CL

Agg. Klas S, t = 20 cm
Agg. Klas B, t = 20 cm Aspal HRS WC, t = 5 cm
Geotektile Klas 2, L = 2m Agg. Klas A, t = 20 cm
Agg. Klas B, t = 30 cm

Perbaikan
Agg. Klas B,
t = 20 cm

6.00
PERKERASAN EXISTING

1.00 5.00 1.00


PELEBARAN ASPAL PELEBARAN

1.00 5.50 1.00


BAHU JALAN AGREGAT KLAS A BAHU JALAN

7.50
AGREGAT KLAS B

RENCANA PENANGANAN
STA. 14+062 s.d STA.16+680
CL
Agg. Klas S, t = 20 cm
Agg. Klas B, t = 30 cm Aspal HRS WC, t = 5 cm
Geotektile Klas 2, L = 3m Agg. Klas A, t = 20 cm
Agg. Klas B, t = 30 cm

Cerucuk Galam, dia. 8-10 cm


P = 3.7 m, arah x/y 0.5/0.5

5.00
PERKERASAN EXISTING

1.50 5.00 1.50


PELEBARAN ASPAL PELEBARAN

1.00 5.50 1.00


BAHU JALAN BAHU JALAN
AGREGAT KLAS A

7.50
AGREGAT KLAS B

RENCANA PENANGANAN
STA. 16+680 s.d STA.17+643
CL

Agg. Klas C, t = 40 cm
Geotektile
Klas 2, L=8m

Knople Galam, dia. 8-10 cm


P = 3.7 m

Cerucuk Galam, dia. 8-10 cm


P = 3.7 m

7.00 m
RENCANA PERKERASAN

Variasi 7 - 9 m
BADAN JALAN EXISTING

RENCANA PENANGANAN
STA. 17+700 s.d STA.19+600
CL

Agg. Klas C, t = 40 cm

Geotektile Klas 2

Knople Galam, dia. 8-10 cm


P = 3.7 m

Cerucuk Galam, dia. 8-10 cm


P = 3.7 m

7.00 m
RENCANA PERKERASAN

7.20 m
BADAN JALAN EXISTING

RENCANA PENANGANAN
STA. 17+700 s.d STA.19+600
(Spot-spot)
PERHITUNGAN VOLUME PEKERJAAN
Ruas Jalan Sei Asam - Bakungin - Palingkau Seberang - Batas Kalsel
TAHUN ANGGARAN 2023

No. JENIS PEKERJAAN SATUAN STA - STA KIRI/ PANJANG LEBAR prosen Tebal JUMLAH HARGA SATUAN TOTAL KET.
KANAN pengananan rata2 VOLUME ( Rp.) HARGA
(m) (m) (m) ( Rp.)

1.2 Mobilisasi Ls 1.00 128,960,219.44 128,960,219.44

1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 15,048,000.00 15,048,000.00


1.19 Keselamatan dan Kesehatan Kerja - 1.00 21,950,000.00 21,950,000.00
1.21 Manajemen Mutu Ls 1.00 52,250,000.00 52,250,000.00
1+425
3.2.(2a) Timbunan Pilihan Dari Sumber Galian m3 - 360,000.00 -
17+700 - 19+600 1 1,773.61 7.00 - -

3.3.(1) Penyiapan Badan Jalan m2 20,183.00 3,042.83 61,413,437.89


14+062 16+680 1 2,578.00 6.00 15,468.00
16+680 17+643 1 943.00 5.00 4,715.00

3.4.(1) Pembersihan Badan Jalan m2 12,415.30 2,753.22 34,182,104.37


17+700 - 19+600 1 1,773.61 7.00 12,415.30

3.5.(2b)
Geotekstil Separator Kelas 2 m2 30,158.92 23,616.29 712,241,753.13
14+062 16+680 2 2,578.00 2.00 10,312.00
16+680 17+643 2 943.00 3.00 5,658.00
17+700 19+600 1 1,773.61 8.00 14,188.92

5.1.(1) Lapis Pondasi Agregat Kelas A m3 3,873.10 786,371.50 3,045,695,456.65


14+062 17+643 1 3,521.00 5.50 0.20 3,873.10

5.1.(2) Lapis Pondasi Agregat Kelas B m3 9,862.15 770,960.48 7,603,327,897.83


Full 14+062 - 17+643 3,521.00 7.50 0.30 7,922.25
Pelebaran 1 14+062 - 16+680 2 2,558.00 1.00 0.20 1,023.20
Pelebaran 2 16+680 - 17+643 2 963.00 1.50 0.30 866.70
Pebaikan 50.00

5.1.(3a) Lapis Fondasi Agregat Kelas S bahu m3 1,033.20 735,949.84 760,383,374.69


14+062 17+643 2 2,583.00 1.00 0.20 1,033.20

5.1.(3b) Lapis Fondasi Agregat Kelas C m3 4,256.68 762,074.76 3,243,904,879.59


Pelebaran 1 14+062 16+680 2 2,578.00 1.00 - -
Pelebaran 2 16+680 17+643 2 963.00 1.50 - -
Pondasi 17+700 19+600 1,773.61 6.00 0.40 4,256.68
Levelling/Perbaikan 86.39 -

6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Ltr 14,324.00 19,835.56 284,124,561.44
14+062 17+643 3,581.00 5.00 0.80 14,324.00

6.3(3) Lataston Lapis Aus (HRS-WC) Ton 1,996.41 2,167,558.58 4,327,330,205.80


14+062 17+643 3,581.00 5.00 0.05 1,996.41

7.1 (8) Beton , fc’15 Mpa m3 375.20 1,686,426.44 632,747,200.29


14+062 15+000 2 938.00 1.00 0.20 375.20
No. JENIS PEKERJAAN SATUAN STA - STA KIRI/ PANJANG LEBAR prosen Tebal JUMLAH HARGA SATUAN TOTAL KET.
KANAN pengananan rata2 VOLUME ( Rp.) HARGA
(m) (m) (m) ( Rp.)
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan m' 109,712.00 10,453.70 1,146,896,334.40
Pelebaran 1 2 2,578.00 1.00 2.00 - -
Pelebaran 2 2 943.00 1.50 3.00 3.70 41,869.00
Pondasi 2 1,000.00 1.00 2.00 3.70 29,600.00
Siring 2 500.00 1.00 10.00 3.70 37,000.00
Bawah Bronjong 1 28.00 1.00 6.00 3.70 1,243.00

7.6 (1)a Knople 3,700.00 65,471.85 242,245,845.00


Spot-spot 1,000.00 3.70 3,700.00

7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis m3 84.00 1,299,516.63 109,159,397.17
4+800 4+828 1 28.00 2.00 1.50 84.00

9.2.(2) Marka Jalan Termoplastik m2 0+000 17+643 17,643.00 5,060.01 258,011.05 1,305,539,112.34
as 2,293.59 3.00 0.120 825.69
sisi 2 17,643.00 0.120 4,234.32

10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A m3 737.19 1,163,029.01 857,369,287.08


737.19

10.1.(9) Perbaikan Campuran Aspal Panas m3 214.90 5,457,361.18 1,172,762,360.09


214.90

10.1.(22) Pengendalian Tanaman m2 ki/ka kontrak 3 kali kerja 163,200.00 1,706.49 278,499,203.44
2 13,600.00 2.00 3.00 163,200.00

JUMLAH 26,036,030,630.63
PPN 11% 2,863,963,369.37
JUMLAH + PPN 28,899,994,000.00

28,899,994,000.00
-