ID Analisa Pekerjaan Satuan Koefisien VOL RAB

PEK.STRUKTUR

Lantai1
B1001 Beton 1:1,5:2,5/m3,dgn Koral
Bahan
Semen sak 7.2000 Semen1
Pasir Beton m3 0.5500 Pasir Beton1
Koral Beton m3 0.8000 Koral Beton1

Upah
Kenek ht 0.8000
Tk.Batu Kasar ht 0.2667
Kep.Tukang ht 0.0533
Mandor ht 0.0178

Alat Bantu
Mixer m3 0.4000 Mixer1
Vibrator m3 0.4000 Vibrator1
Ember bh 0.2000 Ember1
Pacul bh 0.0200 Pacul1
Sekop bh 0.0200 Sekop1

B1002 Beton 1:2:3/m3,dgn Koral


Bahan
Semen sak 6.4000 Semen2
Pasir Beton m3 0.5500 Pasir Beton2
Koral Beton m3 0.7500 Koral Beton2

Upah
Kenek ht 0.8000
Tk.Batu Kasar ht 0.2667
Kep.Tukang ht 0.0533
Mandor ht 0.0178

610846221.xls
Page 2 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Alat Bantu
Mixer m3 0.4000 Mixer2
Vibrator m3 0.4000 Vibrator2
Ember bh 0.2000 Ember2
Pacul bh 0.0200 Pacul2
Sekop bh 0.0200 Sekop2

B1003 Beton 1:3:5/m3,dgn Koral


Bahan
Semen sak 4.8000
Pasir Beton m3 0.6500
Koral Beton m3 0.9000

Upah
Kenek ht 0.8000
Tk.Batu Kasar ht 0.2667
Kep.Tukang ht 0.0533
Mandor ht 0.0178

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B1004 Beton 1:1,5:2,5/m3,dgn Seplit


Bahan
Semen sak 7.2000
Pasir Beton m3 0.5500
Seplit 2X3 m3 0.8000

Upah
Kenek ht 0.8000
Tk.Batu Kasar ht 0.2667
Kep.Tukang ht 0.0533
Mandor ht 0.0178

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B1005 Beton 1:2:3/m3,dgn Seplit


Bahan
Semen sak 6.4000
Pasir Beton m3 0.5500
Seplit 2X3 m3 0.7500

Upah
Kenek ht 0.8000
Tk.Batu Kasar ht 0.2667
Kep.Tukang ht 0.0533
Mandor ht 0.0178

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

610846221.xls
Page 3 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

B1006 Beton 1:3:5/m3,dgn Seplit


Bahan
Semen sak 4.8000
Pasir Beton m3 0.6500
Seplit 2X3 m3 0.9000

Upah
Kenek ht 0.8000
Tk.Batu Kasar ht 0.2667
Kep.Tukang ht 0.0533
Mandor ht 0.0178

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B1007 Beton Ready Mix K.250/m3


Bahan
Beton K.250 m3 1.0300

Upah
Kenek ht 0.5000
Tk.Batu Kasar ht 0.1667
Kep.Tukang ht 0.0333
Mandor ht 0.0111

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B1008 Beton Ready Mix K.225/m3


Bahan
Beton K.225 m3 1.0300

Upah
Kenek ht 0.5000
Tk.Batu Kasar ht 0.1667
Kep.Tukang ht 0.0333
Mandor ht 0.0111

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B1009 Beton Ready Mix K.200/m3


Bahan
Beton K.200 m3 1.0300

Upah
Kenek ht 0.5000
Tk.Batu Kasar ht 0.1667
Kep.Tukang ht 0.0333
Mandor ht 0.0111

610846221.xls
Page 4 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B1010 Beton Ready Mix K.175/m3


Bahan
Beton K.175 m3 1.0300

Upah
Kenek ht 0.5000
Tk.Batu Kasar ht 0.1667
Kep.Tukang ht 0.0333
Mandor ht 0.0111

