Terbilang : Tujuh milyar lima ratus lima puluh empat juta tujuh ratus tujuh puluh enam ribu rupiah
Jakarta, Oktober 2019
Page 1 of 454
RENCANA ANGGARAN BIAYA
PEKERJAAN : PERLUASAN LAHAN PARKIR MOBIL, AKSES & SARANA OLAHRAGA
UNIT USAHA : CAKUNG MARUNDA TG. PRIOK
LOKASI PROYEK : BLOK A.02 KAWASAN CAKUNG PT. KBN (PERSERO)
I PEKERJAAN PERSIAPAN
1 Ls 1.00
Papan Nama Proyek 690,327.00 640,827.00 1,331,154.00 1,331,154.00
2 Ls 1.00
Mobilisasi dan Demobilisasi 9,984,000.00 9,984,000.00 9,984,000.00
3 Ls 1.00
Penyediaan Air dan Listrik Kerja 8,995,800.00 8,995,800.00 8,995,800.00
4 Ls 1.00
Administrasi dan Dokumentasi Proyek 3,080,000.00 3,080,000.00 3,080,000.00
5 Ls 1.00
Pengukuran dan Pemasangan Bouwplank 2,719,878.48 2,719,878.48 2,719,878.48
6 Ls 1.00
Pekerjaan Pembersihan (Awal & Akhir Proyek) 10,334,233.80 10,334,233.80 10,334,233.80
7 Test CBR subgrade dan base course Ls 1.00 6,500,000.00 6,500,000.00 6,500,000.00
8 Persyaratan K3 Ls 1.00 23,300,000.00 23,300,000.00 23,300,000.00
II PEKERJAAN URUGAN
1 Urugan tanah merah padat CBR Min.10% m3 3,996.15 277,200.00 80,949.66 358,149.66 1,431,219,242.25
4 Lantai kerja beton ad.1:3:5 tb. 5 cm m3 3.38 814,440.00 138,003.03 952,443.03 3,220,686.11
6 Cover U ditch Uk. 60 x 120 m' 75.00 496,558.33 30,233.94 526,792.27 39,509,420.50
8 Peninggian Dinding Saluran beton ad. 1:2:3 m3 2.70 1,257,564.00 138,003.03 1,395,567.03 3,768,030.98
10 Gutter Buis beton dia. 30 cm m' 135.26 237,356.90 96,458.77 333,815.67 45,151,907.09
11 Pas. Bata dinding gutter ad.1:5 m2 33.82 146,979.80 133,360.74 280,340.54 9,479,715.50
12 Bak kontrol Uk. 60 x 60 x 120 Beton bertulang ad.1:2:3 m3 0.36 2,472,034.75 653,825.14 3,125,859.89 1,125,309.56
1 Urugan base course Klas B CBR min 60% tb. 30 cm m3 224.76 310,200.00 163,168.50 473,368.50 106,394,304.31
3 Lapisan Aspal ATB rata - rata Tb. 7 cm m2 749.20 225,076.92 43,076.92 268,153.85 200,900,861.54
5 Lapisan Aspal Laston rata-rata tb. 3 cm m2 749.20 107,142.86 21,428.57 128,571.43 96,325,714.29
6 Pasang Beton Kanstin uk. 18/22 - 25/60Cm m' 141.69 136,601.67 19,037.91 155,639.58 22,052,572.26
7 Pas. Bata dinding gutter ad.1:5 m2 141.69 146,979.80 133,360.74 280,340.54 39,721,451.68
1 Urugan base course Klas B CBR min 60% tb. 20 cm m3 147.00 310,200.00 163,168.50 473,368.50 69,585,169.66
2 Pas. Paving Block tb. 8 cm + sand bedding tb. 8 cm m2 4,714.40 106,508.10 169,846.83 276,354.93 1,302,847,674.72
3 Urugan tanah merah padat pedestrian m3 137.84 277,200.00 80,949.66 358,149.66 49,365,558.39
4 Pasang Beton Kanstin uk. 18/22 - 25/60Cm m' 783.00 136,601.67 19,037.91 155,639.58 121,865,792.05
Page 2 of 454
HARGA SATUAN (Rp)
No. PEKERJAAN SAT VOL HARGA JADI JUMLAH
BAHAN UPAH
Page 3 of 454
HARGA SATUAN (Rp)
No. PEKERJAAN SAT VOL HARGA JADI JUMLAH
BAHAN UPAH
6 Pek. Tali air pipa PVC 2 x 4" m' 293.17 348,150.00 25,758.26 373,908.26 109,617,438.22
V PEKERJAAN BONGKAR PASANG PAGAR PRECAST, BRC & TURAP BATU BELAH
4 Pas. Pondasi & turap batu belah/batu kali m3 420.58 833,184.00 380,758.29 1,213,942.29 510,564,400.61
5 Pas. Pagar panel Precast Uk. 5x40x240 (eksisting)+ Kolom Uk. 18x20x300 (baru) m2 580.00 315,544.90 83,310.62 398,855.52 231,336,199.51
6 Bongkar pasang Pagar BRC sisi timur m' 105.00 75,685.50 83,310.62 158,996.12 16,694,592.22
8 Kolom beton Pagar Tralis ad.1:2:3 Uk. 30x30x160 m3 0.14 1,453,899.70 625,283.55 2,079,183.24 299,402.39
9 Sloof beton bertulang ad. 1:2:3 uk. 15/20 m3 0.12 2,472,034.75 653,825.14 3,125,859.89 375,103.19
10 Pas. Bata tangga penghubung area kantor ad.1:5 m2 1.40 146,979.80 133,360.74 280,340.54 392,476.76
11 Rabat beton ad. 1:3:5 tb. 15 cm m3 0.30 814,440.00 138,003.03 952,443.03 285,732.91
VI PEKERJAAN TAMAN
A. PEKERJAAN STRUKTUR
9 Pemasangan jaring kawat harmonika + tiang pipa GIP t. 5 m + Kolom pedestal m2 615.30 712,382.37 19,625.76 732,008.12 450,404,598.85
10 Pas. Bata pengunci paving ad. 1:5 m2 13.95 146,979.80 133,360.74 280,340.54 3,910,750.59
11 Pasang Beton Kanstin uk. 18/22 - 30/60Cm m' 199.60 136,601.67 19,037.91 155,639.58 31,065,660.40
12 Pas. Paving block tb. 8 cm keliling lapangan + sand bedding tb. 8 cm m2 245.40 106,508.10 169,846.83 276,354.93 67,817,499.44
13 Kolom pedestal beton bertulang ad. 1:2:3 uk. 30x30x100 + angkur m3 5.06 1,040,591.51 506,271.15 1,546,862.66 7,830,992.22
JOGGING TRACK
2 Floor Hardener warna 5 kg/m2 + Curing Compound m2 61.50 32,472.00 46,409.54 78,881.54 4,851,214.69
3 Pas. Paving block warna tb. 8 cm + sand bedding tb. 8 cm m2 159.90 118,729.10 169,846.83 288,575.93 46,143,290.96
4 Pas. Bata pot area jogging track ad. 1:5 m2 12.06 146,979.80 133,360.74 280,340.54 3,380,234.14
5 plesteran ad. 1:4 tb. 2cm m2 30.52 26,259.20 101,938.58 128,197.78 3,912,698.93
Page 4 of 454
HARGA SATUAN (Rp)
No. PEKERJAAN SAT VOL HARGA JADI JUMLAH
BAHAN UPAH
a. PEKERJAAN PONDASI
3 Lantai kerja bawah pondasi, beton ad. 1:3:5 tb. 5 cm m3 0.52 814,440.00 138,003.03 952,443.03 496,222.82
4 Sloof beton bertulang ad. 1:2:3 uk. 15/20 m3 3.13 1,445,580.23 625,283.55 2,070,863.78 6,473,520.17
1 Kolom beton bertulang ad. 1:2:3 uk. 15/15 m3 1.08 1,445,580.23 625,283.55 2,070,863.78 2,236,532.88
2 Urug sirtu padat bawah lantai tb.5 cm m3 2.89 294,360.00 67,680.80 362,040.80 1,044,759.24
3 Lantai kerja bangunan utama & selasar, beton ad. 1:2:3 tb. 12 cm m3 6.93 1,257,564.00 138,003.03 1,395,567.03 9,665,418.14
4 Lantai kerja Rg. bilas, beton ad. 1:3:5 tb. 5 cm m3 0.60 814,440.00 138,003.03 952,443.03 571,465.82
5 Ring Balk beton bertulang ad. 1:2:3 uk. 15/15 m3 0.93 1,445,580.23 625,283.55 2,070,863.78 1,919,690.72
c. PEKERJAAN ATAP
1 Pemasangan Rangka atap baja ringan Hi-Ten G.550 Lapis Lindung Zinc Alumunium m2 89.37 150,000.00 45,000.00 195,000.00 17,426,175.00
2 Penutup atap utama, atap metal Zincalume - Galvalume AZ 150 G.550 m2 89.37 134,510.87 167,105.62 301,616.49 26,953,957.59
B. PEKERJAAN ARSITEKTUR
1 Pasang keramik lantai uk.40x40 (polished) m2 43.30 133,975.60 177,687.20 311,662.80 13,494,999.33
2 Pasang keramik lantai uk.40x40 (unpolished) m2 11.00 155,975.60 177,687.20 333,662.80 3,670,290.82
4 Pasang keramik polished uk.30x30 (meja beton) m2 2.59 107,575.60 177,687.20 285,262.80 738,830.66
1 Pas. Dinding batu bata + plester, acian m2 35.37 180,389.00 286,067.10 466,456.10 16,499,718.40
3 Pas. Dinding cubicle (ruang bilas) m2 19.32 371,800.00 83,539.50 455,339.50 8,797,159.14
5 Pengecatan dinding bagian luar (weathershield) m2 83.65 122,145.83 16,489.64 138,635.47 11,596,857.21
5 Jendela Kaca uk. 1,6 X 0,7 (J1) bh 2.00 560,000.00 356,958.00 916,958.00 1,833,916.00
1 Pemasangan closet duduk (lengkap terpasang) unit 2.00 4,081,000.00 714,338.90 4,795,338.90 9,590,677.80
Page 5 of 454
HARGA SATUAN (Rp)
No. PEKERJAAN SAT VOL HARGA JADI JUMLAH
BAHAN UPAH
5 Pemasangan kran shower air unit 4.00 448,978.75 77,900.90 526,879.65 2,107,518.60
Pipa PVC AW dia. 4 " (lengkap terpasang) m' 16.00 308,286.00 38,327.58 346,613.58 5,545,817.20
Pipa PVC AW dia. 4 " (Sparingan kabel di bawah jalan) m' 41.00 308,286.00 38,327.58 346,613.58 14,211,156.58
Pipa PVC AW dia. 3 " (lengkap terpasang) m' 16.00 204,930.00 38,327.58 243,257.58 3,892,121.20
Pipa PVC AW dia. 2 " (lengkap terpasang) m' 51.00 99,346.50 25,618.89 124,965.39 6,373,234.89
Pipa PVC AW dia. 1 " (lengkap terpasang) m' 23.00 33,412.50 17,079.26 50,491.76 1,161,310.48
Pipa PVC AW dia. 1/2 " (lengkap terpasang) m' 15.00 14,701.50 17,079.26 31,780.76 476,711.40
7 Pemasangan tower dan water torn kapasitas 1000 liter unit 1.00 6,769,037.00 515,649.20 7,284,686.20 7,284,686.20
8 Pengadaan dan pemasangan septic tank biotech 2000 lt unit 1.00 9,977,223.01 722,331.82 10,699,554.83 10,699,554.83
9 Relokasi box pemadam kebakaran unit 1.00 497,651.00 333,439.70 831,090.70 831,090.70
- pipa 150 mm
IX PEKERJAAN ELEKTRIKAL
1 Pemasangan main panel DB (lengkap terpasang) set 1.00 1,858,050.00 280,000.00 2,138,050.00 2,138,050.00
3 buah MCB 50 A
3 buah MCB 16 A
2 buah MCB 10 A
4 buah MCB 6 A
2 Mcb 6 A di tiap tiang PJU & lampu sorot bh 16.00 83,000.00 10,000.00 93,000.00 1,488,000.00
3 Lampu TL 2 x 36 Watt (lengkap terpasang) unit 6.00 404,712.00 46,978.07 451,690.07 2,710,140.41
4 Lampu down Light LED 11 Watt (lengkap terpasang) unit 6.00 404,712.00 46,978.07 451,690.07 2,710,140.41
NYFGbY-rm 0.6/1kV 4Cx25 mm2 dari Power House ke Panel DB m' 82.00 225,000.00 62,935.24 287,935.24 23,610,689.27
NYY-rm 0.6/1kV 4Cx10 mm2 dari Panel DB ke lampu PJU m' 443.00 111,000.00 62,935.24 173,935.24 77,053,309.11
2
NYY-rm 0.6/1kV 3Cx10 mm dari Panel DB ke Lampu Sorot m' 91.00 85,000.00 62,935.24 147,935.24 13,462,106.39
NYM 3Cx1.5 mm2 dalam tiang PJU m' 102.00 6,574.00 1,500.00 8,074.00 823,548.00
7 Lampu PJU satu ornamen lengkap dengan : set 4.00 7,502,743.86 428,315.25 7,931,059.11 31,724,236.46
8 Lampu PJU dua ornamen lengkap dengan : unit 8.00 11,604,643.86 428,315.25 12,032,959.11 96,263,672.91
Page 6 of 454
HARGA SATUAN (Rp)
No. PEKERJAAN SAT VOL HARGA JADI JUMLAH
BAHAN UPAH
9 Lampu sorot lengkap dengan : set 4.00 8,808,333.86 428,315.25 9,236,649.11 36,946,596.46
10 Relokasi 3 Lampu PJU satu ornamen : set 3.00 1,853,044.86 856,630.50 2,709,675.36 8,129,026.09
PEMBULATAN 7,556,235,000.00
Page 7 of 454
ANALISA HARGA SATUAN
PEKERJAAN ARSITEKTUR
AA PEKERJAAN ATAP
AD PEKERJAAN DINDING
AB PEKERJAAN BUKAAN
a AB.1 Pemasangan 1 m2 pintu kaca rangka alluminium
Referensi: Permen PU No.11/PRT/M/2013 hal.424
Bahan
Frame daun pintu
Kaca Rayben Warna 5 mm ( Blue,Bronze,Green,Grey)
Sealent
Tenaga kerja
Pekerja
Tukang Besi
Kepala Tukang besi
Mandor
AP.3 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Multiplek 4' x 8' tbl 9mm
Paku kecil / triplek
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AL.6 Glassblock
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Glassblock
Semen PC
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
AE PEKERJAAN EKSTERNAL
AD.1 Memasang dinding Batu bata api ( Fire brick SK 34 -Std 65)
Referensi:
Bahan
Fire Brick SK 34 -Std 65 (230x114x65) mm
Mortar SM -34
Tenaga kerja
Pekerja
Tukang Bata api
Mandor
AD.1 Memasang dinding Batu bata api Y0 ( Fire brick SK 34 -Std 65)
Referensi:
Bahan
Fire Brick SK 34 -Std 65 Y0 (230x114x65-61) mm
Mortar SM -34
Tenaga kerja
Pekerja
Tukang Bata api
Mandor
Material
Tanah merah ( Tanah humus )
Tenaga kerja
Pekerja
Mandor
Material
Pupuk kandang
Pohon glodokan tiang
Tenaga kerja
Pekerja
Mandor
Harga Satuan Pekerjaan dan Jasa
Peralatan
DUMP TRUCK 3-4 M³ / 5 TON
Chainsaw
Tenaga kerja
Pekerja
Mandor
a ALE.5 Pasang Pagar + Tiang pagar pipa dia. 2" hot-dipped galvanize t. 1,9 m
Refrensi :
Material
Panel pagar BRC T.190X240
Tiang pagar pipa dia. 2" hot-dipped galvanize t. 190 + Tutup
Clip
Mob demob
Pasir Beton
Koral beton
Tenaga kerja
Pekerja
Tukang batu
Kepala tukang batu
Mandor
M2 - 88,601.26 88,601.26
m2 2.2000 - -
Kg 0.2500 - -
M3 0.063 - -
5 kg 0.0158 36,800.00 581.44
Lembar 1.5000 - -
Kg 0.0500 28,000.00 1,400.00
m’ 3.6000 - -
Kg 0.1500 26,000.00 3,900.00
Buah 1.0500 - -
Lembar 0.7500 - -
M2 - 59,354.55 59,354.55
m2 1.0500 - -
Kg 0.3500 - -
M2 - 41,826.21 41,826.21
m2 1.0500 - -
Kg 0.3500 - -
m2 1.0500 - -
Kg 0.6000 135,000.00 81,000.00
lbr 0.4200 -
btg 0.4200 138,000.00 57,960.00
bh 4.2000 800.00 3,360.00
ls 1.0000 4,200.00 4,200.00
m3 0.0050 261,000.00 1,305.00
m3 0.0090 220,000.00 1,980.00
245000
harga pasar
harga DKI
1 kg = 1000 bh
6m = 8,95 kg
ST.13 Timbunan tanah M3 277,200.00 80,949.66 358,149.66
Referensi : Permen PU No 11/PRT/M/2013 - Hal.82 - T.14
Material
Tanah Merah / Tanah urug M3 1.2000 210,000.00 252,000.00
Tenaga kerja
Pekerja OH 0.3300 135,500.00 44,715.00
Mandor OH 0.0330 183,200.00 6,045.60
Peralatan
Buldozer 425 Hp jam 0.0500 425,000.00 21,250.00
Vibro jam 0.0050 316,000.00 1,580.00
Jumlah / M3 252,000.00 73,590.60 325,590.60
Harga Satuan Pekerjaan dan Jasa 10% 277,200.00 80,949.66 358,149.66
Material
Sirtu m3 1.2000 223,000.00 267,600.00
Tenaga kerja
Pekerja Oh 0.4000 135,500.00 54,200.00
Mandor Oh 0.0400 183,200.00 7,328.00
Jumlah / M3 267,600.00 61,528.00 329,128.00
Harga Satuan Pekerjaan dan Jasa 10% 294,360.00 67,680.80 362,040.80
ANALISA HARGA SATUAN
PEKERJAAN ARSITEKTUR
NO.
URAIAN PEKERJAAN
AA PEKERJAAN ATAP
AA.1 Pekerjaan Atap Zincalum t.05
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Zincalume t.0.5
Skrup Zincalume
Tenaga kerja
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Tenaga kerja
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
AD PEKERJAAN DINDING
AD.1 Memasang Batu bata ukuran (5 x 11 x 22) cm t. ½ bata
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Batu bata
Semen PC
Pasir pasang
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
AD.2 Memasang dinding Batu bataukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 Semen PC : 4 Pa
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Batu bata
Semen PC
Pasir pasang
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
AD.4 Memasang dinding HB/CB 10, campuran spesi 1 Semen PC : 4 Pasir pasang
Referensi: Permen PU No.11/PRT/M/2013
Bahan
HB 10
Semen PC
Pasir pasang
Besi angku
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
AD.5 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 Semen PC : 3 Pas
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Rooster bata merah uk 120x115x240 mm
Semen PC
Pasir pasang
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
AD.6 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 Semen PC : 4 Pas
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Rooster bata merah uk 120x115x240 mm
Semen PC
Pasir pasang
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga kerja
Pekerja
Tukang cat
Kepala Tukang Cat
Mandor
AB PEKERJAAN BUKAAN
AB.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Balok Uk 5x10x400 cm
Paku Uk 10 cm
Lem kayu
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.2 Membuat dan memasang daun pintu panel, kayu kelas I atau II
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Papan Uk 3x20x400 cm
Lem kayu
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.3 Membuat dan memasang pintu dan jendela kaca, kayu kelas I atau II
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Papan Uk 3x20x400 cm
Lem kayu
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.4 Membuat dan memasang pintu dan jendela jalusi kayu kelas I atau II
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Papan Uk 3x20x400 cm
Lem kayu
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.5 Pasang pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar 90 cm)
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Kusen aluminium
Papan Uk 3x20x400 cm
Paku Uk 2 cm
Lem kayu
Plywood Sungkai uk 4'x8'x18 mm 1 muka
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.5 Pintu utama P1 double swing kaca rangka aluminium + jendela kaca rangka aluminium (incl. Doo
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Kusen alumunium 4"
Pintu kaca
Jendela ka
Lock case BDN Swing/Pull
Double Cylinder
Lefer handle
Engsel 4"
Door closer
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.5 Pintu P2 & kusen besi single swing finish zinchromate & marine paint + kaca rangka alumini
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Pintu & kusen besi single
Jendela kaca rangka aluminum
Lock case BDN Swing/Pull
Double Cylinder
Lefer handle
Engsel 4"
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.5 Pintu & kusen besi double swing finish zinchromate & marine paint
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Pintu & kusen besi double
Lock case BDN Swing/Pull
Lefer handle
Engsel 4"
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AB.5 Jendela J1 kaca rangka aluminium uk.505x270 cm
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Jendela kaca rangka aluminum
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AP.3 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Multiplek 4' x 8' tbl 9mm
Paku kecil / triplek
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AP.4 Memasang langit-langit gypsum board
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Gypsum board 4"x 8" tbl 9mm Ex Jaya Board
Paku kecil / triplek
Rangka plafond besi hallaw
Compound Gypsum
Tenaga kerja
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
AL PEKERJAAN LANTAI
AL.1 Pekerjaan lantai HT ukuran (60 x 60) cm
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Keramik Uk 60x60 cm
Semen PC
Pasir pasang
Semen warna
Tenaga kerja
Pekerja
Tukang Batu
Kepala Tukang batu
Mandor
AE PEKERJAAN EKSTERNAL
AD.1 Memasang dinding Batu bata api ( Fire brick SK 34 -Std 65)
Referensi:
Bahan
Fire Brick SK 34 -Std 65 (230x114x65) mm
Mortar SM -34
Tenaga kerja
Pekerja
Tukang Bata api
Mandor
AD.1 Memasang dinding Batu bata api Y0 ( Fire brick SK 34 -Std 65)
Referensi:
Bahan
Fire Brick SK 34 -Std 65 Y0 (230x114x65-61) mm
Mortar SM -34
Tenaga kerja
Pekerja
Tukang Bata api
Mandor
SAT.
