1. Volume Beton
0.15 m
1.00 m
V= 0.15 X 1.00 X 1200 = 180.00 M3
1.00 m
V= 0.10 X 1.00 X 1200 = 120.00 M3
ANALISA KEBUTUHAN BAHAN DAN UPAH UNTUK BETON CAMPURAN K250 D-07
I. Bahan
1. Pasir Beton = 0.5221 X 180.00 = 93.98 M3 Dibulatkan 94.00 M3
2. Split pecah mesin 2/3 = 0.74786 X 180.00 = 134.61 M3 Dibulatkan 135.00 M3
3. Semen PC (50 Kg) = 7.6800 X 180.00 = 1382.40 Zak Dibulatkan 1383.00 Zak
4. Sirtu = 1.2000 X 120.00 = 144.00 M3 Dibulatkan 144.00 M3
II Upah
1. Pekerja = 1.6500 X 180.00 = 297 x 1.00 = 297 Dibulatkan 297 HOK
2. Tukang = 0.2800 X 180.00 = 50.4 x 1.00 = 50.4 Dibulatkan 50 HOK
2 Upah Timbunan
1. Pekerja = 80.00 HOK Dibulatkan 80.00 HOK
KUSNADI
Kabupaten Bogor Jenis Prasarana : Jalan Rabat Beton
Kecamatan : Caringin Take Of Sheet 0
Desa : Pasirbuncir Volume : 1200 X 1 x 0.15 m
1200
I. Bahan
1. Kaso 5/7 2 x pakai = 0.0170 X 198.08 = 3.37 M3 Dibulatkan 4.00 M3
2.Papan Terentang = 0.0100 X 198.08 = 1.98 M3 Dibulatkan 2.00 M3
3 Paku 5 cm = 0.2000 X 198.08 = 39.62 Kg Dibulatkan 40.00 Kg
II Upah
1. Pekerja = 0.1200 X 198.08 = 23.769 HOK Dibulatkan 24 HOK
2. Tukang = 0.1500 X 198.08 = 29.71125 HOK Dibulatkan 30 HOK
KUSNADI
Propinsi Jawa Barat Jenis Prasarana : Tembok Penahan Tanah
Kabupaten : Bogor Lokasi
Kecamatan : Caringin Take Of Sheet Volume : x x m
Desa : Pasirbuncir
II. UPAH
1. Pekerja = 1.500 X 0.75 X - = - HOK
2. Tukang = 0.750 X 0.75 X - = - HOK
II. UPAH
1. Pekerja = 0.300 X 1.00 X 0.0 = 0.00 HOK
2.Tukang = 0.150 X 1.00 X 0.0 = 0.00 HOK
I. BAHAN
1. Batu Belah = 0.00 M3 Dibulatkan 0
2.Pasir pasang = 0.00 + 0.00 = 0.00 M3 Dibulatkan 0
3.Semen Pc 50 kg = 0.00 + 0.00 = 0.00 Zak Dibulatkan 0
4. Pasir Urug = 0.00 0.00 M3 Dibulatkan 0
5. Bambu = 10 10 Btg Dibulatkan 10
II. UPAH
1. Pekerja = - + - + 0.00 = - HOK 0
2.Tukang = - + 0.00 = - HOK 0
Dibuat Oleh;
SUPRIATNA
RENCANA ANGGARAN BIAYA (RAB) PERUBAHAN
1 BAHAN
1 Batu Split 2/3 135.0 - 135.0 M3 290,000 - 39,150,000
2 Pasir Beton 94.0 - 94.0 M3 300,000 - 28,200,000
3 Sirtu 144.0 - 144.0 m3 230,000 - 33,120,000
4 Semen Pc 50 kg 1383.0 - 1383.0 Zak 70,000 - 96,810,000
5 Kaso 5/7 4.0 4.0 m3 1,100,000 - 4,400,000
6 Papan Terentang 2.0 2.0 m3 1,200,000 - 2,400,000
7 Paku 5 cm 40.0 40.0 kg 15,000 - 600,000
10 Plastik 65.0 - 65.0 Kg 25,000 - 1,625,000
B. BANGUNAN PELENGKAP
I BAHAN
1 1. Batu Belah 0.0 - 0.0 m3 270,000 - -
2 2.Pasir pasang 0.0 - 0.0 m3 250,000 - -
3 3.Semen Pc 50 kg 0.0 - 0.0 Zak 70,000 - -
4 Pasir Urug 0.0 - 0.0 m3 220,000 - -
5 Bambu 10.0 10.0 Btg 20,000 - 200,000
B ALAT
1 Solar Molen 104.00 104.00 liter 8,000 - 832,000
2 Molen 30.00 30.00 Hri 500,000 - 15,000,000
