4 Pekerja ahli
Mandor OH 150,000
B HARGA SATUAN BAHAN
1 Bahan Pasangan dan Tanah
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Batu belah 15 cm - 20 cm m3 163,000 489,000
2 Batu Paras m3 196,000
3 Batu kali alam m3 175,000
4 Batu pecah 5-7 cm m3 224,000
5 Batu pecah 3-5 cm m3 281,000
6 Batu pecah 2-3 cm m3 304,000
7 Batu pecah 2-3 cm (kg) kg 150
8 Kerikil alam 2/3 cm m3 303,000
9 Kerikil Sungai - Royalti m3 287,000
10 Kerikil pecah 1/2 cm m3 294,000
11 Kerikil alam 1 cm m3 294,000
12 Koral Beton m3 163,000
13 Agregate 2-3 (stone crusher) m3 323,000
14 Agregate 1-2 (stone crusher) m3 398,000
15 Bata merah kelas 1 buah 500
16 Bata merah kelas 2 buah 400
17 Bata Ringan / Hebel t = 10 cm Biasa m3 690,000
18 Pasir Beton (PB) m3 163,000
19 Pasir Beton (PB) - kg kg 100
20 Pasir pasang m3 147,000
21 Pasir urug m3 116,000
22 Sirtu m3 115,000
23 Tanah urug biasa m3 74,000
24 Tanah urug pilihan m3 98,000
25 Semen Merah (SM) m3 87,000
26 Semen Warna kg 13,000
27 Semen Portland kg 1,500 75,000
28 Mortar Utama (MU-380) Perekat Bata Ringan kg 4,400
29 Rumput Gebalan m2 21,000
30 Kapur gamping kg 1,600
31 Kapur biasa kg 6,650
32 List plafon (propil) 4/4 cm m' 21,000
33 Air Liter 180
2 Bahan Atap
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Genteng keramik Buah 17,000
2 Atap multiroof 3,5 mm (lapis butiran) m² 263,000
3 Seng Spandek 3 mm lebar 70 cm m' 61,000
4 Genteng beton type flat Buah 8,500
5 Nok genteng beton type flat Buah 9,500
3 Bahan Kayu
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Papan
Papan Kayu Klas I m³ 14,900,000
Papan Kayu Klas II m³ 9,000,000
Papan Kayu Klas III m³ 3,000,000
Papan kayu bekisting m³ 1,500,000
2 Balok
Balok Kayu Klas I m³ 14,500,000
Balok Kayu Klas II m³ 8,700,000
Balok Kayu Klas III m³ 2,500,000
Balok kayu bekisting m³ 1,000,000
Dolken / Perancah Dia. 7 cm - 4 M batang 18,000
Kayu usuk 5/7 cm m³ 6,000,000
Penjaga jarak bekisting/spacer m¹ 4,500
4 Bahan Bambu
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Bambu (dia.12,5 cm, P - 6 m) batang 21,000
2 Bambu (dia.10 cm, P- 6 m) batang 19,000
3 Bambu (dia.7 cm, P- 6 m) batang 16,000
5 Bahan Cetak
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Buis Beton Dia. 30 cm. bh.L= 0.5M. 82,000
2 Buis Beton Dia. 40 Cm. bh.L= 0.5M. 82,000
3 Buis Beton Dia. 60 Cm. bh.L= 0.5M. 103,000
4 Buis Beton Dia. 80 Cm. bh.L= 0.5M. 136,000
6 Bahan Lantai
Harga (Rp.)