PEKERJAAN
Zincalume t.0.5 m2
Skrup Zincalume bh
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
AN DINDING
Memasang Batu bata ukuran (5 x 11 x 22) cm t. ½ bata M2
: Permen PU No.11/PRT/M/2013
Buah
Semen PC Kg
Pasir pasang m3
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
sang dinding Batu bataukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 Semen PC : 4 Pasir pasang M2
: Permen PU No.11/PRT/M/2013
Buah
Semen PC Kg
Pasir pasang m3
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Sandwich panel m2
ls
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Sandwich panel m2
ls
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Buah
Semen PC Kg
Pasir pasang m3
φ =8 mm Kg
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
asang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 Semen PC : 3 Pasir pasang M2
: Permen PU No.11/PRT/M/2013
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Harga Satuan Pekerjaan dan Jasa
asang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 Semen PC : 4 Pasir pasang M2
: Permen PU No.11/PRT/M/2013
OH
Tukang Batu OH
Kepala Tukang OH
OH
Papan Uk 3x20x400 cm m3
Paku Uk 5 cm Kg
8 mm Kg
Kawat beton Kg
Semen PC Kg
Pasir Beton m3
2/3 cm m3
OH
Tukang Batu OH
Tukang Kayu OH
Tukang Besi OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Harga Satuan Pekerjaan dan Jasa
Semen PC Kg
Pasir pasang m3
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Semen PC Kg
Pasir pasang m3
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
Semen PC Kg
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Cat OH
Kepala Tukang Cat OH
OH
Plamir tembok Kg
Cat Pentalite Dulux ICI warna standar ( Interior) Kg
OH
Tukang Cat OH
Kepala Tukang Cat OH
OH
Wall sealer kg
kg
OH
Tukang cat OH
Kepala Tukang Cat OH
OH
AN BUKAAN
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III M3
: Permen PU No.11/PRT/M/2013
Balok Uk 5x10x400 cm m3
Paku Uk 10 cm Kg
Kg
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Papan Uk 3x20x400 cm m3
Kg
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Membuat dan memasang pintu dan jendela kaca, kayu kelas I atau II M2
: Permen PU No.11/PRT/M/2013
Papan Uk 3x20x400 cm m3
Kg
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Membuat dan memasang pintu dan jendela jalusi kayu kelas I atau II M2
: Permen PU No.11/PRT/M/2013
Papan Uk 3x20x400 cm m3
Kg
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Pasang pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar 90 cm) M2
: Permen PU No.11/PRT/M/2013
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
u utama P1 double swing kaca rangka aluminium + jendela kaca rangka aluminium (incl. Door closer) unit
: Permen PU No.11/PRT/M/2013
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Pintu P2 & kusen besi single swing finish zinchromate & marine paint + kaca rangka aluminium unit
: Permen PU No.11/PRT/M/2013
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Pintu & kusen besi double swing finish zinchromate & marine paint unit
: Permen PU No.11/PRT/M/2013
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Harga Satuan Pekerjaan dan Jasa
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Harga Satuan Pekerjaan dan Jasa
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Glassblock bh
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Papan Uk 3x20x400 cm m3
Paku Uk 2 cm Kg
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Rolling Door M2
Chain Block Bh
OH
Tukang Besi OH
Kepala Tukang OH
OH
Rolling Door M2
Chain Block Bh
OH
Tukang Besi OH
Kepala Tukang OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Gypsum waterproof board 4"x 8" tbl 9mm Ex Jaya Board Lembar
Paku kecil / triplek Kg
Rangka plafond besi hallaw m2
Compound Gypsum Kg
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
OH
Tukang Kayu OH
Kepala Tukang OH
OH
OH
Tukang Besi OH
Kepala Tukang Besi OH
OH
OH
Tukang Kayu OH
Kepala Tukang kayu OH
OH
Keramik Uk 60x60 cm m2
Semen PC Kg
Pasir pasang m3
Semen warna Kg
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
Buah
Semen PC Kg
Pasir pasang m3
Semen warna Kg
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
Keramik Uk 25x25 cm M2
Semen PC Kg
Pasir pasang m3
Semen warna Kg
OH
Tukang Batu OH
Kepala Tukang OH
OH
Keramik Uk 30x30 cm M2
Semen PC Kg
Pasir pasang m3
Semen warna Kg
OH
Tukang Batu OH
Kepala Tukang OH
OH
Keramik Uk 40x40 cm M2
Semen PC Kg
Pasir pasang m3
Semen warna Kg
OH
Tukang Batu OH
Kepala Tukang OH
OH
Keramik Uk 40x40 cm M2
Semen PC Kg
Pasir pasang m3
Semen warna Kg
OH
Tukang Batu OH
Kepala Tukang OH
OH
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
Harga Satuan Pekerjaan dan Jasa
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
Under layer m2
Kg
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
m2
Kg
OH
Tukang Batu OH
Kepala Tukang batu OH
OH
OH
Tukang Batu OH
Kepala Tukang OH
OH
OH
OH
OH
Kepala Tukang OH
OH
OH
OH
Kepala Tukang OH
OH
OH
OH
Kepala Tukang OH
OH
waterproofing membrane m2
OH
OH
Kepala Tukang OH
OH
OH
Tukang Bata api OH
OH
OH
Tukang Bata api OH
OH
OH
Tukang Bata api OH
OH
OH
Tukang Bata api OH
OH
OH
Tukang besi OH
OH
OH
Tukang besi OH
OH
OH
Tukang besi OH
OH
Upah Pekerja ls
Upah Pekerja ls
n Pondasi Rolagh M3
Bata Ringan t.10cm m3
Perekat bata Ringan ( MU 380 ) zak
φ =8 mm Kg
OH
Tukang Batu OH
Kepala Tukang Batu OH
OH
245000
1.0300 163,900.00 168,817.00
8.0000 3,600.00 28,800.00
245000
1.0300 55,000.00 56,650.00
245000
20.0000 90,562.50 1,811,250.00
11.0000 148,500.00 1,633,500.00
245000
1.0000 98,500.00 98,500.00
245000
1.0000 68,500.00 68,500.00
245000
10.0000 34,125.00 341,250.00
245000
70.0000 641.90 44,932.76
14.3700 1,365.00 19,615.05
0.0400 255,712.80 10,228.51
12.5000 -
12.1300 1,365.00 16,557.45
0.3880 255,712.80 99,216.57
0.2800 12,935.06 3,621.82
57,200,000.00 - 57,200,000.00
M PEKERJAAN MEKANIKAL
M.1 Pemasangan 1 unit closet duduk M2
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 547
Material
1 Closet duduk Unit 1.0000
1 Perlengkapan (6 % material) Ls 1.0000
Tenaga kerja
Pekerja Oh 3.3000
Tukang batu Oh 1.1000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0100
Mandor Oh 0.1600
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Closet Jongkok porselen Unit 1.0000
Semen PC Kg 6.0000
Pasir pasang M3 0.1000
Tenaga kerja
Pekerja Oh 1.0000
Tukang batu Oh 1.5000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.1500
Mandor Oh 0.1600
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Closet jongkok teraso Unit 1.0000
Semen PC Kg 6.0000
Pasir pasang M3 0.0100
Batu bata Buah 7.0000
Tenaga kerja
Pekerja Oh 1.0000
Tukang batu Oh 1.5000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.1500
Mandor Oh 0.0500
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Urinoir Unit 1.0000
Semen PC Kg 6.0000
Pasir pasang M3 0.0100
Perlengkapan (30 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 1.0000
Tukang batu Oh 1.0000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.1000
Mandor Oh 0.0500
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Wastafel Unit 1.2000
Semen PC Kg 6.0000
Pasir pasang M3 0.0100
Perlengkapan (12 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 1.2000
Tukang batu Oh 1.4500
Kepala Tukang Pasang Pipa /Ledeng Oh 0.1500
Mandor Oh 0.0600
Jumlah /
Harga Satuan Pekerjaan dan Jasa
M.6 Pemasangan 1 unit Floor drain M2
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 554
1 Material
Floor drain Unit 1.0000
Tenaga kerja
Pekerja Oh 0.0100
Tukang batu Oh 0.1000
Kepala Tukang batu Oh 0.0100
Mandor Oh 0.0050
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa Galvanish 1/2" Unit 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0540
Tukang batu Oh 0.0900
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0090
Mandor Oh 0.0270
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Kran air Unit 1.0000
1 Seal tape buah 0.0250
Tenaga kerja
Pekerja Oh 0.0100
Tukang batu Oh 0.4000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0400
Mandor Oh 0.0050
Jumlah /
Harga Satuan Pekerjaan dan Jasa
M.8 Pemasangan fixed shower dia 1/2" dan 3/4" bh
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 556
Material
Fixed shower Unit 1.0000
Seal tape buah 0.1500
Tenaga kerja
Pekerja Oh 0.0100
Tukang batu Oh 0.4000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0400
Mandor Oh 0.0050
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa Galvanish 3/4" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0540
Tukang batu Oh 0.0900
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0090
Mandor Oh 0.0270
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa Galvanish 1" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0540
Tukang batu Oh 0.0900
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0090
Mandor Oh 0.0270
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa Galvanish 1 1/2" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.1080
Tukang batu Oh 0.1800
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0180
Mandor Oh 0.0050
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa Galvanish 3" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.1350
Tukang batu Oh 0.2250
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0230
Mandor Oh 0.0070
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa Galvanish 4" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.1350
Tukang batu Oh 0.2250
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0230
Mandor Oh 0.0070
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 1/2" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0360
Tukang batu Oh 0.0600
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0060
Mandor Oh 0.0020
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 3/4" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0360
Tukang batu Oh 0.0600
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0060
Mandor Oh 0.0020
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 1" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0360
Tukang batu Oh 0.0600
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0060
Mandor Oh 0.0020
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 1" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0540
Tukang batu Oh 0.0900
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0090
Mandor Oh 0.0030
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 2" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0540
Tukang batu Oh 0.0900
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0090
Mandor Oh 0.0030
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 2 1/2" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0810
Tukang batu Oh 0.1350
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0135
Mandor Oh 0.0040
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 3" M' 1.2000
1 Perlengkapan (35 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0810
Tukang batu Oh 0.1350
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0135
Mandor Oh 0.0040
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Pipa PVC tipe AW Ø 4" M' 1.2000
1 Perlengkapan (35 % material) ls
Tenaga kerja
Pekerja Oh 0.0810
Tukang batu Oh
Kepala Tukang Pasang Pipa /Ledeng Oh
Mandor Oh 0.0040
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
M.22 Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm" (tanpa pipa) M'
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 563
Material
1 Pipa air limbah jenis pipa tanah Ǿ 20 cm" M' 1.6000
Semen PC Kg 35.0000
Pasir pasang M3 0.0140
Pasir urug M3 0.0140
Tenaga kerja
Pekerja Oh 0.0800
Tukang batu Oh 0.1350
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0135
Mandor Oh 0.0040
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
M.23 Pemasangan pipa air limbah jenis pipa tanah Ǿ 15 cm" (tanpa pipa) M'
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 564
Material
1 Pipa air limbah jenis pipa tanah Ǿ 15 cm" M' 0.0600
Semen PC Kg 30.0000
Pasir pasang M3 0.0030
Pasir urug M3 0.0030
Tenaga kerja
Pekerja Oh 0.0810
Tukang batu Oh 0.0400
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0040
Mandor Oh 0.0040
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Pipa beton diameter 15-20 cm M' 1.1000
Batu bata Buah 0.0270
Semen PC Kg 3.9200
Pasir pasang M3 0.0560
Pasir urug M3 0.0240
Tenaga kerja
Pekerja Oh 0.1400
Tukang batu Oh 0.0700
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0070
Mandor Oh 0.0070
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Buis beton bulat dia. 100 cm tanpa tulang m 2.0000
Batu bata Buah 0.5500
Semen PC Kg 10.3000
Pasir pasang M3 0.0610
Pasir urug M3 0.0690
Tenaga kerja
Pekerja Oh 0.3800
Tukang batu Oh 0.1900
Kepala Tukang batu Oh 0.0190
Mandor Oh 0.0190
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
Buis beton 1/2 bulat dia. 30 cm tanpa tulang m 1.0000
Batu bata Buah 0.5500
Semen PC Kg 10.3000
Pasir pasang M3 0.0610
Pasir urug M3 0.0690
Tenaga kerja
Pekerja Oh 0.3800
Tukang batu Oh 0.1900
Kepala Tukang batu Oh 0.0190
Mandor Oh 0.0190
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Bak cuci piring M' 1.0000
1 waterdrain Buah 1.0000
Tenaga kerja
Pekerja Oh 0.0300
Tukang batu Oh 0.3000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0300
Mandor Oh 0.0150
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 Bak cuci piring Unit 1.0000
1 waterdrain Buah 1.0000
Semen PC Kg 20.0000
Pasir pasang M3 0.0500
Tenaga kerja
Pekerja Oh 0.0500
Tukang batu Oh 0.5000
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0500
Mandor Oh 0.0250
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Material
1 bathcuip Unit 1.0000
1 Perlengkapan (20 % material) ls 1.0000
Tenaga kerja
Pekerja Oh 0.0750
Tukang batu Oh 0.7500
Kepala Tukang Pasang Pipa /Ledeng Oh 0.0750
Mandor Oh 0.0375
Peralatan
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Jumlah /
Harga Satuan Pekerjaan dan Jasa
E PEKERJAAN ELEKTRIKAL
E.1 Pasang Instalasi Site Office ls
Material
Kabel Listrik NYY 4 x 6 mm2 m 35.00
Sepatu Kabel 6 mm2 set 16.00
Telephone set Set 1.00
1 Kabel Listrik ITC 1 x 2 x 1,5 mm rol 0.25
Saklar Dinding Telepon Set 1.00
1 Accessories ( 30 % material ) ls 1.00
Tenaga kerja
Mandor Oh 0.0675
Instalator Oh 2.0000
Pekerja Oh 4.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Tenaga Ahli Muda Oh 1.0000
Instalator Oh 2.0000
Pekerja Oh 4.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Tenaga Ahli Muda Oh 1.0000
Instalator Oh 1.0000
Pekerja Oh 2.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
E.4 Pemasangan Socket 3ph4w 32A dan Socket 1ph3w Reefer termasuk p
Material
Power Outlet 3ph4w 32A IP67 bh 4.00
Power Plug 3ph4w 32A IP67 bh 4.00
Power Outlet 1ph3w 10 A bh 4.00
Power Plug 1ph3w 10A IP67 bh 4.00
MCB 3P 32A 6kA bh 4.00
MCB 1P 16A 6kA bh 4.00
Box SUS304 IP66 bh 4.00
Isolator Switch 125A bh 1.00
Accessories % 10.00
Tenaga kerja
Mandor Oh 4.0000
