REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp.)

I PEKERJAAN PERSIAPAN

JUMLAH I -

II PEKERJAAN TANAH

JUMLAH II -

III PEKERJAAN STRUKTUR

JUMLAH III -

IV PEKERJAAN FURNITURE JEMBATAN

JUMLAH IV -

-
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp.)

-
-

JUMLAH (A + B) -
PPN 10% -
JUMLAH TOTAL -
DIBULATKAN -
Terbilang :

Jakarta, __ Februari 2018


Penawar,
NAMA PT.
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp.)

NAMA DIREKTUR
Direktur
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING


LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
HARSAT JUMLAH HARGA
NO URAIAN PEKERJAAN KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5
A. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 15000 M2 13,207.03 198,105,468.75
(pembersihan lahan termasuk bangunan warung
& rumah di area perluasan Bukit
Cinta)
SUB TOTAL 1 198,105,468.75
JUMLAH A.1 198,105,468.75

B. PEKERJAAN PENATAAN SEGMEN SUB KAWASAN


I. PENATAAN SEGMEN 1 - AREA GERBANG MASUK
1 Pekerjaan Optimalisasi Bangunan Gerbang Masuk
- Pekerjaan Pengecatan Kembali Tembok Lama
- Pembersihan bidang permukaan tembok lama 413.8 M2 10,062.50 4,163,862.50
- Pengecatan tembok interior 294.6 M2 9,620.44 2,834,181.62
- Pengecatan tembok eksterior 119.2 M2 9,620.44 1,146,756.45
- Pekerjaan Pembungkusan Dinding Eksterior
- Kupas plesteran lama 175.4 M2 10,062.50 1,764,962.50
- Pasang lantai batu andesit 40x40 tebal 1,4 cm 175.4 M2 -
- Pekerjaan Pembongkaran dan Pekerjaan Plafond Baru Gypsum Board
- Pembongkaran plafond lama 262.5 M2 -
- Pemasangan plafond gypsum board rangka hollow galvanis 40x40mm 262.5 M2 -
- Pemasangan list plafond 196.4 M' -
- Pengecatan plafond 262.5 M2 -
- Pekerjaan Perbaikan Lavatory
- Pembongkaran kloset duduk/monoblock 4.00 BH -
- Pembongkaran urinoir 5.00 BH -
- Pembongkaran wastafel 3.00 BH -
- Pembongkaran keramik lantai 40.50 M2 -
- Pemasangan kloset duduk/monoblock baru lengkap 2.00 BH -
- Pemasangan kloset jongkok 2.00 BH -
- Pemasangan urinoir 5.00 BH -
- Pemasangan wastafel 5.00 BH -
- Pemasangan keramik lantai 40.50 M2 -
SUB JUMLAH 1 9,909,763.07

2 Pekerjaan Optimalisasi Lansekap


- Penggantian perkerasan paving block jalan masuk
- Pembongkaran paving block lama 1,945.50 M2 -
Pemindahan paving block lama 1,945.50 M2 -
- Pasang paving block bata tebal 8cm 10,5x21 (K300) 1,945.50 M2 -
- Pasang kansteen beton K300 uk. 60x15x30 164.00 M1 -
- Pembuatan lansekap taman
- Tanah pohon pelindung tinggi 2m 12.00 Lubang -
- Tanam bambu jepang 60.00 Lubang -
- Tanam perdu (polibag) 12.00 Lubang -
- Tanam rumput gajah mini (silang papan catur) 150.00 M2 -
SUB JUMLAH 2 -

3 Pekerjaan Art Work Portal


- Art work portal 1.00 UNIT -
SUB JUMLAH 3 -

4 Pekerjaan Cover 2 Menara


- Pelapisan menara dengan art work 2.00 UNIT -
SUB JUMLAH 4 -

5 Pekerjaan Sign Letter "Bukit Cinta Rawa Pening"


- Pombongkaran Dinding Bata Dudukan Sign Letter 30.00 M2 -
- Pembongkaran Sign Letter lama 22.50 M2 -
- Sloof beton bertulang dudukan Sign Letter (20x40)cm 1.44 M3 -
- Pemasangan Sign Letter baru ukuran 1,8x21m tebal 1,5-2mm, dua sisi 15.58 M2 -
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING


LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
HARSAT JUMLAH HARGA
NO URAIAN PEKERJAAN KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5
SUB JUMLAH 5 -
JUMLAH B.I 9,909,763.07
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING


LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
HARSAT JUMLAH HARGA
NO URAIAN PEKERJAAN KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5
A. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 15000 M2 -
(pembersihan lahan termasuk bangunan warung
& rumah di area perluasan Bukit
Cinta)
SUB TOTAL 1 -
JUMLAH A.1 -

B. PEKERJAAN PENATAAN SEGMEN SUB KAWASAN


I. PENATAAN SEGMEN 1 - AREA GERBANG MASUK
1 Pekerjaan Optimalisasi Bangunan Gerbang Masuk
- Pekerjaan Pengecatan Kembali Tembok Lama
- Pembersihan bidang permukaan tembok lama 413.8 M2 -
- Pengecatan tembok interior 294.6 M2 -
- Pengecatan tembok eksterior 119.2 M2 -
- Pekerjaan Pembungkusan Dinding Eksterior
- Kupas plesteran lama 175.4 M2 -
- Pasang lantai batu andesit 40x40 tebal 1,4 cm 175.4 M2 -
- Pekerjaan Pembongkaran dan Pekerjaan Plafond Baru Gypsum Board
- Pembongkaran plafond lama 262.5 M2 -
- Pemasangan plafond gypsum board rangka hollow galvanis 40x40mm 262.5 M2 -
- Pemasangan list plafond 196.4 M' -
- Pengecatan plafond 262.5 M2 -
- Pekerjaan Perbaikan Lavatory
- Pembongkaran kloset duduk/monoblock 4.00 BH -
- Pembongkaran urinoir 5.00 BH -
- Pembongkaran wastafel 3.00 BH -
- Pembongkaran keramik lantai 40.50 M2 -
- Pemasangan kloset duduk/monoblock baru lengkap 2.00 BH -
- Pemasangan kloset jongkok 2.00 BH -
- Pemasangan urinoir 5.00 BH -
- Pemasangan wastafel 5.00 BH -
- Pemasangan keramik lantai 40.50 M2 -
SUB JUMLAH 1 -

2 Pekerjaan Optimalisasi Lansekap


- Penggantian perkerasan paving block jalan masuk
- Pembongkaran paving block lama 1,945.50 M2 -
Pemindahan paving block lama 1,945.50 M2 -
- Pasang paving block bata tebal 8cm 10,5x21 (K300) 1,945.50 M2 -
- Pasang kansteen beton K300 uk. 60x15x30 164.00 M1 -
- Pembuatan lansekap taman
- Tanah pohon pelindung tinggi 2m 12.00 Lubang -
- Tanam bambu jepang 60.00 Lubang -
- Tanam perdu (polibag) 12.00 Lubang -
- Tanam rumput gajah mini (silang papan catur) 150.00 M2 -
SUB JUMLAH 2 -

3 Pekerjaan Art Work Portal


- Art work portal 1.00 UNIT -
SUB JUMLAH 3 -

4 Pekerjaan Cover 2 Menara


- Pelapisan menara dengan art work 2.00 UNIT -
SUB JUMLAH 4 -

5 Pekerjaan Sign Letter "Bukit Cinta Rawa Pening"


- Pombongkaran Dinding Bata Dudukan Sign Letter 30.00 M2 -
- Pembongkaran Sign Letter lama 22.50 M2 -
- Sloof beton bertulang dudukan Sign Letter (20x40)cm 1.44 M3 -
- Pemasangan Sign Letter baru ukuran 1,8x21m tebal 1,5-2mm, dua sisi 15.58 M2 -
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING


LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019
HARSAT JUMLAH HARGA
NO URAIAN PEKERJAAN KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5
SUB JUMLAH 5 -
JUMLAH B.I -
HARGA SATUAN PEKERJAAN
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARGA SATUAN
CODE JENIS PEKERJAAN SATUAN
(Rp)
1 #REF!
1 Pengukuran dan Pemasangan Bouwplank M2 64,149.52
2 Papan Nama Proyek M2 254,799.80
3 Kantor sementara lantai plesteran M2 1,301,418.63
4 Rumah jaga (konstruksi kayu) M2 1,499,557.02
5 Gudang semen dan peralatan M2 1,313,540.78
6 Bedeng pekerja M2 1,359,433.83
7 Pembersihan dan Perataan Lapangan M2 13,207.03

2 #REF!
1 Penggalian Tanah Biasa M3 54,903.52
2 Penggalian Tanah dengan alat berat M3 69,829.41
3 Pembongkaran jalan M3 108,444.51
2 Pengurugan Kembali Galian M3 15,644.67
3 Pemadatan Tanah M3 40,807.03
3 Pengurugan dengan Pasir Sirtu M3 187,620.70
4 Pengurugan dengan Pasir Urug M3 139,320.70

3 #REF!
1 Pembuatan Rabat Beton M3 825,805.08
2 Pekerjaan Bor Pile dia. 20 cm, H= 3 m M' 902,013.85
3 Pembuatan 1 m3 beton mutu fc 21,7 MPa (K250) M3 972,393.28
4 Pekerjaan Besi Beton kg 11,693.13
5 Pekerjaan Bekisting M2 125,971.72
5 Pekerjaan Bekisting Pondasi M2 178,069.96
6 Pekerjaan Bekisting Kolom Motif M2 220,314.15
7 Pekerjaan Bekisting Kolom M2 220,314.15
8 Pekerjaan Bekisting Sloof M2 163,403.64
9 1 m3 Pengecoran Beton Ready Mix Mutu K - 175 M3 1,192,215.78
10 1 m3 Pengecoran Beton Ready Mix Mutu K - 225 M3 1,278,465.78
11 1 m3 Pengecoran Beton Ready Mix Mutu K - 250 M3 1,548,715.78
12 1 m3 Pengecoran Beton Ready Mix Mutu K - 275 M3 1,623,465.78
13 Pek. pondasi footplat K-250 (uk 1,3 x 1,3 x 0,5 m) M3 3,254,139.48
14 Pek. kolom motif h=630 cm M3 3,211,982.20
15 Pek. kolom motif h=580 cm M3 3,211,982.20
16 Pek. kolom motif h=690 cm M3 3,211,982.20
17 Pek. kolom 15/50 M3 4,679,257.27
18 Pek. Sloof 30/50 M3 4,331,981.66
19 Pek. kolom praktis 12/15 M3 2,366,552.85
20 Saluran U-ditch 40 M' 831,917.19
21 Saluran U-ditch 80 M' 1,262,017.19
22 Cover U-ditch 80 heavy Duty M' 1,048,404.69

Page 8 of 300
HARGA SATUAN PEKERJAAN
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARGA SATUAN
CODE JENIS PEKERJAAN SATUAN
(Rp)
4 PEKERJAAN PEMBESIAN (KONSTRUKSI TUGU)
1 Pemasangan Ankur Bolt dia. 19 mm Bh 84,076.14
2 Pembuatan Buah Durian dari Perunggu Bh 325,000,000.00
3 Pembuatan Keong Binga dan Ikan dari Perunggu Bh 230,000,000.00
4 Pembuatan Buah Perahu dari Perunggu Bh 665,000,000.00
5 Pembuatan Pot Bunga + Dudukan Bh 405,015.47
6 Plat Joint, T = 3 mm Kg 26,278.92
7 Pekerjaan Pengelasan Cm 2,672.38
8 Pekerjaan Pipa Pagar Stainless Steel m' 1,323,555.13
9 Pemasangan Tali Rantai m' 656,902.28
10 Pemasangan Jangkar Unit 5,757,152.28
11 Pekerjaan Ornamen Ikan Ls 8,000,000.00

5 PEKERJAAN PASANGAN
1 Plesteran 1 PC : 3 PP; tebal 15 mm m2 72,860.81
2 Acian m2 26,542.72
3 Pasangan Kansteen m' 125,892.97
4 Pasangan Batu Andesit m2 219,922.15
5 Pasangan Batu Tempel m2 187,319.65
6 Pasangan Aspalt m2 1,761,533.07
7 Pasangan conwood m2 354,240.32
8 Pekerjaan pasangan Batukali (1pc : 4Psr) m3 790,120.51
9 Pekerjaan pasangan Bata merah m2 137,622.58
10 Pekerjaan pasangan Paving Block m2 220,525.08
11 Pekerjaan pasangan keramik motif batu m2 193,564.91
12 Pasangan lantai disabilitas tipe 1 m' 127,376.20
13 Pasangan lantai disabilitas tipe 2 m2 318,748.94

6 PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2 44,611.02
2 Pengecatan Pot Bunga M2 45,912.37
3 Pengecatan List Profil Exterior M2 47,278.78

7 PEKERJAAN PLUMBING, SANITASI DAN ACCESORIES


1 Peralatan Air Mancur Ls. 4,200,000.00
2 Instalasi Air dia. 3 inch M' 211,321.45
3 Kran Air + Aksesoris Bh 150,569.14
4 Bak Kontrol Air Unit 738,486.24
5 Waterproofing Ls. 3,280,000.00

8 PEKERJAAN PLUMBING, SANITASI DAN ACCESORIES


1 Pemasangan PLN Daya. 4400 VA unit 6,500,000.00
2 Armature dan Instalasi Listrik Titik 460,345.00
3 Lampu Sorot Titik 270,537.50
4 Sekering MCB Titik 288,937.50

Page 9 of 300
HARGA SATUAN PEKERJAAN
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARGA SATUAN
CODE JENIS PEKERJAAN SATUAN
(Rp)

Page 10 of 300
HARGA SATUAN PEKERJAAN
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARGA SATUAN
CODE JENIS PEKERJAAN SATUAN
(Rp)
9 PEKERJAAN LAIN - LAIN
1 Ornamen Tugu Ls. 17,000,000.00
2 Taman (Top Soil ) Ls. 8,000,000.00
3 Vegetasi Rumput M2 19,019.56
4 Tanaman Bunga bh 233,046.78
5 Pekerjaan Bollard Bola dan Finishing bh 663,542.81
6 Pekerjaan cutting laser h=473 m M2 5,200,000.00
7 Pekerjaan cutting laser h=418 m M2 5,200,000.00
8 Pekerjaan cutting laser h=527 m M2 5,200,000.00
9 Pekerjaan Paket Lampu LED + Instalasinya unit 674,245.00
10 Pek. Pengadaan dan pemasangan tiang lampu besi customized unit 5,300,342.81
11 Pek. Pengadaan dan pemasangan Lampu dan jaringan instalasi unit 2,600,495.00
12 Tutup main hole bh 2,095,411.41
13 Tutup grill bh 556,511.95
14 Pipa PVC 4" Inlet Drainase m' 71,078.30
15 Pipa utilitas (pipa PE) m' 231,434.30
16 Steel pipe dia 114 mm ASTM A36 customized m' 310,472.50
17 Plate Aksesoris tiang m 158,619.22
18 Cat Duco ex kansai jotun M2 55,777.12
19 Genteng CTI Shingles Bitumen Tipe CT3 M2 275,000.00
20 Waste 3% M2 275,000.00
21 Starter CTI Shingles Bitumen M2 260,000.00
22 Multipleks 12 mm ex Meranti Campur lembar 170,100.00
23 Underlayer @ 1 roll = 1 m x 50 m roll 756,000.00
24 Kelengkapan pemasangan bitumen unit 64,550.00
25 Aksesoris dan decoratif lampu serta tulisan Tanjung kelayang unit 1,356,000.00
26 Kursi taman unit 1,113,023.91
27 Lampu taman gantung unit 442,688.91
28 Keranjang sampah unit 766,298.91
29 Parkir sepeda rental unit 650,723.91

Page 11 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
1 #REF!
1 Pengukuran dan Pemasangan Bouwplank M2 46,290.00 - 9,492.19 8,367.33 64,149.52
2 Papan Nama Proyek M2 212,072.86 - 9,492.19 33,234.76 254,799.80
3 Kantor sementara lantai plesteran M2 899,309.00 - 232,359.38 169,750.26 1,301,418.63
4 Rumah jaga (konstruksi kayu) M2 1,113,322.00 - 190,640.63 195,594.39 1,499,557.02
5 Gudang semen dan peralatan M2 909,850.00 - 232,359.38 171,331.41 1,313,540.78
6 Bedeng pekerja M2 949,757.00 - 232,359.38 177,317.46 1,359,433.83
7 Pembersihan dan Perataan Lapangan M2 - - 11,484.38 1,722.66 13,207.03

2 #REF!
1 Penggalian Tanah Biasa M3 - - 47,742.19 7,161.33 54,903.52
2 Penggalian Tanah dengan alat berat M3 - 34,669.15 26,052.08 9,108.18 69,829.41
3 Pembongkaran jalan M3 - 82,301.91 11,997.67 14,144.94 108,444.51
2 Pengurugan Kembali Galian M3 - - 13,604.06 2,040.61 15,644.67
3 Pemadatan Tanah M3 - - 35,484.38 5,322.66 40,807.03
3 Pengurugan dengan Pasir Sirtu M3 162,000.00 - 1,148.44 24,472.27 187,620.70
4 Pengurugan dengan Pasir Urug M3 120,000.00 - 1,148.44 18,172.27 139,320.70

3 #REF!
1 Pembuatan Rabat Beton M3 589,457.00 - 128,634.38 107,713.71 825,805.08
2 Pekerjaan Bor Pile dia. 20 cm, H= 3 m M' 240,358.81 - 544,001.06 117,653.98 902,013.85
3 Pembuatan 1 m3 beton mutu fc 21,7 MPa (K250) M3 788,850.00 - 56,709.38 126,833.91 972,393.28
4 Pekerjaan Besi Beton kg 9,120.00 - 1,047.94 1,525.19 11,693.13
5 Pekerjaan Bekisting M2 82,100.00 - 27,440.63 16,431.09 125,971.72
5 Pekerjaan Bekisting Pondasi M2 99,097.82 - 55,745.63 23,226.52 178,069.96
6 Pekerjaan Bekisting Kolom Motif M2 135,831.90 - 55,745.63 28,736.63 220,314.15
Page 12 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
7 Pekerjaan Bekisting Kolom M2 135,831.90 - 55,745.63 28,736.63 220,314.15
8 Pekerjaan Bekisting Sloof M2 86,344.50 - 55,745.63 21,313.52 163,403.64
9 1 m3 Pengecoran Beton Ready Mix Mutu K - 175 M3 980,000.00 - 56,709.38 155,506.41 1,192,215.78
10 1 m3 Pengecoran Beton Ready Mix Mutu K - 225 M3 1,055,000.00 - 56,709.38 166,756.41 1,278,465.78

Page 13 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
11 1 m3 Pengecoran Beton Ready Mix Mutu K - 250 M3 1,290,000.00 - 56,709.38 202,006.41 1,548,715.78
12 1 m3 Pengecoran Beton Ready Mix Mutu K - 275 M3 1,355,000.00 - 56,709.38 211,756.41 1,623,465.78
13 Pek. pondasi footplat K-250 (uk 1,3 x 1,3 x 0,5 m) M3 2,568,539.67 - 261,146.84 424,452.98 3,254,139.48
14 Pek. kolom motif h=630 cm M3 2,533,516.56 - 259,511.44 418,954.20 3,211,982.20
15 Pek. kolom motif h=580 cm M3 2,533,516.56 - 259,511.44 418,954.20 3,211,982.20
16 Pek. kolom motif h=690 cm M3 2,533,516.56 - 259,511.44 418,954.20 3,211,982.20
17 Pek. kolom 15/50 M3 3,438,146.40 630,772.96 610,337.90 4,679,257.27
18 Pek. Sloof 30/50 M3 -
19 Pek. kolom praktis 12/15 M3 -
20 Saluran U-ditch 40 M' -
21 Saluran U-ditch 80 M' -
22 Cover U-ditch 80 heavy Duty M' -

4 PEKERJAAN PEMBESIAN (KONSTRUKSI TUGU)


1 Pemasangan Ankur Bolt dia. 19 mm Bh -
2 Pembuatan Buah Durian dari Perunggu Bh -
3 Pembuatan Keong Binga dan Ikan dari Perunggu Bh -
4 Pembuatan Buah Perahu dari Perunggu Bh -
5 Pembuatan Pot Bunga + Dudukan Bh -
6 Plat Joint, T = 3 mm Kg -
7 Pekerjaan Pengelasan Cm -
8 Pekerjaan Pipa Pagar Stainless Steel m' -
9 Pemasangan Tali Rantai m' -
10 Pemasangan Jangkar Unit -
11 Pekerjaan Ornamen Ikan Ls -

Page 14 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
5 PEKERJAAN PASANGAN
1 Plesteran 1 PC : 3 PP; tebal 15 mm m2 -
2 Acian m2 -

Page 15 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
3 Pasangan Kansteen m' -
4 Pasangan Batu Andesit m2 -
5 Pasangan Batu Tempel m2 -
6 Pasangan Aspalt m2 -
7 Pasangan conwood m2 -
8 Pekerjaan pasangan Batukali (1pc : 4Psr) m3 -
9 Pekerjaan pasangan Bata merah m2 -
10 Pekerjaan pasangan Paving Block m2 -
11 Pekerjaan pasangan keramik motif batu m2 -
12 Pasangan lantai disabilitas tipe 1 m' -
13 Pasangan lantai disabilitas tipe 2 m2 -

6 PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2 -
2 Pengecatan Pot Bunga M2 -
3 Pengecatan List Profil Exterior M2 -

7 PEKERJAAN PLUMBING, SANITASI DAN ACCESORIES


1 Peralatan Air Mancur Ls. -
2 Instalasi Air dia. 3 inch M' -
3 Kran Air + Aksesoris Bh -
4 Bak Kontrol Air Unit -
5 Waterproofing Ls. -

8 PEKERJAAN PLUMBING, SANITASI DAN ACCESORIES


1 Pemasangan PLN Daya. 4400 VA unit -
Page 16 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
2 Armature dan Instalasi Listrik Titik -
3 Lampu Sorot Titik -
4 Sekering MCB Titik -

Page 17 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
9 PEKERJAAN LAIN - LAIN
1 Ornamen Tugu Ls. -
2 Taman (Top Soil ) Ls. -
3 Vegetasi Rumput M2 -
4 Tanaman Bunga bh -
5 Pekerjaan Bollard Bola dan Finishing bh -
6 Pekerjaan cutting laser h=473 m M2 -
7 Pekerjaan cutting laser h=418 m M2 -
8 Pekerjaan cutting laser h=527 m M2 -
9 Pekerjaan Paket Lampu LED + Instalasinya unit -
10 Pek. Pengadaan dan pemasangan tiang lampu besi customized unit -
11 Pek. Pengadaan dan pemasangan Lampu dan jaringan instalasi unit -
12 Tutup main hole bh -
13 Tutup grill bh -
14 Pipa PVC 4" Inlet Drainase m' -
15 Pipa utilitas (pipa PE) m' -
16 Steel pipe dia 114 mm ASTM A36 customized m' -
17 Plate Aksesoris tiang m -
18 Cat Duco ex kansai jotun M2 -
19 Genteng CTI Shingles Bitumen Tipe CT3 M2 -
20 Waste 3% M2 -
21 Starter CTI Shingles Bitumen M2 -
22 Multipleks 12 mm ex Meranti Campur lembar -
23 Underlayer @ 1 roll = 1 m x 50 m roll -
24 Kelengkapan pemasangan bitumen unit -
25 Aksesoris dan decoratif lampu serta tulisan Tanjung kelayang unit -
Page 18 of 300
HARGA SATUAN PEKERJAAN TERPISAH
KEGIATAN Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGRN : 2018/2019

HARSAT BAHAN HARSAT ALAT HARSAT UPAH KEUNTUNGAN HARGA SATUAN


CODE JENIS PEKERJAAN SATUAN
(Rp) (Rp) (Rp) 15% (Rp) (Rp)
26 Kursi taman unit -
27 Lampu taman gantung unit -
28 Keranjang sampah unit -
29 Parkir sepeda rental unit -

Page 19 of 300
NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.1 Membuat 1 m' pagar sementara dari kayu tinggi 2 meter
2 A.2.2.1.2 Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter
3 A.2.2.1.3 Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter
4 A.2.2.1.4 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank
5 A.2.2.1.5 Membuat 1 m² kantor sementara lantai plesteran
6 A.2.2.1.6 Membuat 1 m² rumah jaga konstruksi kayu
7 A.2.2.1.7 Membuat 1 m² gudang semen dan alat-alat
8 A.2.2.1.8 Membuat 1 m² bedeng buruh
9 A.2.2.1.9 Membersihkan 1 m² lapangan dan perataan
10 A.2.2.1.10 Membuat 1 m² steger dari bambu
11 A.2.2.1.11 Membuat 1 m² bak adukan ukuran (40 x 50 x 25) cm
12 A.2.2.1.12 Membuat 1 m² jalan sementara
13 A.2.2.1.13 Membongkar 1 m³ beton bertulang
14 A.2.2.1.14 Membongkar 1 m2 dinding tembok bata merah
15 A.2.2.1.15 Membuat 1 m' pagar kawat jaring galvanis panjang 240 cm
16 A.2.2.1.16 Memasang 1 m' panel beton pracetak 5 x 40 x 240

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


17 A.2.3.1.1 Menggali 1 m³ tanah biasa sedalam 1 meter
18 A.2.3.1.2 Menggali 1 m³ tanah biasa sedalam 2 meter
19 A.2.3.1.3 Menggali 1 m³ tanah biasa sedalam 3 meter
20 A.2.3.1.4 Menggali 1 m³ tanah keras sedalam 1 meter
21 A.2.3.1.5 Menggali 1 m³ tanah cadas sedalam 1 meter
22 A.2.3.1.6 Menggali 1 m³ tanah lumpur sedalam 1 meter
23 A.2.3.1.7 Mengerjakan 1 m² stripping tebing setinggi 1 meter
24 A.2.3.1.8 Membuang 1 m³ tanah sejauh 30 meter
25 A.2.3.1.9 Mengurug kembali 1 m³ galian sedalam 1 m
26 A.2.3.1.10 Memadatkan 1 m³ tanah (per 20 cm)
27 A.2.3.1.11 Mengurug 1 m³ pasir urug
28 A.2.3.1.11.a Mengurug 1 m³ tanah urug
29 A.2.3.1.11.b Mengurug 1 m³ tanah urug pilihan
30 A.2.3.1.13 Memasang 1 m² lapisan ijuk tebal 10 cm untuk bidang resapan
31 A.2.3.1.14 Mengurug 1 m³ sirtu padat

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


32 A.3.2.1.1 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP
33 A.3.2.1.2 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP
34 A.3.2.1.2.a Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP menggunakan
35 A.3.2.1.3 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP

Harga Satuan Pekerjaan 2016 20 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

36 A.3.2.1.4 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 6 PP


37 A.3.2.1.5 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 8 PP
38 A.3.2.1.6 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 1 KP : 2 PP
39 A.3.2.1.7 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 KP : 10 PP
40 A.3.2.1.8 Memasang 1 m³ pondasi batu belah; campuran ¼ PC : 1 KP : 4 PP
41 A.3.2.1.9 Memasang 1 m³ batu kosong (aanstampeeng)
Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR
42 A.3.2.1.10 dan 40 % batu belah
Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR
43 A.3.2.1.10.a dan 40 % batu belah tak bertulang
44 A.3.2.1.11 Memasang 1 m³ pondasi sumuran; diameter 100 cm

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata;
45 A.4.4.1.1 campuran 1 PC : 2 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata;
46 A.4.4.1.2 campuran 1 PC : 3 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata;
47 A.4.4.1.3 campuran 1 PC : 4 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata;
48 A.4.4.1.4 campuran 1 PC : 5 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata;
49 A.4.4.1.5 campuran 1 PC : 6 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata;
50 A.4.4.1.6 campuran 1 PC : 3 KP : 10 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
51 A.4.4.1.7 campuran 1 PC : 2 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
52 A.4.4.1.8 campuran 1 PC : 3 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
53 A.4.4.1.9 campuran 1 PC : 4 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
54 A.4.4.1.10 campuran 1 PC : 5 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
55 A.4.4.1.11 campuran 1 PC : 6 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
56 A.4.4.1.12 campuran 1 PC : 8 PP
Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata;
57 A.4.4.1.13 campuran 1 PC : 3 KP : 10 PP
58 A.4.4.1.16 Memasang 1 m² dinding Conblock HB 20, Campuran spesi 1 PC : 3 PP
59 A.4.4.1.17 Memasang 1 m² dinding Conblock HB 20, Campuran spesi 1 PC : 4 PP
60 A.4.4.1.18 Memasang 1 m² dinding Conblock HB 15, Campuran spesi 1 PC : 3 PP
61 A.4.4.1.19 Memasang 1 m² dinding Conblock HB 15, Campuran spesi 1 PC : 4 PP
62 A.4.4.1.20 Memasang 1 m² dinding Conblock HB 10, Campuran spesi 1 PC : 3 PP

Harga Satuan Pekerjaan 2016 21 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

63 A.4.4.1.21 Memasang 1 m² dinding Conblock HB 10, Campuran spesi 1 PC : 4 PP


64 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; Campuran
A.4.4.1.22 spesi 1 PC : 3 PP
Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; Campuran
65 A.4.4.1.23 spesi 1 PC : 4 PP

A.44.2 HARGA SATUAN PEKERJAAN PLESTERAN


66 A.44.2.1 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm
67 A.44.2.2 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm
68 A.44.2.3 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm
69 A.44.2.4 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm
70 A.44.2.5 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm
71 A.44.2.6 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mm
72 A.44.2.7 Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mm
73 A.44.2.8 Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mm
74 A.44.2.9 Memasang 1 m² plesteran 1 PC : ½ KP : 3 PP; tebal 15 mm
75 A.44.2.10 Memasang 1 m² plesteran 1 PC : 2 KP : 8 PP; tebal 15 mm
76 A.44.2.13 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mm
77 A.44.2.14 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm
78 A.44.2.15 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mm
79 A.44.2.16 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm
80 A.44.2.17 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mm
81 A.44.2.19 Memasang 1 m² berapen 1 PC : 5 PP; tebal 15 mm
82 A.44.2.20 Memasang 1 m' plesteran skoning 1 Pc : 2 PP; lebar 10 mm
83 A.44.2.23 Memasang 1 m² plesteran ciprat / kamprotan 1 PC : 2 PP
84 A.44.2.24 Memasang 1 m² finishing siar pasangan dinding bata merah (= 20 m')
85 A.44.2.25 Memasang 1 m² finishing siar pasangan dinding conblock ekspose (= 8
m')
86 A.44.2.26 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP
87 A.44.2.27 Memasang 1 m² acian

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


88 A.4.6.1.1 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kela I
( Kayu Jati )
89 A.4.6.1.2 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas
II ( kayu Kamper )
90 A.4.6.1.2.a Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas
II ( kayu Bangkirai )
91 A.4.6.1.2.b Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas
III ( kayu Kruing )
92 A.4.6.1.2.c Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas
III ( kayu Kempas )
93 A.4.6.1.2.d Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas
IV ( kayu Meranti batu )
94 A.4.6.1.2.e Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas
IV ( kayu Punak )

Harga Satuan Pekerjaan 2016 22 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

95 A.4.6.1.3 Membuat dan memasang 1 m² pintu klamp standar, kayu kelas II ( kayu
Kamper )
96 A.4.6.1.3.a Membuat dan memasang 1 m² pintu klamp standar, kayu kelas II ( kayu
Bangkiai )
97 A.4.6.1.3.b Membuat dan memasang 1 m² pintu klamp standar, kayu kelas III ( kayu
Kruing )
98 A.4.6.1.3.c Membuat dan memasang 1 m² pintu klamp standar, kayu kelas III ( kayu
Kempas )
99 A.4.6.1.4 Membuat dan memasang 1 m² pintu klam sederhana, Kayu kelas IV
( Kayu Meranti Batu )
100 A.4.6.1.5 Membuat dan memasang 1 m² daun pintu panel, kayu kelas I ( kayu Jati )

101 A.4.6.1.5.a Membuat dan memasang 1 m² daun pintu panel, kayu kelas II ( kayu
Kamper )
102 A.4.6.1.5.b Membuat dan memasang 1 m² daun pintu panel, kayu kelas II ( kayu
Bangkiai )
103 A.4.6.1.5.c Membuat dan memasang 1 m² daun pintu panel, kayu kelas III ( kayu
Kruing )
104 A.4.6.1.5.d Membuat dan memasang 1 m² daun pintu panel + kaca bening 5 mm
rangka kayu kelas II ( kayu Bangkirai )
105 A.4.6.1.5.e Membuat dan memasang 1 m² daun pintu panel + kaca bening 5 mm
rangka kayu kelas III ( kayu Kruing )
106 A.4.6.1.6 Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas I ( kayu
Jati )
107 A.4.6.1.6.a Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas II
( kayu Kamper )
108 A.4.6.1.6.b Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas II
( kayu Bangkirai )
109 A.4.6.1.6.c Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas III
( kayu Kruing )
110 A.4.6.1.6.d Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas III
( kayu Kempas )
111 A.4.6.1.7 Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas I ( kayu
Jati )
112 A.4.6.1.7.a Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas II
( kayu Kamper )
113 A.4.6.1.7.b Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas II
( kayu Bangkirai )
114 A.4.6.1.7.c Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas III
( kayu Kruing )
115 A.4.6.1.7.d Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas III
( kayu Kempas )

Harga Satuan Pekerjaan 2016 23 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

116 A.4.6.1.8 Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas II
( kayu Kruing ) lebar sampai 90 cm
117 A.4.6.1.8.a Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas II
( kayu Bangkirai ) lebar sampai 90 cm
118 A.4.6.1.8.b Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas
III ( kayu Kruing ) lebar sampai 90 cm
119 A.4.6.1.8.c Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas
III ( kayu Kempas ) lebar sampai 90 cm
120 A.4.6.1.9 Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II
( kayu Kamper )
121 A.4.6.1.9.a Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II
( kayu Bangkirai )
122 A.4.6.1.9.b Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II
( kayu Kruing )
123 Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II
A.4.6.1.9.c ( kayu Kempas )
124 A.4.6.1.10 Memasang 1 m² jalusi kusen, kayu kelas II ( kayu Kamper )
125 A.4.6.1.10.a Memasang 1 m² jalusi kusen, kayu kelas II ( kayu Bangkirai )
126 A.4.6.1.10.b Memasang 1 m² jalusi kusen, kayu kelas III ( kayu Kruing )
127 A.4.6.1.10.c Memasang 1 m² jalusi kusen, kayu kelas III ( kayu Kempas )
128 A.4.6.1.11 Memasang 1 m² teakwood rangkap, rangka expose kayu kelas II ( kayu
Kamper )
129 A.4.6.1.11.a Memasang 1 m² teakwood rangkap, rangka expose kayu kelas II ( kayu
Bangkirai )
130 A.4.6.1.11.b Memasang 1 m² teakwood rangkap, rangka expose kayu kelas III ( kayu
Kruing )
131 A.4.6.1.11.c Memasang 1 m² teakwood rangkap, rangka expose kayu kelas III ( kayu
Kempas )
132 A.4.6.1.12 Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu
kelas II ( kayu Kamper )
133 A.4.6.1.12.a Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu
kelas II ( kayu Bangkirai )
134 A.4.6.1.12.b Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu
kelas II ( kayu Kruing )
135 A.4.6.1.12.c Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu
kelas II ( kayu Kempas )
136 A.4.6.1.13 Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas I ( kayu
Jati ) bentang 6 meter
137 A.4.6.1.13.a Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas II ( kayu
Kamper ) bentang 6 meter
138 A.4.6.1.13.b Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas II ( kayu
Bangkirai ) bentang 6 meter

Harga Satuan Pekerjaan 2016 24 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

139 A.4.6.1.13.c Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas III ( kayu
Kruing ) bentang 6 meter
140 A.4.6.1.13.d Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas III ( kayu
Kempas ) bentang 6 meter
141 A.4.6.1.13.e Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas III ( kayu
Meranti batu ) bentang 6 meter
142 A.4.6.1.14 Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas I ( kayu Jati )
143 A.4.6.1.14.a Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas II ( kayu Kamper
)
144 A.4.6.1.14.b Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas II ( kayu
Bangkirai )
145 A.4.6.1.14.c Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas III ( kayu Kruing
)
146 A.4.6.1.14.d Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas III ( kayu
Kempas )
147 A.4.6.1.14.e Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas IV ( kayu
Meranti batu )
148 A.4.6.1.15 Memasang 1 m³ kontruksi gording, kayu kelas II ( kayu Kamper )
149 A.4.6.1.15.a Memasang 1 m³ kontruksi gording, kayu kelas II ( kayu Bangkirai )
150 A.4.6.1.15.b Memasang 1 m³ kontruksi gording, kayu kelas III ( kayu Kruing )
151 A.4.6.1.15.c Memasang 1 m³ kontruksi gording, kayu kelas III ( kayu Kempas )
152 A.4.6.1.15.d Memasang 1 m³ kontruksi gording, kayu kelas IV ( kayu Meranti batu )
153 A.4.6.1.16 Memasang 1 m² rangaka atap genteng keramik, kayu kelas II ( Kayu
Kamper )
154 A.4.6.1.16.a Memasang 1 m² rangaka atap genteng keramik, kayu kelas II ( Kayu
Bangkirai )
155 A.4.6.1.16.b Memasang 1 m² rangaka atap genteng keramik, kayu kelas III ( Kayu
Kruing )
156 A.4.6.1.16.c Memasang 1 m² rangaka atap genteng keramik, kayu kelas III ( Kayu
Kempas )
157 A.4.6.1.16.d Memasang 1 m² rangaka atap genteng keramik, kayu kelas IV ( Kayu
Meranti batu )
158 A.4.6.1.16.e Memasang 1 m² rangaka atap genteng palentong, kayu kelas II ( Kayu
Kamper )
159 A.4.6.1.16.f Memasang 1 m² rangaka atap genteng palentong, kayu kelas II ( Kayu
Bangkirai )
160 A.4.6.1.16.g Memasang 1 m² rangaka atap genteng palentong, kayu kelas III ( Kayu
Kruing )
161 A.4.6.1.16.h Memasang 1 m² rangaka atap genteng palentong, kayu kelas III ( Kayu
Kempas )
162 A.4.6.1.16.i Memasang 1 m² rangaka atap genteng palentong, kayu kelas IV ( Kayu
Meranti batu )

Harga Satuan Pekerjaan 2016 25 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

163 A.4.6.1.16.j Memasang 1 m² rangaka atap genteng palentong, kayu kelas IV ( Kaso
kayu Kruing reng kayu Meranti batu )
164 A.4.6.1.16.k Memasang 1 m² rangaka atap genteng palentong, kayu kelas III ( Kaso
kayu Kruing reng kayu lokal )
165 A.4.6.1.16.l Memasang 1 m² rangaka atap genteng palentong, kayu kelas IV ( Kaso
kayu Glugu reng kayu lokal )
166 A.4.6.1.17 Memasang 1 m² rangka atap genteng Beton, kayu kelas III ( kaso kayu
Kruing reng kayu Kruing )
167 A.4.6.1.17.a Memasang 1 m² rangka atap genteng Morando biasa, kayu kelas III
( kaso kayu Kruing reng kayu Kruing )
168 A.4.6.1.17.b Memasang 1 m² rangka atap genteng Morando glazuur, kayu kelas III
( kaso kayu Kruing reng kayu Kruing )
169 A.4.6.1.18 Memasang 1 m² rangka atap sirap, kayu kelas III ( kaso kayu Kruing )
170 A.4.6.1.19 Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas II ( kayu
Kamper )
171 A.4.6.1.19.a Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas III ( kayu
Kruing )
172 A.4.6.1.19.b Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas IV ( kayu
Meranti batu )
173 A.4.6.1.19.c Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas IV ( kayu
lokal )
174 A.4.6.1.20 Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas II ( kayu
Kamper )
175 A.4.6.1.20.a Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas III ( kayu
Kruing )
176 A.4.6.1.20.b Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas IV ( kayu
Meranti batu )
177 A.4.6.1.20.c Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas IV ( kayu
Punak )
178 A.4.6.1.21 Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas I ( kayu Jati )
179 A.4.6.1.21.a Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II ( kayu
Kamper )
180 A.4.6.1.21.b Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II ( kayu
Bangkirai )
181 A.4.6.1.21.c Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III ( kayu Kruing )

182 A.4.6.1.21.d Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III ( kayu Kempas
)
183 A.4.6.1.21.e Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas IV ( kayu Meranti
batu )
184 A.4.6.1.22 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I ( kayu Jati )

Harga Satuan Pekerjaan 2016 26 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

185 A.4.6.1.22.a Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II ( kayu
Kamper )
186 A.4.6.1.22.b Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II ( kayu
Bangkirai )
187 A.4.6.1.22.c Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas III ( kayu Kruing )

188 A.4.6.1.22.d Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas III ( kayu Kempas
)
189 A.4.6.1.22.e Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas IV ( kayu Meranti
batu )
190 A.4.6.1.23 Memasang 1 m² rangka dinding pemisah (60 x 120) cm, kayu kelas II
( kayu Bangkirai )
191 A.4.6.1.23.a Memasang 1 m² rangka dinding pemisah (60 x 120) cm, kayu kelas III
( kayu Kruing )
192 A.4.6.1.23.b Memasang 1 m² rangka dinding pemisah (60 x 120) cm, kayu kelas IV
( kayu Meranti batu )
193 A.4.6.1.24 Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas II
( kayu Kamper )
194 A.4.6.1.24.a Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas II
( kayu Bangkirai )
195 A.4.6.1.24.b Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas
196 A.4.6.1.24.c Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas
III ( kayu Kempas )
197 A.4.6.1.24.d Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas
IV ( kayu Meranti batu )
198 A.4.6.1.25 Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas II (
199 A.4.6.1.25.a Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas II (
kayu Bangkirai )
200 A.4.6.1.25.b Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas III
( kayu Kruing )
201 A.4.6.1.25.c Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas III
202 A.4.6.1.25.d Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas IV
( kayu Meranti batu )
203 A.4.6.1.26 Memasang 1 m² dinding lambriziring dari papan kayu kelas II ( kayu
Kamper )
204 A.4.6.1.26.a Memasang 1 m² dinding lambriziring dari papan kayu kelas II ( kayu
Bangkirai )
205 A.4.6.1.27 Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cm

206 A.4.6.1.28 Memasang 1 m² dinding bilik, rangka kayu kelas III ( kayu Kruing )

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

Harga Satuan Pekerjaan 2016 27 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

207 A.4.1.1.1 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c =
0,87
208 A.4.1.1.2 Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c =
0,78
209 A.4.1.1.3 Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c
= 0,72
Membuat 1 m³ lantai kerja beton mutu f'c=7,4 Mpa (K 100); slump (3-6)
210 A.A.4.1.1.4 cm; w/c = 0,87
211 A.A.4.1.1.5 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c
= 0,66
212 A.A.4.1.1.6 Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c
= 0,61
213 A.4.1.1.7 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c
= 0,58
214 A.4.1.1.8 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c
= 0,56
215 A.4.1.1.9 Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c
= 0,53
216 A.4.1.1.10 Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c
= 0,52
217 A.4.1.1.11 Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c
= 0,49
218 A.4.1.1.12 Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c
= 0,48
219 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
220 A.4.1.1.17.a Pembesian 1 kg dengan besi polos atau besi ulir
221 A.4.1.1.18 Memasang 10 kg kabel presstressed polos / strands
222 A.4.1.1.19 Memasang 10 kg jaring kawat baja (wiremesh)
223 A.4.1.1.20 Memasang 1 m² bekisting untuk pondasi
224 A.4.1.1.21 Memasang 1 m² bekisting untuk sloof
225 A.4.1.1.22 Memasang 1 m² bekisting untuk kolom
226 A.4.1.1.23 Memasang 1 m² bekisting untuk balok
227 A.4.1.1.24 Memasang 1 m² bekisting untuk lantai
228 A.4.1.1.25 Memasang 1 m² bekisting untuk dinding
229 A.4.1.1.26 Memasang 1 m² bekisting untuk tangga
230 A.4.1.1.27 Memasang 1 m² jembatan untuk pengecoran beton
231 A.4.1.1.28 Membuat 1 m³ pondasi beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah tangan
232 A.4.1.1.28.a Membuat 1 m³ pondasi beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah mesin
233 A.4.1.1.29 Membuat 1 m³ sloof beton bertulang (200 kg besi + bekisting)
menggunakan batu pecah tangan
234 A.4.1.1.29.a Membuat 1 m³ sloof beton bertulang (200 kg besi + bekisting)
menggunakan batu pecah mesin

Harga Satuan Pekerjaan 2016 28 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

235 A.4.1.1.30 Membuat 1 m³ kolom beton bertulang (300 kg besi + bekisting)


menggunakan batu pecah tangan
236 A.4.1.1.30.a Membuat 1 m³ kolom beton bertulang (300 kg besi + bekisting)
menggunakan batu pecah mesin
237 A.4.1.1.31 Membuat 1 m³ balok beton bertulang (200 kg besi + bekisting)
menggunakan batu pecah tangan
238 A.4.1.1.31.a Membuat 1 m³ balok beton bertulang (200 kg besi + bekisting)
menggunakan batu pecah mesin
239 A.4.1.1.31.b Membuat 1 m³ balok beton bertulang (179 kg besi + bekisting)
menggunakan batu pecah tangan
240 A.4.1.1.31.c Membuat 1 m³ balok beton bertulang (179 kg besi + bekisting)
menggunakan batu pecah mesin
241 A.4.1.1.31.d Membuat 1 m³ balok beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah tangan
242 A.4.1.1.31.e Membuat 1 m³ balok beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah mesin
243 A.4.1.1.31.f Membuat 1 m³ balok beton bertulang (132 kg besi + bekisting)
menggunakan batu pecah tangan
244 A.4.1.1.31.g Membuat 1 m³ balok beton bertulang (132 kg besi + bekisting)
menggunakan batu pecah mesin
245 A.4.1.1.32 Membuat 1 m³ kolom beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah tangan
246 A.4.1.1.32.a Membuat 1 m³ kolom beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah mesin
247 A.4.1.1.33 Membuat 1 m³ dinding beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah tangan
248 A.4.1.1.33.a Membuat 1 m³ dinding beton bertulang (150 kg besi + bekisting)
menggunakan batu pecah mesin
249 A.4.1.1.34 Membuat 1 m³ dinding beton bertulang (200 kg besi + bekisting)
menggunakan batu pecah tangan
250 A.4.1.1.34.a Membuat 1 m³ dinding beton bertulang (200 kg besi + bekisting)
menggunakan batu pecah mesin
251 A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11 x 11 cm) menggunakan
batu pecah tangan
252 A.4.1.1.35.a Membuat 1 m' kolom praktis beton bertulang (11 x 11 cm) menggunakan
batu pecah mesin
253 A.4.1.1.36 Membuat 1 m' ring balok beton bertulang (10 x 15 cm) menggunakan
batu pecah tangan
254 A.4.1.1.36.a Membuat 1 m' ring balok beton bertulang (10 x 15 cm) menggunakan
batu pecah mesin

G.1 PEKERJAAN BETON

Harga Satuan Pekerjaan 2016 29 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

255 G.042 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR menggunakan batu split


pecah tangan
256 G.043 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR menggunakan batu split
pecah tangan
257 G.044 Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KR menggunakan batu split
pecah tangan
258 G.045 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm
menggunakan batu split pecah tangan

G.2 PEKERJAAN BETON


259 G.046 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu
pecah mesin
260 G.046.A Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu
pecah tangan
261 G.047 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KR menggunakan batu
pecah tangan