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B1011 Beton Ready Mix K.150/m3


Bahan
Beton K.150 m3 1.0300

Upah
Kenek ht 0.5000
Tk.Batu Kasar ht 0.1667
Kep.Tukang ht 0.0333
Mandor ht 0.0111

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B1012 Beton Ready Mix K.125/m3


Bahan
Beton K.125 m3 1.0300

Upah
Kenek ht 0.5000
Tk.Batu Kasar ht 0.1667
Kep.Tukang ht 0.0333
Mandor ht 0.0111

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B1013 Pembesian Polos/kg


Bahan
Besi Polos kg 1.1500
Kawat Beton kg 0.0150

610846221.xls
Page 5 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah Buat & Pasang


Kenek ht 0.0200
Tk.Besi ht 0.0100
Kep.Tukang ht 0.0020
Mandor ht 0.0007

Alat Bantu
Bar Cutter kg 1.0000
Bar Binder kg 1.0000

B1014 Pembesian Ulir/kg


Bahan
Besi Ulir kg 1.1500
Kawat Beton kg 0.0150

Upah Buat & Pasang


Kenek ht 0.0200
Tk.Besi ht 0.0100
Kep.Tukang ht 0.0020
Mandor ht 0.0007

Alat Bantu
Bar Cutter kg 1.0000
Bar Binder kg 1.0000

B1015 Bekisting Kolom/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156
Kaso Klam 4x6 m3 0.0066
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.1955
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2000
Tk.Kayu Kasar ht 0.1000
Kep.Tukang ht 0.0200
Mandor ht 0.0067

B1016 Bekisting Kolom/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.1909
Kaso Klam 4x6 m3 0.0306
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.2440
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2000
Tk.Kayu Kasar ht 0.1000
Kep.Tukang ht 0.0200
Mandor ht 0.0067

B1017 Bekisting Kolom/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi m3 0.1909
Kaso Klam 4x6 m3 0.0306
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.2440
Paku 10cm kg 0.0916

610846221.xls
Page 6 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.2200
Tk.Kayu Kasar ht 0.1100
Kep.Tukang ht 0.0220
Mandor ht 0.0073

B1018 Bekisting Balok/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi U 2x20 m3 0.0126
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan Stut 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.3000
Tk.Kayu Kasar ht 0.1500
Kep.Tukang ht 0.0300
Mandor ht 0.0100

B1019 Bekisting Balok/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi U lbr 0.1909
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.2500
Tk.Kayu Kasar ht 0.1250
Kep.Tukang ht 0.0250
Mandor ht 0.0083

B1020 Bekisting Balok/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi U lbr 0.1909
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.2750
Tk.Kayu Kasar ht 0.1375
Kep.Tukang ht 0.0275
Mandor ht 0.0092

610846221.xls
Page 7 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

B1021 Bekisting Plat/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.2750
Tk.Kayu Kasar ht 0.1375
Kep.Tukang ht 0.0275
Mandor ht 0.0092

B1022 Bekisting Plat/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.2000
Tk.Kayu Kasar ht 0.1000
Kep.Tukang ht 0.0200
Mandor ht 0.0067

B1023 Bekisting Plat/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.2500
Tk.Kayu Kasar ht 0.1250
Kep.Tukang ht 0.0250
Mandor ht 0.0083

B1024 Bekisting Tangga/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0036
Kaso Slempang 4x6 m3 0.0016
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

610846221.xls
Page 8 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.5500
Tk.Kayu Kasar ht 0.2750
Kep.Tukang ht 0.0550
Mandor ht 0.0183

B1025 Bekisting Tangga/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0073
Kaso Slempang 4x6 m3 0.0033
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.5000
Tk.Kayu Kasar ht 0.2500
Kep.Tukang ht 0.0500
Mandor ht 0.0167

B1026 Bekisting Tangga/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0073
Kaso Slempang 4x6 m3 0.0033
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.6000
Tk.Kayu Kasar ht 0.3000
Kep.Tukang ht 0.0600
Mandor ht 0.0200

