NO.

Uraian Satuan

A. Upah Tenaga Kerja

1 Mandor OH
2 Tukang gali tanah OH
3 Kepala tukang batu OH
4 Tukang Batu OH
5 Laden tukang batu OH
6 Kepala tukang kayu OH
7 Tukang kayu OH
8 Laden Tukang Kayu OH
9 Kepala Tukang Besi OH
10 Tukang besi OH
11 Laden Tukang Besi OH
12 Kepala tukang cat OH
13 Tukang cat OH
14 Laden tukang cat OH
15 Penjaga malam OH
16 Buruh tak terlatih OH
17 Buruh lapangan agak terlatih OH
18 Buruh Lapangan terlatih OH
19 Tukang listrik OH
20 Tukang las OH
21 Tukang tebas OH
22 Tukang anyam OH

B. Bahan Bangunan

1 besi 8 Btg = 11 m'


2 besi 6 Btg = 11 m'
3 besi 4 Btg = 11 m'
4 besi 10 Btg = 11 m'
4 semen zak
5 Pasir Pasang rit
6 Pasir Urug rit
7 koral rit
papan bekisting m3
kayu bekisting btg
Atap Zimculome Collor ( sakura elang ) 2 susun Lbr
Atap Zimculome Collor ( Mega Roof ) 3 susun Lbr
Bak mandi Fibre 50 x 50 Segi empat kecil Bh
Balok kayu Meranti Ukuran 5x10x400 cm M3
Balok kayu Meranti Ukuran 6x12x400 cm M3
Balok kayu Meranti Ukuran 8 x12 x 400 cm M3
Bataco Bh
keramik dinding wc doz
keramik lantai wc doz
closed jongkok INA Bh
keramik lantai 40 x40 doz
pipa 1/2" btg
pipa 3/4" btg
pipa 3" btg
flor drain Bh
keran air Bh
papan kayu 2/20 (kayu kuat I Benuas/ulin) m3
cat dasar klg
cat dinding klg
cat kayu platon klg
Minyak cat klg
engsel pintu ps
engsel jendela ps
grendel pintu Bh
tarikan jendela Bh
hak angin ps
kunci tanam jendela Bh
kunci tanam pintu Bh
bindrat kg
plamir kg
Harga Dasar

Rp 98,300.00
Rp 68,000.00
Rp 90,700.00
Rp 83,100.00
Rp 68,000.00
Rp 90,700.00
Rp 83,100.00
Rp 68,000.00
Rp 90,700.00
Rp 83,100.00
Rp 68,000.00
Rp 90,700.00
Rp 83,100.00
Rp 68,000.00
Rp 68,000.00
Rp 68,000.00
Rp 68,000.00
Rp 68,000.00
Rp 75,000.00
Rp 98,300.00
Rp 98,300.00
Rp 75,500.00

Rp 32,000.00
Rp 16,000.00
Rp 7,500.00
Rp 52,500.00
Rp 58,000.00
Rp 270,000.00
Rp 170,000.00 42500
Rp 1,150,000.00 Rp 287,500.00
Rp 1,200,000.00
Rp 3,000.00
Rp 28,000.00
Rp 31,300.00
Rp 120,000.00
Rp 2,500,000.00
Rp 2,000.00
Rp 49,000.00
Rp 49,000.00
Rp 120,000.00
Rp 51,000.00

Rp 15,000.00
Rp 10,000.00
Rp 2,500,000.00

Rp 16,000.00
DAFTAR ANALISA HARGA SATUAN PE

ANALISA URAIAN

1. PEKERJAAN PENDAHULUAN

SNI 01.1.1 1 M1 Pembersihan perataan lahan


0.100 Oh Tukang Tebas
0.050 Oh Mandor

SNI 01.1.2 1 M2 Pembuatan Direksi Keet


1.700 Btg Kayu dolken/galam ø10-12 cm,4
0.210 M³ Kayu Klas III
0.300 Kg Paku Biasa
10.500 Kg Semen Portland
0.030 M3 Pasir Beton
3
0.050 M Koral Beton
1.500 lbr Seng Gelombang bljs 20 cm
2.000 Oh Tukang Kayu
1.000 Oh Pembantu Tukang Kayu
0.200 Oh Kepala Tukang Kayu
0.050 Oh Mandor

1
SNI 01.2.1 1 M Pengukuran dan pasang bouwplank
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.100 Oh Pembantu tukang kayu
3
0.012 M Balok kayu kelas kuat III
0.007 M3 Papan bouwplank
0.020 Kg Paku kayu

SNI 01 3.2 1 M2 Pembuatan gudang semen dan alat-alat los (kerja)


0.050 Oh Mandor
0.200 Oh Kepala tukang kayu
2.000 Oh Tukang kayu
1.000 Oh Pembantu tukang kayu
1.700 Btg Kayu dolken dia. 8-10/400 cm
3
0.210 M Papan kayu kelas II
0.300 Kg Paku kayu
10.500 Kg Semen PC
3
0.030 M Pasir beton
0.050 M3 Koral beton
1.500 Lbr Seng Gelombang bljs 20 cm
2. PEKERJAAN TANAH

SNI 02.6.1 1 M3 Galian tanah biasa sedalam 1 m


0.025 Oh Mandor
0.750 Oh Tukang gali tanah

SNI 02.6.2 1 M3 Galian tanah biasa sedalam 2 m


0.045 Oh Mandor
0.900 Oh Tukang gali tanah

SNI 02.6.9 1 M3 urugan tanah kembali


0.015 Oh Mandor
0.300 Oh Tukang gali tanah
3
0.400 M Pasir urug

SNI 02.6.10 1 M3 Pemadatan tanah (per 20 cm)


0.050 Oh Mandor
0.500 Oh Tukang gali tanah

SNI 02.6.11 1 M3 Urugan pasir bawah pondasi


0.010 Oh Mandor
0.300 Oh Tukang gali tanah
3
1.200 M Pasir urug

SNI 02.6.11 1 M3 Urugan pasir bawah lantai


0.010 Oh Mandor
0.300 Oh Tukang gali tanah
3
1.200 M Pasir urug

3. PEKERJAAN PONDASI
SNI 03.6.1 1 M3 Pasang pondasi batu belah adukan 1 Pc : 3 Ps
0.075 Oh Mandor
0.075 Oh Kepala tukang batu
0.750 Oh Tukang batu
1.500 Oh Pembantu tukang batu
3
1.200 M Batu belah 15/20 cm
20.200 Kg Semen PC
3
0.485 M Pasir pasang

3
SNI 03.6.9 1 M Pasang pondasi batu kosong ( aanstamping )
0.039 Oh Mandor
0.039 Oh Kepala tukang batu
0.390 Oh Tukang batu
0.780 Oh Pembantu tukang batu
3
1.200 M Batu belah 15/20 cm
0.432 M3 Pasir urug

4. PEKERJAAN PEMBETONAN
SNI 07. 6. 5 1 M³ Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr
0.0800 Oh Mandor
0.0250 Oh Kepala Tukang Batu
0.2500 Oh Tukang Batu
1.6500 Oh Laden Tukang Batu
23.200 Kg Semen Portland / Kg
3
0.5200 M Pasir Beton
3
0.7800 M Koral Beton

SNI 07. 6. 1 1 M³ Membuat Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


0.0800 Oh Mandor
0.0250 Oh Kepala Tukang Batu
0.2500 Oh Tukang Batu
1.6500 Oh Laden Tukang Batu
23.2000 Kg Semen Portland / Kg
3
0.5200 M Pasir Beton
0.7800 M3 Koral Beton

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir Ø 8mm
0.0003 Oh Mandor
0.0007 Oh Kepala Tukang Besi
0.0070 Oh Tukang Besi
0.0070 Oh Laden Tukang Besi
1.0500 Kg Besi beton
0.0150 Kg Kawat Beton

