BECK UP VOLUME

ITEM PEKERJAAN VOLUME SAT

1 Pekerjaan Persiapan

1 Pembongkaran Atap Eksisting 1.000 Ls


2 Pembersihan Lahan 1.000 Ls

2 Pekerjaan Galian Tanah Biasa


P L T Keb. Vol
1 Pondasi Footplate 0.70 x 0.70 x 0.60 x 2.00 = 0.59 0.588 m3
0.588 m3

3 Pekerjaan Urugan
P L T Keb. Vol
1 Urugan Bawah Footplate 0.70 x 0.70 x 0.05 x 2.00 = 0.05 0.049 m3
2 Urugan Badan Pondasi 0.70 x 0.70 x 0.35 x 2.00 = 0.34 0.343 m3
0.392 m3

4 Pekerjaan Beton Camp 1:2:3


P L T Keb. Vol
1 Beton Footplate 70x70x20 cm 0.70 x 0.70 x 0.20 x 2.00 = 0.20 0.196 m3
2 Beton Kolom 20x20 cm 3.85 x 0.20 x 0.20 x 2.00 = 0.31 0.308 m3
3 Beton Balok Gantung 15x25 cm 14.70 x 0.15 x 0.25 x 1.00 = 0.55 0.551 m3
4 Beton Plat Dak t:10 cm 7.00 x 6.00 x 0.10 x 1.00 = 4.20 4.200 m3
5.255 m3

5 Pekerjaan Pembesian
1 Pembesian Footplate 70x70x20 Panjang isi dibltkan besi Ø Berat/m Kebutuhan Tot. Besi Koef.(1.05) m1 ljr 30.902 kg
Tulangan 1.80 4.67 5 12 0.888 2.00 15.98 16.78 18.90 1.58
Sengkang 1.80 4.67 5 12 0.888 2.00 14.92 15.66 17.64 1.47

2 Pembesian Kolom 20x20 cm Panjang isi dibltkan besi Ø Berat/m Kebutuhan Tot. Besi Koef.(1.05) m1 ljr 44.672 kg
Tulangan 3.85 4.00 4 13 1.040 2.00 32.03 33.63 32.34 2.70
Sengkang 0.80 19.25 20 8 0.395 2.00 12.64 13.27 33.60 2.80

3 Pembesian Balok Gantung 15x25 cm Panjang isi dibltkan besi Ø Berat/m Kebutuhan Tot. Besi Koef.(1.05) m1 ljr 107.849 kg
Tulangan Pokok 14.70 5.00 5 12 0.888 1.00 65.27 68.53 77.18 6.43
Tulangan 14.70 2.00 2 8 0.395 1.00 11.61 12.19 30.87 2.57
Sengkang 0.80 98.00 98 8 0.395 1.00 30.97 32.52 82.32 6.86

4 Pembesian Plat Dak t:10 cm Panjang Lebar Layer besi Ø Berat/lbr Kebutuhan Tot. Besi Tot. Berat/kg lbr 7.407 lbr
Wiremesh M5 2,1m X 5,4m 7.00 6.00 2 Wiremesh M5 24.140 1.00 178.81 178.81 7.41

6 Pekerjaan Bekisting
*Bekisting Kolom & Balok P L Keb. 1x pakai Luas
1 Bekisting Kolom 20x20 cm 3.85 x 0.80 x 2.00 / 1.00 = 6.16 6.160 m2
2 Bekisting Balok Gantung 15x25 cm 14.70 x 0.65 x 1.00 / 1.00 = 9.56 9.555 m2
15.72 m2
*Bekisting Plat P L Luas
1 Bekisting Beton Plat Dak t:10 cm 7.00 x 6.00 = 42.00 42.000 m2
*lis 10 cm 19.00 x 0.10 1.90 1.900 m2
43.90 m2

7 Pengecatan
P L Keb. Luas
1 Kolom 20x20 cm 3.85 x 0.80 2.00 = 6.16 6.160 m2
2 Balok Gantung 15x25 cm 14.70 x 0.30 1.00 = 4.41 4.410 m2
3 Plat Dak t:10 cm 7.00 x 6.00 1.00 = 42.00 42.000 m2
*lis 10 cm 19.00 x 0.10 1.00 = 1.90 1.900 m2
54.47 m2

8 Pelapisan No Drop
P L Luas
1 Plat Dak t:10 cm 7.00 x 6.00 = 42.00 42.00 m2
42.00 m2

9 Instalasi titik lampu


Keb. JMLH
1 Teras Jurusan Matematika 2.00 = 2.00 2.00 bh
2.00 bh

10 Pasang lampu
Keb. JMLH
1 Teras Jurusan Matematika 2.00 = 2.00 2.00 bh
2.00 bh

Back up Volume Hlm 1