Instalator Oh 8.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.2000
Instalator Oh 2.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0250
Instalator Oh 0.2500
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.4000
Instalator Oh 4.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 1.0000
Instalator Oh 1.0000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0333
Pekerja Oh 0.3333
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0500
Pekerja Oh 0.5000
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
E.6 Penarikan Kabel Sub-Distribusi NYY 3 x 2.5 mm2 M
Material
Kabel Listrik NYY 3 x 2.5 mm2 m 120.0
Sepatu kabel 4 mm2 unit 48.0
Kabel Ties 10 cm set 6.0000
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0250
Tukang Oh 0.2500
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh 0.0675
Tukang Oh 0.6750
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Tenaga Ahli Muda orang 1.0
Teknisi Mandor 10.0
Pekerja Pekerja 12.0
Jumlah /
Harga Satuan Pekerjaan dan Jasa
Jumlah /
Harga Satuan Pekerjaan dan Jasa
HARSAT BAHAN UPAH JUMLAH
KETERANGAN Koef Keuntungan
(Rp) (Rp) (Rp) (Rp)
3,150,000.00 3,150,000.00
189,000.00 189,000.00
135,500.00 447,150.00
155,800.00 171,380.00
155,700.00 1,557.00
183,200.00 29,312.00
335,000.00 335,000.00
2,000.00 12,000.00
226,000.00 22,600.00
135,500.00 135,500.00
155,800.00 233,700.00
155,700.00 23,355.00
183,200.00 29,312.00
598,000.00 598,000.00
2,000.00 12,000.00
226,000.00 2,260.00
850.00 5,950.00
135,500.00 135,500.00
155,800.00 233,700.00
155,700.00 23,355.00
183,200.00 9,160.00
590,600.00 590,600.00
2,000.00 12,000.00
226,000.00 2,260.00
177,180.00 177,180.00
135,500.00 135,500.00
155,800.00 155,800.00
155,700.00 15,570.00
183,200.00 9,160.00
1,284,000.00 1,540,800.00
2,000.00 12,000.00
226,000.00 2,260.00
184,896.00 184,896.00
135,500.00 162,600.00
155,800.00 225,910.00
155,700.00 23,355.00
183,200.00 10,992.00
84,500.00 84,500.00
135,500.00 1,355.00
155,800.00 15,580.00
164,052.00 1,640.52
183,200.00 916.00
26,666.67 32,000.00
11,200.00 11,200.00
135,500.00 7,317.00
155,800.00 14,022.00
155,700.00 1,401.30
183,200.00 4,946.40
58,500.00 58,500.00
7,400.00 185.00
135,500.00 1,355.00
155,800.00 62,320.00
155,700.00 6,228.00
183,200.00 916.00
783,912.00 783,912.00
7,400.00 1,110.00
135,500.00 1,355.00
155,800.00 62,320.00
155,700.00 6,228.00
183,200.00 916.00
34,166.67 41,000.00
14,350.00 14,350.00
135,500.00 7,317.00
155,800.00 14,022.00
155,700.00 1,401.30
183,200.00 4,946.40
50,833.33 61,000.00
21,350.00 21,350.00
135,500.00 7,317.00
155,800.00 14,022.00
155,700.00 1,401.30
183,200.00 4,946.40
M' 82,350.00 27,686.70 110,036.70
10% 90,585.00 30,455.37 121,040.37
76,666.67 92,000.00
32,200.00 32,200.00
135,500.00 14,634.00
155,800.00 28,044.00
155,700.00 2,802.60
183,200.00 916.00
172,500.00 207,000.00
72,450.00 72,450.00
135,500.00 18,292.50
155,800.00 35,055.00
155,700.00 3,581.10
183,200.00 1,282.40
245,833.33 295,000.00
103,250.00 103,250.00
135,500.00 18,292.50
155,800.00 35,055.00
155,700.00 3,581.10
183,200.00 1,282.40
M' 398,250.00 58,211.00 456,461.00
10% 438,075.00 64,032.10 502,107.10
9,575.00 11,490.00
4,021.50 4,021.50
135,500.00 4,878.00
155,800.00 9,348.00
155,700.00 934.20
183,200.00 366.40
11,500.00 13,800.00
4,830.00 4,830.00
135,500.00 4,878.00
155,800.00 9,348.00
155,700.00 934.20
183,200.00 366.40
16,725.00 20,070.00
7,024.50 7,024.50
135,500.00 4,878.00
155,800.00 9,348.00
155,700.00 934.20
183,200.00 366.40
M' 27,094.50 15,526.60 42,621.10
10% 29,803.95 17,079.26 46,883.21
16,725.00 20,070.00
7,024.50 7,024.50
135,500.00 7,317.00
155,800.00 14,022.00
155,700.00 1,401.30
183,200.00 549.60
41,625.00 49,950.00
17,482.50 17,482.50
135,500.00 7,317.00
155,800.00 14,022.00
155,700.00 1,401.30
183,200.00 549.60
53,550.00 64,260.00
22,491.00 22,491.00
135,500.00 10,975.50
155,800.00 21,033.00
155,700.00 2,101.95
183,200.00 732.80
M' 86,751.00 34,843.25 121,594.25
10% 95,426.10 38,327.58 133,753.68
85,325.00 102,390.00
35,836.50 35,836.50
135,500.00 10,975.50
155,800.00 21,033.00
155,700.00 2,101.95
183,200.00 732.80
131,875.00 158,250.00
55,387.50 -
-
135,500.00 10,975.50
155,800.00 -
155,700.00 -
183,200.00 732.80
- -
2,000.00 70,000.00
226,000.00 3,164.00
232,000.00 3,248.00
135,500.00 10,840.00
155,800.00 21,033.00
155,700.00 2,101.95
183,200.00 732.80
- -
2,000.00 60,000.00
226,000.00 678.00
232,000.00 696.00
135,500.00 10,975.50
155,800.00 6,232.00
155,700.00 622.80
183,200.00 732.80
- -
850.00 22.95
2,000.00 7,840.00
226,000.00 12,656.00
232,000.00 5,568.00
135,500.00 18,970.00
155,800.00 10,906.00
155,700.00 1,089.90
183,200.00 1,282.40
135,500.00 51,490.00
155,800.00 29,602.00
164,052.00 3,116.99
183,200.00 3,480.80
165,000.00 165,000.00
700.00 385.00
2,000.00 20,600.00
226,000.00 13,786.00
232,000.00 16,008.00
135,500.00 51,490.00
155,800.00 29,602.00
164,052.00 3,116.99
183,200.00 3,480.80
- -
84,500.00 84,500.00
135,500.00 4,065.00
155,800.00 46,740.00
155,700.00 4,671.00
183,200.00 2,748.00
- -
84,500.00 84,500.00
2,000.00 40,000.00
226,000.00 11,300.00
135,500.00 6,775.00
155,800.00 77,900.00
155,700.00 7,785.00
183,200.00 4,580.00
- 160,116.00 160,116.00
- -
- -
135,500.00 10,162.50
155,800.00 116,850.00
155,700.00 11,677.50
183,200.00 6,870.00
bh - 145,560.00 145,560.00
10% - 160,116.00 160,116.00
- 1,408,291.50 1,408,291.50
- -
- -
135,500.00 406,500.00
155,800.00 701,100.00
155,700.00 7,785.00
183,200.00 164,880.00
M3 - 1,280,265.00 1,280,265.00
10% - 1,408,291.50 1,408,291.50
79,200.00 2,772,000.00
3,000.00 48,000.00
300,000.00 300,000.00
168,792.00 42,198.00
60,000.00 60,000.00
966,659.40 966,659.40
183,200.00 12,366.00
170,600.00 341,200.00
135,500.00 542,000.00
15,383,500.00 15,383,500.00
475,000.00 475,000.00
65,450.00 1,636,250.00
633,375.00 158,343.75
70,000.00 70,000.00
125,000.00 125,000.00
600,000.00 600,000.00
123,500.00 123,500.00
170,600.00 341,200.00
135,500.00 542,000.00
9,873,000.00 9,873,000.00
475,000.00 475,000.00
65,450.00 1,636,250.00
633,375.00 633,375.00
125,000.00 125,000.00
600,000.00 600,000.00
926,250.00 926,250.00
170,600.00 170,600.00
135,500.00 271,000.00
430,650.00 1,722,600.00
317,900.00 1,271,600.00
285,450.00 1,141,800.00
201,850.00 807,400.00
475,200.00 1,900,800.00
95,000.00 380,000.00
2,500,000.00 10,000,000.00
1,457,000.00 1,457,000.00
17,224,200.00 1,722,420.00
183,200.00 732,800.00
170,600.00 1,364,800.00
475,000.00 475,000.00
125,000.00 125,000.00
65,450.00 1,178,100.00
70,000.00 840,000.00
183,200.00 36,640.00
170,600.00 341,200.00
72,916.67 72,916.67
19,500.00 19,500.00
183,200.00 4,580.00
170,600.00 42,650.00
155,000.00 2,325,000.00
65,000.00 455,000.00
30,000.00 360,000.00
183,200.00 73,280.00
170,600.00 682,400.00
4,850,000.00 4,850,000.00
250,000.00 250,000.00
183,200.00 183,200.00
170,600.00 170,600.00
unit 5,100,000.00 353,800.00 5,453,800.00
10% 5,610,000.00 389,180.00 5,999,180.00
75,000.00 15,000.00
850.00 3,541.67
232,000.00 18,560.00
3,500.00 3,500.00
183,200.00 6,106.67
135,500.00 45,166.67
232,000.00 18,560.00
131,875.00 263,750.00
3,500.00 3,500.00
183,200.00 9,160.00
135,500.00 67,750.00
40,700.00 5,087,500.00
2,000.00 40,000.00
40,000.00 240,000.00
183,200.00 1,545,750.00
155,800.00 13,145,625.00
37,400.00 4,488,000.00
2,000.00 96,000.00
40,000.00 240,000.00
183,200.00 1,483,920.00
155,800.00 12,619,800.00
7,608.00 304,320.00
6,500.00 195,000.00
40,000.00 240,000.00
183,200.00 494,640.00
155,800.00 4,206,600.00
11,400.00 1,596,000.00
50,833.33 5,083,333.33
15,000.00 150,000.00
30,000.00 1,500,000.00
183,200.00 641,200.00
155,800.00 5,453,000.00
53,900.00 19,404,000.00
2,000.00 192,000.00
40,000.00 240,000.00
183,200.00 4,451,760.00
155,800.00 37,859,400.00
79,200.00 7,920,000.00
3,000.00 96,000.00
40,000.00 240,000.00
183,200.00 1,236,600.00
155,800.00 10,516,500.00
63,800.00 2,233,000.00
2,000.00 32,000.00
40,000.00 240,000.00
183,200.00 432,810.00
155,800.00 3,680,775.00
79,200.00 3,960,000.00
3,000.00 48,000.00
40,000.00 240,000.00
183,200.00 618,300.00
155,800.00 5,258,250.00
118,580.00 58,934,260.00
5,000.00 80,000.00
40,000.00 240,000.00
183,200.00 6,145,902.00
155,800.00 52,267,005.00
199,250.00 99,027,250.00
5,000.00 80,000.00
40,000.00 240,000.00
183,200.00 6,145,902.00
155,800.00 52,267,005.00
540,000.00 10,800,000.00
70,000.00 1,120,000.00
40,000.00 240,000.00
183,200.00 247,320.00
155,800.00 2,103,300.00
802,200.00 228,627,000.00
100,000.00 1,600,000.00
100,000.00 400,000.00
20,386.15 5,810,052.75
9,464.00 2,697,240.00
183,200.00 3,524,310.00
155,800.00 29,972,025.00
59,000,000.00 59,000,000.00
1,500,000.00 1,500,000.00
65,450.00 1,963,500.00
600,000.00 600,000.00
800,000.00 800,000.00
200,000.00 200,000.00
7,890,000.00 7,890,000.00
926,250.00 926,250.00
123,500.00 1,235,000.00
135,500.00 1,626,000.00
7,500,000.00 45,000,000.00
63,800.00 1,914,000.00
37,400.00 336,600.00
50,833.33 1,220,000.00
125,000.00 125,000.00
40,000.00 160,000.00
750,000.00 750,000.00
926,250.00 926,250.00
123,500.00 2,470,000.00
135,500.00 2,710,000.00
https://www.sejasa.com/blog/daftar-harga-kabel-listrik-terbaru/
https://www.sejasa.com/blog/daftar-harga-kabel-listrik-terbaru/
https://www.sejasa.com/blog/daftar-harga-kabel-listrik-terbaru/
https://www.sejasa.com/blog/daftar-harga-kabel-listrik-terbaru/
https://www.sejasa.com/blog/daftar-harga-kabel-listrik-terbaru/
https://www.sejasa.com/blog/daftar-harga-kabel-listrik-terbaru/
https://www.tokopedia.com/electrical7/kabel-ties-cable-tis-50cm-isi-100-pcs?$desktop_url=https://www.tokopedia.com/ele
Penarikan
http://www.http://wwwhttps://www.bukalapak.com/p/elektronik/walkie-talkie/1ubq2g-jual-tower-triangle-25x25cm-tinggi-2
https://www.https://www
http://teknokaryautama.web.indotrading.com/product/paket-penangkal-petir-p191611.aspx
https://wwwhttps://www.bukalapak.com/p/industrial/industrial-lainnya/kqvfnc-jual-box-grounding-inspection-pit
http://www.https://wwhttps://www.tokopedia.com/visiotekindo/ground-rod-copper-bonded-58-inch-3-meter
https://www.tokopedia.com/primajayaled8881/lampu-tembak-led-500-watt?ev_efid=CjwKCAiAl7PgBRBWEiwAzFhmmmFMiy
http://tungghttps://www.celebesteknik.com/p/box-panel-listrik.html
=https://www.tokopedia.com/electrical7/kabel-ties-cable-tis-50cm-isi-100-pcs&utm_source=PRICEZA&utm_medium=A7YBwu6v&utm_ca
l-tower-triangle-25x25cm-tinggi-24-meter
ngkal-petir-p191611.aspx
ounding-inspection-pit
ed-58-inch-3-meter
CAiAl7PgBRBWEiwAzFhmmmFMiyVxk5XwWhOBKxbvwQ6ShDs0OptCYbZLWA3bf9Nz9Oe0YMvzrBoCGj4QAvD_BwE:G:s&gclid=CjwKCAiAl7
um=A7YBwu6v&utm_campaign=marketplace_branchfeed_priceza&_branch_match_id=496508699511386924
E:G:s&gclid=CjwKCAiAl7PgBRBWEiwAzFhmmmFMiyVxk5XwWhOBKxbvwQ6ShDs0OptCYbZLWA3bf9Nz9Oe0YMvzrBoCGj4QAvD_BwE&gcls
BoCGj4QAvD_BwE&gclsrc=aw.ds&ef_id=WoObiwAAAH7kzy9A:20181210005411:s
ELV. RENCANA 3.775
Elevasi eksisting
Section Elevasi tanah rencana Kebutuhan tanah
El. Titik El. Rata-rata
2.576
2.538
1 2.768 3.465 0.697
2.579
3.380
2.602
2.430
2 2.856 3.465 0.610
3.424
2.966
2.590
2.636
3 2.851 3.465 0.614
2.610
3.567
2.616
3.350
4 2.849 3.465 0.616
2.732
2.697
2.617
3.005
5 3.043 3.465 0.422
3.400
3.151
2.568
3.000
6 3.006 3.465 0.459
3.435
3.022
3.118
3.584
7 3.360 3.465 0.106
3.136
3.600
2.870
3.467
8 3.195 3.465 0.270
2.999
8 3.195 3.465 0.270
3.445
3.568
2.682
9 3.094 3.465 0.371
3.415
2.710
3.029
3.392
10 3.134 3.465 0.331
2.736
3.379
3.553
3.184
11 3.243 3.465 0.222
2.752
3.482
3.667
3.036
12 3.167 3.465 0.298
2.682
3.283
2.916
3.486
13 3.206 3.465 0.259
2.915
3.506
2.817
3.625
14 3.158 3.465 0.308
2.769
3.419
3.283
2.792
15 3.004 3.465 0.461
2.976
2.965
2.695
2.827
16 2.746 3.465 0.719
2.679
2.782
3.024
3.265
17 3.021 3.465 0.444
2.956
2.838
3.076
3.242
18 3.043 3.465 0.422
3.316
2.538
0.4238
24788.176
Elevasi eksisting
Section
El. Titik El. Rata-rata
2.568 2.560
3.000 2.588
1 3.006
3.435 2.563
3.022
3.118 2.660
3.584 2.658
2 3.360
3.136 2.663
3.600
3.568 2.692
2.682 2.648
3 3.094
3.415 2.703
2.710
3.029
3.392
4 3.134
2.736
3.379
1 Jl.masuk 128.3
taman sebelah
3 44.6
A.03
taman sebelah
4 185.9
A.03
taman sebelah
4 185.9
A.03
taman area
5 287.2
olahraga
taman tempat
6 230.6
jogging
2.570 0.436
2.660 0.699
2.681 0.413
2.450 0.684
pengangkutan 1252.995
ngan tanah 646.475809166667
Elevasi eksisting
Section
El. Titik
0.556
2.568
3.000
1
1
3.435
3.022
0.910
3.118
3.584
2
3.029
3.392
0.644
3.136
3.600
3
3.553
3.184
0.684
2.870
3.467
4
0.698 2.667
3.036
pengangkutan 1252.995
ngan tanah 875.060383125
3.65
2.71325
Elevasi eksisting
Section
El. Titik El. Rata-rata
3.024
3.265
17 3.021
2.956
2.838
3.076
3.242
18 3.043
3.316
2.538
Tinggi Rencana Urugan
Elevasi eksisting
Elevasi setelah
Jml tanah
diambil
terangkut
El. Rata-rata
2.560
2.588
3.006 2.570 0.436
3.006 2.570 0.436
2.563
2.660
2.658
3.281 2.660 0.620
2.663
2.692
2.648
3.368 2.681 0.687
2.703
Elevasi eksisting
Elevasi tanah rencana Kebutuhan tanah Section
El. Titik
2.576
2.538
3.595 0.574 1
2.560
2.660
2.602
2.692
3.595 0.552 2
3.424
2.966
Rencana Urugan 0.5631 2.590
2.636
3
2.610
3.567
2.616
3.350
4
2.732
2.697
2.617
3.005
5
3.400
3.151
2.568
2.588
6
2.658
2.648
7 3.118
3.584
3.136
3.600
2.870
3.467
8 3.195
8 3.195
2.999
3.445
2.563
2.682
9 2.653
2.703
2.663
3.029
3.392
10 3.134
2.736
3.379
3.553
3.184
11 3.243
2.752
3.482
3.667
3.036
12
2.682
3.283
2.916
3.486
13
2.915
3.506
2.817
3.625
14
2.769
3.419
3.283
2.792
15
2.976
2.965
2.695
2.827
16
2.679
2.782
elevasi rencana 3.575
levasi eksisting
Elevasi tanah rencana Kebutuhan tanah
El. Rata-rata
3.265 0.070
3.265 0.070
3.265 0.612
3.265 0.131
3.265 0.022
7 Bongkar Kantin
7 Bongkar Parkir
7 Bongkar Kanopi
8 Bongkar Pintu
-
-
-
-
-
-
20,326,513
20,870,973 582
41,197,487 70,833
15,063,398 360
15,063,398 41,843
44,179,054
12,956,760
6,001,727
531,899
2,328,175
2,721,867 600
68,719,482 114,532
60,979,540
8,494,053
4,721,457
554,062
1,303,778
11,934,339 398
87,987,229 221,125
7,674,296
3,109,622
2,280,656
323,203
1,179,609
6,237,641 144
20,805,026 144,479
1,980,570
253,945
1,024,397
625,264 180
3,884,176 21,579
4,201,209
2,483,387
5,373,942 300
12,058,538
507,414
210,637
111,313
52,659
250,000
1,132,023
HARGA
NO Produk SATUAN
LOCO (DROP) UPAH
1 Teak coat Rp 12,000 Rp 12,000 Liter
2 Prime coat Rp 13,000 Rp 13,000 Liter
3 ATB Rp 1,045,000 Rp 1,245,000 Ton
4 AC - BC Rp 1,105,000 Rp 1,225,000 Ton
5 AC - WC Rp 1,095,000 Rp 1,345,000 Ton
6 HRS Rp 1,185,000 Rp 1,435,000 Ton
7 III Laston Rp 1,175,000 Rp 1,425,000 Ton
8 III Laston Special Rp 1,250,000 Rp 1,500,000 Ton
9 Shand sheet Rp 1,355,000 Rp 1,605,000 Ton
10 Mob & Demob Alat 10,000,000 s/d 12,000,000 LS
29,474 206,321
32,738 Rp 98,214
268,154 225,077
128,571 107,143
DAYA SEBAR / T 1 ton asphalt hotmix
(M2) = 1 ton/(2,4 ton/m³)
1 = 0,4167 m³
0.5 ≈ 0,42 m³ 14
107,142.86 35,714.29
7.8
159,615.38 31,923.08
43,077
21,429
≈ 2,6 ton/m³)
DAFTAR HARGA SATUAN
