Instansi : Dinas Pekerjaan Umum dan Penataan Ruang Kota Serang Bidang Cipta Karya
a b c
REKAPITULASI
I GEDUNG UTAMA 2.612.602.661,06
A PEKERJAAN PERSIAPAN 74.055.272,21
B. PEKERJAAN K3 11.910.000,00
C. PEKERJAAN BONGKARAN 143.971.584,17
D. PEK. TANAH DAN PONDASI 155.680.281,00
E. PEK. DINDING DAN PLESTERAN 569.257.068,74
F. PEK. BETON 321.676.389,93
G. PEK. LANTAI 409.603.749,00
H. PEK. PENUTUP ATAP DAN RANGKA ATAP 269.873.330,02
I. PEKERJAAN LANGIT - LANGIT 190.954.520,00
J. PEKERJAAN PINTU DAN JENDELA 209.044.100,00
K. PEKERJAAN MEKANIKAL ELEKTRIKAL 79.659.000,00
L. PEKERJAAN SANITASI 143.299.660,00
M. PEK. DRAINASE 33.617.706,00
PEMBULATAN 3.800.000.000,00
INSTANSI : Dinas Pekerjaan Umum dan Penataan Ruang Kota Serang Bidang Cipta Karya
PEKERJAAN : DED DPMPTSP KOTA SERANG
LOKASI : KOTA SERANG
TAHUN ANGGARAN : APBD KOTA SERANG 2022
NO MATA HARGA
URAIAN PEKERJAAN VOLUME SATUAN JUMLAH HARGA
PEMBAYARAN SATUAN
(a) (b) (c) (d) (e) (f)
I GEDUNG UTAMA
A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1,00 ls 250.000 250.000,00
2 Mobilisasi dan Demobilisasi 1,00 ls 9.022.512 9.022.512,21
3 Listrik dan Air Kerja 1,00 ls 3.000.000 3.000.000,00
4 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 116,00 m2 325.900 37.804.400,00
5 Pembuatan kantor sementara lantai plesteran 6,00 m2 1.353.500 8.121.000,00
6 Pembuatan gudang semen dan peralatan 6,00 m2 1.073.800 6.442.800,00
7 Biaya Pelaporan Administrasi dan Dokumentasi 1,00 ls 2.000.000 2.000.000,00
8 Pengukuran dan pasang bouwplank 121,95 m' 60.800 7.414.560,00
Subtotal A 74.055.272,21
B PEKERJAAN K3
1 Penyiapan RK3K 1,00 set 1.700.000 1.700.000,00
2 Pembuatan Kartu Identitas Pekerja (KIP) 20,00 org 15.000 300.000,00
3 Induksi K3 (Safety Induction), khusus untuk pekerja baru 20,00 org 25.000 500.000,00
4 Spanduk (banner) 1,00 lb 30.000 30.000,00
5 Poster 1,00 lb 75.000 75.000,00
6 Papan informasi K3 1,00 bh 125.000 125.000,00
7 Alat pelindung kerja
Pembatas area (Restricted Area) 1,00 ls 100.000 100.000,00
8 Alat pelindung diri
Helm pelindung (Safety Hekmet) 20,00 bh 25.000 500.000,00
Pelindung mata (Goggles Spectacles) 5,00 bh 25.000 125.000,00
Pelindung pernafasan dan mulut (Masker) 20,00 bh 9.000 180.000,00
Sarung tangan (Safety Gloves) 10,00 psg 17.500 175.000,00
Sepatu keselamatan (Safety Shoes), untuk staf 10,00 psg 250.000 2.500.000,00
Sepatu keselamatan (Rubber Safety Shoes and toe cap) 20,00 psg 80.000 1.600.000,00
Rompi untuk keselamatan (Safety Vest) 20,00 bh 15.000 300.000,00
9 Asuransi dan Perijinan
BPJS Ketenagakerjaan dan Keselamatan Kerja 1,00 ls 1.500.000 1.500.000,00
10 Fasilitas sarana kesehatan
Peralatan P3K (Kotak P3K, Oksigen, Obat luka,Perban, dll) 1,00 ls 1.000.000 1.000.000,00
11 Rambu - rambu
Rambu petunjuk 2,00 bh 150.000 300.000,00
Rambu larangan 2,00 bh 150.000 300.000,00
Rambu peringatan 2,00 bh 150.000 300.000,00
Rambu informasi 2,00 bh 150.000 300.000,00
Subtotal B 11.910.000,00
C PEKERJAAN BONGKARAN
1 Bongkaran Rangka Atap 632,66 m2 16.800 10.628.617,67
2 Bongkaran Genteng Lama 632,66 m2 3.800 2.404.092,09
3 Bongkaran Plafon 586,63 m2 14.500 8.506.142,25
4 Bongkaran Kusen Pintu dan Jendela 17,73 m3 61.600 1.091.900,04
5 Bongkaran Lantai Keramik 526,82 m2 7.100 3.740.439,75
6 Bongkaran Dinding Bata Merah 93,63 m3 738.800 69.173.123,67
7 Bongkaran Beton Bertulang 23,34 m3 1.576.600 36.800.208,90
8 Buang Puing Bongkaran 217,74 m3 53.400 11.627.059,79
Subtotal C 143.971.584,17
D PEK. TANAH DAN PONDASI
1 Pek. Galian Tanah 256,77 m3 86.600 22.236.282
2 Pek. Urugan Tanah 85,59 m3 63.200 5.409.288
3 Pek. Batu Kosong (Aanstamping) 41,99 m3 546.100 22.928.009
4 Pek. Urugan Pasir 14,27 m3 404.500 5.770.193
5 Pek. Pondasi Batu Belah 1:4 108,85 m3 912.600 99.336.510
Subtotal D 155.680.281,00
E PEK. DINDING DAN PLESTERAN
1 Pas. Dinding Bata Merah 944,71 m2 240.300 227.013.284,34
2 Pek . Plesteran 1.889,42 m2 72.600 137.171.572,56
3 Pek. Acian 1.889,42 m2 42.800 80.866.987,68
4 Pek. Pengecatan Eksterior 615,60 m2 41.800 25.732.080,00
5 Pek. Pengecatan Interior 1.273,82 m2 33.600 42.800.204,16
6 Pek. Dinding Lapis HPL R. Rapat 93,90 m2 516.600 48.508.740,00
7 Pek. Backdrop R. Rapat 1,00 unit 7.164.200 7.164.200,00
Subtotal E 569.257.068,74
F PEK. BETON
1 Sloof 15/20
- Beton (Site Mix K175) 9,51 m3 1.139.300 10.834.743
- Besi Tulangan 2687,00 kg 19.000 51.052.956
- Bekisting 31,70 m2 160.500 5.087.850
2 Kolom 15/15
- Beton (Site Mix K175) 5,39 m3 1.139.300 6.136.839
- Besi Tulangan 1112,33 kg 19.000 21.134.312
- Bekisting 71,82 m2 282.600 20.296.332
3 Kolom 15/20
- Beton (Site Mix K175) 5,59 m3 1.139.300 6.364.130
- Besi Tulangan 914,18 kg 19.000 17.369.419
- Bekisting 37,73 m2 282.600 10.662.498
4 Kolom 20/20
- Beton (Site Mix K175) 0,61 m3 1.139.300 692.694
- Besi Tulangan 78,63 kg 19.000 1.493.962
- Bekisting 6,08 m2 282.600 1.718.208
5 Ring Balok 15/20
- Beton (Site Mix K175) 12,31 m3 1.139.300 14.019.200
- Besi Tulangan 2791,98 kg 19.000 53.047.623
- Bekisting 225,59 m2 160.500 36.207.757
6 Ring Balok 20/40
- Beton (Site Mix K175) 1,81 m3 1.139.300 2.058.943
- Besi Tulangan 210,98 kg 19.000 4.008.607
- Bekisting 22,59 m2 160.500 3.625.695
7 Balok Lintel 6/10
- Beton (Site Mix K175) 0,70 m3 1.139.300 802.796
- Besi Tulangan 354,63 kg 19.000 6.737.963
- Bekisting 30,53 m2 282.600 8.629.021
8 Pek. Dak Beton
- Beton (Site Mix K175) 7,86 m3 1.139.300 8.951.548
- Besi Tulangan 356,77 kg 19.000 6.778.562
- Bekisting 92,36 m2 143.800 13.281.756
9 Pek. Meja Beton Washtafel
- Beton (Site Mix K175) 0,34 m3 1.139.300 385.539
- Besi Tulangan 15,37 kg 19.000 291.950
- Bekisting 4,38 m2 143.800 629.844
10 Pek. Ramp Difabel
- Beton (Site Mix K175) 2,10 m3 1.139.300 2.392.530
11 Pek. Rabat Beton (K100) 7,20 m3 970.200 6.983.112
Subtotal F 321.676.389,93
G PEK. LANTAI
1 Granit 80x80 cm 657,08 m2 584.000 383.734.720,00
2 Keramik Anti Slip KM/WC 40x40 cm 40,00 m2 267.200 10.688.000,00
3 Pasang keramik Dinding kamar mandi 25 x 40 77,28 m2 184.500 14.258.529,00
4 Pek. Stepnozing Tangga 9,00 m' 102.500 922.500,00
Subtotal G 409.603.749,00
H PEK. PENUTUP ATAP DAN RANGKA ATAP
1 Pek. Rangka Atap Baja Ringan 498,68 m2 204.700 102.080.132,73
2 Pas Genteng Onduline 498,68 m2 279.200 139.231.915,28
3 Pas Nok Onduline 115,08 m' 175.400 20.185.032,00
4 Listplank GRC 167,53 m' 50.000 8.376.250,00
Subtotal H 269.873.330,02
I PEKERJAAN LANGIT - LANGIT
1 Pas Plafond PVC + Rangka Hollow 640,40 m2 263.200 168.553.280,00
2 Pek. List Plafon PVC 878,48 m' 25.500 22.401.240,00
Subtotal I 190.954.520,00
J PEKERJAAN PINTU DAN JENDELA
1 P1 4,00 unit 3.887.100 15.548.400,00
2 P2 1,00 unit 4.234.100 4.234.100,00
3 P3 8,00 unit 2.926.300 23.410.400,00
4 P4 2,00 unit 2.896.900 5.793.800,00
5 P5 3,00 unit 2.876.000 8.628.000,00
6 PINTU UPVC (P6) 3,00 unit 1.238.400 3.715.200,00
7 P7 3,00 unit 15.791.400 47.374.200,00
8 BV1 3,00 unit 297.200 891.600,00
9 BV2 2,00 unit 594.400 1.188.800,00
10 J1 42,00 unit 2.309.200 96.986.400,00
11 J2 1,00 unit 1.273.200 1.273.200,00
Subtotal J 209.044.100,00
K PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Instalasi Penerangan kabel NYM 3 x 2,5 mm 84,00 titik 331.300 27.829.200,00
2 Instalasi Stop Kontak kabel NYM 3 x 2,5 mm 53,00 titik 331.200 17.553.600,00
3 Instalasi Sakelar kabel NYM 2 x 2,5 mm 26,00 titik 269.600 7.009.600,00
4 Lampu Led Downlight 11 W Warna Warm White 41,00 bh 90.700 3.718.700,00
5 Lampu Led Downlight 4" 18 W 8,00 bh 156.700 1.253.600,00
6 Saklar Double Switch 9,00 bh 71.300 641.700,00
7 Saklar Single Switch 17,00 bh 61.200 1.040.400,00
8 Stop Kontak Dengan Tutup 30,00 bh 66.600 1.998.000,00
9 Stop Kontak AC 23,00 bh 129.600 2.980.800,00
10 Lampu Downlight RM 2x18 W 35,00 bh 426.200 14.917.000,00
11 Pek. Box Panel MCB 20x20 + MCB 6 A 2,00 Unit 358.200 716.400,00
Subtotal K 79.659.000,00
L PEKERJAAN SANITASI
1 Pek. Closet Duduk 7,00 bh 2.538.200 17.767.400
2 Pek. Washtafle + Accessories 5,00 bh 1.867.200 9.336.000
3 Pek. Kran Air 12,00 bh 87.800 1.053.600
4 Pek. Urinoir 3,00 bh 2.777.600 8.332.800
5 Pek. Floor Drain 7,00 bh 41.700 291.900
6 Pek. Pipa Air Kotor 4" PVC + Instalasi 25,00 m' 150.400 3.760.000
7 Pek. Pipa Air Kotor 2" PVC + Instalasi 53,00 m' 59.600 3.158.800
8 Pek. Pipa Air Bersih 1/2" PVC + Instalasi 72,65 m' 23.600 1.714.540
9 Pek. Pipa Air Bersih 2" PVC + Instalasi 35,00 m' 59.600 2.086.000
10 Toilet Cubicle Partisi 26,80 m2 1.087.900,00 29.155.720
11 Septic Tank Bio Kap. 5.000 Lt 1,00 unit 32.916.800 32.916.800
12 Sumur Bor (30 m) 1,00 unit 8.800.000 8.800.000
13 Water Torn Kap 2000 ltr dan Menara Air 1,00 unit 16.953.500 16.953.500
14 Pompa Air 500 watt 1,00 unit 7.972.600 7.972.600
Subtotal L 143.299.660,00
M PEK. DRAINASE
1 Galian tanah 16,68 m3 86.600 1.444.488
2 Pek. Dinding Bata Merah 1/2 Batu 1:4 104,25 m2 116.600 12.155.550
3 Pek. Plesteran 104,25 m2 71.600 7.464.300
4 Pek. Acian 104,25 m2 42.800 4.461.900
5 Pek. Lantai Kerja Beton 8,34 m3 970.200 8.091.468
Subtotal M 33.617.706,00
TOTAL I. 2.612.602.661,06
Subtotal E 60.903.796,97
TOTAL II. 231.957.514,90
INSTANSI : Dinas Pekerjaan Umum dan Penataan Ruang Kota Serang Bidang Cipta Karya
PEKERJAAN : DED DPMPTSP KOTA SERANG
LOKASI : KOTA SERANG
TAHUN ANGGARAN : APBD KOTA SERANG 2022
NO MATA HARGA
URAIAN PEKERJAAN VOLUME SATUAN JUMLAH HARGA
PEMBAYARAN SATUAN
(a) (b) (c) (d) (e) (f)
I GEDUNG UTAMA
A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1,00 ls
2 Mobilisasi dan Demobilisasi 1,00 ls
3 Listrik dan Air Kerja 1,00 ls
4 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 116,00 m2
5 Pembuatan kantor sementara lantai plesteran 6,00 m2
6 Pembuatan gudang semen dan peralatan 6,00 m2
7 Biaya Pelaporan Administrasi dan Dokumentasi 1,00 ls
8 Pengukuran dan pasang bouwplank 121,95 m'
Subtotal A -
B PEKERJAAN K3
1 Penyiapan RK3K 1,00 set
2 Pembuatan Kartu Identitas Pekerja (KIP) 20,00 org
3 Induksi K3 (Safety Induction), khusus untuk pekerja baru 20,00 org
4 Spanduk (banner) 1,00 lb
5 Poster 1,00 lb
6 Papan informasi K3 1,00 bh
7 Alat pelindung kerja
Pembatas area (Restricted Area) 1,00 ls
8 Alat pelindung diri
Helm pelindung (Safety Hekmet) 20,00 bh
Pelindung mata (Goggles Spectacles) 5,00 bh
Pelindung pernafasan dan mulut (Masker) 20,00 bh
Sarung tangan (Safety Gloves) 10,00 psg
Sepatu keselamatan (Safety Shoes), untuk staf 10,00 psg
Sepatu keselamatan (Rubber Safety Shoes and toe cap) 20,00 psg
Rompi untuk keselamatan (Safety Vest) 20,00 bh
9 Asuransi dan Perijinan
BPJS Ketenagakerjaan dan Keselamatan Kerja 1,00 ls
10 Fasilitas sarana kesehatan
Peralatan P3K (Kotak P3K, Oksigen, Obat luka,Perban, dll) 1,00 ls
11 Rambu - rambu
Rambu petunjuk 2,00 bh
Rambu larangan 2,00 bh
Rambu peringatan 2,00 bh
Rambu informasi 2,00 bh
Subtotal B -
C PEKERJAAN BONGKARAN
1 Bongkaran Rangka Atap 632,66 m2
2 Bongkaran Genteng Lama 632,66 m2
3 Bongkaran Plafon 586,63 m2
4 Bongkaran Kusen Pintu dan Jendela 17,73 m3
5 Bongkaran Lantai Keramik 526,82 m2
6 Bongkaran Dinding Bata Merah 93,63 m3
7 Bongkaran Beton Bertulang 23,34 m3
8 Buang Puing Bongkaran 217,74 m3
Subtotal C -
D PEK. TANAH DAN PONDASI
1 Pek. Galian Tanah 256,77 m3
2 Pek. Urugan Tanah 85,59 m3
3 Pek. Batu Kosong (Aanstamping) 41,99 m3
4 Pek. Urugan Pasir 14,27 m3
5 Pek. Pondasi Batu Belah 1:4 108,85 m3
Subtotal D -
E PEK. DINDING DAN PLESTERAN
1 Pas. Dinding Bata Merah 944,71 m2
2 Pek . Plesteran 1.889,42 m2
3 Pek. Acian 1.889,42 m2
4 Pek. Pengecatan Eksterior 615,60 m2
5 Pek. Pengecatan Interior 1.273,82 m2
6 Pek. Dinding Lapis HPL R. Rapat 93,90 m2
7 Pek. Backdrop R. Rapat 1,00 unit
Subtotal E -
F PEK. BETON
1 Sloof 15/20
- Beton (Site Mix K175) 9,51 m3
- Besi Tulangan 2687,00 kg
- Bekisting 31,70 m2
2 Kolom 15/15
- Beton (Site Mix K175) 5,39 m3
- Besi Tulangan 1112,33 kg
- Bekisting 71,82 m2
3 Kolom 15/20
- Beton (Site Mix K175) 5,59 m3
- Besi Tulangan 914,18 kg
- Bekisting 37,73 m2
4 Kolom 20/20
- Beton (Site Mix K175) 0,61 m3
- Besi Tulangan 78,63 kg
- Bekisting 6,08 m2
5 Ring Balok 15/20
- Beton (Site Mix K175) 12,31 m3
- Besi Tulangan 2791,98 kg
- Bekisting 225,59 m2
6 Ring Balok 20/40
- Beton (Site Mix K175) 1,81 m3
- Besi Tulangan 210,98 kg
- Bekisting 22,59 m2
7 Balok Lintel 6/10
- Beton (Site Mix K175) 0,70 m3
- Besi Tulangan 354,63 kg
- Bekisting 30,53 m2
8 Pek. Dak Beton
- Beton (Site Mix K175) 7,86 m3
- Besi Tulangan 356,77 kg
- Bekisting 92,36 m2
9 Pek. Meja Beton Washtafel
- Beton (Site Mix K175) 0,34 m3
- Besi Tulangan 15,37 kg
- Bekisting 4,38 m2
10 Pek. Ramp Difabel
- Beton (Site Mix K175) 2,10 m3
11 Pek. Rabat Beton (K100) 7,20 m3
Subtotal F -
G PEK. LANTAI
1 Granit 80x80 cm 657,08 m2
2 Keramik Anti Slip KM/WC 40x40 cm 40,00 m2
3 Pasang keramik Dinding kamar mandi 25 x 40 77,28 m2
4 Pek. Stepnozing Tangga 9,00 m'
Subtotal G -
H PEK. PENUTUP ATAP DAN RANGKA ATAP
1 Pek. Rangka Atap Baja Ringan 498,68 m2
2 Pas Genteng Onduline 498,68 m2
3 Pas Nok Onduline 115,08 m'
4 Listplank GRC 167,53 m'
Subtotal H -
I PEKERJAAN LANGIT - LANGIT
1 Pas Plafond PVC + Rangka Hollow 640,40 m2
2 Pek. List Plafon PVC 878,48 m'
Subtotal I -
J PEKERJAAN PINTU DAN JENDELA
1 P1 4,00 unit
2 P2 1,00 unit
3 P3 8,00 unit
4 P4 2,00 unit
5 P5 3,00 unit
6 PINTU UPVC (P6) 3,00 unit
7 P7 3,00 unit
8 BV1 3,00 unit
9 BV2 2,00 unit
10 J1 42,00 unit
11 J2 1,00 unit
Subtotal J -
K PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Instalasi Penerangan kabel NYM 3 x 2,5 mm 84,00 titik
2 Instalasi Stop Kontak kabel NYM 3 x 2,5 mm 53,00 titik
3 Instalasi Sakelar kabel NYM 2 x 2,5 mm 26,00 titik
4 Lampu Led Downlight 11 W Warna Warm White 41,00 bh
5 Lampu Led Downlight 4" 18 W 8,00 bh
6 Saklar Double Switch 9,00 bh
7 Saklar Single Switch 17,00 bh
8 Stop Kontak Dengan Tutup 30,00 bh
9 Stop Kontak AC 23,00 bh
10 Lampu Downlight RM 2x18 W 35,00 bh
11 Pek. Box Panel MCB 20x20 + MCB 6 A 2,00 Unit
Subtotal K -
L PEKERJAAN SANITASI
1 Pek. Closet Duduk 7,00 bh
2 Pek. Washtafle + Accessories 5,00 bh
3 Pek. Kran Air 12,00 bh
4 Pek. Urinoir 3,00 bh
5 Pek. Floor Drain 7,00 bh
6 Pek. Pipa Air Kotor 4" PVC + Instalasi 25,00 m'
7 Pek. Pipa Air Kotor 2" PVC + Instalasi 53,00 m'
8 Pek. Pipa Air Bersih 1/2" PVC + Instalasi 72,65 m'
9 Pek. Pipa Air Bersih 2" PVC + Instalasi 35,00 m'
10 Toilet Cubicle Partisi 26,80 m2
11 Septic Tank Bio Kap. 5.000 Lt 1,00 unit
12 Sumur Bor (30 m) 1,00 unit
13 Water Torn Kap 2000 ltr dan Menara Air 1,00 unit
14 Pompa Air 500 watt 1,00 unit
Subtotal L -
M PEK. DRAINASE
1 Galian tanah 16,68 m3
2 Pek. Dinding Bata Merah 1/2 Batu 1:4 104,25 m2
3 Pek. Plesteran 104,25 m2
4 Pek. Acian 104,25 m2
5 Pek. Lantai Kerja Beton 8,34 m3
Subtotal M -
TOTAL I. -
Subtotal E -
TOTAL II. -
JUMLAH
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Bongkaran Rangka Atap
632,66 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Bongkaran Rangka Atap
