PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
JUMLAH
HARGA
(Rp.)
15,000.00
6,000.00
650.00
1,050.00
22,700.00
51,000.51
7,350.00
58,350.51
81,050.51
JUMLAH
HARGA
(Rp.)
15,000.00
6,000.00
650.00
1,050.00
22,700.00
38,500.00
12,064.00
8,903.30
59,467.30
82,167.30
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2014
No KODE BAHAN BANGUNAN SATUAN HARGA
KETERANGAN
Semen
Instalasi Listrik
DAFTAR PERALATAN
TAHUN ANGGARAN 2014