G.3 HARGA SATUAN PEKERJAAN BETON


262 B.13.a.1 Menghamparkan 1 m³ beton mutu K-125 (ready mix)
263 B.13.a.2 Menghamparkan 1 m³ beton mutu K-175 (ready mix)
264 B.13.a.3 Menghamparkan 1 m³ beton mutu K-225 (ready mix)
265 B.13.a.4 Menghamparkan 1 m³ beton mutu K-250 (ready mix)
266 B.13.a.5 Menghamparkan 1 m³ beton mutu K-275 (ready mix)
267 B.13.a.6 Menghamparkan 1 m³ beton mutu K-300 (ready mix)
268 B.13.a.7 Menghamparkan 1 m³ beton mutu K-350 (ready mix)
269 B.35 Membongkar 1 m2 begisting cara biasa dan membereskan puing - puing
270 B.37 Menggenangi air 100 m2 permukaan beton
271 B.37.a Menggenangi air 1 m2 permukaan beton
272 B.38.a Memasang 100 m2 terpal/karung goni
273 B.38.b Memasang 1 m2 terpal/karung goni
274 B.38.c Menyirami 100 m2 Beton dengan air selama 4 hari
275 G.055 Memasang 1 m² plat beton "bondex"
276 G.055.a Memasang 1 m² plat lantai beton sistem bondex termasuk besi dan
277 G.056 Pembesian 1 kg dengan besi beton U-24
278 G.057 Pembesian 1 kg dengan besi beton U-29
279 G.058 Memasang 1 m² bekisting dengan papan
280 G.059 Memasang 1 m² bekisting multipleks 9 mm
281 G.060 Memasang 1 m² bekisting multipleks 12 mm
282 G.061 Memasang 1 m² stootwerk
283 G.062 Membuat 1 m³ beton dengan mutu K - 225
284 G.063 Membuat 1 m³ beton dengan mutu K - 275

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


285 A.4.5.2.1 Memasang 1 m² penutup atap genteng Palentong ( Pres Jatiwangi )
286 A.4.5.2.1.a Memasang 1 m² penutup atap genteng Morando biasa
287 A.4.5.2.1.b Memasang 1 m² penutup atap genteng Morando glazur
288 A.4.5.2.1.a Memasang 1 m² penutup atap genteng lokal

Harga Satuan Pekerjaan 2016 30 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

289 A.4.5.2.2 Memasang 1 m² penutup atap genteng kodok glazuur ( Pres Jatiwangi )
290 A.4.5.2.3 Memasang 1 m² penutup atap genteng Palentong besar / Super
291 A.4.5.2.4 Memasang 1 m' bubung pada genteng palentong pres Jatiwangi
292 A.4.5.2.4.a Memasang 1 m' bubung pada genteng Morando biasa
293 A.4.5.2.4.b Memasang 1 m' bubung pada genteng Morando glazur
294 A.4.5.2.5 Memasang 1 m' bubung pada genteng kodok glazuur
295 A.4.5.2.6 Memasang 1 m' bubung pada genteng palentong besar
296 A.4.5.2.7 Memasang 1 m² roof light fiberglass 90 x 180 cm
297 A.4.5.2.8 Memasang 1 m² atap asbes gelombang 92 x 250 cm x 5 mm
298 A.4.5.2.9 Memasang 1 m² atap asbes gelombang 92 x 225 cm x 5 mm
299 A.4.5.2.10 Memasang 1 m² atap asbes gelombang 92 x 200 cm x 5 mm
300 A.4.5.2.11 Memasang 1 m² atap asbes gelombang 90 x 180 cm x 5 mm
301 A.4.5.2.12 Memasang 1 m² atap asbes gelombang 105 x 300 cm x 4 mm
302 A.4.5.2.13 Memasang 1 m² atap asbes gelombang 105 x 270 cm x 4 mm
303 A.4.5.2.14 Memasang 1 m² atap asbes gelombang 105 x 240 cm x 4 mm
304 A.4.5.2.15 Memasang 1 m² atap asbes gelombang 105 x 210 cm x 4 mm
305 A.4.5.2.16 Memasang 1 m² atap asbes gelombang 105 x 150 cm x 4 mm
306 A.4.5.2.30 Memasang 1 m² penutup atap genteng beton
307 A.4.5.2.32 Memasang 1 m² penutup atap genteng metal polos
308 A.4.5.2.32.a Memasang 1 m² penutup atap genteng metal berpasir
309 A.4.5.2.33 Memasang 1 m² penutup atap sirap kayu
310 A.4.5.2.34 Memasang 1 m' bubung pada genteng Beton
311 A.4.5.2.36 Memasang 1 m' bubung pada genteng metal
312 A.4.5.2.37 Memasang 1 m' bubung pada genteng sirap
313 A.4.5.2.38 Memasang 1 m² penutup atap seng gelombang
314 A.4.5.2.39 Memasang 1 m² bubungan atap seng
315 A.4.5.2.40 Memasang 1 m² penutup atap alumunium
316 A.4.5.2.41 Memasang 1 m² bubunan alumunium

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT - LANGIT ( PLAFOND )


317 A.4.5.1.1 Memasang 1 m² langit-langit kalsiboard tbl. 4 mm, 5 mm, 6 mm
318 A.4.5.1.5 Memasang 1 m² langit-langit tripleks ukuran (120 x 240 ) cm; tbl. 3 mm,
4 mm, 6 mm
319 A.4.5.1.6 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm
320 A.4.5.1.7 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9
mm
321 A.4.5.1.9 Memasang 1 m' list langit-langit kayu profil
322 A.4.5.1.9.a Memasang 1 m' list plafond gypsum profil pj. 10 cm
323 A.4.5.1.9.b Memasang 1 m' list plafond gypsum profil pj. 15 cm

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


324 A.5.1.1.1 Memasang 1 buah closet duduk/monoblok
325 A.5.1.1.2 Memasang 1 buah closet jongkok porselen INA warna tua
326 A.5.1.1.2.a Memasang 1 buah closet jongkok porselen INA warna muda
327 A.5.1.1.4 Memasang 1 buah urinoir
328 A.5.1.1.5 Memasang 1 buah wastafel
329 A.5.1.1.7 Memasang 1 buah bak mandi fibreglass volume 1,00 m³
330 A.5.1.1.8 Memasang 1 buah bak mandi batu bata volume 0,30 m³ + porselen
331 A.5.1.1.10 Memasang 1 buah tangki air (bak air) fibreglass volume 1 m3

Harga Satuan Pekerjaan 2016 31 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

332 A.5.1.1.11 Memasang 1 buah bak beton volume 1 m3


333 A.5.1.1.12 Memasang 1 buah bak cuci piring stainless steel lengkap
334 A.5.1.1.14 Memasang 1 buah floor drain
335 A.5.1.1.15 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35
cm
336 A.5.1.1.16 Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 50
cm
337 A.5.1.1.17 Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65
cm
338 A.5.1.1.18 Memasang 1 m' pipa galvanis Ø ½"
339 A.5.1.1.19 Memasang 1 buah kran Ø ¾" atau ½" standar
340 A.5.1.1.19.a Memasang 1 buah kran Ø ¾" atau ½" kualitas baik
341 A.5.1.1.20 Memasang 1 m' pipa galvanis Ø ¾"
342 A.5.1.1.21 Memasang 1 m' pipa galvanis Ø 1"
343 A.5.1.1.22 Memasang 1 m' pipa galvanis Ø 1½"
344 A.5.1.1.23 Memasang 1 m' pipa galvanis Ø 3"
345 A.5.1.1.24 Memasang 1 m' pipa galvanis Ø 4"
346 A.5.1.1.25 Memasang 1 m' pipa PVC tipe AW Ø ½"
347 A.5.1.1.26 Memasang 1 m' pipa PVC tipe AW Ø ¾"
348 A.5.1.1.27 Memasang 1 m' pipa PVC tipe AW Ø 1"
349 A.5.1.1.28 Memasang 1 m' pipa PVC tipe AW Ø 1½"
350 A.5.1.1.29 Memasang 1 m' pipa PVC tipe AW Ø 2"
351 A.5.1.1.30 Memasang 1 m' pipa PVC tipe AW Ø 2½"
352 A.5.1.1.31 Memasang 1 m' pipa PVC tipe AW Ø 3"
353 A.5.1.1.32 Memasang 1 m' pipa PVC tipe AW Ø 4"
354 A.5.1.1.35 Memasang 1m' pipa beton Ø 15-20 cm
355 A.5.1.1.35.a Memasang 1m' pipa beton U. 20 cm
356 A.5.1.1.36 Memasang 1m' pipa beton Ø 30 cm
357 A.5.1.1.36.a Memasang 1m' pipa beton U. 30 cm
358 A.5.1.1.36.b Memasang 1m' pipa beton Ø 40 cm
359 A.5.1.1.36.c Memasang 1m' pipa beton Ø 50 cm
360 A.5.1.1.36.d Memasang 1m' pipa beton Ø 60 cm
361 A.5.1.1.36.e Memasang 1m' pipa beton Ø 80 cm
362 A.5.1.1.36.f Memasang 1m' pipa beton Ø 100 cm

J.1 PEKERJAAN SANITASI


Membuat 1 unit septic tank ukuran 2 x 2 x 1,5 m + rembesan (kantor tipe
335 J.038 sedang)
Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor
336 J.039 tipe kecil)
Membuat 1 unit septic tank ukuran 1,5 x 1,5 x 1,5 m + rembesan (rumah
337 J.040 tipe sedang)
Membuat 1 unit septic tank ukuran 1,5 x 1 x 1,5 m + rembesan (rumah
338 J.041 tipe kecil)

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


339 A.4.2.1.1 Memasang 1 kg Besi Profil

Harga Satuan Pekerjaan 2016 32 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

340 A.4.2.1.2 Memasang 1 kg rangka kuda-kuda baja IWF


341 A.4.2.1.3 Mengerjakan 100 kg pekerjaan perakitan
342 A.4.2.1.3.a Mengerjakan 1 kg pekerjaan perakitan
343 A.4.2.1.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

344 A.4.2.1.5 Mengerjakan 10 cm pengelasan dengan las listrik


345 A.4.2.1.7 Memasang 1 m² pintu gulung (rolling door) besi
346 A.4.2.1.8 Memasang 1 m² pintu lipat (folding door) bahan plastik / PVC
347 A.4.2.1.9 Memasang 1 m² sunscreen alumunium
348 A.4.2.1.10 Memasang 1 m² rolling door alumunium
349 A.4.2.1.11 Memasang 1 m' kusen pintu allumunium coklat
350 A.4.2.1.11.a Memasang 1 m' kusen pintu allumunium putih
351 A.4.2.1.12 Memasang 1 m² pintu allumunium strip lebar 8 cm
352 A.4.2.1.13 Memasang 1 m² pintu kaca rangka allumunium
353 A.4.2.1.14 Memasang 1 m² Venetions Blinds dan Vertical blinds
354 A.4.2.1.15 Memasang 1 m² terali besi strip (2 x 3) mm
355 A.4.2.1.16 Memasang 1 m² kawat nyamuk
356 A.4.2.1.17 Memasang 1 m² jendela naco dan tralis
357 A.4.2.1.18 Memasang 1 m' talang datar / jurai seng BJLS 30 lebar 90 cm
358 A.4.2.1.19 Memasang 1 m' talang ½ lingkaran Ø 15 cm, seng plat BJLS 30 lebar 90
cm
359 A.4.2.1.19.a Memasang 1 m' talang ½ lingkaran Ø 15 cm, seng plat BJLS 30 lebar 60
cm
360 A.4.2.1.20 Memasang 1 m² rangka besi hollow 1 x 40.40.2 mm modul 60 x 120 cm
dinding partisi
361 A.4.2.1.20.a Memasang 1 m² rangka besi hollow 1 x 40.40.1,2 mm modul 60 x 120 cm
dinding partisi
361 A.4.2.1.21 Memasang 1 m² rangka besi hollow 1 x 40.40.2 mm modul 60 x 60 cm
plafond
362 A.4.2.1.21.a Memasang 1 m² rangka besi hollow 1 x 40.40.1,2 mm modul 60 x 60 cm
plafond

K. PEKERJAAN BESI DAN ALUMUNIUM


362 K.014 Memasang 1 m' talang miring seng BJLS 30 lebar 90 cm
363 K.015 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30, 90 cm

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


364 A.4.6.2.1 Memasang 1 buah kunci tanam kualitas baik ( antik )
365 A.4.6.2.2 Memasang 1 buah kunci tanam biasa
366 A.4.6.2.3 Memasang 1 buah kunci untuk kamar mandi / WC
367 A.4.6.2.4 Memasang 1 buah kunci silinder
368 A.4.6.2.5 Memasang 1 buah engsel pintu
369 A.4.6.2.6 Memasang 1 buah engsel jendela kupu - kupu
370 A.4.6.2.7 Memasang 1 buah engsel angin
371 A.4.6.2.8 Memasang 1 buah spring knip
372 A.4.6.2.9 Memasang 1 buah kait angin
373 A.4.6.2.10 Memasang 1 buah door closer

Harga Satuan Pekerjaan 2016 33 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

374 A.4.6.2.11 Memasang 1 buah kunci slot


375 A.4.6.2.12 Memasang 1 buah door holder
376 A.4.6.2.13 Memasang 1 buah door stop
377 A.4.6.2.14 Memasang 1 unit rel pintu dorong
378 A.4.6.2.15 Memasang 1 buah kunci lemari
379 A.4.6.2.16 Memasang 1 m² kaca bening tebal 3 mm
380 A.4.6.2.17 Memasang 1 m² kaca bening tebal 5 mm
381 A.4.6.2.17.a Memasang 1 m² kaca rayben tebal 5 mm
382 A.4.6.2.18 Memasang 1 m² kaca bening tebal 8 mm
383 A.4.6.2.19 Memasang 1 m² kaca bening tebal 12 mm

L. PEKERJAAN KUNCI DAN KACA


384 L.011 Memasang 1 buah gerendel (pendek) pintu
385 L.012 Memasang 1 buah gerendel (panjang) pintu
386 L.013 Memasang 1 buah gerendel jendela
387 L.016 Memasang 1 m² kaca bening tebal 3 mm dengan kisi - kisi
388 L.017 Memasang 1 m² kaca rayben tebal 5 mm

A.4.4.3.1 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


389 A.4.4.3.32 Memasang 1 m² lantai keramik artistik ukuran 10 x 20 cm
390 A.4.4.3.33 Memasang 1 m² lantai keramik artistik ukuran 10 x 10 cm atau 5 x 20 cm

391 A.4.4.3.34 Memasang 1 m² lantai keramik polos (33 x 33) cm


392 A.4.4.3.35 Memasang 1 m² lantai keramik polos (30 x 30) cm
393 A.4.4.3.35.a Memasang 1 m² lantai keramik motif (30 x 30) cm
394 A.4.4.3.35.b Memasang 1 m² lantai keramik motif granit (30 x 30) cm
395 A.4.4.3.35.c Memasang 1 m² lantai keramik polos (40 x 40) cm
396 A.4.4.3.35.d Memasang 1 m² lantai keramik motif (40 x 40) cm
397 A.4.4.3.35.e Memasang 1 m² lantai keramik motif granit (40 x 40) cm
398 A.4.4.3.35.f Memasang 1 m² lantai keramik polos 60 x 60 cm
399 A.4.4.3.35.g Memasang 1 m² lantai keramik motif 60 x 60 cm
400 A.4.4.3.35.h Memasang 1 m² lantai keramik motif granit 60 x 60 cm
401 A.4.4.3.36 Memasang 1 m² lantai keramik polos (20 x 20) cm
402 A.4.4.3.36.a Memasang 1 m² lantai keramik motif ukuran 20 x 20 cm (anti slip)
403 A.4.4.3.39 Memasang 1 m' plint keramik ukuran 10 x 20 cm
404 A.4.4.3.40 Memasang 1 m' plint keramik ukuran 10 x 10 cm
405 A.4.4.3.41 Memasang 1 m' plint keramik ukuran 5 x 20 cm
406 A.4.4.3.44 Memasang 1 m² lantai karpet
407 A.4.4.3.48 Memasang 1 m² dinding porselen ukuran (11 x 11) cm
408 A.4.4.3.51 Memasang 1 m² dinding keramik artistisk (10 x 20) cm
409 A.4.4.3.52 Memasang 1 m' dinding keramik ukuran (5 x 20) cm
410 A.4.4.3.53 Memasang 1 m' dinding keramik artistisk (10 x 20) cm
411 A.4.4.3.54 Memasang 1 m² dinding keramik polos ukuran 20 x 20 cm
412 A.4.4.3.54.a Memasang 1 m² dinding keramik motif ukuran 20 x 20 cm
413 A.4.4.3.54.b Memasang 1 m² dinding keramik polos ukuran 20 x 25 cm
414 A.4.4.3.54.c Memasang 1 m² dinding keramik motif ukuran 20 x 25 cm
415 A.4.4.3.54.d Memasang 1 m² dinding keramik motif ukuran 30 x 60 cm
416 A.4.4.3.54.e Memasang 1 m² dinding keramik motif ukuran 25 x 40 cm
417 A.4.4.3.57 Memasang 1 m² dinding batu tempel Palimanan Hijau
418 A.4.4.3.57.a Memasang 1 m² dinding batu tempel Palimanan Kuning

Harga Satuan Pekerjaan 2016 34 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

419 A.4.4.3.57.b Memasang 1 m² dinding batu tempel serit hitam lurus


420 A.4.4.3.58 Memasang 1 m² dinding batu tempel hitam tidak beraturan ( kecil )
421 A.4.4.3.58.a Memasang 1 m² dinding batu tempel hitam tidak beraturan ( besar )
422 A.4.4.3.60 Memasang 1 m² wallpaper lebar 50 cm
423 A.4.4.3.63 Memasang 1 m' Plint kayu kelas I tebal 2 cm, lebar 10 cm ( kayu Jati )

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


424 A.4.7.1.1 1 m² mengorek atau mengikis cat tembok cara manual
425 A.4.7.1.2 1 m² mencuci bidang permukaan tembok lama dengan sabun
426 A.4.7.1.3 1 m² mengorek karat pada permukaan baja cara manual
427 A.4.7.1.4 1 m² mengecat bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2
lapis cat penutup )
428 A.4.7.1.5 1 m² mengecat bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 3
lapis cat penutup )
429 A.4.7.1.6 1 m² Pelaburan bidang kayu dengan teak oil
430 A.4.7.1.7 1 m² pelaburan bidang kayu dengan pelitur 2 lapis menggunakan kuas

431 A.4.7.1.8 1 m² pelapisan bidang kayu dengan reside / ter


432 A.4.7.1.9 1 m² pelapisan bidang kayu dengan dengan vernis
433 A.4.7.1.10 1 m² pengecetan tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis
cat penutup )
434 A.4.7.1.10.a 1 m² pengecetan plafond baru menggunakan perancah ( 1 lapis plamur, 1
lapis cat dasar, 2 lapis cat penutup )
435 A.4.7.1.11 1 m² pengecetan tembok lama ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis
cat penutup )
436 A.4.7.1.15 1 m² pemasangan wallpaper
437 A.4.7.1.16 1 m² melapis meni pada permukaan baja
438 A.4.7.1.17 1 m² melapis meni pada permukaan baja menggunakan perancah
439 A.4.7.1.18 1 m² Pengecatan permukaan baja galvanis secara manual 4 lapis
440 A.4.7.1.19 1 m² Pengecatan permukaan baja galvanis secara manual sistem 1 lapis
cat mutakhir
441 A.4.7.1.20 1 m² Pengecatan permukaan baja galvanis secara manual sistem 3 lapis
cat
442 A.4.7.1.21 1 m² Pengecatan permukaan baja galvanis secara semprot 3 lapis cat
mutakhir

O. PEKERJAAN PAVING, JALAN DAN LAIN-LAIN


443 O.001 Memasang 1 m² paving block natural segi empat; tebal 6 cm
444 O.001.a Memasang 1 m² paving block natural segi empat; tebal 6 cm
445 O.002 Memasang 1 m² paving block natural segi empat manggunakan bahan
lama
446 O.002.a Memasang 1 m² paving block natural segi empat manggunakan bahan
lama
447 O.003 Memasang 1 m² paving block natural segi enam; tebal 6 cm
448 O.003.a Memasang 1 m² paving block natural segi enam; tebal 6 cm
449 O.004 Memasang 1 m² paving block natural segi enam menggunakan bahan

Harga Satuan Pekerjaan 2016 35 dari 300


NOMOR
NO. JENIS PEKERJAAN
ANALISA
1 2 3

450 O.005 Memasang 1 m² paving block warna segi empat; tebal 6 cm

451 O.006 Memasang 1 m² paving block warna segi enam; tebal 6 cm


452 O.007 Memasang 1 m² paving block segi empat natural; tebal 6 cm ( K. 175 )

453 O.008 Memasang 1 m² paving block segi empat natural; tebal 8 cm ( K. 175 )

454 O.009 Memasang 1 m' kansteen beton cetak 10 x 20 x 40 cm


455 O.009.a Memasang 1 m' kansteen beton cetak 10 x 20 x 40 cm
456 O.010 Memasang 1 m' kansteen beton cetak 15 x 30 x 60 cm
457 O.010.a Memasang 1 m' kansteen beton cetak 15 x 30 x 60 cm

PEKERJAAN JALAN ASPAL


458 3.1 (8a) GALIAN PERKERASAN BERASPAL TANPA COLD MM
459 3,3 PENYIAPAN BADAN JALAN
460 4.2 (2) LAPIS PONDASI AGREGAT KELAS B (BAHU JALAN)
461 5.1 (1) LAPIS AGREGAT PONDASI KELAS A
462 5.1 (2) LAPIS AGREGAT PONDASI KELAS B
463 6.1 (1) LAPIS RESAP PENGIKAT (Prime coat)
464 6.1 (2) LAPIS PEREKAT (Tack Coat)
465 6.3 (1) LATASIR KLAS A (SS-A), (t = 1.5 cm)
466 6.3 (1a) LATASIR KLAS A (SS-A), (t = 1.50 cm) Manual
467 6.3 (3) LASTON LAPIS AUS (HRS-WC) Tebal 3 cm
468 6.3 (7a) LASTON LAPIS PONDASI (AC - BASE)
469 6.3 (7c) LASTON LAPIS PONDASI PERATA (AC-BASE L)
470 6.6 (1) LAPIS PERMUKAAN PENETRASI (t = 5 cm)
471 8.1 (7) PENETRASI MACADAM UNTUK PEK. MINOR (LEV. LAPEN)
472 K.515 KONTRUKSI LAPIS PONDASI BAWAH (LPB)KLAS``B``
473 K.516 KONTRUKSI LAPIS BAWAH (LPB TELPOORD)

Harga Satuan Pekerjaan 2016 36 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

-
m' 376,931.13
m' 458,351.13
m' 131,873.03
m² 104,760.98
m² 1,278,361.85
m² 1,285,572.00
m² 1,266,601.95
m² 1,333,798.75
m² 6,785.00
m² 47,264.77
m² 162,150.23
m² 127,080.75
m³ 904,647.50
m² 452,323.75
m' 9,754.30
m' 466,008.29

-
m³ 49,737.50
m³ 61,065.00
m³ 72,576.50
m³ 66,194.00
m³ 100,395.00
m³ 80,040.00
m² 3,622.50
m³ 21,792.50
m³ 36,225.00
m³ 36,225.00
m³ 142,577.00
m³ 142,577.00
m³ 178,733.00
m² 137,137.50
m³ 198,616.50

-
m³ 846,726.03
m³ 793,634.55
m³ 522,188.55
m³ 756,832.71

Harga Satuan Pekerjaan 2016 37 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m³ 730,957.37
m³ 695,496.31
m³ 668,340.90
m³ 716,233.69
m³ 682,326.51
m³ 402,396.27

m³ 2,351,263.55

m³ 895,639.55

m³ 816,570.15

m² 286,025.70

m² 271,970.52

m² 262,508.55

m² 257,607.13

m² 255,909.73

m² 253,001.96

m² 138,297.62

m² 131,640.27

m² 127,818.25

m² 125,414.06

m² 124,119.16

m² 121,514.75

m² 127,145.73

m² 462,714.12
m² 462,185.12
m² 410,708.82
m² 410,119.56
m² 1,111,619.00

Harga Satuan Pekerjaan 2016 38 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m² 435,584.35

m² 232,396.03

m² 232,396.03

-
m² 60,473.85
m² 53,138.23
m² 49,966.51
m² 47,799.75
m² 46,572.88
m² 45,589.61
m² 45,050.15
m² 44,510.68
m² 48,066.55
m² 46,376.63
m² 71,101.72
m² 57,189.75
m² 63,917.00
m² 62,347.92
m² 60,970.15
m² 29,972.63
m' 43,531.30
m² 36,895.91
m² 21,567.93
m² 10,343.10

m² 45,551.27
m² 27,260.75

-
m³ 23,299,540.50

m³ 15,809,027.00

m³ 15,050,303.00

m³ 11,670,131.00

m³ 10,679,705.00

m³ 8,512,415.00

m³ 10,679,705.00

Harga Satuan Pekerjaan 2016 39 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m² 627,027.15

m² 524,874.95

m² 450,465.35

m² 428,794.75

m² 335,230.75

m² 1,105,823.90

m² 850,132.90

m² 747,980.70

m² 673,571.10

m² 880,345.70

m² 805,936.10

m² 729,159.34

m² 575,744.74

m² 514,453.42

m² 469,807.66

m² 456,805.30

m² 1,566,009.74

m² 1,156,904.14

m² 993,460.62

m² 874,405.26

m² 839,732.30

Harga Satuan Pekerjaan 2016 40 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m² 644,552.58

m² 580,707.45

m² 534,201.45

m² 520,657.33

m² 685,054.36

m² 619,676.95

m² 572,054.80

m² 558,185.62

m² 1,016,121.60
m² 862,893.30
m² 751,278.90
m² 718,773.00
m² 685,251.08

m² 621,405.95

m² 574,899.95

m² 561,355.83

m² 773,185.83

m² 709,340.70

m² 662,834.70

m² 649,290.58

m³ 19,971,613.00

m³ 14,342,742.50

m³ 13,647,245.50

Harga Satuan Pekerjaan 2016 41 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m³ 10,548,754.50

m³ 9,640,864.00

m³ 7,654,181.50

m³ 22,519,679.50
m³ 16,379,093.50

m³ 15,620,369.50

m³ 12,240,197.50

m³ 12,240,197.50

m³ 9,082,481.50

m² 15,188,556.00
m³ 14,493,059.00
m³ 11,394,568.00
m³ 10,486,677.50
m³ 8,499,995.00
m² 199,396.11

m² 185,821.00

m² 144,458.68

m² 125,333.90

m² 93,546.98

m² 199,396.11

m² 185,821.00

m² 144,458.68

m² 125,333.90

m² 93,546.98

Harga Satuan Pekerjaan 2016 42 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m² 134,044.92

m² 128,409.97

m² 64,030.90

m² 159,383.13

m² 170,043.46

m² 170,043.46

m² 1,194,325.03
m² 203,079.28

m² 155,009.03

m² 110,461.30

m² 86,356.21

m² 210,249.28

m² 159,369.73

m² 112,218.55

m² 141,657.58

m' 232,797.63
m' 163,761.06

m' 136,179.96

m' 116,089.37

m' 110,238.31

m' 84,976.03

m' 235,850.51

Harga Satuan Pekerjaan 2016 43 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m' 165,535.49

m' 137,443.63

m' 116,980.99

m' 111,021.58

m' 85,291.48

m² 355,901.77

m² 277,031.09

m² 203,351.05

m² 483,697.13

m² 465,993.57

m² 387,122.89
m² 364,012.95

m² 313,442.85

m² 500,067.38
m² 482,363.82

m² 403,493.14

m² 380,383.20
m² 329,813.10

m² 291,414.95

m² 273,538.31

m² 54,734.25

m² 125,303.86

Harga Satuan Pekerjaan 2016 44 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m³ 965,756.61

m³ 1,008,649.68

m³ 1,041,509.79

m³ 913,756.65

m³ 1,081,294.00

m³ 1,117,838.46

m³ 1,147,404.27

m³ 1,164,076.12

m³ 1,192,766.53

m³ 1,201,560.07

m³ 1,272,314.92

m³ 1,283,877.58

kg 132,175.25
kg 13,217.53
kg 128,092.75
kg 10,228.68
m² 147,186.20
m² 157,721.35
m² 344,448.58
m² 357,091.10
m² 451,168.58
m² 379,869.15
m² 483,280.03
m² 92,914.34
m³ 3,821,331.55

m³ 3,821,331.55

m³ 4,660,623.40

m³ 4,660,623.40

Harga Satuan Pekerjaan 2016 45 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m³ 8,145,147.55

m³ 8,145,147.55

m³ 6,366,107.90

m³ 6,366,107.90

m³ 6,117,604.40

m³ 6,117,604.40

m³ 5,774,432.90

m³ 5,774,432.90

m³ 5,561,429.90

m³ 5,561,429.90

m³ 5,970,300.90

m³ 5,970,300.90

m³ 5,756,606.75

m³ 5,756,606.75

m³ 5,903,645.18

m³ 5,903,645.18

m' 75,670.81

m' 75,670.81

m' 93,577.80

m' 93,577.80

RSNI-T-13-2002

Harga Satuan Pekerjaan 2016 46 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m³ 818,228.00

m³ 807,094.00

m³ 766,633.00

m² 99,327.80

SNI 7394 : 2008


m³ 984,832.00

m³ 984,832.00

m³ 956,421.00

RSNI-T-13-2002
m³ 1,228,799.15
m³ 1,263,871.85
m³ 1,294,604.45
m³ 1,319,120.15
m³ 1,355,131.25
m³ 1,366,861.25
m³ 1,412,139.05
m³ 2,898.00
m² 341,780.00
m² 3,417.80
m² 424,522.50
m² 4,245.23
m² 1,285,700.00
m² 190,484.00
m² 203,496.41
kg 15,513.00
kg 15,513.00
m² 186,510.80
m² 152,155.80
m² 165,411.20
m² 127,856.40
m³ 1,301,330.00
m³ 1,336,326.00

-
m² 85,735.38
m² 74,695.38
m² 118,165.38
m² 65,610.38

Harga Satuan Pekerjaan 2016 47 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m² 82,903.50
m² 65,078.50
m' 84,008.88
m' 83,203.88
m' 95,623.88
m' 94,933.88
m' 89,643.88
m² 52,694.15
m² 17,239.20
m² 17,239.20
m² 17,068.70
m² 47,100.55
m² 58,025.55
m² 58,460.25
m² 52,367.55
m² 57,922.05
m² 66,213.55
m² 130,246.70
m² 75,115.70
m² 112,534.40
m² 543,219.75
m² 105,665.68
m' 38,151.25
m' 54,498.50
m' 53,914.30
m² 33,820.35
m² 99,017.30
m² 99,017.30

-
m² 31,779.16
m² 23,917.82

m² 206,204.78
m² 41,358.83

m' 12,886.90
m' 23,172.50
m' 27,036.50

-
bh 896,621.65
bh 412,080.65
bh 390,805.65
bh 2,044,241.15
bh 1,172,603.25
bh 898,469.70
bh 1,241,941.04
bh 1,677,669.45

Harga Satuan Pekerjaan 2016 48 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

bh 5,735,244.35
bh 313,743.00
bh 26,220.00
bh 382,977.60

bh 567,654.95

bh 727,193.65

m' 43,481.50
bh 86,882.50
bh 207,287.50
m' 50,968.00
m' 60,237.00
m' 99,388.75
m' 181,700.00
m' 224,658.25
m' 16,404.75
m' 19,791.50
m' 24,247.75
m' 40,025.75
m' 48,047.00
m' 70,509.38
m' 89,403.88
m' 136,105.38
m' 149,051.60
m' 111,228.31
m' 246,285.38
m' 174,426.48
m' 305,866.88
m' 356,000.61
m' 416,485.38
m' 357,616.88
m' 457,571.74

unit 12,520,843.76

unit 10,051,079.18

unit 8,795,661.38

unit 6,460,548.75

-
kg 26,639.75

Harga Satuan Pekerjaan 2016 49 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

kg 26,639.75
kg 94,041.25
kg 9,404.13
m² 930,091.25

cm 33,735.25
m² 568,307.00
m² 1,448,057.00
m² 76,451.43
m² 756,700.00
m² 123,557.73
m² 107,745.23
m² 377,370.78
m² 508,988.85
m² 176,887.25
m² 484,079.92
m² 111,977.64
m² 189,497.00
m' 165,621.05
m' 116,720.40

m' 84,600.90

m² 182,020.85

m² 126,079.10

m² 213,411.25

m² 151,253.75

SNI 7393 : 2008


m' 120,638.30
m' 105,044.30

bh 254,771.00
bh 134,780.00
bh 140,259.75
bh 94,489.75
bh 38,081.10
bh 27,991.00
bh 45,643.50
bh 34,258.50
bh 23,103.50
bh 943,851.00

Harga Satuan Pekerjaan 2016 50 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

bh 114,977.00
bh 391,851.00
bh 101,775.00
bh 254,771.00
bh 35,597.10
m² 127,407.35
m² 127,407.35
m² 160,550.35
m² 194,282.15
m² 277,563.31

Pt. T - 30 - 2002 C
bh 17,450.00
bh 27,350.00
bh 17,450.00
m² 140,345.00
m² 148,130.00

-
m² 392,419.22
m² 649,352.22

m² 191,976.98
m² 191,613.44
m² 193,824.82
m² 325,033.42
m² 194,058.52
m² 203,085.93
m² 326,663.83
m² 304,823.03
m² 313,165.13
m² 340,116.53
m² 195,789.23
m² 200,909.03
m' 40,899.64
m' 62,528.84
m' 55,380.26
m² 59,386.00
m² 186,763.34
m² 410,976.42
m' 53,137.76
m' 186,070.92
m² 215,945.62
m² 221,065.42
m² 223,623.02
m² 230,178.02
m² 301,073.45
m² 226,613.02
m' 301,603.03
m' 275,164.53

Harga Satuan Pekerjaan 2016 51 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m' 295,025.03
m² 261,882.03
m² 268,460.03
m² 140,133.25
m' 76,866.23

-
m² 10,062.50
m² 10,131.50
m² 10,591.50
m² 42,413.15

m² 49,095.80

m² 43,719.55
m² 88,249.39

m² 13,196.25
m² 35,040.50
m² 19,138.88

m² 23,593.75

m² 9,620.44

m² 77,418.00
m² 21,613.10
m² 43,426.65
m² 48,249.40
m² 28,958.15

m² 107,671.05

m² 94,377.05

HSPK
m² 126,727.00
m² 139,399.70
m² 62,390.00

m² 68,629.00

m² 126,727.00
m² 139,399.70
m² 62,390.00

Harga Satuan Pekerjaan 2016 52 dari 300


HARGA SATUAN
SATUAN
( Rp )
4 5

m² 132,080.00

m² 132,080.00
m² 146,523.00

m² 158,845.00

m' 76,061.71
m' 82,775.00
m' 80,617.71
m' 87,786.60

-
m³ 85,671.37
m² 574.98
m³ 435,852.29
m³ 442,745.80
m³ 430,366.36
liter 9,663.26
liter 9,432.92
m² 56,688.99
m³ 56,232.03
m³ 80,049.84
m³ 2,493,264.69
ton 1,032,625.68
m³ 1,706,074.25
m³ 1,694,762.39
m³ 254,523.75
m³ 340,996.56

