STANDAR HARGA SATUAN UPAH DAN BAHAN BANGUNAN
1 2 3 4 5
1 Mandor OH 174,800.00
2 Pekerja OH 110,700.00
3 Pekerja Terlatih OH
4 Pekerja di Hutan OH
5 Pemasak Aspal OH
6 Tukang OH 151,500.00
7 Kepala Tukang OH -
8 Tukang OH 151,500.00
9 Kepala Tukang OH -
10 Tukang OH 151,500.00
11 Kepala Tukang OH -
12 Tukang Las OH 151,500.00
13 Kepala Tukang Las OH
14 Tukang Pelitur OH 151,500.00
15 Tukang Cat OH 151,500.00
16 Kepala Tukang OH -
17 Tukang Pipa OH 151,500.00
2. DAFTAR HARGA SATUAN BAHAN
2.1. Bahan Pasangan
NO. JENIS BAHAN / BARANG SATUAN HARGA KET.
(Rp.)
1 2 3 4 5
1 Batu Kali Alam M3 210,700.00
2 Batu Gunung W = 500 - 700 Kg M3
3 Krikil Sungai/Royalty (MR 012) M3
Batu Pecah (Manual) -
Batu Belah M3 185,000.00
4 Batu Pecah 5-7 cm M3 153,000.00
5 Batu Pecah 3-5 cm M3 428,300.00
6 Batu pecah 2 - 3 cm M3 400,000.00 1,400,000.00
7 Batu Pecah 1-2 cm M3 445,800.00
8 Batu Pecah 0.5-1 cm M3 360,000.00
Batu Pecah (menggunakan Mesin) -
9 Kerikil Pecah 3-5 cm M3
10 Batu Pecah 2-3 cm M3 -
11 Batu Pecah 1-2 cm M3
12 Batu Pecah 0.5-1 cm M3
13 Batu Kali Utuh M3
14 Batu Kali Belah M3
15 Filler (abu batu) M3
16 Kerikil alam 5-7 cm M3
17 Kerikil alam 3-5 cm M3
18 Kerikil alam 2-3 cm M3
19 Kerikil alam 1-2 cm M3
20 Kerikil alam 0.5-1 cm M3
20 Kerikil/koral 0.5-1 cm M3
21 Pasir cor M3 214,800.00 751,800.00
22 Pasir pasangan M3 207,500.00 726,250.00
23 Pasir urug M3 188,900.00 661,150.00
24 Sirtu M3 187,600.00 656,600.00
25 Tanah Urug M3 67,300.00 235,550.00
26 Tanah Urug Pilihan M3 187,600.00 656,600.00
27 Bata Merah Buah 1,500.00
28 Kapur Pasangan M3 500.00
29 Kapur Gamping Kg 6,200.00
30 Aspal (Aspal Concrete/AC) Kg 12,000.00
31 Aspal (Medium Curring/MC) Kg 10,000.00
32 Aspal emulsi Liter 10,000.00
33 Aditif 113,000.00
34 Grevel M3 155,000.00
35 Button Granular Asphalt (BUTAS) Kg
36 Box Culvert W 1 Standar Bina Marga (K 300) bh 4,343,000.00
P= 1,3 m
6 Dinabolt 10 x 65 @ 150 Pc Pc
7 Baut SDS 12 x 50 (Baut spandek) @ 200 Pc Pc 2,200.00
PIPA Satinlisstill
Pipa Stailisetill Ø 1 1/4" Meter 80,000.00
Pipa Stailisetill Ø 1" Meter 65,000.00
PIPA PVC
Pipa PVC tidak bertekanan (Kwalitas C)
2 Pipa Listrik Ø (5/8) Meter 2,000.00
3 Ø 1/2" Meter 2,500.00
4 Ø 3/4" Meter 3,500.00
5 Ø 1" Meter 5,000.00
6 Ø 11/4" Meter 6,000.00
7 Ø 11/2 Meter 7,000.00
8 Ø 2" Meter 9,000.00
9 Ø 2 ½" Meter 11,000.00
10 Ø 3" Meter 15,000.00
Ø 4" Meter 20,000.00
Pipa PVC tidak bertekanan (Kwalitas D) -
Pipa HDPE -
1 Pipa HDPE Ø 1/2" Meter 12,000.00 PN 16 SDR 11
2 Pipa HDPE Ø 3/4" Meter 13,000.00 PN 16 SDR 11
3 Pipa HDPE Ø 1" Meter 19,000.00 PN 16 SDR 11
4 Pipa HDPE Ø 11/4" Meter 30,000.00 PN 16 SDR 11
5 Pipa HDPE Ø 1,5" Meter 29,000.00 PN 10 SDR 17
6 Pipa HDPE Ø 2" Meter 62,000.00 PN 10 SDR 17
7 Pipa HDPE Ø 2,5" Meter 65,000.00 PN 10 SDR 17
8 Pipa HDPE Ø 3" Meter 110,000.00 PN 10 SDR 17
9 Pipa HDPE Ø 4" Meter 135,000.00 PN 10 SDR 17
10 Pipa HDPE Ø 4 1/2" Meter
11 Pipa HDPE Ø 5" Meter 172,000.00 PN 10 SDR 17
12 Pipa HDPE Ø 6" Meter 282,000.00 PN 10 SDR 17
13 Ø 7" Meter
14 Ø 8" Meter
15 Ø 9" Meter
16 Ø 10" Meter
17 Ø 11" Meter
18 Ø 12" Meter
19 Ø 14" Meter
20 Ø 16" Meter
21 Ø 18" Meter
22 Ø 20" Meter
23 Ø 22" Meter
24 Coupler HDPE 2" Buah 317,200.00
25 Coupler HDPE 1" Buah 182,200.00
26 Reducer Coupler 2"x1" Buah 174,200.00
-
ACSSESORIS PIPA -
Stop Kran -
1 Stop Kran Ø 1/2" Buah 79,000.00
2 Stop Kran Ø 3/4" Buah 98,000.00
3 Stop Kran Ø 1" Buah 163,000.00
4 Stop Kran Ø 11/2 Buah 327,000.00
5 Stop Kran Ø 2" Buah 444,000.00
6 Stop Kran Ø 2.5" Buah 950,000.00
7 Stop Kran Ø 3" Buah 1,400,000.00
8 Stop Kran Ø 4" Buah 2,000,000.00
Kran
1 Kran Ø 1/2" Buah 20,000.00
2 Ø 3/4" Buah 92,000.00
3 Ø 1" Buah 128,000.00
Knee GI -
1 Knee GI Ø 1/2" Buah 9,000.00
2 Knee GI Ø 3/4" Buah 10,000.00
3 Knee GI Ø 1" Buah 11,000.00
4 Knee GI Ø 11/2 Buah 35,000.00
5 Knee GI Ø 2" Buah 55,000.00
5 Knee GI Ø 2.5" Buah
6 Knee GI Ø 3" Buah 130,000.00
7 Knee GI Ø 4" Buah 150,000.00
8 Band GI Ø 1,5" x 45 Buah 80,000.00
9 Band GI Ø 2" x 45 Buah 133,000.00
10 Band GI Ø 2,5" x 45 Buah 133,000.00
11 Band GI Ø 3" x 45 Buah 216,000.00
12 Band GI Ø 4" x 46 Buah 374,000.00
13 Band GI Ø 6" x 47 Buah 646,000.00
Tee PVC
1 Tee PVC Ø 1/2" Buah 30,000.00
2 Tee PVC Ø 3/4" Buah 40,000.00
3 Tee PVC Ø 1" Buah 50,000.00
4 Tee PVC Ø 11/2 Buah 70,000.00
5 Tee PVC Ø 2" Buah 85,000.00
6 Tee PVC Ø 2.5" Buah 120,000.00
6 Tee PVC Ø 3" Buah 150,000.00
7 Tee PVC Ø 4" Buah 200,000.00
8 Tee PVC Ø 6" Buah 330,000.00
Keterangan:
Ø = Diameter
Catatan :
Harga bahan (Mineral Batuan Bukan Logam) tersebut di atas belum termasuk :
1 Biaya Angkut dari Lokasi (Quary) ke Lokasi Proyek = Rp. 3.870/km/m3
2 Biaya lansiran 100 s/d 250 m = Rp. 20.000/M3.
3 Biaya lansiran 250 m s/d 500 m = Rp. 30.000/M3.
4 Biaya lansiran 500 m s/d 750 m = Rp. 40.000/M3.
5 Biaya lansiran 750 m s/d 1.000 m = Rp. 50.000/M3.
6 Pajak Daerah Mineral Batuan Bukan Logam (sesuai dengan peraturan dan ketentuan yang berlaku).
7 Apabila terdapat daftar barang yang tidak tercantum dalam Standar Harga Kabupaten Lombok Timur, maka dapat
PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT
TAHUN ANGGARAN 2021
1 M3 BETON MUTU f 'c = 7,4 MPa ( K 100 ), slump ( 12 ± 2 ) cm, w/c = 0,87 A.4.1.1.1 986,055.33
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Semen 4.94 Zak 60,000.00 296,400.00
Pasir cor 0.6207 M3 214,800.00 133,329.43
Bahan
Batu pecah 2 - 3 cm 0.7400 M3 400,000.00 296,000.00
Air 215.00 liter 100.00 21,500.00
Pekerja 1.6500 OH 110,700.00 182,655.00
Tukang 0.2750 OH 151,500.00 41,662.50
Tenaga
Kepala Tukang 0.0280 OH - -
Mandor 0.0830 OH 174,800.00 14,508.40
JUMLAH 986,055.33
Overhead 10% = -
Jumlah Total = 986,055.33
1 M3 BETON MUTU f 'c = 14,5 MPa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 A.4.1.1.5 768,131.61
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Semen 6.52 Zak 60,000.00 391,200.00
Pasir cor 0.5429 M3 214,800.00 116,605.71
Bahan
Batu Pecah 2-3 cm 0.7622 M3 -
Air 215.00 liter 100.00 21,500.00
Pekerja 1.6500 OH 110,700.00 182,655.00
Tukang 0.2750 OH 151,500.00 41,662.50
Tenaga
Kepala Tukang 0.0280 OH - -
Mandor 0.0830 OH 174,800.00 14,508.40
768,131.61
Overhead 10% = -
Jumlah Total = 768,131.61
1 M1 PEK. BETON BALOK BERTULANG 10X15CM (Besi 4Ø10 ; Bg. Ø6-15) A.4.1.1.36 149,865.20
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Papan Kayu Begisting 0.0030 m3 5,501,200.00 16,503.60
Paku 0.0200 kg 20,000.00 400.00
Minyak bekisting 0.0000 liter 15,000.00 -
Besi beton polos 3.6000 Kg 20,050.00 72,180.00
Bahan
Kawat Ikat Beton 0.0500 Kg 35,000.00 1,750.00
Semen 0.1100 Zak 60,000.00 6,600.00
Pasir cor 0.0090 M3 214,800.00 1,933.20
Batu Pecah 2-3 cm 0.0150 M3 -
Pekerja 0.2970 OH 110,700.00 32,877.90
Tukang 0.0990 OH 151,500.00 14,998.50
Tenaga
Kepala Tukang 0.0100 OH - -
Mandor 0.0150 OH 174,800.00 2,622.00
JUMLAH 149,865.20
Overhead 10% = -
Jumlah Total = 149,865.20
1 M2 PEK. DINDING UK.( 5 X 11 X 22 ) CM TEBAL 1/2 BATA, CAMP. 1C : 3PS A.4.4.1.8 181,526.00
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Bata merah 70.000 Buah 1,500.00 105,000.00
Bahan Semen 0.287 Zak 60,000.00 17,244.00
Pasir pasangan 0.040 M3 207,500.00 8,300.00
Pekerja 0.300 OH 110,700.00 33,210.00
Tukang 0.100 OH 151,500.00 15,150.00
Tenaga
Kepala Tukang 0.010 OH - -
Mandor 0.015 OH 174,800.00 2,622.00
JUMLAH 181,526.00
Overhead 10% = -
Jumlah Total = 181,526.00
1 M2 PEK. DINDING UK.( 5 X 11 X 22 ) CM TEBAL 1/2 BATA, CAMP. 1C : 5PS A.4.4.1.10 176,935.50
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Bata merah 70.000 Buah 1,500.00 105,000.00
Bahan Semen 0.194 Zak 60,000.00 11,616.00
Pasir pasangan 0.045 M3 207,500.00 9,337.50
Pekerja 0.300 OH 110,700.00 33,210.00
Tukang 0.100 OH 151,500.00 15,150.00
Tenaga
Kepala Tukang 0.010 OH - -
Mandor 0.015 OH 174,800.00 2,622.00
JUMLAH 176,935.50
Overhead 10% = -
Jumlah Total = 176,935.50
1 M2 CAT TEMBOK - (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10 35,582.90
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Plamir Tembok 0.1000 kg 47,000.00 4,700.00
Cat tembok 0.3600 kg 35,000.00 12,600.00
Bahan Ampelas 0.2000 lembar 30,000.00 6,000.00
Kape 0.0100 -
Kuas 0.0100 -
Pekerja 0.0200 OH 110,700.00 2,214.00
Tukang 0.0630 OH 151,500.00 9,544.50
Tenaga
Kepala Tukang 0.0063 OH - -
Mandor 0.0030 OH 174,800.00 524.40
JUMLAH 35,582.90
Overhead 10% = -
Jumlah Total = 35,582.90
1 M2 CAT KAYU - (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.4 44,726.90
Harga Satuan Jumlah
Kebutuhan Indeks Satuan
Bahan / Upah (Rp.) (Rp.)
