Anda di halaman 1dari 168

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DINAS CIPTA KARYA


TAHUN ANGGARAN 2017

HARGA
NO. ANALIS JENIS PEKERJAAN VOL. SAT. SATUAN UPAH (Rp) BAHAN (Rp)
(Rp)
1 100.04 Pembuatan papan nama proyek 1 x 1.2 m 1.00 bh 108,120.00 145,879.54
1.200 Pekerja 70,000.00 84,000.00
U 0.134 Tukang Kayu 90,000.00 12,060.00
P
0.134 Tukang Cat 90,000.00 12,060.00
A
H

0.043 m3 Kayu Arbise Persegian 1,900,000.00 81,700.00


B 0.300 lbr Triplek 4 mm (124X244X0.3) 75,000.00 22,500.00
A 0.256 kg Paku Reng / Usuk 21,400.00 5,478.40
H
A 0.500 kg Cat Kayu (sekualitas Bee Brand) 61,000.00 30,500.00
N 0.197 blick Tinner A 29,000.00 5,701.14

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

2 200.01 Penggalian tanah biasa (kedalaman 0,5 - 1 m) 1.00 m3 40,000.00 0.00


0.400 Tukang Gali 90,000.00 36,000.00
U 0.040 Mandor 100,000.00 4,000.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
p KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

3 200,01a Penggalian tanah biasa (kedalaman 1 - 2 m) 1.00 m3 62,530.00 0.00


0.667 Tukang Gali 90,000.00 60,030.00
U 0.025 Mandor 100,000.00 2,500.00
P
A Hal. 1 dari 168
H
U
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 2 dari 168


4 200,01b Penggalian tanah biasa (kedalaman 2 - 3 m) 1.00 m3 92,500.00 0.00
1.000 Tukang Gali 90,000.00 90,000.00
U 0.025 Mandor 100,000.00 2,500.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 3 dari 168


Penggalian tanah keras (kedalaman sampai
5 200.02 1.00 m3 108,750.00 0.00
dengan 3 m)
1.125 Tukang Gali 90,000.00 101,250.00
U 0.075 Mandor 100,000.00 7,500.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

6 200.04 Penggalian tanah lumpur 1.00 m3 110,000.00 0.00


1.500 Pekerja 70,000.00 105,000.00
U 0.050 Mandor 100,000.00 5,000.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

7 200.05 Pekerjaan buangan tanah / lumpur 1.00 m3 24,100.00 0.00


0.330 Pekerja 70,000.00 23,100.00
U 0.010 Mandor 100,000.00 1,000.00
P
A
H

B
A
H
A
N

Hal. 4 dari 168


H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 5 dari 168


8 200.06 Pengurugan kembali bekas galian 1.00 m3 15,340.00 0.00
0.192 Pekerja 70,000.00 13,440.00
U 0.019 Mandor 100,000.00 1,900.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

9 200.07 Pengurugan tanah 1.00 m3 21,250.00 122,040.00


0.225 Tukang Gali 90,000.00 20,250.00
U 0.010 Mandor 100,000.00 1,000.00
P
A
H

1.200 m3 Tanah Urug 101,700.00 122,040.00


B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

10 200.08 Pengurugan sirtu 1.00 m3 20,250.00 138,720.00


0.275 Pekerja 70,000.00 19,250.00
U 0.010 Mandor 100,000.00 1,000.00
P
A
H

1.200 m3 Sirtu 115,600.00 138,720.00


B
A
H
A
N

Hal. 6 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 7 dari 168


11 200.09 Pengurugan pasir 1.00 m3 22,000.00 114,240.00
0.300 Pekerja 70,000.00 21,000.00
U 0.010 Mandor 100,000.00 1,000.00
P
A
H

1.200 m3 Pasir Urug 95,200.00 114,240.00


B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

12 200,10 Pemadatan tanah (tiap 20 cm) 1.00 m2 40,000.00 0.00


0.500 Pekerja 70,000.00 35,000.00
U 0.050 Mandor 100,000.00 5,000.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

13 210,01 Pemasangan cerucuk bambu 1.00 m1 58,000.00 0.00


0.400 Pekerja 70,000.00 28,000.00
U 0.300 Tukang Kayu 90,000.00 27,000.00
P
0.030 Mandor 100,000.00 3,000.00
A
H

B
A
H
A
N

Hal. 8 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 9 dari 168


14 220,01 Bongkaran pasangan dinding bata / batu 1.00 m3 463,320.00 0.00
6.000 Pekerja 70,000.00 420,000.00
U 0.433 Mandor 100,000.00 43,320.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

15 250.01 Pemasangan batu kosong 1.00 m3 103,400.00 271,925.26


1.370 Pekerja 70,000.00 95,900.00
U 0.075 Mandor 100,000.00 7,500.00
P
A
H

1.300 m3 Batu Pecah 15-20 192,600.00 250,380.00


B 0.226 m3 Pasir Urug 95,200.00 21,545.26
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Pemasangan cycloop + 40% batu kali (adukan


16 250,01a 1.00 m3 607,800.00 530,305.00
1:3:5)
5.540 Pekerja 70,000.00 387,800.00
U 1.000 Tukang Batu 90,000.00 90,000.00
P
1.000 Kepala Tukang 100,000.00 100,000.00
A
H 0.300 Mandor 100,000.00 30,000.00

0.980 zak Semen PC 50 kg 70,000.00 68,600.00


B 0.400 m3 Pasir Beton / Pasir Aspal 278,200.00 111,280.00
A 0.650 m3 Batu Pecah 2-3 (mesin) 331,700.00 215,605.00
H
A 0.700 m3 Batu Pecah 15-20 192,600.00 134,820.00
N

Hal. 10 dari 168


H
A
N

0.660 jam Concrete Mixer 0,125 m3 40,000.00


A 0.062 jam Concrete Vibrator 30,000.00
L
0.062 ls Alat Bantu 0.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 11 dari 168


17 250.02 Pemasangan batu kali 1:3 1.00 m3 348,130.00 594,004.20
3.218 Pekerja 70,000.00 225,260.00
U 1.073 Tukang Batu 90,000.00 96,570.00
P
0.107 Kepala Tukang 100,000.00 10,700.00
A
H 0.156 Mandor 100,000.00 15,600.00

1.200 m3 Batu Pecah 15-20 192,600.00 231,120.00


B 3.624 zak Semen PC 50 kg 70,000.00 253,680.00
A 0.486 m3 Pasir Pasang 224,700.00 109,204.20
H
A
N

0.300 jam Concrete Mixer 0,125 m3 40,000.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

18 250.03 Pemasangan batu kali 1:4 1.00 m3 172,500.00 556,904.00


1.500 Pekerja 70,000.00 105,000.00
U 0.600 Tukang Batu 90,000.00 54,000.00
P
0.060 Kepala Tukang 100,000.00 6,000.00
A
H 0.075 Mandor 100,000.00 7,500.00

1.100 m3 Batu Pecah 15-20 192,600.00 211,860.00


B 3.260 zak Semen PC 50 kg 70,000.00 228,200.00
A 0.520 m3 Pasir Pasang 224,700.00 116,844.00
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

19 250.04 Pemasangan batu kali 1:5 1.00 m3 172,500.00 524,496.80


1.500 Pekerja 70,000.00 105,000.00
U 0.600 Tukang Batu 90,000.00 54,000.00
P
0.060 Kepala Tukang 100,000.00 6,000.00
A
H 0.075 Mandor 100,000.00 7,500.00

1.100 m3 Batu Pecah 15-20 192,600.00 211,860.00


B 2.720 zak Semen PC 50 kg 70,000.00 190,400.00
A 0.544 m3 Pasir Pasang 224,700.00 122,236.80
H
A
N

Hal. 12 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 13 dari 168


20 250,10 Pemasangan bata merah 1:5(1 bata) 1.00 m2 68,500.00 170,044.00
0.650 Pekerja 70,000.00 45,500.00
U 0.200 Tukang Batu 90,000.00 18,000.00
P
0.020 Kepala Tukang 100,000.00 2,000.00
A
H 0.030 Mandor 100,000.00 3,000.00

140.000 bh Bata Merah 800.00 112,000.00


B 0.444 zak Semen PC 50 kg 70,000.00 31,080.00
A 0.120 m3 Pasir Pasang 224,700.00 26,964.00
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

21 250.11 Pemasangan bata merah 1:4 1.00 m2 33,900.00 81,762.10


0.320 Pekerja 70,000.00 22,400.00
U 0.100 Tukang Batu 90,000.00 9,000.00
P
0.010 Kepala Tukang 100,000.00 1,000.00
A
H 0.015 Mandor 100,000.00 1,500.00

70.000 bh Bata Merah 800.00 56,000.00


B 0.230 zak Semen PC 50 kg 70,000.00 16,100.00
A 0.043 m3 Pasir Pasang 224,700.00 9,662.10
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

22 250.12 Pemasangan bata merah 1:5 (1/2 bata) 1.00 m2 33,900.00 79,663.50
0.320 Pekerja 70,000.00 22,400.00
U 0.100 Tukang Batu 90,000.00 9,000.00
P
0.010 Kepala Tukang 100,000.00 1,000.00
A
H 0.015 Mandor 100,000.00 1,500.00

70.000 bh Bata Merah 800.00 56,000.00


B 0.194 zak Semen PC 50 kg 70,000.00 13,552.00
A 0.045 m3 Pasir Pasang 224,700.00 10,111.50
H
A
N

Hal. 14 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 15 dari 168


23 260.01 Plesteran 1:2 1.00 m2 41,230.00 18,869.90
0.380 Pekerja 70,000.00 26,600.00
U 0.127 Tukang Batu 90,000.00 11,430.00
P
0.013 Kepala Tukang 100,000.00 1,300.00
A
H 0.019 Mandor 100,000.00 1,900.00

0.215 zak Semen PC 50 kg 70,000.00 15,050.00


B 0.017 m3 Pasir Pasang 224,700.00 3,819.90
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

24 260.02 Plesteran 1:3 1.00 m2 41,230.00 15,679.30


0.380 Pekerja 70,000.00 26,600.00
U 0.127 Tukang Batu 90,000.00 11,430.00
P
0.013 Kepala Tukang 100,000.00 1,300.00
A
H 0.019 Mandor 100,000.00 1,900.00

0.163 zak Semen PC 50 kg 70,000.00 11,410.00


B 0.019 m3 Pasir Pasang 224,700.00 4,269.30
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

25 260.03 Plesteran 1:4 1.00 m2 30,000.00 11,774.00


0.200 Pekerja 70,000.00 14,000.00
U 0.150 Tukang Batu 90,000.00 13,500.00
P
0.015 Kepala Tukang 100,000.00 1,500.00
A
H 0.010 Mandor 100,000.00 1,000.00

0.104 zak Semen PC 50 kg 70,000.00 7,280.00


B 0.020 m3 Pasir Pasang 224,700.00 4,494.00
A
H
A
N

Hal. 16 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 17 dari 168


26 260.04 Plesteran 1:5 1.00 m2 30,000.00 10,991.40
0.200 Pekerja 70,000.00 14,000.00
U 0.150 Tukang Batu 90,000.00 13,500.00
P
0.015 Kepala Tukang 100,000.00 1,500.00
A
H 0.010 Mandor 100,000.00 1,000.00

0.086 zak Semen PC 50 kg 70,000.00 6,048.00


B 0.022 m3 Pasir Pasang 224,700.00 4,943.40
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

27 270,01 Pekerjaan siar batu (adukan 1:2) 1.00 m2 18,300.00 9,615.20


0.150 Pekerja 70,000.00 10,500.00
U 0.070 Tukang Batu 90,000.00 6,300.00
P
0.007 Kepala Tukang 100,000.00 700.00
A
H 0.008 Mandor 100,000.00 800.00

0.086 zak Semen PC 50 kg 70,000.00 6,020.00


B 0.016 m3 Pasir Pasang 224,700.00 3,595.20
A
H
A
N

0.006 jam Concrete Mixer 0,125 m3 40,000.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

28 300.01 Pemasangan beton 1:2:3 (Mutu K-175) 1.00 m3 148,500.00 728,190.00


1.650 Pekerja 70,000.00 115,500.00
U 0.250 Tukang Batu 90,000.00 22,500.00
P
0.025 Kepala Tukang 100,000.00 2,500.00
A
H 0.080 Mandor 100,000.00 8,000.00

0.780 m3 Batu Pecah 2-3 (mesin) 331,700.00 258,726.00


B 0.520 m3 Pasir Beton / Pasir Aspal 278,200.00 144,664.00
A 4.640 zak Semen PC 50 kg 70,000.00 324,800.00
H
A
N

Hal. 18 dari 168


0.660 jam Concrete Mixer 0,125 m3 40,000.00
A 0.062 jam Concrete Vibrator 30,000.00
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 19 dari 168


29 300,01a Pemasangan beton 1 : 1,5 : 2,5(Mutu K-225) 1.00 m3 148,500.00 853,693.41
1.650 Pekerja 70,000.00 115,500.00
U 0.250 Tukang Batu 90,000.00 22,500.00
P
0.025 Kepala Tukang 100,000.00 2,500.00
A
H 0.080 Mandor 100,000.00 8,000.00

0.580 m3 Batu Pecah 2-3 (mesin) 331,700.00 192,386.00


B 0.420 m3 Pasir Beton / Pasir Aspal 278,200.00 116,844.00
A 7.778 zak Semen PC 50 kg 70,000.00 544,463.41
H
A
N

0.660 jam Concrete Mixer 0,125 m3 40,000.00


A 0.062 jam Concrete Vibrator 30,000.00
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

30 300.02 Pemasangan beton tumbuk 1:3:5 1.00 m3 145,500.00 630,737.00


1.650 Pekerja 70,000.00 115,500.00
U 0.250 Tukang Batu 90,000.00 22,500.00
P
0.025 Kepala Tukang 100,000.00 2,500.00
A
H 0.050 Mandor 100,000.00 5,000.00

4.360 zak Semen PC 50 kg 70,000.00 305,200.00


B 0.520 m3 Pasir Beton / Pasir Aspal 278,200.00 144,664.00
A 0.870 m3 Koral Beton 207,900.00 180,873.00
H
A
N

0.660 jam Concrete Mixer 0,125 m3 40,000.00


A 0.062 jam Concrete Vibrator 30,000.00
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

31 300.03 Pemasangan beton tumbuk 1:3:6 1.00 m3 145,500.00 707,190.02


1.650 Pekerja 70,000.00 115,500.00
U 0.250 Tukang Batu 90,000.00 22,500.00
P
0.025 Kepala Tukang 100,000.00 2,500.00
A
H 0.050 Mandor 100,000.00 5,000.00

3.158 zak Semen PC 50 kg 70,000.00 221,089.02


B 0.555 m3 Pasir Beton / Pasir Aspal 278,200.00 154,401.00
A 1.000 m3 Batu Pecah 2-3 (mesin) 331,700.00 331,700.00
H
A
N

Hal. 20 dari 168


0.660 jam Concrete Mixer 0,125 m3 40,000.00
A 0.062 jam Concrete Vibrator 30,000.00
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 21 dari 168


32 300,20 Pemasangan bekisting plat beton 1.00 m2 55,800.00 428,121.49
0.300 Pekerja 70,000.00 21,000.00
U 0.330 Tukang Kayu 90,000.00 29,700.00
P
0.033 Kepala Tukang 100,000.00 3,300.00
A
H 0.018 Mandor 100,000.00 1,800.00

0.065 m3 Kayu Arbise Persegian 1,900,000.00 123,500.00


B 0.600 bh Paku Biasa 2-5" 16,100.00 9,660.00
A 0.100 ltr Minyak Bekisting 17,700.00 1,770.00
H
A 0.020 m3 Kayu Papan Cor 1,900,000.00 38,000.00
N 0.434 lbr Triplek 4 mm (120X240X4) 81,000.00 35,191.49
4.000 btg Kayu Dolken dia 8 cm - 4 m 55,000.00 220,000.00

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

33 300.21 Pemasangan bekisting sloop 1.00 m2 52,000.00 33,420.00


0.300 Pekerja 70,000.00 21,000.00
U 0.260 Tukang Kayu 90,000.00 23,400.00
P
0.026 Kepala Tukang 100,000.00 2,600.00
A
H 0.050 Mandor 100,000.00 5,000.00

0.015 m3 Kayu papan cor 1,800,000.00 27,000.00


B 0.300 kg Paku Reng / Usuk 21,400.00 6,420.00
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

34 300.23 Pemasangan bekisting untuk kolom / balok 1.00 m2 56,000.00 232,570.00


0.320 Pekerja 70,000.00 22,400.00
U 0.330 Tukang Kayu 90,000.00 29,700.00
P
0.033 Kepala Tukang 100,000.00 3,300.00
A
H 0.006 Mandor 100,000.00 600.00