Harga Satuan Pekerjaan 2016 53 dari 300


ANALISA HARGA SATUAN PEKERJAAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
1 Pengukuran dan pemasangan bouwplank 1 m2
Bahan
Kayu Terentang 0.012 M3 2,340,000.00 28,080.00
Paku biasa 2"-5" 0.020 Kg 18,000.00 360.00
Kayu papan 0.007 M3 2,550,000.00 17,850.00
Jumlah Bahan 46,290.00
Tenaga kerja
Tukang kayu 0.100 Oh 75,000.00 7,500.00
Pekerja 0.010 Oh 60,000.00 600.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.005 Oh 109,687.50 548.44
Jumlah Upah 9,492.19
Jumlah Bahan + Upah 55,782.19
Keuntungan + Overhead 8,367.33
Jumlah 64,149.52
2 Papan Nama Proyek 1 m2
Bahan
Kayu Terentang 0.033 M3 2,340,000.00 78,000.00
Paku biasa 2"-5" 0.010 Kg 18,000.00 180.00
Kayu papan 0.038 M3 2,550,000.00 97,142.86
Cetak Banner 1.050 M2 35,000.00 36,750.00
Jumlah Bahan 212,072.86
Tenaga kerja
Tukang kayu 0.100 Oh 75,000.00 7,500.00
Pekerja 0.010 Oh 60,000.00 600.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.005 Oh 109,687.50 548.44
Jumlah Upah 9,492.19
Jumlah Bahan + Upah 221,565.04
Keuntungan + Overhead 33,234.76
Jumlah 254,799.80
3 Kantor sementara lantai plesteran 1 m2
Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.250 m' 5,800.00 7,250.00
Kayu Meranti Batu 5/7 (ikat) 0.180 m³ 3,664,500.00 659,610.00
Paku biasa 0.080 kg 13,600.00 1,088.00
Besi strip 1.100 kg 17,000.00 18,700.00
Semen Portland 35.000 kg 1,450.00 50,750.00
Pasir pasang 0.150 m³ 174,100.00 26,115.00
Pasir Beton 0.100 m³ 172,500.00 17,250.00
Koral Beton 2/3 cm 0.150 m³ 327,300.00 49,095.00
bata merah 30.000 bh 900.00 27,000.00
Jendela naco 0.200 bh 15,000.00 3,000.00
Seng plat 0.250 lbr 58,400.00 14,600.00
Kaca polos 0.080 m² 88,900.00 7,112.00
Kunci tanam 0.150 bh 78,500.00 11,775.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Plywood 4 mm 0.060 bh 99,400.00 5,964.00
Jumlah Bahan 899,309.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 1.000 Oh 60,000.00 60,000.00
Tukang Kayu 2.000 Oh 75,000.00 150,000.00
Kepala Tukang 0.200 Oh 84,375.00 16,875.00
Mandor 0.050 Oh 109,687.50 5,484.38
Jumlah Upah 232,359.38
Jumlah Bahan + Upah 1,131,668.38
Keuntungan + Overhead 169,750.26
Jumlah 1,301,418.63
4 Rumah jaga (konstruksi kayu) 1 m2
Bahan
Kayu Dolken dia 8-10 panjang 4 m 3.000 m' 5,800.00 17,400.00
Kayu Meranti Batu 5/7 (ikat) 0.276 m³ 3,664,500.00 1,011,402.00
Paku biasa 0.700 kg 13,600.00 9,520.00
Seng Gelombang BJLS 32 1.500 lbr 50,000.00 75,000.00
Jumlah Bahan 1,113,322.00
Tenaga kerja
Pekerja 1.000 OH 60,000.00 60,000.00
Tukang Kayu 1.500 OH 75,000.00 112,500.00
Kepala Tukang 0.150 OH 84,375.00 12,656.25
Mandor 0.050 OH 109,687.50 5,484.38
Jumlah Upah 190,640.63
Jumlah Bahan + Upah 1,303,962.63
Keuntungan + Overhead 195,594.39
Jumlah 1,499,557.02
5 Gudang semen dan peralatan 1 m2
Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.700 m' 5,800.00 9,860.00
Kayu Meranti Batu 5/7 (ikat) 0.210 m³ 3,664,500.00 769,545.00
Paku 0.300 kg 13,600.00 4,080.00
Semen Portland 10.500 kg 1,450.00 15,225.00
Pasir Beton 0.030 m³ 172,500.00 5,175.00
Koral Beton 2/3 cm 0.050 m³ 327,300.00 16,365.00
Seng Gelombang BJLS 32 1.500 lbr 50,000.00 75,000.00
Seng plat 0.250 lbr 58,400.00 14,600.00
Jumlah Bahan 909,850.00
Tenaga kerja
Pekerja 1.000 OH 60,000.00 60,000.00
Tukang Kayu 2.000 OH 75,000.00 150,000.00
Kepala Tukang 0.200 OH 84,375.00 16,875.00
Mandor 0.050 OH 109,687.50 5,484.38
Jumlah Upah 232,359.38
Jumlah Bahan + Upah 1,142,209.38
Keuntungan + Overhead 171,331.41
Jumlah 1,313,540.78
6 Bedeng pekerja 1 m2
Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.250 m' 5,800.00 7,250.00
Kayu Meranti Batu 5/7 (ikat) 0.186 m³ 3,664,500.00 681,597.00
Paku biasa 0.300 kg 13,600.00 4,080.00
Semen Portland 18.000 kg 1,450.00 26,100.00
Pasir Beton 0.030 m³ 172,500.00 5,175.00
Koral Beton 2/3 cm 0.050 m³ 327,300.00 16,365.00
Seng Gelombang BJLS 32 1.500 lbr 50,000.00 75,000.00
Plywood 4 mm 1.350 lbr 99,400.00 134,190.00
Jumlah Bahan 949,757.00
Tenaga kerja
Pekerja 1.000 OH 60,000.00 60,000.00
Tukang Kayu 2.000 OH 75,000.00 150,000.00
Kepala Tukang 0.200 OH 84,375.00 16,875.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Mandor 0.050 OH 109,687.50 5,484.38
Jumlah Upah 232,359.38
Jumlah Bahan + Upah 1,182,116.38
Keuntungan + Overhead 177,317.46
Jumlah 1,359,433.83
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
7 Pembersihan dan Perataan Lapangan 1 m2
Tenaga kerja
Pekerja 0.1000 Oh 60,000.00 6,000.00
Mandor 0.0500 Oh 109,687.50 5,484.38
Jumlah Upah 11,484.38
Jumlah Bahan + Upah 11,484.38
Keuntungan + Overhead 1,722.66
Jumlah 13,207.03
8 1 M3 Galian Tanah Biasa sedalam 1 m
Tenaga kerja
Pekerja 0.750 Oh 60,000.00 45,000.00
Mandor 0.025 Oh 109,687.50 2,742.19
Jumlah Upah 47,742.19
Jumlah Bahan + Upah 47,742.19
Keuntungan + Overhead 7,161.33
Jumlah 54,903.52
9 1 M3 Galian Tanah dengan Alat Berat
Alat Berat
Excavator 0.007 jam 450,000.00 3,357.95
Dump Truck 0.130 jam 225,000.00 29,286.20
Alat Bantu 1.000 Ls 2,025.00 2,025.00
Jumlah Alat 34,669.15
Tenaga kerja
Mandor 0.209 Oh 109,687.50 22,917.99
Pekerja 0.052 Oh 60,000.00 3,134.08
Jumlah Upah 26,052.08
Jumlah Alat + Upah 60,721.23
Keuntungan + Overhead 9,108.18
Jumlah 69,829.41
10 1 M3 Pembongkaran Jalan
Alat Berat
Excavator 0.007 jam 450,000.00 3,357.95
Dump Truck 0.342 jam 225,000.00 76,918.96
Alat Bantu 1.000 Ls 2,025.00 2,025.00
Jumlah Alat 82,301.91
Tenaga kerja
Mandor 0.104 Oh 60,000.00 6,268.17
Pekerja 0.052 Oh 109,687.50 5,729.50
Jumlah Upah 11,997.67
Jumlah Alat + Upah 94,299.57
Keuntungan + Overhead 14,144.94
Jumlah 108,444.51
11 1 m3 Urugan kembali (1/3 dari Indeks Pek. Galian 1 m1)
Tenaga kerja
Pekerja 0.1920 Oh 60,000.00 11,520.00
Mandor 0.0190 Oh 109,687.50 2,084.06
Jumlah Upah 13,604.06
Jumlah Bahan + Upah 13,604.06
Keuntungan + Overhead 2,040.61
Jumlah 15,644.67
12 Pemadatan tanah (per 20 cm) 1 m3
Tenaga kerja
Pekerja 0.5000 Oh 60,000.00 30,000.00
Mandor 0.0500 Oh 109,687.50 5,484.38
Jumlah Upah 35,484.38
Jumlah Bahan + Upah 35,484.38
Keuntungan + Overhead 5,322.66
Jumlah 40,807.03
13 1 M3 Urugaan Pasir
Bahan
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Pasir urug 1.200 M3 100,000.00 120,000.00
Jumlah Bahan 120,000.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.010 Oh 60,000.00 600.00
Mandor 0.005 Oh 109,687.50 548.44
Jumlah Upah 1,148.44
Jumlah Bahan + Upah 121,148.44
Keuntungan + Overhead 18,172.27
Jumlah 139,320.70
14 1 M3 Urugaan Sirtu
Bahan
Sirtu 1.200 M3 135,000.00 162,000.00
Jumlah Bahan 162,000.00
Tenaga kerja
Pekerja 0.010 Oh 60,000.00 600.00
Mandor 0.005 Oh 109,687.50 548.44
Jumlah Upah 1,148.44
Jumlah Bahan + Upah 163,148.44
Keuntungan + Overhead 24,472.27
Jumlah 187,620.70
15 Pembuatan Rabat Beton 1 m3
Bahan
Semen Portland 218.000 Kg 1,450.00 316,100.00
Pasir Beton 0.520 M3 172,500.00 89,700.00
Batu Pecah Mesin 2/3 0.870 M3 211,100.00 183,657.00
Jumlah Bahan 589,457.00
Tenaga kerja
Pekerja 1.650 Oh 60,000.00 99,000.00
Tukang Batu 0.250 Oh 75,000.00 18,750.00
Kepala Tukang 0.025 Oh 84,375.00 2,109.38
Mandor 0.080 Oh 109,687.50 8,775.00
Jumlah Upah 128,634.38
Jumlah Bahan + Upah 718,091.38
Keuntungan + Overhead 107,713.71
Jumlah 825,805.08
16 1 m' Pekerjaan Bor Pile dia. 20 cm, H= 3 m
Bahan
Beton K-275 0.031 M3 1,175,000.00 36,913.71
Besi beton Ulir 6.143 Kg 8,400.00 51,602.16
Kawat beton 0.092 Kg 20,000.00 1,842.93
Bor Lubang Strauszpaal Ø 60 1.000 M3 150,000.00 150,000.00
Jumlah Bahan 240,358.81
Tenaga kerja
Pekerja 1.657 Oh 60,000.00 99,420.00
Tukang Batu 1.657 Oh 75,000.00 124,275.00
Kepala Tukang 1.651 Oh 84,375.00 139,277.81
Mandor 1.650 Oh 109,687.50 181,028.25
Jumlah Upah 544,001.06
Jumlah Bahan + Upah 784,359.87
Keuntungan + Overhead 117,653.98
Jumlah 902,013.85
17 Pembuatan 1 m3 beton mutu fc 21,7 MPa (K250)
Bahan
Semen portland 384.000 Kg 1,450.00 556,800.00
Pasir beton 0.520 m3 172,500.00 89,700.00
Kerikil (maksimum 30 mm) 0.780 m3 182,500.00 142,350.00
Jumlah Bahan 788,850.00
Tenaga kerja
Pekerja 0.700 Oh 60,000.00 42,000.00
Tukang Batu 0.150 Oh 75,000.00 11,250.00
Kepala Tukang 0.015 Oh 84,375.00 1,265.63
Mandor 0.020 Oh 109,687.50 2,193.75
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Jumlah Upah 56,709.38
Jumlah Bahan + Upah 845,559.38
Keuntungan + Overhead 126,833.91
Jumlah 972,393.28
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
18 1 kg Pekerjaan Besi Beton
Bahan
Besi beton ulir 1.050 Kg 8,400.00 8,820.00
Kawat beton 0.015 Kg 20,000.00 300.00
Jumlah Bahan 9,120.00
Tenaga kerja
Pekerja 0.007 Oh 60,000.00 420.00
Tukang Besi 0.007 Oh 75,000.00 525.00
Kepala Tukang 0.001 Oh 84,375.00 59.06
Mandor 0.000 Oh 109,687.50 43.88
Jumlah Upah 1,047.94
Jumlah Bahan + Upah 10,167.94
Keuntungan + Overhead 1,525.19
Jumlah 11,693.13
19 1 m2 Pekerjaan Bekisting
Bahan
Kayu Terentang 0.030 M3 2,550,000.00 76,500.00
Paku 5 cm - 10 cm 0.200 Kg 18,000.00 3,600.00
Minyak bekisting 0.100 Liter 20,000.00 2,000.00
Jumlah Bahan 82,100.00
Tenaga kerja
Pekerja 0.300 Oh 60,000.00 18,000.00
Tukang kayu 0.100 Oh 75,000.00 7,500.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 27,440.63
Jumlah Bahan + Upah 109,540.63
Keuntungan + Overhead 16,431.09
Jumlah 125,971.72
20 Memasang bekisting untuk pondasi 1 M2
Bahan
Multipleks 12 mm 0.120 lbr 170,100.00 20,407.82
Paku 5 cm - 12 cm 0.300 kg 18,000.00 5,400.00
Balok Kayu Meranti Batu 5/7 0.020 m³ 3,664,500.00 73,290.00
Jumlah Bahan 99,097.82
Tenaga kerja
Pekerja 0.520 Oh 60,000.00 31,200.00
Tukang kayu 0.260 Oh 75,000.00 19,500.00
Kepala tukang 0.026 Oh 84,375.00 2,193.75
Mandor 0.026 Oh 109,687.50 2,851.88
Jumlah Upah 55,745.63
Jumlah Bahan + Upah 154,843.45
Keuntungan + Overhead 23,226.52
Jumlah 178,069.96
21 Memasang bekisting untuk kolom 1 M2
Bahan
Multipleks 12 mm 0.336 lbr 170,100.00 57,141.90
Paku 5 cm - 12 cm 0.300 kg 18,000.00 5,400.00
Balok Kayu Meranti Batu 5/7 0.020 m³ 3,664,500.00 73,290.00
Jumlah Bahan 135,831.90
Tenaga kerja
Pekerja 0.520 Oh 60,000.00 31,200.00
Tukang kayu 0.260 Oh 75,000.00 19,500.00
Kepala tukang 0.026 Oh 84,375.00 2,193.75
Mandor 0.026 Oh 109,687.50 2,851.88
Jumlah Upah 55,745.63
Jumlah Bahan + Upah 191,577.52
Keuntungan + Overhead 28,736.63
Jumlah 220,314.15
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
22 Memasang bekisting untuk Sloof 1 M2
Bahan
Multipleks 12 mm 0.045 lbr 170,100.00 7,654.50
Paku 5 cm - 12 cm 0.300 kg 18,000.00 5,400.00
Balok Kayu Meranti Batu 5/7 0.020 m³ 3,664,500.00 73,290.00
Jumlah Bahan 86,344.50
Tenaga kerja
Pekerja 0.520 Oh 60,000.00 31,200.00
Tukang kayu 0.260 Oh 75,000.00 19,500.00
Kepala tukang 0.026 Oh 84,375.00 2,193.75
Mandor 0.026 Oh 109,687.50 2,851.88
Jumlah Upah 55,745.63
Jumlah Bahan + Upah 142,090.13
Keuntungan + Overhead 21,313.52
Jumlah 163,403.64
23 1 m3 Membuat Beton Ready Mix Mutu K - 175
Bahan
Beton Ready Mix K-175 1.000 m3 800,000.00 800,000.00
Sewa Alat Pompa Beton 1.000 m3 180,000.00 180,000.00
Jumlah Bahan 980,000.00
Tenaga kerja
Pekerja 0.700 Oh 60,000.00 42,000.00
Tukang batu 0.150 Oh 75,000.00 11,250.00
Kepala tukang 0.015 Oh 84,375.00 1,265.63
Mandor 0.020 Oh 109,687.50 2,193.75
Jumlah Upah 56,709.38
Jumlah Bahan + Upah 1,036,709.38
Keuntungan + Overhead 155,506.41
Jumlah 1,192,215.78
24 1 m3 Membuat Beton Ready Mix Mutu K - 225
Bahan
Beton Ready Mix K-225 1.000 m3 875,000.00 875,000.00
Sewa Alat Pompa Beton 1.000 m3 180,000.00 180,000.00
Jumlah Bahan 1,055,000.00
Tenaga kerja
Pekerja 0.700 Oh 60,000.00 42,000.00
Tukang batu 0.150 Oh 75,000.00 11,250.00
Kepala tukang 0.015 Oh 84,375.00 1,265.63
Mandor 0.020 Oh 109,687.50 2,193.75
Jumlah Upah 56,709.38
Jumlah Bahan + Upah 1,111,709.38
Keuntungan + Overhead 166,756.41
Jumlah 1,278,465.78
25 1 m3 Membuat Beton Ready Mix Mutu K - 250
Bahan
Beton Ready Mix K-250 1.000 m3 1,110,000.00 1,110,000.00
Sewa Alat Pompa Beton 1.000 m3 180,000.00 180,000.00
Jumlah Bahan 1,290,000.00
Tenaga kerja
Pekerja 0.700 Oh 60,000.00 42,000.00
Tukang batu 0.150 Oh 75,000.00 11,250.00
Kepala tukang 0.015 Oh 84,375.00 1,265.63
Mandor 0.020 Oh 109,687.50 2,193.75
Jumlah Upah 56,709.38
Jumlah Bahan + Upah 1,346,709.38
Keuntungan + Overhead 202,006.41
Jumlah 1,548,715.78
26 1 m3 Membuat Beton Ready Mix Mutu K - 275
Bahan
Beton Ready Mix K-275 1.000 m3 1,175,000.00 1,175,000.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Sewa Alat Pompa Beton 1.000 m3 180,000.00 180,000.00
Jumlah Bahan 1,355,000.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.700 Oh 60,000.00 42,000.00
Tukang batu 0.150 Oh 75,000.00 11,250.00
Kepala tukang 0.015 Oh 84,375.00 1,265.63
Mandor 0.020 Oh 109,687.50 2,193.75
Jumlah Upah 56,709.38
Jumlah Bahan + Upah 1,411,709.38
Keuntungan + Overhead 211,756.41
Jumlah 1,623,465.78
27 1 m3 Pek. pondasi footplat K-250 (uk 1,3 x 1,3 x 0,5 m)
Bahan
Beton Ready Mix Mutu K - 250 1.050 m3 1,548,715.78 1,626,151.57
Besi beton U 39 117.906 Kg 11,693.13 1,378,689.96
Bekisting 1.400 M2 178,069.96 249,297.95
Jumlah 3,254,139.48
28 1 m3 Pek. kolom motif
Bahan
Beton Ready Mix Mutu K - 250 1.050 m3 1,548,715.78 1,626,151.57
Besi beton U 39 105.348 Kg 11,693.13 1,231,842.05
Bekisting 1.607 M2 220,314.15 353,988.58
Jumlah 3,211,982.20
29 1 m3 Pek. Kolom 15/50
Bahan
Beton Ready Mix Mutu K - 250 1.050 m3 1,548,715.78 1,626,151.57
Besi beton U 39 105.348 Kg 11,693.13 1,231,842.05
Bekisting pondasi 8.267 M2 220,314.15 1,821,263.65
Jumlah 4,679,257.27
30 1 m3 Pek. kolom praktis 12/15
Bahan
Beton Ready Mix Mutu K - 175 1.050 m3 800,000.00 840,000.00
Besi beton U 39 52.674 Kg 11,693.13 615,921.02
Bekisting 4.133 M2 220,314.15 910,631.82
Jumlah 2,366,552.85
31 1 m3 Pek. Sloof 30/50
Bahan
Beton Ready Mix Mutu K - 250 1.050 m3 1,548,715.78 1,626,151.57
Besi beton U 39 163.085 Kg 11,693.13 1,906,971.46
Bekisting 4.889 M2 163,403.64 798,858.63
Jumlah 4,331,981.66
32 1 m' Saluran U-ditch 40
Bahan dan Alat
U-Ditch 40 1.000 m1 605,000.00 605,000.00
Hiab Crane 0.080 jam 450,000.00 36,000.00
Jumlah Bahan 641,000.00
Tenaga kerja
Pekerja 0.800 Oh 60,000.00 48,000.00
Tukang 0.200 Oh 75,000.00 15,000.00
Kepala 0.100 Oh 84,375.00 8,437.50
Mandor 0.100 Oh 109,687.50 10,968.75
Jumlah Upah 82,406.25
Jumlah Bahan + Upah 723,406.25
Keuntungan + Overhead 108,510.94
Jumlah 831,917.19
33 1 m' Saluran U-ditch 80
Bahan dan Alat
U-Ditch 80 1.000 m1 970,000.00 970,000.00
Hiab Crane 0.100 jam 450,000.00 45,000.00
Jumlah Bahan 1,015,000.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.800 Oh 60,000.00 48,000.00
Tukang 0.200 Oh 75,000.00 15,000.00
Kepala 0.100 Oh 84,375.00 8,437.50
Mandor 0.100 Oh 109,687.50 10,968.75
Jumlah Upah 82,406.25
Jumlah Bahan + Upah 1,097,406.25
Keuntungan + Overhead 164,610.94
Jumlah 1,262,017.19
34 1 m' Cover Saluran U-ditch 80 Heavy Duty
Bahan dan Alat
Cover Uditch 80 Heavy Duty 1.000 m1 800,000.00 800,000.00
Hiab Crane 0.065 jam 450,000.00 29,250.00
Jumlah Bahan 829,250.00
Tenaga kerja
Pekerja 0.800 Oh 60,000.00 48,000.00
Tukang 0.200 Oh 75,000.00 15,000.00
Kepala 0.100 Oh 84,375.00 8,437.50
Mandor 0.100 Oh 109,687.50 10,968.75
Jumlah Upah 82,406.25
Jumlah Bahan + Upah 911,656.25
Keuntungan + Overhead 136,748.44
Jumlah 1,048,404.69
35 1 bh Pemasangan Ankur Bolt dia. 19 mm
Bahan dan Alat
Angkur besi + Baut dia. 19 mm 1.000 bh 70,000.00 70,000.00
Jumlah Bahan 70,000.00
Tenaga kerja
Pekerja 0.050 Oh 60,000.00 3,000.00
Mandor 0.001 Oh 109,687.50 109.69
Jumlah Upah 3,109.69
Jumlah Bahan + Upah 73,109.69
Keuntungan + Overhead 10,966.45
Jumlah 84,076.14
36 1 bh Pembuatan Pot Bunga + Dudukan
Bahan dan Alat
Pot Bunga 1.000 bh 250,000.00 250,000.00
Dudukan Beton K - 175 0.054 m3 972,393.28 52,509.24
Jumlah Bahan 302,509.24
Tenaga kerja
Pekerja 0.700 Oh 60,000.00 42,000.00
Mandor 0.070 Oh 109,687.50 7,678.13
Jumlah Upah 49,678.13
Jumlah Bahan + Upah 352,187.36
Keuntungan + Overhead 52,828.10
Jumlah 405,015.47
37 1 Kg Plat Joint, T = 3 mm
Bahan dan Alat
Solar 0.010 ltr 18,500.00 185.00
Minyak pelumas 0.001 ltr 40,000.00 40.00
Sewa alat las 0.008 jam 65,000.00 520.00
Meni Besi 0.080 kg 26,500.00 2,120.00
Plat Besi 1.050 Kg 14,600.00 15,330.00
Jumlah Bahan 18,195.00
Tenaga kerja
Pekerja 0.061 Oh 60,000.00 3,660.00
Tukang besi 0.006 Oh 75,000.00 450.75
Kepala tukang 0.006 Oh 84,375.00 507.09
Mandor 0.000 Oh 109,687.50 38.39
Jumlah Upah 4,656.23
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Jumlah Bahan + Upah 22,851.23
Keuntungan + Overhead 3,427.69
Jumlah 26,278.92
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
38 1 cm Pekerjaan Pengelasan
Bahan dan Alat
kawat las 0.040 kg 24,500.00 980.00
Solar 0.010 ltr 18,500.00 185.00
Minyak pelumas 0.002 ltr 40,000.00 80.00
Sewa alat las 0.010 jam 65,000.00 650.00
Jumlah Bahan 1,895.00
Tenaga kerja
Pekerja 0.004 Oh 60,000.00 240.00
Tukang besi 0.002 Oh 75,000.00 150.00
Kepala tukang 0.000 Oh 84,375.00 16.88
Mandor 0.000 Oh 109,687.50 21.94
Jumlah Upah 428.81
Jumlah Bahan + Upah 2,323.81
Keuntungan + Overhead 348.57
Jumlah 2,672.38
39 1 M' Pekerjaan Pipa Pagar Stainless Steel
Bahan dan Alat
Pipa Stainless Steel 1.500 m' 454,000.00 681,000.00
Dudukan, mur, baut dll 1.000 ls 227,000.00 227,000.00
Jumlah Bahan 908,000.00
Tenaga kerja
Pekerja 2.352 Oh 60,000.00 141,120.00
Tukang besi 0.784 Oh 75,000.00 58,800.00
Mandor 0.392 Oh 109,687.50 42,997.50
Jumlah Upah 242,917.50
Jumlah Bahan + Upah 1,150,917.50
Keuntungan + Overhead 172,637.63
Jumlah 1,323,555.13
40 1 bh Pemasangan Tali Rantai
Bahan dan Alat
Tali Rantai 1.000 bh 565,000.00 565,000.00
Jumlah Bahan 565,000.00
Tenaga kerja
Pekerja 0.100 Oh 60,000.00 6,000.00
Mandor 0.002 Oh 109,687.50 219.38
Jumlah Upah 6,219.38
Jumlah Bahan + Upah 571,219.38
Keuntungan + Overhead 85,682.91
Jumlah 656,902.28
41 1 unit Pemasangan Jangkar
Bahan dan Alat
Jangkar 1.000 bh 5,000,000.00 5,000,000.00
Jumlah Bahan 5,000,000.00
Tenaga kerja
Pekerja 0.100 Oh 60,000.00 6,000.00
Mandor 0.002 Oh 109,687.50 219.38
Jumlah Upah 6,219.38
Jumlah Bahan + Upah 5,006,219.38
Keuntungan + Overhead 750,932.91
Jumlah 5,757,152.28
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
42 1 M' Pasangan Kansteen
Bahan dan Alat
Galian Tanah 0.012 m³ 54,903.52 658.842
Spesi 1 PC : 3 PP 0.004 m³ 72,860.81 313.301
Kansteen Beton Cetak 2.500 bh 39,000.00 97,500.000
Upah Kerja Pasang Kansteen 1.000 ls 11,000.00 11,000.000
Jumlah Bahan + Upah 109,472.14
Keuntungan + Overhead 16,420.82
Jumlah 125,892.97
43 1 m2 Plesteran Rabat 1 Pc : 3 Ps, tebal 15 mm
Bahan dan Alat
Semen portland 10.368 Kg 1,450.00 15,033.60
Pasir pasang 0.030 M3 174,100.00 5,223.00
Jumlah Bahan 20,256.60
Tenaga kerja
Pekerja 0.400 Oh 60,000.00 24,000.00
Tukang batu 0.200 Oh 75,000.00 15,000.00
Kepala tukang 0.020 Oh 84,375.00 1,687.50
Mandor 0.022 Oh 109,687.50 2,413.13
Jumlah Upah 43,100.63
Jumlah Bahan + Upah 63,357.23
Keuntungan + Overhead 9,503.58
Jumlah 72,860.81
44 Membuat acian 1 m2
Bahan dan Alat
Semen portland 3.200 Kg 1,450.00 4,640.00
Jumlah Bahan 4,640.00
Tenaga kerja
Pekerja 0.150 Oh 60,000.00 9,000.00
Tukang batu 0.100 Oh 75,000.00 7,500.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 18,440.63
Jumlah Bahan + Upah 23,080.63
Keuntungan + Overhead 3,462.09
Jumlah 26,542.72
45 1 M2 Pasangan Batu Andesit
Bahan dan Alat
Batu andesit 20 x 20 cm 1.050 m2 125,000.00 131,250.00
Semen abu-abu 8.000 Kg 1,450.00 11,600.00
Semen warna 0.013 Kg 1,450.00 18.85
Pasir pasang 0.018 M3 174,100.00 3,133.80
Jumlah Bahan 146,002.65
Tenaga kerja
Pekerja 0.188 Oh 60,000.00 11,250.00
Tukang batu 0.375 Oh 75,000.00 28,125.00
Kepala tukang 0.045 Oh 84,375.00 3,796.88
Mandor 0.019 Oh 109,687.50 2,062.13
Jumlah Upah 45,234.00
Jumlah Bahan + Upah 191,236.65
Keuntungan + Overhead 28,685.50
Jumlah 219,922.15
46 1 M2 Pasangan Batu Tempel
Bahan dan Alat
Batu tempel 1.050 m2 98,000.00 102,900.00
Semen abu-abu 8.000 Kg 1,450.00 11,600.00
Semen warna 0.013 Kg 1,450.00 18.85
Pasir pasang 0.018 M3 174,100.00 3,133.80
Jumlah Bahan 117,652.65
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.188 Oh 60,000.00 11,250.00
Tukang batu 0.375 Oh 75,000.00 28,125.00
Kepala tukang 0.045 Oh 84,375.00 3,796.88
Mandor 0.019 Oh 109,687.50 2,062.13
Jumlah Upah 45,234.00
Jumlah Bahan + Upah 162,886.65
Keuntungan + Overhead 24,433.00
Jumlah 187,319.65
47 1 M2 Pekerjaan Aspalt
Bahan dan Alat
Agregat Kasar 2.147 m3 185,000.00 397,213.50
Aspal 105.000 kg 9,000.00 945,000.00
Dump Truck 0.817 jam 225,000.00 183,892.50
Light Roller 0.018 jam 225,000.00 3,937.50
Jumlah Bahan 1,530,043.50
Tenaga kerja
Pekerja 0.170 Oj 8,571.43 1,458.00
Mandor 0.017 Oj 15,669.64 266.38
Jumlah Upah 1,724.38
Jumlah Bahan + Upah 1,531,767.88
Keuntungan + Overhead 229,765.18
Jumlah 1,761,533.07
48 1 M2 Pekerjaan Pas. Conwood
Bahan dan Alat
Conwood Lap Siding BG 2.150 bh 130,000.00 279,500.00
Sealent 1.720 m' 7,500.00 12,900.00
Skrup Fixer 8.600 bh 250.00 2,150.00
Alat Bantu 1.000 ls 688.75 688.75
Jumlah Bahan 295,238.75
Tenaga kerja
Pekerja 0.086 Oh 60,000.00 5,160.00
Tukang batu 0.086 Oh 75,000.00 6,450.00
Kepala tukang 0.009 Oh 84,375.00 725.63
Mandor 0.004 Oh 109,687.50 460.69
Jumlah Upah 12,796.31
Jumlah Bahan + Upah 308,035.06
Keuntungan + Overhead 46,205.26
Jumlah 354,240.32
49 1 M3 Pekerjaan pasangan Batukali (1pc : 4Psr)
Bahan dan Alat
Batu belah 15 cm/20 cm 1.200 M3 187,500.00 225,000.00
Semen portland 163.000 Kg 1,450.00 236,350.00
Pasir pasang 0.520 M3 174,100.00 90,532.00
Alat Bantu 1.000 ls 1,815.25 1,815.25
Jumlah Bahan 553,697.25
Tenaga kerja
Pekerja 1.200 Oh 60,000.00 72,000.00
Tukang batu 0.650 Oh 75,000.00 48,750.00
Kepala tukang 0.065 Oh 84,375.00 5,484.38
Mandor 0.065 Oh 109,687.50 7,129.69
Jumlah Upah 133,364.06
Jumlah Bahan + Upah 687,061.31
Keuntungan + Overhead 103,059.20
Jumlah 790,120.51
50 1 m2 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 3 Ps
Bahan dan Alat
Bata merah 5 x 11 x 22 cm 70.000 Bh 900.00 63,000.00
Semen portland 14.370 Kg 1,450.00 20,836.50
Pasir pasang 0.040 M3 174,100.00 6,964.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Alat Bantu 1.000 ls 882.25 882.25
Jumlah Bahan 91,682.75
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.300 Oh 60,000.00 18,000.00
Tukang batu 0.100 Oh 75,000.00 7,500.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.015 Oh 109,687.50 1,645.31
Jumlah Upah 27,989.06
Jumlah Bahan + Upah 119,671.81
Keuntungan + Overhead 17,950.77
Jumlah 137,622.58
51 1 m2 Pekerjaan pasangan Paving Block
Bahan dan Alat
Paving Segi Empat natural/warna; tebal 8 cm 1.010 m2 120,000.00 121,200.00
Pasir Urug 0.100 m3 100,000.00 10,000.00
Alat Bantu 1.000 ls 1,100.00 1,100.00
Jumlah Bahan 132,300.00
Tenaga kerja
Pekerja 0.250 Oh 60,000.00 15,000.00
Tukang batu 0.500 Oh 75,000.00 37,500.00
Kepala tukang 0.050 Oh 84,375.00 4,218.75
Mandor 0.025 Oh 109,687.50 2,742.19
Jumlah Upah 59,460.94
Jumlah Bahan + Upah 191,760.94
Keuntungan + Overhead 28,764.14
Jumlah 220,525.08
52 1 m2 Pekerjaan pasangan keramik motif batu
Bahan dan Alat
Keramik Motif Batu 40x40 1.010 m2 110,000.00 111,100.00
Semen portland 14.370 Kg 1,450.00 20,836.50
Pasir pasang 0.040 M3 174,100.00 6,964.00
Alat Bantu 1.000 ls 1,427.75 1,427.75
Jumlah Bahan 140,328.25
Tenaga kerja
Pekerja 0.300 Oh 60,000.00 18,000.00
Tukang batu 0.100 Oh 75,000.00 7,500.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.015 Oh 109,687.50 1,645.31
Jumlah Upah 27,989.06
Jumlah Bahan + Upah 168,317.31
Keuntungan + Overhead 25,247.60
Jumlah 193,564.91
53 1 m' Pasangan lantai disabilitas tipe 1 (Guiding Block)
Bahan dan Alat
Guiding Block Type 1 3.030 bh 24,000.00 72,727.27
Semen portland 14.370 Kg 1,450.00 20,836.50
Pasir pasang 0.040 M3 174,100.00 6,964.00
Alat Bantu 1.000 ls 997.75 997.75
Jumlah Bahan 101,525.52
Tenaga kerja
Pekerja 0.099 Oh 60,000.00 5,940.00
Tukang batu 0.033 Oh 75,000.00 2,475.00
Kepala tukang 0.003 Oh 84,375.00 278.44
Mandor 0.005 Oh 109,687.50 542.95
Jumlah Upah 9,236.39
Jumlah Bahan + Upah 110,761.91
Keuntungan + Overhead 16,614.29
Jumlah 127,376.20
54 1 m2 Pasangan lantai disabilitas tipe 2 (Guiding Block)
Bahan dan Alat
Guiding Block Type 2 9.183 bh 24,000.00 220,385.67
Semen portland 14.370 Kg 1,450.00 20,836.50
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Pasir pasang 0.040 M3 174,100.00 6,964.00
Alat Bantu 1.000 ls 997.75 997.75
Jumlah Bahan 249,183.92
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.300 Oh 60,000.00 18,000.00
Tukang batu 0.100 Oh 75,000.00 7,500.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.015 Oh 109,687.50 1,645.31
Jumlah Upah 27,989.06
Jumlah Bahan + Upah 277,172.99
Keuntungan + Overhead 41,575.95
Jumlah 318,748.94
55 1 M2 Pengecatan dinding (Weathershield) (3x)
Bahan dan Alat
Cat tembok eksterior 0.175 Kg 58,000.00 10,150.00
Cat dasar alkali 0.160 Kg 13,000.00 2,080.00
Rol cat 0.010 Bh 18,000.00 180.00
Ampelas 0.500 Lbr 7,500.00 3,750.00
Jumlah Bahan 16,160.00
Tenaga kerja
Pekerja 0.104 Oh 60,000.00 6,240.00
Tukang batu 0.182 Oh 75,000.00 13,650.00
Kepala tukang 0.020 Oh 84,375.00 1,645.31
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 22,632.19
Jumlah Bahan + Upah 38,792.19
Keuntungan + Overhead 5,818.83
Jumlah 44,611.02
56 1 M2 Pengecatan dinding (Weathershield) (3x)
Bahan dan Alat
Cat tembok eksterior 0.175 Kg 58,000.00 10,150.00
Cat dasar alkali 0.160 Kg 13,000.00 2,080.00
Rol cat 0.010 Bh 18,000.00 180.00
Ampelas 0.500 Lbr 7,500.00 3,750.00
Jumlah Bahan 16,160.00
Tenaga kerja
Pekerja 0.109 Oh 60,000.00 6,552.00
Tukang batu 0.191 Oh 75,000.00 14,332.50
Kepala tukang 0.020 Oh 84,375.00 1,727.58
Mandor 0.011 Oh 109,687.50 1,151.72
Jumlah Upah 23,763.80
Jumlah Bahan + Upah 39,923.80
Keuntungan + Overhead 5,988.57
Jumlah 45,912.37
57 1 M2 Pengecatan List Profil Exterior (Weathershield) (3x)
Bahan dan Alat
Cat tembok eksterior 0.175 Kg 58,000.00 10,150.00
Cat dasar alkali 0.160 Kg 13,000.00 2,080.00
Rol cat 0.010 Bh 18,000.00 180.00
Ampelas 0.500 Lbr 7,500.00 3,750.00
Jumlah Bahan 16,160.00
Tenaga kerja
Pekerja 0.115 Oh 60,000.00 6,879.60
Tukang batu 0.201 Oh 75,000.00 15,049.13
Kepala tukang 0.021 Oh 84,375.00 1,813.96
Mandor 0.011 Oh 109,687.50 1,209.30
Jumlah Upah 24,951.99
Jumlah Bahan + Upah 41,111.99
Keuntungan + Overhead 6,166.80
Jumlah 47,278.78
58 1 M' Instalasi Air dia. 3 inch
Bahan dan Alat
Pipa besi 3'' 1.200 m' 135,000.00 162,000.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Aksesories 0.160 ls 32,400.00 5,184.00
Jumlah Bahan 167,184.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Tenaga kerja
Pekerja 0.081 Oh 60,000.00 4,860.00
Tukang batu 0.135 Oh 75,000.00 10,125.00
Kepala tukang 0.014 Oh 84,375.00 1,139.06
Mandor 0.004 Oh 109,687.50 449.72
Jumlah Upah 16,573.78
Jumlah Bahan + Upah 183,757.78
Keuntungan + Overhead 27,563.67
Jumlah 211,321.45
59 1 bh Kran Air + Aksesoris
Bahan dan Alat
Kran air 1.000 Bh 125,000.00 125,000.00
Seal tape 0.025 Bh 7,500.00 187.50
Jumlah Bahan 125,187.50
Tenaga kerja
Pekerja 0.010 Oh 60,000.00 600.00
Tukang batu 0.050 Oh 75,000.00 3,750.00
Kepala tukang 0.010 Oh 84,375.00 843.75
Mandor 0.005 Oh 109,687.50 548.44
Jumlah Upah 5,742.19
Jumlah Bahan + Upah 130,929.69
Keuntungan + Overhead 19,639.45
Jumlah 150,569.14
60 1 unit Bak Kontrol Air
Bahan dan Alat
Bata merah 186.000 bh 900.00 167,400.00
P.C (50 gk) 114.000 Kg 1,450.00 165,300.00
Pasir pasang 0.184 m3 174,100.00 32,034.40
Batu pecah 2/3 0.033 m3 211,100.00 6,966.30
Besi beton 4.850 m3 8,400.00 40,740.00
Pasir beton 0.120 m3 172,500.00 20,700.00
Jumlah Bahan 433,140.70
Tenaga kerja
Pekerja 2.160 Oh 60,000.00 129,600.00
Tukang gali 0.100 Oh 75,000.00 7,500.00
Tukang batu 0.720 Oh 75,000.00 54,000.00
Kepala tukang 0.072 Oh 84,375.00 6,075.00
Mandor 0.108 Oh 109,687.50 11,846.25
Jumlah Upah 209,021.25
Jumlah Bahan + Upah 642,161.95
Keuntungan + Overhead 96,324.29
Jumlah 738,486.24
61 1 Titik Armature dan Instalasi Listrik
Bahan dan Alat
Kabel NYY 3x2.5 mm2 12.000 M1 10,000.00 120,000.00
Selotip 0.200 Roll 4,000.00 800.00
Pipa listrik 1.500 Btg 2,000.00 3,000.00
T-Dus 1.000 Bh 2,500.00 2,500.00
Inbow Dus 1.000 Bh 25,000.00 25,000.00
Saklar seri Legrand 1.000 Bh 39,000.00 39,000.00
Upah Kerja Pasang 1.000 ls 210,000.00 210,000.00
Jumlah 400,300.00
Jumlah Bahan + Upah 400,300.00
Keuntungan + Overhead 60,045.00
Jumlah Total 460,345.00
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
62 1 Titik Lampu Sorot
Bahan dan Alat
Lampu Sorot BE040 1.000 Bh 225,000.00 225,000.00
Alat bantu 0.025 Lot 10,000.00 250.00
Upah Kerja Pasang 1.000 ls 10,000.00 10,000.00
Jumlah 235,250.00
Jumlah Bahan + Upah 235,250.00
Keuntungan + Overhead 35,287.50
Jumlah Total 270,537.50
63 1 titik MCB
Bahan dan Alat
MCB 20A 1.000 Bh 51,000.00 51,000.00
Alat bantu 0.025 Lot 10,000.00 250.00
Upah Kerja Pasang 1.000 ls 200,000.00 200,000.00
Jumlah 251,250.00
Jumlah Bahan + Upah 251,250.00
Keuntungan + Overhead 37,687.50
Jumlah Total 288,937.50
64 1 M2 Vegetasi Rumput
Bahan dan Alat
Pupuk kandang 0.040 krg 30,000.00 1,200.00
Rumput jepang 0.500 m2 25,000.00 12,500.00
Jumlah Bahan 13,700.00
Tenaga kerja
Pekerja 0.040 Oh 60,000.00 2,400.00
Mandor 0.004 Oh 109,687.50 438.75
Jumlah Upah 2,838.75
Jumlah Bahan + Upah 16,538.75
Keuntungan + Overhead 2,480.81
Jumlah 19,019.56
65 1 bh Tanaman Bunga
Bahan dan Alat
Pupuk kandang 0.040 krg 30,000.00 1,200.00
Furadan 0.0010 kg 30,000.00 30.00
Tanaman Bunga 1.000 bh 200,000.00 200,000.00
Jumlah Bahan 201,230.00
Tenaga kerja
Pekerja 0.020 Oh 60,000.00 1,200.00
Mandor 0.002 Oh 109,687.50 219.38
Jumlah Upah 1,419.38
Jumlah Bahan + Upah 202,649.38
Keuntungan + Overhead 30,397.41
Jumlah 233,046.78
66 1 bh Pekerjaan Bollard Bola dan Finishing
Bahan dan Alat
Batu Bollard 1.000 bh 560,000.00 560,000.00
Alat Bantu 1.0000 ls 2,800.00 2,800.00
Jumlah Bahan 562,800.00
Tenaga kerja
Pekerja 0.200 Oh 60,000.00 12,000.00
Mandor 0.020 Oh 109,687.50 2,193.75
Jumlah Upah 14,193.75
Jumlah Bahan + Upah 576,993.75
Keuntungan + Overhead 86,549.06
Jumlah 663,542.81
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
67 1 Unit Lampu LED dan Instalasinya
Bahan dan Alat
Kabel NYY 3x2.5 mm2 12.000 M1 10,000.00 120,000.00
Selotip 0.200 Roll 4,000.00 800.00
Pipa listrik 1.500 Btg 2,000.00 3,000.00
T-Dus 1.000 Bh 2,500.00 2,500.00
Inbow Dus 1.000 Bh 25,000.00 25,000.00
Lampu Sorot BE040 1.000 Bh 225,000.00 225,000.00
Upah Kerja Pasang 1.000 ls 210,000.00 210,000.00
Jumlah 586,300.00
Jumlah Bahan + Upah 586,300.00
Keuntungan + Overhead 87,945.00
Jumlah Total 674,245.00
68 1 unit Pek. Pengadaan dan pemasangan tiang lampu besi customized
Bahan dan Alat
Tiang Lampu PJU 1.000 bh 4,560,000.00 4,560,000.00
Alat Bantu 1.0000 ls 22,800.00 22,800.00
Jumlah Bahan 4,582,800.00
Tenaga kerja
Pekerja 0.400 Oh 60,000.00 24,000.00
Mandor 0.020 Oh 109,687.50 2,193.75
Jumlah Upah 26,193.75
Jumlah Bahan + Upah 4,608,993.75
Keuntungan + Overhead 691,349.06
Jumlah 5,300,342.81
69 1 unit Pek. Pengadaan dan pemasangan Lampu dan jaringan instalasi
Bahan dan Alat
Kabel NYY 3x2.5 mm2 12.000 M1 10,000.00 120,000.00
Selotip 0.200 Roll 4,000.00 800.00
Pipa listrik 1.500 Btg 2,000.00 3,000.00
T-Dus 1.000 Bh 2,500.00 2,500.00
Inbow Dus 1.000 Bh 25,000.00 25,000.00
Lampu PJU 2.000 bh 950,000.00 1,900,000.00
Upah Kerja Pasang 1.0000 ls 210,000.00 210,000.00
Jumlah 2,261,300.00
Jumlah Bahan + Upah 2,261,300.00
Keuntungan + Overhead 339,195.00
Jumlah Total 2,600,495.00
70 1 bh Tutup main hole
Bahan dan Alat
Cover Man hole 1.000 bh 1,800,000.00 1,800,000.00
Alat Bantu 1.0000 ls 9,000.00 9,000.00
Jumlah Bahan 1,809,000.00
Tenaga kerja
Pekerja 0.200 Oh 60,000.00 12,000.00
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 13,096.88
Jumlah Bahan + Upah 1,822,096.88
Keuntungan + Overhead 273,314.53
Jumlah 2,095,411.41
71 1 bh Tutup grill
Bahan dan Alat
Tutup Grill 1.000 bh 475,000.00 475,000.00
Alat Bantu 1.0000 ls 2,375.00 2,375.00
Jumlah Bahan 477,375.00
Tenaga kerja
Pekerja 0.100 Oh 60,000.00 6,000.00
Mandor 0.005 Oh 109,687.50 548.44
Jumlah Upah 6,548.44
Jumlah Bahan + Upah 483,923.44
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Keuntungan + Overhead 72,588.52
Jumlah 556,511.95
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
72 1 M' Pipa PVC 4''
Bahan dan Alat
Pipa PVC AW 4'' 1.050 m' 36,000.00 37,800.00
Aksesories 1.000 Ls 7,560.00 7,560.00
Jumlah Bahan 45,360.00
Tenaga kerja
Pekerja 0.081 Oh 60,000.00 4,860.00
Tukang batu 0.135 Oh 75,000.00 10,125.00
Kepala tukang 0.014 Oh 75,000.00 1,012.50
Mandor 0.004 Oh 109,687.50 449.72
Jumlah Upah 16,447.22
Jumlah Bahan + Upah 61,807.22
Keuntungan + Overhead 9,271.08
Jumlah 71,078.30
73 1 M' Pipa PE
Bahan dan Alat
Pipa PE 1.050 m' 160,000.00 168,000.00
Aksesories dan lem 1.000 Ls 16,800.00 16,800.00
Jumlah Bahan 184,800.00
Tenaga kerja
Pekerja 0.081 Oh 60,000.00 4,860.00
Tukang batu 0.135 Oh 75,000.00 10,125.00
Kepala tukang 0.014 Oh 75,000.00 1,012.50
Mandor 0.004 Oh 109,687.50 449.72
Jumlah Upah 16,447.22
Jumlah Bahan + Upah 201,247.22
Keuntungan + Overhead 30,187.08
Jumlah 231,434.30
74 1 unit Pek. Pengadaan dan pemasangan Kursi Taman
Bahan dan Alat
Kursi Taman 1.000 bh 950,000.00 950,000.00
Alat Bantu 1.0000 ls 4,750.00 4,750.00
Jumlah Bahan 954,750.00
Tenaga kerja
Pekerja 0.200 Oh 60,000.00 12,000.00
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 13,096.88
Jumlah Bahan + Upah 967,846.88
Keuntungan + Overhead 145,177.03
Jumlah 1,113,023.91
75 1 unit Pek. Pengadaan dan pemasangan Lampu Taman Gantung
Bahan dan Alat
Lampu Taman 1.000 bh 370,000.00 370,000.00
Alat Bantu 1.0000 ls 1,850.00 1,850.00
Jumlah Bahan 371,850.00
Tenaga kerja
Pekerja 0.200 Oh 60,000.00 12,000.00
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 13,096.88
Jumlah Bahan + Upah 384,946.88
Keuntungan + Overhead 57,742.03
Jumlah 442,688.91
76 1 unit Pek. Pengadaan dan pemasangan Keranjang sampah
Bahan dan Alat
Keranjang sampah 1.000 bh 650,000.00 650,000.00
Alat Bantu 1.0000 ls 3,250.00 3,250.00
Jumlah Bahan 653,250.00
Tenaga kerja
Pekerja 0.200 Oh 60,000.00 12,000.00
Mandor 0.010 Oh 109,687.50 1,096.88
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
Jumlah Upah 13,096.88
Jumlah Bahan + Upah 666,346.88
Keuntungan + Overhead 99,952.03
Jumlah 766,298.91
HARGA SATUAN
NO URAIAN PEKERJAAN INDEKS SAT JUMLAH HARGA (Rp)
(Rp)
77 1 unit Pek. Pengadaan dan pemasangan Parkir Sepeda
Bahan dan Alat
Parkir sepeda rental 1.000 bh 550,000.00 550,000.00
Alat Bantu 1.0000 ls 2,750.00 2,750.00
Jumlah Bahan 552,750.00
Tenaga kerja
Pekerja 0.200 Oh 60,000.00 12,000.00
Mandor 0.010 Oh 109,687.50 1,096.88
Jumlah Upah 13,096.88
Jumlah Bahan + Upah 565,846.88
Keuntungan + Overhead 84,877.03
Jumlah 650,723.91
78 1 M2 Pengecatan dinding (Weathershield) (3x)
Bahan dan Alat
Cat besi setara ICI 0.300 Kg 70,000.00 21,000.00
Rol cat 0.010 Bh 18,000.00 180.00
Ampelas 0.500 Lbr 7,500.00 3,750.00
Jumlah Bahan 24,930.00
Tenaga kerja
Pekerja 0.109 Oh 60,000.00 6,552.00
Tukang batu 0.191 Oh 75,000.00 14,332.50
Kepala tukang 0.020 Oh 75,000.00 1,535.63
Mandor 0.011 Oh 109,687.50 1,151.72
Jumlah Upah 23,571.84
Jumlah Bahan + Upah 48,501.84
Keuntungan + Overhead 7,275.28
Jumlah 55,777.12
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN: 2018/2019

HARGA SAT JUMLAH


NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1 Membuat 1 m' pagar sementara dari kayu tinggi 2 meter
A. Bahan
Kayu Dolken dia 8-10 cm panjang 4 m 1.250 btg 5,800.00 7,250.00 BR
Portland Cement (PC) 5.000 kg 1,340.00 6,700.00
Pasir Beton (PB) 0.005 m³ 174,100.00 870.50
Koral Beton 2/3 cm 0.009 m³ 367,300.00 3,305.70
Kayu Meranti Batu 5/7 (ikat) 0.072 m³ 3,664,500.00 263,844.00
Paku Biasa 2" - 5" 0.060 kg 13,600.00 816.00
Residu 0.400 lt 15,700.00 6,280.00
Jumlah harga bahan 289,066.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.020 OH 80,000.00 1,600.00
Jumlah harga tenaga 38,700.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 327,766.20
E. Overhead and profit 15 % 49,164.93
F. Harga satuan pekerjaan ( D + E ) 376,931.13
A.2.2.1.2 Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter
A. Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.250 m' 5,800.00 7,250.00 BR
Portland Cement (PC) 2.500 kg 1,340.00 3,350.00
Seng Gelombang 3" - 5" 1.200 lbr 58,400.00 70,080.00
Pasir Beton (PB) 0.005 m³ 174,100.00 870.50
Koral Beton 2/3 cm 0.009 m³ 367,300.00 3,305.70
Kayu Meranti Batu 5/7 (ikat) 0.072 m³ 3,664,500.00 263,844.00
Paku Biasa 2" - 5" 0.060 kg 13,600.00 816.00
Meni Besi 0.450 kg 23,000.00 10,350.00
Jumlah harga bahan 359,866.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.020 OH 80,000.00 1,600.00
Jumlah harga tenaga 38,700.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 398,566.20
E. Overhead and profit 15 % 59,784.93
F. Harga satuan pekerjaan ( D + E ) 458,351.13
A.2.2.1.3 Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter
A. Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.000 m' 5,800.00 5,800.00 BR
Portland Cement (PC) 2.000 kg 1,340.00 2,680.00
Kawat Duri 25.000 m' 2,720.00 68,000.00
Pasir Beton (PB) 0.005 m³ 174,100.00 870.50
Koral Beton 2/3 cm 0.009 m³ 367,300.00 3,305.70
Paku Biasa 2" - 5" 0.060 kg 13,600.00 816.00
Jumlah harga bahan 81,472.20
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.020 OH 80,000.00 1,600.00
Jumlah harga tenaga 33,200.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 114,672.20
E. Overhead and profit 15 % 17,200.83
F. Harga satuan pekerjaan ( D + E ) 131,873.03

83 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.2.2.1.4 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank
A. Bahan
Kayu Meranti Batu 5/7 (ikat) 0.012 m³ 3,664,500.00 43,974.00
Paku Biasa 2" - 5" 0.020 kg 13,600.00 272.00
Kayu Papan Meranti Batu (2 x 20 x 400) 0.007 m³ 4,771,500.00 33,400.50
Jumlah harga bahan 77,646.50
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 91,096.50
E. Overhead and profit 15 % 13,664.48
F. Harga satuan pekerjaan ( D + E ) 104,760.98
A.2.2.1.5 Membuat 1 m² kantor sementara lantai plesteran
A. Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.250 m' 5,800.00 7,250.00
Kayu Meranti Batu 5/7 (ikat) 0.180 m³ 3,664,500.00 659,610.00
Paku biasa 0.080 kg 13,600.00 1,088.00
Besi strip 1.100 kg 17,000.00 18,700.00
Semen Portland 35.000 kg 1,340.00 46,900.00
Pasir pasang 0.150 m³ 174,100.00 26,115.00
Pasir Beton 0.100 m³ 174,100.00 17,410.00
Koral Beton 2/3 cm 0.150 m³ 367,300.00 55,095.00
bata merah 30.000 bh 900.00 27,000.00
Jendela naco 0.200 bh 15,000.00 3,000.00
Seng plat 0.250 lbr 58,400.00 14,600.00
Kaca polos 0.080 m² 88,900.00 7,112.00
Kunci tanam 0.150 bh 78,500.00 11,775.00
Plywood 4 mm 0.060 bh 99,400.00 5,964.00
Jumlah harga bahan 901,619.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 210,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,111,619.00
E. Overhead and profit 15 % 166,742.85
F. Harga satuan pekerjaan ( D + E ) 1,278,361.85
A.2.2.1.6 Membuat 1 m² rumah jaga konstruksi kayu
A. Bahan
Kayu Dolken dia 8-10 panjang 4 m 3.000 m' 5,800.00 17,400.00 BR
Kayu Meranti Batu 5/7 (ikat) 0.276 m³ 3,664,500.00 1,011,402.00
Paku biasa 0.700 kg 13,600.00 9,520.00
Seng Gelombang BJLS 32 1.500 lbr 50,000.00 75,000.00
Jumlah harga bahan 1,113,322.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 1.500 OH 68,000.00 102,000.00
Kepala Tukang 0.150 OH 75,000.00 11,250.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 172,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,285,572.00
E. Overhead and profit 15 % 192,835.80
F. Harga satuan pekerjaan ( D + E ) 1,285,572.00
A.2.2.1.7 Membuat 1 m² gudang semen dan alat-alat
A. Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.700 m' 5,800.00 9,860.00 BR
Kayu Meranti Batu 5/7 (ikat) 0.210 m³ 3,664,500.00 769,545.00
Paku 0.300 kg 13,600.00 4,080.00
Semen Portland 10.500 kg 1,340.00 14,070.00
Pasir Beton 0.030 m³ 174,100.00 5,223.00
Koral Beton 2/3 cm 0.050 m³ 367,300.00 18,365.00
Seng Gelombang BJLS 32 1.500 lbr 37,100.00 55,650.00
Seng plat 0.250 lbr 58,400.00 14,600.00

84 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga bahan 891,393.00

85 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 210,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,101,393.00
E. Overhead and profit 15 % 165,208.95
F. Harga satuan pekerjaan ( D + E ) 1,266,601.95
A.2.2.1.8 Membuat 1 m² bedeng buruh
A. Bahan
Kayu Dolken dia 8-10 panjang 4 m 1.250 m' 5,800.00 7,250.00 BR
Kayu Meranti Batu 5/7 (ikat) 0.186 m³ 3,664,500.00 681,597.00
Paku biasa 0.300 kg 13,600.00 4,080.00
Semen Portland 18.000 kg 1,340.00 24,120.00
Pasir Beton 0.030 m³ 174,100.00 5,223.00
Koral Beton 2/3 cm 0.050 m³ 367,300.00 18,365.00
Seng Gelombang BJLS 32 1.500 lbr 50,000.00 75,000.00
Plywood 4 mm 1.350 lbr 99,400.00 134,190.00
Jumlah harga bahan 949,825.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 210,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,159,825.00
E. Overhead and profit 15 % 173,973.75
F. Harga satuan pekerjaan ( D + E ) 1,333,798.75
A.2.2.1.9 Membersihkan 1 m² lapangan dan perataan
A. Bahan -

Jumlah harga bahan -


B. Pekerja 0.100 OH 55,000.00 5,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 5,900.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,900.00
E. Overhead and profit 15 % 885.00
F. Harga satuan pekerjaan ( D + E ) 6,785.00
A.2.2.1.10 Membuat 1 m² steger dari bambu
A. Bahan
Bambu diameter 6-10/600 cm 1.200 btg 18,000.00 21,600.00
Tali Ijuk 0.186 kg 18,300.00 3,403.80
Jumlah harga bahan 25,003.80
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Kayu 0.017 OH 68,000.00 1,156.00
Kepala Tukang 0.002 OH 75,000.00 150.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah harga tenaga 16,096.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 41,099.80
E. Overhead and profit 15 % 6,164.97
F. Harga satuan pekerjaan ( D + E ) 47,264.77
A.2.2.1.11 Membuat 1 m² bak adukan ukuran (40 x 50 x 25) cm
A. Bahan
Kayu Terentang (rawa pinus) 0.036 m³ 1,832,200.00 65,959.20
Paku biasa 0.080 kg 13,600.00 1,088.00
Kayu Meranti Batu 5/7 (ikat) 0.014 m³ 3,664,500.00 51,303.00
Jumlah harga bahan 118,350.20
B. Tenaga
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Jumlah harga tenaga 22,650.00
C. Peralatan -

86 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 141,000.20
E. Overhead and profit 15 % 21,150.03
F. Harga satuan pekerjaan ( D + E ) 162,150.23

87 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.2.2.1.12 Membuat 1 m² jalan sementara
A. Bahan
Batu Belah 15/20 0.150 m³ 196,700.00 29,505.00
Batu Pecah 5/7 0.090 m³ 225,100.00 20,259.00
Pasir Pasang 0.010 m³ 174,100.00 1,741.00
Jumlah harga bahan 51,505.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 59,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 110,505.00
E. Overhead and profit 15 % 16,575.75
F. Harga satuan pekerjaan ( D + E ) 127,080.75
A.2.2.1.13 Membongkar 1 m³ beton bertulang
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 13.334 OH 55,000.00 733,370.00
Mandor 0.666 OH 80,000.00 53,280.00
Jumlah harga tenaga 786,650.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 786,650.00
E. Overhead and profit 15 % 117,997.50
F. Harga satuan pekerjaan ( D + E ) 904,647.50
A.2.2.1.14 Membongkar 1 m2 dinding tembok bata merah
A. Bahan -

