DAFTAR UPAH KERJA WIL.

LOWOKWARU 2015

NO URAIAN SAT
a b c
1 Mandor org/hr
2 Kepala Tukang Batu org/hr
3 Kepala Tukang Kayu org/hr
4 Kepala Tukang Besi org/hr
5 Kepala Tukang Cat org/hr
6 Kepala Tukang Listrik org/hr
7 Tukang Gali org/hr
8 Tukang Batu org/hr
9 Tukang Kayu org/hr
10 Tukang Besi org/hr
11 Tukang Cat org/hr
12 Tukang Plitur org/hr
13 Tukang Pipa org/hr
14 Tukang Listrik org/hr
15 Tukang Aspal org/hr
16 Tukang Kapur org/hr
17 Pembantu Tukang org/hr
18 Pekerja Biasa org/hr
19 Penjaga Malam org/hr
20 Sopir org/hr
21 Operator org/hr
22 Mekanik org/hr
23 Pembantu Sopir org/hr
24 Pembantu Operator org/hr
25 Pembantu Mekanik org/hr
26 Juru Ukur org/hr
27 Engineer dan Crew Ls

DAFTAR ANALISA HARGA SATUAN


MENURUT SNI 2015
HARGA SAT
NO URAIAN
(Rp)
a b c
A.018 1 mᵌ GALIAN TANAH BIASA SEDALAM 1.00 m
Upah
0,040 Oh Mandor Rp 72,000.00
0,400 Oh Pekerja Rp 63,000.00
SUB JUMLAH
A.026 1 mᵌ URUGAN TANAH KEMBALI
Upah
0.019 Oh Mandor Rp 72,000.00
0.192 Oh Pekerja Rp 63,000.00
SUB JUMLAH
A.028 1 mᵌ URUGAN PASIR
Bahan
1.200 m3 Pasir Urug
Upah
0.010 Oh Mandor Rp 72,000.00
0.192 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.037 1 mᵌ PASANGAN BATU KALI PC : 4 PS
Bahan
1.100 m3 Batu kali
163.000 kg Semen PC (50kg)
0,520 m3 Pasir Pasang
Upah
0.075 Oh Mandor
0.060 Oh Kepala Tukang Batu
0.600 Oh Tukang Batu
1.500 Oh Pekerja
SUB JUMLAH
A.046 1 mᵌ PASANGAN BATU KOSONG (AANSTAMPING)
Bahan
1.200 m3 Batu Kali
0.300 m3 Pasir Urug
Upah
0.039 Oh Mandor
0.039 Oh Kepala Tukang Batu
0.390 Oh Tukang Batu
0.780 Oh Pekerja
SUB JUMLAH
A.061 1 mᵌ PASANGAN BATU MERAH 1/2 BATA 1PC : PS
Bahan
70.000 bh Batu merah 5 x 11 x 22 cm
11.500 kg Semen PC (50 kg)
0.042 m3 Pasir Pasang
Upah
0.015 Oh Mandor
0.010 Oh Kepala Tukang Batu
0.100 Oh Tukang Batu
0.320 Oh Pekerja
SUB JUMLAH
A.117 1 mᵌ PASANG KUSEN PINTU & JENDELA KAYU KHAMPER
Bahan
1.200 m3 Kayu Khamper balok
Upah
0.300 Oh Mandor
2.000 Oh Kepala Tukang Batu
18.000 Oh Tukang Batu
6000 Oh Pekerja
SUB JUMLAH
A.310 1 mᵌ SLOOF BETON BERTULANG (200 KG BESI + BEKISTING)
Bahan
0.270 m3 Papan Meranto (2 x 20) cm
2.000 kg Paku segala ukuran
0.600 ltr Minyak bekisting
200.000 kg Besi beton
3000 kg Kawat beton
323.000 kg Semen PC
0.520 m3 Pasir beton
0.780 m3 Steinslag pecah mesin 2/3
Upah
0.017 Oh Mandor
0.331 Oh Kepala Tukang Batu
1.400 Oh Tukang Batu
1.560 Oh Tukang Kayu
0.350 Oh Tukang besi
4.850 Oh Pekerja
SUB JUMLAH
A.311 1 mᵌ KOLLOM BETON BERTULANG (150 KG BESI + BEKISTING)
Bahan
0.400 m3 Papam meranti (2x20) cm
4.000 kg Paku segala ukuran
2.000 ltr Minyak bekisting
0.150 m3 Balok Meranti
3.500 lbr Multiplex t = 9 mm
20.000 btg Dolken Ø8 - 10/4m
150.000 kg Besi beton
4.500 kg Kawat beton
323.000 kg Semen PC
0.520 m3 Pasir beton
0.780 m3 Steinslag pecah mesin 2/3
Upah
0.250 Oh Mandor
0.570 Oh Kepala Tukang Batu
0.350 Oh Tukang Batu
3.300 Oh Tukang Kayu
2.100 Oh Tukang besi
7.300 Oh Pekerja
SUB JUMLAH
A.312 1 mᵌ BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
Bahan
0.320 m3 Papam meranti (2x20) cm
3.200 kg Paku segala ukuran
1.600 ltr Minyak bekisting
0.140 mᵌ Balok Meranti
2.800 lbr Multiplex t = 9 mm
16.000 btg Dolken Ø8 - 10/4m
200.000 kg Besi beton
4.500 kg Kawat beton
323.000 kg Semen PC
0.520 mᵌ Pasir beton
0.780 m3 Steinslag pecah mesin 2/3
Upah
0.208 Oh Mandor
0.455 Oh Kepala Tukang Batu
0.350 Oh Tukang Batu
2.800 Oh Tukang Kayu
1400 Oh Tukang besi
5.690 Oh Pekerja
SUB JUMLAH

