I PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²)
Tenaga
Pekerja Oh 0.100
Mandor Oh 0.050
Sub Total
B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹)
Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.25
Semen Portland gresik zak 0.10
Pasir Beton M³ 0.005
Koral Beton M³ 0.009
Kayu meranti 5/7 M³ 0.072
Paku Biasa 2"-5" Doz 0.060
Seng gelombang (0,8 x 1,5m) M1 0.400
Tenaga
Tukang Kayu Oh 0.200
Pekerja Oh 0.400
Mandor Oh 0.020
Sub Total
C. Memasang Bouwplank (m¹)
Bahan
Kayu meranti usuk 5/7 M³ 0.012
Paku Biasa 2"-5" Doz 0.050
Kayu Papan Bengkirai 3/20 M³ 0.008
Tenaga
Tukang Kayu Oh 0.100
Pekerja Oh 0.100
Mandor Oh 0.005
Sub Total
D. Memasang Papan Nama Proyek 80x120 cm (Bh)
Bahan
Kayu Meranti Btg 0.035
Paku Biasa 2"-5" Doz 0.600
Seng Lembaran 90 cm M¹ 1.400
Cat kayu Kg 1.500
Semen Portland Zak 16.800
Pasir Beton M³ 0.027
Koral Beton M³ 0.041
Tenaga
Tukang Kayu Oh 1.000
Tukang Batu Oh 0.018
Tukang Cat Oh 1.000
Pekerja Oh 2.100
Mandor Oh 1.005
Sub Total
E. Membuat direksi keet & Gudang Sementara (m²)
Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250
Kayu 5/7 M³ 0.180
Paku Biasa 2"-5" Kg 0.850
Besi Strip Kg 1.100
Semen Portland gresik zak 35.000
Pasir Pasang M³ 0.150
Pasir Beton M³ 0.100
Koral Beton M³ 0.150
Bata Merah Bh 30.000
Seng Plat Lbr 0.250
Jendela Nako Bh 2.0000
Kaca Polos 3 mm M² 0.080
Kunci Tanam Bh 0.150
Plywood 4 mm Lbr 0.060
Tenaga
Tukang Kayu Oh 2.000
Tukang Batu Oh 1.000
Pekerja Oh 2.000
Mandor Oh 0.050
Sub Total
II PEKERJAAN TANAH
A. Galian Tanah Biasa sedalam 1,5 m (m³)
Tenaga
Pekerja Oh 0.228
Mandor Oh 0.008
sewa peralatan
Sewa dump truk 5 ton jam 0.074
Sewa exavator 6m3 jam 0.052
Sub Total
B. Urugan Kembali 1,5(m³)
Tenaga
Pekerja Oh 0.500
Mandor Oh 0.050
Sub Total
C. Urugan Pasir Bawah Pondasi (m³)
Bahan
Pasir Urug M³ 1.200
Tenaga
Pekerja Oh 0.300
Mandor Oh 0.010
Sub Total
IV PEKERJAAN BETON
A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³)
Bahan
Kayu meranti bekisting M³ 0.270
Paku Biasa 2"-5" Kg 2.000
Minyak Bekisting (oli) Lt 0.600
Besi Beton polos Kg 210.000
Kawat Beton Kg 3.000
Semen Portland Kg 8.400
Pasir Beton M³ 0.540
Koral Beton M³ 0.810
Tenaga
Pekerja Oh 5.700
Tukang Batu Oh 1.570
Tukang Kayu Oh 0.278
Tukang Besi Oh 1.412
Mandor Oh 0.170
Sub Total
B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³)
Bahan
Kayu Terentang M³ 0.400
Paku Biasa 2"-5" Kg 2.000
Minyak Bekisting Lt 2.000
Besi Beton polos Kg 210.000
Kawat Beton Kg 4.500
Semen Portland Kg 8.400
Pasir Beton M³ 0.520
Koral Beton M³ 0.780
Kayu meranti Balok 5/7 cm M³ 0.150