Atap 1 2,6 5,7 0,86 17,233
Atap 2 63,95 8 0,86 594,884
Atap 3 2,5 3 0,86 8,721
Atap 4 3,388 3 0,86 11,819
JUMLAH 632,656
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Bongkaran Genteng Lama
632,66 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Bongkaran Genteng Lama
Atap 1 2,6 5,7 0,86 17,233
Atap 2 63,95 8 0,86 594,884
Atap 3 2,5 3 0,86 8,721
Atap 4 3,388 3 0,86 11,819
JUMLAH 632,656
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Bongkaran Plafon
586,63 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Bongkaran Plafon
L1 63,95 8 511,600
L2 2 4 8,000
L3 2,6 5,7 14,820
L4 3 2,5 7,500
Selasar 74,76 0,8 59,808
Pengurang
L1 4,5 -3,355 (15,098)
JUMLAH 586,631
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Bongkaran Kusen Pintu dan Jendela
177,26 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
P1 2,08 2,54 3 15,850
P2 1,52 2,54 10 38,608
P3 PVC 0,75 1,95 5 7,313
PJ1 2,08 2,54 2 10,566
1,6 1,6 2 5,120
PJ2 2 2,54 1 5,080
1,6 1,6 1 2,560
J1 2,4 1,6 23 88,320
J2 1,6 1,6 1 2,560
J3 0,8 1,6 1 1,280
JUMLAH 177,257
JUMLAH 526,82
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Bongkaran Kusen Pintu dan Jendela
19,48 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 19,48
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Bongkaran Beton Bertulang
23,34 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 23,34
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pembuangan Puing Bongkaran
217,74 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 M2/M3 Titik D N P1 Ptotal Bj Besi
Beton
- Bertulang 23,34 23,342
Kusen
Pintu
- Jenela 0,1 19,48 63,266
Keramik/
- Lantai 0,05 526,82 15,816
JUMLAH 217,74
JUMLAH 127,900
JENIS PEKERJAAN : Pek. Galian Tanah Pondasi
256,77 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Galian
Axis X 198 0,9 0,9 1 160,380
Axis Y 119 0,9 0,9 1 96,390
JUMLAH 256,77
JENIS PEKERJAAN : Pek. Urugan Tanah Kembali
85,59 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Urugan Tanah 85,590
JUMLAH 85,59
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pasir Urug t = 5 cm
14,27 m2
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
198 0,9 0,05 8,910
119 0,9 0,05 5,355
JUMLAH 14,27
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Batu Kosong t = 15 cm
41,99 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Batu Kosong 192 0,9 0,15 25,920
119 0,9 0,15 16,065
JUMLAH 41,99
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pondasi Batu Kali
108,85 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 108,85
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Dinding Bata Merah
944,71 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pengurang
P1 1,43 2,54 -4 (14,529)
P2 1,52 2,54 -1 (3,861)
P3 0,98 2,54 -8 (19,914)
P4 0,88 2,54 -2 (4,470)
P5 0,85 2,54 -3 (6,477)
UPVC P6 0,8 2 -3 (4,800)
P7 2,08 2,34 -3 (14,602)
1,41 3,2 -6 (27,072)
2,88 0,4 -6 (6,912)
BV1 0,6 0,48 -3 (0,864)
BV2 1,2 0,48 -2 (1,152)
J1 2 Modul 1,5 1,6 -42 (100,800)
J2 1 Modul 0,775 1,6 -1 (1,240)
JUMLAH 944,71
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Plesteran
1.889,42 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Plesteran 944,71 2 1.889,416
JUMLAH 1.889,42
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Acian
1.889,42 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Acian 944,71 2 1.889,416
JUMLAH 1.889,42
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pengecatan Tembok Eksterior
615,60 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Dinding Belakang (Selatan) 58 3,8 1 220,400
Dinding Depan (Utara) 64 3,8 1 243,200
Dinding Samping (Timur) 20 3,8 1 76,000
Dinding Samping (Barat) 20 3,8 1 76,000
JUMLAH 615,60
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pengecatan Tembok Interior
1.273,82 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pengecatan Total 1.889,416
Pengurang (Pek. Cat Eksterior) (615,600)
JUMLAH 1.273,82
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Dinding Lapis HPL Ruang Rapat
93,90 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
B.
- Dinding 19,5 3,4 66,300
4 0,84 3,360
4 0,96 3,840
Penguran
- g 0,6 3,4 -6 (12,240)
0,4 3,4 -2 (2,720)
JUMLAH 93,90
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Backdrop Ruang Rapat
13,87 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Papan R.
- Rapat 1 1,5 1,500
- Sekat 0,4 1,6 2 1,280
0,4 4,2 2 3,360
Rak.
Ruang
- Rapat 4,2 1,04 2 4,368
0,8 4,2 3,360
JUMLAH 13,87
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Nok Onduline
115,08 m'
SATUAN PEMBAYARAN : m'
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Nok Onduline 115,08 115,080
JUMLAH 115,08
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Listplank GRC
167,53 m2
SATUAN PEMBAYARAN : m'
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Listplank GRC 167,53 167,525
JUMLAH 167,53
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Rangka Atap
498,68 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Luas 1 trapaseium 49,81 54 2 1 103,810
54 60 1,41 1 80,370
4,9 9,75 1,41 1 10,328
Segitiga 4,9 2 4,900
Pengurang
Lantai KM/WC 1 2 2 -1 (4,000)
Lantai Toilet Pria 4,5 3 -1 (13,500)
1,5 3 -1 (4,500)
Lantai Toilet Wanita 4,5 3 -1 (13,500)
1,5 3 -1 (4,500)
JUMLAH 657,080
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Lantai Anti Slip KM/WC 40x40 cm
40,00 m2
SATUAN PEMBAYARAN :
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 77,282
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Stepnozing Tangga
9,00 m'
SATUAN PEMBAYARAN :
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Tangga 1 3 3,000
Tangga 2 3 3,000
Tangga 3 3 3,000
JUMLAH 9,000
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Mekanikal dan Elektrikal
328,00 m2
SATUAN PEMBAYARAN :
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Dropoff 1 2 3 1 6,000
Dropoff 2 2 3 1 6,000
Dropoff 3 2 3 1 6,000
Selasar 5 0,5 2 5,000
5 0,5 2 5,000
67 0,3 1 20,100
78 0,3 1 23,400
JUMLAH 640,400
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. List Plafond PVC
878,48 m'
SATUAN PEMBAYARAN : m'
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Ruang Kadis
KM/WC kadis 10 10,000
R. Kadis 84,38 84,380
JUMLAH 16,68
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Dinding Bata Merah Drainase
104,25 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 104,25
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Plesteran
104,25 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
139 0,45 62,550
139 0,3 41,700
JUMLAH 104,25
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Acian
104,25 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
139 0,45 62,550
139 0,3 41,700
JUMLAH 104,25
JUMLAH 8,34
II. PEKERJAAN PAGAR
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Bongkaran Dinding Bata Pagar
23,94 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Bongkaran Bata
Pagar Depan 43 1,2 51,600
Pagar
Belakang 58 2 116,000
Pengurang -8 (8,000)
Dikali 0,15 JUMLAH 23,94
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Galian Tanah Pagar
64,64 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Galian Tanah Pagar
Pagar Depan 43 0,8 0,8 1 27,520
Pagar
Belakang 58 0,8 0,8 1 37,120
JUMLAH 64,64
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pasir Urug t = 5 cm Pagar
4,04 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pagar Depan 43 0,8 0,05 1,720
Pagar Belakang 58 0,8 0,05 2,320
JUMLAH 4,04
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Batu Kosong t = 5 cm Pagar
4,04 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
43 0,8 0,05 1,720
58 0,8 0,05 2,320
JUMLAH 4,04
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pondasi Batu Kali Pagar
33,85 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 33,85
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Dinding Bata Merah Pagar
158,93 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Penguran
g Kolom 0,6 1,03 -6 (3,708)
0,3 1,03 -6 (1,854)
Ekspose
Kolom Pagar Depan K30x30 4,320
K60x60 17,280
JUMLAH 158,93
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Plesteran Pagar
317,86 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Dinding Bata Merah 158,93 2 317,856
JUMLAH 317,86
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Acian Pagar
317,86 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Dinding Bata Merah 158,93 2 317,856
JUMLAH 317,86
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pengecatan Dinding Pagar
317,86 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Dinding Bata Merah 158,93 2 317,856
JUMLAH 317,86
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Batu Alam Pagar
8,00 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pagar Depan 0,15 0,625 79 7,406
0,95 0,625 1 0,594
JUMLAH 8,00
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Huruf Acrylic + LED
1.020,00 cm
SATUAN PEMBAYARAN : cm
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Huruf /Papan Nama Kantor (DPMPTSP KOTA SERANG) Tinggi 30 cm Acrylic LED 60 17 1.020,000
JUMLAH 1.020,00
III. PEKERAAN LANDSCAPE
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Landscape
-
SATUAN PEMBAYARAN :
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 D N P1 Ptotal Bj Besi
1 Pek. Kansteen 60x14x30 cm 69,20 69,200
2 Pek. Dinding Bata Merah 1/2 Batu 1:4 69,87 0,3 20,961
13,00 0,25 -
3 Pek. Plesteran 69,87 0,3 20,961
13,00 0,25 -
4 Pek. Acian 69,87 0,3 20,961
13,00 0,25 -
5 Pek. Pengecatan 69,87 0,3 20,961
JUMLAH
JUMLAH 16,00
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Galian Tanah Pondasi Pos Jaga
17,17 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Galian
Axis X 9,2 0,9 0,9 1 7,452
Axis Y 12 0,9 0,9 1 9,720
JUMLAH 17,17
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pasir Urug t = 5 cm Pos Jaga
0,95 m2
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
9,2 0,9 0,05 0,414
12 0,9 0,05 0,540
JUMLAH 0,95
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Batu Kosong t = 15 cm Pos Jaga
2,86 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
9,2 0,9 0,15 1,242
12 0,9 0,15 1,620
JUMLAH 2,86
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pondasi Batu Kali Pos Jaga
7,95 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 7,95
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Dinding Bata Merah Pos Jaga
63,69 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pengurang
P1 0,88 2,54 -1 (2,235)
UPVC
(P6) 0,8 2 -1 (1,600)
J1 1,44 1,6 -1 (2,304)
J2 0,77 1,6 -1 (1,232)
JUMLAH 63,69
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Plesteran Pos Jaga
127,38 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Plesteran 63,69 2 127,378
JUMLAH 127,38
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Acian Pos Jaga
127,38 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
Luas T1 T2 Titik D N P1 Ptotal Bj Besi
Pek. Acian 63,69 2 127,378
JUMLAH 127,38
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pengecatan Tembok Eksterior Pos Jaga
50,27 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Dinding Belakang 4 3,8 1 15,200
Dinding Depan 4 3,8 1 15,200
Dinding Samping 4 3,8 1 15,200
Dinding Samping 2,5 3,8 1 9,500
Peng
uran
g
P1 0,88 2,54 -1 (2,235)
J1 1,44 1,6 -1 (2,304)
BV1 0,6 0,48 -1 (0,288)
JUMLAH 50,27
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pengecatan Tembok Interior Pos Jaga
77,10 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Pengecatan Total 127,378
Pengurang (Pek. Cat Eksterior) (50,273)
JUMLAH 77,10
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Rangka Atap
20,34 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Luas trapaseium 2,16 1 1,37 2 4,329
1,77 3,32 1,77 1 4,505
Segitiga 5,6 1,37 3 11,508
JUMLAH 20,34
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Genteng Onduline
20,34 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Luas trapaseium 2,16 1 1,37 2 4,329
1,77 3,32 1,77 1 4,505
Segitiga 5,6 1,37 3 11,508
JUMLAH 20,34
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Nok Genteng Onduline
15,68 m'
SATUAN PEMBAYARAN : m'
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
15,68 15,680
JUMLAH 15,68
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Listplank GRC
22,40 m'
SATUAN PEMBAYARAN : m'
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
22,4 22,400
JUMLAH 22,40
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Langit - langit Pos Jaga
27,31 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
langit -
langit
elv +3,4 4 4 16,000
elv+3,55
18,85 0,6 11,310
JUMLAH 27,31
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. List Plafon Pos Jaga
69,00 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
69 69,000
JUMLAH 69,00
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Rabat Beton
0,90 m3
SATUAN PEMBAYARAN : m3
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
18,7 0,6 0,08 0,898
-
JUMLAH 0,90
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Lantai Keramik Utama 40 x 40 cm
13,60 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Luas 4 4 16,000
Penguran
g KM/WC 1,2 -2 (2,400)
JUMLAH 13,60
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Lantai Keramik KM/WC 40 x 40 cm
2,40 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
-
Lantai
KM/WC 1,2 2 2,400
JUMLAH 2,40
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Lantai Keramik Dinding KM/WC 25 x 40 cm
8,64 m2
SATUAN PEMBAYARAN : m2
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
Lantai
KM/WC 2 1,6 2 6,400
1,2 1,6 2 3,840
Penguran
g
0,8 -2 1 (1,600)
JUMLAH 8,64
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Mekanikal Elektrikal Pos Jaga
22,00
SATUAN PEMBAYARAN :
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 22,00
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Sanitasi Pos Jaga
54,65
SATUAN PEMBAYARAN :
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
JUMLAH 54,65
ITEM PEMBAYARAN NO. : VOLUME
KET
JENIS PEKERJAAN : Pek. Pintu dan Jendela Pos Jaga
5,00
SATUAN PEMBAYARAN : unit
DIMENSI Jmlh DATA BESI
NO URAIAN VOLUME
P L T1 T2 Titik D N P1 Ptotal Bj Besi
P1 1,00 1,000
P2 (UPVC) 1,00 1,000
J1 1,00 1,000
J2 1,00 1,000
BV1 1,00 1,000
JUMLAH 5,00
TABEL VOLUME PLAT DAK DAN MEJA BETON
Sloof 15/20
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,2 0,15 317 9,51 m3
Besi 0,2 0,15 317 0,51 0,15 8 12 0,8917 8 0,3950 2.687,00 kg
Bekisting 0,2 0,15 317 31,70 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,2 0,15 317 9,51 m3
Besi bawah-atas 0,2 0,15 317 0,51 0,1 4 12 0,8917 8 0,3950 1.769,23 kg
Besi tengah 317 2 12 0,8917 565,32 kg
Bekisting 0,2 0,15 317 174,35 m2
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang
No Uraian Volume Satuan
H B P JML Sengkan Sengkan Tul. (mm) & (bj.) (mm) & (bj.)