REKAPITULASI ANGGARAN BIAYA

No Jenis Pekerjaan Satuan

1 Galian mᵌ
2 Urugan Tanah Kembali mᵌ
3 Urugan Pasir mᵌ
4 Pas. Pondasi Batu Kali mᵌ
5 Pas. Batu Kosong mᵌ
6 Pas. Bata Merah 1/2 Bata m²
7 Pas. Kusen Pintu & Jendela mᵌ
8 Sloof Beton Bertulang mᵌ
9 Kolom Beton Bertulang mᵌ
10 Balok Beton Bertulang (Ring Balk) mᵌ

Total
WOKWARU 2015

HARGA SATUAN KETERANGAN


d e
Rp 72,000.00
Rp 67,500.00
Rp 67,500.00
Rp 67,500.00
Rp 67,500.00
Rp 67,500.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 63,000.00
Rp 49,500.00
Rp 49,500.00
Rp 49,500.00
Rp 63,000.00
Rp 67,500.00
Rp 72,000.00
Rp 58,500.00
Rp 58,500.00
Rp 54,500.00
Rp 126,000.00
Rp 720,000.00

ISA HARGA SATUAN


RUT SNI 2015
UPAH Bahan
JML HARGA
(Rp) (Rp)
d e f

Rp 2,880.00
Rp 25,200.00
Rp 28,080.00 Rp 28,080.00

Rp 1,368.00
Rp 12,096.00
Rp 13,464.00 Rp 13,464.00
Rp 7,200.00
Rp 9,504.00
Rp 16,704.00 Rp 16,704.00

Rp - Rp - Rp -

Rp -
I ANGGARAN BIAYA

Volume Harga Satuan (Rp) Jumlah Harga (Rp)

155.8 Rp 28,080.00 Rp 4,374,864.00


155.8 Rp 13,464.00 Rp 2,097,691.20
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp0
a. Pembersihan site/lokasi tanah

v = pxl p 20.00
200.00 mᵌ l 10.00

b. Pengukuran dan pemasangan bowplank

v = (p+l) x 2 a 0.80
60.00 mᵌ b 1.00
h 0.70
p 59.40

c. Galian Tanah Pondasi

va = (a+b) / 2 x h x p a 0.80
37.42 mᵌ b 1.00
h 0.70
p 59.40

d. Urugan Pasir dan Tanah


1. Urugan pasir bawah pondasi
va = h x b x p
9.50 mᵌ
2. Urugan pasir bawah lantai
va = h x L L 72.00
14.40 mᵌ h 0.20 (tebal pasir urug)
3. Urugan tanah kembali
v = v galian tanah - (v pasangan batu kali + v urugan pasir dibawah pondasi)
mᵌ

e. Pekerjaan pondasi
1. Pondasi batu kali
va = (a+b) / 2 x h x p a 0.50
27.03 mᵌ b 0.80

