Anda di halaman 1dari 13

BACK UP DATA HASIL PEKERJAAN

GEDUNG SERBAGUNA
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME :
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

I PEKERJAAN PERSIAPAN
1 Bongkaran Dinding ls 1.00 1.00 Sudah Jelas

II PEKERJAAN TANAH

1, Galian Tanah Pondasi m3 28.92 28.92 P x L x T x Banyaknya


6.40 0.50 0.50 2.00 bh = 3.20 m3 Sloof Teras Depan
4.30 0.50 0.50 1.00 bh = 1.08 m3 Sloof Teras Depan
1.20 1.20 1.00 6.00 bh = 8.64 m3 Pondasi Tapak Teras
0.50 0.50 0.50 4.00 bh = 0.50 m3 Pondasi Tapak Pojok
5.75 0.30 0.40 4.00 bh = 2.76 m3 Sloof Kaca Sudut
11.38 0.70 0.80 2.00 bh = 12.75 m3 + Pondasi Batu kali KM

TOTAL 28.92 m3

2 Urugan Tanah Kembali m3 13.16 13.16 V. Pondasi


V. Pon Pjk + V.Pon Trs + V.Pon Bt Kl
1.07 3.39 8.36 = 12.82 m3

V. Galian - V. Pasir - V. Lt. Kerja - V.Pondasi

28.92 1.47 1.47 12.82 = 13.16 m3

3 Urugan Pasir Bawah Pondasi, Sloof T = 5 cm m3 1.47 1.47 P x L x T x Banyaknya


1.20 1.20 0.05 6.00 ttk = 0.43 m3 Pondasi Tapak Teras
0.60 0.60 0.05 4.00 ttk = 0.07 m3 Pondasi Tapak Pojok
11.38 0.60 0.05 2.00 ttk = 0.68 m3 Bt Kali Km/Wc
11.38 0.25 0.05 2.00 ttk = 0.28 m3 + Sloof Bt Kali Km/Wc

TOTAL = 1.47 m3

4 Urugan Peninggian Lantai 10cm

a Urugan Pasir m3 8.10 8.10 P x L x T x Banyaknya


18.00 9.00 0.05 1.00 ls = 8.10 m3

b Lantai Kerja m3 8.10 8.10 P x L x T x Banyaknya


18.00 9.00 0.05 1.00 ls = 8.10 m3
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME :
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

III PEKERJAAN PONDASI P x L x T x Banyaknya


1. Lantai kerja , t = 5 cm m3 1.47 1.47 0.60 0.60 0.05 4.00 ttk = 0.07 m3 Pondasi Kaca Sudut
1.20 1.20 0.05 6.00 ttk = 0.43 m3 Pondasi Teras
11.38 0.60 0.05 2.00 ttk = 0.68 m3 Pondasi Batu Kali KM
11.38 0.25 0.05 2.00 ttk = 0.28 m3 Sloof Batu Kali KM
1.47 m3

2 Pondasi Tapak Kaca Sudut m3 1.07 1.07 p x l x t


0.50 0.50 0.25 = 0.06
Atas Footplate (A) Alas Pedestal Kolom
+ x t
p x l p x l
0.50 x 0.50 + 0.15 x 0.15
x 0.10
2 = 0.20 +
0.27 m3
Volume 1 bh Pondasi
0.27 m3 x 4.00 ttk 1.07 m3

3 Pondasi Tapak Teras Depan m3 3.39 3.39 p x l x t


1.20 1.20 0.25 = 0.36
Atas Footplate (A) Alas Pedestal Kolom
+ x t
p x l p x l
1.20 x 1.20 + 0.30 x 0.30
x 0.10
2 = 0.20 +
0.56 m3
Volume 1 bh Pondasi
0.56 m3 x 6.00 ttk 3.39 m3