Beton 0,15 0,15 3,8 63 5,39 m3
Besi 0,15 0,15 3,8 63 0,41 0,15 4 12 0,8917 8 0,3950 1.112,33 kg
Bekisting 0,15 0,15 3,8 63 71,82 m2
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang
No Uraian Volume Satuan
H B P JML Sengkan Sengkan Tul. (mm) & (bj.) (mm) & (bj.)
Beton 0,2 0,15 3,8 49 5,59 m3
Besi 0,2 0,15 3,8 49 0,51 0,15 4 12 0,8917 8 0,3950 914,18 kg
Bekisting 0,2 0,15 3,8 49 37,73 m2
Kolom 20/20 cm (K2)
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang
No Uraian Volume Satuan
H B P JML Sengkan Sengkan Tul. (mm) & (bj.) (mm) & (bj.)
Beton 0,2 0,2 3,8 4 0,61 m3
Besi 0,2 0,2 3,8 4 0,61 0,15 4 12 0,8917 8 0,3950 78,63 kg
Bekisting 0,2 0,2 3,8 4 6,08 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 79,8 0,48 m3
Besi bawah-atas 0,1 0,06 79,8 0,21 0,15 4 10 0,6167 8 0,3950 240,97 kg
Besi tengah 79,8 2 10 - kg
Bekisting 0,1 0,06 79,8 20,75 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 1,17 0,01 m3
Besi bawah-atas 0,1 0,06 1,17 0,21 0,15 4 10 0,6167 8 0,3950 3,53 kg
Besi tengah 1,17 2 10 - kg
Bekisting 0,1 0,06 1,17 0,30 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 3 0,02 m3
Besi bawah-atas 0,1 0,06 3 0,21 0,15 4 10 0,6167 8 0,3950 9,06 kg
Besi tengah 3 2 10 - kg
Bekisting 0,1 0,06 3 0,78 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 3,2 0,02 m3
Besi bawah-atas 0,1 0,06 3,2 0,21 0,15 4 10 0,6167 8 0,3950 9,66 kg
Besi tengah 3,2 2 10 - kg
Bekisting 0,1 0,06 3,2 0,83 m2
Balok Lintel 6/10
P6
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 3,6 0,02 m3
Besi bawah-atas 0,1 0,06 3,6 0,21 0,15 4 10 0,6167 8 0,3950 10,87 kg
Besi tengah 3,6 2 10 - kg
Bekisting 0,1 0,06 3,6 0,94 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 3,75 0,02 m3
Besi bawah-atas 0,1 0,06 3,75 0,21 0,15 4 10 0,6167 8 0,3950 11,32 kg
Besi tengah 3,75 2 10 - kg
Bekisting 0,1 0,06 3,75 0,98 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 2,56 0,02 m3
Besi bawah-atas 0,1 0,06 2,56 0,21 0,15 4 10 0,6167 8 0,3950 7,73 kg
Besi tengah 2,56 2 10 - kg
Bekisting 0,1 0,06 2,56 0,67 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 11,04 0,07 m3
Besi bawah-atas 0,1 0,06 11,04 0,21 0,15 4 10 0,6167 8 0,3950 33,34 kg
Besi tengah 11,04 2 10 - kg
Bekisting 0,1 0,06 11,04 2,87 m2
Balok Lintel 6/10
P2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 2 0,01 m3
Besi bawah-atas 0,1 0,06 2 0,21 0,15 4 10 0,6167 8 0,3950 6,04 kg
Besi tengah 2 2 10 - kg
Bekisting 0,1 0,06 2 0,52 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 7,32 0,04 m3
Besi bawah-atas 0,1 0,06 7,32 0,21 0,15 4 10 0,6167 8 0,3950 22,10 kg
Besi tengah 7,32 2 10 - kg
Bekisting 0,1 0,06 7,32 1,90 m2
RB 15/20
Pada Dak
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,2 0,15 93,17 2,80 m3
Besi bawah-atas 0,2 0,15 93,17 0,51 0,15 4 12 0,8917 8 0,3950 457,43 kg
Besi tengah 93,17 2 12 - kg
Bekisting 0,2 0,15 93,17 51,24 m2
Back Up Balok Lintel 6/10
Beton 0,70 m3
Besi bawah-atas 354,63 kg
Besi tengah kg
Bekisting 30,53 m2
TABEL VOLUME SLOOF PAGAR
Sloof 15/20
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) (mm) & (bj.)
Beton 0,2 0,15 101 3,03 m3
Besi 0,2 0,15 101 0,81 0,15 8 12 0,8917 8 0,3950 935,90 kg
Bekisting 0,2 0,15 101 10,10 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) (mm) & (bj.)
Beton 0,2 0,15 101 3,03 m3
Besi bawah-atas 0,2 0,15 101 0,41 0,1 4 12 0,8917 8 0,3950 523,80 kg
Besi tengah 101 2 12 0,8917 180,12 kg
Bekisting 0,2 0,15 101 55,55 m2
Kolom 15/15 cm
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang (mm) &
No Uraian Volume Satuan
H B P JML Sengkan Sengkan Tul. (mm) & (bj.) (bj.)
Beton 0,15 0,15 1,2 20 0,54 m3
Besi 0,15 0,15 1,2 20 0,41 0,15 4 12 0,8917 8 0,3950 111,51 kg
Bekisting 0,15 0,15 1,2 20 7,20 m2
Kolom 15/15 cm
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang (mm) &
No Uraian Volume Satuan
H B P JML Sengkan Sengkan Tul. (mm) & (bj.) (bj.)
Beton 0,15 0,15 2 6 0,27 m3
Besi 0,15 0,15 2 6 0,41 0,15 4 12 0,8917 8 0,3950 55,76 kg
Bekisting 0,15 0,15 2 6 3,60 m2
Kolom 30/30 cm
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang (mm) &
No Uraian Volume Satuan
H B P JML Sengkan Sengkan Tul. (mm) & (bj.) (bj.)
Beton 0,3 0,3 2,2 6 1,19 m3
Besi 0,3 0,3 2,2 6 1,01 0,15 4 12 0,8917 8 0,3950 82,19 kg
Bekisting 0,3 0,3 2,2 6 7,92 m2
TABEL VOLUME SLOOF, KOLOM, RB POS JAGA
Sloof 15/20
Dimensi Sloof Jumlah
P besi Jarak Dia. Tul.
Tul. Dia. Tul. Utama
No Uraian Sengkan Sengkan Sengkang (mm) & Volume Satuan
H B P Utama (mm) & (bj.)
g (m') g (m') (bj.)
(bh)
Beton 0,2 0,15 25 0,75 m3
Besi 0,2 0,15 25 0,51 0,15 8 12 0,8917 8 0,3950 211,91 kg
Bekisting 0,2 0,15 25 2,50 m2
Kolom 15/15 cm
Dimensi Kolom P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul. Sengkang
No Uraian Volume Satuan
H B P JML Sengkan Sengkang Tul. (mm) & (bj.) (mm) & (bj.)
Beton 0,15 0,15 3,8 11 0,94 m3
Besi 0,15 0,15 3,8 11 0,41 0,15 4 12 0,8917 8 0,3950 194,22 kg
Bekisting 0,15 0,15 3,8 11 12,54 m2
Balok Lintel 6/10
P1
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 1,28 0,01 m3
Besi bawah-atas 0,1 0,06 1,28 0,21 0,15 4 10 0,6167 8 0,3950 3,87 kg
Besi tengah 1,28 2 10 - kg
Bekisting 0,1 0,06 1,28 0,33 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 1,2 0,01 m3
Besi bawah-atas 0,1 0,06 1,2 0,21 0,15 4 10 0,6167 8 0,3950 3,62 kg
Besi tengah 1,2 2 10 - kg
Bekisting 0,1 0,06 1,2 0,31 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 1,84 0,01 m3
Besi bawah-atas 0,1 0,06 1,84 0,21 0,15 4 10 0,6167 8 0,3950 5,56 kg
Besi tengah 1,84 2 10 - kg
Bekisting 0,1 0,06 1,84 0,48 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 1,17 0,01 m3
Besi bawah-atas 0,1 0,06 1,17 0,21 0,15 4 10 0,6167 8 0,3950 3,53 kg
Besi tengah 1,17 2 10 - kg
Bekisting 0,1 0,06 1,17 0,30 m2
Balok Lintel 6/10
BV1
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,1 0,06 1 0,01 m3
Besi bawah-atas 0,1 0,06 1 0,21 0,15 4 10 0,6167 8 0,3950 3,02 kg
Besi tengah 1 2 10 - kg
Bekisting 0,1 0,06 1 0,26 m2
Dimensi Sloof P besi Jarak Jumlah Dia. Tul. Utama Dia. Tul.
No Uraian Volume Satuan
H B P Sengkan Sengkan Tul. (mm) & (bj.) Sengkang (mm) &
Beton 0,2 0,15 8,5 0,26 m3
Besi bawah-atas 0,2 0,15 8,5 0,51 0,15 4 12 0,8917 8 0,3950 41,73 kg
Besi tengah 8,5 2 12 - kg
Bekisting 0,2 0,15 8,5 4,68 m2
Beton 0,04 m3
Besi bawah-atas 19,60 kg
Besi tengah kg
Bekisting 1,69 m2
LEMBAR PERHITUNGAN
(FIELD ENGINEERING)
URAIAN PEKERJAAN
sketsa ; DIVISI 4. PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapis Pondasi Agregat Kelas A
Vol.
86,00 M3
LEBAR
PANJANG LUAS TINGGI VOLUME
NO Uraian eks KETERANGAN
(m) (m) (m2) (m) (m3)
-
-
1 Pek. Lapis Pondasi Agregat Kls A 1.719,99 0,05 86,00
Serang 2022
URAIAN PEKERJAAN
sketsa ;
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat Aspal Cair
(Ltr)
Vol.
1375,99 Liter
-
1 Pek. Lapis Resap Pengikat Aspal Cair 1.719,99 0,40 688,00 0,80 1.375,99
TOTA; 63,95 58,00 3.709,10
Pengurang G. Blkng (714,00)
G. Utama (955,00)
Pos Stpam (28,62)
Mushola (76,00)
Taman (53,59)
(105,88)
(19,84)
Drainase (36,18)
LAINNYA
Serang 2022
URAIAN PEKERJAAN
sketsa ;
DIVISI 6. PERKERASAN ASPAL
Laston Lapis Aus
Vol.