Meni Kayu 0.2000 kg 56,000.00 11,200.00
Plamir kayu 0.1500 kg 40,000.00 6,000.00
Cat Kayu Mutu Sedang 0.1700 kg 62,000.00 10,540.00
Bahan
Kuas 1" 0.0100 Buah 15,000.00 150.00
Minyak Cat biasa 0.0300 Liter 40,000.00 1,200.00
Ampelas 0.2000 lembar 30,000.00 6,000.00
Pekerja 0.0700 OH 110,700.00 7,749.00
Tukang 0.0090 OH 151,500.00 1,363.50
Tenaga
Kepala Tukang 0.0060 OH - -
Mandor 0.0030 OH 174,800.00 524.40
JUMLAH 44,726.90
Overhead 10% = -
Jumlah Total = 44,726.90
Batas analisa
A. TENAGA KERJA
1. Pekerja OH 4.0000 110,700.00 442,800.00
B. BAHAN
1. Pemasangan Accessories ls 1.0000 55,000.00 55,000.00
2. Galian Tanah Campuran m3 0.2700 51,480.00 13,899.60
3. Timbunan Tanah Kembali dipa m3 0.1080 21,395.00 2,310.66
C. PERALATAN
Alat Bantu (0,5 % x (UP+BHN) ls 1.0000 2,738.05 2,738.05
A. TENAGA KERJA
1. Pekerja OH 1.2150 110,700.00 134,500.50
B. BAHAN
Seal tape Buah 8.0000 9,000.00 72,000.00
C. PERALATAN
Alat bantu 0,05 % x (A+B) -
A. TENAGA KERJA
1. Pekerja OH 0.6075 110,700.00 67,250.25
B. BAHAN
Seal tape Buah 4.0000 9,000.00 36,000.00
C. PERALATAN
Alat bantu 0,05 % x (A+B) -
A. TENAGA KERJA
1. Pekerja OH 0.6075 110,700.00 67,250.25
B. BAHAN
1. Pelicin/Lubrican Kg 0.0386 0.00 -
C. PERALATAN
1. Alat Bantu 0,05 % x (A+B) Ls 1.0000 5,282.72 5,282.72
A. TENAGA KERJA
1. Pekerja OH 0.4860 110,700.00 53,800.20
B. BAHAN
1. Pelicin/Lubrican Kg 0.0222 0.00 -
C. PERALATAN
1. Alat Bantu 0,5 % x (A+B) Ls 1.0000 88,257.60 88,257.60
A. TENAGA KERJA
1. Pekerja OH 0.4050 110,700.00 44,833.50
B. BAHAN
Lem PVC Kg 0.0125 0.00 -
C. PERALATAN
A. TENAGA KERJA
1. Pekerja OH 0.3240 110,700.00 35,866.80
B. BAHAN
Lem PVC Kg 0.0080 0.00 -
C. PERALATAN
A. TENAGA KERJA
1. Pekerja OH 0.2160 110,700.00 23,911.20
B. BAHAN
1. Lem PVC Kg 0.0067 0.00 -
C. PERALATAN
A. TENAGA KERJA
1. Pekerja OH 0.0960 110,700.00 10,627.20
B. BAHAN
1. Lem PVC Kg 0.0040 0.00 -
C. PERALATAN
A. TENAGA KERJA
1. Pekerja OH 0.6000 110,700.00 66,420.00
B. BAHAN
1. Volume Air Terpakai m3 2.6494 1,200.00 3,179.28
C. PERALATAN
1. Mesin Pengetesan Hari 0.2000 150,000.00 30,000.00
A. TENAGA KERJA
1. Pekerja OH 0.4000 110,700.00 44,280.00
B. BAHAN
1. Volume Air Terpakai m3 0.0000 1,200.00 -
C. PERALATAN
1. Mesin Pengetesan Hari 0.1333 150,000.00 20,000.00
A. TENAGA KERJA
1. Pekerja OH 0.3000 110,700.00 33,210.00
B. BAHAN
1. Volume Air Terpakai m3 0.6623 1,200.00 794.76
C. PERALATAN
1. Mesin Pengetesan Hari 0.1000 150,000.00 15,000.00
A. TENAGA KERJA
1. Pekerja OH 0.2000 110,700.00 22,140.00
B. BAHAN
1. Volume Air Terpakai m3 0.2940 1,200.00 352.80
C. PERALATAN
1. Mesin Pengetesan Hari 0.0670 150,000.00 10,050.00
A. TENAGA KERJA
1. Pekerja OH 0.2000 110,700.00 22,140.00
B. BAHAN
1. Volume Air Terpakai m3 0.000 1,200.00 -
C. PERALATAN
1. Mesin Pengetesan Hari 0.0533 150,000.00 8,000.00
A. TENAGA KERJA
1. Pekerja OH 2.2278 110,700.00 246,617.46
B. BAHAN
1. Volume Air Terpakai m3 3.5325 1,200.00 4,239.00
2. Kaporit 60 % gram 17.6625 7,000.00 123,637.50
C. PERALATAN
1. Mesin Pompa Hari 0.2000 100,000.00 20,000.00
A. TENAGA KERJA
1. Pekerja OH 1.4852 110,700.00 164,411.64
B. BAHAN
1. Volume Air Terpakai m3 0.0000 1,200.00 -
2. Kaporit 60 % gram 0.0000 7,000.00 -
C. PERALATAN
1. Mesin Pompa Hari 0.1333 100,000.00 13,333.33
A. TENAGA KERJA
1. Pekerja OH 1.1139 110,700.00 123,308.73
B. BAHAN
1. Volume Air Terpakai m3 0.8831 1,200.00 1,059.72
2. Kaporit 60 % gram 4.4156 7,000.00 30,909.20
C. PERALATAN
1. Mesin Pompa Hari 0.1000 100,000.00 10,000.00
A. TENAGA KERJA
1. Pekerja OH 0.7426 110,700.00 82,205.82
B. BAHAN
1. Volume Air Terpakai m3 0.3930 1,200.00 471.60
2. Kaporit 60 % gram 1.9630 7,000.00 13,741.00
C. PERALATAN
1. Mesin Pompa Hari 0.0667 100,000.00 6,670.00
A. TENAGA KERJA
1. Pekerja OH 0.5941 110,700.00 65,764.66
B. BAHAN
1. Volume Air Terpakai m3 0.000 1,200.00 -
2. Kaporit 60 % grm 0.000 7,000.00 -
C. PERALATAN
1. Mesin Pompa Hari 0.0533 100,000.00 5,333.33
M' 1 M' Crossing Jalan (Boring) Ø 100 mm (4") Kode Analisa : Bp. 4
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
A. TENAGA KERJA
1. Pekerja OH 1.5000 110,700.00 166,050.00
2. Tukang Bor OH 0.1500 0.00 -
3. Mandor OH 0.0750 0.00 -
B. BAHAN
1. Pasir Urug m3 0.0090 85,000.00 765.00
C. PERALATAN
1. Alat Bor Hari 0.0375 100,000.00 3,750.00
A. TENAGA KERJA
1. Pekerja OH 1.0000 110,700.00 110,700.00
2. Tukang Bor OH 0.1000 0.00 -
B. BAHAN
1. Pasir Urug m3 0.0060 85,000.00 510.00
C. PERALATAN
1. Alat Bor Hari 0.0250 100,000.00 2,500.00
Unit 1 Unit Mobilisasi dan Demobilisasi Peralatan Pengeboran ter Kode Analisa : SB,01
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
A. PERALATAN PENGEBORAN
Mesin Bor, menara stang Bor, Meliputi :
Mesin Las, Kompresor,
Generator, Pompa Pumping
Test, dan Selang Pemberat
dengan berat peralatan 20
Ton/Unit
a. Biaya Mobilisasi 1 bh Truk 6 s unit truk 1.0000 500,000.00 500,000.00
b. Pekerja Untuk bongkar muat P OH 4.0000 110,700.00 442,800.00
c. Pekerja Untuk bongkar muat P OH 5.0000 110,700.00 553,500.00
B. MOBILISASI MATERIAL
Pipa Chasing, Screen,SUMUR
Pipa Meliputi :
Sonding, Bentonite, Additive
beton dll.