Jumlah harga bahan -


Pekerja 6.667 OH 55,000.00 366,685.00
Mandor 0.333 OH 80,000.00 26,640.00
Jumlah harga tenaga 393,325.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 393,325.00
E. Overhead and profit 15 % 58,998.75
F. Harga satuan pekerjaan ( D + E ) 452,323.75
A.2.2.1.15 Membuat 1 m' pagar kawat jaring galvanis panjang 240 cm
A. Bahan
Pagar kawat jaring 0.434 m' 2,250.00 976.50
Jumlah harga bahan 976.50
B. Tenaga
Pekerja 0.042 OH 55,000.00 2,310.00
Tukang batu 0.042 OH 68,000.00 2,856.00
Kepala Tukang 0.004 OH 75,000.00 300.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 5,626.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,482.00
E. Overhead and profit 15 % 1,272.30
F. Harga satuan pekerjaan ( D + E ) 9,754.30
A.2.2.1.16 Memasang 1 m' panel beton pracetak 5 x 40 x 240
A. Bahan
Panel beton pracetak 0.986 lbr 106,400.00 104,910.40
Kolom beton pracetak 0.525 btg 270,400.00 141,960.00
Semen Portland 45.000 kg 1,340.00 60,300.00
Pasir Beton 0.074 m³ 174,100.00 12,883.40
Koral Beton 2/3 cm 0.146 m³ 367,300.00 53,625.80
Jumlah harga bahan 373,679.60
B. Tenaga
Pekerja 0.375 OH 55,000.00 20,625.00
Tukang batu 0.125 OH 68,000.00 8,500.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 31,545.00
C. Peralatan -

Jumlah harga peralatan -

88 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. Jumlah ( A + B + C ) 405,224.60
E. Overhead and profit 15 % 60,783.69
F. Harga satuan pekerjaan ( D + E ) 466,008.29

89 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Menggali 1 m³ tanah biasa sedalam 1 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 0.750 OH 55,000.00 41,250.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah harga tenaga 43,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 43,250.00
E. Overhead and profit 15 % 6,487.50
F. Harga satuan pekerjaan ( D + E ) 49,737.50
A.2.3.1.2 Menggali 1 m³ tanah biasa sedalam 2 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 53,100.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 53,100.00
E. Overhead and profit 15 % 7,965.00
F. Harga satuan pekerjaan ( D + E ) 61,065.00
A.2.3.1.3 Menggali 1 m³ tanah biasa sedalam 3 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 1.050 OH 55,000.00 57,750.00
Mandor 0.067 OH 80,000.00 5,360.00
Jumlah harga tenaga 63,110.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 63,110.00
E. Overhead and profit 15 % 9,466.50
F. Harga satuan pekerjaan ( D + E ) 72,576.50
A.2.3.1.4 Menggali 1 m³ tanah keras sedalam 1 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Mandor 0.032 OH 80,000.00 2,560.00
Jumlah harga tenaga 57,560.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 57,560.00
E. Overhead and profit 15 % 8,634.00
F. Harga satuan pekerjaan ( D + E ) 66,194.00
A.2.3.1.5 Menggali 1 m³ tanah cadas sedalam 1 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Mandor 0.060 OH 80,000.00 4,800.00
Jumlah harga tenaga 87,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 87,300.00
E. Overhead and profit 15 % 13,095.00
F. Harga satuan pekerjaan ( D + E ) 100,395.00
A.2.3.1.6 Menggali 1 m³ tanah lumpur sedalam 1 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga

90 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pekerja 1.200 OH 55,000.00 66,000.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 69,600.00

91 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 69,600.00
E. Overhead and profit 15 % 10,440.00
F. Harga satuan pekerjaan ( D + E ) 80,040.00
A.2.3.1.7 Mengerjakan 1 m² stripping tebing setinggi 1 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 3,150.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 3,150.00
E. Overhead and profit 15 % 472.50
F. Harga satuan pekerjaan ( D + E ) 3,622.50
A.2.3.1.8 Membuang 1 m³ tanah sejauh 30 meter
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 0.330 OH 55,000.00 18,150.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 18,950.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 18,950.00
E. Overhead and profit 15 % 2,842.50
F. Harga satuan pekerjaan ( D + E ) 21,792.50
A.2.3.1.9 Mengurug kembali 1 m³ galian sedalam 1 m
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 0.500 OH 55,000.00 27,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 31,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 31,500.00
E. Overhead and profit 15 % 4,725.00
F. Harga satuan pekerjaan ( D + E ) 36,225.00
A.2.3.1.10 Memadatkan 1 m³ tanah (per 20 cm)
A. Bahan -

Jumlah harga bahan -


B. Tenaga
Pekerja 0.500 OH 55,000.00 27,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 31,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 31,500.00
E. Overhead and profit 15 % 4,725.00
F. Harga satuan pekerjaan ( D + E ) 36,225.00
A.2.3.1.11 Mengurug 1 m³ pasir urug
A. Bahan
Pasir Urug 1.200 m³ 88,900.00 106,680.00
Jumlah harga bahan 106,680.00
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 17,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 123,980.00
E. Overhead and profit 15 % 18,597.00
F. Harga satuan pekerjaan ( D + E ) 142,577.00

92 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.2.3.1.11.a Mengurug 1 m³ tanah urug
A. Bahan
Tanah Urug 1.200 m³ 88,900.00 106,680.00
Jumlah harga bahan 106,680.00

93 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 17,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 123,980.00
E. Overhead and profit 15 % 18,597.00
F. Harga satuan pekerjaan ( D + E ) 142,577.00
A.2.3.1.11.b Mengurug 1 m³ tanah urug pilihan
A. Bahan
Tanah Urug pilihan 1.200 m³ 115,100.00 138,120.00
Jumlah harga bahan 138,120.00
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 17,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 155,420.00
E. Overhead and profit 15 % 23,313.00
F. Harga satuan pekerjaan ( D + E ) 178,733.00
A.2.3.1.13 Memasang 1 m² lapisan ijuk tebal 10 cm untuk bidang resapan
A. Bahan
Ijuk 6.000 kg 18,300.00 109,800.00
Jumlah harga bahan 109,800.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 9,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 119,250.00
E. Overhead and profit 15 % 17,887.50
F. Harga satuan pekerjaan ( D + E ) 137,137.50
A.2.3.1.14 Mengurug 1 m³ sirtu padat
A. Bahan
Sirtu 1.200 m³ 130,800.00 156,960.00
Jumlah harga bahan 156,960.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah harga tenaga 15,750.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 172,710.00
E. Overhead and profit 15 % 25,906.50
F. Harga satuan pekerjaan ( D + E ) 198,616.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP
A. Bahan
Batu Belah 15/20 cm 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 202.000 kg 1,340.00 270,680.00
Pasir Pasang (PP) 0.485 m³ 174,100.00 84,438.50
Jumlah harga bahan 591,158.50
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 736,283.50
E. Overhead and profit 15 % 110,442.53
F. Harga satuan pekerjaan ( D + E ) 846,726.03
A.3.2.1.2 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP
A. Bahan
Batu Belah 15/20 cm 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 163.000 kg 1,340.00 218,420.00
Pasir Pasang (PP) 0.520 m³ 174,100.00 90,532.00

94 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga bahan 544,992.00

95 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 690,117.00
E. Overhead and profit 15 % 103,517.55
F. Harga satuan pekerjaan ( D + E ) 793,634.55
A.3.2.1.2.a Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP menggunakan batu kali lama ditempat
A. Bahan
Batu Belah 15/20 cm 1.200 m³ - -
Portland Cement (PC) 163.000 kg 1,340.00 218,420.00
Pasir Pasang (PP) 0.520 m³ 174,100.00 90,532.00
Jumlah harga bahan 308,952.00
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 454,077.00
E. Overhead and profit 15 % 68,111.55
F. Harga satuan pekerjaan ( D + E ) 522,188.55
A.3.2.1.3 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP
A. Bahan
Batu Belah 15/20 cm 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 136.000 kg 1,340.00 182,240.00
Pasir Pasang (PP) 0.544 m³ 174,100.00 94,710.40
Jumlah harga bahan 512,990.40
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 658,115.40
E. Overhead and profit 15 % 98,717.31
F. Harga satuan pekerjaan ( D + E ) 756,832.71
A.3.2.1.4 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 6 PP
A. Bahan
Batu Belah 15/20 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 117.000 kg 1,340.00 156,780.00
Pasir Pasang (PP) 0.561 m³ 174,100.00 97,670.10
Jumlah harga bahan 490,490.10
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 635,615.10
E. Overhead and profit 15 % 95,342.27
F. Harga satuan pekerjaan ( D + E ) 730,957.37
A.3.2.1.5 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 8 PP
A. Bahan
Batu Belah 15/20 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 91.000 kg 1,340.00 121,940.00
Pasir Pasang (PP) 0.584 m³ 174,100.00 101,674.40
Jumlah harga bahan 459,654.40
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00

96 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00

97 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 604,779.40
E. Overhead and profit 15 % 90,716.91
F. Harga satuan pekerjaan ( D + E ) 695,496.31
A.3.2.1.6 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 1 KP : 2 PP
A. Bahan
Batu Belah 15/20 1.200 m³ 196,700.00 236,040.00
Kapur 0.170 m³ 505,100.00 85,867.00
Portland Cement (PC) 41.000 kg 1,340.00 54,940.00
Pasir Pasang (PP) 0.340 m³ 174,100.00 59,194.00
Jumlah harga bahan 436,041.00
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 581,166.00
E. Overhead and profit 15 % 87,174.90
F. Harga satuan pekerjaan ( D + E ) 668,340.90
A.3.2.1.7 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 KP : 10 PP
A. Bahan
Batu Belah 15/20 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 61.000 kg 1,340.00 81,740.00
Kapur Pasang (KP) 0.147 m³ 505,100.00 74,249.70
Pasir Pasang (PP) 0.492 m³ 174,100.00 85,657.20
Jumlah harga bahan 477,686.90
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 622,811.90
E. Overhead and profit 15 % 93,421.79
F. Harga satuan pekerjaan ( D + E ) 716,233.69
A.3.2.1.8 Memasang 1 m³ pondasi batu belah; campuran ¼ PC : 1 KP : 4 PP
A. Bahan
Batu Belah 15/20 1.200 m³ 196,700.00 236,040.00
Portland Cement (PC) 41.000 kg 1,340.00 54,940.00
Kapur Pasang (KP) 0.131 m³ 505,100.00 66,168.10
Pasir Pasang (PP) 0.523 m³ 174,100.00 91,054.30
Jumlah harga bahan 448,202.40
B. Tenaga
Pekerja 1.500 OH 55,000.00 82,500.00
Tukang Batu 0.750 OH 68,000.00 51,000.00
Kepala Tukang 0.075 OH 75,000.00 5,625.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 145,125.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 593,327.40
E. Overhead and profit 15 % 88,999.11
F. Harga satuan pekerjaan ( D + E ) 682,326.51
A.3.2.1.9 Memasang 1 m³ batu kosong (aanstampeeng)
A. Bahan
Batu Belah 15/20 1.200 m³ 196,700.00 236,040.00
Pasir Urug 0.432 m³ 88,900.00 38,404.80
Jumlah harga bahan 274,444.80
B. Tenaga
Pekerja 0.780 OH 55,000.00 42,900.00
Tukang Batu 0.390 OH 68,000.00 26,520.00
Kepala Tukang 0.039 OH 75,000.00 2,925.00
Mandor 0.039 OH 80,000.00 3,120.00
Jumlah harga tenaga 75,465.00
C. Peralatan -

98 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga peralatan -
D. Jumlah ( A + B + C ) 349,909.80
E. Overhead and profit 15 % 52,486.47
F. Harga satuan pekerjaan ( D + E ) 402,396.27

99 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.3.2.1.10 Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah
A. Bahan
Batu Belah 15/20 0.480 m³ 196,700.00 94,416.00
Portland Cement (PC) 194.000 kg 1,340.00 259,960.00
Pasir Beton 0.312 m³ 174,100.00 54,319.20
Koral (Batu pecah ukuran 5 mm - 40 mm) 0.468 m³ 225,100.00 105,346.80
Besi Beton 126.000 m³ 9,800.00 1,234,800.00
Kawat Beton 1.800 m³ 17,200.00 30,960.00
Jumlah harga bahan 1,779,802.00
B. Tenaga
Pekerja 3.400 OH 55,000.00 187,000.00
Tukang Batu 0.850 OH 68,000.00 57,800.00
Kepala Tukang 0.085 OH 75,000.00 6,375.00
Mandor 0.170 OH 80,000.00 13,600.00
Jumlah harga tenaga 264,775.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 2,044,577.00
E. Overhead and profit 15 % 306,686.55
F. Harga satuan pekerjaan ( D + E ) 2,351,263.55
A.3.2.1.10.a Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah tak bertulang
A. Bahan
Batu Belah 15/20 0.480 m³ 196,700.00 94,416.00
Portland Cement (PC) 194.000 kg 1,340.00 259,960.00
Pasir Beton 0.312 m³ 174,100.00 54,319.20
Koral (Batu pecah ukuran 5 mm - 40 mm) 0.468 m³ 225,100.00 105,346.80
Jumlah harga bahan 514,042.00
B. Tenaga
Pekerja 3.400 OH 55,000.00 187,000.00
Tukang Batu 0.850 OH 68,000.00 57,800.00
Kepala Tukang 0.085 OH 75,000.00 6,375.00
Mandor 0.170 OH 80,000.00 13,600.00
Jumlah harga tenaga 264,775.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 778,817.00
E. Overhead and profit 15 % 116,822.55
F. Harga satuan pekerjaan ( D + E ) 895,639.55
A.3.2.1.11 Memasang 1 m³ pondasi sumuran; diameter 100 cm
A. Bahan
Batu Belah 15/20 0.450 m³ 196,700.00 88,515.00
Portland Cement (PC) 194.000 kg 1,340.00 259,960.00
Pasir Beton 0.312 m³ 174,100.00 54,319.20
Koral (Batu pecah ukuran 5 mm - 40 mm) 0.468 m³ 225,100.00 105,346.80
Jumlah harga bahan 508,141.00
B. Tenaga
Pekerja 2.400 OH 55,000.00 132,000.00
Tukang Batu 0.800 OH 68,000.00 54,400.00
Kepala Tukang 0.080 OH 75,000.00 6,000.00
Mandor 0.119 OH 80,000.00 9,520.00
Jumlah harga tenaga 201,920.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 710,061.00
E. Overhead and profit 15 % 106,509.15
F. Harga satuan pekerjaan ( D + E ) 816,570.15
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 2 PP
A. Bahan
Bata Merah 140.000 buah 900.00 126,000.00
Portland Cement (PC) 43.500 kg 1,340.00 58,290.00
Pasir Pasang (PP) 0.080 m³ 174,100.00 13,928.00
Jumlah harga bahan 198,218.00
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 50,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 248,718.00

100 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Overhead and profit 15 % 37,307.70
F. Harga satuan pekerjaan ( D + E ) 286,025.70

101 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.4.1.2 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 3 PP
A. Bahan
Bata Merah 140.000 buah 900.00 126,000.00
Portland Cement (PC) 32.950 kg 1,340.00 44,153.00
Pasir Pasang (PP) 0.091 m³ 174,100.00 15,843.10
Jumlah harga bahan 185,996.10
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 50,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 236,496.10
E. Overhead and profit 15 % 35,474.42
F. Harga satuan pekerjaan ( D + E ) 271,970.52
A.4.4.1.3 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 4 PP
A. Bahan
Bata Merah 140.000 buah 900.00 126,000.00
Portland Cement (PC) 26.550 kg 1,340.00 35,577.00
Pasir Pasang (PP) 0.093 m³ 174,100.00 16,191.30
Jumlah harga bahan 177,768.30
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 50,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 228,268.30
E. Overhead and profit 15 % 34,240.25
F. Harga satuan pekerjaan ( D + E ) 262,508.55
A.4.4.1.4 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 5 PP
A. Bahan
Bata Merah 140.000 buah 900.00 126,000.00
Portland Cement (PC) 22.200 kg 1,340.00 29,748.00
Pasir Pasang (PP) 0.102 m³ 174,100.00 17,758.20
Jumlah harga bahan 173,506.20
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 50,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 224,006.20
E. Overhead and profit 15 % 33,600.93
F. Harga satuan pekerjaan ( D + E ) 257,607.13
A.4.4.1.5 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 6 PP
A. Bahan
Bata Merah 140.000 buah 900.00 126,000.00
Portland Cement (PC) 18.500 kg 1,340.00 24,790.00
Pasir Pasang (PP) 0.122 m³ 174,100.00 21,240.20
Jumlah harga bahan 172,030.20
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 50,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 222,530.20
E. Overhead and profit 15 % 33,379.53
F. Harga satuan pekerjaan ( D + E ) 255,909.73
A.4.4.1.6 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 3 KP : 10 PP
A. Bahan
Bata Merah 140.000 buah 900.00 126,000.00
Portland Cement (PC) 10.080 kg 1,340.00 13,507.20

102 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pasir Pasang (PP) 0.0925 m³ 174,100.00 16,104.25
Kapur Pasang (KP) 0.0275 m³ 505,100.00 13,890.25
Jumlah harga bahan 169,501.70

103 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 50,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 220,001.70
E. Overhead and profit 15 % 33,000.26
F. Harga satuan pekerjaan ( D + E ) 253,001.96
A.4.4.1.7 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 2 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 18.950 kg 1,340.00 25,393.00
Pasir Pasang (PP) 0.038 m³ 174,100.00 6,615.80
Jumlah harga bahan 95,008.80
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 120,258.80
E. Overhead and profit 15 % 18,038.82
F. Harga satuan pekerjaan ( D + E ) 138,297.62
A.4.4.1.8 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 3 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 14.370 kg 1,340.00 19,255.80
Pasir Pasang (PP) 0.040 m³ 174,100.00 6,964.00
Jumlah harga bahan 89,219.80
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 114,469.80
E. Overhead and profit 15 % 17,170.47
F. Harga satuan pekerjaan ( D + E ) 131,640.27
A.4.4.1.9 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 4 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 11.500 kg 1,340.00 15,410.00
Pasir Pasang (PP) 0.043 m³ 174,100.00 7,486.30
Jumlah harga bahan 85,896.30
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 111,146.30
E. Overhead and profit 15 % 16,671.95
F. Harga satuan pekerjaan ( D + E ) 127,818.25
A.4.4.1.10 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 5 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 9.680 kg 1,340.00 12,971.20
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Jumlah harga bahan 83,805.70
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00

104 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.015 OH 80,000.00 1,200.00

105 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 109,055.70
E. Overhead and profit 15 % 16,358.36
F. Harga satuan pekerjaan ( D + E ) 125,414.06
A.4.4.1.11 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 6 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 8.320 kg 1,340.00 11,148.80
Pasir Pasang (PP) 0.049 m³ 174,100.00 8,530.90
Jumlah harga bahan 82,679.70
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 107,929.70
E. Overhead and profit 15 % 16,189.46
F. Harga satuan pekerjaan ( D + E ) 124,119.16
A.4.4.1.12 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 8 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 6.500 kg 1,340.00 8,710.00
Pasir Pasang (PP) 0.050 m³ 174,100.00 8,705.00
Jumlah harga bahan 80,415.00
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 105,665.00
E. Overhead and profit 15 % 15,849.75
F. Harga satuan pekerjaan ( D + E ) 121,514.75
A.4.4.1.13 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 3 KP : 10 PP
A. Bahan
Bata Merah 70.000 buah 900.00 63,000.00
Portland Cement (PC) 4.500 kg 1,340.00 6,030.00
Kapur Pasang (KP) 0.015 m³ 505,100.00 7,576.50
Pasir Pasang (PP) 0.050 m³ 174,100.00 8,705.00
Jumlah harga bahan 85,311.50
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 110,561.50
E. Overhead and profit 15 % 16,584.23
F. Harga satuan pekerjaan ( D + E ) 127,145.73
A.4.4.1.16 Memasang 1 m² dinding Conblock HB 20, Campuran spesi 1 PC : 3 PP
A. Bahan
Concret Block (CB) HB 20 12.500 buah 16,018.20 200,227.50 ###
Portland Cement (PC) 30.320 kg 1,340.00 40,628.80 ###
Pasir Pasang (PP) 0.728 m³ 174,100.00 126,744.80 ###
Besi angkur Ø 8 mm 0.280 kg 9,800.00 2,744.00
Jumlah harga bahan 370,345.10
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 32,015.00
C. Peralatan -

106 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 402,360.10
E. Overhead and profit 15 % 60,354.02
F. Harga satuan pekerjaan ( D + E ) 462,714.12

107 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.4.1.17 Memasang 1 m² dinding Conblock HB 20, Campuran spesi 1 PC : 4 PP
A. Bahan
Concret Block (CB) HB 20 12.500 buah 16,018.20 200,227.50 ###
Portland Cement (PC) 24.260 kg 1,340.00 32,508.40 ###
Pasir Pasang (PP) 0.772 m³ 174,100.00 134,405.20 ###
Besi angkur Ø 8 mm 0.280 kg 9,800.00 2,744.00
Jumlah harga bahan 369,885.10
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 32,015.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 401,900.10
E. Overhead and profit 15 % 60,285.02
F. Harga satuan pekerjaan ( D + E ) 462,185.12
A.4.4.1.18 Memasang 1 m² dinding Conblock HB 15, Campuran spesi 1 PC : 3 PP
A. Bahan
Concret Block (CB) HB 15 12.500 buah 16,018.20 200,227.50 ###
Portland Cement (PC) 22.740 kg 1,340.00 30,471.60 ###
Pasir Pasang (PP) 0.550 m³ 174,100.00 95,755.00 ###
Besi angkur Ø 8 mm 0.280 kg 9,800.00 2,744.00
Jumlah harga bahan 329,198.10
B. Tenaga
Pekerja 0.320 OH 55,000.00 17,600.00
Tukang Batu 0.120 OH 68,000.00 8,160.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.016 OH 80,000.00 1,280.00
Jumlah harga tenaga 27,940.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 357,138.10
E. Overhead and profit 15 % 53,570.72
F. Harga satuan pekerjaan ( D + E ) 410,708.82
A.4.4.1.19 Memasang 1 m² dinding Conblock HB 15, Campuran spesi 1 PC : 4 PP
A. Bahan
Concret Block (CB) HB 15 12.500 buah 16,018.20 200,227.50
Portland Cement (PC) 18.200 kg 1,340.00 24,388.00
Pasir Pasang (PP) 0.582 m³ 174,100.00 101,326.20 ###
Besi angkur Ø 8 mm 0.280 kg 9,800.00 2,744.00 ###
Jumlah harga bahan 328,685.70 ###
B. Tenaga
Pekerja 0.320 OH 55,000.00 17,600.00
Tukang Batu 0.120 OH 68,000.00 8,160.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.016 OH 80,000.00 1,280.00
Jumlah harga tenaga 27,940.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 356,625.70
E. Overhead and profit 15 % 53,493.86
F. Harga satuan pekerjaan ( D + E ) 410,119.56
A.4.4.1.20 Memasang 1 m² dinding Conblock HB 10, Campuran spesi 1 PC : 3 PP
A. Bahan
Concret Block (CB) HB 15 12.500 buah 21,357.60 266,970.00 ###
Portland Cement (PC) 15.160 kg 1,340.00 20,314.40 ###
Pasir Pasang (PP) 0.364 m³ 174,100.00 63,372.40 ###
Besi angkur Ø 8 mm 0.280 kg 9,800.00 2,744.00
Jumlah harga bahan 353,400.80
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 378,650.80
E. Overhead and profit 15 % 56,797.62
F. Harga satuan pekerjaan ( D + E ) 435,448.42

108 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.4.1.21 Memasang 1 m² dinding Conblock HB 10, Campuran spesi 1 PC : 4 PP
A. Bahan
Concret Block (CB) HB 15 12.500 buah 21,357.60 266,970.00 ###
Portland Cement (PC) 12.130 kg 1,340.00 16,254.20 ###
Pasir Pasang (PP) 0.388 m³ 174,100.00 67,550.80 ###
Besi angkur Ø 8 mm 0.280 kg 9,800.00 2,744.00
Jumlah harga bahan 353,519.00
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 378,769.00
E. Overhead and profit 15 % 56,815.35
F. Harga satuan pekerjaan ( D + E ) 435,584.35
A.4.4.1.22 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; Campuran spesi 1 PC : 3 PP
A. Bahan
Bata Terawang / Roster 30.000 buah 5,200.00 156,000.00
Portland Cement (PC) 11.000 kg 1,340.00 14,740.00
Pasir Pasang (PP) 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 176,833.50
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 202,083.50
E. Overhead and profit 15 % 30,312.53
F. Harga satuan pekerjaan ( D + E ) 232,396.03
A.4.4.1.23 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; Campuran spesi 1 PC : 4 PP
A. Bahan
Bata Terawang / Roster 30.000 buah 5,200.00 156,000.00
Portland Cement (PC) 11.000 kg 1,340.00 14,740.00
Pasir Pasang (PP) 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 176,833.50
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 202,083.50
E. Overhead and profit 15 % 30,312.53
F. Harga satuan pekerjaan ( D + E ) 232,396.03
A.44.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.44.2.1 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 15.504 kg 1,340.00 20,775.36
Pasir Pasang 0.016 m³ 174,100.00 2,785.60
Jumlah harga bahan 23,560.96
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 52,585.96
E. Overhead and profit 15 % 7,887.89
F. Harga satuan pekerjaan ( D + E ) 60,473.85
A.44.2.2 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 10.224 kg 1,340.00 13,700.16

109 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pasir Pasang 0.020 m³ 174,100.00 3,482.00
Jumlah harga bahan 17,182.16

110 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 46,207.16
E. Overhead and profit 15 % 6,931.07
F. Harga satuan pekerjaan ( D + E ) 53,138.23
A.44.2.3 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 7.776 kg 1,340.00 10,419.84
Pasir Pasang 0.023 m³ 174,100.00 4,004.30
Jumlah harga bahan 14,424.14
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 43,449.14
E. Overhead and profit 15 % 6,517.37
F. Harga satuan pekerjaan ( D + E ) 49,966.51
A.44.2.4 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 6.240 kg 1,340.00 8,361.60
Pasir Pasang 0.024 m³ 174,100.00 4,178.40
Jumlah harga bahan 12,540.00
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 41,565.00
E. Overhead and profit 15 % 6,234.75
F. Harga satuan pekerjaan ( D + E ) 47,799.75
A.44.2.5 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 5.184 kg 1,340.00 6,946.56
Pasir Pasang 0.026 m³ 174,100.00 4,526.60
Jumlah harga bahan 11,473.16
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 40,498.16
E. Overhead and profit 15 % 6,074.72
F. Harga satuan pekerjaan ( D + E ) 46,572.88
A.44.2.6 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 4.416 kg 1,340.00 5,917.44
Pasir Pasang 0.027 m³ 174,100.00 4,700.70
Jumlah harga bahan 10,618.14
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

111 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga peralatan -
D. Jumlah ( A + B + C ) 39,643.14
E. Overhead and profit 15 % 5,946.47
F. Harga satuan pekerjaan ( D + E ) 45,589.61

112 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.44.2.7 Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 3.936 kg 1,340.00 5,274.24
Pasir Pasang 0.028 m³ 174,100.00 4,874.80
Jumlah harga bahan 10,149.04
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 39,174.04
E. Overhead and profit 15 % 5,876.11
F. Harga satuan pekerjaan ( D + E ) 45,050.15
A.44.2.8 Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 3.456 kg 1,340.00 4,631.04
Pasir Pasang 0.029 m³ 174,100.00 5,048.90
Jumlah harga bahan 9,679.94
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 38,704.94
E. Overhead and profit 15 % 5,805.74
F. Harga satuan pekerjaan ( D + E ) 44,510.68
A.44.2.9 Memasang 1 m² plesteran 1 PC : ½ KP : 3 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 5.760 kg 1,340.00 7,718.40
Kapur Pasang (KP) 0.003 m³ 505,100.00 1,515.30
Pasir Pasang 0.013 m³ 174,100.00 2,263.30
Jumlah harga bahan 11,497.00
B. Tenaga
Pekerja 0.360 OH 55,000.00 19,800.00
Tukang Batu 0.120 OH 68,000.00 8,160.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 30,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 41,797.00
E. Overhead and profit 15 % 6,269.55
F. Harga satuan pekerjaan ( D + E ) 48,066.55
A.44.2.10 Memasang 1 m² plesteran 1 PC : 2 KP : 8 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 3.000 kg 1,340.00 4,020.00
Kapur Pasang (KP) 0.005 m³ 505,100.00 2,525.50
Pasir Pasang 0.020 m³ 174,100.00 3,482.00
Jumlah harga bahan 10,027.50
B. Tenaga
Pekerja 0.360 OH 55,000.00 19,800.00
Tukang Batu 0.120 OH 68,000.00 8,160.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 30,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 40,327.50
E. Overhead and profit 15 % 6,049.13
F. Harga satuan pekerjaan ( D + E ) 46,376.63
A.44.2.13 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mm
A. Bahan
Portland Cement (PC) 13.632 kg 1,340.00 18,266.88
Pasir Pasang (Ps) 0.027 m³ 174,100.00 4,700.70
Jumlah harga bahan 22,967.58

113 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.022 OH 80,000.00 1,760.00
Jumlah harga tenaga 38,860.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 61,827.58
E. Overhead and profit 15 % 9,274.14
F. Harga satuan pekerjaan ( D + E ) 71,101.72
A.44.2.14 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm
A. Bahan
Portland Cement (PC) 10.368 kg 1,340.00 13,893.12
Pasir Pasang (Ps) 0.031 m³ 174,100.00 5,397.10
Jumlah harga bahan 19,290.22
B. Tenaga
Pekerja 0.260 OH 55,000.00 14,300.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah harga tenaga 30,440.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 49,730.22
E. Overhead and profit 15 % 7,459.53
F. Harga satuan pekerjaan ( D + E ) 57,189.75
A.44.2.15 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mm
A. Bahan
Portland Cement (PC) 8.320 kg 1,340.00 11,148.80
Pasir Pasang (Ps) 0.032 m³ 174,100.00 5,571.20
Jumlah harga bahan 16,720.00
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.022 OH 80,000.00 1,760.00
Jumlah harga tenaga 38,860.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 55,580.00
E. Overhead and profit 15 % 8,337.00
F. Harga satuan pekerjaan ( D + E ) 63,917.00
A.44.2.16 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm
A. Bahan
Portland Cement (PC) 6.912 kg 1,340.00 9,262.08
Pasir Pasang (Ps) 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 15,355.58
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.022 OH 80,000.00 1,760.00
Jumlah harga tenaga 38,860.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 54,215.58
E. Overhead and profit 15 % 8,132.34
F. Harga satuan pekerjaan ( D + E ) 62,347.92
A.44.2.17 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mm
A. Bahan
Portland Cement (PC) 5.888 kg 1,340.00 7,889.92
Pasir Pasang (Ps) 0.036 m³ 174,100.00 6,267.60
Jumlah harga bahan 14,157.52
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.022 OH 80,000.00 1,760.00
Jumlah harga tenaga 38,860.00
C. Peralatan -

114 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga peralatan -
D. Jumlah ( A + B + C ) 53,017.52
E. Overhead and profit 15 % 7,952.63
F. Harga satuan pekerjaan ( D + E ) 60,970.15

115 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.44.2.19 Memasang 1 m² berapen 1 PC : 5 PP; tebal 15 mm
A. Bahan
Portland Cement (PC) 5.184 kg 1,340.00 6,946.56
Pasir Pasang (PP) 0.026 m³ 174,100.00 4,526.60
Jumlah harga bahan 11,473.16
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Batu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,590.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 26,063.16
E. Overhead and profit 15 % 3,909.47
F. Harga satuan pekerjaan ( D + E ) 29,972.63
A.44.2.20 Memasang 1 m' plesteran skoning 1 Pc : 2 PP; lebar 10 mm
A. Bahan
Portland Cement (PC) 0.500 kg 1,340.00 670.00
Pasir Pasang (PP) 0.013 m³ 174,100.00 2,263.30
Jumlah harga bahan 2,933.30
B. Tenaga
Pekerja 0.080 OH 55,000.00 4,400.00
Tukang Batu 0.400 OH 68,000.00 27,200.00
Kepala Tukang 0.040 OH 75,000.00 3,000.00
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 34,920.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 37,853.30
E. Overhead and profit 15 % 5,678.00
F. Harga satuan pekerjaan ( D + E ) 43,531.30
A.44.2.23 Memasang 1 m² plesteran ciprat / kamprotan 1 PC : 2 PP
A. Bahan
Portland Cement (PC) 4.320 kg 1,340.00 5,788.80
Pasir Pasang (Ps) 0.006 m³ 174,100.00 1,044.60
Jumlah harga bahan 6,833.40
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,250.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 32,083.40
E. Overhead and profit 15 % 4,812.51
F. Harga satuan pekerjaan ( D + E ) 36,895.91
A.44.2.24 Memasang 1 m² finishing siar pasangan dinding bata merah (= 20 m')
A. Bahan
Portland Cement (PC) 3.108 kg 1,340.00 4,164.72
Jumlah harga bahan 4,164.72
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Batu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,590.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 18,754.72
E. Overhead and profit 15 % 2,813.21
F. Harga satuan pekerjaan ( D + E ) 21,567.93
A.44.2.25 Memasang 1 m² finishing siar pasangan dinding conblock ekspose (= 8 m')
A. Bahan
Portland Cement (PC) 1.600 kg 1,340.00 2,144.00
Jumlah harga bahan 2,144.00
B. Tenaga
Pekerja 0.070 OH 55,000.00 3,850.00
Tukang Batu 0.035 OH 68,000.00 2,380.00
Kepala Tukang 0.004 OH 75,000.00 300.00
Mandor 0.004 OH 80,000.00 320.00

116 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga tenaga 6,850.00

117 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,994.00
E. Overhead and profit 15 % 1,349.10
F. Harga satuan pekerjaan ( D + E ) 10,343.10
A.44.2.26 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP
A. Bahan
Portland Cement (PC) 6.340 kg 1,340.00 8,495.60
Pasir Pasang (Ps) 0.012 m³ 174,100.00 2,089.20
Jumlah harga bahan 10,584.80
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 29,025.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 39,609.80
E. Overhead and profit 15 % 5,941.47
F. Harga satuan pekerjaan ( D + E ) 45,551.27
A.44.2.27 Memasang 1 m² acian
A. Bahan
Portland Cement (PC) 3.250 kg 1,340.00 4,355.00
Jumlah harga bahan 4,355.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 19,350.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 23,705.00
E. Overhead and profit 15 % 3,555.75
F. Harga satuan pekerjaan ( D + E ) 27,260.75
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kela I ( Kayu Jati )
A. Bahan
Balok Kayu kelas I (Kayu Jati) 1.100 m³ 16,569,700.00 18,226,670.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00
Lem kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 18,261,970.00
B. Tenaga
Pekerja 7.000 OH 55,000.00 385,000.00
Tukang Kayu 21.000 OH 68,000.00 1,428,000.00
Kepala Tukang 2.100 OH 75,000.00 157,500.00
Mandor 0.350 OH 80,000.00 28,000.00
Jumlah harga tenaga 1,998,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 20,260,470.00
E. Overhead and profit 15 % 3,039,070.50
F. Harga satuan pekerjaan ( D + E ) 23,299,540.50
A.4.6.1.2 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas II ( kayu Kamper )
A. Bahan
Balok Kayu kelas II ( kayu Kamper ) 1.200 m³ 9,998,900.00 11,998,680.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00
Lem Kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 12,033,980.00
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Kayu 18.000 OH 68,000.00 1,224,000.00
Kepala Tukang 1.800 OH 75,000.00 135,000.00
Mandor 0.300 OH 80,000.00 24,000.00
Jumlah harga tenaga 1,713,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 13,746,980.00
E. Overhead and profit 15 % 2,062,047.00
F. Harga satuan pekerjaan ( D + E ) 15,809,027.00

118 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.2.a Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas II ( kayu Bangkirai )
A. Bahan
Balok Kayu Bangkirai 1.200 m³ 9,449,100.00 11,338,920.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00
Lem kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 11,374,220.00
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Kayu 18.000 OH 68,000.00 1,224,000.00
Kepala Tukang 1.800 OH 75,000.00 135,000.00
Mandor 0.300 OH 80,000.00 24,000.00
Jumlah harga tenaga 1,713,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 13,087,220.00
E. Overhead and profit 15 % 1,963,083.00
F. Harga satuan pekerjaan ( D + E ) 15,050,303.00
A.4.6.1.2.b Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas III ( kayu Kruing )
A. Bahan
Balok Kayu Kruing 1.200 m³ 6,999,700.00 8,399,640.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00
Lem kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 8,434,940.00
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Kayu 18.000 OH 68,000.00 1,224,000.00
Kepala Tukang 1.800 OH 75,000.00 135,000.00
Mandor 0.300 OH 80,000.00 24,000.00
Jumlah harga tenaga 1,713,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 10,147,940.00
E. Overhead and profit 15 % 1,522,191.00
F. Harga satuan pekerjaan ( D + E ) 11,670,131.00
A.4.6.1.2.c Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas III ( kayu Kempas )
A. Bahan
Balok Kayu Kempas 1.200 m³ 6,282,000.00 7,538,400.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00
Lem kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 7,573,700.00
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Kayu 18.000 OH 68,000.00 1,224,000.00
Kepala Tukang 1.800 OH 75,000.00 135,000.00
Mandor 0.300 OH 80,000.00 24,000.00
Jumlah harga tenaga 1,713,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 9,286,700.00
E. Overhead and profit 15 % 1,393,005.00
F. Harga satuan pekerjaan ( D + E ) 10,679,705.00
A.4.6.1.2.d Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Balok Kayu Meranti batu 1.200 m³ 4,711,500.00 5,653,800.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00
Lem kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 5,689,100.00
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Kayu 18.000 OH 68,000.00 1,224,000.00
Kepala Tukang 1.800 OH 75,000.00 135,000.00
Mandor 0.300 OH 80,000.00 24,000.00
Jumlah harga tenaga 1,713,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 7,402,100.00
E. Overhead and profit 15 % 1,110,315.00
F. Harga satuan pekerjaan ( D + E ) 8,512,415.00
A.4.6.1.2.e Membuat dan memasang 1 m³ kusen pintu dan kusen jendela, kayu kelas IV ( kayu Punak )
A. Bahan
Balok Kayu Punak 1.200 m³ 6,282,000.00 7,538,400.00
Paku 10 cm 1.250 kg 13,600.00 17,000.00

119 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Lem kayu 1.000 kg 18,300.00 18,300.00
Jumlah harga bahan 7,573,700.00

120 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Kayu 18.000 OH 68,000.00 1,224,000.00
Kepala Tukang 1.800 OH 75,000.00 135,000.00
Mandor 0.300 OH 80,000.00 24,000.00
Jumlah harga tenaga 1,713,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 9,286,700.00
E. Overhead and profit 15 % 1,393,005.00
F. Harga satuan pekerjaan ( D + E ) 10,679,705.00
A.4.6.1.3 Membuat dan memasang 1 m² pintu klamp standar, kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.040 m³ 11,114,900.00 444,596.00
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 445,276.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.105 OH 75,000.00 7,875.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 99,965.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 545,241.00
E. Overhead and profit 15 % 81,786.15
F. Harga satuan pekerjaan ( D + E ) 627,027.15
A.4.6.1.3.a Membuat dan memasang 1 m² pintu klamp standar, kayu kelas II ( kayu Bangkiai )
A. Bahan
Papan Kayu Bangkirai 0.040 m³ 8,894,200.00 355,768.00
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 356,448.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.105 OH 75,000.00 7,875.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 99,965.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 456,413.00
E. Overhead and profit 15 % 68,461.95
F. Harga satuan pekerjaan ( D + E ) 524,874.95
A.4.6.1.3.b Membuat dan memasang 1 m² pintu klamp standar, kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.040 m³ 7,276,600.00 291,064.00
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 291,744.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.105 OH 75,000.00 7,875.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 99,965.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 391,709.00
E. Overhead and profit 15 % 58,756.35
F. Harga satuan pekerjaan ( D + E ) 450,465.35
A.4.6.1.3.c Membuat dan memasang 1 m² pintu klamp standar, kayu kelas III ( kayu Kempas )
A. Bahan
Papan Kayu Kempas 0.040 m³ 6,805,500.00 272,220.00
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 272,900.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.105 OH 75,000.00 7,875.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 99,965.00

121 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 372,865.00
E. Overhead and profit 15 % 55,929.75
F. Harga satuan pekerjaan ( D + E ) 428,794.75
A.4.6.1.4 Membuat dan memasang 1 m² pintu klam sederhana, Kayu kelas IV ( Kayu Meranti Batu )
A. Bahan
Papan Kayu Meranti Batu 0.040 m³ 4,771,500.00 190,860.00
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 191,540.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.105 OH 75,000.00 7,875.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 99,965.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 291,505.00
E. Overhead and profit 15 % 43,725.75
F. Harga satuan pekerjaan ( D + E ) 335,230.75
A.4.6.1.5 Membuat dan memasang 1 m² daun pintu panel, kayu kelas I ( kayu Jati )
A. Bahan
Papan kayu Jati 0.040 m³ 16,673,400.00 666,936.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 676,086.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 961,586.00
E. Overhead and profit 15 % 144,237.90
F. Harga satuan pekerjaan ( D + E ) 1,105,823.90
A.4.6.1.5.a Membuat dan memasang 1 m² daun pintu panel, kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.040 m³ 11,114,900.00 444,596.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 453,746.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 739,246.00
E. Overhead and profit 15 % 110,886.90
F. Harga satuan pekerjaan ( D + E ) 850,132.90
A.4.6.1.5.b Membuat dan memasang 1 m² daun pintu panel, kayu kelas II ( kayu Bangkiai )
A. Bahan
Papan kayu Bangkirai 0.040 m³ 8,894,200.00 355,768.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 364,918.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 650,418.00
E. Overhead and profit 15 % 97,562.70
F. Harga satuan pekerjaan ( D + E ) 747,980.70

122 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.5.c Membuat dan memasang 1 m² daun pintu panel, kayu kelas III ( kayu Kruing )
A. Bahan
Papan kayu Kruing 0.040 m³ 7,276,600.00 291,064.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 300,214.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 585,714.00
E. Overhead and profit 15 % 87,857.10
F. Harga satuan pekerjaan ( D + E ) 673,571.10
A.4.6.1.5.d Membuat dan memasang 1 m² daun pintu panel + kaca bening 5 mm rangka kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan Kayu Bangkirai 0.040 m³ 8,894,200.00 355,768.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Kaca rayben 5 mm 1.000 m2 115,100.00 115,100.00
Jumlah harga bahan 480,018.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 765,518.00
E. Overhead and profit 15 % 114,827.70
F. Harga satuan pekerjaan ( D + E ) 880,345.70
A.4.6.1.5.e Membuat dan memasang 1 m² daun pintu panel + kaca bening 5 mm rangka kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.040 m³ 7,276,600.00 291,064.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Kaca rayben 5 mm 1.000 m2 115,100.00 115,100.00
Jumlah harga bahan 415,314.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 700,814.00
E. Overhead and profit 15 % 105,122.10
F. Harga satuan pekerjaan ( D + E ) 805,936.10
A.4.6.1.6 Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas I ( kayu Jati )
A. Bahan
Papan kayu Jati 0.024 m³ 16,673,400.00 400,161.60
Lem kayu 0.300 kg 18,300.00 5,490.00
Jumlah harga bahan 405,651.60
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 634,051.60
E. Overhead and profit 15 % 95,107.74
F. Harga satuan pekerjaan ( D + E ) 729,159.34
A.4.6.1.6.a Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas II ( kayu Kamper )
A. Bahan
Papan Kayu Kamper 0.024 m³ 11,114,900.00 266,757.60
Lem kayu 0.300 kg 18,300.00 5,490.00
Jumlah harga bahan 272,247.60

123 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 500,647.60
E. Overhead and profit 15 % 75,097.14
F. Harga satuan pekerjaan ( D + E ) 575,744.74
A.4.6.1.6.b Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan Kayu Bangkirai 0.024 m³ 8,894,200.00 213,460.80
Lem kayu 0.300 kg 18,300.00 5,490.00
Jumlah harga bahan 218,950.80
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 447,350.80
E. Overhead and profit 15 % 67,102.62
F. Harga satuan pekerjaan ( D + E ) 514,453.42
A.4.6.1.6.c Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.024 m³ 7,276,600.00 174,638.40
Lem kayu 0.300 kg 18,300.00 5,490.00
Jumlah harga bahan 180,128.40
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 408,528.40
E. Overhead and profit 15 % 61,279.26
F. Harga satuan pekerjaan ( D + E ) 469,807.66
A.4.6.1.6.d Membuat dan memasang 1 m² pintu dan jendela kaca, kayu kelas III ( kayu Kempas )
A. Bahan
Papan kayu Kempas 0.024 m³ 6,805,500.00 163,332.00
Lem kayu 0.300 kg 18,300.00 5,490.00
Jumlah harga bahan 168,822.00
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 397,222.00
E. Overhead and profit 15 % 59,583.30
F. Harga satuan pekerjaan ( D + E ) 456,805.30
A.4.6.1.7 Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas I ( kayu Jati )
A. Bahan
Papan kayu Jati 0.064 m³ 16,673,400.00 1,067,097.60
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 1,076,247.60
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00

124 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,361,747.60
E. Overhead and profit 15 % 204,262.14
F. Harga satuan pekerjaan ( D + E ) 1,566,009.74
A.4.6.1.7.a Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.064 m³ 11,114,900.00 711,353.60
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 720,503.60
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,006,003.60
E. Overhead and profit 15 % 150,900.54
F. Harga satuan pekerjaan ( D + E ) 1,156,904.14
A.4.6.1.7.b Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan kayu Bangkirai 0.064 m³ 8,894,200.00 569,228.80
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 578,378.80
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 863,878.80
E. Overhead and profit 15 % 129,581.82
F. Harga satuan pekerjaan ( D + E ) 993,460.62
A.4.6.1.7.c Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.064 m³ 7,276,600.00 465,702.40
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 474,852.40
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 760,352.40
E. Overhead and profit 15 % 114,052.86
F. Harga satuan pekerjaan ( D + E ) 874,405.26
A.4.6.1.7.d Membuat dan memasang 1 m² pintu dan jendela jalusi kayu kelas III ( kayu Kempas )
A. Bahan
Papan Kayu Kempas 0.064 m³ 6,805,500.00 435,552.00
Lem kayu 0.500 kg 18,300.00 9,150.00
Jumlah harga bahan 444,702.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Kayu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 285,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 730,202.00
E. Overhead and profit 15 % 109,530.30
F. Harga satuan pekerjaan ( D + E ) 839,732.30
A.4.6.1.8 Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas II ( kayu Kruing ) lebar sampai 90 cm
A. Bahan

125 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Papan Kayu Kamper 0.025 m³ 11,114,900.00 277,872.50
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 kg 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 lembar 73,200.00 73,200.00
Jumlah harga bahan 360,630.50