No. Uraian Satuan Keterangan
No. Uraian Satuan Keterangan
P. Lombok
1 Keramik dinding m² 66,000
2 Keramik KW I (Motif) m² 85,000
3 Keramik KW II (Motif) m² 72,000
4 Keramik KW I (polos) m² 58,000
5 Keramik KW II (polos) m² 52,000
Ubin Keramik
1 Ubin Keramik 40/40 m² 61,000
2 Ubin Keramik 20/20 m² 61,000
3 Ubin Keramik 10/33 m² 70,000
3 Batu tempel paras m² 121,000
4 Batu tempel hitam m² 130,000
5 Ubin Granit 40/40 m² 188,000.00
6 Ubin Granit 60/60 m² 215,000.00
Batu
1 Batu Teraso (Krikil Sikat) kg 5,200
2 Batu Granit (Krikil Sikat) kg 11,000
7 Bahan Besi
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Besi Beton Ulir kg 15,900
2 Besi Beton Polos kg 15,000
3 Besi Profil Siku ST 33 kg 14,200
4 Besi Plat kg 15,000
5 Besi profil siku ST 37 kg 15,000
6 Besi Baja WF dan Sejenisnya ST 37 kg 15,500
7 Besi Black steel (S40) kg 16,100
8 Alluminium Kuzen tebal 1,2 mm (natural) m' 98,800
9 Alluminium Kuzen tebal 1,2 mm (warna) m' 105,900
10 Besi canal C kg 16,000
11 Kawat Ikat Beton kg 23,200
12 Kawat Nyamuk Besi m2 23,200
13 Kawat Nyamuk Plastik m2 18,000
14 Kawat Las kg 33,100
15 Rolling door alluminium m2 500,200
16 Alluminium strip m2 46,200
17 Pintu Alluminium m' 113,000
18 Profil kaca alluminium m' 47,000
19 Venetions blinds dan vertical blinds (tirai) m2 210,100
20 Rangka metal hollow 40.40.2 mm m 25,500
21 Rangka metal hollow 40.20.1 mm m 20,400
22 Main Trust C 75 - 85 m¹ 22,000
23 Main Trust C 75 - 75 m¹ 19,500
24 Reng TS 40 - 0,50 m¹ 1,200
25 Srew 12-14x20 Bh 600
26 Srew 10-16x16 Bh 400
27 Anchor Bolt Bh 12,750
28 Wiremesh M 8 m2 59,730
29 Wiremesh M 10 m2 93,968
30 Bondex Tebal 0,75 mm m2 156,000
8 Bahan Langit-langit
Harga (Rp.)
No. Uraian Satuan Keterangan
No. Uraian Satuan Keterangan
P. Lombok
1 Triplek 120x240x 6 mm lembar 95,000
2 Triplek 120x240x 9 mm lembar 152,000
3 Triplek 120x240x 12 mm lembar 197,000
4 Triplek 120x240x 18 mm lembar 275,000
5 Triplek lapis alluminium lembar 132,000
6 Multipleks 120 x 240 x 12 mm lembar 203,000
7 Multipleks 120 x 240 x 18 mm lembar 286,000
8 Multipleks 120 x 240 x 4 mm lembar 89,000
9 Multipleks 120 x 240 x 6 mm lembar 89,000
10 Multipleks 120 x 240 x 9 mm lembar 152,000
11 Calsiboard 120 x 240 x 3,5 mm lembar 74,000
12 Gypsum board 120 x 240 x 9 mm lembar 108,000
13 List Gypsum Profil 10 cm m¹ 22,000
14 List Gypsum Profil besar m¹ 29,000
15 List Kayu Profil m¹ 6,400
16 Lem Kayu kg 39,000
17 Lem kg 28,000
18 Kalsiplang L=20 cm. m¹ 27,000
19 Teakwood 90x290x3 mm lembar 121,000
9 Bahan Pipa
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
Pipa PVC
1 Pipa PVC Ø 1/2" M' 5,600
2 Pipa PVC Ø 3/4" M' 7,000
3 Pipa PVC Ø 1" M' 11,000
4 Pipa PVC Ø 1 1/2" M' 34,000
5 Pipa PVC Ø 2" M' 84,000
6 Pipa PVC Ø 3" M' 123,000
7 Pipa PVC Ø 4" M' 131,000
8 Pipa PVC Dia. 2" Type D M' 25,000
9 Pipa PVC Dia. 2½" Type D M' 37,000
10 Pipa PVC Dia. 3" Type D M' 22,000
11 Pipa PVC Dia. 4" Type D M' 25,000
12 Lem PVC kg 122,000
ACESSORIS PIPA
1 Stop Kran
1 Dia ½" Buah 57,000
2 Dia ¾" Buah 87,000
3 Dia 1" Buah 216,000
4 Dia 2" Buah 576,000
5 Dia 3" Buah 1,571,000
2 Kran
1 Kran Ø ½" Buah 30,000
2 Kran Ø ¾" Buah 43,000
10 Bahan Kaca
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Kaca Polos 3 mm m² 93,000
2 Kaca Polos 5 mm m² 123,000
11 Bahan Finishing
No. Uraian Satuan Harga (Rp.)
