Anda di halaman 1dari 109

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH SULAWESI SELATAN


KABUPATEN JENEPONTO
TAHUN 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
I AGREGAT HALUS
1 Pasir Urug/ Pasir Timbunan M3 140,000
2 Pasar Pasang/ Kali M3 224,000
3 Pasir Beton M3 234,000 167.14
4 Pasir Batu ( Sirtu ) M3 210,000
5 Kerikil Koral M3 329,300
6 Kerikil Sungai M3 235,000 130.56
7 Kerikil Tersaring M3 313,600
8 Kerikil Sungai Royalt M3 282,200
9 Kerikil Sungai Pecah Tersaring M3 392,000
10 Kerikil Sungai Tidak Tersaring M3 313,600
11 Tanah Timbunan Pilihan M3 132,200
12 Tanah Timbunan Biasa M3 106,300
13 Tanah Liat M3 58,400

II. AGREGAT KASAR


1 Batu Kali M3 241,900
2 Batu Karang Hitam M3 204,100
3 Batun Karang Puth/Batu Gunung M3 203,100
4 Batu Pecah 10-15 cm M3 345,200
5 Batu Pecah 7-10 cm M3 330,100
6 Batu Pecah 5-7 cm M3 415,800
7 Batu Pecah 3-5 cm M3 468,700
8 Batu Pecah 2-3 cm M3 461,200
9 Batu Pecah 1 - 2 cm M3 491,400
10 Batu Pecah 0,5 - 1 cm M3 506,500
11 Batu Belah M3 241,900
12 Batu Bata Standar ( Besar ) Kelas 1 Buah 900
13 Batu Bata Standar Buah 800
14 Kapur Zak 15,200
15 Aspal Kg 10,700

III SEMEN
1 Semen Portland Kg 1,700
2 Semen Puth Kg 3,100
3 Semen Warna Grout Kg 62,400

IV KAYU
1 Kayu Balok Kelas 1 (Bayam) M3 12,936,000
2 Kayu Papan Kelas 1 (Bayam) M3 14,322,000
3 Kayu Balok Kelas II M3 7,854,000
4 Kayu Papan kelas II M3 7,854,000
5 Kayu Balok Kelas III M3 4,389,000
6. Kayu Papan Kelas III M3 4,389,000

V KAYU LAPIS
1 Tripleks 3 mm (Uk. 120 x 240 ) Lembar 79,000
2 Tripleks 4 mm (Uk. 120 x 240 ) Lembar 98,400
3 Tripleks 6 mm (Uk. 120 x 240 ) Lembar 120,200
4 Tripleks 9 mm (Uk. 120 x 240 ) Lembar 184,800
5 Tripleks 12 mm (Uk. 120 x 240 ) Lembar 217,200
6 Tripleks 15 mm (Uk. 120 x 240 ) Lembar 307,300
7 Tripleks 18 mm (Uk. 120 x 240 ) Lembar 381,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
8 Teakwood Lembar 122,000
9 Kalsiboard tebal 4 mm Lembar 97,200

VI GYPSUN
1 Gypsun (120 x 240 mm) Jaya Board Lembar 90,100

VII LIST PROFIL


1 List Profil K1 A M1 27,700
2 List Profil T 11 M1 25,600
3 List Profil Kayu 7 cm M1 23,300
4 Lambersering 9 cm M1 13,900

VIII PAKU
1 Paku Kayu/Tripleks Uk. 1 - 4 cm Kg 31,000
2 Paku Kayu/Tripleks Uk. 5 - 12 cm Kg 27,700
3 Paku Beton Biasa (semua ukuran) Dos 34,700
4 Paku Beton Bagus (semua ukuran) Dos 69,900
5 Paku Perahu Uk. 1 - 4 cm Kg 46,600
6 Paku Perahu uk. 5 - 12 cm Kg 38,800
7 Paku Asbes Kg 37,300
8 Kawat Beton Kg 27,700

IX SENG
1 Seng Gelombang Bjls 0.25 Sermani Lembar 89,300
2 Seng Gelombang Bjls 0.30 Gajah Lembar 105,600
3 Seng Licin Bjls 0.20 - 6 Kaki Gajah Lembar 93,100
4 Seng Licin Bjls 0.30 - 6 Kaki Jabesemen Lembar 88,500
5 Asbes Gelombang Besar ( 300x102x5 mm ) Jabesemen Lembar 167,700
6 Asbes Gelombang Besar ( 200x102x5 mm ) Jabesemen Lembar 129,100
7 Asbes Gelombang Besar ( 180x102x5 mm ) Jabesemen Lembar 110,000
8 Asbes Gelombang Kecil ( 300x102x5 mm ) Jabesemen Lembar 112,800
9 Asbes Gelombang Kecil ( 270x102x5 mm ) Jabesemen Lembar 98,500
10 Asbes Gelombang Kecil ( 210x102x5 mm ) Jabesemen Lembar 80,000
11 Asbes Gelombang Kecil ( 180x102x5 mm ) Jabesemen Lembar 70,100
12 Asbes Gelombang Kecil ( 150x102x5 mm ) Jabesemen Lembar 68,500
13 Asbes Gelombang Kecil ( 240x102x5 mm ) Jabesemen Lembar 106,500
14 Asbes Nok Gelombang Besar Jabesemen Lembar 72,700
15 Asbes Nok Gelombang Kecl Jabesemen Lembar 47,800
16 Seng Plat 0,35 - 6 Kaki Jabesemen Lembar 86,600

X BESI
1 Besi Profil IWF Kg 16,800
2 Besi Siku L 30 x 30 x 3 mm Batang 98,100
3 Besi Siku L 40 x 40 x 4 mm Batang 161,100
4 Besi Siku L 50 x 50 x 5 mm Batang 291,100
5 Besi Strip Kg 23,300
6 Besi Beton 6 mm (12 m) Batang 39,200
7 Besi Beton 8 mm (12 m) Batang 52,900
8 Besi Beton 10 mm (12 m) Batang 80,300
9 Besi Beton 12 mm (12 m) Batang 111,400
10 Besi Beton 16 mm (12 m) Batang 176,400
11 Besi Beton 19 mm (12 m) Batang 252,000
12 Besi Beton Ulir 10 mm Batang 85,500
13 Besi Beton Ulir 13 mm Batang 121,100 9,703.53
14 Besi Beton Ulir 16 mm Batang 203,800
15 Besi Beton Ulir 19 mm Batang 264,600
16 Angkur Kg 23,500
17 Besi Beugel/Baut Kg 28,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

XI KERAMIK/TEGEL
1 Keramik Uk. 20 x 20 cm (W.Puth) Mulia M2 85,400
2 Keramik Uk. 30 x 30 cm (W.Muda) Mulia M2 69,300
3 Keramik Dinding Uk. 20 x 25 cm (W.Tua) Asia Tile M2 76,200
4 Keramik Dinding Uk. 20 x 25 cm (W. Muda) Asia Tile M2 80,400
5 Keramik Lantai Uk. 20 x 20 cm (W. Puth) Asia Tile M2 76,200
6 Keramik Lantai Uk. 30 x 30 cm (W. Puth) Asia Tile M2 76,200
7 Keramik Lantai Uk. 40 x 40 cm (W. Puth) Asia Tile M2 106,300
8 Keramik Lantai Uk. 20 x 20 cm (Motf) Roman M2 109,900
9 Keramik Teras /Garansi 30 x 30 cm Materina M2 74,500
10 Keramik Plint 7,5 x 20 cm Buah 18,600
11 Keramik Plint 8 x 25 cm Buah 31,000
12 Kuku Macan Buah 3,500
13 Granit 40 x 40 cm Granito M2 194,000
14 Granit 60 x 60 cm (W. Muda) M2 242,600
15 Granit 60 x 60 cm (W. Tua) M2 346,500
16 Ubin Abu-Abu 20 x 20 M2 55,400
17 Ubin Suoer Hitam 20 x 20 M2 76,200
18 Ubin Badak 30 x 30 M2 79,000

XII KACA
1 Kaca Bening Tebal 3 mm M2 131,900
2 Kaca Bening Tebal 5 mm M2 147,500
3 Kaca Bening Tebal 8 mm M2 201,800
4 Kaca Bening Tebal 10 mm M2 287,200
5 Kaca Rayban Tebal 3 mm M2 100,900
6 Kaca Rayban Tebal 5 mm M2 103,200
7 Kaca Rayban Tebal 6 mm M2 194,000
8 Kaca Rayban Tebal 8 mm M2 341,500
9 Nako Buah 27,700

XIII GENTENG
1 Genteng Beton Biasa Buah 6,200
2 Genteng Kanmuri Glassure Buah 10,900
3 Genteng Kanmuri Biasa Buah 9,300
4 Karet Talang L=55X29 Rol 155,000
5 Karet Talang L=90X29 Rol 195,500
6 Karet Lapis Genteng M2 3,100
7 Genteng Keramik KIA Natural Buah 8,500
8 Genteng Keramik KIA Maroon Buah 14,000
9 Non Keramik KIA Buah 16,300
10 Non Beton Press Buah 9,300
11 Ujung Nok Buah 69,900
12 Genteng Metal Zincalume Kasar 100 x 77 Multroof M2 186,300
13 Genteng Metal Zincalume Polos 100 x 77 Multroof M2 150,600
14 Genteng Metal Zincalume Kasar 80 x 77 Suryaroof M2 111,800
15 Genteng Metal Zincalume Polos 80 x 77 Suryaroof M2 104,000
16 Genteng Asbes Buah 54,300