Keputusan Kepala Biro Prasarana dan Sarana Kota Setda Provinsi DKI Jakarta
No. 07 /2014 Periode Januari - Juni 2014
D. BAHAN BETON READY MIX (BETON JADI) - TIDAK TERMASUK POMPA BETON
Non Fly Ash
1 Beton Ready Mix BO slump 10 cm (+/- 2 cm) m3 653,000.00
2 Beton Ready Mix K 100 slump 10 cm (+/- 2 cm) m3 678,000.00
3 Beton Ready Mix K 125 slump 10 cm (+/- 2 cm) m3 688,000.00
4 Beton Ready Mix K 150 slump 10 cm (+/- 2 cm) m3 699,000.00
5 Beton Ready Mix K 175 slump 10 cm (+/- 2 cm) m3 719,000.00
6 Beton Ready Mix K 200 slump 10 cm (+/- 2 cm) m3 736,000.00
7 Beton Ready Mix K 225 slump 10 cm (+/- 2 cm) m3 750,000.00
8 Beton Ready Mix K 250 slump 10 cm (+/- 2 cm) m3 765,000.00
9 Beton Ready Mix K 275 slump 10 cm (+/- 2 cm) m3 782,000.00
10 Beton Ready Mix K 300 slump 10 cm (+/- 2 cm) m3 800,000.00
11 Beton Ready Mix K 350 slump 10 cm (+/- 2 cm) m3 812,000.00
12 Beton Ready Mix K 400 slump 10 cm (+/- 2 cm) m3 859,000.00
13 Beton Ready Mix K 450 slump 10 cm (+/- 2 cm) m3 891,000.00
14 Beton Decking B0 m3 663,000.00
Fly Ash
1 Beton Ready Mix BO slump 10 cm (+/- 2 cm) FA m3 625,000.00
2 Beton Ready Mix K 100 slump 10 cm (+/- 2 cm) FA m3 658,000.00
3 Beton Ready Mix K 125 slump 10 cm (+/- 2 cm) FA m3 668,000.00
4 Beton Ready Mix K 150 slump 10 cm (+/- 2 cm) FA m3 677,000.00
5 Beton Ready Mix K 175 slump 10 cm (+/- 2 cm) FA m3 695,000.00
6 Beton Ready Mix K 200 slump 10 cm (+/- 2 cm) FA m3 709,000.00
7 Beton Ready Mix K 225 slump 10 cm (+/- 2 cm) FA m3 722,000.00
8 Beton Ready Mix K 250 slump 10 cm (+/- 2 cm) FA m3 735,000.00
9 Beton Ready Mix K 275 slump 10 cm (+/- 2 cm) FA m3 749,000.00
10 Beton Ready Mix K 300 slump 10 cm (+/- 2 cm) FA m3 766,000.00
11 Beton Ready Mix K 350 slump 10 cm (+/- 2 cm) FA m3 775,000.00
12 Beton Ready Mix K 400 slump 10 cm (+/- 2 cm) FA m3 817,000.00
13 Beton Ready Mix K 450 slump 10 cm (+/- 2 cm) FA m3 846,000.00
E. WATER STOP
1 Waterstop lebar 150 mm m' 85,900.00
2 Waterstop lebar 200 mm m' 128,000.00
3 Waterstop lebar 230 mm - 320 mm m' 237,200.00
F. BESI & KAWAT
1 Besi beton Polos U24 Kg 11,600.00
2 Besi beton Ulir U 39 Kg 12,900.00
3 Wiremesh Kg 10,151.23
4 Dudukan Besi beton Kg -
5 Kawat beton Kg 26,000.00
6 Kawat Las Kg 26,500.00
7 Kawat duri m' 1,644.00
8 Kawat Harmonika m2 -
9 Kawat Saring pasir m2 22,300.00
10 Kawat Bronjong 3 mm Unit 363,000.00
11 Kawat Bronjong 4 mm Unit 449,000.00
12 Paku Uk 1 cm Kg 22,000.00
13 Paku Uk 2 cm Kg 22,000.00
14 Paku Uk 3 cm Kg 19,000.00
15 Paku Uk 5 cm Kg 17,200.00
16 Paku Uk 7 cm Kg 20,000.00
17 Paku Uk 10 cm Kg 20,000.00
18 Paku Uk 12 cm Kg 16,500.00
19 Paku Uk 15 cm Kg 16,500.00
20 Paku Kg 24,600.00
21 Paku kecil / triplek Kg 28,000.00
22 Paku beton bulat Kotak 35,000.00
23 Paku asbes Kg 40,000.00
24 Baja H Beam , WF Kg 9,929.69
25 Baja Siku Kg 10,000.00
26 Besi baja profil Kg 9,800.00
27 Baja Canal C ( Chanal ) Kg 8,943.09
28 Besi Plat strip Kg 10,611.00
29 Besi Plat Hitam Kg 15,000.00
30 Besi Plat Putih Kg 9,800.00
31 Besi Plat Bordes Kg 11,000.00
32 Besi Baja H Beam Kg 10,365.08
WIRE MESH : /LEMBAR UKURAN 2,1 X 5,4 M2
1 BESI WIRE MESH M-4 LBR 190,000.00
2 BESI WIRE MESH M-5 LBR 286,783.00
3 BESI WIRE MESH M-6 LBR 405,302.00
4 BESI WIRE MESH M-7 LBR 551,635.00
5 BESI WIRE MESH M-8 LBR 720,471.00
6 BESI WIRE MESH M-9 LBR 929,135.00
7 BESI WIRE MESH M-10 LBR 1,147,014.00
8 BESI WIRE MESH M-10 / m2 m2 101,147.62
9 BESI WIRE MESH M-12 LBR 1,670,566.00
10 BESI WIRE MESH M-12 / m2 m2 147,316.23
ANGKUR
1 Ø16 BH -
2 Ø19 BH -
3 Ø22 BH -
4 Besi angkur Kg -
5 TURN BUCKLE BH -
6 Baut Roofing kg 75,000.00
7 M16 A325 L - 7cm BH -
8 M19 A325 L - 7cm BH -
9 M12 A325 L - 7cm BH -
10 Floor Deck CBM 1000x4.3 cm x 0.75 m' 107,000.00
11 Floor Deck (blue transindoco) t=0.7mm m2 -
12 Grating SS m2 800,000.00
13 Angkur M-19 + 2 nuts-2 washer BH 65,000.00
14 Chemical Anchor liter 825,000.00
G. BAHAN CAT
1 Cat Pentalite Dulux ICI warna standar ( Interior) Kg 235,000.00
2 Cat Weatershild Dulux ICI warna standar ( Exterior) Kg 260,000.00
3 Cat Weatershild Dulux ICI warna khusus ( Exterior) Kg 249,000.00
4 Cat besi / kayu ICI Dulux Kg 55,000.00
5 Plamir tembok Kg 31,000.00
6 Plamir kayu Kg 36,000.00
7 Meni kayu Kg 29,000.00
8 Meni besi Kg 33,000.00
9 Zinkromate Kg -
10 Cat Warna : Kuda terbang Kg 14,000.00
11 Amplas Kayu / Besi Lbr 4,000.00
12 Dempul Kayu Kg 45,000.00
13 Spiritus Btl 15,700.00
14 Minyak Cat Terpentin Kg -
15 Cat Epoxy Kg -
16 Thiner high class Kg 27,000.00
17 Politur Kg 65,000.00
18 Brons Kg -
19 Lem kayu Kg 135,000.00
20 Lem kayu Kuning Aica Aibon Kg 24,500.00
21 Roll cat besar Bh 27,500.00
22 Roll catkecil Bh 20,000.00
23 Kwass 4" Bh 11,000.00
24 Kwass 3" Bh 9,000.00
25 Kwass 2" Bh 7,000.00
26 Soda api Kg -
27 Cat marka jalan ( Thermoplastik ) Kg 79,200.00
28 Cat Genteng Kg 157,000.00
29 Kapur Sirih Kg 10,000.00
H. BAHAN WATERPROOFING -
1 Waterproofing sheet Tb 4 mm, systim Torging m2 -
2 Waterproofing Anti Toxsin m2 -
3 Waterproofing systim Coating ( Cemen base ) m2 -
4 Integrated Waterproofing Ltr -
5 Waterproofing Aquaproof 20kg klg 825,000.00
6 Waterproofing Moonproof 1kg klg 37,500.00
7 Hydrocap Kg -
8 Supramur Kg -
9 Premier Kg -
10 Epoxy Resin Kg -
11 Resiner & Oil base Kg -
I. BAHAN KAYU
I.1. KAYU JATI KLAS II (JAWA TENGAH )
1 Balok Uk 6x15x100-140 cm m3 -
2 Balok Uk 6x15x150-190 cm m3 -
3 Balok Uk 6x15x1090-240 cm m3 -
4 Balok Uk 6x15x240-290 cm m3 -
5 Balok Uk 6x15x300-340 cm m3 -
6 Balok Uk 6x15x340-360 cm m3 -
7 Kaso uk 5x15x 0-90 cm m3 -
8 Reng uk 3-4 x8x100 - 190 cm m3 -
9 Papan Uk 2/3/4x20x100 - 190 cm m3 -
10 Papan Uk 2/3/4x20x200 - 290 cm m3 -
11 Papan Uk 2/3/4x20x300 - 390 cm m3 -
12 Papan Uk 2/3/4x25x300 - 390 cm m3 -
13 Papan Uk 2/3/4x30x300 - 390 cm m3 -
I.2.A KAYU KAMPER SAMARINDA - BASAH
1 Balok Uk 8x15x400 cm m3 13,672,000.00
2 Balok Uk 8x12x400 cm m3 -
3 Balok Uk 6x15x400 cm m3 -
4 Balok Uk 6x12x400 cm m3 -
5 Balok Uk 5x10x400 cm m3 -
6 Kaso Uk 4x6x400 cm m3 -
7 Kaso Uk 5x7x400 cm m3 -
8 Reng Uk 2x3x400 cm m3 -
9 Reng Uk 3x4x400 cm m3 -
10 Papan Uk 3x20x400 cm m3 15,912,000.00
11 Papan Uk 3x30x400 cm m3 -
12 Papan Uk 2x30x400 cm m3 -
I.2.B KAYU KAMPER SAMARINDA - OVEN
1 Balok Uk 8x15x400 cm m3 13,672,000.00
2 Balok Uk 8x12x400 cm m3 -
3 Balok Uk 6x15x400 cm m3 -
4 Balok Uk 6x12x400 cm m3 -
5 Balok Uk 5x10x400 cm m3 -
6 Kaso Uk 4x6x400 cm m3 -
7 Kaso Uk 5x7x400 cm m3 -
8 Reng Uk 2x3x400 cm m3 -
9 Reng Uk 3x4x400 cm m3 -
10 Papan Uk 3x20x400 cm m3 15,912,000.00
11 Papan Uk 3x30x400 cm m3 -
12 Papan Uk 2x30x400 cm m3 -
I.3.A KAYU KAMPER MEDAN / BANJAR / KRUING - BASAH
1 Balok Uk 8x15x400 cm m3 8,751,600.00
2 Balok Uk 8x12x400 cm m3 -
3 Balok Uk 6x15x400 cm m3 -
4 Balok Uk 6x12x400 cm m3 -
5 Balok Uk 5x10x400 cm m3 -
6 Kaso Uk 4x6x400 cm m3 -
7 Kaso Uk 5x7x400 cm m3 -
8 Reng Uk 2x3x400 cm m3 -
9 Reng Uk 3x4x400 cm m3 -
10 Papan Uk 3x20x400 cm m3 8,751,600.00
11 Papan Uk 3x30x400 cm m3 -
12 Papan Uk 2x30x400 cm m3 -
I.3.B. KAYU KAMPER MEDAN - OVEN
1 Balok Uk 8x15x400 cm m3 -
2 Balok Uk 8x12x400 cm m3 -
3 Balok Uk 6x15x400 cm m3 -
4 Balok Uk 6x12x400 cm m3 -
5 Balok Uk 5x10x400 cm m3 -
6 Kaso Uk 4x6x400 cm m3 -
7 Kaso Uk 5x7x400 cm m3 -
8 Reng Uk 2x3x400 cm m3 -
9 Reng Uk 3x4x400 cm m3 -
10 Papan Uk 3x20x400 cm m3 -
11 Papan Uk 3x30x400 cm m3 -
12 Papan Uk 2x30x400 cm m3 -
I.4.A KAYU RIMBA CAMPURAN ( KRC ) - BASAH
1 Balok Uk 8x15x400 cm m3 -
2 Balok Uk 8x12x400 cm m3 -
3 Balok Uk 6x15x400 cm m3 -
4 Balok Uk 6x12x400 cm m3 -
5 Balok Uk 5x10x400 cm m3 -
6 Kaso Uk 4x6x400 cm m3 -
7 Kaso Uk 5x7x400 cm m3 -
8 Reng Uk 2x3x400 cm m3 -
9 Reng Uk 3x4x400 cm m3 -
10 Papan Uk 3x20x400 cm m3 -
11 Papan Uk 3x30x400 cm m3 -
12 Papan Uk 2x30x400 cm m3 -
I.5. KAYU MERANTI - BASAH
1 Balok Uk 8x15x400 cm m3 10,342,800.00
2 Balok Uk 8x12x400 cm m3 -
3 Balok Uk 6x15x400 cm m3 -
4 Balok Uk 6x12x400 cm m3 -
5 Balok Uk 5x10x400 cm m3 -
6 Kaso Uk 4x6x400 cm m3 -
7 Kaso uk 5x7x400 cm m3 2,750,000.00
8 Reng Uk 2x3x400 cm m3 -
9 Reng Uk 3x4x400 cm m3 -
10 Papan Uk 3x20x400 cm m3 10,342,800.00
11 Papan Uk 3x30x400 cm m3 -
12 Papan Uk 2x30x400 cm m3 -
I.3. KAYU LAINNYA
1 Dolken dia 8-10 cm x 4.00cm btg 33,300.00
2 Dolken dia 5 - 8 cm x 4.00cm btg 29,100.00
3 Bambu dia 6 - 8 cm x 6.00 cm btg 19,000.00
4 Kayu Terentang, papan 3x30x400 m3 3,357,100.00
5 Kayu Albasiyah m3 7,160,400.00
6 Bilik bambu m2 65,700.00
I.4. BAHAN KAYU LAPIS
1 Teak Wood 3' x 7' tbl 3mm Lb 91,600.00
2 Teak Wood 4' x 8' tbl 3mm Lb 103,000.00
3 Teak Wood 3' x 7' tbl 4mm Lb 119,900.00
4 Teak Wood 4' x 8' tbl 4mm Lb 158,100.00
5 Teak Wood 4' x 8' tbl 4mm motif Sungkai Lb -
6 Triplek 3' x 7' tbl 3mm Lb 55,000.00
7 Triplek 3' x 7' tbl 4mm Lb 66,000.00
8 Triplek 3' x 7' tbl 6mm Lb 80,000.00
9 Multiplek 4' x 8' tbl 6mm Lb -
10 Multiplek 4' x 8' tbl 9mm Lb 188,000.00
11 Multiplek 4' x 8' tbl 12mm Lb 246,000.00
12 Multiplek 4' x 8' tbl 18mm Lb 256,000.00
13 Multiplek 4' x 8' tbl 20mm Lb -
14 Teak Blok 4' x 8' tbl 18mm Lb -
15 Teak Blok 4' x 8' tbl 20mm Lb -
16 Plywood Sungkai uk 4'x8'x3 mm Lb -
17 Plywood Sungkai uk 4'x8'x4 mm Lb -
18 Plywood Sungkai uk 4'x8'x18 mm 1 muka Lb -
19 Plywood Sungkai uk 4'x8'x18 mm 2 muka Lb -
20 Formika Polos Uk 4' x 8' FM A Lb 240,000.00
21 Formika Solid Colour Uk 4' x 8' FM A Lb -
22 Formika Solid Colour Uk 4' x 8' FM B Lb -
23 Formika Solid Colour Uk 4' x 8' FM C Lb -
24 Formika Patterns Colour Uk 4' x 8' FM A Lb -
25 Formika Patterns Colour Uk 4' x 8' FM B Lb -
26 Formika Patterns Colour Uk 4' x 8' FM C Lb -
27 Formika WoodGrains Colour Uk 4' x 8' FM A Lb -
28 Formika Wood Grains Colour Uk 4' x 8' FM B Lb -
29 Formika Wood Grains Colour Uk 4' x 8' FM C Lb -
30 List Plafond berprofil m' 34,500.00
J. BAHAN ATAP
1 Genteng Asbes gel 6 mm (3x1,08) bh 73,200.00
2 Bubungan Genteng Asbes gel kecil M' 65,700.00
3 Genteng metal color tb 0,3 tct M2 115,500.00
4 Bubungan Genteng metal color (u) tb 0,3 tct M2 -
5 Zink Gelombang BJLS 0.20 M2 64,492.75
6 Zink Gelombang BJLS 0.25 M2 90,579.71
7 metal Zincalume - Galvalume AZ 150 G.550 Hi-Ten 0.3 TCT M2 102,173.91
8 Zink Datar / Plat BJLS 0.40 M2 150,602.41
9 Zink Datar / Plat BJLS 0.50 M2 183,132.53
10 Zink Datar / Plat BJLS 0.60 M2 213,253.01
11 Clipplok zinkalum M2 -
12 KL 65 bh -
13 Nok Clipplok zincalume bh -
14 Metal deck colour bond M2 -
15 Nok Metal deck colour bound M' -
16 Genteng badan Keramik bercat bh 6,400.00
17 Nok Genteng Keramik bercat bh -
18 Nok Genteng Keramik bercat cab 2 bh -
19 Nok Genteng Keramik bercat cab 3 bh -
20 Nok Genteng Keramik bercat cab 4 bh -
21 Nok Genteng Keramik bercat Ending Atas / Bawah bh -
22 Genteng Keramik bercat Tepi Kiri / Kanan bh -
23 Genteng Keramik Penyambung tepi bh -
24 Nok Genteng Keramik Penangkal Petir / Ventilasi bh -
25 Nok Hiasan sudut bh 32,500.00
26 Flashing zincalume AZ 100 G.550 flat sheet 300 mm M' -
27 Flashing zincalume AZ 100 G.550 flat sheet 600 mm M' -
28 Ram kawat M2 30,000.00
29 Nok Alumunium bh 81,300.00
K. BAHAN BAKAR & PELUMAS
1 Solar ltr 7,200.00
2 Bensin Premium ltr 7,500.00
3 Petramax ltr 9,500.00
4 Oli SAE 150 ltr 65,000.00
5 Oli Gardan ltr -
6 Oli Hydrolik ltr -
7 Minyak bekisting ltr 16,500.00
L. BAHAN LAIN2
1 Glass wool tbl 2,5 cm m2 -
2 Alumunium foil m2 8,200.00
3 Karpet (Tile Carpet interfase Timberline - Setara) M2 -
4 Editif Pozolith ltr -
5 Compond Kg 1,937.50
6 Parket M2 -
7 Pipa BSP dia 50mm M' -
8 Knie BSP dia 50mm Bh -
9 Pipa hollow 20x40mm M' 23,250.00
10 Pipa BSP dia 100mm M' -
11 Knie BSP dia 100mm Bh -
12 Pipa hollow 40x40mm M' 30,450.00
13 Knie Stainless steel dia 50mm Bh -
14 Pipa Stainlees steell dia 50mm M' -
15 Halaw Stainlees steell 20 x 50mm Bh -
16 Pipa Stainlees steell dia 20mm M' -
17 End pipa Stainlees stell dia 20 mm bh -
18 Inlay nat Stainlees steell tbl 6mm bh -
19 Poly carbonate M2 -
20 Wall Guard M' -
21 Bed Head Unit -
22 Plastik cor M2 -
M. BAHAN LANTAI
1 Keramik Uk 20x20 cm M2 55,000.00
2 Keramik Uk 30x30 cm M2 63,500.00
3 Keramik Uk 40x40 cm, Unpolished Putih M2 65,000.00
4 KeramikUk 60x60 cm, M2 84,000.00
5 Noosing keramik Uk 10 x 60 cm bh 33,250.00
6 Keramik Dinding Uk 20 x 25 cm M2 65,500.00
N. BAHAN CEILING ( PLAFOND )
1 Gypsum board 4"x 8" tbl 9mm Ex Jaya Board Lb 95,000.00
2 Gypsum Perforated Board 4"x 8" tbl 9 mm Lb 105,000.00
3 Rangka plafond besi hallaw M2 -
4 Rangka plafond alumunium ( metal furring) M2 -
5 Calsi Board 4" x 8" tbl 4mm Lb -
6 Gypsum Tile Panel uk 0,60 x 1,20 m M2 -
7 Acaustic Uk 4"x8" Daikin M2 -
8 Acaustic Uk 2" x 4" Daikin M2 -
9 Compound Gypsum Kg 77,500.00
10 GRC tb 4,5 mm uk 1,20 x 2,40 m Lb 75,000.00
11 List Gypsum berprofil uk 5 cm m' 30,000.00
E Frame Plafond Flat
1 Metal Furring -Line tb 0,45 mm L 4 . 00 M pc -
1 E Joiner ( Joiner furring to furring ) pc -
2 E Connector ( Connector main runner to cross runner ) pc -
3 Suspension Bracket pc -
4 Suspension Rod D : 5 mm pc -
5 Suspension Clip pc -
6 Wall angel L 300 mm pc -
E Frame Partition
1 U Stud 75 tb 0.50 mm L 3..M pc -
2 C Stud 75 tb 0.50 mm L 3..M pc -
A SANITAIR
1 Closet Duduk Type CW 660 JW Bh -
TX 902 CV 1 Z Bh -
TX 263 S Bh -
TX 215 C Bh 100,000.00
T 53 DSN Bh -
SW 660 IJ Bh -
SW 660 CRJ Bh -
TX 212 CWS Bh -
TC 364 Bh -
2 Closet Duduk Type C 436
Closet Duduk Type C 436 Bh 8,261,800.00
C 436 CR Bh -
TS 436 SRXNWS Bh -
TS 251 FT 2N Bh -
TC 365 Bh -
T 53 P 100 Bh -
T 53 DSR Bh -
3 Pasang Closet Jongkok CE 9
Pasang Closet Jongkok CE 9 bh 3,810,000.00
TV 150 NWV 12 bh -
T 82 C 32 bh -
4 Wastafel type LW 861CJ
Wastafel type LW 861CJ bh 799,000.00
TX101 LB bh -
THX 1 A5 N bh -
TX 263 SV 1 bh -
TX 263 SV 1 bh -
5 Urinoir U 57 M -
Urinoir U 57 M bh 2,960,000.00
T 64 BW bh -
T 9 RA bh -
T 62-16 bh -
T 60 P bh 1,480,000.00
6 Urinoir partitiaon exs Toto -
7 Partition A 100 bh -
8 Kran T 23 B 13V 7 N bh -
9 Kran T 23 B 13 bh -
10 Kran T 30 AR 13 V 7 N bh -
11 Floor drain bh 84,500.00
Merk Standard
12 Clean out exs Toto -
TX 1 BN bh -
13 Shower Sprey exs Toto -
THX 20 MCRB bh -
14 Shower Head exs Toto -
TX 402 SZ bh -
15 Soap holder exs Toto -
TX 706 AES / S 156 N bh -
16 Paper holder exs Toto -
TX 11 B , atau TS 116 R bh -
17 Gantungan Baju exs Toto -
TS 118 WSB Double Rob Hock bh -
18 Hand Drayer exs Toto -
Hand drayer bh -
19 Shower Tray -
20 Pasang Shower Tray (bilyonet) bh -
21 Zink 2 lobang bh -
22 Zink 1 lobang bh -
23 Bak mandi Fibre glass bh -
24 Kran Zink TX 603 KCS bh -
25 Soap Holde Wastafel TS 125 R bh -
26 Stop Valve TL 340 bh -
27 Kran Wastafel TEN 40 AWX bh -
28 Soap dispenser bh -
29 Grabbar TX 3 A 2 ( L 50 cm ) bh -
30 Closet Duduk Type CW 630 IJ -
Closet Duduk Type CW 630 IJ bh -
CW 630 CRJP bh -
TX 263 S bh -
TX 215 C bh -
TX 276 C bh -
TX 630 C 8 WS bh -
TC 282 SJ bh -
31 Pasang Loundry Sink SK 508 -
Loundry Sink SK 508 bh -
THX 54 bh -
THX 1 A - 3 V 1 N bh -
T 30 ARQ 13 N bh -
32 Pasang Spool Hock SK 33 -
Spool Hock SK 33 bh -
TV 150 NS bh -
T 52 S 32 R bh -
TX 901 CV 12 bh -
T 53 DSRN bh -
TK 133 AR bh -
Pasang Closet Jongkok CE 6 -
Closet Jongkok C 6 bh -
T 82 C 32 bh -