Plywood uk. 122x244x 9 mm Lbr 3.500
Dolken Kayu Ø 8-10/400 cm Btg 20.000
Tenaga
Pekerja Oh 7.300
Tukang Batu Oh 0.350
Tukang Kayu Oh 3.300
Tukang Besi Oh 2.100
Mandor Oh 0.250
Sub Total
F. Pembesian Besi Wiremesh plat beton(Kg)
Bahan
Wiremesh DM-4 M2 1.020
Kawat Beton Kg 0.015
Tenaga
Pekerja Oh 0.007
Tukang Besi Oh 0.007
Mandor Oh 0.000
Sub Total
G. Pasang Bekisting untuk Plat Beton (m²)
Bahan
Paku Biasa usuk Kg 0.400
Minyak Bekisting Lt 0.200
Kayu meranti Balok 5/7 cm M³ 0.015
Plywood tebal 9 mm Lbr 0.350
kayu meranti bekisting m3 0.040
Tenaga
Pekerja Oh 0.320
Tukang kayu Oh 0.330
Mandor Oh 0.006
Sub Total
IV PEKERJAAN PENUTUP ATAP
A. Pasang Genteng Bubung Palentong (m¹)
Bahan
Genteng Bubung Palentong Bh 5.000
Semen Portland Kg 8.000
Pasir Pasang M3 0.032
Tenaga
Pekerja Oh 0.400
Tukang Kayu Oh 0.200
Kepala Tukang Oh 0.020
Mandor Oh 0.002
Sub Total
B. Pasang Atap Genteng Beton (m²)
Bahan
Genteng Beton Bh 11.000
Paku Biasa 2" - 5" Kg 0.030
Tenaga
Pekerja Oh 0.200
Tukang Kayu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.010
Sub Total
V PEKERJAAN PLAFON
A. Pasang List Langit-langit Kayu Profil (m¹)
Bahan
Kayu Profil M¹ 1.100
Paku plafon Kg 0.010
Tenaga
Pekerja Oh 0.050
Tukang Kayu Oh 0.050
Kepala Tukang Oh 0.005
Mandor Oh 0.003
Sub Total
B. Langit-langit Asbes (m²)
Bahan
Pelat Asbes tebal 6mm M² 1.100
Paku plafon Kg 0.010
Tenaga
Pekerja Oh 0.030
Tukang Kayu Oh 0.070
Kepala Tukang Oh 0.007
Mandor Oh 0.002
Sub Total
100,000.00 10,000.00
110,000.00 5,500.00
15,500.00
25,000.00 31,250.00
57,000.00 5,700.00
272,500.00 1,362.50
275,000.00 2,475.00
4,000,000.00 288,000.00
29,000.00 1,740.00
63,000.00 25,200.00
120,000.00 24,000.00
100,000.00 40,000.00
110,000.00 2,200.00
421,927.50
4,000,000.00 48,000.00
29,000.00 1,450.00
3,350,000.00 26,800.00
120,000.00 12,000.00
100,000.00 10,000.00
110,000.00 550.00
98,800.00
4,000,000.00 140,000.00
29,000.00 17,400.00
63,000.00 88,200.00
50,000.00 75,000.00
1,050.00 17,640.00
272,500.00 7,357.50
275,000.00 11,275.00
120,000.00 120,000.00
120,000.00 2,160.00
50,000.00 50,000.00
100,000.00 210,000.00
110,000.00 110,550.00
849,582.50
25,000.00 31,250.00
4,000,000.00 720,000.00
29,000.00 24,650.00
11,000.00 12,100.00
57,000.00 1,995,000.00
250,000.00 37,500.00
272,500.00 27,250.00
275,000.00 41,250.00
800.00 24,000.00
27,000.00 6,750.00
12,500.00 25,000.00
50,000.00 4,000.00
25,000.00 3,750.00
50,000.00 3,000.00
120,000.00 240,000.00
120,000.00 120,000.00
100,000.00 200,000.00
110,000.00 5,500.00
3,521,000.00
100,000.00 22,800.00
