Panjang Jalan : 2,600 Meter


Rencana Lebar Jalan : 2.5 Meter
Luas Jalan : 2600 x 2.5 = 6,500 m2

TOTAL LUAS PENGASPALAN = 6,500

1. Lapis Permukaan Aspal LATASIR (SANDSHEET) ------->Kode Pekerjaan K.638

Volume Jalan = = 6,500 m2


Kebutuhan Bahan, Upah dan Alat :
* Bahan - Campuran LATASIR = 0.044 x 6500 = 286.00 ~
- Aspal Bitumen = 0.400 x 6500 = 2600.00 ~
- Satu drum aspal beratnya 155= 2600 / 155 = 16.77 =
- Minyak Bakar = 0.100 x 6500 = 650.00 ~
-

* Alat - Mesin Gilas Tandem 6 - 10 T = 0.003 x 6500 = 19.50 ~


- Mesin Gilas Roda Karet 6 - 15 = 0.003 x 6500 = 19.50 ~
- Penyemprot Aspal 350 Lt = 0.003 x 6500 = 19.50 ~
- Compresor 150 m3/jam = 0.003 x 6500 = 19.50 ~

* Upah - Mandor = 0.001 x 6500 = 6.50 ~


- Operator Terlatih = 0.003 x 6500 = 19.50 ~
- Pekerja = 0.006 x 6500 = 39.00 ~
- Tukang = 0.005 x 6500 = 32.50 ~

Total Kebutuhan Bahan, Upah dan Alat untuk Pekerjaan Jalan


* BAHAN - Campuran LATASIR = 286.0 Ton
- Aspal Bitumen = 17.0 drum
- Minyak Bakar = 650.0 Lt
-

* ALAT - Mesin Gilas Tandem 6 - 10 T = 20.0 Hari


- Mesin Gilas Roda Karet 6 - 15 = 20.0 Hari
- Penyemprot Aspal 350 Lt = 20.0 Hari
- Compresor 150 m3/jam = 20.0 Hari
- Mobilisasi Alat Berat = 1.0 Ls

* UPAH - Mandor = 7.0 hok


- Operator Terlatih = 20.0 hok
- Pekerja = 39.0 hok
- Tukang = 33.0 hok

Tanggal Survey : Referensi : Dibuat Oleh :


Analisa Harga Satuan Pekerjaan Wllayah FT, PL, KPMD dan TPKD
III ( Ciamis ) AJAT SUDRAJAT
SINDANGKERTA

Tanggal :

JAAN DAN KEBUTUHAN BAHAN, UPAH DAN ALAT

286.0 Ton
### Kg
17.0 drum
650.0 Lt

20.0 Hari
20.0 Hari
20.0 Hari
20.0 Hari

7.0 Hari
20.0 Hari
39.0 Hari
33.0 Hari
Dibuat Oleh :
FT, PL, KPMD dan TPKD
AJAT SUDRAJAT
RENCANA ANGGARAN BIAYA (RAB)
DESA SINDANGKERTA KECAMATAN MAJA
TAHUN ANGGARAN 2020

No.RAB : ….. / 2019


Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Penghamparan Lapis Permukaan Aspal LATASIR (SANDSHEET)
Waktu Pelaksanaan : 20 Hari kerja
Lokasi : Desa Sindangkerta
Volume Panjang : 2,600 m' Lebar 2,5meter

Format Kebutuhan Bahan Alat Upah Untuk RAB


Jumlah Total
No. URAIAN Volume Satuan Harga Satuan Rp Rp

1 2 3 4 5 6=5x4 No. Uraian/Bahan Volume Satuan


1 Belanja Upah
1 Honor Panitia Pelaksana 1.0 Ls Rp 9,000,000 Rp 9,000,000 1 Campuran LATASIR 286.0 Ton
2 Mandor 7.0 hok Rp 150,000 Rp 1,050,000 2 Aspal Bitumen 17.0 drum
3 Operator Terlatih 20.0 hok Rp 120,000 Rp 2,400,000 3 Minyak Bakar 650.0 Lt
4 Pekerja 39.0 hok Rp 85,000 Rp 3,315,000 4
5 Tukang 33.0 hok Rp 105,000 Rp 3,465,000 5 Mesin Gilas Tandem 6 - 10 T 20.0 Hari
Sub Total (1) Rp 19,230,000 6 Mesin Gilas Roda Karet 6 - 15 T 20.0 Hari
2 Belanja Modal Bahan Baku 7 Penyemprot Aspal 350 Lt 20.0 Hari
1 Campuran LATASIR 286.0 Ton Rp 1,350,000 Rp 386,100,000 8 Compresor 150 m3/jam 20.0 Hari
2 Aspal Bitumen 17.0 drum Rp 2,000,000 Rp 34,000,000 9 Mobilisasi Alat Berat 1.0 LS
3 Minyak Bakar 650.0 Lt Rp 17,000 Rp 11,050,000 10
4 Prasasti Kegiatan 1.0 Bh Rp 800,000 Rp 800,000 11
5 Papan Proyek 1.0 Bh Rp 250,000 Rp 250,000 Jumlah PPN + PPH Yang Harus dibayar
Sub Total (2) Rp 432,200,000
3 Belanja Sewa Alat
1 Mesin Gilas Tandem 6-10 T 20.0 Hari Rp 480,000 Rp 9,600,000
2 Mesin Gilas Roda karet 6-15 T 20.0 Hari Rp 640,000 Rp 12,800,000
3 Penyemprot Aspal 350 ltr 20.0 Hari Rp 400,000 Rp 8,000,000
4 Compressor 150 m3/jam 20.0 Hari Rp 400,000 Rp 8,000,000
5 mobilisasi alat 1.0 LS Rp 2,500,000 Rp 2,500,000
Sub Total (3 ) Rp 40,900,000
TOTAL RAB Rp 492,330,000

Sindangkerta.,Tanggal September 2019


Disetujui/mengesahkan : Dibuat Oleh :
Kepala Desa Pelaksana Kegiatan

(ZULIYANTO) (AJAT SUDRAJAT)

Mengetahui : Diverifikasi Oleh :


Kepala UPTD
BMCK Wilayah Maja

( ASEP SAEPULLAH , ST. ) ( JUHARI, S.Sos. )


NIP. 19751006 200901 1 003 NIP. 19620803 198603 1 006
Harga Sat Jumlah Harga PPN PPH Jumlah Harga + PPN+PPH Pembulatan Harga Sat
PPN+PPH Harga Sat RAB
1,350,000 386,100,000 35,100,000 5,265,000 426,465,000 141,136 141,100 1,491,100
2,000,000 34,000,000 3,090,909 463,636 37,554,545 209,091 209,000 2,209,000
17,000 11,050,000 1,004,545 150,682 12,205,227 1,777 1,700 18,700
- - - - - - -
480,000 9,600,000 872,727 130,909 10,603,636 50,182 50,100 530,100
640,000 12,800,000 1,163,636 174,545 14,138,182 66,909 66,900 706,900
400,000 8,000,000 727,273 109,091 8,836,364 41,818 41,800 441,800
400,000 8,000,000 727,273 160,000 8,887,273 48,000 48,000 448,000
2,500,000 2,500,000 227,273 34,091 2,761,364 261,364 261,300 2,761,300
- - - - - - -
- - - - - - -
42,913,636 6,487,955