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir Ø 10mm
0.0003 Oh Mandor
0.0007 Oh Kepala Tukang Besi
0.0070 Oh Tukang Besi
0.0070 Oh Laden Tukang Besi
1.0500 Kg Besi beton
0.0150 Kg Kawat Beton

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir Ø 12 mm


0.0003 Oh Mandor
0.0007 Oh Kepala Tukang Besi
0.0070 Oh Tukang Besi
0.0070 Oh Laden Tukang Besi
1.0500 Kg Besi beton
0.0150 Kg Kawat Beton

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir Ø 16mm
0.0003 Oh Mandor
0.0007 Oh Kepala Tukang Besi
0.0070 Oh Tukang Besi
0.0070 Oh Laden Tukang Besi
1.0500 Kg Besi beton
0.0150 Kg Kawat Beton

2
SNI 09.6.20 1 M Pasang bekisting untuk pondasi
0.026 Oh Mandor
0.026 Oh Kepala tukang kayu
0.260 Oh Tukang kayu
0.520 Oh Pembantu tukang kayu
3
0.040 M Kayu papan bekisting
0.300 Kg Paku kayu
0.100 Ltr Minyak bekisting (olie)

SNI 09.6.20 1 M2 Pasang bekisting untuk Sloof


0.026 Oh Mandor
0.026 Oh Kepala tukang kayu
0.260 Oh Tukang kayu
0.520 Oh Pembantu tukang kayu
3
0.045 M Kayu papan bekisting
0.300 Kg Paku kayu
0.100 Ltr Minyak bekisting (olie)

SNI 09.6.22 1 M2 Pasang bekisting untuk kolom


0.033 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.660 Oh Pembantu tukang kayu
3
0.040 M Kayu papan bekisting
0.400 Kg Paku kayu
0.200 Ltr Minyak bekisting (olie)
3
0.015 M Balok kayu kelas kuat II
0.350 Lbr Plywood tebal 9mm
2.000 Btg Kayu dolken/galam dia. 8-10 cm pjg 4 m

2
SNI 09.6.23 1 M Pasang bekisting untuk balok
0.033 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.660 Oh Pembantu tukang kayu
3
0.040 M Kayu papan bekisting
0.400 Kg Paku kayu
0.200 Ltr Minyak bekisting (olie)
3
0.018 M Balok kayu kelas kuat II
0.350 Lbr Plywood tebal 9mm
2.000 Btg Kayu dolken/galam dia. 8-10 cm pjg 4 m

SNI 09.6.24 1 M2 Pasang bekisting untuk lantai


0.033 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.660 Oh Pembantu tukang kayu
3
0.040 M Kayu papan bekisting
0.400 Kg Paku kayu
0.200 Ltr Minyak bekisting (olie)
3
0.015 M Balok kayu kelas kuat II
0.350 Lbr Plywood tebal 9mm
6.000 Btg Kayu dolken/galam dia. 8-10 cm pjg 4 m

SNI 09.6.26 1 M2 Pasang bekisting untuk tangga


0.033 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.660 Oh Pembantu tukang kayu
3
0.030 M Kayu terentang (papan bekisting)
0.400 Kg Paku kayu
0.150 Ltr Minyak bekisting (olie)
3
0.015 M Balok kayu kelas kuat II
0.350 Lbr Plywood tebal 9mm
2.000 Btg Kayu dolken/galam dia. 8-10 cm pjg 4 m

5. PEKERJAAN LANTAI
SNI 10.2.3 1 M2 Pasang lantai keramik 20 x 20 cm
0.035 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.700 Oh Pembantu tukang batu
26.500 Bh keramik 20 x 20 cm
10.000 Kg Semen PC
3
0.045 M Pasir pasang
1.500 Kg Semen warna

SNI 10.2.3 1 M2 Pasang lantai keramik 40 x 40 cm


0.035 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.700 Oh Pembantu tukang batu
26.500 Bh keramik 20 x 20 cm
10.000 Kg Semen PC
3
0.045 M Pasir pasang
1.500 Kg Semen warna

2
SNI 10.2.3 1 M Pasang lantai keramik 10 x 40 cm
0.035 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.700 Oh Pembantu tukang batu
2.650 Bh keramik 10 x 40 cm
10.000 Kg Semen PC
3
0.045 M Pasir pasang
1.500 Kg Semen warna

SNI 10.19.4 1 M2 Pasang lantai keramik 15 x 20 cm


0.035 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.700 Oh Pembantu tukang batu
26.500 Bh keramik 15 x 20 cm
10.400 Kg Semen PC
3
0.045 M Pasir pasang
1.620 Kg Semen warna

6. PEKERJAAN KUSEN PINTU,JENDELA DAN VENTILASI


SNI 07.1.2 1 M3 Pasang kusen pintu dan jendela kayu kelas kuat II (kayu lanan/meranti)
0.300 Oh Mandor
2.100 Oh Kepala tukang kayu
21.000 Oh Tukang kayu
7.000 Oh Pembantu tukang kayu
3
1.200 M Balok kayu kelas kuat II
1.250 Kg Paku kayu
1.000 Kg Lem kayu

SNI 12.2.1 1 Bh Pasang engsel pintu


0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pembantu tukang kayu
1.000 Bh Engsel lokal "4"

SNI 12.2.1 1 Bh Pasang kunci tanam


0.003 Oh Mandor
0.060 Oh Kepala tukang kayu
0.600 Oh Tukang kayu
0.060 Oh Pembantu tukang kayu
1.000 Bh Kunci tanam merk ISEO

SNI 12.11.2 1 M2 Pasang kaca polos/bening tebal3 mm


0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pembantu tukang kayu
2
1.100 M Kaca polos/bening tebal 3 mm

SNI 12.2.2 1 Bh Pasang engsel jendela


0.001 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.010 Oh Pembantu tukang kayu
1.000 Bh Engsel jendela "3"

SNI 12.4.1 1 Bh Pasang kait angin


0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pembantu tukang kayu
1.000 Bh Kait angin

SNI 12.6.1 1 Bh Pasang kunci selot


0.001 Oh Mandor
0.020 Oh Kepala tukang kayu
0.200 Oh Tukang kayu
0.020 Oh Pembantu tukang kayu
1.000 Bh Kunci selot

SNI 12.7.1 1 Bh Pasang pegangan pintu


0.003 Oh Mandor
0.050 Oh Kepala tukang kayu
0.500 Oh Tukang kayu
0.050 Oh Pembantu tukang kayu
1.000 Bh Pegangan pintu

SNI 11.6.7 1 M2 Pasang Pintu Panel Kayu


0.05 Oh Mandor
0.25 Oh Kepala Tukang Kayu
2.5 Oh Tukang Kayu
1 Oh Laden Tukang Kayu
0.04 Bh Kayu Ulin, Balok

SNI 12.7.1a 1 Bh Pasang pegangan jendela


0.003 Oh Mandor
0.050 Oh Kepala tukang kayu
0.500 Oh Tukang kayu
0.050 Oh Pembantu tukang kayu
1.000 Bh Pegangan jendela

7. PEKERJAAN DINDING DAN PLESTERAN


SNI 04. 6. 10 1 M2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 3 Ps
0.0150 Oh Mandor
0.0100 Oh Kepala tukang batu
0.1000 Oh Tukang batu
0.3000 Oh Pembantu tukang batu
15.0000 Bh batako
11.5000 Kg Semen PC
3
0.0430 M Pasir pasang

SNI 06.6.3 1 M² Plesteran camp 1 Pc : 3 Ps tebal 15 mm


0.015 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.300 Oh Pembantu tukang batu
7.776 Kg Semen PC
3
0.023 M Pasir pasang

SNI 06.5 1 M² Plesteran camp 1 Pc : 5 Ps tebal 15 mm


0.015 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.300 Oh Pembantu tukang batu
7.776 Kg Semen PC
3
0.038 M Pasir pasang