126 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Kayu 2.100 OH 68,000.00 142,800.00
Kepala Tukang 0.210 OH 75,000.00 15,750.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 199,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 560,480.50
E. Overhead and profit 15 % 84,072.08
F. Harga satuan pekerjaan ( D + E ) 644,552.58
A.4.6.1.8.a Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas II ( kayu Bangkirai ) lebar sampai 90 cm
A. Bahan
Papan Kayu Bangkirai 0.025 m³ 8,894,200.00 222,355.00
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 kg 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 lembar 73,200.00 73,200.00
Jumlah harga bahan 305,113.00
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Kayu 2.100 OH 68,000.00 142,800.00
Kepala Tukang 0.210 OH 75,000.00 15,750.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 199,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 504,963.00
E. Overhead and profit 15 % 75,744.45
F. Harga satuan pekerjaan ( D + E ) 580,707.45
A.4.6.1.8.b Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas III ( kayu Kruing ) lebar sampai 90 cm
A. Bahan
Papan Kayu Kruing 0.025 m³ 7,276,600.00 181,915.00
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 kg 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 lembar 73,200.00 73,200.00
Jumlah harga bahan 264,673.00
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Kayu 2.100 OH 68,000.00 142,800.00
Kepala Tukang 0.210 OH 75,000.00 15,750.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 199,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 464,523.00
E. Overhead and profit 15 % 69,678.45
F. Harga satuan pekerjaan ( D + E ) 534,201.45
A.4.6.1.8.c Membuat 1 m² daun pintu plywood rangkap, rangka tertutup kayu kelas III ( kayu Kempas ) lebar sampai 90 cm
A. Bahan
Papan Kayu Kempas 0.025 m³ 6,805,500.00 170,137.50
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 kg 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 lembar 73,200.00 73,200.00
Jumlah harga bahan 252,895.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Kayu 2.100 OH 68,000.00 142,800.00
Kepala Tukang 0.210 OH 75,000.00 15,750.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 199,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 452,745.50
E. Overhead and profit 15 % 67,911.83
F. Harga satuan pekerjaan ( D + E ) 520,657.33
A.4.6.1.9 Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II ( kayu Kamper )
A. Bahan
Papan Kayu Kamper 0.0256 m³ 11,114,900.00 284,541.44
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 73,200.00 73,200.00
Jumlah harga bahan 367,299.44

127 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 595,699.44
E. Overhead and profit 15 % 89,354.92
F. Harga satuan pekerjaan ( D + E ) 685,054.36
A.4.6.1.9.a Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan Kayu Bangkirai 0.0256 m³ 8,894,200.00 227,691.52
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 73,200.00 73,200.00
Jumlah harga bahan 310,449.52
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 538,849.52
E. Overhead and profit 15 % 80,827.43
F. Harga satuan pekerjaan ( D + E ) 619,676.95
A.4.6.1.9.b Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.0256 m³ 7,276,600.00 186,280.96
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 73,200.00 73,200.00
Jumlah harga bahan 269,038.96
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 497,438.96
E. Overhead and profit 15 % 74,615.84
F. Harga satuan pekerjaan ( D + E ) 572,054.80
A.4.6.1.9.c Membuat 1 m² pintu plywood rangkap, rangka expose kayu kelas II ( kayu Kempas )
A. Bahan
Papan Kayu Kempas 0.0256 m³ 6,805,500.00 174,220.80
Paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.500 18,300.00 9,150.00
plywood tebal 3 mm ukuran (90 x 220) cm 1.000 73,200.00 73,200.00
Jumlah harga bahan 256,978.80
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 485,378.80
E. Overhead and profit 15 % 72,806.82
F. Harga satuan pekerjaan ( D + E ) 558,185.62
A.4.6.1.10 Memasang 1 m² jalusi kusen, kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.060 m³ 11,114,900.00 666,894.00
Paku 1 cm - 2,5 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 668,934.00
B. Tenaga
Pekerja 0.670 OH 55,000.00 36,850.00

128 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 214,650.00

129 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 883,584.00
E. Overhead and profit 15 % 132,537.60
F. Harga satuan pekerjaan ( D + E ) 1,016,121.60
A.4.6.1.10.a Memasang 1 m² jalusi kusen, kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan Kayu Bangkirai 0.060 m³ 8,894,200.00 533,652.00
Paku 1 cm - 2,5 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 535,692.00
B. Tenaga
Pekerja 0.670 OH 55,000.00 36,850.00
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 214,650.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 750,342.00
E. Overhead and profit 15 % 112,551.30
F. Harga satuan pekerjaan ( D + E ) 862,893.30
A.4.6.1.10.b Memasang 1 m² jalusi kusen, kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.060 m³ 7,276,600.00 436,596.00
Paku 1 cm - 2,5 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 438,636.00
B. Tenaga
Pekerja 0.670 OH 55,000.00 36,850.00
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 214,650.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 653,286.00
E. Overhead and profit 15 % 97,992.90
F. Harga satuan pekerjaan ( D + E ) 751,278.90
A.4.6.1.10.c Memasang 1 m² jalusi kusen, kayu kelas III ( kayu Kempas )
A. Bahan
Papan kayu Kempas 0.060 m³ 6,805,500.00 408,330.00
Paku 1 cm - 2,5 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 410,370.00
B. Tenaga
Pekerja 0.670 OH 55,000.00 36,850.00
Tukang Kayu 2.000 OH 68,000.00 136,000.00
Kepala Tukang 0.200 OH 75,000.00 15,000.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 214,650.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 625,020.00
E. Overhead and profit 15 % 93,753.00
F. Harga satuan pekerjaan ( D + E ) 718,773.00
A.4.6.1.11 Memasang 1 m² teakwood rangkap, rangka expose kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.025 m³ 11,114,900.00 277,872.50
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.300 kg 18,300.00 5,490.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Jumlah harga bahan 367,470.50
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 595,870.50
E. Overhead and profit 15 % 89,380.58
F. Harga satuan pekerjaan ( D + E ) 685,251.08

130 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.11.a Memasang 1 m² teakwood rangkap, rangka expose kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan Kayu Bangkirai 0.025 m³ 8,894,200.00 222,355.00
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.300 kg 18,300.00 5,490.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Jumlah harga bahan 311,953.00
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 540,353.00
E. Overhead and profit 15 % 81,052.95
F. Harga satuan pekerjaan ( D + E ) 621,405.95
A.4.6.1.11.b Memasang 1 m² teakwood rangkap, rangka expose kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.025 m³ 7,276,600.00 181,915.00
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.300 kg 18,300.00 5,490.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Jumlah harga bahan 271,513.00
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 499,913.00
E. Overhead and profit 15 % 74,986.95
F. Harga satuan pekerjaan ( D + E ) 574,899.95
A.4.6.1.11.c Memasang 1 m² teakwood rangkap, rangka expose kayu kelas III ( kayu Kempas )
A. Bahan
Papan Kayu Kempas 0.025 m³ 6,805,500.00 170,137.50
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.300 kg 18,300.00 5,490.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Jumlah harga bahan 259,735.50
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 2.400 OH 68,000.00 163,200.00
Kepala Tukang 0.240 OH 75,000.00 18,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 228,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 488,135.50
E. Overhead and profit 15 % 73,220.33
F. Harga satuan pekerjaan ( D + E ) 561,355.83
A.4.6.1.12 Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.025 m³ 11,114,900.00 277,872.50
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.800 kg 18,300.00 14,640.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Formika 0.500 lembar 106,000.00 53,000.00
Jumlah harga bahan 429,620.50
B. Tenaga
Pekerja 0.850 OH 55,000.00 46,750.00
Tukang Kayu 2.550 OH 68,000.00 173,400.00
Kepala Tukang 0.255 OH 75,000.00 19,125.00
Mandor 0.043 OH 80,000.00 3,440.00
Jumlah harga tenaga 242,715.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 672,335.50
E. Overhead and profit 15 % 100,850.33

131 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 773,185.83

132 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.12.a Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan Kayu Bangkirai 0.025 m³ 8,894,200.00 222,355.00
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.800 kg 18,300.00 14,640.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Formika 0.500 lembar 106,000.00 53,000.00
Jumlah harga bahan 374,103.00
B. Tenaga
Pekerja 0.850 OH 55,000.00 46,750.00
Tukang Kayu 2.550 OH 68,000.00 173,400.00
Kepala Tukang 0.255 OH 75,000.00 19,125.00
Mandor 0.043 OH 80,000.00 3,440.00
Jumlah harga tenaga 242,715.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 616,818.00
E. Overhead and profit 15 % 92,522.70
F. Harga satuan pekerjaan ( D + E ) 709,340.70
A.4.6.1.12.b Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II ( kayu Kruing )
A. Bahan
Papan Kayu Kruing 0.025 m³ 7,276,600.00 181,915.00
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.800 kg 18,300.00 14,640.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Formika 0.500 lembar 106,000.00 53,000.00
Jumlah harga bahan 333,663.00
B. Tenaga
Pekerja 0.850 OH 55,000.00 46,750.00
Tukang Kayu 2.550 OH 68,000.00 173,400.00
Kepala Tukang 0.255 OH 75,000.00 19,125.00
Mandor 0.043 OH 80,000.00 3,440.00
Jumlah harga tenaga 242,715.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 576,378.00
E. Overhead and profit 15 % 86,456.70
F. Harga satuan pekerjaan ( D + E ) 662,834.70
A.4.6.1.12.c Memasang 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II ( kayu Kempas )
A. Bahan
Papan Kayu Kempas 0.025 m³ 6,805,500.00 170,137.50
paku 1 cm - 2,5 cm 0.030 kg 13,600.00 408.00
Lem Kayu 0.800 kg 18,300.00 14,640.00
Teakwood tebal 4 mm Ukuran (90 x 220 ) cm 1.000 lembar 83,700.00 83,700.00
Formika 0.500 lembar 106,000.00 53,000.00
Jumlah harga bahan 321,885.50
B. Tenaga
Pekerja 0.850 OH 55,000.00 46,750.00
Tukang Kayu 2.550 OH 68,000.00 173,400.00
Kepala Tukang 0.255 OH 75,000.00 19,125.00
Mandor 0.043 OH 80,000.00 3,440.00
Jumlah harga tenaga 242,715.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 564,600.50
E. Overhead and profit 15 % 84,690.08
F. Harga satuan pekerjaan ( D + E ) 649,290.58
A.4.6.1.13 Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas I ( kayu Jati ) bentang 6 meter
A. Bahan
Balok Kayu Jati 1.100 m³ 14,448,600.00 15,893,460.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 16,224,620.00
B. Tenaga
Pekerja 4.000 OH 55,000.00 220,000.00
Tukang Kayu 12.000 OH 68,000.00 816,000.00
Kepala Tukang 1.200 OH 75,000.00 90,000.00
Mandor 0.200 OH 80,000.00 16,000.00
Jumlah harga tenaga 1,142,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 17,366,620.00

133 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Overhead and profit 15 % 2,604,993.00
F. Harga satuan pekerjaan ( D + E ) 19,971,613.00

134 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.13.a Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas II ( kayu Kamper ) bentang 6 meter
A. Bahan
Balok Kayu Kamper 1.100 m³ 9,998,900.00 10,998,790.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 11,329,950.00
B. Tenaga
Pekerja 4.000 OH 55,000.00 220,000.00
Tukang Kayu 12.000 OH 68,000.00 816,000.00
Kepala Tukang 1.200 OH 75,000.00 90,000.00
Mandor 0.200 OH 80,000.00 16,000.00
Jumlah harga tenaga 1,142,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 12,471,950.00
E. Overhead and profit 15 % 1,870,792.50
F. Harga satuan pekerjaan ( D + E ) 14,342,742.50
A.4.6.1.13.b Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas II ( kayu Bangkirai ) bentang 6 meter
A. Bahan
Balok Kayu Bangkirai 1.100 m³ 9,449,100.00 10,394,010.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 10,725,170.00
B. Tenaga
Pekerja 4.000 OH 55,000.00 220,000.00
Tukang Kayu 12.000 OH 68,000.00 816,000.00
Kepala Tukang 1.200 OH 75,000.00 90,000.00
Mandor 0.200 OH 80,000.00 16,000.00
Jumlah harga tenaga 1,142,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 11,867,170.00
E. Overhead and profit 15 % 1,780,075.50
F. Harga satuan pekerjaan ( D + E ) 13,647,245.50
A.4.6.1.13.c Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas III ( kayu Kruing ) bentang 6 meter
A. Bahan
Balok Kayu Kruing 1.100 m³ 6,999,700.00 7,699,670.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 8,030,830.00
B. Tenaga
Pekerja 4.000 OH 55,000.00 220,000.00
Tukang Kayu 12.000 OH 68,000.00 816,000.00
Kepala Tukang 1.200 OH 75,000.00 90,000.00
Mandor 0.200 OH 80,000.00 16,000.00
Jumlah harga tenaga 1,142,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 9,172,830.00
E. Overhead and profit 15 % 1,375,924.50
F. Harga satuan pekerjaan ( D + E ) 10,548,754.50
A.4.6.1.13.d Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas III ( kayu Kempas ) bentang 6 meter
A. Bahan
Balok Kayu Kempas 1.100 m³ 6,282,000.00 6,910,200.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 7,241,360.00
B. Tenaga
Pekerja 4.000 OH 55,000.00 220,000.00
Tukang Kayu 12.000 OH 68,000.00 816,000.00
Kepala Tukang 1.200 OH 75,000.00 90,000.00
Mandor 0.200 OH 80,000.00 16,000.00
Jumlah harga tenaga 1,142,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,383,360.00
E. Overhead and profit 15 % 1,257,504.00
F. Harga satuan pekerjaan ( D + E ) 9,640,864.00
A.4.6.1.13.e Memasang 1m³ kontruksi kuda-kuda konvensional, kayu kelas III ( kayu Meranti batu ) bentang 6 meter
A. Bahan
Balok Kayu Maranti batu 1.100 m³ 4,711,500.00 5,182,650.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00

135 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 5,513,810.00

136 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 4.000 OH 55,000.00 220,000.00
Tukang Kayu 12.000 OH 68,000.00 816,000.00
Kepala Tukang 1.200 OH 75,000.00 90,000.00
Mandor 0.200 OH 80,000.00 16,000.00
Jumlah harga tenaga 1,142,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 6,655,810.00
E. Overhead and profit 15 % 998,371.50
F. Harga satuan pekerjaan ( D + E ) 7,654,181.50
A.4.6.1.14 Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas I ( kayu Jati )
A. Bahan
Balok Kayu Jati 1.200 m³ 14,448,600.00 17,338,320.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 17,669,480.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 19,582,330.00
E. Overhead and profit 15 % 2,937,349.50
F. Harga satuan pekerjaan ( D + E ) 22,519,679.50
A.4.6.1.14.a Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas II ( kayu Kamper )
A. Bahan
Balok Kayu Kamper 1.200 m³ 9,998,900.00 11,998,680.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 12,329,840.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 14,242,690.00
E. Overhead and profit 15 % 2,136,403.50
F. Harga satuan pekerjaan ( D + E ) 16,379,093.50
A.4.6.1.14.b Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas II ( kayu Bangkirai )
A. Bahan
Balok Kayu Bangkirai 1.200 m³ 9,449,100.00 11,338,920.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 11,670,080.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 13,582,930.00
E. Overhead and profit 15 % 2,037,439.50
F. Harga satuan pekerjaan ( D + E ) 15,620,369.50
A.4.6.1.14.c Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas III ( kayu Kruing )
A. Bahan
Balok Kayu Kruing 1.200 m³ 6,999,700.00 8,399,640.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 8,730,800.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00

137 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00

138 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 10,643,650.00
E. Overhead and profit 15 % 1,596,547.50
F. Harga satuan pekerjaan ( D + E ) 12,240,197.50
A.4.6.1.14.d Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas III ( kayu Kempas )
A. Bahan
Balok Kayu Kempas 1.200 m³ 6,999,700.00 8,399,640.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 8,730,800.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 10,643,650.00
E. Overhead and profit 15 % 1,596,547.50
F. Harga satuan pekerjaan ( D + E ) 12,240,197.50
A.4.6.1.14.e Memasang 1 m³ kontruksi kuda-kuda expose, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Balok Kayu Meranti batu 1.200 m³ 4,711,500.00 5,653,800.00
Besi strip tebal 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 5.600 kg 13,600.00 76,160.00
Jumlah harga bahan 5,984,960.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 7,897,810.00
E. Overhead and profit 15 % 1,184,671.50
F. Harga satuan pekerjaan ( D + E ) 9,082,481.50
A.4.6.1.15 Memasang 1 m³ kontruksi gording, kayu kelas II ( kayu Kamper )
A. Bahan
Balok Kayu Kamper 1.100 m³ 9,998,900.00 10,998,790.00
Besi Strip 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 3.000 kg 13,600.00 40,800.00
Jumlah harga bahan 11,294,590.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 13,207,440.00
E. Overhead and profit 15 % 1,981,116.00
F. Harga satuan pekerjaan ( D + E ) 15,188,556.00
A.4.6.1.15.a Memasang 1 m³ kontruksi gording, kayu kelas II ( kayu Bangkirai )
A. Bahan
Balok Kayu Bangkirai 1.100 m³ 9,449,100.00 10,394,010.00
Besi Strip 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 3.000 kg 13,600.00 40,800.00
Jumlah harga bahan 10,689,810.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 12,602,660.00

139 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Overhead and profit 15 % 1,890,399.00
F. Harga satuan pekerjaan ( D + E ) 14,493,059.00

140 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.15.b Memasang 1 m³ kontruksi gording, kayu kelas III ( kayu Kruing )
A. Bahan
Balok Kayu Kruing 1.100 m³ 6,999,700.00 7,699,670.00
Besi Strip 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 3.000 kg 13,600.00 40,800.00
Jumlah harga bahan 7,995,470.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 9,908,320.00
E. Overhead and profit 15 % 1,486,248.00
F. Harga satuan pekerjaan ( D + E ) 11,394,568.00
A.4.6.1.15.c Memasang 1 m³ kontruksi gording, kayu kelas III ( kayu Kempas )
A. Bahan
Balok Kayu Kempas 1.100 m³ 6,282,000.00 6,910,200.00
Besi Strip 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 3.000 kg 13,600.00 40,800.00
Jumlah harga bahan 7,206,000.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 9,118,850.00
E. Overhead and profit 15 % 1,367,827.50
F. Harga satuan pekerjaan ( D + E ) 10,486,677.50
A.4.6.1.15.d Memasang 1 m³ kontruksi gording, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Balok Kayu Meranti batu 1.100 m³ 4,711,500.00 5,182,650.00
Besi Strip 5 mm 15.000 kg 17,000.00 255,000.00
Paku 12 cm 3.000 kg 13,600.00 40,800.00
Jumlah harga bahan 5,478,450.00
B. Tenaga
Pekerja 6.700 OH 55,000.00 368,500.00
Tukang Kayu 20.100 OH 68,000.00 1,366,800.00
Kepala Tukang 2.010 OH 75,000.00 150,750.00
Mandor 0.335 OH 80,000.00 26,800.00
Jumlah harga tenaga 1,912,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 7,391,300.00
E. Overhead and profit 15 % 1,108,695.00
F. Harga satuan pekerjaan ( D + E ) 8,499,995.00
A.4.6.1.16 Memasang 1 m² rangaka atap genteng keramik, kayu kelas II ( Kayu Kamper )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kamper 0.014 m³ 8,894,200.00 124,518.80
Reng 2 x 3 cm kayu Kamper 0.0036 m³ 8,894,200.00 32,019.12
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 159,937.92
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 173,387.92
E. Overhead and profit 15 % 26,008.19
F. Harga satuan pekerjaan ( D + E ) 199,396.11
A.4.6.1.16.a Memasang 1 m² rangaka atap genteng keramik, kayu kelas II ( Kayu Bangkirai )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Bangkirai 0.014 m³ 8,337,200.00 116,720.80
Reng 2 x 3 cm kayu Bangkirai 0.0036 m³ 7,781,300.00 28,012.68

141 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 148,133.48

142 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 161,583.48
E. Overhead and profit 15 % 24,237.52
F. Harga satuan pekerjaan ( D + E ) 185,821.00
A.4.6.1.16.b Memasang 1 m² rangaka atap genteng keramik, kayu kelas III ( Kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 2 x 3 cm kayu Kruing 0.0036 m³ 6,179,900.00 22,247.64
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 112,166.24
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 125,616.24
E. Overhead and profit 15 % 18,842.44
F. Harga satuan pekerjaan ( D + E ) 144,458.68
A.4.6.1.16.c Memasang 1 m² rangaka atap genteng keramik, kayu kelas III ( Kayu Kempas )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kempas 0.014 m³ 5,235,000.00 73,290.00
Reng 2 x 3 cm kayu Kempas 0.0036 m³ 5,235,000.00 18,846.00
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 95,536.00
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 108,986.00
E. Overhead and profit 15 % 16,347.90
F. Harga satuan pekerjaan ( D + E ) 125,333.90
A.4.6.1.16.d Memasang 1 m² rangaka atap genteng keramik, kayu kelas IV ( Kayu Meranti batu )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Meranti batu 0.014 m³ 3,664,500.00 51,303.00
Reng 2 x 3 cm kayu Meranti batu 0.0036 m³ 3,664,500.00 13,192.20
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 67,895.20
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 81,345.20
E. Overhead and profit 15 % 12,201.78
F. Harga satuan pekerjaan ( D + E ) 93,546.98
A.4.6.1.16.e Memasang 1 m² rangaka atap genteng palentong, kayu kelas II ( Kayu Kamper )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kamper 0.014 m³ 8,894,200.00 124,518.80
Reng 2 x 3 cm kayu Kamper 0.0036 m³ 8,894,200.00 32,019.12
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 159,937.92
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00

143 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00

144 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 173,387.92
E. Overhead and profit 15 % 26,008.19
F. Harga satuan pekerjaan ( D + E ) 199,396.11
A.4.6.1.16.f Memasang 1 m² rangaka atap genteng palentong, kayu kelas II ( Kayu Bangkirai )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Bangkirai 0.014 m³ 8,337,200.00 116,720.80
Reng 2 x 3 cm kayu Bangkirai 0.0036 m³ 7,781,300.00 28,012.68
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 148,133.48
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 161,583.48
E. Overhead and profit 15 % 24,237.52
F. Harga satuan pekerjaan ( D + E ) 185,821.00
A.4.6.1.16.g Memasang 1 m² rangaka atap genteng palentong, kayu kelas III ( Kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 2 x 3 cm kayu Kruing 0.0036 m³ 6,179,900.00 22,247.64
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 112,166.24
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 125,616.24
E. Overhead and profit 15 % 18,842.44
F. Harga satuan pekerjaan ( D + E ) 144,458.68
A.4.6.1.16.h Memasang 1 m² rangaka atap genteng palentong, kayu kelas III ( Kayu Kempas )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kempas 0.014 m³ 5,235,000.00 73,290.00
Reng 2 x 3 cm kayu Kempas 0.0036 m³ 5,235,000.00 18,846.00
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 95,536.00
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 108,986.00
E. Overhead and profit 15 % 16,347.90
F. Harga satuan pekerjaan ( D + E ) 125,333.90
A.4.6.1.16.i Memasang 1 m² rangaka atap genteng palentong, kayu kelas IV ( Kayu Meranti batu )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Meranti batu 0.014 m³ 3,664,500.00 51,303.00
Reng 2 x 3 cm kayu Meranti batu 0.0036 m³ 3,664,500.00 13,192.20
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 67,895.20
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 81,345.20

145 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Overhead and profit 15 % 12,201.78
F. Harga satuan pekerjaan ( D + E ) 93,546.98
A.4.6.1.16.j Memasang 1 m² rangaka atap genteng palentong, kayu kelas IV ( Kaso kayu Kruing reng kayu Meranti batu )

146 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 2 x 3 cm kayu Meranti batu 0.0036 m³ 3,664,500.00 13,192.20
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 103,110.80
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 116,560.80
E. Overhead and profit 15 % 17,484.12
F. Harga satuan pekerjaan ( D + E ) 134,044.92
A.4.6.1.16.k Memasang 1 m² rangaka atap genteng palentong, kayu kelas III ( Kaso kayu Kruing reng kayu lokal )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 2 x 3 cm kayu lokal 0.0036 m³ 2,303,400.00 8,292.24
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 98,210.84
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 111,660.84
E. Overhead and profit 15 % 16,749.13
F. Harga satuan pekerjaan ( D + E ) 128,409.97
A.4.6.1.16.l Memasang 1 m² rangaka atap genteng palentong, kayu kelas IV ( Kaso kayu Glugu reng kayu lokal )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Glugu 0.014 m³ 2,181,200.00 30,536.80
Reng 2 x 3 cm kayu lokal 0.0036 m³ 2,303,400.00 8,292.24
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 42,229.04
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 55,679.04
E. Overhead and profit 15 % 8,351.86
F. Harga satuan pekerjaan ( D + E ) 64,030.90
A.4.6.1.17 Memasang 1 m² rangka atap genteng Beton, kayu kelas III ( kaso kayu Kruing reng kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 3 x 4 cm kayu Kruing 0.0057 m³ 6,179,900.00 35,225.43
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 125,144.03
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 138,594.03
E. Overhead and profit 15 % 20,789.10
F. Harga satuan pekerjaan ( D + E ) 159,383.13
A.4.6.1.17.a Memasang 1 m² rangka atap genteng Morando biasa, kayu kelas III ( kaso kayu Kruing reng kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 3 x 4 cm kayu Kruing 0.0072 m³ 6,179,900.00 44,495.28
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00

147 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga bahan 134,413.88

148 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 147,863.88
E. Overhead and profit 15 % 22,179.58
F. Harga satuan pekerjaan ( D + E ) 170,043.46
A.4.6.1.17.b Memasang 1 m² rangka atap genteng Morando glazuur, kayu kelas III ( kaso kayu Kruing reng kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
Reng 3 x 4 cm kayu Kruing 0.0072 m³ 6,179,900.00 44,495.28
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 134,413.88
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 147,863.88
E. Overhead and profit 15 % 22,179.58
F. Harga satuan pekerjaan ( D + E ) 170,043.46
A.4.6.1.18 Memasang 1 m² rangka atap sirap, kayu kelas III ( kaso kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.165 m³ 6,179,900.00 1,019,683.50
Paku 5 cm & 10 cm 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 1,022,403.50
B. Tenaga
Pekerja 0.120 OH 55,000.00 6,600.00
Tukang Kayu 0.120 OH 68,000.00 8,160.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 16,140.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,038,543.50
E. Overhead and profit 15 % 155,781.53
F. Harga satuan pekerjaan ( D + E ) 1,194,325.03
A.4.6.1.19 Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas II ( kayu Kamper )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kamper 0.0154 m³ 8,894,200.00 136,970.68
Paku 5 cm & 10 cm 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 139,690.68
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 36,900.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 176,590.68
E. Overhead and profit 15 % 26,488.60
F. Harga satuan pekerjaan ( D + E ) 203,079.28
A.4.6.1.19.a Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas III ( kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.0154 m³ 6,179,900.00 95,170.46
Paku 5 cm & 10 cm 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 97,890.46
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 36,900.00
C. Peralatan -

149 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -

150 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. Jumlah ( A + B + C ) 134,790.46
E. Overhead and profit 15 % 20,218.57
F. Harga satuan pekerjaan ( D + E ) 155,009.03
A.4.6.1.19.b Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Meranti batu 0.0154 m³ 3,664,500.00 56,433.30
Paku 5 cm & 10 cm 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 59,153.30
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 36,900.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 96,053.30
E. Overhead and profit 15 % 14,408.00
F. Harga satuan pekerjaan ( D + E ) 110,461.30
A.4.6.1.19.c Memasang 1 m² rangka langit-langit (50 x 100) cm, kayu kelas IV ( kayu lokal )
A. Bahan
Kaso-kaso (5 x 7) cm kayu lokal 0.0154 m³ 2,303,400.00 35,472.36
Paku 5 cm & 10 cm 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 38,192.36
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.075 OH 80,000.00 6,000.00
Jumlah harga tenaga 36,900.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 75,092.36
E. Overhead and profit 15 % 11,263.85
F. Harga satuan pekerjaan ( D + E ) 86,356.21
A.4.6.1.20 Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas II ( kayu Kamper )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kamper 0.0163 m³ 8,894,200.00 144,975.46
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 148,375.46
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 34,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 182,825.46
E. Overhead and profit 15 % 27,423.82
F. Harga satuan pekerjaan ( D + E ) 210,249.28
A.4.6.1.20.a Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas III ( kayu Kruing )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Kruing 0.0163 m³ 6,179,900.00 100,732.37
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 104,132.37
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 34,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 138,582.37
E. Overhead and profit 15 % 20,787.36
F. Harga satuan pekerjaan ( D + E ) 159,369.73
A.4.6.1.20.b Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Meranti batu 0.0163 m³ 3,664,500.00 59,731.35
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 63,131.35

151 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 34,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 97,581.35
E. Overhead and profit 15 % 14,637.20
F. Harga satuan pekerjaan ( D + E ) 112,218.55
A.4.6.1.20.c Memasang 1 m² rangka langit-langit (60 x 60) cm, kayu kelas IV ( kayu Punak )
A. Bahan
Kaso-kaso (5 x 7) cm kayu Punak 0.0163 m³ 5,235,000.00 85,330.50
Paku 5 cm & 10 cm 0.250 kg 13,600.00 3,400.00
Jumlah harga bahan 88,730.50
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 34,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 123,180.50
E. Overhead and profit 15 % 18,477.08
F. Harga satuan pekerjaan ( D + E ) 141,657.58
A.4.6.1.21 Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas I ( kayu Jati )
A. Bahan
Papan kayu Jati 0.0108 m³ 16,673,400.00 180,072.72
Paku 5 cm - 7 cm 0.100 kg 13,600.00 1,360.00
Jumlah harga bahan 181,432.72
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 202,432.72
E. Overhead and profit 15 % 30,364.91
F. Harga satuan pekerjaan ( D + E ) 232,797.63
A.4.6.1.21.a Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.0108 m³ 11,114,900.00 120,040.92
Paku 5 cm - 7 cm 0.100 kg 13,600.00 1,360.00
Jumlah harga bahan 121,400.92
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 142,400.92
E. Overhead and profit 15 % 21,360.14
F. Harga satuan pekerjaan ( D + E ) 163,761.06
A.4.6.1.21.b Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan kayu Bangkirai 0.0108 m³ 8,894,200.00 96,057.36
Paku 5 cm - 7 cm 0.100 kg 13,600.00 1,360.00
Jumlah harga bahan 97,417.36
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00

152 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 118,417.36
E. Overhead and profit 15 % 17,762.60
F. Harga satuan pekerjaan ( D + E ) 136,179.96
A.4.6.1.21.c Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III ( kayu Kruing )
A. Bahan
Papan kayu Kruing 0.0108 m³ 7,276,600.00 78,587.28
Paku 5 cm - 7 cm 0.100 kg 13,600.00 1,360.00
Jumlah harga bahan 79,947.28
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 100,947.28
E. Overhead and profit 15 % 15,142.09
F. Harga satuan pekerjaan ( D + E ) 116,089.37
A.4.6.1.21.d Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III ( kayu Kempas )
A. Bahan
Papan kayu Kempas 0.0108 m³ 6,805,500.00 73,499.40
Paku 5 cm - 7 cm 0.100 kg 13,600.00 1,360.00
Jumlah harga bahan 74,859.40
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 95,859.40
E. Overhead and profit 15 % 14,378.91
F. Harga satuan pekerjaan ( D + E ) 110,238.31
A.4.6.1.21.e Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Papan kayu Meranti batu 0.0108 m³ 4,771,500.00 51,532.20
Paku 5 cm - 7 cm 0.100 kg 13,600.00 1,360.00
Jumlah harga bahan 52,892.20
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 73,892.20
E. Overhead and profit 15 % 11,083.83
F. Harga satuan pekerjaan ( D + E ) 84,976.03
A.4.6.1.22 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I ( kayu Jati )
A. Bahan
Papan kayu Jati 0.011 m³ 16,673,400.00 183,407.40
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 184,087.40
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 205,087.40
E. Overhead and profit 15 % 30,763.11
F. Harga satuan pekerjaan ( D + E ) 235,850.51
A.4.6.1.22.a Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II ( kayu Kamper )
A. Bahan

153 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Papan kayu Kamper 0.011 m³ 11,114,900.00 122,263.90
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 122,943.90

154 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 143,943.90
E. Overhead and profit 15 % 21,591.59
F. Harga satuan pekerjaan ( D + E ) 165,535.49
A.4.6.1.22.b Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan kayu Bangkirai 0.011 m³ 8,894,200.00 97,836.20
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 98,516.20
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 119,516.20
E. Overhead and profit 15 % 17,927.43
F. Harga satuan pekerjaan ( D + E ) 137,443.63
A.4.6.1.22.c Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas III ( kayu Kruing )
A. Bahan
Papan kayu Kruing 0.011 m³ 7,276,600.00 80,042.60
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 80,722.60
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 101,722.60
E. Overhead and profit 15 % 15,258.39
F. Harga satuan pekerjaan ( D + E ) 116,980.99
A.4.6.1.22.d Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas III ( kayu Kempas )
A. Bahan
Papan kayu Kempas 0.011 m³ 6,805,500.00 74,860.50
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 75,540.50
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 96,540.50
E. Overhead and profit 15 % 14,481.08
F. Harga satuan pekerjaan ( D + E ) 111,021.58
A.4.6.1.22.e Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Papan kayu Meranti batu 0.011 m³ 4,771,500.00 52,486.50
Paku 5 cm - 7 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 53,166.50
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 21,000.00

155 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 74,166.50
E. Overhead and profit 15 % 11,124.98
F. Harga satuan pekerjaan ( D + E ) 85,291.48
A.4.6.1.23 Memasang 1 m² rangka dinding pemisah (60 x 120) cm, kayu kelas II ( kayu Bangkirai )
A. Bahan
Balok Kayu Bangkirai 0.028 m³ 9,449,100.00 264,574.80
Paku 5 cm - 7 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 266,614.80
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 309,479.80
E. Overhead and profit 15 % 46,421.97
F. Harga satuan pekerjaan ( D + E ) 355,901.77
A.4.6.1.23.a Memasang 1 m² rangka dinding pemisah (60 x 120) cm, kayu kelas III ( kayu Kruing )
A. Bahan
Balok Kayu Kruing 0.028 m³ 6,999,700.00 195,991.60
Paku 5 cm - 7 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 198,031.60
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 240,896.60
E. Overhead and profit 15 % 36,134.49
F. Harga satuan pekerjaan ( D + E ) 277,031.09
A.4.6.1.23.b Memasang 1 m² rangka dinding pemisah (60 x 120) cm, kayu kelas IV ( kayu Meranti batu )
A. Bahan
Balok Kayu Meranti batu 0.028 m³ 4,711,500.00 131,922.00
Paku 5 cm - 7 cm 0.150 kg 13,600.00 2,040.00
Jumlah harga bahan 133,962.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 176,827.00
E. Overhead and profit 15 % 26,524.05
F. Harga satuan pekerjaan ( D + E ) 203,351.05
A.4.6.1.24 Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas II ( kayu Kamper )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Kamper 0.028 m³ 9,998,900.00 279,969.20
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
Teakwood tebal 4 mm Ukuran (120 x 240 ) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 377,741.20
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 420,606.20
E. Overhead and profit 15 % 63,090.93
F. Harga satuan pekerjaan ( D + E ) 483,697.13

156 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.24.a Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas II ( kayu Bangkirai )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Bangkirai 0.028 m³ 9,449,100.00 264,574.80
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
Teakwood tebal 4 mm Ukuran (120 x 240 ) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 362,346.80
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 405,211.80
E. Overhead and profit 15 % 60,781.77
F. Harga satuan pekerjaan ( D + E ) 465,993.57
A.4.6.1.24.b Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas III ( kayu Kruing )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Kruing 0.028 m³ 6,999,700.00 195,991.60
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
Teakwood tebal 4 mm Ukuran (120 x 240 ) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 293,763.60
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 336,628.60
E. Overhead and profit 15 % 50,494.29
F. Harga satuan pekerjaan ( D + E ) 387,122.89
A.4.6.1.24.c Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas III ( kayu Kempas )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Kempas 0.028 m³ 6,282,000.00 175,896.00
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
Teakwood tebal 4 mm Ukuran (120 x 240 ) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 273,668.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 316,533.00
E. Overhead and profit 15 % 47,479.95
F. Harga satuan pekerjaan ( D + E ) 364,012.95
A.4.6.1.24.d Memasang 1 m² dinding pemisah teakwood rangkap, rangka kayu kelas IV ( kayu Meranti batu )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Meranti batu 0.028 m³ 4,711,500.00 131,922.00
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
Teakwood tebal 4 mm Ukuran (120 x 240 ) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 229,694.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 42,865.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 272,559.00
E. Overhead and profit 15 % 40,883.85
F. Harga satuan pekerjaan ( D + E ) 313,442.85

157 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.25 Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas II ( kayu Kamper )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Kamper 0.028 m³ 9,998,900.00 279,969.20
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
plywood tebal 4 mm Ukuran (120 x 240) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 377,741.20
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 57,100.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 434,841.20
E. Overhead and profit 15 % 65,226.18
F. Harga satuan pekerjaan ( D + E ) 500,067.38
A.4.6.1.25.a Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas II ( kayu Bangkirai )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Bangkirai 0.028 m³ 9,449,100.00 264,574.80
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
plywood tebal 4 mm Ukuran (120 x 240) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 362,346.80
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 57,100.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 419,446.80
E. Overhead and profit 15 % 62,917.02
F. Harga satuan pekerjaan ( D + E ) 482,363.82
A.4.6.1.25.b Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas III ( kayu Kruing )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Kruing 0.028 m³ 6,999,700.00 195,991.60
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
plywood tebal 4 mm Ukuran (120 x 240) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 293,763.60
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 57,100.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 350,863.60
E. Overhead and profit 15 % 52,629.54
F. Harga satuan pekerjaan ( D + E ) 403,493.14
A.4.6.1.25.c Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas III ( kayu Kempas )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Kempas 0.028 m³ 6,282,000.00 175,896.00
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
plywood tebal 4 mm Ukuran (120 x 240) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 273,668.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 57,100.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 330,768.00
E. Overhead and profit 15 % 49,615.20
F. Harga satuan pekerjaan ( D + E ) 380,383.20

158 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.25.d Memasang 1 m² dinding pemisah plywood rangkap, rangka kayu kelas IV ( kayu Meranti batu )
A. Bahan
Balok Kayu ukuran (6 x 12) cm Kayu Meranti batu 0.028 m³ 4,711,500.00 131,922.00
Paku 5 cm dan 10 cm 0.150 kg 13,600.00 2,040.00
plywood tebal 4 mm Ukuran (120 x 240) cm 0.860 lbr 99,400.00 85,484.00
Lem kayu 0.560 kg 18,300.00 10,248.00
Jumlah harga bahan 229,694.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 57,100.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 286,794.00
E. Overhead and profit 15 % 43,019.10
F. Harga satuan pekerjaan ( D + E ) 329,813.10
A.4.6.1.26 Memasang 1 m² dinding lambriziring dari papan kayu kelas II ( kayu Kamper )
A. Bahan
Papan kayu Kamper 0.007 m³ 11,114,900.00 77,804.30
Paku 5 cm dan 10 cm 0.100 kg 13,600.00 1,360.00
Paku skrup 10 0.150 kg 19,600.00 2,940.00
Jumlah harga bahan 82,104.30
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Kayu 1.800 OH 68,000.00 122,400.00
Kepala Tukang 0.180 OH 75,000.00 13,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 171,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 253,404.30
E. Overhead and profit 15 % 38,010.65
F. Harga satuan pekerjaan ( D + E ) 291,414.95
A.4.6.1.26.a Memasang 1 m² dinding lambriziring dari papan kayu kelas II ( kayu Bangkirai )
A. Bahan
Papan kayu Bangkirai 0.007 m³ 8,894,200.00 62,259.40
Paku 5 cm dan 10 cm 0.100 kg 13,600.00 1,360.00
Paku skrup 10 0.150 kg 19,600.00 2,940.00
Jumlah harga bahan 66,559.40
B. Tenaga
Pekerja 0.600 OH 55,000.00 33,000.00
Tukang Kayu 1.800 OH 68,000.00 122,400.00
Kepala Tukang 0.180 OH 75,000.00 13,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 171,300.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 237,859.40
E. Overhead and profit 15 % 35,678.91
F. Harga satuan pekerjaan ( D + E ) 273,538.31
A.4.6.1.27 Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cm
A. Bahan
plywood tebal 4 mm 0.400 m³ 99,400.00 39,760.00
Paku 1 cm dan 2.5 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 40,440.00
B. Tenaga
Pekerja 0.025 OH 55,000.00 1,375.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.001 OH 80,000.00 80.00
Jumlah harga tenaga 7,155.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 47,595.00
E. Overhead and profit 15 % 7,139.25
F. Harga satuan pekerjaan ( D + E ) 54,734.25

159 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.6.1.28 Memasang 1 m² dinding bilik, rangka kayu kelas III ( kayu Kruing )
A. Bahan
Bilik Bambu polos 1.500 m² 8,400.00 12,600.00
Kaso-kaso (5 x 7) cm kayu Kruing 0.014 m³ 6,179,900.00 86,518.60
paku 0.012 kg 13,600.00 163.20
List Kayu 2/4 profil 0.003 m' 1,025.00 3.08
Jumlah harga bahan 99,284.88
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 9,675.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 108,959.88
E. Overhead and profit 15 % 16,343.98
F. Harga satuan pekerjaan ( D + E ) 125,303.86
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87
A. Bahan
Portland Cement (PC) 247.000 kg 1,340.00 330,980.00
Pasir Beton (PB) 869.000 kg 124.36 108,066.36 ###
Koral Beton (maksimum 30 mm) pecah mesin 999.000 kg 272.07 271,802.00 ###
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 721,598.36 harga pasir
B. Tenaga harga koral
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00 PADUKAN
Mandor 0.083 OH 80,000.00 6,640.00 HARGA BA
Jumlah harga tenaga 118,190.00 BEDA DIKIT
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 839,788.36
E. Overhead and profit 15 % 125,968.25
F. Harga satuan pekerjaan ( D + E ) 965,756.61
A.4.1.1.2 Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78
A. Bahan
Portland Cement (PC) 276.000 kg 1,340.00 369,840.00
Pasir Beton (PB) 828.000 kg 124.36 102,967.71
Koral Beton (maksimum 30 mm) pecah mesin 1,012.000 kg 272.07 275,338.96
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 758,896.68
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 877,086.68
E. Overhead and profit 15 % 131,563.00
F. Harga satuan pekerjaan ( D + E ) 1,008,649.68
A.4.1.1.3 Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72
A. Bahan
Portland Cement (PC) 299.000 kg 1,340.00 400,660.00
Pasir Beton (PB) 799.000 kg 124.36 99,361.36
Koral Beton (maksimum 30 mm) pecah mesin 1,017.000 kg 272.07 276,699.33
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 787,470.69
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 905,660.69
E. Overhead and profit 15 % 135,849.10

160 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 1,041,509.79

Bobot isi pasir = 1.400 kg/m 3, Bobot isi kerikil = 1.350 kg/m 3, Buckling factor pasir = 20 %

161 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.A.4.1.1.4 Membuat 1 m³ lantai kerja beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87
A. Bahan
Portland Cement (PC) 230.000 kg 1,340.00 308,200.00
Pasir Beton (PB) 893.000 kg 124.36 111,050.93
Koral Beton (maksimum 30 mm) pecah mesin 1,027.000 kg 272.07 279,420.07
Air 200.000 liter 50.00 10,000.00
Jumlah harga bahan 708,671.00
B. Tenaga
Pekerja 1.200 OH 55,000.00 66,000.00
Tukang Batu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.060 OH 80,000.00 4,800.00
Jumlah harga tenaga 85,900.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 794,571.00
E. Overhead and profit 15 % 119,185.65
F. Harga satuan pekerjaan ( D + E ) 913,756.65
A.A.4.1.1.5 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66
A. Bahan
Portland Cement (PC) 326.000 kg 1,340.00 436,840.00
Pasir Beton (PB) 760.000 kg 124.36 94,511.43
Koral Beton (maksimum 30 mm) pecah mesin 1,029.000 kg 272.07 279,964.22
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 822,065.65
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 940,255.65
E. Overhead and profit 15 % 141,038.35
F. Harga satuan pekerjaan ( D + E ) 1,081,294.00
A.A.4.1.1.6 Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61
A. Bahan
Portland Cement (PC) 352.000 kg 1,340.00 471,680.00
Pasir Beton (PB) 731.000 kg 124.36 90,905.07
Koral Beton (maksimum 30 mm) pecah mesin 1,031.000 kg 272.07 280,508.37
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 853,843.44
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 972,033.44
E. Overhead and profit 15 % 145,805.02
F. Harga satuan pekerjaan ( D + E ) 1,117,838.46
A.4.1.1.7 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58
A. Bahan
Portland Cement (PC) 371.000 kg 1,340.00 497,140.00
Pasir Beton (PB) 698.000 kg 124.36 86,801.29
Koral Beton (maksimum 30 mm) pecah mesin 1,047.000 kg 272.07 284,861.56
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 879,552.84
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 997,742.84
E. Overhead and profit 15 % 149,661.43
F. Harga satuan pekerjaan ( D + E ) 1,147,404.27

162 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.1.1.8 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56
A. Bahan
Portland Cement (PC) 384.000 kg 1,340.00 514,560.00
Pasir Beton (PB) 692.000 kg 124.36 86,055.14
Koral Beton (maksimum 30 mm) pecah mesin 1,039.000 kg 272.07 282,684.96
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 894,050.11
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,012,240.11
E. Overhead and profit 15 % 151,836.02
F. Harga satuan pekerjaan ( D + E ) 1,164,076.12
A.4.1.1.9 Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53
A. Bahan
Portland Cement (PC) 406.000 kg 1,340.00 544,040.00
Pasir Beton (PB) 684.000 kg 124.36 85,060.29
Koral Beton (maksimum 30 mm) pecah mesin 1,026.000 kg 272.07 279,148.00
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 918,998.29
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,037,188.29
E. Overhead and profit 15 % 155,578.24
F. Harga satuan pekerjaan ( D + E ) 1,192,766.53
A.4.1.1.10 Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52
A. Bahan
Portland Cement (PC) 413.000 kg 1,340.00 553,420.00
Pasir Beton (PB) 681.000 kg 124.36 84,687.21
Koral Beton (maksimum 30 mm) pecah mesin 1,021.000 kg 272.07 277,787.63
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 926,644.84
B. Tenaga
Pekerja 1.650 OH 55,000.00 90,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Kepala Tukang 0.028 OH 75,000.00 2,100.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 118,190.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,044,834.84
E. Overhead and profit 15 % 156,725.23
F. Harga satuan pekerjaan ( D + E ) 1,201,560.07
A.4.1.1.11 Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49
A. Bahan
Portland Cement (PC) 439.000 kg 1,340.00 588,260.00
Pasir Beton (PB) 670.000 kg 124.36 83,319.29
Koral Beton (maksimum 30 mm) pecah mesin 1,006.000 kg 272.07 273,706.52
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 956,035.80
B. Tenaga
Pekerja 2.100 OH 55,000.00 115,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.105 OH 80,000.00 8,400.00
Jumlah harga tenaga 150,325.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,106,360.80
E. Overhead and profit 15 % 165,954.12
F. Harga satuan pekerjaan ( D + E ) 1,272,314.92