2. Pondasi batu kosong a 0.50


va = (a+b) / 2 b 0.80
0.65 mᵌ

3. Pondasi batu kali setengah


va = (a+b) / 2 x h x p a 0.40
24.95 mᵌ b 0.80

4. Pondasi setempat
va = a x b x h a 1.00
0.53 mᵌ b 0.30
h 1.75 tinggi pondasi
f. Sloof Beton 15 x 15
va = b x h x p b 0.15
1.34 mᵌ h 0.15

g. Balok Tarik 15 x 15 Ring Balk


va = b x h x p b 0.15 1.34 0.15
1.34 mᵌ h 0.15 0.15

g. Balok 15 x 15
va = b x h x p b 0.15
1.34 mᵌ h 0.15

h. Kolom
Type 1
vb = (b x h x t)∑k b 0.15
2.34 mᵌ h 0.15
t 4.00
∑k 26.00

vb = (b x h x t)∑k b 0.40
1.28 mᵌ h 0.40
t 4.00
∑k 2.00
Type 2
Total volume kolom 3.62 mᵌ

i. Lantai kerja 19,85 x 9,85


va = p x l
195.52 mᵌ p 19.85
l 9.85
Total lantai kerja lantai 1 & lantai 2 = 391.05 mᵌ

j. Pelat lantai 2 (h= 0,15)


va = p x l x h h 0.15
29.33 mᵌ

j. Pasang dinding bata merah 1 : 4


1. Lantai 1
v = (h x p) - ∑lp - ∑lj h 4.00
230.46 mᵌ p 59.40
∑lp 2.73
∑lj 4.41

2. Lantai 2
v = (h x p) - ∑lp - ∑lj
93.06
Total pasangan dinding bata me

h. Plesteran dan aci 1 :4


1. Lantai 1
vs = {(h plesteran x p plesteran) - L pintu} x 2 h 4.00
469.74 p 59.40
L pintu 2.73
2. Lantai 2
vs = {(h plesteran x p plesteran)
194.94

Total plesteran dan aci 1 : 5 lant

i. Lantai keramik 30 x 30
v=pxl p 8.85
69.47 m² l 7.85

kusen
j1
v = p x l x unit l 0.78
1.40 p 1.80
unit 1.00

j2
v = p x h x unit
6.37 l 1.18
p 1.80
unit 3.00
pj1
v = (p x h x unit) - v tidak terpakai v v tidak terpakai
2.69 v = (p x h x unit) l 1.36 v = p x l
2.86 p 2.10 0.17
unit 1.00
pj2
v = (p x h x unit) - v tidak terpakai v v tidak terpakai
4.12 v = (p x h x unit) l 2.12 v = p x l x 2
4.45 p 2.10 0.34
unit 1.00
p2
v = p x h x unit l 0.80
6.72 p 2.10
unit 4.00

p3 l 0.70
1.47 p 2.10
unit 1.00

v kusen 22.77
2. Lantai 2
vb = (b x h x t)∑k b 0.50
4.50 mᵌ h 0.50
t 3.00
∑k 6.00

2. Lantai 2
v = (h x p) - ∑lp - ∑lj h 3.00
mᵌ p 33.40
∑lp 2.73 (profil bata)
∑lj 4.41 plester, panjang, tinggi
Total pasangan dinding bata merah 1 : 5 323.52 m²

