LANGSIR/100 M

1 2 3 4 6
I BAHAN PASIR
1 Pasir Urug M3 82,500 5,000
2 Sirtu (tidak diayak) M3 83,500 5,000
3 Pasir Pasang/Cor M3 90,000 5,000
4 Tanah Urug M3 55,000 5,000
5 Grosok M3 83,500 5,000
6 Abu batu M3 110,000 5,000

II BAHAN BATU
1 Batu kali pecah 15/20 (tangan) M3 110,000 6,000
2 Batu kali pecah 10/15 (tangan) M3 110,000 6,000
3 Batu kali pecah 5/7 (tangan) M3 121,000 5,000
4 Batu kali pecah 3/5 (mesin) M3 143,000 5,000
5 Batu kali pecah 2/3 (mesin) M3 165,000 5,000
6 Batu kali pecah 1/2 (mesin) M3 137,500 6,000
7 Batu kali pecah 1/1 (mesin) M3 159,500 6,000
8 Batu kali pecah 0,5-1 (mesin) M3 159,500 6,000
9 Batu gunung atau Quarry M3 99,000 6,000
10 Kerikil galian bukit M3 49,500 6,000
11 Batu kali M3 99,000 6,000
12 Kerikil sungai ayak tnp pasir 0,5-1 M3 49,500 6,000

III BAHAN BATU BATA


1 Batu bata merah bh 425
2 Batako bh 2,750
3 Paving stone K.175 tebal 6 cm M2 37,900
4 Paving stone K.200 tebal 6 cm M2 41,200
5 Paving stone K.200 tebal 8 cm M2 46,700
6 Paving stone K.300 tebal 6 cm M2 46,700
7 Paving stone K.300 tebal 8 cm M2 48,900
8 Paving stone K.300 warna t = 6 cm M2 47,800
9 Paving stone K.300 warna t = 8 cm M2 53,300
10 Paving stone K.175 warna t = 6 cm M2 45,000
11 Paving stone K.175 warna t = 8 cm M2 48,000
12 Paving stone K.125 warna t = 6 cm M2 41,000

Hal 1
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
13 Kanstin 10x20x40 K.275 bh 10,000
14 Kanstin 10x20x40 K.300 bh 11,000
15 Roster beton bh 7,000

IV PORTLAND CEMENT (PC) DAN KAPUR


1 Semen Gresik 40 Kg Zak 47,500 250
2 Semen Gresik 50 Kg Zak 59,400 300
3 Semen Holcim 40 Kg Zak 46,200 250
4 Semen Holcim 50 Kg Zak 58,300 300
5 Semen Bosowa 40 Kg Zak 41,800 250
6 Semen Bosowa 50 Kg Zak 51,700 300
7 Semen Putih Tiga Roda Zak 72,600 300
8 Semen Putih Banteng Zak 49,500 300
9 Semen berwarna yiyitan / nat Kg 8,750
10 Kapur bubuk / padam Zak 33,000
11 Kapur Gamping Kg 3,850
12 Dolosit Zak 8,800

V BAHAN BESI
1 Baja Konstruksi Kg 15,950
2 Rangka atap baja ringan (Galvalume) + PPN
M2 207,000
(datar)
3 Besi beton polos Kg 9,900
4 Baja ulir/Tulangan Mutu U-24 Kg 15,400
5 Besi siku 30x30x3 panjang 6 m Ljr 77,000
6 Besi siku 60x60x6 panjang 6 m Ljr 154,000
7 Pipa air Galvanis medium 1/2" Ljr 80,850
8 Pipa air Galvanis Medium 3/4 " Ljr 104,500
9 Pipa air Galvanis medium 1 " Ljr 145,200
10 Pipa air Galvanis medium 1,25 " Ljr 187,000
11 Pipa air Galvanis medium 1,5 " Ljr 379,500
12 Pipa air Galvanis medium 2 " Ljr 352,000
13 Pipa air Galvanis medium 2,5 " Ljr 687,500
14 Pipa air Galvanis medium 3 " Ljr 577,500
15 Pipa air Galvanis medium 4 " Ljr 1,265,000
16 Kawat Beton (bendrat) Kg 13,200
17 Kawat bronjong 3,8 mm Kg 17,600
18 Bronjong kawat (0,5x1x2) 3 lilitan lbr 357,500
19 Kawat nyamuk kasa alumunium M2 16,500
20 Kawat harmonika M2 22,000
21 Kawat biasa (tali) Kg 14,300
22 Paku asbes bh 825

Hal 2
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
23 Paku asbes Kg 13,200
24 Paku pancing bh 1,100
25 Paku eternit Kg 13,200
26 Paku reng Kg 11,550
27 Paku usuk Kg 11,550
28 Paku triplek Kg 13,200

VI TEGEL/KERAMIK
1 Tegel abu-abu 20x20 Cm M2 20,000
2 Keramik 10x20 Cm M2 38,500
3 Keramik 20x20 (lantai) Kw I M2 40,700
4 Keramik 20x25 (dinding) Kw I M2 40,700
5 Keramik Putih 30x30 (lantai) M2 29,700
6 Keramik motip (30x30) Kw I M2 37,400

VII BUIS BETON


1 Buis beton bulat 15 cm M 17,600
2 Buis beton bulat 20 cm M 24,200
3 Buis beton bulat 30 cm M 38,500
4 Buis beton bulat 40 cm M 49,500
5 Buis beton bulat 50 cm M 60,500
6 Buis beton bulat 60 cm M 90,000
7 Buis beton bulat 70 cm M 100,000
8 Buis beton bulat 80 cm M 110,000
9 Buis beton bulat 90 cm M 145,000
10 Buis beton bulat 100 cm M 165,000
11 Buis beton U 20 cm M 13,200
12 Buis beton U 30 cm M 19,800
13 Buis beton U 40 cm M 19,800

VIII BAHAN KAYU/TRIPLEK DAN BAMBU


1 Kayu Jati 10/20 x 3,5m M3 19,000,000
2 Kayu balau M3 6,550,000
3 Kayu bengkirai M3 4,400,000
4 Kayu Kamper 8/12, 6/12.6/15 M3 7,480,000
5 Kayu Kamper 3/30 x 3m M3 8,250,000
6 Kayu kamper 5/7, 4/6, 3/5, 2/3 M3 6,600,000
7 Kayu meranti 8/12,6/12,6/15 M3 4,400,000
8 Kayu merenti 3/30 x 3m M3 4,950,000
9 Kayu meranti 5/7,4/6,3/5,2/3 M3 3,850,000
10 Kayu Meranti (papan begesting) M3 4,400,000

Hal 3
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
11 Kayu randu ( Papan Begisting ) 4m Lbr 8,800
12 Kayu kruing 8/12,6/12,6,15 M3 4,950,000
13 Kayu Kruing 2/20 x 3m M3 5,500,000
14 Kayu bakar M3 75,000
15 Kayu Kruing 5/7,4/6,3/5,2/3 M3 4,400,000
16 List Kayu Polos 1/5 x 2m M 3,300
17 List Kayu Profil 2/5 x2m M 5,500
18 Dolken Kayu Jati D = 0,13 x 3m Bt 84,700
19 Gedeg guling M2 12,100
20 Bambu Bongkotan Bt 12,100
21 Triplek lapis almunium Lbr 79,750
22 Triplek 90.210.3 mm Lbr 35,750
23 Triplek 90.210.4 mm Lbr 39,000
24 Triplek 120.240.2 mm Lbr 34,100
25 Triplek 120.240.3 mm Lbr 38,500
26 Triplek 120.240.4 mm Lbr 56,100
27 Triplek 120.240.6 mm Lbr 66,000
28 Triplek 120.240.9 mm Lbr 99,000
29 Triplek 120.240.12 mm Lbr 132,000
30 Teakwood 122.244.3 mm Lbr 93,500
31 Teakwood 122.244.4 mm Lbr 105,000
32 Plywood 122.244.4 mm Lbr 93,500
33 Plywood 122.244.9 mm Lbr 110,000

IX BAHAN PENUTUP ATAP


1 Genteng lokal ex Mojokembang (mantilian) Bh 990
2 Genteng Nglayur model kr.pilang (kodok) Bh 1,250
3 Genteng bub. Ngayur model kr.pilang (kodok ) Bh 3,300
4 Genteng bub.ex Mojokembang ( mantilian ) Bh 3,150
5 Plat Asbes tebal 4 mm (1.00 x 1.00) / Eternit Lbr 8,800
6 Asbes datar tebal 4mm (60x200) Lbr 18,700
7 Asbes datar tebal 5 mm (60 x200) Lbr 85,250
8 Asbes datar tebal 6 mm (40 x 280) Lbr 73,150
9 Asbes datar tebal 4 mm (60 x 280) Lbr 71,500
10 Asbes gelombang kecil tebal 4 mm (3.00 x 1.05) Lbr 65,000
11 Asbes gelombang kecil tebal 5 mm (3.05 x 1.05) Lbr 25,850
12 Asbes wuwung gelombang besar tebal 5 mm Lbr 40,700
13 Asbes wuwung gelombang kecil tebal 5 mm Lbr 25,850
14 Teak wood tebal 3 mm (1.22 x 2.44) Lbr 88,220
15 Teak wood tebal 4 mm (1.22 x 2.44) Lbr 93,500
16 Playwood tebal 4 mm (1.22 x 2.44) Lbr 47,850

Hal 4
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
17 Playwood tebal 9 mm (1.22 x 2.44) Lbr 93,500
18 Triplek tebal 3 mm (1.10 x 2,10) Lbr 35,750
19 Triplek tebal 3 mm (1,20 x 2.40) Lbr 38,500
20 Triplek tebal 4 mm (1,20 x 2.40) Lbr 56,100
21 Triplek tebal 6 mm (1,20 x 2.40) Lbr 66,000
22 Triplek tebal 9 mm (1,20 x 2.40) Lbr 99,000
23 Triplek tebal 12 mm (1,20 x 2.40) Lbr 132,000
24 Lis Gypsum M' 11,000

X BAHAN INTALASI AIR


1 Keni PVC 1/2" Bh 1,100
2 Keni PVC 3/4" Bh 1,100
3 Keni PVC 2" Bh 2,750
4 Keni PVC 3" Bh 5,500
5 Keni PVC 4" Bh 9,350
6 Keni PVC 5" Bh 11,550
7 Klem PVC Bh 2,750
8 Pipa paralon 5/8" panjang 4.00 M (Sejenis) Ljr 4,950
9 Pipa PVC 1/2" panjang 4.00 m (Sejenis) Ljr 13,200
10 Pipa PVC 3/4" panjang 4.00 m (Sejenis) Ljr 17,600
11 Pipa PVC 1" panjang 4.00 m (Sejenis) Ljr 20,900
12 Pipa PVC 2" panjang 4.00 m (Sejenis) Ljr 31,900
13 Pipa PVC 3" panjang 4.00 m (Sejenis) Ljr 69,300
14 Pipa PVC 4" panjang 4.00 m (Sejenis) Ljr 96,800
15 Pipa PVC 5" panjang 4.00 m (Sejenis) Ljr 158,400
16 Pipa PVC 1/2" type AW panjang 4.00 m Ljr 17,050
17 Pipa PVC 3/4" type AW panjang 4.00 m Ljr 19,800
18 Pipa PVC 1" type AW panjang 4.00 m Ljr 25,850
19 Pipa PVC 2" type AW panjang 4.00 m Ljr 70,950
20 Pipa PVC 3" type AW panjang 4.00 m Ljr 123,200
21 Pipa PVC 4" type AW panjang 4.00 m Ljr 188,650
22 Pipa PVC 5" type AW panjang 4.00 m Ljr 204,600
23 Lem Paralond Bh 6,050

XI BAHAN UNTUK KM / WC & URINOIR


1 Pipa / slang spiral saluran kran (DN) Set 12,100
2 Closet duduk putih porselin komplit (ina) Bh 990,000
3 Closet jongkok porselin warna (ina) Bh 104,500
4 Bak cuci stainless steel Bh 198,000
5 Seal Tape Bh 1,100
6 Wastafel (ina) Bh 242,000

Hal 5
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
7 Kran air (Amico) 3/4 " Bh 25,300
8 Kran air (Amico) 1/2" Bh 22,000
9 Water drain + Assesories ( Plastik ) Set 2,200
10 Urinoir Bh 184,250
11 Floor drain Bh 6,600

XI BAHAN CAT DAN PLITUR


1 Cat (besi / Kayu) Sejenis ( EMCO ) Kg 41,800
2 Cat meni (besi/kayu) cat Pedang Kg 15,400
3 Tiner A Lt 17,600
4 Tiner B Lt 8,250
5 Cat tembok PARAGON Kg 11,880
6 Cat tembok DECOLIT Kg 12,100
7 Cerlak Kg 66,000
8 Politur Lt 34,100
9 Vernis Lt 15,400
10 Teer / blek Kg 110,000
11 Kertas gosok Lbr 2,750
12 Plamur tembok Kg 11,000
13 Plamur tembok / set Set 16,500
14 Plamur kayu Kg 14,850
15 Plamur Besi Kg 14,850
16 Spiritus Lt 10,450
17 Lem kayu Kg 10,450
18 Kuas Cat Bh 13,750
19 Rol cat Bh 13,200
20 Soda api Kg 9,900

XII KACA
1 Kaca bening 5 mm M2 66,000
2 Kaca rayband 5 mm M2 77,000
3 kaca es 5 mm M2 93,500
4 Jendela nako 13 daun Ps 143,000

XIII ALAT PENGGANTUNG DAN KUNCI


1 Engsel jendela Bh 16,500
2 Engsel pintu Bh 22,000
3 Grendel Bh 19,000
4 Kunci tanam besar Bh 71,500
5 Kunci tanam kamar mandi Bh 33,000
6 Sping knip Bh 9,900
7 Door closer Bh 121,000
Hal 6
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
8 Door stop Bh 16,500
9 Hak angin (pasang) Bh 9,000
10 Pegangan pintu (pasang) Bh 93,500

XIV BAHAN LAMPU DAN INSTALASI LISTRIK


1 Lampu TL 20 W/220 V komp. balas, kac. Philip Set 32,000
2 Lampu TL 40 W/220 V komp. balas, kac. Philip Set 89,500
3 Lampu Pijar 25-100 watt Philip Bh 4,000
4 Saklar tunggal "BROCO" Bh 12,500
5 Saklar ganda "BROCO" Bh 15,000
6 Stop kontak "BROCO" Bh 12,000
7 Sekering kast tunggal LN Bh 24,750
8 Sekering kast ganda LN Bh 38,500
9 NYA 1000 Vol 1,5 mm rol 120,000
10 NYA 1000 vol 2,5 mm rol 229,600
11 NYA 1000 vol 2 x 2,5 mm "Eterna rol 803,200
12 NYA 1000 vol 2 x 4 mm "Eterna rol 1,068,000
13 NYA 1000 vol 4 x 4 mm "Eterna rol 1,763,200
14 Pasang listrik titik 75,000
15 Fitting plafond Bh 7,500
16 T dos PVC Bh 750
17 Dop Son H 220 W / Pillips Asli Bh 212,850
18 Dop Son H 350 W / Pillips Asli Bh 264,550
19 Dop Son T 250 W / Pillips Asli Bh 96,250
20 Dop Son T 400 W / Pillips Asli Bh 102,300
21 Dop Son 400 W / Pillips Asli Bh 119,350
22 Dop Son 250 W / Pillips Asli Bh 97,350
23 Dop Son 150 W / Pillips Asli Bh 85,250
24 Dop HPL N 400 W / Pillips Asli Bh 62,150
25 Dop HPL N 125 W / Pillips Asli Bh 24,750
26 Dop HPL N 250 W / Pillips Asli Bh 48,400
27 Dop HPI T 250 W / Pillips Asli Bh 148,500
28 Dop HPI T 400 W / Pillips Asli Bh 170,500
29 Dop TL 36 W Pillips Asli Bh 11,550
30 Dop Varilux 9 Watt Kuning Bh 28,000
31 Dop Esential 23 Watt Bh 31,350
32 Travo TL 40 W / Sinar Bh 28,000
33 Travo MC 125 W / Pillips Asli Bh 106,500
34 Travo MC 250 W / Pillips Asli Bh 159,500
35 Travo MC 400 W /Pillips Asli Bh 209,000
36 Travo BSN 150 W / Pillips Asli Bh 160,050

Hal 7
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
37 Travo BSN 250 W /Pillips Asli Bh 206,250
38 Travo BSN 400 W / Pillips Asli Bh 374,550
39 kabel NYA 2,5 mm / ETERNA Rol 221,760
40 Kabel NYYHY 2 x 0,75 mm / ETERNA Rol 295,680
41 Kabel NYY 2 x 2,5 mm / ETERNA Rol 720,720
42 Kabel NYY 2 x 4 mm / ETERNA Rol 1,117,886
43 Kabel NYY 4 x 4 mm / ETERNA Rol 1,714,020
44 Kabel NYY 2 x 10 mm / ETERNA M 6,500
45 Kabel NYY 4 x 10 mm / ETERNA M 13,000
46 Kabel Twisted 2 x 16 mm SUTRADO M 19,000
47 Kabel Twisted 4 x 16 mm SUTRADO M 26,000
48 Kabel Twisted 2 x 10 mm SUTRADO M 8,000
49 Kapasitor 25 uf / Pillips Bh 45,500
50 Kap Lampu SRP 822 SON T 250 watt / Phillip 1,567,500
Set
Komplit
51 Kap Lampu SRP 822 SON T 400 watt / Phillip 1,708,000
Set
Komplit
52 Kap Lampu SPP 368 SON T 150 watt / Phillip 2,006,500
Set
Komplit
53 Kap Lampu SPP 368 SON T 250 watt / Phillip 2,107,000
Set
Komplit
54 Kap Lampu SPP 368 SON T 400 watt / Phillip 2,628,500
Set
Komplit
55 Kap Munik SRX 811 / SON T 150 W Pillips 1,516,500
Set
Komplit
56 Kap Munik SRX 811 / SON T 250 W Pillips 1,650,500
Set
Komplit
57 Kap Munik SRX 811 / SON T 400 W Pillips 1,914,500
Set
Komplit
58 Kap TL WD 1 x 40 W / SUI Bh 35,200
59 Kap TL WD 2 x 40 W / SUI Bh 86,350
60 Ignektor 150 Watt / Pillips Bh -
61 Ignektor S1 51 / Pillips Bh 38,500
62 Ignektor S1 52 / Pillips Bh 55,000
63 ignektor SN 58 / Pillips Bh 41,250
64 Isolasi Unibel Hitam Besar Bh 4,730
65 Fiting Gantung E 40 Set 16,500
66 MCB 2 Amper / 1 Phase / MG Set 37,895
67 MCB 4 Amp / ABB Komplit Set 54,000
68 MCB 32 Amper / 3 Phase / MG Set 202,000
69 MCB 4 Amper / 1 Phase / MG Set 33,495
70 MCB 16 Amper / 1 Phase / MG Set 33,495
71 MCB 20 Amper / 1 Phase / MG Set 49,500
72 MCB 25 Amper / 1 Phase / MG Set 40,810

Hal 8
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
73 MCB 32 Amper / 1 Phase / MG Set 44,220
74 MCB 50 Amper / 1 Phase / MG Set 108,570
75 CT 50 / 5 A GAE Bh 137,500
76 Time Switch TB 118 PANASONIC Bh 533,500
77 Maknit Contaktor SN 80 / MITSUBISHI Bh 927,300
78 Otomatis Lampu Hias / Multi Bh 302,500
79 Photo Cotrol 10 A / SELKON Asli Bh 93,500
80 Stater TL . S .10 Pillips Bh 3,850
81 Lampu Hias 3 Jalur SHINYOKU Bh 2,145,000
82 Service Klem Lidah Bh 24,750
83 Service Klem 4 x 16 - 25 mm Bh 24,475
84 Konektor Kedap Air Bh 7,000
85 Paching Conector 2 baut Bh 8,250
86 OHM Saklar 200 Ampere / Germany Bh 3,479,000
87 Yuke Bh 440
88 Stanlis Bh 247,500
89 Suspension Bh 17,050
90 1,771,000
KWH meter 3 Phase Go/5A Fuji Dharma Electric Bh
91 OA Kast Type VI, 2 (dua) pintu = 80x60x28x0,20 1,210,000
Bh
mm
92 NH&Coatacveer NT. 00-80 Amper (GAE) Set 36,000
93 NH&Coatacveer NT. 00-50 Amper (GAE) Set 36,000
94 NH&Coatacveer NT. 00-40 Amper (GAE) Set 36,000
95 Kabel Skun 16 mm Bh 1,100
96 Kabel Skun 4 mm Bh 440
97 PLC ECLAT 85 WATT Kuning E 40 Bh 148,500
98 PLC LOUTECH 68 WATT Kuning E 27 Bh 182,500
99 Tiang Octagonal 07 Meter Segi 8 - SP / M091
Bh 2,072,400
P821
100 Tiang Octagonal 09 Meter Segi 8 - SP / M091
Bh 2,712,050
P821
101 Tiang Octagonal 11 Meter Segi 8 - MP / M111
Bh 3,845,490
P815
102 Groun Roud 3 m x 1,5" BSA/BC 25 mm Bh 51,000
103 Stang Lampu 2" x 2 M x 6 M /BSA Spindo Btg 495,000
104 Stang Lampu 1,5" x 2 M /BSA Spindo Btg 165,000
105 Stang Lampu 1,5" x 3 M /BSA Spindo Btg 330,000
106 Stang lampu 1,5 x 6 M /BSA Spindo Btg 275,000
107 Begel Stang 10" x 2" x 4 Cm x 0,4 Cm / Hodip Set 22,000
108 Begel 3" x 1,5" / Hodip Set 24,750
109 Begel Stang 6" x 1,5 x 4 Cm x 0,4 Cm / Hodip Set 27,500
110 Begel Trak Angkel 9" /Hodip Set 27,500

Hal 9
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
111 Begel Trak Angkel 3" /Hodip Set 16,500
112 Trak Angker 8 mm x 5 M / Hodip Btg 55,000
113 Trak Angker 10 mm x 7 M / Hodip Btg 66,000
114 OA Kast 80 x 60 x 25 x 0,20 cm 2 Pintu bh 880,000
115 OA Kast 80 x 50 x 25 x 0,20 cm 2 Pintu bh 880,000
116 Kanal 80 x 8 x 5 cm bh 77,000

XV BAHAN BETON PRACETAK


Tiang Pancang
1 Type A2 Bottom+Middle Ø 300 mm M 149,600
2 Type B0 Bottom+Middle Ø 300 mm M 183,700
3 Type C0 Bottom+Middle Ø 300 mm M 212,300
4 Type A2 Bottom+Middle Ø 400 mm M 244,200
5 Type B0 Bottom+Middle Ø 400 mm M 300,300
6 Type C0 Bottom+Middle Ø 400 mm M 345,400
7 Type A1 Bottom+Middle Ø 500 mm M 356,400
8 Type B0 Bottom+Middle Ø 500 mm M 425,700
9 Type C0 Bottom+Middle Ø 500 mm M 465,300
10 Type A2 Bottom+Middle Ø 600 mm M 513,700
11 Type B0 Bottom+Middle Ø 600 mm M 605,000
12 Type C0 Bottom+Middle Ø 600 mm M 677,600

PCI - Girder
1 PCI Girder (H=1,25;L=20,60;CTC=1,85) Bh 77,000,000
2 PCI Girder (H=1,60;L=25,60;CTC=1,85) Bh 126,500,000
3 PCI Girder (H=1,70;L=30,80;CTC=1,85) Bh 176,000,000
4 PCI Girder (H=2,10;L=35,80;CTC=1,85) Bh 199,100,000
5 PCI Girder (H=2,10;L=40,80;CTC=1,85) Bh 233,200,000

XVI BAHAN LAIN-LAIN


1 Aspal drum 60/70 Kg 8,000
2 Aspal curah Kg 6,300
3 Minyak tanah Ltr 4,125
4 Minyak tanah (industri) Ltr 7,700
5 Minyak solar Ltr 4,950
6 Minyak premium Ltr 4,950
7 Minyak pelumas Ltr 39,275
8 Rol meter (50 m) 1 Bh 66,000
9 Palu/bodem 1 Bh 30,000
10 Pisau besar 1 Bh 18,100
11 Keranjang 1 Bh 12,100
12 Kota adukan 1 Bh 42,300
Hal 10
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
13 Cetok 1 Bh 11,000
14 Kuas 1 Bh 8,000
15 Kasut kayu 1 Bh 5,500
16 Gunting pemotong ( Besi ) 1 Bh 88,000
17 Kunci pembengkok tulangan 1 Bh 5,500
18 Gergaji 1 Bh 22,000
19 Tripot dan trimbis 1 Bh 30,200
20 Tang pemotong kawat 1 Bh 16,500
21 Linggis 1 Bh 27,500
22 Kayu pemikul & tampar 1 Bh 14,500
23 Ember 1 Bh 8,250
24 Karung plastik 1 Bh 3,450
25 Ijuk 1 Kg 2,500

XVII HARGA SEWA ALAT BANTU


1 Pesawat ukur 1 unit / hr 55,000
2 Pompa air 1 unit / hr 55,000
3 Tustel 1 unit / hr 38,500
4 Timbris 1 unit 6,000
5 Kereta dorong 1 unit 9,600
6 Alat pemadat Vibrator Roller 1 unit/jam 16,500
7 Gerobak 1 Bh / hr 11,000
8 Molen 1 unit / hr 82,500
9 Vibrator beton 1 unit/jam 22,000

XVIII UPAH KERJA


1 Pekerja / Pembantu Tukang / Org/hr 30,000
Buruh tak terlatih
2 Buruh terlatih Org/hr 35,000
3 Tukang kayu Org/hr 40,000
4 Tukang batu/besi/pipa/listrik/ Org/hr 40,000
plitur/cat/Operator/mekanik
5 Kepala tukang Org/hr 50,000
6 Mandor Org/hr 60,000
7 Operator kurang terlatih / mekanik pembantu Org/hr 35,000
8 Operator Org/hr 50,000
9 Pembantu operator Org/hr 40,000
10 Supir Org/hr 50,000
11 Pembantu supir Org/hr 40,000
12 Tukang listrik/mekanik ahli/operator ahli Org/hr 55,000
13 Pengawas listrik/mekanik ahli/operator ahli Org/hr 75,000

Hal 11
SATUAN ONGKOS
NO JENIS BAHAN HARGA (Rp)
LANGSIR/100 M

1 2 3 4 6
14 Juru ukur Org/hr 65,000

NO PENDIDIKAN / KEAHLIAN PENGALAMAN (Tahun) GAJI/BLN (Rp.)


A PERSONIL
1 S-1 1-4 4,000,000
5-8 5,000,000
9-12 7,000,000
2 D3 1-4 2,000,000
5-8 3,000,000
9-12 4,000,000
3 STM 0-2 1,000,000
3-4 1,500,000
5-8 2,000,000
9-12 2,500,000
4 OPERATOR KOMPUTER 1,000,000
5 STAF KANTOR 750,000

NO URAIAN PENGALAMAN (Tahun) GAJI/BLN (Rp.)


B NON PERSONIL
1 Biaya Perjalanan 60.000/org/hr
2 Sewa Kendaraan Roda 4 3,000,000
3 Sewa Kendaraan Roda 2 400,000
4 Biaya Komunikasi Sesuai kebutuhan
5 Biaya Sewa Komputer 500,000
6 Biaya Peralatan Komputer Sesuai kebutuhan
7 Laporan Akhir 100.000/Dokumen
8 Laporan Mingguan 25.000/Minggu
9 Laporan Bulanan 50,000
10 Alat Tulis Kantor (ATK) Sesuai kebutuhan

BUPATI JOMBANG

SUYANTO

Hal 12
KEPUTUSAN BUPATI JOMBANG
NOMOR : 188.4.45/ /415.10.9/2009

TENTANG

KEPUTUSAN BUPATI JOMBANG


NOMOR : 4.45/ /415.10.9/2009
TENTANG

PATOKAN HARGA SATUAN PEKERJAAN PER


KEGIATAN DAN HARGA SATUAN BAHAN
BANGUNAN SERTA UPAH PEKERJA
DI KABUPATEN JOMBANG
TAHUN ANGGARAN 2009

DIPERBANYAK OLEH
BAGIAN ADMINISTRASI PEMBANGUNAN
SEKRETARIAT DAERAH KABUPATEN
JOMBANG
2009
LAMPIRAN II : KEPUTUSAN BUPATI JOMBANG
NOMOR : 188.4.45/ /415.12/2009
TANGGAL : 200

DAFTAR PATOKAN HARGA SATUAN BAHAN BANGUNAN DAN UPAH PEKERJA


TAHUN ANGGARAN 2009

ONGKOS
SATUAN
NO JENIS BAHAN HARGA ( Rp ) LANGSIR/100
M
1 2 3 4 6
I BAHAN PASIR
1 Pasir Urug M3 82,500 5,000
2 Sirtu (tidak diayak) M3 83,500 5,000
3 Pasir Pasang/Cor M3 90,000 5,000
4 Tanah Urug M3 55,000 5,000
5 Grosok M3 83,500 5,000
6 Abu batu M3 110,000 5,000

II BAHAN BATU
1 Batu kali pecah 15/20 (tangan) M3 110,000 6,000
2 Batu kali pecah 10/15 (tangan) M3 110,000 6,000
3 Batu kali pecah 5/7 (tangan) M3 121,000 5,000
4 Batu kali pecah 3/5 (mesin) M3 143,000 5,000
5 Batu kali pecah 2/3 (mesin) M3 165,000 5,000
6 Batu kali pecah 1/2 (mesin) M3 137,500 6,000
7 Batu kali pecah 1/1 (mesin) M3 159,500 6,000
8 Batu kali pecah 0,5-1 (mesin) M3 159,500 6,000
9 Batu gunung atau Quarry M3 99,000 6,000
10 Kerikil galian bukit M3 49,500 6,000
11 Batu kali M3 99,000 6,000
12 Kerikil sungai ayak tnp pasir 0,5-1 M3 49,500 6,000

III BAHAN BATU BATA


1 Batu bata merah bh 425
2 Batako bh 2,750
3 Paving stone K.175 tebal 6 cm M2 37,900
4 Paving stone K.200 tebal 6 cm M2 41,200
5 Paving stone K.200 tebal 8 cm M2 46,700
6 Paving stone K.300 tebal 6 cm M2 46,700
7 Paving stone K.300 tebal 8 cm M2 48,900
8 Paving stone K.300 warna t = 6 cm M2 47,800
9 Paving stone K.300 warna t = 8 cm M2 53,300
2

1 2 3 4 6
10 Paving stone K.175 warna t = 6 cm M2 45,000
11 Paving stone K.175 warna t = 8 cm M2 48,000
12 Paving stone K.125 warna t = 6 cm M2 41,000
13 Kanstin 10x20x40 K.275 bh 10,000
14 Kanstin 10x20x40 K.300 bh 11,000
15 Roster beton bh 7,000

IV PORTLAND CEMENT (PC) DAN KAPUR


1 Semen Gresik 40 Kg Zak 47,500 250
2 Semen Gresik 50 Kg Zak 59,400 300
3 Semen Holcim 40 Kg Zak 42,000 250
4 Semen Holcim 50 Kg Zak 58,300 300
5 Semen Bosowa 40 Kg Zak 38,000 250
6 Semen Bosowa 50 Kg Zak 51,700 300
6 Semen Putih Tiga Roda Zak 72,600 300
7 Semen Putih Banteng Zak 49,500 300
7 Semen berwarna yiyitan / nat Kg 8,750
8 Kapur bubuk / padam Zak 33,000
8 Kapur Gamping Kg 3,850
9 Dolosit Zak 8,800

V BAHAN BESI
1 Baja Konstruksi Kg 15,950
2 Rangka atap baja ringan (Galvalume) + PPN
M2 207,000
(datar)
3 Besi beton polos Kg 9,900
4 Baja ulir/Tulangan Mutu U-24 Kg 15,400
5 Besi siku 30x30x3 panjang 6 m Ljr 77,000
6 Besi siku 60x60x6 panjang 6 m Ljr 154,000
7 Pipa air Galvanis medium 1/2" Ljr 80,850
8 Pipa air Galvanis Medium 3/4 " Ljr 104,500
9 Pipa air Galvanis medium 1 " Ljr 145,200
10 Pipa air Galvanis medium 1,25 " Ljr 187,000
11 Pipa air Galvanis medium 1,5 " Ljr 379,500
12 Pipa air Galvanis medium 2 " Ljr 352,000
13 Pipa air Galvanis medium 2,5 " Ljr 687,500
14 Pipa air Galvanis medium 3 " Ljr 577,500
15 Pipa air Galvanis medium 4 " Ljr 1,265,000
16 Kawat Beton (bendrat) Kg 13,200
17 Kawat bronjong 3,8 mm Kg 17,600
3

1 2 3 4 6
18 Bronjong kawat (0,5x1x2) 3 lilitan lbr 357,500
19 Kawat nyamuk kasa alumunium M2 16,500
20 Kawat harmonika M2 22,000
21 Kawat biasa (tali) Kg 14,300
22 Paku asbes bh 825
23 Paku asbes Kg 13,200
24 Paku pancing bh 1,100
25 Paku eternit Kg 13,200
26 Paku reng Kg 11,550
27 Paku usuk Kg 11,550
28 Paku triplek Kg 13,200

VI TEGEL/KERAMIK
1 Tegel abu-abu 20x20 Cm M2 20,000
2 Keramik 10x20 Cm M2 38,500
3 Keramik 20x20 (lantai) Kw I M2 40,700
4 Keramik 20x25 (dinding) Kw I M2 40,700
5 Keramik Putih 30x30 (lantai) M2 29,700
6 Keramik motip (30x30) Kw I M2 37,400

VII BUIS BETON


1 Buis beton bulat 15 cm M 17,600
2 Buis beton bulat 20 cm M 24,200
3 Buis beton bulat 30 cm M 38,500
4 Buis beton bulat 40 cm M 49,500
5 Buis beton bulat 50 cm M 60,500
6 Buis beton bulat 60 cm M 90,000
7 Buis beton bulat 70 cm M 100,000
8 Buis beton bulat 80 cm M 110,000
9 Buis beton bulat 90 cm M 145,000
10 Buis beton bulat 100 cm M 165,000
11 Buis beton U 20 cm M 13,200
12 Buis beton U 30 cm M 19,800
13 Buis beton U 40 cm M 19,800

VIII BAHAN KAYU/TRIPLEK DAN BAMBU


1 Kayu Jati 10/20 x 3,5m M3 19,000,000
2 Kayu balau M3 6,550,000
3 Kayu bengkirai M3 4,400,000
4 Kayu Kamper 8/12, 6/12.6/15 M3 7,480,000
5 Kayu Kamper 3/30 x 3m M3 8,250,000
4

1 2 3 4 6
6 Kayu kamper 5/7, 4/6, 3/5, 2/3 M3 6,600,000
7 Kayu meranti 8/12,6/12,6/15 M3 4,400,000
8 Kayu merenti 3/30 x 3m M3 4,950,000
9 Kayu meranti 5/7,4/6,3/5,2/3 M3 3,850,000
10 Kayu Meranti (papan begesting) M3 4,400,000
11 Kayu randu ( Papan Begisting ) 4m Lbr 8,800
12 Kayu kruing 8/12,6/12,6,15 M3 4,950,000
13 Kayu Kruing 2/20 x 3m M3 5,500,000
14 Kayu bakar M3 75,000
15 Kayu Kruing 5/7,4/6,3/5,2/3 M3 4,400,000
16 List Kayu Polos 1/5 x 2m M 3,300
17 List Kayu Profil 2/5 x2m M 5,500
18 Dolken Kayu Jati D = 0,13 x 3m Bt 84,700
19 Gedeg guling M2 12,100
20 Bambu Bongkotan Bt 12,100
21 Triplek lapis almunium Lbr 79,750
22 Triplek 90.210.3 mm Lbr 35,750
23 Triplek 90.210.4 mm Lbr 39,000
24 Triplek 120.240.2 mm Lbr 34,100
25 Triplek 120.240.3 mm Lbr 38,500
26 Triplek 120.240.4 mm Lbr 56,100
27 Triplek 120.240.6 mm Lbr 66,000
28 Triplek 120.240.9 mm Lbr 99,000
29 Triplek 120.240.12 mm Lbr 132,000
30 Teakwood 122.244.3 mm Lbr 93,500
31 Teakwood 122.244.4 mm Lbr 105,000
32 Plywood 122.244.4 mm Lbr 93,500
33 Plywood 122.244.9 mm Lbr 110,000

IX BAHAN PENUTUP ATAP


1 Genteng lokal ex Mojokembang (mantilian) Bh 990
2 Genteng Nglayur model kr.pilang (kodok) Bh 1,250
3 Genteng bub. Ngayur model kr.pilang (kodok ) Bh 3,300
4 Genteng bub.ex Mojokembang ( mantilian ) Bh 3,150
5 Plat Asbes tebal 4 mm (1.00 x 1.00) / Eternit Lbr 8,800
6 Asbes datar tebal 4mm (60x200) Lbr 18,700
7 Asbes datar tebal 5 mm (60 x200) Lbr 85,250
8 Asbes datar tebal 6 mm (40 x 280) Lbr 73,150
9 Asbes datar tebal 4 mm (60 x 280) Lbr 71,500
10 Asbes gelombang kecil tebal 4 mm (3.00 x 1.05) Lbr 65,000
11 Asbes gelombang kecil tebal 5 mm (3.05 x 1.05) Lbr 25,850
12 Asbes wuwung gelombang besar tebal 5 mm Lbr 64,350
5

1 2 3 4 6
13 Asbes wuwung gelombang kecil tebal 5 mm Lbr 25,850
14 Teak wood tebal 3 mm (1.22 x 2.44) Lbr 88,220
15 Teak wood tebal 4 mm (1.22 x 2.44) Lbr 93,500
16 Playwood tebal 4 mm (1.22 x 2.44) Lbr 47,850
17 Playwood tebal 9 mm (1.22 x 2.44) Lbr 93,500
18 Triplek tebal 3 mm (1.10 x 2,10) Lbr 35,750
19 Triplek tebal 3 mm (1,20 x 2.40) Lbr 38,500
20 Triplek tebal 4 mm (1,20 x 2.40) Lbr 56,100
21 Triplek tebal 6 mm (1,20 x 2.40) Lbr 66,000
22 Triplek tebal 9 mm (1,20 x 2.40) Lbr 99,000
23 Triplek tebal 12 mm (1,20 x 2.40) Lbr 132,000
24 Lis Gypsum M' 11,000

X BAHAN INTALASI AIR


1 Keni PVC 1/2" Bh 1,100
2 Keni PVC 3/4" Bh 1,100
3 Keni PVC 2" Bh 2,750
4 Keni PVC 3" Bh 5,500
5 Keni PVC 4" Bh 9,350
6 Keni PVC 5" Bh 11,550
7 Klem PVC Bh 2,750
8 Pipa paralon 5/8" panjang 4.00 M (Sejenis) Ljr 4,950
9 Pipa PVC 1/2" panjang 4.00 m (Sejenis) Ljr 13,200
10 Pipa PVC 3/4" panjang 4.00 m (Sejenis) Ljr 17,600
11 Pipa PVC 1" panjang 4.00 m (Sejenis) Ljr 20,900
12 Pipa PVC 2" panjang 4.00 m (Sejenis) Ljr 31,900
13 Pipa PVC 3" panjang 4.00 m (Sejenis) Ljr 69,300
14 Pipa PVC 4" panjang 4.00 m (Sejenis) Ljr 96,800
15 Pipa PVC 5" panjang 4.00 m (Sejenis) Ljr 158,400
16 Pipa PVC 1/2" type AW panjang 4.00 m Ljr 17,050
17 Pipa PVC 3/4" type AW panjang 4.00 m Ljr 19,800
18 Pipa PVC 1" type AW panjang 4.00 m Ljr 25,850
19 Pipa PVC 2" type AW panjang 4.00 m Ljr 70,950
20 Pipa PVC 3" type AW panjang 4.00 m Ljr 123,200
21 Pipa PVC 4" type AW panjang 4.00 m Ljr 188,650
22 Pipa PVC 5" type AW panjang 4.00 m Ljr 204,600
23 Lem Paralond Bh 6,050

XI BAHAN UNTUK KM / WC & URINOIR


1 Pipa / slang spiral saluran kran (DN) Set 12,100
2 Closet duduk putih porselin komplit (ina) Bh 990,000
6

1 2 3 4 6

3 Closet jongkok porselin warna (ina) Bh 104,500


4 Bak cuci stainless steel Bh 198,000
5 Seal Tape Bh 1,100
6 Wastafel (ina) Bh 242,000
7 Kran air (Amico) 3/4 " Bh 25,300
8 Kran air (Amico) 1/2" Bh 22,000
9 Water drain + Assesories ( Plastik ) Set 2,200
10 Urinoir Bh 184,250
11 Floor drain Bh 6,600

XI BAHAN CAT DAN PLITUR


1 Cat (besi / Kayu) Sejenis ( EMCO ) Kg 41,800
2 Cat meni (besi/kayu) cat Pedang Kg 15,400
3 Tiner A Lt 17,600
4 Tiner B Lt 8,250
5 Cat tembok PARAGON Kg 11,880
6 Cat tembok DECOLIT Kg 12,100
7 Cerlak Kg 66,000
8 Politur Lt 34,100
9 Vernis Lt 15,400
10 Teer / blek Kg 110,000
11 Kertas gosok Lbr 2,750
12 Plamur tembok Kg 11,000
13 Plamur tembok / set Set 16,500
14 Plamur kayu Kg 14,850
15 Plamur Besi Kg 14,850
16 Spiritus Lt 10,450
17 Lem kayu Kg 10,450
18 Kuas Cat Bh 13,750
19 Rol cat Bh 13,200
20 Soda api Kg 9,900

XII KACA
1 Kaca bening 5 mm M2 66,000
2 Kaca rayband 5 mm M2 77,000
3 kaca es 5 mm M2 93,500
4 Jendela nako 13 daun Ps 143,000

XIII ALAT PENGGANTUNG DAN KUNCI


1 Engsel jendela Bh 16,500
2 Engsel pintu Bh 22,000
3 Grendel Bh 19,000
7

1 2 3 4 6
4 Kunci tanam besar Bh 71,500
5 Kunci tanam kamar mandi Bh 33,000
6 Sping knip Bh 9,900
7 Door closer Bh 121,000
8 Door stop Bh 16,500
9 Hak angin (pasang) Bh 9,000
10 Pegangan pintu (pasang) Bh 93,500

XIV BAHAN LAMPU DAN INSTALASI LISTRIK


1 Lampu TL 20 W/220 V komp. balas, kac. Philip Set 32,000
2 Lampu TL 40 W/220 V komp. balas, kac. Philip Set 89,500
3 Lampu Pijar 25-100 watt Philip Bh 4,000
4 Saklar tunggal "BROCO" Bh 12,500
5 Saklar ganda "BROCO" Bh 15,000
6 Stop kontak "BROCO" Bh 12,000
7 Sekering kast tunggal LN Bh 24,750
8 Sekering kast ganda LN Bh 38,500
9 NYA 1000 Vol 1,5 mm rol 120,000
10 NYA 1000 vol 2,5 mm rol 229,600
11 NYA 1000 vol 2 x 2,5 mm "Eterna rol 803,200
12 NYA 1000 vol 2 x 4 mm "Eterna rol 1,068,000
13 NYA 1000 vol 4 x 4 mm "Eterna rol 1,763,200
14 Pasang listrik titik 75,000
15 Fitting plafond Bh 7,500
16 T dos PVC Bh 750
17 Dop Son H 220 W / Pillips Asli Bh 212,850
18 Dop Son H 350 W / Pillips Asli Bh 264,550
19 Dop Son T 250 W / Pillips Asli Bh 96,250
20 Dop Son T 400 W / Pillips Asli Bh 102,300
21 Dop Son 400 W / Pillips Asli Bh 119,350
22 Dop Son 250 W / Pillips Asli Bh 97,350
23 Dop Son 150 W / Pillips Asli Bh 85,250
24 Dop HPL N 400 W / Pillips Asli Bh 62,150
25 Dop HPL N 125 W / Pillips Asli Bh 24,750
26 Dop HPL N 250 W / Pillips Asli Bh 48,400
27 Dop HPI T 250 W / Pillips Asli Bh 148,500
28 Dop HPI T 400 W / Pillips Asli Bh 170,500
29 Dop TL 36 W Pillips Asli Bh 11,550
30 Dop Varilux 9 Watt Kuning Bh 28,000
8

1 2 3 4 6
31 Dop Esential 23 Watt Bh 31,350
32 Travo TL 40 W / Sinar Bh 28,000
33 Travo MC 125 W / Pillips Asli Bh 106,500
34 Travo MC 250 W / Pillips Asli Bh 159,500
35 Travo MC 400 W /Pillips Asli Bh 209,000
36 Travo BSN 150 W / Pillips Asli Bh 160,050
37 Travo BSN 250 W /Pillips Asli Bh 206,250
38 Travo BSN 400 W / Pillips Asli Bh 374,550
39 kabel NYA 2,5 mm / ETERNA Rol 221,760
40 Kabel NYYHY 2 x 0,75 mm / ETERNA Rol 295,680
41 Kabel NYY 2 x 2,5 mm / ETERNA Rol 720,720
42 Kabel NYY 2 x 4 mm / ETERNA Rol 1,117,886
43 Kabel NYY 4 x 4 mm / ETERNA Rol 1,714,020
44 Kabel NYY 2 x 10 mm / ETERNA M 6,500
45 Kabel NYY 4 x 10 mm / ETERNA M 13,000
46 Kabel Twisted 2 x 16 mm SUTRADO M 19,000
47 Kabel Twisted 4 x 16 mm SUTRADO M 26,000
48 Kabel Twisted 2 x 10 mm SUTRADO M 8,000
49 Kapasitor 25 uf / Pillips Bh 45,500
50 Kap Lampu SRP 822 SON T 250 watt / Phillip 1,567,500
Set
Komplit
51 Kap Lampu SRP 822 SON T 400 watt / Phillip 1,708,000
Set
Komplit
52 Kap Lampu SPP 368 SON T 150 watt / Phillip 2,006,500
Set
Komplit
53 Kap Lampu SPP 368 SON T 250 watt / Phillip 2,107,000
Set
Komplit
54 Kap Lampu SPP 368 SON T 400 watt / Phillip 2,628,500
Set
Komplit
55 Kap Munik SRX 811 / SON T 150 W Pillips 1,516,500
Set
Komplit
56 Kap Munik SRX 811 / SON T 250 W Pillips 1,650,500
Set
Komplit
57 Kap Munik SRX 811 / SON T 400 W Pillips 1,914,500
Set
Komplit
58 Kap TL WD 1 x 40 W / SUI Bh 35,200
59 Kap TL WD 2 x 40 W / SUI Bh 86,350
60 Ignektor 150 Watt / Pillips Bh -
61 Ignektor S1 51 / Pillips Bh 38,500
62 Ignektor S1 52 / Pillips Bh 55,000
63 ignektor SN 58 / Pillips Bh 41,250
64 Isolasi Unibel Hitam Besar Bh 4,730
65 Fiting Gantung E 40 Set 16,500
66 MCB 2 Amper / 1 Phase / MG Set 37,895
67 MCB 4 Amp / ABB Komplit Set 54,000
9

1 2 3 4 6
68 MCB 32 Amper / 3 Phase / MG Set 202,000
69 MCB 4 Amper / 1 Phase / MG Set 33,495
70 MCB 16 Amper / 1 Phase / MG Set 33,495
71 MCB 20 Amper / 1 Phase / MG Set 49,500
72 MCB 25 Amper / 1 Phase / MG Set 40,810
73 MCB 32 Amper / 1 Phase / MG Set 44,220
74 MCB 50 Amper / 1 Phase / MG Set 108,570
75 CT 50 / 5 A GAE Bh 137,500
76 Time Switch TB 118 PANASONIC Bh 533,500
77 Maknit Contaktor SN 80 / MITSUBISHI Bh 927,300
78 Otomatis Lampu Hias / Multi Bh 302,500
79 Photo Cotrol 10 A / SELKON Asli Bh 93,500
80 Stater TL . S .10 Pillips Bh 3,850
81 Lampu Hias 3 Jalur SHINYOKU Bh 2,145,000
82 Service Klem Lidah Bh 24,750
83 Service Klem 4 x 16 - 25 mm Bh 24,475
84 Konektor Kedap Air Bh 7,000
85 Paching Conector 2 baut Bh 8,250
86 OHM Saklar 200 Ampere / Germany Bh 3,479,000
87 Yuke Bh 440
88 Stanlis Bh 247,500
89 Suspension Bh 17,050
90 1,771,000
KWH meter 3 Phase Go/5A Fuji Dharma Electric Bh
91 OA Kast Type VI, 2 (dua) pintu = 80x60x28x0,20 1,210,000
Bh
mm
92 NH&Coatacveer NT. 00-80 Amper (GAE) Set 36,000
93 NH&Coatacveer NT. 00-50 Amper (GAE) Set 36,000
94 NH&Coatacveer NT. 00-40 Amper (GAE) Set 36,000
95 Kabel Skun 16 mm Bh 1,100
96 Kabel Skun 4 mm Bh 440
97 PLC ECLAT 85 WATT Kuning E 40 Bh 148,500
98 PLC LOUTECH 68 WATT Kuning E 27 Bh 182,500
99 Tiang Octagonal 07 Meter Segi 8 - SP / M091
Bh 2,072,400
P821
100 Tiang Octagonal 09 Meter Segi 8 - SP / M091
Bh 2,712,050
P821
101 Tiang Octagonal 11 Meter Segi 8 - MP / M111
Bh 3,845,490
P815
102 Groun Roud 3 m x 1,5" BSA/BC 25 mm Bh 51,000
10

1 2 3 4 6

XV BAHAN BETON PRACETAK


Tiang Pancang

1 Type A2 Bottom+Middle Ø 300 mm M


149,600
2 Type B0 Bottom+Middle Ø 300 mm M
183,700
3 Type C0 Bottom+Middle Ø 300 mm M
212,300
4 Type A2 Bottom+Middle Ø 400 mm M
244,200
5 Type B0 Bottom+Middle Ø 400 mm M
300,300
6 Type C0 Bottom+Middle Ø 400 mm M
345,400
7 Type A1 Bottom+Middle Ø 500 mm M
356,400
8 Type B0 Bottom+Middle Ø 500 mm M
425,700
9 Type C0 Bottom+Middle Ø 500 mm M
465,300
10 Type A2 Bottom+Middle Ø 600 mm M
513,700
11 Type B0 Bottom+Middle Ø 600 mm M
605,000
12 Type C0 Bottom+Middle Ø 600 mm M
677,600

PCI - Girder

1 PCI Girder (H=1,25;L=20,60;CTC=1,85) Bh 77,000,000

2 PCI Girder (H=1,60;L=25,60;CTC=1,85) Bh 126,500,000

3 PCI Girder (H=1,70;L=30,80;CTC=1,85) Bh 176,000,000

4 PCI Girder (H=2,10;L=35,80;CTC=1,85) Bh 199,100,000

5 PCI Girder (H=2,10;L=40,80;CTC=1,85) Bh 233,200,000

XVI BAHAN LAIN-LAIN


1 Aspal drum 60/70 Kg 8,000
2 Aspal curah Kg 6,300
3 Minyak tanah Ltr 4,125
4 Minyak tanah (industri) Ltr 7,700
5 Minyak solar Ltr 4,950
6 Minyak premium Ltr 4,950
11

1 2 3 4 6
7 Minyak pelumas Ltr 39,275
8 Rol meter (50 m) 1 Bh 66,000
9 Palu/bodem 1 Bh 30,000
10 Pisau besar 1 Bh 18,100
11 Keranjang 1 Bh 12,100
12 Kota adukan 1 Bh 42,300
13 Cetok 1 Bh 11,000
14 Kuas 1 Bh 8,000
15 Kasut kayu 1 Bh 5,500
16 Gunting pemotong ( Besi ) 1 Bh 88,000
17 Kunci pembengkok tulangan 1 Bh 5,500
18 Gergaji 1 Bh 22,000
19 Tripot dan trimbis 1 Bh 30,200
20 Tang pemotong kawat 1 Bh 16,500
21 Linggis 1 Bh 27,500
22 Kayu pemikul & tampar 1 Bh 14,500
23 Ember 1 Bh 8,250
24 Karung plastik 1 Bh 3,450
25 Ijuk 1 Kg 2,500

XVI HARGA SEWA ALAT BANTU


1 Pesawat ukur 1 unit / hr 55,000
2 Pompa air 1 unit / hr 55,000
3 Tustel 1 unit / hr 38,500
4 Timbris 1 unit 6,000
5 Kereta dorong 1 unit 9,600
6 Alat pemadat Vibrator Roller 1 unit/jam 16,500
7 Gerobak 1 Bh / hr 11,000
8 Molen 1 unit / hr 82,500
9 Vibrator beton 1 unit/jam 22,000

12

1 2 3 4 6
XVII UPAH KERJA
1 Pekerja / Pembantu Tukang / Org/hr 30,000
Buruh tak terlatih
2 Buruh terlatih Org/hr 35,000
3 Tukang kayu Org/hr 40,000
4 Tukang batu/besi/pipa/listrik/ Org/hr 40,000
plitur/cat/Operator/mekanik
5 Kepala tukang Org/hr 50,000
6 Mandor Org/hr 60,000
7 Operator pembantu Org/hr -
8 Operator Org/hr 50,000
9 Pembantu operator Org/hr 40,000
10 Supir Org/hr 50,000
11 Pembantu supir Org/hr 40,000
12 Tukang listrik/mekanik ahli/operator ahli Org/hr 55,000
13 Pengawas listrik/mekanik ahli/operator ahli Org/hr 75,000
14 Juru ukur Org/hr 65,000

NO PENDIDIKAN / KEAHLIAN PENGALAMAN (Tahun)


A PERSONIL
1 S-1 1-4
5-8
9-12
2 D3 1-4
5-8
9-12
3 STM 0-2
3-4
5-8
9-12
4 OPERATOR KOMPUTER
5 STAF KANTOR

13

NO URAIAN PENGALAMAN (Tahun)


B NON PERSONIL
1 Biaya Perjalanan
2 Sewa Kendaraan Roda 4
3 Sewa Kendaraan Roda 2
4 Biaya Komunikasi
5 Biaya Sewa Komputer
6 Biaya Peralatan Komputer
7 Laporan Akhir
8 Laporan Mingguan
9 Laporan Bulanan
10 Alat Tulis Kantor (ATK)

BUPATI JOMBANG

SUYANTO
DAFTAR HARGA SATUAN BAHAN BANGUNAN
KABUPATEN JOMBANG
TRIWULAN I (Januarin - Maret)
No. Daftar Bahan Material Sat. DISETUJUI KETERANGAN
1 2 3 4 5
A. BAHAN PENUTUP ATAP & PLAFOND
1 Asbes datar tebal 4 mm (40 x 200) Lbr 13,000 14,300
2 Asbes datar tebal 6 mm (40 x 200) Lbr -
3 Asbes datar tebal 4 mm (60 x 200) Lbr 17,000 18,700
4 Asbes datar tebal 5 mm (60 x200) Lbr -
5 Asbes datar tebal 6 mm (40 x 280) Lbr -
6 Asbes datar tebal 4 mm (60 x 280) Lbr -
7 Asbes gelombang besar tebal 5 mm (3.05 x 1.05) Lbr 77,500 85,250
8 Asbes gelombang besar tebal 5 mm (3.00 x 1.20) Lbr 66,500 73,150
9 Asbes gelombang kecil tebal 4 mm (3.00 x 1.05) Lbr 65,000 71,500
10 Asbes gelombang kecil tebal 5 mm (3.05 x 1.05) Lbr -
11 Asbes gelombang kecil tebal 5 mm (4.00 x 1.05) Lbr -
12 Asbes wuwung gelombang besar tebal 4 mm Lbr 58,500 64,350
13 Asbes wuwung gelombang kecil tebal 4 mm Lbr 23,500 25,850
14 Asbes wuwung gelombang kecil tebal 5 mm Lbr -
15 Plat Asbes tebal 4 mm (1.00 x 1.00) / Eternit Lbr 8,000 8,800
16 Genteng Lokal bh -
17 Bubungan Genteng Lokal bh -
18 Seng plat 3'x6' BJLS 30.80.300 cm Lbr 80,200 88,220
19 Teak wood tebal 3 mm (1.22 x 2.44) Lbr 85,000 93,500
20 Teak wood tebal 4 mm (1.22 x 2.44) Lbr -
21 Teak wood tebal 4 mm (1.22 x 2.70) Lbr -
22 Playwood tebal 4 mm (0.90 x 2.10) Lbr 43,500 47,850
23 Playwood tebal 4 mm (1.22 x 2.44) Lbr 85,000 93,500
24 Playwood tebal 9 mm (1.22 x 2.44) Lbr -
25 Triplek tebal 3 mm (0.90 x 2,10) Lbr 32,500 35,750
26 Triplek tebal 3 mm (1.10 x 2,10) Lbr -
27 Triplek tebal 2 mm (1,20 x 2.40) Lbr 31,000 34,100
28 Triplek tebal 3 mm (1,20 x 2.40) Lbr 35,000 38,500
29 Triplek tebal 4 mm (1,20 x 2.40) Lbr 51,000 56,100
30 Triplek tebal 6 mm (1,20 x 2.40) Lbr 60,000 66,000
31 Triplek tebal 9 mm (1,20 x 2.40) Lbr 90,000 99,000
32 Triplek tebal 12 mm (1,20 x 2.40) Lbr 120,000 132,000
33 Multipleks tebal 3 mm (1.10 x 2,10) Lbr -
34 Multipleks tebal 4 mm (1,20 x 2.40) Lbr -
35 Triplek lapis aluminium Lbr 72,500 79,750
36 Lis Gypsum M' 10,000 11,000
B. BAHAN KAYU

1 Kayu balau M3 5,940,000 6,534,000


2 Kayu bengkirai M3 4,000,000 4,400,000
3 Kayu kamper 8/12,6/12,6/15 M3 6,800,000 7,480,000
4 Kayu kamper 3/30 x 3m M3 7,500,000 8,250,000
5 Kayu kamper 5/7,4/6,3/5,2/3 M3 6,000,000 6,600,000
6 Kayu meranti 8/12,6/12,6/15 M3 4,000,000 4,400,000
7 Kayu meranti 3/30 x 3m M3 4,500,000 4,950,000
8 Kayu meranti 5/7,4/6,2/3 M3 3,500,000 3,850,000
9 Kayu meranti ( Papan Begisting ) M3 4,000,000 4,400,000
10 Kayu randu ( Papan Begisting ) 4m lbr 8,000 8,800
11 Kayu kruing 8/12,6/12,6/15 M3 4,500,000 4,950,000
12 Kayu kruing 2/20 x 3m M3 5,000,000 5,500,000
13 Kayu kruing 2/20 x 4m M3 4,125,000 4,537,500
14 Kayu kruing 5/7,4/6,3/5,2/3 M3 4,000,000 4,400,000
15 List Kayu Polos 1/5 x 2 M 3,000 3,300
16 List Kayu Profil 2/5 x 2 M 5,000 5,500
17 Dolken Kayu Jati D = 0,13 x 3m Bt 77,000 84,700
18 Bambu Bongkotan Bt 11,000 12,100
1 2 3 4 5
19 Gedeg guling M2 11,000 12,100
C. BAHAN BATA, BATU, PASIR, SEMEN & TANAH

1 Batu Bata Merah Bh 390 429


2 Batako Bh 2,500 2,750
3 Batu kali M3 90,000 99,000
4 Batu quarry dipecah 20-25 M3 90,000 99,000
5 Batu kali pecah 15/20 ( Pecah Tangan ) M3 100,000 110,000
6 Batu pecah 10-15 ( Pecah Tangan ) M3 100,000 110,000
7 Batu pecah 5-7 ( Pecah Mesin ) M3 110,000 121,000
8 Batu pecah 3-5 ( Pecah Mesin ) M3 130,000 143,000
9 Batu/cor koral pecah 2/3 ( Pecah Mesin ) M3 150,000 165,000
10 Batu Pecah 1-2 ( Pecah Mesin ) M3 125,000 137,500
11 Batu pecah 1/1 ( Pecah Mesin ) M3 145,000 159,500
12 Batu pecah 1/2 - 1 ( Pecah Mesin ) M3 145,000 159,500
13 Abu Batu M3 100,000 110,000
14 Split / Grosok M3 76,000 83,600
15 Pasir beton M3 75,000 82,500
16 Pasir Pasang M3 82,000 90,200
17 Pasir urug M3 75,000 82,500
18 Tanah Urug M3 50,000 55,000
19 Tanah sirtu M3 -
20 Sirtu M3 76,000 83,600
21 Semen berwarna yiyitan / nat Kg 7,920 8,712
22 Semen PC Semen Gresik (50 Kg) Zak 54,000 59,400
23 Semen PC Tiga Roda (50 Kg) Zak 47,000 51,700
24 Semen PC Holcim (50 Kg) Zak 53,000 58,300
25 Semen PC Bosowa (50 Kg) Zak 47,000 51,700
26 Semen Putih (Azano) Zak -
27 Semen Putih (TigaRoda) Zak 66,000 72,600
28 Semen Putih (Banteng) Zak 45,000 49,500
29 Kapur Padam m3 35,000 38,500
Kapur Padam / zak Zak 30,000 33,000
30 Kapur Gamping kg 3,500 3,850
31 Dolosit Zak 8,000 8,800
D. BAHAN MENGGUNAKAN BESI / LOGAM

1 Besi begel / baut Kg 13,500 14,850


2 Besi beton polos Kg 9,000 9,900
3 Besi beton ulir Kg 14,000 15,400
4 Besi pipa galvanis medium 1/2, 6m Ljr 73,500 80,850
5 Besi pipa galvanis medium 3/4, 6m Ljr 95,000 104,500
6 Besi pipa galvanis medium 1, 6m Ljr 132,000 145,200
7 Besi pipa galvanis medium 1 1/4, 6 m Ljr 170,000 187,000
8 Besi pipa galvanis medium 1 1/2, 6 m Ljr 345,000 379,500
9 Besi pipa galvanis medium 2, 6m Ljr 320,000 352,000
10 Besi pipa galvanis medium 2 1/2, 6 m Ljr 625,000 687,500
11 Besi pipa galvanis medium 3, 6m Ljr 525,000 577,500
12 Besi pipa galvanis medium 4, 6m Ljr 1,150,000 1,265,000
13 Besi profil WF ( KONSTRUKSI ) Ljr 14,500 15,950
14 Besi siku L 60. 60.6 Ljr 140,000 154,000
15 Besi siku L 30.30.3 Ljr 70,000 77,000
Besi siku L 30.30.3 Ljr 45,000 49,500
16 Kawat ikat beton / Kawar Bendrat Kg 12,000 13,200
17 Kawat bronjong 3,8 mm Kg 16,000 17,600
18 Bronjong kawat (0,5x1x2) 3 lilitan Lbr 325,000 357,500
19 Kawat nyamuk kasa alumunium M2 15,000 16,500
Kawat nyamuk kasa alumunium M -
20 Kawat harmonika M2 20,000 22,000
21 Rangka atap baja ringan (Galvalume) + PPN (datar) M2 205,000 225,500
E. BAHAN UNTUK LANTAI

1 Paving stone 10/20 dan uskup abu-abu tebal 8 cm halus K-175 M2 37,000 40,700
1 2 3 4 5
untuk Trotoar dan Halaman Bh -
2 Paving stone 10/20 dan uskup abu-abu tebal 6 cm halus K-175 M2 29,000 31,900
untuk Trotoar dan Halaman Bh -
3 Paving stone 10/20 dan uskup abu-abu tebal 8 cm Kasar M2 40,500 44,550
Conblok K-270 untuk Jalan Lingkungan Bh -
4 Paving stone 10/20 warna tebal 8 cm Kasar Conblok K-270 M2 43,000 47,300
untuk Jalan Lingkungan Bh -
5 Paving stone 10/20 dan uskup abu-abu tebal 6 cm Kasar M2 33,500 36,850
Conblok K-270 untuk Jalan Lingkungan Bh -
6 Paving stone 10/20 warna tebal 6 cm Kasar Conblok K-270 M2 36,500 40,150
untuk Jalan Lingkungan Bh -
7 Kanstin Paving Ukuran 10/20/40 cm K-200 Bh 8,000 8,800
8 Tegel PC Abu-abu 20 x 20 cm M2 18,000 19,800
9 Tegel Keramik 10 x 20 Cm M2 35,000 38,500
10 Tegel Keramik 20 x 20 Cm KW I M2 37,000 40,700
11 Tegel Keramik 20 x 25 Cm KW I M2 37,000 40,700
12 Tegel keramik 30 x 30 Cm KW I Polos M2 27,000 29,700
13 Tegel keramik 30 x 30 Cm KW I Motif M2 34,000 37,400
F. BAHAN UNTUK PENGECATAN

1 Cat (besi / Kayu) Sejenis ( EMCO ) Kwalitas A Kg 38,000 41,800


2 Cat meni (besi/kayu) cat Pedang Kg 14,000 15,400
3 Tiner A Lt 16,000 17,600
4 Tiner B Lt 7,500 8,250
5 Cat tembok PARAGON Kg 10,800 11,880
6 Cat tembok DECOLIT Kg 11,000 12,100
7 Cerlak Kg 60,000 66,000
8 Politur Lt 31,000 34,100
9 Vernis Lt 14,000 15,400
10 Teer / Blek Blek 100,000 110,000
11 Kertas gosok Lbr 2,500 2,750
12 Plamur tembok Kg 10,000 11,000
Plamur tembok / set Set 15,000 16,500
13 Plamur kayu Kg 13,500 14,850
14 Plamur Besi Kg 13,500 14,850
15 Spiritus Lt 9,500 10,450
16 Lem kayu Kg 9,500 10,450
17 Soda api Kg 9,000 9,900
18 Kuas Cat Bh 12,500 13,750
19 Rol cat Bh 12,000 13,200
G. BAHAN UNTUK PENGANTUNG DAN PENGGUNCI

1 Engsel jendela Bh 15,000 16,500


2 Engsel Pintu Bh 20,000 22,000
3 Grendel Bh 4,000 4,400
4 Kunci tanam besar Bh 65,000 71,500
5 Kunci tanam kamar mandi Bh 25,000 27,500
6 Sping knip Bh 9,000 9,900
7 Door closer Bh 110,000 121,000
8 Door stop Bh 15,000 16,500
9 Hak angin / Pasang Bh 8,000 8,800
10 Pegangan pintu / Pasang Bh 85,000 93,500
H. BAHAN UNTUK KM / WC & URINOIR

1 Pipa / slang spiral saluran kran (DN) Set 11,000 12,100


2 Closet duduk putih porselin komplit (ina) Bh 900,000 990,000
3 Closet jongkok porselin warna (ina) Bh 95,000 104,500
4 Bak cuci stainless steel Bh 180,000 198,000
5 Seal Tape Bh 1,000 1,100
6 Wastafel (ina) Bh 220,000 242,000
7 Kran air (Amico) 3/4 " Bh 23,000 25,300
8 Kran air (Amico) 1/2" Bh 20,000 22,000
9 Water drain + Assesories ( Plastik ) Set 2,000 2,200
1 2 3 4 5
10 Urinoir Bh 167,500 184,250
11 Floor drain Bh 6,000 6,600
I. BAHAN JENIS KACA

1 Kaca polos tb 5 mm M2 60,000 66,000


2 Kaca rayban tb. 5mm M2 70,000 77,000
3 Kaca es 5mm M2 85,000 93,500
4 Jendela nako 13 daun Ps 130,000 143,000
J. BAHAN BETON CETAKAN

1 Buis beton diameter 15 cm O Bh 16,000 17,600


2 Buis beton diameter 20 cm O Bh 22,000 24,200
3 Buis beton diameter 30 cm O Bh 35,000 38,500
4 Buis beton diameter 40 cm O Bh 45,000 49,500
5 Buis beton diameter 50 cm O Bh 55,000 60,500
6 Buis beton U 20 mm Bh 12,000 13,200
7 Buis beton U 30 mm Bh 18,000 19,800
8 Buis beton U 40 mm Bh 22,000 24,200
9 Roster Beton Kecil (10x20) cm Bh 2,500 2,750
K. BAHAN PLASTIK PIPA PVC

1 Keni PVC 1/2" Bh 1,000 1,100


2 Keni PVC 3/4" Bh 1,000 1,100
3 Keni PVC 2" Bh 2,500 2,750
4 Keni PVC 3" Bh 5,000 5,500
5 Keni PVC 4" Bh 8,500 9,350
6 Keni PVC 5" Bh 10,500 11,550
7 Klem PVC Bh 2,500 2,750
8 Pipa paralon 5/8" panjang 4.00 Mt (Sejenis) Ljr 4,500 4,950
9 Pipa PVC 1/2" panjang 4.00 mt (Sejenis) Ljr 12,000 13,200
10 Pipa PVC 3/4" panjang 4.00 mt (Sejenis) Ljr 16,000 17,600
11 Pipa PVC 1" panjang 4.00 mt (Sejenis) Ljr 19,000 20,900
12 Pipa PVC 2" panjang 4.00 mt (Sejenis) Ljr 29,000 31,900
13 Pipa PVC 3" panjang 4.00 mt (Sejenis) Ljr 63,000 69,300
14 Pipa PVC 4" panjang 4.00 mt (Sejenis) Ljr 88,000 96,800
15 Pipa PVC 5" panjang 4.00 mt (Sejenis) Ljr 144,000 158,400
16 Pipa PVC 1/2" type AW panjang 4.00 mt Ljr 15,500 17,050
17 Pipa PVC 3/4" type AW panjang 4.00 mt Ljr 18,000 19,800
18 Pipa PVC 1" type AW panjang 4.00 mt Ljr 23,500 25,850
19 Pipa PVC 2" type AW panjang 4.00 mt Ljr 64,500 70,950
20 Pipa PVC 3" type AW panjang 4.00 mt Ljr 112,000 123,200
21 Pipa PVC 4" type AW panjang 4.00 mt Ljr 171,500 188,650
22 Pipa PVC 5" type AW panjang 4.00 mt Ljr 186,000 204,600
23 Lem Paralond Bh 5,500 6,050
L. BAHAN JENIS PAKU

1 Paku Kg 13,000 14,300


2 Paku asbes Bh 750 825
Paku asbes Kg 12,000 13,200
3 Paku Eternit Kg 12,000 13,200
4 Paku reng Kg 10,500 11,550
5 Paku triplek Kg 12,000 13,200
6 Paku usuk Kg 10,500 11,550
7 Paku Pancing Bh 1,000 1,100
-
M. BAHAN PERALATAN LISTRIK

1 Stop kontak BROCO Bh 8,900 9,790


2 Skakelar BROCO " Tunggal " Bh 7,300 8,030
3 Skakelar BROCO " Ganda " Bh 9,250 10,175
4 Zekering Tunggal "LN" Bh 22,500 24,750
5 Zekering Ganda " LN " Bh 35,000 38,500
6 Kabel NYA 100 Volt 4mm m' 6,750 7,425
1 2 3 4 5
7 Fiting Plafond m' 5,000 5,500
8 T Dos PVC bh 500 550
9 Isolator bh 500 550
10 Panel box MCB Bh 28,000 30,800
11 Lampu pijar 25,40,75 / 220 V Philip Set 3,350 3,685
12 Lampu TL 20 W / 220 V komp. balas, kac. Philip Set 29,000 31,900
13 Lampu TL 40 W / 220 V komp. balas, kac. Philip Set 81,500 89,650
N. SEWA ALAT - ALAT

1 Cangkul,Kranjang bambu, Pikul,tali dsb set -


2 Mesin Gilas 3Roda 6-8 ton Kapasitas 51 HP Umur 10th Rp/jam -
Jam pemakaian 15 Jam. Harga. Rp.108.566.000,00 -
Kode E.080 -
3 Mesin Gilas 3Roda 8-10 ton Kapasitas 40 HP Umur 10th Rp/jam -
Jam pemakaian 15 Jam. Harga. Rp.153.012.000,00 -
Kode E.081 -
O. BAHAN - BAHAN BBM

1 Minyak bakar industri Liter 7,000 7,700


2 Minyak bakar bersubsidi Liter 3,750 4,125
3 Minyak solar Liter 4,500 4,950
4 Premium Liter 4,500 4,950
5 Minyak pelumas Liter 4,500 4,950
6 Aspal 60 - 70 ( kemasan drum ) Kg 7,275 8,000
7 Aspal curah Kg 5,725 6,300
P. TENAGA KERJA / (HARI)

1 MANDOR Org/hr 55,000


2 KEPALA TUKANG Org/hr 44,000
3 TUKANG BATU Org/hr 38,500
4 TUKANG BESI ,KAYU,CAT,LISTRIK,PIPA Org/hr 38,500
5 BURUH TERLATIH Org/hr 35,000
6 PEKERJA /BURUH TAK TERLATIH Org/hr 27,500
7 OPERATOR Org/hr 45,000
8 PEMBANTU OPERATOR Org/hr 29,500
9 OPERATOR KURANG TERLATIH / MEKANIK PEMBANTU Org/hr 33,000
10 SUPIR Org/hr 45,000
11 PEMBANTU SUPIR Org/hr 37,500
12 JURU UKUR Org/hr 65,000
14,300
-
18,700
-
-
-
85,250
73,150
71,500
-
-
64,350
25,850
-
8,800
-
-
88,220
93,500
-
-
47,850
93,500
-
35,750
-
34,100
38,500
56,100
66,000
99,000
132,000
-
-
79,750
11,000

-
6,534,000
4,400,000
7,480,000
8,250,000
6,600,000
4,400,000
4,950,000
3,850,000
4,400,000
8,800
4,950,000
5,500,000
4,537,500
4,400,000
3,300
5,500
84,700
12,100
12,100

-
429
2,750
99,000
99,000
110,000
110,000
121,000
143,000
165,000
137,500
159,500
159,500
110,000
83,600
82,500
90,200
82,500
55,000
-
83,600
8,712
59,400
51,700
58,300
51,700
-
72,600
49,500
38,500
33,000
3,850
8,800
-
14,850
9,900
15,400
80,850
104,500
145,200
187,000
379,500
352,000
687,500
577,500
1,265,000
15,950
154,000
77,000
49,500
13,200
17,600
357,500
16,500
-
22,000
225,500

40,700
-
31,900
-
44,550
-
47,300
-
36,850
-
40,150
-
8,800
19,800
38,500
40,700
40,700
29,700
37,400
-

41,800
15,400
17,600
8,250
11,880
12,100
66,000
34,100
15,400
110,000
2,750
11,000
16,500
14,850
14,850
10,450
10,450
9,900
13,750
13,200

-
16,500
22,000
4,400
71,500
27,500
9,900
121,000
16,500
8,800
93,500

12,100
990,000
104,500
198,000
1,100
242,000
25,300
22,000
2,200
184,250
6,600
-

66,000
77,000
93,500
143,000
-

17,600
24,200
38,500
49,500
60,500
13,200
19,800
24,200
2,750

1,100
1,100
2,750
5,500
9,350
11,550
2,750
4,950
13,200
17,600
20,900
31,900
69,300
96,800
158,400
17,050
19,800
25,850
70,950
123,200
188,650
204,600
6,050
-

14,300
825
13,200
13,200
11,550
13,200
11,550
1,100
-
-

9,790
8,030
10,175
24,750
38,500
7,425
5,500
550
550
30,800
3,685
31,900
89,650

-
-
-
-
-
-
-

7,700
4,125
4,950
4,950
4,950
8,000
6,300
-

-
-
-
-
-
-
-
-
-
-
-
-
LAMPIRAN I : KEPUTUSAN KEPALA DESA
NOMOR :
TANGGAL :

DAFTAR PATOKAN HARGA SATUAN


BAHAN BANGUNAN DAN UPAH PEKERJA
DESA .........................................
TAHUN ANGGARAN 2009

HARGA DI LOKASI
NO JENIS BAHAN SATUAN
PEKERJAAN

1 2 3 4
I BAHAN PASIR
1 Pasir Urug M3
2 Sirtu (tidak diayak) M3
3 Pasir Pasang/Cor M3
4 Tanah Urug M3
5 Grosok M3
6 Abu batu M3

II BAHAN BATU
1 Batu kali pecah 15/20 (tangan) M3
2 Batu kali pecah 10/15 (tangan) M3
3 Batu kali pecah 5/7 (tangan) M3
4 Batu kali pecah 3/5 (mesin) M3
5 Batu kali pecah 2/3 (mesin) M3
6 Batu kali pecah 1/2 (mesin) M3
7 Batu Pecah 1/1 (mesin) M3
8 Batu kali pecah 0,5-1 (mesin) M3
9 Batu gunung atau Quarry M3
10 Kerikil galian bukit M3
11 Batu kali M3
12 Kerikil sungai ayak tnp pasir 0,5-1 M3

III BAHAN BATU BATA


1 Batu bata merah bh
2 Batako bh
3 Paving stone K.175 tebal 6 cm M2
4 Paving stone K.200 tebal 6 cm M2

Page 36
1 2 3 4
5 Paving stone K. 200 tebal 8 cm M2
6 Paving stone K. 300 tebal 6 cm M2
7 Paving stone K. 300 tebal 8 cm M2
8 Paving stone K. 300 warna t = 6 cm M2
9 Paving stone K. 300 warna t = 8 cm M2
10 Paving stone K. 175 warna t = 6 cm M2
11 Paving stone K. 175 warna t = 8 cm M2
12 Paving stone K. 125 warna t = 6 cm M2
13 Kanstin 10x20x40x K. 275 bh
14 Kanstin 10x20x40x K. 300 bh
15 Roster beton bh

IV PORTLAND CEMENT (PC) DAN KAPUR


1 Semen Gresik 40 Kg Zak
2 Semen Gresik 50 Kg Zak
3 Semen Holcim 40 Kg Zak
4 Semen Holcim 50 Kg Zak
5 Semen Bosowa 40 Kg Zak
6 Semen Bosowa 50 Kg Zak
7 Semen Putih Tiga Roda Zak
8 Semen Putih Banteng Zak
9 Kapur bubuk Kg
10 Kapur Gamping Kg
11 Dolosit Zak

V BAHAN BESI
1 Baja Konstruksi Kg
2 Besi beton polos Kg
3 Baja ulir/Tulangan Mutu U-24 Kg
4 Besi siku 30x30x3 panjang 6 m Ljr
5 Besi siku 60x60x6 panjang 6 m Ljr
6 Pipa air Galvanis medium 1/2" Ljr
7 Pipa air Galvanis Medium 3/4 " Ljr
8 Pipa air Galvanis medium 1 " Ljr
9 Pipa air Galvanis medium 1,25 " Ljr
10 Pipa air Galvanis medium 2 " Ljr
11 Pipa air Galvanis medium 3 " Ljr
12 Kawat Beton (bendrat) Kg
13 Kawat bronjong 3,8 mm Kg
14 Bronjong kawat (0,5x1x2) 3 lilitan lbr

Page 37
1 2 3 4
15 Kawat biasa (tali) Kg
16 Paku asbes bh
17 Paku asbes Kg
18 Paku pancing bh
19 Paku eternit Kg
20 Paku reng Kg
21 Paku usuk Kg
22 Paku triplek Kg

VI TEGEL/KERAMIK
1 Tegel abu-abu 20x20 Cm M2
2 Keramik 10x20 Cm M2
3 Keramik 20x20 (lantai) Kw I M2
4 Keramik 20x25 (dinding) Kw I M2
5 Keramik Putih 30x30 (lantai) M2
6 Keramik motip (30x30) Kw I M2
7 Keramik motif (40x40) Kw I M2

VII BUIS BETON


1 Buis beton bulat 15 cm M
2 Buis beton bulat 20 cm M
3 Buis beton bulat 30 cm M
4 Buis beton bulat 40 cm M
5 Buis beton bulat 50 cm M
6 Buis beton bulat 60 cm M
7 Buis beton bulat 70 cm M
8 Buis beton bulat 80 cm M
9 Buis beton bulat 90 cm M
10 Buis beton bulat 100 cm M
11 Buis beton U 20 cm M
12 Buis beton U 30 cm M
13 Buis beton U 40 cm M

VIII BAHAN KAYU/TRIPLEK DAN BAMBU


1 Kayu jati 10/20 x 3,5 m M3
2 Kayu Balau 10/20 x 3.5 m M3
3 Kayu Kamper 8/12, 6/12.6/15 M3
4 Kayu Kamper 3/30 x 3m M3
5 Kayu kamper 5/7, 4/6, 3/5, 2/3 M3
6 Kayu meranti 8/12,6/12,6/15 M3

Page 38
1 2 3 4
7 Kayu merenti 3/30 x 3m M3
8 Kayu meranti 5/7,4/6,3/5,2/3 M3
9 Kayu Meranti (papan begesting) M3
10 Kayu kruing 8/12,6/12,6,15 M3
11 Kayu Kruing 2/20 x 3m M3
12 Kayu Kruing 5/7,4/6,3/5,2/3 M3
13 List Kayu Polos 1/5 x 2m M
14 List Kayu Profil 2/5 x2m M
15 Bambu Bingkotan (2,5 - 3 m) Bt
16 Bambu Bongkotan 2 m Bt
17 Triplek lapis almunium Lbr
18 Triplek 90.210.3 mm Lbr
19 Triplek 90.210.4 mm Lbr
20 Triplek 120.240.2 mm Lbr
21 Triplek 120.240.3 mm Lbr
22 Triplek 120.240.4 mm Lbr
23 Triplek 120.240.6 mm Lbr
24 Triplek 120.240.9 mm Lbr
25 Triplek 120.240.12 mm Lbr
26 Teakwood 122.244.3 mm Lbr
27 Teakwood 122.244.4 mm Lbr
28 Plywood 122.244.4 mm Lbr
29 Plywood 122.244.9 mm Lbr
30 Gedeg guling M2

IX BAHAN PENUTUP ATAP


1 Genteng lokal ex Mojokembang Bh
2 Genteng Nglayur model kr.pilang Bh
3 Genteng bub. model kr.pilang Bh
4 Genteng bub.ex Mojokembang Bh
5 Eternit Lbr
6 Asbes datar tebal 4mm (60x200) Lbr
7 Asbes datar tebal 5mm (60x200) Lbr
8 Asbes datar tebal 6mm (40x200) Lbr
9 Asber Gel. Besar 305x105x5 mm Lbr
10 Asber Gel. Kecil 305x105x5 mm Lbr
11 Asbes wuwung gel. besar t. 5 mm Lbr
12 Asbes wuwung gel. kecil t. 4 mm Lbr
13 List gypsum M

Page 39
1 2 3 4
X BAHAN INTALASI AIR
1 Pipa PVC AW 1/2" 4 m Ljr
2 Pipa PVC AW 3/4" 4 m Ljr
3 Pipa PVC AW 1" 4 m Ljr
4 Pipa PVC AW 2" 4 m Ljr ,
5 Pipa PVC AW 3" 4 m Ljr 3
6 Pipa PVC AW 4" 4 m Ljr
7 Pipa PVC AW 5" 4 m Ljr
8 Pipa PVC 1/2" 4 m sejenis Ljr
9 Pipa PVC 3/4" 4 m sejenis Ljr
10 Pipa PVC 1" 4 m sejenis Ljr
11 Pipa PVC 2" 4 m sejenis Ljr
12 Pipa PVC 3" 4 m sejenis Ljr
13 Pipa PVC 4" 4 m sejenis Ljr
14 Pipa PVC 5" 4 m sejenis Ljr
15 Keni PVC 1/2" Bh
16 Keni PVC 3/4" Bh
17 Keni PVC 2" Bh
18 Keni PVC 3" Bh
19 Keni PVC 4" Bh
20 Keni PVC 5" Bh
21 Klem PVC Bh
22 Lem PVC Bh

XI BAHAN CAT DAN PLITUR


1 Kertas Gosok lbr
2 Plamur tembok Kg
3 Plamur Kayu Kg
4 Plamur Besi Kg
5 Cat kayu/besi "EMCO" /setara Kg
6 Cat tembok " DECOLITH" Kg
7 Cat tembok "PAROGON" Kg
8 Cat meni "PEDANG" Kg
9 Dempul kayu Kg
10 Minyak cat/thiner B Ltr
11 Minyak cat/thiner A Ltr
12 Spiritus Ltr
13 Politur Ltr
14 Vernis Ltr

Page 40
1 2 3 4
15 Kolter Ltr
16 Lem kayu Kg
17 Cerlak Kg
18 Soda api Kg

XII KACA
1 Kaca bening 5 mm M2
2 Kaca rayband 5 mm M2
3 kaca es 5 mm M2

XIII ALAT PENGGANTUNG DAN KUNCI


1 Engsel jendela Bh
2 Engsel pintu Bh
3 Grendel Bh
4 Kunci tanam besar Bh
5 Kunci tanam kamar mandi Bh
6 Sping knip Bh
7 Door closer Bh
8 door stop Bh
9 Hak angin (pasang) Bh
10 Pegangan pintu (pasang) Bh

XIV BAHAN LAMPU DAN INSTALASI LISTRIK


1 Lampu TL 1x10 W "Philip Bh
2 Lampu TL 1x20 W "Philip Bh
3 Lampu TL 1x40 W "Philip Bh
4 Lampu Pijar 25-100 watt Philip Bh
5 Saklar tunggal "BROCO" Bh
6 Saklar ganda "BROCO" Bh
7 Stop kontak "BROCO" Bh
8 Sekering kast tunggal LN Bh
9 Sekering kast ganda LN Bh
10 NYA 1000 Vol 1,5 mm rol
11 NYA 1000 vol 2,5 mm rol
12 NYA 1000 vol 2 x 2,5 mm "Eterna rol
13 NYA 1000 vol 2 x 4 mm "Eterna rol
14 NYA 1000 vol 4 x 4 mm "Eterna rol
15 Panel MCB 4 Amp "ABB Komplit Unit
16 Pasang listrik titik
17 Fitting plafond Bh

Page 41
1 2 3 4
18 Fitting Gantung E 40 / Putu Bh
19 T dos PVC Bh
20 Isolasi Unibel Hitam Besar Bh
21 Dop Son H 220 W / Philips Asli Bh
22 Dop Son H 350 W / Philips Asli Bh
23 Dop Son H 250 W / Philips Asli Bh
24 Dop Son H 400 W / Philips Asli Bh
25 Dop HPL N 400 W / Philips Asli Bh
26 Dop HPL N 125 W / Philips Asli Bh
27 Dop HPL N 250 W / Philips Asli Bh
28 Dop HPI T 250 W / Philips Asli Bh
29 Dop HPI T 400 W / Philips Asli Bh
30 Dop TL 36 W / Philips Asli Bh
31 Dop Varilux 9 Kuning / Philips Asli Bh
32 Travo TL 40 W / Philips Asli Bh
33 Travo MC 125 W / Philips Asli Bh
34 Travo MC 250 W / Philips Asli Bh
35 Travo MC 400 W / Philips Asli Bh
36 Travo BSN 250 W / Philips Asli Bh
37 Travo BSN 400 W / Philips Asli Bh
38 Kap TL WD 1 x 40 W / SUI Bh
39 Kabel Twisted 2x16 mm SUTRADO M
40 Kapasitor 25 uf / Philips Bh
41 Kap Munik SRK 811 / HPI T 400 W Philips
Komplit Set
42 Ignektor S1 51 / Philips Bh
43 Ignektor S1 52 / Philips Bh
44 Ignektor SN 58 / Philips Bh
45 CT 100 / 5 a GAE Bh
46 Time Switch TB 118 Nasional Bh
47 Maknit Kontaktor SN 80 / MITSUBISHI Bh
48 Otomatis Lampu Hias / Multi Bh
49 Photo Control 10 A / SELKON Asli Bh
50 Mor Baut M 16 x 60 mm Hodip Bh
51 Baugel Stang 2" x 11" / HODIP Set
52 Kabel Twisted 2x10 mm SUTRADO M
53 Stater TL.S.10 Philips Bh
54 Lampu Hias 4 Warna SHINYOKU LEB rol
55 Tiang PJ 14 M,5"x4"3"2", 6 M x 3 M x 2 M x 3 M
Btg

Page 42
1 2 3 4
56 Baugel SKOUR 9" / HODIP Set
57 Trek SOUR 10 mm x 5,5 m Btg
58 Kawat No. 14 Kg
59 Lampu ZETALUX ZY 6009 SON 150W
(Komplit) / Philips Set
60 Lampu ZETALUX ZY 6009 SON 250W
(Komplit) / Philips Set
61 Lampu ZETALUX ZY 6009 SON 400W
(Komplit) / Philips Set
62 Konektor Adikita Kedap Air Bh
63 Stang Lampu 2M x 1,5" BSA Spindo Btg
64 Stang Lampu 3M x 1,5" BSA Spindo Btg
65 Stang Lampu 4M x 1,5" BSA Spindo Btg
66 Stang Lampu 6M x 1,5" BSA Spindo Btg
67 Stang Lampu 6M x 3M , 2" x 1,5" BSA Spindo
Btg
68 Begel Stang 3" x 1,5' Hodip Set
69 Begel Stang 4" x 1,5' Hodip Set
70 Begel Stang 5" x 1,5' Hodip Set
71 Begel Stang 6" x 1,5' Hodip Set
72 Begel Stang 11" x 1,5' Hodip Set
73 Stang Skour 4 M x10 mm Beton Ester Btg
74 Stang Skour 5 M x10 mm Beton Ester Btg
75 Stang Skour 6 M x10 mm Beton Ester Btg
76 Begel Skour 3" Hodip Set
77 Begel Skour 4" Hodip Set
78 Begel Skour 8" Hodip Set
79
Kap SRX 086 SON T 250 W Komplit / Philips Set
80 Tiang Type Octagonal 2 Cabang 10 Meter /
Hodip Btg
81 Tiang Type Octagonal 2 Cabang 10 Meter /
Hodip Btg
XV BAHAN LAIN-LAIN
1 Aspal drum 60/70 Kg
2 Aspal curah Kg
3 Minyak tanah Ltr
4 Minyak tanah (industri) Ltr
5 Minyak solar Ltr
6 Minyak premium Ltr
7 Minyak pelumas Ltr
8 Rol meter (50 m) 1 Bh

Page 43
1 2 3 4
9 Palu/bodem 1 Bh
10 Pisau besar 1 Bh
11 Keranjang 1 Bh
12 Kotak adukan 1 Bh
13 Cetok 1 Bh
14 Kuas 1 Bh
15 Kasut kayu 1 Bh
16 Gunting pemotong 1 Bh
17 Kunci pembengkok tulangan 1 Bh
18 Gergaji 1 Bh
19 Tripot dan trimbis 1 Bh
20 Tang pemotong kawat 1 Bh
21 Linggis 1 Bh
22 Kayu pemikul & tampar 1 Bh
23 Ember 1 Bh

, 2009

Page 44
LAMPIRAN I : KEPUTUSAN BUPATI JOMBANG
NOMOR : 188.4.45/ /415.10.10/2009
TANGGAL : 2009

DAFTAR PATOKAN HARGA SATUAN PEKERJAAN PER KEGIATAN (HSPK)


DI KABUPATEN JOMBANG TAHUN ANGGARAN 2009

HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4

I BIDANG PENGAIRAN
1 Pengukuran bendung untuk MC bh 339,980.00
2 Pengukuran saluran untuk MC Km 474,370.00
3 Pengukuran bangunan untuk MC bh 62,860.00
4 Foto dokumentasi unit #VALUE!
5 Pendongkelan rumpun bambu m² #VALUE!
6 Pendongkelan pohon keliling >0,75 m btg #VALUE!

Penebangan/Pendongkelan Pohon kllg >0,75 m &


7 btg #VALUE!
menimbun kembali bekas dongkelan

8 Kosrekan tanah setebal 15 cm dan dibuang keluar m² #VALUE!


9 pembuatan dan pembongkaran kisdam tinggi >1,00 m m³ #VALUE!
10 Jam pengeringan / pemompaan air jam #VALUE!
11 Galian tanah biasa langsung untuk timbunan / dibuang m³ #VALUE!
12 Galian tanah biasa diangkat .1,00 m untuk timbunan m³ #VALUE!
13 Galian tanah biasa untuk timbunan / dibuang + 50 m m³ #VALUE!
14 Galian tanah berbatu dibuang + 50 m m³ #VALUE!
15 Galian tanah berbatu diangkut > 1,00 m dibuang m³ #VALUE!
16 Galian tanah keras / cadas dibuang + 50 m m³ #VALUE!
17 Galian tanah keras / cadas diangkat > 1,00 m m³ #VALUE!

18 Timbunan tanah kembali dipadatkan & dirapikan (manual) m³ #VALUE!

19 Timbunan tanah dari luar dipadatkan & dirapikan (manual) m³ #VALUE!

Hal 45
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
Timbunan tanah kembali dipadatkan & dirapikan
20 m³ #VALUE!
(mekanis)
Timbunan tanah dari luar dipadatkan & dirapikan
21 m³ #VALUE!
(mekanis)
22 pemadatan tanah timbunan & dirapikan (manual) m³ #VALUE!
23 pemadatan tanah timbunan & dirapikan (mekanis) m³ #VALUE!
24 Bongkaran pasangan batu kali dan dirapikan m³ #VALUE!
25 Bongkaran dinding pasangan batu merah / dibuang m³ #VALUE!
26 Bongkaran pasangan linning plat beton & dibersihkan m³ #VALUE!
27 Tabalan rumput m² #VALUE!
28 Pasangan batu kali bekas bongkaran 1 Pc : 4 psr m³ #VALUE!
29 Pasangan batu kali dengan spesi 1 Pc : 3 Psr m³ #VALUE!
30 Pasangan batu candi dengan spesi 1 Pc : 3 Psr m³ #VALUE!
31 Pasangan batu kali dengan spesi 1 Pc : 4 psr m³ #VALUE!
32 Siaran dengan spesi 1 Pc : 2 Psr m² #VALUE!
33 Plesteran tebal 1,5 cm dengan spesi 1 Pc : 3 Psr m² #VALUE!
34 Pasangan batu kali / Gunung kosong m³ #VALUE!
35 Beton kurus campuran 1 Pc : 3 Psr : 6 Kr m³ #VALUE!
36 Beton tak bertulang K 125 m³ #VALUE!
37 Beton bertulang K 125 untuk plat pelayanan & titian m³ #VALUE!
38 Beton bertulang K 175 untuk plat pelayanan & titian m³ #VALUE!
39 Beton bertulang K 125 untuk pondasi linning plat beton m³ #VALUE!
40 Pasang pipa sandaran Galvanis D 3" m' #VALUE!
41 Pancang bungkotan D=0,8m, P=2,5m, masuk =2m btg #VALUE!
42 Tiang pancang dolken D=0,13m, P=2,5m btg 211,660.00
43 Bronjong kawat galvanis D=3,8mm m³ #VALUE!
44 Bronjong kawat galvanis D=3,8mm dengan batu lama m³ #VALUE!
45 Pasang gorong-gorong D 0,15 - 1,00 m m' #VALUE!

Hal 46
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
46 Pasang gorong-gorong D 0,20 - 1,00 m m' #VALUE!
47 Pasang gorong-gorong D 0,30 - 1,00 m m' #VALUE!
48 Pasang gorong-gorong D 0,40 - 1,00 m m' #VALUE!
49 Pasang gorong-gorong D 0,50 - 1,00 m m' #VALUE!
50 Pasang gorong-gorong D 0,60 - 1,00 m m' #VALUE!
51 Pasang gorong-gorong D 0,80 - 1,00 m m' #VALUE!
52 Pasang gorong-gorong D 1,00 - 1,00 m m' #VALUE!

II BIDANG PRASARANA JALAN


1 Pasangan onderlaag 10/15 m³ 188,912.50
2 LPB Klas C 15 Cm m³ 208,712.68
3 LPB Klas B 10 Cm m³ 227,000.53
4 LPA Klas A 5 Cm m³ 289,409.07
5 ATB 10 Cm m³ 1,477,387.11
6 Lapen 5 Cm m² 57,476.12
7 AC tebal 5 Cm m² 79,918.92
8 AC tebal 4 cm m² 63,935.14
9 AC tebal 3,5 cm m² 55,943.25
10 Prime Coat m² 9,216.00
11 Teack Coat m² 9,395.50
12 Lataston 3 Cm Ton 766,250.90
13 HRS tebal 3 Cm m² 56,001.21
14 Burtu m² 26,374.59
15 Pasangan Batu Kali 1:5 siar 1:2 m³ 445,532.00
16 Spesi Beton ( K.730) m³ 962,021.83
17 Spesi Beton ( K.723) m³ 612,561.74
18 Spesi Beton ( K.721) m³ 458,000.00
19 Spesi Beton ( K.722) m³ 706,874.59

Hal 47
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
20 Spesi Beton ( K.719) m³ 605,584.62
21 Perancah m² 163,936.00
22 Pembesian (Polos) Kg 12,386.70
23 Pembesian (Ulir) Kg 12,386.70
24 Galian Tanah m³ 32,823.40
25 Pasang Bronjong m³ 367,496.00
26 Sirtu (Ls) m³ 89,500.00
27 Plester 1:3 m² 22,418.85
28 Urug Bahu Jalan m³ 80,100.00
29 Urug Sirtu m³ 108,300.00
30 Pasang Batu Tepi 15/20 m' 6,374.00
31 Patok Pengaman dia 15 cm bh 75,000.00
32 Pipa PVC 3/4" m' 6,000.00
33 Pipa Sandaran m' 30,000.00
34 Pasangan Batu Merah m³ 367,000.00
35 pasangan Trasraam 1:4 m³ 510,000.00
36 Perataan muka jalan m² 1,500.00
37 Pengecatan Marka Jalan m² 100,969.87
38 Pacing/Pengupasan m² 3,000.00
39 Pembersihan Parit m' 5,016.16
40 Penyiapan Tanah Dasar Are 43,828.00

III BIDANG GEDUNG DAN PERMUKIMAN


A Pekerjaan Persiapan
1 Pembersihan lapangan m² 6,000.00
2 Pengukuran dan pemasangan bowplank m' 88,881.00
3 Pembuatan jalan sementara m² 60,300.00
4 Bongkaran beton bertulang m³ 219,990.00

Hal 48
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
5 Bongkaran dinding tembok bata merah m³ 219,990.00

B Pekerjaan Tanah
1 Galian untuk tanah biasa sedalam 1 m m³ 14,400.00
2 Galian untuk tanah biasa sedalam 2 m m³ 18,900.00
3 Galian untuk tanah biasa sedalam 3 m m³ 26,430.00
4 Galian untuk tanah keras sedalam 1 m m³ 22,470.00
5 Galian untuk tanah cadas sedalam 1 m m³ 45,000.00
6 Galian untuk tanah lumpur sedalam 1 m m³ 29,670.00
7 Pekerjaan stripping 1 m m² 1,800.00
8 Pembuangan tanah sejauh 150 m m³ 18,480.00
9 Urugan kembali m³ 6,900.00
10 Pemadatan tanah m³ 18,000.00
11 Urugan pasir m³ 108,600.00
12 Urugan sirtu m³ 87,000.00

C Pekerjaan Pondasi
1 Pasang pondasi batu kosong m³ 200,040.00
2 Pasang pondasi batu kali 1 Pc : 1 Psr m³ 702,456.00
3 Pasang pondasi batu kali 1 Pc : 2 Psr m³ 549,923.50
4 Pasang pondasi batu kali 1 Pc : 3 Psr m³ 481,126.00
5 Pasang pondasi batu kali 1 Pc : 4 Psr m³ 437,944.00
6 Pasang pondasi batu kali 1 Pc : 5 Psr m³ 408,028.00
7 Pasang pondasi batu kali 1 Pc : 6 Psr m³ 386,986.00
8 Pasang pondasi batu kali 1 Pc : 8 Psr m³ 356,098.00

D Pekerjaan Beton
1 Membuat beton tumbuk 1 Pc : 3 Psr : 5 Kr m³ 514,884.00

Hal 49
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Psr : 5 Kr m³ 57,240.00
3 Membuat beton bertulang 1 Pc : 2 Psr : 3 Kr m³ 516,666.00
4 Membuat beton bertulang 1 Pc : 2 Psr : 4 Kr m³ 587,190.00
5 Membuat beton bertulang 1 Pc : 1 Psr : 2 Kr m³ 790,002.00
6 Pembesian dengan besi polos atau ulir Kg 11,136.00
7 Pasang bekisting untuk pondasi m² 201,950.00
8 Pasang bekisting untuk sloof m² 223,950.00
9 Pasang bekisting untuk kolom m² 207,800.00
10 Pasang bekisting untuk balok m² 208,400.00
11 Pasang bekisting untuk lantai m² 208,400.00
12 Pasang bekisting untuk dinding m² 164,400.00
13 Pasang bekisting untuk tangga m² 163,657.50

E Pekerjaan Pasangan
1 Pasangan bata merah tebal 1 bata 1 Pc : 2 Psr m² 148,678.00
2 Pasangan bata merah tebal 1 bata 1 Pc : 4 Psr m² 129,711.40
3 Pasangan bata merah tebal 1 bata 1 Pc : 6 Psr m² 125,353.60
4 Pasangan bata merah tebal 1/2 bata 1 Pc : 2 Psr m² 70,682.60
5 Pasangan bata merah tebal 1/2 bata 1 Pc : 4 Psr m² 62,282.00
6 Pasangan bata merah tebal 1/2 bata 1 Pc : 6 Psr m² 59,044.16
7 Pasangan dinding roster/terawang (12x11x24) cm m² 284,756.40

F Pekerjaan Plesteran
1 Plesteran 1 Pc : 2 Psr tebal 15 mm m² 25,001.76
2 Plesteran 1 Pc : 4 Psr tebal 15 mm m² 21,327.60
3 Plesteran 1 Pc : 6 Psr tebal 15 mm m² 19,791.84
4 Plesteran 1 Pc : 2 Psr tebal 20 mm m² 36,284.64
5 Plesteran 1 Pc : 4 Psr tebal 20 mm m² 30,081.84

Hal 50
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
6 Plesteran 1 Pc : 6 Psr tebal 20 mm m² 27,363.12
7 Plesteran 1 Pc : 3 Psr tebal 20 mm m² 18,419.16
8 Plesteran beton 1 Pc : 3 Psr tebal 15 mm m² 27,869.16
9 Plesteran ciprat 1 pc : 2 Psr m² 19,022.16

G Pekerjaan Kayu
1 Pasang kusen pintu dan jendela kayu kamper m³ 9,994,000.00
2 Pasang pintu panil kayu kamper m² 475,500.00
3 Pasang pintu klamp kayu kamper m² 356,407.50
4 Pasang pintu dan jendela jalusi kayu kamper m² 723,000.00
5 Pasang pintu plywood rangkap rangka kayu kamper m² 203,300.00
6 pasang jalusi mati kusen kayu kamper m² 603,232.50
7 Pasang pintu teakwood rangkap rangka kayu kamper m² 383,100.00
8 Pasang konstruksi kuda-kuda kayu kamper m² 9,148,490.00
9 Pasang konstruksi kuda-kuda kayu kruing m² 6,365,490.00
10 Pasang kaso + reng genteng kodok kayu kamper m² 99,292.50
11 Pasang kaso + reng genteng munier kayu kamper m² 114,252.50
12 Pasang kaso + reng atap sirap kayu kamper m² 1,245,870.00
13 Pasang rangka langit-langit (1.00x1.00)m kayu kamper m² 111,165.00
14 Pasang lisplang ukuran ( 3 x 20 )cm, kayu kamper m' 72,527.50
15 Pasang rangka dinding pemisah kayu kamper m² 234,015.00

H Pekerjaan Atap
1 Pasang atap genteng plenthong kecil m² 33,130.00
2 Pasang atap genteng plenthong super/besar m² 25,380.00
3 Pasang atap bubung plenthong kecil m' 49,254.00
4 Pasang atap bubung plenthong besar m' 46,704.00

Hal 51
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
I Pekerjaan Penutup Plafond
1 Pas. langit-langit asbes (1.00 x 1.00 )m, tebal 5mm m² 13,952.00
2 Pas. langit-langit plywood (30 x 60 )m, tebal 4mm m² 40,816.50
3 Pas. langit-langit plywood (30 x 120 )m, tebal 4mm m² 42,219.00
4 Pas. langit-langit teakwood (30 x 60 )m, tebal 4mm m² 44,956.50
5 Pas. langit-langit teakwood (30 x 120 )m, tebal 4mm m² 46,531.50
6 Pas. langit-langit lat kayu kamper m² 232,375.50

J Pekerjaan Sanitasi
1 Memasang 1 buah kloset duduk/monoblok bh 1,053,650.00
2 Memasang 1 buah kloset duduk porselen bh 282,728.00
3 Memasang 1 buah urinoir bh 268,128.00
4 Memasang 1 buah wastafel bh 354,628.00
5 Memasang 1 buah bak mandi batu bata volume 0.3 m3 bh 683,189.00
Memasang 1 m' pipa penyalur air limbah jenis pipa tanah
6 bh 21,145.34
D 15
K Pekerjaan Kunci dan Kaca
1 Pasang kunci tanam bh 92,600.00
2 Pasang engsel pintu bh 29,245.00
3 Pasang engsel jendela kupu-kupu bh 21,330.00
4 Pasang spring knip bh 17,145.00
5 Pasang door closer bh 145,150.00
6 Pasang pegangan pintu bh 93,500.00
7 pasang door stop bh 21,330.00
8 Pasang kaca tebal 5 mm bh 79,845.00

L Pekerjaan Lantai dan Dinding


1 Pasang lantai ubin PC abu-abu ukuran 20 x 20 cm m² 49,530.20

Hal 52
HARGA
NO MACAM PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
2 Pasang lantai keramik 20 x 20 cm m² 98,769.44
3 Pasang dinding keramik 20 x 20 cm m² 98,038.40

M Pekerjaan Pengecatan
1 Mengikis, mengerok permukaan cat tembok lama m² 5,145.00
2 Pengecatan kayu lama m² 22,064.50
3 Pengecatan kayu baru (1xplamir, 1x cat dasar, 2x cat
m² 26,191.50
penutup)
4 Pengecatan tembok baru (1xplamir, 1x cat dasar, 2x cat
m² 9,423.80
penutup)
5 Pengecatan tembok lama (1xplamir, 1x cat dasar, 2x cat
m² 6,470.40
penutup)

N Pekerjaan Meubelair
1 Pembuatan meja jati siswa bh 670,000.00
2 Pembuatan kursi jati siswa bh 190,000.00

BUPATI JOMBANG

S UYAN T O

Hal 53
LAMPIRAN I : KEPUTUSAN KEPALA DESA
NOMOR :
TANGGAL : 2009

DAFTAR PATOKAN HARGA SATUAN PEKERJAAN PER KEGIATAN (HSPK)


TAHUN ANGGARAN 2009

HARGA SATUAN
NO MACAM PEKERJAAN SATUAN
( Rp. )
1 2 3 4

I BIDANG PENGAIRAN
1 Pengukuran bendung untuk MC bh
2 Pengukuran saluran untuk MC Km
3 Pengukuran bangunan untuk MC bh
4 Foto dokumentasi unit
5 Pendongkelan rumpun bambu m²
6 Pendongkelan pohon keliling >0,75 m btg

Pendongkelan Pohon kllg >0,75 & menimbun kembali bekas


7 btg
dongkelan

8 Kosrekan tanah setebal 15 cm edan dibuang keluar m²


9 pembuatan dan pembongkaran kisdam tinggi >1,00 m m³
10 Jam pengeringan / pemompaan air jam
11 Galian tanah biasa langsung untuk timbunan / dibuang m³
12 Galian tanah biasa diangkat .1,00 m untuk timbunan m³
13 Galian tanah biasa untuk timbunan / dibuang + 50 m m³
14 Galian tanah berbatu dibuang + 50 m m³
15 Galian tanah berbatu diangkut > 1,00 m dibuang m³
16 Galian tanah keras / cadas dibuang + 50 m m³
17 Galian tanah keras / cadas diangkat > 1,00 m m³
18 Timbunan tanah kembali dipadatkan & dirapikan (manual) m³
19 Timbunan tanah dari luar dipadatkan & dirapikan (manual) m³

20 Timbunan tanah kembali dipadatkan & dirapikan (mekanis) m³

21 Timbunan tanah dari luar dipadatkan & dirapikan (mekanis) m³

22 pemadatan tanah timbunan & dirapikan (manual) m³


23 pemadatan tanah timbunan & dirapikan (mekanis) m³
24 Bongkaran pasangan batu kali dan dirapikan m³
2

1 2 3 4
25 Bongkaran dinding pasangan batu merah / dibuang m³
26 Bongkaran pasangan linning plat beton & dibersihkan m³
27 Tabalan rumput m²
28 Pasangan batu kali bekas bongkaran 1 Pc : 4 psr m³
29 Pasangan batu kali dengan spesi 1 Pc : 3 Psr m³
30 Pasangan batu candi dengan spesi 1 Pc : 3 Psr m³
31 Pasangan batu kali dengan spesi 1 Pc : 4 psr m³
32 Siaran dengan spesi 1 Pc : 2 Psr m²
33 Plesteran tebal 1,5 cm dengan spesi 1 Pc : 3 Psr m²
34 Pasangan batu kali / Gunung kosong m³
35 Beton kurus campuran 1 Pc : 3 Psr : 6 Kr m³
36 Beton tak bertulang K 125 m³
37 Beton bertulang K 125 untuk plat pelayanan & titian m³
38 Beton bertulang K 175 untuk plat pelayanan & titian m³
39 Beton bertulang K 125 untuk pondasi linning plat beton m³
40 Pasang pipa sandaran D 3" m'
41 Pancang bungkotan D=0,8m, L=2,5m, masuk =2m btg
42 Tiang pancang dolken D=0,13m, L=2,5m btg
43 Bronjong kawat galvanis D=3,8mm m³
44 Bronjong kawat galvanis D=3,8mm dengan batu lama m³
45 Pasang gorong-gorong D 0,15 - 1,00 m m'
46 Pasang gorong-gorong D 0,20 - 1,00 m m'
47 Pasang gorong-gorong D 0,30 - 1,00 m m'
48 Pasang gorong-gorong D 0,40 - 1,00 m m'
49 Pasang gorong-gorong D 0,50 - 1,00 m m'
50 Pasang gorong-gorong D 0,60 - 1,00 m m'
51 Pasang gorong-gorong D 0,80 - 1,00 m m'
52 Pasang gorong-gorong D 1,00 - 1,00 m m'

II BIDANG PRASARANA JALAN


1 Pasangan onderlaag m³
2 LPB Klas C 15 Cm m³
3 LPB Klas B 10 Cm m³
3

1 2 3 4
4 LPA Klas A 5 Cm m³
5 ATB 10 Cm m³
6 Lapen 5 Cm m²
7 AC tebal 5 Cm m²
8 AC tebal 4 cm m²
9 AC tebal 3,5 cm m²
10 Prime Coat m²
11 Teack Coat m²
12 Lataston 3 Cm Ton
13 HRS tebal 3 Cm m²
14 Burtu m²
15 Pasangan Batu Kali 1:5 siar 1:2 m³
16 Spesi Beton ( K.730) m³
17 Spesi Beton ( K.723) m³
18 Spesi Beton ( K.721) m³
19 Spesi Beton ( K.722) m³
20 Spesi Beton ( K.719) m³
21 Perancah m²
22 Pembesian (Polos) Kg
23 Pembesian (Ulir) Kg
24 Galian Tanah m³
25 Pasang Bronjong m³
26 Sirtu (Ls) m³
27 Plester 1:3 m²
28 Urug Bahu Jalan m³
29 Urug Sirtu m³
30 Pasang Batu Tepi 15/20 m'
31 Patok Pengaman bh
32 Pipa PVC 3/4" m'
33 Pipa Sandaran m'
34 Pasangan Batu Merah m³
35 pasangan Trasraam 1:4 m³
36 Perataan m²

1 2 3 4
37 Pengecatan Marka Jalan m²
38 Pacing/Pengupasan m²
39 Pembersihan Parit m'
40 Penyiapan Tanah Dasar Are

III BIDANG GEDUNG DAN PERMUKIMAN


A Pekerjaan Persiapan
1 Pembersihan lapangan dan peralatan m²
2 Pengukuran dan pemasangan bowplank m'
3 Pembuatan jalan sementara m²
4 Bongkaran beton bertulang m³
5 Bongkaran dinding tembok bata merah m³

B Pekerjaan Tanah
1 Galian untuk tanah biasa sedalam 1 m m³
2 Galian untuk tanah biasa sedalam 2 m m³
3 Galian untuk tanah biasa sedalam 3 m m³
4 Galian untuk tanah keras sedalam 1 m m³
5 Galian untuk tanah cadas sedalam 1 m m³
6 Galian untuk tanah lumpur sedalam 1 m m³
7 Pekerjaan stripping 1 m m²
8 Pembuangan tanah sejauh 150 m m³
9 Urugan kembali m³
10 Pemadatan tanah m³
11 Urugan pasir m³
12 Urugan sirtu m³

C Pekerjaan Pondasi
1 Pasang pondasi batu kosong m³
2 Pasang pondasi batu kali 1 Pc : 1 Psr m³
3 Pasang pondasi batu kali 1 Pc : 2 Psr m³
4 Pasang pondasi batu kali 1 Pc : 3 Psr m³
5 Pasang pondasi batu kali 1 Pc : 4 Psr m³

1 2 3 4
6 Pasang pondasi batu kali 1 Pc : 5 Psr m³
7 Pasang pondasi batu kali 1 Pc : 6 Psr m³
8 Pasang pondasi batu kali 1 Pc : 8 Psr m³

D Pekerjaan Beton
1 Membuat beton tumbuk 1 Pc : 3 Psr : 5 Kr m³
2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Psr : 5 Kr m³
3 Membuat beton bertulang 1 Pc : 2 Psr : 3 Kr m³
4 Membuat beton bertulang 1 Pc : 2 Psr : 4 Kr m³
5 Membuat beton bertulang 1 Pc : 1 Psr : 2 Kr m³
6 Pembesian dengan besi polos atau ulir Kg
7 Pasang bekisting untuk pondasi m²
8 Pasang bekisting untuk sloof m²
9 Pasang bekisting untuk kolom m²
10 Pasang bekisting untuk balok m²
11 Pasang bekisting untuk lantai m²
12 Pasang bekisting untuk dinding m²
13 Pasang bekisting untuk tangga m²

E Pekerjaan Pasangan
1 Pasangan bata merah tebal 1 bata 1 Pc : 2 Psr m²
2 Pasangan bata merah tebal 1 bata 1 Pc : 4 Psr m²
3 Pasangan bata merah tebal 1 bata 1 Pc : 6 Psr m²
4 Pasangan bata merah tebal 1/2 bata 1 Pc : 2 Psr m²
5 Pasangan bata merah tebal 1/2 bata 1 Pc : 4 Psr m²
6 Pasangan bata merah tebal 1/2 bata 1 Pc : 6 Psr m²
7 Pasangan dinding roster/terawang (12x11x24) cm m²
F Pekerjaan Plesteran
1 Plesteran 1 Pc : 2 Psr tebal 15 mm m²
2 Plesteran 1 Pc : 4 Psr tebal 15 mm m²
3 Plesteran 1 Pc : 6 Psr tebal 15 mm m²
4 Plesteran 1 Pc : 2 Psr tebal 20 mm m²

1 2 3 4
5 Plesteran 1 Pc : 4 Psr tebal 20 mm m²
6 Plesteran 1 Pc : 6 Psr tebal 20 mm m²
7 Plesteran 1 Pc : 3 Psr tebal 20 mm m²
8 Plesteran beton 1 Pc : 3 Psr tebal 15 mm m²
9 Plesteran ciprat 1 pc : 2 Psr m²

G Pekerjaan Kayu
1 Pasang kusen pintu dan jendela kayu kamper m³
2 Pasang pintu panil kayu kamper m²
3 Pasang pintu klamp kayu kamper m²
4 Pasang pintu dan jendela jalusi kayu kamper m²
5 Pasang pintu plywood rangkap rangka kayu kamper m²
6 pasang jalusi mati kusen kayu kamper m²
7 Pasang pintu teakwood rangkap rangka kayu kamper m²
8 Pasang konstruksi kuda-kuda kayu kamper m²
9 Pasang konstruksi kuda-kuda kayu kruing m²
10 Pasang kaso + reng genteng kodok kayu kamper m²
11 Pasang kaso + reng genteng munier kayu kamper m²
12 Pasang kaso + reng atap sirap kayu kamper m²
13 Pasang rangka langit-langit (1.00x1.00)m kayu kamper m²
14 Pasang lisplang ukuran ( 3 x 20 )cm, kayu kamper m'
15 Pasang rangka dinding pemisah kayu kamper m²

H Pekerjaan Atap
1 Pasang atap genteng plenthong kecil m²
2 Pasang atap genteng plenthong super/besar m²
3 Pasang atap bubung plenthong kecil m'
4 Pasang atap bubung plenthong besar m'

I Pekerjaan Penutup Plafond


1 Pas. langit-langit asbes (1.00 x 1.00 )m, tebal 5mm m²
2 Pas. langit-langit plywood (30 x 60 )m, tebal 4mm m²
3 Pas. langit-langit plywood (30 x 120 )m, tebal 4mm m²

1 2 3 4

4 Pas. langit-langit teakwood (30 x 60 )m, tebal 4mm m²


5 Pas. langit-langit teakwood (30 x 120 )m, tebal 4mm m²
6 Pas. langit-langit lat kayu kamper m²

J Pekerjaan Sanitasi
1 Memasang 1 buah kloset duduk/monoblok bh
2 Memasang 1 buah kloset duduk porselen bh
3 Memasang 1 buah urinoir bh
4 Memasang 1 buah wastafel bh
5 Memasang 1 buah bak mandi batu bata volume 0.3 m3 bh
Memasang 1 m' pipa penyalur air limbah jenis pipa tanah D
6 bh
15
K Pekerjaan Kunci dan Kaca
1 Pasang kunci tanam bh
2 Pasang engsel pintu bh
3 Pasang engsel jendela kupu-kupu bh
4 Pasang spring knip bh
5 Pasang door closer bh
6 Pasang pegangan pintu bh
7 pasang door stop bh
8 Pasang kaca tebal 5 mm bh

L Pekerjaan Lantai dan Dinding


1 Pasang lantai ubin PC abu-abu ukuran 20 x 20 cm m²
2 Pasang lantai keramik 20 x 20 cm m²
3 Pasang dinding keramik 20 x 20 cm m²

M Pekerjaan Pengecatan
1 Mengikis, mengerok permukaan cat tembok lama m²
2 Pengecatan kayu lama m²
3 Pengecatan kayu baru (1xplamir, 1x cat dasar, 2x cat

penutup)

1 2 3 4

4 Pengecatan tembok baru (1xplamir, 1x cat dasar, 2x cat



penutup)
5 Pengecatan tembok lama (1xplamir, 1x cat dasar, 2x cat

penutup)

N Pekerjaan Meubelair
1 Pembuatan meja jati siswa bh
2 Pembuatan kursi jati siswa bh

KEPALA DESA
0

manual
DAFTAR HARGA SATUAN PEKERJAAN
PROGRAM : PENGEMBANGAN & PENGELOLAAN JARINGAN IRIGASI
DAN JARINGAN LAINNYA
KEGIATAN : NORM. DAN PERB. PAS. TALUD SAL. SEK. KETAPANG KUNING
SUMBER DANA : APBD
TAHUN ANGGARAN : 2006
DINAS : PENGAIRAN KABUPATEN JOMBANG

NO. MACAM PEKERJAAN SAT. HARGA


( Rp. )

1 Pengukuran Bendung untuk MC. 1 Bh 339,980.00


2 Pengukuran Saluran untuk MC. 1 Km 474,370.00
3 Pengukuran Bangunan untuk MC. 1 Bh 62,860.00
4 Foto dokumentasi. 1 Unit #VALUE!
5 Pendongkelan rumpun bambu 1 M2 #VALUE!
6 Pendongkelan pohon keliling >0,75 m 1 Btg #VALUE!
7 Pendongkelan pohon kll >0,75 m dan menimbun kembali ex dongkelan. 1 Btg #VALUE!
8 Kosrekan tanah setebal 15 cm dan dibuang keluar. 1 M2 #VALUE!
9 Pembuatan dan pembongkaran kisdam tinggi > 1,00 M. 1 M3 #VALUE!
10 Jam Pengeringan / Pemompaan Air. 1 Jam #VALUE!
11 Galian tanah biasa langsung untuk timbunan / dibuang 1 M3 #VALUE!
12 Galian tanah biasa diangkat >1 m untuk timbunan 1 M3 #VALUE!
13 Galian tanah biasa untuk timbunan/dibuang ± 50 m 1 M3 #VALUE!
14 Galian tanah berbatu dibuang ± 50 M. 1 M3 #VALUE!
15 Galian tanah berbatu diangkut >1 m dibuang 1 M3 #VALUE!
16 Galian tanah keras / cadas dibuang ± 50 M. 1 M3 #VALUE!
17 Galian tanah keras / cadas diangkat > 1 m dibuang. 1 M3 #VALUE!
18 Timbunan tanah kembali dipadatkan & dirapikan (Manual) 1 M3 #VALUE!
19 Timbunan tanah dari luar dipadatkan & dirapikan (Manual). 1 M3 #VALUE!
20 Timbunan tanah kembali dipadatkan & dirapikan (Mekanis) 1 M3 #VALUE!
21 Timbunan tanah dari luar dipadatkan & dirapikan (Mekanis) 1 M3 #VALUE!
22 Pemadatan tanah timbunan & dirapikan (Manual) 1 M3 #VALUE!
23 Pemadatan tanah timbunan & dirapikan (Mekanis) 1 M3 #VALUE!
24 Bongkaran Pasangan batu kali & dibersihkan. 1 M3 #VALUE!
25 Bongkaran dinding pasangan Batu Merah / dibuang. 1 M3 #VALUE!
26 Bongkaran Pasangan Linning Plat Beton & Dibersihkan. 1 M3 #VALUE!
27 Tabalan rumput. 1 M2 #VALUE!
28 Pasangan batu kali bekas bongkaran 1 Pc : 4 Psr. 1 M3 #VALUE!
29 Pasangan batu kali dengan spesi 1 Pc : 3 Psr. 1 M3 #VALUE!
30 Pasangan batu candi dengan spesi 1 Pc : 3 Psr. 1 M3 #VALUE!
31 Pasangan batu kali dengan spesi 1 Pc : 4 Psr. 1 M3 #VALUE!
32 Siaran dengan spesi 1 Pc : 2 Psr 1 M2 #VALUE!
33 Plesteran tebal 1,5 cm dengan spesi 1 PC : 3 Ps. . 1 M2 #VALUE!
34 Pasangan batu kali/gunung kosong. 1 M3 #VALUE!
35 Beton kurus campuran 1PC : 3Ps : 6Kr 1 M3 #VALUE!
36 Beton Tak Bertulang K. 125. 1 M3 #VALUE!
37 Beton bertulang K125 untuk plat pelayanan & titian 1 M3 #VALUE!
38 Beton bertulang K175 untuk jembatan orang dan jembatan kendaraan 1 M3 #VALUE!
39 Beton bertulang K125 untuk pondasi linning plate beton 1 M3 #VALUE!
40 Pasang pipa sandaran D = 3" 1 M' #VALUE!
41 Pancang bongkotan bambu D= 0,08 M, L= 3,00 M, Masuk= 2,00 M 1 Btg #VALUE!
42 Tiang pancang dolken D = 0,13 M, L = 2,50 M 1 Btg #VALUE!
43 Bronjong kawat galvanis D = 3,8 mm 1 M3 #VALUE!
44 Bronjong kawat galvanis D = 3,8 mm dengan batu lama 1 M3 #VALUE!
NO. MACAM PEKERJAAN SAT. HARGA
( Rp. )

45 Pasang Gorong-gorong Ø 0,15 - 1,00 m 1 M' #VALUE!


46 Pasang Gorong-gorong Ø 0,20 - 1,00 m 1 M' #VALUE!
47 Pasang Gorong-gorong Ø 0,30 - 1,00 m 1 M' #VALUE!
48 Pasang Gorong-gorong Ø 0,40 - 1,00 m 1 M' #VALUE!
49 Pasang Gorong-gorong Ø 0,50 - 1,00 m 1 M' #VALUE!
50 Pasang Gorong-gorong Ø 0,60 - 1,00 m 1 M' #VALUE!
51 Pasang Gorong-gorong Ø 0,80 - 1,00 m 1 M' #VALUE!
52 Pasang Gorong-gorong Ø 1,00 - 1,00 m 1 M' #VALUE!

WILAYAH 30 Km
1 Perbaikan Embung Banjardowo
2 Pengendalian Banjir Kali Marmoyo
3 Pembangunan Talang dan Sal. Sek. Menturus
4 Pembangunan Talang, Normalisasi dan Perbaikan Pasangan Talud. Sal. Sek. Kedungbogo
5 Perbaikan Dam Marmoyo VII
6 Perbaikan Dam Katemas dan Jaringannya
7 Normalisasi dan Perbaikan Pasangan Talud Sal. Sek. Ketapang Kuning
8 Normalisasi dan Perkuatan Tebing Afvour Cangak Desa Sumbernongko
9 Pembuatan Dam Kepuhsari
DAFTAR HARGA SATUAN BAHAN & UPAH TENAGA KERJA
PROYEK
PEKERJAAN
LOKASI
TAHUN 2006

Harga
No. Jenis Bahan Satuan
Satuan
A. Bahan Pasir
1 Pasir Urug m3 82,500.00
2 Pasir Pasang m3 90,000.00
3 Pasir Cor m3 90,000.00
4 Sirtu m3 65,000.00
5 Tanah Urug m3 55,000.00
6 Tanah grosok m3 83,500.00

B. Bahan Batu
1 Batu Kali Pecah 15/20 ( tangan ) m3 110,000.00
2 Batu Kali m3 110,000.00
3 Batu Kali Pecah 10/15 ( tangan ) m3 110,000.00
4 Batu Kali Pecah 5/7 ( tangan ) m3 110,000.00
5 Batu Kali Pecah 3/5 ( mesin ) m3 143,000.00
6 Batu Kali Pecah 2/3 ( mesin ) m3 165,000.00
7 Batu Kali Pecah 0.5 - 1 ( mesin ) m3 159,500.00
8 Batu Kali Pecah 1/2 ( mesin ) m3 137,500.00
9 Koral Beton 1/2 m3 137,500.00
10 Koral Beton 2/3 m3 165,000.00
11 Batu Bata merah ( kelas I ) m3 425.00
12 Paving stone / beton blok kelas I m3 41,200.00
13 Paving stone / beton blok kelas II m3 46,700.00
14 Rooster beton bh 7,000.00
14.b Bata berongga bh Bata berongga
15 Hollow block 10 bh Hollow block 10
16 Hollow block 15 bh Hollow block 15
17 Hollow block 20 bh Hollow block 20
18 Conblock 10 bh Conblock 10
19 Conblock 15 bh Conblock 15
20 Conblock 20 bh Conblock 20

C. Bahan Semen
1 Semen Gresik 50 kg kg 1,188.00
2 Semen Tiga Roda 50 kg zak -
3 Semen putih ( Azano / Tiga Roda ) kg 1,452.00
4 Semen merah zak Semen merah

D. Bahan kapur
1 Kapur bubuk m3 33,000.00
2 Kapur gamping m3 3,850.00

E. Bahan Lantai
1 Tegel abu-abu 20 x 20 cm m2 20,000.00
2 Tegel Wafel 20 x 20 cm m2 22,500.00
3 Tegel keramik 30x30 cm ( KW I ) m2 29,700.00
4 Tegel keramik 20x20 cm ( KW I ) m2 40,700.00
5 Tegel keramik motif 30x30 cm m2 37,400.00
Harga
No. Jenis Bahan Satuan
Satuan
6 Keramik dinding 20x25 cm ( KW I ) m2 40,700.00
7 Granit 30x30 cm m2 Granit 30x30 cm

F. Bahan Kayu
1 Papan jati m3 -
2 Kayu reng jati 2/3 m3 -
3 Kayu Kamfer balok 8/12, 6/15 m3 7,480,000.00
4 Kayu kamfer usuk 5/7 m3 6,600,000.00
5 Kayu kamfer papan 3/30 m3 8,250,000.00
6 Kayu Kamfer reng 2/3 m3 6,600,000.00
7 Kayu kruing papan 2/20 m3 5,500,000.00
8 Kayu kruing balok 8/12,6/15 m3 4,950,000.00
9 Kayu kruing usuk 5/7 m3 4,400,000.00
10 Kayu kruing usuk 4/6 m3 4,400,000.00
11 Kayu kruing reng 2/3 m3 4,400,000.00
12 Kayu bengkirai 8/12, 6/15 m3 -
13 Kayu meranti balok 8/12, 6/15 m3 4,400,000.00
14 Keyu meranti usuk 5/7 m3 3,850,000.00
15 Kayu meranti papan 3/30/300 m3 4,950,000.00
16 Kayu meranti papan begisting m3 4,400,000.00
17 Teakwood 90.210.4 mm lbr 93,500.00
18 Teakwood 110.210.4 mm lbr Teakwood 110.210.4 mm
19 Teakwood 122.244.4 mm lbr 105,000.00
20 Plywood 122.244.4 mm lbr 93,500.00
21 Plywood 122.244.9 mm lbr 110,000.00
22 Triplek lapis aluminium lbr 79,750.00
23 Triplek 90.210.3 mm lbr 35,750.00
24 Triplek 90.210.4 mm lbr 39,000.00
25 Triplek 120.240.2 mm lbr 34,100.00
26 Triplek 120.240.3 mm lbr 38,500.00
27 Triplek 120.240.4 mm lbr 56,100.00
28 Triplek 120.240.6 mm lbr 66,000.00
29 Triplek 120.240.9 mm lbr 99,000.00
30 Triplek 120.240.12 mm lbr 132,000.00
31 List plafond 1/5 m' 5,500.00
32 Kayu kalimantan m3 -
33 Bambu Bongkotan (2,5 - 3 m) bt 12,100.00

G. Bahan Besi
1 Besi beton Polos o 6 mm kg 9,900.00
2 Besi beton Polos o 8 mm kg 15,400.00
3 Besi beton Polos o 10 mm kg 77,000.00
4 Besi beton Polos o 12 mm kg 154,000.00
5 Kawat bendrat kg 13,200.00
6 Paku reng kg 11,550.00
7 Paku usuk kg 11,550.00
8 Paku eternit kg 13,200.00
9 Besi lempeng / bulat / strip kg 15,950.00
10 Mur baut kuda-kuda kg 15,950.00
11 Mur baut kuda-kuda bh Mur baut kuda-kuda
12 Plat baut kuda-kuda kg 15,950.00
13 Plat baut kuda-kuda bh Plat baut kuda-kuda
14 Plat baut gording bh Plat baut gording
Harga
No. Jenis Bahan Satuan
Satuan
15 Mur baut gording bh Mur baut gording
16 Paku payung bh 825.00
17 Ankur kusen bh Ankur kusen
18 Pagar BRC 90.240 cm unit Pagar BRC 90.240 cm
19 Pagar BRC 120.240 cm unit Pagar BRC 120.240 cm
20 Besi siku 30x30x3 panjang 6 m ljr 77,000.00
21 Besi siku 40x40x3 panjang 6 m ljr Besi siku 40x40x3 panjang 6 m
22 Besi siku 40x40x4 panjang 6 m ljr Besi siku 40x40x4 panjang 6 m
23 Besi Strip kg 15,950.00
24 Pipa air galvanis medium 1/2" ljr 80,850.00
25 Pipa air galvanis medium 3/4" ljr 104,500.00
26 Pipa air galvanis medium 1" ljr 145,200.00
27 Pipa air galvanis medium 1,25" ljr 187,000.00
28 Pipa air galvanis medium 2" ljr 352,000.00
29 Pipa air galvanis medium 3" ljr 577,500.00

H. Buis beton
1 Buis beton bulat o 15 cm, 1 m' m 17,600.00
2 Buis beton bulat o 20 cm, 1 m' m 24,200.00
3 Buis beton bulat o 30 cm, 1 m' m 38,500.00
4 Buis beton bulat o 40 cm, 1 m' m 49,500.00
5 Buis beton bulat o 50 cm, 1 m' m 60,500.00
6 Buis beton bulat o 60 cm, 1 m' m Buis beton bulat o 60 cm, 1 m'
7 Buis beton bulat o 80 cm, 1 m' m Buis beton bulat o 80 cm, 1 m'
8 Buis beton bulat o 100 cm, 1 m' m Buis beton bulat o 100 cm, 1 m'
9 Buis beton U - 20cm , m' m 13,200.00
10 Buis beton U - 30cm , m' m 19,800.00

I. Bahan Penutup
1 Genteng lokal ex Mojokembamg bh 990.00
2 Genteng Nglayur bh 1,250.00
3 Genteng karang pilang bh -
4 Genteng bubungan Nglayur bh 3,300.00
5 Genteng bubungan karang pilang bh -
6 Genteng bubungan lokal bh 3,150.00
7 Eternit 1x1m bh 8,800.00
8 Asbes gelombang besar 225 x 110 lbr #REF!
9 Asbes gelombang kecil 225 x 105 lbr #REF!
10 Bubungan Asbes Gelombang 110 bh #REF!
11 Seng plat BJLS 30.80.300 cm lbr Seng plat BJLS 30.80.300 cm

J. Bahan Cat
1 Kertas gosok lbr 2,750.00
2 Plamur tembok kg 15,400.00
3 Plamur kayu " PEDANG " kg 14,850.00
4 Cat kayu / besi EMCO/setara kg 41,800.00
5 Cat tembok "DECOLITH" kg 12,100.00
6 Cat tembok "PARAGON" kg 11,880.00
7 Cat meni "PEDANG" kg 15,400.00
8 Dempul kayu kg 15,400.00
9 Minyak cat / thiner B ltr 110,000.00
10 Spiritus ltr 11,000.00
11 Plitur jadi ltr 16,500.00
Harga
No. Jenis Bahan Satuan
Satuan
12 Kolter/minyak begisting ltr 14,850.00
13 Lem kayu kg 10,450.00
14 Soda api kg 9,900.00
15 Cherelag kg 10,450.00

K. Bahan Kaca
1 Kaca bening 3 mm m2 Kaca bening 3 mm
2 Kaca bening 5 mm m2 66,000.00
3 Kaca rayband 3 mm m2 Kaca rayband 3 mm
4 Kaca raybend 5 mm m2 77,000.00
5 Kaca nako + rangka "NIKY" m2 Kaca nako + rangka "NIKY"

L. Bahan Penggantung dan Pengunci


1 Kunci "UNION" 2 x putar bh -
2 Kunci tanam besar bh 71,500.00
3 Kunci tanam kamar mandi bh 33,000.00
4 Engsel pintu bh 22,000.00
5 Engsel jendela bh 16,500.00
6 Grendel injak bh -
7 Grendel bh 19,000.00
8 Grendel tanam jendela bh -
9 Hak angin psg 9,000.00
10 Sping kinip bh 9,900.00
11 Door closer bh 121,000.00
12 Door stop bh 16,500.00
13 Pegangan pintu psg 93,500.00

M. Bahan Instalasi Air


1 Kran air "SAN EI" bh Kran air "SAN EI"
2 Kran air "AMICO 1/2" bh Kran air "AMICO 1/2"
3 Kran air "AMICO 3/4" bh Kran air "AMICO 3/4"
4 Pompa air "GOLD STAR" bh Pompa air "GOLD STAR"
5 Pompa air "NASIONAL" bh Pompa air "NASIONAL"
6 Pipa PVC AW o 1/2" 4 m ljr 1,100.00
7 Pipa PVC AW o 3/4" 4m ljr 1,100.00
8 Pipa PVC AW o 1".4m ljr 2,750.00
9 Pipa PVC AW o 2" 4 m ljr 5,500.00
10 Pipa PVC AW o 3" 4 m ljr 9,350.00
11 Pipa PVC AW o 4" 4m ljr 11,550.00
12 Talang " U " Maspion 4m ljr Talang " U " Maspion 4m
13 Floor drains bh Floor drains
14 Closed Jongkok INA warna bh Closed Jongkok INA warna
15 Closed duduk "TOTO" bh Closed duduk "TOTO"
16 Tutup bak mandi bh Tutup bak mandi
17 Lem paralon bh 204,600.00
18 Westafel bh 180,000.00
19 Pompa air " NASIONAL " bh -
20 Kloset duduk/monoblok bh 850,000.00
21 Kloset jongkok porselen bh 78,500.00
22 Urinoir bh 90,000.00

N. Bahan lampu dan instalasi listrik


1 Pasang listrik ttk 75,000.00
Harga
No. Jenis Bahan Satuan
Satuan
2 Lampu TL 1 x 10 w PHILIPS bh 32,000.00
3 Lampu TL 1 x 20 w PHILIPS bh 89,500.00
4 Lampu TL 1 x 40 w PHILIPS bh #REF!
5 Lampu pijar 25 - 100 w PHILIPS bh 4,000.00
6 Isolator bh #REF!
7 Las Doof bh Las Doof
8 Fiting Plafoond bh 7,500.00
9 T dos PVC bh 750.00
10 Stop Kontak "BROCO" bh 12,000.00
11 Saklar tunggal "BROCO" bh 12,500.00
12 Sakla ganda " BROCO " bh 15,000.00
13 Sekrering Tunggal "LN" bh 24,750.00
14 Sekering ganda "LN" bh 38,500.00
15 Kabel NYA 1000 Volt 1,5 mm m 120,000.00
16 Kabel NYA 1000 Volt 2,5 mm m 229,600.00
17 Kabel NYA 1000 Volt 4 mm m 1,068,000.00
18 Panel MCB unit #REF!

O. Harga upah tenaga kerja


1 Mandor Org/hr 60,000.00
2 Kepala Tukang Batu Org/hr 50,000.00
3 Kepala Tukang Kayu Org/hr 50,000.00
4 Tukang Batu Org/hr 40,000.00
5 Tukang Kayu Org/hr 40,000.00
6 Kepala Tukang Org/hr 50,000.00
7 Tukang Cat Org/hr 40,000.00
8 Tukang Besi Org/hr 40,000.00
9 Pekerja Org/hr 30,000.00
10 Tukang Pelitur Org/hr 40,000.00
11 Tukang Listrik Org/hr 40,000.00
34,500.00
50,000.00
50,000.00
49,000.00
24,000.00
54,000.00

75,000.00
69,000.00
83,000.00
84,000.00
100,000.00
110,000.00
130,000.00
130,000.00
125,000.00
110,000.00
220.00
30,000.00
27,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00

31,000.00
29,000.00
45,000.00

350,000.00
375,000.00

15,000.00
16,500.00
29,000.00
34,000.00
34,000.00
34,000.00
65,000.00

6,950,000.00
6,950,000.00
2,725,000.00
2,425,000.00
2,725,000.00
2,225,000.00
1,625,000.00
1,625,000.00
1,625,000.00
1,625,000.00
1,275,000.00
2,175,000.00
1,175,000.00
1,175,000.00
1,175,000.00

34,000.00
45,000.00
50,000.00
45,000.00
50,000.00
60,500.00
27,000.00
30,000.00
22,000.00
30,500.00
33,000.00
41,000.00
64,000.00
88,500.00
1,500.00
6,950,000.00

6,000.00
6,000.00
6,000.00
6,000.00
8,500.00
7,000.00
7,000.00
8,500.00
8,500.00
8,500.00
2,500.00
8,500.00
15,000.00
10,000.00
2,250.00
200.00
500.00
165,000.00
187,000.00
50,000.00
62,000.00
65,000.00
39,500.00
40,000.00
50,000.00
60,000.00
70,000.00
95,000.00
120,000.00

10,000.00
15,000.00
20,000.00
24,000.00
40,000.00
44,000.00
55,000.00
90,000.00
10,000.00
12,500.00

350.00
750.00
750.00
2,000.00
2,000.00
1,500.00
5,000.00
55,000.00
35,000.00
47,500.00
20,000.00

3,000.00
3,500.00
9,000.00
35,000.00
10,250.00
10,250.00
10,000.00
9,000.00
3,500.00
10,000.00
10,000.00
2,500.00
7,000.00
6,000.00
27,500.00

35,750.00
51,000.00
52,000.00
66,000.00
8,500.00

57,500.00
65,000.00
57,500.00
8,500.00
5,250.00
10,000.00
6,500.00
3,000.00
5,000.00

15,500.00
14,000.00
16,000.00
300,000.00
275,000.00
12,000.00
15,000.00
20,000.00
30,000.00
42,000.00
60,000.00
41,000.00
3,500.00
150,000.00
945,000.00
2,000.00
4,500.00
160,000.00 200,000.00

750,000.00 950,000.00
67,000.00 90,000.00
81,000.00 99,000.00

44,000.00
33,000.00
43,000.00
60,000.00
9,000.00
5,000.00
2,000.00
500.00
750.00
13,000.00
13,000.00
14,000.00
28,000.00
41,000.00
1,000.00
1,500.00
2,250.00
82,500.00

40,000.00
35,000.00
37,500.00
30,000.00
35,000.00
35,000.00
30,000.00
32,500.00
22,500.00
32,500.00
32,500.00
LAMPIRAN I : KEPUTUSAN BUPATI JOMBANG
NOMOR : 188/2019/415.12/2006
TANGGAL : 12 Junil 2006

DAFTAR HARGA SATUAN PEKERJAAN PER KEGIATAN (HSPK)


DI KABUPATEN JOMBANG TAHUN ANGGARAN 2006

NO MACAM PEKERJAAN SATUAN

1 2 3

I BIDANG PENGAIRAN
1 Pengukuran bendung untuk MC bh
2 Pengukuran saluran untuk MC Km
3 Pengukuran bangunan untuk MC bh
4 Foto dokumentasi unit
5 Pendongkelan rumpun bambu m²
6 Pendongkelan pohon keliling >0,75 m btg
Pendongkelan Pohon kll>0,75 & menimbun kembali bekas
7 btg
dongkelan
8 Kosrekan tanah setebal 15 cm edan dibuang keluar m²
9 pembuatan dan pembongkaran kisdam tinggi >1,00 m m³
10 Jam pengeringan / pemompaan air jam
11 Galian tanah biasa langsung untuk timbunan / dibuang m³
12 Galian tanah biasa diangkat .1,00 m untuk timbunan m³
13 Galian tanah biasa untuk timbunan / dibuang + 50 m m³
14 Galian tanah berbatu dibuang + 50 m m³
15 Galian tanah berbatu diangkut > 1,00 m dibuang m³
16 Galian tanah keras / cadas dibuang + 50 m m³
17 Galian tanah keras / cadas diangkat > 1,00 m m³
18
Timbunan tanah kembali dipadatkan & dirapikan (manual) m³

19
Timbunan tanah dari luar dipadatkan & dirapikan (manual) m³
2

1 2 3
20
Timbunan tanah kembali dipadatkan & dirapikan (mekanis) m³

21
Timbunan tanah dari luar dipadatkan & dirapikan (mekanis) m³

22 pemadatan tanah timbunan & dirapikan (manual) m³


23 pemadatan tanah timbunan & dirapikan (mekanis) m³
24 Bongkaran pasangan batu kali dan dirapikan m³
25 Bongkaran dinding pasangan batu merah / dibuang m³
26 Bongkaran pasangan linning plat beton & dibersihkan m³
27 Tabalan rumput m²
28 Pasangan batu kali bekas bongkaran 1 Pc : 4 psr m³
29 Pasangan batu kali dengan spesi 1 Pc : 3 Psr m³
30 Pasangan batu candi dengan spesi 1 Pc : 3 Psr m³
31 Pasangan batu kali dengan spesi 1 Pc : 4 psr m³
32 Siaran dengan spesi 1 Pc : 2 Psr m²
33 Plesteran tebal 1,5 cm dengan spesi 1 Pc : 3 Psr m²
34 Pasangan batu kali / Gunung kosong m³
35 Beton kurus campuran 1 Pc : 3 Psr : 6 Kr m³
36 Beton tak bertulang K 125 m³
37 Beton bertulang K 125 untuk plat pelayanan & titian m³
38 Beton bertulang K 125 untuk pondasi linning plat beton m³
39 Pasang pipa sandaran D 2" m'
40 Pancang bungkotan D=0,8m, L=3m, masuk =2m btg
41 Tiang pancang dolken D=0,13m, L=2,5m btg
42 Bronjong kawat galvanis D=3,8mm m³
43 Bronjong kawat galvanis D=3,8mm dengan batu lama m³
44 Pasang gorong-gorong D 0,15 - 1,00 m m'
45 Pasang gorong-gorong D 0,20 - 1,00 m m'
46 Pasang gorong-gorong D 0,30 - 1,00 m m'
3

1 2 3
47 Pasang gorong-gorong D 0,40 - 1,00 m m'
48 Pasang gorong-gorong D 0,50 - 1,00 m m'
49 Pasang gorong-gorong D 0,60 - 1,00 m m'
50 Pasang gorong-gorong D 0,80 - 1,00 m m'
51 Pasang gorong-gorong D 1,00 - 1,00 m m'

II BIDANG PRASARANA JALAN


1 Pasangan onderlaag m³
2 LPB Klas C 15 Cm m³
3 LPB Klas B 10 Cm m³
4 LPA Klas A 5 Cm m³
5 ATB 10 Cm m³
6 Lapen 5 Cm m²
7 AC tebal 5 Cm m²
8 AC tebal 4 cm m²
9 AC tebal 3,5 cm m²
10 Prime Coat m²
11 Teack Coat m²
12 Lataston 3 Cm Ton
13 HRS tebal 3 Cm m²
14 Burtu m²
15 Pasangan Batu Kali 1:5 siar 1:2 m³
16 Spesi Beton ( K.730) m³
17 Spesi Beton ( K.723) m³
18 Spesi Beton ( K.721) m³
19 Spesi Beton ( K.722) m³
20 Spesi Beton ( K.719) m³
21 Perancah m²
22 Pembesian (Polos) Kg
23 Pembesian (Ulir) Kg
24 Galian Tanah m³
4

1 2 3
25 Pasang Bronjong m³
26 Sirtu (Ls) m³
27 Plester 1:3 m²
28 Urug Bahu Jalan m³
29 Urug Sirtu m³
30 Pasang Batu Tepi 15/20 m'
31 Patok Pengaman bh
32 Pipa PVC 3/4" m'
33 Pipa Sandaran m'
34 Pasangan Batu Merah m³
35 pasangan Trasraam 1:4 m³
36 Perataan m²
37 Pengecatan Marka Jalan m²
38 Pacing/Pengupasan m²
39 Pembersihan Parit m'
40 Penyiapan Tanah Dasar Are

III BIDANG GEDUNG DAN PERMUKIMAN


A Pekerjaan Persiapan
1 Pembersihan lapangan dan peralatan m²
2 Pengukuran dan pemasangan bowplank m'
3 Pembuatan jalan sementara m²
4 Bongkaran beton bertulang m³
5 Bongkaran dinding tembok bata merah m³

B Pekerjaan Tanah
1 Galian untuk tanah biasa sedalam 1 m m³
2 Galian untuk tanah biasa sedalam 2 m m³
3 Galian untuk tanah biasa sedalam 3 m m³
4 Galian untuk tanah keras sedalam 1 m m³
5 Galian untuk tanah cadas sedalam 1 m m³
5

1 2 3
6 Galian untuk tanah lumpur sedalam 1 m m³
7 Pekerjaan stripping 1 m m³
8 Pembuangan tanah sejauh 150 m m³
9 Urugan kembali m³
10 Pemadatan tanah m³
11 Urugan pasir m³
12 Urugan sirtu m³

C Pekerjaan Pondasi
1 Pasang pondasi batu kosong m³
2 Pasang pondasi batu kali 1 Pc : 1 Psr m³
3 Pasang pondasi batu kali 1 Pc : 2 Psr m³
4 Pasang pondasi batu kali 1 Pc : 3 Psr m³
5 Pasang pondasi batu kali 1 Pc : 4 Psr m³
6 Pasang pondasi batu kali 1 Pc : 5 Psr m³
7 Pasang pondasi batu kali 1 Pc : 6 Psr m³
8 Pasang pondasi batu kali 1 Pc : 8 Psr m³

D Pekerjaan Beton
1 Membuat beton tumbuk 1 Pc : 3 Psr : 5 Kr m³
2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Psr : 5 Kr m³
3 Membuat beton bertulang 1 Pc : 2 Psr : 3 Kr m³
4 Membuat beton bertulang 1 Pc : 2 Psr : 4 Kr m³
5 Membuat beton bertulang 1 Pc : 1 Psr : 2 Kr m³
6 Pembesian dengan besi polos atau ulir Kg
7 Pasang bekisting untuk pondasi m²
8 Pasang bekisting untuk sloof m²
9 Pasang bekisting untuk kolom m²
10 Pasang bekisting untuk balok m²
11 Pasang bekisting untuk lantai m²
12 Pasang bekisting untuk dinding m²
13 Pasang bekisting untuk tangga m²
6

1 2 3
E Pekerjaan Pasangan
1 Pasangan bata merah tebal 1 bata 1 Pc : 2 Psr m²
2 Pasangan bata merah tebal 1 bata 1 Pc : 4 Psr m²
3 Pasangan bata merah tebal 1 bata 1 Pc : 6 Psr m²
4 Pasangan bata merah tebal 1/2 bata 1 Pc : 2 Psr m²
5 Pasangan bata merah tebal 1/2 bata 1 Pc : 4 Psr m²
6 Pasangan bata merah tebal 1/2 bata 1 Pc : 6 Psr m²
7 Pasangan dinding roster/terawang (12x11x24) cm m²

F Pekerjaan Plesteran
1 Plesteran 1 Pc : 2 Psr tebal 15 mm m²
2 Plesteran 1 Pc : 4 Psr tebal 15 mm m²
3 Plesteran 1 Pc : 6 Psr tebal 15 mm m²
4 Plesteran 1 Pc : 2 Psr tebal 20 mm m²
5 Plesteran 1 Pc : 4 Psr tebal 20 mm m²
6 Plesteran 1 Pc : 6 Psr tebal 20 mm m²
7 Plesteran 1 Pc : 3 Psr tebal 20 mm m²
8 Plesteran beton 1 Pc : 3 Psr tebal 15 mm m²
9 Plesteran ciprat 1 pc : 2 Psr m²

G Pekerjaan Kayu
1 Pasang kusen pintu dan jendela kayu kamper m³
2 Pasang pintu panil kayu kamper m²
3 Pasang pintu klamp kayu kamper m²
4 Pasang pintu dan jendela jalusi kayu kamper m²
5 Pasang pintu plywood rangkap rangka kayu kamper m²
6 pasang jalusi mati kusen kayu kamper m²
7 Pasang pintu teakwood rangkap rangka kayu kamper m²
8 Pasang konstruksi kuda-kuda kayu kamper m²
9 Pasang konstruksi kuda-kuda kayu kruing m²
10 Pasang kaso + reng genteng kodok kayu kamper m²
7

1 2 3
11 Pasang kaso + reng genteng munier kayu kamper m²
12 Pasang kaso + reng atap sirap kayu kamper m²
13 Pasang rangka langit-langit (1.00x1.00)m kayu kamper m²
14 Pasang lisplang ukuran ( 3 x 20 )cm, kayu kamper m'
15 Pasang rangka dinding pemisah kayu kamper m²

H Pekerjaan Atap
1 Pasang atap genteng plenthong kecil m²
2 Pasang atap genteng plenthong super/besar m²
3 Pasang atap bubung plenthong kecil m'
4 Pasang atap bubung plenthong besar m'

I Pekerjaan Penutup Plafond


1 Pas. langit-langit asbes (1.00 x 1.00 )m, tebal 5mm m²
2 Pas. langit-langit plywood (30 x 60 )m, tebal 4mm m²
3 Pas. langit-langit plywood (30 x 120 )m, tebal 4mm m²
4 Pas. langit-langit teakwood (30 x 60 )m, tebal 4mm m²
5 Pas. langit-langit teakwood (30 x 120 )m, tebal 4mm m²
6 Pas. langit-langit lat kayu kamper m²

J Pekerjaan Sanitasi
1 Memasang 1 buah kloset duduk/monoblok bh
2 Memasang 1 buah kloset duduk porselen bh
3 Memasang 1 buah urinoir bh
4 Memasang 1 buah wastafel bh
5 Memasang 1 buah bak mandi batu bata volume 0.3 m3 bh
Memasang 1 m' pipa penyalur air limbah jenis pipa tanah D
6 bh
15
K Pekerjaan Kunci dan Kaca
1 Pasang kunci tanam bh
2 Pasang engsel pintu bh
3 Pasang engsel jendela kupu-kupu bh
4 Pasang spring knip bh
8

1 2 3
5 Pasang door closer bh
6 Pasang pegangan pintu bh
7 pasang door stop bh
8 Pasang kaca tebal 5 mm bh

L Pekerkejaan Lantai dan Dinding


1 Pasang lantai ubin PC abu-abu ukuran 20 x 20 cm m²
2 Pasang lantai keramik 20 x 20 cm m²
3 Pasang dinding keramik 20 x 20 cm m²

M Pekerjaan Pengecatan
1 Mengikis, mengerok permukaan cat tembok lama m²
2 Pengecatan kayu lama m²
Pengecatan kayu baru (1xplamir, 1x cat dasar, 2x cat
3 m²
penutup)
Pengecatan tembok baru (1xplamir, 1x cat dasar, 2x cat
4 m²
penutup)
Pengecatan tembok lama (1xplamir, 1x cat dasar, 2x cat
5 m²
penutup)

N Pekerjaan Meubelair
1 Pembuatan meja jati siswa bh
2 Pembuatan kursi jati siswa bh

BUPATI JOMBANG

S UYAN T O
BUPATI JOMBANG
88/2019/415.12/2006
2 Junil 2006

IATAN (HSPK)
RAN 2006

HARGA
SATUAN
( Rp. )
4

291,900
419,000
55,500
670,500
39,000
94,500

180,500

6,000
50,500
8,000
20,000
26,000
29,000
43,500
43,000
42,500
38,500

19,500

80,000
4

24,000

85,500

7,000
13,500
61,000
53,000
5,000
4,500
324,500
479,500
541,000
448,000
21,500
27,000
164,000
572,000
604,500
2,970,000
1,594,500
44,000
61,500
206,500
404,000
301,000
40,000
42,500
47,500

4
68,500
79,500
198,500
296,000
413,000

188,913
208,713
227,001
289,409
1,477,387
57,476
79,919
63,935
55,943
1,879
9,396
766,251
56,001
26,375
445,532
962,022
612,562
458,000
706,875
605,585
163,936
12,387
12,387
32,823

4
367,496
89,500
22,419
80,100
108,300
6,374
75,000
6,000
30,000
367,000
510,000
1,500
100,970
3,000
5,016
43,828

4,500
50,500
48,500
180,000
180,000

12,000
15,500
21,500
18,500
36,500

4
24,000
1,500
15,000
6,000
14,500
59,500
82,000

152,500
524,000
406,500
362,500
331,000
309,500
294,000
271,500

390,500
46,000
390,500
443,500
588,500
10,000
91,000
100,000
95,000
95,500
95,500
78,000
78,000

99,500
85,500
82,500
47,000
41,000
38,500
133,500

20,000
17,000
16,000
28,500
24,000
22,000
14,500
22,500
15,500

5,114,000
310,500
215,500
457,500
159,000
367,500
257,500
4,580,500
3,315,500
50,000

4
57,000
587,500
89,500
44,000
126,000

20,000
18,500
35,000
35,500

9,500
28,000
29,000
30,000
31,000
139,000

1,028,500
235,500
225,500
313,000
12,000

33,500

60,000
13,000
9,000
12,500

4
107,500
100,000
12,000
62,000

420,000
819,500
1,019,500

4,500
20,000

23,500

8,000

5,500

670,000
190,000

PATI JOMBANG

UYAN T O
HARGA SATUAN PEKERJAAN PER KEGIATAN
(HSPK)
KABUPATEN JOMBANG
TAHUN ANGGARAN NOPEMBER 2006

HARGA SATUAN
NO. JENIS PEKERJAAN SAT.
(Rp.)
1 2 3 4

I. Pekerjaan Persiapan
1. Pembersihan Lapangan dan Peralatan M2 6,000.00
2. Pengukuran dan Pasang Papan Bowplank M' 88,881.00
3. Pembuatan jalan sementara M2 60,300.00
4. Bongkaran beton bertulang M3 219,990.00
5. Bongkaran dinding tembok bata merah M3 219,990.00

II. Pekerjaan Tanah


1. Galian Untuk Tanah Biasa sedalam 1 m M3 14,400.00
2. Galian Untuk Tanah Biasa sedalam 2 m M3 18,900.00
3. Galian Untuk Tanah Biasa sedalam 3 m M3 26,430.00
4. Galian Untuk Tanah keras sedalam 1 m M3 22,470.00
5. Galian Untuk Tanah cadas sedalam 1 m M3 45,000.00
6. Galian Untuk Tanah lumpur sedalam 1 m M3 29,670.00
7. Pekerjaan stripping setinggi 1 m M2 1,800.00
8. Pembuangan tanah sejauh 150 m M3 18,480.00
9. Urugan kembali M3 6,900.00
10. Pemadatan tanah M3 18,000.00
11. Urugan pasir M3 108,600.00
12. Urugan sirtu M3 87,000.00

III. Pekerjaan Pondasi


1. Pasang pondasi batu kosong M3 200,040.00
2. Pasang pondasi batu kali 1 Pc : 1 Ps M3 702,456.00
3. Pasang pondasi batu kali 1 Pc : 2 Ps M3 549,923.50
4. Pasang pondasi batu kali 1 Pc : 3 Ps M3 481,126.00
5. Pasang pondasi batu kali 1 Pc : 4 Ps M3 437,944.00
6. Pasang pondasi batu kali 1 Pc : 5 Ps M3 408,028.00
7. Pasang pondasi batu kali 1 Pc : 6 Ps M3 386,986.00
8. Pasang pondasi batu kali 1 Pc : 8 Ps M3 356,098.00

IV. Pekerjaan Beton


1. Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr M3 514,884.00
2. Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr M3 57,240.00
3. Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr M3 516,666.00
4. Membuat beton bertulang, 1 Pc : 2 Ps : 4 Kr M3 587,190.00
5. Membuat beton bertulang, 1 Pc : 1 Ps : 2 Kr M3 790,002.00
6. Pembesian dengan besi polos atau ulir KG 11,136.00
7. Pasang bekisting untuk pondasi M2 201,950.00
8. Pasang bekisting untuk sloof M2 223,950.00
9. Pasang bekisting untuk kolom M2 207,800.00
10. Pasang bekisting untuk balok M2 208,400.00
11. Pasang bekisting untuk lantai M2 208,400.00
12. Pasang bekisting untuk dinding M2 164,400.00
13. Pasang bekisting untuk tangga M2 163,657.50
1 2 3 4
V. Pekerjaan Pasangan
1. Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps M2 148,678.00
2. Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps M2 129,711.40
3. Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps M2 125,353.60
4. Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps M2 70,682.60
5. Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps M2 62,282.00
6. Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps M2 59,044.16
7. Pasangan dinding roster/terawang ( 12 x 11 x 24 ) cm M2 284,756.40

VI. Pekerjaan Plesteran


1. Plesteran, 1 Pc : 2 Ps, tebal 15 mm M2 25,001.76
2. Plesteran, 1 Pc : 4 Ps, tebal 15 mm M2 21,327.60
3. Plesteran, 1 Pc : 6 Ps, tebal 15 mm M2 19,791.84
4. Plesteran, 1 Pc : 2 Ps, tebal 20 mm M2 36,284.64
5. Plesteran, 1 Pc : 4 Ps, tebal 20 mm M2 30,081.84
6. Plesteran, 1 Pc : 6 Ps, tebal 20 mm M2 27,363.12
7. Berapen, 1 Pc : 3 Ps, tebal 30 mm M2 18,419.16
8. Plesteran beton, 1 Pc : 3 Ps, tebal 15 mm M2 27,869.16
9. Plesteran ciprat, 1 Pc : 2 Ps M2 19,022.16

VII. Pekerjaan Kayu


1. Pasang kusen pintu & jendela kayu kamper M3 9,994,000.00
2. Pasang pintu panil kayu kamper M2 475,500.00
3. Pasang pintu klamp kayu kamper M2 356,407.50
4. Pasang pintu & jendela jalusi kayu kamper M2 723,000.00
5. Pasang pintu plywood rangkap, rangka kayu kamper M2 203,300.00
6. Pasang jalusi mati kusen kayu kamper M2 603,232.50
7. Pasang pintu teakwood rangkap, rangka kayu kamper M2 383,100.00
8. Pasang konstruksi kuda-kuda kayu kamper M3 9,148,490.00
9. Pasang konstruksi kuda-kuda kayu kruing M3 6,365,490.00
10. Pasang kaso + reng genteng kodok kayu kamper M2 99,292.50
11. Pasang kaso + reng genteng munier kayu kamper M2 114,252.50
12. Pasang kaso + reng atap sirap kayu kamper M2 1,245,870.00
13. Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kamper M2 111,165.00
14. Pasang lisplang ukuran ( 3 x 20 ) cm, kayu kamper M' 72,527.50
15. Pasang rangka dinding pemisah kayu kamper M2 234,015.00

VIII. Pekerjaan Atap


1. Pasang atap genteng plenthong kecil M2 33,130.00
2. Pasang atap genteng plenthong super/besar M2 25,380.00
3. Pasang genteng bubung plenthong kecil M' 49,254.00
4. Pasang genteng bubung plenthong besar M' 46,704.00

IX. Pekerjaan Penutup Plafond


1. Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 5 mm M2 13,952.00
2. Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm M2 40,816.50
3. Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm M2 42,219.00
4. Pasang langit-langit teakwood ( 30 x 60 ) cm, tebal 4 mm M2 44,956.50
5. Pasang langit-langit teakwood ( 60 x 120 ) cm, tebal 4 mm M2 46,531.50
6. Pasang langit-langit lat kayu kamper M2 232,375.50

X. Pekerjaan Sanitasi
1. Memasang 1 buah kloset duduk/monoblok bh 1,053,650.00
2. Memasang 1 buah kloset jongkok porselen bh 282,728.00
1 2 3 4
3. Memasang 1 buah urinoir bh 268,128.00
4. Memasang 1 buah wastafel bh 354,628.00
5. Memasang 1 buah bak mandi batu bata volume 0.3 m3 bh 683,189.00
6. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 15 cm M' 21,145.34
1 2 3 4
XI. Pekerjaan Kunci dan Kaca
1. 1 buah pasang kunci tanam biasa bh 92,600.00
2. 1 buah pasang engsel pintu bh 29,245.00
3. 1 buah pasang engsel jendela kupu-kupu bh 21,330.00
4. 1 buah pasang spring knip bh 17,145.00
5. 1 buah pasang door closer bh 145,150.00
6. Pegangan pintu bh 93,500.00
7. 1 buah pasang door stop bh 21,330.00
8. Pasang kaca tebal 5 mm M2 79,845.00

XII. Pekerjaan Lantai dan Dinding


1. Pasang lantai ubin PC abu-abu akuran 20 x 20 cm M2 49,530.20
2. Pasang lantai keramik 20 x 20 cm M2 98,769.44
3. Pasang dinding keramik 20 x 20 cm M2 98,038.40

XIII. Pekerjaan Pengecatan


1. Mengikis/mengerok permukaan cat tembok lama M2 5,145.00
2. Pengecatan bidang kayu lama M2 22,064.50
3. Pengecatan bidang kayu baru (1x plamir, 1x cat dasar, 2x cat penutup) M2 26,191.50
4. Pengecatan tembok baru (1x plamir, 1x cat dasar, 2x cat penutup) M2 9,423.80
5. Pengecatan tembok lama (1x cat dasar, 2x cat penutup) M2 6,470.40

XIV. Pekerjaan Meubelair


1. Pembuatan meja siswa bh
2. Pembuatan kursi siswa bh
PEKERJAAN PERSIAPAN
1. 1 m2 Pembersihan Lapangan dan Peralatan
Upah An. SNI ( Revisi ) 6.8.1
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 6,000.00
Harga 1 m2 = Rp 6,000.00

2. 1 m' Pengukuran dan Pasang Papan Bowplank


Bahan An. SNI ( Revisi ) 6.4.1
0.012 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 46,200.00
0.020 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 231.00
0.007 m3 Kayu Papan meranti 3/20 @ Rp. 4,950,000.00 = Rp 34,650.00
= Rp 81,081.00
Upah An. SNI ( Revisi ) 6.4.2
0.100 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 4,000.00
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,800.00
Total Upah dan Bahan = Rp 88,881.00

3. 1 m' Pagar sementara dari kayu tinggi 2 m


Bahan An. SNI ( Revisi ) 6.1.1
1.250 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 15,125.00
5.500 kg Semen Portland @ Rp. 1,188.00 = Rp 6,534.00
0.005 m3 Pasir beton @ Rp. 90,000.00 = Rp 450.00
0.009 m3 Koral beton @ Rp. 165,000.00 = Rp 1,485.00
0.072 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 277,200.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 693.00
0.400 Lt Residu @ Rp. = Rp -
= Rp 301,487.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 8,000.00
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp 12,000.00
0.020 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 1,000.00
0.020 Oh Mandor @ Rp. 60,000.00 = Rp 1,200.00
= Rp 22,200.00
Total Upah dan Bahan = Rp 323,687.00

4. 1 m' Pagar sementara dari seng gelombang tinggi 2 m


Bahan An. SNI ( Revisi ) 6.2.1
1.250 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 15,125.00
2.500 kg Semen Portland @ Rp. 1,188.00 = Rp 2,970.00
1.200 Lbr Seng gelombang 3" - 5" @ Rp. Seng plat BJLS 30.80.300 = Rp #VALUE!
0.005 m3 Pasir beton @ Rp. 90,000.00 = Rp 450.00
0.009 m3 Koral beton @ Rp. 165,000.00 = Rp 1,485.00
0.072 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 277,200.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 693.00
0.450 kg Meni besi @ Rp. 15,400.00 = Rp 6,930.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.2.2
0.200 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 8,000.00
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp 12,000.00
0.020 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 1,000.00
0.020 Oh Mandor @ Rp. 60,000.00 = Rp 1,200.00
= Rp 22,200.00
Total Upah dan Bahan = Rp #VALUE!

5. 1 m' Pagar sementara dari kawat duri tinggi 1.8 m


Bahan An. SNI ( Revisi ) 6.3.1
1.250 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 15,125.00
2.000 kg Semen Portland @ Rp. 1,188.00 = Rp 2,376.00
25.000 kg Kawat duri @ Rp. 15,950.00 = Rp 398,750.00
0.005 m3 Pasir beton @ Rp. 90,000.00 = Rp 450.00
0.009 m3 Koral beton @ Rp. 165,000.00 = Rp 1,485.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 693.00
= Rp 418,879.00
Upah An. SNI ( Revisi ) 6.3.2
0.200 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 8,000.00
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.020 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 1,000.00
0.020 Oh Mandor @ Rp. 60,000.00 = Rp 1,200.00
= Rp 19,200.00
Total Upah dan Bahan = Rp 438,079.00

6. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran


Bahan An. SNI ( Revisi ) 6.5.1
1.250 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 15,125.00
0.180 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 693,000.00
0.850 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 9,817.50
1.100 kg Besi strip @ Rp. 15,950.00 = Rp 17,545.00
35.000 kg Semen Portland @ Rp. 1,188.00 = Rp 41,580.00
0.150 m3 Pasir pasang @ Rp. 90,000.00 = Rp 13,500.00
0.100 m3 Pasir beton @ Rp. 90,000.00 = Rp 9,000.00
0.150 m3 Koral beton @ Rp. 165,000.00 = Rp 24,750.00
30.000 Bh Bata merah @ Rp. 425.00 = Rp 12,750.00
0.250 Lbr Seng plat @ Rp. Seng plat BJLS 30.80.300 = Rp #VALUE!
2.000 m2 Jendela nako @ Rp. Kaca nako + rangka "NIKY= Rp #VALUE!
0.080 m2 Kaca polos @ Rp. 66,000.00 = Rp 5,280.00
0.150 Bh Kunci tanam @ Rp. 71,500.00 = Rp 10,725.00
0.060 Lbr Playwood 4mm @ Rp. 56,100.00 = Rp 3,366.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.5.2
2.000 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 80,000.00
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
0.300 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 15,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 128,000.00
Total Upah dan Bahan = Rp #VALUE!

7. 1 m2 Pembuatan gudang semen dan alat-alat


Bahan An. SNI ( Revisi ) 6.6.1
1.700 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 20,570.00
0.210 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 808,500.00
0.300 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 3,465.00
10.500 kg Semen Portland @ Rp. 1,188.00 = Rp 12,474.00
0.030 m3 Pasir beton @ Rp. 90,000.00 = Rp 2,700.00
0.050 m3 Koral beton @ Rp. 165,000.00 = Rp 8,250.00
1.500 Lbr Seng gelombang bljs 32 @ Rp. Seng plat BJLS 30.80.300 = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.6.2
2.000 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 80,000.00
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
0.200 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 10,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 123,000.00
Total Upah dan Bahan = Rp #VALUE!
8. 1 m2 Pembuatan rumah jaga/konstruksi kayu
Bahan An. SNI ( Revisi ) 6.7.1
3.000 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 36,300.00
0.276 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 1,062,600.00
0.700 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 8,085.00
1.500 Lbr Seng gelombang bljs 32 @ Rp. Seng plat BJLS 30.80.300 = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.7.2
1.500 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 60,000.00
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
0.150 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 7,500.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 100,500.00
Total Upah dan Bahan = Rp #VALUE!

9. 1 m2 Pembuatan bedeng buruh


Bahan An. SNI ( Revisi ) 6.9.1
1.250 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 15,125.00
0.186 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 716,100.00
0.300 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 3,465.00
18.000 kg Semen Portland @ Rp. 1,188.00 = Rp 21,384.00
0.030 m3 Pasir beton @ Rp. 90,000.00 = Rp 2,700.00
0.050 m3 Koral beton @ Rp. 165,000.00 = Rp 8,250.00
1.500 Lbr Seng gelombang bljs 32 @ Rp. Seng plat BJLS 30.80.300 = Rp #VALUE!
1.350 Lbr Playwood 4mm @ Rp. 56,100.00 = Rp 75,735.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.9.2
2.000 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 80,000.00
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
0.200 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 10,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 123,000.00
Total Upah dan Bahan = Rp #VALUE!

10. 1 m2 Pembuatan bak adukan ukuran ( 40 x 50 x 25 ) cm


Bahan An. SNI ( Revisi ) 6.10.1
0.036 m3 Kayu Terentang @ Rp. = Rp -
0.080 kg Paku biasa 2" - 5 " @ Rp. 11,550.00 = Rp 924.00
1.000 Btg Kaso meranti 5/7 @ Rp. 3,850,000.00 = Rp 3,850,000.00
= Rp 3,850,924.00
Upah An. SNI ( Revisi ) 6.10.2
0.300 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 12,000.00
= Rp 12,000.00
Total Upah dan Bahan = Rp 3,862,924.00

11. 1 m2 Pembuatan stegger dari bambu


Bahan An. SNI ( Revisi ) 6.11.1
1.000 Btg Bambu Ø 6 - 10 / 600 cm @ Rp. = Rp -
0.250 Kg Tali ijuk @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.250 Oh Tukang Kayu @ Rp. 40,000.00 = Rp 10,000.00
0.002 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 100.00
0.017 Oh Pekerja @ Rp. 30,000.00 = Rp 510.00
0.013 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 11,390.00
Total Upah dan Bahan = Rp 11,390.00
12. 1 m2 Pembuatan jalan sementara
Bahan An. SNI ( Revisi ) 6.12.1
0.150 m3 Batu belah 15/20 @ Rp. 110,000.00 = Rp 16,500.00
0.090 m3 Batu pecah 5/7 @ Rp. 110,000.00 = Rp 9,900.00
0.010 m3 Pasir pasang @ Rp. 90,000.00 = Rp 900.00
= Rp 27,300.00
Upah An. SNI ( Revisi ) 6.12.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 33,000.00
Total Upah dan Bahan = Rp 60,300.00

13. 1 m3 Bongkaran beton bertulang


Upah An. SNI ( Revisi ) 6.13.1
6.667 Oh Pekerja @ Rp. 30,000.00 = Rp 200,010.00
0.333 Oh Mandor @ Rp. 60,000.00 = Rp 19,980.00
= Rp 219,990.00
Total Upah = Rp 219,990.00

14. 1 m3 Bongkaran dinding tembok bata merah


Upah An. SNI ( Revisi ) 6.14.1+ membuat
6.667 Oh Pekerja @ Rp. 30,000.00 = Rp 200,010.00
0.333 Oh Mandor @ Rp. 60,000.00 = Rp 19,980.00
= Rp 219,990.00
Total Upah x 3/4 = Rp 219,990.00

15. 1 m' Pasang pagar kawat jaring galvanis, panjang 240 cm


Bahan An. SNI ( Revisi ) 6.15.1
0.434 Lbr Pagar kawat jaring @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.15.2
0.042 Oh Pekerja @ Rp. 30,000.00 = Rp 1,260.00
0.004 Oh Kepala Tukang @ Rp. 50,000.00 = Rp 200.00
0.042 Oh Tukang @ Rp. 40,000.00 = Rp 1,680.00
0.002 Oh Mandor @ Rp. 60,000.00 = Rp 120.00
= Rp 3,260.00
Total Upah dan Bahan = Rp 3,260.00

16. 1 m' Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm


Bahan An. SNI ( Revisi ) 6.16.1
0.986 Lbr Panel beton pracetak @ Rp. - = Rp -
0.525 Btg Kolom beton pracetak @ Rp. - = Rp -
0.074 m3 Pasir beton @ Rp. 90,000.00 = Rp 6,660.00
0.146 m3 Koral 2/3 @ Rp. 165,000.00 = Rp 24,090.00
45.000 Kg Semen abu-abu @ Rp. 1,188.00 = Rp 53,460.00
= Rp 53,460.00
Upah An. SNI ( Revisi ) 6.16.2
0.125 Oh Tukang batu @ Rp. 40,000.00 = Rp 5,000.00
0.375 Oh Pekerja @ Rp. 30,000.00 = Rp 11,250.00
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp 600.00
0.019 Oh Mandor @ Rp. 60,000.00 = Rp 1,140.00
= Rp 17,990.00
Total Upah dan Bahan = Rp 71,450.00
PEKERJAAN TANAH
1. 1 m3 Galian Untuk Tanah Biasa sedalam 1 m
Upah An. SNI ( Revisi ) 6.1.1
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp. 12,000.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp. 2,400.00
= Rp. 14,400.00

2. 1 m3 Galian Untuk Tanah Biasa sedalam 2 m


Upah An. SNI ( Revisi ) 6.2.1
0.526 Oh Pekerja @ Rp. 30,000.00 = Rp. 15,780.00
0.052 Oh Mandor @ Rp. 60,000.00 = Rp. 3,120.00
= Rp. 18,900.00

3. 1 m3 Galian Untuk Tanah Biasa sedalam 3 m


Upah An. SNI ( Revisi ) 6.3.1
0.735 Oh Pekerja @ Rp. 30,000.00 = Rp. 22,050.00
0.073 Oh Mandor @ Rp. 60,000.00 = Rp. 4,380.00
= Rp. 26,430.00

4. 1 m3 Galian Untuk Tanah keras sedalam 1 m


Upah An. SNI ( Revisi ) 6.4.1
0.625 Oh Pekerja @ Rp. 30,000.00 = Rp. 18,750.00
0.062 Oh Mandor @ Rp. 60,000.00 = Rp. 3,720.00
= Rp. 22,470.00

5. 1 m3 Galian Untuk Tanah cadas sedalam 1 m


Upah An. SNI ( Revisi ) 6.5.1
1.250 Oh Pekerja @ Rp. 30,000.00 = Rp. 37,500.00
0.125 Oh Mandor @ Rp. 60,000.00 = Rp. 7,500.00
= Rp. 45,000.00

6. 1 m3 Galian Untuk Tanah lumpur sedalam 1 m


Upah An. SNI ( Revisi ) 6.6.1
0.823 Oh Pekerja @ Rp. 30,000.00 = Rp. 24,690.00
0.083 Oh Mandor @ Rp. 60,000.00 = Rp. 4,980.00
= Rp. 29,670.00

7. 1 m2 Pekerjaan stripping setinggi 1 m


Upah An. SNI ( Revisi ) 6.7.1
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp. 1,500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp. 300.00
= Rp. 1,800.00

8. 1 m3 Pembuangan tanah sejauh 150 m


Upah An. SNI ( Revisi ) 6.8.1
0.516 Oh Pekerja @ Rp. 30,000.00 = Rp. 15,480.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp. 3,000.00
= Rp. 18,480.00

9. 1 m3 Urugan kembali
Upah An. SNI ( Revisi ) 6.9.1
0.192 Oh Pekerja @ Rp. 30,000.00 = Rp. 5,760.00
0.019 Oh Mandor @ Rp. 60,000.00 = Rp. 1,140.00
= Rp. 6,900.00

10. 1 m3 Pemadatan tanah


Upah An. SNI ( Revisi ) 6.10.1
0.500 Oh Pekerja @ Rp. 30,000.00 = Rp. 15,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp. 3,000.00
= Rp. 18,000.00

11. 1 m3 Urugan pasir


Bahan An. SNI ( Revisi ) 6.11.1
1.200 m3 Pasir urug @ Rp. 82,500.00 = 99,000.00
= 99,000.00
Upah An. SNI ( Revisi ) 6.11.2
0.300 Oh Pekerja @ Rp. 30,000.00 = 9,000.00
0.0100 Oh Mandor @ Rp. 60,000.00 = 600.00
= 9,600.00
Total Upah dan Bahan = 108,600.00
12. 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 Tl
Bahan An. SNI ( Revisi ) 6.12.1
0.330 m3 Pasir urug @ Rp. 82,500.00 = 27,225.00
0.109 m3 Kapur padam @ Rp. 3,850.00 = 419.65
0.763 m3 Tanah liat @ Rp. 83,500.00 = 63,710.50
= 63,710.50
Upah An. SNI ( Revisi ) 6.12.2
0.833 Oh Pekerja @ Rp. 30,000.00 = 24,990.00
0.416 Oh Tukang batu @ Rp. 40,000.00 = 16,640.00
0.040 Oh Kepala tukang @ Rp. 50,000.00 = 2,000.00
0.0830 Oh Mandor @ Rp. 60,000.00 = 4,980.00
= 6,980.00
Total Upah dan Bahan = 70,690.50

13. 1 m3 Lapisan pudel campuran 1 Kp : 5 Tl


Bahan An. SNI ( Revisi ) 6.13.1
0.200 m3 Kapur padam @ Rp. 3,850.00 = 770.00
1.000 m3 Tanah liat @ Rp. 83,500.00 = 83,500.00
= 83,500.00
Upah An. SNI ( Revisi ) 6.13.2
0.833 Oh Pekerja @ Rp. 30,000.00 = 24,990.00
0.416 Oh Tukang batu @ Rp. 40,000.00 = 16,640.00
0.041 Oh Kepala tukang @ Rp. 50,000.00 = 2,050.00
0.081 Oh Mandor @ Rp. 60,000.00 = 4,860.00
= 6,910.00
Total Upah dan Bahan = 90,410.00

14. 1 m3 Pemasangan lapisan ijuk


Bahan An. SNI ( Revisi ) 6.14.1
1.200 m3 Ijuk @ Rp. = -
= #REF!
Upah An. SNI ( Revisi ) 6.14.2
0.150 Oh Pekerja @ Rp. 30,000.00 = 4,500.00
0.015 Oh Mandor @ Rp. 60,000.00 = 900.00
= 900.00
Total Upah dan Bahan = #REF!
15. 1 m3 Urugan sirtu
Bahan An. SNI ( Revisi ) 6.15.1
1.200 m3 Sirtu @ Rp. 65,000.00 = 78,000.00
= 78,000.00
Upah An. SNI ( Revisi ) 6.15.2
0.250 Oh Pekerja @ Rp. 30,000.00 = 7,500.00
0.025 Oh Mandor @ Rp. 60,000.00 = 1,500.00
= 9,000.00
Total Upah dan Bahan = 87,000.00

16. 1 m2 Pembuatan jalan sementara, tebal 25 cm


Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu belah @ Rp. 110,000.00 = #VALUE!
0.030 m3 Kerikil @ Rp. 137,500.00 = #VALUE!
0.050 m3 Pasir pasang @ Rp. 90,000.00 = #VALUE!
= #VALUE!
Upah An. SNI ( Revisi ) 6.17.2
1.000 Oh Pekerja @ Rp. 30,000.00 = #VALUE!
0.100 Oh Mandor @ Rp. 60,000.00 = #VALUE!
= #VALUE!
Total Upah dan Bahan = #VALUE!
PEKERJAAN PONDASI
1. 1 m3 Pasang pondasi batu kosong
Bahan An. SNI ( Revisi ) 6.14.1
1.200 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 132,000.00
0.300 m3 Pasir urug @ Rp. 82,500.00 = Rp 24,750.00
= Rp 156,750.00
Upah An. SNI ( Revisi ) 6.14.2
0.780 Oh Pekerja @ Rp. 30,000.00 = Rp 23,400.00
0.390 Oh Tukang batu @ Rp. 40,000.00 = Rp 15,600.00
0.039 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,950.00
0.039 Oh Mandor @ Rp. 60,000.00 = Rp 2,340.00
= Rp 43,290.00
Total harga = Rp 200,040.00

2. 1 m3 Pasang pondasi batu kali 1 Pc : 1 Ps


Bahan An. SNI ( Revisi ) 6.1.1
1.200 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 132,000.00
392.000 Kg Semen porland @ Rp. 1,188.00 = Rp 465,696.00
0.314 m3 Pasir pasang @ Rp. 90,000.00 = Rp 28,260.00
= Rp 625,956.00
Upah An. SNI ( Revisi ) 6.1.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 702,456.00

3. 1 m3 Pasang pondasi batu kali 1 Pc : 2 Ps


Bahan An. SNI ( Revisi ) 6.2.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
267.000 Kg Semen porland @ Rp. 1,188.00 = Rp 317,196.00
0.427 m3 Pasir pasang @ Rp. 82,500.00 = Rp 35,227.50
= Rp 473,423.50
Upah An. SNI ( Revisi ) 6.2.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 549,923.50

4. 1 m3 Pasang pondasi batu kali 1 Pc : 2.5 Ps


Bahan An. SNI ( Revisi ) 6.3.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
392.000 Kg Semen porland @ Rp. 1,188.00 = Rp 465,696.00
0.314 m3 Pasir pasang @ Rp. 90,000.00 = Rp 28,260.00
= Rp 614,956.00
Upah An. SNI ( Revisi ) 6.3.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 691,456.00
5. 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.4.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
202.000 Kg Semen porland @ Rp. 1,188.00 = Rp 239,976.00
0.485 m3 Pasir pasang @ Rp. 90,000.00 = Rp 43,650.00
= Rp 404,626.00
Upah An. SNI ( Revisi ) 6.4.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 481,126.00

6. 1 m3 Pasang pondasi batu kali 1 Pc : 4 Ps


Bahan An. SNI ( Revisi ) 6.5.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
163.000 Kg Semen porland @ Rp. 1,188.00 = Rp 193,644.00
0.520 m3 Pasir pasang @ Rp. 90,000.00 = Rp 46,800.00
= Rp 361,444.00
Upah An. SNI ( Revisi ) 6.5.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 437,944.00

7. 1 m3 Pasang pondasi batu kali 1 Pc : 5 Ps


Bahan An. SNI ( Revisi ) 6.6.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
136.000 Kg Semen porland @ Rp. 1,188.00 = Rp 161,568.00
0.544 m3 Pasir pasang @ Rp. 90,000.00 = Rp 48,960.00
= Rp 331,528.00
Upah An. SNI ( Revisi ) 6.6.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 408,028.00

8. 1 m3 Pasang pondasi batu kali 1 Pc : 6 Ps


Bahan An. SNI ( Revisi ) 6.7.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
117.000 Kg Semen porland @ Rp. 1,188.00 = Rp 138,996.00
0.561 m3 Pasir pasang @ Rp. 90,000.00 = Rp 50,490.00
= Rp 310,486.00
Upah An. SNI ( Revisi ) 6.7.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 386,986.00
9. 1 m3 Pasang pondasi batu kali 1 Pc : 8 Ps
Bahan An. SNI ( Revisi ) 6.8.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
91.000 Kg Semen porland @ Rp. 1,188.00 = Rp 108,108.00
0.561 m3 Pasir pasang @ Rp. 90,000.00 = Rp 50,490.00
= Rp 279,598.00
Upah An. SNI ( Revisi ) 6.8.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp 356,098.00

10. 1 m3 Pasang pondasi batu kali 1 Kp : 1 Sm : 1 Ps


Bahan An. SNI ( Revisi ) 6.9.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
0.229 Kg Kapur pasang @ Rp. 33,000.00 = Rp 7,557.00
0.229 m3 Semen merah @ Rp. Semen merah = Rp #VALUE!
0.544 m3 Pasir pasang @ Rp. 90,000.00 = Rp 48,960.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.9.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 45,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 76,500.00
Total harga = Rp #VALUE!

11. 1 m3 Pasang pondasi batu kali 1 Kp : 1 Sm : 2 Ps


Bahan An. SNI ( Revisi ) 6.10.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110,000.00 = Rp 121,000.00
0.170 Kg Kapur pasang @ Rp. 90,000.00 = Rp 15,300.00
0.170 m3 Semen merah @ Rp. Semen merah = Rp #VALUE!
0.340 m3 Pasir pasang @ Rp. 90,000.00 = Rp 30,600.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.10.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 75,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 36,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.075 Oh Mandor @ Rp. 60,000.00 = Rp -
-- = Rp 111,000.00
Total harga = Rp #VALUE!

12. 1 m3 Pasang pondasi batu kali 1 Pc : 1/4 Kp : 4 Ps


Bahan An. SNI ( Revisi ) 6.11.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110000 = Rp 36,300.00
156.000 Kg Semen portland @ Rp. 1188 = Rp 14,040,000.00
0.032 m3 Kapur pasang @ Rp. 33,000.00 = Rp -
0.584 m3 Pasir pasang @ Rp. 90,000.00 = Rp 105,120.00
180,000.00 = Rp 14,181,420.00
Upah An. SNI ( Revisi ) 6.11.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 75,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 36,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.075 Oh Mandor @ Rp. 60,000.00 = Rp -
-- = Rp 111,000.00
Total harga = Rp 14,292,420.00
13. 1 m3 Pasang pondasi batu kali 1 Pc : 3 Kp : 10 Ps
Bahan An. SNI ( Revisi ) 6.12.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110000 = Rp 36,300.00
61.000 Kg Semen portland @ Rp. 1188 = Rp 5,490,000.00
0.147 m3 Kapur pasang @ Rp. 33,000.00 = Rp -
0.492 m3 Pasir pasang @ Rp. 90,000.00 = Rp #REF!
#REF! = Rp #REF!
Upah An. SNI ( Revisi ) 6.12.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 75,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 36,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.075 Oh Mandor @ Rp. 60,000.00 = Rp -
-- = Rp 111,000.00
Total harga = Rp #REF!

14. 1 m3 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps


Bahan An. SNI ( Revisi ) 6.13.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 110000 = Rp 36,300.00
41.000 Kg Semen portland @ Rp. 1188 = Rp 3,690,000.00
0.131 m3 Kapur pasang @ Rp. 33,000.00 = Rp -
0.523 m3 Pasir pasang @ Rp. 90,000.00 = Rp -
- = Rp 3,726,300.00
Upah An. SNI ( Revisi ) 6.13.2
1.500 Oh Pekerja @ Rp. 30,000.00 = Rp 75,000.00
0.600 Oh Tukang batu @ Rp. 40,000.00 = Rp 36,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.075 Oh Mandor @ Rp. 60,000.00 = Rp -
- = Rp 111,000.00
Total harga = Rp 3,837,300.00

15. 1 m3 Pasang pondasi siklop 40 % batu kali


Bahan An. SNI ( Revisi ) 6.15.1
75.000 Kg Besi beton @ Rp. 9900 = Rp 6,750,000.00
202.000 Kg Semen portland @ Rp. 1188 = Rp 33,330,000.00
0.320 m3 Pasir beton @ Rp. 90,000.00 = Rp 4,224.00
0.490 m3 Koral beton @ Rp. 165,000.00 = Rp -
0.800 Kg Kawat beton @ Rp. 13,200.00 = Rp -
- = Rp 40,084,224.00
Upah An. SNI ( Revisi ) 6.15.2
3.000 Oh Pekerja @ Rp. 30,000.00 = Rp 150,000.00
0.850 Oh Tukang batu @ Rp. 40,000.00 = Rp 51,000.00
0.085 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.150 Oh Mandor @ Rp. 60,000.00 = Rp -
- = Rp 201,000.00
Total harga = Rp 40,285,224.00

16. 1 m3 Pasang pondasi sumuran Ø 100 cm


Bahan An. SNI ( Revisi ) 6.16.1
0.450 m3 Batu belah ( 15/20 ) @ Rp. 110000 = Rp 40,500.00
280.000 Kg Semen portland @ Rp. 1188 = Rp 46,200,000.00
0.450 m3 Pasir beton @ Rp. 90,000.00 = Rp -
0.670 m3 Koral beton @ Rp. 165,000.00 = Rp -
- = Rp 46,240,500.00
Upah An. SNI ( Revisi ) 6.16.2
2.380 Oh Pekerja @ Rp. 30,000.00 = Rp 119,000.00
0.300 Oh Tukang batu @ Rp. 40,000.00 = Rp 18,000.00
0.030 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.080 Oh Mandor @ Rp. 60,000.00 = Rp -
- = Rp 137,000.00
Total harga = Rp 46,377,500.00
17. 1 m' Pembuatan tiang pancang ( 40 x 40 ) cm, beton bertulang
Bahan An. SNI ( Revisi ) 6.17.1
0.019 m3 Pasir urug darat @ Rp. 82500 = Rp 3,135.00
0.094 m3 Pasir beton @ Rp. 90000 = Rp 111.67
0.150 m3 Koral beton @ Rp. 165,000.00 = Rp 1,485.00
60.500 Kg Semen portland @ Rp. 1,188.00 = Rp 798,600.00
45.000 Kg Besi beton @ Rp. 9,900.00 = Rp 173,250,000.00
0.900 Kg Kawat beton @ Rp. 13,200.00 = Rp 10,395.00
0.032 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp -
0.120 Kg Paku @ Rp. 11,550.00 = Rp 1,848.00
0.090 Lt Minyak bekisting @ Rp. = Rp -
0.240 Kg Plamuur tembok @ Rp. 15,400.00 = Rp -
- = Rp 174,065,574.67
Upah An. SNI ( Revisi ) 6.17.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 50,000.00
0.670 Oh Tukang batu @ Rp. 40,000.00 = Rp 40,200.00
0.067 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.050 Oh Mandor @ Rp. 60,000.00 = Rp -
-- = Rp 90,200.00
Total harga = Rp 174,155,774.67

18. 1 m' Pembuatan tiang pancang ( 35 x 35 ) cm, beton bertulang


Bahan An. SNI ( Revisi ) 6.18.1
0.016 m3 Pasir urug darat @ Rp. 82500 = Rp 2,640.00
0.080 m3 Pasir beton @ Rp. 90000 = Rp 95.04
0.125 m3 Koral beton @ Rp. 165,000.00 = Rp 1,237.50
49.000 Kg Semen portland @ Rp. 1,188.00 = Rp 646,800.00
34.500 Kg Besi beton @ Rp. 9,900.00 = Rp 132,825,000.00
0.700 Kg Kawat beton @ Rp. 13,200.00 = Rp 8,085.00
0.027 m3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp -
0.120 Kg Paku @ Rp. 11,550.00 = Rp 1,848.00
0.090 Lt Minyak bekisting @ Rp. - = Rp -
0.200 Kg Plamuur tembok @ Rp. 15,400.00 = Rp -
- = Rp 133,485,705.54
Upah An. SNI ( Revisi ) 6.18.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 40,000.00
0.500 Oh Tukang batu @ Rp. 40,000.00 = Rp 30,000.00
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp -
0.040 Oh Mandor @ Rp. 60,000.00 = Rp -
-- = Rp 70,000.00
Total harga = Rp 133,555,705.54
3.26 4.075

1.100
2.925
3.4 0.561
1.500
0.600
PEKERJAAN PLESTERAN
1. 1 m2 Plesteran, 1 Pc : 1 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.1.1
12.920 Kg Semen portland @ Rp. 1,188.00 = Rp 15,348.96
0.013 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,170.00
= Rp 16,518.96
Upah An. SNI ( Revisi ) 6.1.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 29,868.96
2. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.2.1
8.520 Kg Semen portland @ Rp. 1,188.00 = Rp 10,121.76
0.017 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,530.00
= Rp 11,651.76
Upah An. SNI ( Revisi ) 6.2.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 25,001.76
3. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.3.1
6.480 Kg Semen portland @ Rp. 1,188.00 = Rp 7,698.24
0.019 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,710.00
= Rp 9,408.24
Upah An. SNI ( Revisi ) 6.3.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 22,758.24
4. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.4.1
5.200 Kg Semen portland @ Rp. 1,188.00 = Rp 6,177.60
0.020 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,800.00
= Rp 7,977.60
Upah An. SNI ( Revisi ) 6.4.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 21,327.60
5. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.5.1
4.320 Kg Semen portland @ Rp. 1,188.00 = Rp 5,132.16
0.022 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,980.00
= Rp 7,112.16
Upah An. SNI ( Revisi ) 6.5.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 20,462.16
6. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.6.1
3.680 Kg Semen portland @ Rp. 1,188.00 = Rp 4,371.84
0.023 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,070.00
= Rp 6,441.84
Upah An. SNI ( Revisi ) 6.6.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 19,791.84
7. 1 m2 Plesteran, 1 Pc : 8 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.7.1
2.880 Kg Semen portland @ Rp. 1,188.00 = Rp 3,421.44
0.024 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,160.00
= Rp 5,581.44
Upah An. SNI ( Revisi ) 6.7.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 18,931.44
8. 1 m2 Plesteran, 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.8.1
5.760 Kg Semen portland @ Rp. 1,188.00 = Rp 6,842.88
0.003 m3 Kapur Padam @ Rp. 33,000.00 = Rp 99.00
0.013 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,170.00
= Rp 8,111.88
Upah An. SNI ( Revisi ) 6.8.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 21,461.88
9. 1 m2 Plesteran, 1 Pc : 3 Kp : 10 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.9.1
1.840 Kg Semen portland @ Rp. 352,000.00 = Rp 647,680.00
0.006 m3 Kapur Padam @ Rp. 187,000.00 = Rp 1,122.00
0.014 m3 Pasir pasang @ Rp. 352,000.00 = Rp 4,928.00
= Rp 653,730.00
Upah An. SNI ( Revisi ) 6.9.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 667,080.00
10. 1 m2 Plesteran, 0.5 Pc : 1 Kp : 4 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.10.1
3.000 Kg Semen portland @ Rp. 1,188.00 = Rp 3,564.00
0.005 m3 Kapur Padam @ Rp. 33,000.00 = Rp 165.00
0.019 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,710.00
= Rp 5,439.00
Upah An. SNI ( Revisi ) 6.10.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp 18,789.00
11. 1 m2 Plesteran, 1 Kp : 1 Sm : 1 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.009 m3 Semen merah @ Rp. Semen merah = Rp #VALUE!
0.009 m3 Kapur Padam @ Rp. 33,000.00 = Rp 297.00
0.009 m3 Pasir pasang @ Rp. 90,000.00 = Rp 810.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.11.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp #VALUE!
12. 1 m2 Plesteran, 1 Kp : 1 Sm : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.007 m3 Semen merah @ Rp. Semen merah = Rp #VALUE!
0.007 m3 Kapur Padam @ Rp. 33,000.00 = Rp 231.00
0.150 m3 Pasir pasang @ Rp. 90,000.00 = Rp 13,500.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.12.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 13,350.00
Total harga = Rp #VALUE!
13. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.13.1
14.280 Kg Semen portland @ Rp. 1,188.00 = Rp 16,964.64
0.023 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,070.00
= Rp 19,034.64
Upah An. SNI ( Revisi ) 6.13.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 17,250.00
Total harga = Rp 36,284.64
14. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.14.1
10.800 Kg Semen portland @ Rp. 1,188.00 = Rp 12,830.40
0.026 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,340.00
= Rp 15,170.40
Upah An. SNI ( Revisi ) 6.14.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 17,250.00
Total harga = Rp 32,420.40
15. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.15.1
8.680 Kg Semen portland @ Rp. 1,188.00 = Rp 10,311.84
0.028 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,520.00
= Rp 12,831.84
Upah An. SNI ( Revisi ) 6.15.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 17,250.00
Total harga = Rp 30,081.84
16. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.16.1
7.290 Kg Semen portland @ Rp. 1,188.00 = Rp 8,660.52
0.028 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,520.00
= Rp 11,180.52
Upah An. SNI ( Revisi ) 6.16.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 17,250.00
Total harga = Rp 28,430.52
17. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.17.1
6.240 Kg Semen portland @ Rp. 1,188.00 = Rp 7,413.12
0.030 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,700.00
= Rp 10,113.12
Upah An. SNI ( Revisi ) 6.17.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 17,250.00
Total harga = Rp 27,363.12
18. 1 m2 Plesteran, 1 Kp : 1 Sm : 2 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.18.1
0.009 m3 Semen merah @ Rp. Semen merah = Rp #VALUE!
0.009 m3 Pasir padam @ Rp. 33,000.00 = Rp 297.00
0.018 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,620.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.18.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 17,250.00
Total harga = Rp #VALUE!
19. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.19.1
15.500 Kg Semen portland @ Rp. 1,188.00 = Rp 18,414.00
0.013 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,170.00
= Rp 19,584.00
Upah An. SNI ( Revisi ) 6.19.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0130 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 18,780.00
Total harga = Rp 38,364.00
20. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.20.1
11.750 Kg Semen portland @ Rp. 1,188.00 = Rp 13,959.00
0.035 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,150.00
= Rp 17,109.00
Upah An. SNI ( Revisi ) 6.20.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0130 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 18,780.00
Total harga = Rp 35,889.00
21. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.21.1
9.480 Kg Semen portland @ Rp. 1,188.00 = Rp 11,262.24
0.038 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,420.00
= Rp 14,682.24
Upah An. SNI ( Revisi ) 6.21.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0130 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 18,780.00
Total harga = Rp 33,462.24
22. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.22.1
7.940 Kg Semen portland @ Rp. 1,188.00 = Rp 9,432.72
0.039 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,510.00
= Rp 12,942.72
Upah An. SNI ( Revisi ) 6.22.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0130 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 18,780.00
Total harga = Rp 31,722.72
23. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.23.1
18.650 Kg Semen portland @ Rp. 1,188.00 = Rp 22,156.20
0.035 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,150.00
= Rp 25,306.20
Upah An. SNI ( Revisi ) 6.23.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.0150 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 21,750.00
Total harga = Rp 47,056.20
24. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.24.1
14.150 Kg Semen portland @ Rp. 1,188.00 = Rp 16,810.20
0.039 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,510.00
= Rp 20,320.20
Upah An. SNI ( Revisi ) 6.24.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.0150 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 21,750.00
Total harga = Rp 42,070.20
25. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.25.1
11.380 Kg Semen portland @ Rp. 1,188.00 = Rp 13,519.44
0.042 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,780.00
= Rp 17,299.44
Upah An. SNI ( Revisi ) 6.25.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.0150 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 21,750.00
Total harga = Rp 39,049.44
26. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.26.1
8.190 Kg Semen portland @ Rp. 1,188.00 = Rp 9,729.72
0.045 m3 Pasir pasang @ Rp. 90,000.00 = Rp 4,050.00
= Rp 13,779.72
Upah An. SNI ( Revisi ) 6.26.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.0150 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 21,750.00
Total harga = Rp 35,529.72
27. 1 m2 Berapen, 1 Pc : 3 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.27.1
7.070 Kg Semen portland @ Rp. 1,188.00 = Rp 8,399.16
0.021 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,890.00
= Rp 10,289.16
Upah An. SNI ( Revisi ) 6.27.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.070 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.0080 Oh Mandor @ Rp. 60,000.00 = Rp 480.00
= Rp 8,130.00
Total harga = Rp 18,419.16
28. 1 m2 Berapen, 1 Pc : 5 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.28.1
5.670 Kg Semen portland @ Rp. 1,188.00 = Rp 6,735.96
0.023 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,070.00
= Rp 8,805.96
Upah An. SNI ( Revisi ) 6.28.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.070 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.0080 Oh Mandor @ Rp. 60,000.00 = Rp 480.00
= Rp 8,130.00
Total harga = Rp 16,935.96
29. 1 m2 Plesteran beton, 1 Pc : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.29.1
9.300 Kg Semen portland @ Rp. 1,188.00 = Rp 11,048.40
0.018 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,620.00
= Rp 12,668.40
Upah An. SNI ( Revisi ) 6.29.2
0.260 Oh Pekerja @ Rp. 30,000.00 = Rp 7,800.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0130 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 17,580.00
Total harga = Rp 30,248.40
30. 1 m2 Plesteran beton, 1 Pc : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.30.1
7.070 Kg Semen portland @ Rp. 1,188.00 = Rp 8,399.16
0.021 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,890.00
= Rp 10,289.16
Upah An. SNI ( Revisi ) 6.30.2
0.260 Oh Pekerja @ Rp. 30,000.00 = Rp 7,800.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.0130 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 17,580.00
Total harga = Rp 27,869.16
31. 1 m2 Plesteran skoning, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.31.1
0.500 Kg Semen portland @ Rp. 1,188.00 = Rp 594.00
0.002 m3 Pasir pasang @ Rp. 90,000.00 = Rp 180.00
= Rp 774.00
Upah An. SNI ( Revisi ) 6.31.2
0.057 Oh Pekerja @ Rp. 30,000.00 = Rp 1,710.00
0.038 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,520.00
0.038 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,900.00
0.0020 Oh Mandor @ Rp. 60,000.00 = Rp 120.00
= Rp 5,250.00
Total harga = Rp 6,024.00
32. 1 m2 Plesteran granito, 1 Pc warna : 2 Granito, tebal 10 mm
Bahan An. SNI ( Revisi ) 6.32.1
0.144 Kg Pc warna @ Rp. 1,188.00 = Rp 171.07
15.000 Kg Batu granito @ Rp. 90,000.00 = Rp 1,350,000.00
= Rp 1,350,171.07
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp 1,500.00
0.020 Oh Tukang batu @ Rp. 40,000.00 = Rp 800.00
0.002 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100.00
0.0050 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 2,700.00
Total harga = Rp 1,352,871.07
33. 1 m2 Plesteran Teraso, 1 Pc warna : 2 batu teraso, tebal 10 mm
Bahan An. SNI ( Revisi ) 6.33.1
0.440 Kg Pc warna @ Rp. 1,188.00 = Rp 522.72
11.500 Kg Batu teraso @ Rp. 90,000.00 = Rp 1,035,000.00
= Rp 1,035,522.72
Upah An. SNI ( Revisi ) 6.33.2
0.450 Oh Pekerja @ Rp. 30,000.00 = Rp 13,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.002 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100.00
0.025 Oh Mandor @ Rp. 60,000.00 = Rp 1,500.00
= Rp 23,100.00
Total harga = Rp 1,058,622.72
34. 1 m2 Plesteran ciprat, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.34.1
4.320 Kg Semen portland @ Rp. 1,188.00 = Rp 5,132.16
0.016 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,440.00
= Rp 6,572.16
Upah An. SNI ( Revisi ) 6.34.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.001 Oh Kepala tukang @ Rp. 50,000.00 = Rp 50.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 12,450.00
Total harga = Rp 19,022.16
35. 1 m2 Plesteran siar adukan, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.35.1
4.320 Kg Semen portland @ Rp. 1,188.00 = Rp 5,132.16
0.016 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,440.00
= Rp 6,572.16
Upah An. SNI ( Revisi ) 6.35.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.070 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.008 Oh Mandor @ Rp. 60,000.00 = Rp 480.00
= Rp 8,130.00
Total harga = Rp 14,702.16
36. 1 m2 Plesteran waterproof batacote 3 lapis
Bahan An. SNI ( Revisi ) 6.36.1
0.500 Kg Semen portland @ Rp. 1,188.00 = Rp 594.00
2.900 Kg Batacote @ Rp. - = Rp -
0.006 m3 Pasir pasang @ Rp. 90,000.00 = Rp 540.00
= Rp 1,134.00
Upah An. SNI ( Revisi ) 6.36.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 18,900.00
Total harga = Rp 20,034.00
PEKERJAAN PASANGAN
1. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps
Bahan An. SNI ( Revisi ) 6.1.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
64.030 Kg Semen portland @ Rp. 1,188.00 = Rp 76,067.64
0.059 m3 Pasir pasang @ Rp. 90,000.00 = Rp 5,310.00
= Rp 140,877.64
Upah An. SNI ( Revisi ) 6.1.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 171,177.64
2. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.2.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
43.500 Kg Semen portland @ Rp. 1,188.00 = Rp 51,678.00
0.080 m3 Pasir pasang @ Rp. 90,000.00 = Rp 7,200.00
= Rp 118,378.00
Upah An. SNI ( Revisi ) 6.2.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 148,678.00
3. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.3.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
32.950 Kg Semen portland @ Rp. 1,188.00 = Rp 39,144.60
0.091 m3 Pasir pasang @ Rp. 90,000.00 = Rp 8,190.00
= Rp 106,834.60
Upah An. SNI ( Revisi ) 6.3.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 137,134.60
4. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.4.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
26.550 Kg Semen portland @ Rp. 1,188.00 = Rp 31,541.40
0.093 m3 Pasir pasang @ Rp. 90,000.00 = Rp 8,370.00
= Rp 99,411.40
Upah An. SNI ( Revisi ) 6.4.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 129,711.40
5. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Bahan An. SNI ( Revisi ) 6.5.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
22.200 Kg Semen portland @ Rp. 1,188.00 = Rp 26,373.60
0.102 m3 Pasir pasang @ Rp. 90,000.00 = Rp 9,180.00
= Rp 95,053.60
Upah An. SNI ( Revisi ) 6.5.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 125,353.60
6. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Bahan An. SNI ( Revisi ) 6.6.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
22.200 Kg Semen portland @ Rp. 1,188.00 = Rp 26,373.60
0.102 m3 Pasir pasang @ Rp. 90,000.00 = Rp 9,180.00
= Rp 95,053.60
Upah An. SNI ( Revisi ) 6.6.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 125,353.60

7. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


Bahan An. SNI ( Revisi ) 6.7.1
140.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 59,500.00
10.0800 Kg Semen portland @ Rp. 1,188.00 = Rp 11,975.04
0.0925 m3 Pasir pasang @ Rp. 90,000.00 = Rp 8,325.00
0.0275 m3 Kapur pasang @ Rp. 3,850.00 = Rp 105.88
= Rp 79,905.92
Upah An. SNI ( Revisi ) 6.7.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp 19,500.00
0.200 Oh Tukang batu @ Rp. 40,000.00 = Rp 8,000.00
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 30,300.00
Total harga = Rp 110,205.92

8. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 1 Ps


Bahan An. SNI ( Revisi ) 6.8.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
27.800 Kg Semen portland @ Rp. 1,188.00 = Rp 33,026.40
0.028 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,520.00
= Rp 65,296.40
Upah An. SNI ( Revisi ) 6.8.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 5,400.00
Total harga = Rp #VALUE!

9. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps


Bahan An. SNI ( Revisi ) 6.9.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
18.950 Kg Semen portland @ Rp. 1,188.00 = Rp 22,512.60
0.038 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,420.00
= Rp 55,682.60
Upah An. SNI ( Revisi ) 6.9.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 70,682.60
10. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.10.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
14.370 Kg Semen portland @ Rp. 1,188.00 = Rp 17,071.56
0.004 m3 Pasir pasang @ Rp. 90,000.00 = Rp 360.00
= Rp 17,431.56
Upah An. SNI ( Revisi ) 6.10.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 32,431.56
11. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.4.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
11.500 Kg Semen portland @ Rp. 1,188.00 = Rp 13,662.00
0.043 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,870.00
= Rp 47,282.00
Upah An. SNI ( Revisi ) 6.4.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 62,282.00

12. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps


Bahan An. SNI ( Revisi ) 6.12.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
9.680 Kg Semen portland @ Rp. 1,188.00 = Rp 11,499.84
0.045 m3 Pasir pasang @ Rp. 90,000.00 = Rp 4,050.00
= Rp 45,299.84
Upah An. SNI ( Revisi ) 6.12.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 60,299.84

13. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps


Bahan An. SNI ( Revisi ) 6.13.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
8.320 Kg Semen portland @ Rp. 1,188.00 = Rp 9,884.16
0.049 m3 Pasir pasang @ Rp. 90,000.00 = Rp 4,410.00
= Rp 44,044.16
Upah An. SNI ( Revisi ) 6.13.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 59,044.16

14. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps


Bahan An. SNI ( Revisi ) 6.14.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
6.500 Kg Semen portland @ Rp. 1,188.00 = Rp 7,722.00
0.050 m3 Pasir pasang @ Rp. 90,000.00 = Rp 4,500.00
= Rp 41,972.00
Upah An. SNI ( Revisi ) 6.14.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 56,972.00

15. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


Bahan An. SNI ( Revisi ) 6.15.1
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
4.5000 Kg Semen portland @ Rp. 1,188.00 = Rp 5,346.00
0.0500 m3 Pasir pasang @ Rp. 90,000.00 = Rp 4,500.00
0.0150 m3 Kapur padam @ Rp. 3,850.00 = Rp 57.75
= Rp 39,653.75
Upah An. SNI ( Revisi ) 6.15.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp 54,653.75

16. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps


Bahan An. SNI ( Revisi ) 6.16.1
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
0.0180 Kg Semen merah / bata merah tumbuk @ Rp. Semen merah = Rp #VALUE!
0.0180 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,620.00
0.0180 m3 Kapur padam @ Rp. 3,850.00 = Rp 69.30
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.16.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp #VALUE!

17. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps


Bahan An. SNI ( Revisi ) 6.17.1
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 425.00 = Rp 29,750.00
0.0140 Kg Semen merah / bata merah tumbuk @ Rp. Semen merah = Rp #VALUE!
0.0280 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,520.00
0.0140 m3 Kapur padam @ Rp. 3,850.00 = Rp 53.90
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.17.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp #VALUE!

18. 1 m2 Pasangan dinding hollow block ( HB. 20 )


Bahan An. SNI ( Revisi ) 6.18.1
12.5000 Bh Hollow block ( HB. 20 ) @ Rp. Hollow block 20 = Rp #VALUE!
13.5000 Kg Semen portland @ Rp. 1,188.00 = Rp 16,038.00
0.0480 m3 Pasir pasang @ Rp. 90,000.00 = Rp 4,320.00
1.9500 Kg Besi beton polos @ Rp. 9,900.00 = Rp 19,305.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.18.2
0.350 Oh Pekerja @ Rp. 30,000.00 = Rp 10,500.00
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.017 Oh Mandor @ Rp. 60,000.00 = Rp 1,020.00
= Rp 18,270.00
Total harga = Rp #VALUE!

19. 1 m2 Pasangan dinding hollow block ( HB. 15 )


Bahan An. SNI ( Revisi ) 6.19.1
12.5000 Bh Hollow block ( HB. 15 ) @ Rp. Hollow block 15 = Rp #VALUE!
10.4500 Kg Semen portland @ Rp. 1,188.00 = Rp 12,414.60
0.0380 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,420.00
1.9500 Kg Besi beton polos @ Rp. 9,900.00 = Rp 19,305.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.19.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,800.00
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp 600.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,900.00
Total harga = Rp #VALUE!

20. 1 m2 Pasangan dinding hollow block ( HB. 10 )


Bahan An. SNI ( Revisi ) 6.20.1
12.5000 Bh Hollow block ( HB. 10 ) @ Rp. Hollow block 10 = Rp #VALUE!
7.5000 Kg Semen portland @ Rp. 1,188.00 = Rp 8,910.00
0.0270 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,430.00
1.9500 Kg Besi beton polos @ Rp. 9,900.00 = Rp 19,305.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.20.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.015 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 15,000.00
Total harga = Rp #VALUE!

21. 1 m2 Pasangan dinding conblock ( CB. 20 )


Bahan An. SNI ( Revisi ) 6.21.1
12.5000 Bh Concrete block ( CB. 20 ) @ Rp. Conblock 20 = Rp #VALUE!
14.0500 Kg Semen portland @ Rp. 1,188.00 = Rp 16,691.40
0.0040 m3 Pasir beton @ Rp. 90,000.00 = Rp 360.00
0.0420 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,780.00
3.8700 Kg Besi beton polos Ø 8 mm @ Rp. 15,400.00 = Rp 59,598.00
0.0060 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 69.30
0.0010 m3 Kayu terentang @ Rp. - = Rp -
0.0300 Kg Kawat beton @ Rp. 13,200.00 = Rp 396.00
0.0050 m3 Koral beton @ Rp. 165,000.00 = Rp 825.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.21.2
0.3700 Oh Pekerja @ Rp. 30,000.00 = Rp 11,100.00
0.1570 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,280.00
0.0070 Oh Tukang besi @ Rp. 40,000.00 = Rp 280.00
0.0164 Oh Kepala tukang @ Rp. 50,000.00 = Rp 820.00
0.0185 Oh Mandor @ Rp. 60,000.00 = Rp 1,110.00
= Rp 19,590.00
Total harga = Rp #VALUE!
22. 1 m2 Pasangan dinding conblock ( CB. 15 )
Bahan An. SNI ( Revisi ) 6.22.1
12.5000 Bh Concrete block ( CB. 15 ) @ Rp. Conblock 15 = Rp #VALUE!
10.4600 Kg Semen portland @ Rp. 1,188.00 = Rp 12,426.48
0.0030 m3 Pasir beton @ Rp. 90,000.00 = Rp 270.00
0.0320 m3 Pasir pasang @ Rp. 90,000.00 = Rp 2,880.00
0.8700 Kg Besi beton polos Ø 8 mm @ Rp. 15,400.00 = Rp 13,398.00
0.0040 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 46.20
0.0010 m3 Kayu terentang @ Rp. - = Rp -
0.0200 Kg Kawat beton @ Rp. 13,200.00 = Rp 264.00
0.0040 m3 Koral beton @ Rp. 165,000.00 = Rp 660.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.22.2
0.3400 Oh Pekerja @ Rp. 30,000.00 = Rp 10,200.00
0.1300 Oh Tukang batu @ Rp. 40,000.00 = Rp 5,200.00
0.0070 Oh Tukang besi @ Rp. 40,000.00 = Rp 280.00
0.0137 Oh Kepala tukang @ Rp. 50,000.00 = Rp 685.00
0.0170 Oh Mandor @ Rp. 60,000.00 = Rp 1,020.00
= Rp 17,385.00
Total harga = Rp #VALUE!

23. 1 m2 Pasangan dinding conblock ( CB. 10 )


Bahan An. SNI ( Revisi ) 6.23.1
12.5000 Bh Concrete block ( CB. 10 ) @ Rp. Conblock 10 = Rp #VALUE!
7.2000 Kg Semen portland @ Rp. 1,188.00 = Rp 8,553.60
0.0020 m3 Pasir beton @ Rp. 90,000.00 = Rp 180.00
0.0210 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,890.00
2.5400 Kg Besi beton polos Ø 8 mm @ Rp. 15,400.00 = Rp 39,116.00
0.0030 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 34.65
0.0010 m3 Kayu terentang @ Rp. - = Rp -
0.0150 Kg Kawat beton @ Rp. 13,200.00 = Rp 198.00
0.0030 m3 Koral beton @ Rp. 165,000.00 = Rp 495.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.23.2
0.3400 Oh Pekerja @ Rp. 30,000.00 = Rp 10,200.00
0.1070 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,280.00
0.0070 Oh Tukang besi @ Rp. 40,000.00 = Rp 280.00
0.0114 Oh Kepala tukang @ Rp. 50,000.00 = Rp 570.00
0.0170 Oh Mandor @ Rp. 60,000.00 = Rp 1,020.00
= Rp 16,350.00
Total harga = Rp #VALUE!

24. 1 m2 Pasangan dinding latai


Bahan An. SNI ( Revisi ) 6.24.1
2.5000 Bh Bondbeam 40 x 20 x 20 cm @ Rp. - = Rp -
5.1000 Kg Semen portland @ Rp. 1,188.00 = Rp 6,058.80
0.0800 m3 Pasir beton @ Rp. 90,000.00 = Rp 7,200.00
1.5000 Kg Besi beton polos Ø 8 mm @ Rp. 15,400.00 = Rp 23,100.00
0.1500 m3 Koral beton @ Rp. 165,000.00 = Rp 24,750.00
= Rp 36,358.80
Upah An. SNI ( Revisi ) 6.24.2
0.1000 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.0300 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,200.00
0.0300 Oh Tukang besi @ Rp. 40,000.00 = Rp 1,200.00
0.0060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0050 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 6,000.00
Total harga = Rp 42,358.80
25. 1 m2 Pasangan dinding roster/terawang ( 12 x 11 x 24 ) cm
Bahan An. SNI ( Revisi ) 6.25.1
36.0000 Bh Roster/terawang @ Rp. 7,000.00 = Rp 252,000.00
12.8000 Kg Semen portland @ Rp. 1,188.00 = Rp 15,206.40
0.0350 m3 Pasir pasang @ Rp. 90,000.00 = Rp 3,150.00
= Rp 270,356.40
Upah An. SNI ( Revisi ) 6.25.2
0.3000 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.1000 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.0100 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0150 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 14,400.00
Total harga = Rp 284,756.40

26. 1 m2 Pasangan bata berongga ( 5 x 11 x 24 ) cm


Bahan An. SNI ( Revisi ) 6.26.1
80.0000 Bh Bata berongga @ Rp. Bata berongga = Rp #VALUE!
23.6500 Kg Semen portland @ Rp. 1,188.00 = Rp 28,096.20
0.5700 m3 Pasir pasang @ Rp. 90,000.00 = Rp 51,300.00
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.26.2
0.3200 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.1500 Oh Tukang batu @ Rp. 40,000.00 = Rp 6,000.00
0.0150 Oh Kepala tukang @ Rp. 50,000.00 = Rp 750.00
0.0150 Oh Mandor @ Rp. 60,000.00 = Rp 900.00
= Rp 17,250.00
Total harga = Rp #VALUE!

27. 1 m2 Pasangan dinding anyaman bambu, rangka kayu


Bahan An. SNI ( Revisi ) 6.27.1
1.5000 M2 Bilik bambu @ Rp. - = Rp -
0.0140 M3 Kayu meranti 5/7 @ Rp. 3,850,000.00 = Rp 53,900.00
0.0120 Kg Paku @ Rp. 11,550.00 = Rp 138.60
0.0030 m3 List kayu 2/4 @ Rp. 5,500.00 = Rp 16.50
= Rp 54,055.10
Upah An. SNI ( Revisi ) 6.27.2
0.1000 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.0500 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,000.00
0.0050 Oh Kepala tukang @ Rp. 50,000.00 = Rp 250.00
0.0020 Oh Mandor @ Rp. 60,000.00 = Rp 120.00
= Rp 5,370.00
Total harga = Rp 59,425.10
PEKERJAAN BETON
1. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Bahan An. SNI ( Revisi ) 6.1.1
218.000 Kg Semen portland @ Rp. 1,188.00 = Rp 258,984.00
0.520 m3 Pasir beton @ Rp. 90,000.00 = Rp 46,800.00
0.870 m3 Koral beton @ Rp. 165,000.00 = Rp 143,550.00
= Rp 449,334.00
Upah An. SNI ( Revisi ) 6.1.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 514,884.00
2. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr
Bahan An. SNI ( Revisi ) 6.2.1
197.000 Kg Semen portland @ Rp. 1,188.00 = Rp 234,036.00
0.470 m3 Pasir beton @ Rp. 90,000.00 = Rp 42,300.00
0.940 m3 Koral beton @ Rp. 165,000.00 = Rp 155,100.00
= Rp 431,436.00
Upah An. SNI ( Revisi ) 6.2.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 496,986.00
3. 1 m3 Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr
Bahan An. SNI ( Revisi ) 6.3.1
173.000 Kg Semen portland @ Rp. 1,188.00 = Rp 205,524.00
0.570 m3 Pasir beton @ Rp. 90,000.00 = Rp 51,300.00
0.870 m3 Koral beton @ Rp. 165,000.00 = Rp 143,550.00
= Rp 400,374.00
Upah An. SNI ( Revisi ) 6.3.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 465,924.00
4. 1 m3 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Bahan An. SNI ( Revisi ) 6.4.1
10.000 Kg Semen portland @ Rp. 1,188.00 = Rp 11,880.00
0.026 m3 Pasir beton @ Rp. 90,000.00 = Rp 2,340.00
0.044 m3 Koral beton @ Rp. 165,000.00 = Rp 7,260.00
= Rp 21,480.00
Upah An. SNI ( Revisi ) 6.4.2
1.150 Oh Pekerja @ Rp. 30,000.00 = Rp 34,500.00
0.020 Oh Tukang batu @ Rp. 40,000.00 = Rp 800.00
0.002 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 35,760.00
Total harga = Rp 57,240.00
5. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan An. SNI ( Revisi ) 6.5.1
232.000 Kg Semen portland @ Rp. 1,188.00 = Rp 275,616.00
0.520 m3 Pasir beton @ Rp. 90,000.00 = Rp 46,800.00
0.780 m3 Koral beton @ Rp. 165,000.00 = Rp 128,700.00
= Rp 451,116.00
Upah An. SNI ( Revisi ) 6.5.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 516,666.00
6. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 4 Kr
Bahan An. SNI ( Revisi ) 6.6.1
280.000 Kg Semen portland @ Rp. 1,188.00 = Rp 332,640.00
0.450 m3 Pasir beton @ Rp. 90,000.00 = Rp 40,500.00
0.900 m3 Koral beton @ Rp. 165,000.00 = Rp 148,500.00
= Rp 521,640.00
Upah An. SNI ( Revisi ) 6.6.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 587,190.00
7. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 2.5 Kr
Bahan An. SNI ( Revisi ) 6.7.1
352.000 Kg Semen portland @ Rp. 1,188.00 = Rp 418,176.00
0.560 m3 Pasir beton @ Rp. 90,000.00 = Rp 50,400.00
0.700 m3 Koral beton @ Rp. 165,000.00 = Rp 115,500.00
= Rp 584,076.00
Upah An. SNI ( Revisi ) 6.7.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 649,626.00
8. 1 m3 Membuat beton bertulang, 1 Pc : 1.5 Ps : 3 Kr
Bahan An. SNI ( Revisi ) 6.8.1
357.000 Kg Semen portland @ Rp. 1,188.00 = Rp 424,116.00
0.420 m3 Pasir beton @ Rp. 90,000.00 = Rp 37,800.00
0.540 m3 Koral beton @ Rp. 165,000.00 = Rp 89,100.00
= Rp 551,016.00
Upah An. SNI ( Revisi ) 6.8.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 616,566.00
9. 1 m3 Membuat beton bertulang, 1 Pc : 1.5 Ps : 2.5 Kr
Bahan An. SNI ( Revisi ) 6.9.1
386.000 Kg Semen portland @ Rp. 1,188.00 = Rp 458,568.00
0.470 m3 Pasir beton @ Rp. 90,000.00 = Rp 42,300.00
0.780 m3 Koral beton @ Rp. 165,000.00 = Rp 128,700.00
= Rp 629,568.00
Upah An. SNI ( Revisi ) 6.9.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 695,118.00
10. 1 m3 Membuat beton bertulang, 1 Pc : 1 Ps : 2 Kr
Bahan An. SNI ( Revisi ) 6.10.1
479.000 Kg Semen portland @ Rp. 1,188.00 = Rp 569,052.00
0.370 m3 Pasir beton @ Rp. 90,000.00 = Rp 33,300.00
0.740 m3 Koral beton @ Rp. 165,000.00 = Rp 122,100.00
= Rp 724,452.00
Upah An. SNI ( Revisi ) 6.10.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 790,002.00
11. 1 m3 Membuat tiang pancang prestressed beton
Bahan An. SNI ( Revisi ) 6.11.1
440.000 Kg Semen portland @ Rp. 1,188.00 = Rp 522,720.00
0.500 m3 Pasir beton @ Rp. 90,000.00 = Rp 45,000.00
0.800 m3 Koral beton @ Rp. 165,000.00 = Rp 132,000.00
2.460 Gln Repidrant @ Rp. 11,880.00 = Rp 29,224.80
= Rp 728,944.80
Upah An. SNI ( Revisi ) 6.11.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp 794,494.80
12. 1 m3 Membuat beton dengan puzzdith - 100 XR
Bahan An. SNI ( Revisi ) 6.12.1
336.000 Kg Semen portland @ Rp. 1,188.00 = Rp 399,168.00
0.540 m3 Pasir beton @ Rp. 90,000.00 = Rp 48,600.00
0.810 m3 Koral beton @ Rp. 165,000.00 = Rp 133,650.00
1.000 Ltr Puzzdith - 100 XR @ Rp. Kaca nako + rangka "N = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.12.2
1.650 Oh Pekerja @ Rp. 30,000.00 = Rp 49,500.00
0.250 Oh Tukang batu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.080 Oh Mandor @ Rp. 60,000.00 = Rp 4,800.00
= Rp 65,550.00
Total harga = Rp #VALUE!
13. 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr
Bahan An. SNI ( Revisi ) 6.17.1
615.000 Kg Semen portland @ Rp. 1,188.00 = Rp 730,620.00
0.520 m3 Pasir beton @ Rp. 90,000.00 = Rp 46,800.00
0.520 m3 Koral beton @ Rp. 165,000.00 = Rp 85,800.00
= Rp 863,220.00
Upah An. SNI ( Revisi ) 6.17.2
2.000 Oh Pekerja @ Rp. 30,000.00 = Rp 60,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,750.00
1.000 Oh Mandor @ Rp. 60,000.00 = Rp 60,000.00
= Rp 135,750.00
Total harga = Rp 998,970.00
14. 1 m3 Membuat beton kedap air dengan storox - 100
Bahan An. SNI ( Revisi ) 6.18.1
400.000 Kg Semen portland @ Rp. 1,188.00 = Rp 475,200.00
0.480 m3 Pasir beton @ Rp. 90,000.00 = Rp 43,200.00
0.800 m3 Koral beton 2/3 @ Rp. 165,000.00 = Rp 132,000.00
1.200 Kg Storox - 100 @ Rp. 204,600.00 = Rp 245,520.00
= Rp 895,920.00
Upah An. SNI ( Revisi ) 6.18.2
2.000 Oh Pekerja @ Rp. 30,000.00 = Rp 60,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,750.00
1.000 Oh Mandor @ Rp. 60,000.00 = Rp 60,000.00
= Rp 135,750.00
Total harga = Rp 1,031,670.00
15. 1 m' Memasang PVC waterstop lebar 150 mm
Bahan An. SNI ( Revisi ) 6.19.1
1.050 m' Waterstop lebar 150 mm @ Rp. = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp 1,500.00
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,200.00
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp 150.00
0.002 Oh Mandor @ Rp. 60,000.00 = Rp 120.00
= Rp 2,970.00
Total harga = Rp 2,970.00
16. 1 m' Memasang PVC waterstop lebar 200 mm
Bahan An. SNI ( Revisi ) 6.20.1
1.050 m' Waterstop lebar 200 mm @ Rp. = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp 1,500.00
0.035 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,400.00
0.0035 Oh Kepala tukang @ Rp. 50,000.00 = Rp 175.00
0.002 Oh Mandor @ Rp. 60,000.00 = Rp 120.00
= Rp 3,195.00
Total harga = Rp 3,195.00
17. 1 m' Memasang PVC waterstop lebar 230 mm
Bahan An. SNI ( Revisi ) 6.21.1
1.050 m' Waterstop lebar 230 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.550 Oh Pekerja @ Rp. 30,000.00 = Rp 16,500.00
0.035 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,400.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 18,080.00
Total harga = Rp 18,080.00
18. 1 m' Memasang PVC waterstop lebar 250 mm
Bahan An. SNI ( Revisi ) 6.22.1
1.050 m' Waterstop lebar 250 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.550 Oh Pekerja @ Rp. 30,000.00 = Rp 16,500.00
0.035 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,400.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 18,080.00
Total harga = Rp 18,080.00
19. 1 m' Memasang PVC waterstop lebar 300 mm
Bahan An. SNI ( Revisi ) 6.23.1
1.050 m' Waterstop lebar 300 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.550 Oh Pekerja @ Rp. 30,000.00 = Rp 16,500.00
0.035 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,400.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 18,080.00
Total harga = Rp 18,080.00
20. 1 m' Memasang PVC waterstop lebar 320 mm
Bahan An. SNI ( Revisi ) 6.24.1
1.050 m' Waterstop lebar 320 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.550 Oh Pekerja @ Rp. 30,000.00 = Rp 16,500.00
0.035 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,400.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 18,080.00
Total harga = Rp 18,080.00
21. 1 Kg Pembesian dengan besi polos atau ulir
Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( polos/ulir ) @ Rp. 9,900.00 = Rp 10,395.00
0.015 Kg Kawat beton @ Rp. 13,200.00 = Rp 198.00
= Rp 10,593.00
Upah An. SNI ( Revisi ) 6.25.2
0.007 Oh Pekerja @ Rp. 30,000.00 = Rp 210.00
0.007 Oh Tukang besi @ Rp. 40,000.00 = Rp 280.00
0.0007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 35.00
0.0003 Oh Mandor @ Rp. 60,000.00 = Rp 18.00
= Rp 543.00
Total harga = Rp 11,136.00
22. 1 Kg Kabel presstessed polos/strands
Bahan An. SNI ( Revisi ) 6.26.1
1.050 Kg Besi presstessed polos @ Rp. - = Rp -
0.010 Kg Kawat beton @ Rp. 13,200.00 = Rp 132.00
= Rp 132.00
Upah An. SNI ( Revisi ) 6.26.2
0.005 Oh Pekerja @ Rp. 30,000.00 = Rp 150.00
0.005 Oh Tukang besi @ Rp. 40,000.00 = Rp 200.00
0.0005 Oh Kepala tukang @ Rp. 50,000.00 = Rp 25.00
0.0003 Oh Mandor @ Rp. 60,000.00 = Rp 18.00
= Rp 393.00
Total harga = Rp 525.00
23. 1 Kg Jaring kawat baja
Bahan An. SNI ( Revisi ) 6.27.1
1.020 Kg Besi jaring kawat baja @ Rp. - = Rp -
0.805 Kg Kawat beton @ Rp. 13,200.00 = Rp 10,626.00
= Rp 10,626.00
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pekerja @ Rp. 30,000.00 = Rp 750.00
0.025 Oh Tukang besi @ Rp. 40,000.00 = Rp 1,000.00
0.0025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 125.00
0.0015 Oh Mandor @ Rp. 60,000.00 = Rp 90.00
= Rp 1,965.00
Total harga = Rp 12,591.00
24. 1 m2 Pasang bekisting untuk pondasi
Bahan An. SNI ( Revisi ) 6.28.1
0.040 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 176,000.00
0.300 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 3,465.00
0.100 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 1,485.00
= Rp 180,950.00
Upah An. SNI ( Revisi ) 6.28.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.260 Oh Tukang kayu @ Rp. 40,000.00 = Rp 10,400.00
0.026 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,300.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 21,000.00
Total harga = Rp 201,950.00
25. 1 m2 Pasang bekisting untuk sloof
Bahan An. SNI ( Revisi ) 6.29.1
0.045 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 198,000.00
0.300 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 3,465.00
0.100 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 1,485.00
= Rp 202,950.00
Upah An. SNI ( Revisi ) 6.29.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.260 Oh Tukang kayu @ Rp. 40,000.00 = Rp 10,400.00
0.026 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,300.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 21,000.00
Total harga = Rp 223,950.00
26. 1 m2 Pasang bekisting untuk kolom
Bahan An. SNI ( Revisi ) 6.30.1
0.040 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 176,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 4,620.00
0.200 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 2,970.00
0.015 m3 Balok kayu borneo @ Rp. 4,950,000.00 = Rp 74,250.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 99,000.00 = Rp 34,650.00
2.000 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 24,200.00
= Rp 183,590.00
Upah An. SNI ( Revisi ) 6.30.2
0.300 Oh Pekerja @ Rp. 30,000.00 = Rp 9,000.00
0.330 Oh Tukang kayu @ Rp. 40,000.00 = Rp 13,200.00
0.033 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,650.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 24,210.00
Total harga = Rp 207,800.00
27. 1 m2 Pasang bekisting untuk balok
Bahan An. SNI ( Revisi ) 6.31.1
0.040 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 176,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 4,620.00
0.200 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 2,970.00
0.018 m3 Balok kayu borneo @ Rp. 4,950,000.00 = Rp 89,100.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 99,000.00 = Rp 34,650.00
2.000 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 24,200.00
= Rp 183,590.00
Upah An. SNI ( Revisi ) 6.31.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.330 Oh Tukang kayu @ Rp. 40,000.00 = Rp 13,200.00
0.033 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,650.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 24,810.00
Total harga = Rp 208,400.00
28. 1 m2 Pasang bekisting untuk lantai
Bahan An. SNI ( Revisi ) 6.32.1
0.040 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 176,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 4,620.00
0.200 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 2,970.00
0.015 m3 Balok kayu borneo @ Rp. 4,950,000.00 = Rp 74,250.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 99,000.00 = Rp 34,650.00
6.000 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 72,600.00
= Rp 183,590.00
Upah An. SNI ( Revisi ) 6.32.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.330 Oh Tukang kayu @ Rp. 40,000.00 = Rp 13,200.00
0.033 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,650.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 24,810.00
Total harga = Rp 208,400.00
29. 1 m2 Pasang bekisting untuk dinding
Bahan An. SNI ( Revisi ) 6.33.1
0.030 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 132,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 4,620.00
0.200 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 2,970.00
0.020 m3 Balok kayu borneo @ Rp. 4,950,000.00 = Rp 99,000.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 99,000.00 = Rp 34,650.00
3.000 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 36,300.00
4.000 Bh Formtie/penjaga jarak bkstng @ Rp. - = Rp -
= Rp 139,590.00
Upah An. SNI ( Revisi ) 6.33.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.330 Oh Tukang kayu @ Rp. 40,000.00 = Rp 13,200.00
0.033 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,650.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 24,810.00
Total harga = Rp 164,400.00
30. 1 m2 Pasang bekisting untuk tangga
Bahan An. SNI ( Revisi ) 6.34.1
0.030 m3 Kayu terentang @ Rp. 4,400,000.00 = Rp 132,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 4,620.00
0.150 Ltr Minyak bekisting @ Rp. 14,850.00 = Rp 2,227.50
0.015 m3 Balok kayu borneo @ Rp. 4,950,000.00 = Rp 74,250.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 99,000.00 = Rp 34,650.00
2.000 Btg Bambu Bongkotan (2,5 - 3 m) @ Rp. 12,100.00 = Rp 24,200.00
= Rp 138,847.50
Upah An. SNI ( Revisi ) 6.34.2
0.320 Oh Pekerja @ Rp. 30,000.00 = Rp 9,600.00
0.330 Oh Tukang kayu @ Rp. 40,000.00 = Rp 13,200.00
0.033 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,650.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 24,810.00
Total harga = Rp 163,657.50
31. 1 m3 Membuat beton dengan mutu K 225
Bahan An. SNI ( Revisi ) 6.35.1
388.000 Kg Semen portland @ Rp. 1,188.00 = Rp 460,944.00
0.650 m3 Pasir beton @ Rp. 90,000.00 = Rp 58,500.00
0.650 m3 Koral beton @ Rp. 165,000.00 = Rp 107,250.00
= Rp 460,944.00
Upah An. SNI ( Revisi ) 6.35.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
1.000 Oh Tukang batu @ Rp. 40,000.00 = Rp 40,000.00
0.100 Oh Kepala tukang @ Rp. 50,000.00 = Rp 5,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 243,000.00
Total harga = Rp 703,944.00
32. 1 m3 Membuat beton dengan mutu K 275
Bahan An. SNI ( Revisi ) 6.36.1
400.000 Kg Semen portland @ Rp. 1,188.00 = Rp 475,200.00
0.400 m3 Pasir beton @ Rp. 90,000.00 = Rp 36,000.00
0.820 m3 Koral beton @ Rp. 165,000.00 = Rp 135,300.00
= Rp 475,200.00
Upah An. SNI ( Revisi ) 6.36.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
1.000 Oh Tukang batu @ Rp. 40,000.00 = Rp 40,000.00
0.100 Oh Kepala tukang @ Rp. 50,000.00 = Rp 5,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 243,000.00
Total harga = Rp 718,200.00
33. 1 m2 Pasang jembatan cor
Bahan An. SNI ( Revisi ) 6.37.1
0.0264 m3 Kayu terentang @ Rp. - = Rp -
0.600 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp -
0.500 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.37.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.050 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,000.00
0.005 Oh Kepala tukang @ Rp. 50,000.00 = Rp 250.00
0.007 Oh Mandor @ Rp. 60,000.00 = Rp 420.00
= Rp 7,170.00
Total harga = Rp 7,170.00
34. 1 m3 Membuat pondasi beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.38.1
0.200 m3 Kayu terentang @ Rp. - = Rp -
1.500 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp -
0.400 Ltr Minyak bekisting @ Rp. - = Rp -
150.000 Kg Besi beton polos @ Rp. 9,900.00 = Rp -
2.250 Kg Kawat beton @ Rp. 13,200.00 = Rp -
323.000 Kg Semen portland @ Rp. 1,188.00 = Rp -
0.520 m3 Pasir beton @ Rp. 90,000.00 = Rp -
0.780 m3 Koral beton @ Rp. 165,000.00 = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.38.2
3.900 Oh Pekerja @ Rp. 30,000.00 = Rp 117,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
1.040 Oh Tukang kayu @ Rp. 40,000.00 = Rp 41,600.00
1.050 Oh Tukang besi @ Rp. 40,000.00 = Rp 42,000.00
0.245 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,250.00
0.165 Oh Mandor @ Rp. 60,000.00 = Rp 9,900.00
= Rp 236,750.00
Total harga = Rp 236,750.00
35. 1 m3 Membuat sloof beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang @ Rp. - = Rp -
2.000 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.600 Ltr Minyak bekisting @ Rp. - = Rp -
200.000 Kg Besi beton polos @ Rp. - = Rp -
3.000 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja @ Rp. 30,000.00 = Rp 145,500.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
1.560 Oh Tukang kayu @ Rp. 40,000.00 = Rp 62,400.00
1.400 Oh Tukang besi @ Rp. 40,000.00 = Rp 56,000.00
0.331 Oh Kepala tukang @ Rp. 50,000.00 = Rp 16,550.00
0.170 Oh Mandor @ Rp. 60,000.00 = Rp 10,200.00
= Rp 304,650.00
Total harga = Rp 304,650.00
36. 1 m3 Membuat kolom beton bertulang ( 300 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.40.1
0.400 m3 Kayu terentang @ Rp. - = Rp -
4.000 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
2.000 Ltr Minyak bekisting @ Rp. - = Rp -
300.000 Kg Besi beton polos @ Rp. - = Rp -
4.500 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.015 m3 Balok kayu borneo @ Rp. - = Rp -
3.500 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
20.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.40.2
7.300 Oh Pekerja @ Rp. 30,000.00 = Rp 219,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
3.300 Oh Tukang kayu @ Rp. 40,000.00 = Rp 132,000.00
2.100 Oh Tukang besi @ Rp. 40,000.00 = Rp 84,000.00
0.570 Oh Kepala tukang @ Rp. 50,000.00 = Rp 28,500.00
0.250 Oh Mandor @ Rp. 60,000.00 = Rp 15,000.00
= Rp 492,500.00
Total harga = Rp 492,500.00
37. 1 m3 Membuat balok beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.41.1
0.320 m3 Kayu terentang @ Rp. - = Rp -
3.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.600 Ltr Minyak bekisting @ Rp. - = Rp -
200.000 Kg Besi beton polos @ Rp. - = Rp -
3.000 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.140 m3 Balok kayu borneo @ Rp. - = Rp -
2.800 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
16.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.41.2
5.960 Oh Pekerja @ Rp. 30,000.00 = Rp 178,800.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
2.800 Oh Tukang kayu @ Rp. 40,000.00 = Rp 112,000.00
1.400 Oh Tukang besi @ Rp. 40,000.00 = Rp 56,000.00
0.455 Oh Kepala tukang @ Rp. 50,000.00 = Rp 22,750.00
0.208 Oh Mandor @ Rp. 60,000.00 = Rp 12,480.00
= Rp 396,030.00
Total harga = Rp 396,030.00
38. 1 m3 Membuat balok beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.42.1
0.320 m3 Kayu terentang @ Rp. - = Rp -
3.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.600 Ltr Minyak bekisting @ Rp. - = Rp -
150.000 Kg Besi beton polos @ Rp. - = Rp -
2.250 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.120 m3 Balok kayu borneo @ Rp. - = Rp -
2.800 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
32.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.42.2
5.800 Oh Pekerja @ Rp. 30,000.00 = Rp 174,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
2.800 Oh Tukang kayu @ Rp. 40,000.00 = Rp 112,000.00
1.050 Oh Tukang besi @ Rp. 40,000.00 = Rp 42,000.00
0.420 Oh Kepala tukang @ Rp. 50,000.00 = Rp 21,000.00
0.185 Oh Mandor @ Rp. 60,000.00 = Rp 11,100.00
= Rp 374,100.00
Total harga = Rp 374,100.00
39. 1 m3 Membuat dinding beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.43.1
0.240 m3 Kayu terentang @ Rp. - = Rp -
3.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.600 Ltr Minyak bekisting @ Rp. - = Rp -
150.000 Kg Besi beton polos @ Rp. - = Rp -
2.250 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.160 m3 Balok kayu borneo @ Rp. - = Rp -
2.800 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
24.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.43.2
5.600 Oh Pekerja @ Rp. 30,000.00 = Rp 168,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
2.640 Oh Tukang kayu @ Rp. 40,000.00 = Rp 105,600.00
1.050 Oh Tukang besi @ Rp. 40,000.00 = Rp 42,000.00
0.400 Oh Kepala tukang @ Rp. 50,000.00 = Rp 20,000.00
0.193 Oh Mandor @ Rp. 60,000.00 = Rp 11,580.00
= Rp 361,180.00
Total harga = Rp 361,180.00
40. 1 m3 Membuat tangga beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.44.1
0.250 m3 Kayu terentang @ Rp. - = Rp -
3.000 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.200 Ltr Minyak bekisting @ Rp. - = Rp -
200.000 Kg Besi beton polos @ Rp. - = Rp -
3.000 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.105 m3 Balok kayu borneo @ Rp. - = Rp -
2.500 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
14.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.44.2
5.600 Oh Pekerja @ Rp. 30,000.00 = Rp 168,000.00
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp 14,000.00
2.300 Oh Tukang kayu @ Rp. 40,000.00 = Rp 92,000.00
1.400 Oh Tukang besi @ Rp. 40,000.00 = Rp 56,000.00
0.405 Oh Kepala tukang @ Rp. 50,000.00 = Rp 20,250.00
0.202 Oh Mandor @ Rp. 60,000.00 = Rp 12,120.00
= Rp 362,370.00
Total harga = Rp 362,370.00
41. 1 m' Membuat kolom penguat beton bertulang ( 11 x 11 ) cm
Bahan An. SNI ( Revisi ) 6.45.1
0.002 m3 Kayu terentang @ Rp. - = Rp -
0.010 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
3.000 Kg Besi beton polos @ Rp. - = Rp -
0.450 Kg Kawat beton @ Rp. - = Rp -
4.000 Kg Semen portland @ Rp. - = Rp -
0.006 m3 Pasir beton @ Rp. - = Rp -
0.009 m3 Koral beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.45.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp 1,800.00
0.020 Oh Tukang batu @ Rp. 40,000.00 = Rp 800.00
0.020 Oh Tukang kayu @ Rp. 40,000.00 = Rp 800.00
0.020 Oh Tukang besi @ Rp. 40,000.00 = Rp 800.00
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 4,680.00
Total harga = Rp 4,680.00
42. 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm
Bahan An. SNI ( Revisi ) 6.46.1
0.003 m3 Kayu terentang @ Rp. - = Rp -
0.020 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
3.600 Kg Besi beton polos @ Rp. - = Rp -
0.050 Kg Kawat beton @ Rp. - = Rp -
5.500 Kg Semen portland @ Rp. - = Rp -
0.009 m3 Pasir beton @ Rp. - = Rp -
0.015 m3 Koral beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.46.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.033 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,320.00
0.033 Oh Tukang kayu @ Rp. 40,000.00 = Rp 1,320.00
0.033 Oh Tukang besi @ Rp. 40,000.00 = Rp 1,320.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,760.00
Total harga = Rp 7,760.00
4.36
5.45
5.8
PEKERJAAN KAYU
1. 1 m3 Pasang kusen pintu & jendela kayu jati
Bahan An. SNI ( Revisi ) 6.1.1
1.100 m3 Kayu jati, balok @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
20.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 800,000.00
2.000 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 1,098,000.00
Total harga = Rp 1,098,000.00
2. 1 m3 Pasang kusen pintu & jendela kayu kamper
Bahan An. SNI ( Revisi ) 6.2.1
1.200 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 8,976,000.00
= Rp 8,976,000.00
Upah An. SNI ( Revisi ) 6.2.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
18.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 720,000.00
2.000 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 1,018,000.00
Total harga = Rp 9,994,000.00
3. 1 m3 Pasang kusen pintu & jendela kayu borneo
Bahan An. SNI ( Revisi ) 6.3.1
1.200 m3 Kayu borneo, balok @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.3.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
18.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 720,000.00
2.000 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 1,018,000.00
Total harga = Rp 1,018,000.00
4. 1 m3 Pasang kusen pintu & jendela kayu damar laut
Bahan An. SNI ( Revisi ) 6.4.1
1.200 m3 Kayu damar laut, balok @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.4.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
18.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 720,000.00
2.000 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 1,018,000.00
Total harga = Rp 1,018,000.00
5. 1 m2 Pasang pintu klamp kayu kamper
Bahan An. SNI ( Revisi ) 6.5.1
0.036 m3 Kayu kamper papan @ Rp. 8,250,000.00 = Rp 297,000.00
0.050 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 577.50
= Rp 297,577.50
Upah An. SNI ( Revisi ) 6.5.2
0.350 Oh Pekerja @ Rp. 30,000.00 = Rp 10,500.00
1.050 Oh Tukang kayu @ Rp. 40,000.00 = Rp 42,000.00
0.105 Oh Kepala tukang @ Rp. 50,000.00 = Rp 5,250.00
0.018 Oh Mandor @ Rp. 60,000.00 = Rp 1,080.00
= Rp 58,830.00
Total harga = Rp 356,407.50
6. 1 m2 Pasang pintu klamp kayu borneo
Bahan An. SNI ( Revisi ) 6.6.1
0.036 m3 Kayu borneo papan @ Rp. 4,950,000.00 = Rp 178,200.00
0.050 Kg Paku biasa 2" - 5" @ Rp. 93,500.00 = Rp 4,675.00
= Rp 4,675.00
Upah An. SNI ( Revisi ) 6.6.2
0.350 Oh Pekerja @ Rp. 30,000.00 = Rp 10,500.00
1.050 Oh Tukang kayu @ Rp. 40,000.00 = Rp 42,000.00
0.105 Oh Kepala tukang @ Rp. 50,000.00 = Rp 5,250.00
0.018 Oh Mandor @ Rp. 60,000.00 = Rp 1,080.00
= Rp 58,830.00
Total harga = Rp 63,505.00
7. 1 m2 Pasang pintu panil kayu jati
Bahan An. SNI ( Revisi ) 6.7.1
0.040 m3 Kayu jati, papan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.7.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
2.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 100,000.00
0.250 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,500.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 145,500.00
Total harga = Rp 145,500.00
8. 1 m2 Pasang pintu panil kayu kamper
Bahan An. SNI ( Revisi ) 6.8.1
0.040 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 330,000.00
= Rp 330,000.00
Upah An. SNI ( Revisi ) 6.8.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
2.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 100,000.00
0.250 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,500.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 145,500.00
Total harga = Rp 475,500.00
9. 1 m2 Pasang pintu & jendela kaca kayu jati
Bahan An. SNI ( Revisi ) 6.9.1
0.035 m3 Kayu jati, papan @ Rp. 77,000.00 = Rp 2,695.00
= Rp 2,695.00
Upah An. SNI ( Revisi ) 6.9.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 116,400.00
Total harga = Rp 119,095.00
10. 1 m2 Pasang pintu & jendela kaca kayu kamper
Bahan An. SNI ( Revisi ) 6.10.1
0.035 m3 Kayu kamper, papan @ Rp. 24,200.00 = Rp 847.00
= Rp 847.00
Upah An. SNI ( Revisi ) 6.10.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 116,400.00
Total harga = Rp 117,247.00
11. 1 m2 Pasang pintu & jendela kaca kayu borneo
Bahan An. SNI ( Revisi ) 6.11.1
0.035 m3 Kayu borneo, papan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 116,400.00
Total harga = Rp 116,400.00
12. 1 m2 Pasang pintu & jendela jalusi kayu jati
Bahan An. SNI ( Revisi ) 6.12.1
0.064 m3 Kayu jati, papan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.12.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
3.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 120,000.00
0.300 Oh Kepala tukang @ Rp. 50,000.00 = Rp 15,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 183,000.00
Total harga = Rp 183,000.00
13. 1 m2 Pasang pintu & jendela jalusi kayu kamper
Bahan An. SNI ( Revisi ) 6.13.1
0.064 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 528,000.00
= Rp 528,000.00
Upah An. SNI ( Revisi ) 6.13.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
3.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 120,000.00
0.300 Oh Kepala tukang @ Rp. 50,000.00 = Rp 15,000.00
0.500 Oh Mandor @ Rp. 60,000.00 = Rp 30,000.00
= Rp 195,000.00
Total harga = Rp 723,000.00
14. 1 m2 Pasang pintu plywood rangkap, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.0196 m3 Kayu jati, papan @ Rp. 77,000.00 = Rp 1,509.20
0.030 Kg Paku biasa 1/2" - 1" @ Rp. Kaca nako + rangka "NIK = Rp #VALUE!
0.300 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.14.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 109,800.00
Total harga = Rp 109,800.00
15. 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.15.1
0.0196 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 161,700.00
0.030 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp 346.50
0.300 Lt Lem kayu @ Rp. 10,450.00 = Rp 3,135.00
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp. 93,500.00 = Rp 93,500.00
= Rp 93,500.00
Upah An. SNI ( Revisi ) 6.15.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 109,800.00
Total harga = Rp 203,300.00
16. 1 m2 Pasang jalusi mati kusen kayu jati
Bahan An. SNI ( Revisi ) 6.16.1
0.060 m3 Kayu jati, papan @ Rp. - = Rp -
0.150 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp 1,732.50
= Rp 1,732.50
Upah An. SNI ( Revisi ) 6.16.2
0.500 Oh Pekerja @ Rp. 30,000.00 = Rp 15,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.025 Oh Mandor @ Rp. 60,000.00 = Rp 1,500.00
= Rp 106,500.00
Total harga = Rp 108,232.50
17. 1 m2 Pasang jalusi mati kusen kayu kamper
Bahan An. SNI ( Revisi ) 6.17.1
0.060 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 495,000.00
0.150 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp 1,732.50
= Rp 496,732.50
Upah An. SNI ( Revisi ) 6.17.2
0.500 Oh Pekerja @ Rp. 30,000.00 = Rp 15,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.025 Oh Mandor @ Rp. 60,000.00 = Rp 1,500.00
= Rp 106,500.00
Total harga = Rp 603,232.50
18. 1 m2 Pasang pintu plywood rangkap,rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.18.1
0.0196 m3 Kayu borneo, papan @ Rp. - = Rp -
0.030 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp 346.50
0.300 Lt Lem kayu @ Rp. 10,450.00 = Rp 3,135.00
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp. 93,500.00 = Rp 93,500.00
= Rp 96,981.50
Upah An. SNI ( Revisi ) 6.18.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 109,800.00
Total harga = Rp 206,781.50
19. 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.19.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp 3,465.00
0.300 Lt Lem kayu @ Rp. 10,450.00 = Rp 3,135.00
1.000 Lbr Teakwood 4' x 8' x 4 mm @ Rp. 105,000.00 = Rp 105,000.00
= Rp 105,000.00
Upah An. SNI ( Revisi ) 6.19.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 109,800.00
Total harga = Rp 109,800.00
20. 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.20.1
0.0196 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 161,700.00
0.300 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp 3,465.00
0.300 Lt Lem kayu @ Rp. 10,450.00 = Rp 3,135.00
1.000 Lbr Teakwood 4' x 8' x 4 mm @ Rp. 105,000.00 = Rp 105,000.00
= Rp 273,300.00
Upah An. SNI ( Revisi ) 6.20.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 80,000.00
0.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 10,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 109,800.00
Total harga = Rp 383,100.00
21. 1 m2 Pasang pintu plywood & formika, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.21.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lbr Formica 4' x 3' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 100,000.00
0.250 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,500.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 138,900.00
Total harga = Rp 138,900.00
22. 1 m2 Pasang pintu plywood & formika, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.22.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lbr Formica 4' x 3' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 100,000.00
0.250 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,500.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 138,900.00
Total harga = Rp 138,900.00
23. 1 m2 Pasang pintu teakwood & formika, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.23.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
0.500 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 100,000.00
0.250 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,500.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 138,900.00
Total harga = Rp 138,900.00
24. 1 m2 Pasang pintu teakwood & formika, rangka kayu kamper ( divernis )
Bahan An. SNI ( Revisi ) 6.24.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
0.500 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lt Vernis @ Rp. - = Rp -
0.500 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.800 Oh Pekerja @ Rp. 30,000.00 = Rp 24,000.00
2.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 100,000.00
0.250 Oh Kepala tukang @ Rp. 50,000.00 = Rp 12,500.00
0.040 Oh Mandor @ Rp. 60,000.00 = Rp 2,400.00
= Rp 138,900.00
Total harga = Rp 138,900.00
25. 1 m2 Pasang pintu formika double, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.25.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
1.200 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
1.000 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
2.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 104,000.00
0.260 Oh Kepala tukang @ Rp. 50,000.00 = Rp 13,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 150,000.00
Total harga = Rp 150,000.00
26. 1 m2 Pasang pintu formika double, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.26.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
1.200 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
1.000 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
2.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 104,000.00
0.260 Oh Kepala tukang @ Rp. 50,000.00 = Rp 13,000.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 150,000.00
Total harga = Rp 150,000.00
27. 1 m3 Pasang konstruksi kuda-kuda kayu jati
Bahan An. SNI ( Revisi ) 6.27.1
1.100 m3 Kayu jati, balok @ Rp. - = Rp -
15.000 Kg Besi strip @ Rp. - = Rp -
0.800 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
4.000 Oh Pekerja @ Rp. 30,000.00 = Rp 120,000.00
12.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 480,000.00
1.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 60,000.00
0.200 Oh Mandor @ Rp. 60,000.00 = Rp 12,000.00
= Rp 672,000.00
Total harga = Rp 672,000.00
28. 1 m3 Pasang konstruksi kuda-kuda kayu kamper
Bahan An. SNI ( Revisi ) 6.28.1
1.100 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 8,228,000.00
15.000 Kg Besi strip @ Rp. 15,950.00 = Rp 239,250.00
0.800 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 9,240.00
= Rp 8,476,490.00
Upah An. SNI ( Revisi ) 6.28.2
4.000 Oh Pekerja @ Rp. 30,000.00 = Rp 120,000.00
12.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 480,000.00
1.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 60,000.00
0.200 Oh Mandor @ Rp. 60,000.00 = Rp 12,000.00
= Rp 672,000.00
Total harga = Rp 9,148,490.00
29. 1 m3 Pasang konstruksi kuda-kuda kayu borneo
Bahan An. SNI ( Revisi ) 6.29.1
1.100 m3 Kayu borneo, balok @ Rp. - = Rp -
15.000 Kg Besi strip @ Rp. 15,950.00 = Rp 239,250.00
0.800 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 9,240.00
= Rp 248,490.00
Upah An. SNI ( Revisi ) 6.29.2
4.000 Oh Pekerja @ Rp. 30,000.00 = Rp 120,000.00
12.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 480,000.00
1.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 60,000.00
0.200 Oh Mandor @ Rp. 60,000.00 = Rp 12,000.00
= Rp 672,000.00
Total harga = Rp 672,000.00
30. 1 m3 Pasang konstruksi kuda-kuda kayu kruing
Bahan An. SNI ( Revisi ) 6.30.1
1.100 m3 Kayu kruing, balok @ Rp. 4,950,000.00 = Rp 5,445,000.00
15.000 Kg Besi strip @ Rp. 15,950.00 = Rp 239,250.00
0.800 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 9,240.00
= Rp 5,693,490.00
Upah An. SNI ( Revisi ) 6.30.2
4.000 Oh Pekerja @ Rp. 30,000.00 = Rp 120,000.00
12.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp 480,000.00
1.200 Oh Kepala tukang @ Rp. 50,000.00 = Rp 60,000.00
0.200 Oh Mandor @ Rp. 60,000.00 = Rp 12,000.00
= Rp 672,000.00
Total harga = Rp 6,365,490.00
31. 1 m2 Pasang kaso + reng genteng kodok kayu kamper
Bahan An. SNI ( Revisi ) 6.31.1
0.012 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 89,760.00
0.150 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 1,732.50
= Rp 91,492.50
Upah An. SNI ( Revisi ) 6.31.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,800.00
Total harga = Rp 99,292.50
32. 1 m2 Pasang kaso + reng genteng kodok kayu borneo
Bahan An. SNI ( Revisi ) 6.32.1
0.012 m3 Kayu borneo, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,800.00
Total harga = Rp 7,800.00
33. 1 m2 Pasang kaso + reng genteng munier kayu jati
Bahan An. SNI ( Revisi ) 6.33.1
0.014 m3 Kayu jati, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,800.00
Total harga = Rp 7,800.00
34. 1 m2 Pasang kaso + reng genteng munier kayu kamper
Bahan An. SNI ( Revisi ) 6.34.1
0.014 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 104,720.00
0.150 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 1,732.50
= Rp 106,452.50
Upah An. SNI ( Revisi ) 6.34.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,800.00
Total harga = Rp 114,252.50
35. 1 m2 Pasang kaso + reng genteng beton kayu borneo
Bahan An. SNI ( Revisi ) 6.35.1
0.014 m3 Kayu borneo, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 7,800.00
Total harga = Rp 7,800.00
36. 1 m2 Pasang kaso + reng atap sirap kayu kamper
Bahan An. SNI ( Revisi ) 6.36.1
0.165 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 1,234,200.00
0.200 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 2,310.00
= Rp 1,236,510.00
Upah An. SNI ( Revisi ) 6.36.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp 3,600.00
0.120 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,800.00
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp 600.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 9,360.00
Total harga = Rp 1,245,870.00
37. 1 m2 Pasang kaso + reng atap sirap kayu borneo
Bahan An. SNI ( Revisi ) 6.37.1
0.165 m3 Kayu borneo, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.37.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp 3,600.00
0.120 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,800.00
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp 600.00
0.006 Oh Mandor @ Rp. 60,000.00 = Rp 360.00
= Rp 9,360.00
Total harga = Rp 9,360.00
38. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu jati
Bahan An. SNI ( Revisi ) 6.38.1
0.012 m3 Kayu jati, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.38.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 20,250.00
Total harga = Rp 20,250.00
39. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kamper
Bahan An. SNI ( Revisi ) 6.39.1
0.012 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 89,760.00
0.100 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 1,155.00
= Rp 90,915.00
Upah An. SNI ( Revisi ) 6.39.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 20,250.00
Total harga = Rp 111,165.00
40. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu borneo
Bahan An. SNI ( Revisi ) 6.40.1
0.012 m3 Kayu borneo, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.40.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 20,250.00
Total harga = Rp 20,250.00
41. 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.41.1
0.023 m3 Kayu jati, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.41.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.300 Oh Tukang kayu @ Rp. 40,000.00 = Rp 12,000.00
0.030 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,500.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 20,100.00
Total harga = Rp 20,100.00
42. 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.42.1
0.023 m3 Kayu kamper, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.42.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.300 Oh Tukang kayu @ Rp. 40,000.00 = Rp 12,000.00
0.030 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,500.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 20,100.00
Total harga = Rp 20,100.00
43. 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu borneo
Bahan An. SNI ( Revisi ) 6.43.1
0.023 m3 Kayu borneo, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.43.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.300 Oh Tukang kayu @ Rp. 40,000.00 = Rp 12,000.00
0.030 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,500.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 20,100.00
Total harga = Rp 20,100.00
44. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.44.1
0.027 m3 Kayu jati, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.44.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.350 Oh Tukang kayu @ Rp. 40,000.00 = Rp 14,000.00
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,750.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 24,000.00
Total harga = Rp 24,000.00
45. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.45.1
0.027 m3 Kayu kamper, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.45.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.350 Oh Tukang kayu @ Rp. 40,000.00 = Rp 14,000.00
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,750.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 24,000.00
Total harga = Rp 24,000.00
46. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu borneo
Bahan An. SNI ( Revisi ) 6.46.1
0.027 m3 Kayu borneo, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.46.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp 7,500.00
0.350 Oh Tukang kayu @ Rp. 40,000.00 = Rp 14,000.00
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,750.00
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp 750.00
= Rp 24,000.00
Total harga = Rp 24,000.00
47. 1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.47.1
0.0072 m3 Kayu jati, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.47.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp 8,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.0050 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 12,550.00
Total harga = Rp 12,550.00
48. 1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.48.1
0.0072 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 59,400.00
0.050 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 577.50
= Rp 59,977.50
Upah An. SNI ( Revisi ) 6.48.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp 8,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.0050 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 12,550.00
Total harga = Rp 72,527.50
49. 1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.49.1
0.011 m3 Kayu jati, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.49.2
0.110 Oh Pekerja @ Rp. 30,000.00 = Rp 3,300.00
0.220 Oh Tukang kayu @ Rp. 40,000.00 = Rp 8,800.00
0.022 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,100.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 13,500.00
Total harga = Rp 13,500.00
50. 1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.50.1
0.011 m3 Kayu kamper, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.50.2
0.110 Oh Pekerja @ Rp. 30,000.00 = Rp 3,300.00
0.220 Oh Tukang kayu @ Rp. 40,000.00 = Rp 8,800.00
0.022 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,100.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 13,500.00
Total harga = Rp 13,500.00
51. 1 m' Pasang lisplang ukuran 2 x ( 3 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.51.1
0.0145 m3 Kayu kamper, papan @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.51.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp 10,000.00
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 20,250.00
Total harga = Rp 20,250.00
52. 1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.52.1
0.0086 m3 Kayu kamper, papan @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.52.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 10,500.00
Total harga = Rp 10,500.00
53. 1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu borneo
Bahan An. SNI ( Revisi ) 6.53.1
0.0088 m3 Kayu borneo, papan @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.53.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.050 Oh Mandor @ Rp. 60,000.00 = Rp 3,000.00
= Rp 10,500.00
Total harga = Rp 10,500.00
54. 1 m2 Pasang rangka dinding pemisah kayu kamper
Bahan An. SNI ( Revisi ) 6.54.1
0.0195 m3 Kayu kamper, balok @ Rp. 7,480,000.00 = Rp 145,860.00
0.007 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 57,750.00
0.100 Kg Paku biasa 2" - 5" @ Rp. 11,550.00 = Rp 1,155.00
= Rp 204,765.00
Upah An. SNI ( Revisi ) 6.54.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.450 Oh Tukang kayu @ Rp. 40,000.00 = Rp 18,000.00
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 29,250.00
Total harga = Rp 234,015.00
55. 1 m2 Pasang rangka dinding pemisah kayu borneo
Bahan An. SNI ( Revisi ) 6.55.1
0.0195 m3 Kayu borneo, balok @ Rp. - = Rp -
0.007 m3 Kayu borneo, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.55.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.450 Oh Tukang kayu @ Rp. 40,000.00 = Rp 18,000.00
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 29,250.00
Total harga = Rp 29,250.00
56. 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.56.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.56.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.450 Oh Tukang kayu @ Rp. 40,000.00 = Rp 18,000.00
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,250.00
0.075 Oh Mandor @ Rp. 60,000.00 = Rp 4,500.00
= Rp 29,250.00
Total harga = Rp 29,250.00
56. 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.56.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.560 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.56.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 33,600.00
Total harga = Rp 33,600.00
57. 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.57.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.560 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.57.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 33,600.00
Total harga = Rp 33,600.00
58. 1 m2 Pasang dinding lambriziring dari papan jati
Bahan An. SNI ( Revisi ) 6.58.1
0.0070 m3 Kayu jati, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.150 Kg Paku skrup 3,5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.58.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
1.800 Oh Tukang kayu @ Rp. 40,000.00 = Rp 72,000.00
0.180 Oh Kepala tukang @ Rp. 50,000.00 = Rp 9,000.00
0.030 Oh Mandor @ Rp. 60,000.00 = Rp 1,800.00
= Rp 100,800.00
Total harga = Rp 100,800.00
59. 1 m2 Pasang plywood tebal 4 mm untuk dinding
Bahan An. SNI ( Revisi ) 6.59.1
0.400 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.59.2
0.025 Oh Pekerja @ Rp. 30,000.00 = Rp 750.00
0.075 Oh Tukang kayu @ Rp. 40,000.00 = Rp 3,000.00
0.0075 Oh Kepala tukang @ Rp. 50,000.00 = Rp 375.00
0.0013 Oh Mandor @ Rp. 60,000.00 = Rp 78.00
= Rp 4,203.00
Total harga = Rp 4,203.00
60. 1 m' Pasang list plafond, kayu profil
Bahan An. SNI ( Revisi ) 6.60.1
1.050 m' Kayu profil @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.60.2
0.021 Oh Pekerja @ Rp. 30,000.00 = Rp 630.00
0.021 Oh Tukang kayu @ Rp. 40,000.00 = Rp 840.00
0.002 Oh Kepala tukang @ Rp. 50,000.00 = Rp 100.00
0.001 Oh Mandor @ Rp. 60,000.00 = Rp 60.00
= Rp 1,630.00
Total harga = Rp 1,630.00
PEKERJAAN PENUTUP ATAP
1. 1 m2 Pasang atap genteng plenthong kecil
Bahan An. SNI ( Revisi ) 6.1.1
25.000 Bh Genteng plenthong @ Rp. 990.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.075 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Pasang atap genteng kodok/glazzur
Bahan An. SNI ( Revisi ) 6.2.1
25.000 Bh Genteng kodok @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.075 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Pasang atap genteng plenthong super/besar
Bahan An. SNI ( Revisi ) 6.3.1
12.000 Bh Genteng plenthong super @ Rp. 1,250.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.060 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m' Pasang genteng bubung plenthong kecil
Bahan An. SNI ( Revisi ) 6.4.1
5.000 Bh Genteng bubung plenthong kecil @ Rp. 3,150.00 = Rp
8.000 Kg Semen portland @ Rp. 1,188.00 = Rp
0.032 m3 Pasir pasang @ Rp. 90,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.002 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m' Pasang genteng bubung kodok glazzur
Bahan An. SNI ( Revisi ) 6.5.1
5.000 Bh Genteng bubung kodok @ Rp. 8,250,000.00 = Rp
8.000 Kg Semen portland @ Rp. 8,250,000.00 = Rp
0.032 m3 Pasir pasang @ Rp. 6,600,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.002 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m' Pasang genteng bubung plenthong besar
Bahan An. SNI ( Revisi ) 6.6.1
4.000 Bh Genteng bubung plenthong besar @ Rp. 3,300.00 = Rp
8.000 Kg Semen portland @ Rp. 1,188.00 = Rp
0.032 m3 Pasir pasang @ Rp. 90,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.002 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
7. 1 m2 Pasang roof light fiberglass ( 180 x 90 ) cm
Bahan An. SNI ( Revisi ) 6.7.1
0.600 Lbr Roof light fiberglass @ Rp. 154,000.00 = Rp
0.050 Kg Paku biasa 1/2" - 1" @ Rp. 11,550.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
8. 1 m2 Pasang atap asbes glmbg ( 2.50 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.500 Lbr Asbes glmbg @ Rp. Ankur kusen = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. Pagar BRC 120.240 cm = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.075 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
9. 1 m2 Pasang atap asbes glmbg ( 2.25 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.9.1
0.600 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 24,200.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.075 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
10. 1 m2 Pasang atap asbes glmbg ( 2.00 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.10.1
0.600 Lbr Asbes glmbg @ Rp. 1,250.00 = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 3,300.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
11. 1 m2 Pasang atap asbes glmbg ( 1.80 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.750 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 2,750.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
12. 1 m2 Pasang atap asbes glmbg ( 3.00 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Lbr Asbes glmbg @ Rp. 14,850.00 = Rp
0.120 Kg Paku pancing @ Rp. 9,900.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
13. 1 m2 Pasang atap asbes glmbg ( 2.70 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.420 Lbr Asbes glmbg @ Rp. 33,000.00 = Rp
0.120 Kg Paku pancing @ Rp. 16,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
14. 1 m2 Pasang atap asbes glmbg ( 2.40 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.14.1
0.440 Lbr Asbes glmbg @ Rp. 1,100.00 = Rp
0.120 Kg Paku pancing @ Rp. 2,750.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
15. 1 m2 Pasang atap asbes glmbg ( 2.10 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.15.1
0.510 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 Pasang atap asbes glmbg ( 1.50 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.16.1
0.800 Lbr Asbes glmbg @ Rp. 750.00 = Rp
0.120 Kg Paku pancing @ Rp. 12,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 Pasang atap asbes glmbg ( 3.00 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.17.1
0.370 Lbr Asbes glmbg @ Rp. 50,000.00 = Rp
0.120 Kg Paku pancing @ Rp. 40,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m2 Pasang atap asbes glmbg ( 2.70 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.18.1
0.380 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m2 Pasang atap asbes glmbg ( 2.40 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.19.1
0.460 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m2 Pasang atap asbes glmbg ( 2.10 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.20.1
0.490 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m2 Pasang atap asbes glmbg ( 1.80 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.21.1
0.570 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp
0.067 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.007 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
22. 1 m' Pasang bubung stel gelombang 0.92 m
Bahan An. SNI ( Revisi ) 6.22.1
2.400 Lbr Bubung stel gelombang @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
23. 1 m' Pasang nok stel gelombang 1.05 m
Bahan An. SNI ( Revisi ) 6.23.1
2.100 Lbr Nok stel gelombang @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
24. 1 m' Pasang nok stel gelombang 1.08 m
Bahan An. SNI ( Revisi ) 6.24.1
2.050 Lbr Nok stel gelombang @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
25. 1 m' Pasang nok paten 0.92 m
Bahan An. SNI ( Revisi ) 6.25.1
1.200 Lbr Nok paten @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.25.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
26. 1 m' Pasang nok paten 1.05 m
Bahan An. SNI ( Revisi ) 6.26.1
1.200 Lbr Nok paten @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.26.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
27. 1 m' Pasang nok paten 1.08 m
Bahan An. SNI ( Revisi ) 6.27.1
1.200 Lbr Nok paten @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.27.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
28. 1 m' Pasang nok stel rata 0.92 m
Bahan An. SNI ( Revisi ) 6.28.1
1.100 Lbr Nok stel rata @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.28.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
29. 1 m' Pasang nok stel rata 1.05 m
Bahan An. SNI ( Revisi ) 6.29.1
1.100 Lbr Nok stel rata @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.29.2
0.084 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
30. 1 m2 Pasang atap genteng beton
Bahan An. SNI ( Revisi ) 6.30.1
11.000 Bh Genteng beton @ Rp. - = Rp
0.030 Kg Paku biasa 2" - 5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.30.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.010 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
31. 1 m2 Pasang atap genteng aspal
Bahan An. SNI ( Revisi ) 6.31.1
6.900 Lbr Genteng aspal @ Rp. - = Rp
0.350 Lbr Plywood 4" x 8" x 6 mm @ Rp. - = Rp
0.030 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.500 Bh Plastic aerator @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.31.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp
0.300 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.010 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
32. 1 m2 Pasang atap genteng metal
Bahan An. SNI ( Revisi ) 6.32.1
1.020 Lbr Genteng metal @ Rp. - = Rp
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.001 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
33. 1 m2 Pasang atap sirap
Bahan An. SNI ( Revisi ) 6.33.1
60.000 Bh Genteng sirap @ Rp. - = Rp
0.200 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.33.2
0.166 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
34. 1 m' Pasang nok genteng beton
Bahan An. SNI ( Revisi ) 6.34.1
3.500 Bh Nok genteng beton @ Rp. - = Rp
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp
10.800 Kg Semen abu-abu @ Rp. - = Rp
0.032 m3 Pasir pasang @ Rp. - = Rp
1.000 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.34.2
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.020 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
35. 1 m' Pasang nok genteng aspal
Bahan An. SNI ( Revisi ) 6.35.1
2.000 Bh Nok genteng aspal @ Rp. - = Rp
0.050 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.0035 m3 Kayu borneo, balok @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.35.2
0.125 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
36. 1 m' Pasang nok genteng metal
Bahan An. SNI ( Revisi ) 6.36.1
1.100 Bh genteng decra bond @ Rp. - = Rp
0.050 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.36.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.013 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
37. 1 m' Pasang nok sirap
Bahan An. SNI ( Revisi ) 6.37.1
0.400 Lbr Seng plat 3" x 6" bjls 28 @ Rp. - = Rp
0.060 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp
0.004 m3 Kayu borneo, papan tebal 3 cm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.37.2
0.125 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
38. 1 m2 Pasang atap seng gelombang
Bahan An. SNI ( Revisi ) 6.38.1
0.700 Lbr Seng glmbg 3" x 6" bjls 28 @ Rp. - = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.38.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp
0.060 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
39. 1 m2 Pasang atap nok seng
Bahan An. SNI ( Revisi ) 6.39.1
0.300 Lbr Seng plat 3" x 6" bjls 28 @ Rp. - = Rp
0.040 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.39.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
40. 1 m2 Pasang atap alluminium
Bahan An. SNI ( Revisi ) 6.40.1
1.050 m2 Atap alluminium glmbg tbl 0.55 @ Rp. - = Rp
0.020 Kg Paku hak panjang 15 cm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.40.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.750 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
41. 1 m2 Pasang nok alluminium
Bahan An. SNI ( Revisi ) 6.41.1
1.200 m2 Nok standar 40 cm 18, swg 22 @ Rp. - = Rp
0.040 Kg Paku hak panjang 15 cm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.41.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
1.000 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.010 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
42. 1 m2 Pasang alluminium foil/sisalation
Bahan An. SNI ( Revisi ) 6.42.1
1.050 m2 Alluminium foil/sisalation @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.42.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.050 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.008 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
24,750.00
24,750.00

4,500.00
3,000.00
400.00
480.00
8,380.00
33,130.00

-
-

4,500.00
3,000.00
400.00
480.00
8,380.00
8,380.00

15,000.00
15,000.00

4,500.00
2,400.00
3,000.00
480.00
10,380.00
25,380.00

15,750.00
9,504.00
2,880.00
28,134.00

12,000.00
8,000.00
1,000.00
120.00
21,120.00
49,254.00
41,250,000.00
66,000,000.00
211,200.00
107,461,200.00

12,000.00
8,000.00
1,000.00
120.00
21,120.00
107,482,320.00
13,200.00
9,504.00
2,880.00
25,584.00

12,000.00
8,000.00
1,000.00
120.00
21,120.00
46,704.00

92,400.00
577.50
92,977.50

4,200.00
2,680.00
350.00
420.00
7,650.00
100,627.50

#VALUE!
#VALUE!
#VALUE!

4,200.00
3,000.00
400.00
480.00
8,080.00
#VALUE!

-
2,904.00
2,904.00

4,200.00
3,000.00
400.00
480.00
8,080.00
10,984.00
750.00
396.00
1,146.00

4,200.00
2,800.00
350.00
420.00
7,770.00
8,916.00
-
330.00
330.00

4,200.00
2,800.00
350.00
420.00
7,770.00
8,100.00

5,197.50
1,188.00
6,385.50

4,200.00
2,800.00
350.00
420.00
7,770.00
14,155.50

13,860.00
1,980.00
15,840.00

4,200.00
2,800.00
350.00
420.00
7,770.00
23,610.00

484.00
330.00
814.00

4,200.00
2,680.00
350.00
420.00
7,650.00
8,464.00
-
-
-

4,200.00
2,680.00
350.00
420.00
7,650.00
7,650.00
600.00
1,500.00
2,100.00

4,200.00
2,680.00
350.00
420.00
7,650.00
9,750.00

18,500.00
4,800.00
23,300.00

4,200.00
2,680.00
350.00
420.00
7,650.00
30,950.00

-
-
-

4,200.00
2,680.00
350.00
420.00
7,650.00
7,650.00

-
-
-

4,200.00
2,680.00
350.00
420.00
7,650.00
7,650.00
-
-
-

4,200.00
2,680.00
350.00
420.00
7,650.00
7,650.00
-
-
-

4,200.00
2,680.00
350.00
420.00
7,650.00
7,650.00

-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00

-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00

-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00
-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00
-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00

-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00

-
-
-

3,000.00
6,000.00
650.00
240.00
9,890.00
9,890.00

-
-
-

2,520.00
5,000.00
650.00
240.00
8,410.00
8,410.00
-
-
-

6,000.00
4,000.00
500.00
600.00
11,100.00
11,100.00
-
-
-
-
-

6,000.00
12,000.00
150.00
600.00
18,750.00
18,750.00

-
-
-

6,000.00
4,000.00
500.00
60.00
10,560.00
10,560.00

-
-
-

4,980.00
10,000.00
1,250.00
480.00
16,710.00
16,710.00

-
-
-
-
-
-

12,000.00
8,000.00
1,000.00
1,200.00
22,200.00
22,200.00

-
-
-
-
3,750.00
10,000.00
1,250.00
360.00
15,360.00
15,360.00

-
-
-

7,500.00
6,000.00
750.00
780.00
15,030.00
15,030.00

-
-
-
-
-

3,750.00
10,000.00
1,250.00
360.00
15,360.00
15,360.00

-
-
-

3,600.00
2,400.00
300.00
360.00
6,660.00
6,660.00

-
-
-

4,500.00
2,800.00
400.00
360.00
8,060.00
8,060.00
-
-
-

4,500.00
30,000.00
400.00
360.00
35,260.00
35,260.00

-
-
-

3,000.00
40,000.00
500.00
600.00
44,100.00
44,100.00

-
-

4,500.00
2,000.00
250.00
480.00
7,230.00
7,230.00
PEKERJAAN PENUTUP PLAFOND
1. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Lbr Asbes langit-langit tbl 6 mm @ Rp. 8,800.00 = Rp 9,680.00
0.010 Kg Paku @ Rp. 13,200.00 = Rp 132.00
= Rp 9,812.00
Upah An. SNI ( Revisi ) 6.1.2
0.030 Oh Pekerja @ Rp. 30,000.00 = Rp 900.00
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.0015 Oh Mandor @ Rp. 60,000.00 = Rp 90.00
= Rp 4,140.00
Total harga = Rp 13,952.00
2. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.2.1
1.100 Lbr Asbes langit-langit tbl 5 mm @ Rp. 8,800.00 = Rp 9,680.00
0.010 Kg Paku @ Rp. 13,200.00 = Rp 132.00
= Rp 9,812.00
Upah An. SNI ( Revisi ) 6.2.2
0.030 Oh Pekerja @ Rp. 30,000.00 = Rp 900.00
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.0015 Oh Mandor @ Rp. 60,000.00 = Rp 90.00
= Rp 4,140.00
Total harga = Rp 13,952.00
3. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.3.1
1.100 Lbr Asbes langit-langit tbl 4 mm @ Rp. 425.00 = Rp 467.50
0.010 Kg Paku @ Rp. 41,200.00 = Rp 412.00
= Rp 879.50
Upah An. SNI ( Revisi ) 6.3.2
0.030 Oh Pekerja @ Rp. 30,000.00 = Rp 900.00
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.0015 Oh Mandor @ Rp. 60,000.00 = Rp 90.00
= Rp 4,140.00
Total harga = Rp 5,019.50
4. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 3.5 mm
Bahan An. SNI ( Revisi ) 6.4.1
1.100 Lbr Asbes langit-langit tbl 3.5 mm @ Rp. 22,500.00 = Rp 24,750.00
0.010 Kg Paku @ Rp. 29,700.00 = Rp 297.00
= Rp 25,047.00
Upah An. SNI ( Revisi ) 6.4.2
0.030 Oh Pekerja @ Rp. 30,000.00 = Rp 900.00
0.070 Oh Tukang kayu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.0015 Oh Mandor @ Rp. 60,000.00 = Rp 90.00
= Rp 4,140.00
Total harga = Rp 29,187.00
5. 1 m2 Pasang langit-langit akustik ( 30 x 30 ) cm
Bahan An. SNI ( Revisi ) 6.5.1
11.500 Lbr Akustik ukuran 30 x 30 cm @ Rp. 5,500,000.00 = Rp 63,250,000.00
0.050 Kg Paku @ Rp. 4,950,000.00 = Rp 247,500.00
= Rp 63,497,500.00
Upah An. SNI ( Revisi ) 6.5.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp 1,800.00
0.120 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,800.00
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp 600.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 7,380.00
Total harga = Rp 63,504,880.00
6. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm
Bahan An. SNI ( Revisi ) 6.6.1
5.800 Lbr Akustik ukuran 30 x 60 cm @ Rp. #REF! = Rp #REF!
0.050 Kg Paku @ Rp. #REF! = Rp #REF!
= Rp #REF!
Upah An. SNI ( Revisi ) 6.6.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp 1,800.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 6,480.00
Total harga = Rp #REF!
7. 1 m2 Pasang langit-langit akustik ( 60 x 120 ) cm
Bahan An. SNI ( Revisi ) 6.7.1
1.500 Lbr Akustik arm strong 60 x 120 cm @ Rp. 9,900.00 = Rp 14,850.00
0.050 Kg Paku @ Rp. 15,400.00 = Rp 770.00
= Rp 15,620.00
Upah An. SNI ( Revisi ) 6.7.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp 1,800.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 6,480.00
Total harga = Rp 22,100.00
8. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.360 Lbr Plywood 4' x 8' x 4 mm @ Rp. 93,500.00 = Rp 33,660.00
0.030 Kg Paku @ Rp. 11,550.00 = Rp 346.50
= Rp 34,006.50
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp 2,100.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0035 Oh Mandor @ Rp. 60,000.00 = Rp 210.00
= Rp 6,810.00
Total harga = Rp 40,816.50
9. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.9.1
0.360 Lbr Plywood 4' x 8' x 6 mm @ Rp. 93,500.00 = Rp 33,660.00
0.030 Kg Paku @ Rp. 11,550.00 = Rp 346.50
= Rp 34,006.50
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp 2,100.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0035 Oh Mandor @ Rp. 60,000.00 = Rp 210.00
= Rp 6,810.00
Total harga = Rp 40,816.50
10. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.10.1
0.375 Lbr Plywood 4' x 8' x 4 mm @ Rp. 93,500.00 = Rp 35,062.50
0.030 Kg Paku @ Rp. 11,550.00 = Rp 346.50
= Rp 35,409.00
Upah An. SNI ( Revisi ) 6.10.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp 2,100.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0035 Oh Mandor @ Rp. 60,000.00 = Rp 210.00
= Rp 6,810.00
Total harga = Rp 42,219.00
11. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.375 Lbr Plywood 4' x 8' x 6 mm @ Rp. #REF! = Rp #REF!
0.030 Kg Paku @ Rp. #REF! = Rp #REF!
= Rp #REF!
Upah An. SNI ( Revisi ) 6.11.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp 2,100.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0035 Oh Mandor @ Rp. 60,000.00 = Rp 210.00
= Rp 6,810.00
Total harga = Rp #REF!
12. 1 m2 Pasang langit-langit teakwood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.360 Lbr Teakwood 4' x 8' x 4 mm @ Rp. 105,000.00 = Rp 37,800.00
0.030 Kg Paku @ Rp. 11,550.00 = Rp 346.50
= Rp 38,146.50
Upah An. SNI ( Revisi ) 6.12.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp 2,100.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0035 Oh Mandor @ Rp. 60,000.00 = Rp 210.00
= Rp 6,810.00
Total harga = Rp 44,956.50
13. 1 m2 Pasang langit-langit teakwood ( 60 x 120 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.375 Lbr Teakwood 4' x 8' x 4 mm @ Rp. 105,000.00 = Rp 39,375.00
0.030 Kg Paku @ Rp. 11,550.00 = Rp 346.50
= Rp 39,721.50
Upah An. SNI ( Revisi ) 6.13.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp 2,100.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.0035 Oh Mandor @ Rp. 60,000.00 = Rp 210.00
= Rp 6,810.00
Total harga = Rp 46,531.50
14. 1 m2 Pasang langit-langit lat kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.024 m3 Kayu jati, papan @ Rp. Kran air "AMICO 3/4" = Rp #VALUE!
0.010 Kg Paku @ Rp. Pompa air "GOLD STAR" = Rp #VALUE!
0.050 Kg Paku sekrup @ Rp. Pompa air "NASIONAL" = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.14.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 33,600.00
Total harga = Rp #VALUE!
15. 1 m2 Pasang langit-langit lat kayu ramin
Bahan An. SNI ( Revisi ) 6.15.1
0.024 m3 Kayu ramin @ Rp. 204,600.00 = Rp 4,910.40
0.010 Kg Paku @ Rp. 180,000.00 = Rp 1,800.00
0.050 Kg Paku sekrup @ Rp. - = Rp -
= Rp 6,710.40
Upah An. SNI ( Revisi ) 6.15.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 33,600.00
Total harga = Rp 40,310.40
16. 1 m2 Pasang langit-langit lat kayu kamper
Bahan An. SNI ( Revisi ) 6.16.1
0.024 m3 Kayu kamper, papan @ Rp. 8,250,000.00 = Rp 198,000.00
0.010 Kg Paku @ Rp. 11,550.00 = Rp 115.50
0.050 Kg Paku sekrup @ Rp. 13,200.00 = Rp 660.00
= Rp 198,775.50
Upah An. SNI ( Revisi ) 6.16.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,000.00
0.010 Oh Mandor @ Rp. 60,000.00 = Rp 600.00
= Rp 33,600.00
Total harga = Rp 232,375.50
17. 1 m2 Pasang langit-langit soft board
Bahan An. SNI ( Revisi ) 6.17.1
0.350 Lbr Soft board 4' x 8' x 4mm @ Rp. 50,000.00 = Rp 17,500.00
0.030 Kg Paku @ Rp. 50,000.00 = Rp 1,500.00
= Rp 19,000.00
Upah An. SNI ( Revisi ) 6.17.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp 18,000.00
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 22,680.00
Total harga = Rp 41,680.00
18. 1 m2 Pasang langit-langit akustik 60 x 120 cm + rangka alluminium
Bahan An. SNI ( Revisi ) 6.18.1
3.600 m' Profil alluminium T @ Rp. - = Rp -
0.150 Kg Kawat seng polos @ Rp. - = Rp -
1.000 Bh Ramset/dinabolt @ Rp. - = Rp -
1.500 Lbr Akustik arm strong 60x120 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp 4,500.00
0.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp 20,000.00
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,500.00
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp 450.00
= Rp 27,450.00
Total harga = Rp 27,450.00
19. 1 m' Pasang list langit-langit kayu profil
Bahan An. SNI ( Revisi ) 6.19.1
1.100 m' List kayu profil @ Rp. - = Rp -
0.010 Kg Paku @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp 1,500.00
0.050 Oh Tukang kayu @ Rp. 40,000.00 = Rp 2,000.00
0.005 Oh Kepala tukang @ Rp. 50,000.00 = Rp 250.00
0.003 Oh Mandor @ Rp. 60,000.00 = Rp 180.00
= Rp 3,930.00
Total harga = Rp 3,930.00
20. 1 m2 Pasang langit-langit asbes ( 1.00x1.00 ) m, tebal 3.2 mm, rangka borneo
Bahan An. SNI ( Revisi ) 6.20.1
0.012 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
1.100 Lbr Asbes 1.00 x 1.00 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.180 Oh Pekerja @ Rp. 30,000.00 = Rp 5,400.00
0.320 Oh Tukang kayu @ Rp. 40,000.00 = Rp 12,800.00
0.032 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,600.00
0.009 Oh Mandor @ Rp. 60,000.00 = Rp 540.00
= Rp 20,340.00
Total harga = Rp 20,340.00
21. 1 m2 Pasang langit-langit plywood 4 mm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.21.1
0.023 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.390 Lbr Plywood 4' x 8 ' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.270 Oh Pekerja @ Rp. 30,000.00 = Rp 8,100.00
0.400 Oh Tukang kayu @ Rp. 40,000.00 = Rp 16,000.00
0.040 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,000.00
0.0135 Oh Mandor @ Rp. 60,000.00 = Rp 810.00
= Rp 26,910.00
Total harga = Rp 26,910.00
22. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.22.1
0.023 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
5.800 Lbr Akustik 30 x 60 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.260 Oh Pekerja @ Rp. 30,000.00 = Rp 7,800.00
0.400 Oh Tukang kayu @ Rp. 40,000.00 = Rp 16,000.00
0.040 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,000.00
0.013 Oh Mandor @ Rp. 60,000.00 = Rp 780.00
= Rp 26,580.00
Total harga = Rp 26,580.00
23. 1 m2 Pasang langit-langit akustik ( 30 x 30 ) cm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.23.1
0.027 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
11.500 Lbr Akustik 30 x 30 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.310 Oh Pekerja @ Rp. 30,000.00 = Rp 9,300.00
0.470 Oh Tukang kayu @ Rp. 40,000.00 = Rp 18,800.00
0.047 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,350.00
0.0155 Oh Mandor @ Rp. 60,000.00 = Rp 930.00
= Rp 31,380.00
Total harga = Rp 31,380.00
24. 1 m2 Pasang langit-langit gypsum board, tebal 9 mm
Bahan An. SNI ( Revisi ) 6.24.1
0.364 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. - = Rp -
0.110 Kg Paku sekrup @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp 3,000.00
0.050 Oh Tukang kayu @ Rp. 40,000.00 = Rp 2,000.00
0.005 Oh Kepala tukang @ Rp. 50,000.00 = Rp 250.00
0.0050 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 5,550.00
Total harga = Rp 5,550.00
PEKERJAAN SANITASI
1. Memasang 1 buah kloset duduk/monoblok
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kloset duduk/monoblok @ Rp. 850,000.00 = Rp 850,000.00
6% harga kloset = Perlengkapan @ Rp. 51,000.00 = Rp 51,000.00
= Rp 901,000.00
Upah An. SNI ( Revisi ) 6.1.2
3.300 Oh Pekerja @ Rp. 30,000.00 = Rp 99,000.00
1.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 44,000.00
0.001 Oh Kepala tukang @ Rp. 50,000.00 = Rp 50.00
0.1600 Oh Mandor @ Rp. 60,000.00 = Rp 9,600.00
= Rp 152,650.00
Total harga = Rp 1,053,650.00
2. Memasang 1 buah kloset jongkok porselen
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kloset jongkok porselen @ Rp. 78,500.00 = Rp 78,500.00
6.000 Kg Semen portland @ Rp. 1,188.00 = Rp 7,128.00
0.010 m3 Pasir pasang @ Rp. 90,000.00 = Rp 90,000.00
= Rp 175,628.00
Upah An. SNI ( Revisi ) 6.2.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
1.500 Oh Tukang batu @ Rp. 40,000.00 = Rp 60,000.00
0.150 Oh Kepala tukang @ Rp. 50,000.00 = Rp 7,500.00
0.160 Oh Mandor @ Rp. 60,000.00 = Rp 9,600.00
= Rp 107,100.00
Total harga = Rp 282,728.00
3. Memasang 1 buah kloset jongkok teraso
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kloset jongkok teraso @ Rp. 41,200.00 = Rp 41,200.00
7.000 Bh Bata merah 5 x 11 x 22 @ Rp. 46,700.00 = Rp 326,900.00
6.000 Kg Semen portland @ Rp. 46,700.00 = Rp 280,200.00
0.010 m3 Pasir pasang @ Rp. 2,472.00 = Rp 2,472.00
= Rp 650,772.00
Upah An. SNI ( Revisi ) 6.3.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
1.500 Oh Tukang batu @ Rp. 40,000.00 = Rp 60,000.00
0.300 Oh Kepala tukang @ Rp. 50,000.00 = Rp 15,000.00
0.110 Oh Mandor @ Rp. 60,000.00 = Rp 6,600.00
= Rp 111,600.00
Total harga = Rp 762,372.00
4. Memasang 1 buah urinoir
Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Urinoir @ Rp. 90,000.00 = Rp 90,000.00
30% harga urinoir = Perlengkapan @ Rp. 27,000.00 = Rp -
6.000 Kg Semen portland @ Rp. 1,188.00 = Rp 7,128.00
0.010 m3 Pasir pasang @ Rp. 90,000.00 = Rp 90,000.00
= Rp 187,128.00
Upah An. SNI ( Revisi ) 6.4.2
1.000 Oh Pekerja @ Rp. 30,000.00 = Rp 30,000.00
1.000 Oh Tukang batu @ Rp. 40,000.00 = Rp 40,000.00
0.100 Oh Kepala tukang @ Rp. 50,000.00 = Rp 5,000.00
0.100 Oh Mandor @ Rp. 60,000.00 = Rp 6,000.00
= Rp 81,000.00
Total harga = Rp 268,128.00
5. Memasang 1 buah wastafel
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Wastafel @ Rp. 180,000.00 = Rp 180,000.00
12% harga wstfel. = Perlengkapan @ Rp. 21,600.00 = Rp -
6.000 Kg Semen portland @ Rp. 1,188.00 = Rp 7,128.00
0.010 m3 Pasir pasang @ Rp. 90,000.00 = Rp 90,000.00
= Rp 277,128.00
Upah An. SNI ( Revisi ) 6.5.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp 6,000.00
1.450 Oh Tukang batu @ Rp. 40,000.00 = Rp 58,000.00
0.150 Oh Kepala tukang @ Rp. 50,000.00 = Rp 7,500.00
0.100 Oh Mandor @ Rp. 60,000.00 = Rp 6,000.00
= Rp 77,500.00
Total harga = Rp 354,628.00
6. Memasang 1 buah bak mandi teraso volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Bak teraso @ Rp. 56,100.00 = Rp 56,100.00
6.000 Kg Semen portland @ Rp. 66,000.00 = Rp 396,000.00
0.010 m3 Pasir pasang @ Rp. 3,366.00 = Rp 3,366.00
= Rp 455,466.00
Upah An. SNI ( Revisi ) 6.6.2
2.100 Oh Pekerja @ Rp. 30,000.00 = Rp 63,000.00
0.750 Oh Tukang batu @ Rp. 40,000.00 = Rp 30,000.00
0.070 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,500.00
0.110 Oh Mandor @ Rp. 60,000.00 = Rp 6,600.00
= Rp 103,100.00
Total harga = Rp 558,566.00
7. Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Bak fiberglass @ Rp. 15,950.00 = Rp 15,950.00
18% harga bak = Perlengkapan @ Rp. 2,871.00 = Rp -
= Rp 15,950.00
Upah An. SNI ( Revisi ) 6.7.2
1.800 Oh Pekerja @ Rp. 30,000.00 = Rp 54,000.00
2.700 Oh Tukang batu @ Rp. 40,000.00 = Rp 108,000.00
0.540 Oh Kepala tukang @ Rp. 50,000.00 = Rp 27,000.00
0.110 Oh Mandor @ Rp. 60,000.00 = Rp 6,600.00
= Rp 195,600.00
Total harga = Rp 211,550.00
8. Memasang 1 buah bak mandi batu bata volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.8.1
0.400 m3 Batu bata @ Rp. 425.00 = Rp 170.00
120.000 Kg Semen portland @ Rp. 1,188.00 = Rp 142,560.00
0.300 m3 Pasir pasang @ Rp. 90,000.00 = Rp 27,000.00
360.000 Bh Porselen ( 11x11 ) cm @ Rp. 500.00 = Rp 180,000.00
6.000 Kg Semen nat @ Rp. 76.50 = Rp 459.00
= Rp 350,189.00
Upah An. SNI ( Revisi ) 6.8.2
6.000 Oh Pekerja @ Rp. 30,000.00 = Rp 180,000.00
3.000 Oh Tukang batu @ Rp. 40,000.00 = Rp 120,000.00
0.300 Oh Kepala tukang @ Rp. 50,000.00 = Rp 15,000.00
0.300 Oh Mandor @ Rp. 60,000.00 = Rp 18,000.00
= Rp 333,000.00
Total harga = Rp 683,189.00
9. Memasang 1 buah badkip porselen
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m3 Badkip @ Rp. Buis beton bulat o 100 = Rp #VALUE!
20% harga badkip = Perlengkapan @ Rp. - = Rp -
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.9.2
0.000 Oh Pekerja @ Rp. 30,000.00 = Rp -
0.075 Oh Tukang batu @ Rp. 40,000.00 = Rp 3,000.00
0.750 Oh Kepala tukang @ Rp. 50,000.00 = Rp 37,500.00
0.250 Oh Mandor @ Rp. 60,000.00 = Rp 15,000.00
= Rp 55,500.00
Total harga = Rp #VALUE!
10. Membuat 1 buah bak beton volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.10.1
0.900 m3 Beton 1 : 1.5 : 2.5 @ Rp. #REF! = Rp #REF!
180.000 Kg Besi beton @ Rp. Seng plat BJLS 30.80 = Rp #VALUE!
8.000 m3 Kayu cetakan @ Rp. #REF! = Rp #REF!
5.000 m2 Ubin porselen @ Rp. #REF! = Rp #REF!
10% harga bhn = Perlengkapan @ Rp. #REF! = Rp #REF!
= Rp #REF!
Upah An. SNI ( Revisi ) 6.10.2
3.500 Oh Pekerja @ Rp. 30,000.00 = Rp 105,000.00
4.500 Oh Tukang batu @ Rp. 40,000.00 = Rp 180,000.00
0.900 Oh Kepala tukang @ Rp. 50,000.00 = Rp 45,000.00
0.900 Oh Mandor @ Rp. 60,000.00 = Rp 54,000.00
= Rp 384,000.00
Total harga = Rp #REF!
11. Memasang 1 buah bak mandi fiberglass volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Bak fiberglass @ Rp. 11,000.00 = Rp 11,000.00
12% harga bak = Perlengkapan @ Rp. 1,980.00 = Rp -
= Rp 11,000.00
Upah An. SNI ( Revisi ) 6.11.2
3.000 Oh Pekerja @ Rp. 30,000.00 = Rp 90,000.00
4.500 Oh Tukang batu @ Rp. 40,000.00 = Rp 180,000.00
0.900 Oh Kepala tukang @ Rp. 50,000.00 = Rp 45,000.00
0.900 Oh Mandor @ Rp. 60,000.00 = Rp 54,000.00
= Rp 369,000.00
Total harga = Rp 380,000.00
12. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 15 cm
Bahan An. SNI ( Revisi ) 6.12.1
1.600 Bh Pipa tanah @ Rp. 9,350.00 = Rp 14,960.00
0.680 Kg Semen portland @ Rp. 1,188.00 = Rp 807.84
0.013 m3 Pasir pasang @ Rp. 90,000.00 = Rp 1,170.00
0.011 m3 Pasir urug @ Rp. 82,500.00 = Rp 907.50
= Rp 17,845.34
Upah An. SNI ( Revisi ) 6.12.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp 1,800.00
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,200.00
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp 150.00
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp 150.00
= Rp 3,300.00
Total harga = Rp 21,145.34
13. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 20 cm
Bahan An. SNI ( Revisi ) 6.13.1
1.600 Bh Pipa tanah @ Rp. 1,100.00 = Rp 1,760.00
0.870 Kg Semen portland @ Rp. 1,100.00 = Rp 957.00
0.014 m3 Pasir pasang @ Rp. 2,750.00 = Rp 38.50
0.014 m3 Pasir urug @ Rp. 198.00 = Rp 2.77
= Rp 2,758.27
Upah An. SNI ( Revisi ) 6.13.2
0.080 Oh Pekerja @ Rp. 30,000.00 = Rp 2,400.00
0.040 Oh Tukang batu @ Rp. 40,000.00 = Rp 1,600.00
0.004 Oh Kepala tukang @ Rp. 50,000.00 = Rp 200.00
0.007 Oh Mandor @ Rp. 60,000.00 = Rp 420.00
= Rp 4,620.00
Total harga = Rp 7,378.27
14. Memasang 1 m' pipa beton, Ø 15 - 20 cm
Bahan An. SNI ( Revisi ) 6.14.1
1.100 Bh Pipa beton @ Rp. - = Rp -
0.027 m3 Batu bata @ Rp. - = Rp -
3.920 Kg Semen portland @ Rp. 75,000.00 = Rp 294,000.00
0.065 m3 Pasir pasang @ Rp. 32,000.00 = Rp 2,080.00
0.024 m3 Pasir urug @ Rp. - = Rp -
= Rp 296,080.00
Upah An. SNI ( Revisi ) 6.14.2
0.140 Oh Pekerja @ Rp. 30,000.00 = Rp 4,200.00
0.070 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,800.00
0.007 Oh Kepala tukang @ Rp. 50,000.00 = Rp 350.00
0.007 Oh Mandor @ Rp. 60,000.00 = Rp 420.00
= Rp 7,770.00
Total harga = Rp 303,850.00
15. Memasang 1 m' pipa beton, Ø 30 - 100 cm
Bahan An. SNI ( Revisi ) 6.15.1
1.100 Bh Pipa beton @ Rp. 38,500.00 = Rp 42,350.00
0.550 m3 Batu bata @ Rp. 38,500.00 = Rp 21,175.00
10.300 Kg Semen portland @ Rp. 120,000.00 = Rp 1,236,000.00
0.061 m3 Pasir pasang @ Rp. 229,600.00 = Rp 14,005.60
0.069 m3 Pasir urug @ Rp. 6,930.00 = Rp 478.17
= Rp 1,314,008.77
Upah An. SNI ( Revisi ) 6.15.2
0.380 Oh Pekerja @ Rp. 30,000.00 = Rp 11,400.00
0.190 Oh Tukang batu @ Rp. 40,000.00 = Rp 7,600.00
0.019 Oh Kepala tukang @ Rp. 50,000.00 = Rp 950.00
0.019 Oh Mandor @ Rp. 60,000.00 = Rp 1,140.00
= Rp 21,090.00
Total harga = Rp 1,335,098.77
16. Memasang 1 buah bak kontrol pas. batu bata ( 30x30 ) cm, tinggi 35 cm
Bahan An. SNI ( Revisi ) 6.16.1
0.145 m3 Batu bata @ Rp. 30,000.00 = Rp 4,350.00
44.000 Kg Semen portland @ Rp. 40,000.00 = Rp 1,760,000.00
0.070 m3 Pasir pasang @ Rp. 40,000.00 = Rp 2,800.00
0.070 m3 Batu kerikil @ Rp. - = Rp -
1.600 Kg Besi beton @ Rp. - = Rp -
0.060 m3 Pasir beton @ Rp. 5,400.00 = Rp 324.00
= Rp 1,767,474.00
Upah An. SNI ( Revisi ) 6.16.2
3.200 Oh Pekerja @ Rp. 30,000.00 = Rp 96,000.00
1.015 Oh Tukang batu @ Rp. 40,000.00 = Rp 40,600.00
0.0015 Oh Kepala tukang @ Rp. 50,000.00 = Rp 75.00
0.016 Oh Mandor @ Rp. 60,000.00 = Rp 960.00
= Rp 137,635.00
Total harga = Rp 1,905,109.00
17. Memasang 1 buah bak kontrol pas. batu bata ( 45x45 ) cm, tinggi 50 cm
Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu bata @ Rp. - = Rp -
77.000 Kg Semen portland @ Rp. - = Rp -
0.130 m3 Pasir pasang @ Rp. - = Rp -
0.020 m3 Batu kerikil @ Rp. - = Rp -
2.600 Kg Besi beton @ Rp. - = Rp -
0.090 m3 Pasir beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.17.2
1.420 Oh Pekerja @ Rp. 30,000.00 = Rp 42,600.00
0.470 Oh Tukang batu @ Rp. 40,000.00 = Rp 18,800.00
0.047 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,350.00
0.071 Oh Mandor @ Rp. 60,000.00 = Rp 4,260.00
= Rp 68,010.00
Total harga = Rp 68,010.00
18. Memasang 1 buah bak kontrol pas. batu bata ( 60x60 ) cm, tinggi 65 cm
Bahan An. SNI ( Revisi ) 6.18.1
0.371 m3 Batu bata @ Rp. - = Rp -
114.000 Kg Semen portland @ Rp. - = Rp -
0.184 m3 Pasir pasang @ Rp. - = Rp -
0.033 m3 Batu kerikil @ Rp. - = Rp -
4.850 Kg Besi beton @ Rp. - = Rp -
0.120 m3 Pasir beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
2.160 Oh Pekerja @ Rp. 30,000.00 = Rp 64,800.00
0.720 Oh Tukang batu @ Rp. 40,000.00 = Rp 28,800.00
0.072 Oh Kepala tukang @ Rp. 50,000.00 = Rp 3,600.00
0.108 Oh Mandor @ Rp. 60,000.00 = Rp 6,480.00
0.100 Oh Tukang gali @ Rp. 40,000.00 = Rp 4,000.00
= Rp 107,680.00
Total harga = Rp 107,680.00
19. Memasang 1 m' pipa galvanis ø 1/2"
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 30,000.00 = Rp 1,620.00
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp 3,600.00
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp 450.00
0.027 Oh Mandor @ Rp. 60,000.00 = Rp 1,620.00
= Rp 7,290.00
Total harga = Rp 7,290.00
20. Memasang 1 m' pipa galvanis ø 3/4"
Bahan An. SNI ( Revisi ) 6.20.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.054 Oh Pekerja @ Rp. 30,000.00 = Rp 1,620.00
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp 3,600.00
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp 450.00
0.027 Oh Mandor @ Rp. 60,000.00 = Rp 1,620.00
= Rp 7,290.00
Total harga = Rp 7,290.00
21. Memasang 1 m' pipa galvanis ø 1"
Bahan An. SNI ( Revisi ) 6.21.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.054 Oh Pekerja @ Rp. 30,000.00 = Rp 1,620.00
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp 3,600.00
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp 450.00
0.027 Oh Mandor @ Rp. 60,000.00 = Rp 1,620.00
= Rp 7,290.00
Total harga = Rp 7,290.00
22. Memasang 1 m' pipa galvanis ø 1.5"
Bahan An. SNI ( Revisi ) 6.22.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.108 Oh Pekerja @ Rp. 30,000.00 = Rp 3,240.00
0.180 Oh Tukang batu @ Rp. 40,000.00 = Rp 7,200.00
0.018 Oh Kepala tukang @ Rp. 50,000.00 = Rp 900.00
0.0054 Oh Mandor @ Rp. 60,000.00 = Rp 324.00
= Rp 11,664.00
Total harga = Rp 11,664.00
23. Memasang 1 m' pipa galvanis ø 3"
Bahan An. SNI ( Revisi ) 6.23.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.108 Oh Pekerja @ Rp. 30,000.00 = Rp 3,240.00
0.180 Oh Tukang batu @ Rp. 40,000.00 = Rp 7,200.00
0.018 Oh Kepala tukang @ Rp. 50,000.00 = Rp 900.00
0.0054 Oh Mandor @ Rp. 60,000.00 = Rp 324.00
= Rp 11,664.00
Total harga = Rp 11,664.00
24. Memasang 1 m' pipa galvanis ø 4"
Bahan An. SNI ( Revisi ) 6.24.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.135 Oh Pekerja @ Rp. 30,000.00 = Rp 4,050.00
0.225 Oh Tukang batu @ Rp. 40,000.00 = Rp 9,000.00
0.0225 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,125.00
0.0068 Oh Mandor @ Rp. 60,000.00 = Rp 408.00
= Rp 14,583.00
Total harga = Rp 14,583.00
25. Memasang 1 m' pipa PVC tipe AW ø 1/2"
Bahan An. SNI ( Revisi ) 6.25.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
0.036 Oh Pekerja @ Rp. 30,000.00 = Rp 1,080.00
0.060 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,400.00
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0018 Oh Mandor @ Rp. 60,000.00 = Rp 108.00
= Rp 3,888.00
Total harga = Rp 3,888.00
26. Memasang 1 m' pipa PVC tipe AW ø 3/4"
Bahan An. SNI ( Revisi ) 6.26.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
0.036 Oh Pekerja @ Rp. 30,000.00 = Rp 1,080.00
0.060 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,400.00
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0018 Oh Mandor @ Rp. 60,000.00 = Rp 108.00
= Rp 3,888.00
Total harga = Rp 3,888.00
27. Memasang 1 m' pipa PVC tipe AW ø 1"
Bahan An. SNI ( Revisi ) 6.27.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
0.036 Oh Pekerja @ Rp. 30,000.00 = Rp 1,080.00
0.060 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,400.00
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0018 Oh Mandor @ Rp. 60,000.00 = Rp 108.00
= Rp 3,888.00
Total harga = Rp 3,888.00
28. Memasang 1 m' pipa PVC tipe AW ø 1.5"
Bahan An. SNI ( Revisi ) 6.28.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
0.036 Oh Pekerja @ Rp. 30,000.00 = Rp 1,080.00
0.060 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,400.00
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0018 Oh Mandor @ Rp. 60,000.00 = Rp 108.00
= Rp 3,888.00
Total harga = Rp 3,888.00
29. Memasang 1 m' pipa PVC tipe AW ø 2"
Bahan An. SNI ( Revisi ) 6.29.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
0.036 Oh Pekerja @ Rp. 30,000.00 = Rp 1,080.00
0.060 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,400.00
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0018 Oh Mandor @ Rp. 60,000.00 = Rp 108.00
= Rp 3,888.00
Total harga = Rp 3,888.00
30. Memasang 1 m' pipa PVC tipe AW ø 2.5"
Bahan An. SNI ( Revisi ) 6.30.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
0.036 Oh Pekerja @ Rp. 30,000.00 = Rp 1,080.00
0.060 Oh Tukang batu @ Rp. 40,000.00 = Rp 2,400.00
0.0060 Oh Kepala tukang @ Rp. 50,000.00 = Rp 300.00
0.0018 Oh Mandor @ Rp. 60,000.00 = Rp 108.00
= Rp 3,888.00
Total harga = Rp 3,888.00
31. Memasang 1 m' pipa PVC tipe AW ø 3"
Bahan An. SNI ( Revisi ) 6.31.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.081 Oh Pekerja @ Rp. 30,000.00 = Rp 2,430.00
0.135 Oh Tukang batu @ Rp. 40,000.00 = Rp 5,400.00
0.0135 Oh Kepala tukang @ Rp. 50,000.00 = Rp 675.00
0.0041 Oh Mandor @ Rp. 60,000.00 = Rp 246.00
= Rp 8,751.00
Total harga = Rp 8,751.00
32. Memasang 1 m' pipa PVC tipe AW ø 4"
Bahan An. SNI ( Revisi ) 6.32.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.081 Oh Pekerja @ Rp. 30,000.00 = Rp 2,430.00
0.135 Oh Tukang batu @ Rp. 40,000.00 = Rp 5,400.00
0.0135 Oh Kepala tukang @ Rp. 50,000.00 = Rp 675.00
0.0041 Oh Mandor @ Rp. 60,000.00 = Rp 246.00
= Rp 8,751.00
Total harga = Rp 8,751.00
33. Memasang 1 buah bak cuci piring stainless steel
Bahan An. SNI ( Revisi ) 6.33.1
1.000 Bh Bak cuci stainless steel @ Rp. - = Rp -
1.000 set Water drain + assesories @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.030 Oh Pekerja @ Rp. 30,000.00 = Rp 900.00
0.300 Oh Tukang batu @ Rp. 40,000.00 = Rp 12,000.00
0.030 Oh Kepala tukang @ Rp. 50,000.00 = Rp 1,500.00
0.0015 Oh Mandor @ Rp. 60,000.00 = Rp 90.00
= Rp 14,490.00
Total harga = Rp 14,490.00
34. Memasang 1 buah bak cuci piring teraso
Bahan An. SNI ( Revisi ) 6.34.1
1.000 Bh Bak cuci teraso @ Rp. - = Rp -
1.000 set Water drain + assesories @ Rp. - = Rp -
20.000 Kg Semen portland @ Rp. - = Rp -
0.050 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp 1,500.00
0.500 Oh Tukang batu @ Rp. 40,000.00 = Rp 20,000.00
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp 2,500.00
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp 150.00
= Rp 24,150.00
Total harga = Rp 24,150.00
35. Memasang 1 buah kran ø 3/4" atau 1/2"
Bahan An. SNI ( Revisi ) 6.35.1
1.000 Bh Kran air @ Rp. - = Rp -
0.025 Bh Seal tape @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.010 Oh Pekerja @ Rp. 30,000.00 = Rp 300.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 5,100.00
Total harga = Rp 5,100.00
36. Memasang 1 buah floor drain
Bahan An. SNI ( Revisi ) 6.36.1
1.000 Bh Floor drain @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.010 Oh Pekerja @ Rp. 30,000.00 = Rp 300.00
0.100 Oh Tukang batu @ Rp. 40,000.00 = Rp 4,000.00
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp 500.00
0.005 Oh Mandor @ Rp. 60,000.00 = Rp 300.00
= Rp 5,100.00
Total harga = Rp 5,100.00
#REF!
PEKERJAAN BESI & ALLUMINIUM
1. 1 Kg Pasang rangka atap baja
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Kg Besi profil WF @ Rp. - = Rp
0.080 Kg Meni besi @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.006 Oh Tukang besi @ Rp. 40,000.00 = Rp
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.006 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Pasang pintu besi baja
Bahan An. SNI ( Revisi ) 6.2.1
1.000 m2 Pintu besi baja @ Rp. 55,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.650 Oh Tukang besi @ Rp. 40,000.00 = Rp
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp
0.065 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.032 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Pasang jendela besi
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m2 Jendela besi @ Rp. 165,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
1.050 Oh Tukang besi @ Rp. 40,000.00 = Rp
1.050 Oh Pekerja @ Rp. 30,000.00 = Rp
0.105 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00525 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Pasang jendela besi tahan api
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m2 Jendela besi tahan api @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
1.200 Oh Tukang besi @ Rp. 40,000.00 = Rp
1.022 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Pasang pintu gulung besi
Bahan An. SNI ( Revisi ) 6.5.1
1.000 m2 Pintu gulung besi @ Rp. 6,600,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
1.200 Oh Tukang besi @ Rp. 40,000.00 = Rp
1.200 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Pasang pintu lipat
Bahan An. SNI ( Revisi ) 6.6.1
1.000 m2 Pintu lipat @ Rp. 93,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
1.050 Oh Tukang besi @ Rp. 40,000.00 = Rp
1.050 Oh Pekerja @ Rp. 30,000.00 = Rp
0.105 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0052 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
7. 1 m2 Pasang pintu sunscreen alliminium
Bahan An. SNI ( Revisi ) 6.7.1
1.000 m2 Sunscreen alluminium @ Rp. 66,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.800 Oh Tukang besi @ Rp. 40,000.00 = Rp
0.080 Oh Pekerja @ Rp. 30,000.00 = Rp
0.080 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
8. 1 m2 Pasang rolling door
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m2 Rolling door @ Rp. 13,200.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
1.500 Oh Tukang besi @ Rp. 40,000.00 = Rp
1.050 Oh Pekerja @ Rp. 30,000.00 = Rp
0.105 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0052 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
9. 1 m2 Pasang pintu alluminium
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m2 Pintu alluminium @ Rp. 77,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
1.050 Oh Tukang besi @ Rp. 40,000.00 = Rp
1.050 Oh Pekerja @ Rp. 30,000.00 = Rp
0.105 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0052 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
10. 1 m2 Pasang venetions blinds
Bahan An. SNI ( Revisi ) 6.10.1
1.000 m2 Venetions blind @ Rp. 24,200.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.350 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.350 Oh Pekerja @ Rp. 30,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00175 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
11. 1 m2 Pasang verticals blinds
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m2 Verticals blind @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.350 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.350 Oh Pekerja @ Rp. 30,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00175 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
12. 1 m2 Pasang terali besi
Bahan An. SNI ( Revisi ) 6.12.1
11.500 m' Besi strip 2 x 3 @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
1.200 Oh Tukang las @ Rp. 40,000.00 = Rp
1.200 Oh Pekerja @ Rp. 30,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0006 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
13. 1 m2 Pasang kawat harmonika
Bahan An. SNI ( Revisi ) 6.13.1
1.100 m2 Kawat harmonika @ Rp. 16,500.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 14,850.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 10,450.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
14. 1 m2 Pasang kawat nyamuk
Bahan An. SNI ( Revisi ) 6.14.1
1.100 m2 Kawat nyamuk @ Rp. 33,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 22,000.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 16,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
15. 1 m2 Pasang kawat kassa
Bahan An. SNI ( Revisi ) 6.15.1
1.100 m2 Kawat kassa @ Rp. 1,100.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 2,750.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 5,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 Pasang kawat burung
Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kawat burung @ Rp. - = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 75,000.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 32,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 Pasang jendela nako & trallis
Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Jendela nako @ Rp. 15,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1"/ skrup @ Rp. 24,750.00 = Rp
0.025 m2 Besi strip @ Rp. 38,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.200 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.001 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m' Pasang talang datar, seng bjls 28
Bahan An. SNI ( Revisi ) 6.18.1
0.500 Lbr Seng plat 3' x 6' bjls 28 @ Rp. 50,000.00 = Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp. 40,000.00 = Rp
0.0096 m3 Kayu borneo, papan @ Rp. 40,000.00 = Rp
0.250 Kg Flincote/meni besi @ Rp. 40,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.400 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m' Pasang talang miring, seng bjls 28
Bahan An. SNI ( Revisi ) 6.19.1
0.500 Lbr Seng plat 3' x 6' bjls 28 @ Rp. - = Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.300 Kg Flincote/meni besi @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.040 Oh Pekerja @ Rp. 30,000.00 = Rp
0.400 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng bjls 28
Bahan An. SNI ( Revisi ) 6.20.1
0.300 Lbr Seng plat 3' x 6' bjls 28 @ Rp. - = Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.500 Kg Besi strip @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng bjls 24
Bahan An. SNI ( Revisi ) 6.21.1
0.300 Lbr Seng plat 3' x 6' bjls 24 @ Rp. - = Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.500 Kg Besi strip @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
-
-
-