B1027 Bekisting Beton Praktis/m2


Bahan
Papan Tepi 2/20 m3 0.0231
Paku 5cm kg 0.1100
Kawat Beton kg 0.2200

Upah
Kenek ht 0.0782
Tk.Kayu Kasar ht 0.0782
Kep.Tukang ht 0.0078
Mandor ht 0.0026

Lantai2
B2001 Beton 1:1,5:2,5/m3,dgn Koral
Bahan
Semen sak 7.2000
Pasir Beton m3 0.5500
Koral Beton m3 0.8000

Upah
Kenek ht 0.9200
Tk.Batu Kasar ht 0.3067
Kep.Tukang ht 0.0613
Mandor ht 0.0204

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000

610846221.xls
Page 9 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Pacul bh 0.0200
Sekop bh 0.0200

B2002 Beton 1:2:3/m3,dgn Koral


Bahan
Semen sak 6.4000
Pasir Beton m3 0.5500
Koral Beton m3 0.7500

Upah
Kenek ht 0.9200
Tk.Batu Kasar ht 0.3067
Kep.Tukang ht 0.0613
Mandor ht 0.0204

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B2003 Beton 1:3:5/m3,dgn Koral


Bahan
Semen sak 4.8000
Pasir Beton m3 0.6500
Koral Beton m3 0.9000

Upah
Kenek ht 0.9200
Tk.Batu Kasar ht 0.3067
Kep.Tukang ht 0.0613
Mandor ht 0.0204

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B2004 Beton 1:1,5:2,5/m3,dgn Seplit


Bahan
Semen sak 7.2000
Pasir Beton m3 0.5500
Seplit 2X3 m3 0.8000

Upah
Kenek ht 0.9200
Tk.Batu Kasar ht 0.3067
Kep.Tukang ht 0.0613
Mandor ht 0.0204

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B2005 Beton 1:2:3/m3,dgn Seplit


Bahan
Semen sak 6.4000
Pasir Beton m3 0.5500
Seplit 2X3 m3 0.7500

Upah
Kenek ht 0.9200

610846221.xls
Page 10 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Tk.Batu Kasar ht 0.3067


Kep.Tukang ht 0.0613
Mandor ht 0.0204

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B2006 Beton 1:3:5/m3,dgn Seplit


Bahan
Semen sak 4.8000
Pasir Beton m3 0.6500
Seplit 2X3 m3 0.9000

Upah
Kenek ht 0.9200
Tk.Batu Kasar ht 0.3067
Kep.Tukang ht 0.0613
Mandor ht 0.0204

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B2007 Beton Ready Mix K.250/m3


Bahan
Beton K.250 m3 1.0300

Upah
Kenek ht 0.5750
Tk.Batu Kasar ht 0.1917
Kep.Tukang ht 0.0383
Mandor ht 0.0128

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B2008 Beton Ready Mix K.225/m3


Bahan
Beton K.225 m3 1.0300

Upah
Kenek ht 0.5750
Tk.Batu Kasar ht 0.1917
Kep.Tukang ht 0.0383
Mandor ht 0.0128

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B2009 Beton Ready Mix K.200/m3


Bahan
Beton K.200 m3 1.0300

610846221.xls
Page 11 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.5750
Tk.Batu Kasar ht 0.1917
Kep.Tukang ht 0.0383
Mandor ht 0.0128

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B2010 Beton Ready Mix K.175/m3


Bahan
Beton K.175 m3 1.0300

Upah
Kenek ht 0.5750
Tk.Batu Kasar ht 0.1917
Kep.Tukang ht 0.0383
Mandor ht 0.0128

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B2011 Beton Ready Mix K.150/m3


Bahan
Beton K.150 m3 1.0300

Upah
Kenek ht 0.5750
Tk.Batu Kasar ht 0.1917
Kep.Tukang ht 0.0383
Mandor ht 0.0128