a. Biaya Transportasi dari Kabup unit truk 1.0000 500,000.00 500,000.00
b. Pekerja Untuk bongkar muat OH 3.0000 110,700.00 332,100.00
4,422,340.00
TOTAL UNTUK BURUH, MATERIAL DAN PERALATAN 5,918,640.00
OVER HEAD DAN KEUNTUNGAN 10% -
HARGA SATUAN DILUAR PPN 5,918,640.00
- Operasional mesin Bor Kode Analisa : SB,02
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
Pengeboran diperhitungkan 1 hari = 8 jam
OPERATIONAL MESIN BOR
Merk : Standar Isi Oli Transmisi : 60 Liter
Hp. : 78 PK Isi Oli Hidraulis : 200 Liter
Isi Oli Mesin : 18 Liter Harga Pokok Mesin : Rp. 990.000.000,-
Isi Oli Gardan : 18 Liter Jam Kerja : 2.000 Jam
A. UPAH
1. Penanggung Jawab Pengebor hari 1.000 - -
2. Tukang Bor hari 1.000 - -
3. Mekanik hari 1.000 - -
4. Pekerja hari 1.000 110,700.00 110,700.00
B. BAHAN
1. Bahan Bakar Minyak Liter 38.640 6,000.00 231,840.00
2. Pelumas Mesin Liter 0.140 39,000.00 5,460.00
3. Pelumas Gardan Liter 0.200 44,500.00 8,900.00
4. Pelumas Transmisi Liter 0.080 44,500.00 3,560.00
5. Pelumas Hidraulis Liter 2.560 44,500.00 113,920.00
6. Gemuk Kg 2.000 15,000.00 30,000.00
7. Biaya Perbaikan % 0.0128 - -
8. Penyusutan Mesin dan Perala % 0.080 - -
A. UPAH
1. Tukang Bor hari 1.000 - -
2. Pekerja hari 1.000 110,700.00 110,700.00
B. BAHAN
1. Bahan Bakar Minyak Liter 35.200 6,000.00 211,200.00
2. Pelumas Mesin Liter 0.070 39,000.00 2,730.00
3. Pelumas Gardan Liter 0.330 44,500.00 14,685.00
4. Gemuk Kg 2.000 15,000.00 30,000.00
5. Biaya Perbaikan % 0.0200 330,000,000.00 66,000.00
6. Penyusutan Mesin dan Perala % 0.010 330,000,000.00 33,000.00
B. BAHAN
1. Bentonite kg 110.000 15,000.00 1,650,000.00
2. Additive kg 0.070 48,000.00 3,360.00
3. Air untuk Sirkulasi Liter 0.330 150.00 49.50
M' 1 m' Lubang Bor diameter 150 mm (6") Kode Analisa SB,05
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
A. UPAH, BAHAN DAN ALAT
Diperkirakan kecepatan
Pengeboran dengan Segala
Formasi rata-rata 8 m'/hari
M' 1 m' Pelebaran Lubang Bor (reaming) dari dia 150 mm ke 300 mm Kode Analisa SB,06
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
A. UPAH, BAHAN DAN ALAT
Diperkirakan kecepatan
Pengeboran dengan Segala
Formasi rata-rata 12 m'/hari
A. UPAH
1. Operator Logging hari 7.000 - -
2. Pembantu Operator Loging hari 7.000 80,000.00 560,000.00
3. Pekerja hari 10.000 110,700.00 1,107,000.00
B. BAHAN
1. Kertas Logging Set 1.000 250,000.00 250,000.00
2. Tinta dan Pen Logging Unit 1.000 75,000.00 75,000.00
3. Batterai dan Kabel Unit 1.000 400,000.00 400,000.00
4. Biaya Penyusutan Alat Unit 1.000 70,000.00 70,000.00
5. Akomodasi Operator Ls 1.000 200,000.00 200,000.00
M' 1 m' Pemasangan Pipa Chasing dia 150 mm Kode Analisa SB,08
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
Biaya untuk 100 meter Logging
A. UPAH
1. Operational Mesin Bor unit/hari 0.500 - -
B. BAHAN
1. Pipa PVC diameter 150 mm m' 1.000 170,000.00 170,000.00
M' 1 m' Pemasangan Pipa Screen dia 150 mm Kode Analisa SB,09
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
Biaya untuk 100 meter Logging
A. UPAH
1. Pemasangan Pipa Screen di unit/hari 0.333 - -
B. BAHAN
1. Pipa Screen diameter 150 mm m' 1.000 170,000.00 170,000.00
A. UPAH
1. Penanggung Jawab Pengebor hari 1.000 - -
2. Tukang Bor hari 1.000 - -
3. Pekerja hari 3.000 110,700.00 332,100.00
B. BAHAN
1. Bahan Bakar Minyak Liter 26.400 6,000.00 158,400.00
2. Pelumas Mesin Liter 0.100 39,000.00 3,900.00
B. BAHAN
1. Kerikil m³ 1.670 445,800.00 744,486.00
A. BIAYA
1. Operasional Mesin Bor Unit 0.500 504,380.00 252,190.00
2. Operasional Pompa Lumpur Unit 1.143 1,874,809.50 2,143,094.74
B. BAHAN
1. Air untuk Sirkulasi m³ 12.000 100.00 1,200.00
2. Bahan Kimia STTP kg 40.000 18,500.00 740,000.00
A. UPAH
1. Tukang Bor hari 1.000 - -
2. Pekerja hari 1.000 110,700.00 110,700.00
B. BAHAN
1. Bahan Bakar Minyak Liter 35.200 6,000.00 211,200.00
2. Pelumas Mesin Liter 0.070 39,000.00 2,730.00
3. Pelumas Gardan Liter 0.330 44,500.00 14,685.00
4. Biaya Perbaikan % 0.030 200,000,000.00 60,000.00
5. Penyusutan Mesin dan perala % 0.190 200,000,000.00 380,000.00
A. UPAH
1. Teknisi Pumping Test hari 0.100 - -
2. Analisa Laboratorium Sample 1.000 375,000.00 375,000.00
B. BAHAN
1. Jerigen m³ 1.000 11,250.00 11,250.00
- 1 Unit Pembuatan Box Valve/ Air Valve (Analisa sendiri) Kode Analisa : TP.3
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
A. TENAGA KERJA
1. Pekerja OH 2.0000 110,700.00 221,400.00
3. Tukang Pipa OH 1.0000 151,500.00 151,500.00
4. Kepala tukang pipa OH 0.1000 - -
B. BAHAN
1. Pemasangan Accessories ls 1.0000 61,000.00 61,000.00
2. Galian Tanah Campuran m3 0.2700 51,480.00 13,899.60
3. Timbunan Tanah Kembali dipa m3 0.0602 21,395.00 1,288.41
C. PERALATAN
Alat Bantu (0,5 % x (UP+BHN) ls 1.0000 2,245.44 2,245.44
- 1 Unit Pembuatan Box Valve/ Air Valve (Analisa sendiri) Kode Analisa : TP.3
BIAYA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
Rp. Rp.
A. TENAGA KERJA
1. Pekerja OH 0.2000 110,700.00 22,140.00
3. Tukang OH 0.0175 151,500.00 2,651.25
3. Mandor OH 0.0070 - -
B. BAHAN
1. Pemasangan Accessories ls - 61,000.00 -
2. Galian Tanah Campuran m3 - - -
3. Timbunan Tanah Kembali dipa m3 - 9,000.00 -
C. PERALATAN
Truck Crane + perlengkapan ls 0.3500 60,266.98 21,093.44
a. Biaya mobilisasi dan demobilisasi 2 Unit Truk a. Transportasi = 2.00 Unit/hari 1,000,000 2,000,000
TOTAL II 2,000,000
IV PENGERJAAN PENGEBORAN
2. Upah
a. Mekanik = 80 x 0.33 = 26.67 HOK -
b. Pekerja = 80 x 0.33 = 26.67 HOK 110,700 2,952,000
c. Operator Alat bor = 80 x 0.33 = 26.67 HOK -
2. Upah
2. Upah
a. Mekanik = 80 x 0.17 = 13.33 HOK -
b. Pekerja = 80 x 0.17 = 13.33 HOK 110,700 1,476,000
c. Operator Alat bor = 80 x 0.17 = 13.33 HOK -
2. Upah
a. Operator Logging = 1 x 7.00 = 5.60 HOK -
b. Pembantu operator = 1 x 7.00 = 5.60 HOK -
c. Pekerja = 1 x 10.00 = 8.00 HOK 110,700 885,600
b. Pekerjaan Perpipaan Pengadaan dan pemasangan cassing pipa PVC (AW) 64 m 1. Bahan
Pipa PVC bertekanan 64 165,000
dia 150 mm (6") a. (AW) Ø 6" = x 1.00 = 64.00 m 10,560,000
b. End cop (Dop PVC) Ø 6" = 1 x 1.00 = 1.00 Buah 156,000 156,000
2. Upah
a. Pekerja = 64 x 0.50 = 32.00 HOK 110,700 3,542,400
b. Operator Alat bor = 64 x 0.50 = 32.00 HOK -
2. Upah
a. Pekerja = 16 x 0.50 = 8.00 HOK 110,700 885,600
b. Operator Alat bor = 16 x 0.50 = 8.00 HOK -
2. Upah
a. Pekerja = 1 x 1.65 = 1.55 HOK 110,700 171,056
b. Tukang = 1 x 0.28 = 0.26 HOK 151,500 39,017
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
e. Pekerjaan Penyelesaian Pembersihan dengan air jetting 1 Titik a Air jetting test = 1 x 1.00 = 1.00 Titik 3,136,485 3,136,485
Pembersihan dengan water jetting Titik b Water jetting = - x 1.00 = - Titik 1,031,505 -
TOTAL IV 66,222,282
Upah
Pasangan Buis Dia. 80 cm 0.5 Pekerja = 0.5 X 0.14 = 0.07 OH 110,700 7,749
Tukang = 0.5 X 0.07 = 0.04 OH 151,500 5,303
Bahan -
Buis Beton Ø 80 Cm panja = 0.5 X 2 = 1.00 Buah 250,000 250,000
Bata Merah = 0.5 X 0 = - Buah 1,500 -
Semen = 0.5 X 0.0784 = 0.04 Zak 60,000 2,352
Pasir Pasangan = 0.5 X 0.056 = 0.03 M3 207,500 5,810
Pasir urug = 0.5 X 0.024 = 0.01 M3 188,900 2,267
TOTAL V 523,480
VI ALAT PELINDUNG DIRI
1 Masker Kain 12.0 Bh Masker Kain 12.00 Bh 10,000 120,000
2 Sabun Cuci Tangan Cair 1.0 Btl Sabun Cuci Tangan Cair 1.00 Btl 50,000 50,000
3 Ember dan Keran 1.0 Bh Ember dan Keran 1.00 Bh 85,000 85,000
TOTAL VI 255,000
GRAND TOTAL 70,163,112
DIBULATKAN 70,163,000
RENCANA ANGGARAN BIAYA
II ALAT
Transportasi - - - - - Unit Truk 1,000,000.00 - - - - -
III UPAH
Pekerja - - OH 110,700.00 - - - - -
Tukang - - OH 151,500.00 - - - - -
Mekanik - - OH - - - - - -
Operator Logging - - OH - - - - - -
Pembantu operator - - OH - - - - - -
Operator Alat bor - - OH - - - - - -
Teknisi Pumping test - - - - - OH - - - - - -
JUMLAH TOTAL - - - - -
DIBULATKAN - - - - -
Kabupaten : …..... Jenis Prasarana : Panel, Pompa dan Aksesoris
Kecamatan : …………. Take Of Sheet Lokasi : …………..
Desa : ………….. Volume : 1.00 Unit
Sketsa Kasar Perhitungan Volume Vol. Sat. Analisa Kebutuhan Sat. harga satuan Biaya
I PEKERJAAN INSTALASI LISTRIK
a. Pemasangan Baru 1 UPAH
a. Instalasi dan Setting Pump = 1.00 X 1.00 = 1.00 Ls 8,362,500.00 8,362,500.00
2 BAHAN
a. Panel Kontrol Solar Inverter = 1.00 X 1.00 = 1.00 Unit 16,725,000.00 16,725,000.00
b. Solar Panel = 8.00 X 1.00 = 8.00 Lbr 2,230,000.00 17,840,000.00
c. Suport Panel dan Aksesoris = 1.00 X 1.00 = 1.00 Set 11,150,000.00 11,150,000.00
d. Kabel Power = 0.25 X 1.00 = 0.25 Roll 5,017,500.00 1,254,375.00
e. Kabel WLC = 0.50 X 1.00 = 0.50 Roll 2,787,500.00 1,393,750.00
f. Pompa Celup DC 12V = 1.00 X 1.00 = 1.00 Unit 1,000,000.00 1,000,000.00
57,725,625.00
Nomor RAB : 03
Pekerjaan / Kegiatan : Sarana Air Minum
Sub Total 2) -
B UPAH
1 Instalasi dan Setting Pump 1.00 Ls 8,362,500 8,362,500
Perhitungan
Persegi Panjang Trapesium Lingkaran Vol.