XIV SANRANGAN /BUIS BETON


1 Dia. 80 x 50 Buah 93,100
2 Dia. 70 x 50 Buah 77,600
3 Dia. 60 x 50 Buah 62,100

XV GORONG-GORONG
1 Dia 1 x 60 Buah 93,100
2 Dia 1 x 50 Buah 77,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
3 Dia 1 x 40 Buah 69,900
4 Dia 1 x 30 Buah 46,600
5 Dia 1 x 20 Buah 31,000
6 Dia 1 x 100 Buah 155,200

XVI PAVING BLOK


1 Uk.6 cm ( 60 bh /m2) M2 93,100
2 Uk.8 cm ( 60 bh /m2) M2 111,800
3 Loster Semen Uk.15 x 30 cm Buah 69,900
4 Loster Semen Uk. 20 x 30 cm Buah 34,700
5 Batako 40 x 20 x10 Buah 4,900
6 Rumput Peking M2 69,300

XVII PIPA
1 Pipa PVC Type AW 1/2" Batang 34,700
2 Pipa PVC Type AW 3/4" Batang 41,600
3 Pipa PVC Type AW 1" Batang 55,400
4 Pipa PVC Type AW 1 1/4' Batang 62,400
5 Pipa PVC Type AW 1 1/2" Batang 76,200
6 Pipa PVC Type AW 2" Batang 94,400
7 Pipa PVC Type AW 1 1/2" Batang 97,000
8 Pipa PVC Type AW 3" Batang 186,900
9 Pipa PVC Type AW 4" Batang 311,100
10 Pipa PVC Type AW 5" Batang 500,700
11 Pipa PVC Type AW 6" Batang 679,600
12 Pipa PVC Type AW 8" Batang 1,093,900
13 Pipa PVC Type C 1/2" Batang 27,700
14 Pipa PVC Type C 3/4" Batang 34,700
15 Pipa PVC Type C 1" Batang 48,500
16 Pipa PVC Type C 2" Batang 59,800
17 Pipa PVC Type C 2 1/2" Batang 75,400
18 Pipa PVC Type C 3" Batang 88,500
19 Pipa PVC Type C 4" Batang 113,300
20 Pipa PVC Type D 1 1/4" Batang 37,600
21 Pipa PVC Type D 1 1/2" Batang 45,800
22 Pipa PVC Type D 2" Batang 60,900
23 Pipa PVC Type D 3" Batang 131,900
24 Pipa PVC Type D 4" Batang 169,000
25 Pipa PVC Type D5" Batang 255,000
26 Pipa PVC Type D 6" Batang 388,700
27 Pipa PVC Type D 8" Batang 652,000
28 Pipa Galvanis Medium GIP 1/2" Batang 236,000
29 Pipa Galvanis Medium GIP 3/4" Batang 307,400
30 Pipa Galvanis Medium GIP 1" Batang 422,200
31 Pipa Galvanis Medium GIP 1 1/4" Batang 552,600
32 Pipa Galvanis Medium GIP 1 1/2" Batang 633,300
33 Pipa Galvanis Medium GIP 2" Batang 838,300
34 Pipa Galvanis Medium GIP 2 1/2" Batang 1,066,400
35 Pipa Galvanis Medium GIP 3" Batang 1,909,400

XVIII SAMBUNGAN PIPA


1 Knie 90o- 1/2" Buah 4,200
2 Knie 90o- 3/4" Buah 4,200
3 Knie 90o- 1" Buah 4,900
4 Knie 90o-1 1/4" Buah 8,300
5 Knie 90o-1 1/2" Buah 10,400
6 Knie 90o- 2" Buah 11,100
7 Knie 90o- 2 1/2" Buah 11,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
8 Knie 3" Buah 13,900
9 Knie 4" Buah 23,300
10 Knie 5" Buah 62,900
11 Knie 6" Buah 82,400
12 Tee 1/2" Buah 4,200
13 Tee 3/4" Buah 4,900
14 Tee 1" Buah 7,000
15 Tee 1 1/4" Buah 5,500
16 Tee 1 1/2" Buah 7,000
17 Tee 2" Buah 8,800
18 Tee 2 1/2" Buah 14,900
19 Tee 3" Buah 7,500
20 Tee 4" Buah 21,900
21 Tee 5" Buah 65,200
22 Tee 6" Buah 102,500
23 Socket 1/2" Buah 4,200
24 Socket 3/4" Buah 4,200
25 Socket 1" Buah 4,200
26 Socket 1 1/4" Buah 6,900
27 Socket 1 1/2" Buah 4,200
28 Socket 2" Buah 4,900
29 Socket 2 1/2" Buah 6,500
30 Socket 3" Buah 7,900
31 Socket 4" Buah 11,200
32 Socket 5" Buah 32,600
33 Socket 6" Buah 46,600
34 Knie 45o-2" Buah 102,500
35 Knie 45o-2 1/2" Buah 14,000
36 Knie 45o-3" Buah 20,500
37 Knie 45o-4" Buah 37,300

XIX KUNCI
1 Kunci Tanam double Slag/selot pintu Buah 83,800
2 Kunci Tanam Antk Buah 465,700
3 Kunci Lemari Buah 27,700
4 Door Holder Buah 34,700
5 Kunci laci 101 Buah 172,500
6 Kunci laci 808 kecil Buah 18,400
7 Kunci laci 808 besar Buah 23,000
8 Kunci Tanam Silinder Buah 139,700
9 Kunci Kamar Mandi Buah 48,500
10 Engsel Pintu Kuningan 3 " Buah 23,300
11 Engsel Pintu Kuningan 4 " Buah 21,700
12 Engsel Pintu Nilon 3" Buah 13,900
13 Engsel Pintu Nilon 4" Buah 15,500
14 Engsel Stainless Stell 3" Buah 34,900
15 Engsel Stainless Stell 4" Buah 44,200
16 Grendel Uk.5-10 cm Buah 18,000
17 Grendel Uk.11 -15 cm Buah 23,600
18 Grendel 16 - 20 cm Buah 34,700
19 Kain Angin Kuningan Uk.10-20 cm Buah 23,600
20 Kain Angin Kuningan Uk.21-30 cm Buah 41,600
21 Espagnolet tanam Uk.21-30 cm Buah 34,700
22 Door Clossset Type 81 New Star Buah 204,900
23 Door Stop Lokal Buah 15,500
24 Engsel Pintu 77 Buah 20,800
25 Engsel Jendela 77 Buah 20,800
26 Hak Angin 8" Buah 23,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
27 Lem pipa Kaleng 52,000
28 Meter Rol Buah 100,000
29 Meter Rol Buah 125,000
30 Rel Pintu Dorong Buah 20,800
31 Pintu PVC Buah 504,500
32 Pintu Aluminium Buah 519,800
33 Rooling Door bahan besi M2 554,400
34 Rooling Door Bahan Aluminium M2 465,700
35 Sunscreen Aluminium M2 558,800
36 Pintu Gulung Besi M2 512,300
37 Pintu Besi Baja M2 1,474,700
38 Jendela Besi M2 1,552,300

XX PINTU AIR
1 Pintu Tersier Unit 6,860,700
2 Pintu Romijing b=0,5 m; h = 1 m Unit 18,295,200
3 Pintu Romijing b=0,6 m; h = 1 m Unit 18,447,700
4 Pintu Romijing b=0,7 m; h = 1 m Unit 19,438,700
5 Pintu Romijing b=0,8 m; h = 1 m Unit 22,106,700
6 Pintu Sorong b=1 m; h = 1 m Unit 30,492,000
7 Pintu Sorong b=1 m; h = 1,2 m Unit 32,016,600
8 Pintu Sorong b=1 m; h = 1,25 m Unit 34,650,000
9 Pintu Sorong b=1 m; h = 1,5 m Unit 41,850,000

XXI SANITASI
1 Bak air mandi fiberglasss 0,3 m3 Buah 554,400
2 Kloset Jongkok Standar Buah 831,600
3 Kloset Duduk Standar Lengkap Buah 3,395,700
4 Urinior Buah 1,940,400
5 Wastafel Stabndar Kecil Buah 838,300
6 Wastafel Standar Besar Buah 1,024,500
7 Kran Air wastafel Buah 32,600
8 Kran Air wastafel Buah 65,200
9 Kran Air bak cuci dapur Buah 55,900
10 Tempat Sabun Porselin Buah 1,319,500
11 Tangki Air Fiberglass bulat 500 ltr Paint chrome 0,9 liter Buah 1,940,400
12 Tangki Fiberglass bulat 1000 ltr Paint chrome finish Buah 6,900
13 Sealtape kecil Buah 85,400
14 Pipa Fleksibel Buah

XXII CAT MINYAK


1 Cat Besi/ Kayu warna standar Emco Kg 34,700
2 Cat Besi/ Kayu warna khusus Emco Kg 62,400
3 Cat Besi/Kayu Avian Kg 60,800
4 Cat Tembok Metrolite Kg 28,000
5 Cat Tembok Interior Warna Standar Mowilex Liter 75,300
6 Cat Tembok Exterior Warna Standar Mowilex Liter 70,700
7 Cat Tembok Interior Warna Standar Dulux Liter 87,000
8 Cat Tembok Exterior Warna Standar Dulux Liter 93,900
9 Cat Meni Biasa Kg 27,200
10 Cat Meni KAYU Kg 31,200
11 Cat 5 kg 225,000
12 Dempul kayu kg 54,300
13 mber cor kecil Buah 10,000
14 Ember cor besar Buah 15,000
15 isolasi pipa Buah 6,000
16 Plamur Kg 27,900
17 Politur 2,5 Liter Liter 68,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
18 Teak Oil 1 Liter Liter 42,700
19 Pernis Liter 32,600
20 Minyak Cat Liter 20,800
21 Thinner A Liter 59,000
22 Thinner Biasa Liter 25,000
23 Spirtus Liter 25,000
24 Wood Filler kg 40,400
25 Amplas lbr 6,900
26 Kuas Roll Buah 19,800
27 Kuas Roll Ace 23,300
28 Kuas 1" Buah 10,000
29 Kuas 1 / 2 Buah 20,800
30 Kuas 4 " Buah 23,600
31 Lem Kayu Fox Kg 27,700
32 Lem Fox Bungkus 22,400
33 Lem Fox Bungkus 16,300
34 Lem Epoxy Pasang 37,000
35 Residu Liter 20,200
36 Minyak Bekistng Liter 13,900