8. PEKERJAAN PLAFOND
SNI 08.17.4 1 M² Pasang rangka langit-lamgit 60 x 60 cm kayu kelas kuat II (kayu lanan/meranti)
0.011 Oh Mandor
0.035 Oh Kepala tukang kayu
0.350 Oh Tukang kayu
0.210 Oh Pembantu tukang kayu
3
0.017 M Balok kayu kelas kuat II
0.115 Kg Paku kayu

SNI 08.1.4 1 M² Pasang langit-langit nusaboard


0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.100 Oh Pembantu tukang kayu
0.050 Kg Paku nusaboard
0.347 Lbr nusaboard

9. PEKERJAAN PENGECATAN
SNI 13.8.1 1 M2 Pengecatan bidang kayu baru: 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.009 Oh Tukang cat
0.070 Oh Pembantu tukang cat
0.200 Kg Cat meni
0.150 Kg Plamir (dempul kayu) biasa
0.170 Kg Cat dasar
0.260 Kg Cat penutup merk TKS

2
SNI 13.10.2 1 M Pengecatan tembok baru: 1 lapis cat dasar dan 2 lapis cat penutup
0.003 Oh Mandor
0.004 Oh Kepala tukang cat
0.043 Oh Tukang cat
0.028 Oh Pembantu tukang cat
0.130 Kg Cat dasar
0.230 Kg Cat penutup merk vinilex

10. PEKERJAAN KUDA-KUDA DAN ATAP


SNI 06.12.2 1 M3 Pasang konstruksi kuda-kuda kayu kelas kuat II (kayu lanan/meranti)
0.2000 OH Mandor
1.2000 OH Kepala tukang kayu
12.0000 OH Tukang kayu
4.0000 OH Laden tukang kayu
1.1000 OH Balok kayu kelas kuat II
15.0000 M' Besi strip
0.8000 Kg Paku kayu

SNI 6.6.31 1 M³ Rangka atap Kasau 5/7 dan Reng 3/4


0.0050 OH Mandor
0.0100 OH Kepala Tukang Kayu
0.1000 OH Tukang Kayu
0.1000 OH Laden Tukang Kayu
0.0088 M3 Balok Kayu Meranti
0.0600 Kg Paku Ulin

SNI 08.6.32 1 M² Pasang Atap Genteng Metal merk Mulitroof


0.0010 OH Mandor
0.0100 OH Kepala Tukang Kayu
0.1000 OH Tukang Kayu
0.2000 OH Laden Tukang Kayu
1.6700 M2 Genteng Metal

SNI 6.6.53 1 M Listplank 3x30 cm Papan meranti


0.0050 OH Mandor
0.0100 OH Kepala Tukang Kayu
0.1000 OH Tukang Kayu
0.1000 OH Laden Tukang Kayu
0.0088 M3 PapanMeranti
0.0600 Kg Paku Ulin

11. PEKERJAAN KAMAR MANDI


SNI 11.2.1 Pasang 1 buah kloset jongkok berwarna Merk INA
0.160 Oh Mandor
1.500 Oh Kepala tukang batu
1.500 Oh Tukang batu
1.000 Oh Pembantu tukang batu
1.000 Bh Kloset jongkok berwarna merk INA
6.000 Kg Semen PC
3
0.010 M Pasir pasang

SNI 10.17.1 Pasang 1 buah kran air diameter 3/4" atau 1/2"
0.005 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.010 Oh Pembantu tukang batu
1.000 Bh Krain air
0.500 Bh Seal tape
3
SNI 6.27 Pasang 1 m pipa pvc tipe AW diameter /4"
0.002 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.010 Oh Pembantu tukang batu
1.200 Bh Pipa PVC
0.500 Bh Seal tape

3
SNI 11.6.1 Pasang 1 buah bak mandi fiber glass, volume 0,30 m (50 x 50) cm
0.110 Oh Mandor
0.540 Oh Kepala tukang batu
2.700 Oh Tukang batu
1.800 Oh Pembantu tukang batu
1.000 Bh Bak Fiber
0.180 Perlengkapan 18% dari harga bak

SNI 10.19.4a 1 M2 Pasang dinding keramik 20 x 20 cm


0.045 Oh Mandor
0.045 Oh Kepala tukang batu
0.450 Oh Tukang batu
0.900 Oh Pembantu tukang batu
26.500 Bh Ubin keramik 20 x 20 cm
9.300 Kg Semen PC
0.018 M3 Pasir pasang
1.940 Kg Semen warna

12. PEKERJAAN SEPTICTANK DAN RESAPAN


SNI 10. 6.42 Menggali galian 1 buah septictank
0.9000 Mandor
0.9000 Kepala Tukang Batu
4.5000 Tukang Batu
3.0000 Laden Tukang Batu
0.4000 Tukang gali

SNI 10. 6.42 Menggali galian 1 buah Resapan


0.9000 Mandor
0.9000 Kepala Tukang Batu
4.5000 Tukang Batu
3.0000 Laden Tukang Batu
0.4000 Tukang gali
1.0000 Ijuk /kg
0.9990 Kerikil/m3
1.0000 Tanah urug
SNI 07. 6. 1 1 M³ Membuat Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr
0.0800 Oh Mandor
0.0250 Oh Kepala Tukang Batu
0.2500 Oh Tukang Batu
1.6500 Oh Laden Tukang Batu
23.2000 Kg Semen Portland / Kg
3
0.5200 M Pasir Beton
3
0.7800 M Koral Beton

SNI 07. 6. 5 1 M³ Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr


0.0800 Oh Mandor
0.0250 Oh Kepala Tukang Batu
0.2500 Oh Tukang Batu
1.6500 Oh Laden Tukang Batu
23.200 Kg Semen Portland / Kg
3
0.5200 M Pasir Beton
0.7800 M3 Koral Beton

sloof per m3
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

HARGA SATUAN HARGA UPAH HARGA BAHAN JUMLAH

@ Rp. 75,500.00 Rp. 7,550.00


@ Rp. 98,300.00 Rp. 4,915.00
Rp. 12,465.00 Rp. - Rp.

@ Rp. 13,800.00 Rp. Rp. 23,460.00


@ Rp. 1,600,000.00 Rp. Rp. 336,000.00
@ Rp. 13,000.00 Rp. Rp. 3,900.00
@ Rp. 1,500.00 Rp. Rp. 15,750.00
@ Rp. 67,500.00 Rp. Rp. 2,025.00
@ Rp. 325,000.00 Rp. Rp. 16,250.00
@ Rp. 39,300.00 Rp. Rp. 58,950.00
@ Rp. 83,100.00 Rp. 166,200.00 Rp.
@ Rp. 68,000.00 Rp. 68,000.00 Rp.
@ Rp. 90,700.00 Rp. 18,140.00 Rp.
@ Rp. 98,300.00 Rp. 4,915.00 Rp.
Rp. 257,255.00 Rp. 456,335.00 Rp.

@ Rp. 98,300.00 Rp. 491.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 6,800.00
@ Rp. 1,500,000.00 Rp. 18,000.00
@ Rp. 1,860,000.00 Rp. 13,020.00
@ Rp. 13,000.00 Rp. 260.00
Rp. 16,508.50 Rp. 31,280.00 Rp.

@ Rp. 98,300.00 Rp. 4,915.00


@ Rp. 90,700.00 Rp. 18,140.00
@ Rp. 83,100.00 Rp. 166,200.00
@ Rp. 6,800.00 Rp. 6,800.00
@ Rp. 13,800.00 Rp. 23,460.00
@ Rp. 1,860,000.00 Rp. 390,600.00
@ Rp. 13,000.00 Rp. 3,900.00
@ Rp. 1,500.00 Rp. 15,750.00
@ Rp. 67,500.00 Rp. 2,025.00
@ Rp. 325,000.00 Rp. 16,250.00
@ Rp. 39,300.00 Rp. 58,950.00
Rp. 196,055.00 Rp. 510,935.00 Rp.

@ Rp. 98,300.00 Rp. 2,457.50


@ Rp. 68,000.00 Rp. 51,000.00
Rp. 53,457.50 Rp. - Rp.

