring Material 1.00 lot 1,950,000.00 1,950,000.00
JUMLAH - I 169,979,014.75
II. PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 103.40 m3 600,240.00 62,064,816.00
2 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 5.57 m2 109,795.28 611,559.71
3 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 1.60 m3 4,790,681.10 7,665,089.76
4 Beton Sloof SL2 15/25 25.85 m3 4,078,216.72 105,421,902.21
5 Pek. Beton Pedistal Tiang 0.95 m3 4,790,681.10 4,527,193.64
JUMLAH - II 180,290,561.32
SUB TOTAL STRUKTURE 350,269,576.07
III. PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 110.00 m3 109,795.28 12,077,480.80
2 Lantai kerja t = 5 cm 55.00 m2 217,530.80 11,964,194.00
3 Pek. Beton bertulang untuk Lantai 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg 132.00 m2 5,620,695.20 741,931,765.77
4 Pek. Plesteran beton 1 PC : 3 Ps, tebal 15 mm 1,100.00 m' 50,827.90 55,910,690.00
5 Pek. Bak kontrol 6.00 ls 109,795.28 658,771.68
JUMLAH VI 104,192,000.00
V. PEKERJAAN ATAP
1 Pek. Penutup Atap 320.00 m3 91,615.00 29,316,800.00
2 Pek.. Kerpusan 55.00 m2 35,123.84 1,931,811.20
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
JUMLAH V 31,248,611.20
SUB TOTAL ARSITEKTURE 957,983,513.45
VI. PEKERJAAN INSTALASI AIR BERSIH
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 40.00 m 20,592.00 823,680.00
- PPR dia 3/4 inc 90.00 m 82,323.00 7,409,070.00
- PPR dia 1 inc 20.00 m 29,502.00 590,040.00
b. Valve (Class 125 psi) -
- Gate valve dia 3/4 inc 1.00 unit 100,000.00 100,000.00
- Gate valve dia 1 inc 1.00 unit 160,000.00 160,000.00
JUMLAH - VI 9,082,790.00
VII. PEKERJAAN INSTALASI AIR KOTOR
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 50.00 m 44,730.00 2,236,500.00
- PVC dia 3 inc 115.00 m 126,806.00 14,582,690.00
AREA GAZEBO
VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP.) (RP.)
1 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 618.00 m2 1,000.00 618,000.00
2 Pek. Pembersihan Lokasi Site 618.00 m2 6,050.00 3,738,900.00
JUMLAH - A 169,979,014.75
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
B PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 9.84 m3 600,240.00 5,906,361.60
2 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 2.96 m2 109,795.28 324,994.03
3 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 2.40 m3 4,790,681.10 11,497,634.64
4 Beton Sloof SL2 15/25 5.54 m3 4,078,216.72 22,572,929.55
JUMLAH - B 40,301,919.81
SUB TOTAL STRUKTURE 210,280,934.56
III. PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING
1 Pek. Pasang bata 1pc : 6ps 444.00 m2 384,779.80 170,842,231.20
2 Pek. Plesteran 1pc : 5 ps tebal 15mm 444.00 m3 37,542.80 16,669,003.20
JUMLAH - A 187,511,234.40
B PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 73.80 m3 109,795.28 8,102,891.66
2 Lantai kerja t = 5 cm 36.90 m3 217,530.80 8,026,886.52
3 Pek. Pasangan batu alam 444.00 m2 561,186.50 249,166,806.00
JUMLAH - B 265,296,584.18
C PEKERJAAN KAYU
1 Pek. Tiang gazebo 1.44 m3 4,206,395.17 6,057,209.05
2 Pek.Balok gazebo 3.60 m4 4,206,395.17 15,143,022.62
3 Pek.lantai kayu gazebo 74.40 m2 204,108.50 15,185,672.40
JUMLAH C 36,385,904.06
D PEKERJAAN ATAP
1 Pek. Pek. Rangka atap Kayu 186.00 m2 78,213.93 14,547,790.53
2 Pek.Penutup atap 186.00 m2 102,580.00 19,079,880.00
3 Pek.Lisplang 54.00 m2 72,390.10 3,909,065.40