0.058 m3 Kayu papan cor 1,800,000.00 104,400.00


B 0.400 kg Paku Reng / Usuk 21,400.00 8,560.00
A 0.350 lbr Triplek 4 mm (124X244X0.3) 75,000.00 26,250.00
H
A 2.000 btg Kayu Dolken dia 5 cm - 4 m 45,000.00 90,000.00
N 1.200 m2 Plastik 0,7 mg 2,800.00 3,360.00

Hal. 22 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 23 dari 168


35 300,30 Besi beton terpasang (1 kg) 1.00 kg 2,120.00 13,641.25
0.0070 Pekerja 70,000.00 490.00
U 0.0070 Tukang Besi 90,000.00 630.00
P
0.0070 Kepala Tukang 100,000.00 700.00
A
H 0.0030 Mandor 100,000.00 300.00

1.067 kg Besi Beton U24 12,700.00 13,553.44


B 0.005 kg Kawat Beton 16,100.00 87.81
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Pemasangan Plat Duicker Beton Bertulang ( 20


36 ABK-PLP-BT 1.00 m2 101,900.00 949,008.00
cm)
0.596 Pekerja 70,000.00 41,720.00
U 0.035 Tukang Batu 90,000.00 3,150.00
P 0.280 Tukang Kayu 90,000.00 25,200.00
A 0.280 Tukang Besi 90,000.00 25,200.00
H 0.046 Kepala Tukang 100,000.00 4,550.00
0.021 Mandor 100,000.00 2,080.00
0.080 m3 Kayu papan cor 1,800,000.00 144,000.00
0.800 kg Paku Reng / Usuk 21,400.00 17,120.00
B 5.600 ltr Oli SAE 20 25,000.00 140,000.00
A 36.400 kg Besi Beton U24 12,700.00 462,280.00
H
A 0.900 kg Kawat Beton 16,100.00 14,490.00
N 1.292 zak Semen PC 50 kg 70,000.00 90,440.00
0.104 m3 Pasir Beton / Pasir Aspal 278,200.00 28,932.80
0.156 m3 Batu Pecah 2-3 (mesin) 331,700.00 51,745.20

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Pemasangan Plat Duicker Beton Bertulang ( 15 )


37 ABK-PLP-BT 1.00 m2 76,425.00 606,756.00
cm
0.447 Pekerja 70,000.00 31,290.00
U 0.026 Tukang Batu 90,000.00 2,362.50
P 0.210 Tukang Kayu 90,000.00 18,900.00
A 0.210 Tukang Besi 90,000.00 18,900.00
H 0.034 Kepala Tukang 100,000.00 3,412.50
0.016 Mandor 100,000.00 1,560.00
Hal. 24 dari 168
0.060 m3 Kayu papan cor 1,800,000.00 108,000.00
0.600 kg Paku Reng / Usuk 21,400.00 12,840.00
B
A 27.300 kg Besi Beton U24 12,700.00 346,710.00
H 0.675 kg Kawat Beton 16,100.00 10,867.50
A 0.969 zak Semen PC 50 kg 70,000.00 67,830.00
N
0.078 m3 Pasir Beton / Pasir Aspal 278,200.00 21,699.60
0.117 m3 Batu Pecah 2-3 (mesin) 331,700.00 38,808.90

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 25 dari 168


Pemasangan Plat Duicker Beton Bertulang ( 10
38 ABK-PLP-BT 1.00 m2 50,950.00 404,504.00
cm)
0.298 Pekerja 70,000.00 20,860.00
U 0.018 Tukang Batu 90,000.00 1,575.00
P 0.140 Tukang Kayu 90,000.00 12,600.00
A 0.140 Tukang Besi 90,000.00 12,600.00
H 0.023 Kepala Tukang 100,000.00 2,275.00
0.010 Mandor 100,000.00 1,040.00
0.040 m3 Kayu papan cor 1,800,000.00 72,000.00
0.400 kg Paku Reng / Usuk 21,400.00 8,560.00
B
A 18.200 kg Besi Beton U24 12,700.00 231,140.00
H 0.450 kg Kawat Beton 16,100.00 7,245.00
A 0.646 zak Semen PC 50 kg 70,000.00 45,220.00
N
0.052 m3 Pasir Beton / Pasir Aspal 278,200.00 14,466.40
0.078 m3 Batu Pecah 2-3 (mesin) 331,700.00 25,872.60

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

39 ABK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 8 cm) 1.00 m2 40,760.00 323,603.20

0.238 Pekerja 70,000.00 16,688.00


U 0.014 Tukang Batu 90,000.00 1,260.00
P 0.112 Tukang Kayu 90,000.00 10,080.00
A 0.112 Tukang Besi 90,000.00 10,080.00
H 0.018 Kepala Tukang 100,000.00 1,820.00
0.008 Mandor 100,000.00 832.00
0.032 m3 Kayu papan cor 1,800,000.00 57,600.00
0.320 kg Paku Reng / Usuk 21,400.00 6,848.00
B
A 14.560 kg Besi Beton U24 12,700.00 184,912.00
H 0.360 kg Kawat Beton 16,100.00 5,796.00
A 0.517 zak Semen PC 50 kg 70,000.00 36,176.00
N
0.042 m3 Pasir Beton / Pasir Aspal 278,200.00 11,573.12
0.062 m3 Batu Pecah 2-3 (mesin) 331,700.00 20,698.08

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Pemasangan Plat Duicker Beton Bertulang ( 12


40 ABK-PLP-BT 1.00 m2 61,140.00 485,404.80
cm)
0.358 Pekerja 70,000.00 25,032.00
U 0.021 Tukang Batu 90,000.00 1,890.00
P 0.168 Tukang Kayu 90,000.00 15,120.00
A 0.168 Tukang Besi 90,000.00 15,120.00
H
Hal. 26 dari 168
U
P
A
H 0.027 Kepala Tukang 100,000.00 2,730.00
0.012 Mandor 100,000.00 1,248.00
0.048 m3 Kayu papan cor 1,800,000.00 86,400.00
0.480 kg Paku Reng / Usuk 21,400.00 10,272.00
B
A 21.840 kg Besi Beton U24 12,700.00 277,368.00
H 0.540 kg Kawat Beton 16,100.00 8,694.00
A 0.775 zak Semen PC 50 kg 70,000.00 54,264.00
N
0.062 m3 Pasir Beton / Pasir Aspal 278,200.00 17,359.68
0.094 m3 Batu Pecah 2-3 (mesin) 331,700.00 31,047.12

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 27 dari 168


41 AC Acian Dinding 1.00 m2 15,050.00 4,200.00
0.100 Pekerja 70,000.00 7,000.00
U 0.075 Tukang Batu 90,000.00 6,750.00
P 0.008 Kepala Tukang 100,000.00 800.00
A 0.005 Mandor 100,000.00 500.00
H

0.060 Semen PC 50 kg 70,000.00 4,200.00


B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

42 650,90 Pemasangan paving block tebal 6 cm (abu-abu) 1.00 m2 28,500.00 54,224.00

0.250 Pekerja 70,000.00 17,500.00


U 0.100 Tukang Batu 90,000.00 9,000.00
P
0.010 Kepala Tukang 100,000.00 1,000.00
A
H 0.010 Mandor 100,000.00 1,000.00

1.000 m2 Paving Block 6 cm (abu-abu) 42,800.00 42,800.00


B 0.120 m3 Pasir Urug 95,200.00 11,424.00
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

43 650.91 Pemasangan paving block tebal 6 cm (warna) 1.00 m2 28,500.00 59,624.00

0.250 Pekerja 70,000.00 17,500.00


U 0.100 Tukang Batu 90,000.00 9,000.00
P
0.010 Kepala Tukang 100,000.00 1,000.00
A
H 0.010 Mandor 100,000.00 1,000.00

1.000 m2 Paving Block 6 cm (warna) 48,200.00 48,200.00


B 0.120 m3 Pasir Urug 95,200.00 11,424.00
A
H
A
Hal. 28 dari 168
N
B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 29 dari 168


44 950,20a Pemasangan buis beton dia. 20 cm 1.00 m' 17,416.68 90,387.19
0.132 Pekerja 70,000.00 9,216.68
U 0.080 Tukang Batu 90,000.00 7,200.00
P
0.010 Mandor 100,000.00 1,000.00
A
H

1.000 bh Buis Beton dia. 20 cm -1m' 65,600.00 65,600.00


B 0.005 zak Semen PC 50 kg 70,000.00 337.79
A 0.002 m3 Pasir Pasang 224,700.00 449.40
H
A 30.000 bh Bata Merah 800.00 24,000.00
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

45 950,20b Pemasangan buis beton dia. 30 cm 1.00 m' 14,640.00 123,242.20


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

1.000 bh Buis Beton dia. 30 cm -1m' 69,600.00 69,600.00


B 0.180 zak Semen PC 50 kg 70,000.00 12,600.00
A 0.026 m3 Pasir Pasang 224,700.00 5,842.20
H
A 44.000 bh Bata Merah 800.00 35,200.00
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

46 950,20c Pemasangan buis beton dia. 40 cm 1.00 m' 14,640.00 143,342.20


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

1.000 bh Buis Beton dia. 40 cm -1m' 89,700.00 89,700.00


B 0.180 zak Semen PC 50 kg 70,000.00 12,600.00
A 0.026 m3 Pasir Pasang 224,700.00 5,842.20
H
A 44.000 bh Bata Merah 800.00 35,200.00
N

Hal. 30 dari 168


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 31 dari 168


47 950,20d Pemasangan buis beton (gravel) ½ dia. 20 cm 1.00 m' 7,320.00 89,896.40
0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

1.000 bh Buis Beton ½ dia. 20 cm -1m' 65,600.00 65,600.00


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A 20.000 bh Bata Merah 800.00 16,000.00
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

48 950,20e Pemasangan buis beton (grevel) ½ dia. 30 cm 1.00 m' 7,320.00 96,421.10
0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

1.000 bh Buis Beton ½ dia. 30 cm -1m' 69,600.00 69,600.00


B 0.090 zak Semen PC 50 kg 70,000.00 6,300.00
A 0.013 m3 Pasir Pasang 224,700.00 2,921.10
H
A 22.000 bh Bata Merah 800.00 17,600.00
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

49 BK.30 Pemasangan bak kontrol 30x30x35 cm 1.00 bh 227,100.00 130,658.00


3.200 Pekerja 70,000.00 224,000.00
U 0.015 Tukang Batu 90,000.00 1,350.00
P
0.002 Kepala Tukang 100,000.00 150.00
A
H 0.016 Mandor 100,000.00 1,600.00

0.880 zak Semen PC 50 kg 70,000.00 61,600.00


0.060 m3 Pasir Beton / Pasir Aspal 278,200.00 16,692.00
B
A 0.070 m3 Pasir Pasang 224,700.00 15,729.00
H 0.070 m3 Koral Beton 207,900.00 14,553.00
A 1.600 kg Besi Beton U24 12,700.00 20,320.00
N
2.205 bh Bata Merah 800.00 1,764.00

Hal. 32 dari 168


A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 33 dari 168


50 BK.50 Pemasangan bak kontrol 45X45X50 cm 1.00 bh 153,770.00 205,463.80
1.420 Pekerja 70,000.00 99,400.00
U 0.473 Tukang Batu 90,000.00 42,570.00
P
0.047 Kepala Tukang 100,000.00 4,700.00
A
H 0.071 Mandor 100,000.00 7,100.00

1.540 zak Semen PC 50 kg 70,000.00 107,800.00


0.090 m3 Pasir Beton / Pasir Aspal 278,200.00 25,038.00
B
A 0.130 m3 Pasir Pasang 224,700.00 29,211.00
H 0.020 m3 Koral Beton 207,900.00 4,158.00
A 2.600 kg Besi Beton U24 12,700.00 33,020.00
N
7.796 bh Bata Merah 800.00 6,236.80

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

51 950,20f Pekerjaan kurasan saluran terbuka 1.00 m3 51,100.00 0.00


0.025 Mandor 100,000.00 2,500.00
U 0.540 Tukang Gali 90,000.00 48,600.00
P
A
H

B
A
H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

52 950,20g Pekerjaan kurasan saluran tertutup 1.00 m3 102,200.00 0.00


0.050 Mandor 100,000.00 5,000.00
U 1.080 Tukang Gali 90,000.00 97,200.00
P
A
H

B
A
H
A
N

Hal. 34 dari 168


H
A
N

A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 35 dari 168


53 PL Pembuatan plat beton bertulang (160.08) 140x140 1.00 m3 306,200.00 2,105,319.49
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 20 cm) 101,900.00 949,008.00
300,20 Pemasangan bekisting plat beton 1.00 55,800.00 428,121.49
54 PL-125 Pembuatan plat beton bertulang 125 1.00 m3 280,725.00 1,763,067.49
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 15 ) cm 76,425.00 606,756.00
300,20 Pemasangan bekisting plat beton 1.00 55,800.00 428,121.49
55 PL-100 Pembuatan plat beton bertulang 100 1.00 m3 255,250.00 1,560,815.49
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 10 cm) 50,950.00 404,504.00
300,20 Pemasangan bekisting plat beton 1.00 55,800.00 428,121.49

56 SL-125 Pembuatan sloof beton bertulang 125 1.00 m3 250,925.00 1,351,656.00


300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 15 ) cm 76,425.00 606,756.00
300.210 Pemasangan bekisting sloop (50%) 3.00 26,000.00 16,710.00
57 SL-100 Pembuatan sloof beton bertulang 100 1.00 m3 225,450.00 1,149,404.00
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 10 cm) 50,950.00 404,504.00
300.210 Pemasangan bekisting sloop (50%) 3.00 26,000.00 16,710.00

58 KS-150 Pembuatan kolom struktur beton bertulang 150 1.00 m3 306,400.00 1,909,768.00
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 20 cm) 101,900.00 949,008.00
300.230 Pemasangan bekisting untuk kolom / balok 3.00 56,000.00 232,570.00
59 KS-125 Pembuatan kolom struktur beton bertulang 125 1.00 m3 280,925.00 1,567,516.00
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 15 ) cm 76,425.00 606,756.00
300.230 Pemasangan bekisting untuk kolom / balok 3.00 56,000.00 232,570.00

60 BS-150 Pembuatan balok struktur beton bertulang 150 1.00 m3 306,400.00 1,909,768.00
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 20 cm) 101,900.00 949,008.00
300.230 Pemasangan bekisting untuk kolom / balok 3.00 56,000.00 232,570.00
61 BS-125 Pembuatan balok struktur beton bertulang 125 1.00 m3 280,925.00 1,567,516.00
300.010 Pemasangan beton 1:2:3 (Mutu K-175) 148,500.00 728,190.00
BK-PLP-BT Pemasangan Plat Duicker Beton Bertulang ( 15 ) cm 76,425.00 606,756.00
300.230 Pemasangan bekisting untuk kolom / balok 3.00 56,000.00 232,570.00

Pengadaan kerikil sungai tidak disaring


62 K,012 360.00 m3 6,390,000.00 41,707,520.00
(menggunakan alat)
1.000 Mandor 100,000.00 100,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P
18.000 Supir Terampil 150,000.00 2,700,000.00
A
H 18.000 Pembantu Supir 120,000.00 2,160,000.00
8.000 Buruh Tak Terampil 70,000.00 560,000.00

360.000 m3 Sirtu 115,600.00 41,616,000.00


B 0.320 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 91,520.00
A
H
A
N

9.000 jam Buldozer 100 HP 540,000.00


A
L Hal. 36 dari 168
A
A 108.000 jam Dump Truck 5 ton 150,000.00
L
6.000 jam Loader Wheel 30 ton 95 MP 540,000.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M3 :

Hal. 37 dari 168


Pengadaan kerikil sungai tidak disaring
63 K,013 60.00 m3 5,750,000.00 7,622,400.00
(menggunakan buruh)
2.000 Mandor 100,000.00 200,000.00
U 5.000 Supir Terampil 150,000.00 750,000.00
P 5.000 Pembantu Supir 120,000.00 600,000.00
A 60.000 Buruh Tak Terampil 70,000.00 4,200,000.00
H

60.000 m3 Sirtu 115,600.00 6,936,000.00


B 2.400 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 686,400.00
A
H
A
N

30.000 jam Plat Bed Truck 4 ton 410,000.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M3 :

64 K,016 Pengadaan kerikil sungai tersaring 60.00 m3 2,510,000.00 9,316,640.00


1.000 Mandor 100,000.00 100,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 4.000 Supir Terampil 150,000.00 600,000.00
A 4.000 Pembantu Supir 120,000.00 480,000.00
H 4.000 Buruh Tak Terampil 70,000.00 280,000.00
2.000 Buruh Terampil 90,000.00 180,000.00

80.000 m3 Sirtu 115,600.00 9,248,000.00


B 0.240 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 68,640.00
A
H
A
N

2.000 jam Buldozer 100 HP 540,000.00


A 5.000 jam Loader Wheel 30 ton 95 MP 540,000.00
L
24.000 jam Dump Truck 5 ton 150,000.00
A
T 6.000 jam Screening Plant HP 80 400,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M3 :