1 Ampelas lembar 3,500
2 Plamir Kayu kg 25,000
3 Minyak Cat liter 10,000
4 Residu liter 13,000
5 Melamin lembar 81,000
6 Meni Besi liter 24,000
7 Meni Kayu kg 41,000
8 Cat Kayu Mutu Menengah kg 35,000
9 Cat Kayu Mutu Tinggi kg 53,000
10 Cat Tembok Mutu Menengah Kg 39,000
11 Cat Tembok Mutu Tinggi kg/ kaleng 66,000
12 Cat Dasar Kayu kg 24,000
13 Cat Besi kg 30,000
14 Kuas bh 10,000
15 Plamir Tembok kg 9,000
16 Tepung Gypsum kg 18,000
17 Minyak Cat liter 37,000
18 Aqua Proff kg 50,000
19 Cat dasar anti alkali kg 54,000
20 Roll cat buah 12,000
21 Cat Dasar Tembok Kg 47,000
12 Bahan Pengunci
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Kunci pintu mutu menengah buah 110,000
2 Kunci pintu mutu Tinggi buah 220,000
3 Yale Kecil buah 60,000
4 Yale Besar buah 108,000
5 Kuda Terbang Kecil buah 62,000
6 Kuda Terbang Besar buah 77,000
7 Haag Angin Besar stel 7,000
8 Haag Angin Kecil stel 5,600
9 Grendel Besar buah 12,000
10 Grendel Kecil buah 9,000
11 Engsel Nylon buah 14,000
12 Engsel Biasa buah 9,000
13 Expagnolet buah 58,000
14 Kunci Tanam Biasa buah 95,000
15 Kunci Tanam Biasa Mutu Menengah buah 158,000
16 Kunci Tanam Antik buah 254,000
17 Kunci Silinder buah 44,000
18 Kunci Slot buah 63,000
19 Door Holder buah 38,000
20 Door Closer buah 190,000
13 Bahan Sanitaire
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Closet Jongkok porselain buah 138,000
2 Closed duduk keramik buah 2,115,000
3 Wastafel buah 1,322,000
4 Urinoir Porselin (Kw.1) buah 1,542,000
5 Saringan Air Besi Stainless buah 155,000
6 Saringan air besi buah 56,000
7 Floor Drain buah 17,000
8 Seal tape buah 3,000
9 Jetspray Buah 120,000
14 Bahan Paku
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Paku 1 cm - 2.5 cm kg 21,000
2 Paku 5 cm - 10 cm kg 20,000
3 Paku 5 cm - 7 cm kg 20,000
4 Paku 5 cm - 12 cm kg 19,000
5 Paku Skrup kg 19,000
6 Paku Kait buah 1,900
7 Skrup / Piles 1,5 cm. doos kecil 9,200
8 Skrup / Piles 2,0 cm. doos kecil 11,000
9 Paku Skrup 5 cm kg 22,000
10 Paku Skrup 10 cm kg 22,000
11 Paku Skrup 1 cm - 2,5 cm buah 400
12 Skrup Fixer buah 17,000
13 Paku kg 19,000
15 Bahan Listrik
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Titik Lampu buah 264,000
2 Stop Kontak Tanam buah 211,000
3 Stop Kontak Luar buah 201,000
4 Saklar ganda buah 26,000
5 Saklar tunggal buah 21,000
6 Zekering Boxes 1 Group buah 286,000
7 Zekering Boxs 2 Group buah 370,000
8 Zekering Boxs 3 Group buah 455,000
9 Box Skring 2 Grup buah 165,000
10 NYA 2,5 mm klas biasa m' 3,000
11 Pipa paralon 5/8" batang 5,000
16 Bahan Tambahan
Harga (Rp.)
No. Uraian Satuan Keterangan
P. Lombok
1 Minyak Pelumas liter 23,000
2 Minyak Begisting liter 14,000
3 Sealent tube 19,000
4 Solar liter 6,800
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
TAHUN ANGGARAN 2020
56,000.00
C Peralatan