@ Rp. 98,300.00 Rp. 4,423.50


@ Rp. 68,000.00 Rp. 61,200.00
Rp. 65,623.50 Rp. - Rp.

@ Rp. 98,300.00 Rp. 1,474.50


@ Rp. 68,000.00 Rp. 20,400.00
@ Rp. 42,500.00 Rp. 17,000.00
Rp. 21,874.50 Rp. 17,000.00 Rp.

@ Rp. 98,300.00 Rp. 4,915.00


@ Rp. 68,000.00 Rp. 34,000.00
Rp. 38,915.00 Rp. - Rp.

@ Rp. 98,300.00 Rp. 983.00


@ Rp. 68,000.00 Rp. 20,400.00
@ Rp. 42,500.00 Rp. 51,000.00
Rp. 21,383.00 Rp. 51,000.00 Rp.

@ Rp. 98,300.00 Rp. 983.00


@ Rp. 68,000.00 Rp. 20,400.00
@ Rp. 42,500.00 Rp. 51,000.00
Rp. 21,383.00 Rp. 51,000.00 Rp.

@ Rp. 98,300.00 Rp. 7,372.50


@ Rp. 90,700.00 Rp. 6,802.50
@ Rp. 83,100.00 Rp. 62,325.00
@ Rp. 68,000.00 Rp. 102,000.00
@ Rp. 212,500.00 Rp. 255,000.00
@ Rp. 1,500.00 Rp. 30,300.00
@ Rp. 67,500.00 Rp. 32,737.50
Rp. 178,500.00 Rp. 318,037.50 Rp.

@ Rp. 98,300.00 Rp. 3,833.70


@ Rp. 90,700.00 Rp. 3,537.30
@ Rp. 83,100.00 Rp. 32,409.00
@ Rp. 68,000.00 Rp. 53,040.00
@ Rp. 212,500.00 Rp. 255,000.00
@ Rp. 42,500.00 Rp. 18,360.00
Rp. 92,820.00 Rp. 273,360.00 Rp.

@ Rp. 98,300.00 Rp. 7,864.00


@ Rp. 90,700.00 Rp. 2,267.50
@ Rp. 83,100.00 Rp. 20,775.00
@ Rp. 68,000.00 Rp. 112,200.00
@ Rp. 1,500.00 Rp. 34,800.00
@ Rp. 67,500.00 Rp. 35,100.00
@ Rp. 287,500.00 Rp. 224,250.00
Rp. 143,106.50 Rp. 294,150.00 Rp.

@ Rp. 98,300.00 Rp. 7,864.00


@ Rp. 90,700.00 Rp. 2,267.50
@ Rp. 83,100.00 Rp. 20,775.00
@ Rp. 68,000.00 Rp. 112,200.00
@ Rp. 1,500.00 Rp. 34,800.00
@ Rp. 67,500.00 Rp. 35,100.00
@ Rp. 287,500.00 Rp. 224,250.00
Rp. 143,106.50 Rp. 69,900.00 Rp.

@ Rp. 98,300.00 Rp. 29.49


@ Rp. 90,700.00 Rp. 63.49
@ Rp. 83,100.00 Rp. 581.70
@ Rp. 68,000.00 Rp. 476.00
@ Rp. 6,500.00 Rp. 6,825.00
@ Rp. 16,000.00 Rp. 240.00
Rp. 1,150.68 Rp. 7,065.00 Rp.

@ Rp. 98,300.00 Rp. 29.49


@ Rp. 90,700.00 Rp. 63.49
@ Rp. 83,100.00 Rp. 581.70
@ Rp. 68,000.00 Rp. 476.00
@ Rp. 6,500.00 Rp. 6,825.00
@ Rp. 16,000.00 Rp. 240.00
Rp. 1,150.68 Rp. 7,065.00 Rp.

@ Rp. 98,300.00 Rp. 29.49


@ Rp. 90,700.00 Rp. 63.49
@ Rp. 83,100.00 Rp. 581.70
@ Rp. 68,000.00 Rp. 476.00
@ Rp. 6,500.00 Rp. 6,825.00
@ Rp. 16,000.00 Rp. 240.00
Rp. 1,150.68 Rp. 7,065.00 Rp.

@ Rp. 98,300.00 Rp. 29.49


@ Rp. 90,700.00 Rp. 63.49
@ Rp. 83,100.00 Rp. 581.70
@ Rp. 68,000.00 Rp. 476.00
@ Rp. 6,500.00 Rp. 6,825.00
@ Rp. 16,000.00 Rp. 240.00
Rp. 1,150.68 Rp. 7,065.00 Rp.

@ Rp. 98,300.00 Rp. 2,555.80


@ Rp. 90,700.00 Rp. 2,358.20
@ Rp. 83,100.00 Rp. 21,606.00
@ Rp. 68,000.00 Rp. 35,360.00
@ Rp. 1,200,000.00 Rp. 48,000.00
@ Rp. 13,000.00 Rp. 3,900.00
@ Rp. 0.00 Rp. 0.00
Rp. 61,880.00 Rp. 51,900.00 Rp.

@ Rp. 98,300.00 Rp. 2,555.80


@ Rp. 90,700.00 Rp. 2,358.20
@ Rp. 83,100.00 Rp. 21,606.00
@ Rp. 68,000.00 Rp. 35,360.00
@ Rp. 1,200,000.00 Rp. 54,000.00
@ Rp. 13,000.00 Rp. 3,900.00
@ Rp. 0.00 Rp. 0.00
Rp. 61,880.00 Rp. 57,900.00 Rp.

@ Rp. 98,300.00 Rp. 3,243.90


@ Rp. 90,700.00 Rp. 2,993.10
@ Rp. 83,100.00 Rp. 27,423.00
@ Rp. 68,000.00 Rp. 44,880.00
@ Rp. 1,200,000.00 Rp. 48,000.00
@ Rp. 13,000.00 Rp. 5,200.00
@ Rp. 0.00 Rp. 0.00
@ Rp. 1,200,000.00 Rp. 18,000.00
@ Rp. 146,900.00 Rp. 51,415.00
@ Rp. 13,800.00 Rp. 27,600.00
Rp. 78,540.00 Rp. 150,215.00 Rp.
@ Rp. 98,300.00 Rp. 3,243.90
@ Rp. 90,700.00 Rp. 2,993.10
@ Rp. 83,100.00 Rp. 27,423.00
@ Rp. 68,000.00 Rp. 44,880.00
@ Rp. 1,200,000.00 Rp. 48,000.00
@ Rp. 13,000.00 Rp. 5,200.00
@ Rp. 0.00 Rp. 0.00
@ Rp. 1,200,000.00 Rp. 21,600.00
@ Rp. 146,900.00 Rp. 51,415.00
@ Rp. 13,800.00 Rp. 27,600.00
Rp. 78,540.00 Rp. 153,815.00 Rp.

@ Rp. 98,300.00 Rp. 3,243.90


@ Rp. 90,700.00 Rp. 2,993.10
@ Rp. 83,100.00 Rp. 27,423.00
@ Rp. 68,000.00 Rp. 44,880.00
@ Rp. 1,200,000.00 Rp. 48,000.00
@ Rp. 13,000.00 Rp. 5,200.00
@ Rp. 0.00 Rp. 0.00
@ Rp. 1,200,000.00 Rp. 18,000.00
@ Rp. 146,900.00 Rp. 51,415.00
@ Rp. 13,800.00 Rp. 82,800.00
Rp. 78,540.00 Rp. 205,415.00 Rp.

@ Rp. 98,300.00 Rp. 3,243.90


@ Rp. 90,700.00 Rp. 2,993.10
@ Rp. 83,100.00 Rp. 27,423.00
@ Rp. 68,000.00 Rp. 44,880.00
@ Rp. 1,200,000.00 Rp. 36,000.00
@ Rp. 13,000.00 Rp. 5,200.00
@ Rp. 0.00 Rp. 0.00
@ Rp. 1,200,000.00 Rp. 18,000.00
@ Rp. 146,900.00 Rp. 51,415.00
@ Rp. 13,800.00 Rp. 27,600.00
Rp. 0.00
Rp. 78,540.00 Rp. 138,215.00 Rp.