Hal. 38 dari 168


Produksi batu pecah tersaring menggunakan batu
65 K,017 40.00 m3 3,050,000.00 19,337,200.00
sungai (dgn alat)
1.000 Mandor 100,000.00 100,000.00
4.000 Operator Terampil 170,000.00 680,000.00
U 4.000 Pembantu Operator 120,000.00 480,000.00
P 4.000 Supir Terampil 150,000.00 600,000.00
A 4.000 Pembantu Supir 120,000.00 480,000.00
H 5.000 Buruh Tak Terampil 70,000.00 350,000.00
4.000 Buruh Terampil 90,000.00 360,000.00

80.000 m3 Kerikil Sungai Royalti 241,000.00 19,280,000.00


B 0.200 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 57,200.00
A
H
A
N

2.000 jam Buldozer 100 HP 540,000.00


A 6.000 jam Loader Wheel 30 ton 95 MP 540,000.00
L
24.000 jam Dump Truck 5 ton 150,000.00
A
T 4.000 jam Stone Cruisher 30 ton 540,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M3 :

Aspal beton untuk lapis pondasi atas (laston atas)


66 K,026 100.00 ton 2,740,000.00 112,004,720.00
produksi & suplai (dgn alat)
1.000 Mandor 100,000.00 100,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 4.000 Supir Terampil 150,000.00 600,000.00
A 4.000 Pembantu Supir 120,000.00 480,000.00
H 6.000 Buruh Tak Terampil 70,000.00 420,000.00
3.000 Buruh Terampil 90,000.00 270,000.00

24.000 m3 Pasir Ayak (untuk beton) 270,000.00 6,480,000.00


6,000.000 kg Aspal Curah 12,900.00 77,400,000.00
B
A 37.000 zak Semen PC 50 kg 70,000.00 2,590,000.00
H 2.000 m3 Kapur Hidarasi 152,000.00 304,000.00
A 0.240 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 68,640.00
N
31.000 m3 Pengadaan Kerikil Sungai 811,680.00 25,162,080.00

2.000 jam Loader Wheel 30 ton 95 MP 540,000.00


A 6.000 jam AMP (Asphalt Mixing Plant) 5,320,000.00
L
24.000 jam Dump Truck 5 ton 150,000.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER TON :

Hal. 39 dari 168


Lapis tipis aspal beton (lataston) produksi dan
67 K,035 100.00 ton 2,740,000.00 127,323,440.00
suplai (dgn alat)
1.000 Mandor 100,000.00 100,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 4.000 Supir Terampil 150,000.00 600,000.00
A 4.000 Pembantu Supir 120,000.00 480,000.00
H 6.000 Buruh Tak Terampil 70,000.00 420,000.00
3.000 Buruh Terampil 90,000.00 270,000.00

31.000 m3 Pasir Ayak (untuk beton) 270,000.00 8,370,000.00


7,300.000 kg Aspal Curah 12,900.00 94,170,000.00
B
A 90.000 zak Semen PC 50 kg 70,000.00 6,300,000.00
H 1.000 m3 Kapur Hidarasi 152,000.00 152,000.00
A 0.240 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 68,640.00
N
22.500 m3 Batu pecah tersaring bergradasi 811,680.00 18,262,800.00

5.000 jam Loader Wheel 30 ton 95 MP 540,000.00


A 5.000 jam AMP (Asphalt Mixing Plant) 5,320,000.00
L
24.000 jam Dump Truck 5 ton 150,000.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER TON :

Lapis tipis aspal beton ( AC lataston) produksi dan


68 K,035a 100.00 ton 2,740,000.00 120,873,440.00
suplai (dgn alat)
1.000 Mandor 100,000.00 100,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 4.000 Supir Terampil 150,000.00 600,000.00
A 4.000 Pembantu Supir 120,000.00 480,000.00
H 6.000 Buruh Tak Terampil 70,000.00 420,000.00
3.000 Buruh Terampil 90,000.00 270,000.00

31.000 m3 Pasir Ayak (untuk beton) 270,000.00 8,370,000.00


6,800.000 kg Aspal Curah 12,900.00 87,720,000.00
B
A 90.000 zak Semen PC 50 kg 70,000.00 6,300,000.00
H 1.000 m3 Kapur Hidarasi 152,000.00 152,000.00
A 0.240 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 68,640.00
N
22.500 m3 Batu pecah tersaring bergradasi 811,680.00 18,262,800.00

5.000 jam Loader Wheel 30 ton 95 MP 540,000.00


A 5.000 jam AMP (Asphalt Mixing Plant) 5,320,000.00
L
24.000 jam Dump Truck 5 ton 150,000.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER TON :

Hal. 40 dari 168


69 K,040 Aspal beton produksi & suplai (dgn alat) 100.00 ton 2,740,000.00 120,529,840.00
1.000 Mandor 100,000.00 100,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 4.000 Supir Terampil 150,000.00 600,000.00
A 4.000 Pembantu Supir 120,000.00 480,000.00
H 6.000 Buruh Tak Terampil 70,000.00 420,000.00
3.000 Buruh Terampil 90,000.00 270,000.00

27.000 m3 Pasir Ayak (untuk beton) 270,000.00 7,290,000.00


B 6,500.000 kg Aspal Curah 12,900.00 83,850,000.00
A 100.000 zak Semen PC 50 kg 70,000.00 7,000,000.00
H
A 0.240 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 68,640.00
N 27.500 m3 Batu pecah tersaring bergradasi 811,680.00 22,321,200.00

5.000 jam Loader Wheel 30 ton 95 MP 540,000.00


A 5.000 jam AMP (Asphalt Mixing Plant) 5,320,000.00
L
24.000 jam Dump Truck 5 ton 150,000.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER TON :

70 K,620 Lapis aspal pelekat (tack coat) 2,200.00 m2 480,000.00 6,021,380.00


0.500 Mandor 100,000.00 50,000.00
U 1.000 Operator Terampil 170,000.00 170,000.00
P
1.000 Pembantu Operator 120,000.00 120,000.00
A
H 2.000 Buruh Tak Terampil 70,000.00 140,000.00

106.000 ltr Minyak Tanah (Kerosin) 12,900.00 1,367,400.00


B 359.000 kg Aspal Curah 12,900.00 4,631,100.00
A 0.080 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 22,880.00
H
A
N

2.500 jam Asphalt Sprayer 180,000.00


A 2.500 jam Air Compressor 110,000.00
L
5.000 jam Blower 30,000.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

Hal. 41 dari 168


Penghamparan lapis pondasi atas aspal beton
71 K,528 45.00 m3 2,820,000.00 154,744,500.00
(laston atas - dgn alat)
1.000 Mandor 100,000.00 100,000.00
U 4.000 Operator Terampil 170,000.00 680,000.00
P 4.000 Pembantu Operator 120,000.00 480,000.00
A 12.000 Buruh Tak Terampil 70,000.00 840,000.00
H 8.000 Buruh Terampil 90,000.00 720,000.00

100.000 ton Laston Atas 1,513,447.20 151,344,720.00


B 0.600 m3 Pasir Ayak (untuk beton) 270,000.00 162,000.00
A 180.000 kg Aspal Penetrasi 60-70 14,000.00 2,520,000.00
H
A 45.000 ltr Minyak Tanah (Kerosin) 12,900.00 580,500.00
N 0.480 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 137,280.00

4.000 jam Air Compressor 110,000.00


A 5.000 jam Asphalt Finisher 540,000.00
L 3.000 jam Asphalt Sprayer 180,000.00
A 5.000 jam Pneumatic Roller 8 - 15 ton 540,000.00
T 5.000 jam Three Wheel Roller 6 - 8 ton 370,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M3 :
JUMLAH HARGA PER TON :

Penghamparan lapis tipis aspal beton (lataston -


72 K,636 1,500.00 m2 3,500,000.00 173,435,720.00
dgn alat)
1.000 Mandor 100,000.00 100,000.00
U 5.000 Operator Terampil 170,000.00 850,000.00
P 5.000 Pembantu Operator 120,000.00 600,000.00
A 15.000 Buruh Tak Terampil 70,000.00 1,050,000.00
H 10.000 Buruh Terampil 90,000.00 900,000.00

100.000 ton Lataston 1,629,634.40 162,963,440.00


B 600.000 kg Aspal Penetrasi 60-70 14,000.00 8,400,000.00
A 150.000 ltr Minyak Tanah (Kerosin) 12,900.00 1,935,000.00
H
A 0.480 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 137,280.00
N

4.000 jam Air Compressor 110,000.00


5.000 jam Asphalt Finisher 540,000.00
A 5.000 jam Asphalt Sprayer 180,000.00
L
5.000 jam Pneumatic Roller 8 - 15 ton 540,000.00
A
T 5.000 jam Tandem Roller 6 - 10 ton 540,000.00
5.000 jam Three Wheel Roller 6 - 8 ton 370,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :
JUMLAH HARGA PER TON :

Hal. 42 dari 168


73 K,636a Penghamparan lapis AC laston (dgn alat) 1,100.00 m2 3,500,000.00 166,985,720.00
1.000 Mandor 100,000.00 100,000.00
U 5.000 Operator Terampil 170,000.00 850,000.00
P 5.000 Pembantu Operator 120,000.00 600,000.00
A 15.000 Buruh Tak Terampil 70,000.00 1,050,000.00
H 10.000 Buruh Terampil 90,000.00 900,000.00

100.000 ton AC Laston 1,565,134.40 156,513,440.00


B 600.000 kg Aspal Penetrasi 60-70 14,000.00 8,400,000.00
A 150.000 ltr Minyak Tanah (Kerosin) 12,900.00 1,935,000.00
H
A 0.480 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 137,280.00
N

4.000 jam Air Compressor 110,000.00


5.000 jam Asphalt Finisher 540,000.00
A 5.000 jam Asphalt Sprayer 180,000.00
L
5.000 jam Pneumatic Roller 8 - 15 ton 540,000.00
A
T 5.000 jam Tandem Roller 6 - 10 ton 540,000.00
5.000 jam Three Wheel Roller 6 - 8 ton 370,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :
JUMLAH HARGA PER TON :

Penghamparan lapis permukaan aspal beton


74 K,641 900.00 m2 3,500,000.00 162,751,120.00
(laston - dgn alat)
1.000 Mandor 100,000.00 100,000.00
U 5.000 Operator Terampil 170,000.00 850,000.00
P 5.000 Pembantu Operator 120,000.00 600,000.00
A 15.000 Buruh Tak Terampil 70,000.00 1,050,000.00
H 10.000 Buruh Terampil 90,000.00 900,000.00

100.000 ton Aspal Beton 1,561,698.40 156,169,840.00


B 0.900 m3 Pasir Ayak (untuk beton) 270,000.00 243,000.00
A 360.000 kg Aspal Penetrasi 60-70 14,000.00 5,040,000.00
H
A 90.000 ltr Minyak Tanah (Kerosin) 12,900.00 1,161,000.00
N 0.480 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 137,280.00

4.000 jam Air Compressor 110,000.00


5.000 jam Asphalt Finisher 540,000.00
A 3.000 jam Asphalt Sprayer 180,000.00
L
5.000 jam Pneumatic Roller 8 - 15 ton 540,000.00
A
T 5.000 jam Tandem Roller 6 - 10 ton 540,000.00
5.000 jam Three Wheel Roller 6 - 8 ton 370,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :
JUMLAH HARGA PER TON :

Hal. 43 dari 168


75 W.4 Biaya Gilas (dalam 1 bulan) 1.00 bln 21,900,000.00 8,984,500.00
30.000 Operator Terampil 170,000.00 5,100,000.00
U 30.000 Buruh Terampil 90,000.00 2,700,000.00
P
30.000 Buruh Tak Terampil 70,000.00 2,100,000.00
A
H 150.000 Buruh Agak Terampil 80,000.00 12,000,000.00

74.000 ltr Oli SAE 20 25,000.00 1,850,000.00


20.000 ltr Oli SAE 40 28,000.00 560,000.00
B 10.000 ltr Oli SAE 90 31,000.00 310,000.00
A 625.000 ltr Minyak Solar 9,200.00 5,750,000.00
H
A 20.000 ltr Minyak Tanah (Kerosin) 12,900.00 258,000.00
N 30.000 ltr Bensin 8,200.00 246,000.00
0.250 kg Stempet 42,000.00 10,500.00

125.000 jam Mesin Gilas (kapasitas 4 ton) 100,000.00


A 8.000 jam Alat Ganti Perpacking 120,000.00
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

76 W.4.rob1 Biaya Gilas (dalam 1 bulan) 1.00 bln 21,000,000.00 9,084,500.00


30.000 Masinis 150,000.00 4,500,000.00
U 30.000 Pembantu Masinis 120,000.00 3,600,000.00
P 30.000 Penjaga 80,000.00 2,400,000.00
A 150.000 Pekerja 70,000.00 10,500,000.00
H

74.000 ltr Oli SAE 20 25,000.00 1,850,000.00


20.000 ltr Oli SAE 40 28,000.00 560,000.00
10.000 ltr Oli SAE 90 31,000.00 310,000.00
B
A 625.000 ltr Minyak Solar 9,200.00 5,750,000.00
H 20.000 ltr Minyak Tanah (Kerosin) 12,900.00 258,000.00
A 30.000 ltr Bensin 8,200.00 246,000.00
N
0.250 kg Stempet 42,000.00 10,500.00
1.000 ls Spare Part 100,000.00 100,000.00

150.000 jam Mesin Gilas (kapasitas 4 ton) 100,000.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

77 W.2 Pasang lapis onderslag 10 / 15 1.00 m2 31,900.00 43,280.00


0.019 Mandor 100,000.00 1,900.00
U 0.375 Buruh Agak Terampil 80,000.00 30,000.00
P
A
H

Hal. 44 dari 168


P
A
H

0.200 m3 Batu Pecah 15-20 192,600.00 38,520.00


B 0.050 m3 Pasir Urug 95,200.00 4,760.00
A
H
A
N

0.00013 bln Biaya Gilas (W.4) 44,344,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 45 dari 168


78 W.2.rob1 Pasang lapis onderslag 1.00 m2 28,150.00 43,280.00
0.019 Mandor 100,000.00 1,900.00
U 0.375 Pekerja 70,000.00 26,250.00
P
A
H

0.200 m3 Batu Pecah 15-20 192,600.00 38,520.00


B 0.050 m3 Pasir Urug 95,200.00 4,760.00
A
H
A
N

0.00013 bln Biaya Gilas (W.4 rob1) 45,084,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

79 W.3 Pasang lapis steinslag 5 / 7 100.00 m2 637,500.00 2,219,400.00


0.375 Mandor 100,000.00 37,500.00
U 7.500 Buruh Agak Terampil 80,000.00 600,000.00
P
A
H

3.000 m3 Batu Pecah 3-5 (mesin) 275,000.00 825,000.00


B 5.000 m3 Batu Pecah 5-7 240,800.00 1,204,000.00
A 2.000 m3 Pasir Urug 95,200.00 190,400.00
H
A
N

0.02660 bln Biaya Gilas (W.4 rob1) 45,084,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

80 W.3.rob1 Pasang lapis steinslag tebal 7 cm 100.00 m2 565,000.00 2,454,350.00


0.400 Mandor 100,000.00 40,000.00
U 7.500 Pekerja 70,000.00 525,000.00
P
A
H

7.000 m3 Batu Pecah 5-7 240,800.00 1,685,600.00


1.500 m3 Batu Pecah 3-5 (mesin) 275,000.00 412,500.00
B
A 0.500 m3 Batu Pecah 2-3 (mesin) 331,700.00 165,850.00
H 2.000 m3 Pasir Urug 95,200.00 190,400.00
A
N
Hal. 46 dari 168
B
A
H
A
N

0.02660 bln Biaya Gilas (W.4 rob1) 45,084,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

Hal. 47 dari 168


81 K,619 Lapis aspal resap pelekat (prime coat) 1,000.00 m2 620,000.00 15,010,760.00
0.500 Mandor 100,000.00 50,000.00
U 1.000 Operator Terampil 170,000.00 170,000.00
P
1.000 Pembantu Operator 120,000.00 120,000.00
A
H 4.000 Buruh Tak Terampil 70,000.00 280,000.00

510.000 ltr Minyak Tanah (Kerosin) 12,900.00 6,579,000.00


B 599.000 kg Aspal Penetrasi 60-70 14,000.00 8,386,000.00
A 0.160 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 45,760.00
H
A
N

5.000 jam Asphalt Sprayer 180,000.00


A 5.000 jam Blower 30,000.00
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

Lapis penetrasi / permukaan macadam 5 cm (dgn


82 K,618 1,400.00 m2 16,380,000.00 125,273,877.00
buruh)
3.000 Mandor 100,000.00 300,000.00
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 3.000 Supir Terampil 150,000.00 450,000.00
A 3.000 Pembantu Supir 120,000.00 360,000.00
H 198.000 Buruh Tak Terampil 70,000.00 13,860,000.00
6.000 Buruh Terampil 90,000.00 540,000.00