240.00
1,800.00
300.00
18.00
2,358.00
2,358.00

55,000.00
55,000.00

26,000.00
19,500.00
3,250.00
1,920.00
50,670.00
105,670.00

165,000.00
165,000.00

42,000.00
31,500.00
5,250.00
315.00
79,065.00
244,065.00

-
-

48,000.00
30,660.00
6,000.00
360.00
85,020.00
85,020.00

6,600,000.00
6,600,000.00

48,000.00
36,000.00
6,000.00
360.00
90,360.00
6,690,360.00
93,500.00
93,500.00

42,000.00
31,500.00
5,250.00
312.00
79,062.00
172,562.00

66,000.00
66,000.00

32,000.00
2,400.00
4,000.00
240.00
38,640.00
104,640.00

13,200.00
13,200.00

60,000.00
31,500.00
5,250.00
312.00
97,062.00
110,262.00

77,000.00
77,000.00

42,000.00
31,500.00
5,250.00
312.00
79,062.00
156,062.00

24,200.00
24,200.00
14,000.00
10,500.00
1,750.00
105.00
26,355.00
50,555.00
-
-

14,000.00
10,500.00
1,750.00
105.00
26,355.00
26,355.00

-
-

48,000.00
36,000.00
600.00
36.00
84,636.00
84,636.00

18,150.00
297.00
18.81
18,465.81

3,000.00
4,000.00
500.00
30.00
7,530.00
25,995.81

36,300.00
440.00
29.70
36,769.70

3,000.00
4,000.00
500.00
30.00
7,530.00
44,299.70
1,210.00
55.00
9.90
1,274.90

3,000.00
4,000.00
500.00
30.00
7,530.00
8,804.90
-
1,500.00
57.60
1,557.60

3,000.00
4,000.00
500.00
30.00
7,530.00
9,087.60

16,500.00
495.00
962.50
17,957.50

6,000.00
8,000.00
1,000.00
60.00
15,060.00
33,017.50

25,000.00
600.00
384.00
10,000.00
35,984.00

4,500.00
16,000.00
1,250.00
75.00
21,825.00
57,809.00

-
-
-
-
-

1,200.00
16,000.00
1,250.00
75.00
18,525.00
18,525.00

-
-
-
-
-
4,500.00
10,000.00
1,250.00
75.00
15,825.00
15,825.00

-
-
-
-
-

4,500.00
10,000.00
1,250.00
75.00
15,825.00
15,825.00
PEKERJAAN KUNCI & KACA
1. 1 buah pasang kunci tanam antik
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kunci tanam antik @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
2. 1 buah pasang kunci tanam biasa
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kunci tanam biasa @ Rp. 71,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.010 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
3. 1 buah pasang kunci tanam KM/WC
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kunci tanam KM/WC @ Rp. 137,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.005 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
4. 1 buah pasang kunci silinder
Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Kunci silinder @ Rp. 3,850.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.005 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
5. 1 buah pasang engsel pintu
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Engsel pintu @ Rp. 22,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
6. 1 buah pasang engsel jendela kupu-kupu
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Engsel jendela @ Rp. 16,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.010 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
7. 1 buah pasang engsel angin
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Engsel angin @ Rp. 16,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.020 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.010 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
8. 1 buah pasang spring knip
Bahan An. SNI ( Revisi ) 6.8.1
1.000 Bh Spring knip @ Rp. 9,900.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
9. 1 buah pasang kait angin
Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Kait angin @ Rp. Pagar BRC 120.240 c = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
10. 1 buah pasang door closer
Bahan An. SNI ( Revisi ) 6.10.1
1.000 Bh Door closer @ Rp. 121,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
11. 1 buah pasang kunci selot
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot @ Rp. 1,250.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.020 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.001 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
12. 1 buah pasang pegangan pintu/door holder
Bahan An. SNI ( Revisi ) 6.12.1
1.000 Bh Door holder @ Rp. #REF! = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.050 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
13. 1 buah pasang door stop
Bahan An. SNI ( Revisi ) 6.13.1
1.000 Bh Door stop @ Rp. 16,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.010 Oh Pekerja @ Rp. 30,000.00 = Rp
0.100 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0005 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
14. 1 buah pasang rel pintu dorong
Bahan An. SNI ( Revisi ) 6.14.1
1.000 Bh Rel pintu dorong @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.600 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
15. 1 buah pasang kunci lemari
Bahan An. SNI ( Revisi ) 6.15.1
1.000 Bh Kunci lemari @ Rp. Kran air "AMICO 1/2" = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.025 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 pasang kaca, tebal 3 mm
Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kaca tebal 3 mm @ Rp. Closed Jongkok INA w = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 pasang kaca, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Kaca tebal 5 mm @ Rp. 66,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m2 pasang kaca, tebal 8 mm
Bahan An. SNI ( Revisi ) 6.18.1
1.100 m2 Kaca tebal 8 mm @ Rp. 120,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.0165 Oh Pekerja @ Rp. 30,000.00 = Rp
0.165 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.0165 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00080 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m2 pasang kaca buram, tebal 12 mm
Bahan An. SNI ( Revisi ) 6.19.1
1.100 m2 Kaca buram @ Rp. 40,000.00 = Rp
0.050 Kg Sealent @ Rp. 40,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.025 Oh Pekerja @ Rp. 30,000.00 = Rp
0.250 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m2 pasang kaca cermin, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.20.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m2 pasang kaca cermin, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.21.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
22. 1 m2 pasang kaca cermin, tebal 8 mm
Bahan An. SNI ( Revisi ) 6.22.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.0165 Oh Pekerja @ Rp. 30,000.00 = Rp
0.165 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.0165 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00080 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
23. 1 m2 pasang kaca wireglass, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.23.1
1.100 m2 Kaca wireglass @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
24. 1 m2 pasang kaca patri, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.24.1
1.100 m2 Kaca patri @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.015 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.00075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
-
-

1,800.00
24,000.00
3,000.00
180.00
28,980.00
28,980.00

71,500.00
71,500.00

300.00
20,000.00
500.00
300.00
21,100.00
92,600.00

137,500.00
137,500.00

150.00
20,000.00
250.00
150.00
20,550.00
158,050.00

3,850.00
3,850.00

150.00
20,000.00
250.00
15.00
20,415.00
24,265.00

22,000.00
22,000.00
450.00
6,000.00
750.00
45.00
7,245.00
29,245.00

16,500.00
16,500.00
300.00
4,000.00
500.00
30.00
4,830.00
21,330.00

16,500.00
16,500.00

600.00
8,000.00
1,000.00
600.00
10,200.00
26,700.00

9,900.00
9,900.00

450.00
6,000.00
750.00
45.00
7,245.00
17,145.00

#VALUE!
#VALUE!

450.00
6,000.00
750.00
45.00
7,245.00
#VALUE!

121,000.00
121,000.00

1,500.00
20,000.00
2,500.00
150.00
24,150.00
145,150.00

1,250.00
1,250.00

600.00
8,000.00
1,000.00
60.00
9,660.00
10,910.00

#REF!
#REF!

1,500.00
20,000.00
2,500.00
150.00
24,150.00
#REF!

16,500.00
16,500.00

300.00
4,000.00
500.00
30.00
4,830.00
21,330.00

-
-

1,800.00
24,000.00
3,000.00
180.00
28,980.00
28,980.00

#VALUE!
#VALUE!

750.00
10,000.00
1,250.00
75.00
12,075.00
#VALUE!

#VALUE!
#VALUE!

450.00
6,000.00
750.00
45.00
7,245.00
#VALUE!
72,600.00
72,600.00

450.00
6,000.00
750.00
45.00
7,245.00
79,845.00

132,000.00
132,000.00

495.00
6,600.00
825.00
48.00
7,968.00
139,968.00

44,000.00
2,000.00
46,000.00

750.00
10,000.00
1,250.00
75.00
12,075.00
58,075.00

-
-

450.00
6,000.00
750.00
45.00
7,245.00
7,245.00

-
-
450.00
6,000.00
750.00
45.00
7,245.00
7,245.00
-
-

495.00
6,600.00
825.00
48.00
7,968.00
7,968.00

-
-

450.00
6,000.00
750.00
45.00
7,245.00
7,245.00

-
-

450.00
6,000.00
750.00
45.00
7,245.00
7,245.00
PEKERJAAN PENUTUP LANTAI & DINDING
1. 1 m2 Pasang lantai ubin PC abu-abu akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.1.1
6.630 Bh Ubin abu-abu 40 x 40 cm @ Rp. - = Rp
9.800 Kg Semen portland @ Rp. - = Rp
0.0215 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Pasang lantai ubin PC abu-abu akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.2.1
11.870 Bh Ubin abu-abu 30 x 30 cm @ Rp. 5,000.00 = Rp
10.000 Kg Semen portland @ Rp. 1,188.00 = Rp
0.0215 m3 Pasir pasang @ Rp. 90,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.260 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.0125 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.013 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Pasang lantai ubin PC abu-abu akuran 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.3.1
26.500 Bh Ubin abu-abu 20 x 20 cm @ Rp. 800.00 = Rp
10.400 Kg Semen portland @ Rp. 1,188.00 = Rp
0.0135 m3 Pasir pasang @ Rp. 90,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.270 Oh Pekerja @ Rp. 30,000.00 = Rp
0.130 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.0130 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0135 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Pasang lantai ubin warna akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.4.1
6.630 Bh Ubin warna 40 x 40 cm @ Rp. 6,783.33 = Rp
8.160 Kg Semen portland @ Rp. 1,188.00 = Rp
0.023 m3 Pasir pasang @ Rp. 90,000.00 = Rp
0.900 Kg Semen warna @ Rp. 1,188.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Pasang lantai ubin warna akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.5.1
11.870 Bh Ubin warna 30 x 30 cm @ Rp. 3,400.00 = Rp
8.360 Kg Semen portland @ Rp. 1,188.00 = Rp
0.023 m3 Pasir pasang @ Rp. 90,000.00 = Rp
0.900 Kg Semen warna @ Rp. 1,188.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Pasang lantai ubin warna akuran 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.6.1
26.500 Bh Ubin warna 20 x 20 cm @ Rp. 900 = Rp
8.760 Kg Semen portland @ Rp. 56,100.00 = Rp
0.023 m3 Pasir pasang @ Rp. 56,100.00 = Rp
0.900 Kg Semen warna @ Rp. 99,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.270 Oh Pekerja @ Rp. 30,000.00 = Rp
0.130 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0135 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
7. 1 m2 Pasang lantai ubin teraso akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.7.1
6.250 Bh Ubin teraso 40 x 40 cm @ Rp. 15,950.00 = Rp
8.800 Kg Semen portland @ Rp. 15,950.00 = Rp
0.0215 m3 Pasir pasang @ Rp. 15,950.00 = Rp
0.900 Kg Semen warna @ Rp. 15,950.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
8. 1 m2 Pasang lantai ubin teraso akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.8.1
11.870 Bh Ubin teraso 30 x 30 cm @ Rp. 80,850.00 = Rp
10.000 Kg Semen portland @ Rp. 104,500.00 = Rp
0.0215 m3 Pasir pasang @ Rp. 104,500.00 = Rp
1.540 Kg Semen warna @ Rp. 187,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.260 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
9. 1 m2 Pasang lantai ubin granito akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.9.1
6.930 Bh Ubin granito 40 x 40 cm @ Rp. 13,200.00 = Rp
9.800 Kg Semen portland @ Rp. 19,800.00 = Rp
0.0215 m3 Pasir pasang @ Rp. 19,800.00 = Rp
1.300 Kg Semen warna @ Rp. 990.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
10. 1 m2 Pasang lantai ubin granito akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.10.1
11.870 Bh Ubin granito 30 x 30 cm @ Rp. #REF! = Rp
10.000 Kg Semen portland @ Rp. #REF! = Rp
0.0215 m3 Pasir pasang @ Rp. #REF! = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.260 Oh Pekerja @ Rp. 30,000.00 = Rp
0.125 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.0130 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
11. 1 m2 Pasang lantai ubin teralux kerang akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.11.1
6.250 Bh Ubin teralux kerang 40 x 40 cm @ Rp. 14,850.00 = Rp
8.800 Kg Semen portland @ Rp. 10,450.00 = Rp
0.0215 m3 Pasir pasang @ Rp. 10,450.00 = Rp
1.300 Kg Semen warna @ Rp. 10,450.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.0120 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
12. 1 m2 Pasang lantai ubin teralux kerang akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.12.1
11.870 Bh Ubin teralux kerang 30 x 30 cm @ Rp. 16,500.00 = Rp
10.000 Kg Semen portland @ Rp. - = Rp
0.0215 m3 Pasir pasang @ Rp. - = Rp
1.125 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.0120 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
13. 1 m2 Pasang lantai ubin teralux marmer akuran 60 x 60 cm
Bahan An. SNI ( Revisi ) 6.13.1
5.600 Bh Ubin teralux marmer 60 x 60 cm @ Rp. 9,350.00 = Rp
8.190 Kg Semen portland @ Rp. 11,550.00 = Rp
0.045 m3 Pasir pasang @ Rp. 11,550.00 = Rp
1.000 Kg Semen warna @ Rp. Floor drains = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0125 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
14. 1 m2 Pasang lantai ubin teralux marmer akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.14.1
6.250 Bh Ubin teralux marmer 40 x 40 cm @ Rp. #REF! = Rp
8.800 Kg Semen portland @ Rp. 4,000.00 = Rp
0.0215 m3 Pasir pasang @ Rp. 4,000.00 = Rp
1.300 Kg Semen warna @ Rp. Las Doof = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.672 Oh Pekerja @ Rp. 30,000.00 = Rp
0.224 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.022 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0340 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
15. 1 m2 Pasang lantai ubin teralux marmer akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.15.1
11.870 Bh Ubin teralux marmer 30 x 30 cm @ Rp. 1,068,000.00 = Rp
10.000 Kg Semen portland @ Rp. #REF! = Rp
0.0215 m3 Pasir pasang @ Rp. #REF! = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.700 Oh Pekerja @ Rp. 30,000.00 = Rp
0.340 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.034 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0350 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m' Pasang plint ubin pc abu-abu akuran 15 x 20 cm
Bahan An. SNI ( Revisi ) 6.16.1
5.300 Bh Plint ubin 15 x 20 cm @ Rp. - = Rp
1.560 Kg Semen portland @ Rp. - = Rp
0.004 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m' Pasang plint ubin pc abu-abu akuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.17.1
3.530 Bh Plint ubin 10 x 30 cm @ Rp. - = Rp
1.560 Kg Semen portland @ Rp. - = Rp
0.003 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m' Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.18.1
2.650 Bh Plint ubin 10 x 40 cm @ Rp. - = Rp
1.560 Kg Semen portland @ Rp. - = Rp
0.003 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m' Pasang plint ubin pc warna ukuran 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.19.1
5.300 Bh Plint ubin pc warna 10 x 20 cm @ Rp. - = Rp
1.200 Kg Semen portland @ Rp. - = Rp
0.003 m3 Pasir pasang @ Rp. - = Rp
0.190 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m' Pasang plint ubin pc warna ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.20.1
3.330 Bh Plint ubin pc warna 10 x 30 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m' Pasang plint ubin pc warna ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.21.1
2.650 Bh Plint ubin pc warna 10 x 40 cm @ Rp. - = Rp
1.200 Kg Semen portland @ Rp. - = Rp
0.0030 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.080 Oh Pekerja @ Rp. 30,000.00 = Rp
0.040 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.004 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
22. 1 m' Pasang plint ubin teraso ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.22.1
3.530 Bh Plint ubin teraso 10 x 30 cm @ Rp. - = Rp
1.560 Kg Semen portland @ Rp. - = Rp
0.0030 m3 Pasir pasang @ Rp. - = Rp
0.190 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.080 Oh Pekerja @ Rp. 30,000.00 = Rp
0.040 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.004 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
23. 1 m' Pasang plint ubin teraso ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.23.1
2.650 Bh Plint ubin teraso 10 x 40 cm @ Rp. - = Rp
1.200 Kg Semen portland @ Rp. - = Rp
0.0030 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.080 Oh Pekerja @ Rp. 30,000.00 = Rp
0.040 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.004 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.004 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
24. 1 m' Pasang plint ubin granito ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.24.1
2.650 Bh Plint ubin granito 10 x 40 cm @ Rp. - = Rp
1.200 Kg Semen portland @ Rp. - = Rp
0.0030 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.060 Oh Pekerja @ Rp. 30,000.00 = Rp
0.030 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.003 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
25. 1 m' Pasang plint ubin granito ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.25.1
3.330 Bh Plint ubin granito 10 x 30 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.25.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
26. 1 m' Pasang plint ubin teralux kerang ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.26.1
2.500 Bh Plint ubin teralux kerang 10 x 40 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.26.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
27. 1 m' Pasang plint ubin teralux kerang ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.27.1
3.330 Bh Plint ubin teralux kerang 10 x 30 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.27.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
28. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 60 cm
Bahan An. SNI ( Revisi ) 6.28.1
1.700 Bh Plint ubin teralux marmer 10 x 60 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.28.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
29. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.29.1
2.500 Bh Plint ubin teralux marmer 10 x 40 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.29.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
30. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.30.1
3.330 Bh Plint ubin teralux marmer 10 x 30 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.30.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
31. 1 m2 Pasang teraso cor ditempat
Bahan An. SNI ( Revisi ) 6.31.1
0.0036 m3 Bahan teraso cor @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.31.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
32. 1 m2 Pasang teralux cor ditempat, tebal 3 cm
Bahan An. SNI ( Revisi ) 6.32.1
0.0036 m3 Bahan teralux cor @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.32.2
0.900 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
33. 1 m2 Pasang ubin tahan asam
Bahan An. SNI ( Revisi ) 6.33.1
1.050 m3 Ubin tahan asam @ Rp. - = Rp
14.140 Kg Semen tahan asam @ Rp. - = Rp
0.040 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.33.2
0.270 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0135 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
34. 1 m2 Pasang lantai keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.34.1
50.000 Bh Ubin keramik artistik 10x20 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.34.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
35. 1 m2 Pasang lantai keramik artistik 10 x 10 cm
Bahan An. SNI ( Revisi ) 6.35.1
100.000 Bh Ubin keramik artistik 10x10 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
2.000 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.35.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
36. 1 m2 Pasang lantai keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.36.1
100.000 Bh Ubin keramik artistik 5x20 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.36.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
37. 1 m' Pasang plint keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.37.1
5.000 Bh Plint keramik artistik 10x20 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.100 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.37.2
0.090 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
38. 1 m' Pasang plint keramik artistik 10 x 10 cm
Bahan An. SNI ( Revisi ) 6.38.1
10.000 Bh Plint keramik artistik 10x10 cm @ Rp. - = Rp
1.650 Kg Semen portland @ Rp. - = Rp
0.0032 m3 Pasir pasang @ Rp. - = Rp
0.120 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.38.2
0.090 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
39. 1 m' Pasang plint keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.39.1
5.000 Bh Plint keramik artistik 5x20 cm @ Rp. - = Rp
0.850 Kg Semen portland @ Rp. - = Rp
0.0022 m3 Pasir pasang @ Rp. - = Rp
0.080 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.39.2
0.090 Oh Pekerja @ Rp. 30,000.00 = Rp
0.090 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.009 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0045 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
40. 1 m' Internal cove artistik ( 5 x 5 x 20 ) cm
Bahan An. SNI ( Revisi ) 6.40.1
10.000 Bh Internal cove ( 5x5x20 ) cm @ Rp. - = Rp
1.415 Kg Semen portland @ Rp. - = Rp
0.0390 m3 Pasir pasang @ Rp. - = Rp
1.200 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.40.2
0.750 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0375 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
41. 1 m' Pasang plint vinyl tanpa adukan
Bahan An. SNI ( Revisi ) 6.41.1
3.500 Bh Lt vinyl karet 30x30 KW 1 @ Rp. - = Rp
0.080 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.41.2
0.080 Oh Pekerja @ Rp. 30,000.00 = Rp
0.080 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0040 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
42. 1 m2 Pasang lantai keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.42.1
50.000 Bh Ubin keramik 10x20 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.42.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
43. 1 m2 Pasang lantai keramik 15 x 15 cm
Bahan An. SNI ( Revisi ) 6.43.1
44.000 Bh Ubin keramik 15x15 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.43.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
44. 1 m2 Pasang lantai keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.44.1
26.500 Bh Ubin keramik 20x20 cm @ Rp. 1,628.00 = Rp
11.380 Kg Semen portland @ Rp. 1,188.00 = Rp
0.0420 m3 Pasir pasang @ Rp. 90,000.00 = Rp
1.500 Kg Semen warna @ Rp. 1,452.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.44.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
45. 1 m2 Pasang lantai keramik 25 x 25 cm
Bahan An. SNI ( Revisi ) 6.45.1
16.000 Bh Ubin keramik 25x25 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.45.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
46. 1 m2 Pasang lantai keramik 15 x 20 cm
Bahan An. SNI ( Revisi ) 6.46.1
35.000 Bh Ubin keramik 15x20 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.46.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
47. 1 m2 Pasang lantai keramik 33 x 33 cm
Bahan An. SNI ( Revisi ) 6.47.1
10.000 Bh Ubin keramik 33x33 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.47.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
48. 1 m2 Pasang lantai keramik 33 x 33 cm anti slip
Bahan An. SNI ( Revisi ) 6.48.1
10.000 Bh Ubin keramik 33x33 cm anti slip @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.48.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
49. 1 m2 Pasang lantai keramik 10 x 33 cm
Bahan An. SNI ( Revisi ) 6.49.1
33.000 Bh Ubin keramik 10x33 cm @ Rp. - = Rp
11.380 Kg Semen portland @ Rp. - = Rp
0.0420 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.49.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
50. 1 m2 Pasang lantai mosaik 30 x 30 cm, lokal
Bahan An. SNI ( Revisi ) 6.50.1
12.000 Bh Mosaik 30x30cm @ Rp. - = Rp
14.150 Kg Semen portland @ Rp. - = Rp
0.0390 m3 Pasir pasang @ Rp. - = Rp
2.000 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.50.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
51. 1 m2 Pasang lantai marmer
Bahan An. SNI ( Revisi ) 6.51.1
1.052 m2 Mosaik 30x30cm @ Rp. - = Rp
14.150 Kg Semen portland @ Rp. - = Rp
0.0390 m3 Pasir pasang @ Rp. - = Rp
2.000 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.51.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
52. 1 m2 Pasang lantai karper 100% wool
Bahan An. SNI ( Revisi ) 6.52.1
1.050 m2 Feltex carpet 100% T-21 @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.52.2
0.170 Oh Pekerja @ Rp. 30,000.00 = Rp
0.170 Oh Tukang @ Rp. 40,000.00 = Rp
0.017 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0085 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
53. 1 m2 Pasang lantai karper 80% wool, 20% nylon
Bahan An. SNI ( Revisi ) 6.53.1
1.050 m2 Carpet 80% wool, 20% nylon @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.53.2
0.170 Oh Pekerja @ Rp. 30,000.00 = Rp
0.170 Oh Tukang @ Rp. 40,000.00 = Rp
0.017 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0085 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
54. 1 m2 Pasang underlyer, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.54.1
1.050 m2 Underlyer/rubber corrugated, 6 mm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.54.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0060 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
55. 1 m2 Pasang lantai karper
Bahan An. SNI ( Revisi ) 6.55.1
1.050 m2 Carpet @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.55.2
0.170 Oh Pekerja @ Rp. 30,000.00 = Rp
0.170 Oh Tukang @ Rp. 40,000.00 = Rp
0.017 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0085 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
56. 1 m2 Pasang lantai parquet jati
Bahan An. SNI ( Revisi ) 6.56.1
1.050 m2 Parquet jati @ Rp. - = Rp
0.600 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.56.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0325 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
57. 1 m2 Pasang gymfloor
Bahan An. SNI ( Revisi ) 6.57.1
1.050 m2 Gymfloor @ Rp. - = Rp
0.600 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.57.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0325 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
58. 1 m2 Pasang dinding porselin 11 x 11 cm, putih
Bahan An. SNI ( Revisi ) 6.58.1
83.000 Bh Porselin 11x11 cm @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.58.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
59. 1 m2 Pasang dinding porselin 11 x 11 cm, warna
Bahan An. SNI ( Revisi ) 6.59.1
83.000 Bh Porselin 11x11 cm, warna @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.59.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
60. 1 m2 Pasang dinding porselin 15 x 15 cm, putih
Bahan An. SNI ( Revisi ) 6.60.1
45.000 Bh Porselin 15x15 cm, putih @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.60.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
61. 1 m2 Pasang dinding porselin 15 x 15 cm, warna
Bahan An. SNI ( Revisi ) 6.61.1
45.000 Bh Porselin 15x15 cm, warna @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.61.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
62. 1 m2 Pasang dinding porselin 10 x 20 cm, warna
Bahan An. SNI ( Revisi ) 6.62.1
50.000 Bh Porselin 10x20 cm, warna @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.62.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
63. 1 m2 Pasang dinding porselin 20 x 20 cm, warna
Bahan An. SNI ( Revisi ) 6.63.1
25.000 Bh Porselin 20x20 cm, warna @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.63.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
64. 1 m2 Pasang dinding keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.64.1
50.000 Bh Keramik artistik 10x20 cm @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.64.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
65. 1 m2 Pasang dinding keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.65.1
100.000 Bh Keramik artistik 5x20 cm @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.65.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
66. 1 m2 Pasang dinding keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.66.1
50.000 Bh Keramik 10x20 cm @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.66.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
67. 1 m2 Pasang dinding keramik 15 x 15 cm
Bahan An. SNI ( Revisi ) 6.67.1
45.000 Bh Keramik 15x15 cm @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.67.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
68. 1 m2 Pasang dinding keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.68.1
26.500 Bh Keramik 20x20 cm @ Rp. 1,628.00 = Rp
9.300 Kg Semen portland @ Rp. 1,188.00 = Rp
0.0180 m3 Pasir pasang @ Rp. 90,000.00 = Rp
1.500 Kg Semen warna @ Rp. 1,452.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.68.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
69. 1 m2 Pasang dinding keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.69.1
50.000 Bh Keramik 10x20 cm @ Rp. - = Rp
9.300 Kg Semen portland @ Rp. - = Rp
0.0180 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.69.2
0.600 Oh Pekerja @ Rp. 30,000.00 = Rp
0.450 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.045 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
70. 1 m2 Pasang dinding marmer
Bahan An. SNI ( Revisi ) 6.70.1
1.020 m2 Marmer @ Rp. - = Rp
2.000 Bh Paku pancing 60x230 @ Rp. - = Rp
12.440 Kg Semen portland @ Rp. - = Rp
0.0250 m3 Pasir pasang @ Rp. - = Rp
1.500 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.70.2
0.720 Oh Pekerja @ Rp. 30,000.00 = Rp
0.650 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.065 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0350 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
71. 1 m2 Pasang dinding bata pelapis 7 x 3 x 24 cm
Bahan An. SNI ( Revisi ) 6.71.1
60.000 Bh Bata pelapis dinding @ Rp. - = Rp
12.440 Kg Semen portland @ Rp. - = Rp
0.0250 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.71.2
0.650 Oh Pekerja @ Rp. 30,000.00 = Rp
0.500 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
72. 1 m2 Pasang dinding bata klinker 5 x 5 x 24 cm
Bahan An. SNI ( Revisi ) 6.72.1
80.000 Bh Bata pelapis klinker @ Rp. - = Rp
12.440 Kg Semen portland @ Rp. - = Rp
0.0250 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.72.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
73. 1 m2 Pasang dinding batu paros
Bahan An. SNI ( Revisi ) 6.73.1
1.050 m2 Batu paros @ Rp. - = Rp
11.750 Kg Semen portland @ Rp. - = Rp
0.0350 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.73.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
74. 1 m2 Pasang dinding batu tempel hitam
Bahan An. SNI ( Revisi ) 6.74.1
1.050 m2 Batu tempel hitam @ Rp. - = Rp
11.750 Kg Semen portland @ Rp. - = Rp
0.0350 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.74.2
0.620 Oh Pekerja @ Rp. 30,000.00 = Rp
0.350 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.035 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0300 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
75. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL 1
Bahan An. SNI ( Revisi ) 6.75.1
11.050 Bh Vinyl karet 30x30 cm KL1 @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.75.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
76. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL 2
Bahan An. SNI ( Revisi ) 6.76.1
11.050 Bh Vinyl karet 30x30 cm KL2 @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.76.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
77. 1 m2 Pasang lantai vinyl asbes 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.77.1
11.050 Bh Vinyl asbes 30x30 cm @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.77.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
78. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.78.1
11.050 Bh Vinyl mtf kembang 30x30 cm ex DN @ Rp. - = Rp
0.350 Kg Lem vinyl @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.78.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.150 Oh Tukang @ Rp. 40,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
79. 1 m2 Pasang wall covering lebar 50 cm
Bahan An. SNI ( Revisi ) 6.79.1
1.100 m2 Vinyl wall covering, 50 cm @ Rp. - = Rp
0.250 Kg Lem @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.79.2
0.750 Oh Pekerja @ Rp. 30,000.00 = Rp
0.170 Oh Tukang @ Rp. 40,000.00 = Rp
0.017 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0085 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
80. 1 m2 Floor hardener ferrovax
Bahan An. SNI ( Revisi ) 6.80.1
3.000 Kg Floor hardener ferrovax @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.80.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0060 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
81. 1 m2 Floor hardener mastercron
Bahan An. SNI ( Revisi ) 6.81.1
5.000 Kg Mastercron "S" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.81.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang batu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0060 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
82. 1 m2 Plint kayu 2 x 10 cm
Bahan An. SNI ( Revisi ) 6.82.1
0.0024 m3 Kayu jati, papan @ Rp. - = Rp
0.050 Kg Paku skrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.82.2
0.120 Oh Pekerja @ Rp. 30,000.00 = Rp
0.120 Oh Tukang kayu @ Rp. 40,000.00 = Rp
0.012 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0060 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
-
-
-
-

7,500.00
5,000.00
600.00
750.00
13,850.00
13,850.00

59,350.00
11,880.00
1,935.00
73,165.00

7,800.00
5,000.00
625.00
780.00
14,205.00
87,370.00

21,200.00
12,355.20
1,215.00
34,770.20

8,100.00
5,200.00
650.00
810.00
14,760.00
49,530.20

44,973.50
9,694.08
2,070.00
1,069.20
57,806.78

7,500.00
4,800.00
600.00
750.00
13,650.00
71,456.78

40,358.00
9,931.68
2,070.00
1,069.20
53,428.88
7,500.00
4,800.00
600.00
750.00
13,650.00
67,078.88

23,850.00
491,436.00
1,290.30
89,100.00
605,676.30

8,100.00
5,200.00
650.00
810.00
14,760.00
620,436.30

99,687.50
140,360.00
342.93
14,355.00
254,745.43

7,500.00
4,800.00
600.00
750.00
13,650.00
268,395.43

959,689.50
1,045,000.00
2,246.75
287,980.00
2,294,916.25

7,800.00
5,000.00
625.00
750.00
14,175.00
2,309,091.25
91,476.00
194,040.00
425.70
1,287.00
287,228.70

7,500.00
4,800.00
600.00
750.00
13,650.00
300,878.70
#REF!
#REF!
#REF!
-
#REF!

7,800.00
5,000.00
650.00
750.00
14,200.00
#REF!

92,812.50
91,960.00
224.68
13,585.00
198,582.18

7,500.00
4,800.00
600.00
750.00
13,650.00
212,232.18

195,855.00
-
-
-
195,855.00

7,500.00
4,800.00
600.00
750.00
13,650.00
209,505.00

52,360.00
94,594.50
519.75
#VALUE!
#VALUE!
7,500.00
4,800.00
600.00
750.00
13,650.00
#VALUE!

#REF!
35,200.00
86.00
#VALUE!
#REF!

20,160.00
8,960.00
1,100.00
2,040.00
32,260.00
#REF!

12,677,160.00
#REF!
#REF!
-
#REF!

21,000.00
13,600.00
1,700.00
2,100.00
38,400.00
#REF!