4 Pondasi batu kali m3 8.36 8.36 L. atas + L. alas


x T x Bentang
2
0.45 0.60 Pnds Bt Kali KM/WC
0.70 22.75 m1 = 8.36 m3
2

5 Sloof Beton 25/35 Alas


x Bentang x Jml
L x T
m3 4.06 4.06 0.25 0.35 6.00 m1 2.00 = 1.05 m3 Teras Depan
0.25 0.35 3.00 m1 1.00 = 0.26 m3 Teras Depan
0.20 0.30 5.75 m1 4.00 = 1.38 m3 Kaca Sudut
0.20 0.30 11.38 m1 2.00 = 1.37 m3 + Km / Wc
TOTAL 4.06 m3
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

IV PEKERJAAN STRUKTUR

1 Pekerjaan Kolom Struktur 30/30 Lt.1 m3 2.30 2.30 L. alas x P. alas x T x Banyaknya
0.30 0.30 3.70 6.00 bh = 2.00 m3 Kolom Teras Depan
0.30 0.30 0.55 6.00 bh = 0.30 m3 Kolom Pedestal
2.30 m3

2 Pekerjaan Kolom Struktur 30/30 Lt.2 dan Atap m3 2.48 2.48 L. alas x P. alas x T x Banyaknya
0.30 0.30 3.05 6.00 bh = 1.65 m3 Kolom R.Perpustakaan
0.30 0.30 1.55 6.00 bh = 0.84 m3 Kolom Lt.atap R. Perpustakaan
2.48 m3

3 Pekerjaan Kolom Praktis Lt.1 m3 3.24 3.24 L. alas x P. alas x T x Banyaknya


0.13 0.13 3.20 45.00 bh = 2.43 m3 Km/wc & kaca sudut depan
0.13 0.13 3.00 16.00 bh = 0.81 m3 Kolom diantara jendela
= 3.24 m3

4 Pekerjaan Kolom Praktis Lt.2 dan Atap m3 4.23 4.23 L. alas x P. alas x T x Banyaknya
0.13 0.13 3.00 28.00 bh = 1.42 m3 Kolom R. Serbaguna
0.13 0.30 3.00 16.00 bh = 1.87 m3 Kolom diantara jendela
0.13 0.30 2.50 8.00 bh = 0.78 m3 Kolom Praktis lt.2 R. Perpus
0.13 0.13 1.30 22.00 bh = 0.48 m3 Kolom Praktis atap teras
0.15 0.50 3.65 4.00 bh = 1.10 m3 Kolom Praktis lt.2 depan Perpus

= 4.23 m3

Balok Lt.1
5 Balok Beton diatas Kusen m3 2.00 2.00 L. alas x T. alas x Bentang x Banyaknya
0.15 0.25 0.90 24.00 bh = 0.81 m3 Kusen Samping
0.15 0.25 2.50 2.00 bh = 0.19 m3 Kusen Sudut
SUBTOTAL = 1.00 m3

Balok Lt.2
L. alas x T. alas x Bentang x Banyaknya
0.15 0.25 0.90 24.00 bh = 0.81 m3 Kusen Samping
0.15 0.25 2.50 2.00 bh = 0.19 m3 Kusen Sudut

SUBTOTAL = 1.00 m3

TOTAL = 2.00 m3

6 Balok 20/40 Lt 2 R. Perpustakaan m3 2.06 2.06 L x T x Bentang x Banyaknya


0.20 0.40 6.85 2.00 bh = 1.10 m3 Balok Perpustakaan
0.20 0.40 4.20 2.00 bh = 0.67 m3 Balok Perpustakaan
0.20 0.40 0.85 2.00 bh = 0.14 m3 Balok Perpustakaan
0.07 0.60 3.60 1.00 bh = 0.15 m3 Balok Janggutan Perpustakaan
2.06 m3
No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

7 Plat Lt 2 R. Perpustakaan m3 2.18 2.18 P x L x T x Banyaknya


1.83 2.85 0.12 1.00 bh = 0.62 m3 Plat Lt. Bag Dpn Pintu perpus
2.99 2.85 0.12 1.00 bh = 1.02 m3 Plat Lt. Bag Tengah Perpus
0.65 3.45 0.12 2.00 bh = 0.53 m3 Plat Lt. Bag Dkt Jndla Dpn
2.18 m3