154,80 Ton
-
-
1 Pek. Pengaspalan 1.719,99 0,04 68,80 2,25 154,80
Serang 2022
34.162.311
Diukur dan dihitung
Konsultan Perencana
PT. RADITYA TRIYASA KONSULTAN
0,00
0,00
0,00
0,00
0,00
EDI MARYANTO, A.Md
Direktur
DAFTAR UPAH DAN BAHAN
KOTA : SERANG
PROVINSI : BANTEN
HARGA
No URAIAN KODE SPESIFIKASI SATUAN
SATUAN
UPAH
1 Pekerja Semi Terlatih U.01 OH 100.000
2 TUKANG U.02
- Tukang Gali OH 120.000
- Tukang Batu / Tembok OH 120.000
- Tukang Kayu OH 117.376
- Tukang Besi / Besi Beton / Aluminium OH 120.000
- Tukang Cat / Pelitur OH 117.376
- Tukang Pipa / Operator Pompa OH 130.000
- Tukang Las OH 130.000
3 Kepala Tukang U.03 OH 150.000
4 Mandor U.04 OH 150.000
5 Juru Ukur, Operator Terlatih / Mekanik Alat Berat U.05 OH 145.000
6 Supir Terlatih U.06 OH 150.000
7 Drafter CAD U.07 OH
8 Desain Engineer U.08 OH
9 Pembantu Operator U.09 OH 95.000
BAHAN
A AGREGAT KASAR, PEREKAT, & MATERIAL LAINNYA
1 Bahan tanah timbunan didatangkan A.01 m3 150.500
2 Bata Hebel A.02 10 x 20 x 60 Cm buah 9.600
3 Batu Belah A.03 15-20 Cm m3 200.000
4 Batu Kali A.04 m3 206.400
5 Bata Terawang A.05 buah 7.482
6 Batako A.06 8 x 10 x 20 Cm buah 2.236
7 Batako A.07 8 x 10 x 30 Cm buah 3.096
8 Bata Merah A.08 5 X 11 X 22 Cm buah 500
9 Batu Pecah A.09 10-15 Cm m3 225.320
10 Batu Pecah A.10 7-10 Cm m3 176.300
11 Batu Pecah A.11 5-7 Cm m3 176.300
12 Batu Pecah A.12 3-5 Cm m3 223.900
13 Batu Pecah A.13 2-3 Cm m3 220.000
14 Batu Pecah A.14 1-2 Cm m3 217.400
15 Batu Pecah A.15 0,5-1 Cm m3 180.800
16 Beton Readymix A.16 B.0 m3 824.880
17 Beton Readymix A.17 K.100 m3 849.240
18 Beton Readymix A.18 K.125 m3 879.480
19 Beton Readymix A.19 K.175 m3 921.480
20 Beton Readymix A.20 K. 225 m3 970.200
21 Beton Readymix A.21 K. 250 m3 994.560
22 Beton Readymix A.22 K. 275 m3 1.018.080
23 Beton Readymix A.23 K. 300 m3 1.043.280
24 Beton Readymix A.24 K. 350 m3 1.092.000
25 Beton Pracetak Panel A.24.a 5x0,50x2,13 M' lembar 111.300
26 Beton Pracetak Kolom A.24.b T. 2,40 M' batang 256.872
27 Cansteen 60X14X30 Cm Buah 70.000
28 Cansteen A.25 10x20x40 Cm buah 53.000
29 Cansteen A.26 15x30x40 Cm buah 31.920
30 Drymix Perekat Bata Ringan MU 380 A.27 kg 2.600
31 Drymix Acian MU 200 A.28 kg 4.200
32 Drymix Plester MU 200 A.29 kg 4.089
33 Drymix Thin Bed MU 100 (Plester Premium) A.30 kg 1.392
34 Grass Block Ex. Conblock Internusa A.31 20 x 40 cm, 8 cm m2 151.554
35 Grass Block Ex. Conblock Internusa A.32 20 x 40 cm, 10 cm m2 189.921
36 Grass Block Ex. Hollywood A.32.a 20 x 40 cm, 8 cm m2 75.000
37 Grass Block Ex. Hollywood A.32.a 20 x 40 cm, 10 cm m2 102.696
38 Pasir Beton A.33 m3 225.500
39 Pasir Pasang A.34 m3 241.600
40 Pasir Urug/Alas A.35 m3 280.200
41 Tanah Urug m3 157.800
42 Paving Blok Conbloc 4 Ex. Conblock Internusa A.36 M/K/H/Klasik 10,5x21x6 cm m2 180.224
43 Paving Blok Warna Ex. Hollywood A.36.a M/K/H/Klasik 10,5x21x6 cm m2 80.784
44 Paving Blok Conbloc 4 Ex. Conblock Internusa A.37 Abu 10,5x21x6 cm m2 158.048
45 Paving Blok Natural Ex. Hollywood A.37.a Abu 10,5x21x6 cm m2 103.637
46 Paving Blok Conbloc 4 Ex. Conblock Internusa A.38 Abu 10,5x21x8 cm m2 177.144
47 Paving Blok Natural Ex. Hollywood A.38.a Abu 10,5x21x8 cm m2 121.000
48 Paving Blok Conbloc 4 Ex. Conblock Internusa A.39 M/K/H/Klasik 10,5x21x8 cm m2 202.840
49 Paving blok warna Ex. Hollywood A.39.a M/K/H/Klasik 10,5x21x8 cm m2 97.064
50 Paving Blok Topi Uskup Natural Ex. Conblock Intern A.40 Abu 21x30x6x6 m2 149.600
51 Paving Blok Topi Uskup Warna Ex. Conblock Internus A.40 M/K/H/Klasik 21x30x6x6 m2 192.808
52 Paving Blok Topi Uskup Natural Ex. Conblock Intern A.41 Abu 21x30x6x8 m2 154.000
53 Paving Blok Topi Uskup Warna Ex. Conblock Internus A.42 M/K/H/Klasik 21x30x6x8 m2 222.376
54 Semen Abu-abu (PC) A.43 50 Kg/Zak kg 1.300
55 Semen Nat A.44 kg 10.320
56 Semen Putih A.45 40 Kg/Zak zak 105.000
57 Sirtu (Kerikil pecah tersaring bergradasi) A.46 m3 148.750
58 Stone dust untuk filler A.47 m3 153.510
59 Tiang Pancang Beton Bertulang A.48 25 x 25 Cm m' 231.200
60 Tiang Pancang Beton Bertulang A.49 20 x 20 Cm m' 220.660
61 Koral Sikat A.50 karung 68.425
62 Paving Blok Conbloc 16 (Cacing) Ex. Conblock Inter A.51 Abu 11,5 x 22,5 x 6 cm m2 151.725
63 Paving Blok Conbloc 16 (Cacing) Ex. Conblock Inter A.52 M/K/H/Klasik 11,5 x 22,5x6 cm m2 172.125
64 Paving Blok Conbloc 16 (Cacing) Ex. Conblock Inter A.53 Hijau 11,5 x 22,5 x 6 cm m2 192.525
65 Paving Blok Conbloc 16 (Cacing) Ex. Conblock Inter A.54 Abu 11,5 x 22,5 x 8 cm m2 176.460
66 Paving Blok Conbloc 16 (Cacing) Ex. Conblock Inter A.55 M/K/H/Klasik 11,5 x 22,5 x 8 cm m2 201.280
67 Paving Blok Conbloc 16 (Cacing) Ex. Conblock Inter A.56 Hijau 11,5 x 22,5 x 8 cm m2 221.255
68 Paving Blok Veta Ex. Conblock Internusa A.57 Abu 10,5 x 10,5 x 8 cm m2 172.550
69 Paving Blok Veta Ex. Conblock Internusa A.58 M/K/H/Klasik 10,5 x 10,5 x 8 cm m2 199.325
70 Paving Blok Veta Ex. Conblock Internusa A.59 Hijau 10,5 x 10,5 x 8 cm m2 221.255
71 Paving Blok Veta Ex. Conblock Internusa A.60 Abu 10,5 x 10,5 x 6 cm m2 148.325
72 Paving Blok Veta Ex. Conblock Internusa A.61 M/K/H/Klasik 10,5 x 10,5 x 6 cm m2 174.080
73 Paving Blok Veta Ex. Conblock Internusa A.62 Hijau 10,5 x 10,5 x 6 cm m2 201.585
74 Paving Blok Munich Ex. Conblock Internusa A.63 Abu 22,5 x 13,5 x 9 x 8 cm m2 189.392
75 Paving Blok Munich Ex. Conblock Internusa A.64 M/K/H/Klasik 22,5 x 13,5 x 9 x 8 cm m2 213.778
76 Paving Blok Munich Ex. Conblock Internusa A.65 Hijau 22,5 x 13,5 x 9 x 8 cm m2 236.206
77 Paving Blok Coblestone Ex. Conblock Internusa A.66 Abu 21 x 21 x 6 cm m2 152.991
78 Paving Blok Coblestone Ex. Conblock Internusa A.67 M/K/H/Klasik 21 x 21 x 6 cm m2 173.550
79 Paving Blok Coblestone Ex. Conblock Internusa A.68 Hijau 21 x 21 x 6 cm m2 194.109
80 Paving Blok Coblestone Ex. Conblock Internusa A.69 Abu 21 x 21 x 6 cm m2 181.560
81 Paving Blok Coblestone Ex. Conblock Internusa A.70 M/K/H/Klasik 21 x 21 x 8 cm m2 193.397
82 Paving Blok Coblestone Ex. Conblock Internusa A.71 Hijau 21 x 21 x 8 cm m2 223.123
83 Paving Blok Zurich (3 Berlian) Ex. Conblock Intern A.72 Abu 6,5 x 6,5 x 6,5 x 6 cm m2 156.373
84 Paving Blok Zurich (3 Berlian) Ex. Conblock Intern A.73 M/K/H/Klasik 6,5 x 6,5 x 6,5 x 6 cm m2 180.403
85 Paving Blok Zurich (3 Berlian) Ex. Conblock Intern A.74 Hijau 6,5 x 6,5 x 6,5 x 6 cm m2 198.648
86 Paving Blok Zurich (3 Berlian) Ex. Conblock Intern A.75 Abu 6,5 x 6,5 x 6,5 x 6 cm m2 182.450
87 Paving Blok Zurich (3 Berlian) Ex. Conblock Intern A.76 M/K/H/Klasik 6,5 x 6,5 x 6,5 x 6 cm m2 207.014
88 Paving Blok Zurich (3 Berlian) Ex. Conblock Intern A.77 Hijau 6,5 x 6,5 x 6,5 x 6 cm m2 227.484
B PENUTUP PLAFOND
1 Akustik B.01 60 x 120 cm lembar 22.200
2 Asbes B.02 (Eternit 1x1m), 4 mm lembar 41.800
3 Coumpond B.03 20 kg/zak kg 60.000
4 Eternit Biasa B.04 1,20 m x 2,40 m lembar 50.000
5 GRC B.05 1,20 m x 2,40 m, 6 mm lembar 97.000
6 GRC B.05.a 1,20 m x 2,40 m, 9 mm lembar 144.136
7 Gypsum Board B.06 1,20 m x 2,40 m, 9 mm lembar 65.500
8 Shunda Plafond PVC Plat Gloss White B.07 0,8 mm x 20 cm m' 20.210
9 Shunda Plafond PVC Plat Gloss Brown B.07.a 0,8 mm x 20 cm m' 25.628
10 Shunda Plafond PVC Plafond Khusus B.07.b 0,8 mm x 25cm m' 21.070
11 Shunda Plafond PVC Hgh Quality Plafond B.07.c 0,8 mm x 30 cm m' 55.845
12 List Kayu Plapond B.08 Lebar 4 cm, Panjang 4 m' batang 20.000
13 List Kayu Plapond B.09 Lebar 5 cm, Panjang 4 m' batang 25.000
14 List Gypsum Plapond B.10 Lebar 7 cm, Panjang 2 m' batang 15.000
15 List Gypsum Plapond B.10.a Lebar 10 cm, Panjang 2 m' batang 20.000
16 List Plapond PVC Ex. Shunda Plapond B.10.b Panjang 4 m' batang 22.000
17 List Kayu B.11 2/4, Panjang 4 m' batang 15.000
D SALURAN
1 Buis Beton D.01 Dia. 20 cm (1 m') m' 95.000
2 Buis Beton D.02 Dia. 30 cm (1 m') m' 125.000
3 Buis Beton D.03 Dia. 40 cm (1 m') m' 147.000
4 Buis Beton D.04 Dia. 50 cm (1 m') m' 200.000
5 Buis Beton D.05 Dia. 60 cm (1 m') m' 320.000
6 Buis Beton D.06 Dia. 80 cm (1 m') m' 203.580
7 Buis Beton D.07 Dia.100 cm (0,5 m') m' 247.080
8 Buis Beton D.08 U 20 Cm m' 68.000
9 Buis Beton D.09 U 30 Cm m' 78.000
10 Buis Beton D.10 U 40 Cm m' 100.000
11 Saluran U-Ditch D.11 Uk. 40 x 40 x 120 cm bh 345.390
12 Tutup U Ditch D.12 Tutup U.40 @ 60 cm HD bh 207.234
13 Saluran U Ditch D.13 Uk. 40 x 60 x 120 cm bh 468.234
14 Saluran U Ditch D.14 Uk. 60 x 80 x 120 cm bh 731.104
15 Tutup U Ditch D.15 Tutup U.60 @ 60 cm HD bh 314.336
16 Saluran U Ditch D.16 Uk. 80 x 100 x 120 cm bh 1.447.100
17 Saluran U Ditch D.17 Uk. 100 x 120 x 120 cm bh 1.536.480
18 Tutup U Ditch D.18 Tutup U.100@ 60 cm HD bh 525.448
19 Tutup U Ditch D.19 Tutup U.80 @ 60 cm HD bh 393.008
E FINISHING
1 Alkali E.01 kg 125.000
2 Amplas E.02 lembar 10.000
3 Cat anti jamur ( Bakteri ) E.03 kg 45.588
4 Cat Besi E.04 kg 68.000
5 Cat Eksterior Ex. ICI Dulux Weathershield E.05 kg 67.300
6 Cat Interior Ex. ICI Dulux Pentalite E.06 kg 38.600
7 Cat Jembatan E.07 kg 51.852
8 Cat Kayu E.08 kg 70.000
9 Cat Tembok Ex. Metrolite E.09 kg 23.055
10 Cat Meni E.10 kg 22.620
11 Cat Batu Alam kg 65.000
12 Dempul Plitur E.11 kg 36.100
13 Dempul Kayu E.12 kg 30.000
14 Koas 2" E.13 buah 13.600
koas 3" buah 16.000
15 Menie Besi E.14 kg 35000
16 Menie Kayu E.15 kg 30000
17 Milamik Impra E.16 kg 50.000
18 Minyak Cat E.17 liter 21.672
19 Plamur Kayu E.18 kg 48.000
20 Plamur Tembok E.19 kg 74.900
21 Politur Jadi E.20 kg 62.000
22 Residu E.21 kg 54200
23 Roll Cat E.22 buah 35.000
24 Teer E.23 liter 6.966
25 Vernis E.24 kg 83.000
26 Waterproofing Emulsion E.25 kg 50.000
27 Waterproofing Membrance E.26 m2 74.906
28 Thiner E.27 liter 33.540
29 Varnish Batu Alam E.28 kg 85.000
30 Cat Zinchromate E.29 kg 58.333
F PENUTUP ATAP
1 Alumunium Foil s/s F.01 1.25 x 60 m,Single roll 10.360
2 Alumunium Foil s/s F.01.a 1.25 x 60 m,Insulation (Double) roll 1.710.115
3 Asbes Gelombang F.02 80 x 180 cm, 5 mm lembar 55.000
4 Asbes Gelombang F.03 105 x 180cm, 5 mm lembar 65.000
5 Genteng Beton Natural F.04 1 m2 = 14,5 Bh buah 5.600
6 Genteng Beton Warna F.05 1 m2 = 14,5 Bh buah 9.350
7 Genteng Bubung Beton F.06 buah 11.220
8 Genteng Bubung Murando Glazur F.07 buah 16.575
9 Genteng Bubung Murando Natural F.08 buah 8.840
10 Genteng Bubung Keramik Natural Ex. Kanmuri F.09 buah 17.170
11 Genteng Bubung Keramik Glazur Ex. Kanmuri F.09.a buah 22.950
12 Genteng Bubung Keser F.10 buah 3.485
13 Genteng Bubung Press Jatiwangi F.11 buah 5.695
14 Genteng Bubung Metal Multicolour (Non Pasir) F.12 Panjang 90 Cm m2 54.655
15 Genteng Bubung Metal Multiroof (Pasir) F.13 Panjang 90 Cm m2 88.315
16 Genteng Murando Glazur F.14 1 m2 = 20 Bh buah 1.600
17 Genteng Murando Natural F.15 1 m2 = 20 Bh buah 3.600
18 Genteng Keramik Natural F.16 buah 8.500
19 Genteng Keramik Glazur F.17 buah 17.556
20 Genteng Plentong Keser F.18 buah 3.000
21 Genteng Press Jatiwangi F.19 buah 2.604
22 Genteng Metal Multicolour (Non Pasir) F.20 0,35 mm, 1 m2 = 1,63 Lbr m2 87.360
23 Genteng Metal Multiroof (Pasir) F.21 0,35 mm, 1 m2 = 1,63 Lbr m2 54200
24 Karpet Talang F.22 L 90 Cm m' 15.000
25 Karpet Talang F.23 L 50 Cm m' 10.000
26 Nok Asbes Gelombang F.24 m' 45.000
27 Nok Seng Gelombang F.25 m' 65.000
28 Roofmesh F.26 1,80 x 30 m m2 14.952
29 Seng Gelombang F.27 0,2 x 914 x 1829 mm lembar 41.664
30 Zincalume Platt ALSS Stonish F.28 0.30 mm m2 65.100
31 Zincalume Platt ALSS Color F.29 0.30 mm m2 83.160
32 Zincalume Platt ALSS Stonish F.30 0.35 mm m2 73.920
33 Zincalume Platt ALSS Color F.31 0.35 mm m2 93.492
34 Zincalume Platt ALSS Stonish F.32 0.4 mm m2 82.404
35 Zincalume Platt ALSS Color F.33 0.4 mm m2 102.480
36 Roof Light Fiberglass F.34 90 x 180 cm lembar 77.868
37 Nok Zincalume F.35 Flat Sheet 450 mm ;T.0,3 mm m' 21.700
38 Nok Zincalume F.36 Flat Sheet 450 mm ;T.0,35 mm m' 51.514
39 Nok Zincalume F.37 Flat Sheet 450 mm ;T.0,4 mm m' 57.104
40 Glasswool 1,20 x 15 M' F.38 T. 5 cm;Density 24 kg/m3 m2 28.380
41 Poliycarbonate Ex. Solarlite F.39 5 mm (2,1 m x 11,8 m) m2 74.476
42 Polycarbonate Ex. Twinlite F.40 6 mm (2,1 m x 11,8 m) m2 106.296
F.41
43 Polycarbonate ex twinlite 10 mm (2,1 m x 11,8 m) m2 146.888
(Kemiringan Atap Min.10° - 15°) Uk.
F.42
44 Atap Bitumen Bergelombang Monolayer 3 mm 200 x 95 x 0.30 cm, Jarak Rangka lembar 112.700
Gording / Reng max. 45 Cm
(Kemiringan Atap > 10°) Uk.
45 Atap Bitumen Bergelombang Monolayer 3 mm F.43 195 x 96 x 0.30 Cm, Jarak Rangka lembar 127.710
Gording / Reng max. 46 Cm
(Kemiringan Atap > 15°) Uk.
