KABUPATEN : BALANGAN JENIS KEGIATAN : PEMBERSIHAN JALAN
KECAMATAN : AWAYAN LOKASI : RT 1 DESA : PUTAT BASIUN DIMENSI : 300 M x 1 M
I. BAHAN
PEKERJAAN : PEMBERSIHAN JALAN
Volume = 300 x 1 = 300 M2
II. ALAT SUB TOTAL 2 = Rp. - III. UPAH 1 Upah Pembersihan HOK = Volume total x Satuan Upah = 300 x Rp 17.500 x Rp. 17.500 Upah 110.000 = 47,73 HOK = 48 HOK Upah 164 SUB TOTAL 3 = Rp. 4.800.000 Upah Pengecoran = HOK x Satuan Upah = 48 x Rp. 100.000 5,8575 IV. LAIN - LAIN
1 Papan Proyek Kegiatan = 1 x Rp. 200.000 = Rp. 200.000
SUB TOTAL 4 = Rp. 200.000 TOTAL = Sub total 1 + Sub Total 2 + Sub Total 3 + Sub Total 4