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B2012 Beton Ready Mix K.125/m3


Bahan
Beton K.125 m3 1.0300

Upah
Kenek ht 0.5750
Tk.Batu Kasar ht 0.1917
Kep.Tukang ht 0.0383
Mandor ht 0.0128

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B2013 Pembesian Polos/kg


Bahan
Besi Polos kg 1.1500
Kawat Beton kg 0.0150

610846221.xls
Page 12 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah Buat & Pasang


Kenek ht 0.0230
Tk.Besi ht 0.0115
Kep.Tukang ht 0.0023
Mandor ht 0.0008

Alat Bantu
Bar Cutter kg 1.0000
Bar Binder kg 1.0000

B2014 Pembesian Ulir/kg


Bahan
Besi Ulir kg 1.1500
Kawat Beton kg 0.0150

Upah Buat & Pasang


Kenek ht 0.0230
Tk.Besi ht 0.0115
Kep.Tukang ht 0.0023
Mandor ht 0.0008

Alat Bantu
Bar Cutter kg 1.0000
Bar Binder kg 1.0000

B2015 Bekisting Kolom/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156
Kaso Klam 4x6 m3 0.0066
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.1955
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2300
Tk.Kayu Kasar ht 0.1150
Kep.Tukang ht 0.0230
Mandor ht 0.0077

B2016 Bekisting Kolom/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.1909
Kaso Klam 4x6 m3 0.0306
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.2440
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2300
Tk.Kayu Kasar ht 0.1150
Kep.Tukang ht 0.0230
Mandor ht 0.0077

B2017 Bekisting Kolom/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi m3 0.1909
Kaso Klam 4x6 m3 0.0306
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.2440
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2530
Tk.Kayu Kasar ht 0.1265

610846221.xls
Page 13 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Kep.Tukang ht 0.0253
Mandor ht 0.0084

B2018 Bekisting Balok/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi U 2x20 m3 0.0126
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan Stut 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.3450
Tk.Kayu Kasar ht 0.1725
Kep.Tukang ht 0.0345
Mandor ht 0.0115

B2019 Bekisting Balok/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi U lbr 0.1909
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.2875
Tk.Kayu Kasar ht 0.1438
Kep.Tukang ht 0.0288
Mandor ht 0.0096

B2020 Bekisting Balok/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi U lbr 0.1909
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.3163
Tk.Kayu Kasar ht 0.1582
Kep.Tukang ht 0.0316
Mandor ht 0.0105

B2021 Bekisting Plat/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

610846221.xls
Page 14 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.3163
Tk.Kayu Kasar ht 0.1582
Kep.Tukang ht 0.0316
Mandor ht 0.0105

B2022 Bekisting Plat/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.2300
Tk.Kayu Kasar ht 0.1150
Kep.Tukang ht 0.0230
Mandor ht 0.0077

B2023 Bekisting Plat/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.2875
Tk.Kayu Kasar ht 0.1438
Kep.Tukang ht 0.0288
Mandor ht 0.0096

B2024 Bekisting Tangga/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0036
Kaso Slempang 4x6 m3 0.0016
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.6325
Tk.Kayu Kasar ht 0.3163
Kep.Tukang ht 0.0633
Mandor ht 0.0211

B2025 Bekisting Tangga/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0073
Kaso Slempang 4x6 m3 0.0033
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

610846221.xls
Page 15 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.5750
Tk.Kayu Kasar ht 0.2875
Kep.Tukang ht 0.0575
Mandor ht 0.0192

B2026 Bekisting Tangga/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0073
Kaso Slempang 4x6 m3 0.0033
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.6900
Tk.Kayu Kasar ht 0.3450
Kep.Tukang ht 0.0690
Mandor ht 0.0230