XXIII ELETRICAL
1 Skun 16 mili Batang 3,100
2 Spiral Kabel M' 108,700
3 Kabel Tig Btg 1,000
4 Kabel NYM 2 x 1,5 Roll 388,100
5 Kabel NYM 2 x 2,5 M' 6,900
6 Kabel NYM 2 x 2,5 Eterna Roll 519,800
7 Kabel NYM 3 x 2,5 Eterna Roll 582,100
8 Kabel NYM 3 x 4 Eterna Roll 776,200
9 Kabel NYM 4 x 16 M' 54,300
10 Kabel NYM 4 x 2,5 M' 11,600
11 Kabel NYM 4 x 4 M' 15,500
12 Kabel NYA 10 m M' 13,900
13 BC 50 mm Kg 57,400
14 Spit Tembaga Asli Buah 10,900
15 Tiang Spit Buah 38,800
16 Arde 4 mtr Asli Batang 543,300
17 Down Light Kuning Buah 54,300
18 Down Light Besar Buah 77,600
19 Down Light Sedang Buah 69,900
20 Lampu Merkuri Philips 250 Watt Asli Buah 465,700
21 Fitting Merkuri 250 Watt Buah 77,600
22 Lampu Merkuri Philips 250 Watt Set 1,241,900
23 Lampu TL 20 Watt Philips Set 77,600
24 Lampu Softone 40 watt Philips Buah 69,900
25 Fitting Batu Buah 18,000
26 Kayu Roset Buah 6,900
27 MCB 16 Grup MG Asli Buah 69,900
28 MCB 10 Grup MG Asli Buah 62,100
29 Rang pasir Meter 20,000
30 Sisir MCB Legrand Buah 31,000
31 Boks MCB 4 GRUP IB Buah 38,800
32 Boks MCB Plastk Grup MCB Asli Set 1,009,000
33 MCB 63 Amp MG Buah 341,500
34 Panel OB+mcb 12 Amp Set 776,200
35 MCB 30 Amp 3 Phase Buah 698,500
36 Saklar 63 Amp Buah 209,600
37 Boks MCB Buah 54,300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
38 Panel Kas 30 x 40 cm Unit 100,900
39 Panel kas untuk lampu Merkuri Asli Set 1,319,500
40 Panel Kas Lengkap Asli MG Set 3,259,900
41 kwh 3 Phase Japan Buah 1,241,900
42 MCB + KWH Meter + OK Set 357,000
43 MCB 3 pas Asli MG Buah 1,086,600
44 OMH Saklar Buah 698,500
45 NFB Buah 236,000
46 Engkel IB Buah 18,600
47 Stop Arde IB Mekel Buah 13,900
48 Saklar Seri Makel / Stop Arde Makel Buah 15,200
49 OHN Saklar 60 grup set 388,100
50 Stop Arde + Tedos OB Buah 31,000
51 Steker Arde Buah 15,200
52 Engkel IB Makel Buah 15,500
53 Kabel Arde M' 18,600
54 Saklar Engkel + Tedos Set 46,600
55 Dora Dos Buah 38,800

XXIV UPAH TENAGA KERJA


1 Mandor Org/Hr 130,000
2 Buruh Lapangan Tidak Terlath Org/Hr 81,000
3 Buruh Lapangan Semi Terlath Org/Hr 85,000
4 Buruh Lapangan Terlath Org/Hr 91,000
5 Pekerja Org/Hr 108,000
6 Tukang Batu Org/Hr 108,000
7 Tukang Kayu Org/Hr 108,000
8 Tukang Besi Org/Hr 108,000
9 Tukang Cat Org/Hr 108,000
10 Kepala Tukang Org/Hr 130,000
11 Petugas Satpam Org/Hr 120,000
12 Mekanik Org/Hr 108,000
13 Mekanik Pembantu Org/Hr 108,000
14 Operator Terlath Org/Hr 108,000
15 Operator Kurang Terlarth Org/Hr 105,000
16 Pembantu Operator Org/Hr 91,000
17 Sopir Terampil Org/Hr 91,000
18 Pembantu Sopir Org/Hr 70,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Sisi Kanan
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH

Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5

1 Tr0 33.09
50.00 32.68
2 Tr2 32.28
50.00 32.27
3 Tr4 32.26
50.00 33.24
4 Tr6 34.22
50.00 33.68
5 Tr8 33.14
50.00 33.56
6 Tr10 33.97
50.00 34.02
7 Tr12 34.07
50.00 34.02
8 Tr14 33.97
50.00 34.00
9 Tr16 34.04
50.00 34.03
10 Tr18 34.03
50.00 35.12
11 Tr20 36.21
50.00 35.93
12 Tr22 35.65
50.00 35.41
13 Tr24 35.16
50.00 34.66
14 Tr26 34.16
50.00 33.82
15 Tr28 33.48
50.00 33.32
16 Tr30 33.17
50.00 34.33
17 Tr32 35.49
50.00 34.56
18 Tr34 33.62
50.00 31.68
19 Tr36 29.75
50.00 29.76
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH

Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5

20 Tr38 29.77
50.00 32.58
21 Tr40 35.39
50.00 34.72
22 Tr42 34.04
50.00 33.91
23 Tr44 33.77
50.00 33.61
24 Tr46 33.44
50.00 32.67
25 Tr48 31.89
50.00 32.10
26 Tr50 32.32
50.00 32.51
27 Tr52 32.71
50.00 31.35
28 Tr54 29.99
50.00 29.16
29 Tr56 28.34
50.00 30.21
30 Tr58 32.09
50.00 31.90
31 Tr60 31.71
50.00 31.63
32 Tr62 31.55
50.00 31.00
33 Tr64 30.46
50.00 30.67
34 Tr66 30.88
50.00 31.53
35 Tr68 32.18
50.00 31.90
36 Tr70 31.63
50.00 31.83
37 Tr72 32.03
50.00 33.01
38 Tr74 34.00
50.00 34.18
39 Tr76 34.37
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH

Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5

50.00 33.53
40 Tr78 32.70
50.00 32.03
41 Tr80 31.36
50.00 33.21
42 Tr82 35.06
50.00 35.21
43 Tr84 35.35
Volume Total
Sisi Kiri
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH
SISI KIR
Jarak Panjang Panjang Rata2
No. Sta.
m m m
1 2 3 4 5

1 Tr0 32.43
50.00 32.09
2 Tr2 31.75
50.00 32.30
3 Tr4 32.85
50.00 32.50
4 Tr6 32.16
50.00 32.43
5 Tr8 32.71
50.00 32.13
6 Tr10 31.55
50.00 33.13
7 Tr12 34.71
50.00 34.52
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH

Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5

8 Tr14 34.33
50.00 34.03
9 Tr16 33.72
50.00 33.44
10 Tr18 33.15
50.00 33.89
11 Tr20 34.63
50.00 34.65
12 Tr22 34.67
50.00 34.30
13 Tr24 33.92
50.00 34.06
14 Tr26 34.21
50.00 33.44
15 Tr28 32.67
50.00 33.35
16 Tr30 34.03
50.00 34.29
17 Tr32 34.54
50.00 34.20
18 Tr34 33.86
50.00 34.58
19 Tr36 35.30
50.00 34.90
20 Tr38 34.50
50.00 33.19
21 Tr40 31.88
50.00 32.54
22 Tr42 33.20
50.00 31.65
23 Tr44 30.10
50.00 32.38
24 Tr46 34.67
50.00 33.80
25 Tr48 32.94
50.00 33.47
26 Tr50 34.00
50.00 33.32
27 Tr52 32.64
LEMBAR PERHITUNGAN VOLUME (CALCULATION SH

Sisi Kanan
Jarak Lebar Lebar Rata2
No. Sta.
m m m
1 2 3 4 5

50.00 33.23
28 Tr54 33.82
50.00 31.81
29 Tr56 29.80
50.00 30.43
30 Tr58 31.06
50.00 30.94
31 Tr60 30.82
50.00 31.05
32 Tr62 31.29
50.00 31.54
33 Tr64 31.80
50.00 31.37
34 Tr66 30.95
50.00 31.69
35 Tr68 32.44
50.00 31.10
36 Tr70 29.77
50.00 31.68
37 Tr72 33.60
50.00 32.40
38 Tr74 31.20
50.00 31.08
39 Tr76 30.96
50.00 30.84
40 Tr78 30.73
50.00 31.42
41 Tr80 32.12
50.00 32.48
42 Tr82 32.85
50.00 32.27
43 Tr84 31.68
HITUNGAN VOLUME (CALCULATION SHEET)

anan
Luas Ket.
m2
6=3x5 7

1,634.00

1,613.50

1,662.00

1,684.00

1,678.00

1,701.00

1,701.00

1,700.00

1,701.50

1,756.00

1,796.50

1,770.50

1,733.00

1,691.00

1,666.00

1,716.50

1,728.00

1,584.00

1,488.00
HITUNGAN VOLUME (CALCULATION SHEET)

anan
Luas Ket.
m2
6=3x5 7

1,629.00

1,736.00

1,695.50

1,680.50

1,633.50

1,605.00

1,625.50

1,567.50

1,458.00

1,510.50

1,595.00

1,581.50

1,550.00

1,533.50

1,576.50

1,595.00

1,591.50

1,650.50

1,709.00
HITUNGAN VOLUME (CALCULATION SHEET)

anan
Luas Ket.
m2
6=3x5 7

1,676.50

1,601.50

1,660.50

1,760.50

69,227.00

HITUNGAN VOLUME (CALCULATION SHEET)


