Anda di halaman 1dari 5

REKAPITULASI HARGA PERKIRAAN SENDIRI

PEKERJAAN : PROYEK RENOVASI MESJID


LOKASI : KAB. TASIKMALAYA
TAHUN ANGGARAN : 2020

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(RP)

A PEKERJAAN PERSIAPAN 12,092,257.50

B PEKERJAAN KONSTRUKSI LANTAI I


I PEK. TANAH DAN PONDASI 36,316,896.91
II PEK. DINDING DAN PLESTERAN 78,926,945.79
III PEK. BETON BERTULANG 471,022,506.39
IV PEK. PLAFOND 28,983,383.42
V PEK. BESI, KUSEN, PINTU DAN JENDELA 47,726,370.45
VI PEK. LANTAI 48,810,932.44
VII PEK. SANITAIR 4,187,317.50
VIII PEK. PENGECATAN DAN LABURAN 22,715,519.90
IX PEK. LISTRIK 3,747,000.00
SUB JUMLAH B 742,436,872.80
C PEKERJAAN KONSTRUKSI LANTAI II
I PEK. DINDING DAN PLESTERAN 116,006,765.24
II PEK. BETON BERTULANG 338,140,140.55
III PEK. BESI, KUSEN, PINTU DAN JENDELA 16,441,301.96
IV PEK. ATAP & PLAFOND 26,651,469.23
V PEK. LANTAI 45,716,851.47
VI PEK. SANITAIR -
VII PEK. PENGECATAN DAN LABURAN 25,393,955.80
VIII PEK. LISTRIK 10,122,000.00
SUB JUMLAH C 578,472,484.26

JUMLAH TOTAL ( A+B+C ) 1,333,001,614.56


DIBULATKAN 1,333,001,000.00

TERBILANG : SATU MILYAR TIGA RATUS TIGA PULUH TIGA JUTA SERIBU RUPIAH
RINCIAN RENCANA ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI
PEKERJAAN : PROYEK RENOVASI MESJID
LOKASI : KAB. TASIKMALAYA
TAHUN ANGGARAN : 2020

KODE
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA (RP)
ANS. (RP)

1 2 3 4 5 6 7

A PEKERJAAN PERSIAPAN
4 Buangan dan pembersihan DIHITUNG 1.25 Ls 3,000,000.00 3,750,000.00
5 Perancah/Esteger DIHITUNG 1.50 Ls 3,500,000.00 5,250,000.00
6 Pasangan papan bouplank A.2.2.1.4 67.15 M' 46,050.00 3,092,257.50
JUMLAH 12,092,257.50