2. Lantai 2
vs = {(h plesteran x p plesteran) - L pintu} x 2 h 3.00
p 33.40
L pintu 2.73
Total plesteran dan aci 1 : 5 lantai 1 & lantai 2 = 664.68

v tidak terpakai
p 0.3
l 0.56

v tidak terpakai
v=pxlx2 p 0.3
l 0.56
DAFTAR UPAH KERJA WIL. LOWOKWARU 2015
NO URAIAN SAT HARGA SATUAN
a b c d
1 Mandor org/hr Rp 72,000.00
2 Kepala Tukang Batu org/hr Rp 67,500.00
3 Kepala Tukang Kayu org/hr Rp 67,500.00
4 Kepala Tukang Besi org/hr Rp 67,500.00
5 Kepala Tukang Cat org/hr Rp 67,500.00
6 Kepala Tukang Listrik org/hr Rp 67,500.00
7 Tukang Gali org/hr Rp 63,000.00
8 Tukang Batu org/hr Rp 63,000.00
9 Tukang Kayu org/hr Rp 63,000.00
10 Tukang Besi org/hr Rp 63,000.00
11 Tukang Cat org/hr Rp 63,000.00
12 Tukang Plitur org/hr Rp 63,000.00
13 Tukang Pipa org/hr Rp 63,000.00
14 Tukang Listrik org/hr Rp 63,000.00
15 Tukang Aspal org/hr Rp 63,000.00
16 Tukang Kapur org/hr Rp 63,000.00
17 Pembantu Tukang org/hr Rp 49,500.00
18 Pekerja Biasa org/hr Rp 49,500.00
19 Penjaga Malam org/hr Rp 49,500.00
20 Sopir org/hr Rp 63,000.00
21 Operator org/hr Rp 67,500.00
22 Mekanik org/hr Rp 72,000.00
23 Pembantu Sopir org/hr Rp 58,500.00
24 Pembantu Operator org/hr Rp 58,500.00
25 Pembantu Mekanik org/hr Rp 54,500.00
26 Juru Ukur org/hr Rp 126,000.00
27 Engineer dan Crew Ls Rp 720,000.00
015
KETERANGAN
e
DAFTAR ANALISA HARGA SATUAN
MENURUT SNI 2015
HARGA SAT
NO URAIAN
(Rp)
a b c
A.018 1 mᵌ GALIAN TANAH BIASA SEDALAM 1.00 m
Upah
0,040 Oh Mandor Rp 72,000.00
0,400 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.026 1 mᵌ URUGAN TANAH KEMBALI
Upah
0.019 Oh Mandor Rp 72,000.00
0.192 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.028 1 mᵌ URUGAN PASIR
Bahan
1.200 m3 Pasir Urug
Upah
0.010 Oh Mandor Rp 72,000.00
0.192 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.037 1 mᵌ PASANGAN BATU KALI PC : 4 PS
Bahan
1.100 m3 Batu kali
163.000 kg Semen PC (50kg)
0,520 m3 Pasir Pasang
Upah
0.075 Oh Mandor Rp 72,000.00
0.060 Oh Kepala Tukang Batu Rp 67,500.00
0.600 Oh Tukang Batu Rp 63,000.00
1.500 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.046 1 mᵌ PASANGAN BATU KOSONG (AANSTAMPING)
Bahan
1.200 m3 Batu Kali
0.300 m3 Pasir Urug
Upah
0.039 Oh Mandor Rp 72,000.00
0.039 Oh Kepala Tukang Batu Rp 67,500.00
0.390 Oh Tukang Batu Rp 63,000.00
0.780 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.061 1 mᵌ PASANGAN BATU MERAH 1/2 BATA 1PC : PS
Bahan
A.061