3.500 m3 Batu Pecah 0,5-1 (mesin) 395,900.00 1,385,650.00


15.600 m3 Batu Pecah 1-2 (mesin) 363,800.00 5,675,280.00
B
A 31.110 m3 Batu Pecah 2-3 (mesin) 331,700.00 10,319,187.00
H 56.000 m3 Batu Pecah 3-5 (mesin) 275,000.00 15,400,000.00
A 6,440.000 kg Aspal Penetrasi 60-70 14,000.00 90,160,000.00
N
8.160 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 2,333,760.00

30.000 jam Asphalt Sprayer 180,000.00


A 15.000 jam Blower 30,000.00
L
15.000 jam Plat Bed Truck 4 ton 410,000.00
A
T 15.000 jam Three Wheel Roller 6 - 8 ton 370,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

Hal. 48 dari 168


83 K,618.rob1 Lapis penetrasi tebal 4 cm 100.00 m2 962,620.00 9,190,908.00
12.000 Pekerja 70,000.00 840,000.00
U 0.130 Masinis 150,000.00 19,500.00
P 0.026 Pembantu Masinis 120,000.00 3,120.00
A 1.000 Mandor 100,000.00 100,000.00
H

1.000 m3 Batu Pecah 0,5-1 (mesin) 395,900.00 395,900.00


1.600 m3 Batu Pecah 1-2 (mesin) 363,800.00 582,080.00
B 3.840 m3 Batu Pecah 2-3 (mesin) 331,700.00 1,273,728.00
A 1.000 m3 Pasir Beton / Pasir Aspal 278,200.00 278,200.00
H
A 500.000 kg Aspal Curah 12,900.00 6,450,000.00
N 1.000 m3 Kayu Bakar 210,000.00 210,000.00
1.000 ls Alat Bantu 1,000.00 1,000.00

0.020 bln Biaya Gilas (W.4 rob1) 45,084,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

84 K,612 Laburan aspal pasir (buras - dgn alat) 2,400.00 m2 1,970,000.00 36,954,400.00
1.000 Mandor 100,000.00 100,000.00
2.000 Operator Terampil 170,000.00 340,000.00
U 2.000 Pembantu Operator 120,000.00 240,000.00
P 1.000 Supir Terampil 150,000.00 150,000.00
A 1.000 Pembantu Supir 120,000.00 120,000.00
H 12.000 Buruh Tak Terampil 70,000.00 840,000.00
2.000 Buruh Terampil 90,000.00 180,000.00

12.000 m3 Pasir Ayak (untuk beton) 270,000.00 3,240,000.00


B 2,400.000 kg Aspal Penetrasi 60-70 14,000.00 33,600,000.00
A 0.400 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 114,400.00
H
A
N

4.000 jam Air Compressor 110,000.00


A 10.000 jam Asphalt Sprayer 180,000.00
L 5.000 jam Blower 30,000.00
A 5.000 jam Dump Truck 5 ton 150,000.00
T 5.000 jam Pneumatic Roller 8 - 15 ton 540,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

85 K,615 Laburan aspal satu lapis (burtu - dgn buruh) 1,800.00 m2 3,940,000.00 62,318,560.00
2.000 Mandor 100,000.00 200,000.00
4.000 Operator Terampil 170,000.00 680,000.00
U
P Hal. 49 dari 168
A
U 4.000 Pembantu Operator 120,000.00 480,000.00
P 2.000 Supir Terampil 150,000.00 300,000.00
A 2.000 Pembantu Supir 120,000.00 240,000.00
H 24.000 Buruh Tak Terampil 70,000.00 1,680,000.00
4.000 Buruh Terampil 90,000.00 360,000.00

30.000 m3 Batu Pecah 1-2 (mesin) 363,800.00 10,914,000.00


B 3,305.000 kg Aspal Penetrasi 60-70 14,000.00 46,270,000.00
A 18.000 m3 Pasir Ayak (untuk beton) 270,000.00 4,860,000.00
H
A 0.960 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 274,560.00
N

20.000 jam Asphalt Sprayer 180,000.00


A 10.000 jam Blower 30,000.00
L
10.000 jam Plat Bed Truck 4 ton 410,000.00
A
T 10.000 jam Pneumatic Roller 8 - 15 ton 540,000.00

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

Hal. 50 dari 168


86 HTMX.man Pemasangan Hotmix ( Tebal 3 cm) 1,500.00 m2 3,500,000.00 173,298,440.00
1.000 Mandor 100,000.00 100,000.00
5.000 Operator Terampil 170,000.00 850,000.00
U 5.000 Operator Kurang Terampil 120,000.00 600,000.00
P 15.000 Buruh Tak Terampil 70,000.00 1,050,000.00
A 10.000 Buruh Terampil 90,000.00 900,000.00
H

100.000 ton Lapis tipis aspal beton (lataston) produksi dan suplai (dgn alat) 1,629,634.40 162,963,440.00
600.000 kg Aspal Penetrasi 60-70 14,000.00 8,400,000.00
B
A 150.000 ltr Minyak Tanah (Kerosin) 12,900.00 1,935,000.00
H
A
N

4.000 hr Air Compressor 110,000.00


A 5.000 hr Asphalt Finisher 540,000.00
L 5.000 hr Asphalt Sprayer 180,000.00
A 5.000 hr Pneumatic Roller 8 - 15 ton 540,000.00
T 5.000 hr Tandem Roller 6 - 10 ton 540,000.00
5.000 hr Three Wheel Roller 6 - 8 ton 370,000.00
JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

87 K,618.rob2 Lapis penetrasi tebal 3 cm 100.00 m2 721,965.00 6,892,431.00


9.000 Pekerja 70,000.00 630,000.00
U 0.098 Masinis 150,000.00 14,625.00
P 0.020 Pembantu Masinis 120,000.00 2,340.00
A 0.750 Mandor 100,000.00 75,000.00
H

0.750 m3 Batu Pecah 0,5-1 (mesin) 395,900.00 296,925.00


1.200 m3 Batu Pecah 1-2 (mesin) 363,800.00 436,560.00
B 2.880 m3 Batu Pecah 2-3 (mesin) 331,700.00 955,296.00
A 0.750 m3 Pasir Beton / Pasir Aspal 278,200.00 208,650.00
H
A 375.000 kg Aspal Curah 12,900.00 4,837,500.00
N 0.750 m3 Kayu Bakar 210,000.00 157,500.00
0.000 ls Alat Bantu 1,000.00 0.00

0.015 bln Biaya Gilas (W.4 rob1) 45,084,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :

88 HTMX.man Lapisan Latasir ( Tebal rata-rata 1,5 cm) 1,600.00 m2 2,260,000.00 98,161,280.00
1.000 Mandor 100,000.00 100,000.00

U Hal. 51 dari 168


P
3.000 Operator Terampil 170,000.00 510,000.00
U 3.000 Pembantu Operator 120,000.00 360,000.00
P 12.000 Buruh Tak Terampil 70,000.00 840,000.00
A 2.000 Buruh Terampil 90,000.00 180,000.00
H 1.000 Supir Terampil 150,000.00 150,000.00
1.000 Pembantu Supir 120,000.00 120,000.00

60.000 ton Latasir + Angkut 1,450,000.00 87,000,000.00


640.000 kg Aspal Penetrasi 60-70 14,000.00 8,960,000.00
B
A 160.000 ltr Minyak Tanah (Kerosin) 12,900.00 2,064,000.00
H 0.480 set Alat Bantu (alat-alat kerja 3 set) 286,000.00 137,280.00
A
N

5.000 hr Tandem Roller 6 - 10 ton 540,000.00


A 5.000 hr Alat Bantu 500,000.00
L 5.000 hr Asphalt Sprayer 180,000.00
A 5.000 hr Dump Truck 5 ton 150,000.00
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
JUMLAH HARGA PER M2 :
JUMLAH HARGA PER M2 :

U 89 UDITCH.01 Pemasangan U-Ditch 300x300 1.00 m1 14,640.00 330,046.40


P
0.120 Pekerja 70,000.00 8,400.00
A
H 0.056 Tukang Batu 90,000.00 5,040.00
0.012 Mandor 100,000.00 1,200.00

B
A
H 0.833 bh U-Ditch 300x300 386,100.00 321,750.00
A 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
N
0.012 m3 Pasir Pasang 224,700.00 2,696.40

A
L
1.000 ls Alat Bantu 19,305.00
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

90 UDITCH.02 Pemasangan U-Ditch 300x400 1.00 m1 14,640.00 362,879.73


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 300x400 425,500.00 354,583.33


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A Hal. 52 dari 168
H
A
B
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 21,275.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

91 UDITCH.03 Pemasangan U-Ditch 400x400 1.00 m1 14,640.00 464,879.73


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 400x400 547,900.00 456,583.33


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 27,395.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

92 UDITCH.04 Pemasangan U-Ditch 400x500 1.00 m1 14,640.00 534,046.40


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 400x500 630,900.00 525,750.00


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 31,545.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :
Hal. 53 dari 168
93 UDITCH.05 Pemasangan U-Ditch 400x600 1.00 m1 14,640.00 568,879.73
0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 400x600 672,700.00 560,583.33


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 33,635.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

94 UDITCH.06 Pemasangan U-Ditch 500x500 1.00 m1 14,640.00 599,963.07


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 500x500 710,000.00 591,666.67


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 35,500.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

95 UDITCH.07 Pemasangan U-Ditch 500x600 1.00 m1 14,640.00 700,296.40


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 500x600 830,400.00 692,000.00


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

Hal. 54 dari 168


1.000 ls Alat Bantu 41,520.00
A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

96 UDITCH.08 Pemasangan U-Ditch 500x700 1.00 m1 14,640.00 810,129.73


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 500x700 962,200.00 801,833.33


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 48,110.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

97 UDITCH.09 Pemasangan U-Ditch 600x600 1.00 m1 14,640.00 787,629.73


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 600x600 935,200.00 779,333.33


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 46,760.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 55 dari 168


98 UDITCH.10 Pemasangan U-Ditch 600x700 1.00 m1 14,640.00 853,296.40
0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 600x700 1,014,000.00 845,000.00


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 50,700.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

99 UDITCH.11 Pemasangan U-Ditch 600x800 1.00 m1 14,640.00 949,463.07


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 600x800 1,129,400.00 941,166.67


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 56,470.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

100 UDITCH.12 Pemasangan U-Ditch 800x800 1.00 m1 14,640.00 1,293,213.07


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 800x800 1,541,900.00 1,284,916.67


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 77,095.00


A Hal. 56 dari 168
L
A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

101 UDITCH.13 Pemasangan U-Ditch 800x900 1.00 m1 14,640.00 1,390,796.40


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 800x900 1,659,000.00 1,382,500.00


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 82,950.00


A
L
A
T

Hal. 57 dari 168


JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

102 UDITCH.14 Pemasangan U-Ditch 800x1000 1.00 m1 14,640.00 1,515,879.73


0.120 Pekerja 70,000.00 8,400.00
U 0.056 Tukang Batu 90,000.00 5,040.00
P
0.012 Mandor 100,000.00 1,200.00
A
H

0.833 bh U-Ditch 800x1000 1,809,100.00 1,507,583.33


B 0.080 zak Semen PC 50 kg 70,000.00 5,600.00
A 0.012 m3 Pasir Pasang 224,700.00 2,696.40
H
A
N

1.000 ls Alat Bantu 90,455.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

103 CUD.01 Pemasangan CUD 300 LD 1.00 m1 7,320.00 128,731.53


0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

0.833 bh CUD 300 LD 149,500.00 124,583.33


B 0.040 zak Semen PC 50 kg 70,000.00 2,800.00
A 0.006 m3 Pasir Pasang 224,700.00 1,348.20
H
A
N

1.000 ls Alat Bantu 3,737.50


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

104 CUD.02 Pemasangan CUD 400 LD 1.00 m1 7,320.00 158,148.20


0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

0.833 bh CUD 400 LD 184,800.00 154,000.00


B 0.040 zak Semen PC 50 kg 70,000.00 2,800.00
A
Hal. 58 dari 168
H
A
B
A 0.006 m3 Pasir Pasang 224,700.00 1,348.20
H
A
N

1.000 ls Alat Bantu 4,620.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

105 CUD.03 Pemasangan CUD 500 LD 1.00 m1 7,320.00 190,564.87


0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

0.833 bh CUD 500 LD 223,700.00 186,416.67


B 0.040 zak Semen PC 50 kg 70,000.00 2,800.00
A 0.006 m3 Pasir Pasang 224,700.00 1,348.20
H
A
N

1.000 ls Alat Bantu 5,592.50


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Hal. 59 dari 168


106 CUD.04 Pemasangan CUD 600 LD 1.00 m1 7,320.00 219,981.53
0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

0.833 bh CUD 600 LD 259,000.00 215,833.33


B 0.040 zak Semen PC 50 kg 70,000.00 2,800.00
A 0.006 m3 Pasir Pasang 224,700.00 1,348.20
H
A
N

1.000 ls Alat Bantu 6,475.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

107 CUD.05 Pemasangan CUD 800 LD 1.00 m1 7,320.00 278,814.87


0.060 Pekerja 70,000.00 4,200.00
U 0.028 Tukang Batu 90,000.00 2,520.00
P
0.006 Mandor 100,000.00 600.00
A
H

0.833 bh CUD 800 LD 329,600.00 274,666.67


B 0.040 zak Semen PC 50 kg 70,000.00 2,800.00
A 0.006 m3 Pasir Pasang 224,700.00 1,348.20
H
A
N

1.000 ls Alat Bantu 8,240.00


A
L
A
T

JUMLAH :
KEUNTUNGAN 10% :
PPN 10% :
JUMLAH TOTAL :

Cirebon, Jan

Kepala Dinas PU, Per


dan Sumber Daya Mine

Ir. BUDI RAHAR


NIP. 19580404 19
Hal. 60 dari 168
A HARGA SATUAN PEKERJAAN
NAS CIPTA KARYA
UN ANGGARAN 2017

JUMLAH
ALAT (Rp) HARGA
(Rp)
0.00 253,999.54
84,000.00
12,060.00
12,060.00

81,700.00
22,500.00
5,478.40
30,500.00
5,701.14

A 253,999.54
B 25,399.95
C = 10%(A+B) 27,939.95
D = (A+B+C) 307,339.44

0.00 40,000.00
36,000.00
4,000.00

A 40,000.00
B 4,000.00
C = 10%(A+B) 4,400.00
D = (A+B+C) 48,400.00

0.00 62,530.00
60,030.00
2,500.00
Hal. 61 dari 168
A 62,530.00
B 6,253.00
C = 10%(A+B) 6,878.30
D = (A+B+C) 75,661.30