46 Atap Bitumen Bergelombang Monolayer 3 mm F.44 106 x 40 x 0.30 Cm, Jarak Rangka lembar 43.430
Gording / Reng max. 32 Cm
47 Nok Bitumen Monolayer F.45 Uk. 100 x 50 cm lembar 75.680
48 Penutup Samping / Verge Bitumen Monolayer F.46 Uk. 104 x 10.50 x 11.40 (h) cm lembar 69.230
G KACA
1 Glass Block G.01 20 x 20 cm m2 25.000
2 Kaca Polos G.02 2 mm m2 75.429
3 Kaca Polos G.03 3 mm m2 78.900
4 Kaca Polos G.04 5 mm m2 120.800
5 Kaca Polos G.05 8 mm m2 157.122
6 Kaca Rayband G.06 5 mm m2 72.300
7 Kaca Rayband G.07 3 mm m2 123.627
8 Kaca Tempered (Non Gosok) G.08 8 mm m2 755.080
9 Kaca Tempered (Gosok) G.08.a 8 mm m2 818.032
10 Kaca Tempered (Non Gosok) G.09 10 mm m2 885.456
11 Kaca Tempered (Gosok) G.09.a 10 mm m2 933.530
12 Kaca Tempered (Non Gosok) G.09.b 12 mm m2 1.010.586
13 Kaca Tempered (Gosok) G.09.c 12 mm m2 1.299.288
14 Karet kaca/gasket G.10 m' 5.246
15 Sealant G.11 tube 35.000
16 Kaca Stopsol G.12 5 mm m2 558.656
17 Kaca Stopsol G.13 6 mm m2 663.318
18 Kaca Stopsol G.14 8 mm m2 891.562
H KAYU
1 Dolken Kayu H.01 5-7 x 350-400 cm batang 18.000
2 Dolken Kayu H.02 7-10 x 350-400 cm batang 44.200
3 Kayu Bakar H.03 m3 180.800
4 Kayu Bekisting H.04 m3 2.021.300
5 Kayu Jati Ex. Jawa Barat & Banten H.05 m3 16.742.195
6 Kayu Kaso Albasia H.06 4/6 cm, 5/7 cm m3 1.397.145
7 Kayu Kamper (Untuk Kusen) H.07 6/15 cm m3 4.437.800
8 Kayu Kelas I Kayu Kelas II H.08 m3 5.807.000
9 Kayu Kelas II H.09 4/6 cm m3 3.323.500
10 Kayu Kelas II H.10 5/7 cm m3 3.323.500
11 Kayu Kelas II H.11 6/12 cm m3 3.667.750
12 Kayu Kelas II H.12 8/15 cm m3 3.667.750
13 Kayu Reng H.13 2/3 Cm m3 1.745.050
14 Kayu Untuk Konstruksi Jembatan H.14 m3 3.569.830
15 Kayu Untuk Konstruksi Perancah H.15 m3 3.323.500
16 Lem Kayu H.16 kg 65.800
17 Listplank Meranti H.17 3/30 cm m3 3.675.570
18 Papan H.18 3/30 cm m3 2.974.150
19 Papan Bekisting H.19 2/20 cm m3 2.021.300
I KAYU LAPIS
1 Bilik Bambu (Tanpa Kulit) I.01 1 Lembar = 2 x 2.5 m m2 63.280
2 Bilik Bambu (Dengan Kulit / Bilik Hinis) I.02 1 Lembar = 2 x 2.5 m m2 79.560
3 Bilik Bambu Hitam Variasi (Motif) I.03 1 Lembar = 2 x 2.5 m m2 101.280
4 Multipleks I.04 1,20 x 2,40 m2, T. 9 mm lembar 72.800
5 Multipleks I.05 1,20 x 2,40 m2, T.12 mm lembar 150.000
6 Plywood I.06 1,20 x 2,40 m2, T.12 mm lembar 169.092
7 Plywood I.07 1,20 x 2,40 m2, T. 9 mm lembar 95.000
8 Plywood I.07.a 1,20 x 2,40 m2, T. 6 mm lembar 70.000
9 Plywood I.08 1,20 x 2,40 m2, T. 4 mm lembar 52.248
10 Plywood Film I.09 12 mm lembar 489.636
11 Plywood Film I.10 15 mm lembar 622.608
12 Teack Wood 3 mm I.11 1,20 x 2,40 m, T. 3 mm lembar 76.800
13 Teack Wood 4 mm I.12 1,20 x 2,40 m, T. 4 mm lembar 97.800
14 Triplek I.13 1,20 x 2,40 m, T. 3 mm lembar 70.000
15 Triplek I.14 1,20 x 2,40 m, T. 4 mm lembar 80.000
16 Triplek I.15 1,20 x 2,40 m, T. 6 mm lembar 100.000
17 Triplek I.16 1,20 x 2,40 m, T. 9 mm lembar 155.000
18 HPL lembar 177.144
19 Lisplang woodplank I.17 4050 x 2000 x 8 mm m' 14.608
20 Listplank Woodplank I.18 4050 x 300 x 8 mm m' 18.480
21 Galvalume Plate I.18.a Uk. 1,219 x 1 m m2 198.880
22 Bambu Kupas Yang Telah Diawetkan / Telah dibilah I.19 m2 77.528
23 Bambu Anyaman Yang Telah Diawetkan I.20 m2 77.528
24 Bambu Batangan Yang Diawetkan I.21 Diameter 8 -12 cm,12 batang m2 110.176
25 Bambu Batangan Plafond Yang Diawetkan I.22 Diameter 6 - 8 cm, 16 batang m2 131.296
L ANEKA PAKU
1 Mur dan Boud L.01 Dia. 19 s/d 16 set 12.814
2 Paku Asbes L.02 kg 14.534
3 Paku Beton Putih L.03 2,5 cm,3 cm,4 cm,5 cm kg 50000
4 Paku Beton Hitam L.04 3 cm kg 30000
5 Paku Beton Hitam L.05 5 cm kg 15.480
6 Paku Beton Hitam L.06 7cm kg 13.588
7 Paku Kayu L.07 2 cm kg 32000
8 Paku Kayu L.08 2,5 cm kg 32000
9 Paku Kayu L.09 3 cm kg 32000
10 Paku Kayu L.10 4 cm kg 32000
11 Paku Kayu L.11 5 cm, 7 cm,10 cm kg 21000
12 Paku Kayu L.12 12,5 cm kg 21000
13 Paku Jalusi L.13 kg 18.490
14 Paku Jembatan L.14 kg 37.900
15 Paku Kancing L.15 60 x 230 buah 17.200
16 Paku Reng L.16 kg 12.900
17 Paku Sekrup fisher L.17 buah 400
18 Paku Sekrup L.17.a dus 55000
19 Paku Seng L.18 kg 30000
20 Paku Seng L.19 kg 30000
N PENDUKUNG LAINNYA
1 Air N.01 liter 1.305
2 Alat Bantu N.02 set 36.714
3 Bambu N.03 Dia 5 s/d 7 cm batang 30.450
4 Bambu N.04 Dia 7 s/d 10 cm batang 38.106
5 Curing Concrete N.05 m3 11.919
6 Daun Jendela N.06 buah 442.656
7 Daun Pintu Teakwood N.07 buah 790.395
8 Ijuk N.08 kg 12.180
9 Kapur Hidrasi/Bakar N.09 m3 121.017
10 Lempengan Rumput Gajah N.10 m3 39.672
11 Minyak Bekisting N.11 liter 38.600
12 Minyak Diesel/Solar N.12 liter 8.613
13 Minyak Pelumas/Olie N.13 liter 30.015
14 Pengelasan N.14 cm 23.142
15 Plastik Sintetis N.15 m2 13.050
16 Premium/Bensin N.16 liter 7.917
17 Siller N.17 liter 31.581
18 Strorox N.18 kg 15.921
19 Solar N.19 liter 12.180
20 Soda Api N.20 kg 22.446
21 Plastic Aerator N.21 buah 22.185
22 Bahan Aditif N.22 liter 39.324
23 CD Soft Copy File Foto Image N.23 buah 3.219
24 Foto Printing N.24 lembar 2.175
25 Foto Album N.25 buah 62.100
26 Fotocopy Kertas A4 N.26 halaman 174
27 Fotocopy Kertas A3 N.26.a halaman 880
28 Menjilid A4 N.27 buah 11.000
29 Menjilid A3 N.27.a buah 30.800
30 Colour/Black Print A4 N.28 lembar 616
31 Colour/Black Print A3 N.28.a lembar 1.056
32 Banner N.29 m2 66.000
33 Minyak Tanah N.30 liter 13.024
34 Shear Connector N.31 ls 9.680
35 Timah N.32 kg 145.200
36 Air Keras N.33 liter 52.800
37 Pelapis Plastik / Terpal N.34 m2 22.000
38 Sekam + Pupuk N.35 m3 154.000
39 Tanah Merah Subur N.36 m3 290.400
40 Bayam Pasir (Cyathula Prostrata Cultivar ) N.37 polybag 2.816
41 Brokoli Hias Kuning N.38 polybag 2.816
42 Ruella N.38.a polybag 2.816
43 Ketapang Kencana (Terminalia Mantaly) T: 3-5m N.39 buah 748.000
44 Kursi Taman N.40 buah 1.936.000
45 Tabebuia Pink (Tabebuia Rosea) N.41 buah 792.000
46 Tabebuia Kuning (Tabebuia Palida) N.42 buah 792.000
47 Liang Liu N.43 buah 792.000
48 Gailardia N.44 polybag 2.816
49 Bakung lele N.45 polybag 2.816
50 Melaleuca quinquenervia (Kayu Putih) N.46 buah 774.000
51 Rumput Sintesis N.47 m2 268.750
52 Peace Lilly N.48 polybag 2.752
53 Melati Jepang N.49 polybag 2.752
54 Mata pisau senai dia 1/2 inchi N.50 set 414.176
55 Casing mata pisau N.51 set 32.336
56 Photo Visual / Pelaporan N.52 paket 32.336
57 Jas Hujan N.56 buah 216.100
58 Jasa Lasser Cutting + Bahan ls 850.000
59 Huruf Acrylic + LED cm 15.000
60 Huruf Stainless + LED cm 8.000
61 Meja Kantor/Meja Kerja (MDF + Anti rayap + Anti Air) m 2.450.000
62 Meja Kantor/Meja Kerja (Multipleks) m 1.750.000
63 Meja Customer Service (MDF + Anti rayap + Anti Air) m 2.950.000
64 Meja Customer Service (Multipleks) m 1.950.000
65 Kursi Tunggu / Sofa Custom m 2.450.000
66 Neon Box Acrylic LED 1 sisi 2.200.000
67 Backdrop Dinding m 1.250.000
68 Pelapisan HPL Ulang m 950.000
69 Mesin Tiket / Antrian bh 28.000.000
70 Makara / Mahkota Masjid / Kubah Masjid T = 1 m D = 1 m buah 2.500.000
O ALAT
1 Sewa Komputer O.01 sewa/bln 850.000
2 Sewa Scanner Uk. A4 O.02 sewa/bln 212.500
3 Pemadat Tanah (Stamper) O.03 sewa/hr 127.500
4 Tripod Tinggi 5 M O.04 sewa/hr 297.500
5 Alat Pancang & Hammer 0,5 Ton O.05 sewa-jam 392.020
6 Alat Pancang & Hammer 2 Ton O.05.a sewa - jam 264.945
7 Alat Penyambung Tiang Pancang Dolken O.06 buah 21.250
8 Alat Penyambung Tiang Pancang Beton O.06.a buah 102.000
9 Alat Potong Rumput O.07 sewa - hari 130.900
10 Molen 0,35 M³ O.08 sewa - hari 340.000
11 Pompa dan Conveyor Beton O.09 sewa - hari 170.000
12 Alat Besar O.10 sewa - hari 223.550
13 Hammer 1-2 Ton (manual) O.11 sewa - hari 653.650
14 Crane 5-10 Ton O.12 sewa - jam 297.500
15 Alat Bantu (Mesin Bor Listrik) / Genset O.13 sewa -hari 17.850
16 Sewa Alat Las O.14 sewa - jam 7.735
17 Genset O.15 100 KVA, 3-Phase, 1500 Rpm Unit 158.843.750
18 Peralatan (sewa tripot/tackel & handle crane 2 T mesin lasO.16 hdpe, dsb) sewa -hari 200.770
19 Bor horizontal lengkap O.17 sewa - hari 85.000
20 Alat Bantu ( linggis, palu, godam, kunci dll ) O.18 set 10.200
21 Cross tie giptel plafond O.19 bh 29.400
22 Rod gantung giptel O.20 bh 1.638
23 Klep pegantung ke plafond { giptel } O.21 bh 2.520
24 Lisplang GRC 6 cm X 20 mm O.22 lbr 50.400
25 Bak air / ember O.24 bh 42.000
26 Pagar BRC ( Uk. 120 x 2440 x 7 mm ) O.25 set 461.160
27 Mesin pompa air Panasonik Jet Pump GF 255 HCX O.27 Set 3.524.640
Mesin pompa air / jet pump setara sanyo jet pump 500 watt autoO.27
PD - H255 - JP unit 6.452.400
28 Acssesoris Jet pump dan dudukan tangki ( beton ) O.28 set 630.000
29 Nok Genteng metal (pasir ) O.29 29.400
30 Mesin bor tanah O.30 hr/jam 420.000
31 Pintu UPVC O.31 bh 1.105.440
32 Tangki air penguin 1000 liter ( Setara ) O.32 bh 2.432.900
33 Panel otomatis hidup & mati O.33 set 714.000
34 Main tee giptel plafond O.34 bh 21.000
35 AC Ceiling Mounted Cassie Daikin Series R410A Daya 2 PK Dimensi 57x57x28 cm bh 13.500.000
36 Kamera CCTV HK Vision 1 Ampere bh 550.000
36 Ceiling Speaker Petronic 3 Watt bh 250.000
37 LED TV 32" bh 2.699.000
37 LED TV 55" bh 5.299.900
38 Bingkai Videotron / Fram Videotron P = 300 cm L = 9.5 cm T = 3.5 cm btg 225.000
R PEK. LAINNYA
1 U-DITCH 30X40X120 cm unit 297.000
2 Cover U-DITCH 40x60 cm unit 100.000
3 U-DITCH 100X100X120 cm unit 1.413.500
4 Cover U-DITCH 100x60 cm unit 475.000
DAFTAR HARGA SATUAN PEKERJAAN
HARGA
No KODE URAIAN SAT. SATUAN
I A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.1 1 m2 Pembuatan Pagar Sementara dari Kayu Tinggi 2 meter m2 223.300
A. 2.2.1.2 1 m2 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter m2 325.900
A. 2.2.1.4 1 m' Pengukuran dan pemasangan Bouwplank m' 60.800
A. 2.2.1.5 1 m2 Pembuatan kantor sementara lantai plesteran m2 1.353.500
A. 2.2.1.6 1 m2 Pembuatan rumah jaga (konstruksi kayu) m2 1.123.000
A.2.2.1.7 1 m2 Pembuatan gudang semen dan peralatan m2 1.073.800
A.2.2.1.8 1 m2 Pembuatan bedeng pekerja m2 1.039.800
A.2.2.1.9 1 m2 Pembersihan lapangan dan perataan m2 19.200
A.2.2.1.13 1 m3 Pembongkaran beton bertulang m3 1.576.600
A.2.2.1.14 1 m3 Pembongkaran dinding tembok bata m3 738.800
1 m2 Pembongkaran dinding partisi m2 13.200
1 m2 Pengerokan Permukaan Cat Tembok Lama m2 18.100
1 m3 Pembongkaran Kusen Pintu dan Jendela m3 61.600
A.2.2.1.15 1 m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm m2 15.100
A.2.2.1.16 1 m2 Pemasangan panel beton pracetak 5x50x240 cm untuk pagar m2 450.400
A.2.2.1.17. 1 m3 Pembongkaran batu kali tebal < 50 cm m3 177.300
A.2.2.1.18. 1 m3 Pembongkaran batu kali tebal > 50 cm m3 354.700
A.2.2.1.19. 1 m2 Pembongkaran Keramik m2 7.100
A.2.2.1.20. 1 m2 Pembongkaran Genteng/Sirap (Bongkaran tidak dipakai) m2 3.800
A.2.2.1.21. 1 m2 Pembongkaran Genteng/Sirap (Bongkaran dipakai) m2 7.700
A.2.2.1.22. 1 m2 Pembongkaran Rangka Atap/Reng Kaso (Bongkaran Dipakai) m2 33.700
A.2.2.1.23. 1 m2 Pembongkaran Rangka Atap/Reng Kaso (Bongkaran Tidak Dipakai) m2 16.800
A.2.2.1.24. 1 m3 Pembongkaran kuda-kuda/Gording-Balok (Bongkaran Tidak Dipakai) m3 449.700
A.2.2.1.25. 1 m3 Pembongkaran kuda-kuda/Gording-Balok (Bongkaran Dipakai) m3 1.308.400
A.2.2.1.26. 1 m2 Pembongkaran plesteran dinding m2 9.600
A.2.2.1.27. 1 m2 Pembongkaran plafond (bongkaran dipakai) m2 46.500
A.2.2.1.28. 1 m2 Pembongkaran plafond (bongkaran tidak dipakai) m2 14.500
A.2.2.1.29. 1 m' Pembongkaran lisplank m' 3.300
A.2.2.1.30. 1 m3 Pembongkaran kuda-kuda/Gording-Balok (Bongkaran Dipakai) m3 1.308.400
A.2.2.1.31. 1 m3 Pembongkaran kuda-kuda/Gording-Balok (Bongkaran Tidak Dipakai) m3 860.300
1 m3 Angkutan Material Sejauh 3 km m3 53.400
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 1 m3 Penggalian tanah biasa sedalam 1 m m3 86.600
A.2.3.1.2 1 m3 Penggalian tanah biasa sedalam 2 m m3 106.400
A.2.3.1.4 1 m3 Menggali tanah keras sedalam 1 m m3 115.200
A.2.3.1.8 1 m3 Pembuangan tanah sejauh 30 meter m3 52.800
A.2.3.1.9 1 m3 Pengurugan kembali galian tanah m3 63.200
A.2.3.1.10 1 m3 Pemadatan tanah ( per 20 cm) m3 63.200
A.2.3.1.11 1 m3 Pengurugan dengan pasir urug m3 404.500
A.2.3.1.14 1 m3 Pengurugan sirtu padat m3 227.900
1 m3 Pengurugan dengan tanah urug m3 242.900
III A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1 1 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP m3 959.700
A.3.2.1.2 1 m3 Pemasangan pondasi batu belah campuran 1SP : 4PP m3 912.600
A.3.2.1.3 1 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP m3 880.000
A.3.2.1.9 1 m3 Pemasangan batu kosong (Aanstamping) m3 546.100
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 1 m3 Membuat beton mutu f’c = 7,4 Mpa (K100) m3 970.200
A.4.1.1.2 1 m3 Membuat beton mutu f’c = 9,8 Mpa (K125) m3 1.080.500
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) m3 970.200
A.4.1.1.5 1 m3 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) m3 1.139.300
A.4.1.1.6 1 m3 Membuat beton mutu f’c = 16,9 Mpa,slum (12±2)cm, w/c = 0,58 (K200) m3 1.169.800
A.4.1.1.7 1 m3 Membuat beton mutu f’c = 19,3 Mpa,slum (12±2)cm, w/c = 0,58 (K225) m3 1.192.600
A.4.1.1.8 1 m3 Membuat beton mutu f’c = 21,7 Mpa,slum (12±2)cm, w/c = 0,56 (K250) m3 1.207.800
A.4.1.1.9 1 m3 Membuat beton mutu f’c = 24,0 Mpa,slum (12±2)cm, w/c = 0,56 (K300) m3 1.362.800
A.4.1.1.10. 1 m3 Rabat Beton (1 PC:3 PB:5 Kr)/B0 m3 823.100
A.4.1.1.17 1 kg Pembesian 10 kg dengan besi polos atau besi ulir kg 19.000