KIR
Luas Ket.
m2
6=3x5 7

1,604.50 11,455.000

1,615.00

1,625.00

1,621.50

1,606.50

1,656.50

1,726.00
HITUNGAN VOLUME (CALCULATION SHEET)

anan
Luas Ket.
m2
6=3x5 7

1,701.50 20,456.500

1,672.00

1,694.50

1,732.50

1,715.00

1,703.00

1,672.00

1,667.50

1,714.50

1,710.00

1,729.00

1,745.00
3,286.500
1,659.50

1,627.00

1,582.50 16,104.000

1,619.00

1,690.00

1,673.50

1,666.00
HITUNGAN VOLUME (CALCULATION SHEET)

anan
Luas Ket.
m2
6=3x5 7

1,661.50

1,590.50

1,521.50

1,547.00

1,552.50

1,577.00 15,816.500

1,568.50

1,584.50

1,555.00

1,584.00
136,345.500
1,620.00

1,554.00

1,542.00

1,571.00

1,624.00

1,613.50

136,345.500
Luas Galian Rata-Rata Gallian Luas Galian
No. STA Jarak (m) Volume (m3)
Kiri (m2) Kiri(m2) Kanan (m2)

0 0.438 0.425
50 0.665 33.225
2 0.891 2.438
50 0.705 35.250
4 0.519 1.708
50 0.555 27.750
6 0.591 0.930
50 0.551 27.550
8 0.511 0.924
50 0.534 26.700
10 0.557 0.758
50 0.574 28.700
12 0.591 0.548
50 0.657 32.825
14 0.722 1.866
50 0.828 41.400
16 0.934 0.492
50 0.806 40.275
18 0.677 2.575
50 0.829 41.450
20 0.981 2.177
50 1.011 50.525
22 1.040 2.086
50 0.807 40.350
24 0.574 1.958
50 0.952 47.600
26 1.330 1.756
50 2.618 130.900
28 3.906 2.741
50 2.167 108.325
30 0.427 0.972
50 0.429 21.450
32 0.431 2.676
50 1.039 51.950
34 1.647 1.729
50 1.542 77.100
36 1.437 1.581
50 1.673 83.625
38 1.908 0.457
50 1.776 88.800
40 1.644 3.287
50 1.210 60.475
42 0.775 0.548
50 1.167 58.325
44 1.558 3.595
50 1.164 58.200
46 0.770 1.166
50 0.785 39.250
48 0.800 0.430
50 0.654 32.700
50 0.508 0.450
50 0.535 26.750
52 0.562 0.430
50 0.572 28.600
54 0.582 0.472
50 0.580 29.000
56 0.578 0.567
50 0.536 26.775
58 0.493 0.495
50 0.475 23.750
60 0.457 0.501
50 0.492 24.600
62 0.527 0.539
50 0.527 26.350
64 0.527 0.552
50 0.658 32.900
66 0.789 1.247
50 0.720 35.975
68 0.650 0.587
50 0.714 35.675
70 0.777 0.513
50 1.696 84.775
72 2.614 0.525
50 1.746 87.300
74 0.878 0.479
50 0.708 35.400
76 0.538 2.016
50 1.071 53.550
78 1.604 0.506
50 2.237 111.825
80 2.869 2.821
50 2.187 109.350
82 1.505 1.442
50 2.103 105.125
84 2.700 2.187
Total vol. galian
Rata-Rata Galian Total Volume
Volume (m3) No. STA Jarak (m)
Kanan (m2) (m3)

0
1.432 71.575 104.80 50
2
2.073 103.650 138.90 50
4
1.319 65.950 93.70 50
6
0.927 46.350 73.90 50
8
0.841 42.050 68.75 50
10
0.653 32.650 61.35 50
12
1.207 60.350 93.18 50
14
1.179 58.950 100.35 50
16
1.534 76.675 116.95 50
18
2.376 118.800 160.25 50
20
2.132 106.575 157.10 50
22
2.022 101.100 141.45 50
24
1.857 92.850 140.45 50
26
2.249 112.425 243.33 50
28
1.857 92.825 201.15 50
30
1.824 91.200 112.65 50
32
2.203 110.125 162.08 50
34
1.655 82.750 159.85 50
36
1.019 50.950 134.58 50
38
1.872 93.600 182.40 50
40
1.918 95.875 156.35 50
42
2.072 103.575 161.90 50
44
2.381 119.025 177.23 50
46
0.798 39.900 79.15 50
48
0.440 22.000 54.70 50
50
0.440 22.000 48.75 50
52
0.451 22.550 51.15 50
54
0.520 25.975 54.98 50
56
0.531 26.550 53.33 50
58
0.498 24.900 48.65 50
60
0.520 26.000 50.60 50
62
0.546 27.275 53.63 50
64
0.900 44.975 77.88 50
66
0.917 45.850 81.83 50
68
0.550 27.500 63.18 50
70
0.519 25.950 110.73 50
72
0.502 25.100 112.40 50
74
1.248 62.375 97.78 50
76
1.261 63.050 116.60 50
78
1.664 83.175 195.00 50
80
2.132 106.575 215.93 50
82
1.815 90.725 195.85 50
84
4904.70 Tota
Luas Timbunan Rata-Rata Gallian Luas Timbunan Rata-Rata Galian
Volume (m3) Volume (m3)
Kiri (m2) Kiri(m2) Kanan (m2) Kanan (m2)

98.528 94.257
92.236 4611.775 85.025 4251.250
85.943 75.793
93.935 4696.750 84.321 4216.025
101.927 92.848
97.529 4876.425 97.431 4871.525
93.13 102.013
96.845 4842.250 94.267 4713.325
100.56 86.52
92.306 4615.300 88.550 4427.500
84.052 90.58
86.054 4302.675 95.578 4778.900
88.055 100.576
79.059 3952.950 87.642 4382.100
70.063 74.708
60.261 3013.050 80.642 4032.075
50.459 86.575
60.417 3020.850 94.147 4707.325
70.375 101.718
80.326 4016.300 101.577 5078.850
90.277 101.436
88.734 4436.675 91.840 4591.975
87.19 82.243
82.847 4142.325 90.253 4512.650
78.503 98.263
86.763 4338.150 94.009 4700.425
95.023 89.754
88.393 4419.650 80.257 4012.825
81.763 70.759
95.008 4750.400 79.850 3992.475
108.253 88.94
107.307 5365.350 93.761 4688.025
106.361 98.581
92.048 4602.375 89.657 4482.825
77.734 80.732
91.254 4562.675 68.829 3441.425
104.773 56.925
91.625 4581.225 60.223 3011.150
78.476 63.521
79.281 3964.050 81.629 4081.450
80.086 99.737
80.299 4014.925 103.869 5193.425
80.511 108
73.943 3697.125 87.470 4373.500
67.374 66.94
76.540 3827.000 66.034 3301.700
85.706 65.128
94.730 4736.500 84.899 4244.925
103.754 104.669
104.345 5217.225 99.893 4994.625
104.935 95.116
83.858 4192.900 101.174 5058.675
62.781 107.231
65.749 3287.450 84.305 4215.250
68.717 61.379
59.380 2969.000 53.580 2679.000
50.043 45.781
63.654 3182.675 68.658 3432.900
77.264 91.535
76.059 3802.950 90.720 4535.975
74.854 89.904
77.109 3855.425 89.388 4469.400
79.363 88.872
83.517 4175.825 84.637 4231.825
87.67 80.401
80.105 4005.250 77.968 3898.400
72.54 75.535
83.933 4196.650 83.628 4181.375
95.326 91.72
79.013 3950.650 88.401 4420.025
62.7 85.081
72.377 3618.850 86.731 4336.525
82.054 88.38
80.361 4018.050 87.670 4383.475
78.668 86.959
75.670 3783.475 90.555 4527.725
72.671 94.15
69.506 3475.300 83.906 4195.300
66.341 73.662
68.952 3447.575 71.834 3591.675
71.562 70.005
77.520 3876.000 89.878 4493.900
83.478 109.751
73.373 3668.625 104.915 5245.725
63.267 100.078
Total vol. tmbunan
Total Volume
(m3)

8863.03

8912.78

9747.95

9555.58

9042.80

9081.58

8335.05

7045.13

7728.18

9095.15

9028.65

8654.98

9038.58

8432.48

8742.88

10053.38

9085.20

8004.10

7592.38

8045.50
9208.35

8070.63

7128.70

8981.43

10211.85

9251.58

7502.70

5648.00

6615.58

8338.93

8324.83

8407.65

7903.65

8378.03

8370.68

7955.38

8401.53

8311.20

7670.60

7039.25

8369.90

8914.35

353090.05
PERHITUNGAN

PERHITUNGAN
Panjang VOLUME
No. SKETSA BETON Tinggi
Beton
(m) (m) (m2)

BETON A

1 0.70 19.600 27.440


0.221
0.358

0.700

0.389

0.400

BETON B

0.400

1 7.862 0.40 7.862 6.290

7.626

0.358

BETON C
1 0.40 19.600 15.680

0.400

0.400 0.400

0.400

BETON D

1 0.16 2.379 0.761

0.400

0.400 0.400

0.400
NGAN TOTAL Jumlah Tanggul Volume Total
99.580 106 21,111.055

Volume
Total

(m2)

54.880

12.579

31.360
0.761
PERHITUNGAN

PERHITUNGAN
Panjang VOLUME
No. SKETSA BETON Luas
Pot.
(m') (m3)

BETON A

1 0.22 19.600 4.261


0.221
0.358

0.700

0.389

0.400

BETON B

0.400

1 7.862 2.77 0.400 1.108

7.626

0.358

BETON C
1 0.16 19.600 3.136

0.400

0.400 0.400

0.400

BETON D

1 0.16 2.379 0.381

0.400

0.400 0.400

0.400
NGAN TOTAL Jumlah Tanggul Volume Total
17.391 106 3686.8408147

Volume
Total

(m3)

8.521

2.217

6.272
0.381
PERHITUNGAN

PERHITUNGAN
Panjang Jumlah Total
No. SKETSA PEMBESIAN DIA.
Pot. Btg Panjang
(m) (bh) (m)

BETON A
1 Tulangan Memanjang 13 19.776 6 118.656
D 13-300 19.500
0.078 0.078
0.060 0.060
2 Begel 10 1.948 66 128.548
D 10-300 0.142
0.316

0.700

0.389

0.400

BETON B
1 Tulangan Memanjang 13 7.738 4 30.952
D13 - 300 7.462
0.078 0.078
0.060 0.060
2 Begel 10 1.136 25 28.390
D 10-300
0.310

0.258 0.258

0.310

BETON C

1 Tulangan Memanjang 13 19.776 4 79.104


D13 - 300 19.500
0.078 0.078
0.060 0.060
2 Begel 10 1.240 66 81.840
D 10-300
0.310

0.310 0.310

0.310

BETON D
1 Tulangan Memanjang 13 2.486 4 9.944
D13 - 300 2.210
0.078 0.078
0.060 0.060

2 Begel 10 1.240 7 8.680


D 10-300
0.310

0.310 0.310

0.310
Volume Jumlah Tanggul Total
1,115.268 106 118218.43816
ERHITUNGAN
VOLUME
Berat Ket.

(kg) (kg)

405.743 2
1.042 123.600

0.617 79.271

396.657 2
1.042 32.242

0.617 17.507

297.158 2

1.042 82.400
0.617 50.468

15.711
1.042 10.358

0.617 5.353
Lebar (m) Tebal (m) Jarak (m) Volume (m3)
2.6 0.2 2100 2184
Plasteran Pas. Batu A
Panjang Lebar Volume
19.6 7.83 306.787
Plasteran Pas. Batu B
Panjang Lebar Volume
19.6 2.38 46.62644 Volume Total
Total Volume 706.827 74923.66
Volume Total
13340.186496

14,230,390,163.26
432,411,951.19
100,632,831,791.41
1,922,335,204.50
117,217,969,110.36

Pas. Batu A
Panjang Lebar Tebal Volume
19.6 7.83 0.4 122.7148
Pas. Batu B
Panjang Lebar Tebal Volume
19.6 2.38 0.4 3.136
Total Volume 251.7016 26,680.37
Pas. Batu B

Panjang Lebar Tebal Volume


19.6 2.38 0.4 3.136
Geotekstle A Geotekstle B
Panjang (m) Lebar (m) Volume (m2) Panjang (m) Lebar (m)
19.6 7.626 298.9392 19.6 2.3789
Geotekstle B
Volume Total (m2)
Volume (m2)
46.62644 73,259.92
SPESIFIKASI DAN HARGA ALAT
Umur
No. Alat Merek Type Tahun Ekonomis
1 Dump Truck Nissan DND3253CWB459H 2015 4
2 Excavator Komatsu PC200-8M0 2016 4
3 Bulldozer CATERPILLAR 854G 2018 5
4 Motor Greder Komatsu S6D95L 2013 3
5 Wheel Loader Komatsu WA180-3 2018 5
6 Vibrator Roller Bomag BW 211 D-50 2016 4
7 Water tank VELDLION EQ1040 2018 5
8 concrete Mixer Tiger AR04-12 2017 4
9 Truck Mixer Howo Howo KLS-12 2018 5
NB:
1 Cubic Yard = 0.764 554 858 Cubic Meters
Yd3 Faktor M3
1 0.764554858 0.764554858

> Jam Kerja / Hari 8 Jam


KASI DAN HARGA ALAT
Jam kapasitas Dimensi Blade
Harga HP
Penggunaan Bucket (m3) Blade (m3) Lebar (m)
2100 Rp 971,250,000 344 13.5 - -
2100 Rp 1,025,641,000 148 1 - -
2100 Rp 916,299,824 800 - 25.4 2.179
2100 Rp 532,150,000 135.4 - 0.227 2.395
2100 Rp 1,750,000,000 110 1.6 - -
2100 Rp 1,500,000,000 47 - - 2.134
2100 Rp 332,157,525 102 5 - -
2100 Rp 15,000,000 8.5 500 - -
2100 Rp 753,536,000 336 9 336

KETERANGAN UMUR ALAT


2018 - 2019 5
2015 - 2017 4
20012 - 2014 3
< 2012 2
Dimensi Blade
Tinggi (m)
-
-
6.321
3.49
-

-
-
Jam
Umur Harga Dasar Pemilikan
Tenaga Kerja /
Ekonomis (HDP)
No Jenis Peralatan Tahun

Pw A W B

1 Dump Truck 344 4 2,100 Rp 971,250,000


2 Excavator 148 4 2,100 Rp 1,025,641,000
3 Bulldozer 800 5 2,100 Rp 916,299,824
4 Motor Greder 135.4 3 2,100 Rp 532,150,000
5 Wheel Loader 110 5 2,100 Rp 1,750,000,000
6 Vibrator Roller 47 4 2,100 Rp 1,500,000,000
7 Water Tank 102 5 2,100 Rp 332,157,525
8 Concrete Mixer 8.5 4 2,100 Rp 15,000,000
9 Truck Mixer Howo 336 5 2,100 753,536,000
RINGKASAN ANALISA PERALATAN

Biaya Pemilikan
Faktor Angsuran Asuransi Biaya Bahan Baka
Nilai Sisa Modal Pengembalian dll Past 0,125 - 0,175 Lt
(20% * HDP) Modal
Faktor Solar : Rp. 5.500
Suku Bunga i = 16%
Rp 0 Bensin : Rp. 6.400
C D E F G H
20% x B ix(1+i)^A/(1+i)^A-1 (B-C) x D / W (0,002xB)/W (E+F) 0,125 x Pw x M
Rp 194,250,000 0.3090313 Rp 114,342 Rp 925 Rp 115,267 0.125
Rp 205,128,200 0.3090313 Rp 120,745 Rp 977 Rp 121,722 0.125
Rp 183,259,965 0.2675038 Rp 93,377 Rp 873 Rp 94,249 0.125
Rp 106,430,000 0.3797802 Rp 76,990 Rp 507 Rp 77,497 0.125
Rp 350,000,000 0.2675038 Rp 178,336 Rp 1,667 Rp 180,003 0.125
Rp 300,000,000 0.3090313 Rp 176,589 Rp 1,429 Rp 178,018 0.125
Rp 66,431,505 0.2675038 Rp 33,849 Rp 316 Rp 34,165 0.125
Rp 3,000,000 0.3090313 Rp 1,766 Rp 14 Rp 1,780 0.125
Rp 150,707,200 0.2675038 Rp 76,790 Rp 718 Rp 77,508 0.125
TAN

Biaya Operasional

Bahan Bakar Pelumas Perawatan & Pembantu


0,125 - 0,175 Ltr/HP Perbaikan Operator Operator
Solar : Rp. 5.500 (Ms) 0,01-0,02 ltr/HP
Bensin : Rp. 6.400 (Mb) Rp/ltr 32.000 (Mp) 12,5% - 17,5 %
H I K L M
0,125 x Pw x Ms 0,01 x Pw x Mp ( 12,5 x B ) / W
s Rp 236,500 0.01 110,080.00 12.5 57,812.50 s 10,714.29 10,714.29
s Rp 101,750 0.01 47,360.00 12.5 61,050.06 O 14,285.71 10,714.29
s Rp 550,000 0.01 256,000.00 12.5 54,541.66 O 14,285.71 10,714.29
s Rp 93,088 0.01 43,328.00 12.5 31,675.60 PO 10,714.29 10,714.29
s Rp 75,625 0.01 35,200.00 12.5 104,166.67 PO 10,714.29 10,714.29
s Rp 32,313 0.01 15,040.00 12.5 89,285.71 O 14,285.71 10,714.29
s Rp 70,125 0.01 32,640.00 12.5 19,771.28 s 10,714.29 10,714.29
s Rp 5,844 0.01 2,720.00 12.5 892.86 s 10,714.29 10,714.29
s Rp 556,416 0.01 151,200.00 12.5 44,853.33 17,125.00 16,500.00
Biaya Biaya Alat
Operasi per Jam
(Rp) (Rp)

P S
H+I+K+L+M G+P
425,821.07 541,087.65
235,160.06 356,881.69
885,541.66 979,790.95
189,519.67 267,016.97
236,420.24 416,422.75
161,638.21 339,656.10
143,964.85 178,130.10
30,885.18 32,665.36
786,094.33 863,601.97
URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN : GALIAN BIASA


SATUAN PEMBAYARAN : M3

NO U R A I A N KODE KOEF.

I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi Pekerjaan :
3 Kondisi jalan : Mulus
4 Jam kerja efektif per - hari Tk 8.00
5 Faktor Pengembangan Bahan Fk 1.00

II URUTAN KERJA
1 Galian tanah umumnya berupa pelebaran badan jalan
2 Penggalian dilakukan dengan Excavator.
###
3 Hasil galian dimuat kedalam Dump Truck dengan Exca-
vator
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh ….. L 3.50

III PEMAKAIAN BAHAN, ALAT DAN TENAGA

1 BAHAN

Tidak ada bahan yang digunakan

2 ALAT
2a. EXCAVATOR (E-10)
Kapasitas Alat / Bucket V 1.00
Faktor Bucket Fb 1.00
Faktor koreksi efisiensi kerja Fk 0.69
Faktor koreksi akibat kecakapan operator Fo 0.85
Faktor koreksi akibat kedalaman Fd 1.00
Faktor koreksi efisiensi waktu Ft 0.85
Faktor Koreksi FK 0.50

Waktu Siklus Ts1


- Menggali / memuat ke Dump Truck T1 18.00
- Lain - lain T2 30.00
Ts1 48.00
V x FK x 3600
Kap. Prod./jam = Q1 37.389375
Fk x Ts1
Koefisien Alat / M3 = 1 : Q1 (E-10) 0.0267

2b. DUMP TRUCK (E-08)


Kapasitas Bak V 13.50
Faktor Koreksi Efisiensi Kerja Fk 0.69
Faktor Koreksi Akibat Efisiensi Waktu Ft 0.85
Faktor Koreksi Akiba Kecakapan Operator Fo 0.85
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 35.00
Waktu Siklus : Ts2
- Waktu Tempuh Isi = ( L : v1 ) x 60 T1 10.50
- Waktu Tempuh Kosong = ( L : v2 ) x 60 T2 6.00
- Waktu Muat = ( V : Q1 ) x 60 T3 21.6639
- Waktu Lain - lain T4 4.00
Ts2 42.1639

URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN : GALIAN BIASA


SATUAN PEMBAYARAN : M3

NO U R A I A N KODE KOEF.

Kapasitas Produksi / Jam = ( VxFax60) : (FkxTs2) Q2 13.26


Koefisien Alat / m3 = 1 : Q2 (E-08) 0.0754

2c. BULLDOZER D61EX


Faktor Koreksi Akibat Efisiensi Kerja Fk 0.69
Lebar Efektif Blade Lb 2.18
Tinggi Blade Tb 6.321
Faktor Blade Fb 0.90
Produksi/siklus = Lb x Tb2 x Fb q 3
Jarak Gusur Lg 20
Kecepatan Maju Fv 3.00
Fv 50.00
Kecepatan Mundur Rv 5.00
Rv 83.33
Waktu Untuk Ganti Gigi Z 0.06
Waktu Siklus = (Lg/Fv)+(Lg/Rv)+Z Ts3 0.70

Produksi / Jam = ( q x 60 x Fa ) / Ts3 Q3 174.38


Koefisien Alat = 1 : Q3 D61EX 0.0057

2d. ALAT BANTU


Diperlukan alat bantu kecil, seperti :
- Sekop dan Keranjang

3. TENAGA
Produksi menentukan : EXCAVATOR Q4 37.39
Produksi Galian / hari = Tk x Q1 Qt 299.115
Kebutuhan tenaga :
- Pekerja P 5
- Tukang Tb 0
- Mandor M 1

Koefisien tenaga / M3 :

- Pekerja = (Tk x P) : Qt L-01 0.1170


- Tukang = (Tk x Tb) : Qt L-02 0.0000
- Mandor = (Tk x M) : Qt L-03 0.0234

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Analisa Harga Satuan
Didapat Harga Satuan Pekerjaan :

Rp. 87,470.76 / m3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 4 Bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan 17,678.57 m3
N

SATUAN KET.

jam asumsi
- Lanau

Km
1266
3066

lempung
M3
- lamp 6
lamp 3
lamp 4
lamp 5
lamp 2

- dihitung

detik lamp. 7
detik asumsi
detik
37.389375
M3 / jam

Jam

M3
- Lamp 3
- Lamp 2
- lamp 4
Km/Jam asumsi
Km/Jam asumsi

Menit
Menit
Menit
Menit asumsi
Menit

Bersambung …

SATUAN KET.

m3 / jam
jam

- lamp 3
m
m
- Lamp.1
m3
m Produksi menentukan: DUMP TRUCK
Km/jam asumsi Produksi Galian / hari = Tk x Q2
m/menit Kebutuhan tenaga :
Km/jam asumsi - Pekerja
m/menit - Tukang
menit asumsi - Mandor
menit

m3 / jam
jam

M3 / jam
M3
orang
orang
orang

Jam
Jam
Jam
Q2 13.26
Qt 106.0433

P 2 orang
Tb 0 orang
M 1 orang
URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN : TIMBUNAN BIASA


SATUAN PEMBAYARAN : M3

NO U R A I A N KODE KOEF. SATUAN

4 HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam Analisa Harga Satuan
Didapat Harga Satuan Pekerjaan :

Rp. 99,006.22 / m3

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 2 Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan 2,200,000.00 M3
KET.
ANALISA HARGA SATUAN
NO. MATA PEMBAYARAN : 3.1 (1)
JENIS PEKERJAAN : GALIAN BIASA

PERKIRAAN KUANTITAS :
SATUAN PENGUKURAN : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :

Perkiraan Harga Satuan Jumlah Harga


No. Uraian Satuan
Kuantitas (Rp) (Rp)

A ` TENAGA
1 Mandor (L03) jam 0.0403 21,714.29 876.05
2 Tukang (L02) jam 0.0000 19,357.14 0.00
3 Pekerja (L01) jam 0.2017 12,071.43 2,435.06

JUMLAH HARGA TENAGA 3,311.11


B BAHAN
( Tidak ada bahan yang digunakan )

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Alat Bantu LS 1.0000 5,000.00 5,000.00
2 Excavator jam 0.0297 356,881.69 10,595.24
3 Dump Truck jam 0.0997 541,087.65 53,969.12
4 Bulldozer jam 0.0017 979,790.95 1,636.06

JUMLAH HARGA PERALATAN 71,200.43

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 74,511.54


E BIAYA UMUM DAN KEUNTUNGAN ( 10% x D ) 7,451.15
F HARGA SATUAN PEKERJAAN ( D + E ) 81,962.69
Bersambung…
ANALISA HARGA SATUAN
NO. MATA PEMBAYARAN : 3.2 (1)
JENIS PEKERJAAN : TIMBUNAN BIASA

PERKIRAAN KUANTITAS :
SATUAN PENGUKURAN : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :

Perkiraan Harga Satuan Jumlah Harga


No. Uraian Satuan
Kuantitas (Rp) (Rp)

A TENAGA
1 Mandor (L03) jam 0.0487 21,714.29 1057.77
2 Tukang (L02) jam 0.0000 15,714.29 0.00
3 Pekerja (L01) jam 0.2923 12,071.43 3528.23

JUMLAH HARGA TENAGA 4,586.00


B BAHAN
1 Material Tanah Timbunan m3 1.5900 15,000.00 23,850.00

JUMLAH HARGA BAHAN 23,850.00


C PERALATAN
1 Alat Bantu LS 1.0000 5,000.00 5,000.00
2 Wheel Loader jam 0.0192 676,602.05 12,989.49
3 Motor Grader jam 0.0025 519,743.15 1,291.27
4 Vibratory Roller jam 0.0038 639,599.14 2,461.32
5 Dump Truck jam 0.3825 537,812.37 205,693.46
6 Water Tank Truck jam 0.0029 638,146.14 1859.81

JUMLAH HARGA PERALATAN 229,295.35

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 257,731.35


E BIAYA UMUM DAN KEUNTUNGAN ( 10% x D ) 25,773.14
F HARGA SATUAN PEKERJAAN ( D + E ) 283,504.49
URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN : Pasangan Batu


SATUAN PEMBAYARAN : M3

No. URAIAN KODE KOEF.

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.50
5 Jam kerja efektif per-hari Tk 8.00
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20
: - Volume Pasir Ps 80
7 Perbandingan Batu & Mortar :
- Batu Bt 60
- Mortar (campuran semen & pasir) Mr 40
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40
- Batu D2 1.60
- Adukan (mortar) D3 1.80
- Pasir D4 1.67
- Semen Portland D5 1.44

II. URUTAN KERJA


1 Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan Concrete Mixer
2 Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Batu Kali -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.0800
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1120
x {D5 x (1000)} (M12) 161
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4829
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00
- Mengaduk T2 3.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00

No. URAIAN KODE KOEF.

Kap. Prod. / jam = V x Fa x 60 Q1 2.490


1000 x Ts

Koefisien Alat / M3 = 1 : Q1 (E06) 0.4016

2.b. WATER TANK TRUCK (E23)


Volume Tangki Air V 25
Kebutuhan Air/m material padat
3
Wc 0.08
Pengisian Tangki / jam N 3.00
Faktor koreksi akibat efisiensi waktu Ft 0.75
Faktor koreksi akibat efisiensi kerja Fk 0.61
faktor koreksi akibat kecakapan operator Fo 0.8
Faktor Koreksi Fk 0.366

Kap. Produksi / Jam = ( V x n x Fk ) : Wc Q5 343.125


Koefisien Alat / m3 = 1 : Q5 E-23 0.0029144
3. TENAGA
Produksi menentukan : CONCRETE MIXER Q1 2.49
Produksi agregat / hari = Tk x Q1 Qt 19.92
Kebutuhan tenaga :
- Pekerja P 7.00
- Tukang Batu T 1.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 2.8112
- T. Batu (Tk x T) : Qt - 0.4016
- Mandor = (Tk x M) : Qt - 0.4016
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 909,626.51 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 6 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 9,156.45 M3

Berlanjut k

ANALISA HARGA SATUAN


NO. MATA PEMBAYARAN : 3.4 (1)
JENIS PEKERJAAN : PASANGAN BATU

PERKIRAAN KUANTITAS
SATUAN PENGUKURAN : Meter Kubik TOTAL HARGA ( Rp )
% THDP BIAYA PROYEK

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R
A. TENAGA

1. Pekerja (L01) Hari 2.8112 84,500.00


2. Tukang Batu (L02) Hari 0.4016 135,500.00
3. Mandor (L03) Hari 0.4016 152,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1. Batu (M02) M3 1.0800 164,000.00


2. Semen (M12) Kg 161.00 1,387.50
3. Pasir (M01) M3 0.4829 148,000.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Concrete Mixer (E06) Jam 0.4016 4,666.48
2. Water Tank Truck (E23) Jam 0.0029 25,447.16
6. Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
URAIAN ANALISA HARGA SATUAN

SATUAN KET

KM
jam
% Spec.
% Spec.

%
%

ton/M3
ton/M3
ton/M3
ton/M3
ton/M3

M3 Lepas
M3
Kg
M3
liter
-

menit
menit
menit
menit
menit

SATUAN KET

M3

jam

m3
m3 asumsi
kali
lamp.2
lamp. 3
lamp. 4

m3/jam
jam

M3/jam
M3

orang
orang
orang
hari
hari
hari

Berlanjut ke hal. berikut.

SA HARGA SATUAN

:
:
:

JUMLAH
HARGA
(Rp.)
237,550.20
54,417.67
61,044.18

353,012.05

177,120.00
223,387.50
71,465.39

471,972.89

1,874.09
74.16
0.00

1,948.25

826,933.19
82,693.32
909,626.51
ANALISA HARGA SATUAN
NO. MATA PEMBAYAR: 3.1 (1)
JENIS PEKERJAAN : GALIAN BIASA

PERKIRAAN KUANTITAS :
SATUAN PENGUKUR : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :

Perkiraan Harga Satuan


No. Uraian Satuan
Kuantitas (Rp)

A TENAGA
1 Mandor (L03) jam 0.0403 23,571.00
2 Tukang (L02) jam 0.0000 15,714.00
3 Pekerja (L01) jam 0.2017 11,000.00

JUMLAH HARGA TENAGA


B BAHAN
( Tidak ada bahan yang digunakan )

JUMLAH HARGA BAHAN


C PERALATAN
1 Alat Bantu LS 1.0000 2,500.00
2 Excavator jam 0.0403 356,881.69
3 Dump Truck jam 0.0955 541,087.65
4 Bulldozer jam 0.007939 979,790.95

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E BIAYA UMUM DAN KEUNTUNGAN ( 10% x D )
F HARGA SATUAN PEKERJAAN ( D + E )
ANALISA HARGA SATUAN
NO. MATA PEMBAYAR: 3.2 (1)
JENIS PEKERJAAN : TIMBUNAN BIASA

PERKIRAAN KUANTITAS :
SATUAN PENGUKUR : Meter Kubik TOTAL HARGA ( Rp ) :
% THDP BIAYA PROYEK :

Perkiraan Harga Satuan


No. Uraian Satuan
Kuantitas (Rp)

A TENAGA
1 Mandor (L03) jam 0.0487 23,571.00
2 Tukang (L02) jam 0.0000 15,714.00
3 Pekerja (L01) jam 0.2923 11,000.00

JUMLAH HARGA TENAGA


B BAHAN
1 Material Tanah Timbunan m3 1.5900 15,000.00
( Digunakan material hasil galian )

JUMLAH HARGA BAHAN


C PERALATAN
1 Alat Bantu LS 1.0000 5,000.00
2 Wheel Loader jam 0.0487 416,422.75
3 Motor Grader jam 0.0020 267,016.97
4 Vibratory Roller jam 0.0038 339,656.10
6 Dump Truck jam 0.0641 541,087.65

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E BIAYA UMUM DAN KEUNTUNGAN ( 10% x D )
F HARGA SATUAN PEKERJAAN ( D + E )
ATUAN

Jumlah Harga
(Rp)

950.95
0.00
2,218.93

3,169.89

0.00

2,500.00
14,398.13
51,672.33
7,778.52

76,348.98

79,518.87
7,951.89
87,470.76
ATUAN

Jumlah Harga
(Rp)

1148.22
0.00
3215.07

4,363.29

23,850.00

23,850.00

5,000.00
20,285.30
539.55
1,304.62
34,662.89

61,792.36

90,005.66
9,000.57
99,006.22
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Land Clearing

Satuan Pengukuran : Meter Persegi

No. Uraian Satuan Koefisien Harga Jumlah


Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja OH 0.06 108,000.00 6,480.00
2 Mandor OH 0.006 130,000.00 780.00
Jumlah Harga Tenaga Kerja 7,260.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Alat bantu LS 1.000 5000 5,000.00
Jumlah Harga Perlatan 5,000.00
D Jumlah Harga Tenaga, Bahan dan
Peralatan (A+B+C) 12,260.00
E Overhead + Profit (Contoh 15%) 15% x D 1,839.00
F Harga Satuan Pekerjaan per - m2 (D+E) 14,099.00
136345.5

1,922,335,204.50
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Galian Biasa

Satuan Pengukuran : Meter Kubik

No. Uraian Satuan Koefisien Harga Jumlah


Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja OH 0.1170 108,000.00 12,637.28
2 Mandor OH 0.0234 130,000.00 3,042.31
Jumlah Harga Tenaga Kerja 15,679.59
B Bahan
Jumlah Harga Bahan
C Peralatan
Excavator Jam 0.0267 356,881.69 9,545.00
Dump Truck Jam 0.0754 541,087.65 40,820.13
Bulldozer Jam 0.0057 979,790.95 5,618.56
Alat Bantu Ls 1.0000 5,000.00 5,000.00
Jumlah Harga Perlatan 60,983.69

D Jumlah Harga Tenaga, Bahan dan


Peralatan (A+B+C) 76,663.28
E Overhead + Profit (Contoh 15%) 15% x D 11,499.49
F Harga Satuan Pekerjaan per - m2 (D+E) 88,162.77

ANALI SA HAR GA SAT UAN


Jenis Pekerjaan : Timbunan Biasa

Satuan Pengukuran : Meter Kubik

No. Uraian Satuan Koefisien Harga Jumlah


Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja OH 0.2896 108,000.00 31,275.00
2 Mandor OH 0.0483 130,000.00 6,274.31
Jumlah Harga Tenaga Kerja 37,549.31
B Bahan
1 Material tanah timbunan m3 1.39 106300 147,757.00
Jumlah Harga Bahan 147,757.00
C Peralatan
Wheel Loader Jam 0.0483 416,422.75 20,098.18
Dump Truck Jam 0.0641 541,087.65 34,662.89
Motor Grader Jam 0.0021 267,016.97 561.09
Vibrator Roller Jam 0.0028 339,656.10 936.26
Water Tank Truck Jam 0.0071 178,130.10 1,266.70
Alat Bantu Ls 1.0000 5,000.00 5,000.00
Jumlah Harga Perlatan 62,525.12
D Jumlah Harga Tenaga, Bahan dan
Peralatan (A+B+C) 247,831.43
E Overhead + Profit (Contoh 15%) 15% x D 37,174.71
F Harga Satuan Pekerjaan per - m2 (D+E) 285,006.14
432411951.18827
100,632,831,791.41
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pasangan Geotekstil

Satuan Pengukuran : Meter Persegi

No. Uraian Satuan Koefisien Harga Jumlah


Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja OH 0.2400 108,000.00 25,920.00
2 Tukang tembok/gali OH 0.0480 130,000.00 6,240.00
3 Mandor OH 0.0240 130,000.00 3,042.31
Jumlah Harga Tenaga Kerja 32,160.00
B Bahan
1 Geotektstil m2 1.1000 6,000.00 6600
Jumlah Harga Bahan
C Peralatan
Alat Bantu Ls 1.0000 5,000.00 5,000.00
Jumlah Harga Perlatan 5,000.00

D Jumlah Harga Tenaga, Bahan dan


Peralatan (A+B+C) 37,160.00
E Overhead + Profit (Contoh 15%) 15% x D 5,574.00
F Harga Satuan Pekerjaan per - m2 (D+E) 42,734.00
3,130,689,237
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pasangan Batu

Satuan Pengukuran : Meter Kubik

No. Uraian Satuan Koefisien Harga Jumlah


Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja OH 1.8000 108,000.00 194,400.00
2 Tukang Batu OH 0.9000 130,000.00 117,000.00
3 Mandor OH 0.1800 130,000.00 3,042.31
Jumlah Harga Tenaga Kerja 311,400.00
B Bahan
1 Batu kali m3 1.080 241,900.00 261,252.00
2 Semen portland kg 161.000 1,700.00 273,700.00
3 Pasir m3 0.483 140,000.00 67,602.40
Jumlah Harga Bahan 602,554.40
C Peralatan
1 Concrete mixer Jam 0.4016 32,665.36 13,118.62
2 Water trank truck Jam 0.0029 178,130.10 519.14
Jumlah Harga Perlatan 13,637.76

D Jumlah Harga Tenaga, Bahan dan


Peralatan (A+B+C) 927,592.15
E Overhead + Profit (Contoh 15%) 15% x D 139,138.82
F Harga Satuan Pekerjaan per - m2 (D+E) 1,066,730.98
28,460,780,327
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Siaran

Satuan Pengukuran : Meter persegi

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.300 108,000.00 32,400.00
2 Tukang Batu OH 0.150 108,000.00 16,200.00
3 Kepala Tukang OH 0.015 130,000.00 1,950.00
4 Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 54450
B. BAHAN
1 Pasir pasang m3 0.018 224,000.00 4,032.00
2 Semen Portland kg 4.840 1,700.00 8,228.00
JUMLAH HARGA BAHAN 12260
C. PERALATAN
1 Alat Bantu Ls 1 5,000.00 5,000.00
JUMLAH HARGA PERALATAN 5,000.00
D. Jumlah harga tenaga, bahan dan peralatan 71,710.00
E. Overhead & Profit 15% x D 10,756.50
F. Harga satuan pekerjaan (D+E) 82,466.50
74923.658 6,178,691,823
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Dewatering