@ Rp. 98,300.00 Rp. 3,440.50


@ Rp. 90,700.00 Rp. 3,174.50
@ Rp. 83,100.00 Rp. 29,085.00
@ Rp. 68,000.00 Rp. 47,600.00
@ Rp. 12,500.00 Rp. 331,250.00
@ Rp. 1,500.00 Rp. 15,000.00
@ Rp. 67,500.00 Rp. 3,037.50
@ Rp. 12,500.00 Rp. 18,750.00
Rp. 83,300.00 Rp. 368,037.50 Rp.

@ Rp. 98,300.00 Rp. 3,440.50


@ Rp. 90,700.00 Rp. 3,174.50
@ Rp. 83,100.00 Rp. 29,085.00
@ Rp. 68,000.00 Rp. 47,600.00
@ Rp. 12,500.00 Rp. 331,250.00
@ Rp. 1,500.00 Rp. 15,000.00
@ Rp. 67,500.00 Rp. 3,037.50
@ Rp. 12,500.00 Rp. 18,750.00
Rp. 83,300.00 Rp. 368,037.50 Rp.

@ Rp. 98,300.00 Rp. 3,440.50


@ Rp. 90,700.00 Rp. 3,174.50
@ Rp. 83,100.00 Rp. 29,085.00
@ Rp. 68,000.00 Rp. 47,600.00
@ Rp. 12,500.00 Rp. 33,125.00
@ Rp. 1,500.00 Rp. 15,000.00
@ Rp. 67,500.00 Rp. 3,037.50
@ Rp. 12,500.00 Rp. 18,750.00
Rp. 83,300.00 Rp. 69,912.50 Rp.

@ Rp. 98,300.00 Rp. 3,440.50


@ Rp. 90,700.00 Rp. 3,174.50
@ Rp. 83,100.00 Rp. 29,085.00
@ Rp. 68,000.00 Rp. 47,600.00
@ Rp. 2,350.00 Rp. 62,275.00
@ Rp. 1,500.00 Rp. 15,600.00
@ Rp. 67,500.00 Rp. 3,037.50
@ Rp. 12,500.00 Rp. 20,250.00
Rp. 83,300.00 Rp. 101,162.50 Rp.

as kuat II (kayu lanan/meranti)


@ Rp. 98,300.00 Rp. 29,490.00
@ Rp. 90,700.00 Rp. 190,470.00
@ Rp. 83,100.00 Rp. 1,745,100.00
@ Rp. 68,000.00 Rp. 476,000.00
@ Rp. 1,200,000.00 Rp. 1,440,000.00
@ Rp. 13,000.00 Rp. 16,250.00
@ Rp. 30,000.00 Rp. 30,000.00
Rp. 2,441,060.00 Rp. 1,486,250.00 Rp.
@ Rp. 98,300.00 Rp. 73.73
@ Rp. 90,700.00 Rp. 1,360.50
@ Rp. 90,700.00 Rp. 13,605.00
@ Rp. 68,000.00 Rp. 1,020.00
@ Rp. 16,900.00 Rp. 16,900.00
Rp. 16,059.23 Rp. 16,900.00 Rp.

@ Rp. 98,300.00 Rp. 294.90


@ Rp. 90,700.00 Rp. 5,442.00
@ Rp. 90,700.00 Rp. 54,420.00
@ Rp. 68,000.00 Rp. 4,080.00
@ Rp. 140,600.00 Rp. 140,600.00
Rp. 64,236.90 Rp. 140,600.00 Rp.

@ Rp. 98,300.00 Rp. 73.73


@ Rp. 90,700.00 Rp. 1,360.50
@ Rp. 90,700.00 Rp. 13,605.00
@ Rp. 68,000.00 Rp. 1,020.00
@ Rp. 90,600.00 Rp. 99,660.00
Rp. 16,059.23 Rp. 99,660.00 Rp.

@ Rp. 98,300.00 Rp. 49.15


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 90,700.00 Rp. 9,070.00
@ Rp. 68,000.00 Rp. 680.00
@ Rp. 11,300.00 Rp. 11,300.00
Rp. 10,706.15 Rp. 11,300.00 Rp.

@ Rp. 98,300.00 Rp. 73.73


@ Rp. 90,700.00 Rp. 1,360.50
@ Rp. 90,700.00 Rp. 13,605.00
@ Rp. 68,000.00 Rp. 1,020.00
@ Rp. 16,600.00 Rp. 16,600.00
Rp. 16,059.23 Rp. 16,600.00 Rp.

@ Rp. 98,300.00 Rp. 98.30


@ Rp. 90,700.00 Rp. 1,814.00
@ Rp. 90,700.00 Rp. 18,140.00
@ Rp. 68,000.00 Rp. 1,360.00
@ Rp. 13,300.00 13,300.00 Rp. 13,300.00
Rp. 34,712.30 Rp. 13,300.00 Rp.

@ Rp. 98,300.00 Rp. 245.75


@ Rp. 90,700.00 Rp. 4,535.00
@ Rp. 90,700.00 Rp. 45,350.00
@ Rp. 68,000.00 Rp. 3,400.00
@ Rp. 43,800.00 Rp. 43,800.00
Rp. 53,530.75 Rp. 43,800.00 Rp.

98,300.00 Rp. 4,915.00


90,700.00 Rp. 22,675.00
90,700.00 Rp. 226,750.00
68,000.00 Rp. 68,000.00
502,500.00 Rp. 20,100.00
Rp. 322,340.00 Rp. 20,100.00 Rp.

@ Rp. 98,300.00 Rp. 245.75


@ Rp. 90,700.00 Rp. 4,535.00
@ Rp. 90,700.00 Rp. 45,350.00
@ Rp. 68,000.00 Rp. 3,400.00
@ Rp. 9,000.00 Rp. 9,000.00
Rp. 53,530.75 Rp. 9,000.00 Rp.

@ Rp. 98,300.00 Rp. 1,474.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 20,400.00
@ Rp. 1,600.00 Rp. 24,000.00
@ Rp. 1,500.00 Rp. 17,250.00
@ Rp. 67,500.00 Rp. 2,902.50
Rp. 31,091.50 Rp. 44,152.50 Rp.

@ Rp. 98,300.00 Rp. 1,474.50


@ Rp. 90,700.00 Rp. 1,360.50
@ Rp. 83,100.00 Rp. 12,465.00
@ Rp. 68,000.00 Rp. 20,400.00
@ Rp. 1,500.00 Rp. 11,664.00
@ Rp. 67,500.00 Rp. 1,552.50
Rp. 35,700.00 Rp. 13,216.50 Rp.

@ Rp. 98,300.00 Rp. 1,474.50


@ Rp. 90,700.00 Rp. 1,360.50
@ Rp. 83,100.00 Rp. 12,465.00
@ Rp. 68,000.00 Rp. 20,400.00
@ Rp. 1,500.00 Rp. 11,664.00
@ Rp. 67,500.00 Rp. 2,565.00
Rp. 35,700.00 Rp. 14,229.00 Rp.

kayu kelas kuat II (kayu lanan/meranti)


@ Rp. 98,300.00 Rp. 1,081.30
@ Rp. 90,700.00 Rp. 3,174.50
@ Rp. 83,100.00 Rp. 29,085.00
@ Rp. 68,000.00 Rp. 14,280.00
@ Rp. 1,200,000.00 Rp. 20,400.00
@ Rp. 13,000.00 Rp. 1,495.00
Rp. 100,448.00 Rp. 21,895.00 Rp.

