1 2 3 4 5
I AGREGAT HALUS
1 Pasir Urug/ Pasir Timbunan M3 140,000
2 Pasar Pasang/ Kali M3 224,000
3 Pasir Beton M3 234,000 167.14
4 Pasir Batu ( Sirtu ) M3 210,000
5 Kerikil Koral M3 329,300
6 Kerikil Sungai M3 235,000 130.56
7 Kerikil Tersaring M3 313,600
8 Kerikil Sungai Royalt M3 282,200
9 Kerikil Sungai Pecah Tersaring M3 392,000
10 Kerikil Sungai Tidak Tersaring M3 313,600
11 Tanah Timbunan Pilihan M3 132,200
12 Tanah Timbunan Biasa M3 106,300
13 Tanah Liat M3 58,400
III SEMEN
1 Semen Portland Kg 1,700
2 Semen Puth Kg 3,100
3 Semen Warna Grout Kg 62,400
IV KAYU
1 Kayu Balok Kelas 1 (Bayam) M3 12,936,000
2 Kayu Papan Kelas 1 (Bayam) M3 14,322,000
3 Kayu Balok Kelas II M3 7,854,000
4 Kayu Papan kelas II M3 7,854,000
5 Kayu Balok Kelas III M3 4,389,000
6. Kayu Papan Kelas III M3 4,389,000
V KAYU LAPIS
1 Tripleks 3 mm (Uk. 120 x 240 ) Lembar 79,000
2 Tripleks 4 mm (Uk. 120 x 240 ) Lembar 98,400
3 Tripleks 6 mm (Uk. 120 x 240 ) Lembar 120,200
4 Tripleks 9 mm (Uk. 120 x 240 ) Lembar 184,800
5 Tripleks 12 mm (Uk. 120 x 240 ) Lembar 217,200
6 Tripleks 15 mm (Uk. 120 x 240 ) Lembar 307,300
7 Tripleks 18 mm (Uk. 120 x 240 ) Lembar 381,200
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
8 Teakwood Lembar 122,000
9 Kalsiboard tebal 4 mm Lembar 97,200
VI GYPSUN
1 Gypsun (120 x 240 mm) Jaya Board Lembar 90,100
VIII PAKU
1 Paku Kayu/Tripleks Uk. 1 - 4 cm Kg 31,000
2 Paku Kayu/Tripleks Uk. 5 - 12 cm Kg 27,700
3 Paku Beton Biasa (semua ukuran) Dos 34,700
4 Paku Beton Bagus (semua ukuran) Dos 69,900
5 Paku Perahu Uk. 1 - 4 cm Kg 46,600
6 Paku Perahu uk. 5 - 12 cm Kg 38,800
7 Paku Asbes Kg 37,300
8 Kawat Beton Kg 27,700
IX SENG
1 Seng Gelombang Bjls 0.25 Sermani Lembar 89,300
2 Seng Gelombang Bjls 0.30 Gajah Lembar 105,600
3 Seng Licin Bjls 0.20 - 6 Kaki Gajah Lembar 93,100
4 Seng Licin Bjls 0.30 - 6 Kaki Jabesemen Lembar 88,500
5 Asbes Gelombang Besar ( 300x102x5 mm ) Jabesemen Lembar 167,700
6 Asbes Gelombang Besar ( 200x102x5 mm ) Jabesemen Lembar 129,100
7 Asbes Gelombang Besar ( 180x102x5 mm ) Jabesemen Lembar 110,000
8 Asbes Gelombang Kecil ( 300x102x5 mm ) Jabesemen Lembar 112,800
9 Asbes Gelombang Kecil ( 270x102x5 mm ) Jabesemen Lembar 98,500
10 Asbes Gelombang Kecil ( 210x102x5 mm ) Jabesemen Lembar 80,000
11 Asbes Gelombang Kecil ( 180x102x5 mm ) Jabesemen Lembar 70,100
12 Asbes Gelombang Kecil ( 150x102x5 mm ) Jabesemen Lembar 68,500
13 Asbes Gelombang Kecil ( 240x102x5 mm ) Jabesemen Lembar 106,500
14 Asbes Nok Gelombang Besar Jabesemen Lembar 72,700
15 Asbes Nok Gelombang Kecl Jabesemen Lembar 47,800
16 Seng Plat 0,35 - 6 Kaki Jabesemen Lembar 86,600
X BESI
1 Besi Profil IWF Kg 16,800
2 Besi Siku L 30 x 30 x 3 mm Batang 98,100
3 Besi Siku L 40 x 40 x 4 mm Batang 161,100
4 Besi Siku L 50 x 50 x 5 mm Batang 291,100
5 Besi Strip Kg 23,300
6 Besi Beton 6 mm (12 m) Batang 39,200
7 Besi Beton 8 mm (12 m) Batang 52,900
8 Besi Beton 10 mm (12 m) Batang 80,300
9 Besi Beton 12 mm (12 m) Batang 111,400
10 Besi Beton 16 mm (12 m) Batang 176,400
11 Besi Beton 19 mm (12 m) Batang 252,000
12 Besi Beton Ulir 10 mm Batang 85,500
13 Besi Beton Ulir 13 mm Batang 121,100 9,703.53
14 Besi Beton Ulir 16 mm Batang 203,800
15 Besi Beton Ulir 19 mm Batang 264,600
16 Angkur Kg 23,500
17 Besi Beugel/Baut Kg 28,500
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
XI KERAMIK/TEGEL
1 Keramik Uk. 20 x 20 cm (W.Puth) Mulia M2 85,400
2 Keramik Uk. 30 x 30 cm (W.Muda) Mulia M2 69,300
3 Keramik Dinding Uk. 20 x 25 cm (W.Tua) Asia Tile M2 76,200
4 Keramik Dinding Uk. 20 x 25 cm (W. Muda) Asia Tile M2 80,400
5 Keramik Lantai Uk. 20 x 20 cm (W. Puth) Asia Tile M2 76,200
6 Keramik Lantai Uk. 30 x 30 cm (W. Puth) Asia Tile M2 76,200
7 Keramik Lantai Uk. 40 x 40 cm (W. Puth) Asia Tile M2 106,300
8 Keramik Lantai Uk. 20 x 20 cm (Motf) Roman M2 109,900
9 Keramik Teras /Garansi 30 x 30 cm Materina M2 74,500
10 Keramik Plint 7,5 x 20 cm Buah 18,600
11 Keramik Plint 8 x 25 cm Buah 31,000
12 Kuku Macan Buah 3,500
13 Granit 40 x 40 cm Granito M2 194,000
14 Granit 60 x 60 cm (W. Muda) M2 242,600
15 Granit 60 x 60 cm (W. Tua) M2 346,500
16 Ubin Abu-Abu 20 x 20 M2 55,400
17 Ubin Suoer Hitam 20 x 20 M2 76,200
18 Ubin Badak 30 x 30 M2 79,000
XII KACA
1 Kaca Bening Tebal 3 mm M2 131,900
2 Kaca Bening Tebal 5 mm M2 147,500
3 Kaca Bening Tebal 8 mm M2 201,800
4 Kaca Bening Tebal 10 mm M2 287,200
5 Kaca Rayban Tebal 3 mm M2 100,900
6 Kaca Rayban Tebal 5 mm M2 103,200
7 Kaca Rayban Tebal 6 mm M2 194,000
8 Kaca Rayban Tebal 8 mm M2 341,500
9 Nako Buah 27,700
XIII GENTENG
1 Genteng Beton Biasa Buah 6,200
2 Genteng Kanmuri Glassure Buah 10,900
3 Genteng Kanmuri Biasa Buah 9,300
4 Karet Talang L=55X29 Rol 155,000
5 Karet Talang L=90X29 Rol 195,500
6 Karet Lapis Genteng M2 3,100
7 Genteng Keramik KIA Natural Buah 8,500
8 Genteng Keramik KIA Maroon Buah 14,000
9 Non Keramik KIA Buah 16,300
10 Non Beton Press Buah 9,300
11 Ujung Nok Buah 69,900
12 Genteng Metal Zincalume Kasar 100 x 77 Multroof M2 186,300
13 Genteng Metal Zincalume Polos 100 x 77 Multroof M2 150,600
14 Genteng Metal Zincalume Kasar 80 x 77 Suryaroof M2 111,800
15 Genteng Metal Zincalume Polos 80 x 77 Suryaroof M2 104,000
16 Genteng Asbes Buah 54,300
XV GORONG-GORONG
1 Dia 1 x 60 Buah 93,100
2 Dia 1 x 50 Buah 77,600
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
3 Dia 1 x 40 Buah 69,900
4 Dia 1 x 30 Buah 46,600
5 Dia 1 x 20 Buah 31,000
6 Dia 1 x 100 Buah 155,200
XVII PIPA
1 Pipa PVC Type AW 1/2" Batang 34,700
2 Pipa PVC Type AW 3/4" Batang 41,600
3 Pipa PVC Type AW 1" Batang 55,400
4 Pipa PVC Type AW 1 1/4' Batang 62,400
5 Pipa PVC Type AW 1 1/2" Batang 76,200
6 Pipa PVC Type AW 2" Batang 94,400
7 Pipa PVC Type AW 1 1/2" Batang 97,000
8 Pipa PVC Type AW 3" Batang 186,900
9 Pipa PVC Type AW 4" Batang 311,100
10 Pipa PVC Type AW 5" Batang 500,700
11 Pipa PVC Type AW 6" Batang 679,600
12 Pipa PVC Type AW 8" Batang 1,093,900
13 Pipa PVC Type C 1/2" Batang 27,700
14 Pipa PVC Type C 3/4" Batang 34,700
15 Pipa PVC Type C 1" Batang 48,500
16 Pipa PVC Type C 2" Batang 59,800
17 Pipa PVC Type C 2 1/2" Batang 75,400
18 Pipa PVC Type C 3" Batang 88,500
19 Pipa PVC Type C 4" Batang 113,300
20 Pipa PVC Type D 1 1/4" Batang 37,600
21 Pipa PVC Type D 1 1/2" Batang 45,800
22 Pipa PVC Type D 2" Batang 60,900
23 Pipa PVC Type D 3" Batang 131,900
24 Pipa PVC Type D 4" Batang 169,000
25 Pipa PVC Type D5" Batang 255,000
26 Pipa PVC Type D 6" Batang 388,700
27 Pipa PVC Type D 8" Batang 652,000
28 Pipa Galvanis Medium GIP 1/2" Batang 236,000
29 Pipa Galvanis Medium GIP 3/4" Batang 307,400
30 Pipa Galvanis Medium GIP 1" Batang 422,200
31 Pipa Galvanis Medium GIP 1 1/4" Batang 552,600
32 Pipa Galvanis Medium GIP 1 1/2" Batang 633,300
33 Pipa Galvanis Medium GIP 2" Batang 838,300
34 Pipa Galvanis Medium GIP 2 1/2" Batang 1,066,400
35 Pipa Galvanis Medium GIP 3" Batang 1,909,400
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
8 Knie 3" Buah 13,900
9 Knie 4" Buah 23,300
10 Knie 5" Buah 62,900
11 Knie 6" Buah 82,400
12 Tee 1/2" Buah 4,200
13 Tee 3/4" Buah 4,900
14 Tee 1" Buah 7,000
15 Tee 1 1/4" Buah 5,500
16 Tee 1 1/2" Buah 7,000
17 Tee 2" Buah 8,800
18 Tee 2 1/2" Buah 14,900
19 Tee 3" Buah 7,500
20 Tee 4" Buah 21,900
21 Tee 5" Buah 65,200
22 Tee 6" Buah 102,500
23 Socket 1/2" Buah 4,200
24 Socket 3/4" Buah 4,200
25 Socket 1" Buah 4,200
26 Socket 1 1/4" Buah 6,900
27 Socket 1 1/2" Buah 4,200
28 Socket 2" Buah 4,900
29 Socket 2 1/2" Buah 6,500
30 Socket 3" Buah 7,900
31 Socket 4" Buah 11,200
32 Socket 5" Buah 32,600
33 Socket 6" Buah 46,600
34 Knie 45o-2" Buah 102,500
35 Knie 45o-2 1/2" Buah 14,000
36 Knie 45o-3" Buah 20,500
37 Knie 45o-4" Buah 37,300
XIX KUNCI
1 Kunci Tanam double Slag/selot pintu Buah 83,800
2 Kunci Tanam Antk Buah 465,700
3 Kunci Lemari Buah 27,700
4 Door Holder Buah 34,700
5 Kunci laci 101 Buah 172,500
6 Kunci laci 808 kecil Buah 18,400
7 Kunci laci 808 besar Buah 23,000
8 Kunci Tanam Silinder Buah 139,700
9 Kunci Kamar Mandi Buah 48,500
10 Engsel Pintu Kuningan 3 " Buah 23,300
11 Engsel Pintu Kuningan 4 " Buah 21,700
12 Engsel Pintu Nilon 3" Buah 13,900
13 Engsel Pintu Nilon 4" Buah 15,500
14 Engsel Stainless Stell 3" Buah 34,900
15 Engsel Stainless Stell 4" Buah 44,200
16 Grendel Uk.5-10 cm Buah 18,000
17 Grendel Uk.11 -15 cm Buah 23,600
18 Grendel 16 - 20 cm Buah 34,700
19 Kain Angin Kuningan Uk.10-20 cm Buah 23,600
20 Kain Angin Kuningan Uk.21-30 cm Buah 41,600
21 Espagnolet tanam Uk.21-30 cm Buah 34,700
22 Door Clossset Type 81 New Star Buah 204,900
23 Door Stop Lokal Buah 15,500
24 Engsel Pintu 77 Buah 20,800
25 Engsel Jendela 77 Buah 20,800
26 Hak Angin 8" Buah 23,600
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
27 Lem pipa Kaleng 52,000
28 Meter Rol Buah 100,000
29 Meter Rol Buah 125,000
30 Rel Pintu Dorong Buah 20,800
31 Pintu PVC Buah 504,500
32 Pintu Aluminium Buah 519,800
33 Rooling Door bahan besi M2 554,400
34 Rooling Door Bahan Aluminium M2 465,700
35 Sunscreen Aluminium M2 558,800
36 Pintu Gulung Besi M2 512,300
37 Pintu Besi Baja M2 1,474,700
38 Jendela Besi M2 1,552,300
XX PINTU AIR
1 Pintu Tersier Unit 6,860,700
2 Pintu Romijing b=0,5 m; h = 1 m Unit 18,295,200
3 Pintu Romijing b=0,6 m; h = 1 m Unit 18,447,700
4 Pintu Romijing b=0,7 m; h = 1 m Unit 19,438,700
5 Pintu Romijing b=0,8 m; h = 1 m Unit 22,106,700
6 Pintu Sorong b=1 m; h = 1 m Unit 30,492,000
7 Pintu Sorong b=1 m; h = 1,2 m Unit 32,016,600
8 Pintu Sorong b=1 m; h = 1,25 m Unit 34,650,000
9 Pintu Sorong b=1 m; h = 1,5 m Unit 41,850,000
XXI SANITASI
1 Bak air mandi fiberglasss 0,3 m3 Buah 554,400
2 Kloset Jongkok Standar Buah 831,600
3 Kloset Duduk Standar Lengkap Buah 3,395,700
4 Urinior Buah 1,940,400
5 Wastafel Stabndar Kecil Buah 838,300
6 Wastafel Standar Besar Buah 1,024,500
7 Kran Air wastafel Buah 32,600
8 Kran Air wastafel Buah 65,200
9 Kran Air bak cuci dapur Buah 55,900
10 Tempat Sabun Porselin Buah 1,319,500
11 Tangki Air Fiberglass bulat 500 ltr Paint chrome 0,9 liter Buah 1,940,400
12 Tangki Fiberglass bulat 1000 ltr Paint chrome finish Buah 6,900
13 Sealtape kecil Buah 85,400
14 Pipa Fleksibel Buah
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
18 Teak Oil 1 Liter Liter 42,700
19 Pernis Liter 32,600
20 Minyak Cat Liter 20,800
21 Thinner A Liter 59,000
22 Thinner Biasa Liter 25,000
23 Spirtus Liter 25,000
24 Wood Filler kg 40,400
25 Amplas lbr 6,900
26 Kuas Roll Buah 19,800
27 Kuas Roll Ace 23,300
28 Kuas 1" Buah 10,000
29 Kuas 1 / 2 Buah 20,800
30 Kuas 4 " Buah 23,600
31 Lem Kayu Fox Kg 27,700
32 Lem Fox Bungkus 22,400
33 Lem Fox Bungkus 16,300
34 Lem Epoxy Pasang 37,000
35 Residu Liter 20,200
36 Minyak Bekistng Liter 13,900
XXIII ELETRICAL
1 Skun 16 mili Batang 3,100
2 Spiral Kabel M' 108,700
3 Kabel Tig Btg 1,000
4 Kabel NYM 2 x 1,5 Roll 388,100
5 Kabel NYM 2 x 2,5 M' 6,900
6 Kabel NYM 2 x 2,5 Eterna Roll 519,800
7 Kabel NYM 3 x 2,5 Eterna Roll 582,100
8 Kabel NYM 3 x 4 Eterna Roll 776,200
9 Kabel NYM 4 x 16 M' 54,300
10 Kabel NYM 4 x 2,5 M' 11,600
11 Kabel NYM 4 x 4 M' 15,500
12 Kabel NYA 10 m M' 13,900
13 BC 50 mm Kg 57,400
14 Spit Tembaga Asli Buah 10,900
15 Tiang Spit Buah 38,800
16 Arde 4 mtr Asli Batang 543,300
17 Down Light Kuning Buah 54,300
18 Down Light Besar Buah 77,600
19 Down Light Sedang Buah 69,900
20 Lampu Merkuri Philips 250 Watt Asli Buah 465,700
21 Fitting Merkuri 250 Watt Buah 77,600
22 Lampu Merkuri Philips 250 Watt Set 1,241,900
23 Lampu TL 20 Watt Philips Set 77,600
24 Lampu Softone 40 watt Philips Buah 69,900
25 Fitting Batu Buah 18,000
26 Kayu Roset Buah 6,900
27 MCB 16 Grup MG Asli Buah 69,900
28 MCB 10 Grup MG Asli Buah 62,100
29 Rang pasir Meter 20,000
30 Sisir MCB Legrand Buah 31,000
31 Boks MCB 4 GRUP IB Buah 38,800
32 Boks MCB Plastk Grup MCB Asli Set 1,009,000
33 MCB 63 Amp MG Buah 341,500
34 Panel OB+mcb 12 Amp Set 776,200
35 MCB 30 Amp 3 Phase Buah 698,500
36 Saklar 63 Amp Buah 209,600
37 Boks MCB Buah 54,300
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
38 Panel Kas 30 x 40 cm Unit 100,900
39 Panel kas untuk lampu Merkuri Asli Set 1,319,500
40 Panel Kas Lengkap Asli MG Set 3,259,900
41 kwh 3 Phase Japan Buah 1,241,900
42 MCB + KWH Meter + OK Set 357,000
43 MCB 3 pas Asli MG Buah 1,086,600
44 OMH Saklar Buah 698,500
45 NFB Buah 236,000
46 Engkel IB Buah 18,600
47 Stop Arde IB Mekel Buah 13,900
48 Saklar Seri Makel / Stop Arde Makel Buah 15,200
49 OHN Saklar 60 grup set 388,100
50 Stop Arde + Tedos OB Buah 31,000
51 Steker Arde Buah 15,200
52 Engkel IB Makel Buah 15,500
53 Kabel Arde M' 18,600
54 Saklar Engkel + Tedos Set 46,600
55 Dora Dos Buah 38,800
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Sisi Kanan
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5
1 Tr0 33.09
50.00 32.68
2 Tr2 32.28
50.00 32.27
3 Tr4 32.26
50.00 33.24
4 Tr6 34.22
50.00 33.68
5 Tr8 33.14
50.00 33.56
6 Tr10 33.97
50.00 34.02
7 Tr12 34.07
50.00 34.02
8 Tr14 33.97
50.00 34.00
9 Tr16 34.04
50.00 34.03
10 Tr18 34.03
50.00 35.12
11 Tr20 36.21
50.00 35.93
12 Tr22 35.65
50.00 35.41
13 Tr24 35.16
50.00 34.66
14 Tr26 34.16
50.00 33.82
15 Tr28 33.48
50.00 33.32
16 Tr30 33.17
50.00 34.33
17 Tr32 35.49
50.00 34.56
18 Tr34 33.62
50.00 31.68
19 Tr36 29.75
50.00 29.76
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5
20 Tr38 29.77
50.00 32.58
21 Tr40 35.39
50.00 34.72
22 Tr42 34.04
50.00 33.91
23 Tr44 33.77
50.00 33.61
24 Tr46 33.44
50.00 32.67
25 Tr48 31.89
50.00 32.10
26 Tr50 32.32
50.00 32.51
27 Tr52 32.71
50.00 31.35
28 Tr54 29.99
50.00 29.16
29 Tr56 28.34
50.00 30.21
30 Tr58 32.09
50.00 31.90
31 Tr60 31.71
50.00 31.63
32 Tr62 31.55
50.00 31.00
33 Tr64 30.46
50.00 30.67
34 Tr66 30.88
50.00 31.53
35 Tr68 32.18
50.00 31.90
36 Tr70 31.63
50.00 31.83
37 Tr72 32.03
50.00 33.01
38 Tr74 34.00
50.00 34.18
39 Tr76 34.37
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5
50.00 33.53
40 Tr78 32.70
50.00 32.03
41 Tr80 31.36
50.00 33.21
42 Tr82 35.06
50.00 35.21
43 Tr84 35.35
Volume Total
Sisi Kiri
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
SISI KIR
Jarak Panjang Panjang Rata2
No. Sta.
m m m
1 2 3 4 5
1 Tr0 32.43
50.00 32.09
2 Tr2 31.75
50.00 32.30
3 Tr4 32.85
50.00 32.50
4 Tr6 32.16
50.00 32.43
5 Tr8 32.71
50.00 32.13
6 Tr10 31.55
50.00 33.13
7 Tr12 34.71
50.00 34.52
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5
8 Tr14 34.33
50.00 34.03
9 Tr16 33.72
50.00 33.44
10 Tr18 33.15
50.00 33.89
11 Tr20 34.63
50.00 34.65
12 Tr22 34.67
50.00 34.30
13 Tr24 33.92
50.00 34.06
14 Tr26 34.21
50.00 33.44
15 Tr28 32.67
50.00 33.35
16 Tr30 34.03
50.00 34.29
17 Tr32 34.54
50.00 34.20
18 Tr34 33.86
50.00 34.58
19 Tr36 35.30
50.00 34.90
20 Tr38 34.50
50.00 33.19
21 Tr40 31.88
50.00 32.54
22 Tr42 33.20
50.00 31.65
23 Tr44 30.10
50.00 32.38
24 Tr46 34.67
50.00 33.80
25 Tr48 32.94
50.00 33.47
26 Tr50 34.00
50.00 33.32
27 Tr52 32.64
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5
50.00 33.23
28 Tr54 33.82
50.00 31.81
29 Tr56 29.80
50.00 30.43
30 Tr58 31.06
50.00 30.94
31 Tr60 30.82
50.00 31.05
32 Tr62 31.29
50.00 31.54
33 Tr64 31.80
50.00 31.37
34 Tr66 30.95
50.00 31.69
35 Tr68 32.44
50.00 31.10
36 Tr70 29.77
50.00 31.68
37 Tr72 33.60
50.00 32.40
38 Tr74 31.20
50.00 31.08
39 Tr76 30.96
50.00 30.84
40 Tr78 30.73
50.00 31.42
41 Tr80 32.12
50.00 32.48
42 Tr82 32.85
50.00 32.27
43 Tr84 31.68
HITUNGAN VOLUME (CALCULATION SHEET)
anan
Luas Ket.
m2
6=3x5 7
1,634.00
1,613.50
1,662.00
1,684.00
1,678.00
1,701.00
1,701.00
1,700.00
1,701.50
1,756.00
1,796.50
1,770.50
1,733.00
1,691.00
1,666.00
1,716.50
1,728.00
1,584.00
1,488.00
HITUNGAN VOLUME (CALCULATION SHEET)
anan
Luas Ket.
m2
6=3x5 7
1,629.00
1,736.00
1,695.50
1,680.50
1,633.50
1,605.00
1,625.50
1,567.50
1,458.00
1,510.50
1,595.00
1,581.50
1,550.00
1,533.50
1,576.50
1,595.00
1,591.50
1,650.50
1,709.00
HITUNGAN VOLUME (CALCULATION SHEET)
anan
Luas Ket.
m2
6=3x5 7
1,676.50
1,601.50
1,660.50
1,760.50
69,227.00
1,604.50 11,455.000
1,615.00
1,625.00
1,621.50
1,606.50
1,656.50
1,726.00
HITUNGAN VOLUME (CALCULATION SHEET)
anan
Luas Ket.
m2
6=3x5 7
1,701.50 20,456.500
1,672.00
1,694.50
1,732.50
1,715.00
1,703.00
1,672.00
1,667.50
1,714.50
1,710.00
1,729.00
1,745.00
3,286.500
1,659.50
1,627.00
1,582.50 16,104.000
1,619.00
1,690.00
1,673.50
1,666.00
HITUNGAN VOLUME (CALCULATION SHEET)
anan
Luas Ket.
m2
6=3x5 7
1,661.50
1,590.50
1,521.50
1,547.00
1,552.50
1,577.00 15,816.500
1,568.50
1,584.50
1,555.00
1,584.00
136,345.500
1,620.00
1,554.00
1,542.00
1,571.00
1,624.00
1,613.50
136,345.500
Luas Galian Rata-Rata Gallian Luas Galian
No. STA Jarak (m) Volume (m3)
Kiri (m2) Kiri(m2) Kanan (m2)
0 0.438 0.425
50 0.665 33.225
2 0.891 2.438
50 0.705 35.250
4 0.519 1.708
50 0.555 27.750
6 0.591 0.930
50 0.551 27.550
8 0.511 0.924
50 0.534 26.700
10 0.557 0.758
50 0.574 28.700
12 0.591 0.548
50 0.657 32.825
14 0.722 1.866
50 0.828 41.400
16 0.934 0.492
50 0.806 40.275
18 0.677 2.575
50 0.829 41.450
20 0.981 2.177
50 1.011 50.525
22 1.040 2.086
50 0.807 40.350
24 0.574 1.958
50 0.952 47.600
26 1.330 1.756
50 2.618 130.900
28 3.906 2.741
50 2.167 108.325
30 0.427 0.972
50 0.429 21.450
32 0.431 2.676
50 1.039 51.950
34 1.647 1.729
50 1.542 77.100
36 1.437 1.581
50 1.673 83.625
38 1.908 0.457
50 1.776 88.800
40 1.644 3.287
50 1.210 60.475
42 0.775 0.548
50 1.167 58.325
44 1.558 3.595
50 1.164 58.200
46 0.770 1.166
50 0.785 39.250
48 0.800 0.430
50 0.654 32.700
50 0.508 0.450
50 0.535 26.750
52 0.562 0.430
50 0.572 28.600
54 0.582 0.472
50 0.580 29.000
56 0.578 0.567
50 0.536 26.775
58 0.493 0.495
50 0.475 23.750
60 0.457 0.501
50 0.492 24.600
62 0.527 0.539
50 0.527 26.350
64 0.527 0.552
50 0.658 32.900
66 0.789 1.247
50 0.720 35.975
68 0.650 0.587
50 0.714 35.675
70 0.777 0.513
50 1.696 84.775
72 2.614 0.525
50 1.746 87.300
74 0.878 0.479
50 0.708 35.400
76 0.538 2.016
50 1.071 53.550
78 1.604 0.506
50 2.237 111.825
80 2.869 2.821
50 2.187 109.350
82 1.505 1.442
50 2.103 105.125
84 2.700 2.187
Total vol. galian
Rata-Rata Galian Total Volume
Volume (m3) No. STA Jarak (m)
Kanan (m2) (m3)
0
1.432 71.575 104.80 50
2
2.073 103.650 138.90 50
4
1.319 65.950 93.70 50
6
0.927 46.350 73.90 50
8
0.841 42.050 68.75 50
10
0.653 32.650 61.35 50
12
1.207 60.350 93.18 50
14
1.179 58.950 100.35 50
16
1.534 76.675 116.95 50
18
2.376 118.800 160.25 50
20
2.132 106.575 157.10 50
22
2.022 101.100 141.45 50
24
1.857 92.850 140.45 50
26
2.249 112.425 243.33 50
28
1.857 92.825 201.15 50
30
1.824 91.200 112.65 50
32
2.203 110.125 162.08 50
34
1.655 82.750 159.85 50
36
1.019 50.950 134.58 50
38
1.872 93.600 182.40 50
40
1.918 95.875 156.35 50
42
2.072 103.575 161.90 50
44
2.381 119.025 177.23 50
46
0.798 39.900 79.15 50
48
0.440 22.000 54.70 50
50
0.440 22.000 48.75 50
52
0.451 22.550 51.15 50
54
0.520 25.975 54.98 50
56
0.531 26.550 53.33 50
58
0.498 24.900 48.65 50
60
0.520 26.000 50.60 50
62
0.546 27.275 53.63 50
64
0.900 44.975 77.88 50
66
0.917 45.850 81.83 50
68
0.550 27.500 63.18 50
70
0.519 25.950 110.73 50
72
0.502 25.100 112.40 50
74
1.248 62.375 97.78 50
76
1.261 63.050 116.60 50
78
1.664 83.175 195.00 50
80
2.132 106.575 215.93 50
82
1.815 90.725 195.85 50
84
4904.70 Tota
Luas Timbunan Rata-Rata Gallian Luas Timbunan Rata-Rata Galian
Volume (m3) Volume (m3)
Kiri (m2) Kiri(m2) Kanan (m2) Kanan (m2)
98.528 94.257
92.236 4611.775 85.025 4251.250
85.943 75.793
93.935 4696.750 84.321 4216.025
101.927 92.848
97.529 4876.425 97.431 4871.525
93.13 102.013
96.845 4842.250 94.267 4713.325
100.56 86.52
92.306 4615.300 88.550 4427.500
84.052 90.58
86.054 4302.675 95.578 4778.900
88.055 100.576
79.059 3952.950 87.642 4382.100
70.063 74.708
60.261 3013.050 80.642 4032.075
50.459 86.575
60.417 3020.850 94.147 4707.325
70.375 101.718
80.326 4016.300 101.577 5078.850
90.277 101.436
88.734 4436.675 91.840 4591.975
87.19 82.243
82.847 4142.325 90.253 4512.650
78.503 98.263
86.763 4338.150 94.009 4700.425
95.023 89.754
88.393 4419.650 80.257 4012.825
81.763 70.759
95.008 4750.400 79.850 3992.475
108.253 88.94
107.307 5365.350 93.761 4688.025
106.361 98.581
92.048 4602.375 89.657 4482.825
77.734 80.732
91.254 4562.675 68.829 3441.425
104.773 56.925
91.625 4581.225 60.223 3011.150
78.476 63.521
79.281 3964.050 81.629 4081.450
80.086 99.737
80.299 4014.925 103.869 5193.425
80.511 108
73.943 3697.125 87.470 4373.500
67.374 66.94
76.540 3827.000 66.034 3301.700
85.706 65.128
94.730 4736.500 84.899 4244.925
103.754 104.669
104.345 5217.225 99.893 4994.625
104.935 95.116
83.858 4192.900 101.174 5058.675
62.781 107.231
65.749 3287.450 84.305 4215.250
68.717 61.379
59.380 2969.000 53.580 2679.000
50.043 45.781
63.654 3182.675 68.658 3432.900
77.264 91.535
76.059 3802.950 90.720 4535.975
74.854 89.904
77.109 3855.425 89.388 4469.400
79.363 88.872
83.517 4175.825 84.637 4231.825
87.67 80.401
80.105 4005.250 77.968 3898.400
72.54 75.535
83.933 4196.650 83.628 4181.375
95.326 91.72
79.013 3950.650 88.401 4420.025
62.7 85.081
72.377 3618.850 86.731 4336.525
82.054 88.38
80.361 4018.050 87.670 4383.475
78.668 86.959
75.670 3783.475 90.555 4527.725
72.671 94.15
69.506 3475.300 83.906 4195.300
66.341 73.662
68.952 3447.575 71.834 3591.675
71.562 70.005
77.520 3876.000 89.878 4493.900
83.478 109.751
73.373 3668.625 104.915 5245.725
63.267 100.078
Total vol. tmbunan
Total Volume
(m3)
8863.03
8912.78
9747.95
9555.58
9042.80
9081.58
8335.05
7045.13
7728.18
9095.15
9028.65
8654.98
9038.58
8432.48
8742.88
10053.38
9085.20
8004.10
7592.38
8045.50
9208.35
8070.63
7128.70
8981.43
10211.85
9251.58
7502.70
5648.00
6615.58
8338.93
8324.83
8407.65
7903.65
8378.03
8370.68
7955.38
8401.53
8311.20
7670.60
7039.25
8369.90
8914.35
353090.05
PERHITUNGAN
PERHITUNGAN
Panjang VOLUME
No. SKETSA BETON Tinggi
Beton
(m) (m) (m2)
BETON A
0.700
0.389
0.400
BETON B
0.400
7.626
0.358
BETON C
1 0.40 19.600 15.680
0.400
0.400 0.400
0.400
BETON D
0.400
0.400 0.400
0.400
NGAN TOTAL Jumlah Tanggul Volume Total
99.580 106 21,111.055
Volume
Total
(m2)
54.880
12.579
31.360
0.761
PERHITUNGAN
PERHITUNGAN
Panjang VOLUME
No. SKETSA BETON Luas
Pot.
(m') (m3)
BETON A
0.700
0.389
0.400
BETON B
0.400
7.626
0.358
BETON C
1 0.16 19.600 3.136
0.400
0.400 0.400
0.400
BETON D
0.400
0.400 0.400
0.400
NGAN TOTAL Jumlah Tanggul Volume Total
17.391 106 3686.8408147
Volume
Total
(m3)
8.521
2.217
6.272
0.381
PERHITUNGAN
PERHITUNGAN
Panjang Jumlah Total
No. SKETSA PEMBESIAN DIA.
Pot. Btg Panjang
(m) (bh) (m)
BETON A
1 Tulangan Memanjang 13 19.776 6 118.656
D 13-300 19.500
0.078 0.078
0.060 0.060
2 Begel 10 1.948 66 128.548
D 10-300 0.142
0.316
0.700
0.389
0.400
BETON B
1 Tulangan Memanjang 13 7.738 4 30.952
D13 - 300 7.462
0.078 0.078
0.060 0.060
2 Begel 10 1.136 25 28.390
D 10-300
0.310
0.258 0.258
0.310
BETON C
0.310 0.310
0.310
BETON D
1 Tulangan Memanjang 13 2.486 4 9.944
D13 - 300 2.210
0.078 0.078
0.060 0.060
0.310 0.310
0.310
Volume Jumlah Tanggul Total
1,115.268 106 118218.43816
ERHITUNGAN
VOLUME
Berat Ket.
(kg) (kg)
405.743 2
1.042 123.600
0.617 79.271
396.657 2
1.042 32.242
0.617 17.507
297.158 2
1.042 82.400
0.617 50.468
15.711
1.042 10.358
0.617 5.353
Lebar (m) Tebal (m) Jarak (m) Volume (m3)
2.6 0.2 2100 2184
Plasteran Pas. Batu A
Panjang Lebar Volume
19.6 7.83 306.787
Plasteran Pas. Batu B
Panjang Lebar Volume
19.6 2.38 46.62644 Volume Total
Total Volume 706.827 74923.66
Volume Total
13340.186496
14,230,390,163.26
432,411,951.19
100,632,831,791.41
1,922,335,204.50
117,217,969,110.36
Pas. Batu A
Panjang Lebar Tebal Volume
19.6 7.83 0.4 122.7148
Pas. Batu B
Panjang Lebar Tebal Volume
19.6 2.38 0.4 3.136
Total Volume 251.7016 26,680.37
Pas. Batu B
-
-
Jam
Umur Harga Dasar Pemilikan
Tenaga Kerja /
Ekonomis (HDP)
No Jenis Peralatan Tahun
Pw A W B
Biaya Pemilikan
Faktor Angsuran Asuransi Biaya Bahan Baka
Nilai Sisa Modal Pengembalian dll Past 0,125 - 0,175 Lt
(20% * HDP) Modal
Faktor Solar : Rp. 5.500
Suku Bunga i = 16%
Rp 0 Bensin : Rp. 6.400
C D E F G H
20% x B ix(1+i)^A/(1+i)^A-1 (B-C) x D / W (0,002xB)/W (E+F) 0,125 x Pw x M
Rp 194,250,000 0.3090313 Rp 114,342 Rp 925 Rp 115,267 0.125
Rp 205,128,200 0.3090313 Rp 120,745 Rp 977 Rp 121,722 0.125
Rp 183,259,965 0.2675038 Rp 93,377 Rp 873 Rp 94,249 0.125
Rp 106,430,000 0.3797802 Rp 76,990 Rp 507 Rp 77,497 0.125
Rp 350,000,000 0.2675038 Rp 178,336 Rp 1,667 Rp 180,003 0.125
Rp 300,000,000 0.3090313 Rp 176,589 Rp 1,429 Rp 178,018 0.125
Rp 66,431,505 0.2675038 Rp 33,849 Rp 316 Rp 34,165 0.125
Rp 3,000,000 0.3090313 Rp 1,766 Rp 14 Rp 1,780 0.125
Rp 150,707,200 0.2675038 Rp 76,790 Rp 718 Rp 77,508 0.125
TAN
Biaya Operasional
P S
H+I+K+L+M G+P
425,821.07 541,087.65
235,160.06 356,881.69
885,541.66 979,790.95
189,519.67 267,016.97
236,420.24 416,422.75
161,638.21 339,656.10
143,964.85 178,130.10
30,885.18 32,665.36
786,094.33 863,601.97
URAIAN ANALISA HARGA SATUAN
NO U R A I A N KODE KOEF.
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi Pekerjaan :
3 Kondisi jalan : Mulus
4 Jam kerja efektif per - hari Tk 8.00
5 Faktor Pengembangan Bahan Fk 1.00
II URUTAN KERJA
1 Galian tanah umumnya berupa pelebaran badan jalan
2 Penggalian dilakukan dengan Excavator.
###
3 Hasil galian dimuat kedalam Dump Truck dengan Exca-
vator
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh ….. L 3.50
1 BAHAN
2 ALAT
2a. EXCAVATOR (E-10)
Kapasitas Alat / Bucket V 1.00
Faktor Bucket Fb 1.00
Faktor koreksi efisiensi kerja Fk 0.69
Faktor koreksi akibat kecakapan operator Fo 0.85
Faktor koreksi akibat kedalaman Fd 1.00
Faktor koreksi efisiensi waktu Ft 0.85
Faktor Koreksi FK 0.50
NO U R A I A N KODE KOEF.
3. TENAGA
Produksi menentukan : EXCAVATOR Q4 37.39
Produksi Galian / hari = Tk x Q1 Qt 299.115
Kebutuhan tenaga :
- Pekerja P 5
- Tukang Tb 0
- Mandor M 1
Koefisien tenaga / M3 :
Rp. 87,470.76 / m3
SATUAN KET.
jam asumsi
- Lanau
Km
1266
3066
lempung
M3
- lamp 6
lamp 3
lamp 4
lamp 5
lamp 2
- dihitung
detik lamp. 7
detik asumsi
detik
37.389375
M3 / jam
Jam
M3
- Lamp 3
- Lamp 2
- lamp 4
Km/Jam asumsi
Km/Jam asumsi
Menit
Menit
Menit
Menit asumsi
Menit
Bersambung …
SATUAN KET.
m3 / jam
jam
- lamp 3
m
m
- Lamp.1
m3
m Produksi menentukan: DUMP TRUCK
Km/jam asumsi Produksi Galian / hari = Tk x Q2
m/menit Kebutuhan tenaga :
Km/jam asumsi - Pekerja
m/menit - Tukang
menit asumsi - Mandor
menit
m3 / jam
jam
M3 / jam
M3
orang
orang
orang
Jam
Jam
Jam
Q2 13.26
Qt 106.0433
P 2 orang
Tb 0 orang
M 1 orang
URAIAN ANALISA HARGA SATUAN
Rp. 99,006.22 / m3
PERKIRAAN KUANTITAS :
SATUAN PENGUKURAN : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :
A ` TENAGA
1 Mandor (L03) jam 0.0403 21,714.29 876.05
2 Tukang (L02) jam 0.0000 19,357.14 0.00
3 Pekerja (L01) jam 0.2017 12,071.43 2,435.06
PERKIRAAN KUANTITAS :
SATUAN PENGUKURAN : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :
A TENAGA
1 Mandor (L03) jam 0.0487 21,714.29 1057.77
2 Tukang (L02) jam 0.0000 15,714.29 0.00
3 Pekerja (L01) jam 0.2923 12,071.43 3528.23
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.50
5 Jam kerja efektif per-hari Tk 8.00
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20
: - Volume Pasir Ps 80
7 Perbandingan Batu & Mortar :
- Batu Bt 60
- Mortar (campuran semen & pasir) Mr 40
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40
- Batu D2 1.60
- Adukan (mortar) D3 1.80
- Pasir D4 1.67
- Semen Portland D5 1.44
Berlanjut k
PERKIRAAN KUANTITAS
SATUAN PENGUKURAN : Meter Kubik TOTAL HARGA ( Rp )
% THDP BIAYA PROYEK
B. BAHAN
C. PERALATAN
1. Concrete Mixer (E06) Jam 0.4016 4,666.48
2. Water Tank Truck (E23) Jam 0.0029 25,447.16
6. Alat Bantu Ls 1.0000 0.00
SATUAN KET
KM
jam
% Spec.
% Spec.
%
%
ton/M3
ton/M3
ton/M3
ton/M3
ton/M3
M3 Lepas
M3
Kg
M3
liter
-
menit
menit
menit
menit
menit
SATUAN KET
M3
jam
m3
m3 asumsi
kali
lamp.2
lamp. 3
lamp. 4
m3/jam
jam
M3/jam
M3
orang
orang
orang
hari
hari
hari
SA HARGA SATUAN
:
:
:
JUMLAH
HARGA
(Rp.)
237,550.20
54,417.67
61,044.18
353,012.05
177,120.00
223,387.50
71,465.39
471,972.89
1,874.09
74.16
0.00
1,948.25
826,933.19
82,693.32
909,626.51
ANALISA HARGA SATUAN
NO. MATA PEMBAYAR: 3.1 (1)
JENIS PEKERJAAN : GALIAN BIASA
PERKIRAAN KUANTITAS :
SATUAN PENGUKUR : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :
A TENAGA
1 Mandor (L03) jam 0.0403 23,571.00
2 Tukang (L02) jam 0.0000 15,714.00
3 Pekerja (L01) jam 0.2017 11,000.00
PERKIRAAN KUANTITAS :
SATUAN PENGUKUR : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :
A TENAGA
1 Mandor (L03) jam 0.0487 23,571.00
2 Tukang (L02) jam 0.0000 15,714.00
3 Pekerja (L01) jam 0.2923 11,000.00
Jumlah Harga
(Rp)
950.95
0.00
2,218.93
3,169.89
0.00
2,500.00
14,398.13
51,672.33
7,778.52
76,348.98
79,518.87
7,951.89
87,470.76
ATUAN
Jumlah Harga
(Rp)
1148.22
0.00
3215.07
4,363.29
23,850.00
23,850.00
5,000.00
20,285.30
539.55
1,304.62
34,662.89
61,792.36
90,005.66
9,000.57
99,006.22
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Land Clearing
1,922,335,204.50
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Galian Biasa
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.300 108,000.00 32,400.00
2 Tukang Batu OH 0.150 108,000.00 16,200.00
3 Kepala Tukang OH 0.015 130,000.00 1,950.00
4 Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 54450
B. BAHAN
1 Pasir pasang m3 0.018 224,000.00 4,032.00
2 Semen Portland kg 4.840 1,700.00 8,228.00
JUMLAH HARGA BAHAN 12260
C. PERALATAN
1 Alat Bantu Ls 1 5,000.00 5,000.00
JUMLAH HARGA PERALATAN 5,000.00
D. Jumlah harga tenaga, bahan dan peralatan 71,710.00
E. Overhead & Profit 15% x D 10,756.50
F. Harga satuan pekerjaan (D+E) 82,466.50
74923.658 6,178,691,823
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Dewatering
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.020 108,000.00 2,160.00
2 Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 2,810.00
B. BAHAN
1 Karung plastik/bagor bh 1.000 2,000.00 2,000.00
2 Tali Rapia/Plastik m 2.000 500.00 1,000.00
3 Sewa pasir (50% harga pasir) m3 0.035 70,000.00 2,450.00
4 Solar ltr 72.600 5,150.00 373,890.00
5 Oli ltr 0.300 55,000.00 16,500.00
JUMLAH HARGA BAHAN 395,840.00
C. PERALATAN
1 Pompa air diesel kW Bh 1.200 350000 420000
1 Alat Bantu Ls 1.000 5000 5000
JUMLAH HARGA PERALATAN 420000