Pasang Wastafel type L 34 -
Wastafel type L 34 bh -
T 23 BQ 13 N bh -
A ALUMUNIUM
Kusen Alumunium
1 Kusen alumunium 4" m' 120,000.00
2 Kusen alumunium 3" m' 95,000.00
3 Frame daun pintu m' 121,800.00
4 Frame daun jendela m' 116,500.00
5 Malion Courtain Wall 4 " m' -
6 Malion Courtain Wall 3 " m' -
7 Hollow Alumunium Tube 25x75x2 mm m' -
8 Plint Alumunium lb 10 cm m' -
9 Jalusi Alumunium m' -
10 List U 1,5 x 2 cm m' 5,600.00
11 BRC lengkap dengan tiang lbr 285,000.00
Kunci & alat penggantung
1 Automatic Q Bh -
2 Kunci & Pull handle -
Lock case BDN Swing/Pull Bh -
Double Cylinder Bh -
Pull handle d 38 -20 Psg -
3 Kunci & Pull handle bh -
Lock case BDN Swing/Pull Bh -
Double Cylinder Bh -
Pull handle Psg -
4 Kunci & Lefer handle bh -
Lock case BDN Swing/Pull Bh -
Double Cylinder Bh -
Lefer handle Psg -
5 Door closer bh -
6 Floor hing Bh -
7 Grendel Bh 75,000.00
8 Engsel 4" Bh 28,000.00
9 Engsel 3" Bh 22,000.00
10 Panic Exit device Bh -
11 Hinges Pintu besi KEND Bh -
12 Door stop Bh -
13 Kunci Tanam Sederhana Bh 45,300.00
14 Spring knip/ Ajuster Bh -
15 Grendel jendela Bh 49,000.00
16 Rolling Door M2 -
17 Chain Block Bh -
18 Grendel / Gembok M2 -
19 Daun Rolling door M2 -
20 Daun pintuFolding gate M2 -
21 Sun louvre ( Alumunium ) M2 -
22 Engsel angin Bh -
Kaca
1 Kaca Polos 3 mm M2 96,800.00
2 Kaca Polos 5 mm M2 160,000.00
3 Kaca Rayben Warna 5 mm ( Blue,Bronze,Green,Grey) M2 170,000.00
4 Kaca Rayben Warna 8 mm ( Blue,Bronze,Green,Grey) M2 280,000.00
5 Kaca Tempered Warna 12 mm M2 -
6 Kaca Tempered Warna 6 mm M2 -
7 Kaca Tempered Polos 12 mm M2 460,000.00
8 Kaca Tempered Polos 6 mm M2 260,500.00
9 Kaca muka/cermin tbl 5 mm M2 135,000.00
10 Kaca Lamenated double 6mm M2 -
11 Kaca Lamenated double 10mm M2 -
Cubical systim -
15 Black Spot Set -
16 Shine Spot Set -
17 Clear Spot Set -
Stain less stell -
18 Plat SS tebal 1 mm M2 -
19 Plat SS tebal 2 mm M2 -
20 Jendela Alumunium standar bh 575,000.00
Pengecatan jadi, dll -
1 Cat Powdercoating M2 -
2 Melamik M2 -
3 Cat duco M2 -
4 Cat zinkromate M2 -
5 Sealent Tube 55,000.00
6 List karet lb 1 cm M' -
7 Resin M' -
8 Alumunium Composite Ranal ( ACP )
9 Alucobest PVDF , t 4 mm Warna Standart M2 -
10 Cutting & Grooving M2 -
11 Alucobest PVDF , t 3 mm Warna Standart M2 -
12 Alucobest PVDF , t 3 mm Warna Standart + Nano M2 -
13 Alucobest PVDF , t 3 mm Warna Khusus M2 -
14 Alucobest PVDF , t 3 mm Warna Khusus + Nano M2 -
15 Alucobest PVDF , t 3 mm Warna Dream X M2 -
16 Cutting & Grooving M2 -
O. BAHAN PERTAMANAN
Alat bantu Taman
1 Pupuk kandang Krg 25,000.00
2 Batu alam ( Andesit ) warna hitam 20 x 40 x 5 cm M2 -
3 Batu alam Bronjol Ø 10 cm M2 -
4 Batu hias diameter 20 s/d 60cm Unit -
5 Koral lepas (setara batu brojol merah hati ) Krg -
6 Batu Cadas besar / sedang t. 50 cm Unit -
Rumput
1 Rumput gajah mini lempeng ( Axonopus compressus ) M2 35,000.00
2 Rumput gajah biasa lempeng M2 -
3 Rumput Embun M2 -
4 Rumput Manila ( Zoysia matrela ) lempeng M2 -
5 Rumput Manila ( Zoysia matrela ) tandur M2 -
6 Rumput Peking M2 -
7 Rumput Jepang Lempeng M2 -
Pohon Palm2 an
1 Pohon Palm Raja (Oreodoxa regia ) tg 300 cm Ø 75 cm Phn -
2 Pohon Palm Raja (Oreodoxa regia ) tg 200 cm Ø 60 cm Phn -
3 Pohon Palm Raja (Oreodoxa regia ) tg 100 cm Ø 35 cm Phn -
4 Pohon Palm sadeng (Livistonia rotundifolta) tg 50 cm Ø 5 cm Phn -
5 Pohon Kepala sayur tg 300 cm Ø 30 cm Phn -
6 Pohon Kelapagading ( Cocos capitata ) tg 300 cm Ø 15 cm Phn -
7 Pohon Kelapasawit batang keras ( Elais geunesis ) tg 300 cm Ø 15 Phn -
8 Pohon Kelapasawit batang keras ( Elais geunesis ) tg 200 cm Ø 40 Phn -
9 Pohon Kelapasawit batang keras ( Elais geunesis ) tg 150 cm Ø 40 Phn -
10 Pohon Kurma btg keras (Phoenik detilifera) tg 100 cm Ø 30 cm Phn -
11 Pohon Kurma btg keras (Phoenik detilifera) tg 200 cm Ø 30 cm Phn -
12 Pohon Lontar ( Borassus Flabefiter ) tg 300 cmØ 25 cm Phn -
13 Pohon Palm botol tg 200 cm Ø 30 cm Phn -
14 Pohon Palm botol tg 100 cm Ø 30 cm Phn -
Pohon Peneduh
1 Pohon Trembesi ( Samanea saman ) tg 200 cmØ 4 cm Phn 120,000.00
2 Pohon Trembesi ( Samanea saman ) tg 300 cmØ 6 cm Phn -
2 Pohon Flamboyan kuning( Delonix regia) Tg 300 cm Ø btg 4 cm Phn -
3 Pohon Kamboja Bali ( Plumeria sp ) aneka warna tg 300cm Ø btg Phn -
3 Pohon Cemara angin ( Casuaria equisetifolia ) tg 200 cm Ø btg 4 c Phn -
4 Pohon bunga kupu2 (Bauhinia purpurea) tg 300 cm Ø 4 cm Phn -
4 Pohon Dadap merah ( Erythrina cristagali ) tg 200 cm Ø btg 3,5 cm Phn -
5 Pohon Angsana ( Ptecarpus indicus ) tg 300 cm Ø btg 6 cm Phn -
Pohon Perdu
1 Dendron biasa ( Philodendron sp ) 1 rpn 4 phn tg 50 cm Phn -
2 Air mata penganten ( Antigonon leptopus ) Phn -
3 Tanaman Hias Komposisi dalam pot.tipe 1 Phn -
4 Arabidea ( arabidea sp ) Phn -
5 Lantana rambat Phn -
6 Sirih gading daun kuning ( Scindapsus ) Phn -
7 Soka Bangkok tg 20 cm Phn -
8 Soka Singapura tg 30 cm Phn -
9 Soka Jawa tg 30 cm Phn -
10 Ipomoea batatas / Ubi rambat / Telotelo tg 10 cm 3 s/d 5 btg / po Phn -
11 Tanaman semak Komposisi, kombinasi t 50 cm 1 rp 4 pohon/m² Phn -
12 Tanaman semak Komposisi Kombinasi tg 50 cm 1 rpn 4 phn Phn -
13 Teh tehan (Durantha) tinggi 50 cm 3 - 4 bt / Rpn Rpn -
14 Teh tehan (Durantha) tinggi 70 cm 3- 4 bt / Rpn Rpn -
15 Kembang sepatu putih ( Hiiscus mutabilis ) tg 70 cm Phn -
16 Kembang sepatu putih ( Hiiscus mutabilis ) tg 90 cm Phn -
17 Agafe putih ( Agave Sp ) tg 40 cm Ø tajuk 30 cm Pot -
18 Agafe Biasa ( Agave Sp ) tg 50 cm Ø tajuk 40 cm Pot -
19 Bilawan ( Plumbago aphylia ) tg 15 cm =3-4 bt /pot Pot -
20 Bougenvil ( Bougainvillea Sp ) bunga bentukan penuh tg 60 cm Pot -
21 Bougenvil ( Bougainvillea Sp ) bunga bentukan penuh tg 200 cm Pot -
22 Bougenvil ( Bougainvillea Sp ) bunga bentukan penuh tg 300 cm Pot -
23 Lantana pagar ( Lantana Camara ) 30 cm = 3-4 bt/ Rpn Rpn -
24 Tanaman Rambat (Flame of irian, orange) t:40cm, dia 30cm 6 pot Rpn -
25 T, Rambat (Clerodendrum sp/Nona mkn sirih) t:50cm, dia 40cm, 6 Rpn -
26 Tanah merah ( Tanah humus ) M3 250,000.00
27 Tali injuk Kg -
28 Pohon glodokan tiang Phn 57,600.00
P. Saluran
1 Buis beton bulat dia. 20 cm tanpa tulang bh 88,000.00
2 Buis beton bulat dia. 30 cm tanpa tulang bh 121,000.00
3 Buis beton bulat dia. 40 cm tanpa tulang bh 182,000.00
4 Buis beton bulat dia. 80 cm tanpa tulang bh 570,000.00
5 Buis beton bulat dia. 100 cm tanpa tulang bh 650,000.00
6 Buis beton 1/2 bulat dia. 50 cm tanpa tulang bh 172,000.00
7 Buis beton 1/2 bulat dia. 80 cm tanpa tulang bh 350,000.00
8 Buis beton 1/2 bulat dia. 100 cm tanpa tulang bh 400,000.00
9 U 400/400 unit / 1,20 m 436,000.00
10 U 500/500 unit / 1,20 m 639,000.00
11 U 500/600 unit / 1,20 m 785,000.00
12 U 600/500 unit / 1,20 m -
13 U 600/600 unit / 1,20 m 794,000.00
14 U 600/700 unit / 1,20 m -
15 U 600/800 unit / 1,20 m 947,000.00
16 U 800/800 unit / 1,20 m 1,170,000.00
17 U 1000/1000 unit / 1,20 m 1,709,500.00
18 Tutup U 400 LD unit / 0,60 m 163,800.00
19 Tutup U 500 LD unit / 0,60 m 216,800.00
20 Tutup U 600 LD unit / 0,60 m 316,100.00
21 Tutup U 800 LD unit / 0,60 m 424,200.00
22 Tutup U 1000 LD unit / 0,60 m 517,700.00
28 Manhole LD 720 x 695 unit
29 Manhole HD 720 x 695 unit
30 BC 500 x 500 LD unit / 1 m -
31 BC 600 x 600 LD unit / 1 m -
32 BC 800 x 800 LD unit / 1 m -
33 BC 1000 x 1000 LD unit / 1 m -
34 BC 400 x 400 HD unit / 1 m 893,000.00
35 BC 500 x 500 HD unit / 1 m 1,132,000.00
36 BC 600 x 600 HD unit / 1 m 1,464,000.00
37 BC 800 x 800 HD unit / 1 m 2,618,000.00
BC 800 x 800 HD (swakelola 2016) unit / 1 m -
38 BC 1000 x 1000 HD unit / 1 m 3,465,000.00
39 BC 1200 x 1200 HD unit / 1 m 4,620,000.00
40 BC 1500 x 1500 HD unit / 1 m 8,625,000.00
41 BC 2000 x 2000 HD unit / 1 m 12,127,000.00
42 Pipa Galvanis O1/2" m' 25,600.00
43 Pipa Galvanis O3/4" m' 27,300.00
44 Pipa Galvanis O1" m' 46,700.00
45 Pipa Galvanis O2" m' 63,400.00
46 Pipa Galvanis O4" m' 142,900.00
47 Pipa PVC tipe AW Ø 1/2" m' 9,575.00
48 Pipa PVC tipe AW Ø 3/4" m' 11,500.00
49 Pipa PVC tipe AW Ø 1" m' 16,725.00
50 Pipa PVC tipe AW Ø 1 1/2" m' 29,300.00
51 Pipa PVC tipe AW Ø 2" m' 41,625.00
52 Pipa PVC tipe AW Ø 2 1/2" m' 53,550.00
53 Pipa PVC tipe AW Ø 3" m' 85,325.00
54 Pipa PVC tipe AW Ø 4" m' 131,875.00
55 Pipa PVC tipe AW Ø 10" m' 571,250.00
56 Pipa PVC tipe D 1 " m' 13,675.00
57 Pipa PVC tipe D 1,5 " m' 15,350.00
58 Pipa PVC tipe D 2 " m' 19,375.00
59 Pipa PVC tipe D 3 " m' 44,825.00
60 Pipa PVC tipe D 4 " m' 67,300.00
61 Pipa PVC tipe D 5 " m' 102,350.00
62 Wall paper Vinyl M2 -
63 Lem wall paper kg -
64 Ramset ls -
65 Keramik Uk 33.3 X 33.3 cm Gol A M2 158,125.00
66 Lem Vinyl -
67 Under layer M2 -
68 Keramik Uk. 30x30 cm M2 55,000.00
69 Keramik Uk. 20x20 cm M2 63,500.00
70 Keramik Tembok Uk. 20x25 cm M2 65,000.00
71 Keramik Homogenous Tile Uk. 60x60 cm Pcs 84,000.00
72 Plint keramik artistik Buah 18,333.33
73 Plint ubin teralux marmer Buah 14,000.00
74 Plint ubin granit Buah 18,333.33
75 Wall sealer kg 174,416.67
76 Accecories ( 30 % material )
77 Bak cuci piring set -
78 Bak fibreglass BH -
79 Batang Tembaga 320,000.00
80 bathcuip
81 Closet duduk Bh 1,850,000.00
82 Closet Jongkok porselen Bh 335,000.00
83 Closet Jongkok teraso Bh 598,000.00
84 Straight Batang Bh -
85 Elbow 90 1/2 inch 20mm Bh 7,150.00
86 Tee PVC AW 0.50" Bh 6,400.00
87 Cross Bh -
88 Reducer 1/2 x 3/4 inch 20x25mm Bh 4,950.00
89 In/Out side Rider Bh -
90 Cover Bh -
91 Kabel Grounding roll (50 M) 317,000.00
92 Kabel BC 50 mm2 m 38,280.00
93 Kabel BC 70 mm2 m 65,450.00
94 Grounding Rod Copper Bonded 5/8 inch 3 meter Bh 475,000.00
95 U-Bolt Clamp Grounding Bh 125,000.00
96 Bak Kontrol Bh 600,000.00
97 Sepatu Kabel 4 mm2 2,000.00
98 Sepatu Kabel 6 mm2 3,000.00
99 Sepatu Kabel 10 mm2 5,000.00
100 Sepatu Kabel 70 mm2 70,000.00
101 Sepatu Kabel 120 mm2 100,000.00
102 Kabel Listrik ITC 1 x 2 x 1,5 mm roll (50 M) 168,792.00
103 Kabel Listrik NYM 2 x 1,5 mm roll (50 M) 271,100.00
104 Kabel Listrik NYM 2 x 2,5 mm2 roll (50 M) 285,000.00
105 Kabel Listrik NYM 3 x 2,5 mm2 roll (50 M) 380,400.00
Kabel Listrik NYM 4 x 2,5 mm2 roll (50 M) 570,000.00
106 Kabel Listrik NYMHY 2 x 1,5 mm2 roll (50 M)
107 Kabel Listrik NYMHY 2 x 1,5 mm2
108 Kabel Listrik NYY 2 x 4 mm2 m 40,700.00
Kabel Listrik NYY 3 x 2.5 mm2 m 37,400.00
109 Kabel Listrik NYY 3 x 4 mm2 m 53,900.00
110 Kabel Listrik NYY 4 x 2.5 mm2 m 44,000.00
111 Kabel Listrik NYY 4 x 4 mm2 m 63,800.00
112 Kabel Listrik NYY 4 x 6 mm2 m 79,200.00
113 Kabel Listrik NYY 4 x 10 mm2 m 107,800.00
114 Kabel Listrik NYY 4 x 70 mm2 m 488,400.00
115 Kabel Listrik NYY 4 x 120 mm2 m 802,200.00
116 Kabel Listrik NYFGbY 4 x 10 mm2 m 118,580.00
Kabel Listrik NYFGbY 4 x 16 mm2 m 199,250.00
Kabel Listrik NYFGbY 4 x 70 mm2 m 540,000.00
T-dus clipsal pcs 15,000.00
117 Kran air BH 58,500.00
118 Perlengkapan
119 Perlengkapan (12%)
120 Perlengkapan (20%)
121 Pipa air limbah jenis pipa tanah Ǿ 15 cm"
122 Pipa air limbah jenis pipa tanah Ǿ 20 cm"
123 Pipa beton diameter 15-20 cm M' -
124 Pipa beton diameter 30-100 cm M' -
125 Pipa Galvanish 1 1/2" M' 76,666.67
126 Pipa Galvanish 1" M' 50,833.33
127 Pipa Galvanish 1/2" M' 26,666.67
128 Pipa Galvanish 3" M' 172,500.00
129 Pipa Galvanish 3/4" M' 34,166.67
130 Pipa Galvanish 4" M' 245,833.33
Pipa conduit RSC 2 1/2" M' 155,000.00
Pipa conduit clipsal 20 mm M' 6,500.00
Clamp pipa metal pcs 30,000.00
Locknut RSC 2 1/2" pcs 65,000.00
Bushing RSC 2 1/2" pcs 65,000.00
Connector RSC 2 1/2" pcs 35,000.00
131 Power Fan + Stop Kontak unit -
132 Seal tape BH 7,400.00
133 Urinoir Bh 590,600.00
134 waterdrain SET 84,500.00
135 Wastafel BH 1,284,000.00
136 Air ltr 2,000.00
137 Ijuk m3 17,000.00
138 Buis beton 1/2 bulat dia. 30 cm tanpa tulang bh 65,000.00
Q. Precast
1 Panel beton 240 x 40 x 5 lbr 110,000.00
2 Tiang beton bertulang 300 x 18 x 16 btg 277,000.00
3 Tiang Pancang beton tulang 30x30 cm m 185,000.00
4 Concrete Barrier bh
R. Penawaran Harga
1 Gerbang otomatis 2 daun pintu @ 15 m unit 120,300,000.00
2 20 Feet Office Container unit 41,000,000.00
3 40 Feet Office Container unit 75,000,000.00
S. Booth
1 Plat eser 1mm m2 70,469.80
2 Hollow 6cm x 2.3mm m1 32,116.67
3 Pintu D1 unit 1,200,000.00
4 Jendela W1 unit 1,600,000.00
5 Jendela W2 unit 850,000.00
6 Jendela W3 unit 1,000,000.00
7 Pengecatan m2 22,000.00
8 Meja dan komputer unit 3,000,000.00
9 AC 1/2 PK unit 2,600,000.00
10 Road Barrier unit 895,000.00
11 Barrier gate unit 8,600,000.00
T. Elektrikal
1 Panel Main DB as SLD ME-LD-001 set 90,000,000.00
2 Tenaga Ahli Muda
Panel OFFICE DB, REEFER DB, SHELTER DB, LIGHTING DB as SLD oh 926,250.00
3 ME-LD-001 set 9,873,000.00
4 Batu Bata Merah pcs 850.00
5 Pasir Urug Darat m3 232,000.00
6 Patok penanda kabel set 75,000.00
7 Papan Penahan Tanah unit 5,107.00
8 Marker tape m' 3,500.00
9 Galian Tanah Biasa m3 20,386.15
10 Urugan Tanah Biasa m3 9,464.00
11 Pemadatan m2 3,713.30
12 Teknisi oh 123,500.00
13 Telephone set set 300,000.00
-
-
harga supplier
NO Produk
harga supplier
harga supplier 1 Teak coat
harga supplier 2 Prime coat
harga supplier 3 ATB
harga supplier 4 AC - BC
harga supplier 5 AC - WC
harga supplier 6 HRS
harga supplier 7 III Laston
harga supplier 8 III Laston Special
harga pasar 9 Shand sheet
10 Mob & Demob Alat
-
-
-
-
-
Jurnal Edisi 37 Hal 265
-
-
-
Jurnal Edisi 37 Hal 270
-
Harga Pasar
Harga Pasar
Harga Pasar
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jurnal Edisi 37 Hal 248
-
-
-
-
-
Jurnal Edisi 37 Hal 248
-
-
Jurnal Edisi 37 Hal 248
-
-
-
Jurnal Edisi 37 Hal 263
-
-
Jurnal Edisi 37 Hal 271
-
-
-
Jurnal Edisi 37 Hal 256
-
-
Jurnal Edisi 37 Hal 256
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jurnal Edisi 37 Hal 306
-
-
-
-
-
-
-
Jurnal Edisi 37 Hal 294
Jurnal Edisi 37 Hal 293
Jurnal Edisi 37 Hal 293
Jurnal Edisi 37 Hal 229 Harga Provinsi Banten
Harga Pasaran
Harga Pasaran
Jurnal Edisi 37 Hal 323
Harga Pasaran
-
-
-
-
Jurnal Edisi 37 Hal 287
Jurnal Edisi 37 Hal 287
Jurnal Edisi 37 Hal 287
Jurnal Edisi 37 Hal 287
-
Jurnal Edisi 37 Hal 287
Jurnal Edisi 37 Hal 287
Jurnal Edisi 37 Hal 287
Jurnal Edisi 37 Hal 287
-
-
Penawaran (rod Copper 5/8")
-
-
Jurnal Edisi 37 Hal 255
Jurnal Edisi 37 Hal 255
Jurnal Edisi 37 Hal 255
Jurnal Edisi 37 Hal 255
Jurnal Edisi 37 Hal 255
Jurnal Edisi 37 Hal 255
Penawaran Harga 29 Okt 2018 Gerbang Jaya. Jl. Siti Mustika Jaya, Bekasi
Penawaran Harga 26 Okt 2018 JayaKon. Jl. Raya Cacing No.89 Jakarta Utara 14130
Penawaran Harga 26 Okt 2018 JayaKon. Jl. Raya Cacing No.89 Jakarta Utara 14130
HARGA
Produk SAT
LOCO (DROP) TERPASANG
Rp 12,000 Rp 12,000 Liter
Prime coat Rp 13,000 Rp 13,000 Liter
Rp 1,045,000 Rp 1,245,000 Ton
Rp 1,105,000 Rp 1,225,000 Ton
Rp 1,095,000 Rp 1,345,000 Ton
Rp 1,185,000 Rp 1,435,000 Ton
Rp 1,175,000 Rp 1,425,000 Ton
III Laston Special Rp 1,250,000 Rp 1,500,000 Ton
Shand sheet Rp 1,355,000 Rp 1,605,000 Ton
Mob & Demob Alat 10,000,000 s/d 12,000,000 LS
JENIS PEKERJAAN : MOBILISASI
HARGA
No. JENIS ALAT SATUAN VOL. SATUAN
(Rp.)