3 Mobilisasi dan Demobilisasi 1.00 1.00 Ls 10,000,000 - 10,000,000
6 Ember 31.00 31.00 bh 10,000 310,000
7 Benang 20.00 20.00 bh 5,000 100,000
8 Selang 300.00 300.00 m 7,500 2,250,000
9 Pengki 30.00 30.00 bh 15,000 450,000
10 Cangkul 10.00 10.00 bh 85,000 850,000
11 Sekop 9.00 9.00 bh 55,000 495,000
12 Palu 5.00 5.00 bh 85,000 425,000
13 Gergaji Kayu 5.00 5.00 bh 65,000 325,000
14 Gergaji Besi 4.00 4.00 bh 50,000 200,000
15 Prasasti 1.00 1.00 bh 850,000 850,000
16 Papan proyek 1.00 1.00 bh 250,000 250,000
-
Sub Total Peralatan 32,337,000
Volume Sumber Dana
Kode Harga Satuan
No URAIAN Dari Satuan
Dari Kategori Swadaya APBD
Total Swaday
APBD (Rp) (Rp) (Rp)
a
C BIAYA OPERASIONAL
1 Ketua 1.00 1.00 0rg 5,500,000 5,500,000
2 Sekertaris 1.00 1.00 0rg 4,500,000 4,500,000
3 Anggota 5.00 5.00 0rg 4,100,000 20,500,000
4 Atk 1.00 1.00 Paket 2,000,000 2,000,000
5 Pelaporan Progres 1.00 1.00 Paket 1,000,000 1,000,000
6 Pelaporan Akhir 1.00 1.00 Paket 413,000 413,000
7 Transport TPK 1.00 1.00 ls - -
Sub Total I) 33,913,000
TOTAL BIAYA OPERASIONAL
Dibuat oleh,
Diketahui, TIM PELAKSANA KEGIATAN
KEPALA DESA
( SUPRIATNA )
( OPIK SAHRUDIN )
Diperiksa
1. PERANGKAT DAERAH TERKAIT ________________________
Bangunan Pelengkap
TOTAL (Rp)
(Rp)
k = i+j
39,150,000
28,200,000
33,120,000
96,810,000
4,400,000
2,400,000
600,000
1,625,000
206,305,000
48,600,000
12,600,000
-
61,200,000
267,505,000
-
-
-
-
200,000
200,000
-
-
-
-
200,000
832,000
15,000,000
10,000,000
310,000
100,000
2,250,000
450,000
850,000
495,000
425,000
325,000
200,000
850,000
250,000
-
32,337,000
TOTAL (Rp)
(Rp)
5,500,000
4,500,000
20,500,000
2,000,000
1,000,000
413,000
-
33,913,000
33,913,000
267,705,000
32,337,000
33,913,000
333,955,000
-
333,955,000
Dibuat oleh,
TIM PELAKSANA KEGIATAN
( SUPRIATNA )
________________________
________________________
Form 7.
DOKUMENTASI 0%
TITIK AWAL TITIK TENGAH TITIK AKHIR
DOKUMENTASI KEGIATAN
PROPINSI
JAWA BARAT
KABUPATEN
BOGOR
KECAMATAN
CARINGIN
DESA
CIMANDE
JENIS PRASARANA
SARANA DAN PRASARANA
LOKASI
KP.BARU RW.004
Dibuat oleh,
TPK
SUPRIATNA
Disetujui oleh,
Kepala Desa Cimande Hilir
OPIK SAHRUDIN
PERALATAN
II 32,337,000.00 - 9.68% - - - - 32,337,000.00 - 9.68%
300,042,000 - - 300,042,000 -
J u m l a h BAHAN dan - - -
89.85% 0% 89.85%
UPAH
- - 300,042,000
0.00%
GAMBAR RENCANA
PROPINSI
JAWA BARAT
KABUPATEN
BOGOR
KECAMATAN
CARINGIN
DESA
CIMANDE
JENIS PRASARANA
TPT
LOKASI
KP.BARU RW.004
JUDUL GAMBAR
POTONGAN MELINTANG
DETAIL POT. MELINTANG
Dibuat oleh,
TPK
SUPRIATNA
Disetujui oleh,
Kepala Desa Cimande
OPIK SAHRUDIN
Diperiksa oleh,
PDTI / TA Infrastruktur
Lembar 1 dari 1 Lembar