D. Jumlah harga tenaga, bahan dan peralatan 818,650.00
E. Overhead & Profit 15% x D 122,797.50
F. Harga satuan pekerjaan (D+E) 941,447.50
3,954,079,500.00
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pekerjaan Beton K-250
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 1.323 108,000.00 142,884.00
2 Tukang Batu OH 0.189 130,000.00 24,570.00
3 Kepala Tukang OH 0.019 130,000.00 2,470.00
4 Mandor OH 0.132 130,000.00 17,160.00
JUMLAH TENAGA KERJA 167,454.00
B. BAHAN
1 Semen Portland kg 384 1,700.00 652,800.00
2 Pasir beton kg 692 167.14 115,662.86
3 Kerikil kg 1039 130.56 135,647.22
4 Air ltr 215 5.00 1,075.00
JUMLAH HARGA BAHAN 905,185.08
C. PERALATAN
1 Concrete Mixer jam 0.402 32,665.36 13,118.41
2 Water tank truck jam 0.030 178,130.10 5,395.56
3 Alat Bantu Ls 1.000 5000 5000
JUMLAH HARGA PERALATAN 23,513.97
D. Jumlah harga tenaga, bahan dan peralatan 1,096,153.05
E. Overhead & Profit 15% x D 164,422.96
F. Harga satuan pekerjaan (D+E) 1,260,576.00
-
4,647,543,064.82
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Bekisting
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.200 108,000.00 21,600.00
2 Tukang Kayu OH 0.500 108,000.00 54,000.00
3 Kepala Tukang OH 0.050 130,000.00 6,500.00
4 Mandor OH 0.01 130,000.00 1,300.00
JUMLAH TENAGA KERJA 83,400.00
B. BAHAN
1 Multiflex 12 mm atau 18 mm lbr 0.350 217,200.00 76,020.00
2 Kaso 5/7 cm m3 0.020 3,000,000.00 60,000.00
3 Paku 5cm dan 7 cm kg 0.250 27,700.00 6,925.00
4 Minyak Bekisting L 0.200 13,900.00 2,780.00
JUMLAH HARGA BAHAN 145,725.00
C. PERALATAN
JUMLAH HARGA PERALATAN
D. Jumlah harga tenaga, bahan dan peralatan 229,125.00
E. Overhead & Profit 15% x D 34,368.75
F. Harga satuan pekerjaan (D+E) 263,493.75
21,111.05 5,562,631,042.08
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pembesian
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.700 108,000.00 75,600.00
2 Tukang Besi OH 0.700 108,000.00 75,600.00
3 Kepala Tukang OH 0.070 130,000.00 9,100.00
4 Mandor OH 0.040 130,000.00 5,200.00
JUMLAH TENAGA KERJA 165,500.00
B. BAHAN
1 Besi Beton Ulir kg 105 9,703.53 1,018,870.19
2 Kawat Beton kg 1.5 27,700.00 41,550.00
JUMLAH HARGA BAHAN 1,060,420.19
C. PERALATAN
1 Mesin Potong Besi Hari 0.050 295000 14,750
JUMLAH HARGA PERALATAN 14750
D. Jumlah harga tenaga, bahan dan peralatan 1,240,670.19
E. Overhead & Profit 15% x D 186,100.53
F. Harga satuan pekerjaan (D+E) 1,426,770.72
168,670,606,262.94
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pengecoran
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 1.150 108,000.00 124,200.00
2 Tukang Batu OH 0.200 108,000.00 21,600.00
3 Kepala Tukang OH 0.020 130,000.00 2,600.00
4 Mandor OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 156,200.00
B. BAHAN
1 Semen Portland kg 247 1,700.00 419,900.00
2 Pasir beton kg 869 163.14 141,771.14
3 Kerikil kg 999 130.56 130,425.00
4 Air ltr 215 5.00 1,075.00
JUMLAH HARGA BAHAN 693,171.14
C. PERALATAN
1 Truck Mixer Jam 0.200 863,601.97 172,720.39
JUMLAH HARGA PERALATAN 172720.394687881
D. Jumlah harga tenaga, bahan dan peralatan 1,022,091.54
E. Overhead & Profit 15% x D 153,313.73
F. Harga satuan pekerjaan (D+E) 1,175,405.27
4,936,702,127.89
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Jalan Inspeksi
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.023 108,000.00 2,527.20
2 Mandor OH 0.0016 130,000.00 208.00
JUMLAH TENAGA KERJA 2,735.20
B. BAHAN
1 Sirtu m3 1.200 210,000.00 252,000.00
JUMLAH HARGA BAHAN 252,000.00
C. PERALATAN
1 Bulldozer Jam 0.013 979,790.95 12,247.39
2 Vibro Roller Jam 0.025 339,656.10 8,491.40
3 Water Tank Truck Jam 0.025 178,130.10 4,453.25
JUMLAH HARGA PERALATAN 25,192.04
D. Jumlah harga tenaga, bahan dan peralatan 279,927.24
E. Overhead & Profit 15% x D 41,989.09
F. Harga satuan pekerjaan (D+E) 321,916.33
703,065,261
REKAPITULASI
Rp14,099 Rp 1,922,335,204.50
Rp88,163 Rp 432,411,951.19
Rp285,006 Rp 100,632,831,791.41
Rp42,734 Rp 3,130,689,236.67
Rp1,066,731 Rp 28,460,780,326.53
Rp82,467 Rp 6,178,691,822.67
Rp941,448 Rp 3,954,079,500.00
Rp -
Rp1,260,576 Rp 4,647,543,064.82
Rp263,494 Rp 5,562,631,042.08
Rp1,426,771 Rp 168,670,606,262.94
Rp1,175,405 Rp 4,333,532,117.91
Rp941,448 Rp 2,056,121,340.00
Rp 329,982,253,660.70
Rp 49,497,338,049.11
Rp 379,479,591,709.81
Rp 378,700,000,000.00
No URAIAN PEKERJAAN
Rp 1,922,335,204.50
Rp 432,411,951.19
Rp 100,632,831,791.41
Rp 3,130,689,236.67
Rp 28,460,780,326.53
Rp 6,178,691,822.67
Rp 3,954,079,500.00
Rp 183,214,312,487.74
Rp 2,056,121,340.00
Rp 329,982,253,660.70
Rp 49,497,338,049.11
Rp 379,479,591,709.81
Rp 378,700,000,000.00