4 Pek.Kerpusan 144.00 m 97,556.80 14,048,179.20
5 Pek. Mahkota atap 60.00 unit 50,000.00 3,000,000.00
JUMLAH D 54,584,915.13
SUB TOTAL ARSITEKTURE 543,778,637.77
VIII. PEKERJAAN ELEKTRIKAL
1. PEMASANGAN PANEL
a Input
- MCCB 3P 32 A 3.00 bh 325,000.00 975,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 3.00 set 80,500.00 241,500.00
Output
- MCB 1P 16A 3.00 bh 70,000.00 210,000.00
b SDP
- Panel box (800x600x250) mm 1.00 bh 2,750,000.00 2,750,000.00
- Busbar+Wiring Material 1.00 lot 1,950,000.00 1,950,000.00
JUMLAH - A 18,457,299.66
B PEKERJAAN PONDASI, POER & SLOOF
1 Pek. Aanstamping Batukali 14.55 m3 600,240.00 8,733,492.00
2 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 5.76 m2 109,795.28 632,695.30
3 Pekerjaan Beton Pondasi Plat Type P-1 (0.5X0.5X0,25)m 8.50 m3 4,790,681.10 40,720,789.35
4 Beton Sloof SL2 15/15 14.55 m3 4,078,216.72 59,338,053.28
JUMLAH - B 109,425,029.93
SUB TOTAL STRUKTURE 127,882,329.59
C PEKERJAAN ATAP
1 Pek. Pek. Rangka atap baja ringan 615.00 m2 325,600.00 200,244,000.00
2 Pek.Penutup atap 615.00 m2 123,750.00 76,106,250.00
3 Pek.Lisplang 2 x20 cm 260.00 m2 72,390.10 18,821,426.00
4 Pek. Kayu tiang selasar 20 x 10 cm 1.49 m3 3,392,245.17 5,037,484.08
5 Pek. Tiang besi galvanis D 2 in selasar 117.50 m 165,000.00 19,387,500.00
JUMLAH - A 516,153,993.20
B PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 36.50 m3 109,795.28 4,007,527.72
2 Lantai kerja t = 5 cm 18.25 m3 217,530.80 3,969,937.10
3 Pek. Keramik 25x25 365.00 m2 169,583.20 61,897,868.00
JUMLAH - B 69,875,332.82
C PEKERJAAN PINTU JENDELA
1 Pek. Pasang pintu pvc 56.00 m3 463,200.00 25,939,200.00
2 Pek.pasang boven 56.00 m4 295,700.00 16,559,200.00
JUMLAH C 42,498,400.00
D PEKERJAAN PLAFOND
1 Pek. Rangka plafond besi hollow 365.00 m3 171,848.74 62,724,789.72
2 Pek.Plafon GRC 365.00 m4 32,397.14 11,824,956.10
JUMLAH D 74,549,745.82
SUB TOTAL ARSITEKTURE 703,077,471.84
IV PEKERJAAN MEKANIKAL & SANITARY
1 PEKERJAAN INSTALASI AIR BERSIH
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 75.00 m 20,592.00 1,544,400.00
- PPR dia 3/4 inc 175.00 m 82,323.00 14,406,525.00
- PPR dia 1 inc 30.00 m 29,502.00 885,060.00
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 5.00 unit 100,000.00 500,000.00
- Gate valve dia 1 inc 5.00 unit 160,000.00 800,000.00
JUMLAH - I 18,135,985.00
2 PEKERJAAN INSTALASI AIR KOTOR
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 90.00 m 44,730.00 4,025,700.00
- PVC dia 3 inc 90.00 m 126,806.00 11,412,540.00
- PVC dia 4 inc 90.00 m 185,450.00 16,690,500.00
JUMLAH - II 32,128,740.00
3 PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 56.00 bh 60,300.00 3,376,800.00
2 Kran air 1/2" 56.00 bh 51,609.93 2,890,155.80
3 Washtafel Bulat + Accecories "TOTO" 16.00 bh 770,523.00 12,328,368.00
TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
JUMLAH - III 18,595,323.80
SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY 68,860,048.80
V PEKERJAAN ELEKTRIKAL
1. PEMASANGAN PANEL
a Input
- MCCB 3P 32 A 5.00 bh 325,000.00 1,625,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 5.00 set 80,500.00 402,500.00
Output
- MCB 1P 16A 5.00 bh 70,000.00 350,000.00
b SDP
- Panel box (800x600x250) mm 5.00 bh 2,750,000.00 13,750,000.00
- Busbar+Wiring Material 5.00 lot 1,950,000.00 9,750,000.00