Hal. 62 dari 168


0.00 92,500.00
90,000.00
2,500.00

A 92,500.00
B 9,250.00
C = 10%(A+B) 10,175.00
D = (A+B+C) 111,925.00

Hal. 63 dari 168


0.00 108,750.00

101,250.00
7,500.00

A 108,750.00
B 10,875.00
C = 10%(A+B) 11,962.50
D = (A+B+C) 131,587.50

0.00 110,000.00
105,000.00
5,000.00

A 110,000.00
B 11,000.00
C = 10%(A+B) 12,100.00
D = (A+B+C) 133,100.00

0.00 24,100.00
23,100.00
1,000.00

Hal. 64 dari 168


A 24,100.00
B 2,410.00
C = 10%(A+B) 2,651.00
D = (A+B+C) 29,161.00

Hal. 65 dari 168


0.00 15,340.00
13,440.00
1,900.00

A 15,340.00
B 1,534.00
C = 10%(A+B) 1,687.40
D = (A+B+C) 18,561.40

0.00 143,290.00
20,250.00
1,000.00

122,040.00

A 143,290.00
B 14,329.00
C = 10%(A+B) 15,761.90
D = (A+B+C) 173,380.90

0.00 158,970.00
19,250.00
1,000.00

138,720.00

Hal. 66 dari 168


A 158,970.00
B 15,897.00
C = 10%(A+B) 17,486.70
D = (A+B+C) 94,259.00

Hal. 67 dari 168


0.00 136,240.00
21,000.00
1,000.00

114,240.00

A 136,240.00
B 13,624.00
C = 10%(A+B) 14,986.40
D = (A+B+C) 91,355.00

0.00 40,000.00
35,000.00
5,000.00

A 40,000.00
B 4,000.00
C = 10%(A+B) 4,400.00
D = (A+B+C) 48,400.00

0.00 58,000.00
28,000.00
27,000.00
3,000.00

Hal. 68 dari 168


A 58,000.00
B 5,800.00
C = 10%(A+B) 6,380.00
D = (A+B+C) 70,180.00

Hal. 69 dari 168


0.00 463,320.00
420,000.00
43,320.00

A 463,320.00
B 46,332.00
C = 10%(A+B) 50,965.20
D = (A+B+C) 560,617.20

0.00 375,325.26
95,900.00
7,500.00

250,380.00
21,545.26

A 375,325.26
B 37,532.53
C = 10%(A+B) 41,285.78
D = (A+B+C) 454,143.56

28,260.00 1,166,365.00

387,800.00
90,000.00
100,000.00
30,000.00

68,600.00
111,280.00
215,605.00
134,820.00

Hal. 70 dari 168


26,400.00 26,400.00
1,860.00 1,860.00

A 1,166,365.00
B 116,636.50
C = 10%(A+B) 128,300.15
D = (A+B+C) 1,411,301.65

Hal. 71 dari 168


12,000.00 954,134.20
225,260.00
96,570.00
10,700.00
15,600.00

231,120.00
253,680.00
109,204.20

12,000.00 12,000.00

A 954,134.20
B 95,413.42
C = 10%(A+B) 104,954.76
D = (A+B+C) 1,154,502.38

0.00 729,404.00
105,000.00
54,000.00
6,000.00
7,500.00

211,860.00
228,200.00
116,844.00

A 729,404.00
B 72,940.40
C = 10%(A+B) 80,234.44
D = (A+B+C) 882,578.84

0.00 696,996.80
105,000.00
54,000.00
6,000.00
7,500.00

211,860.00
190,400.00
122,236.80

Hal. 72 dari 168


A 696,996.80
B 69,699.68
C = 10%(A+B) 76,669.65
D = (A+B+C) 843,366.13

Hal. 73 dari 168


0.00 238,544.00
45,500.00
18,000.00
2,000.00
3,000.00

112,000.00
31,080.00
26,964.00

A 238,544.00
B 23,854.40
C = 10%(A+B) 26,239.84
D = (A+B+C) 288,638.24

0.00 115,662.10
22,400.00
9,000.00
1,000.00
1,500.00

56,000.00
16,100.00
9,662.10

A 115,662.10
B 11,566.21
C = 10%(A+B) 12,722.83
D = (A+B+C) 139,951.14

0.00 113,563.50
22,400.00
9,000.00
1,000.00
1,500.00

56,000.00
13,552.00
10,111.50

Hal. 74 dari 168


A 113,563.50
B 11,356.35
C = 10%(A+B) 12,491.99
D = (A+B+C) 137,411.84

Hal. 75 dari 168


0.00 60,099.90
26,600.00
11,430.00
1,300.00
1,900.00

15,050.00
3,819.90

A 60,099.90
B 6,009.99
C = 10%(A+B) 6,610.99
D = (A+B+C) 72,720.88

0.00 56,909.30
26,600.00
11,430.00
1,300.00
1,900.00

11,410.00
4,269.30

A 56,909.30
B 5,690.93
C = 10%(A+B) 6,260.02
D = (A+B+C) 68,860.25

0.00 41,774.00
14,000.00
13,500.00
1,500.00
1,000.00

7,280.00
4,494.00

Hal. 76 dari 168


A 41,774.00
B 4,177.40
C = 10%(A+B) 4,595.14
D = (A+B+C) 50,546.54

Hal. 77 dari 168


0.00 40,991.40
14,000.00
13,500.00
1,500.00
1,000.00

6,048.00
4,943.40

A 40,991.40
B 4,099.14
C = 10%(A+B) 4,509.05
D = (A+B+C) 49,599.59

240.00 28,155.20
10,500.00
6,300.00
700.00
800.00

6,020.00
3,595.20

240.00 240.00

A 28,155.20
B 2,815.52
C = 10%(A+B) 3,097.07
D = (A+B+C) 34,067.79

28,260.00 904,950.00
115,500.00
22,500.00
2,500.00
8,000.00

258,726.00
144,664.00
324,800.00

Hal. 78 dari 168


26,400.00 26,400.00
1,860.00 1,860.00

A 904,950.00
B 90,495.00
C = 10%(A+B) 99,544.50
D = (A+B+C) 1,094,989.50

Hal. 79 dari 168


28,260.00 1,030,453.41
115,500.00
22,500.00
2,500.00
8,000.00

192,386.00
116,844.00
544,463.41

26,400.00 26,400.00
1,860.00 1,860.00

A 1,030,453.41
B 103,045.34
C = 10%(A+B) 113,349.88
D = (A+B+C) 1,246,848.63

28,260.00 804,497.00
115,500.00
22,500.00
2,500.00
5,000.00

305,200.00
144,664.00
180,873.00

26,400.00 26,400.00
1,860.00 1,860.00

A 804,497.00
B 80,449.70
C = 10%(A+B) 88,494.67
D = (A+B+C) 973,441.37

28,260.00 880,950.02
115,500.00
22,500.00
2,500.00
5,000.00

221,089.02
154,401.00
331,700.00

Hal. 80 dari 168


26,400.00 26,400.00
1,860.00 1,860.00

A 880,950.02
B 88,095.00
C = 10%(A+B) 96,904.50
D = (A+B+C) 1,065,949.52

Hal. 81 dari 168


0.00 483,921.49
21,000.00
29,700.00
3,300.00
1,800.00

123,500.00
9,660.00
1,770.00
38,000.00
35,191.49
220,000.00

A 483,921.49
B 48,392.15
C = 10%(A+B) 53,231.36
D = (A+B+C) 585,545.00

0.00 85,420.00
21,000.00
23,400.00
2,600.00
5,000.00

27,000.00
6,420.00

A 85,420.00
B 8,542.00
C = 10%(A+B) 9,396.20
D = (A+B+C) 103,358.20

0.00 288,570.00
22,400.00
29,700.00
3,300.00
600.00

104,400.00
8,560.00
26,250.00
90,000.00
3,360.00

Hal. 82 dari 168


A 288,570.00
B 28,857.00
C = 10%(A+B) 31,742.70
D = (A+B+C) 349,169.70

Hal. 83 dari 168


0.00 15,761.25
490.00
630.00
700.00
300.00

13,553.44
87.81

A 15,761.25
B 1,576.13
C = 10%(A+B) 1,733.74
D = (A+B+C) 19,071.11

0.00 1,050,908.00

41,720.00
3,150.00
25,200.00
25,200.00
4,550.00
2,080.00
144,000.00
17,120.00
140,000.00
462,280.00
14,490.00
90,440.00
28,932.80
51,745.20

A 1,050,908.00
B 105,090.80
C = 10%(A+B) 115,599.88
D = (A+B+C) 1,271,598.68

0.00 683,181.00

31,290.00
2,362.50
18,900.00
18,900.00
3,412.50
1,560.00
Hal. 84 dari 168
108,000.00
12,840.00
346,710.00
10,867.50
67,830.00
21,699.60
38,808.90

A 683,181.00
B 68,318.10
C = 10%(A+B) 75,149.91
D = (A+B+C) 826,649.01

Hal. 85 dari 168


0.00 455,454.00

20,860.00
1,575.00
12,600.00
12,600.00
2,275.00
1,040.00
72,000.00
8,560.00
231,140.00
7,245.00
45,220.00
14,466.40
25,872.60

A 455,454.00
B 45,545.40
C = 10%(A+B) 50,099.94
D = (A+B+C) 551,099.34

0.00 364,363.20

16,688.00
1,260.00
10,080.00
10,080.00
1,820.00
832.00
57,600.00
6,848.00
184,912.00
5,796.00
36,176.00
11,573.12
20,698.08

A 364,363.20
B 36,436.32
C = 10%(A+B) 40,079.95
D = (A+B+C) 440,879.47

0.00 546,544.80

25,032.00
1,890.00
15,120.00
15,120.00
Hal. 86 dari 168
2,730.00
1,248.00
86,400.00
10,272.00
277,368.00
8,694.00
54,264.00
17,359.68
31,047.12

A 546,544.80
B 54,654.48
C = 10%(A+B) 60,119.93
D = (A+B+C) 661,319.21

Hal. 87 dari 168


0.00 19,250.00
7,000.00
6,750.00
800.00
500.00

4,200.00

A 19,250.00
B 1,925.00
C = 10%(A+B) 2,117.50
D = (A+B+C) 23,292.50

0.00 82,724.00

17,500.00
9,000.00
1,000.00
1,000.00

42,800.00
11,424.00

A 82,724.00
B 8,272.40
C = 10%(A+B) 9,099.64
D = (A+B+C) 100,096.04

0.00 88,124.00

17,500.00
9,000.00
1,000.00
1,000.00

48,200.00
11,424.00

Hal. 88 dari 168


A 88,124.00
B 8,812.40
C = 10%(A+B) 9,693.64
D = (A+B+C) 106,630.04

Hal. 89 dari 168


0.00 107,803.87
9,216.68
7,200.00
1,000.00

65,600.00
337.79
449.40
24,000.00

A 107,803.87
B 10,780.39
C = 10%(A+B) 11,858.43
D = (A+B+C) 130,442.68

0.00 137,882.20
8,400.00
5,040.00
1,200.00

69,600.00
12,600.00
5,842.20
35,200.00

A 137,882.20
B 13,788.22
C = 10%(A+B) 15,167.04
D = (A+B+C) 166,837.46

0.00 157,982.20
8,400.00
5,040.00
1,200.00

89,700.00
12,600.00
5,842.20
35,200.00

Hal. 90 dari 168


A 157,982.20
B 15,798.22
C = 10%(A+B) 17,378.04
D = (A+B+C) 191,158.46

Hal. 91 dari 168


0.00 97,216.40
4,200.00
2,520.00
600.00

65,600.00
5,600.00
2,696.40
16,000.00

A 97,216.40
B 9,721.64
C = 10%(A+B) 10,693.80
D = (A+B+C) 117,631.84

0.00 103,741.10
4,200.00
2,520.00
600.00

69,600.00
6,300.00
2,921.10
17,600.00

A 103,741.10
B 10,374.11
C = 10%(A+B) 11,411.52
D = (A+B+C) 125,526.73

0.00 357,758.00
224,000.00
1,350.00
150.00
1,600.00

61,600.00
16,692.00
15,729.00
14,553.00
20,320.00
1,764.00

Hal. 92 dari 168


A 357,758.00
B 35,775.80
C = 10%(A+B) 39,353.38
D = (A+B+C) 432,887.18

Hal. 93 dari 168


0.00 359,233.80
99,400.00
42,570.00
4,700.00
7,100.00

107,800.00
25,038.00
29,211.00
4,158.00
33,020.00
6,236.80

A 359,233.80
B 35,923.38
C = 10%(A+B) 39,515.72
D = (A+B+C) 434,672.90

0.00 51,100.00
2,500.00
48,600.00

A 51,100.00
B 5,110.00
C = 10%(A+B) 5,621.00
D = (A+B+C) 61,831.00

0.00 102,200.00
5,000.00
97,200.00

Hal. 94 dari 168


A 102,200.00
B 10,220.00
C = 10%(A+B) 11,242.00
D = (A+B+C) 123,662.00

Hal. 95 dari 168


28,260.00 2,439,779.49
28,260.00 904,950.00
0.00 1,050,908.00
0.00 483,921.49
28,260.00 2,072,052.49
28,260.00 904,950.00
0.00 683,181.00
0.00 483,921.49
28,260.00 1,844,325.49
28,260.00 904,950.00
0.00 455,454.00
0.00 483,921.49

28,260.00 1,716,261.00
28,260.00 904,950.00
0.00 683,181.00
0.00 128,130.00
28,260.00 1,488,534.00
28,260.00 904,950.00
0.00 455,454.00
0.00 128,130.00

28,260.00 2,821,568.00
28,260.00 904,950.00
0.00 1,050,908.00
0.00 865,710.00
28,260.00 2,453,841.00
28,260.00 904,950.00
0.00 683,181.00
0.00 865,710.00

28,260.00 2,821,568.00
28,260.00 904,950.00
0.00 1,050,908.00
0.00 865,710.00
28,260.00 2,453,841.00
28,260.00 904,950.00
0.00 683,181.00
0.00 865,710.00

24,300,000.00 72,397,520.00

100,000.00
510,000.00
360,000.00
2,700,000.00
2,160,000.00
560,000.00

41,616,000.00
91,520.00

4,860,000.00 4,860,000.00

Hal. 96 dari 168


16,200,000.00 16,200,000.00
3,240,000.00 3,240,000.00

A 72,397,520.00
B 7,239,752.00
C = 10%(A+B) 7,963,727.20
D = (A+B+C) 87,600,999.20
(D / 360 M3) 243,336.11

Hal. 97 dari 168


12,300,000.00 25,672,400.00

200,000.00
750,000.00
600,000.00
4,200,000.00

6,936,000.00
686,400.00

12,300,000.00 12,300,000.00

A 25,672,400.00
B 2,567,240.00
C = 10%(A+B) 2,823,964.00
D = (A+B+C) 31,063,604.00
(D / 60 M3) 517,726.73

9,780,000.00 21,606,640.00
100,000.00
510,000.00
360,000.00
600,000.00
480,000.00
280,000.00
180,000.00

9,248,000.00
68,640.00

1,080,000.00 1,080,000.00
2,700,000.00 2,700,000.00
3,600,000.00 3,600,000.00
2,400,000.00 2,400,000.00

A 21,606,640.00
B 2,160,664.00
C = 10%(A+B) 2,376,730.40
D = (A+B+C) 26,144,034.40
(D / 60 M3) 435,733.91

Hal. 98 dari 168


10,080,000.00 32,467,200.00

100,000.00
680,000.00
480,000.00
600,000.00
480,000.00
350,000.00
360,000.00

19,280,000.00
57,200.00

1,080,000.00 1,080,000.00
3,240,000.00 3,240,000.00
3,600,000.00 3,600,000.00
2,160,000.00 2,160,000.00

A 32,467,200.00
B 3,246,720.00
C = 10%(A+B) 3,571,392.00
D = (A+B+C) 39,285,312.00
(D / 40 M3) 982,132.80

36,600,000.00 151,344,720.00

100,000.00
510,000.00
360,000.00
600,000.00
480,000.00
420,000.00
270,000.00

6,480,000.00
77,400,000.00
2,590,000.00
304,000.00
68,640.00
25,162,080.00

1,080,000.00 1,080,000.00
31,920,000.00 31,920,000.00
3,600,000.00 3,600,000.00

A 151,344,720.00
B 15,134,472.00
C = 10%(A+B) 16,647,919.20
D = (A+B+C) 183,127,111.20
(D / 100 TON) 1,831,271.11

Hal. 99 dari 168


32,900,000.00 162,963,440.00

100,000.00
510,000.00
360,000.00
600,000.00
480,000.00
420,000.00
270,000.00

8,370,000.00
94,170,000.00
6,300,000.00
152,000.00
68,640.00
18,262,800.00

2,700,000.00 2,700,000.00
26,600,000.00 26,600,000.00
3,600,000.00 3,600,000.00

A 162,963,440.00
B 16,296,344.00
C = 10%(A+B) 17,925,978.40
D = (A+B+C) 197,185,762.40
(D / 100 TON) 1,971,857.62

32,900,000.00 156,513,440.00

100,000.00
510,000.00
360,000.00
600,000.00
480,000.00
420,000.00
270,000.00

8,370,000.00
87,720,000.00
6,300,000.00
152,000.00
68,640.00
18,262,800.00

2,700,000.00 2,700,000.00
26,600,000.00 26,600,000.00
3,600,000.00 3,600,000.00

A 156,513,440.00
B 15,651,344.00
C = 10%(A+B) 17,216,478.40
D = (A+B+C) 189,381,262.40
(D / 100 TON) 1,893,812.62

Hal. 100 dari 168


32,900,000.00 156,169,840.00
100,000.00
510,000.00
360,000.00
600,000.00
480,000.00
420,000.00
270,000.00

7,290,000.00
83,850,000.00
7,000,000.00
68,640.00
22,321,200.00

2,700,000.00 2,700,000.00
26,600,000.00 26,600,000.00
3,600,000.00 3,600,000.00

A 156,169,840.00
B 15,616,984.00
C = 10%(A+B) 17,178,682.40
D = (A+B+C) 188,965,506.40
(D / 100 TON) 1,889,655.06

875,000.00 7,376,380.00
50,000.00
170,000.00
120,000.00
140,000.00

1,367,400.00
4,631,100.00
22,880.00

450,000.00 450,000.00
275,000.00 275,000.00
150,000.00 150,000.00

A 7,376,380.00
B 737,638.00
C = 10%(A+B) 811,401.80
D = (A+B+C) 8,925,419.80
(D / 2200 M2) 4,057.01

Hal. 101 dari 168


8,230,000.00 165,794,500.00

100,000.00
680,000.00
480,000.00
840,000.00
720,000.00

151,344,720.00
162,000.00
2,520,000.00
580,500.00
137,280.00

440,000.00 440,000.00
2,700,000.00 2,700,000.00
540,000.00 540,000.00
2,700,000.00 2,700,000.00
1,850,000.00 1,850,000.00

A 165,794,500.00
B 16,579,450.00
C = 10%(A+B) 18,237,395.00
D = (A+B+C) 200,611,345.00
E = (D / 45 M3) 4,458,029.89
(E / 2,25 ) 1,981,346.62