Jml
No. Uraian Pekerjaan Lb Pj Tg S. Bwh S. Ats Tg Pj Ø1 Ø2 Tg
Sat
m m m m m m m m m Bh
V=LbxPjxTg V=((1/2(S.Bwh+S.Atas))xTg)xPj
2.1 PEK. SUMUR BOR 1 (UNIT)
1 Toren 10000L 1 1.00 Unit
TOTAL I 110,700
II PEKERJAAN TANAH dan PASIR
a. Galian Tanah pondasi 15.36 m3 Pekerja 0.75 x 15.36 = 11.52 OH 110,700 1,275,264
= 1.6 x 1.60 x 1.5 = 4
= 15.36 m3
b. Timbunan Kembali Tanah Galian x 1/3 galian 5.12 m3 Pekerja 0.25 x 5.12 = 1.28 OH 110,700 141,696
d. Urugan pasir dibawah lantai dan pondasi 0.93 m3 Pasir urug 1.2 x 0.932 = 1.12 M3 188,900 211,266
- Pondasi Pekerja 0.3 x 0.932 = 0.28 OH 110,700 30,952
= 1.6 x 2 x 0.05 = 4
= 0.512 m3
- Lantai
= 0x 0 x 0.05 = 1
= 0 m3
- Pondasi batu kali
= 0.7 x 12 x 0.05 = 1
= 0.42 m3
TOTAL II 1,659,177
b. Pasangan 1/2 Bata 1pc:4ps 23.32 m2 Bata merah 70 x 23.32 = 1,632.40 buah 1,500 2,448,600
= 2.5 x 1 x 2.5 = 4 Semen 0.194 x 23.32 = 4.51 Zak 60,000 270,885
= 25 m2 Pasir pasangan 0.045 x 23.32 = 1.05 M3 207,500 217,750
Lubang kusen
= 0.8 x 2.10 = 1.68 Pekerja 0.3 x 23.32 = 7.00 OH 110,700 774,457
Tukang 0.1 x 23.32 = 2.33 OH 151,500 353,298
-
2 Pekerjaan Beton Bertulang K-175 7.02 m3 Semen 6.52 x 7.024 = 45.80 Zak 60,000 2,747,789
Footplat (100x100) cm Pasir Cor 0.543 x 7.024 = 3.81 M3 214,800 819,039
= 1.4 x 1.4 x 0.25 = 4 Batu Pecah 2-3 cm 0.762 x 7.024 = 5.35 M3 400,000 2,141,540
= 1.96 M3 Air 215 x 7.024 = 1,510.16 Ltr 100 151,016
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
Beton sloof 20/30 cm Pekerja 1.65 x 7.024 = 11.59 OH 110,700 1,282,969
= 12 x 0.2 x 0.3 = 1 Tukang 0.275 x 7.024 = 1.93 OH 151,500 292,637
= 0.72 M3
Beton Kolom 30x30 cm
= 0.30 x 0.30 x 14.60 = 1
= 1.31 M3
Beton Kolom 15x15 cm
= 0.15 x 0.15 x 2 = 4
= 0.18 M3
Beton Balok 15/20 cm
= 0 x 0 x 0 = 1
= 0 M3
Beton Balok 20/40 cm
= 0.2 x 12 x 0.4 = 1
= 0.96 M3
Beton Balok Silang 20/30 cm
= 0.2 x 7 x 0.3 = 1
= 0.42 M3
Beton Plat Lantai 12 cm
= 3.5 x 3.5 x 0.12 = 1
= 1.47 M3
Beton Plat Penutup Gudang t 8 cm
= 0 x 0 x 0 = 1
= 0 M3
Beton Plat Dinding 10 cm
= 0 x 0 x 0 = 1
= 0 M3
Beton Plat Penutup t = 8 cm
= 0 x 0 x 0 = 1
= 0 M3
Footplat (140x140) cm Besi Beton Polos 1.05 x 753.673 = 791.36 kg 20,050 15,866,694
= 225.48 kg Kawat Ikat Beton 0.015 x 753.673 = 11.31 kg 35,000 395,678
TOTAL IV 27,113,269
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
TOTAL V 6,721,489
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
VI PEKERJAAN PLESTERAN
Plesteran dinding 1pc:4ps 48.00 m2 Semen 0.156 x 48 = 7.46 Zak 60,000 447,898
dinding gudang kontrol Pasir pasangan 0.023 x 48 = 1.10 M3 207,500 229,080
= 0 + 0 x 2.5 = 2
= 0 m2 Pekerja 0.3 x 48 = 14.40 OH 110,700 1,594,080
dinding tower Beton Tukang 0.15 x 48 = 7.20 OH 151,500 1,090,800
= 3 + 3 x 2 = 2
= 48 m2
Plesteran lantai 1pc:3ps 9.00 m2 Semen 0.156 x 9.00 = 1.40 Zak 60,000 83,981
gudang kontrol Pasir pasangan 0.023 x 9.00 = 0.21 M3 207,500 42,953
= 0 x 3 x 1 = 1
= 0 m2 Pekerja 0.3 x 9.00 = 2.70 OH 110,700 298,890
lantai tower Tukang 0.15 x 9.00 = 1.35 OH 151,500 204,525
= 3 x 3 x 1 = 1
= 9 m2
Pekerja 6 x 0 = - OH 110,700 -
Tukang 18 x 0 = - OH 151,500 -
TOTAL IV -
Pipa GI Ø 2" (Outlet dan Penguras) m PIPA Galpanis (GI Medium A) Ø 2" = - m 150,000 -
= 6 + 0 x 0 = 0 Pekerja 0.11 x - = - M3 110,700 -
= 6 m2 Tukang 0.18 x - = - M3 151,500 -
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
Pipa GI Ø 3" (outlet/keluar dan pengiras) - m PIPA Galpanis (GI Medium A) Ø 3" = - m 265,700 -
= 6 + 0 x 0 = 0 Pekerja 0.14 x - = - OH 110,700 -
= m2 Tukang 0.23 x - = - OH 151,500 -
TOTAL II -
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
IX PENGERJAAN PENGECATAN Cat tembok 41.04 M2 Plamir Tembok 0.1 x 41.04 = 4.10 kg 47,000 192,888
Dinding ruangan Cat tembok 0.36 x 41.04 = 14.77 Kg 41,000 605,750
= 0 x x 0 = 8 Ampelas 0 x 41.04 = - m' 30,000 -
= 0 M2 Kape 0 x 41.04 = - Buah - -
Beton Kolom 30x30 cm Kuas 3" 0 x 41.04 = - Buah 18,000 -
= 0.3 x 0.3 x 4 = 4
= 19.2 M2 Pekerja 0.02 x 41.04 = 0.82 OH 110,700 90,863
Beton Balok 15/20 cm Tukang 0.063 x 41.04 = 2.59 OH 151,500 391,706
= 0.15 x 0.2 x 3 = 4
= 6.6 M2
Beton Balok 20/40 cm
= 0.4 0.4 x 3 = 4
= 14.4 M2
Beton Plat Lantai 12 cm
= 3.5 x 3.5 x 0.12 = 2
= 0.84 M2
Beton Plat Dinding 15 cm
= x x =
= M2
Beton Plat Penutup t = 8 cm
= 0 x 0 x 1 = 1
= 0 M2
TOTAL IV 1,281,207
V BAK
Toren 5000 L 1.00 Bh Toren 5000 L 1.00 Bh 7,800,000 7,800,000
Toren 2500 L 1.00 Bh Toren 2500 L 1.00 Bh 5,000,000 5,000,000
-
TOTAL V 12,800,000
a. Pek. Pondasi batu 1 : 4 4.00 m3 Batu Kali Alam 1.2 x 3.6 = 4.32 M3 210,700 910,224
- penyangga toren di kampung Semen 2.72 x 3.6 = 9.79 Zak 60,000 587,520
L atas L bawah Tinggi Kelilling Pasir pasangan 0.544 x 3.6 = 1.96 M3 207,500 406,368
= 2+ 2 x 1 x 2
= 4 m3 Pekerja 1.5 x 3.6 = 5.40 OH 110,700 597,780
Tukang 0.75 x 3.6 = 2.70 OH 151,500 409,050
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
I. PEKERJAAN GALIAN
1 Galian Tanah 113.25 M3 2 Upah
P L d = Vol (m3) a. Pekerja = 57 X 0.75 = 42.47 Hok 110,700
Pipa GI dia. 6 " = = -
Pipa GI dia. 4 " = = -
Pipa GI dia. 3 " = = -
Pipa GI dia. 2.5" = = -
Pipa GI dia. 2" = = -
Pipa GI dia. 1.5" = = -
Pipa GI dia. 1" = = -
Pipa GI dia. 3/4" = = -
Pipa GI dia. 0.5" = = -
Pipa HDPE dia. 6 " = 0.35 0.53 = -
Pipa HDPE dia. 4 " = 0.30 0.47 = -
Pipa HDPE dia. 3 " = 0.30 0.44 = -
Pipa HDPE dia. 2.5" = 0.30 0.41 = -
Pipa HDPE dia. 2" = 300 0.25 0.39 = 29
Pipa HDPE dia. 1.5" = 0.20 0.38 = -
Pipa HDPE dia. 1" = 1200 0.20 0.35 = 84
Pipa HDPE dia. 3/4" = 0.15 0.2 = -
Pipa HDPE dia. 0.5" = 0.15 0.2 = -
Pipa PVC dia. 6" = 0.35 0.53 = -
Pipa PVC dia. 4" = 0.30 0.47 = -
Pipa PVC dia. 3" = 0.30 0.44 = -
Pipa PVC dia. 2.5" = 0.30 0.41 = - -
Pipa PVC dia. 2" = 0 0.25 0.39 = - -
Pipa PVC dia. 1.5" = 0 0.20 0.38 = - -
Pipa PVC dia. 1.5" = 0.17 0.35 = - -
Pipa PVC dia. 3/4" = 0.15 0.2 = - -
Pipa PVC dia. 0.5" = 0.15 0.2 = - -
= 1500 = 113 M3
Upah
2 Timbunan bekas galian 38 37.75 a. Pekerja = 38 X 0.25 = 9.44 Hok 110,700
1/3 x galian
Total I
II. PEKERJAAN PASANGAN
PIPA
1 Pasangan Pipa GI (GALVANIS)
a. Pipa GI dia. 6 " - M 1 Bahan
2 Upah
a. Pekerja = - X 0.51 = - Hok 110,700
b. Tukang = - X 0.25 = - Hok 151,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
2 Upah
a. Pekerja = - X 0.14 = - Hok 110,700
b. Tukang = - X 0.23 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.14 = - Hok 110,700
b. Tukang = - X 0.23 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.11 = - Hok 110,700
b. Tukang = - X 0.18 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.11 = - Hok 110,700
b. Tukang = - X 0.18 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.11 = - Hok 110,700
b. Tukang = - X 0.18 = - Hok 151,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
2 Upah
a. Pekerja = - X 0.05 = - Hok 110,700
b. Tukang = - X 0.09 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.05 = - Hok 110,700
b. Tukang = - X 0.09 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.05 = - Hok 110,700
b. Tukang = - X 0.09 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.06 = - 110,700
b. Tukang = - X 0.03 = - 151,500
2 Upah
a. Pekerja = - X 0.04 = - 110,700
b. Tukang = - X 0.02 = - 151,500
2 Upah
a. Pekerja = - X 0.04 = - 110,700
b. Tukang = - X 0.02 = - 151,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
2 Upah
a. Pekerja = - X 0.04 = - 110,700
b. Tukang = - X 0.02 = - 151,500
2 Upah
a. Pekerja = 300 X 0.04 = 5.25 110,700
b. Tukang = 300 X 0.02 = 2.55 151,500
2 Upah
a. Pekerja = - X 0.04 = - 110,700
b. Tukang = - X 0.02 = - 151,500
2 Upah
a. Pekerja = 1,200 X 0.04 = 21.00 110,700
b. Tukang = 1,200 X 0.02 = 10.20 151,500
2 Upah
a. Pekerja = - X 0.04 = - 110,700
b. Tukang = - X 0.02 = - 151,500
2 Upah
a. Pekerja = - X 0.04 = - 110,700
b. Tukang = - X 0.02 = - 151,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
2 Upah
a. Pekerja = - X 0.08 = - Hok 110,700
b. Tukang = - X 0.14 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.08 = - Hok 110,700
b. Tukang = - X 0.14 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.08 = - Hok 110,700
b. Tukang = - X 0.14 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.05 = - Hok 110,700
b. Tukang = - X 0.07 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.05 = - Hok 110,700
b. Tukang = - X 0.07 = - Hok 151,500
Kabupaten : Jenis Prasarana : Instalasi Pipa
Kecamatan :
Desa/Kelurahan :
Take Of Sheet Lokasi
Volume
:
: 1,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
c. Pasangan Pipa PVC Dia. 1,5" - M 1 Bahan
Panjang = 0m a. Pipa S 12,5 SNI Ø 1,5" = - X 1 = - m 25,000
2 Upah