A.4.1.1.19 1 kg Pemasangan 10 kg jaring kawat baja (wiremesh) kg 562.100
A.4.1.1.20 1 m2 Pemasangan bekisting untuk pondasi m2 154.900
A.4.1.1.21 1 m2 Pemasangan bekisting untuk sloof m2 160.500
A.4.1.1.22 1 m2 Pemasangan bekisting untuk kolom m2 282.600
A.4.1.1.23 1 m2 Pemasangan bekisting untuk balok m2 288.100
A.4.1.1.24 1 m2 Pemasangan bekisting untuk lantai m2 379.800
A.4.1.1.26 1 m2 Pemasangan bekisting untuk tangga m2 269.300
1 m2 Pemasangan bekisting papan m2 143.800
A.4.1.1.28 1 m' Membuat kolom praktis beton bertulang (11 x 11) cm m' 102.000
A.4.1.1.36 1 m' Membuat ring balok beton bertulang (10 x 15) cm m' 126.800
1 m3 Beton Ready Mix K-250 m3 1.367.042
V A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. 1 kg Pemasangan besi profil kg 35.500
A.4.2.1.2. 1 kg Pemasangan rangka kuda-kuda baja IWF kg 34.200
A.4.2.1.7. 1 m2 Pemasangan Pintu Rolling Door Besi m2 650.800
A.4.2.1.8. 1 m2 Pemasangan Pintu Lipat (Folding Door) m2 470.300
A.4.2.1.9. 1 m2 Pemasangan sunscreen alluminium m2 408.900
A.4.2.1.10. 1 m2 Pemasangan rolling door alluminium m2 548.800
A.4.2.1.11. 1 m' Pemasangan Kusen Pintu Aluminium m' 121.400
A.4.2.1.12. 1 m2 Pemasangan pintu alluminium strip lebar 8 cm m2 640.200
A.4.2.1.13. 1 m2 Pemasangan Pintu Kaca Rangka Allumunium m2 1.018.100
A.4.2.1.15. 1 m2 Pemasangan terali besi strip (2 x 3) mm m2 998.200
A.4.2.1.16. 1 m2 Pemasangan kawat nyamuk m2 353.000
A.4.2.1.18. 1 m' Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm m' 190.600
1 m' Pemasangan talang air PVC m' 107.100
A.4.2.1.20. 1 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi m2 243.100
A.4.2.1.21. 1 m' Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon m' 240.000
A.4.2.1.22. 1 m2 Pemasangan atap pelana rangka atap baja canal dingin profil C75 m2 239.300
A.4.2.1.23. 1 m2 Pemasangan Atap Jurai Rangka Atap Baja Canal Dingin Profil C75 m2 260.900
A.4.2.1.24. 1 m' Pemasangan pagar BRC 150 x 2440 x 7 mm m' 700.300
1 unit Memasang Tiang bendera unit 2.143.400
1 m2 Railling Tangga Pipa Stainless Steel (Pipa Dia. 2" dan 1 ") m2 1.518.700
1 m2 Pagar Besi Hollow m2 665.500
VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP m2 261.100
A.4.4.1.2. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP m2 248.900
A.4.4.1.3. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP m2 240.300
A.4.4.1.4. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP m2 236.500
A.4.4.1.7. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP m2 125.900
A.4.4.1.8. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP m2 120.000
A.4.4.1.9. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 4PP m2 116.600
A.4.4.1.10. 1 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 5PP m2 114.600
A.4.4.1.25. 1 m2 Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar m2 183.500
A.4.4.1.26. 1 m2 Pemasangan dinding bata ringan tebal 10 cm dengan mortar m2 182.400
1 m2 Pemasangan Partisi Baja Ringan C.75 + Gypsum 9 mm m2 231.700
VII A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.2. 1 m2 Pemasangan plesteran 1SP : 2PP tebal 15 mm m2 77.200
A.4.4.2.3. 1 m2 Pemasangan plesteran 1SP : 3PP tebal 15 mm m2 74.500
A.4.4.2.4. 1 m2 Pemasangan plesteran 1SP : 4PP tebal 15 mm m2 72.600
A.4.4.2.5. 1 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm m2 71.600
A.4.4.2.27. 1 m2 Pemasangan acian m2 42.800
A.4.4.2.28. 1 m2 Pemasangan plesteran dengan mortar siap pakai (MSP) m2 47.200
A.4.4.2.29. 1 m2 Pemasangan plesteran dengan mortar siap pakai (MSP) m2 42.800
VIII A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.34. 1 m2 Pemasangan lantai keramik ukuran 33 cm x 33 cm m2 206.900
A.4.4.3.35. 1 m2 Pemasangan lantai keramik ukuran 30 cm x 30 cm m2 206.900
A.4.4.3.35.a 1 m2 Pemasangan lantai keramik anti slip ukuran 40 cm x 40 cm m2 267.200
A.4.4.3.35.b 1 m2 Pemasangan lantai keramik ukuran 40 cm x 40 cm (corak) m2 229.900
A.4.4.3.36. 1 m2 Pemasangan lantai keramik ukuran 25 cm x 25 cm m2 241.300
A.4.4.3.37. 1 m2 Pemasangan lantai keramik ukuran 10 cm x 33 cm untuk variasi/border m2 344.800
A.4.4.3.53. 1 m2 Pemasangan dinding keramik 10 cm x 20 cm m2 185.000
A.4.4.3.54. 1 m2 Pemasangan dinding keramik 25 cm x 40 cm m2 184.500
A.4.4.3.58. 1 m2 Pemasangan dinding batu tempel hitam m2 323.600
A.4.4.3.58.a 1 m2 Pemasangan batu Alam Andesit m2 295.200
A.4.4.3.61. 1 m2 Pemasangan Floor Hardener m2 53.400
A.4.4.3.64. 1 m2 Pemasangan paving block natural tebal 6 cm m2 240.800
A.4.4.3.65. 1 m2 Pemasangan paving block natural tebal 8 cm m2 294.900
A.4.4.3.66. 1 m2 Pemasangan paving block warna tebal 6 cm m2 212.800
A.4.4.3.67. 1 m2 Pemasangan paving block warna tebal 8 cm m2 265.700
A.4.4.3.68. 1 m' Cansteen 10 x 20 x 40 m' 171.300
1 m' Cansteen 60 x 14 x 30 m' 254.300
A.4.4.3.69. 1 m' Pemasangan paving uskup m' 38.700
1 m' Pemasangan Stepnozing m' 102.500
1 m2 Pemasangan Homogeunios Tile 60 x 60 cm m2 777.500
1 m2 Pemasangan Alumunium Composite Panel (ACP) + Rangka m2 934.100
1 m2 Pemasangan Waterproofing Coating m2 116.300
1 m2 Pemasangan Waterproofing Membrance m2 180.800
1 m2 Pemasangan Granit 80x80 cm m2 584.000
1 m2 Pemasangan Laser Cutting 2mm Carbon Steel m2 935.000
IX A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.2. 1 m2 Pemasangan langit-langit akustik ukuran (30 x 30) cm m2 323.800
A.4.5.1.4. 1 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm m2 64.700
A.4.5.1.7. 1 m2 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm m2 46.000
A.4.5.1.7a. 1 m2 Pemasangan langit-langit GRC ukuran (120x240x9) mm, tebal 9 mm m2 77.400
A.4.5.1.7b. 1 m2 Pemasangan langit-langit GRC t = 4 mm + rangka besi hollow m2 90.500
A.4.5.1.8. 1 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium m2 302.300
A.4.5.1.9. 1 m' Pemasangan list langit-langit Profil Gypsum m' 30.800
1 m2 Pemasangan 1 m2 Rangka Langit - langit 60 cm x 60 cm, besi hollow m2 145.000
1 m2 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm m2 46.000
X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 m2 Pemasangan Atap Bitumen setara Onduvilla (106 x 40) cm m2 279.200
1 m2 Pemasangan Reng Atap Bitumen setara Onduvilla (106 x 40) cm m2 64.900
1 m' Pemasangan Nok Onduline (100 x 50) cm m' 175.400
1 m2 Pemasangan Rangka Baja Ringan Zincalum C.75.75 m2 204.700
1 m2 Pemasangan Plafond PVC + Rangka Hollow ,modul 60 x 60 cm m2 263.200
1 m' Pemasangan List Plafond PVC m' 25.500
1 m' Listplank GRC m' 50.000
1 m2 Pemasangan genteng metal pasir m2 98.700
1 m' Pemasangan nok genteng metal m' 84.700
XI A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.4. 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III m2 336.700
A.4.6.1.5. 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II m2 846.700
A.4.6.1.6. 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II m2 721.200
A.4.6.1.7. 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II m2 832.300
A.4.6.1.8. 1 m2 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar m2 549.400
sampai 90 cm)
A.4.6.1.9. 1 m2 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II m2 614.200
A.4.6.1.10. 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II m2 627.300
A.4.6.1.11. 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I m2 548.200
A.4.6.1.12. 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap Lapis Formika, Rangka m2 762.700
expose Kayu Klas II
A.4.6.1.17. 1 m2 Pemasangan rangka atap genteng beton, kayu kelas II m2 291.700
A.4.6.1.19. 1 m2 Pemasangan rangka langit-langit (50x1,00) m, kayu Klas II atau III m2 133.400
A.4.6.1.20. 1 m2 Pemasangan rangka langit-langit (20x20) m, kayu Klas II atau III m2 132.600
A.4.6.1.21. 1 m' Pemasangan lisplank GRC (6 mm x 20cm) m' 46.300
A.4.6.1.22. 1 m' Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau Kelas II m' 349.300
XII A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.2. 1 bh Pemasangan kunci tanam biasa bh 249.600
A.4.6.2.3. 1 bh Pemasangan kunci kamar mandi bh 150.800
A.4.6.2.4. 1 bh Pemasangan kunci silender bh 135.700
A.4.6.2.5. 1 bh Pemasangan engsel pintu bh 62.100
A.4.6.2.6. 1 bh Pemasangan engsel jendela kupu kupu bh 37.700
A.4.6.2.7. 1 bh Pemasangan engsel angin bh 52.300
A.4.6.2.9. 1 bh Pemasangan kait angin bh 153.100
A.4.6.2.10. 1 bh Pemasangan door closer bh 287.800
A.4.6.2.11. 1 bh Pemasangan kunci slot bh 53.400
A.4.6.2.12. 1 bh Pemasangan door holder bh 181.700
A.4.6.2.13. 1 bh Pemasangan door stop bh 175.800
A.4.6.2.14. 1 bh Pemasangan rel pintu dorong bh 418.900
A.4.6.2.16. 1 m2 Pemasangan kaca tebal 3 mm m2 119.000
A.4.6.2.17. 1 m2 Pemasangan kaca tebal 5 mm m2 169.700
A.4.6.2.18. 1 bh Pemasangan Rambucis bh 59.500
XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama m2 18.200
A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat m2 17.500
A.4.7.1.10. 1 m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m2 29.200
A.4.7.1.10.a 1 m2 Pengecatan tembok baru Eksterior (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
m2 41.800
A.4.7.1.10.b 1 m2 Pengecatan tembok baru interior (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
m2 33.600
A.4.7.1.11. 1 m2 Pengecatan plafond m2 20.900
A.4.7.1.12. 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat Penutup) m2 16.100
1 m2 Pengecatan Batu Alam m2 29.800
1 m2 Pengecatan Permukaan Baja dengan Meni Besi m2 36.900
XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. 1 bh Pemasangan closet duduk/monoblock bh 2.538.200
A.5.1.1.2. 1 bh Pemasangan closet Jongkok bh 667.000
A.5.1.1.4. 1 bh Pemasangan Urinoir bh 2.777.600
A.5.1.1.5. 1 bh Pemasangan wastafel bh 1.867.200
A.5.1.1.14. 1 bh Pemasangan floor drain bh 41.700
A.5.1.1.15. 1 bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm bh 507.100
A.5.1.1.16. 1 bh Pemasangan bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm bh 759.900
A.5.1.1.17. 1 bh Pemasangan bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm bh 905.600
A.5.1.1.18. 1 m' Pemasangan pipa galvanis diameter ½” m' 31.400
A.5.1.1.19. 1 bh Pemasangan kran diameter ½” atau ¾ ” m' 87.800
A.5.1.1.20. 1 m' Pemasangan pipa galvanis diameter 3/4” m' 33.400
A.5.1.1.21. 1 m' Pemasangan pipa galvanis diameter 1” m' 37.100
A.5.1.1.22. 1 m' Pemasangan pipa galvanis diameter 1 1/2” m' 64.400
A.5.1.1.23. 1 m' Pemasangan pipa galvanis diameter 3” m' 111.300
A.5.1.1.24. 1 m' Pemasangan pipa galvanis diameter 4” m' 148.300
A.5.1.1.25. 1 m' Pemasangan pipa PVC diameter ½ ” m' 23.600
A.5.1.1.26. 1 m' Pemasangan pipa PVC diameter ¾ ” m' 27.000
A.5.1.1.27. 1 m' Pemasangan pipa PVC diameter 1 ” m' 31.700
A.5.1.1.28. 1 m' Pemasangan pipa PVC diameter 1 ½ ” m' 51.000
A.5.1.1.29. 1 m' Pemasangan pipa PVC diameter 2 ” m' 59.600
A.5.1.1.31. 1 m' Pemasangan pipa PVC diameter 3 ” m' 110.200
A.5.1.1.32. 1 m' Pemasangan pipa PVC diameter 4 ” m' 150.400
A.5.1.1.33. 1 unit Septictank 2x1x1,50 m + Rembesan unit 5.140.300
1 m2 Pekerjaan Memasang Toilet Cubicle Partisi PVC unit 1.087.900
1 unit Pekerjaan Memasang Pompa Air dan Instalasi unit 7.972.600
1 unit Pekerjaan Memasang Septictank Biotech Kap. 5000 ltr unit 32.916.800
A.5.1.1.34. 1 unit Sumur Bor Kedalaman 30 m unit 8.800.000
A.5.1.1.35. 1 m' Pekerjaan Saluran Air Limbah Buis beton type U-30 cm m' 285.400
A.5.1.1.36. 1 Unit Pekerjaan Memasang Menara Air + Tanki 2000 liter Unit 16.953.500
1 Unit Pekerjaan Memasang Sumur Resapan komplit Unit 678.600
1 m' Pemasangan U-Ditch 30x40x120 cm m' 303.050
1 m' Pemasangan Cover U-Ditch 40x60 cm m' 199.390
1 m' Pemasangan U-Ditch 100x100x120 cm m' 1.326.500
1 m' Pemasangan Cover U-Ditch 100x60 cm m' 886.800
XV A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
A.8.4.6.1 1 ttk Instalasi Penerangan kabel NYM 3 x 2,5 mm ttk 331.300
A.8.4.6.2 1 ttk Instalasi Penerangan kabel NYM 2 x 2,5 mm ttk 269.700
A.8.4.6.3 1 ttk Instalasi Stop Kontak kabel NYM 3 x 2,5 mm ttk 331.200
A.8.4.6.4 1 ttk Instalasi Sakelar kabel NYM 2 x 2,5 mm ttk 269.600
A.8.4.6.5 1 ttk Sakelar Seri Setara Panasonic ttk 71.300
A.8.4.6.6. 1 ttk Sakelar Tunggal Setara Panasonic ttk 61.200
A.8.4.6.7. 1 ttk Stop Kontak Setara Panasonic ttk 66.600
A.8.4.6.8. 1 bh Lampu TL 20 Watt Beserta Armatur Biasa bh 103.200
A.8.4.6.9. 1 bh Lampu TL 2 x 18 Watt Beserta Armatur Biasa bh 160.600
A.8.4.6.10. 1 bh Down Light SL 25 Watt Beserta armatur bh 122.300
A.8.4.6.11. 1 bh Lampu SL 25 Watt, Komplit Philips bh 63.300
A.8.4.6.12. 1 bh Lampu LED 18 Watt, Komplit Philips bh 68.900
A.8.4.6.12.a 1 bh Lampu LED 5 Watt, Komplit Philips bh 41.300
A.8.4.6.13. 1 bh Fitting Lampu bh 30.200
A.8.4.6.14. 1 bh MCB bh 358.200
1 ttk Stop Kontak AC ttk 129.600
1 ttk Stop Kontak Antena TV ttk 93.300
1 bh Lampu RM 2 x 18 watt + Kap + Komponen bh 426.200
1 bh Lampu LED Downlight 18 Watt bh 156.700
1 bh Lampu LED Downlight 11 Watt bh 90.700
1 bh Lampu Taman bh 1.764.900
1 unit Pek. Pemasangan Bingkai Videotron (2x1 m) unit 1.773.900
1 unit Pemasangan KWH 1300 VA unit 1.397.400
XVI HARGA SATUAN LAINNYA
1 Unit Tiang Bendera Stainless Steel 201 Tinggi = 6m Pipa 2,5,2 Unit 6.050.000
1 cm Huruf Acrylic + LED cm 18.100
1 unit Neon Box Acrylic Logo Kota Serang (60x40) cm + LED unit 1.500.000