@ Rp. 98,300.00 Rp. 491.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 6,800.00
@ Rp. 21,400.00 Rp. 22,000.00
@ Rp. 51,000.00 Rp. 51,000.00
Rp. 16,508.50 Rp. 73,000.00 Rp.

amir, 1 lapis cat dasar dan 2 lapis cat penutup


@ Rp. 98,300.00 Rp. 245.75
@ Rp. 90,700.00 Rp. 544.20
@ Rp. 90,700.00 Rp. 816.30
@ Rp. 68,000.00 Rp. 4,760.00
@ Rp. 30,000.00 Rp. 6,000.00
@ Rp. 26,700.00 Rp. 4,005.00
@ Rp. 27,600.00 Rp. 4,692.00
@ Rp. 26,400.00 Rp. 6,864.00
Rp. 6,366.25 Rp. 21,561.00 Rp.

ar dan 2 lapis cat penutup


@ Rp. 98,300.00 Rp. 327.34
@ Rp. 90,700.00 Rp. 390.01
@ Rp. 90,700.00 Rp. 3,900.10
@ Rp. 68,000.00 Rp. 1,904.00
@ Rp. 27,600.00 3,588.00 Rp. 3,588.00
@ Rp. 16,300.00 Rp. 3,749.00
Rp. 10,109.45 Rp. 7,337.00 Rp.

s kuat II (kayu lanan/meranti)


@ Rp. 98,300.00 Rp. 19,660.00
@ Rp. 90,700.00 Rp. 108,840.00
@ Rp. 83,100.00 Rp. 997,200.00
@ Rp. 68,000.00 Rp. 272,000.00
@ Rp. 1,200,000.00 Rp. 1,320,000.00
@ Rp. 20,400.00 Rp. 306,000.00
@ Rp. 13,000.00 Rp. 10,400.00
Rp. 1,397,700.00 Rp. 1,636,400.00 Rp.

@ Rp. 98,300.00 Rp. 491.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 6,800.00
@ Rp. 2989100 Rp. 26,304.08
@ Rp. 21900 Rp. 1,314.00
Rp. 16,508.50 Rp. 27,618.08 Rp.

@ Rp. 98,300.00 Rp. 98.30


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 13,600.00
@ Rp. 28,000.00 Rp. 46,760.00
Rp. 22,915.30 Rp. 46,760.00 Rp.

@ Rp. 98,300.00 Rp. 491.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 6,800.00
@ Rp. Rp. 0.00
@ Rp. 21900 Rp. 1,314.00
Rp. 16,508.50 Rp. 1,314.00 Rp.

@ Rp. 98,300.00 Rp. 15,728.00


@ Rp. 90,700.00 Rp. 136,050.00
@ Rp. 83,100.00 Rp. 124,650.00
@ Rp. 68,000.00 Rp. 68,000.00
@ Rp. 139,600.00 Rp. 139,600.00
@ Rp. 1,500.00 Rp. 9,000.00
@ Rp. 67,500.00 Rp. 675.00
Rp. 344,428.00 Rp. 149,275.00 Rp.

@ Rp. 98,300.00 Rp. 491.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 680.00
@ Rp. 20,200.00 Rp. 20,200.00
@ Rp. 2,000.00 Rp. 1,000.00
Rp. 10,388.50 Rp. 21,200.00 Rp.

@ Rp. 98,300.00 Rp. 491.50


@ Rp. 90,700.00 Rp. 907.00
@ Rp. 83,100.00 Rp. 8,310.00
@ Rp. 68,000.00 Rp. 680.00
@ Rp. 20,200.00 Rp. 24,240.00
@ Rp. 2,000.00 Rp. 1,000.00
Rp. 10,388.50 Rp. 25,240.00 Rp.

3
0,30 m (50 x 50) cm
@ Rp. 98,300.00 Rp. 10,813.00
@ Rp. 90,700.00 Rp. 48,978.00
@ Rp. 83,100.00 Rp. 224,370.00
@ Rp. 68,000.00 Rp. 122,400.00
@ Rp. 197,500.00 197,500.00 Rp. 197,500.00
@ Rp. 35,550.00 Rp. 6,399.00
Rp. 604,061.00 Rp. 203,899.00 Rp.

@ Rp. 98,300.00 Rp. 4,423.50


@ Rp. 90,700.00 Rp. 4,081.50
@ Rp. 83,100.00 Rp. 37,395.00
@ Rp. 68,000.00 Rp. 61,200.00
@ Rp. 2,400.00 Rp. 63,600.00
@ Rp. 1,500.00 Rp. 13,950.00
@ Rp. 67,500.00 Rp. 1,215.00
@ Rp. 12,500.00 Rp. 24,250.00
Rp. 107,100.00 Rp. 103,015.00 Rp.

@ Rp. 98,300.00 Rp. 88,470.00


@ Rp. 90,700.00 Rp. 81,630.00
@ Rp. 83,100.00 Rp. 373,950.00
@ Rp. 68,000.00 Rp. 204,000.00
@ Rp. 68,000.00 Rp. 27,200.00
Rp. 775,250.00 Rp. Rp.

@ Rp. 98,300.00 Rp. 88,470.00


@ Rp. 90,700.00 Rp. 81,630.00
@ Rp. 83,100.00 Rp. 373,950.00
@ Rp. 68,000.00 Rp. 204,000.00
@ Rp. 68,000.00 Rp. 27,200.00
@ Rp. 62,100.00 Rp. 62,100.00
@ Rp. 287,500.00 Rp. 287,212.50
@ Rp. 42,500.00 Rp. 42,500.00
Rp. 775,250.00 Rp. 391,812.50 Rp.

@ Rp. 98,300.00 Rp. 7,864.00


@ Rp. 90,700.00 Rp. 2,267.50
@ Rp. 83,100.00 Rp. 20,775.00
@ Rp. 68,000.00 Rp. 112,200.00
@ Rp. 1,500.00 Rp. 34,800.00
@ Rp. 67,500.00 Rp. 35,100.00
@ Rp. 287,500.00 224,250.00
Rp. 143,106.50 Rp. 294,150.00 Rp.

@ Rp. 98,300.00 Rp. 7,864.00


@ Rp. 90,700.00 Rp. 2,267.50
@ Rp. 83,100.00 Rp. 20,775.00
@ Rp. 68,000.00 Rp. 112,200.00
@ Rp. 1,500.00 Rp. 34,800.00
@ Rp. 67,500.00 Rp. 35,100.00
@ Rp. 287,500.00 Rp. 224,250.00
Rp. 143,106.50 Rp. 294,150.00 Rp.

Rp 3,897,147.31
Rp 70,148.65
JUMLAH

12,465.00

713,590.00

47,788.50
706,990.00

53,457.50

65,623.50

38,874.50

38,915.00

72,383.00

72,383.00

$ 206,900,100.00
$ 180,000,000.00
$ 1,800,000.00
$ 21,600,000.00
$ 158,400,000.00
$ 38,400,000.00
$ 54,000,000.00