70.000 bh Batu merah 5 x 11 x 22 cm


11.500 kg Semen PC (50 kg)
0.042 m3 Pasir Pasang
Upah
0.015 Oh Mandor Rp 72,000.00
0.010 Oh Kepala Tukang Batu Rp 67,500.00
0.100 Oh Tukang Batu Rp 63,000.00
0.320 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.117 1 mᵌ PASANG KUSEN PINTU & JENDELA KAYU KHAMPER
Bahan
1.200 m3 Kayu Khamper balok
Upah
0.300 Oh Mandor Rp 72,000.00
2.000 Oh Kepala Tukang Batu Rp 67,500.00
18.000 Oh Tukang Batu Rp 63,000.00
6000 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.310 1 mᵌ SLOOF BETON BERTULANG (200 KG BESI + BEKISTING)
Bahan
0.270 m3 Papan Meranti (2 x 20) cm
2.000 kg Paku segala ukuran
0.600 ltr Minyak bekisting
200.000 kg Besi beton
3000 kg Kawat beton
323.000 kg Semen PC
0.520 m3 Pasir beton
0.780 m3 Steinslag pecah mesin 2/3
Upah
0.017 Oh Mandor Rp 72,000.00
0.331 Oh Kepala Tukang Batu Rp 67,500.00
1.400 Oh Tukang Batu Rp 63,000.00
1.560 Oh Tukang Kayu Rp 63,000.00
0.350 Oh Tukang besi Rp 63,000.00
4.850 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.311 1 mᵌ KOLLOM BETON BERTULANG (150 KG BESI + BEKISTING)
Bahan
0.400 m3 Papam meranti (2x20) cm
4.000 kg Paku segala ukuran
2.000 ltr Minyak bekisting
0.150 m3 Balok Meranti
3.500 lbr Multiplex t = 9 mm
20.000 btg Dolken Ø8 - 10/4m
150.000 kg Besi beton
4.500 kg Kawat beton
323.000 kg Semen PC
0.520 m3 Pasir beton
0.780 m3 Steinslag pecah mesin 2/3
Upah
0.250 Oh Mandor Rp 72,000.00
0.570 Oh Kepala Tukang Batu Rp 67,500.00
0.350 Oh Tukang Batu Rp 63,000.00
3.300 Oh Tukang Kayu Rp 63,000.00
2.100 Oh Tukang besi Rp 63,000.00
7.300 Oh Pekerja Rp 49,500.00
SUB JUMLAH
A.312 1 mᵌ BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
Bahan
0.320 m3 Papam meranti (2x20) cm
3.200 kg Paku segala ukuran
1.600 ltr Minyak bekisting
0.140 mᵌ Balok Meranti
2.800 lbr Multiplex t = 9 mm
16.000 btg Dolken Ø8 - 10/4m
200.000 kg Besi beton
4.500 kg Kawat beton
323.000 kg Semen PC
0.520 mᵌ Pasir beton
0.780 m3 Steinslag pecah mesin 2/3
Upah
0.208 Oh Mandor
0.455 Oh Kepala Tukang Batu
0.350 Oh Tukang Batu
2.800 Oh Tukang Kayu
1400 Oh Tukang besi
5.690 Oh Pekerja
SUB JUMLAH
R ANALISA HARGA SATUAN
MENURUT SNI 2015
UPAH Bahan
JML HARGA
(Rp) (Rp)
d e f

Rp 2,880.00
Rp 19,800.00
Rp 22,680.00 Rp 22,680.00

Rp 1,368.00
Rp 9,504.00
Rp 10,872.00 Rp 10,872.00

Rp 96,900.00

Rp 7,200.00
Rp 9,504.00
Rp 16,704.00 Rp 16,704.00

Rp 147,900.00
Rp 1,564.68
Rp 132,600.00

Rp - Rp 282,064.68 Rp 282,064.68

Rp 147,900.00
Rp 96,900.00

Rp - Rp 244,800.00 Rp 244,800.00
Rp 159.00
Rp 1,564.68
Rp 132,600.00

Rp 8,568,000.00

Rp 9,180,000.00
Rp 16,320.00
Rp 5,100.00
Rp 19,380.00
Rp 19,380.00
Rp 1,564.68
Rp 137,700.00
Rp 275,400.00

Rp 9,180,000.00
Rp 16,320.00
Rp 5,100.00
Rp 3,978,000.00
Rp 214,200.00
Rp 10,800.00
Rp 19,380.00
Rp 19,380.00
Rp 1,564.68
Rp 137,700.00
Rp 275,400.00
REKAPITULASI ANGGARAN BIAYA

No Jenis Pekerjaan Satuan Volume

1 Galian mᵌ 155.8
2 Urugan Tanah Kembali mᵌ 155.8
3 Urugan Pasir mᵌ
4 Pas. Pondasi Batu Kali mᵌ
5 Pas. Batu Kosong mᵌ
6 Pas. Bata Merah 1/2 Bata m²
7 Pas. Kusen Pintu & Jendela mᵌ
8 Sloof Beton Bertulang mᵌ
9 Kolom Beton Bertulang mᵌ
10 Balok Beton Bertulang (Ring Balk) mᵌ

Total
N BIAYA

Harga Satuan (Rp) Jumlah Harga (Rp)

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp0