GAMBAR TEKNIS

KEGIATAN : PEMBANGUNAN SALURAN DRAINASE


LOKASI : RT 1 RW 3 DESA TUNJUNGAN

Desain dan perhitungan volume

Panjang Saluran = 161.0 M Cor Beton camp 1 Pc : 2 Ps : 3 Kr


0.3 0.3
0.2 plesteran 0.2
0.10

2
0.60 1 0.6

0.20
0.3
3 0.2

0.2 0.4 0.2

TAKE OF SHEET ( TOS )


Volume Beton
V.1 = 0.20 x 0.80 x 161
= 25.76 m3

V.2 = 0.20 x 0.80 x 161.0


= 25.76 m3

V.3 = 0.20 x 0.40 x 161.0


= 12.88 m3

VOLUME TOTAL Beton = 25.8 + 25.76 + 12.88


= 64.4 m3

Volume Plesteran
P = 0.30 + 0.10 x 2
= 0.80 m'
Luas Plesteran = 0.80 x 161.0
= 128.80 M2

volume galian
v.1 = 0.80 x 0.80 x 161.0
= 103.04 m3
Volume 1/2 Pekerjaan galian
= 51.52 m3
DAFTAR HARGA BAHAN SATUAN BAHAN , ALAT DAN UPAH

DAFTAR HARGA UPAH

SATUAN
NO. JENIS UPAH VOLUME
HARGA SATUAN

1 Pekerja Tidak terlatih OH 46,600


2 Pekerja Terlatih OH 53,800
3 Kepala Pekerja OH 53,800
4 Tukang OH 61,100
5 Kepala Tukang OH 82,600

DAFTAR HARGA BAHAN

SATUAN
NO. JENIS BAHAN VOLUME
HARGA SATUAN

1 Semen Pc 40 kg Zak 65,500


2 Semen PC 50 kg Zak
3 Pasir Beton M3 274,300
4 Pasir Urug/Timbunan Pilihan M3
5 Sirtu m3 234,300
6 Batu Pecah 2/3 ( split ) M3 285,200
7 Batu pecah 5/7 + 3/5 M3
8 Batu Belah 10/15 M3
9 Batu Blondon M3
10 Tanah Urug M3
11 Air Kerja (Bila tidak butuh air kosongka liter

DAFTAR HARGA ALAT

SATUAN
NO. JENIS BAHAN VOLUME
HARGA SATUAN

1 Bambu Batang 12,000


2 Plastik Cor roll 50,000
3 Paku Kg 18,000
4 Ember cor Bh 20,000
5 Benang roll 3,000
6 Kayu Begisting (Usuk panjang 300 cm) Batang 20,000
7 Papan Cor ( 2 cm x 12 cm x 2 m) Lbr 8,000
8 Mobilisasi molen Ls 150,000
9 Sewa molen Hari 150,000
10 Papan Nama Kegiatan Bh 200,000
11 Prasasti Bh 300,000
AT DAN UPAH ANALISA PEKERJAAN
Rev-SNI 91-0007-2007
1 m3 Pekerjaan Beton Camp. 1 : 2 : 3
PC 40 Kg 8.4 sak 65,500
KETERANGAN Pasir Beton 0.54 m3 274,300
Batu Split 2/3 cm 0.81 m3 285,200
Pekerja 2 hok 53,800
Tukang Batu 0.35 hok 61,100
Kepala Tukang 0.035 hok 82,600

64.4 m3 Pekerjaan Beton Camp. 1 : 2 : 3


PC 40 Kg 541 sak 65,500
Pasir Beton 35 m3 274,300
Batu Split 2/3 cm 52.16 m3 285,200
Pekerja 128.80 hok 53,800
KETERANGAN Tukang Batu 22.54 hok 61,100
Kepala Tukang 2.25 hok 82,600

1 m3 pekerjaan galian
Pekerja Gali 1.500 hok 46,600

51.52 Pekerja Gali 77.280 hok 46,600

1M2 Pekerjaan Plesteran


PC 40 Kg 0.130 sak 65,500
Pasir 0.024 m3 274,300
Tk Batu 0.150 hok 61,100
Pekerja 0.300 hok 53,800
Kepala tukang 0.015 hok 82,600

128.80 M2 Pekerjaan Plesteran


PC 40 Kg 16.744 sak 65,500
KETERANGAN Pasir 3.091 m3 274,300
Tk Batu 19.320 hok 61,100
Pekerja 38.640 hok 53,800
Kepala Tukang 1.932 hok 82,600

1 M2 Pekerjaan Acian
PC 40 Kg 0.080 sak 65,500
Tk Batu 0.100 hok 61,100
Pekerja 0.200 hok 53,800
Kepala Tukang 0.010 hok 82,600

128.80 M2 Pekerjaan Acian


PC 40 Kg 10.304 sak 65,500
Tk Batu 12.880 hok 61,100
Pekerja 25.760 hok 53,800
Kepala Tukang 1.288 hok 82,600
REKAPITULASI KEBUTUHAN BAHAN DAN UPAH

550,200
148,122
231,012
107,600 Rekapitulasi Kebutuhan Bahan
21,385 Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total
2,891 Split 2/3 - 52.16 52.16
1,061,210 PC @ 40 kg - 16.74 10.30 540.96 568.01
Pasir pas 34.78 3.09 34.8 72.64

35,432,880
9,539,057
14,877,173 Rekapitulasi Kebutuhan Alat dan Upah
6,929,440
1,377,194 Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total
186,180 Pekerja 52.16 38.64 25.76 128.80 245.36
68,341,924 Tukang Batu 34.78 19.32 12.88 22.54 89.52
Kepala Tukang 128.80 1.93 1.288 2.25 134.27
69,900 Pekerja gali 77.28 77.28
69,900
3,601,248
3,601,248

8,515
6,583
9,165
16,140
1,239
41,642

1,096,732
847,916
1,180,452
2,078,832
159,583
5,363,515

5,240
6,110
10,760
826
22,936

674,912
786,968
1,385,888
106,389
2,954,157
AN UPAH RENCANA ANGGARAN BIAYA DAN KEGIATAN DANA DESA (RAB-DANA DESA
DESA TUNJUNGAN KECAMATAN NGOMBOL
TAHUN ANGGARAN 2018

BIDANG : Pelaksanaan Pembangunan Desa


REKENING :
KEGIATAN : Pembangunan Drainase/ selokan
Dibulatkan sat WAKTU PELAKSANAAN :
53.00 m3
569.00 zag Rincian Pendanaan :
73.00 m3

HARGA
NO URAIAN VOLUME
SATUAN ( Rp )
Kegiatan Pembangunan Talud Jalan
1 Belanja Barang dan Jasa
1.1. Operasional Kegiatan
Dibulatkan sat 1.1.1. ATK Kegiatan
246.00 HOK
90.00 HOK
135.00 HOK
78.00 HOK 1.1.2. Cetak Pengandaan
Foto copy lbr 300
Cetak Foto 3R lbr 3000
Jilid bendel 7000

1.1.2. Uang Sidang Kegiatan


Penaggung Jawab kli 150,000
Ketua 1 x 3 kali sidang kli 130,000
Sekretaris 1 x 3 kali sidang kli 125,000
Anggota 3 x 3 kali sidang kli 100,000
1.2. Alat Kegiatan
Ember B 15 bh 26,000
Ember K 15 bh 11,000

Benang 10 glg 3,000


Paku reng 1 kg 18,000
Bambu 10 btg 15,000

Bedrat 1 kg 19,000
1.3. Upah Kerja
Kepala Tukang 135 Hok 82,600
Tukang 90 Hok 61,100
Pekerja 246 Hok 61,100
Pekerja galian 78.00 Hok 46,600
2 Belanja Modal
Semen/PC 40 kg 569 zak 65,500
Batu Pecah 2/3 ( split ) 53 m3 285,200
Pasir Pasang 73 m3 274,300
JUMLAH
AN BIAYA DAN KEGIATAN DANA DESA (RAB-DANA DESA)
SA TUNJUNGAN KECAMATAN NGOMBOL
TAHUN ANGGARAN 2018

JUMLAH ( Rp )

108,496,400
36,087,400

0
0
0
0
0
0
0
0

0
0
0
0
0
772,000
390,000
165,000

30,000
18,000
150,000

19,000
35,315,400
11,151,000
5,499,000
15,030,600
3,634,800
72,409,000
37,269,500
15,115,600
20,023,900
108,496,400
TAKE OF SHEET ( TOS )

KEGIATAN : PEMBANGUNAN SALURAN DRAINASE


LOKASI : RT 02 RW 04 Desa Puspo Kecamatan Bruno

Desain dan perhitungan volume

Panjang Saluran = 40.0 m


Plesteran Tebal 2cm Camp. 1:6
0.25 0.25
0.15

Kemiringan 1:4

I
0.80
1
Pasangan Batu Camp. 1:4
I1 0.6

3 0.10
2
2
0.10

0.35 0.20
II 0.35

volume pasangan batu


V.1 = 0.35 + 0.25
X 0.60 X 40 x 2
2

= 14.4 m3
V.2 = 0.10 x 0.35 x 40 x 2
= 2.8 m3

V.3 = 0.10 x 0.2 x 40.0


= 0.80 m3

volume total = 14.40 + 2.80 + 0.80


= 18.00 m3

Volume Plesteran
= 0.25 + 0.60 + 0.3 + 0.6 x 40.0
= 68.0 m2
volume galian
V = 0.80 x 0.90 x 40.0
= 28.80 m3

catatan : Volume galian menyesuaikan kondisi lapangan


TAKE OF SHEET ( TOS )
ANALISA PEKERJAAN
SNI 2836 2008
1 m3 Pasang batu belah 1Pc : 5Pasir
1 Batu Blondon 1.200 m3
PC 50 Kg 2.720 sak
Pasir 0.544 m3
Tk Batu 0.750 hok
Pekerja 1.500 hok
Mandor 0.075 hok

18.00 m3 Batu Blondon 21.60 m3


PC 50 Kg 48.96 sak

Pasir 9.79 m3

Tk Batu 13.50 hok


Pekerja 27.00 hok
Mandor 1.350 hok

1 m3 pekerjaan galian
Pekerja Gali 0.750 hok

28.80 Pekerja Gali 21.600 hok

1M2 Plesteran 1 : 4, tebal 1,5 cm


PC 50 Kg 0.125 sak
Pasir 0.024 m3
Tk Batu 0.150 hok
Pekerja 0.300 hok
Mandor 0.015 hok

68.00 M2 Plesteran 1 : 4, tebal 1,5 cm


PC 50 Kg 8.486 sak
Pasir 1.632 m3
Tk Batu 10.200 hok
Pekerja 20.400 hok
Mandor 1.020 hok

1 M2 Acian
PC 50 Kg 0.065 zak
Tk Batu 0.100 hok
Pekerja 0.200 hok
Mandor 0.010 hok

68 M2 Acian 1 m2
PC 40 Kg 4.420 zak
Tk Batu 6.800 hok
Pekerja 13.6 hok
Mandor 0.68 hok
Rekapitulasi Kebutuhan Bahan
Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total Dibulatkan
Batu Blondon 21.60 21.60 22.00
PC @ 50 kg 48.96 8.49 4.42 61.87 62.00
Pasir pas 9.79 1.63 11.42 12.00

Rekapitulasi Kebutuhan Alat dan Upah

Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total Dibulatkan
Pekerja 27.00 10.20 6.80 44.00 44.00
Tukang Batu 13.50 1.63 4.42 19.55 20.00
Mandor 1.35 20.40 13.6 35.35 36.00
Pekerja gali 21.60 21.60 22.00
sat
m3
zak
m3

sat
HOK
HOK
HOK
HOK
RENCANA ANGGARAN BIAYA DAN KEGIATAN DANA DESA (RAB-DANA DESA)
DESA ................... KECAMATAN ...............
TAHUN ANGGARAN 2018

BIDANG : Pelaksanaan Pembangunan Desa

KEGIATAN : Pembangunan Drainase/ selokan


WAKTU PELAKSANAAN :

Lokasi Kegiatan RT 02 RW 04 Desa Puspo Kecamatan Bruno

HARGA
NO URAIAN VOLUME JUMLAH ( Rp )
SATUAN ( Rp )

Kegiatan Pembangunan
Drainasi/Selokan 21,539,800
1 Belanja Barang dan Jasa 9,412,800
1.1. Operasional Kegiatan
1.1.1. ATK Kegiatan 355,800
Kertas HVS 70 gram 2 rim 49,500 99,000
Tinta Computer 1 bh 49,000 49,000
Materai 5 lbr 6,000 30,000
Materai 5 lbr 3,000 15,000
Lakban 2 glg 11,000 22,000
Data Prin Warna 3 btl 37,600 112,800
Pensil 2B 7 bh 4,000 28,000

1.1.2. Cetak Pengandaan 143,000


Foto copy 300 lbr 300 90000
Cetak Foto 3R 6 lbr 3000 18000
Jilid 5 bendel 7000 35000

1.1.2. Uang Sidang Kegiatan 790,000

Ketua 2 kli 150,000 300,000


Sekretaris 2 kli 130,000 260,000
Anggota 2 kli 115,000 230,000
1.2. Alat Kegiatan 603,000
Ember B 15 bh 26,000 390,000
Ember K 15 bh 11,000 165,000
Benang 10 glg 3,000 30,000
Paku reng 1 kg 18,000 18,000

1.3. Upah Kerja 7,521,000


Mandor 36 Hok 82,000 2,952,000
Tukang 20 Hok 75,000 1,500,000
Pekerja 44 Hok 46,500 2,046,000
Pekerja galian 22.00 Hok 46,500 1,023,000
2 Belanja Modal 12,127,000
Semen/PC 50 kg 62 zak 70,000 4,340,000
Batu Blondon 22 m3 204,500 4,499,000
Pasir Pasang 12 m3 274,000 3,288,000
JUMLAH 21,539,800