163 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.1.1.12 Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48
A. Bahan
Portland Cement (PC) 448.000 kg 1,340.00 600,320.00
Pasir Beton (PB) 667.000 kg 124.36 82,946.21
Koral Beton (maksimum 30 mm) pecah mesin 1,000.000 kg 272.07 272,074.07
Air 215.000 liter 50.00 10,750.00
Jumlah harga bahan 966,090.29
B. Tenaga
Pekerja 2.100 OH 55,000.00 115,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.105 OH 80,000.00 8,400.00
Jumlah harga tenaga 150,325.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,116,415.29
E. Overhead and profit 15 % 167,462.29
F. Harga satuan pekerjaan ( D + E ) 1,283,877.58
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
A. Bahan
Besi Beton (polos/ulir) 10.500 kg 9,800.00 102,900.00
Kawat Beton 0.150 kg 17,200.00 2,580.00
Jumlah harga bahan 105,480.00
B. Tenaga
Pekerja 0.070 OH 55,000.00 3,850.00
Tukang Besi 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 9,455.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 114,935.00
E. Overhead and profit 15 % 17,240.25
F. Harga satuan pekerjaan ( D + E ) 132,175.25 ###
A.4.1.1.17.a Pembesian 1 kg dengan besi polos atau besi ulir
A. Bahan
Besi Beton (polos/ulir) 1.050 kg 9,800.00 10,290.00
Kawat Beton 0.015 kg 17,200.00 258.00
Jumlah harga bahan 10,548.00
B. Tenaga
Pekerja 0.007 OH 55,000.00 385.00
Tukang Besi 0.007 OH 68,000.00 476.00
Kepala Tukang 0.001 OH 75,000.00 52.50
Mandor 0.000 OH 80,000.00 32.00
Jumlah harga tenaga 945.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 11,493.50
E. Overhead and profit 15 % 1,724.03
F. Harga satuan pekerjaan ( D + E ) 13,217.53
A.4.1.1.18 Memasang 10 kg kabel presstressed polos / strands
A. Bahan
Besi Beton (polos/ulir) 10.500 kg 9,800.00 102,900.00
Kawat Beton 0.100 kg 17,200.00 1,720.00
Jumlah harga bahan 104,620.00
B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Tukang Besi 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 6,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 111,385.00
E. Overhead and profit 15 % 16,707.75
F. Harga satuan pekerjaan ( D + E ) 128,092.75
A.4.1.1.19 Memasang 10 kg jaring kawat baja (wiremesh)
A. Bahan
1. Jaring kawat baja dilas 10.200 kg 460.00 4,692.00 harga kawat
Kawat Beton 0.050 kg 17,200.00 860.00
Jumlah harga bahan 5,552.00

164 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.025 OH 55,000.00 1,375.00
Tukang Besi 0.025 OH 68,000.00 1,700.00
Kepala Tukang 0.003 OH 75,000.00 187.50
Mandor 0.001 OH 80,000.00 80.00
Jumlah harga tenaga 3,342.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,894.50
E. Overhead and profit 15 % 1,334.18
F. Harga satuan pekerjaan ( D + E ) 10,228.68
A.4.1.1.20 Memasang 1 m² bekisting untuk pondasi
A. Bahan
Kayu Rawa Pinus 0.040 m³ 1,832,200.00 73,288.00
Paku 5 cm - 10 cm 0.300 kg 13,600.00 4,080.00
Minyak Bekisting 0.100 liter 3,100.00 310.00
Jumlah harga bahan 77,678.00
B. Tenaga
Pekerja 0.520 OH 55,000.00 28,600.00
Tukang Kayu 0.260 OH 68,000.00 17,680.00
Kepala Tukang 0.026 OH 75,000.00 1,950.00
Mandor 0.026 OH 80,000.00 2,080.00
Jumlah harga tenaga 50,310.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 127,988.00
E. Overhead and profit 15 % 19,198.20
F. Harga satuan pekerjaan ( D + E ) 147,186.20
A.4.1.1.21 Memasang 1 m² bekisting untuk sloof
A. Bahan
Kayu Rawa Pinus 0.045 m³ 1,832,200.00 82,449.00
Paku 5 cm - 10 cm 0.300 kg 13,600.00 4,080.00
Minyak Bekisting 0.100 liter 3,100.00 310.00
Jumlah harga bahan 86,839.00
B. Tenaga
Pekerja 0.520 OH 55,000.00 28,600.00
Tukang Kayu 0.260 OH 68,000.00 17,680.00
Kepala Tukang 0.026 OH 75,000.00 1,950.00
Mandor 0.026 OH 80,000.00 2,080.00
Jumlah harga tenaga 50,310.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 137,149.00
E. Overhead and profit 15 % 20,572.35
F. Harga satuan pekerjaan ( D + E ) 157,721.35
A.4.1.1.22 Memasang 1 m² bekisting untuk kolom
A. Bahan
Kayu Rawa Pinus 0.040 m³ 1,832,200.00 73,288.00
Paku 5 cm - 12 cm 0.400 kg 13,600.00 5,440.00
Minyak Bekisting 0.200 liter 3,100.00 620.00
Balok Kayu Meranti Batu 5/7 0.015 m³ 3,664,500.00 54,967.50
Plywood tebal 9 mm 0.350 lembar 157,000.00 54,950.00
Dolken Ø (8-10) cm panjang 4 m 2.000 batang 23,200.00 46,400.00
Jumlah harga bahan 235,665.50
B. Tenaga
Pekerja 0.660 OH 55,000.00 36,300.00
Tukang Kayu 0.330 OH 68,000.00 22,440.00
Kepala Tukang 0.033 OH 75,000.00 2,475.00
Mandor 0.033 OH 80,000.00 2,640.00
Jumlah harga tenaga 63,855.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 299,520.50
E. Overhead and profit 15 % 44,928.08
F. Harga satuan pekerjaan ( D + E ) 344,448.58
A.4.1.1.23 Memasang 1 m² bekisting untuk balok
A. Bahan
Kayu Rawa Pinus 0.040 m³ 1,832,200.00 73,288.00
Paku 5 cm - 12 cm 0.400 kg 13,600.00 5,440.00
Minyak Bekisting 0.200 liter 3,100.00 620.00
Balok Kayu Meranti Batu 5/7 0.018 m³ 3,664,500.00 65,961.00
Plywood tebal 9 mm 0.350 lembar 157,000.00 54,950.00

165 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Dolken Ø (8-10) cm panjang 4 m 2.000 batang 23,200.00 46,400.00
Jumlah harga bahan 246,659.00

166 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.660 OH 55,000.00 36,300.00
Tukang Kayu 0.330 OH 68,000.00 22,440.00
Kepala Tukang 0.033 OH 75,000.00 2,475.00
Mandor 0.033 OH 80,000.00 2,640.00
Jumlah harga tenaga 63,855.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 310,514.00
E. Overhead and profit 15 % 46,577.10
F. Harga satuan pekerjaan ( D + E ) 357,091.10
A.4.1.1.24 Memasang 1 m² bekisting untuk lantai
A. Bahan
Kayu Rawa Pinus 0.040 m³ 1,832,200.00 73,288.00
Paku 5 cm - 12 cm 0.400 kg 13,600.00 5,440.00
Minyak Bekisting 0.200 liter 3,100.00 620.00
Balok Kayu Meranti Batu 5/7 0.015 m³ 3,664,500.00 54,967.50
Plywood tebal 9 mm 0.350 lembar 157,000.00 54,950.00
Dolken Ø (8-10) cm panjang 4 m 6.000 batang 23,200.00 139,200.00
Jumlah harga bahan 328,465.50
B. Tenaga
Pekerja 0.660 OH 55,000.00 36,300.00
Tukang Kayu 0.330 OH 68,000.00 22,440.00
Kepala Tukang 0.033 OH 75,000.00 2,475.00
Mandor 0.033 OH 80,000.00 2,640.00
Jumlah harga tenaga 63,855.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 392,320.50
E. Overhead and profit 15 % 58,848.08
F. Harga satuan pekerjaan ( D + E ) 451,168.58
A.4.1.1.25 Memasang 1 m² bekisting untuk dinding
A. Bahan
Kayu Rawa Pinus 0.030 m³ 1,832,200.00 54,966.00
Paku 5 cm - 12 cm 0.400 kg 13,600.00 5,440.00
Minyak Bekisting 0.200 liter 3,100.00 620.00
Balok Kayu Meranti Batu 5/7 0.020 m³ 3,664,500.00 73,290.00
Plywood tebal 9 mm 0.350 lembar 157,000.00 54,950.00
Dolken Ø (8-10) cm panjang 4 m 3.000 batang 23,200.00 69,600.00
Formite/Penjaga jarak Bekisting/spacer 4.000 buah 1,900.00 7,600.00
Jumlah harga bahan 266,466.00
B. Tenaga
Pekerja 0.660 OH 55,000.00 36,300.00
Tukang Kayu 0.330 OH 68,000.00 22,440.00
Kepala Tukang 0.033 OH 75,000.00 2,475.00
Mandor 0.033 OH 80,000.00 2,640.00
Jumlah harga tenaga 63,855.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 330,321.00
E. Overhead and profit 15 % 49,548.15
F. Harga satuan pekerjaan ( D + E ) 379,869.15
A.4.1.1.26 Memasang 1 m² bekisting untuk tangga
A. Bahan
Kayu Rawa Pinus 0.030 m³ 1,832,200.00 54,966.00
Paku 5 cm - 12 cm 0.400 kg 13,600.00 5,440.00
Minyak Bekisting 0.150 liter 3,100.00 465.00
Balok Kayu Meranti Batu 5/7 0.015 m³ 3,664,500.00 54,967.50
Plywood tebal 9 mm 0.350 lembar 157,000.00 54,950.00
Dolken Ø (8-10) cm panjang 4 m 8.000 m' 23,200.00 185,600.00
Jumlah harga bahan 356,388.50
B. Tenaga
Pekerja 0.660 OH 55,000.00 36,300.00
Tukang Kayu 0.330 OH 68,000.00 22,440.00
Kepala Tukang 0.033 OH 75,000.00 2,475.00
Mandor 0.033 OH 80,000.00 2,640.00
Jumlah harga tenaga 63,855.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 420,243.50
E. Overhead and profit 15 % 63,036.53
F. Harga satuan pekerjaan ( D + E ) 483,280.03

167 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.1.1.27 Memasang 1 m² jembatan untuk pengecoran beton
A. Bahan
Kayu Rawa Pinus 0.0264 m³ 1,832,200.00 48,370.08
Paku 5 cm - 12 cm 0.600 kg 13,600.00 8,160.00
Dolken Ø (8-10) cm panjang 4 m 0.500 batang 23,200.00 11,600.00
Jumlah harga bahan 68,130.08

168 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 12,665.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 80,795.08
E. Overhead and profit 15 % 12,119.26
F. Harga satuan pekerjaan ( D + E ) 92,914.34
A.4.1.1.28 Membuat 1 m³ pondasi beton bertulang (150 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.200 m³ 1,832,200.00 366,440.00
Paku 5 cm - 12 cm 1.500 kg 13,600.00 20,400.00
Minyak Bekisting 0.400 liter 3,100.00 1,240.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00 ###
Kawat Beton 2.250 kg 17,200.00 38,700.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Jumlah harga bahan 2,812,047.00
B. Tenaga
Pekerja 5.300 OH 55,000.00 291,500.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.300 OH 68,000.00 88,400.00
Tukang Besi 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.262 OH 75,000.00 19,650.00
Mandor 0.265 OH 80,000.00 21,200.00
Jumlah harga tenaga 510,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 3,322,897.00
E. Overhead and profit 15 % 498,434.55
F. Harga satuan pekerjaan ( D + E ) 3,821,331.55
A.4.1.1.28.a Membuat 1 m³ pondasi beton bertulang (150 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.200 m³ 1,832,200.00 366,440.00
Paku 5 cm - 12 cm 1.500 kg 13,600.00 20,400.00
Minyak Bekisting 0.400 liter 3,100.00 1,240.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00 ###
Kawat Beton 2.250 kg 17,200.00 38,700.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Jumlah harga bahan 2,812,047.00
B. Tenaga
Pekerja 5.300 OH 55,000.00 291,500.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.300 OH 68,000.00 88,400.00
Tukang Besi 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.262 OH 75,000.00 19,650.00
Mandor 0.265 OH 80,000.00 21,200.00
Jumlah harga tenaga 510,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 3,322,897.00
E. Overhead and profit 15 % 498,434.55
F. Harga satuan pekerjaan ( D + E ) 3,821,331.55
A.4.1.1.29 Membuat 1 m³ sloof beton bertulang (200 kg besi + bekisting) menggunakan batu pecah tangan ###
A. Bahan
Kayu kelas III 0.270 m³ 1,832,200.00 494,694.00
Paku 5 cm - 12 cm 2.000 kg 13,600.00 27,200.00
Minyak Bekisting 0.600 liter 3,100.00 1,860.00
Besi Beton (polos/ulir) 210.000 kg 9,800.00 2,058,000.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00 ###
Jumlah harga bahan 3,475,121.00

169 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 5.650 OH 55,000.00 310,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.560 OH 68,000.00 106,080.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.323 OH 75,000.00 24,225.00
Mandor 0.283 OH 80,000.00 22,640.00
Jumlah harga tenaga 577,595.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 4,052,716.00
E. Overhead and profit 15 % 607,907.40
F. Harga satuan pekerjaan ( D + E ) 4,660,623.40
A.4.1.1.29.a Membuat 1 m³ sloof beton bertulang (200 kg besi + bekisting) menggunakan batu pecah mesin 2,988,713.00 ###
A. Bahan
Kayu kelas III 0.270 m³ 1,832,200.00 494,694.00
Paku 5 cm - 12 cm 2.000 kg 13,600.00 27,200.00
Minyak Bekisting 0.600 liter 3,100.00 1,860.00
Besi Beton (polos/ulir) 210.000 kg 9,800.00 2,058,000.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00 ###
Jumlah harga bahan 3,475,121.00
B. Tenaga
Pekerja 5.650 OH 55,000.00 310,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.560 OH 68,000.00 106,080.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.323 OH 75,000.00 24,225.00
Mandor 0.283 OH 80,000.00 22,640.00
Jumlah harga tenaga 577,595.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 4,052,716.00
E. Overhead and profit 15 % 607,907.40
F. Harga satuan pekerjaan ( D + E ) 4,660,623.40
A.4.1.1.30 Membuat 1 m³ kolom beton bertulang (300 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.400 m³ 1,832,200.00 732,880.00
Paku 5 cm - 12 cm 4.000 kg 13,600.00 54,400.00
Minyak Bekisting 2.000 liter 3,100.00 6,200.00
Besi Beton (polos/ulir) 315.000 kg 9,800.00 3,087,000.00 ###
Kawat Beton 4.500 kg 17,200.00 77,400.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.150 m³ 3,664,500.00 549,675.00
Plywood tebal 9 mm 3.500 lembar 157,000.00 549,500.00
Dolken Ø (8-10) cm panjang 4 m 20.000 batang 23,200.00 464,000.00
Jumlah harga bahan 6,362,822.00
B. Tenaga
Pekerja 7.050 OH 55,000.00 387,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 2.100 OH 68,000.00 142,800.00
Kepala Tukang 0.403 OH 75,000.00 30,225.00
Mandor 0.353 OH 80,000.00 28,240.00
Jumlah harga tenaga 719,915.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 7,082,737.00
E. Overhead and profit 15 % 1,062,410.55
F. Harga satuan pekerjaan ( D + E ) 8,145,147.55
A.4.1.1.30.a Membuat 1 m³ kolom beton bertulang (300 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.400 m³ 1,832,200.00 732,880.00
Paku 5 cm - 12 cm 4.000 kg 13,600.00 54,400.00
Minyak Bekisting 2.000 liter 3,100.00 6,200.00
Besi Beton (polos/ulir) 315.000 kg 9,800.00 3,087,000.00 ###
Kawat Beton 4.500 kg 17,200.00 77,400.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00

170 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.150 m³ 3,664,500.00 549,675.00
Plywood tebal 9 mm 3.500 lembar 157,000.00 549,500.00
Dolken Ø (8-10) cm panjang 4 m 20.000 batang 23,200.00 464,000.00
Jumlah harga bahan 6,362,822.00

171 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
B. Tenaga
Pekerja 7.050 OH 55,000.00 387,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 2.100 OH 68,000.00 142,800.00
Kepala Tukang 0.403 OH 75,000.00 30,225.00
Mandor 0.353 OH 80,000.00 28,240.00
Jumlah harga tenaga 719,915.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 7,082,737.00
E. Overhead and profit 15 % 1,062,410.55
F. Harga satuan pekerjaan ( D + E ) 8,145,147.55
A.4.1.1.31 Membuat 1 m³ balok beton bertulang (200 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 210.000 kg 9,800.00 2,058,000.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,909,981.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,535,746.00
E. Overhead and profit 15 % 830,361.90
F. Harga satuan pekerjaan ( D + E ) 6,366,107.90
A.4.1.1.31.a Membuat 1 m³ balok beton bertulang (200 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 210.000 kg 9,800.00 2,058,000.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,909,981.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,535,746.00
E. Overhead and profit 15 % 830,361.90
F. Harga satuan pekerjaan ( D + E ) 6,366,107.90
A.4.1.1.31.b Membuat 1 m³ balok beton bertulang (179 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 187.950 kg 9,800.00 1,841,910.00 ###

172 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,693,891.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,319,656.00
E. Overhead and profit 15 % 797,948.40
F. Harga satuan pekerjaan ( D + E ) 6,117,604.40
A.4.1.1.31.c Membuat 1 m³ balok beton bertulang (179 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 187.950 kg 9,800.00 1,841,910.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,693,891.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,319,656.00
E. Overhead and profit 15 % 797,948.40
F. Harga satuan pekerjaan ( D + E ) 6,117,604.40
A.4.1.1.31.d Membuat 1 m³ balok beton bertulang (150 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,395,481.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,021,246.00

173 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Overhead and profit 15 % 753,186.90
F. Harga satuan pekerjaan ( D + E ) 5,774,432.90
A.4.1.1.31.e Membuat 1 m³ balok beton bertulang (150 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00 ###
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,395,481.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,021,246.00
E. Overhead and profit 15 % 753,186.90
F. Harga satuan pekerjaan ( D + E ) 5,774,432.90
A.4.1.1.31.f Membuat 1 m³ balok beton bertulang (132 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 138.600 kg 9,800.00 1,358,280.00
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,210,261.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 4,836,026.00
E. Overhead and profit 15 % 725,403.90
F. Harga satuan pekerjaan ( D + E ) 5,561,429.90
A.4.1.1.31.g Membuat 1 m³ balok beton bertulang (132 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 138.600 kg 9,800.00 1,358,280.00
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.140 m³ 3,664,500.00 513,030.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 16.000 batang 23,200.00 371,200.00
Jumlah harga bahan 4,210,261.00
B. Tenaga
Pekerja 6.350 OH 55,000.00 349,250.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.650 OH 68,000.00 112,200.00

174 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.333 OH 75,000.00 24,975.00
Mandor 0.318 OH 80,000.00 25,440.00
Jumlah harga tenaga 625,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 4,836,026.00
E. Overhead and profit 15 % 725,403.90
F. Harga satuan pekerjaan ( D + E ) 5,561,429.90
A.4.1.1.32 Membuat 1 m³ kolom beton bertulang (150 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00 ###
Kawat Beton 2.250 kg 17,200.00 38,700.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.120 m³ 3,664,500.00 439,740.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 32.000 batang 23,200.00 742,400.00
Jumlah harga bahan 4,680,491.00
B. Tenaga
Pekerja 5.300 OH 55,000.00 291,500.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.300 OH 68,000.00 88,400.00
Tukang Besi 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.265 OH 75,000.00 19,875.00
Mandor 0.265 OH 80,000.00 21,200.00
Jumlah harga tenaga 511,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,191,566.00
E. Overhead and profit 15 % 778,734.90
F. Harga satuan pekerjaan ( D + E ) 5,970,300.90
A.4.1.1.32.a Membuat 1 m³ kolom beton bertulang (150 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.320 m³ 1,832,200.00 586,304.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00 ###
Kawat Beton 2.250 kg 17,200.00 38,700.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok kayu kelas II 0.120 m³ 3,664,500.00 439,740.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 32.000 batang 23,200.00 742,400.00
Jumlah harga bahan 4,680,491.00
B. Tenaga
Pekerja 5.300 OH 55,000.00 291,500.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.300 OH 68,000.00 88,400.00
Tukang Besi 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.265 OH 75,000.00 19,875.00
Mandor 0.265 OH 80,000.00 21,200.00
Jumlah harga tenaga 511,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,191,566.00
E. Overhead and profit 15 % 778,734.90
F. Harga satuan pekerjaan ( D + E ) 5,970,300.90
A.4.1.1.33 Membuat 1 m³ dinding beton bertulang (150 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.240 m³ 1,832,200.00 439,728.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00
Kawat Beton 2.250 kg 17,200.00 38,700.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00

175 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Balok Kayu Meranti Batu 5/7 0.160 m³ 3,664,500.00 586,320.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 24.000 batang 23,200.00 556,800.00
Jumlah harga bahan 4,494,895.00
B. Tenaga
Pekerja 5.300 OH 55,000.00 291,500.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.300 OH 68,000.00 88,400.00
Tukang Besi 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.262 OH 75,000.00 19,650.00
Mandor 0.265 OH 80,000.00 21,200.00
Jumlah harga tenaga 510,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,005,745.00
E. Overhead and profit 15 % 750,861.75
F. Harga satuan pekerjaan ( D + E ) 5,756,606.75
A.4.1.1.33.a Membuat 1 m³ dinding beton bertulang (150 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.240 m³ 1,832,200.00 439,728.00
Paku 5 cm - 12 cm 3.200 kg 13,600.00 43,520.00
Minyak Bekisting 1.600 liter 3,100.00 4,960.00
Besi Beton (polos/ulir) 157.500 kg 9,800.00 1,543,500.00
Kawat Beton 2.250 kg 17,200.00 38,700.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok Kayu Meranti Batu 5/7 0.160 m³ 3,664,500.00 586,320.00
Plywood tebal 9 mm 2.800 lembar 157,000.00 439,600.00
Dolken Ø (8-10) cm panjang 4 m 24.000 batang 23,200.00 556,800.00
Jumlah harga bahan 4,494,895.00
B. Tenaga
Pekerja 5.300 OH 55,000.00 291,500.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.300 OH 68,000.00 88,400.00
Tukang Besi 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.262 OH 75,000.00 19,650.00
Mandor 0.265 OH 80,000.00 21,200.00
Jumlah harga tenaga 510,850.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,005,745.00
E. Overhead and profit 15 % 750,861.75
F. Harga satuan pekerjaan ( D + E ) 5,756,606.75
A.4.1.1.34 Membuat 1 m³ dinding beton bertulang (200 kg besi + bekisting) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.250 m³ 1,832,200.00 458,050.00
Paku 5 cm - 12 cm 3.000 kg 13,600.00 40,800.00
Minyak Bekisting 1.200 liter 3,100.00 3,720.00
Besi Beton (polos/ulir) 210.000 kg 9,800.00 2,058,000.00
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah tangan 0.810 m³ 367,300.00 297,513.00
Balok Kayu Meranti Batu 5/7 0.105 m³ 3,664,500.00 384,772.50
Plywood tebal 9 mm 2.500 lembar 157,000.00 392,500.00
Dolken Ø (8-10) cm panjang 4 m 14.000 batang 23,200.00 324,800.00
Jumlah harga bahan 4,556,009.50
B. Tenaga
Pekerja 5.650 OH 55,000.00 310,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.560 OH 68,000.00 106,080.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.323 OH 75,000.00 24,225.00
Mandor 0.283 OH 80,000.00 22,640.00
Jumlah harga tenaga 577,595.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,133,604.50
E. Overhead and profit 15 % 770,040.68
F. Harga satuan pekerjaan ( D + E ) 5,903,645.18
A.4.1.1.34.a Membuat 1 m³ dinding beton bertulang (200 kg besi + bekisting) menggunakan batu pecah mesin
A. Bahan

176 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Kayu kelas III 0.250 m³ 1,832,200.00 458,050.00
Paku 5 cm - 12 cm 3.000 kg 13,600.00 40,800.00
Minyak Bekisting 1.200 liter 3,100.00 3,720.00
Besi Beton (polos/ulir) 210.000 kg 9,800.00 2,058,000.00
Kawat Beton 3.000 kg 17,200.00 51,600.00
Portland Cement (PC) 336.000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.540 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.810 m³ 367,300.00 297,513.00
Balok Kayu Meranti Batu 5/7 0.105 m³ 3,664,500.00 384,772.50
Plywood tebal 9 mm 2.500 lembar 157,000.00 392,500.00
Dolken Ø (8-10) cm panjang 4 m 14.000 batang 23,200.00 324,800.00
Jumlah harga bahan 4,556,009.50
B. Tenaga
Pekerja 5.650 OH 55,000.00 310,750.00
Tukang Batu 0.275 OH 68,000.00 18,700.00
Tukang Kayu 1.560 OH 68,000.00 106,080.00
Tukang Besi 1.400 OH 68,000.00 95,200.00
Kepala Tukang 0.323 OH 75,000.00 24,225.00
Mandor 0.283 OH 80,000.00 22,640.00
Jumlah harga tenaga 577,595.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 5,133,604.50
E. Overhead and profit 15 % 770,040.68
F. Harga satuan pekerjaan ( D + E ) 5,903,645.18
A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11 x 11 cm) menggunakan batu pecah tangan
A. Bahan
Kayu kelas III 0.002 m³ 1,832,200.00 3,664.40
Paku 5 cm - 12 cm 0.010 kg 13,600.00 136.00
Besi Beton (polos/ulir) 3.000 kg 9,800.00 29,400.00
Kawat Beton 0.450 kg 17,200.00 7,740.00
Portland Cement (PC) 4.000 kg 1,340.00 5,360.00
Pasir Beton (PB) 0.006 m³ 174,100.00 1,044.60
Koral Beton (maksimum 30 mm) pecah tangan 0.009 m³ 367,300.00 3,305.70
Jumlah harga bahan 50,650.70
B. Tenaga
Pekerja 0.180 OH 55,000.00 9,900.00
Tukang Batu 0.020 OH 68,000.00 1,360.00
Tukang Kayu 0.020 OH 68,000.00 1,360.00
Tukang Besi 0.020 OH 68,000.00 1,360.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.009 OH 80,000.00 720.00
Jumlah harga tenaga 15,150.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 65,800.70
E. Overhead and profit 15 % 9,870.11
F. Harga satuan pekerjaan ( D + E ) 75,670.81
A.4.1.1.35.a Membuat 1 m' kolom praktis beton bertulang (11 x 11 cm) menggunakan batu pecah mesin
A. Bahan
Kayu kelas III 0.002 m³ 1,832,200.00 3,664.40
Paku 5 cm - 12 cm 0.010 kg 13,600.00 136.00
Besi Beton (polos/ulir) 3.000 kg 9,800.00 29,400.00
Kawat Beton 0.450 kg 17,200.00 7,740.00
Portland Cement (PC) 4.000 kg 1,340.00 5,360.00
Pasir Beton (PB) 0.006 m³ 174,100.00 1,044.60
Koral Beton (maksimum 30 mm) pecah mesin 0.009 m³ 367,300.00 3,305.70
Jumlah harga bahan 50,650.70
B. Tenaga
Pekerja 0.180 OH 55,000.00 9,900.00
Tukang Batu 0.020 OH 68,000.00 1,360.00
Tukang Kayu 0.020 OH 68,000.00 1,360.00
Tukang Besi 0.020 OH 68,000.00 1,360.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.009 OH 80,000.00 720.00
Jumlah harga tenaga 15,150.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 65,800.70
E. Overhead and profit 15 % 9,870.11
F. Harga satuan pekerjaan ( D + E ) 75,670.81
A.4.1.1.36 Membuat 1 m' ring balok beton bertulang (10 x 15 cm) menggunakan batu pecah tangan
A. Bahan

177 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Kayu Pinus / Kayu Rawa 0.003 m³ 1,832,200.00 5,496.60
Paku 5 cm - 12 cm 0.020 kg 13,600.00 272.00
Besi Beton (polos/ulir) 3.600 kg 9,800.00 35,280.00
Kawat Beton 0.050 kg 17,200.00 860.00
Portland Cement (PC) 5.500 kg 1,340.00 7,370.00
Pasir Beton (PB) 0.009 m³ 174,100.00 1,566.90
Koral Beton (maksimum 30 mm) pecah tangan 0.015 m³ 367,300.00 5,509.50
Jumlah harga bahan 56,355.00
B. Tenaga
Pekerja 0.297 OH 55,000.00 16,335.00
Tukang Batu 0.033 OH 68,000.00 2,244.00
Tukang Kayu 0.033 OH 68,000.00 2,244.00
Tukang Besi 0.033 OH 68,000.00 2,244.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,017.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 81,372.00
E. Overhead and profit 15 % 12,205.80
F. Harga satuan pekerjaan ( D + E ) 93,577.80
A.4.1.1.36.a Membuat 1 m' ring balok beton bertulang (10 x 15 cm) menggunakan batu pecah mesin
A. Bahan
Kayu Pinus / Kayu Rawa 0.003 m³ 1,832,200.00 5,496.60
Paku 5 cm - 12 cm 0.020 kg 13,600.00 272.00
Besi Beton (polos/ulir) 3.600 kg 9,800.00 35,280.00
Kawat Beton 0.050 kg 17,200.00 860.00
Portland Cement (PC) 5.500 kg 1,340.00 7,370.00
Pasir Beton (PB) 0.009 m³ 174,100.00 1,566.90
Koral Beton (maksimum 30 mm) pecah mesin 0.015 m³ 367,300.00 5,509.50
Jumlah harga bahan 56,355.00
B. Tenaga
Pekerja 0.297 OH 55,000.00 16,335.00
Tukang Batu 0.033 OH 68,000.00 2,244.00
Tukang Kayu 0.033 OH 68,000.00 2,244.00
Tukang Besi 0.033 OH 68,000.00 2,244.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,017.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 81,372.00
E. Overhead and profit 15 % 12,205.80
F. Harga satuan pekerjaan ( D + E ) 93,577.80
G.1 PEKERJAAN BETON RSNI-T-13-2002
G.042 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR menggunakan batu split pecah tangan
Bahan
Portland Cement (PC) 218.0000 kg 1,340.00 292,120.00
Pasir Beton (PB) 0.5200 m³ 174,100.00 90,532.00
Koral Beton (maksimum 30 mm) pecah tangan 0.8700 m³ 367,300.00 319,551.00
Jumlah (1) 702,203.00
Tenaga
Pekerja 1.6500 OH 55,000.00 90,750.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.0800 OH 80,000.00 6,400.00
Jumlah (2) 116,025.00
Jumlah (1) + (2) 818,228.00
G.043 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR menggunakan batu split pecah tangan
Bahan
Portland Cement (PC) 197.0000 kg 1,340.00 263,980.00
Pasir Beton (PB) 0.4700 m³ 174,100.00 81,827.00
Koral Beton (maksimum 30 mm) pecah tangan 0.9400 m³ 367,300.00 345,262.00
Jumlah (1) 691,069.00
Tenaga
Pekerja 1.6500 OH 55,000.00 90,750.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.0800 OH 80,000.00 6,400.00
Jumlah (2) 116,025.00
Jumlah (1) + (2) 807,094.00
G.044 Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KR menggunakan batu split pecah tangan
Bahan
Portland Cement (PC) 173.0000 kg 1,340.00 231,820.00

178 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pasir Beton (PB) 0.5700 m³ 174,100.00 99,237.00
Koral Beton (maksimum 30 mm) pecah tangan 0.8700 m³ 367,300.00 319,551.00
Jumlah (1) 650,608.00
Tenaga
Pekerja 1.6500 OH 55,000.00 90,750.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.0800 OH 80,000.00 6,400.00
Jumlah (2) 116,025.00
Jumlah (1) + (2) 766,633.00
G.045 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm menggunakan batu split pecah tangan
Bahan
Portland Cement (PC) 10.0000 kg 1,340.00 13,400.00
Pasir Beton (PB) 0.0260 m³ 174,100.00 4,526.60
Koral Beton (maksimum 30 mm) pecah tangan 0.0440 m³ 367,300.00 16,161.20
Jumlah (1) 34,087.80
Tenaga
Pekerja 1.1500 OH 55,000.00 63,250.00
Tukang Batu 0.0200 OH 68,000.00 1,360.00
Kepala Tukang 0.0020 OH 75,000.00 150.00
Mandor 0.0060 OH 80,000.00 480.00
Jumlah (2) 65,240.00
Jumlah (1) + (2) 99,327.80
G.2 PEKERJAAN BETON SNI 7394 : 2008
G.046 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu pecah mesin
Bahan
Portland Cement (PC) 336.0000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.5400 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.8100 m³ 367,300.00 297,513.00
Jumlah (1) 841,767.00
Tenaga
Pekerja 2.0000 OH 55,000.00 110,000.00
Tukang Batu 0.3500 OH 68,000.00 23,800.00
Kepala Tukang 0.0350 OH 75,000.00 2,625.00
Mandor 0.0830 OH 80,000.00 6,640.00
Jumlah (2) 143,065.00
Jumlah (1) + (2) 984,832.00
G.046.A Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu pecah tangan
Bahan
Portland Cement (PC) 336.0000 kg 1,340.00 450,240.00
Pasir Beton (PB) 0.5400 m³ 174,100.00 94,014.00
Koral Beton (maksimum 30 mm) pecah mesin 0.8100 m³ 367,300.00 297,513.00
Jumlah (1) 841,767.00
Tenaga
Pekerja 2.0000 OH 55,000.00 110,000.00
Tukang Batu 0.3500 OH 68,000.00 23,800.00
Kepala Tukang 0.0350 OH 75,000.00 2,625.00
Mandor 0.0830 OH 80,000.00 6,640.00
Jumlah (2) 143,065.00
Jumlah (1) + (2) 984,832.00
G.047 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KR menggunakan batu pecah tangan
Bahan
Portland Cement (PC) 291.0000 kg 1,340.00 389,940.00
Pasir Beton (PB) 0.4700 m³ 174,100.00 81,827.00
Koral Beton (maksimum 30 mm) pecah tangan 0.9300 m³ 367,300.00 341,589.00
Jumlah (1) 813,356.00
Tenaga
Pekerja 2.0000 OH 55,000.00 110,000.00
Tukang Batu 0.3500 OH 68,000.00 23,800.00
Kepala Tukang 0.0350 OH 75,000.00 2,625.00
Mandor 0.0830 OH 80,000.00 6,640.00
Jumlah (2) 143,065.00
Jumlah (1) + (2) 956,421.00
G.3 HARGA SATUAN PEKERJAAN BETON RSNI-T-13-2002
B.13.a.1 Menghamparkan 1 m³ beton mutu K-125 (ready mix)
A. Bahan
Beton Ready Mix (K-125) 1.0200 m³ 967,300.00 986,646.00
Jumlah harga bahan 986,646.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

179 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga peralatan -
D. Jumlah ( A + B + C ) 1,068,521.00
E. Overhead and profit 15 % 160,278.15
F. Harga satuan pekerjaan ( D + E ) 1,228,799.15
B.13.a.2 Menghamparkan 1 m³ beton mutu K-175 (ready mix)
A. Bahan
Beton Ready Mix (K-175) 1.0200 m³ 997,200.00 1,017,144.00
Jumlah harga bahan 1,017,144.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,099,019.00
E. Overhead and profit 15 % 164,852.85
F. Harga satuan pekerjaan ( D + E ) 1,263,871.85
B.13.a.3 Menghamparkan 1 m³ beton mutu K-225 (ready mix)
A. Bahan
Beton Ready Mix (K-225) 1.0200 m³ 1,023,400.00 1,043,868.00
Jumlah harga bahan 1,043,868.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,125,743.00
E. Overhead and profit 15 % 168,861.45
F. Harga satuan pekerjaan ( D + E ) 1,294,604.45
B.13.a.4 Menghamparkan 1 m³ beton mutu K-250 (ready mix)
A. Bahan
Beton Ready Mix (K-250) 1.0200 m³ 1,044,300.00 1,065,186.00
Jumlah harga bahan 1,065,186.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,147,061.00
E. Overhead and profit 15 % 172,059.15
F. Harga satuan pekerjaan ( D + E ) 1,319,120.15
B.13.a.5 Menghamparkan 1 m³ beton mutu K-275 (ready mix)
A. Bahan
Beton Ready Mix (K-275) 1.0200 m³ 1,075,000.00 1,096,500.00
Jumlah harga bahan 1,096,500.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,178,375.00
E. Overhead and profit 15 % 176,756.25
F. Harga satuan pekerjaan ( D + E ) 1,355,131.25
B.13.a.6 Menghamparkan 1 m³ beton mutu K-300 (ready mix)
A. Bahan
Beton Ready Mix (K-300) 1.0200 m³ 1,085,000.00 1,106,700.00
Jumlah harga bahan 1,106,700.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00

180 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,188,575.00
E. Overhead and profit 15 % 178,286.25
F. Harga satuan pekerjaan ( D + E ) 1,366,861.25
B.13.a.7 Menghamparkan 1 m³ beton mutu K-350 (ready mix)
A. Bahan
Beton Ready Mix (K-350) 1.0200 m³ 1,123,600.00 1,146,072.00
Jumlah harga bahan 1,146,072.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Batu 0.2500 OH 68,000.00 17,000.00
Kepala Tukang 0.0250 OH 75,000.00 1,875.00
Mandor 0.1000 OH 80,000.00 8,000.00
Jumlah harga tenaga 81,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,227,947.00
E. Overhead and profit 15 % 184,192.05
F. Harga satuan pekerjaan ( D + E ) 1,412,139.05
B.35 Membongkar 1 m2 begisting cara biasa dan membereskan puing - puing
A. Bahan
Air 0.000 m³ 50,000.00 -
Jumlah harga bahan -
B. Tenaga
Pekerja 0.040 OH 55,000.00 2,200.00
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 2,520.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 2,520.00
E. Overhead and profit 15 % 378.00
F. Harga satuan pekerjaan ( D + E ) 2,898.00
B.37 Menggenangi air 100 m2 permukaan beton
A. Bahan
Air 5.000 m³ 50,000.00 250,000.00
Jumlah harga bahan 250,000.00
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 47,200.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 297,200.00
E. Overhead and profit 15 % 44,580.00
F. Harga satuan pekerjaan ( D + E ) 341,780.00
B.37.a Menggenangi air 1 m2 permukaan beton
A. Bahan
Air 0.050 m³ 50,000.00 2,500.00
Jumlah harga bahan 2,500.00
B. Tenaga
Pekerja 0.008 OH 55,000.00 440.00
Mandor 0.0004 OH 80,000.00 32.00
Jumlah harga tenaga 472.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 2,972.00
E. Overhead and profit 15 % 445.80
F. Harga satuan pekerjaan ( D + E ) 3,417.80
B.38.a Memasang 100 m2 terpal/karung goni
A. Bahan
Sewa Karung goni/terpal 102.000 m2 3,125.00 318,750.00
Jumlah harga bahan 318,750.00
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Mandor 0.080 OH 80,000.00 6,400.00
Jumlah harga tenaga 50,400.00
C. Peralatan -

181 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 369,150.00
E. Overhead and profit 15 % 55,372.50
F. Harga satuan pekerjaan ( D + E ) 424,522.50
B.38.b Memasang 1 m2 terpal/karung goni
A. Bahan
Sewa Karung goni/terpal 1.020 m2 3,125.00 3,187.50
Jumlah harga bahan 3,187.50
B. Tenaga
Pekerja 0.008 OH 55,000.00 440.00
Mandor 0.001 OH 80,000.00 64.00
Jumlah harga tenaga 504.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 3,691.50
E. Overhead and profit 15 % 553.73
F. Harga satuan pekerjaan ( D + E ) 4,245.23
B.38.c Menyirami 100 m2 Beton dengan air selama 4 hari
A. Bahan
Air 20.000 m2 50,000.00 1,000,000.00
Jumlah harga bahan 1,000,000.00
B. Tenaga
Pekerja 2.000 OH 55,000.00 110,000.00
Mandor 0.100 OH 80,000.00 8,000.00
Jumlah harga tenaga 118,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,118,000.00
E. Overhead and profit 15 % 167,700.00
F. Harga satuan pekerjaan ( D + E ) 1,285,700.00
B.38.d Menyirami 1 m2 Beton dengan air selama 4 hari
A. Bahan
Air 0.200 m2 50,000.00 10,000.00
Jumlah harga bahan 10,000.00
B. Tenaga
Pekerja 0.020 OH 55,000.00 1,100.00
Mandor 0.001 OH 80,000.00 80.00
Jumlah harga tenaga 1,180.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 11,180.00
E. Overhead and profit 15 % 1,677.00
F. Harga satuan pekerjaan ( D + E ) 12,857.00
G.055 Memasang 1 m² plat beton "bondex"
Bahan
Bondex 1.0100 kg 165,400.00 167,054.00
Kawat Las 0.1000 kg 21,400.00 2,140.00
Jumlah (1) 169,194.00
Tenaga
Pekerja 0.0500 OH 55,000.00 2,750.00
Tukang Besi 0.0300 OH 68,000.00 2,040.00
Mandor 0.0100 OH 80,000.00 800.00
Shear Connector 1.0000 ls 15,700.00 15,700.00
Jumlah (2) 21,290.00
Jumlah (1) + (2) 190,484.00
G.055.a Memasang 1 m² plat lantai beton sistem bondex termasuk besi dan begisting
1 Membuat 1 m² beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58
A. Bahan
Portland Cement (PC) 42.290 kg 1,340.00 56,668.60
Pasir Beton (PB) 79.570 kg 124.36 9,895.10
Koral Beton (maksimum 30 mm) pecah mesin 119.360 kg 272.07 32,474.76
Air 24.510 liter 50.00 1,225.50
Jumlah harga bahan 100,263.96
B. Tenaga
Pekerja 0.190 OH 55,000.00 10,450.00
Tukang Batu 0.030 OH 68,000.00 2,040.00
Kepala Tukang 0.003 OH 75,000.00 240.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 13,530.00
C. Peralatan -

Jumlah harga peralatan -


182 dari 300
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. Jumlah ( A + B + C ) 113,793.96

2 Pembesian dengan besi polos atau besi ulir


A. Bahan
Besi Beton (polos/ulir) 5.800 kg 9,800.00 56,840.00
Kawat Beton 0.080 kg 17,200.00 1,376.00
Jumlah harga bahan 58,216.00
B. Tenaga
Pekerja 0.040 OH 55,000.00 2,200.00
Tukang Besi 0.040 OH 68,000.00 2,720.00
Kepala Tukang 0.0039 OH 75,000.00 289.41
Mandor 0.0022 OH 80,000.00 176.00
Jumlah harga tenaga 5,385.41
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 63,601.41

3 Memasang bekisting untuk lantai


A. Bahan
Plat bondex 1.030 m² 1,832,200.00 1,887,166.00
Kayu Rawa Pinus 0.040 m³ 1,832,200.00 73,288.00
Paku 5 cm - 12 cm 0.100 kg 13,600.00 1,360.00
Minyak Bekisting 0.050 liter 3,100.00 155.00
Balok Kayu Meranti Batu 5/7 0.0038 m³ 3,664,500.00 13,741.88
Plywood tebal 9 mm 0.090 lembar 157,000.00 14,130.00
Dolken Ø (8-10) cm panjang 4 m 1.500 batang 23,200.00 34,800.00
Jumlah harga bahan 137,474.88
B. Tenaga
Pekerja 0.170 OH 55,000.00 9,350.00
Tukang Kayu 0.080 OH 68,000.00 5,440.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 16,340.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 153,814.88
E. Jumlah ( 1 + 2 + 3 ) 331,210.24
F. Overhead and profit 15 % 49,681.54
G. Harga satuan pekerjaan ( E + F ) 203,496.41
G.056 Pembesian 1 kg dengan besi beton U-24
Bahan
Besi Beton U-24 1.0500 kg 9,800.00 10,290.00
Kawat Beton 0.0150 kg 17,200.00 258.00
Jumlah (1) 10,548.00
Tenaga
Pekerja 0.0400 OH 55,000.00 2,200.00
Tukang Besi 0.0150 OH 68,000.00 1,020.00
Kepala Tukang 0.0150 OH 75,000.00 1,125.00
Mandor 0.0075 OH 80,000.00 600.00
Peralatan, Spancer 0.0200 lot 1,000.00 20.00
Jumlah (2) 4,965.00
Jumlah (1) + (2) 15,513.00
G.057 Pembesian 1 kg dengan besi beton U-29
Bahan
Besi Beton U-29 1.0500 kg 9,800.00 10,290.00
Kawat Beton 0.0150 kg 17,200.00 258.00
Jumlah (1) 10,548.00
Tenaga
Pekerja 0.0400 OH 55,000.00 2,200.00
Tukang Besi 0.0150 OH 68,000.00 1,020.00
Kepala Tukang 0.0150 OH 75,000.00 1,125.00
Mandor 0.0075 OH 80,000.00 600.00
Peralatan, Spancer 0.0200 lot 1,000.00 20.00
Jumlah (2) 4,965.00
Jumlah (1) + (2) 15,513.00
G.058 Memasang 1 m² bekisting dengan papan
Bahan
Kayu Pinus/Kayu Rawa 0.0240 m³ 1,832,200.00 43,972.80
Paku 5 cm - 12 cm 0.3000 kg 13,600.00 4,080.00
Minyak Bekisting 0.1000 liter 3,100.00 310.00
Balok Kayu Meranti Batu 5/7 0.0240 m³ 3,664,500.00 87,948.00
Jumlah (1) 136,310.80
Tenaga
Pekerja 0.3000 OH 55,000.00 16,500.00

183 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Tukang Kayu 0.1500 OH 68,000.00 10,200.00
Kepala Tukang 0.1500 OH 75,000.00 11,250.00
Mandor 0.0500 OH 80,000.00 4,000.00
Pekerja (bongkar cetakan) 0.1500 OH 55,000.00 8,250.00
Jumlah (2) 50,200.00
Jumlah (1) + (2) 186,510.80
G.059 Memasang 1 m² bekisting multipleks 9 mm
Bahan
Multipleks 9 mm 0.3470 lbr 131,900.00 45,769.30
Paku 5 cm - 12 cm 0.4000 kg 13,600.00 5,440.00
Balok Kayu Meranti Batu 5/7 0.0170 m³ 3,664,500.00 62,296.50
Jumlah (1) 113,505.80
Tenaga
Pekerja 0.1200 OH 55,000.00 6,600.00
Tukang Kayu 0.1500 OH 68,000.00 10,200.00
Kepala Tukang 0.1500 OH 75,000.00 11,250.00
Mandor 0.0500 OH 80,000.00 4,000.00
Pekerja (bongkar cetakan) 0.1200 OH 55,000.00 6,600.00
Jumlah (2) 38,650.00
Jumlah (1) + (2) 152,155.80
G.060 Memasang 1 m² bekisting multipleks 12 mm
Bahan
Multipleks 12 mm 0.3470 lbr 170,100.00 59,024.70
Paku 5 cm - 12 cm 0.4000 kg 13,600.00 5,440.00
Balok Kayu Meranti Batu 5/7 0.0170 m³ 3,664,500.00 62,296.50
Jumlah (1) 126,761.20
Tenaga
Pekerja 0.1200 OH 55,000.00 6,600.00
Tukang Kayu 0.1500 OH 68,000.00 10,200.00
Kepala Tukang 0.1500 OH 75,000.00 11,250.00
Mandor 0.0500 OH 80,000.00 4,000.00
Pekerja (bongkar cetakan) 0.1200 OH 55,000.00 6,600.00
Jumlah (2) 38,650.00
Jumlah (1) + (2) 165,411.20
G.061 Memasang 1 m² stootwerk
Bahan
Kayu Stoot (2x pakai) 9.0000 bt 6,350.00 57,150.00
Paku 5 cm - 12 cm 0.5000 kg 13,600.00 6,800.00
Papan Terentang (2x pakai) 75% 0.0160 m³ 1,991,025.00 31,856.40
Jumlah (1) 95,806.40
Tenaga
Pekerja 0.1200 OH 55,000.00 6,600.00
Tukang Kayu 0.1500 OH 68,000.00 10,200.00
Kepala Tukang 0.1500 OH 75,000.00 11,250.00
Mandor 0.0500 OH 80,000.00 4,000.00
Jumlah (2) 32,050.00
Jumlah (1) + (2) 127,856.40
G.062 Membuat 1 m³ beton dengan mutu K - 225
Bahan
Portland Cement (PC) 388.000 kg 1,340.00 519,920.00
Pasir Beton (PB) 0.650 m³ 174,100.00 113,165.00
Koral Beton (maksimum 30 mm) pecah mesin 0.650 m³ 367,300.00 238,745.00
Jumlah (1) 871,830.00
Tenaga
Pekerja 6.0000 OH 55,000.00 330,000.00
Tukang batu 1.0000 OH 68,000.00 68,000.00
Kepala Tukang batu 0.1000 OH 75,000.00 7,500.00
Mandor 0.3000 OH 80,000.00 24,000.00
Jumlah (2) 429,500.00
Jumlah (1) + (2) 1,301,330.00
G.063 Membuat 1 m³ beton dengan mutu K - 275
Bahan
Portland Cement (PC) 400.000 kg 1,340.00 536,000.00
Pasir Beton (PB) 0.400 m³ 174,100.00 69,640.00
Koral Beton (maksimum 30 mm) pecah mesin 0.820 m³ 367,300.00 301,186.00
Jumlah (1) 906,826.00
Tenaga
Pekerja 6.0000 OH 55,000.00 330,000.00
Tukang batu 1.0000 OH 68,000.00 68,000.00
Kepala Tukang batu 0.1000 OH 75,000.00 7,500.00
Mandor 0.3000 OH 80,000.00 24,000.00
Jumlah (2) 429,500.00
Jumlah (1) + (2) 1,336,326.00
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1 Memasang 1 m² penutup atap genteng Palentong ( Pres Jatiwangi )
A. Bahan