110,000.00 880.00
70,000.00 5,180.00
153,000.00 7,956.00
36,816.00
100,000.00 50,000.00
110,000.00 5,500.00
55,500.00
177,000.00 212,400.00
100,000.00 30,000.00
110,000.00 1,100.00
243,500.00
85,000.00 3,400.00
57,000.00 969.00
250,000.00 100,000.00
100,000.00 166,000.00
120,000.00 33,240.00
110,000.00 2,200.00
57,000.00 547,200.00
250,000.00 136,750.00
272,500.00 117,720.00
6.00 1,290.00
100,000.00 27,700.00
120,000.00 199,200.00
110,000.00 3,080.00
13,500.00
27,000.00
100,000.00 700.00
120,000.00 1,320.00
110,000.00 550.00
1,341,319.00
2,000,000.00 540,000.00
15,000.00 30,000.00
10,000.00 6,000.00
14,000.00 2,940,000.00
27,000.00 81,000.00
58,000.00 487,200.00
272,500.00 147,150.00
275,000.00 222,750.00
100,000.00 570,000.00
120,000.00 188,400.00
120,000.00 33,336.00
120,000.00 169,440.00
110,000.00 18,700.00
5,433,976.00
2,000,000.00 800,000.00
15,000.00 30,000.00
10,000.00 20,000.00
14,000.00 2,940,000.00
27,000.00 121,500.00
58,000.00 487,200.00
272,500.00 141,700.00
275,000.00 214,500.00
4,711,500.00 706,725.00
105,000.00 367,500.00
25,000.00 500,000.00
100,000.00 730,000.00
120,000.00 42,000.00
120,000.00 396,000.00
120,000.00 252,000.00 lbr pj
110,000.00 27,500.00 2.1 5.4
7,776,625.00
9 lbr untuk 18 m
300,000.00 306,000.00 207 lbr untuk 18x120
27,000.00 405.00 23 untuk 120 m
100,000.00 700.00
120,000.00 840.00
110,000.00 33.00
307,978.00
15,000.00 6,000.00
30,000.00 6,000.00
4,711,500.00 70,672.50
105,000.00 36,750.00
2,000,000.00 80,000.00
100,000.00 32,000.00
120,000.00 39,600.00
110,000.00 660.00
271,682.50
7,500.00 37,500.00
#REF! #REF!
125,000.00 4,000.00
36,000.00 14,400.00
47,500.00 9,500.00
45,000.00 900.00
40,000.00 80.00
#REF!
5,500.00 60,500.00
10,000.00 300.00
36,000.00 7,200.00
47,500.00 4,750.00
45,000.00 450.00
40,000.00 400.00
73,600.00
3,333.33 3,666.67
10,000.00
36,000.00 1,800.00
47,500.00 2,375.00
45,000.00 225.00
40,000.00 120.00
8,186.67
32,000.00 35,200.00
10,000.00
36,000.00 1,080.00
47,500.00 3,325.00
45,000.00 315.00
40,000.00 60.00
39,980.00
100,000.00 120,000.00
36,000.00 10,800.00
42,500.00 -
45,000.00 -
40,000.00 400.00
131,200.00
4,000.00 40,000.00
1,050.00 11,949.00
125,000.00 5,250.00
13,000.00 19,500.00
36,000.00 22,320.00
42,500.00 14,875.00
45,000.00 1,575.00
40,000.00 1,200.00
116,669.00
90,000.00 90,000.00
1,050.00 6,300.00
125,000.00 1,250.00
36,000.00 36,000.00
42,500.00 63,750.00
45,000.00 67,500.00
40,000.00 6,400.00
271,200.00
500.00 125,000.00
1,050.00 126,000.00
125,000.00 37,500.00
2,500.00 900,000.00
13,000.00 78,000.00