B PEKERJAAN KONSTRUKSI LANTAI I


I PEK. TANAH DAN PONDASI
1 Pek. Galian tanah u/ pondasi & sloof A.2.3.1.4 88.73 M3 62,880.00 5,579,499.60
2 Pek. Urugan kembali dipadatkan A.2.3.1.9 26.62 M3 15,747.00 419,181.20
3 Pek. Urugan sirtu peninggian lantai dipadatkan A.2.3.1.15 75.02 M3 125,250.00 9,396,837.41
4 Pek. Urugan pasir bawah pondasi A.2.3.1.11 7.10 M3 122,700.00 870,998.22
5 Pas. Lantai kerja Pondasi Beton adk 1pc : 3ps : 5krl A.4.1.1.4a 1.15 M3 679,370.00 782,634.24
6 Pek. Batu Kosong A.3.2.1.9 20.59 M3 242,388.00 4,990,768.92
7 Pas. Pondasi batu belah adk. 1pc : 5ps A.3.2.1.3 27.02 M3 528,300.00 14,276,977.31
JUMLAH 36,316,896.91
II PEK. DINDING DAN PLESTERAN
1 Pas. Dinding bata adk. 1pc : 5ps A.4.4.1.10 233.38 M2 95,396.20 22,263,088.18
2 Pas. Plesteran dinding adk 1pc : 5ps A.4.4.2.5 466.75 M2 42,636.56 19,900,614.38
3 Pas. Acian Plesteran A.4.4.2.27 466.75 M2 26,155.00 12,207,846.25
4 Pas. Batu alam A.4.4.3.58a 19.25 M2 251,140.00 4,834,445.00
5 Pas. Keramik dinding KM/WC 25/40 warna A.4.4.3.54a 38.30 M2 179,282.00 6,866,500.60
6 Pas. Granit dinding Mihrab 60/60 warna Dihitung 7.13 250,729.20 1,788,451.38
7 Pas. GRC Krawangan Dihitung 11.36 M2 600,000.00 6,816,000.00
8 Pas. Roster Dihitung 170.00 bh 25,000.00 4,250,000.00
JUMLAH 78,926,945.79
III PEK. BETON BERTULANG
1 Pas. Pondasi Setempat K. 225 A.4.1.1.28a 2.88 M3 1,913,406.24 5,510,609.97
2 Pas. Sloof 20/30 K 225 A.4.1.1.29b 1.18 M3 4,019,573.16 4,741,488.50
3 Pas. Sloof 15/20 K 175 A.4.1.1.29a 5.00 M3 3,798,786.85 18,984,057.41
4 Pas. Kolom 12/12 K 175 A.4.1.1.30c 1.21 M3 5,784,110.94 6,996,460.59
7 Pas. Kolom 35/40 K.225 A.4.1.1.30a 12.60 M3 4,251,797.59 53,572,649.59
8 Pas. Balok lintel 12/20 K.175 A.4.1.1.31a 0.95 M3 5,208,503.52 4,956,411.95
9 Pas. Balok 20/35 K.225 A.4.1.1.31d 18.62 M3 6,245,179.16 116,275,868.16
10 Pas. Balok 15/25 K.225 A.4.1.1.31e 1.49 M3 5,114,695.59 7,628,888.15
11 Pas. Balok Dak 20/30 K.225 A.4.1.1.31d 18.62 M3 5,114,695.59 95,227,959.90
12 Pas. Plat Lantai K.225 A.4.1.1.32c 21.64 M3 6,548,649.40 141,730,585.40
13 Pas. Plat tangga K.225 A.4.1.1.32c 1.49 M3 7,322,785.88 10,941,865.93
17 Pas. Plat listplank K.175 A.4.1.1.32a 0.88 M3 5,063,250.97 4,455,660.85
JUMLAH 471,022,506.39
1 2 3 4 5 6 7
IV PEK. PLAFOND
2 Pas. Rangka plafond besi hollow 35/35 & 20/35 mm A.4.2.1.21 180.36 M2 100,025.00 18,040,108.90
3 Pas. Plafond gypsum T. 9 mm A.4.5.1.7 180.36 M2 41,670.00 7,515,434.52
5 Pas. List Plafond gypsum 10 cm A.4.5.1.8 164.80 M' 20,800.00 3,427,840.00
JUMLAH 28,983,383.42
V PEK. BESI, KUSEN, PINTU DAN JENDELA
1 Pas. Pintu alumunium lengkap type P.1 P.1 2.00 Unit 2,414,277.77 4,828,555.54
2 Pas. Pintu alumunium lengkap type P.2 P.2 1.00 Unit 3,873,638.27 3,873,638.27
4 Pas. Pintu alumunium lengkap type P.4 P.3 2.00 Unit 1,729,278.78 3,458,557.56
6 Pas. Jendela alum. cesment type J.1 J.1 5.00 Unit 2,538,346.48 12,691,732.40
7 Pas. Jendela alum. cesment type J.3 J.3 1.00 Unit 1,328,338.68 1,328,338.68