11,290,000.00 188,225,720.00

100,000.00
850,000.00
600,000.00
1,050,000.00
900,000.00

162,963,440.00
8,400,000.00
1,935,000.00
137,280.00

440,000.00 440,000.00
2,700,000.00 2,700,000.00
900,000.00 900,000.00
2,700,000.00 2,700,000.00
2,700,000.00 2,700,000.00
1,850,000.00 1,850,000.00

A 188,225,720.00
B 18,822,572.00
C = 10%(A+B) 20,704,829.20
D = (A+B+C) 227,753,121.20
E = (D / 1500 M2) 151,835.41
(E x 14,815 ) 2,249,441.66

Hal. 102 dari 168


11,290,000.00 181,775,720.00
100,000.00
850,000.00
600,000.00
1,050,000.00
900,000.00

156,513,440.00
8,400,000.00
1,935,000.00
137,280.00

440,000.00 440,000.00
2,700,000.00 2,700,000.00
900,000.00 900,000.00
2,700,000.00 2,700,000.00
2,700,000.00 2,700,000.00
1,850,000.00 1,850,000.00

A 181,775,720.00
B 18,177,572.00
C = 10%(A+B) 19,995,329.20
D = (A+B+C) 219,948,621.20
E = (D / 1100 M2) 199,953.29
(E x 10,869 ) 2,173,292.33

10,930,000.00 177,181,120.00

100,000.00
850,000.00
600,000.00
1,050,000.00
900,000.00

156,169,840.00
243,000.00
5,040,000.00
1,161,000.00
137,280.00

440,000.00 440,000.00
2,700,000.00 2,700,000.00
540,000.00 540,000.00
2,700,000.00 2,700,000.00
2,700,000.00 2,700,000.00
1,850,000.00 1,850,000.00

A 177,181,120.00
B 17,718,112.00
C = 10%(A+B) 19,489,923.20
D = (A+B+C) 214,389,155.20
E = (D / 900 M2) 238,210.17
(E x 8,89 ) 2,117,688.43

Hal. 103 dari 168


13,460,000.00 44,344,500.00
5,100,000.00
2,700,000.00
2,100,000.00
12,000,000.00

1,850,000.00
560,000.00
310,000.00
5,750,000.00
258,000.00
246,000.00
10,500.00

12,500,000.00 12,500,000.00
960,000.00 960,000.00

A 44,344,500.00
B 4,434,450.00
C = 10%(A+B) 4,877,895.00
D = (A+B+C) 53,656,845.00

15,000,000.00 45,084,500.00
4,500,000.00
3,600,000.00
2,400,000.00
10,500,000.00

1,850,000.00
560,000.00
310,000.00
5,750,000.00
258,000.00
246,000.00
10,500.00
100,000.00

15,000,000.00 15,000,000.00

A 45,084,500.00
B 4,508,450.00
C = 10%(A+B) 4,959,295.00
D = (A+B+C) 54,552,245.00

5,764.79 80,944.79
1,900.00
30,000.00

Hal. 104 dari 168


38,520.00
4,760.00

5,764.79 5,764.79

A 80,944.79
B 8,094.48
C = 10%(A+B) 8,903.93
D = (A+B+C) 97,943.20

Hal. 105 dari 168


5,860.99 77,290.99
1,900.00
26,250.00

38,520.00
4,760.00

5,860.99 5,860.99

A 77,290.99
B 7,729.10
C = 10%(A+B) 8,502.01
D = (A+B+C) 93,522.10

1,199,247.70 4,056,147.70
37,500.00
600,000.00

825,000.00
1,204,000.00
190,400.00

1,199,247.70 1,199,247.70

A 4,056,147.70
B 405,614.77
C = 10%(A+B) 446,176.25
D = (A+B+C) 4,907,938.72
(D / 100 M2) 49,079.39

1,199,247.70 4,218,597.70
40,000.00
525,000.00

1,685,600.00
412,500.00
165,850.00
190,400.00

Hal. 106 dari 168


1,199,247.70 1,199,247.70

A 4,218,597.70
B 421,859.77
C = 10%(A+B) 464,045.75
D = (A+B+C) 5,104,503.22
(D / 100 M2) 51,045.03

Hal. 107 dari 168


1,050,000.00 16,680,760.00
50,000.00
170,000.00
120,000.00
280,000.00

6,579,000.00
8,386,000.00
45,760.00

900,000.00 900,000.00
150,000.00 150,000.00

A 16,680,760.00
B 1,668,076.00
C = 10%(A+B) 1,834,883.60
D = (A+B+C) 20,183,719.60
(D / 1000 M2) 20,183.72

17,550,000.00 159,203,877.00

300,000.00
510,000.00
360,000.00
450,000.00
360,000.00
13,860,000.00
540,000.00

1,385,650.00
5,675,280.00
10,319,187.00
15,400,000.00
90,160,000.00
2,333,760.00

5,400,000.00 5,400,000.00
450,000.00 450,000.00
6,150,000.00 6,150,000.00
5,550,000.00 5,550,000.00

A 159,203,877.00
B 15,920,387.70
C = 10%(A+B) 17,512,426.47
D = (A+B+C) 192,636,691.17
(D / 1400 M2) 137,597.64

Hal. 108 dari 168


901,690.00 11,055,218.00
840,000.00
19,500.00
3,120.00
100,000.00

395,900.00
582,080.00
1,273,728.00
278,200.00
6,450,000.00
210,000.00
1,000.00

901,690.00 901,690.00

A 11,055,218.00
B 1,105,521.80
C = 10%(A+B) 1,216,073.98
D = (A+B+C) 13,376,813.78
(D / 100 M2) 133,768.14

5,840,000.00 44,764,400.00
100,000.00
340,000.00
240,000.00
150,000.00
120,000.00
840,000.00
180,000.00

3,240,000.00
33,600,000.00
114,400.00

440,000.00 440,000.00
1,800,000.00 1,800,000.00
150,000.00 150,000.00
750,000.00 750,000.00
2,700,000.00 2,700,000.00

A 44,764,400.00
B 4,476,440.00
C = 10%(A+B) 4,924,084.00
D = (A+B+C) 54,164,924.00
(D / 2400 M2) 22,568.72

13,400,000.00 79,658,560.00
200,000.00
680,000.00

Hal. 109 dari 168


480,000.00
300,000.00
240,000.00
1,680,000.00
360,000.00

10,914,000.00
46,270,000.00
4,860,000.00
274,560.00

3,600,000.00 3,600,000.00
300,000.00 300,000.00
4,100,000.00 4,100,000.00
5,400,000.00 5,400,000.00

A 79,658,560.00
B 7,965,856.00
C = 10%(A+B) 8,762,441.60
D = (A+B+C) 96,386,857.60
(D / 1800 M2) 53,548.25

Hal. 110 dari 168


11,290,000.00 188,088,440.00
100,000.00
850,000.00
600,000.00
1,050,000.00
900,000.00

162,963,440.00
8,400,000.00
1,935,000.00

440,000.00 440,000.00
2,700,000.00 2,700,000.00
900,000.00 900,000.00
2,700,000.00 2,700,000.00
2,700,000.00 2,700,000.00
1,850,000.00 1,850,000.00
A 188,088,440.00
B 18,808,844.00
C = 10%(A+B) 20,689,728.40
D = (A+B+C) 227,587,012.40
(D / 1500 M2) 151,724.67

676,267.50 8,290,663.50
630,000.00
14,625.00
2,340.00
75,000.00

296,925.00
436,560.00
955,296.00
208,650.00
4,837,500.00
157,500.00
0.00

676,267.50 676,267.50

A 8,290,663.50
B 829,066.35
C = 10%(A+B) 911,972.99
D = (A+B+C) 10,031,702.84
(D / 100 M2) 100,317.03

6,850,000.00 107,271,280.00
100,000.00

Hal. 111 dari 168


510,000.00
360,000.00
840,000.00
180,000.00
150,000.00
120,000.00

87,000,000.00
8,960,000.00
2,064,000.00
137,280.00

2,700,000.00 2,700,000.00
2,500,000.00 2,500,000.00
900,000.00 900,000.00
750,000.00 750,000.00

A 107,271,280.00
B 10,727,128.00
C = 10%(A+B) 11,799,840.80
D = (A+B+C) 129,798,248.80
(D / 1600 M2) t =2 81,123.91
(tebal 1,5 cm) 60,842.93

19,305.00 363,991.40
8,400.00
5,040.00
1,200.00

321,750.00
5,600.00
2,696.40

19,305.00 19,305.00

A 363,991.40
B 36,399.14
C = 10%(A+B) 40,039.05
D = (A+B+C) 440,429.59

21,275.00 398,794.73
8,400.00
5,040.00
1,200.00

354,583.33
5,600.00
Hal. 112 dari 168
2,696.40

21,275.00 21,275.00

A 398,794.73
B 39,879.47
C = 10%(A+B) 43,867.42
D = (A+B+C) 482,541.62

27,395.00 506,914.73
8,400.00
5,040.00
1,200.00

456,583.33
5,600.00
2,696.40

27,395.00 27,395.00

A 506,914.73
B 50,691.47
C = 10%(A+B) 55,760.62
D = (A+B+C) 613,366.82

31,545.00 580,231.40
8,400.00
5,040.00
1,200.00

525,750.00
5,600.00
2,696.40

31,545.00 31,545.00

A 580,231.40
B 58,023.14
C = 10%(A+B) 63,825.45
D = (A+B+C) 702,079.99
Hal. 113 dari 168
33,635.00 617,154.73
8,400.00
5,040.00
1,200.00

560,583.33
5,600.00
2,696.40

33,635.00 33,635.00

A 617,154.73
B 61,715.47
C = 10%(A+B) 67,887.02
D = (A+B+C) 746,757.22

35,500.00 650,103.07
8,400.00
5,040.00
1,200.00

591,666.67
5,600.00
2,696.40

35,500.00 35,500.00

A 650,103.07
B 65,010.31
C = 10%(A+B) 71,511.34
D = (A+B+C) 786,624.71

41,520.00 756,456.40
8,400.00
5,040.00
1,200.00

692,000.00
5,600.00
2,696.40

Hal. 114 dari 168


41,520.00 41,520.00

A 756,456.40
B 75,645.64
C = 10%(A+B) 83,210.20
D = (A+B+C) 915,312.24

48,110.00 872,879.73
8,400.00
5,040.00
1,200.00

801,833.33
5,600.00
2,696.40

48,110.00 48,110.00

A 872,879.73
B 87,287.97
C = 10%(A+B) 96,016.77
D = (A+B+C) 1,056,184.47

46,760.00 849,029.73
8,400.00
5,040.00
1,200.00

779,333.33
5,600.00
2,696.40

46,760.00 46,760.00

A 849,029.73
B 84,902.97
C = 10%(A+B) 93,393.27
D = (A+B+C) 1,027,325.97

Hal. 115 dari 168


50,700.00 918,636.40
8,400.00
5,040.00
1,200.00

845,000.00
5,600.00
2,696.40

50,700.00 50,700.00

A 918,636.40
B 91,863.64
C = 10%(A+B) 101,050.00
D = (A+B+C) 1,111,550.04

56,470.00 1,020,573.07
8,400.00
5,040.00
1,200.00

941,166.67
5,600.00
2,696.40

56,470.00 56,470.00

A 1,020,573.07
B 102,057.31
C = 10%(A+B) 112,263.04
D = (A+B+C) 1,234,893.41

77,095.00 1,384,948.07
8,400.00
5,040.00
1,200.00

1,284,916.67
5,600.00
2,696.40

77,095.00 77,095.00
Hal. 116 dari 168
A 1,384,948.07
B 138,494.81
C = 10%(A+B) 152,344.29
D = (A+B+C) 1,675,787.16

82,950.00 1,488,386.40
8,400.00
5,040.00
1,200.00

1,382,500.00
5,600.00
2,696.40

82,950.00 82,950.00

Hal. 117 dari 168


A 1,488,386.40
B 148,838.64
C = 10%(A+B) 163,722.50
D = (A+B+C) 1,800,947.54

90,455.00 1,620,974.73
8,400.00
5,040.00
1,200.00

1,507,583.33
5,600.00
2,696.40

90,455.00 90,455.00

A 1,620,974.73
B 162,097.47
C = 10%(A+B) 178,307.22
D = (A+B+C) 1,961,379.42

3,737.50 139,789.03
4,200.00
2,520.00
600.00

124,583.33
2,800.00
1,348.20

3,737.50 3,737.50

A 139,789.03
B 13,978.90
C = 10%(A+B) 15,376.79
D = (A+B+C) 169,144.73

4,620.00 170,088.20
4,200.00
2,520.00
600.00

154,000.00
2,800.00
Hal. 118 dari 168
1,348.20

4,620.00 4,620.00

A 170,088.20
B 17,008.82
C = 10%(A+B) 18,709.70
D = (A+B+C) 205,806.72

5,592.50 203,477.37
4,200.00
2,520.00
600.00

186,416.67
2,800.00
1,348.20

5,592.50 5,592.50

A 203,477.37
B 20,347.74
C = 10%(A+B) 22,382.51
D = (A+B+C) 246,207.62

Hal. 119 dari 168


6,475.00 233,776.53
4,200.00
2,520.00
600.00

215,833.33
2,800.00
1,348.20

6,475.00 6,475.00

A 233,776.53
B 23,377.65
C = 10%(A+B) 25,715.42
D = (A+B+C) 282,869.60

8,240.00 294,374.87
4,200.00
2,520.00
600.00

274,666.67
2,800.00
1,348.20

8,240.00 8,240.00

A 294,374.87
B 29,437.49
C = 10%(A+B) 32,381.24
D = (A+B+C) 356,193.59

Cirebon, Januari 2017

Kepala Dinas PU, Perumahan, Energi


dan Sumber Daya Mineral Kota Cirebon

Ir. BUDI RAHARDJO, MBA


NIP. 19580404 198903 1 009
Hal. 120 dari 168
Form Hasil Penetapan
Harga BERITA ACARA
PENETAPAN HARGA SATUAN BAHAN,UPAH & ALAT
UNTUK PELAKSANAAN KEGIATAN LINGKUNGAN

KSM/Panitia : Karya Abadi


KELURAHAN : Kesepuhan
KECAMATAN : Lemahwungkuk
KABUPATEN/KOTA : Cirebon

Pada hari ini, .................... tanggal ......, Bulan ......................., Tahun .............., bertempat .di ....................., Desa/
......................, Kota Cirebon, telah mengadakan pertemuan yang .dihadiri oleh ......orang (daftar hadir
musyawarah.dan menyepakati penetapan Harga Satuan Bahan, Upah & Alat sebagai berikut :

HARGA HARGA SATUAN HASIL SURVEY*)


SATUAN
SESUAI Kelp.Masy. - 1 Kelp.Masy.-2
No. Uraian Satuan
STANDAR
KOTA Nama: Nama:
CIREBON Almt : Almt :
Telp : - Telp : -
I. TENAGA KERJA :
1 Ketua Klp/Mandor HOK 100,000
### 110,000 100,000
2 Tukang HOK 90,000
### 100,000 90,000
3 Pekerja HOK 70,000
### 75,000 70,000

HARGA SATUAN HASIL SURVEY*)


HARGA
SATUAN Toko/Pemasok Toko/Pemasok
SESUAI ……………. …………….
No. Uraian Satuan
STANDAR Nama: Nama:
KOTA
CIREBON
Almt : Almt : Awirarangan
Telp : Telp :
____________ ____________
II. BAHAN/MATERIAL :
1 Kayu kaso m3 1,900,000### 2,090,000 1,900,000
2 Kayu papan m3 1,900,000### 2,090,000 1,900,000
3 Paku biasa kg 20,000### 22,000 20,000
4 Pas. U-ditch 30x40 cm bh 398,000### 437,800 398,000
5 Semen portland zak 70,000### 77,000 70,000
6 Pasir pasang m3 200,000### 220,000 200,000
8 Pasir Urug m3 95,000### 104,500 95,000
9 Pemasangan CUD 300 LD bh 149,000### 163,900 149000
III. ALAT :
1 Cangkul Bh 100,000### 110,000 100,000
2 Sendok Bh 15,000### 16,500 15,000
3 Ember Bh 5,000### 5,500 5,000
4 Selang M 2,000### 2,200 2,000
5 alat bantu u-ditch 30/40 ls 21,000### 23,100 21,000
6 alat bantu cover u-ditch 30 ls 4,000### 4,400 4000
7 Benang Rol 2,000### 2,200 2000

Demikian Berita Acara Kesepakatan ini dibuat dan ditandatangani oleh wakil peserta masing-masing untuk dipergunak
Demikian Berita Acara Kesepakatan ini dibuat dan ditandatangani oleh wakil peserta masing-masing untuk dipergunak

:DIPERIKSA OLEH
,FASKEL ,UPL

( ) ( )

:MENGETAHUI
..............................LURAH ,KOORDINATOR

( ) (
H & ALAT
KUNGAN

.di ....................., Desa/Kel. ....................., Kecamatan


......orang (daftar hadir terlampir) untuk mengadakan
:

REKOMENDASI HARGA
L SURVEY*) TERENDAH YANG DIPILIH
UNTUK BULAN INI
Kelp.Masy.-3

Nama: HARGA
KETERANGAN
Almt : SATUAN*)
Telp : -

110,000 100,000
95,000 90,000
75,000 70,000

REKOMENDASI HARGA
L SURVEY*) TERENDAH YANG DIPILIH
UNTUK BULAN INI
Toko/Pemasok
…………….
Nama:
HARGA Nama
SATUAN*) Toko/Pemasok
Almt :
Telp :
____________
1,938,000 1,900,000
1,938,000 1,900,000
20,400 20,000
437,800 398,000
71,400 70,000
204,000 200,000
96,900 95,000
163,900 149,000

102,000 100,000
15,300 15,000
5,100 5,000
2,200 2,000
23,100 21,000
4,400 4,000
2,200 2,000

masing untuk dipergunakan sebagaimana mestinya.


masing untuk dipergunakan sebagaimana mestinya.