36,000.00 216,000.00
42,500.00 127,500.00
45,000.00 13,500.00
40,000.00 12,000.00
1,635,500.00
15,000.00 15,000.00
1,000.00 500.00
36,000.00 360.00
42,500.00 4,250.00
45,000.00 450.00
40,000.00 200.00
20,760.00
6,250.00 7,500.00
7,500.00 2,625.00
36,000.00 2,916.00
42,500.00 5,737.50
45,000.00 607.50
40,000.00 164.00
19,550.00
21,250.00 25,500.00
25,500.00 8,925.00
36,000.00 2,916.00
42,500.00 5,737.50
45,000.00 607.50
40,000.00 164.00
43,850.00
besi wr lbr kg
d4 1 15.45
I PEKERJAAN PERSIAPAN
1 Pembersihan Site M2 290 Rp 15,500
2 Pasang Pagar Seng Pengaman Proyek M' 276 Rp 421,928
3 Pasang Bouwplank M' 68 Rp 98,800
4 Pembuatan Direksikeet dan udang kerja M2 12 Rp 3,521,000
5 Mobilisasi dan Demolisasi Proyek Ls 1 Rp 1,250,000
JUMLAH
Rp 6,361,805
Rp 1,931,400
3. Direksi keet
Rp 2,828,496
Rp 2,088,000
Rp 293,040
Rp 13,502,741
4. Galian Tanah untuk pondasi Footplat
110
145
Rp 14,439,216
Rp 112,950
Rp 19,352,880
5 Timbunan Tanah kembai Untuk Pondasi Footplat
Rp 1,467,173,520
Rp 495,341,050
145
Rp 2,019,957,559
515 15
5 30 40 30 5
110
110
145
515 15
5 30 40 30 5
110
No Gambar Pekerjaan
5 Begisting Sloof
6 Begisting Kolom
URAIAN VOLUME PEKERJAAN PERSIAPAN DAN PONDASI
● Panjang = 120.000 m V = L x P
● Lebar = 18.000 m = 18.00 x 120.000
= 2160.000 m2
● Panjang = 4.000 m V = L x P
● Lebar = 3.000 m = 3.00 x 4.000
= 12.000 m 2
Footplat
● Panjang footplat = 2.200 m L = L T
● Lebar = 2.200 m = 2.20 1.50
● Tinggi = 1.500 m = 3.300 m2
uk Pondasi Footplat
● T. Pondasi = 2.000 m L1 = P L
● T. Galian = 1.500 m = 1.00 1.00
● L. Pondasi = 2.000 m = 1 m2
Jumlah = 5.500 m La Lb
L2 = x T
● Panjang = 1.000 m 2
0.4 1
= x 0.15
2
footplat
● Panjang = 2.200 m La + Lb
L =
● Tinggi h = 0.500 m 2
● Lebar B' = 2.000 m 0.500 + 2.000
=
● Tinggi a = 0.200 m 2
● Tinggi b = 0.500 m = 0.250 m2
L2 = Ta x + La x Tb
= 0.400 + 0.150
= 0.550 m 2
Batu Kali
● Panjang = 2.000 m L1 = L T
● Lebar = 2.000 m = 2.00 0.30
● Tinggi = 0.300 m = 0.6 m2
● Panjang = 0.500 m L = L x T
● Lebar = 0.500 m = 0.50 x 1.300
● Tinggi = 1.300 m = 0.650 m2
Jumlah Tiang = 24 Bh
● Panjang = 120.000 m V = L x T
● Lebar = 18.000 m = 18.00 x 0.120
● Tebal = 0.120 m = 2.160 m2
P V = 2160.000 m2
120.000
1
x 2 V = K x 1
x 2 = 266.000 x 1
1
= 266.000 m'
P V = 12.000 m2
4.000
1
V = L x P
= 3.30 x 2.200
= 174.24 m³
24
V1 = L1 x T
= 1 x 1.10 = 26.40
V2 = L2 x P
24 = 0.105 x 1.00 = 2.52
V. Total = V - V1 - V2
= 174.24 - 26.40 - 2.520
= 0.105
= 145.320 m³
V = L x P
x T
= 0.80 x 2.200
= 42.240 m³
x 0.200
24
- Ta
24
V = L x P
= 0.60 x 2.000
= 28.8 m³