184 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Genteng press Jatiwangi 25.000 bh 2,400.00 60,000.00
Jumlah harga bahan 60,000.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.0075 OH 75,000.00 562.50
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,552.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 74,552.50
E. Overhead and profit 15 % 11,182.88
F. Harga satuan pekerjaan ( D + E ) 85,735.38
A.4.5.2.1.a Memasang 1 m² penutup atap genteng Morando biasa
A. Bahan
Genteng press morando biasa 18.000 bh 2,800.00 50,400.00
Jumlah harga bahan 50,400.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.0075 OH 75,000.00 562.50
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,552.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 64,952.50
E. Overhead and profit 15 % 9,742.88
F. Harga satuan pekerjaan ( D + E ) 74,695.38
A.4.5.2.1.b Memasang 1 m² penutup atap genteng Morando glazur
A. Bahan
Genteng press morando glazur 18.000 bh 4,900.00 88,200.00
Jumlah harga bahan 88,200.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.0075 OH 75,000.00 562.50
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,552.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 102,752.50
E. Overhead and profit 15 % 15,412.88
F. Harga satuan pekerjaan ( D + E ) 118,165.38
A.4.5.2.1.a Memasang 1 m² penutup atap genteng lokal
A. Bahan
Genteng lokal 25.000 bh 1,700.00 42,500.00
Jumlah harga bahan 42,500.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.0075 OH 75,000.00 562.50
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,552.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 57,052.50
E. Overhead and profit 15 % 8,557.88
F. Harga satuan pekerjaan ( D + E ) 65,610.38
A.4.5.2.2 Memasang 1 m² penutup atap genteng kodok glazuur ( Pres Jatiwangi )
A. Bahan
Genteng kodok press Jatiwangi 25.000 bh 2,300.00 57,500.00
Jumlah harga bahan 57,500.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,590.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 72,090.00

185 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Overhead and profit 15 % 10,813.50
F. Harga satuan pekerjaan ( D + E ) 82,903.50
A.4.5.2.3 Memasang 1 m² penutup atap genteng Palentong besar / Super
A. Bahan
Genteng Palentong besar press Jatiwangi 12.000 bh 3,500.00 42,000.00
Jumlah harga bahan 42,000.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,590.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 56,590.00
E. Overhead and profit 15 % 8,488.50
F. Harga satuan pekerjaan ( D + E ) 65,078.50
A.4.5.2.4 Memasang 1 m' bubung pada genteng palentong pres Jatiwangi
A. Bahan
Bubung genteng palentong pres Jatiwangi 5.000 bh 3,900.00 19,500.00
Portland Cement (PC) 8.000 kg 1,340.00 10,720.00
Pasir Pasang 0.032 m³ 174,100.00 5,571.20
Jumlah harga bahan 35,791.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 37,260.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 73,051.20
E. Overhead and profit 15 % 10,957.68
F. Harga satuan pekerjaan ( D + E ) 84,008.88
A.4.5.2.4.a Memasang 1 m' bubung pada genteng Morando biasa
A. Bahan
Bubung genteng Morando biasa 4.000 bh 4,700.00 18,800.00
Portland Cement (PC) 8.000 kg 1,340.00 10,720.00
Pasir Pasang 0.032 m³ 174,100.00 5,571.20
Jumlah harga bahan 35,091.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 37,260.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 72,351.20
E. Overhead and profit 15 % 10,852.68
F. Harga satuan pekerjaan ( D + E ) 83,203.88
A.4.5.2.4.b Memasang 1 m' bubung pada genteng Morando glazur
A. Bahan
Bubung genteng Morando glazur 4.000 bh 7,400.00 29,600.00
Portland Cement (PC) 8.000 kg 1,340.00 10,720.00
Pasir Pasang 0.032 m³ 174,100.00 5,571.20
Jumlah harga bahan 45,891.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 37,260.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 83,151.20
E. Overhead and profit 15 % 12,472.68
F. Harga satuan pekerjaan ( D + E ) 95,623.88
A.4.5.2.5 Memasang 1 m' bubung pada genteng kodok glazuur
A. Bahan
Bubung genteng kodok glazuur 5.000 bh 5,800.00 29,000.00
Portland Cement (PC) 8.000 kg 1,340.00 10,720.00

186 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pasir Pasang 0.032 m³ 174,100.00 5,571.20
Jumlah harga bahan 45,291.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 37,260.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 82,551.20
E. Overhead and profit 15 % 12,382.68
F. Harga satuan pekerjaan ( D + E ) 94,933.88
A.4.5.2.6 Memasang 1 m' bubung pada genteng palentong besar
A. Bahan
Bubung genteng palentong besar 4.000 bh 6,100.00 24,400.00
Portland Cement (PC) 8.000 kg 1,340.00 10,720.00
Pasir Pasang 0.032 m³ 174,100.00 5,571.20
Jumlah harga bahan 40,691.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 37,260.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 77,951.20
E. Overhead and profit 15 % 11,692.68
F. Harga satuan pekerjaan ( D + E ) 89,643.88
A.4.5.2.7 Memasang 1 m² roof light fiberglass 90 x 180 cm
A. Bahan
Roof light 90 x 180 cm 0.600 lembar 53,000.00 31,800.00
Paku biasa 1" 0.050 kg 13,600.00 680.00
Jumlah harga bahan 32,480.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.067 OH 68,000.00 4,556.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,341.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 45,821.00
E. Overhead and profit 15 % 6,873.15
F. Harga satuan pekerjaan ( D + E ) 52,694.15
A.4.5.2.8 Memasang 1 m² atap asbes gelombang 92 x 250 cm x 5 mm
A. Bahan
Asbes gelombang 0.500 lembar - -
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 1,632.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 14,040.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 15,672.00
E. Profit 10 % 1,567.20
F. Harga satuan pekerjaan ( D + E ) 17,239.20
A.4.5.2.9 Memasang 1 m² atap asbes gelombang 92 x 225 cm x 5 mm
A. Bahan
Asbes gelombang 0.600 lembar - -
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 1,632.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.008 OH 80,000.00 640.00

187 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga tenaga 14,040.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 15,672.00
E. Profit 10 % 1,567.20
F. Harga satuan pekerjaan ( D + E ) 17,239.20
A.4.5.2.10 Memasang 1 m² atap asbes gelombang 92 x 200 cm x 5 mm
A. Bahan
Asbes gelombang 0.600 lembar - -
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 1,632.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,885.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 15,517.00
E. Profit 10 % 1,551.70
F. Harga satuan pekerjaan ( D + E ) 17,068.70
A.4.5.2.11 Memasang 1 m² atap asbes gelombang 90 x 180 cm x 5 mm
A. Bahan
Asbes gelombang 0.600 lembar 42,400.00 25,440.00
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 27,072.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,885.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 40,957.00
E. Overhead and profit 15 % 6,143.55
F. Harga satuan pekerjaan ( D + E ) 47,100.55
A.4.5.2.12 Memasang 1 m² atap asbes gelombang 105 x 300 cm x 4 mm
A. Bahan
Asbes gelombang 0.350 lembar 100,800.00 35,280.00
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 36,912.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 50,457.00
E. Overhead and profit 15 % 7,568.55
F. Harga satuan pekerjaan ( D + E ) 58,025.55
A.4.5.2.13 Memasang 1 m² atap asbes gelombang 105 x 270 cm x 4 mm
A. Bahan
Asbes gelombang 0.420 lembar 84,900.00 35,658.00
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 37,290.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 50,835.00
E. Overhead and profit 15 % 7,625.25
F. Harga satuan pekerjaan ( D + E ) 58,460.25
A.4.5.2.14 Memasang 1 m² atap asbes gelombang 105 x 240 cm x 4 mm

188 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. Bahan
Asbes gelombang 0.440 lembar 69,000.00 30,360.00
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 31,992.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 45,537.00
E. Overhead and profit 15 % 6,830.55
F. Harga satuan pekerjaan ( D + E ) 52,367.55
A.4.5.2.15 Memasang 1 m² atap asbes gelombang 105 x 210 cm x 4 mm
A. Bahan
Asbes gelombang 0.510 lembar 69,000.00 35,190.00
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 36,822.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 50,367.00
E. Overhead and profit 15 % 7,555.05
F. Harga satuan pekerjaan ( D + E ) 57,922.05
A.4.5.2.16 Memasang 1 m² atap asbes gelombang 105 x 150 cm x 4 mm
A. Bahan
Asbes gelombang 0.800 lembar 53,000.00 42,400.00
Paku pancing 0.120 kg 13,600.00 1,632.00
Jumlah harga bahan 44,032.00
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 57,577.00
E. Overhead and profit 15 % 8,636.55
F. Harga satuan pekerjaan ( D + E ) 66,213.55
A.4.5.2.30 Memasang 1 m² penutup atap genteng beton
A. Bahan
Genteng Beton 11.000 bh 8,500.00 93,500.00
Paku 2" - 5" 0.030 kg 13,600.00 408.00
Jumlah harga bahan 93,908.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 19,350.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 113,258.00
E. Overhead and profit 15 % 16,988.70
F. Harga satuan pekerjaan ( D + E ) 130,246.70
A.4.5.2.32 Memasang 1 m² penutup atap genteng metal polos
A. Bahan
Genteng metal polos 1.020 bh 42,400.00 43,248.00
Paku 2" - 5" 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 45,968.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00

189 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 19,350.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 65,318.00
E. Overhead and profit 15 % 9,797.70
F. Harga satuan pekerjaan ( D + E ) 75,115.70
A.4.5.2.32.a Memasang 1 m² penutup atap genteng metal berpasir
A. Bahan
Genteng metal berpasir 1.020 bh 74,300.00 75,786.00
Paku 2" - 5" 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 78,506.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 19,350.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 97,856.00
E. Overhead and profit 15 % 14,678.40
F. Harga satuan pekerjaan ( D + E ) 112,534.40
A.4.5.2.33 Memasang 1 m² penutup atap sirap kayu
A. Bahan
Genteng sirap kayu 30.000 bh 14,700.00 441,000.00
Paku 2" - 5" 0.200 kg 13,600.00 2,720.00
Jumlah harga bahan 443,720.00
B. Tenaga
Pekerja 0.166 OH 55,000.00 9,130.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 28,645.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 472,365.00
E. Overhead and profit 15 % 70,854.75
F. Harga satuan pekerjaan ( D + E ) 543,219.75
A.4.5.2.34 Memasang 1 m' bubung pada genteng Beton
A. Bahan
Bubung genteng beton 3.500 lbr 5,800.00 20,300.00
Portland Cement (PC) 10.800 kg 1,340.00 14,472.00
Semen Warna 1.000 kg 13,600.00 13,600.00
Pasir Pasang (PP) 0.032 m³ 174,100.00 5,571.20
Paku 0.050 kg 13,600.00 680.00
Jumlah harga bahan 54,623.20
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 37,260.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 91,883.20
E. Overhead and profit 15 % 13,782.48
F. Harga satuan pekerjaan ( D + E ) 105,665.68
A.4.5.2.36 Memasang 1 m' bubung pada genteng metal
A. Bahan
Bubung genteng metal 1.100 lbr 5,800.00 6,380.00
Paku biasa 0.050 kg 13,600.00 680.00
Jumlah harga bahan 7,060.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah harga tenaga 26,115.00
C. Peralatan -

Jumlah harga peralatan -

190 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. Jumlah ( A + B + C ) 33,175.00
E. Overhead and profit 15 % 4,976.25
F. Harga satuan pekerjaan ( D + E ) 38,151.25
A.4.5.2.37 Memasang 1 m' bubung pada genteng sirap
A. Bahan
Seng plat 0.400 lbr 49,500.00 19,800.00
Paku biasa 1" 0.050 kg 13,600.00 680.00
Paku biasa 2 - 5" 0.050 kg 13,600.00 680.00
Jumlah harga bahan 21,160.00
B. Tenaga
Pekerja 0.125 OH 55,000.00 6,875.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 26,230.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 47,390.00
E. Overhead and profit 15 % 7,108.50
F. Harga satuan pekerjaan ( D + E ) 54,498.50
A.4.5.2.38 Memasang 1 m² penutup atap seng gelombang
A. Bahan
Seng gelombang 0.700 lbr 50,000.00 35,000.00
Paku Biasa 1/2" - 1" 0.020 kg 13,600.00 272.00
Jumlah harga bahan 35,272.00
B. Tenaga
Pekerja 0.120 OH 55,000.00 6,600.00
Tukang Kayu 0.060 OH 68,000.00 4,080.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 11,610.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 46,882.00
E. Overhead and profit 15 % 7,032.30
F. Harga satuan pekerjaan ( D + E ) 53,914.30
A.4.5.2.39 Memasang 1 m² bubungan atap seng
A. Bahan
Seng plat 0.300 lbr 49,500.00 14,850.00
Paku Biasa 1/2" - 1" 0.040 kg 13,600.00 544.00
Jumlah harga bahan 15,394.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 14,015.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 29,409.00
E. Overhead and profit 15 % 4,411.35
F. Harga satuan pekerjaan ( D + E ) 33,820.35
A.4.5.2.40 Memasang 1 m² penutup atap alumunium
A. Bahan
Alumunium tb. 0.55 1.050 lbr 68,000.00 71,400.00
Paku hak pj. 15 cm 0.020 kg 13,600.00 272.00
Jumlah harga bahan 71,672.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.075 OH 68,000.00 5,100.00
Kepala Tukang 0.008 OH 75,000.00 600.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 14,430.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 86,102.00
E. Overhead and profit 15 % 12,915.30
F. Harga satuan pekerjaan ( D + E ) 99,017.30
A.4.5.2.41 Memasang 1 m² bubunan alumunium
A. Bahan
Bubungan alumunium standart 40 x 18 1.200 bh 1,884,600.00 2,261,520.00
Angker baut 0.040 kg 13,600.00 544.00

191 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga bahan 2,262,064.00
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 1.000 OH 68,000.00 68,000.00
Kepala Tukang 0.100 OH 75,000.00 7,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 85,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 2,347,064.00
E. Profit 10 % 234,706.40
F. Harga satuan pekerjaan ( D + E ) 2,581,770.40
A.4.5.2.42 Memasang 1 m² penutup atap alumunium foil / sisalation
A. Bahan
Alumunium foil 1.050 m2 10,000.00 10,500.00
Jumlah harga bahan 10,500.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 15,960.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 26,460.00
E. Overhead and profit 15 % 3,969.00
F. Harga satuan pekerjaan ( D + E ) 30,429.00
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT - LANGIT ( PLAFOND )
A.4.5.1.1 Memasang 1 m² langit-langit kalsiboard tbl. 4 mm, 5 mm, 6 mm
A. Bahan
Kalsiboard tb. 4 mm 1.100 m² 18,402.78 20,243.06 ###
Paku Triplek 0.010 kg 13,600.00 136.00
Jumlah harga bahan 20,379.06
B. Tenaga
Pekerja 0.030 OH 55,000.00 1,650.00
Tukang Kayu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 7,255.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 27,634.06
E. Overhead and profit 15 % 4,145.11
F. Harga satuan pekerjaan ( D + E ) 31,779.16
A.4.5.1.5 Memasang 1 m² langit-langit tripleks ukuran (120 x 240 ) cm; tbl. 3 mm, 4 mm, 6 mm
A. Bahan
Triplek tebal 3 mm ( 120 x 240 ) 0.375 lbr 18,506.94 6,940.10
Paku Triplek 0.030 kg 13,600.00 408.00
Jumlah harga bahan 7,348.10
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 20,798.10
E. Overhead and profit 15 % 3,119.72
F. Harga satuan pekerjaan ( D + E ) 23,917.82
A.4.5.1.6 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm
A. Bahan
Kayu Papan kayu Meranti batu 0.015 m³ 4,771,500.00 71,572.50
Paku Triplek 0.010 kg 13,600.00 136.00
Jumlah harga bahan 71,708.50
B. Tenaga
Pekerja 0.800 OH 55,000.00 44,000.00
Tukang Kayu 0.800 OH 68,000.00 54,400.00
Kepala Tukang 0.080 OH 75,000.00 6,000.00
Mandor 0.040 OH 80,000.00 3,200.00
Jumlah harga tenaga 107,600.00
C. Peralatan -

192 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 179,308.50
E. Overhead and profit 15 % 26,896.28
F. Harga satuan pekerjaan ( D + E ) 206,204.78
A.4.5.1.7 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
A. Bahan
Gypsum Board 120 cm x 240 cm x 9 mm 0.364 lbr 66,300.00 24,133.20
Paku Sekrup 0.110 kg 19,600.00 2,156.00
Jumlah harga bahan 26,289.20
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 9,675.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 35,964.20
E. Overhead and profit 15 % 5,394.63
F. Harga satuan pekerjaan ( D + E ) 41,358.83
A.4.5.1.9 Memasang 1 m' list langit-langit kayu profil
A. Bahan
List Kayu Profil 1.050 m' 4,100.00 4,305.00
Paku Triplek 0.010 kg 13,600.00 136.00
Jumlah harga bahan 4,441.00
B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 6,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 11,206.00
E. Overhead and profit 15 % 1,680.90
F. Harga satuan pekerjaan ( D + E ) 12,886.90
A.4.5.1.9.a Memasang 1 m' list plafond gypsum profil pj. 10 cm
A. Bahan
List gypsum Profil 1.050 m' 12,700.00 13,335.00
Tepung gypsum 0.010 kg 5,000.00 50.00
Jumlah harga bahan 13,385.00
B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 6,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 20,150.00
E. Overhead and profit 15 % 3,022.50
F. Harga satuan pekerjaan ( D + E ) 23,172.50
A.4.5.1.9.b Memasang 1 m' list plafond gypsum profil pj. 15 cm
A. Bahan
List gypsum Profil 1.050 m' 15,900.00 16,695.00
Tepung gypsum 0.010 kg 5,000.00 50.00
Jumlah harga bahan 16,745.00
B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Tukang Kayu 0.050 OH 68,000.00 3,400.00
Kepala Tukang 0.005 OH 75,000.00 375.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 6,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 23,510.00
E. Overhead and profit 15 % 3,526.50
F. Harga satuan pekerjaan ( D + E ) 27,036.50
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1 Memasang 1 buah closet duduk/monoblok
A. Bahan

193 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Closet Duduk/Monoblok 1.000 bh 481,600.00 481,600.00
Perlengkapan 6% harga kloset 28,896.00 28,896.00
Jumlah harga bahan 510,496.00
B. Tenaga
Pekerja 3.300 OH 55,000.00 181,500.00
Tukang Batu 1.100 OH 68,000.00 74,800.00
Kepala Tukang 0.001 OH 75,000.00 75.00
Mandor 0.160 OH 80,000.00 12,800.00
Jumlah harga tenaga 269,175.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 779,671.00
E. Overhead and profit 15 % 116,950.65
F. Harga satuan pekerjaan ( D + E ) 896,621.65
A.5.1.1.2 Memasang 1 buah closet jongkok porselen INA warna tua
A. Bahan
Closet Jongkok INA warna tua 1.000 bh 167,500.00 167,500.00
Portland Cement (PC) 6.000 kg 1,340.00 8,040.00
Pasir Pasang 0.010 m³ 174,100.00 1,741.00
Jumlah harga bahan 177,281.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Batu 1.500 OH 68,000.00 102,000.00
Kepala Tukang 0.150 OH 75,000.00 11,250.00
Mandor 0.160 OH 80,000.00 12,800.00
Jumlah harga tenaga 181,050.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 358,331.00
E. Overhead and profit 15 % 53,749.65
F. Harga satuan pekerjaan ( D + E ) 412,080.65
A.5.1.1.2.a Memasang 1 buah closet jongkok porselen INA warna muda
A. Bahan
Closet Jongkok INA warna muda 1.000 bh 149,000.00 149,000.00
Portland Cement (PC) 6.000 kg 1,340.00 8,040.00
Pasir Pasang 0.010 m³ 174,100.00 1,741.00
Jumlah harga bahan 158,781.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Batu 1.500 OH 68,000.00 102,000.00
Kepala Tukang 0.150 OH 75,000.00 11,250.00
Mandor 0.160 OH 80,000.00 12,800.00
Jumlah harga tenaga 181,050.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 339,831.00
E. Overhead and profit 15 % 50,974.65
F. Harga satuan pekerjaan ( D + E ) 390,805.65
A.5.1.1.4 Memasang 1 buah urinoir
A. Bahan
Urinoir 1.000 bh 1,256,400.00 1,256,400.00
Perlengkapan 30% harga urinoir 376,920.00 376,920.00
Portland Cement (PC) 6.000 kg 1,340.00 8,040.00
Pasir Pasang 0.010 m³ 174,100.00 1,741.00
Jumlah harga bahan 1,643,101.00
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Batu 1.000 OH 68,000.00 68,000.00
Kepala Tukang 0.100 OH 75,000.00 7,500.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 134,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,777,601.00
E. Overhead and profit 15 % 266,640.15
F. Harga satuan pekerjaan ( D + E ) 2,044,241.15
A.5.1.1.5 Memasang 1 buah wastafel
A. Bahan
Wastafel 1.200 bh 628,200.00 753,840.00
Perlengkapan 12% harga wastafel 75,384.00 75,384.00
Portland Cement (PC) 6.000 kg 1,340.00 8,040.00
Pasir Pasang 0.010 m³ 174,100.00 1,741.00

194 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga bahan 839,005.00
B. Tenaga
Pekerja 1.200 OH 55,000.00 66,000.00
Tukang Batu 1.450 OH 68,000.00 98,600.00
Kepala Tukang 0.150 OH 75,000.00 11,250.00
Mandor 0.060 OH 80,000.00 4,800.00
Jumlah harga tenaga 180,650.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,019,655.00
E. Overhead and profit 15 % 152,948.25
F. Harga satuan pekerjaan ( D + E ) 1,172,603.25
A.5.1.1.7 Memasang 1 buah bak mandi fibreglass volume 1,00 m³
A. Bahan
Bak Fibreglass 1.000 bh 209,400.00 209,400.00
Perlengkapan 12% harga bak 25,128.00 25,128.00
Jumlah harga bahan 234,528.00
B. Tenaga
Pekerja 3.000 OH 55,000.00 165,000.00
Tukang Batu 4.500 OH 68,000.00 306,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.900 OH 80,000.00 72,000.00
Jumlah harga tenaga 546,750.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 781,278.00
E. Overhead and profit 15 % 117,191.70
F. Harga satuan pekerjaan ( D + E ) 898,469.70
A.5.1.1.8 Memasang 1 buah bak mandi batu bata volume 0,30 m³ + porselen
A. Bahan
Bata Merah 5 x 12 x 22 cm 113.6364 bh 900.00 102,272.73
Portland Cement (PC) 120.000 kg 1,340.00 160,800.00
Pasir Pasang 0.300 m³ 174,100.00 52,230.00
Porselen (11x11) cm 4.356 m² 28,500.00 124,146.00
Semen warna 6.000 kg 13,600.00 81,600.00
Jumlah harga bahan 521,048.73
B. Tenaga
Pekerja 6.000 OH 55,000.00 330,000.00
Tukang Batu 3.000 OH 68,000.00 204,000.00
Kepala Tukang 0.300 OH 75,000.00 22,500.00
Mandor 0.030 OH 80,000.00 2,400.00
Jumlah harga tenaga 558,900.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,079,948.73
E. Overhead and profit 15 % 161,992.31
F. Harga satuan pekerjaan ( D + E ) 1,241,941.04
A.5.1.1.10 Memasang 1 buah tangki air (bak air) fibreglass volume 1 m3
A. Bahan
Tangki air fiberglas Isi : 1.000 ltr ( 1 m3 ) 1.000 bh 1,256,400.00 1,256,400.00
Perlengkapan 12% harga bak 150,768.00 150,768.00
Jumlah harga bahan 1,407,168.00
B. Tenaga
Pekerja 0.300 OH 55,000.00 16,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 51,675.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,458,843.00
E. Overhead and profit 15 % 218,826.45
F. Harga satuan pekerjaan ( D + E ) 1,677,669.45
A.5.1.1.11 Memasang 1 buah bak beton volume 1 m3
A. Bahan
Beton 1:2:3 K. 175 0.900 m3 1,081,294.00 973,164.60
Baja tulangan 180.000 kg 9,800.00 1,764,000.00
Kayu begisting 8.000 m2 183,220.00 1,465,760.00
Ubin porseling 6.050 m² 28,500.00 172,425.00
Perlengkapan 10% harga bak 108,129.40 108,129.40
Jumlah harga bahan 4,483,479.00
B. Tenaga

195 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pekerja 3.500 OH 55,000.00 192,500.00
Tukang Batu 4.500 OH 68,000.00 306,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 503,690.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 4,987,169.00
E. Overhead and profit 15 % 748,075.35
F. Harga satuan pekerjaan ( D + E ) 5,735,244.35
A.5.1.1.12 Memasang 1 buah bak cuci piring stainless steel lengkap
A. Bahan
Bak Cuci Stainless Steel 1.000 bh 183,200.00 183,200.00
Water Drain + Aksesoris ( 35 % x harga bahan ) 0.350 set 64,120.00 64,120.00
Jumlah harga bahan 247,320.00
B. Tenaga
Pekerja 0.030 OH 55,000.00 1,650.00
Tukang Batu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.015 OH 80,000.00 1,200.00
Jumlah harga tenaga 25,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 272,820.00
E. Overhead and profit 15 % 40,923.00
F. Harga satuan pekerjaan ( D + E ) 313,743.00
A.5.1.1.14 Memasang 1 buah floor drain
A. Bahan
Floordrain 1.000 bh 14,300.00 14,300.00
Jumlah harga bahan 14,300.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Batu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 8,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 22,800.00
E. Overhead and profit 15 % 3,420.00
F. Harga satuan pekerjaan ( D + E ) 26,220.00
A.5.1.1.15 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm
A. Bahan
Bata Merah 5 x 12 x 22 cm 40.000 bh 900.00 36,000.00
Portland Cement (PC) 44.000 kg 1,340.00 58,960.00
Pasir Pasang 0.070 m³ 174,100.00 12,187.00
Batu Kerikil pecah tangan 0.070 m³ 367,300.00 25,711.00
Besi Beton 1.600 kg 9,800.00 15,680.00
Pasir Beton 0.060 m³ 174,100.00 10,446.00
Jumlah harga bahan 158,984.00
B. Tenaga
Pekerja 2.160 OH 55,000.00 118,800.00
Tukang Batu 0.720 OH 68,000.00 48,960.00
Kepala Tukang 0.072 OH 75,000.00 5,400.00
Mandor 0.011 OH 80,000.00 880.00
Jumlah harga tenaga 174,040.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 333,024.00
E. Overhead and profit 15 % 49,953.60
F. Harga satuan pekerjaan ( D + E ) 382,977.60
A.5.1.1.16 Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 50 cm
A. Bahan
Bata Merah 5 x 12 x 22 cm 70.000 bh 900.00 63,000.00
Portland Cement (PC) 77.000 kg 1,340.00 103,180.00
Pasir Pasang 0.130 m³ 174,100.00 22,633.00
Batu Kerikil 0.020 m³ 367,300.00 7,346.00
Besi Beton 2.600 kg 9,800.00 25,480.00
Pasir Beton 0.090 m³ 174,100.00 15,669.00
Jumlah harga bahan 237,308.00
B. Tenaga
Pekerja 3.200 OH 55,000.00 176,000.00

196 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Tukang Batu 1.150 OH 68,000.00 78,200.00
Kepala Tukang 0.011 OH 75,000.00 825.00
Mandor 0.016 OH 80,000.00 1,280.00
Jumlah harga tenaga 256,305.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 493,613.00
E. Overhead and profit 15 % 74,041.95
F. Harga satuan pekerjaan ( D + E ) 567,654.95
A.5.1.1.17 Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm
A. Bahan
Bata Merah 5 x 12 x 22 cm 123.000 bh 900.00 110,700.00
Portland Cement (PC) 114.000 kg 1,340.00 152,760.00
Pasir Pasang 0.184 m³ 174,100.00 32,034.40
Batu Kerikil 0.033 m³ 367,300.00 12,120.90
Besi Beton 4.850 kg 9,800.00 47,530.00
Pasir Beton 0.120 m³ 174,100.00 20,892.00
Jumlah harga bahan 376,037.30
B. Tenaga
Pekerja 3.200 OH 55,000.00 176,000.00
Tukang Batu 1.150 OH 68,000.00 78,200.00
Kepala Tukang 0.011 OH 75,000.00 825.00
Mandor 0.016 OH 80,000.00 1,280.00
Jumlah harga tenaga 256,305.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 632,342.30
E. Overhead and profit 15 % 94,851.35
F. Harga satuan pekerjaan ( D + E ) 727,193.65
A.5.1.1.18 Memasang 1 m' pipa galvanis Ø ½"
A. Bahan
Pipa Galvanis 1.200 m' 16,700.00 20,040.00
Perlengkapan 35% harga pipa 5,845.00 5,845.00
Jumlah harga bahan 25,885.00
B. Tenaga
Pekerja 0.054 OH 55,000.00 2,970.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.027 OH 80,000.00 2,160.00
Jumlah harga tenaga 11,925.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 37,810.00
E. Overhead and profit 15 % 5,671.50
F. Harga satuan pekerjaan ( D + E ) 43,481.50
A.5.1.1.19 Memasang 1 buah kran Ø ¾" atau ½" standar
A. Bahan
Kran Air standar 1.000 bh 41,800.00 41,800.00
Seal Tape 0.025 bh 2,600.00 2,600.00
Jumlah harga bahan 44,400.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Batu 0.400 OH 68,000.00 27,200.00
Kepala Tukang 0.040 OH 75,000.00 3,000.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 31,150.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 75,550.00
E. Overhead and profit 15 % 11,332.50
F. Harga satuan pekerjaan ( D + E ) 86,882.50
A.5.1.1.19.a Memasang 1 buah kran Ø ¾" atau ½" kualitas baik
A. Bahan
Kran Air kualitas baik 1.000 bh 146,500.00 146,500.00
Seal Tape 0.025 bh 2,600.00 2,600.00
Jumlah harga bahan 149,100.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Batu 0.400 OH 68,000.00 27,200.00
Kepala Tukang 0.040 OH 75,000.00 3,000.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 31,150.00

197 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 180,250.00
E. Overhead and profit 15 % 27,037.50
F. Harga satuan pekerjaan ( D + E ) 207,287.50
A.5.1.1.20 Memasang 1 m' pipa galvanis Ø ¾"
A. Bahan
Pipa Galvanis 1.200 m' 20,900.00 25,080.00
Perlengkapan 35% harga pipa 7,315.00 7,315.00
Jumlah harga bahan 32,395.00
B. Tenaga
Pekerja 0.054 OH 55,000.00 2,970.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.027 OH 80,000.00 2,160.00
Jumlah harga tenaga 11,925.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 44,320.00
E. Overhead and profit 15 % 6,648.00
F. Harga satuan pekerjaan ( D + E ) 50,968.00
A.5.1.1.21 Memasang 1 m' pipa galvanis Ø 1"
A. Bahan
Pipa Galvanis 1.200 m' 26,100.00 31,320.00
Perlengkapan 35% harga pipa 9,135.00 9,135.00
Jumlah harga bahan 40,455.00
B. Tenaga
Pekerja 0.054 OH 55,000.00 2,970.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.027 OH 80,000.00 2,160.00
Jumlah harga tenaga 11,925.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 52,380.00
E. Overhead and profit 15 % 7,857.00
F. Harga satuan pekerjaan ( D + E ) 60,237.00
A.5.1.1.22 Memasang 1 m' pipa galvanis Ø 1½"
A. Bahan
Pipa Galvanis 1.200 m' 42,900.00 51,480.00
Perlengkapan 35% harga pipa 15,015.00 15,015.00
Jumlah harga bahan 66,495.00
B. Tenaga
Pekerja 0.108 OH 55,000.00 5,940.00
Tukang Batu 0.180 OH 68,000.00 12,240.00
Kepala Tukang 0.018 OH 75,000.00 1,350.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 19,930.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 86,425.00
E. Overhead and profit 15 % 12,963.75
F. Harga satuan pekerjaan ( D + E ) 99,388.75
A.5.1.1.23 Memasang 1 m' pipa galvanis Ø 3"
A. Bahan
Pipa Galvanis 1.200 m' 85,800.00 102,960.00
Perlengkapan 35% harga pipa 30,030.00 30,030.00
Jumlah harga bahan 132,990.00
B. Tenaga
Pekerja 0.135 OH 55,000.00 7,425.00
Tukang Batu 0.225 OH 68,000.00 15,300.00
Kepala Tukang 0.023 OH 75,000.00 1,725.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 25,010.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 158,000.00
E. Overhead and profit 15 % 23,700.00
F. Harga satuan pekerjaan ( D + E ) 181,700.00
A.5.1.1.24 Memasang 1 m' pipa galvanis Ø 4"
A. Bahan

198 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pipa Galvanis 1.200 m' 109,900.00 131,880.00
Perlengkapan 35% harga pipa 38,465.00 38,465.00
Jumlah harga bahan 170,345.00
B. Tenaga
Pekerja 0.135 OH 55,000.00 7,425.00
Tukang Batu 0.225 OH 68,000.00 15,300.00
Kepala Tukang 0.023 OH 75,000.00 1,725.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 25,010.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 195,355.00
E. Overhead and profit 15 % 29,303.25
F. Harga satuan pekerjaan ( D + E ) 224,658.25
A.5.1.1.25 Memasang 1 m' pipa PVC tipe AW Ø ½"
A. Bahan
Pipa PVC 1.200 m' 4,900.00 5,880.00
Perlengkapan 35% harga pipa 1,715.00 1,715.00
Jumlah harga bahan 7,595.00
B. Tenaga
Pekerja 0.036 OH 55,000.00 1,980.00
Tukang Batu 0.060 OH 68,000.00 4,080.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 6,670.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 14,265.00
E. Overhead and profit 15 % 2,139.75
F. Harga satuan pekerjaan ( D + E ) 16,404.75
A.5.1.1.26 Memasang 1 m' pipa PVC tipe AW Ø ¾"
A. Bahan
Pipa PVC 1.200 m' 6,800.00 8,160.00
Perlengkapan 35% harga pipa 2,380.00 2,380.00
Jumlah harga bahan 10,540.00
B. Tenaga
Pekerja 0.036 OH 55,000.00 1,980.00
Tukang Batu 0.060 OH 68,000.00 4,080.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 6,670.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 17,210.00
E. Overhead and profit 15 % 2,581.50
F. Harga satuan pekerjaan ( D + E ) 19,791.50
A.5.1.1.27 Memasang 1 m' pipa PVC tipe AW Ø 1"
A. Bahan
Pipa PVC 1.200 m' 9,300.00 11,160.00
Perlengkapan 35% harga pipa 3,255.00 3,255.00
Jumlah harga bahan 14,415.00
B. Tenaga
Pekerja 0.036 OH 55,000.00 1,980.00
Tukang Batu 0.060 OH 68,000.00 4,080.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 6,670.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 21,085.00
E. Overhead and profit 15 % 3,162.75
F. Harga satuan pekerjaan ( D + E ) 24,247.75
A.5.1.1.28 Memasang 1 m' pipa PVC tipe AW Ø 1½"
A. Bahan
Pipa PVC 1.200 m' 16,000.00 19,200.00
Perlengkapan 35% harga pipa 5,600.00 5,600.00
Jumlah harga bahan 24,800.00
B. Tenaga
Pekerja 0.054 OH 55,000.00 2,970.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.003 OH 80,000.00 240.00

199 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga tenaga 10,005.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 34,805.00
E. Overhead and profit 15 % 5,220.75
F. Harga satuan pekerjaan ( D + E ) 40,025.75
A.5.1.1.29 Memasang 1 m' pipa PVC tipe AW Ø 2"
A. Bahan
Pipa PVC 1.200 m' 20,500.00 24,600.00
Perlengkapan 35% harga pipa 7,175.00 7,175.00
Jumlah harga bahan 31,775.00
B. Tenaga
Pekerja 0.054 OH 55,000.00 2,970.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 10,005.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 41,780.00
E. Overhead and profit 15 % 6,267.00
F. Harga satuan pekerjaan ( D + E ) 48,047.00
A.5.1.1.30 Memasang 1 m' pipa PVC tipe AW Ø 2½"
A. Bahan
Pipa PVC 1.200 m' 29,900.00 35,880.00
Perlengkapan 35% harga pipa 10,465.00 10,465.00
Jumlah harga bahan 46,345.00
B. Tenaga
Pekerja 0.081 OH 55,000.00 4,455.00
Tukang Batu 0.135 OH 68,000.00 9,180.00
Kepala Tukang 0.0135 OH 75,000.00 1,012.50
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 14,967.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 61,312.50
E. Overhead and profit 15 % 9,196.88
F. Harga satuan pekerjaan ( D + E ) 70,509.38
A.5.1.1.31 Memasang 1 m' pipa PVC tipe AW Ø 3"
A. Bahan
Pipa PVC 1.200 m' 40,500.00 48,600.00
Perlengkapan 35% harga pipa 14,175.00 14,175.00
Jumlah harga bahan 62,775.00
B. Tenaga
Pekerja 0.081 OH 55,000.00 4,455.00
Tukang Batu 0.135 OH 68,000.00 9,180.00
Kepala Tukang 0.0135 OH 75,000.00 1,012.50
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 14,967.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 77,742.50
E. Overhead and profit 15 % 11,661.38
F. Harga satuan pekerjaan ( D + E ) 89,403.88
A.5.1.1.32 Memasang 1 m' pipa PVC tipe AW Ø 4"
A. Bahan
Pipa PVC 1.200 m' 66,700.00 80,040.00
Perlengkapan 35% harga pipa 23,345.00 23,345.00
Jumlah harga bahan 103,385.00
B. Tenaga
Pekerja 0.081 OH 55,000.00 4,455.00
Tukang Batu 0.135 OH 68,000.00 9,180.00
Kepala Tukang 0.0135 OH 75,000.00 1,012.50
Mandor 0.004 OH 80,000.00 320.00
Jumlah harga tenaga 14,967.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 118,352.50
E. Overhead and profit 15 % 17,752.88
F. Harga satuan pekerjaan ( D + E ) 136,105.38
A.5.1.1.35 Memasang 1m' pipa beton Ø 15-20 cm

200 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. Bahan
Pipa Beton 1.100 bh 73,200.00 80,520.00
Bata Merah 5 x 12 x 22 cm 20.455 bh 900.00 18,409.09
Portland Cement (PC) 3.920 kg 1,340.00 5,252.80
Pasir Pasang 0.056 m³ 174,100.00 9,749.60
Pasir Urug 0.024 m³ 88,900.00 2,133.60
Jumlah harga bahan 116,065.09
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Batu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 129,610.09
E. Overhead and profit 15 % 19,441.51
F. Harga satuan pekerjaan ( D + E ) 149,051.60
A.5.1.1.35.a Memasang 1m' pipa beton U. 20 cm
A. Bahan
Pipa Beton 1.100 bh 43,920.00 48,312.00
Bata Merah 5 x 12 x 22 cm 19.697 bh 900.00 17,727.27
Portland Cement (PC) 3.920 kg 1,340.00 5,252.80
Pasir Pasang 0.056 m³ 174,100.00 9,749.60
Pasir Urug 0.024 m³ 88,900.00 2,133.60
Jumlah harga bahan 83,175.27
B. Tenaga
Pekerja 0.140 OH 55,000.00 7,700.00
Tukang Batu 0.070 OH 68,000.00 4,760.00
Kepala Tukang 0.007 OH 75,000.00 525.00
Mandor 0.007 OH 80,000.00 560.00
Jumlah harga tenaga 13,545.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 96,720.27
E. Overhead and profit 15 % 14,508.04
F. Harga satuan pekerjaan ( D + E ) 111,228.31
A.5.1.1.36 Memasang 1m' pipa beton Ø 30 cm
A. Bahan
Pipa Beton 1.100 bh 99,400.00 109,340.00
Bata Merah 5 x 12 x 22 cm 41.667 bh 900.00 37,500.00
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 177,396.20
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 214,161.20
E. Overhead and profit 15 % 32,124.18
F. Harga satuan pekerjaan ( D + E ) 246,285.38
A.5.1.1.36.a Memasang 1m' pipa beton U. 30 cm
A. Bahan
Pipa Beton 1.100 bh 59,640.00 65,604.00
Bata Merah 5 x 12 x 22 cm 20.8333 bh 900.00 18,750.00
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 114,910.20
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -

201 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. Jumlah ( A + B + C ) 151,675.20
E. Overhead and profit 15 % 22,751.28
F. Harga satuan pekerjaan ( D + E ) 174,426.48
A.5.1.1.36.b Memasang 1m' pipa beton Ø 40 cm
A. Bahan
Pipa Beton 1.100 bh 146,500.00 161,150.00
Bata Merah 5 x 12 x 22 cm 41.667 bh 900.00 37,500.00
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 229,206.20
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 265,971.20
E. Overhead and profit 15 % 39,895.68
F. Harga satuan pekerjaan ( D + E ) 305,866.88
A.5.1.1.36.c Memasang 1m' pipa beton Ø 50 cm
A. Bahan
Pipa Beton 1.100 bh 177,900.00 195,690.00
Bata Merah 5 x 12 x 22 cm 51.7273 bh 900.00 46,554.55
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 272,800.75
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 309,565.75
E. Overhead and profit 15 % 46,434.86
F. Harga satuan pekerjaan ( D + E ) 356,000.61
A.5.1.1.36.d Memasang 1m' pipa beton Ø 60 cm
A. Bahan
Pipa Beton 1.100 bh 209,400.00 230,340.00
Bata Merah 5 x 12 x 22 cm 71.6667 bh 900.00 64,500.00
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 325,396.20
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 362,161.20
E. Overhead and profit 15 % 54,324.18
F. Harga satuan pekerjaan ( D + E ) 416,485.38
A.5.1.1.36.e Memasang 1m' pipa beton Ø 80 cm
A. Bahan
Pipa Beton 1.100 bh 146,500.00 161,150.00
Bata Merah 5 x 12 x 22 cm 91.6667 bh 900.00 82,500.00
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 274,206.20
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00

202 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 310,971.20
E. Overhead and profit 15 % 46,645.68
F. Harga satuan pekerjaan ( D + E ) 357,616.88
A.5.1.1.36.f Memasang 1m' pipa beton Ø 100 cm
A. Bahan
Pipa Beton 1.100 bh 209,400.00 230,340.00
Bata Merah 5 x 12 x 22 cm 111.3636 bh 900.00 100,227.27
Portland Cement (PC) 10.300 kg 1,340.00 13,802.00
Pasir Pasang 0.061 m³ 174,100.00 10,620.10
Pasir Urug 0.069 m³ 88,900.00 6,134.10
Jumlah harga bahan 361,123.47
B. Tenaga
Pekerja 0.380 OH 55,000.00 20,900.00
Tukang Batu 0.190 OH 68,000.00 12,920.00
Kepala Tukang 0.019 OH 75,000.00 1,425.00
Mandor 0.019 OH 80,000.00 1,520.00
Jumlah harga tenaga 36,765.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 397,888.47
E. Overhead and profit 15 % 59,683.27
F. Harga satuan pekerjaan ( D + E ) 457,571.74
J.1 PEKERJAAN SANITASI
J.038 Membuat 1 unit septic tank ukuran 2 x 2 x 1,5 m + rembesan (kantor tipe sedang)
Galian Tanah ( B.001) 6.0000 m³ 49,737.50 298,425.00
Urugan Pasir urug (B.011) 0.3000 m³ 142,577.00 42,773.10
Lantai kerja beton 1:3:5 (G.035) 3.0000 m² 99,327.80 297,983.40
Pas. Batu bata 1 PC : 2 PS (D.001) + Plesteran 1:3 (E.003) 19.0000 m² 335,992.21 6,383,852.01
Plat beton bertulang 1:2:3 penutup dan balok (G.023) 0.4500 m³ 3,821,331.55 1,719,599.20
Pipa PVC 4" jenis AW + sambungan (J.027) 9.0000 m' 136,105.38 1,224,948.38
Pipa GIP 1 1/2" (J.017) 2.5000 m' 99,388.75 248,471.88
Galian tanah untuk rembesan (B.001) 4.5000 m³ 49,737.50 223,818.75
Pasang Ijuk (B.012) 6.5000 kg 137,137.50 891,393.75
Urugan kerikil 3-5 cm. (B.013) 1.2000 m³ 198,616.50 238,339.80
Pipa PVC 4" berlobang jenis AW (J.027) 6.0000 m' 136,105.38 816,632.25
Urugan kembali perataan tanah (B.001) 1.5000 m³ 49,737.50 74,606.25
Tambahan upah 0.1200 ls 500,000.00 60,000.00
Jumlah 12,520,843.76
J.039 Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor tipe kecil)
Galian Tanah ( B.001) 4.5000 m³ 49,737.50 223,818.75
Urugan Pasir urug (B.012) 0.2142 m³ 142,577.00 30,539.99
Lantai kerja beton 1:3:5 (G.035) 2.2500 m² 99,327.80 223,487.55
Pas. Batu bata 1 PC : 2 PS + Plesteran (D.002) 15.0000 m² 335,992.21 5,039,883.17
Plat beton bertulang 1:2:3 penutup dan balok (G.023) 0.3375 m³ 3,821,331.55 1,289,699.40
Pipa PVC 4" jenis AW + sambungan (J.029) 9.0000 m' 136,105.38 1,224,948.38
Pipa GIP 1 1/2" (j.019) 1.2000 m' 99,388.75 119,266.50
Galian tanah untuk rembesan (B.001) 3.3750 m³ 49,737.50 167,864.06
Pasang Ijuk (B.015) 5.4000 kg 137,137.50 740,542.50
Urugan kerikil 3-5 cm. (B.016) 1.0500 m³ 198,616.50 208,547.33
Pipa PVC 4" berlobang jenis AW (J.029) 5.0000 m' 136,105.38 680,526.88
Urugan kembali perataan tanah (B.010) 1.1250 m³ 49,737.50 55,954.69
Tambahan upah 0.0920 ls 500,000.00 46,000.00
Jumlah 10,051,079.18
J.040 Membuat 1 unit septic tank ukuran 1,5 x 1,5 x 1,5 m + rembesan (rumah tipe sedang)
Galian Tanah ( B.001) 3.3750 m³ 49,737.50 167,864.06
Urugan Pasir urug (B.012) 0.1125 m³ 142,577.00 16,039.91
Lantai kerja beton 1:3:5 (G.035) 2.2500 m² 99,327.80 223,487.55
Pas. Batu bata 1 PC : 2 PS + Plesteran (D.002) 11.2500 m² 335,992.21 3,779,912.37
Plat beton bertulang 1:2:3 penutup dan balok (G.023) 0.3375 m³ 3,821,331.55 1,289,699.40
Pipa PVC 4" jenis AW + sambungan (J.029) 9.0000 m' 136,105.38 1,224,948.38
Pipa GIP 1 1/2" (j.019) 0.6000 m' 99,388.75 59,633.25
Galian tanah untuk rembesan (B.001) 2.0250 m³ 49,737.50 100,718.44
Pasang Ijuk (B.015) 3.5000 kg 137,137.50 479,981.25
Urugan kerikil 3-5 cm. (B.016) 0.7500 m³ 198,616.50 148,962.38
Pipa PVC 4" berlobang jenis AW (J.029) 9.0000 m' 136,105.38 1,224,948.38
Urugan kembali perataan tanah (B.010) 0.8438 m³ 49,737.50 41,966.02
Tambahan upah 0.0750 ls 500,000.00 37,500.00
Jumlah 8,795,661.38
J.041 Membuat 1 unit septic tank ukuran 1,5 x 1 x 1,5 m + rembesan (rumah tipe kecil)
Galian Tanah ( B.001) 2.2500 m³ 49,737.50 111,909.38
Urugan Pasir urug (B.012) 0.1071 m³ 142,577.00 15,270.00

