Agg. Klas S, t = 20 cm
Agg. Klas B, t = 20 cm Aspal HRS WC, t = 5 cm
Geotektile Klas 2, L = 2m Agg. Klas A, t = 20 cm
Agg. Klas B, t = 30 cm
Perbaikan
Agg. Klas B,
t = 20 cm
6.00
PERKERASAN EXISTING
7.50
AGREGAT KLAS B
RENCANA PENANGANAN
STA. 14+062 s.d STA.16+680
CL
Agg. Klas S, t = 20 cm
Agg. Klas B, t = 30 cm Aspal HRS WC, t = 5 cm
Geotektile Klas 2, L = 3m Agg. Klas A, t = 20 cm
Agg. Klas B, t = 30 cm
5.00
PERKERASAN EXISTING
7.50
AGREGAT KLAS B
RENCANA PENANGANAN
STA. 16+680 s.d STA.17+643
CL
Agg. Klas C, t = 40 cm
Geotektile
Klas 2, L=8m
7.00 m
RENCANA PERKERASAN
Variasi 7 - 9 m
BADAN JALAN EXISTING
RENCANA PENANGANAN
STA. 17+700 s.d STA.19+600
CL
Agg. Klas C, t = 40 cm
Geotektile Klas 2
7.00 m
RENCANA PERKERASAN
7.20 m
BADAN JALAN EXISTING
RENCANA PENANGANAN
STA. 17+700 s.d STA.19+600
(Spot-spot)
PERHITUNGAN VOLUME PEKERJAAN
Ruas Jalan Sei Asam - Bakungin - Palingkau Seberang - Batas Kalsel
TAHUN ANGGARAN 2023
No. JENIS PEKERJAAN SATUAN STA - STA KIRI/ PANJANG LEBAR prosen Tebal JUMLAH HARGA SATUAN TOTAL KET.
KANAN pengananan rata2 VOLUME ( Rp.) HARGA
(m) (m) (m) ( Rp.)
3.5.(2b)
Geotekstil Separator Kelas 2 m2 30,158.92 23,616.29 712,241,753.13
14+062 16+680 2 2,578.00 2.00 10,312.00
16+680 17+643 2 943.00 3.00 5,658.00
17+700 19+600 1 1,773.61 8.00 14,188.92
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Ltr 14,324.00 19,835.56 284,124,561.44
14+062 17+643 3,581.00 5.00 0.80 14,324.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis m3 84.00 1,299,516.63 109,159,397.17
4+800 4+828 1 28.00 2.00 1.50 84.00
9.2.(2) Marka Jalan Termoplastik m2 0+000 17+643 17,643.00 5,060.01 258,011.05 1,305,539,112.34
as 2,293.59 3.00 0.120 825.69
sisi 2 17,643.00 0.120 4,234.32
10.1.(22) Pengendalian Tanaman m2 ki/ka kontrak 3 kali kerja 163,200.00 1,706.49 278,499,203.44
2 13,600.00 2.00 3.00 163,200.00
JUMLAH 26,036,030,630.63
PPN 11% 2,863,963,369.37
JUMLAH + PPN 28,899,994,000.00
28,899,994,000.00
-