A. PERALATAN
B. FASILITAS LABORATORIUM
1 Soil & Aggregate Testing
Compaction Test Set 0 15,000,000
CBR Test Set 0 20,000,000
Specific Gravity Set 0 5,000,000
Atterberg Limits Set 0 5,000,000
Grain Size Analysis Set 0 12,500,000
Field Density Test by Sand Cone Methode Set 0 6,500,000
Moisture Content Set 0 6,000,000
Abrasion of Aggregate by Los Angeles Machine Bln 0 5,000,000
2 Concrete Testing
Slump Cone Set 0 100,000
Cylinder/Cube Mould for Compressive Strength Set 0 1,500,000
Beam Mould for Flexural Strength (RIGID) Set 0 10,000,000
Crushing Machine Set 0 50,000,000
DeMobilisasi
JUMLAH
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
2,500,000
150,000
0
450,000
0
300,000
0
0
1,500,000
0
2,500,000
100,000
0
0
100,000
80,000
0
7,680,000
0
0
0
0
0
0
0
0
0
0
0
0
2,304,000
9,984,000
PERHITUNGAN BIAYA SMK3 KONSTRUKSI YANG MEMPERKERJAKAN 25 ORANG
I PENYIAPAN RK3K
1 Pembuatan manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 3.00
2 Pembuatan Kartu Identitas Pekerja (KIP) Lb 25.00
IV Personil K3
1 Ahli K3 Ob 1.00
2 Petugas K3 Ob -
3 Petugas tanggap darurat Ob -
4 Petugas P3K Ob -
5 Petugas pengatur lalu lintas Ob -
6 Petugas medis Ob -
VI Rambu-rambu
1 Rambu petunjuk Bh 5.00
2 Rambu larangan Bh 2.00
3 Rambu peringatan Bh 5.00
4 Rambu kewajiban Bh 2.00
5 Rambu informasi Bh 2.00
6 Tongkat pengatur lalu lintas (Warning Lights Stick) Bh 1.00
150,000.00 450,000.00
5,000.00 125,000.00
JUMLAH I 575,000.00
10,000.00 100,000.00
500,000.00 500,000.00
15,000.00 150,000.00
375,000.00 375,000.00
400,000.00 400,000.00
JUMLAH II 1,525,000.00
65,000.00 3,250,000.00
75,000.00 2,400,000.00
2,000.00 600,000.00
5,000.00 1,500,000.00
170,000.00 4,250,000.00
50,000.00 1,250,000.00
JUMLAH IV 1,300,000.00
JUMLAH IV 3,500,000.00
900,000.00 900,000.00
JUMLAH V 900,000.00
JUMLAH VI 1,750,000.00
834,372.00 -
75,000.00 -
500,000.00 500,000.00
JUMLAH VI 500,000.00
TOTAL BIAYA 23,300,000.00 4 BULAN
/BULAN 1,941,666.67
RENCANA ANGGARAN BIAYA
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 690,327.00 640,827.00 1,331,154.00 1,331,154.00
2 Mobilisasi dan Demobilisasi Ls 1.00 16,205,750.00 16,205,750.00 16,205,750.00
3 Penyediaan Air dan Listrik Kerja Ls 1.00 8,995,800.00 8,995,800.00 8,995,800.00
4 Administrasi dan Dokumentasi Proyek Ls 1.00 3,080,000.00 3,080,000.00 3,080,000.00
5 Pengukuran dan Pemasangan Bouwplank Ls 1.00 2,719,878.48 2,719,878.48 2,719,878.48
6 Pekerjaan Pembersihan (Awal & Akhir Proyek) Ls 1.00 10,334,233.80 10,334,233.80 10,334,233.80
7 Test CBR subgrade dan base course Ls 1.00 6,500,000.00 6,500,000.00 6,500,000.00
8 Persyaratan K3 Ls 1.00 5,676,000.00 5,676,000.00 5,676,000.00
VI PEKERJAAN PAGAR
1 Pek. Bongkar Pagar eksisting m' 288.82 83,310.62 83,310.62 24,061,605.61
2 Galian tanah pondasi m3 168.96 95,260.73 95,260.73 16,095,112.23
3 Pas. Pondasi batu belah/batu kali m3 287.25 833,184.00 380,758.29 1,213,942.29 348,701,426.65
4 Pas. Pagar Precast Uk. 5x40x240 + Kolom Uk. 18x20x300 m2 577.64 315,544.90 83,310.62 398,855.52 230,393,305.07
5 Pas. Bata tangga penghubung area kantor ad.1:5 m2 1.40 146,979.80 133,360.74 280,340.54 392,476.76
6 Rabat beton ad. 1:3:5 tb. 15 cm m3 0.30 814,440.00 138,003.03 952,443.03 285,732.91
7 Pek.Kolom beton bertulang ad. 1:2:3 uk. 30x30x300 m3 0.64 1,453,899.70 625,283.55 2,079,183.24 1,338,994.01
8 Pek. Pintu Pagar Besi m2 1.00 2,812,500.00 2,812,500.00
c. PEKERJAAN ATAP
1 Pemasangan
Alumunium
Rangka atap baja ringan Hi-Ten G.550 Lapis Lindung Zinc m2 82.08 150,000.00 45,000.00 195,000.00 16,005,600.00
aluminium AZ.100, Profil C.75 tb.0.75 mm TCT Reng tb.0,45 mm TCT +
SD Screw, MG, Accesories lengkap terpasang.
2 Penutup atap utama, atap metal Zincalume - Galvalume AZ 150 G.550 m2 82.08 #REF! #REF! #REF! #REF!
Hi-Ten 0,4 TCT
B. PEKERJAAN ARSITEKTUR
B.1 PEKERJAAN LANTAI
1 Pasang keramik lantai uk.40x40 (polished) m2 58.20 133,975.60 177,687.20 311,662.80 18,138,775.08
2 Pasang keramik dinding uk.20x25(polished) m2 37.59 173,025.60 177,687.20 350,712.80 13,183,294.23
3 Pasang keramik polished uk.30x30 (meja beton) m2 2.59 107,575.60 177,687.20 285,262.80 738,830.66
A. PEKERJAAN MEKANIKAL
B. PEKERJAAN ELEKTRIKAL
1 Pemasangan main panel DB (lengkap terpasang) set 1.00 1,858,050.00 280,000.00 2,138,050.00 2,138,050.00
Box panel indoor 40x60x12 cm unit 1.00
MCB 50 A bh 3.00
MCB 25 A bh 3.00
MCB 16 A bh 3.00
MCB 10 A bh 3.00
Kontaktor + fotocell + busbar + wirring + aksesoris bh 1.00
Grounding lengkap terpasang dengan BC 16 mm set 1.00
2 Pemasangan Box MCB Pos Security (lengkap terpasang) set 1.00 238,200.00 55,000.00 293,200.00 293,200.00
3 Lampu TL 2 x 36 Watt (lengkap terpasang) titik 6.00 404,712.00 46,978.00 451,690.00 2,710,140.00
4 Lampu down Light LED 11 Watt (lengkap terpasang) titik 8.00 404,712.00 46,978.00 451,690.00 3,613,520.00
5 fitting + lampu (lengkap terpasang) titik 2.00 404,712.00 46,978.00 451,690.00 903,380.00
6 Stop Kontak (lengkap Terpasang) titik 6.00 359,370.00 46,978.00 406,348.00 2,438,088.00
7 Pekerjaan Installasi Kabel :
NYFGbY-rm 0.6/1kV 4Cx25 mm2 dari Power House ke Panel DB m1 55.00 225,000.00 60,432.00 285,432.00 15,698,760.00
#REF!
PPN #REF!
JUMLAH TOTAL #REF!
Subgrade :
Luas = 9,009.00 M2
Urugan limestone :
Luas = 9,009.00 M2
Tebal = 0.30 M
Jumlah
-
-
Jumlah
1,900,000.00
-
1,900,000.00
Jumlah
-
-
ANALISA HARGA SATUAN
PEKERJAAN MEKANIKAL ELEKTRIKAL
M PEKERJAAN MEKANIKAL
M.1 Pemasangan 1 unit closet duduk unit
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 547
Refrensi : Material - Jurnal/edisi 37/2018
Material
Kloset duduk lokal Unit
Perlengkapan (6 % material) Ls
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang Pasang Pipa /Ledeng Oh
Mandor Oh
M.22 Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm" (tanpa pipa) M'
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 563
Refrensi : Material - Jurnal/edisi 37/2018
1 Pipa air limbah jenis pipa tanah Ǿ 20 cm" M'
Semen PC Kg
Pasir pasang M3
Pasir urug M3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang Pasang Pipa /Ledeng Oh
Mandor Oh
Peralatan
M.23 Pemasangan pipa air limbah jenis pipa tanah Ǿ 15 cm" (tanpa pipa) M'
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 564
Material
1 Pipa air limbah jenis pipa tanah Ǿ 15 cm" M'
Semen PC Kg
Pasir pasang M3
Pasir urug M3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang Pasang Pipa /Ledeng Oh
Mandor Oh
Peralatan
Material
1 Pipa beton diameter 15-20 cm M'
Batu bata Buah
Semen PC Kg
Pasir pasang M3
Pasir urug M3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang Pasang Pipa /Ledeng Oh
Mandor Oh
Peralatan
Material
Buis beton bulat dia. 100 cm tanpa tulang m
Batu bata Buah
Semen PC Kg
Pasir pasang M3
Pasir urug M3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang batu Oh
Mandor Oh
Peralatan
Material
Buis beton 1/2 bulat dia. 30 cm tanpa tulang m
Batu bata Buah
Semen PC Kg
Pasir pasang M3
Pasir urug M3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang batu Oh
Mandor Oh
Peralatan
Harga Satuan Pekerjaan dan Jasa
E PEKERJAAN ELEKTRIKAL
E.1 Pasang 1 Titik Instalasi Stop Kontak Titik
Refrensi : Material - Jurnal/edisi 37/2018
Refrensi : Upah - Engineering Estimate
Material
1 Kabel Listrik NYM 3 x 2,5 mm m
Pipa conduit 20mm Clipsal btg
Soket 20mm Clipsal bh
T-Dus 20 mm Clipsal bh
Klamp 20mm Clipsal bh
Stopkontak bh
Bobokan m
Tenaga kerja
Instalator Oh
Pekerja Oh
Mandor Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
Tenaga kerja
Mandor Oh
Tukang Gali Oh
Pekerja Oh
Harga Satuan Pekerjaan dan Jasa
Tenaga kerja
Mandor Oh
Pekerja Oh
Tukang Gali Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
Tenaga kerja
Mandor Oh
Instalator Oh
Pekerja Oh
-
1.0000 408,000.00 408,000.00 -
0.0250 6,500.00 162.50 -
340,239.00
1.2000 145,800.00 174,960.00 Jurnal/edisi 38/2019/hal 377
1.0000 61,236.00 61,236.00
387,187.00
1.2000 171,000.00 205,200.00 Jurnal/edisi 38/2019/hal 377
1.0000 71,820.00 71,820.00
66,941.00
1.2000 8,250.00 9,900.00 Jurnal/edisi 38/2019/hal 377
1.0000 3,465.00 3,465.00
127,940.00
1.2000 11,562.50 13,875.00 Jurnal/edisi 38/2019/hal 377
1.0000 4,856.25 4,856.25
155,140.00
1.2000 18,750.00 22,500.00 Jurnal/edisi 38/2019/hal 377
1.0000 7,875.00 7,875.00
160,112.00
1.2000 35,162.50 42,195.00 Jurnal/edisi 38/2019/hal 377
1.0000 14,768.25 14,768.25
229,714.00
1.2000 55,750.00 66,900.00 Jurnal/edisi 38/2019/hal 377
1.0000 23,415.00 23,415.00
1.6000 - -
35.0000 2,000.00 70,000.00
0.0140 226,000.00 3,164.00
0.0140 232,000.00 3,248.00
0.0600 - -
30.0000 2,000.00 60,000.00
0.0030 226,000.00 678.00
0.0030 232,000.00 696.00
1.1000 - -
0.0270 850.00 22.95
3.9200 2,000.00 7,840.00
0.0560 226,000.00 12,656.00
0.0240 232,000.00 5,568.00
0.1400 135,500.00 18,970.00
0.0700 155,800.00 10,906.00
0.0070 155,700.00 1,089.90
0.0070 183,200.00 1,282.40
-
0.06 397,524.00 24,845.25 -
1.00 850.00 850.00 -
0.2500
1.0000
REKAPITULASI HARGA SATUAN
PEKERJAAN PERSIAPAN
P PEKERJAAN PENDAHULUAN
P.1 Papan nama proyek
P.2 Pembersihan dan striping/kosrekan
DKI.1.I.1 Pagar Sementara dari Kayu tinggi 2 m
DKI.1.I.2 Pagar Sementara dari Seng Gelombang tinggi 2 m
DKI.1.I.4 Pek. Pengukuran & Pemasangan Bowplank
DKI.1.I.5 Pek Kantor Direksi Keet, dengan lantai plesteran
DKI.1.I.6 Pembuatan gudang semen dan alat-alat
DKI.1.I.8 Membersihkan Lapangan dan Perataan
DKI.1.I.9 Pembuatan bedeng buruh
DKI.1.I.12 Pembuatan Jalan Sementara
DKI.1.I.13 Bongkaran Beton Bertulang
DKI.1.I.14 Bongkaran Dinding Tembok Bata Merah
PEKERJAAN SIPIL
SB PEKERJAAN PEMBONGKARAN
SB.1 Bongkar pasangan batu (manual)
SB.2 Bongkar pasangan batu (Jack hammer)
SB.3 Bongkar beton dengan Jack Hammer
SB.4 Bongkar Paving blok abuabu Type 4,6 Ex internusa block
SB.5 Bongkar atap genteng
SB.6 Bongkar atap seng/asbes
SB.7 Bongkar Kansteen
ST PEKERJAAN TANAH
DKI.1.II.1 Menggali tanah biasa sedalam 1 meter
DKI.1.II.2 Menggali tanah biasa sedalam 2 meter
DKI.1.II.3 Menggali tanah biasa sedalam 3 meter
DKI.1.II.4 Menggali tanah keras sedalam 1 meter
DKI.1.II.5 Menggali tanah cadas sedalam 1 meter
DKI.1.II.6 Menggali tanah lumpur sedalam 1 meter
DKI.1.II.7 Mengerjakan stripping tebing setinggi 1 meter
DKI.1.II.8 Membuang tanah sejauh 30 meter
DKI.1.II.10 Memadatkan tanah (per 20 cm)
DKI.1.II.11 Mengurug pasir urug
DKI.1.II.12 Mengurug sirtu padat untuk peninggian lantai bangunan
ST.1 Galian tanah biasa sedalam < 1 m
ST.2 Galian tanah biasa sedalam s.d 2 m
ST.3 Galian tanah berbatu sedalam < 1 m
ST.4 Galian tanah cadas atau tanah keras sedalam ≤ 1 m
ST.5 Galian lumpur sedalam ≤ 1 m
ST.6 Galian dengan excavator
ST.7 Pemadatan tanah
ST.8 Timbunan pasir sebagai bahan pengisi
ST.9 Pemadatan pasir sebagai bahan pengisi
ST.10 Cerucuk dolken dia. 8-10 panjang 2 m
ST.11 Urugan base course Klas A CBR min 80%
ST.12 Urugan base course Klas B CBR min 60%
ST.13 Urugan limestone padat CBR 30%
ST.14 Urugan Tanah Merah / Tanah urug CBR 10%
ST.15 Lapisan Geotextile non woven
ST.16 Lapisan Geotextile woven
SJ PEKERJAAN JALAN DAN DEPO
SJ.1 Pemasangan Plastik cor
SJ.2 Pipa PVC tipe D dia. 1.5"
sub.SJ.1 Bekisting Baja
SJ.3 Filler asphalt
SJ.4 Pembesian 1 kg dengan Besi beton Polos U24
sub.SJ.2 Besi dowel dia. 25 - 300 p. 80 cm + cat + pelumas
SJ.5 Pembesian 1 kg dengan Besi beton Ulir U 39
sub.SJ.3 Besi tie bar D 16 - 500 panjang 80 cm
SJ.5 Pembesian 1 kg jaring kawat (wire mesh)
sub.SJ.4 Tulangan wiremesh M-5 (ulir) sbg. tul. atas + dudukan besi
sub.SJ.5 Tulangan wiremesh M-6 (ulir) sbg. tul. atas + dudukan besi
sub.SJ.6 Tulangan wiremesh M-7 (ulir) sbg. tul. bawah + beton decking
sub.SJ.7 Tulangan wiremesh M-8 (ulir) sbg. tul. atas + dudukan besi
sub.SJ.8 Tulangan wiremesh M-8 (ulir) sbg. tul. bawah + beton decking
sub.SJ.9 Tulangan wiremesh M-10 (ulir) sbg. tul. bawah + beton decking
sub.SJ.10 Tulangan wiremesh M-12 (ulir) sbg. tul. bawah + beton decking
SJ.6 Pekerjaan Paving blok abuabu Type 4,6 Ex internusa blok
SJ.7 Pasang kansteen beton K-400 uk. 18/22-25/60 cm
SS PEKERJAAN SALURAN DAN TURAP
SS.1 Pemasangan saluran u-ditch 40x40 cm
SS.2 Pemasangan saluran u-ditch 50x50 cm
SS.3 Pemasangan saluran u-ditch 60x60 cm
SS.4 Pemasangan saluran u-ditch 80x80 cm
SS.5 Pemasangan saluran u-ditch 100x100 cm
SS.6 Pemasangan saluran box culvert 50x50 HD
SS.7 Pemasangan saluran box culvert 60x60 HD
SS.8 Pemasangan saluran box culvert 80x80 HD
SS.9 Pemasangan saluran box culvert 100x100 HD
SS.13 Pemasangan saluran box culvert 150x150 HD
SS.14 Pemasangan saluran box culvert 120x120 HD
SS.10 Pemasangan Pondasi batu belah campuran 1SP : 4PP
DKI.1.III.2 Memasang pondasi batu belah, campuran 1 PC : 4 PP
DKI.1.III.3 Memasang pondasi batu belah, campuran 1 PC : 5 PP
SS.11 Saluran 1/2 buis beton dia. 20 cm
SB PEKERJAAN BETON
SB.1.a Beton Ready Mix K 250 slump 10 cm (+/- 2 cm)
SB.1.b Beton Ready Mix K 300 slump 10 cm (+/- 2 cm)
SB.1.c Beton Ready Mix K 350 slump 10 cm (+/- 2 cm)
SB.1.d Beton Ready Mix K 400 slump 10 cm (+/- 2 cm)
DKI.2.IV.17 Pembesian besi polos atau besi ulir
DKI.2.IV.20 Pekerjaan bekisting untuk pondasi
DKI.2.IV.21 Pekerjaan bekisting untuk sloof
DKI.2.IV.22 Pekerjaan bekisting untuk kolom
DKI.2.IV.23 Pekerjaan bekisting untuk balok
DKI.2.IV.24 Pekerjaan bekisting untuk lantai
DKI.2.IV.26 Pekerjaan bekisting untuk tangga
DKI.2.IV.28 Pekerjaan pondasi beton bertulang (150 kg besi + bekisting)
DKI.2.IV.29 Pekerjaan sloof beton bertulang (200 kg besi + bekisting)