a. Pekerja = - X 0.04 = - Hok 110,700
b. Tukang = - X 0.06 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.0360 = - Hok 110,700
b. Tukang = - X 0.0600 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.036 = - Hok 110,700
b. Tukang = - X 0.060 = - Hok 151,500
2 Upah
a. Pekerja = - X 0.081 = - Hok 110,700
b. Tukang = - X 0.135 = - Hok 151,500
Total II
II. PERLENGKAPAN DAN
ACCESORIS PIPA Dimensi
1 Coupler HDPE 2" 2" 5.00 Bh Coupler HDPE 2" 5.00 Bh 317,200
2 Coupler HDPE 1" 1" 10.00 Bh Coupler HDPE 1" 10.00 Bh 182,200
3 Reducer Coupler 2"x1" 2'x1" 1.00 Bh Reducer Coupler 2"x1" 1.00 Bh 174,200
4" - Bh Tee PVC Ø 4" - Bh 200,000
3" - Bh Tee PVC Ø 3" - Bh 150,000
2" - Bh Tee PVC Ø 2" - Bh 85,000
1,5" - Bh Tee PVC Ø 1,5" - Bh 75,000
1" - Bh Tee PVC Ø 1" - Bh 50,000
Kabupaten : Jenis Prasarana : Instalasi Pipa
Kecamatan :
Desa/Kelurahan :
Take Of Sheet Lokasi
Volume
:
: 1,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
3 Long Bend 90 6" - Bh Long Bend PVC 90 Ø 6" - Bh 140,000
4" - Bh Long Bend PVC 90 Ø 4" - Bh 140,000
3" - Bh Long Bend PVC 90 Ø 3" - Bh 140,000
2" - Bh Long Bend PVC 90 Ø 2" - Bh 110,000
1,5" - Bh Long Bend PVC 90 Ø 1,5" - Bh 80,000
5 Dop/Endcop PVC 2" 1.00 Bh End cop (Dop PVC) Ø 2" 1.00 Bh 50,000
1,5" - Bh End cop (Dop PVC) Ø 1.5 - Bh 35,000
1" - Bh End cop (Dop PVC) Ø 1" - Bh 25,000
3/4" - Bh End cop (Dop PVC) Ø 3/4" - Bh 76,000
7 Tee 3" x 2" - Bh Reducer Tee All Socket PVC Ø 3" x 2" - Bh 160,000
2,5" x 1" - Bh Reducer Tee All Socket PVC Ø 2,5" x 1" - Bh 35,000
2" x 1" - Bh Reducer Tee All Socket PVC Ø 2" x 1" - Bh 110,000
1.5" x 1" - Bh Reducer Tee All Socket PVC Ø 1,5" x 1" - Bh 272,000
8 Shock Drat Luar 6" - Bh Shock Drat Luar PVC Ø 6" - Bh 75,000
4" - Bh Shock Drat Luar PVC Ø 4" - Bh 60,000
3" - Bh Shock Drat Luar PVC Ø 3" - Bh 62,000
2" - Bh Shock Drat Luar PVC Ø 2" - Bh 62,000
1,5" - Bh Shock Drat Luar PVC Ø 1,5" - Bh 56,000
1" - Bh Shock Drat Luar PVC Ø 1" - Bh 62,000
9 Rejucer Socket PVC 6"x4" - Bh Reducer Socket PVC Ø 6" x 4" - Bh 272,000
4" x 3" - Bh Reducer Socket PVC Ø 4" x 3" - Bh 149,000
3" x 2" - Bh Reducer Socket PVC Ø 3" x 2" - Bh 122,000
2.5" x 2" - Bh Reducer Socket PVC Ø 2.5" x 2" - Bh 115,000
2" x 1,5" - Bh Reducer Socket PVC Ø 2" x 1,5" - Bh 90,000
2" x 1" - Bh Reducer Socket PVC Ø 2" x 1" - Bh 80,000
1,5" x 1" - Bh Reducer Socket PVC Ø 1,5" x 1" - Bh 65,000
11 Clamp Saddle 3" x 1" - Bh Clamp Saddle PVC Ø 3" x 1" - Bh 55,000
2" x 1" - Bh Clamp Saddle PVC Ø 2" x 1" - Bh 50,000
2" x 3/4" - Bh Clamp Saddle PVC Ø 2" x 3/4" - Bh 35,000
1" x 3/4" - Bh Clamp Saddle PVC Ø 1" x 3/4" - Bh 30,000
Kabupaten : Jenis Prasarana : Instalasi Pipa
Kecamatan :
Desa/Kelurahan :
Take Of Sheet Lokasi
Volume
:
: 1,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
GRAND TOTAL
III. PEKERJAAN BETON IIIPEKERJAAN BETON BERTULANG 1 : 2 : 3
1 Pekerjaan Cor Plat Beton Penutup (15 Cm) Lantai 1: 2: 3
= P X L * T
= 4 X 1.00 * 0.15
= 0.6 M3
Kebutuhan Besi Memanjang
- Besi Ǿ ### Jarak = 0
Banyaknya beugel = P +
0
= 7 →
Panjang per Besi = 4
= P X Byk
###
= 4.4 X 0
###
= 0 Lonjor
Untuk 2 Lapis
= 0 Lonjor
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
Kabupaten : Jenis Prasarana : Instalasi Pipa
Kecamatan :
Desa/Kelurahan :
Take Of Sheet Lokasi
Volume
:
: 1,500
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan
sumur a. Pas. Buis beton Ø 80cm Panjang 0,5 m 15.00 M 1 Bahan
2 Upah
a. Pekerja = 15 X 0.79 = 11.78 Hok 110,700
b. Tukang = - X 0.09 = - Hok 151,500
m
Biaya
4,701,291
1,044,731
5,746,022
-
-
-
m
Biaya
-
-
-
-
-
-
-
-
-
-
-
m
Biaya
-
-
-
-
-
-
-
-
-
-
-
-
-
m
Biaya
-
-
18,600,000
581,175
386,325
-
-
22,800,000
2,324,700
1,545,300
-
-
-
-
-
m
Biaya
-
-
-
-
-
-
-
-
-
-
m
Biaya
-
-
-
-
-
-
-
-
46,237,500
1,586,000
1,822,000
174,200
-
-
-
-
-
m
Biaya
-
-
-
-
-
-
-
-
-
222,000
-
50,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m
Biaya
-
-
-
55,000
40,000
-
3,949,200
55,932,722
m
Biaya
7,500,000
1,303,493
-
RENCANA ANGGARAN BIAYA
Volume
Harga Satuan
URAIAN Satuan
Total BLM
Rp
1 2=3+4+5 7 8 13=6x8
1 BAHAN
2 UPAH
Sub Total 3) -
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
I PEKERJAAN PENDAHULUAN
a Pekerjaan Pembersihan 0 Ls 0 Ls 50,000.00 -
2 Upah
a Pekerja = 0 X 0.1 = 0 Hok 110,700.00 -
b Tukang = 0 X 0.1 = 0 Hok 151,500.00 -
Total I -
II PEKERJAAN GALIAN DAN URUGAN
L x T x P =
a Galian Tanah Pondasi 0.35 x 1 x 16 = 2.8 2.8 m3 1 Upah
a Pekerja = 2.8 X 0.75 = 2.1 Hok 110,700.00 232,470.00
P x L x T = V
c Urugan Tanah Peniggian Lantai 1 selasar 4 x 1 x 0.2 = 0.8 2.4 m3 1 Bahan
2 Ruangan 4 x 2 x 0.2 = 1.6 a Tanah Urug = 2.4 X 1.2 = 2.88 m3 67,300.00 193,824.00
= 2.4
2 Upah
a Pekerja = 2.4 X 0.30 = 0.72 Hok 110,700.00 79,704.00
P x L x T = V
d Urugan pasir dibawah lantai 1 selasar 4 x 1 x 0.05 = 0.2 0.6 m3 1 Bahan
2 Ruangan 4 x 2 x 0.05 = 0.4 a Pasir Urug = 0.6 X 1.2 = 0.72 m3 188,900.00 136,008.00
= 0.6
2 Upah
a Pekerja = 0.6 X 0.30 = 0.18 Hok 110,700.00 19,926.00
Total II 687,762.00
III PEKERJAAN PASANGAN Panjang Total
a Pasangan Batu Kosong 0.84 m3
Volume P L t = 1 Upah
16 0 0.15 = 0.84 a. Pekerja = 0.84 X 1.50 = 1.26 hok 110,700.00 139,482.00
b. Tukang = 0.84 X 0.60 = 0.504 hok 151,500.00 76,356.00
2 Bahan
a. Batu Kali Alam = 0.84 X 1.20 = 1.008 m3 210,700.00 212,385.60
b. Pasir urug = 0.84 X 0.43 = 0.3629 m3 188,900.00 68,548.03
-
Kabupaten : Lombok Timur Jenis Prasarana : JAMBAN SEKOLAH
Kecamatan : Take Of Sheet Lokasi :
Desa/Kelurahan : Volume : 1 unit
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
a Pasangan Batu Kali 1pc : 4Ps Volume 1.68 m3
P L t = 1 Upah
16 0 0.35 = 1.68 a. Pekerja = 1.68 X 1.50 = 2.52 hok 110,700.00 278,964.00
b. Tukang = 1.68 X 0.60 = 1.008 hok 151,500.00 152,712.00
2 Bahan
a. Batu Kali Alam = 1.68 X 1.10 = 1.848 m3 210,700.00 389,373.60
b. Semen 1.68 2.72 = 4.5696 sak 60,000.00 274,176.00
c Pasir pasangan 1.68 0.54 = 0.9139 m3 207,500.00 189,638.40
lubang
0.7 2 2 2.66
d Plesteran 32.3 64.68 m2 1 Upah
1 Plesteran Trasram 1Pc: 3 Ps dinding a. Pekerja = 64.68 X 0.30 = 19.404 hok 110,700.00 2,148,022.80
P x T sisi b. Tukang = 64.68 X 0.15 = 9.702 ok 151,500.00 1,469,853.00
= 14 x 3 x 2 2 Bahan
= 70 a. Semen = 64.68 X 0.10 = 6.706 sak 60,000.00 402,361.34
= 64.68 b. Pasir pasangan = 64.68 X 0.03 = 1.6817 m3 207,500.00 348,948.60
Lantai
P x T sisi
= 4 x 4 x 1
= 14
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
IV PEKERJAAN LANTAI
a Rabat Lantai Beton 1:2:3. t=10 cm P x L x T m3
3 x 3 x 0.1 1 Upah
a. Pekerja = 0.00 X 1.65 = 0 hok 110,700.00 -
b. Tukang = 0.00 X 0.25 = 0 ok 151,500.00 -
2 Bahan
a. Semen = 0.00 X 6.46 = 0 m3 60,000.00 -
b. Pasir cor = 0.00 X 0.52 = 0 sak 214,800.00 -
c Kerikul pecah 2 - 3 cm = 0.00 X 0.78 = 0 m3 400,000.00 -
b Acian P x L
3 x 3 m2 1 Upah
a. Pekerja = 0.00 X 0.16 = 0 hok 110,700.00 -
b. Tukang = 0.00 X 0.08 = 0 hok 151,500.00 -
2 Bahan
a. Semen = 0.00 X 0.07 = 0 Sak 60,000.00 -
P x L
b Keramik Lantai 4 x 4 14 14 m2 Upah
a. Pekerja = 14.00 X 0.7 = 9.8 hok 110,700.00 1,084,860.00
b. Tukang = 14.00 X 0.35 = 4.9 hok 151,500.00 742,350.00
Bahan
a. Keramik Lantai Kwalitas Seda = 14.00 X 1.00 = 14 m2 74,000.00 1,036,000.00
b. Semen = 14.00 X 0.21 = 2.912 Zak 60,000.00 174,720.00
c Pasir pasangan = 14.00 X 0.05 = 0.63 m3 207,500.00 130,725.00
P x T
b Keramik dinding 7 x 2 x 2 21 m2 Upah
a. Pekerja = 21.00 X 0.90 = 18.9 hok 110,700.00 2,092,230.00
= 21 b. Tukang = 21.00 X 0.45 = 9.45 hok 151,500.00 1,431,675.00
Bahan
a. Keramik Dinding Kwalitas Sed = 21.00 X 1.00 = 21 m2 79,000.00 1,659,000.00
b. Semen = 21.00 X 0.19 = 3.906 Zak 60,000.00 234,360.00
c Pasir pasangan = 21.00 X 0.02 = 0.378 m3 207,500.00 78,435.00
Total IV 8,664,355.00
V PEKERJAAN BETON
Sloof 15/20 cm
P x L x T
14 x 0x 0.2 = 0.42
Kolom Praktis 10/10 cm
P x L x T x Jlh
0.1 x 0.1 x 2.7 x 6 0.16
Ring Balok 10/10 cm
P x L x T
14 x 0x 0.1 0.14
Total 0.72 0.722 M3 BETON
Pekerjaan Beton Bertulang K-175 0.722 M3 1 Bahan
a Semen 0.722 x 6.520 = 4.7074 Sak 60,000.00 282,446.40
b Pasir cor 0.722 x 0.543 = 0.3919 m3 214,800.00 84,189.33
c Kerikil pecah 2 - 3 cm 0.722 x 0.762 = 0.5503 m3 400,000.00 220,129.78
d Air 0.722 x 215.000 = 155.23 Ltr 100.00 15,523.00
2 Upah
a Pekerja 0.722 x 1.650 = 1.1913 Hok 110,700.00 131,876.91
b Tukang 0.722 x 0.275 = 0.1986 Hok 151,500.00 30,080.33
Kabupaten : Lombok Timur Jenis Prasarana : JAMBAN SEKOLAH
Kecamatan : Take Of Sheet Lokasi :
Desa/Kelurahan : Volume : 1 unit
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
2 Upah
a Pekerja #REF! x 0.007 = #REF! Hok 110,700.00 #REF!