Satuan Pengukuran : Meter

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.020 108,000.00 2,160.00
2 Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 2,810.00
B. BAHAN
1 Karung plastik/bagor bh 1.000 2,000.00 2,000.00
2 Tali Rapia/Plastik m 2.000 500.00 1,000.00
3 Sewa pasir (50% harga pasir) m3 0.035 70,000.00 2,450.00
4 Solar ltr 72.600 5,150.00 373,890.00
5 Oli ltr 0.300 55,000.00 16,500.00
JUMLAH HARGA BAHAN 395,840.00
C. PERALATAN
1 Pompa air diesel kW Bh 1.200 350000 420000
1 Alat Bantu Ls 1.000 5000 5000
JUMLAH HARGA PERALATAN 420000
D. Jumlah harga tenaga, bahan dan peralatan 818,650.00
E. Overhead & Profit 15% x D 122,797.50
F. Harga satuan pekerjaan (D+E) 941,447.50
3,954,079,500.00
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pekerjaan Beton K-250

Satuan Pengukuran : Meter Kubik

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 1.323 108,000.00 142,884.00
2 Tukang Batu OH 0.189 130,000.00 24,570.00
3 Kepala Tukang OH 0.019 130,000.00 2,470.00
4 Mandor OH 0.132 130,000.00 17,160.00
JUMLAH TENAGA KERJA 167,454.00
B. BAHAN
1 Semen Portland kg 384 1,700.00 652,800.00
2 Pasir beton kg 692 167.14 115,662.86
3 Kerikil kg 1039 130.56 135,647.22
4 Air ltr 215 5.00 1,075.00
JUMLAH HARGA BAHAN 905,185.08
C. PERALATAN
1 Concrete Mixer jam 0.402 32,665.36 13,118.41
2 Water tank truck jam 0.030 178,130.10 5,395.56
3 Alat Bantu Ls 1.000 5000 5000
JUMLAH HARGA PERALATAN 23,513.97
D. Jumlah harga tenaga, bahan dan peralatan 1,096,153.05
E. Overhead & Profit 15% x D 164,422.96
F. Harga satuan pekerjaan (D+E) 1,260,576.00

-
4,647,543,064.82
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Bekisting

Satuan Pengukuran : Meter Persegi

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.200 108,000.00 21,600.00
2 Tukang Kayu OH 0.500 108,000.00 54,000.00
3 Kepala Tukang OH 0.050 130,000.00 6,500.00
4 Mandor OH 0.01 130,000.00 1,300.00
JUMLAH TENAGA KERJA 83,400.00
B. BAHAN
1 Multiflex 12 mm atau 18 mm lbr 0.350 217,200.00 76,020.00
2 Kaso 5/7 cm m3 0.020 3,000,000.00 60,000.00
3 Paku 5cm dan 7 cm kg 0.250 27,700.00 6,925.00
4 Minyak Bekisting L 0.200 13,900.00 2,780.00
JUMLAH HARGA BAHAN 145,725.00
C. PERALATAN
JUMLAH HARGA PERALATAN
D. Jumlah harga tenaga, bahan dan peralatan 229,125.00
E. Overhead & Profit 15% x D 34,368.75
F. Harga satuan pekerjaan (D+E) 263,493.75
21,111.05 5,562,631,042.08
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pembesian

Satuan Pengukuran : Kilogram

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.700 108,000.00 75,600.00
2 Tukang Besi OH 0.700 108,000.00 75,600.00
3 Kepala Tukang OH 0.070 130,000.00 9,100.00
4 Mandor OH 0.040 130,000.00 5,200.00
JUMLAH TENAGA KERJA 165,500.00
B. BAHAN
1 Besi Beton Ulir kg 105 9,703.53 1,018,870.19
2 Kawat Beton kg 1.5 27,700.00 41,550.00
JUMLAH HARGA BAHAN 1,060,420.19
C. PERALATAN
1 Mesin Potong Besi Hari 0.050 295000 14,750
JUMLAH HARGA PERALATAN 14750
D. Jumlah harga tenaga, bahan dan peralatan 1,240,670.19
E. Overhead & Profit 15% x D 186,100.53
F. Harga satuan pekerjaan (D+E) 1,426,770.72
168,670,606,262.94
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Pengecoran

Satuan Pengukuran : Meter Kubik

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 1.150 108,000.00 124,200.00
2 Tukang Batu OH 0.200 108,000.00 21,600.00
3 Kepala Tukang OH 0.020 130,000.00 2,600.00
4 Mandor OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 156,200.00
B. BAHAN
1 Semen Portland kg 247 1,700.00 419,900.00
2 Pasir beton kg 869 163.14 141,771.14
3 Kerikil kg 999 130.56 130,425.00
4 Air ltr 215 5.00 1,075.00
JUMLAH HARGA BAHAN 693,171.14
C. PERALATAN
1 Truck Mixer Jam 0.200 863,601.97 172,720.39
JUMLAH HARGA PERALATAN 172720.394687881
D. Jumlah harga tenaga, bahan dan peralatan 1,022,091.54
E. Overhead & Profit 15% x D 153,313.73
F. Harga satuan pekerjaan (D+E) 1,175,405.27
4,936,702,127.89
ANALI SA HAR GA SAT UAN
Jenis Pekerjaan : Jalan Inspeksi

Satuan Pengukuran : Meter Kubik

Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
1 2 3 4 5 6
A. TENAGA
1 Pekerja OH 0.023 108,000.00 2,527.20
2 Mandor OH 0.0016 130,000.00 208.00
JUMLAH TENAGA KERJA 2,735.20
B. BAHAN
1 Sirtu m3 1.200 210,000.00 252,000.00
JUMLAH HARGA BAHAN 252,000.00
C. PERALATAN
1 Bulldozer Jam 0.013 979,790.95 12,247.39
2 Vibro Roller Jam 0.025 339,656.10 8,491.40
3 Water Tank Truck Jam 0.025 178,130.10 4,453.25
JUMLAH HARGA PERALATAN 25,192.04
D. Jumlah harga tenaga, bahan dan peralatan 279,927.24
E. Overhead & Profit 15% x D 41,989.09
F. Harga satuan pekerjaan (D+E) 321,916.33
703,065,261
REKAPITULASI

No URAIAN PEKERJAAN VOLUME

I PEKERJAAN LAND CLEARING 136,345.50


II PEKERJAAN GALIAN 4,904.70
III PEKERJAAN TIMBUNAN 353,090.05
IV PEKERJAAN GEOTEKSTILE 73,259.92
V PEKERJAAN PASANGAN BATU 26,680.37
VI PEKERJAAN PLESTERAN 74,923.66
VII PEKERJAAN DEWATERING 4,200
VIII PEKERJAAN BETON
A. BETON SEGAR 3,686.84
B. BEKISTING 21,111.05
C. PEMBESIAN 118,218.44
D. PENGECORAN 3,686.84
IX PEKERJAAN JALAN INSPEKSI 2,184

JUMLAH BIAYA PEKERJAAN


PAJAK PERTAMBAHAN NILAI ( PPN ) = 15%
JUMLAH TOTAL BIAYA PEKERJAAN
DIBULATKAN
TERBILANG
TIGA RATUS TUJUH PULUH DELAPAN MILYAR TUJUH RATUS JUTA RUPIAH
HARGA SATUAN BIAYA

Rp14,099 Rp 1,922,335,204.50
Rp88,163 Rp 432,411,951.19
Rp285,006 Rp 100,632,831,791.41
Rp42,734 Rp 3,130,689,236.67
Rp1,066,731 Rp 28,460,780,326.53
Rp82,467 Rp 6,178,691,822.67
Rp941,448 Rp 3,954,079,500.00
Rp -
Rp1,260,576 Rp 4,647,543,064.82
Rp263,494 Rp 5,562,631,042.08
Rp1,426,771 Rp 168,670,606,262.94
Rp1,175,405 Rp 4,333,532,117.91
Rp941,448 Rp 2,056,121,340.00

Rp 329,982,253,660.70
Rp 49,497,338,049.11
Rp 379,479,591,709.81
Rp 378,700,000,000.00

UJUH RATUS JUTA RUPIAH


REKAPITULASI

No URAIAN PEKERJAAN

I PEKERJAAN LAND CLEARING


II PEKERJAAN GALIAN
III PEKERJAAN TIMBUNAN
IV PEKERJAAN GEOTEKSTILE
V PEKERJAAN PASANGAN BATU
VI PEKERJAAN PLESTERAN
VII PEKERJAAN DEWATERING
VIII PEKERJAAN BETON
IX PEKERJAAN JALAN INSPEKSI

JUMLAH BIAYA PEKERJAAN


PAJAK PERTAMBAHAN NILAI ( PPN ) = 15%
JUMLAH TOTAL BIAYA PEKERJAAN
DIBULATKAN
TERBILANG
TIGA RATUS TUJUH PULUH DELAPAN MILYAR TUJUH RATUS JUTA RUPIAH
BIAYA

Rp 1,922,335,204.50
Rp 432,411,951.19
Rp 100,632,831,791.41
Rp 3,130,689,236.67
Rp 28,460,780,326.53
Rp 6,178,691,822.67
Rp 3,954,079,500.00
Rp 183,214,312,487.74
Rp 2,056,121,340.00

Rp 329,982,253,660.70
Rp 49,497,338,049.11
Rp 379,479,591,709.81
Rp 378,700,000,000.00

UH RATUS JUTA RUPIAH