24
BETON
ngan Luas Banyak Volume Pekerjaan
Tinggi V = L x P
0.500 = 0.13 x 138.000
2 = 34.5 m³
V = L x P
= 0.650 x 0.500
24 = 0.325 m³
V = 0.325 x 24
= 7.8 m³
T V = L x P
0.120 = 2.16 x 120.000
1
= 259.2 m³
2 PEKERJAAN PONDASI
2.1 Pekerjaan Galian Tanah Pondasi Footplat & Batu Kali 174.240 M3
2.2 Urugan Tanah Pondasi Footplat & Batu Kali 145.320 M3
2.3 Urugan Pasir Bawah Pondasi 28.800 M3
2.4 Pasangan Pondasi Foot Plat 42.240 M3
3 PEKERJAAN BETON
3.1 Beton bertulang camp 1 : 2 : 3 Lantai 259.200 M3
3.2 Beton Sloof camp 1pc : 2ps : 3kr 34.500 M3
3.3 Beton Kolom camp 1pc : 2ps : 3kr 7.800 M3
3.4 Pekerjaan pembesian / tulangan Lantai wiremesh 3198.150 Kg
3.5 Pekerjaan pembesian / tulangan Sloof 2418.000 Kg
3.60 Pekerjaan pembesian / tulangan Kolom 378.000 Kg
3.7 Memasang 1 m2 Bekisting untuk Lantai 2160.000 M2
3.8 Memasang 1 m2 Begesting untuk Sloof 4320.000 M2
3.9 Memasang 1 m2 Bekisting untuk Kolom 15.600 M2
SATUAN
Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :
Harga Satuan
No Jenis Pekerjaan Satuan Volume
(Rp)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² 2160 15,500.00
2 Pemasangan Pagar Sementara dari Kayu tinggi 2 m m¹ 276 421,927.50
3 Memasang Bouwplank m¹ 266 98,800.00
4 Memasang Papan Nama Proyek 80x120 cm Bh 1 849,582.50
5 Membuat direksi keet & Gudang Sementara m² 12 3,521,000.00
6 Listrik dan Air Kerja Ls 1 2,000,000.00
7 Mob & Demob Alat Ls 1 2,000,000.00
8 Tes Material Baja dan Beton Ls 1 1,500,000.00
9 Rambu - rambu lalu lintas dan keselamatan Kerja Ls 1 750,000.00
B PEKERJAAN TANAH
1 Galian Tanah Biasa sedalam 1,5 m m³ 174.2 36,816.00
2 Urugan Kembali m³ 145.3 55,500.00
3 Urugan Pasir Bawah Pondasi m³ 28.800 243,500.00
C PEKERJAAN PONDASI
1 Pasangan Pondasi telapak 1 Pc: 5 Ps m³ 42 1,341,319.00
D PEKERJAAN BETON
1 Membuat sloof Beton Bertulang (200Kg besi+bekisting) m³ 35 5,433,976.00
2 Membuat Kolom Beton Bertulang (300Kg besi+bekisting) m³ 7.8 7,776,625.00
3 Pembesian Besi Wiremesh plat beton(Kg) m³ 3198.150 307,978.00
4 Pasang Bekisting untuk Plat Beton (m²) m2 60.000 271,682.50
Jumlah Harga
Total Harga (Rp)
(Rp)
225,564,372.50
33,480,000
116,451,990.00
26,280,800.00
849,582.50
42,252,000.00
2,000,000.00
2,000,000.00
1,500,000.00
750,000.00
21,492,879.84
6,414,819.84
8,065,260.00
7,012,800.00
56,657,314.56
56,657,314.56
1,249,390,637.70
187,472,172.00
60,657,675.00
984,959,840.70
16,300,950.00
Daftar Rekapitulasi Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :
0.024
41.666666667
3,541,666.67
3,888.89
6,250.00
21,250.00
4,000.00
4,444.44