8 Ring Balok Tarik 20/40 Lt. Atap m3 7.73 7.73 L x T x Bentang x Banyaknya
0.15 0.40 9.00 2.00 bh = 1.08 m3 Balok Tarik melintang
L. alas x T. alas x Bentang x Banyaknya
0.17 0.40 18.00 2.00 bh = 2.45 m3 Talang Samping
0.17 0.40 9.00 2.00 bh = 1.22 m3 Talang Depan & Blkng
0.17 0.40 6.00 2.00 bh = 0.82 m3 Talang Teras Dpn
0.17 0.40 4.00 2.00 bh = 0.54 m3 Talang Teras Samping
0.17 0.40 6.85 2.00 bh = 0.93 m3 Balok atap Perpustakaan
0.17 0.40 4.20 2.00 bh = 0.57 m3 Balok atap Perpustakaan
0.17 0.40 0.85 2.00 bh = 0.12 m3 Balok atap Perpustakaan
= 6.65 m3

1.08 + 6.65 TOTAL = 7.73 m3

9 Ring Balok Tarik 15/25 Lt. Atap m3 1.34 1.34 L x T x Bentang x Banyaknya
0.15 0.25 17.80 2.00 bh = 1.34 m3 Balok Tarik memanjang

10 Ring Balok Janggutan Talang m3 3.51 3.51 L. alas x T. alas x Bentang x Banyaknya
0.10 0.45 19.20 2.00 bh = 1.73 m3 Talang Samping
0.10 0.45 10.20 2.00 bh = 0.92 m3 Talang Depan & Blkng
0.10 0.45 6.00 2.00 bh = 0.54 m3 Teras Bag Depan
0.10 0.45 7.10 1.00 bh = 0.32 m3 Teras Bag Samping
TOTAL = 3.51 m3

11 Balok Lt. Atap Keliling ( Profil ) m3 1.68 1.68 L. alas x T. alas x Bentang x Banyaknya
0.10 0.25 19.20 2.00 bh = 0.96 m3 Balok Atap Samping Ka&Ki
0.10 0.25 3.53 2.00 bh = 0.18 m3 Balok Atap Depan
0.10 0.25 1.63 2.00 bh = 0.08 m3 Balok Atap belakang
0.10 0.25 5.76 2.00 bh = 0.29 m3 Balok Atap Samping Ka&Ki
0.10 0.25 3.45 2.00 bh = 0.17 m3 Balok Atap Depan
TOTAL = 1.68 m3

12 Plat canopy t=8cm Lt. 1 dan meja beton lt.2 m3 1.11 1.11 P x L x T x Banyaknya
2.65 0.60 0.08 8.00 bh = 1.02 m3 Canopy samping
3.60 0.50 0.05 1.00 bh = 0.09 m3 meja beton r. perpustakaan
1.11 m3

13 Plat Dak Lt. atap t=12cm m3 8.99 8.99 P x L x T x Banyaknya


19.00 0.60 0.12 2.00 bh = 2.74 m3 Talang Samping
9.00 0.60 0.12 2.00 bh = 1.30 m3 Talang depan
7.45 1.50 0.12 2.00 bh = 2.68 m3 Teras Bag Samping
3.00 1.00 0.12 1.00 bh = 0.36 m3 Teras Bag Depan
1.83 2.85 0.12 1.00 bh = 0.62 m3 Plat atap Bag Dpn Pintu perpus
2.99 2.85 0.12 1.00 bh = 1.02 m3 Plat atap Bag Tengah Perpus
0.65 3.45 0.12 1.00 bh = 0.27 m3 Plat atap Bag Dkt Jndla Dpn
TOTAL = 8.99 m3
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