b Tukang #REF! x 0.007 = #REF! Hok 151,500.00 #REF!
Pekerjaan Bekisting Sloof #REF! M2
Pekerjaan Bekisting Kolom #REF! M2 BEGISTING SLOOF
Pekerjaan Bekisting Ring balok #REF! M2 1 Bahan
a Papan Kayu Begisting #REF! x 0.045 = #REF! m3 5,501,200.00 #REF!
b Paku #REF! x 0.300 = #REF! kg 20,000.00 #REF!
c Minyak Bekisting #REF! x 0.100 = #REF! Ltr - #REF!
2 Upah
a Pekerja #REF! x 0.520 = #REF! Hok 110,700.00 #REF!
b Tukang #REF! x 0.260 = #REF! Hok 151,500.00 #REF!
BEGISTING KOLOM
1 Bahan
a Papan Kayu Begisting #REF! x 0.040 = #REF! m3 5,501,200.00 #REF!
b Paku #REF! x 0.400 = #REF! kg 20,000.00 #REF!
c Minyak bekisting #REF! x 0.200 = #REF! Ltr - #REF!
Balok Kayu Kelas III #REF! x 0.015 = #REF! Ltr 5,501,200.00 #REF!
Triplek besar 122x242 cm tebal #REF! x 0.350 = #REF! Ltr 79,000.00 #REF!
Dolken diamater 8-10cm P=4m #REF! x 2.000 = #REF! Ltr 26,200.00 #REF!
2 Upah
a Pekerja #REF! x 0.660 = #REF! Hok 110,700.00 #REF!
b Tukang #REF! x 0.330 = #REF! Hok 151,500.00 #REF!
BEGISTING RINGBALK
1 Bahan
a Papan Kayu Begisting #REF! x 0.040 = #REF! m3 5,501,200.00 #REF!
b Paku #REF! x 0.400 = #REF! kg 20,000.00 #REF!
c Minyak bekisting #REF! x 0.200 = #REF! Ltr - #REF!
Balok Kayu Kelas III #REF! x 0.018 = #REF! Ltr 5,501,200.00 #REF!
Triplek besar 122x242 cm tebal #REF! x 0.350 = #REF! Ltr 79,000.00 #REF!
Dolken diamater 8-10cm P=4m #REF! x 2.000 = #REF! Ltr 26,200.00 #REF!
2 Upah
a Pekerja #REF! x 0.660 = #REF! Hok 110,700.00 #REF!
b Tukang #REF! x 0.330 = #REF! Hok 151,500.00 #REF!
Total V #REF!
VI Pekerjaan Rangka atap
1 Rangka Atap Kayu Klas. II 1 Atap Induk 2.1 m2 1 Upah
P x L a. Pekerja = 2.10 X 0.10 = 0.21 hok 110,700.00 23,247.00
20 x 0.07 x 0.05 = 1.4 m2 b. Tukang = 2.10 X 0.10 = 0.21 hok 151,500.00 31,815.00
2 Bahan 0
2 Atap Konsol a. Balok Kayu Klas II = 2.10 X 0.01 = 0.0252 m3 4,312,400.00 108,672.48
P x L b. Paku = 2.10 0.05 = 0.0945 Kg 20,000.00 1,890.00
10 x 0.07 x 0.05 = 0.7 m2
2.1 m2
Kabupaten : Lombok Timur Jenis Prasarana : JAMBAN SEKOLAH
Kecamatan : Take Of Sheet Lokasi :
Desa/Kelurahan : Volume : 1 unit
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
2 Atap Spandek 0,30 mm 1 Atap Induk 25 M2 1 Upah
P x L a. Pekerja = 25.00 X 0.12 = 3 hok 110,700.00 332,100.00
5 x 2.7 x = 13.5 m2 b. Tukang = 25.00 X 0.06 = 1.5 Hok 151,500.00 227,250.00
2 Bahan
2 Atap Konsol a. Spandek 3 mm lebar 70 cm = 25.00 X 0.70 = 17.5 Lbr 37,000.00 647,500.00
P x L b. Baut spandek = 25.00 0.02 = 0.5 Kg 30,000.00 15,000.00
5 x 2.3 = 11.5 m2
25 m2
Total VI 2,316,099.48
VII Pekerjaan Kusen Dan Pintu
1 Pek. Kusen Pintu Kayu Kls. II Volume 0.0619
Panjang a b Titik 1 Upah
4.3 x 0 x 0.06 2 m3 a. Pekerja = 0.06 X 14.40 = 0.8916 hok 110,700.00 98,705.43
b. Tukang = 0.06 X 4.80 = 0.2972 Hok 151,500.00 45,028.22
2 Bahan
2 Pek. Daun Pintu Panil Luas a. Balok Kayu Klas II = 0.06 X 1.20 = 0.0743 M3 4,312,400.00 320,428.57
P L Titik
1.7 x 1 x 2 2.38 m2 1 Upah
a. Pekerja = 2.38 X 0.80 = 1.904 hok 110,700.00 210,772.80
b. Tukang = 2.38 X 2.40 = 5.712 Hok 151,500.00 865,368.00
2 Bahan
a. Papan Kayu Klas II = 2.38 X 0.04 = 0.0952 M3 4,312,400.00 410,540.48
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
IX Pasangan Kloset Jongkok+Acc 2 Titik 1 Upah
a. Pekerja = 2.00 X 1.00 = 2.00 hok 110,700.00 221,400.00
b. Tukang = 2.00 X 1.50 = 3.00 Hok 151,500.00 454,500.00
2 Bahan
a. Closet Duduk Lengkap Kwalit = 2.00 X 1.00 = 2.00 Bh 2,000,000.00 4,000,000.00
b Semen = 2.00 x 0.12 = 0.24 Sak 60,000.00 14,400.00
c Pasir pasangan = 2.00 x 0.01 = 0.02 m3 207,500.00 4,150.00
Total X 1,531,000.00
XI SEPTIC TANK
1 Galian Tanah D x L x T =
1.2 x 1 x 1.5 = 3.3912 m3 1 Upah
a Pekerja = 3.3912 X 0.75 = 2.54 Hok 110,700.00 281,554.38
P T
2 Pasangan Buis Dia. 80 cm 2 3 M 1 Upah
a. Pekerja = 3.00 X 0.14 = 0.42 hok 110,700.00 46,494.00
b. Tukang = 3.00 X 0.07 = 0.21 ok 151,500.00 31,815.00
2 Bahan
a. Buis Beton Ø 80 Cm panjang = 3.00 X 2.00 = 6.00 Bh 250,000.00 1,500,000.00
b. Bata Merah 3.00 X 18.90 = 56.70 sak 1,500.00 85,050.00
c Semen 3.00 X 3.92 = 11.76 m3 60,000.00 705,600.00
d. Pasir Pasangan 3.00 X 0.06 0.17 m4 207,500.00 34,860.00
e Pasir urug 3.00 X 0.02 0.07 m5 188,900.00 13,600.80
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. harga satuan Biaya
3,843,166.18
X ALAT PELINDUNG DIRI
1 Masker Kain 12 Bh 1 Masker Kain 12 Bh 10,000.00 120,000.00
2 Ember dan Keran 1 Bh 2 Ember dan Keran 1 Bh 85,000.00 85,000.00
3 Sabun Cuci Tangan Cair 2 Btl 3 Sabun Cuci Tangan Cair 2 Btl 50,000.00 100,000.00
305,000.00
TOTAL BIAYA MCK #REF!
RENCANA ANGGARAN BIAYA
1 BAHAN
17 Paku - - - - kg 20,000 - - - - -
37 Sealtipe - - - - BH 10,000 - - - - -
47 Mil - - - - kg 1,000 - - - - -
Sub Total 1) - - - - -
2 UPAH
1 Pekerja - - - - - OH 110,700 - - - - -
2 Tukang - - - - - OH 151,500 - - - - -
Sub Total 2) - - - - -
3 ALAT PELINDUNG DIRI
JUMLAH TOTAL - - - - -
Program : Program Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (Pamsimas) III
Pekerjaan : Sarana Air Minum dan Sanitasi Masyarakat
Lokasi : Desa …………………….
Tahun Anggaran : 2021
+ PEKERJAAN TANAH -
- Galian tanah A.2.3.1.1 - m3 83,025.00 -
- Timbunan Kembali Tanah Galian A.2.3.1.9 - m3 29,073.40 -
Program : Program Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (Pamsimas) III
Pekerjaan : Sarana Air Minum dan Sanitasi Masyarakat
Lokasi : Desa …………………….
Tahun Anggaran : 2021
JUMLAH #REF!
JUMLAH DIBULATKAN #REF!
Terbilang : Err:522
Perhitungan
Persegi Panjang Trapesium Lingkaran Vol.