1 m2 Dinding Multiplek Lapis HPL m2 516.600
1 unit Backdrop Ruang Rapat unit 7.164.200
XVII HARGA SATUAN PEKERJAAN KUSEN
1 Unit P7 Unit 15.791.400
1 Unit Pemasangan Pintu P1 (2,54 x 1,43) Unit 3.887.100
1 Unit Pemasangan Pintu P2 (2,54 x 1,6) Unit 4.234.100
1 Unit Pemasangan Pintu P3 (2,54 x 0,98) Unit 2.926.300
1 Unit Pemasangan Pintu P4 (2,54 x 0,88) Unit 2.896.900
1 Unit Pemasangan Pintu P5 (2,54 x 0,85) Unit 2.876.000
1 Unit Pintu UPVC Unit 1.238.400
1 Unit Pemasangan Jendela J1 (1,6 x 1,5) Unit 2.309.200
1 Unit Pemasangan Jendela J2 (1,6 x 0,775) Unit 1.273.200
1 Unit Pemasangan Jendela J1 Pos Jaga (1,6 x 1,44) Unit 1.563.100
1 Unit BV 1 Unit 297.200
1 Unit BV 2 Unit 594.400
1 Unit Pemasangan Pintu P1 (2,54 x 0,88) Pos Jaga Unit 2.896.900
DAFTAR HARGA SATUAN PEKERJAAN (AHSP) NO.28/PRT/M/2016
BIDANG CIPTA KARYA
JUMLAH ALAT -
D Jumlah (A+B+C) 203.044
E Overhead & Profit ( 10% ) 10% x D 20.304
F Harga Satuan Pekerjaan (D+E) 223.348
Pembulatan 223.300
A. 2.2.1.2 (K3) 1 m2 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,2000 100.000 20.000
Tukang Kayu L.02 OH 0,4000 117.376 46.950
Kepala Tukang L.03 OH 0,0200 150.000 3.000
Mandor L.04 OH 0,0200 150.000 3.000
JUMLAH PEKERJA 72.950
B BAHAN
Dolken kayu d 8-10/400 cm Batang 1,2500 44.200 55.250
Semen portland Kg 2,5000 1.300 3.250
Seng gelombang Lbr 1,2000 41.664 49.997
Pasir beton m3 0,0050 241.600 1.208
Koral beton m3 0,0090 176.300 1.587
Kayu 5/7 m3 0,0720 1.397.145 100.594
Paku biasa 2” – 5” Kg 0,0600 21.000 1.260
Meni besi Liter 0,4500 22.620 10.179
JUMLAH BAHAN 223.325
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 296.275
E Overhead & Profit ( 10% ) 10% x D 29.628
F Harga Satuan Pekerjaan (D+E) 325.903
Pembulatan 325.900
A. 2.2.1.4 (K3) 1 m' Pengukuran dan pemasangan Bouwplank
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,1000 100.000 10.000
Tukang kayu L.02 OH 0,1000 117.376 11.738
Kepala tukang L.03 OH 0,0100 150.000 1.500
Mandor L.04 OH 0,0050 150.000 750
JUMLAH PEKERJA 23.988
B BAHAN
Kayu balok 5/7 m3 0,0120 1.397.145 16.766
Paku 2”-3” Kg 0,0200 21.000 420
Kayu papan 3/20 m3 0,0070 2.021.300 14.149
JUMLAH BAHAN 31.335
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 55.322
E Overhead & Profit ( 10% ) 10% x D 5.532
F Harga Satuan Pekerjaan (D+E) 60.855
Pembulatan 60.800
JUMLAH ALAT -
D Jumlah (A+B+C) 1.230.485
E Overhead & Profit ( 10% ) 10% x D 123.048
F Harga Satuan Pekerjaan (D+E) 1.353.533
Pembulatan 1.353.500
A. 2.2.1.6 (K3) 1 m2 Pembuatan rumah jaga (konstruksi kayu)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,0000 100.000 100.000
Tukang kayu L.02 OH 1,0500 117.376 123.245
Kepala tukang L.03 OH 0,1500 150.000 22.500
Mandor L.04 OH 0,0500 150.000 7.500
JUMLAH PEKERJA 253.245
B BAHAN
Dolken kayu diameter 8-10/400 cm Batang 3,0000 44.200 132.600
Kayu m3 0,2760 2.021.300 557.879
Paku biasa Kg 0,7000 21.000 14.700
Seng Gelombang Lbr 1,5000 41.664 62.496
JUMLAH BAHAN 767.675
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.020.920
E Overhead & Profit ( 10% ) 10% x D 102.092
F Harga Satuan Pekerjaan (D+E) 1.123.012
Pembulatan 1.123.000
JUMLAH ALAT -
D Jumlah (A+B+C) 976.202
E Overhead & Profit ( 10% ) 10% x D 97.620
F Harga Satuan Pekerjaan (D+E) 1.073.822
Pembulatan 1.073.800
A.2.2.1.8 (K3) 1 m2 Pembuatan bedeng pekerja
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,0000 100.000 100.000
Tukang kayu L.02 OH 2,0000 117.376 234.752
Kepala tukang L.03 OH 0,2000 150.000 30.000
Mandor L.04 OH 0,0500 150.000 7.500
JUMLAH PEKERJA 372.252
B BAHAN
Dolken kayu diameter 8-10/400 cm Batang 1,2500 44.200 55.250
Kayu m3 0,1860 2.021.300 375.962
Paku biasa Kg 0,3000 21.000 6.300
Semen Portland Kg ####### 1.300 23.400
Pasir beton m3 0,0300 225.500 6.765
Koral beton m3 0,0500 176.300 8.815
Seng gelombang Lbr 1,5000 41.664 62.496
Seng pelat Lbr 1,3500 25.245 34.081
JUMLAH BAHAN 573.069
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 945.321
E Overhead & Profit ( 10% ) 10% x D 94.532
F Harga Satuan Pekerjaan (D+E) 1.039.853
Pembulatan 1.039.800
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 17.500
E Overhead & Profit ( 10% ) 10% x D 1.750
F Harga Satuan Pekerjaan (D+E) 19.250
Pembulatan 19.200
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.433.300
E Overhead & Profit ( 10% ) 10% x D 143.330
F Harga Satuan Pekerjaan (D+E) 1.576.630
Pembulatan 1.576.600
A.2.2.1.14 1 m3 Pembongkaran dinding tembok bata
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 6,667 100.000 666.700
Mandor L.04 OH 0,033 150.000 4.995
JUMLAH PEKERJA 671.695
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 671.695
E Overhead & Profit ( 10% ) 10% x D 67.170
F Harga Satuan Pekerjaan (D+E) 738.865
Pembulatan 738.800
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 12.000
E Overhead & Profit ( 10% ) 10% x D 1.200
F Harga Satuan Pekerjaan (D+E) 13.200
Pembulatan 13.200
JUMLAH ALAT -
D Jumlah (A+B+C) 16.497
E Overhead & Profit ( 10% ) 10% x D 1.650
F Harga Satuan Pekerjaan (D+E) 18.147
Pembulatan 18.100
1 m3 Pembongkaran Kusen Pintu dan Jendela
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,500 100.000 50.000
Mandor L.04 OH 0,040 150.000 6.000
JUMLAH PEKERJA 56.000
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 56.000
E Overhead & Profit ( 10% ) 10% x D 5.600
F Harga Satuan Pekerjaan (D+E) 61.600
Pembulatan 61.600
JUMLAH ALAT -
D Jumlah (A+B+C) 13.817
E Overhead & Profit ( 10% ) 10% x D 1.382
F Harga Satuan Pekerjaan (D+E) 15.198
Pembulatan 15.100
JUMLAH ALAT -
D Jumlah (A+B+C) 409.505
E Overhead & Profit ( 10% ) 10% x D 40.951
F Harga Satuan Pekerjaan (D+E) 450.456
Pembulatan 450.400
A.2.2.1.17. 1 m3 Pembongkaran batu kali tebal < 50 cm
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,500 100.000 150.000
Mandor L.04 OH 0,075 150.000 11.250
JUMLAH PEKERJA 161.250
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 161.250
E Overhead & Profit ( 10% ) 10% x D 16.125
F Harga Satuan Pekerjaan (D+E) 177.375
Pembulatan 177.300
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 322.500
E Overhead & Profit ( 10% ) 10% x D 32.250
F Harga Satuan Pekerjaan (D+E) 354.750
Pembulatan 354.700
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 6.500
E Overhead & Profit ( 10% ) 10% x D 650
F Harga Satuan Pekerjaan (D+E) 7.150
Pembulatan 7.100
A.2.2.1.20. 1 m2 Pembongkaran Genteng/Sirap (Bongkaran tidak dipakai) SNI Rev 2005
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,020 100.000 2.000
Mandor L.04 OH 0,010 150.000 1.500
JUMLAH PEKERJA 3.500
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 3.500
E Overhead & Profit ( 10% ) 10% x D 350
F Harga Satuan Pekerjaan (D+E) 3.850
Pembulatan 3.800
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 7.000
E Overhead & Profit ( 10% ) 10% x D 700
F Harga Satuan Pekerjaan (D+E) 7.700
Pembulatan 7.700
A.2.2.1.22. 1 m2 Pembongkaran Rangka Atap/Reng Kaso (Bongkaran Dipakai) SNI Rev 2005
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,0500 100.000 5.000
Tukang kayu L.02 OH 0,2000 117.376 23.475
Kepala tukang L.03 OH 0,0050 150.000 750
Mandor L.04 OH 0,0100 150.000 1.500
JUMLAH PEKERJA 30.725
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 30.725
E Overhead & Profit ( 10% ) 10% x D 3.073
F Harga Satuan Pekerjaan (D+E) 33.798
Pembulatan 33.700
A.2.2.1.23. 1 m2 Pembongkaran Rangka Atap/Reng Kaso (Bongkaran Tidak Dipakai) SNI Rev 2005
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,0250 100.000 2.500
Tukang kayu L.02 OH 0,1000 117.376 11.738
Kepala tukang L.03 OH 0,0025 150.000 375
Mandor L.04 OH 0,0050 150.000 750
JUMLAH PEKERJA 15.363
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 15.363
E Overhead & Profit ( 10% ) 10% x D 1.536
F Harga Satuan Pekerjaan (D+E) 16.899
Pembulatan 16.800
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 408.851
E Overhead & Profit ( 10% ) 10% x D 40.885
F Harga Satuan Pekerjaan (D+E) 449.736
Pembulatan 449.700
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.189.504
E Overhead & Profit ( 10% ) 10% x D 118.950
F Harga Satuan Pekerjaan (D+E) 1.308.454
Pembulatan 1.308.400
A.2.2.1.26. 1 m2 Pembongkaran plesteran dinding SNI Rev 2005
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,050 100.000 5.000
Mandor L.04 OH 0,0250 150.000 3.750
JUMLAH PEKERJA 8.750
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 8.750
E Overhead & Profit ( 10% ) 10% x D 875
F Harga Satuan Pekerjaan (D+E) 9.625
Pembulatan 9.600
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 42.344
E Overhead & Profit ( 10% ) 10% x D 4.234
F Harga Satuan Pekerjaan (D+E) 46.578
Pembulatan 46.500
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 13.250
E Overhead & Profit ( 10% ) 10% x D 1.325
F Harga Satuan Pekerjaan (D+E) 14.575
Pembulatan 14.500
A.2.2.1.29. 1 m' Pembongkaran lisplank SNI Rev. 2005
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,030 100.000 3.000
JUMLAH PEKERJA 3.000
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 3.000
E Overhead & Profit ( 10% ) 10% x D 300
F Harga Satuan Pekerjaan (D+E) 3.300
Pembulatan 3.300
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.189.504
E Overhead & Profit ( 10% ) 10% x D 118.950
F Harga Satuan Pekerjaan (D+E) 1.308.454
Pembulatan 1.308.400
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 782.128
E Overhead & Profit ( 10% ) 10% x D 78.213
F Harga Satuan Pekerjaan (D+E) 860.341
Pembulatan 860.300
1 m3 Angkutan Material Sejauh 3 km
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
JUMLAH PEKERJA -
B BAHAN
JUMLAH BAHAN -
C ALAT
Dump Truck Jam 0,14889 326274,6051 48.579
JUMLAH PEKERJA -
B BAHAN
JUMLAH BAHAN -
C ALAT
Dump Truck Jam 0,2114 326274,6051 68.974
JUMLAH PEKERJA -
B BAHAN
JUMLAH BAHAN -
C ALAT
Dump Truck Jam 0,68014 326274,6051 221.912
JUMLAH PEKERJA -
B BAHAN
JUMLAH BAHAN -
C ALAT
Dump Truck Jam 0,99264 326274,6051 323.873
JUMLAH ALAT 323.873
D Jumlah (A+B+C) 323.873
E Overhead & Profit ( 10% ) 10% x D 32.387
F Harga Satuan Pekerjaan (D+E) 356.261
Pembulatan 356.200
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 78.750
E Overhead & Profit ( 10% ) 10% x D 7.875
F Harga Satuan Pekerjaan (D+E) 86.625
Pembulatan 86.600
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 96.750
E Overhead & Profit ( 10% ) 10% x D 9.675
F Harga Satuan Pekerjaan (D+E) 106.425
Pembulatan 106.400
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 104.800
E Overhead & Profit ( 10% ) 10% x D 10.480
F Harga Satuan Pekerjaan (D+E) 115.280
Pembulatan 115.200
A.2.3.1.8 (K3) 1 m3 Pembuangan tanah sejauh 30 meter
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,330 100.000 33.000
Mandor L.04 OH 0,100 150.000 15.000
JUMLAH PEKERJA 48.000
B BAHAN
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 48.000
E Overhead & Profit ( 10% ) 10% x D 4.800
F Harga Satuan Pekerjaan (D+E) 52.800
Pembulatan 52.800
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 57.500
E Overhead & Profit ( 10% ) 10% x D 5.750
F Harga Satuan Pekerjaan (D+E) 63.250
Pembulatan 63.200
JUMLAH BAHAN -
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 57.500
E Overhead & Profit ( 10% ) 10% x D 5.750
F Harga Satuan Pekerjaan (D+E) 63.250
Pembulatan 63.200
A.2.3.1.11 (K3) 1 m3 Pengurugan dengan pasir urug
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,300 100.000 30.000
Mandor L.04 OH 0,010 150.000 1.500
JUMLAH PEKERJA 31.500
B BAHAN
Pasir Urug m3 1,2000 280.200 336.240
JUMLAH ALAT -
D Jumlah (A+B+C) 367.740
E Overhead & Profit ( 10% ) 10% x D 36.774
F Harga Satuan Pekerjaan (D+E) 404.514
Pembulatan 404.500
JUMLAH ALAT -
D Jumlah (A+B+C) 207.250
E Overhead & Profit ( 10% ) 10% x D 20.725
F Harga Satuan Pekerjaan (D+E) 227.975
Pembulatan 227.900
JUMLAH ALAT -
D Jumlah (A+B+C) 220.860
E Overhead & Profit ( 10% ) 10% x D 22.086
F Harga Satuan Pekerjaan (D+E) 242.946
Pembulatan 242.900
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
JUMLAH ALAT -
D Jumlah (A+B+C) 872.500
E Overhead & Profit ( 10% ) 10% x D 87.250
F Harga Satuan Pekerjaan (D+E) 959.749
Pembulatan 959.700
JUMLAH ALAT -
D Jumlah (A+B+C) 829.692
E Overhead & Profit ( 10% ) 10% x D 82.969
F Harga Satuan Pekerjaan (D+E) 912.661
Pembulatan 912.600
JUMLAH ALAT -
D Jumlah (A+B+C) 800.004
E Overhead & Profit ( 10% ) 10% x D 80.000
F Harga Satuan Pekerjaan (D+E) 880.004
Pembulatan 880.000
A.3.2.1.9 (K3) 1 m3 Pemasangan batu kosong (Aanstamping)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,780 100.000 78.000
Tukang Batu L.02 OH 0,390 117.376 45.777
Kepala Tukang L.03 OH 0,039 150.000 5.850
Mandor L.04 OH 0,039 150.000 5.850
JUMLAH PEKERJA 135.477
B BAHAN
Batu Belah m3 1,200 200.000 240.000
Pasir urug m3 0,432 280.200 121.046
JUMLAH BAHAN 361.046
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 496.523
E Overhead & Profit ( 10% ) 10% x D 49.652
F Harga Satuan Pekerjaan (D+E) 546.175
Pembulatan 546.100
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
JUMLAH ALAT -
D Jumlah (A+B+C) 882.048
E Overhead & Profit ( 10% ) 10% x D 88.205
F Harga Satuan Pekerjaan (D+E) 970.252
Pembulatan 970.200
JUMLAH ALAT -
D Jumlah (A+B+C) 982.363
E Overhead & Profit ( 10% ) 10% x D 98.236