, ........................................Cirebon

:DIBUAT OLEH
,KETUA KSM

( )

,KOORDINATOR BKM

( )
PROGRAM KOTAKU
PROGRAM KOTA TANPA KUMUH
PERHITUNGAN VOLUME/KUANTITAS PEKERJAAN

Propinsi : Jawa Barat KSPM/Panitia


Kota : Cirebon Jenis Kegiatan
Kecamatan : Pulasaren Volume
Kelurahan/Desa : Pekalipan Lokasi

Sketsa & Perhitungan Volume Peke


No. Uraian Pekerjaan Satuan Panjang
SKETSA
(m)
I. Pekerjaan Persiapan
1.1 BOUPLANK atau PROPIL M2 165.00

II. Pekerjaan Tanah


2.1 Galian tanah untuk saluran air M3
Saluran Eksisting 128.0
Saluran Baru 37.0

2.2 Pengurugan tanah kembali M3

2.3 Pembokaran saluran eksisting M3 128.0

2.4 Urugan Pasir (lantai kerja) M3


165.0

2.5 Beton Tumbuk 1:3:5 (Perapihan Kembali)


M3
165.0

III Pek. Saluran Konstuksi U-ditch

3.1 Pas.U-ditch 50x50 cm BH 165.0


IV. Pek. Cover penutup U-ditch

4.1 Pemasangan SUD 500 LD BH 129.0

V. Pek. Grill penutup drainase

5.1 Griil 68 x 200 cm M 18.0

:DIPERIKSA OLEH
FASKEL UPL

.( ) ( )

Mengetahui :

Tim Askot Kota Cirebon Tim Teknis Satker Kota C

1. Deden Kusuma (Askot Infra Kota Cirebon) ( .....................) 1. Haniah, ST. MT

2. Sunandar (Askot UP Kota Cirebon) 2. H. Edi Santoso, ST.


( .....................)
Form - RAB 4
OGRAM KOTAKU
KOTA TANPA KUMUH
UME/KUANTITAS PEKERJAAN

: Karya Abadi
: Pas. U-Dicth 50x50
: 165 m
: RT.04 RW.07 Gg.6

Sketsa & Perhitungan Volume Pekerjaan Volume /


Lebar Tinggi NOS Kuantitas
(m) (m)

0.20 33.00

33.00

0.64 0.10 1.00 8.19


0.64 0.62 1.00 14.68
22.87
5.718

0.20 0.30 2.00 15.36


15.36

0.50 0.05 1.00 4.13


4.13

0.50 0.05 2.00 8.25


8.25

1.00 165.00

165.00
129.00

2.00 36

:DIBUAT OLEH
KETUA KSM/PANITIA

( )

Tim Teknis Satker Kota Cirebon

1. Haniah, ST. MT ( .....................)

2. H. Edi Santoso, ST. ( .....................)


81

253
126.0

0.20 128.00 lebar Volume m3 10.24


0.40 tinggi dua sisi 20.48 m3
-
165.00
165.00

9.5
16.7
PROGRAM KOTAKU
PROGRAM KOTA TANPA KUMUH
PERHITUNGAN KEBUTUHAN DAN BIAYA
TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRAS
(per Item Pekerjaan)

Propinsi : Jawa Barat


Kota : Cirebon
Kecamatan : Pulasaren
Kelurahan : Pekalipan

No Koefisien Uraian Volume Sat

1. BOUPLANK atau PROPIL = 33.00 m2


0.012 Kayu kaso 0.396 M3
0.007 Kayu papan 0.231 M3
0.020 Paku biasa 0.660 KG
0.100 Pekerja 3.300 HOK
0.100 Tukang 3.300 HOK
0.005 Mandor 0.165 HOK
Selang 10.000 M'
Benang 5.000 Rol
Sub Total (1)
2 Galian tanah untuk saluran = 22.87 m3
0.667 Tukang gali 15.257 HOK
0.025 Mandor 0.572 HOK
Cangkul 4.000 Bh
Ember 1.000 Bh
Sub Total (2)
3 Pengurugan kembali bekas galia = 5.72 m3
0.192 Pekerja 1.098 HOK
0.019 Mandor 0.109 HOK
Cangkul - Bh
Ember - Bh
Sub Total (3)

4 Pembongkaran saluran eksisting = 15.36 m3


6.000 Pekerja 92.160 HOK
0.433 Mandor 6.654 HOK
Cangkul 1.000 Bh
Ember - Bh
Sub Total (4)

5 Pas. U-ditch 50x50 cm = 165.00 bh


1.000 u-ditch 50x50 cm 165.000 bh
0.080 Semen portland 13.200 ZAK
0.012 Pasir pasang 1.980 M3
0.120 Pekerja 19.800 HOK
0.056 Tukang 9.240 HOK
0.012 Mandor 1.980 HOK
1.000 alat bantu 165.000 ls
Sub Total (5)
6 Urugan Pasir = 4.13 m3
1.200 Pasir Urug 4.950 m3
0.300 Pekerja 1.238 HOK
0.010 Mandor 0.041 HOK
Cangkul 1.000 bh
Ember 1.000 bh
Sub Total (6)
7 Beton Tumbuk 1:3:5 = 8.25 m3
4.360 Semen Portland 35.970 ZAK
0.520 Pasir Beton 4.290 M3
0.870 Split 2-3 7.178 M3
1.650 Pekerja 13.613 M3
0.250 Tukang 2.063 HOK
0.050 Mandor 0.413 HOK
Cangkul 1.000 ls
Sendok 2.000 ls
Ember 2.000 ls
Sub Total (7)
8 Pemasangan CUD 500 LD 129.00 bh
1.000 CUD 400 LD 129.000 bh
0.040 Semen PC 50 kg 5.160 zak
0.006 Pasir Pasang 0.774 m3
0.06 Pekerja 7.740 HOK
0.03 Tukang Batu 3.612 HOK
0.01 Mandor 0.774 HOK
1.00 Alat Bantu 129.000 ls
Sub Total (8)
9 1 M2 PENGECATAN BESI (3x) 9.36 m2
0.1670 Meni Besi 1.563 kg
0.2000 Cat Besi 1.872 kg
0.1500 Minyak Cat Thiner B 1.404 ltr
0.2000 Pekerja 1.872 oh
0.3000 Tukang Cat 2.808 oh
0.0300 Kepala Tukang Cat 0.281 oh
0.0100 Mandor 0.094 oh
Sub Total (9)
10 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT = 864.000 cm
0.0400 Kawat Las Listrik 34.560 kg
0.0300 Bahan Bakar Solar 25.920 ltr
0.0040 Pelumas 3.456 ltr
0.0004 Pekerja 0.346 org
0.0040 Tk. Las Besi 3.456 org
0.0010 Mandor 0.864 org
0.2500 Peralatan ( Mesin Las Listrikl ) 216.000 lot
Sub Total (10)
11 1 M' PEK. GRILL SALURAN L= 68 cm 36.000 m
8.9467 Besi Siku 4.40.40 322.000 kg
0.4000 Besi dia 16 mm polos 14.400 kg
24.0000 Pengelasan 864.000 cm
0.2600 Pengecatan 9.360 m2
Engsel Besi 54.000 Bh
Sub Total (11)

12 Administrasi
Papan Nama Proyek 1.000 Ls
Pelaporan ( Proposal, LPJ dijilid ) x 4 1.000 Ls
Alat Tulis Kantor (ATK); 1.000 Ls
Prasasti (Photo 0%, 50%, 100%) X 4 1.000 Ls
Foto copy (Proposal, LPJ ) x 4 1.000 Ls
Materai dll (4 bh + sesuaikan dgn banyaknya transaksi) 1.000 Ls

Jumlah Biaya Kontruksi


Jumlah Biaya Administrasi
Jumlah Total

:DIPERIKSA OLEH

FASKEL UPL

:Diverifikasi
:DisiapkanOleh
Oleh
Ketua
,Faskel
,UPL
KSM/Panitia
( ) ( )
Mengetahui :

(..………………………)
(..………………………)

Tim Askot Kota Cirebon Tim Teknis Satker Kot

1. Deden Kusuma (Askot Infra Kota Cirebon) ( .....................) 1. Haniah, ST. MT

2. H. Edi Santoso, ST.


2. Sunandar (Askot UP Kota Cirebon) 2. H. Edi Santoso, ST.
( .....................)
KOTAKU
TANPA KUMUH
UTUHAN DAN BIAYA
LAT DAN ADMINISTRASI
Pekerjaan)

KSPM/Panitia : Karya Abadi


Lokasi Kegiatan : RT.04 RW.07 Gg.6
Jenis Kegiatan : Pas. U-Dicth 50x50
Volume : 165m

Harga Satuan Jumlah Harga

1,900,000 752,400
1,900,000 438,900
20,000 13,200
70,000 231,000
90,000 297,000
100,000 16,500
2,000 20,000
2,000 10,000
Sub Total (1) 1,779,000

90,000 1,373,102
100,000 57,184
100,000 400,000
5,000 5,000
Sub Total (2) 1,835,286

70,000 76,855
100,000 10,865
100,000 -
5,000 -
Sub Total (3) 87,720

70,000 6,451,200
100,000 665,395
100,000 100,000
5,000 -
Sub Total (4) 7,216,595

570,000 94,050,000
70,000 924,000
200,000 396,000
70,000 1,386,000
90,000 831,600
100,000 198,000
35,000 5,775,000
Sub Total (5) 103,560,600

95,000 470,250
70,000 86,625
100,000 4,125
100,000 100,000
5,000 5,000
Sub Total (6) 666,000

70,000 2,517,900
275,000 1,179,750
300,000 2,153,250
70,000 952,875
90,000 185,625
100,000 41,250
100,000 100,000
15,000 30,000
5,000 10,000
Sub Total (7) 7,170,650

180,000 23,220,000
70,000 361,200
200,000 154,800
70,000 541,800
90,000 325,080
100,000 77,400
5,000 645,000
Sub Total (8) 25,325,280
28,000 43,767
55,000 102,960
30,000 42,120
70,000 131,040
90,000 252,720
90,000 25,272
100,000 9,360
Sub Total (9) 607,239

45,000 1,555,200
9,000 233,280
30,000 103,680
70,000 24,192
90,000 311,040
100,000 86,400
3,000 648,000
Sub Total (10) 2,961,792

15,000 4,830,000
12,000 172,800
-
-
30,000 1,620,000
Sub Total (11) 6,622,800

75,000 75,000
75,000 75,000
100,000 100,000
200,000 200,000
200,000 200,000
100,000 100,000
750,000
157,832,963
750,000
158,582,963

KSM

( )

Tim Teknis Satker Kota Cirebon

1. Haniah, ST. MT ( .....................)

2. H. Edi Santoso, ST. ( .....................)


2. H. Edi Santoso, ST. ( .....................)
Mandor HOK 4.05
Tukang HOK 33.47
Pekerja HOK 46.79
SUB TOTAL

Kayu kaso m3 0.40


Kayu papan m3 0.23
Paku biasa kg 0.66
Pas. U-ditch 30x40 cm bh -
Pas. U-ditch 40x40 cm bh 165.00
Semen portland zak 54.33
Pasir Pasang m3 2.75
Pasir Beton m3 4.29
Split 2-3 m3 7.18
80,236.00 Pasir Urug m3 4.95
Meni Besi 1.563
Cat Besi
Minyak Cat Thiner B
Kawat Las Listrik
Bahan Bakar Solar
15,340.00 Pelumas

456,583 Pemasangan CUD 300 LD bh -


Pemasangan CUD 400 LD bh 129.00
Pemasangan Grill 30 x 200 bh #REF!
Pemasangan Grill 40 x 200 bh #REF!
SUB TOTAL

Cangkul Bh 6.00
627,640 Sendok Bh 2.00
Ember Bh 4.00
Selang M' 10.00
Alat bantu u-ditch 30/40 ls -
Alat bantu u-ditch 40/40 ls 165.00
Alat bantu cover u-ditch 30 ls -
Alat bantu cover u-ditch 40 ls 129.00
161,455 Benang Rol 5.00

869,170

154,000

196,320
8,100,000.00
4.0666666667 24.4
0.1000 1.2

10,191,831 10,191,831

37

31,716,593
126,866,370
-
126,866,370
100,000.00 405,323.96
90,000.00 3,012,407.21
70,000.00 3,275,155.30
6,692,886.46

1,900,000.00 752,400.00
1,900,000.00 438,900.00
20,000.00 13,200.00
350,000.00 -
450,000.00 74,250,000.00
70,000.00 3,803,100.00
200,000.00 550,800.00
275,000.00 1,179,750.00
300,000.00 2,153,250.00
95,000.00 470,250.00
28,000.00 43,767.36
55,000.00 -
30,000.00 -
45,000.00 -
9,000.00 -
30,000.00 -

120,000.00 -
180,000.00 23,220,000.00
400,000.00 #REF!
450,000.00 #REF!
#REF!

100,000.00 600,000.00
15,000.00 30,000.00
5,000.00 20,000.00
2,000.00 20,000.00
21,000.00 -
27,000.00 4,455,000.00
3,500.00 -
4,000.00 516,000.00
2,000.00 10,000.00
5,651,000.00
PROGRAM KOTAKU
PROGRAM KOTA TANPA KUMUH
RENCANA ANGGARAN BIAYA DARI KONTIBUSI MASYARAKAT & BDI KOTAKU

Propinsi : Jawa Barat KSPM/Panitia :


Kota : Cirebon Jenis Kegiatan :
Kecamatan : Pulasaren Volume :
Kelurahan : Pekalipan Lokasi :

SWADAYA MASYARAKAT
Komponen/Bentuk Kontribusi Swadaya
NO Sat Volume Harga Jumlah Harga
Masyarakat Volume Harga Satuan Jumlah Harga Volum
Satuan
A. TENAGA KERJA :
1. Ketua Klp/Mandor HOK 11.665 100,000 1,166,479 2.665 100,000 266,479
2. Tukang HOK 40.016 90,000 3,601,439 24.016 90,000 2,161,439
3. Pekerja HOK 141.166 70,000 9,881,587 66.166 70,000 4,631,587
SUB TOTAL 14,649,506 7,059,506
B. BAHAN BANGUNAN :
1 Kayu kaso m3 0.396 1,900,000 752,400 0.40 1,900,000 752,400
2 Kayu papan m3 0.231 1,900,000 438,900 0.23 1,900,000 438,900
3 Paku biasa kg 0.660 20,000 13,200 0.66 20,000 13,200
4 Pas. U-ditch 40x40 cm bh 0.000 450,000 - - 450,000 -
5 Pas. U-ditch 50x50 cm bh 165.000 570,000 94,050,000 17.00 570,000 9,690,000
6 Semen portland zak 54.330 70,000 3,803,100 14.33 70,000 1,003,100
7 Pasir Pasang m3 2.754 200,000 550,800 0.75 200,000 150,800
8 Pasir Beton m3 4.290 275,000 1,179,750 1.29 275,000 354,750
9 Split 2-3 m3 7.178 300,000 2,153,250 4.18 300,000 1,253,250
10 Pasir Urug m3 4.950 95,000 470,250 1.95 95,000 185,250
11 Meni Besi kg 1.563 28,000 43,767 0.56 28,000 15,767
12 Cat Besi kg 1.872 55,000 102,960 0.87 55,000 47,960
13 Minyak Cat Thiner B ltr 1.404 30,000 42,120 0.40 30,000 12,120
14 Kawat Las Listrik kg 34.560 45,000 1,555,200 4.56 45,000 205,200
15 Bahan Bakar Solar ltr 25.920 9,000 233,280 5.92 9,000 53,280
16 Pelumas ltr 3.456 30,000 103,680 1.46 30,000 43,680
17 Besi Siku 4.40.40 kg 322.000 15,000 4,830,000 42.00 15,000 630,000
18 Besi dia 16 mm polos kg 14.400 12,000 172,800 3.40 12,000 40,800
19 Engsel Besi bh 54.000 30,000 1,620,000 9.00 30,000 270,000
20 Pemasangan CUD 500 LD bh 129.000 180,000 23,220,000 17.00 180,000 3,060,000
SUB TOTAL 135,335,457 18,220,457
C. ALAT :
1 Cangkul Bh 7.00 100,000 700,000 7.00 100,000 700,000
2 Sendok Bh 2.00 15,000 30,000 2.00 15,000 30,000
3 Ember Bh 4.00 5,000 20,000 4.00 5,000 20,000
4 Selang M' 10.00 2,000 20,000 10.00 2,000 20,000
5 Alat bantu u-ditch 40/40 ls 0.00 27,000 - - 27,000 -
6 Alat bantu u-ditch 50/50 ls 165.00 35,000 5,775,000 45.00 35,000 1,575,000
7 Alat bantu cover u-ditch 40 ls 0.00 4,000 - - 4,000 -
8 Alat bantu cover u-ditch 50 ls 129.00 5,000 645,000 29.00 5,000 145,000
9 Alat Bantu Las Listrik ls 216.00 3,000 648,000 116.00 3,000 348,000
10 Benang Rol 5.00 2,000 10,000 5.00 2,000 10,000
SUB TOTAL 7,848,000 2,848,000
D ADMINISTRASI :
1 Papan Nama Proyek Bh 1.00 75,000 75,000
2 Pelaporan ( Proposal, LPJ dijilid ) x 4 Ls 1.00 75,000 75,000
3 Alat Tulis Kantor (ATK); Ls 1.00 100,000 100,000
4 Prasasti (Photo 0%, 50%, 100%) X 4 Ls 1.00 200,000 200,000
5 Foto copy (Proposal, LPJ ) x 4 Ls 1.00 200,000 200,000
6 Materai dll (4 bh + sesuaikan dgn banyaknya
Ls
transaksi) 1.00 100,000 100,000
SUB TOTAL 750,000 -
I JUMLAH (A s/d D) 158,582,963 28,127,963
E KONTRIBUSI SWADAYA MASYARAKAT LAINNYA
1 Tanah m2
2 Pohon/Tanaman Bh/Ha
3 Dll
II JUMLAH (E)
JUMLAH (I & II) 158,582,963 28,127,963
PEMBULATAN 158,583,000 28,128,000
:DIPERIKSA OLEH