Jml
No. Uraian Pekerjaan Lb Pj Tg S. Bwh S. Ats Tg Pj Ø1 Ø2 Tg
Sat
m m m m m m m m m Bh
V=LbxPjxTg V=((1/2(S.Bwh+S.Atas))xTg)xPj
2.1 PEK. SUMUR BOR 1 (UNIT)
1 Sumur Bor - 0.00 m
TOTAL I 110,700
II PEKERJAAN TANAH dan PASIR
d. Urugan pasir dibawah lantai dan pondasi - m3 Pasir urug 1.2 x 0 = - M3 188,900 -
- Pondasi Pekerja 0.3 x 0 = - OH 110,700 -
= 0x 2 x 0.05 = 4
= 0 m3
- Lantai
= 0x 0 x 0.05 = 1
= 0 m3
- Pondasi batu kali
= 0x - x 0.05 = 1
= 0 m3
TOTAL II -
-
2 Pekerjaan Beton Bertulang K-175 7.77 m3 Semen 6.52 x 7.765 = 50.63 Zak 60,000 3,037,668
Footplat (100x100) cm Pasir Cor 0.543 x 7.765 = 4.22 M3 214,800 905,443
= 0 x 1.4 x 0.25 = 4 Batu Pecah 2-3 cm 0.762 x 7.765 = 5.92 M3 400,000 2,367,462
= 0 M3 Air 215 x 7.765 = 1,669.48 Ltr 100 166,948
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
Beton sloof 20/20 cm Pekerja 1.65 x 7.765 = 12.81 OH 110,700 1,418,316
= 14 x 0.2 x 0.2 = 1 Tukang 0.275 x 7.765 = 2.14 OH 151,500 323,509
= 0.56 M3
Beton Kolom 20x20 cm
= 0.20 x 0.20 x 6.00 = 1
= 0.24 M3
Ring Balok 15/15 cm
= 0.15 x 0.15 x 14 = 1
= 0.315 M3
Beton Plat Lantai 12 cm
= 3.5 x 3.5 x 0.12 = 1
= 1.47 M3
Beton Dinding 20 cm
= 0.2 x 14 x 1.5 = 1
= 4.2 M3
Beton Plat Penutup t = 8 cm
= 3.5 x 3.5 x 0.08 = 1
= 0.98 M3
Footplat (140x140) cm Besi Beton Polos 1.05 x 516.865 = 542.71 kg 20,050 10,881,296
= - kg Kawat Ikat Beton 0.015 x 516.865 = 7.75 kg 35,000 271,354
TOTAL IV 20,320,650
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
Plat
Begisting Beton Plat Lantai 12 cm Pekerjaan Bekisting Plat 1.47 M2 Papan Kayu Begisting 0.04 x 1.47 = 0.06 M3 5,501,200 323,471
= 3.5 x 3.5 x 0.12 = 1 Paku 0.4 x 1.47 = 0.59 kg 20,000 11,760
= 12.25 M2 Minyak bekisting 0 x 1.47 = - Ltr 15,000 -
= 1.47 m3 Balok Kayu Kelas III 0.015 x 1.47 = 0.02 M3 5,501,200 121,301
Bekisting Beton Plat Penutup t = 8 cm Triplek 122x244x9 mm 0.35 x 24.50 = 8.58 lembar 120,000 1,029,000
= 3.5 x 3.5 x 0 = 1 Bambu 2 x 1.47 = 2.94 btg 40,000 117,600
= 12.25 M2 -
= 0 m3 Pekerja 0.66 x 1.47 = 0.97 OH 110,700 107,401
Tukang 0.33 x 1.47 = 0.49 OH 151,500 73,493
-
TOTAL V 7,080,080
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
VI PEKERJAAN PLESTERAN
Plesteran dinding 1pc:4ps 42.00 m2 Semen 0.156 x 42 = 6.53 Zak 60,000 391,910
dinding gudang kontrol Pasir pasangan 0.023 x 42 = 0.97 M3 207,500 200,445
= 0 + 0 x 2.5 = 2
= 0 m2 Pekerja 0.3 x 42 = 12.60 OH 110,700 1,394,820
dinding Bronkep Tukang 0.15 x 42 = 6.30 OH 151,500 954,450
= 3.5 + 3.5 x 1.5 = 2
= 42 m2
Pekerja 6 x 0 = - OH 110,700 -
Tukang 18 x 0 = - OH 151,500 -
TOTAL IV -
TOTAL II 1,000,000
Sketsa Kasar Perhitungan Volume Vol. Sat. ANALISA KEBUTUHAN Sat. Harga satuan Biaya
IX PENGERJAAN PENGECATAN Cat tembok 33.35 M2 Plamir Tembok 0.1 x 33.35 = 3.34 kg 47,000 156,745
Dinding ruangan Cat tembok 0.36 x 33.35 = 12.01 Kg 41,000 492,246
= 0 x x 0 = 8 Ampelas 0 x 33.35 = - m' 30,000 -
= 0 M2 Kape 0 x 33.35 = - Buah - -
Beton sloof 20/20 cm Kuas 3" 0 x 33.35 = - Buah 18,000 -
= 0.2 x 0.2 x 3.5 = 4
= 11.2 M2 Pekerja 0.02 x 33.35 = 0.67 OH 110,700 73,837
Beton Kolom 20x20 cm Tukang 0.063 x 33.35 = 2.10 OH 151,500 318,309
= 0.2 x 0.2 x 1.5 = 4
= 3.6 M2
Ring Balok 15/15 cm
= 0.15 0.15 x 3.5 = 4
= 6.3 M2
Beton Plat Penutup t = 8 cm
= 3.5 x 3.5 x 1 = 1
= 12.25 M2
TOTAL IV 1,041,137
V ALAT PELINDUNG DIRI
Masker Kain 16.00 Bh Masker Kain 16.00 Bh 10,000 160,000
Sabun Cuci Tangan Cair 2.00 Btl Sabun Cuci Tangan Cair 2.00 Btl 50,000 100,000
Ember dan Keran - Bh Ember dan Keran - Bh 85,000 -
TOTAL V 260,000
Nomor RAB : -
Pekerjaan / Kegiatan : Sumur gali 15 m
Volume
Harga Satuan
URAIAN Satuan TOTAL
Total
Rp
1 2=3+4+5 7 8 13=6x8
1 BAHAN
2 UPAH
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3
TERBILANG : SERATUS TUJUH PULUH TUJUH JUTA LIMA RATUS SEMBILAN PULUH EMPAT RIBU RUPIAH
BAB 4. REKAPITULASI KEGIATAN DAN BIAYA RKM
Masyarakat
`Uraian Satuan Volume Harga Satuan Total Biaya In Cash (4%) Inkind (16 %) APBDes (10 %) APBD 70%
Peningkatan PHBS
1.1 PHBS&CLTS Masyarakat Paket 1 1,040,000 1,040,000 #REF! #REF! #REF!
1.2 PHBS&CLTS Sekolah Paket 1 320,000 320,000 #REF! #REF! 320,000
1.3 Pelatihan STBM Ting. Desa Paket 1 #REF! #REF! #REF! #REF! #REF!
1.4 Media Promkes Paket 1 375,000 375,000 #REF! #REF! -
1.5 Pengambilan sample air kali 2 - - #REF! #REF! 400000
No Uraian Satuan Volume Harga Satuan BLM APBDes Masyarakat Total Biaya
70% 10% In Cash (4%) In Kind(16%)
I Kegiatan Pelatihan Masyarakat
1.1 PELATIHAN KKM DAN SATLAK Kegiatan 1.00 2,000,000 - 2,000,000 2,000,000
1.2 PELATIHAN STBM Paket 1.00 1,300,000 1,300,000 1,300,000
1.3 PELATIHAN DISABELITAS Paket 1.00 1,250,000 1,250,000 1,250,000
1.4 PELATIHAN KKM DAN BPSPAM Kegiatan 1.00 1,250,000 1,250,000 1,250,000
Sub Total I 3,800,000 - 2,000,000 - 5,800,000
II Pembangunan Sarana Air Minum
2.1 PEK. SUMUR BOR Paket 1.00 - - - - - -
2.2 PEK. DAN PENGADAAN INSTALASI LISTRIK Unit 1.00 57,725,000 #REF! - #REF! #REF! #REF!
2.3 PEK. DAN PENGADAAN POMPA & INSTALASI Unit 1.00 #REF! #REF! - #REF! #REF! #REF!
2.4 PEK. TOWER AIR Unit 1.00 55,455,000 #REF! #REF! #REF! #REF! #REF!
2.5 PEK. JARINGAN PERPIPAAN meter #REF! #REF! 55,611,000 #REF! #REF! #REF! #REF!
Sub Total II #REF! #REF! #REF! #REF! #REF!
III Pembangunan Sarana Sanitasi
3.1 PEK. JAMBAN SEHAT SISWA - X 1 UNIT Unit 1.00 - - - - - -
3.2 PEK. SARANA CUCI TANGAN (CTPS) - X 3 UNIT Unit 3.00 #REF! #REF! #REF! #REF! #REF! #REF!
Sub Total III #REF! #REF! #REF! #REF! #REF!
IV Peningkatan PHBS
4.1 PHBS & CLTS MASYARAKAT Paket 1.00 1,500,000 1,500,000 - 1,500,000
4.2 PHBS & CLTS SEKOLAH Paket 1.00 750,000 750,000 750,000
4.3 MEDIA PROMOSI KESEHATAN Paket 1.00 1,000,000 1,000,000 1,000,000
4.4 PENAGAMBILAN SAMPLE AIR
- Pra Konstruksi (1 sample) Ls - - - -
- Pasca Konstruksi (3 sample) Ls 1.00 305,000 305,000 305,000
(SYAMSUL HADY M, ST
) (HAMDANI) (ARMAWAN, ST) (AHMAD RUSDAN) (ABDUL MUHID) (MASNULLAH)
REKAPITULASI BIAYA UPAH DAN BAHAN
Program : PAMSIMAS
Provinsi : NTB
Kabupaten : Lombok Timur
Kecamatan : Rarang Selatan
Desa : Terara
2
Semen 80.64 - #REF! #REF! #REF! Zak 60,000 4,838,700
Paku - - - - - kg 20,000 -
Besi Beton Polos 791.36 - #REF! #REF! #REF! Kg 20,050 15,866,694
Kawat Ikat Beton 11.31 - #REF! #REF! #REF! Kg 35,000 395,678
Minyak bekisting - - #REF! #REF! #REF! liter 15,000 -
Plamir Tembok - - - - - kg 47,000 -
Plamir Kayu - - #REF! #REF! #REF! kg 40,000 -
Meni Kayu - - #REF! #REF! #REF! kg 56,000 -
Cat Tembok Mutu Standar/Sedang - - - - - kg 41,000 -
Mil - - - - - kg 1,000 -
Minyak Cat biasa - - - - - Liter 40,000 -
Cat Kayu Mutu Sedang - - - - - kg 62,000 -
Lem kayu - - - - - Kg 41,000 -
Triplek 122x244x6 mm - - - - - #N/A #N/A #N/A
Triplek 122x244x9 mm 31.94 - #REF! #REF! #REF! lembar 120,000 3,832,500
3 Keramik Lantai KM 20x20 Kwalitas Sedang - - - - - M2 69,000 -
Keramik Dinding KM 20x25 Kwalitas Sedang - - - - - #N/A #N/A #N/A
Seng gelombang BJLS 25 - - - - - lembar 80,000 -
Kunci Pintu Mutu Sedang - - - - - Buah 82,000 -
Engsel Pintu 3 Lubang kwalitas biasa - - - - - Pasang 36,000 -
Closet Duduk Lengkap Kwalitas Sedang - - - - - Set 2,000,000 -
Pilox - - - - - kaleng 35,000 -
Pipa Stailisetill Ø 1" - - - - - Meter 65,000 -
Tee PVC Ø 1/2" - - - - - Buah 30,000 -
Kran Ø 1/2" - - - - - Buah 20,000 -
Stop Kran Ø 1/2" - - - - - Buah 79,000 -
Saringan Air Staenlist - - - - - Buah 45,000 -
Shock Drat Dalam PVC Ø1/2" - - - - - Buah 15,000 -
Pipa PVC tidak bertekanan (Kwalitas C) Ø 3" - - - - - #N/A #N/A #N/A
Pipa PVC bertekanan (AW) Ø 1/2" - - - - - Meter 7,000 -
3 Bend PVC 90 (Knee) Ø 1/2" - - Buah 70,000 -
Box Meter - - - - - Set 100,000 -
Water Meter 1/2" - - - - - Set 150,000 -
No. URAIAN VOL. SATUAN Harga Satuan Total Harga
IN-CASH IN - KIND
Sealtipe - - - - - BH 10,000 -
Ember kapasitas 25 liter - - - - - Buah 75,000 -
Sikat Closet - - - - - Unit 15,000 -
Manhole plat besi 70X70 cm - - - - - Buah 500,000 -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - 50,000.00
- - - -
- - - -
- - - -
- - - -
- - - -
- #REF! #REF! #REF!