V PEKERJAAN DINDING BATA & PLESTERAN


Luas dinding Lt.1
1 Pasangan dinding bata merah 1/2 bata ad. 1:5 Lt.1 m2 221.78 221.78 a. Dinding Km / Wc
P x T x Banyaknya
2.68 2.85 2.00 Bh = 15.25 m2 Km/Wc
2.75 2.85 2.00 Bh = 15.68 m2 Km/Wc
0.85 2.85 2.00 Bh = 4.85 m2 Km/Wc
1.85 2.85 2.00 Bh = 10.55 m2 Km/Wc
1.85 2.85 2.00 Bh = 10.55 m2 Pintu Wc
0.45 2.85 6.00 Bh = 7.70 m2 Km/Wc
1.45 2.85 2.00 Bh = 8.27 m2 Km/Wc
3.48 2.85 2.00 Bh = 19.81 m2 + Km/Wc
92.63 m2
b. Dinding Kaca Sudut Depan
P x T x Banyaknya
3.48 3.20 2.00 Bh = 22.24 m2
3.60 3.20 2.00 Bh = 23.04 m2
0.45 3.20 6.00 Bh = 8.64 m2
0.85 3.20 2.00 Bh = 5.44 m2 + Dinding Smpng P1
59.36 m2
c. Dinding Penebalan kolom
P x T x Banyaknya
1.60 3.20 10.00 Bh = 51.20 m2 Kolom Utama Lt.1
0.85 3.20 16.00 Bh = 43.52 m2 + KP Diantara Jendela Lt.1
94.72 m2
d. Dinding Diantara Jendela
P x T x Banyaknya
0.70 0.45 24.00 Bh = 7.56 m2 Dinding dibawah Jendela Lt.1

e. Terpotong Kolom Praktis


P x T x Banyaknya
0.13 2.85 20.00 Bh = 7.41 m2 Km/Wc
0.13 2.85 10.00 Bh = 3.71 m2 + Kaca Sudut Depan
11.12 m2
f. Terpotong Kusen
P x T x Banyaknya
2.70 2.15 2.00 Bh = 11.61 m2 J12
0.80 0.40 2.00 Bh = 0.64 m2 BV
0.60 1.60 2.00 Bh = 1.92 m2 P8 ( Pintu Shaft )
0.80 2.35 2.00 Bh = 3.76 m2 P5
0.80 2.15 2.00 Bh = 3.44 m2 + P6
21.37 m2

a + b + c + d - e - f
92.63 59.36 94.72 7.56 11.12 21.37

TOTALI = 221.78 m2

2 Pasangan dinding Hebel Lt.1 m2 81.20 81.20 P x T x Banyaknya


1.00 10.15 8.00 Bh T O T A L II = 81.20 m2 Dinding Hebel Depan
No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

3 Pasangan dinding bata merah 1/2 bata ad. 1:5 Lt. 2 m2 189.97 189.97 a. Dinding Perpustakaan
P x T x Banyaknya
1.65 3.50 2.00 Bh = 11.55 m2
1.28 3.50 2.00 Bh = 8.93 m2
0.35 3.50 6.00 Bh = 7.35 m2
0.50 3.50 5.00 Bh = 8.75 m2 +
36.58 m2
b. Dinding Kaca Sudut Depan
P x T x Banyaknya
3.48 3.20 2.00 Bh = 22.24 m2
3.60 3.20 2.00 Bh = 23.04 m2
0.45 3.20 6.00 Bh = 8.64 m2
0.85 3.20 2.00 Bh = 5.44 m2 + Dinding Smpng P1
59.36 m2
c. Dinding Penebalan kolom
P x T x Banyaknya
2.00 3.50 10.00 Bh = 70.00 m2 Kolom Utama Lt.2

d. Terpotong Kusen
P x T x Banyaknya
2.70 2.15 2.00 Bh = 11.61 m2 J12
0.50 2.70 5.00 Bh = 6.75 m2 J10
0.35 2.70 6.00 Bh = 5.67 m2 + J11
24.03 m2

