1. Leveling
Volume Jalan = = 67 m2
Kebutuhan Bahan, Upah dan Alat :
* Bahan - Agregat A = 0.5 x 0.05 x 66.60 ~ 2 m3
* Alat - Mesin Gilas Baby Roller = 0.007 x 0.05 x 0.00 ~ 1.0 Hari
Volume Jalan = = 67 m2
Kebutuhan Bahan, Upah dan Alat :
* Bahan - Shand Seet = 75 x 66.6 = 3.33 ~ 3 Ton
1,500
- Lapis Perekat (Tack Coat) = 0.25 66.6 = 16.65 17 Ltr
Referensi :
Tanggal Survey : Dibuat Oleh :
Analisa Harga Satuan Pekerjaan FT, PL, KPMD dan TPKD
Wllayah III ( Ciamis )
RENCANA ANGGARAN BIAYA (RAB)
DESA GARAWANGI KECAMATAN SUMBERJAYA
TAHUN ANGGARAN 2020
No.RAB : 7
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pengaspalan Jalan (LATASIR/Shand Seet) Tebal 2 cm
Waktu Pelaksanaan : 1 Hari kerja
Lokasi : RT 02 RW 05 Blok Kamis
Volume Panjang : 55.5 m' Lebar 1,2 meter
The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when you save this workbook
in an earlier file format.
Some cells or styles in this workbook contain formatting that is not supported 13
by the selected file format. These formats will be converted to the closest
format available.
LATASIR ( Shand Seet ) 2 Cm
Prime Coat
LPA Klas A 3/5 Cm ( Levelling )
Tack Coat
Telford ( Levelling )
Pasir Urug 5 Cm
132 M
A
55,5 M
Prime Coat
Rabat Beton
1,2 M
KABUPATEN
MAJALENGKA
KECAMATAN
SUMBERJAYA
DESA
GARAWANGI
JENIS PRASARANA
JALAN LINGKUNGAN
JUDUL GAMBAR
sir (Sand Sheet) 2 Cm DENAH SITUASI
Digambar Oleh
Rabat Beton
Pelaksana Kegiatan
HENDRA
Diperiksa dan disetujui
Dinas / Instansi Terkait
dan/atau Tenaga Profesional
TA 2020
Mengetahui
Kepala Desa Garawangi
AGUS SETIAWAN
Tgl Bln Thn
GAMBAR RENCANA
KABUPATEN
MAJALENGKA
KECAMATAN
SUMBERJAYA
DESA
GARAWANGI
JENIS PRASARANA
JALAN LINGKUNGAN
JUDUL GAMBAR
POTONGAN MELINTANG
Digambar Oleh
Pelaksana Kegiatan
HENDRA
Diperiksa dan disetujui
Dinas / Instansi Terkait
dan/atau Tenaga Profesional
.....................................
TA 2020
Mengetahui
Kepala Desa Garawangi
AGUS SETIAWAN
Tgl Bln Thn