A
REVISI TGL T.TANGAN
NAMA PROYEK
200
DIPERIKSA
800
400
Lantai Kerja (B0)
Pasir Urug
Ir. Djoko Kristijono MM
Infrastructure Specialist
200
National Management Consultant (NMC)
TIM KONSULTAN
DEPUTI TEAM LEADER TTD
200
200
B B 55100
Ir. Ikhawan Syamsuddin, ST. IPM
Potongan A-A
TENAGA AHLI TTD
Skala 1 : 200 Civil Engineer
Andri, ST.
Architect
A 200 400
Ø12-150
200 Syamsul Darwis, ST.
200
200
Skala 1 : 200 DR. Silviani, M.Si
400
800
800
GAMBAR PANJANG TYPE TUL. Ø12-150
Wafa Maulana Akmal, S.Ars
a a = 15.000 cm ø 12 - 150
b
b = 75.000 cm
5050 200
5050 200
Estimator :
A
REVISI TGL T.TANGAN
NAMA PROYEK
DIBUAT OLEH
200
DIPERIKSA
900
500
Lantai Kerja (B0)
Pasir Urug
Ir. Djoko Kristijono MM
Infrastructure Specialist
200
National Management Consultant (NMC)
TIM KONSULTAN
DEPUTI TEAM LEADER TTD
200
200
B B 55100
Ir. Ikhawan Syamsuddin, ST. IPM
Potongan A-A
TENAGA AHLI TTD
Skala 1 : 200 Civil Engineer
Andri, ST.
Architect
200 500 200
Ø12-150
A Ø12-150 200 500 200
Syamsul Darwis, ST.
200
200
Type 500/500
DR. Silviani, M.Si
Skala 1 : 200
TABEL PEMBESIAN BOX CULVERT TYPE 50.50 Tenaga Pendukung TTD
500 Ø12-150
900
500
900
Drafter :
GAMBAR PANJANG TYPE TUL. Ø12-150
Wafa Maulana Akmal, S.Ars
a a = 15.000 cm ø 12 - 150
b
b = 85.000 cm
5050 200
5050 200
Estimator :
A
REVISI TGL T.TANGAN
NAMA PROYEK
200
SATUAN KERJA INFRASTRUKTUR BERBASIS MASYARAKAT
Jl. Cipaku V No. 1 Kebayoran Baru Jakarta Selatan 12170
DIBUAT OLEH
1200
800
Lantai Kerja
Pasir Urug
Ir. Djoko Kristijono MM
Infrastructure Specialist
200
National Management Consultant (NMC)
TIM KONSULTAN
B B DEPUTI TEAM LEADER TTD
200
200
Ir. Ikhawan Syamsuddin, ST. IPM
55100
Potongan A-A
TENAGA AHLI TTD
Skala 1 : 200 Civil Engineer
Andri, ST.
200 800 200
Ø14-200
Architect
Ø14-200 200 800 200
A 200
Syamsul Darwis, ST.
200
Denah Box Culvert
Environmental Specialist
Type 800/800
Skala 1 : 200 DR. Silviani, M.Si
Ø14-200
TABEL PEMBESIAN BOX CULVERT TYPE 80.80 Ø14-200
Tenaga Pendukung TTD
1200
1200
800
800
GAMBAR PANJANG TYPE TUL. Drafter :
5050 200
a
ø 14 - 200 Mohammad Mirza, ST
a = 15.000 cm
Lantai Kerja
b b = 115.000 cm
Urugan Pasir REFERENSI REVISI KE
1200 1200
NAMA GAMBAR SKALA
b
a = 54.886 cm ø 14 - 200 Detail Penulangan
Type 800/800 Potongan B-B Denah dan Detail
SKALA 1 : 200
Penulangan Box Culvert
BOX CULVERT Type 800/800
a. Badan= 48 buah ø 14 - 200 Skala 1 : 200 Skala 1 : 200
KODE GBR NO. GBR JMLH. LBR
CATATAN
A
Panjang Box Culvert REVISI TGL T.TANGAN
Aspal
NAMA PROYEK
200
HUNTAP DUYU TAHAP-1
DETAIL ENGINEERING DESIGN
PEMBERI TUGAS
1400
1000
DIBUAT OLEH
TMC 6
Lantai Kerja (B0) DIPERIKSA
Pasir Urug
200
200
200
Ir. Djoko Kristijono MM
B B Infrastructure Specialist
National Management Consultant (NMC)
55100 TIM KONSULTAN
Potongan A-A DEPUTI TEAM LEADER TTD
Skala 1 : 200
Ir. Ikhawan Syamsuddin, ST. IPM
200
Syamsul Darwis, ST.