FASKEL UPL :DIBUA


KETUA KSM

( ) ( ) (

Mengetahui :

Tim Askot Kota Cirebon Tim Teknis Satker Kota C

1. Deden Kusuma (Askot Infra Kota Cirebon) ( .....................) 1. Haniah, ST. MT

2. Sunandar (Askot UP Kota Cirebon) 2. H. Edi Santoso, ST.


( .....................)
PROGRAM KOTAKU
ROGRAM KOTA TANPA KUMUH
YA DARI KONTIBUSI MASYARAKAT & BDI KOTAKU

Karya Abadi
Pas. U-Dicth 50x50
165 m
RT.04 RW.07 Gg.6

BDI
Volume Harga Satuan Jumlah Harga

9.00 100,000 900,000


16.00 90,000 1,440,000
75.00 70,000 5,250,000
7,590,000

- 1,900,000 -
- 1,900,000 -
- 20,000 -
- 450,000 -
148.00 570,000 84,360,000
40.00 70,000 2,800,000
2.00 200,000 400,000
3.00 275,000 825,000
3.00 300,000 900,000
3.00 95,000 285,000
1.00 28,000 28,000
1.00 55,000 55,000
1.00 30,000 30,000
30.00 45,000 1,350,000
20.00 9,000 180,000
2.00 30,000 60,000
280.00 15,000 4,200,000
11.00 12,000 132,000
45.00 30,000 1,350,000
112.00 180,000 20,160,000
117,115,000
100,000 -
- 15,000 -
- 5,000 -
- 2,000 -
- 27,000 -
120.00 35,000 4,200,000
- 4,000 -
100.00 5,000 500,000
100.00 3,000 300,000
- 2,000 -
5,000,000
1.000 75,000 75,000
1.000 75,000 75,000
1.000 100,000 100,000
1.000 200,000 200,000
1.000 200,000 200,000

1.000 100,000 100,000


750,000
130,455,000

130,455,000
130,455,000

:DIBUAT OLEH
KETUA KSM/PANITIA

( )

Tim Teknis Satker Kota Cirebon

1. Haniah, ST. MT ( .....................)

2. H. Edi Santoso, ST. ( .....................)


PROGRAM KOTAKU
PROGRAM KOTA TANPA KUMUH
REKAPITULASI RENCANA ANGGARAN BIAYA (SWADAYA DAN BD
Propinsi : Jawa Barat KSPM/Panit
Kabupaten : Cirebon Jenis Kegiat
Kecamatan : Pulasaren Volume
Kelurahan : Pekalipan Lokasi

Kegiatan : Pas. U-Dicth 50x50 Kegiatan :


Volume : 165 Bobot Volume : Bobot
Jumlah : Jumlah :
NO URAIAN No.RAB (%) No.RAB : %
Dari Dari Dari Dari
TOTAL TOTAL
SWADAYA BDI SWADAYA BDI
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
(1) (2) (3) (4) (5)=(3+4) (6) (7) (8) (9)=(7+8) (10)

A TENAGA KERJA 7,059,506 7,590,000 14,649,506 9.24


B BAHAN 18,220,457 117,115,000 135,335,457 85.34
C ALAT 2,848,000 5,000,000 7,848,000 4.95
D BIAYA ADMINISTRASI - 750,000 750,000 0.47
H JUMLAH (A s/d D) 28,127,963 130,455,000 158,582,963 100.00
I KONTRIBUSI SWADAYA MASYARAKAT LAINNYA
1 Tanah -
2 Pohon/Tanaman
3 Dll.
J JUMLAH (1 s/d 3) - -
JUMLAH (H & J) 28,127,963 130,455,000 158,582,963

K PEMBULATAN 28,127,963 130,455,000 158,582,963

:DIPERIKSA OLEH

FASKEL UPL

( ) ( )

Mengetahui :
:Disiapkan
:Diverifikasi
:iverifikasi
:Disiapkan
Oleh
Oleh
Oleh
Oleh
Oleh
KetuaKetua
,Faskel
KSM/Panitia
,UPLKSM/Panitia
,
Tim Askot Kota Cirebon Tim Teknis Satke

(..………………………)
(..………………………)
1. Deden Kusuma (Askot Infra Kota Cirebon) ( .....................) 1. Haniah, ST. MT
(..………………………)

2. Sunandar (Askot UP Kota Cirebon) ( .....................) 2. H. Edi Santoso,


PROGRAM KOTAKU
AM KOTA TANPA KUMUH
ANGGARAN BIAYA (SWADAYA DAN BDI)
KSPM/Panitia : Karya Abadi
Jenis Kegiatan : Pas. U-Dicth 50x50
Volume : 165 Meter
: RT.04 RW.07 Gg.6

Bobot
JUMLAH TOTAL
Total
(%)
Dari Dari
TOTAL
SWADAYA BDI
(Rp) (Rp) (Rp)
(11)=(3+7) (12) (13)=(11+12) (14)

7,059,506 7,590,000 14,649,506 9.24


18,220,457 117,115,000 135,335,457 85.34
2,848,000 5,000,000 7,848,000 4.95
- 750,000 750,000 0.47
28,127,963 130,455,000 158,582,963 100.00
-
- - -
- - -
-
- - -
28,127,963 130,455,000 158,582,963 100.00
28,128,000 130,455,000 158,583,000 100.00

, ........................Cirebon
:DIBUAT OLEH
KETUA KSM/PANITIA

( )

Tim Teknis Satker Kota Cirebon

1. Haniah, ST. MT ( .....................)

2. H. Edi Santoso, ST. ( .....................)


PROGRAM KOTAKU
PROGRAM KOTA TANPA KUMUH
RENCANA JADWAL PELAKSANAAN KEGIATAN SARANA & PRASARANA

Propinsi : Jawa Barat KSPM/Panitia : Karya Abadi


Kota : Cirebon Jenis Kegiatan : Pas. U-Dicth 50x5
Kecamatan : Lemahwungkuk Volume : 165
Kelurahan/Desa : Kesepuhan Lokasi : RT.04 RW.07 Gg.

Pelaksanaan
Durasi
No. Uraian Pekerjaan Volume Sat Bobot (Harian)
(hari)
(%) 1 2 3 4 5 6 7 8 9 10
1 BOUPLANK atau PROPIL 33.00 M2 1.122 4
2 Galian tanah untuk saluran 22.87 M3 1.157 2
3 Pas. U-ditch 40x40 cm 0.00 M3 0.000 2
4 Urugan Pasir 4.13 M3 0.420 2
5 Beton Tumbuk 1:3:5 8.25 M2 4.522 2
6 Pemasangan CUD 400 LD 0.00 LS 0.000 2
7 Administrasi 1 LS 0.473

Jumlah 7.69 14

:DIKETAHUI OLEH :DIPERIKSA OLEH


FASKEL UPL

( ) ( )
F
o
r
m

a Abadi -
U-Dicth 50x50
R
Meter A
4 RW.07 Gg.6 B

8
Keterangan
11 12 13 14

,...........................Cirebon
:DIBUAT OLEH
KETUA KSM/PANITIA

( )
PROGRAM KOTA TANPA KUMUH (KOTAKU) KOTA CIREBON
RENCANA PENGGUNAAN DANA (RPD)
(TERMIN 60 %) Rp. 78.273.000,.
Nama KSM : Karya Abadi ( Pas. U-Dicth 50x50 )
Lokasi : Pulasaren RW 07
Kelurahan : Pulasaren
Kecamatan : Pekalipan
Kota : Cirebon

Penerimaan (Rp)
Harga Satuan
No TGL Uraian Satuan Vol Jumlah
(Rp) BDI SWD Masyarakat

1 2 3 4 5 6 7 8 9 10
1 15/08/2017 Pas. U-ditch 50x50 cm bh 570,000 96 54,720,000 54,720,000
2 15/08/2017 CUD L500 LD bh 180,000 96 17,280,000 17,280,000
3 15/08/2017 Alat bantu u-ditch 50/50 bh 35,000 70 2,450,000 2,450,000
4 15/08/2017 Mandor HOK 100,000 4 400,000 400,000
5 15/08/2017 Tukang HOK 90,000 8 720,000 720,000
6 15/08/2017 Pekerja HOK 70,000 37 2,590,000 2,590,000
7 15/08/2017 Papan Proyek ls 75,000 1 75,000 75,000
8 15/08/2017 Foto Copy dan ATK ls 38,000 1.0 38,000 38,000
Total Penerimaan 78,273,000

Pulasaren, 15 Agustus 2017


MENGETAHUI
KETUA KSM BENDAHARA KSM
(...............................................) (.........................................)
9
14
47 -28.00

- 130,455,000
78,273,000
13,045,500
78,273,000
PROGRAM KOTA TANPA KUMUH (KOTAKU) KOTA CIREBON
RENCANA PENGGUNAAN DANA (RPD)
(TERMIN 30 %) Rp. 39.136.500,.
Nama KSM : Karya Abadi ( Pas. U-Dicth 50x50 )
Lokasi : Pulasaren RW 07
Kelurahan : Pulasaren
Kecamatan : Pekalipan
Kota : Cirebon
Penerimaan (Rp)
Harga Satuan
No TGL Uraian Satuan Vol Jumlah
(Rp) BDI SWD Masyarakat

1 2 3 4 5 6 7 8 9 10
1 15/08/2017 Pas. U-ditch 50x50 cm bh 570,000 52 29,640,000 29,640,000
2 15/08/2017 CUD L500 LD bh 180,000 16 2,880,000 2,880,000
3 15/08/2017 Alat bantu u-ditch 50/50 bh 35,000 50 1,750,000 1,750,000
4 15/08/2017 Semen portland zak 70,000 10 700,000 700,000
5 15/08/2017 Pasir Pasang m3 200,000 2 400,000 400,000
6 15/08/2017 Pasir Beton m3 275,000 3 825,000 825,000
7 15/08/2017 Split 2-3 m3 300,000 3 900,000 900,000
8 15/08/2017 Pasir Urug m3 95,000 3 285,000 285,000
9 15/08/2017 Mandor HOK 100,000 5 500,000 500,000
10 15/08/2017 Tukang HOK 90,000 6 540,000 540,000
11 15/08/2017 Pekerja HOK 70,000 10 700,000 700,000
12 15/08/2017 Foto Copy dan ATK ls 16,500 1 16,500 16,500
Total Penerimaan 39,136,500

Pulasaren, 15 Agustus 2017


MENGETAHUI
KETUA KSM BENDAHARA KSM
(...............................................) (.........................................)
39,136,500

148 84,360,000
112
120

38

- 130,455,000
78,273,000
39,136,500
13,045,500
PROGRAM KOTA TANPA KUMUH (KOTAKU) KOTA CIREBON
RENCANA PENGGUNAAN DANA (RPD)
(TERMIN 10 %) Rp. 13.045.500,.
Nama KSM : Karya Abadi ( Pas. U-Dicth 50x50 )
Lokasi : Pulasaren RW 07
Kelurahan : Pulasaren
Kecamatan : Pekalipan
Kota : Cirebon
Penerimaan (Rp)
Harga Satuan
No TGL Uraian Satuan Vol Jumlah
(Rp) BDI SWD Masyarakat

1 2 3 4 5 6 7 8 9 10
1 15/08/2017 Meni Besi kg 28,000 1 28,000 28,000
2 15/08/2017 Cat Besi kg 55,000 1 55,000 55,000
3 15/08/2017 Minyak Cat Thiner B ltr 30,000 1 30,000 30,000
4 15/08/2017 Kawat Las Listrik kg 45,000 30 1,350,000 1,350,000
5 15/08/2017 Bahan Bakar Solar ltr 9,000 20 180,000 180,000
6 15/08/2017 Pelumas ltr 30,000 2 60,000 60,000
7 15/08/2017 Besi Siku 4.40.40 kg 15,000 280 4,200,000 4,200,000
8 15/08/2017 Besi dia 16 mm polos kg 12,000 11 132,000 132,000
9 15/08/2017 Engsel Besi bh 30,000 45 1,350,000 1,350,000
10 15/08/2017 Semen portland zak 70,000 30 2,100,000 2,100,000
11 15/08/2017 Alat bantu cover u-ditch 50 ls 5,000 100 500,000 500,000
12 15/08/2017 Alat Bantu Las Listrik ls 3,000 100 300,000 300,000
13 15/08/2017 Tukang HOK 90,000 2 180,000 180,000
14 15/08/2017 Pekerja HOK 70,000 28 1,960,000 1,960,000
15 15/08/2017 Foto Copy dan ATK ls 620,500 1 620,500 620,500
Total Penerimaan 13,045,500
Pulasaren, 15 Agustus 2017
MENGETAHUI
KETUA KSM BENDAHARA KSM
(...............................................) (.........................................)
13,045,500

97 54,748,000
97
71

- 129,500 750,000 130,455,000


39,136,500
13,045,500
M PENATAAN LINGKUNGAN PERMUKIMAN BERBASIS KOMUNITAS ( PLP-BK ) KABUPATEN MAJ
LAPORAN PENGGUNAAN DANA (LPD)
(TERMIN 60%)
Nama KSM : Panjunan 1 ( SPAL Pipa PVC )
Lokasi : RW 05
Desa : Parungjaya
Kecamatan : Leuwimunding
Kabupaten : Majalengka

Harga Pengeluaran Jumlah


Nomor
No TGL Uraian Satuan Satuan Vol Pengelu
Bukti BLM SWD
(Rp) aran
1 2 3 4 5 6 7 8
Pemanfa
atan
Dana
23/02/20
II Lingkung02/UM/II/2015
16
an
Termin
60%
1 23/02/2016Pipa PVC01/UK/II/2016
d m 40,000 164 6,560,000 6,560,000
2 23/02/2016Bata Mera 02/UK/II/2016 bh 800 4550 3,640,000 3,640,000
3 24/02/2016Pasir Pasa03/UK/II/2016 m3 150,000 9 1,350,000 1,350,000
4 25/02/2016Semen 04/UK/II/2016 zak 70,000 35 2,450,000 2,450,000
5 28/02/2016Drill Besi05/UK/II/2016 bh 170,000 65 ### ###
6 02/03/2016Tukang 06/UK/III/2016 HOK 80,000 13 1,040,000 1,040,000
Pekerja /
7 02/03/2016 06/UK/III/2016 HOK 70,000 13 910,000 910,000
Laden
SALDO

Parungjaya, 19 Februari 2016


MENGETAHUI
KETUA KSM BENDAHARA KSM

(...............................................) (...............................................)
-BK ) KABUPATEN MAJALENGKA

Saldo Kas

10

###

###
###
###
###
###
910,000

aya, 19 Februari 2016

BENDAHARA KSM

..........................................)

Anda mungkin juga menyukai