8 Pas. Bovenlight alum. cesment type BV.1 BV.1 2.00 Unit 255,562.00 511,124.00
9 Pas. Bovenlight alum. cesment type BV.2 BV.2 1.00 Unit 511,124.00 511,124.00
10 Pas. Hand realling tangga & void stainless dihitung 25.28 M2 812,000.00 20,523,300.00
JUMLAH 47,726,370.45
VI PEK. LANTAI
1 Pas. Lantai dalam Granit 60/60 cm A.4.4.3.13a 175.26 M2 250,729.20 43,942,799.59
2 Pas. Lantai keramik 25/25 cm anti slip warna A.4.4.3.36b 18.41 M2 159,561.00 2,937,518.01
3 Pas. Lantai tangga Granit 60/60 cm A.4.4.3.13a 7.70 M2 250,729.20 1,930,614.84
4 Pas. Step nosing tangga dihitung BH 65,000.00 -
5 Pas. Plint granit h. 12 cm dihitung M' 45,000.00 -
6 Pas. Saluran grevel 1/2 dia. 20 cm J-14C M' 144,185.62 -
JUMLAH 48,810,932.44
VII PEK. SANITAIR
1 Pas. Kloset Jongkok A.5.1.1.1 2.00 unit 602,490.00 1,204,980.00
3 Pas. Floor drain stainlles A.5.1.1.36 3.00 bh 69,950.00 209,850.00
4 Pas. Kran tembok A.5.1.1.35 9.00 bh 24,992.50 224,932.50
9 Pas. Pipa PVC dia. 3/4 " AW A.5.1.1.26 25.00 M' 18,822.00 470,550.00
10 Pas. Pipa PVC dia. 3 " AW air kotor A.5.1.1.31 10.00 M' 89,784.00 897,840.00
11 Pas. Pipa PVC dia. 4 " AW air kotor A.5.1.1.32 10.00 M' 117,916.50 1,179,165.00
12 Pek. Septictank + resapan DIHITUNG unit 5,088,278.51 -
JUMLAH 4,187,317.50
VIII PEK. PENGECATAN DAN LABURAN
1 Cat dinding dalam sekw. ICI pentalite A.4.7.1.10b 233.38 M2 31,932.00 7,452,130.50
2 Cat dinding luar sekw. Mowilex whetershel A.4.7.1.10 194.88 M2 39,432.00 7,684,311.00
3 Cat plafond sekw. ICI pentalite A.4.7.1.10c 193.63 M2 32,680.00 6,327,828.40
4 Cat coating batu tempel dihitung 19.25 M2 65,000.00 1,251,250.00
5 Water profing dak dihitung M2 95,000.00 -
JUMLAH 22,715,519.90
IX PEK. LISTRIK
1 Pas. Panel SDP lengkap DIHITUNG unit 2,500,000.00 -
2 Pas. Instalasi cahaya sek. kabel prima NYM 2 x 2.5 mm DIHITUNG 17.00 Ttk 100,000.00 1,700,000.00
3 Pas. Instalasi stop kontak sek. kabel prima NYM 3 x 2.5 mm DIHITUNG 5.00 Ttk 110,000.00 550,000.00
4 Pas. Lampu DIHITUNG 17.00 Bh 75,000.00 1,275,000.00
5 Pas. Saklar ganda DIHITUNG 7.00 Bh 15,000.00 105,000.00
6 Pas. Saklar tunggal DIHITUNG 3.00 Bh 14,000.00 42,000.00
7 Pas. Stop kontak DIHITUNG 5.00 Bh 15,000.00 75,000.00
JUMLAH 3,747,000.00
1 2 3 4 5 6 7
C PEKERJAAN KONSTRUKSI LANTAI II
I PEK. DINDING DAN PLESTERAN
1 Pas. Dinding bata adk. 1pc : 5ps A.4.4.1.10a 223.44 M2 103,981.86 23,233,706.35
2 Pas. Dinding bata penebalan adk. 1pc : 5ps A.4.4.1.10a M2 103,981.86 -
3 Pas. Plesteran dinding adk 1pc : 5ps A.4.4.2.5a 446.88 M2 46,473.85 20,768,234.27
4 Pas. Acian Plesteran A.4.4.2.27a 446.88 M2 28,508.95 12,740,079.58
5 Pas. Batu alam A.4.4.3.58b 19.25 M2 273,742.60 5,269,545.05
6 Pas. Granit dinding Mihrab 60/60 warna A.4.4.3.54b M2 195,417.38 -
7 Pas. GRC Krawangan Dihitung 11.36 bh 600,000.00 6,816,000.00
8 Pas. GRC Menara Dihitung 68.63 M2 600,000.00 41,179,200.00
9 Pas. Roster 20x20 cm Dihitung 240.00 bh 25,000.00 6,000,000.00
JUMLAH 116,006,765.24
II PEK. BETON BERTULANG