DKI.2.IV.30 Pekerjaan kolom beton bertulang (300 kg besi + bekisting)
DKI.2.IV.31 Pekerjaan balok beton bertulang (200 kg besi + bekisting)
DKI.2.IV.32 Pekerjaan kolom beton bertulang (150 kg besi + bekisting)
DKI.2.IV.33 Pekerjaan dinding beton bertulang (150 kg besi + bekisting)
DKI.2.IV.34 Pekerjaan dinding beton bertulang (200 kg besi + bekisting)
DKI.2.IV.35 Pekerjaan kolom praktis beton bertulang (11 x 11) cm
DKI.2.IV.36 Pekerjaan ring balok beton (10 x 15) cm
SB.2 Bekisting untuk
permukaan beton
biasa dengan
multiplex 12 mm atau
18 mm
SB.8 Bekisting pondasi dan sloof beton biasa dengan papan ukuran 3/20
SP PEKERJAAN PONDASI
SP.1 Tiang baja beton bertulang (30 cm x 30 cm)
SP.2 Tiang pancang baja pipa atau kotak (30 cm x 30 cm)
SBJ PEKERJAAN STRUKTUR BAJA
DKI.9.XI.2 Pekerjaan rangka kuda-kuda baja IWF
SBJ.1 Memasang besi profil
SBJ.2 Memasang rangka kuda-kuda baja I/WF
SBJ.3 Mengerjakan pekerjaan perakitan
SBJ.4 Mengerjakan pengelasan dengan las listrik
SBJ.5 Pengecatan permukaan baja
PEKERJAAN ARSITEKTUR
AA PEKERJAAN ATAP
AD PEKERJAAN DINDING
DKI.3.V.8 Pekerjaan dinding
bata merah uk
(5x11x22) cm tb 1/2
bata, campuran spesi
1 PC : 3 PP
AB PEKERJAAN BUKAAN
DKI.5.VII.1 Kusen pintu dan kusen jendela, kayu kelas I
DKI.5.VII.2 Kusen pintu dan kusen jendela, kayu kelas II atau III
DKI.5.VII.5 Daun pintu panel, kayu kelas I atau II
DKI.5.VII.6 Pintu dan jendela kaca, kayu kelas I atau II
DKI.5.VII.7 Pintu dan jendela jalusi kayu kelas I atau II
DKI.5.VII.8 Daun pintu kayu lapis
(plywood) rangkap,
rangka tertutup kayu
kelas II (lebar sampai
90 cm)
AB.2 Membuat dan memasang daun pintu panel, kayu kelas I atau II
AB.3 Membuat dan memasang pintu dan jendela kaca, kayu kelas I atau I
AB.4 Membuat dan memasang pintu dan jendela jalusi kayu kelas I atau I
AB.5 Membuat daun pintu
kayu lapis (plywood)
rangkap, rangka
tertutup kayu kelas II
(lebar sampai 90 cm)
DKI.6.IX.25 Pekerjaan plint ubin granit ukuran (10 x 30) cm tanpa plint ubin
DKI.6.IX.28 Pekerjaan plint ubin
teralux marmer
ukuran (10 x 60) cm
tanpa plint ubin
teralux
DKI.7.IX.34 Pekerjaan lantai keramik ukuran (33 x 33) cm tanpa ubin keramik
DKI.7.IX.35 Pekerjaan lantai keramik ukuran (30 x 30) cm tanpa ubin keramik
DKI.7.IX.36 Pekerjaan lantai keramik ukuran (20 x 20) cm tanpa ubin keramik
DKI.7.IX.38 Pekerjaan lantai
mosaik ukuran (30 x
30) cm, campuran
spesi 1 PC : 3 PP
LS 1,213,278.01 479,316.75
M2 - 7,834.87
M 340,340.00 71,364.00
M 727,733.00 71,364.00
M 103,721.00 24,600.00
M2 1,235,531.00 619,297.00
M2 1,236,693.00 381,190.00
M2 - 18,187.00
M2 1,198,042.00 381,190.00
M2 1,232.00 110,815.00
M3 - 738,749.00
M3 - 691,378.00
M3 - 235,046.00
M3 - 122,348.67
M3 - 219,148.67
M2 - 6,529.06
M2 - 4,001.15
M2 - 10,002.88
M' - 58,330.64
M3 - 81,138.00
M3 - 99,734.00
M3 - 118,645.00
M3 - 107,973.00
M3 - 163,854.00
M3 - 130,610.00
M3 - 5,936.00
M3 - 35,543.00
M2 - 59,355.00
M3 335,069.00 32,455.00
M3 316,880.00 29,678.00
M3 - 73,517.16
M3 - 88,142.25
M3 - 308,415.08
M3 - 163,226.39
M3 - 108,774.06
M3 93,665.00 26,801.75
M2 - 22,925.16
M3 372,947.52 52,232.44
M3 - 30,218.11
Titik 11,137.50 17,367.29
M3 336,600.00 129,570.80
M3 303,600.00 129,570.80
M3 231,000.00 122,139.20
M3 217,800.00 35,842.98
M2 34,001.00 37,740.41
M2 20,933.00 37,740.41
M2 2,486.00 373.09
M1 16,843.20 4,075.63
M 49,658.44 67,490.29
kg 8,431.50 377.84
Kg 14,202.94 190.28
Kg 15,623.23 209.30
Kg 14,540.70 190.28
Kg 15,994.77 209.30
Kg 12,660.07 634.70
M2 30,121.63 1,486.23
M2 43,163.51 2,140.07
M2 58,218.27 2,912.74
M2 76,357.68 3,804.23
M2 76,000.42 3,804.23
M2 118,687.40 5,944.31
M2 170,879.48 8,560.91
M2 161,020.12 54,759.76
M 105,262.77 14,718.72
M3 867,306.00 167,757.65
M3 905,454.00 167,757.65
M3 917,796.00 167,757.65
M3 969,408.00 167,757.65
Kg 13,219.00 1,730.00
M2 183,738.00 92,773.00
M2 206,066.00 92,773.00
M2 330,221.00 117,750.00
M2 343,593.00 117,750.00
M2 362,221.00 117,750.00
M2 285,340.00 117,750.00
M3 3,651,772.00 942,099.00
M3 5,234,765.00 1,063,422.00
M3 8,109,076.00 1,325,488.00
M3 6,237,504.00 1,153,299.00
M3 5,612,556.00 942,518.00
M3 5,406,036.00 942,099.00
M3 5,663,315.00 1,063,422.00
M 62,874.00 28,058.00
M 71,497.00 46,333.00
M2 210,970.32 102,467.09
M2 436,975.00 122,960.51
M2 262,139.02 251,908.74
M2 685,360.50 223,429.80
M2 1,024,403.82 122,960.51
M2 1,502,770.50 135,256.56
M2 952,512.00 98,368.41
M2 1,502,770.50 110,664.46
M #N/A #N/A
M #N/A #N/A
Kg 11,445.00 14,760.00
Kg 15,928.46 21,648.22
Kg 12,589.38 21,648.22
Kg - 270.60
Kg - 784.96
M2 25,827.85 21,282.03
M2 72,505.00 46,763.00
M2 69,676.00 46,763.00
M2 19,700.00 71,679.00
M2 7,230.00 46,763.00
M2 4,164.00 35,682.00
M2 80,111.58 51,439.58
M2 75,995.80 51,439.58
M2 231,590.20 51,439.58
M2 11,757,775.92 51,439.58
M2 256,798.25 51,439.58
M2 253,428.41 51,439.58
M3 10,779,700.00 3,614,641.00
M3 11,755,450.00 3,098,264.00
M2 237,900.00 516,377.00
M2 142,740.00 413,102.00
M2 372,540.00 516,377.00
M2 197,204.00 361,464.00
M2 339,543.00 392,228.00
M3 11,838,695.00 3,408,089.85
M2 415,030.00 568,014.98
M2 249,018.00 454,411.98
M2 655,138.00 568,014.98
M2 523,009.96 397,610.48
M2 603,507.30 431,450.84
M2 3,100.00 10,569.00
M2 419,517.00 21,097.00
M2 215,550.50 27,060.27
M2 215,550.50 27,060.27
M2 72,266.70 27,060.27
M2 27,936.70 19,624.96
M' 11,038.50 16,236.16
M2 224,501.86 135,292.00
M2 46,763.00 42,818.00
M 3,758.00 22,219.00
M 3,758.00 22,219.00
M2 46,697.00 124,886.00
M2 47,276.00 124,886.00
M2 49,528.00 124,886.00
M2 526,023.00 124,886.00
M 2,671.00 22,219.00
M 1,343.00 22,219.00
M2 9,450.00 41,899.00
M2 9,450.00 29,520.00
M2 320,700.00 124,886.00
M2 6,750.00 59,926.00
M2 - 29,520.00
M2 103,447.27 47,099.91
M' 63,371.54 24,441.09
M' 9,016.26 24,441.09
M2 157,445.79 137,374.74
M2 97,901.23 137,374.74
M2 107,142.86 137,374.74
M' 92,276.79 24,441.09
M' 90,841.39 24,441.09
M2 205,493.75 46,089.30
M2 36,575.00 32,472.32
M2 392,040.00 137,374.74
M2 5,229,510.00 549,613.79
M2 3,021,246.58 364,061.79
M2 252,690.76 344,955.77
M2 467,770.78 270,602.70
M2 2,939,701.26 362,667.43
M2 110,000.00 16,871.19
M' 53,370.90 24,186.66
bh 21,545.70 1,132.12
M' 69,141.60 24,186.66
M' 95,782.50 24,186.66
M' 283,159.80 39,862.46
M' 325,749.60 50,035.10
M' 411,642.00 50,035.10
M' 7,007.72 13,345.38
M' 9,653.99 13,345.38
M' 13,182.35 13,345.38
M' 13,182.35 20,018.07
M' 29,059.97 20,018.07
M' 42,438.33 29,940.27
M' 57,237.84 29,940.27
M' 94,873.68 29,940.27
M' 58,843.55 29,827.05
M' 44,875.91 15,813.18
M' 64,018.35 27,474.95
M' 115,831.97 74,574.86
bh 93,225.00 50,613.57
bh 137,445.88 84,355.95
bh - 126,533.92
M3 307,371.24 1,103,723.06
1,692,594.76
7,834.87
411,704.00 Hal 1
799,097.00 Hal 1
128,321.00 Hal 1
1,854,828.00 Hal 1
1,617,883.00 Hal 1
18,187.00 Hal 1
1,579,232.00 Hal 1
112,047.00 Hal 1
738,749.00 Hal 1
691,378.00 Hal 1
235,046.00
122,348.67
219,148.67
6,529.06
4,001.15
10,002.88
58,330.64
81,138.00 Hal 1
99,734.00 Hal 1
118,645.00 Hal 1
107,973.00 Hal 1
163,854.00 Hal 1
130,610.00 Hal 1
5,936.00 Hal 1
35,543.00 Hal 1
59,355.00 Hal 1
367,524.00 Hal 1
346,558.00 Hal 1
73,517.16
88,142.25
308,415.08
163,226.39
108,774.06
120,466.75
22,925.16
425,179.96
30,218.11
28,504.79
466,170.80
433,170.80
353,139.20
253,642.98
71,741.41
58,673.41
2,859.09
20,918.83
117,148.73
8,809.34
14,393.22
15,832.54
14,730.97
16,204.07
13,294.77
31,607.87
45,303.59
61,131.01
80,161.91
79,804.65
124,631.71
179,440.39
215,779.88
119,981.49
452,699.86
645,108.19
739,708.19
1,074,291.52
1,788,374.86
1,806,964.86
2,264,564.86
4,201,444.86
5,192,377.63
10,773,064.86
6,765,817.63
1,073,625.24
972,350.00 Hal 1
944,539.00 Hal 1
71,397.95
1,035,063.65
1,073,211.65
1,085,553.65
1,137,165.65
14,949.00 Hal 2
276,511.00 Hal 2
298,839.00 Hal 2
447,971.00 Hal 2
461,343.00 Hal 2
479,971.00 Hal 2
403,090.00 Hal 2
4,593,871.00 Hal 2
6,298,187.00 Hal 2
9,434,564.00 Hal 2
7,390,803.00 Hal 2
6,555,074.00 Hal 2
6,348,135.00 Hal 2
6,726,737.00 Hal 2
90,932.00 Hal 2
117,830.00 Hal 2
313,437.41
559,935.51
514,047.76
908,790.30
1,147,364.33
1,638,027.06
1,050,880.41
1,613,434.96
#N/A
#N/A
26,205.00 Hal 9
37,576.68
34,237.60
270.60
784.96
47,109.88
119,268.00 Hal 3
116,439.00 Hal 3
91,379.00 Hal 4
53,993.00 Hal 4
39,846.00 Hal 4
131,551.16
127,435.38
283,029.78
11,809,215.50
308,237.83
304,867.99
101,985.72
90,989.77
59,499.50
34,058.14
43,910.65
184,800.89
41,230.46
62,523.10
14,394,341.00 Hal 5
14,853,714.00 Hal 5
754,277.00 Hal 5
555,842.00 Hal 5
888,917.00 Hal 5
558,668.00 Hal 5
731,771.00 Hal 5
15,246,784.85
983,044.98
703,429.98
1,223,152.98
920,620.44
1,034,958.14
13,669.00 Hal 9
440,614.00 Hal 9
242,610.77
242,610.77
99,326.97
47,561.66
27,274.66
359,793.86
25,232.99
35,058.00 Hal 8
48,570.00 Hal 8
41,496.00 Hal 8
25,184.00 Hal 8
89,581.00 Hal 6
25,977.00 Hal 6
25,977.00 Hal 6
171,583.00 Hal 7
172,162.00 Hal 7
174,414.00 Hal 7
650,909.00 Hal 7
24,890.00 Hal 7
23,562.00 Hal 7
51,349.00 Hal 7
38,970.00 Hal 7
445,586.00 Hal 7
66,676.00 Hal 7
29,520.00 Hal 7
150,547.18
87,812.63
33,457.35
294,820.53
235,275.97
244,517.60
116,717.88
115,282.48
251,583.05
69,047.32
529,414.74
5,779,123.79
3,385,308.37
597,646.52
738,373.47
3,302,368.68
126,871.19
77,557.56
22,677.82
93,328.26
119,969.16
323,022.26
375,784.70
461,677.10
20,353.10
22,999.37
26,527.73
33,200.42
49,078.04
72,378.60
87,178.11
124,813.95
88,670.61
60,689.09
91,493.30
190,406.83
143,838.57
221,801.83
126,533.92
1,411,094.30
369,375.33
285,845.45
231,359.87
249,433.21
314,308.12
581,155.74
581,155.74
36,758,511.24
1,284,748.74
626,293.49
626,293.49
P.1 Papan nama proyek LS
Refrensi : Permen PU No 11/PRT/M/2013 - Hal.176 - LA.03
Material
Multiplek 4' x 8' tbl 18mm lbr
Balok Uk 8x12x400 cm m3
Paku Uk 5 cm kg
Paku Uk 7 cm kg
Cat besi / kayu ICI Dulux kg
Tenaga kerja
Pekerja Oh
Tukang kayu Oh
kepala tukang kayu Oh
Tukang Cat Oh
Mandor Oh
Tenaga kerja
Operator Alat Berat orang
Surveyor orang
Material
Kaso 5/7 m'
Benang m'
Peralatan
Linggis unit
Palu godam unit
Penyediaan Air dan Listrik Kerja Ls
Material
Tenaga kerja
Peralatan
Lain-lain
Penyediaan Air Kerja Hari
Penyediaan Listrik Kerja Hari
Material
Luasan m2
Tenaga kerja
Pekerja OH
Mandor OH
Peralatan
Dump truck Mishubishi Fv 415 Hari
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Material
Meni besi kg
Cat besi / k (cat dasar) kg
Cat besi / k (cat penutup) kg
Tenaga kerja
Pekerja OH
Tukang cat OH
Kepala tukang OH
Mandor OH
Material
Alat Bantu ls
Tenaga kerja
Pekerja Oh
Mandor Oh
Upah bongkar
Material
Alat Bantu ls
Pekerja Oh
Mandor Oh
Material pintu tambahan
Plat baja tb. 0,5mm kg
Besi siku 50.50.5 kg
Canal c 150 kg
Ram wiremesh M6 m2
Deep channel+angkur m'
Upah pintu tambahan
Plat baja tb. 0,5mm kg
Besi siku 50.50.5 kg
Canal c 150 kg
Ram wiremesh M6 m2
Normalisasi Saluran M3
Refrensi : Permen PU No 11/PRT/M/2013 - Hal.92 - T.01 (g)
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Peralatan
Alat Bantu hari
Material
Tenaga kerja
Pekerja Oh
Tukang cat Oh
Kepala tukang Oh
Mandor Oh
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Tenaga kerja
Pekerja OH
Tukang Besi OH
Kepala Tukang Besi OH
Mandor OH
Material
Besi baja profil kg
Tenaga kerja
Pekerja OH
Tukang las OH
Kepala tukang OH
Mandor OH
Tenaga kerja
Pekerja OH
Tukang Kayu OH
Kepala Tukang kayu OH
Mandor OH
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Material
Alat Bantu ls
Tenaga kerja
Pekerja Oh
Tukang Las Oh
Kepala Tukang Oh
Mandor Oh
Material
Jendela Nako (rangka + kaca 5 mm) M2
Besi Strip M'
Paku Skrup buah
Tenaga kerja
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Material
Beton Ready Mix K 350 slump 10 cm (+/- 2 cm) m3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang batu Oh
Mandor Oh
Material
U 400/400 m'
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
Material
U 400/400 m'
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
Pasang Pagar + Tiang pagar pipa dia. 2" hot-dipped galvanize t. 1,9 m M'
Bahan
Pagar Panel BRC 190 x 240 cm besi dia 7 mm hot dip Galvanized Lembar
Tiang pagar pipa dia. 2" hot-dipped galvanize t. 190 + Tutup Btg
Clip Buah
Mob demob Ls
(PT. Lion Mesh )
Tenaga kerja
Pekerja OH
Tukang besi OH
Kepala tukang OH
Mandor OH
Lain-lain
Administrasi dan Dokumentasi Proyek Bulan
Material
Beton Ready Mix K 350 slump 10 cm (+/- 2 cm) m3
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang batu Oh
Mandor Oh
Material W 0 kg
Beton Decking B0 m3
Upah /M2 0 Kg
Material
Pipa PVC tipe AW Ø 1 1/2" m'
Perlengkapan (35% harga pipa) %
Tenaga kerja
Pekerja OH
Material
Buis beton 1/2 bulat dia. 20 cm tanpa tulang Bh
Tenaga kerja
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
Material
Semen PC Kg
Pasir Beton M3
Koral beton M3
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Peralatan
Memasang dinding Batu bataukuran (5 x 11 x 22) cm tebal ½ bata, campuran
M2
spesi 1 Semen PC : 4 Pasir pasang
Referensi: Permen PU No.11/PRT/M/2013
Bahan
Batu bata Buah
Semen PC Kg
Pasir pasang m3
Tenaga kerja
Pekerja OH
Tukang Batu OH
Kepala Tukang Batu OH
Mandor OH
Material
Tenaga kerja
Pekerja Oh
Tukang Oh
Mandor Oh
Peralatan
Alat Bantu Bongkar Manual hari
Pasang kansteen (tanpa kansteen) M
Referensi : Perhitungan Engineering
Asumsi : Analisis sesuai pemasangan dinding HB 20 (SNI DT-91-0009-2007 An 6.16.) x 0,25 m'
Bagian bawah kanstin diberi adukan 1PC:3PP t=3cm, antar kanstin diberi adukan t=1cm.