- #REF! #REF! #REF!
- #REF! #REF! #REF!
- #REF! #REF! #REF!
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - -
DANA MASYARAKAT APBDes BLM
IN-CASH (Rp.) IN - KIND (Rp.)
- - - #N/A
- - - #N/A
- - - #N/A
- - - #N/A
- - - #N/A
- - - #N/A
- - - #N/A
- - - #N/A
- - - #N/A
DANA MASYARAKAT APBDes BLM
IN-CASH (Rp.) IN - KIND (Rp.)
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - 3,500,000.00
- - - 1,000,000.00
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - 2,000,000.00
TIME SCHEDULE
Desa -
Kecamatan -
Kabupaten -
Propinsi -
AN PENGADAAN
II. POMPA & INSTALASI PANEL 57,725,000 32.50 1.50 3.00 6.24 5.62 6.01 4.06 4.06 2.00
III. PEK. TOWER DAN RUMAH PANEL 55,455,000 31.23 1.01 3.50 5.00 5.30 6.00 6.00 3.90 0.51
IV. PEK. JARINGAN PERPIPAAN 55,611,000 31.31 2.00 3.50 5.00 7.09 5.00 4.00 3.91 0.81
JUMLAH BOBOT 177,594,493 100.00 4.81 10.62 16.86 18.95 17.96 15.01 12.28 3.52
TOTAL BOBOT RENCANA 4.81 15.43 32.29 51.24 69.20 84.20 96.48 100.00
REALISASI PROGRES
DEVIASI PROGRES
TIME SCHEDULE PROGRAM PAMSIMAS III
Desa : Batu Putik
Kecamatan : Keruak Jenis Kegiatan : Pembangunan Sarana Air Bersih & Sanitasi
Kabupaten : Lombok Timur Proyek : PAMSIMAS III 2020
Propinsi : NTB KKM :
KEGIATAN
II.SARANA AIR MINUM
2.1 PEK. SUMUR GALI 15 m 8,803,493 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.2 PEK. DAN PENGADAAN POMPA & INSTALASI PANEL 57,725,000 #REF! #REF! #REF!
2.3 #REF! #REF! #REF! #REF!
2.4 PEK. TOWER DAN RUMAH PANEL 55,455,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.5 PEK. JARINGAN PERPIPAAN 55,611,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL BOBOT RENCANA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI PROGRES
DEVIASI PROGRES
40 % APBD + In-cash TERMIN II 60 %
PROSES PENCAIRAN TERMIN
TOTAL TERMIN 40 % TOTAL TERMIN 100%
BAB 5. RENCANA PENGADAAN BARANG DAN JASA DI TINGKAT
MASYARAKAT
Daftar Rencana Pengadaan Barang dan Jasa
Metoda Waktu
No. Paket Pekerjaan Uraian/ Material Volume Satuan Harga Satuan Jumlah Biaya (Rp) Pengadaan Pelaksanaan
1 PAKET
Material Pipa PIPA Galpanis (GI Medium A) Ø 1,5" #REF! m' 135,000.00 #REF!
PIPA Galpanis (GI Medium A) Ø 2" #REF! m' 150,000.00 #REF!
PIPA Galpanis (GI Medium A) Ø 3" #REF! m' 265,700.00 #REF!
Knee GI Ø 11/2 #REF! Bh 35,000.00 #REF!
Knee GI Ø 3" #REF! Bh 130,000.00 #REF!
Knee GI Ø 2" #REF! Bh 55,000.00 #REF!
Shock Drat luar PVC Ø1.5" #REF! Bh 25,000.00 #REF!
Shock Drat luar GI Ø3" #REF! Bh 96,000.00 #REF!
Shock Drat luar GI Ø2" #REF! Bh 56,000.00 #REF!
Gate Valve 3" #REF! Bh 1,300,000.00 #REF!
Gate Valve 2" #REF! Bh 750,000.00 #REF!
Flank Socket PVC 3" #REF! Bh 100,000.00 #REF!
Flank last 3" #REF! Bh 100,000.00 #REF!
Karet pak 3" #REF! Bh 25,000.00 #REF!
Flank Socket PVC 2" #REF! Bh 60,000.00 #REF!
Flank last 2" #REF! Bh 80,000.00 #REF!
Karet pak 2" #REF! Bh 20,000.00 #REF!
Flank Socket PVC 1,5" #REF! Bh 50,000.00 #REF!
Flank last 1,5" #REF! Bh 60,000.00 #REF!
Karet pak 1,5" #REF! Bh 15,000.00 #REF!
Pipa HDPE Ø 2" #REF! Meter 62000 #REF!
Pipa HDPE Ø 1" #REF! Meter 19,000.00 #REF!
Coupler HDPE 2" #REF! Buah 317,200.00 #REF!
Stop Kran PVC Ø 2" #REF! Buah 222,000.00 #REF!
End cop (Dop PVC) Ø 2" #REF! Buah 50,000.00 #REF!
Lem Pipa Kualitas baik #REF! Buah 55,000.00 #REF!
Sealtipe #REF! Buah 10,000.00 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Setelah
#REF! #REF! #REF! #REF! #REF! Perbandingan Penandatangan
#REF! #REF! #REF! #REF! #REF! Harga
PKS
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
TOTAL #REF!
Metoda Waktu
No. Paket Pekerjaan Uraian/ Material Volume Satuan Harga Satuan Jumlah Biaya (Rp) Pengadaan Pelaksanaan
2 PAKET
Bahan Toko Semen Err:522 Zak 60000 Err:522
Paku Err:522 kg 20,000.00 Err:522
Besi Beton Polos Err:522 Kg 20,050.00 Err:522
Kawat Ikat Beton Err:522 Kg 35,000.00 Err:522
Minyak bekisting #REF! liter 15,000.00 #REF!
Plamir Tembok Err:522 kg 47,000.00 Err:522
Plamir Kayu Err:522 kg 40,000.00 Err:522
Meni Kayu Err:522 kg 56,000.00 Err:522
Cat Tembok Mutu Standar/Sedang Err:522 kg 41,000.00 Err:522
Mil - kg 1,000.00 -
Minyak Cat biasa Err:522 Liter 40,000.00 Err:522
Cat Kayu Mutu Sedang Err:522 kg 62,000.00 Err:522
Lem kayu #REF! Kg 41,000.00 #REF!
Triplek 122x244x6 mm - lembar 79,000.00 -
Triplek 122x244x9 mm #REF! lembar 120,000.00 #REF!
PIPA GI Medium B Ø 1,5" #REF! m' 77,483.00 #REF!
PIPA GI Medium B Ø 1" #REF! m' 49,150.00 #REF!
Keramik Lantai Kwalitas Sedang - M2 74,000.00 -
Keramik Dinding Kwalitas Sedang - M2 79,000.00 -
Spandek 3 mm lebar 70 cm - m 37,000.00 -
Setelah
Baut spandek - Kg 30,000.00 - Perbandingan Penandatangan
Kalsiplank ukuran (8X20) cm - m 15,000.00 - Harga PKS
Kunci Pintu Mutu Sedang Err:522 Buah 82,000.00 Err:522
Engsel Pintu 3 Lubang kwalitas biasa Err:522 Pasang 36,000.00 Err:522
Closet Duduk Lengkap Kwalitas Sedang - Set 2,000,000.00 -
Pilox Err:522 kaleng 35,000.00 Err:522
Pipa Stailisetill Ø 1 1/4" Err:522 Meter 80,000.00 Err:522
Tee PVC Ø 1/2" Err:522 Buah 30,000.00 Err:522
Kran Ø 1/2" Err:522 Buah 20,000.00 Err:522
Stop Kran Ø 1/2" - Buah 79,000.00 -
Saringan Air Staenlist - Buah 45,000.00 -
Shock Drat Dalam PVC Ø1/2" Err:522 Buah 15,000.00 Err:522
Pipa PVC tidak bertekanan (Kwalitas C) Ø - m 35,000.00 -
3"
Pipa PVC bertekanan (AW) Ø 1/2" Err:522 Meter 7,000.00 Err:522
Bend PVC 90 (Knee) Ø 1/2" Err:522 Buah 70,000.00 Err:522
Box Meter Err:522 Set 100,000.00 Err:522
Water Meter 1/2" Err:522 Set 150,000.00 Err:522
Sealtipe Err:522 BH 10,000.00 Err:522
Ember kapasitas 25 liter - Buah 75,000.00 -
Sikat Closet - Unit 15,000.00 -
Manhole plat besi 70X70 cm #REF! Buah 500,000.00 #REF!
TOTAL Err:522
3 PAKET
Material alam Pasir pasangan Err:522 m3 207,500.00 Err:522
Pasir Cor Err:522 m3 214,800.00 Err:522
Bata merah Err:522 Buah 1,500.00 Err:522
Kerikil Pecah 3-5 cm #REF! m3 428,300.00 #REF!
Kerikil alam 2-3 cm Err:522 m3 #REF! #REF!
Papan Kayu Begisting Err:522 m3 5,501,200.00 Err:522
Balok Kayu Klas II Err:522 m3 4,312,400.00 Err:522
Balok Kayu Klas III Err:522 m3 5,501,200.00 Err:522
Papan Kayu Klas II Err:522 m3 4,312,400.00 Err:522 Setelah
Perbandingan
Dolken diamater 8-10cm P=4m - Batang 26,200.00 - Harga Penandatangan
Bambu #REF! Batang 40,000.00 #REF! PKS
Tanah Urug Err:522 M3 67,300.00 Err:522
Pasir urug Err:522 M3 188,900.00 Err:522
Batu Kali Alam Err:522 M3 210,700.00 Err:522
Air Err:522 liter 100.00 Err:522
Buis Beton Ø 80 Cm panjang 0,50 m - Buah 250,000.00 -
Tutup buis Ø 80 cm - Buah 250,000.00 -
#REF! Err:522 #REF! #REF! #REF!
#REF! Err:522 #REF! #REF! #REF!
TOTAL Err:522
Metoda Waktu
No. Paket Pekerjaan Uraian/ Material Volume Satuan Harga Satuan Jumlah Biaya (Rp) Pengadaan Pelaksanaan
4 PAKET
Bahan bakar minyak - liter 5,150.00 -
Jasa pengurasan Sumur
Pelumas mesin - Liter 58,500.00 -
Pelumas gardan - Liter 58,500.00 -
Pelumas transmisi - Liter 58,500.00 -
Air - liter 100.00 -
Bentonit - Zak 250,000.00 -
Oli Hydrolis - Liter 35,875.00 -
Gemuk - Liter 62,500.00 -
Kertas Logging - Set 250,000.00 -
Tinta & Pen Logging - Unit 75,000.00 -
Baterai dan Kabel - Unit 400,000.00 -
Pipa PVC bertekanan (AW) Ø 6" - Meter 165,000.00 -
End cop (Dop PVC) Ø 6" - Buah 156,000.00 -
Kerikil/koral 0.5-1 cm - M3 - -
Semen - Zak 60,000.00 -
Batu Pecah 1-2 cm - M3 445,800.00 -
Pasir Cor - M3 214,800.00 - Setelah
Bata merah - Buah 1,500.00 - Penandatangan
PKS
Pasir pasangan - M3 207,500.00 -
Air jetting test - Titik 3,136,484.74 -
Water jetting - Titik 1,031,505.00 -
Buis Beton Ø 80 Cm panjang 0,50 m - Bh 250,000.00 -
Tutup buis Ø 80 cm - Bh 250,000.00 -
- - - - -
ALAT - - - -
Transportasi - Unit Truk 1,000,000.00 -
- - - - -
UPAH - - - -
Pekerja - OH 110,700.00 -
Tukang - OH 151,500.00 -
Mekanik - OH - -
Operator Logging - OH - -
Pembantu operator - OH - -
Operator Alat bor - OH - -
Teknisi Pumping test - OH - -