F Harga Satuan Pekerjaan (D+E) 1.080.599
Pembulatan 1.080.500
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,200 100.000 120.000
Tukang Batu L.02 OH 0,200 117.376 23.475
Kepala Tukang L.03 OH 0,020 150.000 3.000
Mandor L.04 OH 0,060 150.000 9.000
JUMLAH PEKERJA 155.475
B BAHAN
Semen portland Kg 230 1.300,0 299.000
Pasir Beton m3 893 225,5 201.372
Kerikil (Maks 30 mm) m3 1.027 220,0 225.940
Air ltr 200 1,3 261
JUMLAH BAHAN 726.573
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 882.048
E Overhead & Profit ( 10% ) 10% x D 88.205
F Harga Satuan Pekerjaan (D+E) 970.252
Pembulatan 970.200
A.4.1.1.5 1 m3 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,650 100.000 165.000
Tukang Batu L.02 OH 0,275 117.376 32.278
Kepala Tukang L.03 OH 0,028 150.000 4.200
Mandor L.04 OH 0,083 150.000 12.450
JUMLAH PEKERJA 213.928
B BAHAN
Semen portland Kg 326 1.300,0 423.800
Pasir Beton m3 760 225,5 171.380
Kerikil (Maks 30 mm) m3 1.029 220,0 226.380
Air ltr 215 1,3 281
JUMLAH BAHAN 821.841
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.035.769
E Overhead & Profit ( 10% ) 10% x D 103.577
F Harga Satuan Pekerjaan (D+E) 1.139.346
Pembulatan 1.139.300
A.4.1.1.6 1 m3 Membuat beton mutu f’c = 16,9 Mpa,slum (12±2)cm, w/c = 0,58 (K200)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,650 100.000 165.000
Tukang Batu L.02 OH 0,275 117.376 32.278
Kepala Tukang L.03 OH 0,028 150.000 4.200
Mandor L.04 OH 0,083 150.000 12.450
JUMLAH PEKERJA 213.928
B BAHAN
Semen portland Kg 352 1.300,0 457.600
Pasir Beton m3 731 225,5 164.841
Kerikil (Maks 30 mm) m3 1.031 220,0 226.820
Air ltr 215 1,3 281
JUMLAH BAHAN 849.541
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.063.469
E Overhead & Profit ( 10% ) 10% x D 106.347
F Harga Satuan Pekerjaan (D+E) 1.169.816
Pembulatan 1.169.800
A.4.1.1.7 1 m3 Membuat beton mutu f’c = 19,3 Mpa,slum (12±2)cm, w/c = 0,58 (K225)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,650 100.000 165.000
Tukang Batu L.02 OH 0,275 117.376 32.278
Kepala Tukang L.03 OH 0,028 150.000 4.200
Mandor L.04 OH 0,083 150.000 12.450
JUMLAH PEKERJA 213.928
B BAHAN
Semen portland Kg 371 1.300,0 482.300
Pasir Beton m3 698 225,5 157.399
Kerikil (Maks 30 mm) m3 1.047 220,0 230.340
Air ltr 215 1,3 281
JUMLAH BAHAN 870.320
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.084.248
E Overhead & Profit ( 10% ) 10% x D 108.425
F Harga Satuan Pekerjaan (D+E) 1.192.673
Pembulatan 1.192.600
A.4.1.1.8 1 m3 Membuat beton mutu f’c = 21,7 Mpa,slum (12±2)cm, w/c = 0,56 (K250)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,650 100.000 165.000
Tukang Batu L.02 OH 0,275 117.376 32.278
Kepala Tukang L.03 OH 0,028 150.000 4.200
Mandor L.04 OH 0,083 150.000 12.450
JUMLAH PEKERJA 213.928
B BAHAN
Semen portland Kg 384 1.300,0 499.200
Pasir Beton m3 692 225,5 156.046
Kerikil (Maks 30 mm) m3 1.039 220,0 228.580
Air ltr 215 1,3 281
JUMLAH BAHAN 884.107
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.098.035
E Overhead & Profit ( 10% ) 10% x D 109.803
F Harga Satuan Pekerjaan (D+E) 1.207.838
Pembulatan 1.207.800
A.4.1.1.9 1 m3 Membuat beton mutu f’c = 24,0 Mpa,slum (12±2)cm, w/c = 0,56 (K300)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,650 100.000 165.000
Tukang Batu L.02 OH 0,275 117.376 32.278
Kepala Tukang L.03 OH 0,028 150.000 4.200
Mandor L.04 OH 0,083 150.000 12.450
JUMLAH PEKERJA 213.928
B BAHAN
Semen portland Kg 496 1.300,0 644.800
Pasir Beton m3 684 225,5 154.242
Kerikil (Maks 30 mm) m3 1.026 220,0 225.720
Air ltr 215 1,3 281
JUMLAH BAHAN 1.025.043
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 1.238.971
E Overhead & Profit ( 10% ) 10% x D 123.897
F Harga Satuan Pekerjaan (D+E) 1.362.868
Pembulatan 1.362.800
A.4.1.1.10. 1 m3 Rabat Beton (1 PC:3 PB:5 Kr)/B0
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 1,32 100.000 132.000
Tukang Batu L.02 OH 0,220 117.376 25.823
Kepala Tukang L.03 OH 0,0220 150.000 3.300
Mandor L.04 OH 0,1320 150.000 19.800
JUMLAH PEKERJA 180.923
B BAHAN
Semen portland Kg 200,0 1.300,0 260.000
Pasir Beton m3 0,522 225.500,0 117.711
Kerikil (Maks 30 mm) m3 0,86 220.000,0 189.640
JUMLAH ALAT -
D Jumlah (A+B+C) 748.274
E Overhead & Profit ( 10% ) 10% x D 74.827
F Harga Satuan Pekerjaan (D+E) 823.101
Pembulatan 823.100
JUMLAH ALAT -
D Jumlah (A+B+C) 172.915
E Overhead & Profit ( 10% ) 10% x D 17.292
F Harga Satuan Pekerjaan (D+E) 190.207
di hitung dalam 1 kg 19.021
Pembulatan 19.000
A.4.1.1.19 1 kg Pemasangan 10 kg jaring kawat baja (wiremesh)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,025 100.000 2.500
Tukang Besi L.02 OH 0,025 117.376 2.934
Kepala Tukang L.03 OH 0,025 150.000 3.750
Mandor L.04 OH 0,001 150.000 150
JUMLAH PEKERJA 9.334
B BAHAN
Jaring kawat baja dilas Kg 10,200 500.000 5.100.000
Kawat beton Kg 0,050 24.100 1.205
JUMLAH BAHAN 5.101.205
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 5.110.539
E Overhead & Profit ( 10% ) 10% x D 511.054
F Harga Satuan Pekerjaan (D+E) 5.621.593
di hitung dalam 1 kg 562.159
Pembulatan 562.100
JUMLAH ALAT -
D Jumlah (A+B+C) 140.904
E Overhead & Profit ( 10% ) 10% x D 14.090
F Harga Satuan Pekerjaan (D+E) 154.994
Pembulatan 154.900
JUMLAH ALAT -
D Jumlah (A+B+C) 130.788
E Overhead & Profit ( 10% ) 10% x D 13.079
F Harga Satuan Pekerjaan (D+E) 143.867
Pembulatan 143.800
A.4.1.1.21 (K3) 1 m2 Pemasangan bekisting untuk sloof
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,520 100.000 52.000
Tukang Batu L.02 OH 0,260 117.376 30.518
Kepala Tukang L.03 OH 0,026 150.000 3.900
Mandor L.04 OH 0,026 150.000 3.900
JUMLAH PEKERJA 90.318
B BAHAN
Bahan Kayu Klas III m3 0,023 2.021.300 45.479
Paku 5 cm-10 cm kg 0,300 21.000 6.300
Minyak Bekisting ltr 0,100 38.600 3.860
JUMLAH ALAT -
D Jumlah (A+B+C) 145.957
E Overhead & Profit ( 10% ) 10% x D 14.596
F Harga Satuan Pekerjaan (D+E) 160.553
Pembulatan 160.500
JUMLAH ALAT -
D Jumlah (A+B+C) 256.931
E Overhead & Profit ( 10% ) 10% x D 25.693
F Harga Satuan Pekerjaan (D+E) 282.624
Pembulatan 282.600
A.4.1.1.23 (K3) 1 m2 Pemasangan bekisting untuk balok
No s KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,660 100.000 66.000
Tukang Batu L.02 OH 0,330 117.376 38.734
Kepala Tukang L.03 OH 0,033 150.000 4.950
Mandor L.04 OH 0,033 150.000 4.950
JUMLAH PEKERJA 114.634
B BAHAN
Bahan Kayu Klas III m3 0,020 2.021.300 40.426
Paku 5 cm-12 cm kg 0,400 21.000 8.400
Minyak Bekisting ltr 0,200 38.600 7.720
Balok kayu kelas II m3 0,009 3.323.500 29.912
Plywood tebal 9 mm lbr 0,175 95.000 16.625
Dolken kayu 8- 10cm –panj 4 m Batang 1,000 44.200 44.200
JUMLAH ALAT -
D Jumlah (A+B+C) 261.917
E Overhead & Profit ( 10% ) 10% x D 26.192
F Harga Satuan Pekerjaan (D+E) 288.108
Pembulatan 288.100
JUMLAH ALAT -
D Jumlah (A+B+C) 345.331
E Overhead & Profit ( 10% ) 10% x D 34.533
F Harga Satuan Pekerjaan (D+E) 379.864
Pembulatan 379.800
JUMLAH ALAT -
D Jumlah (A+B+C) 244.895
E Overhead & Profit ( 10% ) 10% x D 24.489
F Harga Satuan Pekerjaan (D+E) 269.384
Pembulatan 269.300
A.4.1.1.28 (K3) 1 m' Membuat kolom praktis beton bertulang (11 x 11) cm
No s KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,180 100.000 18.000
Tukang Batu L.02 OH 0,020 117.376 2.348
Tukang Kayu L.02 OH 0,020 117.376 2.348
Tukang Besi L.02 OH 0,020 117.376 2.348
Kepala Tukang L.03 OH 0,006 117.376 704
Mandor L.04 OH 0,009 150.000 1.350
JUMLAH PEKERJA 27.097
B BAHAN
Bahan Kayu Klas III m3 0,002 2.021.300 4.043
Paku 5 cm-12 cm kg 0,010 21.000 210
Besi Beton Polos kg 3,000 14.000 42.000
Kawat Beton kg 0,450 24.100 10.845
Semen portland kg 4,000 1.300 5.200
Pasir Beton m3 0,006 225.500 1.353
Kerikil m3 0,009 220.000 1.980
JUMLAH ALAT -
D Jumlah (A+B+C) 92.727
E Overhead & Profit ( 10% ) 10% x D 9.273
F Harga Satuan Pekerjaan (D+E) 102.000
Pembulatan 102.000
A.4.1.1.36 (K3) 1 m' Membuat ring balok beton bertulang (10 x 15) cm
No s KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,297 100.000 29.700
Tukang Batu L.02 OH 0,033 117.376 3.873
Tukang Kayu L.02 OH 0,033 117.376 3.873
Tukang Besi L.02 OH 0,033 117.376 3.873
Kepala Tukang L.03 OH 0,010 117.376 1.174
Mandor L.04 OH 0,015 150.000 2.250
JUMLAH PEKERJA 44.744
B BAHAN
Bahan Kayu Klas III m3 0,003 2.021.300 6.064
Paku 5 cm-12 cm kg 0,020 21.000 420
Besi Beton Polos kg 3,600 14.000 50.400
Kawat Beton kg 0,050 24.100 1.205
Semen portland kg 5,500 1.300 7.150
Pasir Beton m3 0,009 225.500,0 2.030
Kerikil m3 0,015 220.000,0 3.300
JUMLAH ALAT -
D Jumlah (A+B+C) 115.312
E Overhead & Profit ( 10% ) 10% x D 11.531
F Harga Satuan Pekerjaan (D+E) 126.844
Pembulatan 126.800
A.4.4.3.HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
JUMLAH ALAT -
D Jumlah (A+B+C) 188.161
E Overhead & Profit ( 10% ) 10% x D 18.816
F Harga Satuan Pekerjaan (D+E) 206.977
Pembulatan 206.900
JUMLAH ALAT -
D Jumlah (A+B+C) 188.161
E Overhead & Profit ( 10% ) 10% x D 18.816
F Harga Satuan Pekerjaan (D+E) 206.977
Pembulatan 206.900
JUMLAH ALAT -
D Jumlah (A+B+C) 242.955
E Overhead & Profit ( 10% ) 10% x D 24.295
F Harga Satuan Pekerjaan (D+E) 267.250
Pembulatan 267.200
A.4.4.3.35.b 1 m2 Pemasangan lantai keramik ukuran 40 cm x 40 cm (corak)
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,700 100.000 70.000
Tukang Batu L.02 OH 0,350 117.376 41.082
Kepala Tukang L.03 OH 0,035 150.000 5.250
Mandor L.04 OH 0,035 150.000 5.250
JUMLAH PEKERJA 121.582
B BAHAN
Ubin Keramik Dos 1,050 57.900 60.795
Semen Portland kg 8,190 1.300 10.647
Pasir pasang m3 0,045 241.600 10.872
Semen Warna kg 0,50 10.320 5.160
JUMLAH BAHAN 87.474
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 209.056
E Overhead & Profit ( 10% ) 10% x D 20.906
F Harga Satuan Pekerjaan (D+E) 229.961
Pembulatan 229.900
JUMLAH ALAT -
D Jumlah (A+B+C) 219.384
E Overhead & Profit ( 10% ) 10% x D 21.938
F Harga Satuan Pekerjaan (D+E) 241.322
Pembulatan 241.300
JUMLAH ALAT -
D Jumlah (A+B+C) 313.533
E Overhead & Profit ( 10% ) 10% x D 31.353
F Harga Satuan Pekerjaan (D+E) 344.886
Pembulatan 344.800
A.4.4.3.53. 1 m2 Pemasangan dinding keramik 10 cm x 20 cm
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,090 100.000 9.000
Tukang Batu L.02 OH 0,450 117.376 52.819
Kepala Tukang L.03 OH 0,045 150.000 6.750
Mandor L.04 OH 0,045 150.000 6.750
JUMLAH PEKERJA 75.319
B BAHAN
Keramik bh 53,000 907 48.074
Semen Portland kg 9,300 1.300 12.090
Pasir pasang m3 0,018 241.600 4.349
Semen Warna kg 2,750 10.320,0 28.380
JUMLAH BAHAN 92.893
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 168.212
E Overhead & Profit ( 10% ) 10% x D 16.821
F Harga Satuan Pekerjaan (D+E) 185.033
Pembulatan 185.000
JUMLAH ALAT -
D Jumlah (A+B+C) 167.779
E Overhead & Profit ( 10% ) 10% x D 16.778
F Harga Satuan Pekerjaan (D+E) 184.557
Pembulatan 184.500
JUMLAH ALAT -
D Jumlah (A+B+C) 294.213
E Overhead & Profit ( 10% ) 10% x D 29.421
F Harga Satuan Pekerjaan (D+E) 323.634
Pembulatan 323.600
A.4.4.3.58.a 1 m2 Pemasangan batu Alam Andesit
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,700 100.000 70.000
Tukang Batu L.02 OH 0,350 117.376 41.082
Kepala Tukang L.03 OH 0,035 150.000 5.250
Mandor L.04 OH 0,035 150.000 5.250
JUMLAH PEKERJA 121.582
B BAHAN
Batu Andesit m2 1,100 111.886 123.075
Semen Portland kg 11,750 1.300 15.275
Pasir pasang m3 0,035 241.600 8.456
JUMLAH ALAT -
D Jumlah (A+B+C) 268.387
E Overhead & Profit ( 10% ) 10% x D 26.839
F Harga Satuan Pekerjaan (D+E) 295.226
Pembulatan 295.200
JUMLAH ALAT -
D Jumlah (A+B+C) 155.765
E Overhead & Profit ( 10% ) 10% x D 15.576
F Harga Satuan Pekerjaan (D+E) 171.341
Pembulatan 171.300
JUMLAH ALAT -
D Jumlah (A+B+C) 231.229
E Overhead & Profit ( 10% ) 10% x D 23.123
F Harga Satuan Pekerjaan (D+E) 254.352
Pembulatan 254.300
A.4.4.3.69. 1 m' Pemasangan paving uskup
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,036 100.000 3.571
Tukang Batu L.02 OH 0,071 117.376 8.384
JUMLAH ALAT -
D Jumlah (A+B+C) 35.204
E Overhead & Profit ( 10% ) 10% x D 3.520
F Harga Satuan Pekerjaan (D+E) 38.724
Pembulatan 38.700
JUMLAH ALAT -
D Jumlah (A+B+C) 48.585
E Overhead & Profit ( 10% ) 10% x D 4.859
F Harga Satuan Pekerjaan (D+E) 53.444
Pembulatan 53.400
1 m' Pemasangan Stepnozing
No URAIAN KODE SAT KOEF. HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja L.01 OH 0,090 100.000 9.000
Tukang Batu L.02 OH 0,090 117.376 10.564
Kepala Tukang L.03 OH 0,009 150.000 1.350
Mandor L.04 OH 0,005 150.000 750
JUMLAH PEKERJA 21.664
B BAHAN
Stepnozing m' 1,667 41.000 68.333
Semen Portland kg 1,140 1.300 1.482
Pasir pasang m3 0,003 241.600 725
Semen Warna kg 0,10 10.320 1.032
JUMLAH BAHAN 71.572
C ALAT
JUMLAH ALAT -
D Jumlah (A+B+C) 93.236
E Overhead & Profit ( 10% ) 10% x D 9.324
F Harga Satuan Pekerjaan (D+E) 102.560
Pembulatan 102.500
JUMLAH ALAT -
D Jumlah (A+B+C) 706.865
E Overhead & Profit ( 10% ) 10% x D 70.686
F Harga Satuan Pekerjaan (D+E) 777.551
Pembulatan 777.500
A.4.4.3.HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
JUMLAH ALAT -
D Jumlah (A+B+C) 188.161
E Overhead & Profit ( 10% ) 10% x D 18.816
F Harga Satuan Pekerjaan (D+E) 206.977
Pembulatan 206.900
JUMLAH ALAT -
D Jumlah (A+B+C) 530.947
E Overhead & Profit ( 10% ) 10% x D 53.095
F Harga Satuan Pekerjaan (D+E) 584.042
Pembulatan 584.000