496,537.50
366,180.00

u 206,137.18
437,256.50 b 353,115.00

213,006.50

8,215.68

8,215.68
8,215.68

8,215.68

113,780.00

119,780.00

228,755.00
232,355.00

283,955.00

216,755.00
451,337.50

451,337.50

153,212.50

184,462.50

3,927,310.00
32,959.23

204,836.90

115,719.23

22,006.15

32,659.23

48,012.30
97,330.75

342,440.00

62,530.75

75,244.00

0.007666667
48,916.50 0.038333333
49,929.00

122,343.00

89,508.50

27,927.25

17,446.45
3,034,100.00

44,126.58

69,675.30

17,822.50

493,703.00
31,588.50

35,628.50

807,960.00

210,115.00

775,250.00
1,167,062.50

437,256.50

437,256.50

Rp 3,897,147.31
Rp 70,148.65
RENCANA ANGGARAN BIAYA
PROGRAM
KEGIATAN
TAHUN ANGGARAN

No. Uraian Pekerjaan Volume

1 2 4
I PEKERJAAN PENDAHULUAN
Pembuatan Papan Nama Proyek 1.00
Pengukuran dan pemasangan bowplank 40.60
Pembersihan lokasi 1.00
SUB T
II PEKERJAAN TANAH DAN PONDASI
1 Penimbunan/peninggian & pemadatan tanah di lokasi
a. Mengurug sirtu padat untuk perbaikan tanah 142
2 Pondasi beton footplat 80 x 80 x 100 cm (100 kg + bekisting)
a. Menggali tanah biasa sedalam 1m 12
b. Mengurug tanah kembali 11.08
c. Lantai kerja beton tumbuk 1pc:3ps:5kr 1.2
d. Bekisting untuk pondasi 5.76
e. Beton bertulang 100kg besi 1pc : 2ps : 4kr 0.92
3 Pek. Slof 15 x 20 cm (100kg + bekisting)
a. Bekisting untuk sloof 16.27
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr 1.22
4 Pek. Kolom 15 x 15 x 345 cm (100 + bekisting)
a. bekisting untuk kolom 10.35
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr 0.78
5 Pek. Ringbalk 15 x 20 cm (100kg + bekisting)
a. Bekisting untuk balok 21.97
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr 1.65
c. Plesteran 1pc : 5ps, tebal 15mm 16.48
d. Acian 16.48
SUB T
III PEKERJAAN DINDING PINTU DAN JENDELA
1 Pek. Dinding dan gewel
a. Pas. Bataco 1pc : 5ps 119.49
b. Plesteran 1pc : 5ps tebal 15mm 238.97
c. Acian 238.97
2 Pek. Kusen, pintu dan jendela
a. Membuat dan memasang kusen pintu dan jendela, 0.06
kayu kelas kuat I
b. Membuat & memasang daun pintu panil, kayu kelas kuat I 5.21
Pintu PVC + kusen PVC (pintu WC) 1
d. Pintu harmonika tebal 1mm + asesoris lengkap terpasang 17.18
e. Pasang pagar BRC jadi T = 1m 9.4
3 Pek. Engsel, kunci dan kaca
a. Pasang engsel pintu 2
b. pasang kunci tanam standar 1
c. Pasang kunci tanam kamar mandi 1
d. Pasang 1 buah kaca bening 5mm 3
SUB T
IV PEKERJAAN LANTAI, KERAMIK & HALAMAN DEPAN
1 Pek. Urugan bawah lantai & pemadatan/perataan 18
2 Pek. Lantai ruang & keramik WC
A. Pek. Lantai ruang
a. Beton tumbuk 1pc : 3ps : 5kr 7.2
b. Memasang keramik lantai ukuran 40x40 cm 57
c. Memasang plin keramik 10x40cm 34.34
B. Pek. Keramik WC
a. Memasang lantai keramik ukuran 20x20 cm 2.64
b. Memasang keramik lantai ukuran 25x20 cm 5.46
3 Pek. Perkerasan/ cor halaman depan t = 10cm
a. beton tumbuk 1pc : 3ps : 6kr 5.43
b. Plesteran 1pc:5ps tebal 15mm 45.29
SUB T
V PEKERJAAN ATAP DAN LISTRIK
1 Pekerjaan rangka penutup atap
a. Pek. Rangka atap baja ringan zinc alum + atap metal 119.23
zincalum 2 susun lengkap terpasangn (termasuk nok dan
Jurai)
b. Lisplang uk. (3x30) kayu kelas I (kayu benuas) 44.1
2 Pekerjaan listrik
a. Instalasi titik lampu bang.beton 5
b. Lampu TL bambu 40 watt 2
c. Lampu SL 20 watt untuk gudang peralatan & lampu luar 3
d. Instalasi stop kontak bang beton 3
SUB T
VI PEKERJAAN SANITASI
a. Septictank dan rembesan 2 m3 1
b. Memasang closed Jongkok porselen 1
c. memasang bak mandi fiberglass 1
d. Memasang floor drain 1
e. Memasang kran Ø3/4" atau 1/2" 1
f. Memasang pipa PVC tipe AW Ø3/4 20
g. Memasang pipa penyalur air limbah jenis pipa tanah Ø3" 3
SUB T
VII PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding, kolom & balok beton
a. Pengecatan Tembok Dinding ( 1 plamir, 1 lapis cat dasar 266.86
2 lapis cat penutup)
2 Pek. Pengecatan seluruh kusen, pintu & lisplank
a. Pengecatan kilap kayu/besi ( 1 lapis cat dasar, 3 lapis cat 46.77
kilap penutup)
SUB T
2 Galian Tanah Biasa 1.00
Urugan Tanah Kembali 1.00
Urugan Pasir 1.00
Pasang Pondasi Batu Belah 1.00
Pasangan Batu Kosong 0.00
SUB T
PEKERJAAN PEMBETONAN
3
b. Sloof 15/20
Membuat Beton Bertulang 1.00
Pembesian dengan besi Ø 8 mm 1.00
Pembesian dengan besi Ø 6 mm 1.00
Pasang Bekisting untuk Sloof 1.00
c. Kolom
Membuat Beton Bertulang 1.00
Pembesian dengan besi Ø 8 mm 1.00
Pembesian dengan besi Ø 6 mm 1.00
Pasang Bekisting untuk Kolom 1.00
d. Balok
Membuat Beton Bertulang 1.00
Pembesian dengan besi Ø 6 mm 1.00
Pembesian dengan besi Ø 4 mm 1.00
Pasang Bekisting untuk Balok 1.00
e. Plat teras
Membuat Beton Bertulang 1.00
Pembesian dengan besi Ø 8 mm 1.00
Pembesian dengan besi Ø 6 1.00
Pasang Bekisting untuk teras 1.00
SUB T
PEKERJAAN LANTAI
4 Pasang Lantai Keramik 30x30 1.00
Pasang Lantai Keramik 15x20 1.00
cor lantai 1.00
Urugan Pasir 1.00
spesi lantai 1.00
tanah urugan 1.00
SUB T
PEKERJAAN KUSEN PINTU,JENDELA DAN VENTILASI
5 Pasang Kusen Pintu dan Jendela Kayu Meranti 1.00
Pasang Pintu Panel Kayu 1.00
Pasang 1 Buah Engsel Pintu 1.00
Pasang 1 Buah Kunci 1.00
Pasang kaca, tebal 3 mm 1.00
Pasang 1 Buah Engsel Jendela 1.00

SUB T
PEKERJAAN DINDING DAN PLESTERAN
6 Pasangan batako 1.00
Plesteran 1 Pc : 3 Ps tebal 15 cm 1.00
SUB T
PEKERJAAN PLAFOND
7 Langit-langit ( 60 x 120 cm ), tebal 4 mm 1.00
Pasang rangka Langit-langit ( 60 x 120 cm ), kayu lanan 1.00
SUB TO
PEKERJAAN PENGECATAN
8 Pengecatan Bidang Kayu Baru 1 lapis plamir, 1.00
Pengecatan Bidang Tembok Baru 1 lapis plamir, 1.00
SUB TO
PEKERJAAN KUDA-KUDA DAN ATAP
9 Pasang Konstruksi Atap Kayu Meranti 1.00
Pasang Atap Genteng Metal 1.00
SUB T
PEKERJAAN KAMAR MANDI
10 Memasang 1 Buah Kloset Jongkok Berwarna INA 1.00
Memasang 1 Buah Kran 1.00
Memasang 1 Buah Bak mandi 1.00
SUB T
PEKERJAAN INSTALASI LISTRIK DAN AIR
12 Paku Kayu 1.00
20 Pipa Saluran Air Kotor Ø 4″ 1.00
21 Pipa Saluran Air Kotor Ø 2″ 1.00
22 Pompa Air 1.00
SUB T
PEKERJAAN SEPTICTANK DAN RESAPAN
23 Menggali galian 1 buah septictank 1.0
24 Membuat Cor Beton Tumbuk / Spesi 1.0
25 Membuat Beton Bertulang 1.0
SUB TO
PEKERJAAN CARPORT
26 Cor beton tumbuk 1.00
TOTAL KESELURUHAN
ANA ANGGARAN BIAYA