-
-
-
-

1,800.00
1,200.00
150.00
180.00
3,330.00
3,330.00
-
-
-
-

1,800.00
1,200.00
150.00
180.00
3,330.00
3,330.00

-
-
-
-

1,800.00
1,200.00
150.00
180.00
3,330.00
3,330.00
-
-
-
-
-

1,800.00
1,200.00
150.00
180.00
3,330.00
3,330.00

-
-
-
-
-

1,800.00
1,200.00
150.00
180.00
3,330.00
3,330.00

-
-
-
-
-

2,400.00
1,600.00
200.00
240.00
4,440.00
4,440.00

-
-
-
-
-
2,400.00
1,600.00
200.00
240.00
4,440.00
4,440.00

-
-
-
-
-

2,400.00
1,600.00
200.00
240.00
4,440.00
4,440.00

-
-
-
-
-

1,800.00
1,200.00
150.00
180.00
3,330.00
3,330.00

-
-
-
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00
-
-
-
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00

-
-
-
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00

-
-
-
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00

-
-
-
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00

-
-
-
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00

-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00
-
-

27,000.00
3,600.00
450.00
270.00
31,320.00
31,320.00

-
-
-
-

8,100.00
6,000.00
750.00
810.00
15,660.00
15,660.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-
18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

2,700.00
3,600.00
450.00
270.00
7,020.00
7,020.00

-
-
-
-
-

2,700.00
3,600.00
450.00
270.00
7,020.00
7,020.00

-
-
-
-
-

2,700.00
3,600.00
450.00
270.00
7,020.00
7,020.00
-
-
-
-
-

22,500.00
18,000.00
2,250.00
2,250.00
45,000.00
45,000.00

-
-
-

2,400.00
3,200.00
400.00
240.00
6,240.00
6,240.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

43,142.00
13,519.44
3,780.00
2,178.00
62,619.44

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
98,769.44

-
-
-
-
-
18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00
-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-

5,100.00
6,800.00
850.00
510.00
13,260.00
13,260.00

-
-
-

5,100.00
6,800.00
850.00
510.00
13,260.00
13,260.00
-
-

3,600.00
4,800.00
600.00
360.00
9,360.00
9,360.00

-
-
-

5,100.00
6,800.00
850.00
510.00
13,260.00
13,260.00

-
-
-

19,500.00
14,000.00
1,750.00
1,950.00
37,200.00
37,200.00

-
-
-

19,500.00
14,000.00
1,750.00
1,950.00
37,200.00
37,200.00
-
-
-
-
-

18,600.00
20,000.00
2,500.00
1,800.00
42,900.00
42,900.00
-
-
-
-
-

18,600.00
20,000.00
2,500.00
1,800.00
42,900.00
42,900.00

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-
18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00
-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

43,142.00
11,048.40
1,620.00
2,178.00
57,988.40

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
98,038.40

-
-
-
-
-

18,000.00
18,000.00
2,250.00
1,800.00
40,050.00
40,050.00

-
-
-
-
-
-

21,600.00
26,000.00
3,250.00
2,100.00
52,950.00
52,950.00

-
-
-
-

19,500.00
20,000.00
2,500.00
1,800.00
43,800.00
43,800.00

-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-
-

18,600.00
14,000.00
1,750.00
1,800.00
36,150.00
36,150.00

-
-
-

4,500.00
6,000.00
750.00
450.00
11,700.00
11,700.00

-
-
-

4,500.00
6,000.00
750.00
450.00
11,700.00
11,700.00
-
-
-

4,500.00
6,000.00
750.00
450.00
11,700.00
11,700.00

-
-
-

4,500.00
6,000.00
750.00
450.00
11,700.00
11,700.00

-
-
-

22,500.00
6,800.00
850.00
510.00
30,660.00
30,660.00

-
-

3,600.00
4,800.00
600.00
360.00
9,360.00
9,360.00

-
-
3,600.00
4,800.00
600.00
360.00
9,360.00
9,360.00
-
-
-

3,600.00
4,800.00
600.00
360.00
9,360.00
9,360.00
PEKERJAAN PENGECATAN
1. 1 m2 Mengikis/mengerok permukaan cat tembok lama
Bahan An. SNI ( Revisi ) 6.1.1
0.050 Kg Soda api @ Rp. 9,900.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0 Oh Tukang cat @ Rp. 40,000.00 = Rp
0 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
Bahan An. SNI ( Revisi ) 6.2.1
0.050 Kg Sabun @ Rp. Sirtu = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0 Oh Tukang cat @ Rp. 40,000.00 = Rp
0 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Bahan An. SNI ( Revisi ) 6.3.1
0.050 Kg Sabun @ Rp. Koral Beton 1/2 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0 Oh Tukang cat @ Rp. 40,000.00 = Rp
0 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Menyabun permukaan tembok lama
Bahan An. SNI ( Revisi ) 6.4.1
0.050 Kg Sabun @ Rp. Kapur gamping = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0 Oh Tukang cat @ Rp. 40,000.00 = Rp
0 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting )
dengan tingkat kebersihan Sa 2.5%
Bahan An. SNI ( Revisi ) 6.5.1
40.000 Kg Pasir silika @ Rp. Kayu reng jati 2/3 = Rp
10.000 Ltr B B M @ Rp. Kayu Kamfer balok 8/12, 6 = Rp
= Rp
Alat An. SNI ( Revisi ) 6.5.2
Sewa / hari Kompressor, blasting pot, @ Rp. - = Rp
selang dan nozle
= Rp
Upah An. SNI ( Revisi ) 6.5.3
1.600 Oh Pekerja @ Rp. 30,000.00 = Rp
1.600 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.800 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.500 Oh Mandor @ Rp. 60,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Mendempul dan menggosok kayu
Bahan An. SNI ( Revisi ) 6.6.1
0.080 Kg Dempul jati @ Rp. - = Rp
0.020 Kg Minyak cat @ Rp. - = Rp
0.010 Kg Batu apung @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.040 Oh Pekerja @ Rp. 30,000.00 = Rp
0.040 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.004 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
7. 1 m2 Pengecatan bidang kayu lama
Bahan An. SNI ( Revisi ) 6.7.1
0.150 Kg Plamir @ Rp. 14,850.00 = Rp
0.170 Kg Cat dasar @ Rp. 41,800.00 = Rp
0.170 Kg Cat penutup @ Rp. 41,800.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp
0.075 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0075 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
8. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.8.1
0.200 Kg Cat meni @ Rp. 15,400.00 = Rp
0.150 Kg Plamir @ Rp. 14,850.00 = Rp
0.170 Kg Cat dasar @ Rp. 41,800.00 = Rp
0.260 Kg Cat penutup 2x @ Rp. 41,800.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp
0.009 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0060 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
9. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 3x cat penutup )
Bahan An. SNI ( Revisi ) 6.9.1
0.200 Kg Cat meni @ Rp. 15,400.00 = Rp
0.150 Kg Plamir @ Rp. 14,850.00 = Rp
0.170 Kg Cat dasar @ Rp. 41,800.00 = Rp
0.350 Kg Cat penutup 2x @ Rp. 41,800.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja @ Rp. 30,000.00 = Rp
0.105 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0040 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
10. 1 m2 Pelaburan bidang kayu dengan teak oil
Bahan An. SNI ( Revisi ) 6.10.1
0.360 Ltr Teak oil @ Rp. Genteng bubungan Nglayu = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.040 Oh Pekerja @ Rp. 30,000.00 = Rp
0.063 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0630 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
11. 1 m2 Pelaburan bidang kayu dengan politur
Bahan An. SNI ( Revisi ) 6.11.1
0.150 Ltr Politur @ Rp. - = Rp
0.372 Ltr Politur jadi @ Rp. - = Rp
2.000 Lbr Ampelas @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.000 Oh Pekerja @ Rp. 30,000.00 = Rp
0.060 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0160 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
12. 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Ltr Residu atau ter @ Rp. Kolter = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.100 Oh Pekerja @ Rp. 30,000.00 = Rp
0.000 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0000 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0060 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
13. 1 m2 Pelaburan bidang kayu dengan vernis
Bahan An. SNI ( Revisi ) 6.13.1
0.150 Ltr Vernis @ Rp. Kunci "ANCHOR" 2 x tan = Rp
0.050 Kg Dempul @ Rp. Kunci "KUDA TERBANG" 2= Rp
0.100 Lbr Ampelas @ Rp. Engsel Nylon "ARCH" asli = Rp
0.010 Bh Kuas @ Rp. Engsel jendela = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.160 Oh Pekerja @ Rp. 30,000.00 = Rp
0.160 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0160 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
14. 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir @ Rp. 15,400.00 = Rp
0.100 Kg Cat dasar @ Rp. 12,100.00 = Rp
0.260 Kg Cat penutup 2x @ Rp. 11,880.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja @ Rp. 30,000.00 = Rp
0.063 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0063 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
15. 1 m2 Pengecatan tembok lama ( 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.15.1
0.120 Kg Cat dasar @ Rp. 12,100.00 = Rp
0.180 Kg Cat penutup 2x @ Rp. 11,880.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.028 Oh Pekerja @ Rp. 30,000.00 = Rp
0.042 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0042 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
16. 1 m2 Melabur tembok dengan kalkarium
Bahan An. SNI ( Revisi ) 6.16.1
0.100 Kg Kalkarium @ Rp. Kabel NYA 1000 Volt 1,5 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.028 Oh Pekerja @ Rp. - = Rp
0.042 Oh Tukang cat @ Rp. - = Rp
0.0042 Oh Kepala tukang @ Rp. - = Rp
0.0025 Oh Mandor @ Rp. - = Rp
. = Rp
Total harga = Rp
17. 1 m2 Melabur tembok dengan kapur sirih
Bahan An. SNI ( Revisi ) 6.17.1
0.100 Lbr Ampelas @ Rp. Tukang Batu = Rp
0.250 Ikt Alang-alang @ Rp. Tukang kayu = Rp
0.002 m3 Perancah kayu @ Rp. Kepala Tukang = Rp
0.150 Kg Kapur sirih @ Rp. Tukang Cat = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.150 Oh Pekerja @ Rp. 30,000.00 = Rp
0.001 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0001 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
18. 1 m2 Melabur tembok lama dengan kapur sirih ( untuk pemeliharaan )
Bahan An. SNI ( Revisi ) 6.18.1
0.002 m3 Perancah kayu @ Rp. - = Rp
0.300 Kg Kapur sirih @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.040 Oh Pekerja @ Rp. 30,000.00 = Rp
0.005 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0005 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
19. 1 m2 Pemasangan wallpaper
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m2 Wall paper @ Rp. - = Rp
0.200 Kg Perekat @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.020 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0020 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0025 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
20. 1 m2 Pengecatan permukaan baja dengan meni besi
Bahan An. SNI ( Revisi ) 6.20.1
0.100 Kg Meni besi @ Rp. - = Rp
0.010 Bh Kuas @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.020 Oh Pekerja @ Rp. 30,000.00 = Rp
0.200 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0200 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0100 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
21. 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah
Bahan An. SNI ( Revisi ) 6.21.1
0.100 Kg Meni besi @ Rp. - = Rp
0.010 Bh Kuas @ Rp. - = Rp
0.002 m3 Perancah kayu @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.250 Oh Pekerja @ Rp. 30,000.00 = Rp
0.225 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
22. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 4 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.22.1
0.100 Kg Meni ( read lead ) A @ Rp. - = Rp
0.100 Kg Meni ( read lead ) B @ Rp. - = Rp
0.040 Kg Alluminium C @ Rp. - = Rp
0.040 Kg Alluminium B @ Rp. - = Rp
0.010 Ltr Pengencer @ Rp. - = Rp
0.002 m3 Perancah kayu @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.006 Oh Pekerja @ Rp. 30,000.00 = Rp
0.006 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0075 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
23. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.23.1
0.300 Kg C a t @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.006 Oh Pekerja @ Rp. 30,000.00 = Rp
0.060 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.0120 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.0060 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
24. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 3 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.24.1
0.110 Kg Cat dasar @ Rp. - = Rp
0.170 Kg Cat antara @ Rp. - = Rp
0.080 Kg Cat penutup @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.500 Oh Pekerja @ Rp. 30,000.00 = Rp
0.800 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.3000 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.2000 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
25. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara semprot ( airless spray )
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.25.1
0.300 Kg Cat dasar @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.25.2
0.400 Oh Pekerja @ Rp. 30,000.00 = Rp
0.700 Oh Tukang cat @ Rp. 40,000.00 = Rp
0.2000 Oh Kepala tukang @ Rp. 50,000.00 = Rp
0.2000 Oh Mandor @ Rp. 60,000.00 = Rp
. = Rp
Total harga = Rp
495.00
495.00

4,500.00
-
-
150.00
4,650.00
5,145.00

#VALUE!
#VALUE!

4,500.00
-
-
150.00
4,650.00
#VALUE!

#VALUE!
#VALUE!

4,500.00
-
-
150.00
4,650.00
#VALUE!

#VALUE!
#VALUE!

4,500.00
-
-
150.00
4,650.00
#VALUE!

#VALUE!
#VALUE!
#VALUE!

-
48,000.00
64,000.00
40,000.00
30,000.00
182,000.00
#VALUE!

-
-
-
-

1,200.00
1,600.00
200.00
150.00
3,150.00
3,150.00

2,227.50
7,106.00
7,106.00
16,439.50

2,100.00
3,000.00
375.00
150.00
5,625.00
22,064.50

3,080.00
2,227.50
7,106.00
10,868.00
23,281.50

2,100.00
360.00
300.00
150.00
2,910.00
26,191.50

3,080.00
2,227.50
7,106.00
14,630.00
27,043.50

2,100.00
4,200.00
200.00
150.00
6,650.00
33,693.50
#VALUE!
#VALUE!

1,200.00
2,520.00
3,150.00
150.00
7,020.00
#VALUE!

-
-
-
-

-
2,400.00
800.00
150.00
3,350.00
3,350.00

#VALUE!
#VALUE!

3,000.00
-
-
360.00
3,360.00
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

4,800.00
6,400.00
800.00
150.00
12,150.00
#VALUE!
1,540.00
1,210.00
3,088.80
5,838.80

600.00
2,520.00
315.00
150.00
3,585.00
9,423.80
1,452.00
2,138.40
3,590.40

840.00
1,680.00
210.00
150.00
2,880.00
6,470.40

#VALUE!
#VALUE!

-
-
-
-
-
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

4,500.00
40.00
5.00
150.00
4,695.00
#VALUE!

-
-
-

1,200.00
200.00
25.00
150.00
1,575.00
1,575.00
-
-
-

600.00
8,000.00
100.00
150.00
8,850.00
8,850.00
-
-
-

600.00
8,000.00
1,000.00
600.00
10,200.00
10,200.00

-
-
-
-

7,500.00
9,000.00
1,125.00
450.00
18,075.00
18,075.00

-
-
-
-
-
-
-

180.00
240.00
1,125.00
450.00
1,995.00
1,995.00

-
-

180.00
2,400.00
600.00
360.00
3,540.00
3,540.00

-
-
-
-
15,000.00
32,000.00
15,000.00
12,000.00
74,000.00
74,000.00

-
-

12,000.00
28,000.00
10,000.00
12,000.00
62,000.00
62,000.00
TENAGA KERJA DAN HARGA SATUAN MATERIAL / BAHAN SWAKELOLA

PROPINSI : JAWA TIMUR (35)


TAHUN ANGGARAN 2005
KABUPATEN : JOMBANG
K. 9
UPAH
No. TENAGA KERJA KODE TENAGA KERJA No. TENAGA KERJA KODE TENAGA KERJA
(Rp./Hari) (Rp./Hari)
1 Mandor lapangan L.061 60,000.00 8 Pembantu Operator L.083 40,000.00
2 Mekanik L.071 40,000.00 9 Supir Truk L.091 50,000.00
3 Mekanik Mekanik pembantu L.072 0.00 10 Pembantu supir L.099 40,000.00
4 Kepala tukang L.073 50,000.00 11 Buruh lapangan Tak terlatih L.101 30,000.00
5 Tukang L.079 40,000.00 12 Buruh lapangan Kurang terlatih L.103 0.00
6 Operator terlatih L.081 50,000.00 13 Buruh lapangan terlatih L.106 40,000.00
7 Operator kurang terlatih L.082 0.00
HARGA DISUM- JARAK ONGKOS JUMLAH
No. MATERIAL Satuan KODE BER/QUARRY ANGKUT ANGKUT HARGA KETERANGAN
(TANPA PAJAK) RATA-RATA PER UNIT (TANPA PAJAK)
(Rp) ( KM ) (Rp) (Rp)

1 Batu Gunung atau Quarry m3 M.010 99,000 10 10,000 109,000


2 Kerikil dari Galian Bukit m3 M.011 49,500 10 10,000 59,500
3 Kerikil sungai m3 M.012 49,500 10 10,000 59,500
4 Batu kali pondasi m3 M.013 99,000 10 10,000 109,000
5 Kerikil sungai ayak tnp.pasir 0,5-1 m3 M.014 49,500 10 10,000 59,500
6 Batu pecah 15-20 cm (tangan) m3 M.020 99,000 12 10,000 109,000
7 Batu pecah 10-15 cm (tangan) m3 M.020 99,000 12 10,000 109,000
8 Batu pecah 5 - 7 cm ( tangan) m3 M.022 99,000 10 10,000 109,000
9 Batu pecah 3 - 5 cm (mesin) m3 M.023 143,000 10 10,000 153,000
10 Batu pecah 2 - 3 cm (mesin) m3 M.024 165,000 10 10,000 175,000
11 Batu pecah 1 - 2 cm (mesin) m3 M.025 137,500 10 11,000 148,500
12 Batu pecah 05 - 1cm (mesin) m3 M.026 159,500 10 11,000 170,500
13 Pasir urug / timbun m3 M.040 82,500 10 5,000 87,500
14 Tanah urug m3 - 55,000 10 5,000 60,000
15 Split / grosok m3 - 83,500 10 6,000 89,500
16 Pasir ayak untuk beton m3 M.041 90,000 10 6,000 96,000
17 Sirtu ( tak diayak ) m3 M.042 83,500 10 6,000 89,500
18 Bahan timbunan pilihan m3 M.050 83,500 10 6,000 89,500
19 Aspal bitumen (kemasan drum) kg M.061 8,000 8,000
20 Aspal curah kg M.061 6,300 6,300
21 Minyak tanah lt M.065 7,700 7,700
22 Semen P.C. 40 Kg kg M.080 47,500 47,500
23 Semen P.C. 50 Kg kg M.080 59,400 59,400
24 Kapur m3 M.081 2,733,500 2,733,500
25 Kawat bendrat kg - 13,200 13,200
26 Paku jembatan kg M.166 13,200 13,200
27 Baja tulangan beton ( polos ) kg M.167 9,900 9,900
28 Baja tulangan mutu U 24 ( ulir ) kg M.167 9,900 9,900
29 Baja Konstruksi kg 15,950 15,950
29 Alat-alat bantu set M.170 82,000 82,000
30 Kayu untuk perancah m3 M.180 4,400,000 4,400,000
DAFTAR : BIAYA OPERASI PERALATAN PER JAM
TAHUN ANGGARAN 2005

NO. JENIS PERALATAN KAPASITAS UMUR HARGA HARGA


THN JAM ( Rp ) NAIK 1,21 KODE Rp/jam

1 Bulldozer 100 HP 8 9,600 285,884,000 345,919,640 E.001 161,000.00


2 Bulldozer 110 HP 8 9,600 314,472,000 380,511,120 E.001 176,000.00
3 Motor Grader 115 HP 8 12,000 257,130,000 311,127,300 E.010 144,000.00
4 Motor Grader 100 HP 8 12,000 223,600,000 270,556,000 E.010 162,000.00
5 Crusher 30 t / h 140 HP 10 15,000 485,641,000 587,625,610 E.031 244,000.00
6 Crusher 20 t / h 200 HP 10 15,000 692,772,000 838,254,120 E.031 318,000.00
7 Screening Plant 80 HP 8 12,000 170,400,000 206,184,000 E.040 85,800.00
8 Loader Tracked 135 HP 8 12,000 128,683,000 155,706,430 E.052 193,000.00
9 Loader Wheeled 115 HP 8 12,000 184,983,000 223,829,430 E.052 145,000.00
10 Weel Tractor 60 HP 60 HP 8 12,000 96,512,870 116,780,572 E.053 75,652.17
11 Roller 3 wheel 6-8 ton 51 HP 10 15,000 108,566,000 131,364,860 E.080 81,000.00
12 Roller 3 wheel 6-10 ton 40 HP 10 15,000 153,012,000 185,144,520 E.081 68,000.00
13 Pneumatic Roller 8-15 ton 95 HP 10 15,000 221,037,000 267,454,770 E.084 143,000.00
14 Vibrator Roller 1000 kg 7 HP 6 7,200 3,333,000 4,032,930 E.087 15,540.00
15 Plate Vibrator Tamper 4 HP 6 4,500 5,375,000 6,503,750 E.088 13,490.00
16 Concrete Vibrator 4 HP 5 3,000 3,362,000 4,068,020 E.089 13,090.00
17 Asphalt Sprayer towed 1000 L 7 HP 6 4,500 46,788,000 56,613,480 E.153 27,330.00
18 Asphalt Mixing Plat 30 t/h 125 HP 10 12,000 841,764,000 1,018,534,440 E.155 419,290.00
19 Asphalt Finisher 30 HP 7 8,400 100,900,000 122,089,000 E.157 92,000.00
20 Water Tank Truck 115 HP 6 9,000 57,140,000 69,139,400 E.182 130,000.00
21 Water Tank Truck 68 HP 6 9,000 33,787,000 40,882,270 E.182 79,600.00
22 Dump Truck 3,5 ton 106 HP 6 9,000 80,000,000 96,800,000 E.211 120,000.00
23 Dump Truck 5 ton 145 HP 6 9,000 92,853,000 112,352,130 E.212 163,000.00
24 Flat Bed Truck 4 ton 80 HP 6 9,000 67,552,000 81,737,920 E.221 107,000.00
25 Motor Grader 100 HP 8 12,000 223,590,000 270,543,900 E.010 144,000.00
26 Concrete Mixer 0,25 m3 10 HP 5 7,500 4,200,000 5,082,000 E.252 12,000.00
27 Compressor air, air 210 m3 20 HP 8 6,000 47,303,000 57,236,630 E.301 52,200.00
28 Water Pump ( 5 cm) 8 HP 4 3,000 2,725,000 3,297,250 E.341 14,330.00
29 Concrete Mixer 0,125 m3 10 HP 5 7,500 2,100,000 2,541,000 E.251 12,310.00
30 Concrete Mixer 0,500 m3 10 HP 5 7,500 8,400,000 10,164,000 E.253 4,406.30
31 Asphalt Sprayer towed 400 L 7 HP 6 4,500 18,715,000 22,645,150 E.154 22,290.00
32 Concrete Mixer 0,150 m3 10 HP 5 7,500 2,520,000 3,049,200 E.251 12,000.00
33 Asphalt Sprayer towed 350 L 7 HP 6 4,500 16,376,000 19,814,960 E.154 16,000.00
34 Asphalt Sprayer towed 200 L 7 HP 6 4,500 15,358,000 18,583,180 E.154 15,000.00
35 Dump Truck 3,5 ton 44 HP 6 9,000 22,610,000 27,358,100 E.211 130,000.00
36 Dump Truck bak terb.3,5 ton 115 HP 6 9,000 59,108,000 71,520,680 E.221 36,004.47
37 Motor Grader 110 HP 8 12,000 245,950,000 297,599,500 E.010 157,000.00
38 Dump Truck 3,5 ton 115 HP 6 9,000 86,792,000 105,018,320 E.211 43,900.00
39 Perataan tractor dll 100 HP 8 12,000 75,471,304 91,320,278 E.401 38,173.91
40 Excavator (1.0 m3) 90 HP 8 12,000 875,700,000 E.020 218,400.00
ANALISA HARGA SATUAN
KODE

MARKA JALAN MJ
( MENGGUNAKAN BURUH )

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (2/8) JOMBANG (17) Dinas Pras. Jal.
PROSES : ANGGAPAN / ASUMSI :

1. Permukaan jalan dibersihkan dari debu / kotoran 1. Pekerjaan dilakukan secara manual
2. Cat disemprotkan dengan compresor diatas mal triple 2. Lokasi pekerjaan di sepanjang jalan
yang dipasang dipermukaan jalan 3. Bahan-bahan seluruhnya diterima dilokasi pekerjaan
3 Glas bit berikan segera setelah cat marka jalan 4. Produksi 8 m2 / 1 hari / 1 kelompok.
selesai disemprotkan 5. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL. Upah B IAYA SUB. JUMLAH
(org/hari) (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 1 1 L.061 1 60,000.00 60,000.00


Tukang 2 1 L.079 2 40,000.00 80,000.00
Buruh tak terampil 6 2 L.101 6 30,000.00 180,000.00

PEKERJA 320,000.00
MAT E R IAL SATU- KODE TOTAL HARGA B IAYA SUB. JUMLAH
AN VOL (Rp./ unit) (Rp.) (Rp.)

Cat thermoplastic Kg 1.50 60,000.00 90,000.00


Minyak pencair ( thiner ) Ltr 0.20 2,750.00 550.00
Glas bit Kg 4.00 25,000.00 100,000.00
Alat bantu (set @ 3 alat) set M.170 0.20 82,000.00 16,400.00

MATERIAL 206,950.00
P E RALATAN JUM- HARI KODE JAM HARGA B IAYA SUB. JUMLAH
LAH KERJA (Rp./jam) (Rp.) (Rp.)

Compresor 1 2 E.301 4 52,200.00 208,800.00

Flat bed truck 3,5 1 2 E.221 2 36,004.47 72,008.94

PERALATAN 280,808.94
TOTAL (Rp.) 807,758.94

VOLUME : [ 8,00 ] Satuan : [ m2 ] Harga satuan Rp. 100,969.87 per [ m2 ]

Harga satuan termasuk PPN 10 % Rp. 111,066.85


ANALISA HAR GA SATUAN
KODE
BRONJONG PENAHAN

K.815
MENGGUNAKAN BURUH

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (28) JOMBANG (17) Dinas Pras. Jal. 0
PROSES : ANGGAPAN / ASUMSI :

1. Menggali muka tanah unutuk tempat bronjong. 1. Batu dikirim kelokasi pekerjaan oleh pemasok.
2. Anyaman bronjong dikirim kelokasi oleh pemasok.
2 Rangkai dan betuk anyaman bronjong. 3 Selesai dalam 2 hari.
3 Isi anyaman kawat dengan batu. 4 Penggunaan alat bantu 1 bulan - orang
4 Anyaman dibuat kokoh dengan ikatan kawat
5 Urug kembali hingga mantap.

PEKERJA VOL HARI KODE TOTAL VOL. U PAH B IAYA SUB. JUMLAH
(org/hari) (Rp./HARI/ORANG) (Rp.) (Rp.)

Mandor 1 2 L.061 2 60,000.00 120,000.00

Buruh tak terlatih 40 2 L.101 80 30,000.00 2,400,000.00

Buruh terlatih 2 2 L.106 4 40,000.00 160,000.00

PEKERJA 2,680,000.00
MATE R IAL SATU- KODE TOTAL HAR GA B IAYA SUB. JUMLAH
AN VOL (Rp./ unit) (Rp.) (Rp.)

Batu quarri m3 M.010 25.00 109,000.00 2,725,000.00

Kawat bronjong kg M.162 200.00 17,600.00 3,520,000.00

Alat bantu ( set 3 alat ) set M.170 3.20 82,000.00 262,400.00

MATERIAL 6,507,400.00
P E RALATAN JUM- HARI KODE JAM HAR GA B IAYA SUB. JUMLAH
LAH KERJA (Rp./jam) (Rp.) (Rp.)

PERALATAN 0.00
TOTAL (Rp.) 9,187,400.00

VOLUME : [ 25 ] Satuan : [ m 3] Harga satuan Rp. 367,496.00 per [ m3 ]


ANALISA HARGA SATUAN
KODE
KONSTRUKSI PASANGAN BATU

K.705
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL
JAWA TIMUR (2/8) JOMBANG (17) Dinas Pras. Jal. Juni 2005
PROSES : ANGGAPAN / ASUMSI :

1. Material ditimbun dilokasi pekerjaan 1. Dilakukan untuk pekerjaan gorong-gorong,jembatan,dinding penahan


Oleh pemasok. tanah dan struktur lainnya yang mrnggunakan konstruksi pasangan batu.
2 Pekerja membawa batu pecah ke tempat 2 amterial dikirim ke tempat pekerjaan oleh pemasok.
tukang batu pekerja 3 Tidak termasuk galian / timbunan
3 Tukang batu memasang batu pecah dengan 4 Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari
adukan pasir / semen. bambu untuk lubang drainase.

PEKERJA VOL HARI KODE TOTAL VOL. U PAH B IAYA SUB. JUMLAH
(org/hari) (Rp./HARI/ORANG) (Rp.) (Rp.)

Kepala tukang 1 1 L.073 1 50,000.00 50,000.00

Tukang 4 1 L079 4 40,000.00 160,000.00

Buruh tak terampil 12 1 L.101 12 30,000.00 360,000.00

PEKERJA 570,000.00
MATE R IAL SATU- KODE TOTAL HARGA B IAYA SUB. JUMLAH
AN VOL (Rp./ unit) (Rp.) (Rp.)

Batu gunung m3 M.010 5.00 109,000.00 545,000.00


Pasir ayak m3 M.041 1.25 96,000.00 120,000.00
Semen 40 kg. zak M.080 19.00 47,500.00 902,500.00
Alat bantu (set @ 3 alat) set M.170 0.75 82,000.00 61,500.00

MATERIAL 1,629,000.00
P E RALATAN JUM- HARI KODE JAM HARGA B IAYA SUB. JUMLAH
LAH KERJA (Rp./jam) (Rp.) (Rp.)

Pompa air ( ø 50 mm ) 30 m3/jam 1 2 E.341 2 14,330.00 28,660.00

PERALATAN 28,660.00
TOTAL (Rp.) 2,227,660.00

VOLUME : [ 5,0 ) Satuan : [ m3 ] Harga satuan Rp. 445,532.00 per [ m3 ]


ANALI SA HAR GA SAT UAN
KODE
LABURAN ASPAL SATU LAPIS

K.615
BURTU ( MENGGUNAKAN BURUH )

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (2/8) JOMBANG (17) Dinas Pras. Jal. 0
PROSES : ANGGAPAN / ASUMSI :

1. Bersihkan permukaan tidak beraspal dari oli 1. Hasil kerja 900 m2/hari
dan material lepas. 2. Agregat ukuran tunggal 9,5 mm tersaring produksi unit pemecah batu
2 Permukaan perkerasan dilapis prime aspal cutback ditimbun dilokasi pekerjaan oleh pemasok.
3 Bersihkan dan tutup permukaan yang sudah digilas 3 Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dengan
dengan lapis aspal cutback & serpihan agregat serta binder.
digilas dengan pneumaticc roda karet 4 Lapis prime/rerep permukaan menggunakan aspal cutback @ 1 Ltr./m2
5 Lapis seni/penutup menggunakan aspal cutback @ 1,6 Ltr/jam
6 Agregat uk.tunggal 9,5 mm dihampar dr.dumtruck penghampar @ 60 m2 /m3
7 Sesuai Rev.Spek Umum B.M Maret '98 - Buku - 3.

PE K E R JA Jumlah Hari Kode Jumlah Upah Biaya SUB. JUMLAH


Orang Orang/hari (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 1 2 L.061 2 60,000.00 120,000.00


Operator terampil 2 2 L.081 4 50,000.00 200,000.00
Pembantu Operator 2 2 L.083 4 40,000.00 160,000.00
Supir terampil 1 2 L.091 2 50,000.00 100,000.00
Pembantu supir 1 2 L.099 2 40,000.00 80,000.00
Buruh tak terampil 12 2 L.101 24 30,000.00 720,000.00
Buruh terampil 2 2 L.106 4 40,000.00 160,000.00
PEKERJA 1,540,000.00
MAT E R IAL SATU- KODE TOTAL HAR GA B IAYA SUB. JUMLAH
AN VOL (Rp./ unit) (Rp.) (Rp.)

Batu sungai pecah tersaring m3 K.017 30.00 222,340.00 6,670,200.00


Aspal drum kg M.061 3,620.00 8,000.00 28,960,000.00
Minyak bakar Ltr M.065 1,060.00 7,700.00 8,162,000.00
Alat bantu (set @ 3 alat) set M.170 0.96 82,000.00 78,720.00

MATERIAL 43,870,920.00
P E RALATAN JUM- HARI KODE JAM HAR GA B IAYA SUB. JUMLAH
LAH KERJA (Rp./jam) (Rp.) (Rp.)

Mesin gilas 3 roda 8 - 15 ton 1 2 E.084 10 143,000.00 1,430,000.00


Mesin penyemprot aspal 1000 Ltr. 1 2 E.153 10 27,330.00 273,300.00
Dum Truk 3,5 ton / 115 HP 1 2 E.221 10 36,004.47 360,044.70

PERALATAN 2,063,344.70
TOTAL (Rp.) 47,474,264.70

VOLUME : [ 1800,0 ] Satuan : [ m2 ] Harga satuan Rp. 26,374.59 per [ m2 ]


ANALISA HARGA SATUAN
KODE
STABILISASI TANAH DASAR / LPB DENGAN SEMEN

K.326
[MENGGUNAKAN ALAT]

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (28) JOMBANG : (17) Dinas Pras. Jal. 0
PROSES : ANGGAPAN / ASUMSI :

1. Tanah dasar / LPB digeburkan setebal 20 cm 1. Menggunakan alat berat ( 5 m X 500/hari)


2 Tanah diaduk dan dilembutkan 2. Tanah dasar / LPB telah dibentuk sesuai pofilnya
sampai tebal yang dikehendaki 3 Traktor menggaru dengan 4 lintasan,penghamparan 1 lintasan,
3 Semen disebar dan dicampur kedalam pencapuran 4 lintasan pp.kemampuan 2500 m2/jam
tanah gembur ( 6% ) 4 Pengiriman bahan kapur sampai kelokasi pekerjaan oleh pemasok
4 Diberi air sampai kelembaban 5 Semen dicampur dengan tanah setebal 20 cm @ 6% dari volume
optimum dan dipadatkan

PEKERJA Jumlah Hari Kode Jumlah Upah Biaya SUB. JUMLAH


Orang Orang/hari (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 1 1 L.061 1 60,000.00 60,000.00


Operator terampil 4 1 L.081 4 50,000.00 200,000.00
Pembantu Operator 4 1 L.083 4 40,000.00 160,000.00
Supir terampil 1 1 L.091 1 50,000.00 50,000.00
Pembantu supir 1 1 L.099 1 40,000.00 40,000.00
Buruh tak terampil 10 1 L.101 10 30,000.00 300,000.00
Buruh terampil 2 1 L.106 2 40,000.00 80,000.00

PEKERJA 890,000.00
MATE R IAL Satu Kode Total Harga Biaya Sub Jumlah
an Vol. (Rp./unit) (Rp.) (Rp.)

Semen 40kg M.080 1,200.00 47,500.00 57,000,000.00


Alat bantu (set @ 3 alat ) set M.170 0.24 82,000.00 19,680.00

MATERIAL 57,019,680.00
P E R ALATAN Jumlah Hari Kode Jam Harga Biaya Sub Jumlah
Kerja Kerja (Rp./jam) (Rp.) (Rp.)

Motor Grader 100 HP 1 1 E.010 5 162,000.00 810,000.00


Weel Tractor 60 HP 1 1 E.053 5 75,652.17 378,260.87
Mesin gilas 3 roda 8 - 10 ton 1 1 E.081 5 68,000.00 340,000.00
Mesin gilas roda karet 10-15 ton 1 1 E.084 5 143,000.00 715,000.00
Truk tangki air 1 1 E.182 5 130,000.00 650,000.00
Perataan tractor dll 1 1 E. 401 5 38,173.91 190,869.57

PERALATAN 2,893,260.87
TOTAL (Rp.) 60,802,940.87

VOLUME : [ 200,0 ] Satuan : [ ( m3) Harga satuan Rp. 304,014.70 per [ m3 ]

Harga satuan termasuk PPN 10 % Rp. 334,416.17


ANALISA BIAYA PEKERJAAN
KODE
LAPIS PONDASI BAWAH KLAS B

( K.517 )
AGREGAT PECAH TERSARING ( Menggunakan Alat )

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (28) JOMBANG (17) 0
PROSES : ANGGAPAN / ASUMSI :

1. Agregat pecah tersaring ditimbun disepanjang 1. Menggunakan alat berat (150 m3/hari]
jalan oleh pemasok. 2. Material ditimbun disepanjang jalan oleh pemasok
2. Grader membentuk ulang permukaan lama jalan 3 Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah
3 Grader menghampar agregat 4 Dihampar dan dipadatkan sampai tebal padat 15 cm
4 Jalan disiram air dengan truk air 5. Dihampar dan dipadatkan 1000 m2/hari
5 Pemadatan dengan mesin gilas 6-8 ton 6. Koefisien pemadatan = 1,2
sampai 100 % MPOD 7. Gradasi bahan lapis pondasi bawah klas B semua harus melalui saringan
saringan 62,5 mm sesuai rev. Spek. Umum B>M. Maret 1998 - Buku 3

PEKERJA Jumlah Hari Kode Jumlah Upah Biaya SUB. JUMLAH


Orang Orang/hari (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 1 1 L.061 1 60,000.00 60,000.00


Operator terampil 2 1 L.081 2 50,000.00 100,000.00
Pembantu operator 2 1 L.083 2 40,000.00 80,000.00
Supir terampil 1 1 L.091 1 50,000.00 50,000.00
Pembantu sopir 1 1 L.099 1 40,000.00 40,000.00
Buruh tak terampil 6 1 L.101 6 30,000.00 180,000.00

PEKERJA 510,000.00
MATE R IAL Satu Kode Total Harga Biaya Sub Jumlah
an Vol. (Rp./unit) (Rp.) (Rp.)

Batu sungai pec. tersaring 2-3 cm M3 K.017 122.50 222,340.00 27,236,650.00

Pasir urug M3 M.040 50.50 87,500.00 4,418,750.00

Alat bantu ( set @ 3 alat) set M.170 0.24 82,000.00 19,680.00

MATERIAL 31,675,080.00
P E RALATAN Jumlah Hari Kode Jam Harga Biaya Sub Jumlah
Kerja Kerja (Rp./jam) (Rp.) (Rp.)

Motor Grader 100 HP 1 1 E.010 5 162,000.00 810,000.00


Mesin gilas 3 roda 6-8 ton 1 1 E.080 5 81,000.00 405,000.00
Truk tangki air 115 HP 1 1 E.182 5 130,000.00 650,000.00

PERALATAN 1,865,000.00
TOTAL (Rp.) 34,050,080.00

VOLUME : [ 150,00 ] Satuan : [ m3 ] Harga satuan Rp. 227,000.53 per [ m3 ]

Harga satuan termasuk PPN 10 % Rp. 249,700.59


DAFTAR ANALIS PASANGAN / JALAN

1 An. G50k 1 m2 plesteran camp. 1 Pc : 3 Ps tebal 10 mm


Upah :
0.15 tukang batu = Rp. 40,000 = Rp. 6,000.00
0.015 kepala tukang = Rp. 50,000 = Rp. 750.00
0.4 pekerja = Rp. 30,000 = Rp. 12,000.00
0.02 mandor = Rp. 60,000 = Rp. 1,200.00
Bahan :
0.1785 zak P C 40 kg = Rp. 7,700 = Rp. 1,374.45
0.0114 m3 pasir pasang = Rp. 96,000 = Rp. 1,094.40
= Rp. 2,468.85 + Rp. 19,950.00
Jumlah = Rp. 22,418.85

2 An. A1.b 1 m3 urugan sirtu dengan membilas :


Bahan :
1.2 m3 Sirtu a Rp. 83,500 = Rp. 100,200.00
Upah :
0.25 pekerja a Rp. 30,000 = = Rp. 7,500.00
0.01 mandor a Rp. 60,000 = = Rp. 600.00
Rp. 100,200 + Rp. 8,100.00
Jumlah = 108,300.00
3 An. A1.a 1 m3 urugan tanah dengan membilas :
Bahan :
1.2 m3 tanah urug a Rp. 60,000 = Rp. 72,000.00
Upah :
0.25 pekerja a Rp. 30,000 = = Rp. 7,500.00
0.01 mandor a Rp. 60,000 = = Rp. 600.00
Rp. 72,000 + Rp. 8,100.00
Jumlah = 80,100.00
4 An. A1+G2 1 m' pasang batu tepi :
Bahan :
0.036 m3 bt.pec.15/20 (tangan) a Rp. 109,000 = Rp. 3,924.00
Upah :
0.75 pekerja a Rp. 30,000 = Rp. 22,500.00
0.025 mandor a Rp. 60,000 = Rp. 1,500.00
1.5 pekerja a Rp. 30,000 = Rp. 45,000.00
0.075 mandor a Rp. 60,000 = Rp. 4,500.00
= Rp. 73,500.00
Upah per m' = 1/30 x Rp. 73,500.00 = Rp. 2,450.00
Rp. 3,924.00 Rp. 2,450.00
Jumlah = Rp. 6,374.00
ANALISA BIAYA PEKERJAAN
KODE
PENGHAMPARAN LAPIS PONDASI ATAS ASPAL BETON

K.528
LASTON ATAS ( MENGGUNAKAN ALAT)

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (28) JOMBANG (17) #REF! #REF!
PROSES : ANGGAPAN / ASUMSI :

1. Permukaan jalan dibersihkan dan kering 1. Menggunakan alat berat (45 m3/hari]
2. Lapis tack/pengikat aspal cut back dihampar 2. Dikirim ATB ke lokasi pekerjaan oleh pemasok dari AMP.
@ 0,5 l/m2 3 ATB dihampar dan dipadatkan sampai tebal padat 10 cm.
3 ATB dihampar dg. aspal finisher. 4 BJ ATB padat = 2,25 ton/m3
4 Temperatur ATB 120 C dan tidak kurang dari 100 C 5. Sesuai Spek., BM No. 03/PT/B/1983 dan revisi Spek. Umum Maret 1989
Buku -3.

PEKERJA Jumlah Hari Kode Jumlah Upah Biaya SUB. JUMLAH


Orang Orang/hari (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 1 1 L.061 1 60,000.00 60,000.00


Operator terampil 4 1 L.081 4 50,000.00 200,000.00
Pembantu operator 4 1 L.083 4 40,000.00 160,000.00
Buruh tak terampil 12 1 L.101 12 30,000.00 360,000.00
Buruh terampil 8 1 L.106 8 40,000.00 320,000.00

PEKERJA 1,100,000.00
MATE R IAL Satu Kode Total Harga Biaya Sub Jumlah
an Vol. (Rp./unit) (Rp.) (Rp.)

ATB ( Laston Atas ) tonne K.026 100 619,341.70 61,934,170.00


Pasir ayak untuk beton m3 M.041 0.6 96,000.00 57,600.00
Aspal curah kg M.061 180 6,300.00 1,134,000.00
Minyak bakar ltr M.065 45 7,700.00 346,500.00
Alat bantu ( set @ 3 alat) set M.170 0.48 82,000.00 39,360.00

MATERIAL 63,511,630.00
P E R ALATAN Jumlah Hari Kode Jam Harga Biaya Sub Jumlah
Kerja Kerja (Rp./jam) (Rp.) (Rp.)

Mesin Gilas roda karet 8-15 ton 1 1 E.084 5 143,000.00 715,000.00

Mesin gilas 3 roda 6-8 ton 1 1 E.080 5 81,000.00 405,000.00

Mesin penyemprot aspal 1,000 ltr 1 1 E.153 3 27,330.00 81,990.00

Mesin penghampar 1,820 mm/30HP 1 1 E.157 5 92,000.00 460,000.00

Compressor 210 m3/jam 1 1 E.301 4 52,200.00 208,800.00


PERALATAN 1,870,790.00
TOTAL (Rp.) 66,482,420.00

VOLUME : [45,00 ] Satuan : [ m3 ] Harga satuan Rp. 1,477,387.11 per [ m3 ] 1,477,387.11

Harga satuan termasuk PPN 10 % Rp. 1,625,125.82


Anl.800/k2-k5.
ANALISA HARGA SATUAN
KODE
PRODUKSI KERIKIL PECAH TERSARING [ALAT]

K.017
MEMPERGUNAKAN KERIKIL SUNGAI [Menggunakan alat]

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (28) JOMBANG (17) #REF! #REF!
PROSES : ANGGAPAN / ASUMSI :

1. Bulldozer membuat timbunan di pinggir sungai 1. Menggunakan alat berat (60 m3/hari], material diolah dua kali
2. Wheel Loader memuat ke truck yang 2. Batu diambil dari sungai & diangkut ketempat pemecahan batu
membongkar batu ditempat penyaringan 3. 33,3 % batu lolos saringan pada mesin dengan produk 15 tone/jam
3. Batu over size dipecah mesin 4. 70 % batu yang sudah dipecah dicampur kembali dengan batu dari
4. Hasil pecahan batu dicampur kembali dengan sungai yang lolos saringan.
batu dari sungai yang lolos saringan 5. Volume yang diukur berdasarkan 5 tone/truk (lepas), 1,0 trip/tr, Bj = 1,5
6. Jarak angkut dari tempat sumber ke tempat pekerjaan 10 km
7 Rata-rata umur alat bantu 1 bulan orang per set.

PEKERJA Jumlah Hari Kode Jumlah Upah Biaya SUB. JUMLAH


Orang Orang/hari (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 1 1 L.061 1 60,000.00 60,000.00


Operator terlatih 3 1 L.081 3 50,000.00 150,000.00
Operator semi terlatih 2 1 L.082 2 0.00 0.00
Supir 4 1 L.091 4 50,000.00 200,000.00
Buruh tak terlatih 4 1 L.101 4 30,000.00 120,000.00
Pekerja semi terlatih 4 1 L.103 4 0.00 0.00
PEKERJA 530,000.00
MATE R IAL Satu Kode Total Harga Biaya Sub Jumlah
an Vol. (Rp./unit) (Rp.) (Rp.)

Kerikil sungai - dipungut M3 M.012 80.00 151,372.89 12,109,831.11


royalty
Alat bantu ( set @ 3 alat ) SET M.170 0.20 82,000.00 16,400.00

MATERIAL 12,126,231.11
P E R ALATAN Jumlah Hari Kode Jam Harga Biaya Sub Jumlah
Kerja Kerja (Rp./jam) (Rp.) (Rp.)

Bulldozer 100 HP 1 1 E.001 6 161,000.00 966,000


Mesin pecah batu 200 HP 1 1 E.031 6 318,000.00 1,908,000
Wheel Loader 80 HP 1 1 E.052 6 193,000.00 1,158,000
Dump Truk 5 t - 145 HP 4 1 E.212 24 163,000.00 3,912,000

PERALATAN 7,944,000.00
TOTAL (Rp.) 20,600,231.11

VOLUME : [ 60,0 ] Satuan : [ m3 ] Harga satuan Rp. 343,337.19 per [ m3 ] 123644.79


ANALISA HARGA SATUAN
KODE
LAPIS PENETRASI/PERMUKAAN MACADAM 50 MM

K.618
LAPEN ( MENGGUNAKAN BURUH )

PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL


JAWA TIMUR (28) JOMBANG (17) #REF! #REF!
PROSES : ANGGAPAN / ASUMSI :

1. Semprotkan aspal tack coat 0,8 Lt/m3 1. Menggunakan tenaga buruh.


2 Hamparkan agregat kasar 20 m2/m3 2. Agregat pecah tersaring dikirim ke lokasi pekerjaan oleh pemasok.
3 Digilas dan dipadatkan dengan mesin gilas roda 3. Digunakan agregat pecah tersaring yang termurah(agregat kasar < 50mm)
baja 8 - 10 ton. agregat pengunci < 25 mm, agregat penutup <12,5mm)
4. Semprotkan aspal binder 4,8 Lt/m2 4 Agregat dimuat ulang ke truck dengan tenaga manusia damn dihampar
5 Hamparkan agregat pengunci 64 m2/m3 dengan mesin penghampar agregat.
6 Hamparkan lapis seal dengan 12,5 mm 5 Tebal padat perkerasan 5 cm.
chip 80 m2/m3 cutback 1,25 Lt/m2 6 Pen Mac sesuai rev.Spek.Umum B>M> Maret '89 - Buku 3

PEKERJA Jumlah Hari Kode Jumlah Upah Biaya SUB. JUMLAH


Orang Orang/hari (Rp./hari/Orang) (Rp.) (Rp.)

Mandor 2 3 L.061 6 60,000.00 360,000.00


Operator terampil 2 3 L.081 6 50,000.00 300,000.00
Pembantu Operator 2 3 L.083 6 40,000.00 240,000.00
Supir terampil 1 3 L.091 3 50,000.00 150,000.00
Pembantu supir 1 3 L.099 3 40,000.00 120,000.00
Buruh tak terampil 66 3 L.101 198 30,000.00 5,940,000.00
Buruh terampil 2 3 L.106 6 40,000.00 240,000.00
PEKERJA 7,350,000.00
MATE R IAL SATU- KODE TOTAL HARGA B IAYA SUB. JUMLAH
AN VOL (Rp./ unit) (Rp.) (Rp.)

Batu pecah 3 - 5 cm m3 M.023 56.00 153,000.00 8,568,000.00


Batu pecah 2 - 3 cm m3 M.024 31.11 175,000.00 5,444,250.00
Batu pecah 1 - 2 cm m3 M.025 15.55 148,500.00 2,309,175.00
Pasir ayak untuk beton m3 M.041 3.50 96,000.00 336,000.00
Aspal drum kg M.061 6,270.00 8,000.00 50,160,000.00
Minyak bakar Ltr M.065 450 7,700.00 3,465,000.00
Alat bantu ( set @ 3 alat ) set M.170 8.16 82,000.00 669,120.00

MATERIAL 70,951,545.00
P E RALATAN JUM- HARI KODE JAM HARGA B IAYA SUB. JUMLAH
LAH KERJA (Rp./jam) (Rp.) (Rp.)

Mesin gilas 3 roda 6-8 ton 1 3 E.080 15 81,000.00 1,215,000.00


Mesin penyemprot aspal 1000 Lt. 1 3 E.153 15 27,330.00 409,950.00
Truk bak terbuka 3,5 ton/115 HP 1 3 E.221 15 107,000.00 1,605,000.00

PERALATAN 3,229,950.00
TOTAL (Rp.) 81,531,495.00

VOLUME : [ 1400,0 ] Satuan : [ m2 ] Harga satuan Rp. 58,236.78 per [ m2 ]