B2027 Bekisting Beton Praktis/m2


Bahan
Papan Tepi 2/20 m3 0.0231
Paku 5cm kg 0.1100
Kawat Beton kg 0.2200

Upah
Kenek ht 0.0899
Tk.Kayu Kasar ht 0.0899
Kep.Tukang ht 0.0090
Mandor ht 0.0030

Lantai3
B3001 Beton 1:1,5:2,5/m3,dgn Koral
Bahan
Semen sak 7.2000
Pasir Beton m3 0.5500
Koral Beton m3 0.8000

Upah
Kenek ht 1.0580
Tk.Batu Kasar ht 0.3527
Kep.Tukang ht 0.0705
Mandor ht 0.0235

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B3002 Beton 1:2:3/m3,dgn Koral


Bahan
Semen sak 6.4000
Pasir Beton m3 0.5500
Koral Beton m3 0.7500

Upah
Kenek ht 1.0580
Tk.Batu Kasar ht 0.3527
Kep.Tukang ht 0.0705
Mandor ht 0.0235

Alat Bantu
Mixer m3 0.4000

610846221.xls
Page 16 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B3003 Beton 1:3:5/m3,dgn Koral


Bahan
Semen sak 4.8000
Pasir Beton m3 0.6500
Koral Beton m3 0.9000

Upah
Kenek ht 1.0580
Tk.Batu Kasar ht 0.3527
Kep.Tukang ht 0.0705
Mandor ht 0.0235

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B3004 Beton 1:1,5:2,5/m3,dgn Seplit


Bahan
Semen sak 7.2000
Pasir Beton m3 0.5500
Seplit 2X3 m3 0.8000

Upah
Kenek ht 1.0580
Tk.Batu Kasar ht 0.3527
Kep.Tukang ht 0.0705
Mandor ht 0.0235

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B3005 Beton 1:2:3/m3,dgn Seplit


Bahan
Semen sak 6.4000
Pasir Beton m3 0.5500
Seplit 2X3 m3 0.7500

Upah
Kenek ht 1.0580
Tk.Batu Kasar ht 0.3527
Kep.Tukang ht 0.0705
Mandor ht 0.0235

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B3006 Beton 1:3:5/m3,dgn Seplit


Bahan
Semen sak 4.8000
Pasir Beton m3 0.6500
Seplit 2X3 m3 0.9000

610846221.xls
Page 17 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 1.0580
Tk.Batu Kasar ht 0.3527
Kep.Tukang ht 0.0705
Mandor ht 0.0235

Alat Bantu
Mixer m3 0.4000
Vibrator m3 0.4000
Ember bh 0.2000
Pacul bh 0.0200
Sekop bh 0.0200

B3007 Beton Ready Mix K.250/m3


Bahan
Beton K.250 m3 1.0300

Upah
Kenek ht 0.6613
Tk.Batu Kasar ht 0.2204
Kep.Tukang ht 0.0441
Mandor ht 0.0147

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B3008 Beton Ready Mix K.225/m3


Bahan
Beton K.225 m3 1.0300

Upah
Kenek ht 0.6613
Tk.Batu Kasar ht 0.2204
Kep.Tukang ht 0.0441
Mandor ht 0.0147

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B3009 Beton Ready Mix K.200/m3


Bahan
Beton K.200 m3 1.0300

Upah
Kenek ht 0.6613
Tk.Batu Kasar ht 0.2204
Kep.Tukang ht 0.0441
Mandor ht 0.0147

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B3010 Beton Ready Mix K.175/m3


Bahan
Beton K.175 m3 1.0300

610846221.xls
Page 18 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.6613
Tk.Batu Kasar ht 0.2204
Kep.Tukang ht 0.0441
Mandor ht 0.0147

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B3011 Beton Ready Mix K.150/m3


Bahan
Beton K.150 m3 1.0300

Upah
Kenek ht 0.6613
Tk.Batu Kasar ht 0.2204
Kep.Tukang ht 0.0441
Mandor ht 0.0147

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B3012 Beton Ready Mix K.125/m3