1 Pas. Kolom 12/12 K 175 A.4.1.1.30c1 1.21 M3 6,304,680.92 7,626,142.04
2 Pas. Kolom 35/40 K.225 A.4.1.1.30a1 12.60 M3 4,634,459.37 58,394,188.05
3 Pas. Balok lintel 12/20 K.175 Elv. + 700 A.4.1.1.31a1 0.65 M3 5,677,268.84 3,699,308.37
4 Pas. Balok 15/25 K.225 A.4.1.1.31b1 17.01 M3 6,114,804.11 104,001,352.64
5 Pas. Plat Dak Atap K.175 Elv. + 800 A.4.1.1.32b1 17.53 M3 7,166,939.88 125,609,938.37
6 Pas. Plat listplank dak K.175 A.4.1.1.32a1 7.03 M3 5,518,943.55 38,809,211.07
JUMLAH 338,140,140.55
III PEK. BESI, KUSEN, PINTU DAN JENDELA
1 Pas. Pintu alumunium lengkap type P.1 P.1 1.00 Unit 2,414,277.77 2,414,277.77
2 Pas. Pintu alumunium lengkap type P.2 P.2 1.00 Unit 3,873,638.27 3,873,638.27
6 Pas. Jendela alum. cesment type J.1 J.1 4.00 Unit 2,538,346.48 10,153,385.92
JUMLAH 16,441,301.96
IV PEK. ATAP & PLAFOND
5 Pas. Rangka plafond besi hollow 35/35 & 20/35 mm A.4.2.1.21a 172.56 M2 109,027.25 18,813,742.26
6 Pas. Plafond dalam gypsum T. 9 mm A.4.5.1.7a 172.56 M2 45,420.30 7,837,726.97
JUMLAH 26,651,469.23
V PEK. LANTAI
1 Pas. Lapisan pasir bawah lantai A.2.3.1.11.a 4.95 M3 133,743.00 661,466.13
2 Pas. Lantai Granit 60/60 cm A.4.4.3.13a 164.86 M2 273,294.83 45,055,385.34
3 Pas. Lantai keramik 25/25 cm anti slip warna A.4.4.3.36c M2 173,921.49 -
4 Pas. Plint granit h. 12 cm dihitung M' 45,000.00 -
JUMLAH 45,716,851.47
VI PEK. SANITAIR
1 Pas. Kloset Jongkok A.5.1.1.1 unit 602,490.00 -
2 Pas. Floor drain stainlles A.5.1.1.36 bh 69,950.00 -
3 Pas. Kran tembok A.5.1.1.35 bh 24,992.50 -
4 Pas. Kran cebok dihitung bh 75,000.00 -
5 Pas. Shower dihitung bh 95,000.00 -
6 Pas. Kaca cermin + bingkai dihitung bh 150,000.00 -
7 Pas. Water turen kap. 1 M3 dihitung bh 1,500,000.00 -
8 Pas. Stop kran 1 " dihitung bh 85,000.00 -
9 Pas. Pipa PVC dia. 1/2 " AW A.5.1.1.25 m' 16,032.00 -
10 Pas. Pipa PVC dia. 3/4 " AW A.5.1.1.26 m' 18,822.00 -
11 Pas. Pipa PVC dia. 3 " AW air kotor A.5.1.1.31 m' 89,784.00 -
12 Pas. Pipa PVC dia. 4 " AW air kotor A.5.1.1.32 m' 117,916.50 -
JUMLAH -
1 2 3 4 5 6 7
VII PEK. PENGECATAN DAN LABURAN
1 Cat dinding dalam sekw. ICI pentalite A.4.7.1.10b1 223.44 M2 34,805.88 7,777,025.83
2 Cat dinding luar sekw. Mowilex whetershel A.4.7.1.10a 223.44 M2 42,980.88 9,603,647.83
3 Cat plafond sekw. ICI pentalite A.4.7.1.10c1 180.36 M2 35,621.20 6,424,497.15
4 Cat listplank sekw. Avian A.4.7.1.4 11.00 M2 30,685.00 337,535.00
5 Cat coating batu tempel dihitung 19.25 M2 65,000.00 1,251,250.00
JUMLAH 25,393,955.80
VIII PEK. LISTRIK
1 Pas. Instalasi cahaya sek. kabel prima NYM 2 x 2.5 mm DIHITUNG 17.00 Ttk 100,000.00 1,700,000.00
2 Pas. Instalasi stop kontak sek. kabel prima NYM 3 x 2.5 mm DIHITUNG 5.00 Ttk 110,000.00 550,000.00
3 Pas. Lampu Baret DIHITUNG 17.00 Bh 450,000.00 7,650,000.00
4 Pas. Saklar ganda DIHITUNG 7.00 Bh 15,000.00 105,000.00
5 Pas. Saklar tunggal DIHITUNG 3.00 Bh 14,000.00 42,000.00
6 Pas. Stop kontak DIHITUNG 5.00 Bh 15,000.00 75,000.00
JUMLAH 10,122,000.00