Skala 1 : 200
Environmental Specialist
1400
1000
1400
a a = 15.000 cm ø 14 - 200
b
b = 135.000 cm Wafa Maulana Akmal, S.Ars
a Estimator :
ø 14 - 200
a = 15.000 cm
b = 135.000 cm Ø14-200 BETON K350
b Mohammad Mirza, ST
5050 200
5050 200
REFERENSI REVISI KE
Lantai Kerja (B0)
b
a = 55.37 cm ø 14 - 200 Urugan Pasir
NAMA GAMBAR SKALA
1400 1400
BOX CULVERT
a. Badan= 56 buah ø 14 - 200 Denah dan Detail
Penulangan Box Culvert SKALA 1 : 200
Detail Penulangan Type 1000/1000
NAMA PROYEK
450
200 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DI REKTORAT J ENDE RAL CI PTA KARYA
SATUAN KERJA INFRASTRUKTUR BERBASIS MASYARAKAT
Jl. Cipaku V No. 1 Kebayoran Baru Jakarta Selatan 12170
DIBUAT OLEH
BETON K350
TMC 6
Ø8-150 DIPERIKSA
TABEL PEMBESIAN DRAINASE TYPE 30.50
Ø10-150
GAMBAR PANJANG TYPE TUL.
70
1200
400
DEPUTI TEAM LEADER TTD
a = 26.236 cm ø 10 - 150
575
Ø8-150
Ø10-150 Ir. Ikhawan Syamsuddin, ST. IPM
b
75 100
TENAGA AHLI TTD
50 Civil Engineer
Mohammad Mirza, ST
REFERENSI REVISI KE
NAMA PROYEK
740
300 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
200 DI REKTORAT J ENDE RAL CI PTA KARYA
SATUAN KERJA INFRASTRUKTUR BERBASIS MASYARAKAT
Jl. Cipaku V No. 1 Kebayoran Baru Jakarta Selatan 12170
DIBUAT OLEH
TMC 6
DIPERIKSA
Ø10-150
1000
Ø10-150 BETON K350 TABEL PEMBESIAN DRAINASE TYPE 50.50
70
GAMBAR PANJANG TYPE TUL.
740 Ir. Djoko Kristijono MM
Infrastructure Specialist
70 600 70 National Management Consultant (NMC)
600
a = 27.912 cm ø 10 - 150
700
700
TENAGA AHLI TTD
Civil Engineer
b
Ø10-150
Ø10-150 Andri, ST.
Ø10-150
70 100
1000
Architect
70
REFERENSI REVISI KE
NAMA PROYEK
1200
250 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DI REKTORAT J ENDE RAL CI PTA KARYA
SATUAN KERJA INFRASTRUKTUR BERBASIS MASYARAKAT
Jl. Cipaku V No. 1 Kebayoran Baru Jakarta Selatan 12170
DIBUAT OLEH
TMC 6
Ø12-150 DIPERIKSA
Ø12-150
1000
BETON K350
100
TABEL PEMBESIAN DRAINASE TYPE 100.100 Ir. Djoko Kristijono MM
100 1000 100 Infrastructure Specialist
GAMBAR PANJANG TYPE TUL. National Management Consultant (NMC)
TIM KONSULTAN
DEPUTI TEAM LEADER TTD
a a = 103.456 cm ø 12 - 150
Ir. Ikhawan Syamsuddin, ST. IPM
Beton K350 b = 113.712 cm
b TENAGA AHLI TTD
900
Civil Engineer
1000
a = 32.036 cm ø 12 - 150
1100
Andri, ST.
Ø12-150 b
1000
100 100
800
100
REFERENSI REVISI KE