Bahan
Beton K.125 m3 1.0300

Upah
Kenek ht 0.6613
Tk.Batu Kasar ht 0.2204
Kep.Tukang ht 0.0441
Mandor ht 0.0147

Alat Bantu Utama


Pompa m3 1.0000
Vibrator m3 1.0000
Ember bh 0.1250
Pacul bh 0.0250
Sekop bh 0.0250

B3013 Pembesian Polos/kg


Bahan
Besi Polos kg 1.1500
Kawat Beton kg 0.0150

Upah Buat & Pasang


Kenek ht 0.0265
Tk.Besi ht 0.0133
Kep.Tukang ht 0.0027
Mandor ht 0.0009

Alat Bantu
Bar Cutter kg 1.0000
Bar Binder kg 1.0000

B3014 Pembesian Ulir/kg


Bahan
Besi Ulir kg 1.1500
Kawat Beton kg 0.0150

Upah Buat & Pasang

610846221.xls
Page 19 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Kenek ht 0.0265
Tk.Besi ht 0.0133
Kep.Tukang ht 0.0027
Mandor ht 0.0009

Alat Bantu
Bar Cutter kg 1.0000
Bar Binder kg 1.0000

B3015 Bekisting Kolom/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi 2x20 m3 0.0156
Kaso Klam 4x6 m3 0.0066
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.1955
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2645
Tk.Kayu Kasar ht 0.1323
Kep.Tukang ht 0.0265
Mandor ht 0.0088

B3016 Bekisting Kolom/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi lbr 0.1909
Kaso Klam 4x6 m3 0.0306
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.2440
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2645
Tk.Kayu Kasar ht 0.1323
Kep.Tukang ht 0.0265
Mandor ht 0.0088

B3017 Bekisting Kolom/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi m3 0.1909
Kaso Klam 4x6 m3 0.0306
Kaso Stut 5x7 m3 0.0091
Benang Rami glg 0.0500
Paku 5cm kg 0.2440
Paku 10cm kg 0.0916

Upah
Kenek ht 0.2910
Tk.Kayu Kasar ht 0.1455
Kep.Tukang ht 0.0291
Mandor ht 0.0097

B3018 Bekisting Balok/m2 2xpakai dgn Papan 2/20


Bahan
Papan Tepi U 2x20 m3 0.0126
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan Stut 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.3968

610846221.xls
Page 20 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Tk.Kayu Kasar ht 0.1984


Kep.Tukang ht 0.0397
Mandor ht 0.0132

B3019 Bekisting Balok/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Tepi U lbr 0.1909
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.3306
Tk.Kayu Kasar ht 0.1653
Kep.Tukang ht 0.0331
Mandor ht 0.0110

B3020 Bekisting Balok/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Tepi U lbr 0.1909
Papan Tumpuan 2x20 m3 0.0069
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0365
Kaso Skur 4x6 m3 0.0060
Kaso Slempang 4x6 m3 0.0133
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.3637
Tk.Kayu Kasar ht 0.1819
Kep.Tukang ht 0.0364
Mandor ht 0.0121

B3021 Bekisting Plat/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.3637
Tk.Kayu Kasar ht 0.1819
Kep.Tukang ht 0.0364
Mandor ht 0.0121

B3022 Bekisting Plat/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

610846221.xls
Page 21 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.2645
Tk.Kayu Kasar ht 0.1323
Kep.Tukang ht 0.0265
Mandor ht 0.0088

B3023 Bekisting Plat/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0146
Kaso Slempang 4x6 m3 0.0066
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.3306
Tk.Kayu Kasar ht 0.1653
Kep.Tukang ht 0.0331
Mandor ht 0.0110

B3024 Bekisting Tangga/m2 2xpakai dgn Papan 2/20


Bahan
Papan Bawah 2x20 m3 0.0156
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0036
Kaso Slempang 4x6 m3 0.0016
Benang Rami glg 0.0500
Paku 5cm kg 0.2200
Paku 10cm kg 0.2500