Harga Harga Jumlah


Sat. Satuan Bahan Satuan Upah Total Harga
(Rp) (Rp) (Rp)
5 6 7

bh Rp - Rp 200,000.00
m Rp 16,508.50 Rp 31,280.00 Rp 1,940,213.10
lok Rp - Rp 300,000.00
SUB TOTAL I Rp 2,440,213.10

m3 Rp 21,383.00 Rp 51,000.00 Rp 10,278,386.00

m3 Rp 53,457.50 Rp - Rp 641,490.00
m3 Rp 21,383.00 Rp 51,000.00 Rp 802,003.64
m3 Rp 143,106.50 Rp 294,150.00 Rp 524,707.80
m2 Rp 61,880.00 Rp 51,900.00 Rp 655,372.80
m3 Rp 206,137.18 Rp 353,115.00 Rp 514,512.01

m2 Rp 61,880.00 Rp 57,900.00 Rp 1,948,820.60


m3 Rp 206,137.18 Rp 353,115.00 Rp 682,287.66

m2 Rp 78,540.00 Rp 150,215.00 Rp 2,367,614.25


m3 Rp 206,137.18 Rp 353,115.00 Rp 436,216.70

m2 Rp 78,540.00 Rp 153,815.00 Rp 5,104,839.35


m3 Rp 206,137.18 Rp 353,115.00 Rp 922,766.10
m2 Rp 35,700.00 Rp 13,216.50 Rp 806,143.92
m2 Rp -
SUB TOTAL II Rp 25,685,160.82

m2 Rp 31,091.50 Rp 44,152.50 Rp 8,990,905.56


m2 Rp 35,700.00 Rp 13,216.50 Rp 11,689,576.01
m2 Rp 35,700.00 Rp 13,216.50 Rp 11,689,576.01

m3 Rp - Rp 382,050.00 Rp 382,050.00

m2 Rp - Rp - Rp 2,000,000.00
set Rp - Rp 270,000.00 Rp 270,000.00
m2 Rp - Rp 750,000.00 Rp 12,885,000.00
m Rp 31,091.50 Rp 44,152.50 Rp 707,293.60
bh Rp 16,059.23 Rp 16,900.00 Rp 65,918.45
bh Rp 64,236.90 Rp 140,600.00 Rp 204,836.90
bh Rp 64,236.90 Rp 140,600.00 Rp 204,836.90
bh Rp 16,059.23 Rp 99,660.00 Rp 347,157.68
SUB TOTAL III Rp 49,437,151.10

m3 Rp 21,383.00 Rp 51,000.00 Rp 1,302,894.00

m3 Rp 143,106.50 Rp 69,900.00 Rp 1,533,646.80


m2 Rp 83,300.00 Rp 368,037.50 Rp 25,726,237.50
m Rp 83,300.00 Rp 69,912.50 Rp 5,261,317.25

m2 Rp 83,300.00 Rp 368,037.50 Rp 1,191,531.00


m2 Rp 83,300.00 Rp 101,162.50 Rp 1,007,165.25

m3 Rp 143,106.50 Rp 69,900.00 Rp 1,156,625.30


m2 Rp 35,700.00 Rp 13,216.50 Rp 2,215,428.29
SUB TOTAL IV Rp 39,394,845.38

m2 Rp - Rp 170,000.00 Rp 20,269,100.00

m Rp 16,508.50 Rp 1,314.00 Rp 785,972.25

ttk Rp 15,000.00 Rp 15,000.00 Rp 150,000.00


bh Rp 15,000.00 Rp 35,000.00 Rp 100,000.00
bh Rp 15,000.00 Rp 25,000.00 Rp 120,000.00
bh Rp 200,000.00 Rp 600,000.00
SUB TOTAL V Rp 22,025,072.25

bh Rp 775,250.00 Rp 391,812.50 Rp 1,167,062.50


unit Rp 344,428.00 Rp 149,275.00 Rp 493,703.00
unit Rp 604,061.00 Rp 203,899.00 Rp 807,960.00
unit Rp 15,000.00 Rp 15,000.00 Rp 30,000.00
unit Rp 10,388.50 Rp 21,200.00 Rp 31,588.50
m Rp 10,388.50 Rp 25,240.00 Rp 712,570.00
m Rp 10,388.50 Rp 25,240.00 Rp 106,885.50
SUB TOTAL VI Rp 3,349,769.50

m2 Rp 6,366.25 Rp 21,561.00 Rp 7,452,665.94

m2 Rp 10,109.45 Rp 7,337.00 Rp 815,970.42

SUB TOTAL I Rp 8,268,636.35


Jumlah Biaya Pekerjaan Rp 147,251,079.00
PPN 10% Rp 14,725,107.90
Jumlah Total Rp 161,976,186.90
Jumlah Total Pembulatan Rp 162,000,000.00

M3 Rp 53,457.50 Rp 53,457.50
M3 Rp 17,000.00 Rp 38,874.50 Rp 55,874.50
M3 Rp 51,000.00 Rp 21,383.00 Rp 72,383.00
M3 Rp 178,500.00 Rp 496,537.50 Rp 675,037.50
M3 Rp - Rp -
SUB TOTAL II Rp 856,752.50

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00
SUB TOTAL III Rp 2,293,871.44

M2 Rp 83,300.00 Rp 368,037.50 Rp 451,337.50


M2 Rp 83,300.00 Rp 101,162.50 Rp 184,462.50
M3 Rp 143,106.50 Rp 69,900.00 Rp 213,006.50
M3 Rp 21,383.00 Rp 51,000.00 Rp 72,383.00
M3 Rp 21,383.00 Rp 51,000.00 Rp 72,383.00
M3 Rp 21,383.00 Rp 51,000.00 Rp 72,383.00
SUB TOTAL IV Rp 1,065,955.50

M Rp 2,441,060.00 Rp 1,486,250.00 Rp 3,927,310.00


M2 Rp 322,340.00 Rp 20,100.00 Rp 342,440.00
Buah Rp 16,059.23 Rp 16,900.00 Rp 32,959.23
Buah Rp 64,236.90 Rp 140,600.00 Rp 204,836.90
M2 Rp 16,059.23 Rp 99,660.00 Rp 115,719.23
Buah Rp 10,706.15 Rp 11,300.00 Rp 22,006.15
Rp -
SUB TOTAL V Rp 4,645,271.50

M2 Rp 31,091.50 Rp 44,152.50 Rp 75,244.00


M2 Rp 35,700.00 Rp 13,216.50 Rp 13,216.50
SUB TOTAL VI Rp 88,460.50

M2 Rp 16,508.50 Rp 73,000.00 Rp 89,508.50


M2 Rp 100,448.00 Rp 21,895.00 Rp 122,343.00
SUB TOTAL VII Rp 211,851.50

M2 Rp 6,366.25 Rp 21,561.00 Rp 27,927.25


M2 Rp 10,109.45 Rp 7,337.00 Rp 17,446.45
SUB TOTAL VIII Rp 45,373.70

M2 #REF! #REF! Rp 69,675.30


M2 Rp 22,915.30 Rp 46,760.00 Rp 46,760.00
SUB TOTAL IX Rp 116,435.30

Buah Rp 344,428.00 Rp 149,275.00 Rp 493,703.00


Buah Rp 10,388.50 Rp 21,200.00 Rp 31,588.50
Buah Rp 604,061.00 Rp 203,899.00 Rp 807,960.00
SUB TOTAL X Rp 1,333,251.50

Kg Rp - Rp -
Buah Rp - Rp -
Buah Rp - Rp -
Buah Rp - Rp -
SUB TOTAL XI Rp -

M3 Rp - Rp -
M3 Rp - Rp -
M3 Rp - Rp -
SUB TOTAL XII Rp -

M3 Rp - Rp -
Rp 13,097,436.54
35.8455
573,467.86
573,467.86

72,383.00

211,851.50

133,834.20