a + b + c + d
36.58 59.36 70.00 24.03 T O T A L III = 189.97 m2

4 Pasangan dinding Hebel Lt.Atap m2 75.71 75.71 a. Dinding Talang Perpustakaan


P x T x Banyaknya
5.76 1.30 2.00 Bh = 14.96 m2 Dinding Talang Samping Ka&Ki
1.60 2.15 2.00 Bh = 6.88 m2 Dinding Benteng atap depan R. Perpus
2.85 3.00 1.00 Bh = 8.55 m2 + Dinding tertinggi atap depan R. Perpus
30.39 m2
b. Dinding Talang R. Serbaguna
P x T x Banyaknya
19.20 1.30 2.00 Bh = 49.92 m2 Dinding Talang Samping Ka&Ki
1.70 1.30 2.00 Bh = 4.42 m2 Dinding Talang Depan
1.60 1.30 2.00 Bh = 4.16 m2 + Dinding Talang belakang
58.50 m2
c. Terpotong Kolom
P x T x Banyaknya
0.30 2.65 4.00 Bh = 3.18 m2 Kolom Struktur Lt. atap Perpus
0.13 2.65 8.00 Bh = 2.76 m2 Kolom Praktis Lt. atap Perpus
0.13 1.25 18.00 Bh = 2.93 m2 + Kolom Praktis Lt. atap R.Serbaguna
8.86 m2
d. Terpotong Lubang
P x T x Banyaknya
0.40 0.20 54.00 Bh = 4.32 m2

a + b - c - d
30.39 58.50 8.86 4.32 T O T A L IV = 75.71 m2

Total Pasangan Hebel


II + IV
81.20 75.71 = 156.91 m2

Total Pasangan Bata


I + III
221.78 189.97 = 411.75 m2

Total Keseluruhan Pasangan dinding


I + II + III + IV
221.78 81.20 189.97 75.71 = 492.95 m2
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATA : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

V PEKERJAAN DINDING PLESTERAN & ACI

1 Plester dan Aci 1:5 Lt. 1 m2 1,152.44 1,152.44 Luas Pasangan Bata Lt.1 = 221.78 m2
Luas Pasangan Hebel Lt.1 = 81.20 m2
Luas Pasangan Bata Lt.2 = 189.97 m2
Luas Pasangan Hebel Lt.2 = 75.71 m2
Luas Plesteran dan Aci Ulang dinding 7.56 m2
SUBTOTAL 576.22 m2

P x T x Banyaknya
0.70 0.45 24.00 bh = 7.56 m2 Plester + Aci di bawah Kusen

Luas
+ Sisi
Dinding
576.22 2.00 = 1,152.44 m2
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK GAMBAR URAIAN PERHITUNGAN KET.

VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja Siku m2 169.20 172.96 A. atas + A. bawah : 2 x T x Sisi
9.00 18.40 2.00 4.70 2.00 sisi = 128.78 Atap memanjang
4.70 2.00 4.70 2.00 sisi = 22.09 Jurai Kanan
4.70 2.00 4.70 2.00 sisi = 22.09 Jurai Kiri
= +
172.96 m2
2 Pekerjaan pasangan Genteng m2 169.20 185.83
A. atas + A. bawah : 2 x T x Sisi
9.50 18.95 2.00 4.90 2.00 sisi = 139.41
4.90 2.00 4.74 2.00 sisi = 23.21
4.90 2.00 4.74 2.00 sisi = 23.21
= +
185.83 m2

3 Pekerjaan Bubungan Atap m1 34.44 34.44 P + sisi


9 1 = 9.00 m 1

6.36 4 = 25.44 m 1

= - m 1

= - m 1

= - m 1

= - m 1

34.44

4 Water Proofing Lt. Atap - 45.62 Luas area water proofing = 45.62 m2

5 Screeding Lt. Atap - 45.62 Luas Screeding = Luas area water proofing
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

VII PEKERJAAN LANTAI I. Pas. keramik lt 1 & 2


1 Pekerjaan keramik lantai 40x40 m2 308.00 323.34 P x L x Banyaknya
14.85 8.48 1.00 = 125.85 R. Serbaguna Lt.1
3.00 3.00 1.00 = 9.00 Teras belakang
1.00### 2.87 1.00 = 2.87 Lobby
1.10 4.10 1.00 = 4.51 Teras depan

Ruang
1.00 0.25 19.00 = 4.75 anak tangga
1.00 0.19 20.00 = 3.80 Tinggi anak tangga
14.85 8.48 1.00 = 125.93 R. Serbaguna Lt.2
2.82 5.74 1.00 = 16.19 R. Serbaguna Lt.2 dpn Tangga
4.53 6.72 1.00 = 30.44 R. Perpustakaan
JUMLAH 323.34 m2

II. Pas. keramik lt 1 & 2


2 Pekerjaan keramik 30x30 Motif 28.00 16.25 P x L x Banyaknya
2.85 2.85 2.00 = 16.25 Km/wc

Ruang
JUMLAH 16.25 m2
I. Pas. keramik lt 1
3 Pekerjaan Keramik Dinding 30x30 m2 76.80 13.64 L x T x Jml
1.85 1.80 2.00 = 6.66 Km/wc

Ruang
1.13 1.80 2.00 = 4.05 Km/wc
1.63 1.80 1.00 = 2.93 Km/wc

JUMLAH 13.64 m2

4 Pas. Granit Dinding ( Gawangan Pintu ) m2 - 8.99 P x L x Sisi


2.67 x 0.32 x 4.00 = 3.42 Kolom Sisi Kiri

Ruang
2.67 x 0.32 x 4.00 = 3.42 Kolom Sisi Kanan
0.32 x 0.32 x 6.00 = 0.61 Sudut Atas Kanan & Kiri
1.60 x 0.32 x 3.00 = 1.54 Sisi Atas

JUMLAH 8.99 m2
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

VII PEKERJAAN PLAFOND I. Pas. Plafond lt 2


1 Pekerjaan Plafond Gyptile m2 264.000 180.28 P x L x Banyaknya
17.67 8.48 1.00 = 149.84 R. serbaguna lt.2

Ruang
4.53 6.72 1.00 = 30.44 R. Perpustakaan
= -
= -
180.28

2 Pekerjaan Plafond Gypsum m2 - 28.13 P x L x Banyaknya


6.72 4.00 1.00 = 26.88 R. Teras Depan

Ruang
2.50 0.50 1.00 = 1.25
= -
28.13

3 Pekerjaan Plafond Gypsum / water resistant m2 - 22.97 P x L x Banyaknya


2.85 2.85 2.00 = 16.25 Km/ wc

Ruang
0.50 6.72 2.00 = 6.72 R. Teras Depan
= -
= -
22.97

4 Pekerjaan List U Alumunium Plafond m1 - 109.00

5 Pekerjaan List Plafond Kayu 5cm m1 70.80 25.06 2.00 x P + 2.00 x L x Banyaknya
2.00 1.85 2.00 1.80 2.00 = 10.90 Km/ wc
2.00 1.13 2.00 = 2.26 Km/ wc
2.00 2.85 2.00 = 5.70 Km/ wc
2.00 1.25 2.00 = 2.50 Km/ wc
2.00 1.00 2.00 = 2.00 Km/ wc
2.00 0.85 2.00 = 1.70 Km/ wc
25.06

6 Pekerjaan List Plafond Gypsum 7cm m1 - 34.50 2.00 x P + 2.00 x L x Banyaknya


2.00 6.72 2.00 4.53 1.00 = 22.50 R. Teras Depan
2.00 3.00 2.00 3.00 1.00 = 12.00 R. Teras Depan Double List
34.50
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATA : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

PEKERJAAN KUSEN,PINTU DAN JENDELA LT 1


1 Pekerjaan Kusen Pintu m3 0.56 0.42 P x L x T x Banyaknya P3
0.05 0.15 3.00 4.00 = 0.0900 m3 Tinggi Kusen
0.05 0.15 2.64 2.00 = 0.0396 m3 Lebar Kusen
0.05 0.15 1.14 1.00 = 0.0086 m3 Lebar Kusen jendela bawah
0.05 0.15 0.05 2.00 = 0.0008 m3 Kupingan Kusen
1 Unit Kusen P3 = 0.1389 m3
Jumlah 3.00 Unit = 0.4167 m3

2 Daun Pintu Panil Kayu Kamper m2 11.52 5.03


Dimensi
x Banyaknya
L x T
1.50 2.35 1.00 unit = 3.5250 m2 P3 Daun Pintu
1.50 0.60 1.00 unit = 0.9000 m2 P3 Bouven Pintu
0.50 0.60 2.00 unit = 0.6000 m2 P3 Bouven jendela

TOTAL 5.0250 m2

3 Pintu Utama ( P1 Tempered ) unit 1.00 1.00 1 bh daun pintu panel memiliki 1 kunci, 3 engsel dan 1 grendel
1 bh daun pintu pvc memiliki 2 engsel dan 1 grendel
4 Pintu KM/WC ( PVC ) unit 5.00 5.00 1 bh J1 memiliki 2 engsel dan 1 grendel

5 Pintu panel satu muka Lapis Formika unit 5.00 5.00 Type Kusen Banyaknya Kunci Grendel Engsel
P3 3.00 3.00 6.00 18.00
6 Pekerjaan Kusen Jendela Aluminium J1 unit 54.00 24.00

7 Pekerjaan Kusen Alumunium J9 unit 24.00 24.00 Pintu KM/WC ( PVC ) 2.00 - 2.00 4.00

Pintu Panel satu muka lapis formika 2.00 2.00 - 6.00

Unit
8 Pekerjaan Kusen Alumunium J10 unit - 5.00
TOTAL 5.00 8.00 28.00
9 Pekerjaan Kusen Alumunium J11 unit - 6.00
J1 24.00 - 24.00 48.00
10 Pekerjaan Kusen Alumunium J12 unit - 4.00 J9 24.00 - 24.00 48.00
BV 4.00 - - -
11 Pekerjaan Bouvenlight unit 4.00 4.00 TOTAL - 48.00 96.00

12 Kunci Pintu bh 2.00 5.00 Engsel pintu : Sepasang


28.00 bh 2.00 = 14.00 ps

13 Engsel Pintu bh - 14.00 Luas Pengecatan Kusen Pintu

14 Grendel Pintu bh - 8.00 Keliling x P/Tinggi x Section


A + B + C + D P3
15 Grendel Jendela bh 40.00 48.00 0.05 0.15 0.05 3.00 2.00 = 1.50 m2 Tinggi Kusen
0.05 0.15 0.05 0.15 3.00 2.00 = 2.40 m2 Tinggi Kusen ( Tengah )
16 Hak Angin bh 80.00 48.00 0.05 0.15 0.05 0.15 1.50 1.00 = 0.60 m2 Lebar Kusen ( Tengah )
0.05 0.15 0.05 1.50 1.00 = 0.38 m2 Lebar Kusen ( Atas )
17 Engsel Jendela bh 80.00 96.00 0.05 0.15 0.05 0.57 2.00 = 0.29 m2 Lebar Kusen ( Jendela atas )
0.05 0.15 0.05 0.57 2.00 = 0.29 m2 Lebar Kusen ( Jendela bawah )
0.05 0.15 0.05 0.15 0.57 2.00 = 0.46 m2 Lebar Kusen ( Jendela tengah )
18 Pengecatan Kusen Kayu & Daun Pintu Kayu m2 132.55 44.48 1 Unit Kusen P3 = 5.16 m2
Jumlah 3.00 unit = 15.48 m2

Keliling x P/Tinggi x Section Pintu Panel satu muka


A + B + C + D lapis pormika Km/Wc
0.05 0.15 0.05 2.35 2.00 = 1.18 m2 Tinggi Kusen
0.05 0.15 0.05 0.15 0.70 1.00 = 0.28 m2 Lebar Kusen ( Tengah )
0.05 0.15 0.05 0.70 1.00 = 0.18 m2 Lebar Kusen ( Atas )
1 Unit Kusen Panel satu muka lapis pormika Km/Wc = 1.63 m2
Jumlah 2.00 unit = 3.26 m2

Dimensi
x Banyaknya Sisi
L x T
1.50 2.35 1.00 unit 2.00 = 7.0500 m2 P3 Daun Pintu
1.50 0.60 1.00 unit 2.00 = 1.8000 m2 P3 Bouven Pintu
0.50 0.60 2.00 unit 2.00 = 1.2000 m2 P3 Bouven jendela
10.05 m2

0.60 2.35 2.00 unit 2.00 = 5.64 m2 Pintu Panel satu muka lapis
pormika Km/Wc
Kusen Pintu Daun Pintu
P3 + Pintu Panel Km/Wc + P3 + Pintu Panel Km/Wc
15.48 3.26 10.05 5.64 = 44.48 m2

Gedung Kantor Kecamatan 11 KUSEN


BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME :
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

PEKERJAAN PENGECATAN
1 Pengecatan dinding Jotun m2 1,152.44 1,152.44 Luas Dinding yang Dicat = Luas Plester aci

Luas
+ Sisi
Dinding
576.22 2.00 = 1,152.44 m2

2 Pengecatan plafond Jotun m2 324.00 197.92


Cat Plafond= Volume Plafond Gypsum + Volume Gypsum water resistant + Volume Plafond Expose

Pl. Gypsum + PL Gypsum GRC


28.13 22.97 = 51.10 m2

Vol Plafond Expose ( Plat )


P x L x Banyaknya
14.85 8.48 1.00 = 125.85 R. Serbaguna Lt.1

Ruang
3.00 3.00 1.00 = 9.00 Teras belakang
1.00### 2.87 1.00 = 2.87 Lobby

137.72 m2
Vol Plafond Expose ( Balok )
2.00 x P + L P x Jml

x
2.00 0.35 0.25 8.80 2.00 = 5.10 Balok Lt.2 melintang
2.00 0.22 0.20 17.80 1.00 = 4.00 Balok Lt.2 memanjang

9.10 m2

197.92 m2

3 Pengecatan List Plafond m1 - Cat List Plafond = Volume List Plafond

List Kayu + List Gypsum


25.06 34.50 = 59.56 m1

PEKERJAAN LAIN - LAIN


1 Perapihan Rabat Beton ls - 1.00 Sudah Jelas
BACK UP DATA HASIL PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR KECAMATAN PINANG
VOLUME : ###
LOKASI KEGIATAN : KOTA TANGERANG

No. PEKERJAAN / GAMBAR SAT KONTRAK REALISASI URAIAN PERHITUNGAN KET.

XIII PEKERJAAN MEKANIKAL & ELEKTRIKAL


A PEKERJAAN LISTRIK
a. Pengadaan dan Pemasangan Instalasi Titik Nyala Lampu
dan Stop Kontak Denah Lantai 1

1 Instalasi Titik Nyala Lampu Penerangan bh 30.000 26.00

3 Instalasi Titik Nyala Stop Kontak Biasa bh 10.000 4.00

4 Saklar Double,setara Broco Standar bh 8.000 4.00

5 Lampu TKI 2 x 18 W Inbouw bh 15.000 19.00

6 Lampu SL 18 Watt Philips pake donlate bh 15.000 4.00

7 Stop Kontak 100 VA,setara Broco Standar bh 8.000 4.00

8 Downlight Lampu SL 13 Watt Philips bh 5.000 2.00

B PEKERJAAN PENANGKAL PETIR ( KONVENSIONAL )


1 Pas. Penangkal Petir bh 1.000 2.00

Tangerang, 12 Oktober 2010

PELAKSANA TEKNIS PENYEDIA JASA KONSULTANSI PENYEDIA JASA KONSTRUKSI


PEMBANGUNAN KANTOR KECAMATAN PINANG PT. ESA SAKTI CONSULTANT PT. MULTI SARISENTOSA

DADANG TEGUH KARYANA ZULKARNAEN, ST SIGIT RYANTO, ST


Nip. 19770321 2007 01 1 008 PENGAWAS LAPANGAN SITE MANAGER

Anda mungkin juga menyukai