Upah
Kenek ht 0.7274
Tk.Kayu Kasar ht 0.3637
Kep.Tukang ht 0.0727
Mandor ht 0.0242

B3025 Bekisting Tangga/m2 2xpakai dgn Triplex 9mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0073
Kaso Slempang 4x6 m3 0.0033
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

Upah
Kenek ht 0.6613
Tk.Kayu Kasar ht 0.3307
Kep.Tukang ht 0.0661
Mandor ht 0.0220

B3026 Bekisting Tangga/m2 2xpakai dgn Triplex 12mm


Bahan
Triplex Bawah lbr 0.2278
Papan Tumpuan 2x20 m3 0.0083
Papan Landasan 2x20 m3 0.0042
Kaso Stut 5x7 m3 0.0073
Kaso Slempang 4x6 m3 0.0033
Benang Rami glg 0.0500
Paku 5cm kg 0.1686
Paku 10cm kg 0.0488

610846221.xls
Page 22 of 27

ID Analisa Pekerjaan Satuan Koefisien VOL RAB

Upah
Kenek ht 0.7935
Tk.Kayu Kasar ht 0.3968
Kep.Tukang ht 0.0794
Mandor ht 0.0265

B3027 Bekisting Beton Praktis/m2


Bahan
Papan Tepi 2/20 m3 0.0231
Paku 5cm kg 0.1100
Kawat Beton kg 0.2200

Upah
Kenek ht 0.1034
Tk.Kayu Kasar ht 0.1034
Kep.Tukang ht 0.0103
Mandor ht 0.0034

610846221.xls
PERHATIAN !!
FILE INI HANYA BISA MENGHITUNG VOLUME BAHAN UNTUK ID Dg INISIAL "B"

Petunjuk penggunaan:
1. Isilah kolom No ID & Kolom Volume saja sesuai dengan RAB (Kolom Pekerjaan & Satuan akan terisi otomatis)
2. Jika ada No ID yang sama, isi satu saja. Besarnya volume adalah jumlah semua volume ID yang sama tadi.

No ID Pekerjaan

0
0
0
b1001 b1001 Beton 1:1,5:2,5/m3,dgn Koral
B1002 B1002 Beton 1:2:3/m3,dgn Koral
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Cek di sini untuk mencari No ID yang sama

Masukkan Jumlah Volume Total ID


an akan terisi otomatis) No ID No ID Yang Sama
e ID yang sama tadi. 0 -

Volume Satuan

0
0
0
50.00 m3 1
17.00 m3 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
VOLUME KEBUTUHAN BAHAN / MATERIAL
PEKERJAAN STRUKTUR
Vol Total
Bar Binder kg -
Bar Cutter kg -
Benang Rami glg -
Besi Polos kg -
Besi Ulir kg -
Beton K.125 m3 -
Beton K.150 m3 -
Beton K.175 m3 -
Beton K.200 m3 -
Beton K.225 m3 -
Beton K.250 m3 -
Ember bh 13.40
Kaso Klam 4x6 m3 -
Kaso Skur 4x6 m3 -
Kaso Slempang 4x6 m3 -
Kaso Stut 5x7 m3 -
Kawat Beton kg -
Koral Beton m3 52.75
Mixer m3 26.80
Pacul bh 1.34
Paku 10cm kg -
Paku 5cm kg -
Papan Bawah 2x20 m3 -
Papan Landasan 2x20 m3 -
Papan Landasan Stut 2x20 m3 -
Papan Tepi 2/20 m3 -
Papan Tepi 2x20 m3 -
Papan Tepi U 2x20 m3 -
Papan Tumpuan 2x20 m3 -
Pasir Beton m3 36.85
Pompa m3 -
Sekop bh 1.34
Semen sak 468.80
Seplit 2X3 m3 -
Triplex Bawah lbr -
Triplex Tepi lbr -
Triplex Tepi U lbr -
Vibrator m3 26.80