Material
Semen PC kg
Pasir pasang m³
Tenaga kerja
Pekerja OH
Tukang batu OH
Kepala Tukang OH
Mandor OH
Material
Kansteen abu abu 18/22x25x60 cm bh
Semen PC kg
Pasir pasang m³
Tenaga kerja
Pekerja OH
Tukang batu OH
Kepala Tukang OH
Mandor OH
Pengecatan Kansteen M2
Referensi : SNI DT-91-0012-2007 An 6.3
Material
Cat genteng Kg
Kapur sirih Kg
Tenaga kerja
Pekerja OH
Tukang batu OH
Mandor OH
Peralatan
Alat Bantu ls
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Peralatan
Alat Bantu hari
Leveling B0 M3
Refrensi : SNI. 03-2835-2002
Material
Beton Decking B0 M3
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Peralatan
Material
Tenaga kerja
Pekerja Oh
Mandor Oh
Tiang lampu Octagonal tinggi 9 M. Tebal plat 3,2 mm singgle stang ornamen M3
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 552
Material
Tiang lampu Octagonal tinggi 9 M. Tebal plat 3,2 mm Unit
Perlengkapan (12 % material) ls
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang Oh
Mandor Oh
Peralatan
Material
Lampu Jalan LED 120 Watt 220 Volt AC Unit
Tenaga kerja
Pekerja Oh
Tukang Pipa Oh
Material
Kabel Listrik NYM 3 x 2,5 mm rol
Tenaga kerja
Pembantu Tukang Oh
Instalator Oh
Material
Kabel Listrik NYFGBY 4 x 10 mm m
Tenaga kerja
Pekerja Oh
Tukang Listrik /Instalatir Oh
Material
Pipa PVC tipe AW Ø 3" m'
Perlengkapan (35 % material) ls
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala Tukang Oh
Mandor Oh
Material
Baja Siku L.100.100.10 6m'
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang batu Oh
Mandor Oh
Pengecatan
Material
kayu kelas III m3
paku 5-12 cm kg
besi beton polos kg
kawat beton kg
PC kg
PB m3
KR m3
Plat cor deck m2
penutup ujung lantai dgn balok cor sterofoam t.3cm m
bambu 7-10 cm panjang 4 m btg
bambu 7-10 cm panjang 4 m pengaku tiang vertikal btg
Tenaga kerja
Pekerja Oh
Tukang batu Oh
tukang kayu Oh
Tukang besi Oh
Kepala tukang batu Oh
Mandor Oh
Material
Baja Siku L.100.100.10 6m'
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang batu Oh
Mandor Oh
Pengecatan
Pengecatan
Material
Tutup U 1000 HD unit
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
Material
Kalsiplank 300 x 2400 tebal 8 mm lbr
Tenaga kerja
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
M.16 Perbaikan talang tegak PVC tipe AW dia. 6" + Aksesoris + Perapihan bh
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 560
Material
Pipa PVC dia. 6 " AW btg
Accecories ls
Tenaga kerja
Pekerja Oh
Tukang Pipa Oh
Kepala Tukang Oh
Mandor Oh
Pas. Kawat loket di Jalusi dan Atap monitor M2
Material
Kawat Loket 5/3mm (harga swakelola) M2
Tenaga kerja
Pekerja OH
Tukang OH
Kepala tukang OH
Mandor OH
Material
Semen PC Kg
Pasir Beton M3
Koral beton M3
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Peralatan
Material
Baja Siku L.50.50.5 Kg
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang batu Oh
Mandor Oh
Pengecatan
Material
Batu Kali Belah m3
Semen PC Kg
Pasir pasang M3
Tenaga kerja
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
SB.10 Pembuatan Plat Duicker (Ad. 1.2.3 + tulangan wiremesh 1 Lapis M-7, tb. 15 cm) M3
Refrensi : SNI DT 91-0008-2007-06
Material
Semen PC Kg
Pasir Beton M3
Batu pecah (Split) M3
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Wiremesh M-7
Material
Kawat Loket 25x25 Galvanized 1x20 M (Abadi Metal Utama) M2
Tenaga kerja
Pekerja OH
Tukang OH
Kepala tukang OH
Mandor OH
Material
Kalsiplank 300 x 2400 tebal 8 mm lbr
Tenaga kerja
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
M.16 Pemasangan talang tegak PVC tipe AW dia. 6" Lengkap + Aksesoris + Perapihan titik
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 560
Material
Pipa PVC dia. 6 " AW btg
Accecories ls
Tenaga kerja
Pekerja Oh
Tukang Pipa Oh
Kepala Tukang Oh
Mandor Oh
Material
Baja Ringan CNP m'
Tenaga kerja
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
AA.2 Pas. Bubungan Zincalume FLAT SHEET 1024 0,3 TCT Bangunan Utama M'
Referensi: SNI
Bahan
FLAT SHEET 1024 0,3 TC M'
Tutup Nok bh
Tenaga kerja
Pekerja OH
Tukang Besi OH
Kepala Tukang Besi OH
Mandor OH
Pekerjaan Connecting bh
Referensi : Perhitungan Engineering
Material
Baja Plat tb. 5 mm kg
Besi angkur kg
Mur Baut HTB (dia. 16mm) bh
Tenaga kerja
Pekerja OH
Tukang las OH
Kepala tukang OH
Mandor OH
M.16 Perbaikan talang tegak PVC tipe AW dia. 6" + Aksesoris + Perapihan m'
Refrensi : Permen PU No 11/PRT/M/2013 Hal. 560
Material
Pipa PVC dia. 6 " AW btg
Accecories ls
Tenaga kerja
Pekerja Oh
Tukang Pipa Oh
Kepala Tukang Oh
Mandor Oh
Material
Pipa PVC dia. 10" AW btg
Accecories ls
Tenaga kerja
Pekerja Oh
Tukang Pipa Oh
Kepala Tukang Oh
Mandor Oh
Material
Plat strip 50.5 kg
L 50.50.5 kg
Mur Baut bh
Tenaga kerja
Pekerja Oh
Tukang las Oh
Kepala tukang Oh
Mandor Oh
Material
Plat strip 2 mm kg
L 40.40.4 kg
Mur Baut bh
Tenaga kerja
Pekerja Oh
Tukang las Oh
Kepala tukang Oh
Mandor Oh
Material
Tutup U 1000 HD unit
Tenaga kerja
Pekerja Oh
Tukang batu Oh
Kepala tukang Oh
Mandor Oh
Material
Silent 50 Titik M2
AquaProf 50 Titik kg
Serat Fiber 50 Titik Bh
Aksesoris LS
Tenaga kerja
Pekerja OH
Tukang cat OH
Kepala tukang OH
Mandor OH
Material
Pupuk kandang krg
Rumput gajah mini m2
Tenaga kerja
Pekerja Oh
Mandor Oh
Material
Paving blok abuabu Type 4,6 Ex internusa m²
Abu batu 5 mm m³
Tenaga kerja
Pekerja OH
Tukang batu OH
Kepala Tukang OH
Mandor OH
Peralatan
PLATE COMPACTOR jam
Material
Semen PC Kg
Pasir Beton M3
Batu pecah (Split) M3
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Peralatan
Material
Base course klas A M3
Tenaga kerja
Pekerja OH
Mandor OH
Peralatan
wheel roller 8 ton jam
Water tank jam
Material
Semen PC Kg
Pasir Beton M3
Batu pecah (Split) M3
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Peralatan
ST.12 Urugan sirtu padat M3
Referensi : Panduan AHS 028/T/BM/1995 & Spek Umum Jalan. (Kobangdikal)
Material
Sirtu M3
Tenaga kerja
Pekerja OH
Mandor OH
Peralatan
Stamper hari
Material
Besi baja profil kg
Tenaga kerja
Pekerja OH
Tukang las OH
Kepala tukang OH
Mandor OH
Material
Beton ad. 1:2:3 (setara K-225) M3
Bekisting M2
Tulangan Kg
Upah Pekerja
Beton ad. 1:2:3 (setara K-225) M3
Bekisting M2
Tulangan M2
Pondasi telapak beton bertulang uk. 50x22,5 cm tb. 22,5 cm ad. 1:2:3 M3
Referensi : Perhitungan Engineering
Material
Beton ad. 1:2:3 (setara K-225) M3
Bekisting M2
Tulangan Kg
Upah Pekerja
Beton ad. 1:2:3 (setara K-225) M3
Bekisting M2
Tulangan M2
Material
Beton K-225 M3
Bekisting M2
Tulangan Kg
Upah Pekerja
Beton K-225 M3
Bekisting M2
Tulangan M2
Material
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Upah Pekerja
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Sloof uk. 20/25 ad. 1 : 2 : 3 tul. 75 Kg/m3 M3
Material
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Upah Pekerja
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Material
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Upah Pekerja
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Material
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Upah Pekerja
Beton ad. 1:2:3 M3
Bekisting M2
Pembesian Kg
Material
Semen PC Kg
Pasir Beton M3
Batu pecah (Split) M3
Baja Plat tb. 5 mm kg
Besi angkur kg
Mur Baut HTB (dia. 16mm) bh
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
Material
Semen PC Kg
Pasir Beton M3
Batu pecah (Split) M3
Baja Plat tb. 5 mm kg
Besi angkur kg
Mur Baut HTB (dia. 16mm) bh
Tenaga kerja
Pekerja Oh
Tukang Batu Oh
Kepala tukang Oh
Mandor Oh
ST.14 Urugan Tanah Merah / Tanah urug CBR 10% M3
Referensi : Panduan AHS 028/T/BM/1995 & Spek Umum Jalan. (Kobangdikal)
Material
Tanah Merah / Tanah urug M3
Tenaga kerja
Pekerja OH
Mandor OH
Peralatan
wheel roller 8 ton jam
Water tank jam
Material
Dolken dia 8-10 cm x 4.00cm btg
Tenaga kerja
Pekerja Oh
Mandor Oh
Jasa
Jasa
Jasa
1,213,278.01 536,035.50
- 16,205,000.00
Jumlah / Ls - 14,732,500.00
Harga Satuan Pekerjaan dan Jasa 10% - 16,205,750.00
Dibulatkan -
389,951.10 431,035.00
- 8,995,000.00
Jumlah / Ls - 8,178,000.00
Harga Satuan Pekerjaan dan Jasa 10% - 8,995,800.00
Dibulatkan -
- 2,170,000.00
4,393.62
494.0000
1.0000 - -
-
Jumlah / Ls - 1,973,134.80
Harga Satuan Pekerjaan dan Jasa 10% - 2,170,448.28
Dibulatkan -
- 2,838,000.00
6.0000 - -
Jumlah / Ls - 2,580,000.00
Harga Satuan Pekerjaan dan Jasa 10% - 2,838,000.00
Dibulatkan -
- 11,203.50
Jumlah / M2 - 10,185.00
Harga Satuan Pekerjaan dan Jasa 10% - 11,203.50
- 15,684.90
Jumlah / M2 - 14,259.00
Harga Satuan Pekerjaan dan Jasa 10% - 15,684.90
- 10,002.88
Jumlah / M2 - 13,314.00
Harga Satuan Pekerjaan dan Jasa 10% - 14,645.40
- 183,067.50
1.2500 115,500.00 144,375.00
0.1250 176,400.00 22,050.00
Jumlah / M3 - 166,425.00
Harga Satuan Pekerjaan dan Jasa 10% - 183,067.50
12,142.54 88,306.68
4,660.73 30,711.45
80,111.58 57,634.50
- 80,272.50
164,390.60 78,135.75
133,705.00 78,135.75
25,827.85 23,813.79
159,532.85 78,135.75
281,996.00 78,135.75
222,222.00 78,135.75
550,000.00 448,140.00
3,955,312.96 3,874,537.25
29,163.50 13,489.71
60,369.83 13,489.71
- 109,872.40
0.6000 115,500.00 69,300.00
0.0600 176,400.00 10,584.00
Jumlah / M3 - 99,884.00
Harga Satuan Pekerjaan dan Jasa 10% - 109,872.40
- 104,308.05
- 224,070.00
35,750.00 29,267.47
15,928.46 24,227.28
- 30,284.10
-
-
- 10,002.88
0.2000 115,500.00 23,100.00
0.1000 176,400.00 17,640.00
Jumlah / M2 - 40,740.00
Harga Satuan Pekerjaan dan Jasa 10% - 44,814.00
- 10,002.88
- 10,002.88
917,796.00 187,976.25
64,475.08 3,226.42
378,125.00 83,522.67
474,527.17 83,522.67
264,726.00 12,719.32
0.4200 417,000.00 175,140.00
0.4200 138,000.00 57,960.00
4.2000 800.00 3,360.00
1.0000 4,200.00 4,200.00
- 3,080,000.00
Jumlah / Ls - 2,800,000.00
Harga Satuan Pekerjaan dan Jasa 10% - 3,080,000.00
Dibulatkan -
917,796.00 187,976.25
58,218.27 2,912.74
15,312.00 4,158.00
43,923.00 30,771.51
762,057.18 120,570.45
- -
Jumlah / M3 692,779.25 109,609.50
Harga Satuan Pekerjaan dan Jasa 10% 762,057.18 120,570.45
75,995.80 57,634.50
12,142.54 88,306.68
- 65,027.60
105,262.77 16,484.74
17,790.56 18,492.98
- 109,872.40
Jumlah / M3 - 99,884.00
Harga Satuan Pekerjaan dan Jasa 10% - 109,872.40
729,300.00 120,570.45
- -
Jumlah / M3 663,000.00 109,609.50
Harga Satuan Pekerjaan dan Jasa 10% 729,300.00 120,570.45
- 429,660.00
3,300,000.00 479,522.67
1.0000 3,000,000.00 3,000,000.00
1.0000 360,000.00 360,000.00
4,400,000.00 166,493.54
0.3247 115,500.00
0.9740 155,400.00 151,357.76
14,019.00 10,798.70
91,740.00 114,761.24
49,168.90 27,047.79
92,011.19 42,679.56
3,229,339.08 93,268.56
63,250.00 36,168.59
66,183.33 21,397.53
23,479.87 19,347.30
819,133.70 83,522.67
46,777.50 15,239.07
696,153.65 16,243.92
236,720.00 19,597.69
762,057.18 120,570.45
- -
Jumlah / M3 692,779.25 109,609.50
Harga Satuan Pekerjaan dan Jasa 10% 762,057.18 120,570.45
12,650.00 14,455.98
668,827.41 329,694.75
776,201.69 269,590.69
47,666.67 19,597.69
46,777.50 15,239.07
869,337.65 16,243.92
63,250.00 36,168.59
103,950.00 15,239.07
90,750.00 15,239.07
158,646.38 103,072.20
292,057.65 10,829.28
722,036.65 10,829.28
765,900.07 317,536.76
798,449.76 317,536.76
819,133.70 83,522.67
111,200.00 47,600.00
14,413.03 5,858.16
161,020.12 61,136.30
717,983.42 266,677.95
232.0000 1,303.70 302,458.40
0.5200 277,385.00 144,240.20
0.7800 264,120.00 206,013.60
- -
Jumlah / M3 652,712.20 242,434.50
Harga Satuan Pekerjaan dan Jasa 10% 717,983.42 266,677.95
336,600.00 144,100.66
724,054.32 266,677.95
- -
Jumlah / M3 658,231.20 242,434.50
Harga Satuan Pekerjaan dan Jasa 10% 724,054.32 266,677.95
348,568.00 142,227.36
15,928.46 24,227.28
4,757,705.45 761,134.07
5,332,193.18 863,601.16
2,851,029.16 701,394.45
2,472,034.75 653,825.14
1,445,580.23 625,283.55
1,453,899.70 625,283.55
1,040,591.51 506,271.15
520,319 2,871,977
1,040,591.51 506,271.15
217,800.00 39,811.20
11,137.50 19,478.38
1,590,285.01
1,749,313.51
16,205,000.00
14,732,500.00
16,205,750.00
16,205,000.00
820,986.10
746,351.00
820,986.10
820,000.00
8,995,000.00
8,178,000.00
8,995,800.00
8,995,000.00
2,170,000.00
1,711,710.00
261,424.80
1,973,134.80
2,170,448.28
2,170,000.00
2,838,000.00
2,580,000.00
2,838,000.00
2,838,000.00
11,203.50
10,185.00
11,203.50
15,684.90
14,259.00
15,684.90
10,002.88
13,314.00
14,645.40
183,067.50
166,425.00
183,067.50
100,449.22
91,317.47
100,449.22
35,372.18
32,156.53
35,372.18
137,746.08
40.625
125,223.71
137,746.08
2,600,070.00
2,363,700.00
2,600,070.00
80,272.50
72,975.00
80,272.50
242,526.35
220,478.50
242,526.35
211,840.75
192,582.50
211,840.75
49,641.64
45,128.77
49,641.64
237,668.60
216,062.37
237,668.60
360,131.75
327,392.50
360,131.75
300,357.75
273,052.50
300,357.75
998,140.00
907,400.00
998,140.00
7,829,850.21
7,118,045.65
7,829,850.21
42,653.21
38,775.65
42,653.21
73,859.54
67,145.04
73,859.54
109,872.40
99,884.00
109,872.40
104,308.05
94,825.50
104,308.05
224,070.00
203,700.00
224,070.00
65,017.47
591,067.90
59,106.79
65,017.47
259,069.60
2,355,178.14
235,517.81
259,069.60
40,155.74
36,505.22
40,155.74
30,284.10
27,531.00
30,284.10
10,002.88
40,740.00
44,814.00
10,002.88
669,745.00
736,719.50
10,002.88
563,062.00
619,368.20
1,105,772.25
1,005,247.50
1,105,772.25
67,701.50
61,546.82
67,701.50
461,647.67
419,679.70
461,647.67
558,049.84
507,318.03
558,049.84
277,445.32
252,223.02
277,445.32
3,080,000.00
2,800,000.00
3,080,000.00
3,080,000.00
1,105,772.25
1,005,247.50
1,105,772.25
61,131.01
55,573.65
61,131.01
19,470.00
19,470.00
19,470.00
74,694.51
67,904.10
74,694.51
882,627.63
802,388.75
882,627.63
133,630.30
121,482.09
133,630.30
100,449.22
91,317.47
100,449.22
65,027.60
59,116.00
65,027.60
30,080.84
27,346.22
30,080.84
121,747.50
110,679.55
121,747.50
36,283.54
32,985.03
36,283.54
109,872.40
99,884.00
109,872.40
849,870.45
772,609.50
849,870.45
429,660.00
390,600.00
429,660.00
3,779,522.67
3,435,929.70
3,779,522.67
4,566,493.54
4,151,357.76
4,566,493.54
24,817.70
24,817.70
24,817.70
206,501.24
187,728.40
206,501.24
76,216.69
69,287.90
76,216.69
134,690.74
122,446.13
134,690.74
3,322,607.64
3,020,552.40
3,322,607.64
99,418.59
903,805.40
90,380.54
99,418.59
87,580.86
79,618.97
87,580.86
902,656.37
820,596.70
902,656.37
62,016.57
56,378.70
62,016.57
712,397.57
647,634.15
712,397.57
256,317.69
233,016.09
256,317.69
882,627.63
802,388.75
882,627.63
27,105.98
24,641.80
27,105.98
998,522.16
907,747.42
998,522.16
1,045,792.38
950,720.35
1,045,792.38
67,264.36
61,149.42
67,264.36
62,016.57
56,378.70
62,016.57
885,581.57
805,074.15
885,581.57
99,418.59
903,805.40
90,380.54
99,418.59
119,189.07
108,353.70
119,189.07
105,989.07
96,353.70
105,989.07
261,718.58
237,925.98
261,718.58
302,886.93
275,351.75
302,886.93
732,865.93
666,241.75
732,865.93
1,083,436.82
984,942.57
1,083,436.82
1,115,986.52
1,014,533.20
1,115,986.52
902,656.37
820,596.70
902,656.37
158,800.00
10000
144,465.05
158,911.56
20,271.19
18,428.35
20,271.19
222,156.41
201,960.37
222,156.41
984,661.37
895,146.70
984,661.37
480,700.66
437,000.60
480,700.66
990,732.27
900,665.70
990,732.27
490,795.36
446,177.60
490,795.36
40,155.74
36,505.22
40,155.74
5,518,839.51
5,017,126.83
5,518,839.51
5,929,926.24
5,390,842.04
5,929,926.24
6,195,794.34
5,632,540.31
6,195,794.34
3,552,423.61
Pembesian Sloof / Balok Beton
- Volume Beton 25.40.1 0.100
Bahan Pjg kg/m' total
- Utama 4Ø12 4.00 0.892 3.567
- Sengkang Ø8-200 5.10 0.395 2.015
5.581
- Pembesian Sloof / Balok Beton 55.812
Pembulatan 250.000
3,229,476.01
3,552,423.61
3,125,859.89
Pembesian Sloof / Balok Beton
- Volume Beton 25.40.1 0.100
Bahan Pjg kg/m' total
- Utama 4Ø12 4.00 0.892 3.567
- Sengkang Ø8-200 5.10 0.395 2.015
5.581
- Pembesian Sloof / Balok Beton 55.812
Pembulatan 250.000
2,841,690.81
3,125,859.89
2,070,863.78
Pembesian Sloof / Balok Beton
- Volume Beton 25.40.1 0.100
Bahan Pjg kg/m' total
- Utama 4Ø12 4.00 0.892 3.567
- Sengkang Ø8-200 5.10 0.395 2.015
5.581
- Pembesian Sloof / Balok Beton 55.812
Pembulatan 250.000
1,882,603.44
2,070,863.78
2,079,183.24
1,890,166.59
2,079,183.24
1,546,862.66
1,406,238.78
1,546,862.66
1,546,862.66
1,406,238.78
1,546,862.66
257,611.20
234,192.00
257,611.20
30,615.88
27,832.62
30,615.88
22,750
12,960
1,500
1,638
38,848 170,468
2,642 11,592
41,489 182,060
22,750
12,960
1,500
1,638
38,848 185,468
26 126
38,874 185,594
22,750
12,960
1,500
1,638
38,848 185,095
3,885 18,510
42,732 203,605
m3
kg
kg/m3
kg/m3
m3
kg
kg/m3
kg/m3
m3
kg
kg/m3
kg/m3
REKAPITULASI HARGA SATUAN
NO.
PEKERJAAN PERSIAPAN
P
P.1
P.2
P.3
DKI.1.I.13
DKI.1.I.14
PEKERJAAN SIPIL
ST
ST.1
ST.2
ST.3
ST.4
ST.5
ST.6
ST.7
ST.9
ST.10
SJ
SJ.1
SJ.2
SJ.3
SJ.4
SJ.5
SJ.6
SJ.7
SJ.8
SJ.9
SS
SS.1
SS.2
SS.4
SB
SB.1
SB.2
SB.3
SB.4
SB.5
SB.6
SB.7
SP
SP.1
SP.2
SP.3
SBJ
SBJ.1
SBJ.2
SBJ.3
SBJ.5
PEKERJAAN ARSITEKTUR
AA
AA
AA.1
AA.2
AA.3
AA.4
AD
AD.1
AD.2
AD.3
AD.4
AD.5
AD.6
AB
AB.1
AB.2
AL
AL.1
ALE
ALE.1
ALE.2
ALE.3
ALE.4
ALE.5
PEKERJAAN MEKANIKAL ELEKTRIKAL
M
M.1
M.2
M.3
M.4
M.5
M.6
M.7
M.8
M.9
M.10
M.11
M.12
M.13
M.14
M.15
M.16
M.17
18
M.19
M.20
M.21
M.22
M.23
M.24
M.25
M.26
M.27
M.28
M.29
E
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
E.11
APITULASI HARGA SATUAN
ERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
Kantor sementara M2
- 738,749.00 738,749.00
- 691,378.00 691,378.00
- 95,260.73 95,260.73
46,319.04 35,095.94 81,414.98
- 93,181.00 93,181.00
298,320.00 67,680.80 366,000.80
- 15,258.84 15,258.84
- 30,218.11 30,218.11
310,200.00 163,168.50 473,368.50
263,604.00 157,290.34 420,894.34
- 84,601.00 84,601.00
Elevasi eksisting
Section Elevasi setelah diambil Jml tanah terangkut
El. Titik El. Rata-rata
2.568
3.000
1 3.006 2.450 0.556
3.435
3.022
3.118
3.584
2 3.360 2.450 0.910
3.136
3.600
3.568
2.682
3 3.094 2.450 0.644
3.415
2.710
3.029
3.392
4 3.134 2.450 0.684
2.736
3.379
Material
Tanah Merah / Tanah urug M3 1.2000 250,000.00 300,000.00
Tenaga kerja
Pekerja OH 0.3300 135,500.00 44,715.00
Mandor OH 0.0330 183,200.00 6,045.60
Peralatan
Buldozer 425 Hp jam 0.0500 425,000.00 21,250.00
Vibro jam 0.0050 316,000.00 1,580.00
Jumlah / M3 300,000.00 73,590.60 373,590.60
Perbandingan Harga tanah antara Harga Jurnal edisi 38 th.2019 dengan Kontrak PT. Brantas Abipraya Berdasarkan Kontrak No. 025/SPP/DRT.5.3/12/2017
HARGA
NO KETERANGAN VOLUME HARGA JADI JUMLAH
MATERIAL UPAH
1 Real (Sesuai Kontrak PT. Brantas Abipraya) 875.06 115,712 22,326 138,038 120,791,585
2 Potensi Kerugian 875.06 300,000.00 73,590.60 373,591 326,914,334
Note : - Real : Sesuai Kontrak PT.Brantas Abipraya No.025/SPP/DRT.5.3/12/2017 tanggal 20 desember 2017
- Potensi Kerugian : Harga yang timbul akibat pengembalian kondisi tanah urug untuk rencana perluasan lahan parkir kantor & sarana olahraga
NO URAIAN SESUAI TIDAK SESUAI