203 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Lantai kerja beton 1:3:5 (G.035) 1.1250 m² 99,327.80 111,743.78
Pas. Batu bata 1 PC : 2 PS + Plesteran (D.002) 7.5000 m² 335,992.21 2,519,941.58
Plat beton bertulang 1:2:3 penutup dan balok (G.023) 0.1500 m³ 3,821,331.55 573,199.73
Pipa PVC 4" jenis AW + sambungan (J.029) 9.0000 m' 136,105.38 1,224,948.38
Pipa GIP 1 1/2" (j.019) 0.6000 m' 99,388.75 59,633.25
Galian tanah untuk rembesan (B.001) 1.6875 m³ 49,737.50 83,932.03
Pasang Ijuk (B.015) 2.7000 kg 137,137.50 370,271.25
Urugan kerikil 3-5 cm. (B.016) 0.5250 m³ 198,616.50 104,273.66
Pipa PVC 4" berlobang jenis AW (J.029) 9.0000 m' 136,105.38 1,224,948.38
Urugan kembali perataan tanah (B.010) 0.5625 m³ 49,737.50 27,977.34
Tambahan upah 0.0650 ls 500,000.00 32,500.00
Jumlah 6,460,548.75
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1 Memasang 1 kg Besi Profil
A. Bahan
Besi Profil 1.150 kg 12,500.00 14,375.00
Jumlah harga bahan 14,375.00
B. Tenaga
Pekerja 0.060 OH 55,000.00 3,300.00
Tukang Las Konstruksi 0.060 OH 80,000.00 4,800.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 8,790.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 23,165.00
E. Overhead and profit 15 % 3,474.75
F. Harga satuan pekerjaan ( D + E ) 26,639.75
A.4.2.1.2 Memasang 1 kg rangka kuda-kuda baja IWF
A. Bahan
Besi Profil IWF 1.150 kg 12,500.00 14,375.00
Jumlah harga bahan 14,375.00
B. Tenaga
Pekerja 0.060 OH 55,000.00 3,300.00
Tukang Las Konstruksi 0.060 OH 80,000.00 4,800.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 8,790.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 23,165.00
E. Overhead and profit 15 % 3,474.75
F. Harga satuan pekerjaan ( D + E ) 26,639.75
A.4.2.1.3 Mengerjakan 100 kg pekerjaan perakitan
A. Bahan
Solar 1.000 ltr 5,650.00 5,650.00
Minyak Pelumas 0.100 ltr 33,500.00 3,350.00
Jumlah harga bahan 9,000.00
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang Besi 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.001 OH 75,000.00 75.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 12,775.00
C. Peralatan
Sewa Alat 0.800 Jam 75,000.00 60,000.00

Jumlah harga peralatan 60,000.00


D. Jumlah ( A + B + C ) 81,775.00
E. Overhead and profit 15 % 12,266.25
F. Harga satuan pekerjaan ( D + E ) 94,041.25
A.4.2.1.3.a Mengerjakan 1 kg pekerjaan perakitan
A. Bahan
Solar 0.100 ltr 5,650.00 565.00
Minyak Pelumas 0.010 ltr 33,500.00 335.00
Jumlah harga bahan 900.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Besi 0.010 OH 68,000.00 680.00
Kepala Tukang 0.0001 OH 75,000.00 7.50
Mandor 0.001 OH 80,000.00 40.00
Jumlah harga tenaga 1,277.50
C. Peralatan
Sewa Alat 0.080 Jam 75,000.00 6,000.00

204 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan 6,000.00


D. Jumlah ( A + B + C ) 8,177.50
E. Overhead and profit 15 % 1,226.63
F. Harga satuan pekerjaan ( D + E ) 9,404.13
A.4.2.1.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A. Bahan
Besi Siku L 15.000 kg 12,500.00 187,500.00
Besi plat baja 32.800 kg 14,600.00 478,880.00
Kawat Las 0.050 kg 24,200.00 1,210.00
Jumlah harga bahan 667,590.00
B. Tenaga
Pekerja 1.050 OH 55,000.00 57,750.00
Tukang Las Biasa 1.050 OH 68,000.00 71,400.00
Kepala Tukang 0.105 OH 75,000.00 7,875.00
Mandor 0.052 OH 80,000.00 4,160.00
Jumlah harga tenaga 141,185.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 808,775.00
E. Overhead and profit 15 % 121,316.25
F. Harga satuan pekerjaan ( D + E ) 930,091.25
A.4.2.1.5 Mengerjakan 10 cm pengelasan dengan las listrik
A. Bahan
Kawat Las Listrik 0.400 kg 24,200.00 9,680.00
Solar 0.300 ltr 5,650.00 1,695.00
Minyak Pelumas 0.040 ltr 33,500.00 1,340.00
Jumlah harga bahan 12,715.00
B. Tenaga
Pekerja 0.040 OH 55,000.00 2,200.00
Tukang Besi 0.020 OH 68,000.00 1,360.00
Kepala Tukang 0.002 OH 75,000.00 150.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 3,870.00
C. Peralatan -
Sewa Alat 0.170 Jam 75,000.00 12,750.00

Jumlah harga peralatan 12,750.00


D. Jumlah ( A + B + C ) 29,335.00
E. Overhead and profit 15 % 4,400.25
F. Harga satuan pekerjaan ( D + E ) 33,735.25
A.4.2.1.7 Memasang 1 m² pintu gulung (rolling door) besi
A. Bahan
Pintu Gulung (Rolling Door) Besi 1.000 m² 337,100.00 337,100.00
Jumlah harga bahan 337,100.00
B. Tenaga
Pekerja 1.200 OH 55,000.00 66,000.00
Tukang Las Biasa 1.200 OH 68,000.00 81,600.00
Kepala Tukang 0.120 OH 75,000.00 9,000.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 157,080.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 494,180.00
E. Overhead and profit 15 % 74,127.00
F. Harga satuan pekerjaan ( D + E ) 568,307.00
A.4.2.1.8 Memasang 1 m² pintu lipat (folding door) bahan plastik / PVC
A. Bahan
Pintu Lipat 1.000 m² 1,200,000.00 1,200,000.00
Jumlah harga bahan 1,200,000.00
B. Tenaga
Pekerja 0.440 OH 55,000.00 24,200.00
Tukang 0.440 OH 68,000.00 29,920.00
Kepala Tukang 0.044 OH 75,000.00 3,300.00
Mandor 0.022 OH 80,000.00 1,760.00
Jumlah harga tenaga 59,180.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 1,259,180.00
E. Overhead and profit 15 % 188,877.00
F. Harga satuan pekerjaan ( D + E ) 1,448,057.00
A.4.2.1.9 Memasang 1 m² sunscreen alumunium
A. Bahan

205 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Sunscreem allumunium 1.0000 m 60,700.00 60,700.00
Jumlah harga bahan 60,700.00
B. Tenaga
Pekerja 0.0430 OH 55,000.00 2,365.00
Tukang Khusus allumunium 0.0430 OH 68,000.00 2,924.00
Kepala Tukang 0.0043 OH 75,000.00 322.50
Mandor 0.0021 OH 80,000.00 168.00
Jumlah harga tenaga 5,779.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 66,479.50
E. Overhead and profit 15 % 9,971.93
F. Harga satuan pekerjaan ( D + E ) 76,451.43
A.4.2.1.10 Memasang 1 m² rolling door alumunium
A. Bahan
Rolling door allumunium 1.000 m 523,500.00 523,500.00
Jumlah harga bahan 523,500.00
B. Tenaga
Pekerja 1.0000 OH 55,000.00 55,000.00
Tukang Khusus allumunium 1.0000 OH 68,000.00 68,000.00
Kepala Tukang 0.1000 OH 75,000.00 7,500.00
Mandor 0.0500 OH 80,000.00 4,000.00
Jumlah harga tenaga 134,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 658,000.00
E. Overhead and profit 15 % 98,700.00
F. Harga satuan pekerjaan ( D + E ) 756,700.00
A.4.2.1.11 Memasang 1 m' kusen pintu allumunium coklat
A. Bahan
Profil allumunium coklat 1.100 m 91,000.00 100,100.00
Skrup fixer 2.000 buah 310.00 620.00
Sealant 0.060 Tube 15,700.00 942.00
Jumlah harga bahan 101,662.00
B. Tenaga
Pekerja 0.043 OH 55,000.00 2,365.00
Tukang Allumunium / Kaca 0.043 OH 68,000.00 2,924.00
Kepala Tukang 0.0043 OH 75,000.00 322.50
Mandor 0.0021 OH 80,000.00 168.00
Jumlah harga tenaga 5,779.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 107,441.50
E. Overhead and profit 15 % 16,116.23
F. Harga satuan pekerjaan ( D + E ) 123,557.73
A.4.2.1.11.a Memasang 1 m' kusen pintu allumunium putih
A. Bahan
Profil allumunium putih 1.100 m 78,500.00 86,350.00
Skrup fixer 2.000 buah 310.00 620.00
Sealant 0.060 Tube 15,700.00 942.00
Jumlah harga bahan 87,912.00
B. Tenaga
Pekerja 0.043 OH 55,000.00 2,365.00
Tukang Allumunium / Kaca 0.043 OH 68,000.00 2,924.00
Kepala Tukang 0.0043 OH 75,000.00 322.50
Mandor 0.0021 OH 80,000.00 168.00
Jumlah harga tenaga 5,779.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 93,691.50
E. Overhead and profit 15 % 14,053.73
F. Harga satuan pekerjaan ( D + E ) 107,745.23
A.4.2.1.12 Memasang 1 m² pintu allumunium strip lebar 8 cm
A. Bahan
Profil allumunium 4.400 m 60,700.00 267,080.00
Alumunium strip lebar 5 cm 14.600 m 3,400.00 49,640.00
Jumlah harga bahan 316,720.00
B. Tenaga
Pekerja 0.085 OH 55,000.00 4,675.00
Tukang Allumunium / Kaca 0.085 OH 68,000.00 5,780.00
Kepala Tukang 0.0085 OH 75,000.00 637.50
Mandor 0.0042 OH 80,000.00 336.00

206 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga tenaga 11,428.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 328,148.50
E. Overhead and profit 15 % 49,222.28
F. Harga satuan pekerjaan ( D + E ) 377,370.78
A.4.2.1.13 Memasang 1 m² pintu kaca rangka allumunium
A. Bahan
Rangka Pintu allumunium 4.400 m 60,700.00 267,080.00
Prosil kaca 4.500 m 35,500.00 159,750.00
Sealant 0.270 Tube 15,700.00 4,239.00
Jumlah harga bahan 431,069.00
B. Tenaga
Pekerja 0.085 OH 55,000.00 4,675.00
Tukang Allumunium / Kaca 0.085 OH 68,000.00 5,780.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 11,530.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 442,599.00
E. Overhead and profit 15 % 66,389.85
F. Harga satuan pekerjaan ( D + E ) 508,988.85
A.4.2.1.14 Memasang 1 m² Venetions Blinds dan Vertical blinds
A. Bahan
Venetions Blinds dan vertical blinds (tirai) 1.000 m² 106,700.00 106,700.00
Jumlah harga bahan 106,700.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Besi 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 47,115.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 153,815.00
E. Overhead and profit 15 % 23,072.25
F. Harga satuan pekerjaan ( D + E ) 176,887.25
A.4.2.1.15 Memasang 1 m² terali besi strip (2 x 3) mm
A. Bahan
Besi Strip 2 x 3 6.177 m' 17,000.00 105,009.00
Pengelasan 27.080 cm 3,373.53 91,355.06
Jumlah harga bahan 196,364.06
B. Tenaga
Pekerja 1.670 OH 55,000.00 91,850.00
Tukang Las 1.670 OH 68,000.00 113,560.00
Kepala Tukang 0.167 OH 75,000.00 12,525.00
Mandor 0.083 OH 80,000.00 6,640.00
Jumlah harga tenaga 224,575.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 420,939.06
E. Overhead and profit 15 % 63,140.86
F. Harga satuan pekerjaan ( D + E ) 484,079.92
A.4.2.1.16 Memasang 1 m² kawat nyamuk
A. Bahan
Kawat Nyamuk 1.100 m² 15,700.00 17,270.00
Pengelasan 11.110 cm 3,373.53 37,479.86
Baja strip (0,2 x 2) cm 1.716 kg 17,000.00 29,172.00
Jumlah harga bahan 83,921.86
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Tukang 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 13,450.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 97,371.86
E. Overhead and profit 15 % 14,605.78
F. Harga satuan pekerjaan ( D + E ) 111,977.64

207 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.4.2.1.17 Memasang 1 m² jendela naco dan tralis
A. Bahan
Jendela naco rangka + kaca 5 mm 1.100 m² 15,000.00 16,500.00
Paku skrup 1 cm - 2.5 cm 10.00 buanh 310.00 3,100.00
Baja strip 7.000 kg 17,000.00 119,000.00
Jumlah harga bahan 138,600.00
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.001 OH 80,000.00 80.00
Jumlah harga tenaga 26,180.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 164,780.00
E. Overhead and profit 15 % 24,717.00
F. Harga satuan pekerjaan ( D + E ) 189,497.00
A.4.2.1.18 Memasang 1 m' talang datar / jurai seng BJLS 30 lebar 90 cm
A. Bahan
Seng Plat 3' x 6 ' BJLS 30, lebar 90 cm 1.050 lbr 50,000.00 52,500.00
Paku Biasa ½" - 1" atau sekrup 0.015 kg 13,600.00 204.00
Kayu Papan Cetak kelas III 0.019 m³ 2,654,700.00 50,439.30
Jumlah harga bahan 103,143.30
B. Tenaga
Pekerja 0.200 OH 55,000.00 11,000.00
Tukang Kayu 0.400 OH 68,000.00 27,200.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.010 OH 80,000.00 800.00
Jumlah harga tenaga 40,875.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 144,018.30
E. Overhead and profit 15 % 21,602.75
F. Harga satuan pekerjaan ( D + E ) 165,621.05
A.4.2.1.19 Memasang 1 m' talang ½ lingkaran Ø 15 cm, seng plat BJLS 30 lebar 90 cm
A. Bahan
Seng Plat 3' x 6 ' BJLS 30, lebar 90 cm 1.050 lbr 58,400.00 61,320.00
Paku Biasa ½" - 1" atau sekrup 0.010 kg 13,600.00 136.00
Besi Strip 0.500 kg 17,000.00 8,500.00
Jumlah harga bahan 69,956.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 31,540.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 101,496.00
E. Overhead and profit 15 % 15,224.40
F. Harga satuan pekerjaan ( D + E ) 116,720.40
A.4.2.1.19.a Memasang 1 m' talang ½ lingkaran Ø 15 cm, seng plat BJLS 30 lebar 60 cm
A. Bahan
Seng Plat 3' x 6 ' BJLS 30, lebar 60 cm 1.050 lbr 31,800.00 33,390.00
Paku Biasa ½" - 1" atau sekrup 0.010 kg 13,600.00 136.00
Besi Strip 0.500 kg 17,000.00 8,500.00
Jumlah harga bahan 42,026.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.300 OH 68,000.00 20,400.00
Kepala Tukang 0.030 OH 75,000.00 2,250.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 31,540.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 73,566.00
E. Overhead and profit 15 % 11,034.90
F. Harga satuan pekerjaan ( D + E ) 84,600.90
A.4.2.1.20 Memasang 1 m² rangka besi hollow 1 x 40.40.2 mm modul 60 x 120 cm dinding partisi
A. Bahan
Rangka metal hollow 40.40.2 mm 3.500 m' 27,692.00 96,922.00
Assesoris ( perkuatan las dll ) 100 %xrgk ls 27,692.00 27,692.00

208 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga bahan 124,614.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah harga tenaga 33,665.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 158,279.00
E. Overhead and profit 15 % 23,741.85
F. Harga satuan pekerjaan ( D + E ) 182,020.85
A.4.2.1.20.a Memasang 1 m² rangka besi hollow 1 x 40.40.1,2 mm modul 60 x 120 cm dinding partisi
A. Bahan
Rangka metal hollow 40.40.1,2 mm 3.500 m' 16,882.00 59,087.00
Assesoris ( perkuatan las dll ) 100 %xrgk ls 16,882.00 16,882.00
Jumlah harga bahan 75,969.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah harga tenaga 33,665.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 109,634.00
E. Overhead and profit 15 % 16,445.10
F. Harga satuan pekerjaan ( D + E ) 126,079.10
A.4.2.1.21 Memasang 1 m² rangka besi hollow 1 x 40.40.2 mm modul 60 x 60 cm plafond
A. Bahan
Rangka metal hollow 40.40.2 mm 4.000 m' 27,692.00 110,768.00
Assesoris ( perkuatan las dll ) 100 %xrgk ls 27,692.00 27,692.00
Jumlah harga bahan 138,460.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 47,115.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 185,575.00
E. Overhead and profit 15 % 27,836.25
F. Harga satuan pekerjaan ( D + E ) 213,411.25
A.4.2.1.21.a Memasang 1 m² rangka besi hollow 1 x 40.40.1,2 mm modul 60 x 60 cm plafond
A. Bahan
Rangka metal hollow 40.40.1,2 mm 4.000 m' 16,882.00 67,528.00
Assesoris ( perkuatan las dll ) 100 %xrgk ls 16,882.00 16,882.00
Jumlah harga bahan 84,410.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Kayu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.018 OH 80,000.00 1,440.00
Jumlah harga tenaga 47,115.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 131,525.00
E. Overhead and profit 15 % 19,728.75
F. Harga satuan pekerjaan ( D + E ) 151,253.75
K. PEKERJAAN BESI DAN ALUMUNIUM SNI 7393 : 2008
K.014 Memasang 1 m' talang miring seng BJLS 30 lebar 90 cm
Bahan
Seng Plat 3' x 6 ' BJLS 30, lebar 90 cm 0.500 lbr 58,400.00 29,200.00
Paku Biasa ½" - 1" atau sekrup 0.015 kg 13,600.00 204.00
Kayu Papan Cetak 0.019 m³ 2,654,700.00 50,439.30
Flincote/Meni Besi 0.300 kg 31,400.00 9,420.00
Jumlah (1) 89,263.30
Tenaga
Pekerja 0.040 OH 55,000.00 2,200.00
Tukang Kayu 0.400 OH 68,000.00 27,200.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00

209 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.00125 OH 80,000.00 100.00
Jumlah (2) 31,375.00
Jumlah (1) + (2) 120,638.30
K.015 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30, 90 cm
Bahan
Seng Plat 3' x 6 ' BJLS 30, lebar 90 cm 0.300 lbr 58,400.00 17,520.00
Paku Biasa ½" - 1" atau sekrup 0.100 kg 13,600.00 1,360.00
Kayu Papan Cetak 0.019 m³ 2,654,700.00 50,439.30
Besi Strip 0.500 kg 17,000.00 8,500.00
Jumlah (1) 77,819.30
Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.00125 OH 80,000.00 100.00
Jumlah (2) 27,225.00
Jumlah (1) + (2) 105,044.30
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1 Memasang 1 buah kunci tanam kualitas baik ( antik )
A. Bahan
Kunci Tanam Kualitas Baik 1.000 bh 172,700.00 172,700.00
Jumlah harga bahan 172,700.00
B. Tenaga
Pekerja 0.060 OH 55,000.00 3,300.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 48,840.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 221,540.00
E. Overhead and profit 15 % 33,231.00
F. Harga satuan pekerjaan ( D + E ) 254,771.00
A.4.6.2.2 Memasang 1 buah kunci tanam biasa
A. Bahan
Kunci Tanam Biasa 1.000 bh 78,500.00 78,500.00
Jumlah harga bahan 78,500.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Kayu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 38,700.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 117,200.00
E. Overhead and profit 15 % 17,580.00
F. Harga satuan pekerjaan ( D + E ) 134,780.00
A.4.6.2.3 Memasang 1 buah kunci untuk kamar mandi / WC
A. Bahan
Kunci Tanam Kamar Mandi / slot 1.000 bh 83,700.00 83,700.00
Jumlah harga bahan 83,700.00
B. Tenaga
Pekerja 0.005 OH 55,000.00 275.00
Tukang Kayu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 38,265.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 121,965.00
E. Overhead and profit 15 % 18,294.75
F. Harga satuan pekerjaan ( D + E ) 140,259.75
A.4.6.2.4 Memasang 1 buah kunci silinder
A. Bahan
Kunci silinder 1.000 bh 43,900.00 43,900.00
Jumlah harga bahan 43,900.00
B. Tenaga
Pekerja 0.005 OH 55,000.00 275.00
Tukang Kayu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 38,265.00

210 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 82,165.00
E. Overhead and profit 15 % 12,324.75
F. Harga satuan pekerjaan ( D + E ) 94,489.75
A.4.6.2.5 Memasang 1 buah engsel pintu
A. Bahan
Engsel Pintu kuningan 1.000 bh 20,900.00 20,900.00
Jumlah harga bahan 20,900.00
B. Tenaga
Pekerja 0.015 OH 55,000.00 825.00
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.0008 OH 80,000.00 64.00
Jumlah harga tenaga 12,214.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 33,114.00
E. Overhead and profit 15 % 4,967.10
F. Harga satuan pekerjaan ( D + E ) 38,081.10
A.4.6.2.6 Memasang 1 buah engsel jendela kupu - kupu
A. Bahan
Engsel kupu - kupu 1.000 bh 16,200.00 16,200.00
Jumlah harga bahan 16,200.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.0005 OH 80,000.00 40.00
Jumlah harga tenaga 8,140.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 24,340.00
E. Overhead and profit 15 % 3,651.00
F. Harga satuan pekerjaan ( D + E ) 27,991.00
A.4.6.2.7 Memasang 1 buah engsel angin
A. Bahan
Engsel angin 1.000 bh 24,000.00 24,000.00
Jumlah harga bahan 24,000.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.0005 OH 80,000.00 40.00
Jumlah harga tenaga 15,690.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 39,690.00
E. Overhead and profit 15 % 5,953.50
F. Harga satuan pekerjaan ( D + E ) 45,643.50
A.4.6.2.8 Memasang 1 buah spring knip
A. Bahan
Spring knip 1.000 bh 17,000.00 17,000.00
Jumlah harga bahan 17,000.00
B. Tenaga
Pekerja 0.015 OH 55,000.00 825.00
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 12,790.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 29,790.00
E. Overhead and profit 15 % 4,468.50
F. Harga satuan pekerjaan ( D + E ) 34,258.50
A.4.6.2.9 Memasang 1 buah kait angin
A. Bahan
Kait Angin Ø 6" 1.000 bh 7,300.00 7,300.00
Jumlah harga bahan 7,300.00
B. Tenaga
Pekerja 0.015 OH 55,000.00 825.00

211 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 12,790.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 20,090.00
E. Overhead and profit 15 % 3,013.50
F. Harga satuan pekerjaan ( D + E ) 23,103.50
A.4.6.2.10 Memasang 1 buah door closer
A. Bahan
Door closer 1.000 bh 780,000.00 780,000.00
Jumlah harga bahan 780,000.00
B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Tukang Kayu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 40,740.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 820,740.00
E. Overhead and profit 15 % 123,111.00
F. Harga satuan pekerjaan ( D + E ) 943,851.00
A.4.6.2.11 Memasang 1 buah kunci slot
A. Bahan
Kunci slot 1.000 bh 83,700.00 83,700.00
Jumlah harga bahan 83,700.00
B. Tenaga
Pekerja 0.020 OH 55,000.00 1,100.00
Tukang Kayu 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.001 OH 80,000.00 80.00
Jumlah harga tenaga 16,280.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 99,980.00
E. Overhead and profit 15 % 14,997.00
F. Harga satuan pekerjaan ( D + E ) 114,977.00
A.4.6.2.12 Memasang 1 buah door holder
A. Bahan
Door holder 1.000 bh 300,000.00 300,000.00
Jumlah harga bahan 300,000.00
B. Tenaga
Pekerja 0.050 OH 55,000.00 2,750.00
Tukang Kayu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 40,740.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 340,740.00
E. Overhead and profit 15 % 51,111.00
F. Harga satuan pekerjaan ( D + E ) 391,851.00
A.4.6.2.13 Memasang 1 buah door stop
A. Bahan
Door stop 1.000 bh 80,000.00 80,000.00
Jumlah harga bahan 80,000.00
B. Tenaga
Pekerja 0.010 OH 55,000.00 550.00
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 8,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 88,500.00
E. Overhead and profit 15 % 13,275.00
F. Harga satuan pekerjaan ( D + E ) 101,775.00
A.4.6.2.14 Memasang 1 unit rel pintu dorong
A. Bahan

212 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Rel Pintu Dorong 1.000 set 172,700.00 172,700.00
Jumlah harga bahan 172,700.00
B. Tenaga
Pekerja 0.060 OH 55,000.00 3,300.00
Tukang Kayu 0.600 OH 68,000.00 40,800.00
Kepala Tukang 0.060 OH 75,000.00 4,500.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 48,840.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 221,540.00
E. Overhead and profit 15 % 33,231.00
F. Harga satuan pekerjaan ( D + E ) 254,771.00
A.4.6.2.15 Memasang 1 buah kunci lemari
A. Bahan
Kunci lemari 1.000 set 10,600.00 10,600.00
Jumlah harga bahan 10,600.00
B. Tenaga
Pekerja 0.025 OH 55,000.00 1,375.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.0013 OH 80,000.00 104.00
Jumlah harga tenaga 20,354.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 30,954.00
E. Overhead and profit 15 % 4,643.10
F. Harga satuan pekerjaan ( D + E ) 35,597.10
A.4.6.2.16 Memasang 1 m² kaca bening tebal 3 mm
A. Bahan
Kaca bening 3 mm 1.100 m² 88,900.00 97,790.00
Sealant 0.050 kg 15,700.00 785.00
Jumlah harga bahan 98,575.00
B. Tenaga
Pekerja 0.015 OH 55,000.00 825.00
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.0008 OH 80,000.00 64.00
Jumlah harga tenaga 12,214.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 110,789.00
E. Overhead and profit 15 % 16,618.35
F. Harga satuan pekerjaan ( D + E ) 127,407.35
A.4.6.2.17 Memasang 1 m² kaca bening tebal 5 mm
A. Bahan
Kaca bening 5 mm 1.100 m² 88,900.00 97,790.00
Sealant 0.050 kg 15,700.00 785.00
Jumlah harga bahan 98,575.00
B. Tenaga
Pekerja 0.015 OH 55,000.00 825.00
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.0008 OH 80,000.00 64.00
Jumlah harga tenaga 12,214.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 110,789.00
E. Overhead and profit 15 % 16,618.35
F. Harga satuan pekerjaan ( D + E ) 127,407.35
A.4.6.2.17.a Memasang 1 m² kaca rayben tebal 5 mm
A. Bahan
Kaca rayben 5 mm 1.100 m² 115,100.00 126,610.00
Sealant 0.050 kg 15,700.00 785.00
Jumlah harga bahan 127,395.00
B. Tenaga
Pekerja 0.015 OH 55,000.00 825.00
Tukang Kayu 0.150 OH 68,000.00 10,200.00
Kepala Tukang 0.015 OH 75,000.00 1,125.00
Mandor 0.0008 OH 80,000.00 64.00
Jumlah harga tenaga 12,214.00
C. Peralatan -

213 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 139,609.00
E. Overhead and profit 15 % 20,941.35
F. Harga satuan pekerjaan ( D + E ) 160,550.35
A.4.6.2.18 Memasang 1 m² kaca bening tebal 8 mm
A. Bahan
Kaca bening 8 mm 1.100 m² 140,000.00 154,000.00
Sealant 0.070 kg 15,700.00 1,099.00
Jumlah harga bahan 155,099.00
B. Tenaga
Pekerja 0.017 OH 55,000.00 935.00
Tukang Kayu 0.170 OH 68,000.00 11,560.00
Kepala Tukang 0.017 OH 75,000.00 1,275.00
Mandor 0.0009 OH 80,000.00 72.00
Jumlah harga tenaga 13,842.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 168,941.00
E. Overhead and profit 15 % 25,341.15
F. Harga satuan pekerjaan ( D + E ) 194,282.15
A.4.6.2.19 Memasang 1 m² kaca bening tebal 12 mm
A. Bahan
Kaca bening 12 mm 1.100 m² 200,000.00 220,000.00
Sealant 0.070 kg 15,700.00 1,099.00
Jumlah harga bahan 221,099.00
B. Tenaga
Pekerja 0.025 OH 55,000.00 1,375.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.00013 OH 80,000.00 10.40
Jumlah harga tenaga 20,260.40
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 241,359.40
E. Overhead and profit 15 % 36,203.91
F. Harga satuan pekerjaan ( D + E ) 277,563.31
L. PEKERJAAN KUNCI DAN KACA Pt. T - 30 - 2002 C
L.011 Memasang 1 buah gerendel (pendek) pintu
Bahan
Gerendel pendek pintu 1.000 bh 9,900.00 9,900.00
Jumlah (1) 9,900.00
Tenaga
Pekerja 0.000 OH 55,000.00 -
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.000 OH 80,000.00 -
Jumlah (2) 7,550.00
Jumlah (1) + (2) 17,450.00
L.012 Memasang 1 buah gerendel (panjang) pintu
Bahan
Gerendel panjang pintu 1.000 bh 19,800.00 19,800.00
Jumlah (1) 19,800.00
Tenaga
Pekerja 0.000 OH 55,000.00 -
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.000 OH 80,000.00 -
Jumlah (2) 7,550.00
Jumlah (1) + (2) 27,350.00
L.013 Memasang 1 buah gerendel jendela
Bahan
Gerendel jendela 1.000 bh 9,900.00 9,900.00
Jumlah (1) 9,900.00
Tenaga
Pekerja 0.000 OH 55,000.00 -
Tukang Kayu 0.100 OH 68,000.00 6,800.00
Kepala Tukang 0.010 OH 75,000.00 750.00
Mandor 0.000 OH 80,000.00 -
Jumlah (2) 7,550.00
Jumlah (1) + (2) 17,450.00
L.016 Memasang 1 m² kaca bening tebal 3 mm dengan kisi - kisi
Bahan
Kaca bening 3 mm 1.200 m² 88,900.00 106,680.00

214 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah (1) 106,680.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Kayu 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah (2) 33,665.00
Jumlah (1) + (2) 140,345.00
L.017 Memasang 1 m² kaca rayben tebal 5 mm
Bahan
Kaca rayben 5 mm 1.100 m² 115,100.00 126,610.00
Jumlah (1) 126,610.00
Tenaga
Pekerja 0.160 OH 55,000.00 8,800.00
Tukang Kayu 0.160 OH 68,000.00 10,880.00
Kepala Tukang 0.016 OH 75,000.00 1,200.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah (2) 21,520.00
Jumlah (1) + (2) 148,130.00
A.4.4.3.1 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A.4.4.3.32 Memasang 1 m² lantai keramik artistik ukuran 10 x 20 cm
A. Bahan
Lantai keramik 10 x 20 cm 53.000 Buah 4,100.00 217,300.00
Portland Cement (PC) 8.190 kg 1,340.00 10,974.60
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 2.750 kg 13,600.00 37,400.00
Jumlah harga bahan 273,509.10
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 341,234.10
E. Overhead and profit 15 % 51,185.12
F. Harga satuan pekerjaan ( D + E ) 392,419.22
A.4.4.3.33 Memasang 1 m² lantai keramik artistik ukuran 10 x 10 cm atau 5 x 20 cm
A. Bahan
Lantai keramik 10 x 10 cm atau 5 x 20 cm 106.000 Buah 4,100.00 434,600.00
Portland Cement (PC) 8.190 kg 1,340.00 10,974.60
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 3.200 kg 13,600.00 43,520.00
Jumlah harga bahan 496,929.10
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 564,654.10
E. Overhead and profit 15 % 84,698.12
F. Harga satuan pekerjaan ( D + E ) 649,352.22
A.4.4.3.34 Memasang 1 m² lantai keramik polos (33 x 33) cm
A. Bahan
keramik 33 x 33 cm polos 10.000 Buah 5,837.04 58,370.40
Portland Cement (PC) 8.190 kg 1,340.00 10,974.60
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.620 kg 13,600.00 22,032.00
Jumlah harga bahan 99,211.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 166,936.50
E. Overhead and profit 15 % 25,040.48

215 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 191,976.98
A.4.4.3.35 Memasang 1 m² lantai keramik polos (30 x 30) cm
A. Bahan
keramik 30 x 30 cm polos 11.870 Buah 4,824.00 57,260.88
Portland Cement (PC) 10.000 kg 1,340.00 13,400.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 98,895.38
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 166,620.38
E. Overhead and profit 15 % 24,993.06
F. Harga satuan pekerjaan ( D + E ) 191,613.44
A.4.4.3.35.a Memasang 1 m² lantai keramik motif (30 x 30) cm
A. Bahan
keramik 30 x 30 cm motif 11.870 Buah 4,986.00 59,183.82
Portland Cement (PC) 10.000 kg 1,340.00 13,400.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 100,818.32
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 168,543.32
E. Overhead and profit 15 % 25,281.50
F. Harga satuan pekerjaan ( D + E ) 193,824.82
A.4.4.3.35.b Memasang 1 m² lantai keramik motif granit (30 x 30) cm
A. Bahan
keramik 30 x 30 cm motif granit 11.870 Buah 14,598.00 173,278.26
Portland Cement (PC) 10.000 kg 1,340.00 13,400.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 214,912.76
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 282,637.76
E. Overhead and profit 15 % 42,395.66
F. Harga satuan pekerjaan ( D + E ) 325,033.42
A.4.4.3.35.c Memasang 1 m² lantai keramik polos (40 x 40) cm
A. Bahan
keramik 40 x 40 cm polos 6.630 Buah 9,408.00 62,375.04
Portland Cement (PC) 9.800 kg 1,340.00 13,132.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.300 kg 13,600.00 17,680.00
Jumlah harga bahan 101,021.54
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 168,746.54
E. Overhead and profit 15 % 25,311.98

216 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 194,058.52
A.4.4.3.35.d Memasang 1 m² lantai keramik motif (40 x 40) cm
A. Bahan
keramik 40 x 40 cm motif 6.630 Buah 10,592.00 70,224.96
Portland Cement (PC) 9.800 kg 1,340.00 13,132.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.300 kg 13,600.00 17,680.00
Jumlah harga bahan 108,871.46
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 176,596.46
E. Overhead and profit 15 % 26,489.47
F. Harga satuan pekerjaan ( D + E ) 203,085.93
A.4.4.3.35.e Memasang 1 m² lantai keramik motif granit (40 x 40) cm
A. Bahan
keramik 40 x 40 cm motif granit 6.630 Buah 26,800.00 177,684.00
Portland Cement (PC) 9.800 kg 1,340.00 13,132.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.300 kg 13,600.00 17,680.00
Jumlah harga bahan 216,330.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 284,055.50
E. Overhead and profit 15 % 42,608.33
F. Harga satuan pekerjaan ( D + E ) 326,663.83
A.4.4.3.35.f Memasang 1 m² lantai keramik polos 60 x 60 cm
A. Bahan
keramik 60 x 60 cm polos 3.100 Buah 50,400.00 156,240.00 ###
Portland Cement (PC) 9.600 kg 1,340.00 12,864.00 ###
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50 ###
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 197,338.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 265,063.50
E. Overhead and profit 15 % 39,759.53
F. Harga satuan pekerjaan ( D + E ) 304,823.03
A.4.4.3.35.g Memasang 1 m² lantai keramik motif 60 x 60 cm
A. Bahan
keramik 60 x 60 cm motif 3.100 Buah 52,740.00 163,494.00
Portland Cement (PC) 9.600 kg 1,340.00 12,864.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 204,592.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 272,317.50
E. Overhead and profit 15 % 40,847.63

217 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 313,165.13
A.4.4.3.35.h Memasang 1 m² lantai keramik motif granit 60 x 60 cm
A. Bahan
keramik 60 x 60 cm motif granit 3.100 Buah 60,300.00 186,930.00
Portland Cement (PC) 9.600 kg 1,340.00 12,864.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 228,028.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 295,753.50
E. Overhead and profit 15 % 44,363.03
F. Harga satuan pekerjaan ( D + E ) 340,116.53
A.4.4.3.36 Memasang 1 m² lantai keramik polos (20 x 20) cm
A. Bahan
keramik 20 x 20 cm polos 26.500 Buah 2,216.00 58,724.00
Portland Cement (PC) 10.400 kg 1,340.00 13,936.00
Pasir Pasang (PP) 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.620 kg 13,600.00 22,032.00
Jumlah harga bahan 102,526.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 170,251.50
E. Overhead and profit 15 % 25,537.73
F. Harga satuan pekerjaan ( D + E ) 195,789.23
A.4.4.3.36.a Memasang 1 m² lantai keramik motif ukuran 20 x 20 cm (anti slip)
A. Bahan
Keramik 20 x 20 cm (anti slip) 26.500 Buah 2,384.00 63,176.00
Portland Cement (PC) 10.400 kg 1,340.00 13,936.00
Pasir Pasang 0.045 m³ 174,100.00 7,834.50
Semen Warna 1.620 kg 13,600.00 22,032.00
Jumlah harga bahan 106,978.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 174,703.50
E. Overhead and profit 15 % 26,205.53
F. Harga satuan pekerjaan ( D + E ) 200,909.03
A.4.4.3.39 Memasang 1 m' plint keramik ukuran 10 x 20 cm
A. Bahan
Plint keramik artistik 5.300 Buah 3,600.00 19,080.00
Portland Cement (PC) 1.140 kg 1,340.00 1,527.60
Pasir Pasang (PP) 0.003 m³ 174,100.00 522.30
Semen Warna 0.025 kg 13,600.00 340.00
Jumlah harga bahan 21,469.90
B. Tenaga
Pekerja 0.090 OH 55,000.00 4,950.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 14,095.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 35,564.90
E. Overhead and profit 15 % 5,334.74

218 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 40,899.64
A.4.4.3.40 Memasang 1 m' plint keramik ukuran 10 x 10 cm
A. Bahan
Plint keramik artistik 10.600 Buah 3,600.00 38,160.00
Portland Cement (PC) 1.140 kg 1,340.00 1,527.60
Pasir Pasang (PP) 0.003 m³ 174,100.00 522.30
Semen Warna 0.005 kg 13,600.00 68.00
Jumlah harga bahan 40,277.90
B. Tenaga
Pekerja 0.090 OH 55,000.00 4,950.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 14,095.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 54,372.90
E. Overhead and profit 15 % 8,155.94
F. Harga satuan pekerjaan ( D + E ) 62,528.84
A.4.4.3.41 Memasang 1 m' plint keramik ukuran 5 x 20 cm
A. Bahan
Plint keramik artistik 5.300 Buah 6,200.00 32,860.00
Portland Cement (PC) 0.570 kg 1,340.00 763.80
Pasir Pasang (PP) 0.0015 m³ 174,100.00 261.15
Semen Warna 0.013 kg 13,600.00 176.80
Jumlah harga bahan 34,061.75
B. Tenaga
Pekerja 0.090 OH 55,000.00 4,950.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 14,095.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 48,156.75
E. Overhead and profit 15 % 7,223.51
F. Harga satuan pekerjaan ( D + E ) 55,380.26
A.4.4.3.44 Memasang 1 m² lantai karpet
A. Bahan
Karpet 1.050 m² 15,700.00 16,485.00
Lem kuning 0.350 kg 35,000.00 12,250.00
Jumlah harga bahan 28,735.00
B. Tenaga
Pekerja 0.170 OH 55,000.00 9,350.00
Tukang kayu 0.170 OH 68,000.00 11,560.00
Kepala Tukang 0.017 OH 75,000.00 1,275.00
Mandor 0.009 OH 80,000.00 720.00
Jumlah harga tenaga 22,905.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 51,640.00
E. Overhead and profit 15 % 7,746.00
F. Harga satuan pekerjaan ( D + E ) 59,386.00
A.4.4.3.48 Memasang 1 m² dinding porselen ukuran (11 x 11) cm
A. Bahan
Porselen 86.000 Buah 344.85 29,657.10
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.500 kg 13,600.00 20,400.00
Jumlah harga bahan 65,652.90
B. Tenaga
Pekerja 1.000 OH 55,000.00 55,000.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.050 OH 80,000.00 4,000.00
Jumlah harga tenaga 96,750.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 162,402.90
E. Overhead and profit 15 % 24,360.44
F. Harga satuan pekerjaan ( D + E ) 186,763.34
A.4.4.3.51 Memasang 1 m² dinding keramik artistisk (10 x 20) cm

219 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. Bahan
Keramik artistik 10 x 20 cm 53.000 Buah 4,100.00 217,300.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 2.750 kg 13,600.00 37,400.00
Jumlah harga bahan 270,295.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 357,370.80
E. Overhead and profit 15 % 53,605.62
F. Harga satuan pekerjaan ( D + E ) 410,976.42
A.4.4.3.52 Memasang 1 m' dinding keramik ukuran (5 x 20) cm
A. Bahan
plint keramik artistik 5.300 Buah 6,200.00 32,860.00
Portland Cement (PC) 0.570 kg 1,340.00 763.80
Pasir Pasang (PP) 0.0015 m³ 174,100.00 261.15
Semen Warna 0.0130 kg 13,600.00 176.80
Jumlah harga bahan 34,061.75
B. Tenaga
Pekerja 0.090 OH 55,000.00 4,950.00
Tukang Batu 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.009 OH 75,000.00 675.00
Mandor 0.005 OH 80,000.00 400.00
Jumlah harga tenaga 12,145.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 46,206.75
E. Overhead and profit 15 % 6,931.01
F. Harga satuan pekerjaan ( D + E ) 53,137.76
A.4.4.3.53 Memasang 1 m' dinding keramik artistisk (10 x 20) cm
A. Bahan
Keramik artistik 10 x 20 cm 5.300 Buah 4,100.00 21,730.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 2.750 kg 13,600.00 37,400.00
Jumlah harga bahan 74,725.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 161,800.80
E. Overhead and profit 15 % 24,270.12
F. Harga satuan pekerjaan ( D + E ) 186,070.92
A.4.4.3.54 Memasang 1 m² dinding keramik polos ukuran 20 x 20 cm
A. Bahan
Keramik 20 x 20 cm polos 26.500 Buah 2,216.00 58,724.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.940 kg 13,600.00 26,384.00
Jumlah harga bahan 100,703.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 187,778.80
E. Overhead and profit 15 % 28,166.82
F. Harga satuan pekerjaan ( D + E ) 215,945.62
A.4.4.3.54.a Memasang 1 m² dinding keramik motif ukuran 20 x 20 cm

220 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. Bahan
Keramik 20 x 20 cm motif 26.500 Buah 2,384.00 63,176.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.940 kg 13,600.00 26,384.00
Jumlah harga bahan 105,155.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 192,230.80
E. Overhead and profit 15 % 28,834.62
F. Harga satuan pekerjaan ( D + E ) 221,065.42
A.4.4.3.54.b Memasang 1 m² dinding keramik polos ukuran 20 x 25 cm
A. Bahan
Keramik 20 x 25 cm polos 20.000 Buah 3,270.00 65,400.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.940 kg 13,600.00 26,384.00
Jumlah harga bahan 107,379.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 194,454.80
E. Overhead and profit 15 % 29,168.22
F. Harga satuan pekerjaan ( D + E ) 223,623.02
A.4.4.3.54.c Memasang 1 m² dinding keramik motif ukuran 20 x 25 cm
A. Bahan
Keramik 20 x 25 cm motif 20.000 Buah 3,555.00 71,100.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.940 kg 13,600.00 26,384.00
Jumlah harga bahan 113,079.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 200,154.80
E. Overhead and profit 15 % 30,023.22
F. Harga satuan pekerjaan ( D + E ) 230,178.02
A.4.4.3.54.d Memasang 1 m² dinding keramik motif ukuran 30 x 60 cm
A. Bahan
Keramik 30 x 60 cm motif 6.100 Buah 21,762.00 132,748.20
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.940 kg 13,600.00 26,384.00
Jumlah harga bahan 174,728.00
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 261,803.00
E. Overhead and profit 15 % 39,270.45
F. Harga satuan pekerjaan ( D + E ) 301,073.45
A.4.4.3.54.e Memasang 1 m² dinding keramik motif ukuran 25 x 40 cm

221 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. Bahan
Keramik 25 x 40 cm motif 10.000 Buah 6,800.00 68,000.00
Portland Cement (PC) 9.300 kg 1,340.00 12,462.00
Pasir Pasang (PP) 0.018 m³ 174,100.00 3,133.80
Semen Warna 1.940 kg 13,600.00 26,384.00
Jumlah harga bahan 109,979.80
B. Tenaga
Pekerja 0.900 OH 55,000.00 49,500.00
Tukang Batu 0.450 OH 68,000.00 30,600.00
Kepala Tukang 0.045 OH 75,000.00 3,375.00
Mandor 0.045 OH 80,000.00 3,600.00
Jumlah harga tenaga 87,075.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 197,054.80
E. Overhead and profit 15 % 29,558.22
F. Harga satuan pekerjaan ( D + E ) 226,613.02
A.4.4.3.57 Memasang 1 m² dinding batu tempel Palimanan Hijau
A. Bahan
Batu tempel Palimanan Hijau 1.100 m² 157,000.00 172,700.00
Portland Cement (PC) 11.750 kg 1,340.00 15,745.00
Pasir Pasang 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 194,538.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 262,263.50
E. Overhead and profit 15 % 39,339.53
F. Harga satuan pekerjaan ( D + E ) 301,603.03
A.4.4.3.57.a Memasang 1 m² dinding batu tempel Palimanan Kuning
A. Bahan
Batu tempel Palimanan Kuning 1.100 m² 136,100.00 149,710.00
Portland Cement (PC) 11.750 kg 1,340.00 15,745.00
Pasir Pasang 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 171,548.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 239,273.50
E. Overhead and profit 15 % 35,891.03
F. Harga satuan pekerjaan ( D + E ) 275,164.53
A.4.4.3.57.b Memasang 1 m² dinding batu tempel serit hitam lurus
A. Bahan
Batu tempel serit hitam lurus 1.100 m² 151,800.00 166,980.00
Portland Cement (PC) 11.750 kg 1,340.00 15,745.00
Pasir Pasang 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 188,818.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 256,543.50
E. Overhead and profit 15 % 38,481.53
F. Harga satuan pekerjaan ( D + E ) 295,025.03
A.4.4.3.58 Memasang 1 m² dinding batu tempel hitam tidak beraturan ( kecil )
A. Bahan
Batu Tempel Hitam 1.100 m² 125,600.00 138,160.00
Portland Cement (PC) 11.750 kg 1,340.00 15,745.00

222 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Pasir Pasang 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 159,998.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 227,723.50
E. Overhead and profit 15 % 34,158.53
F. Harga satuan pekerjaan ( D + E ) 261,882.03
A.4.4.3.58.a Memasang 1 m² dinding batu tempel hitam tidak beraturan ( besar )
A. Bahan
Batu Tempel Hitam 1.100 m² 130,800.00 143,880.00
Portland Cement (PC) 11.750 kg 1,340.00 15,745.00
Pasir Pasang 0.035 m³ 174,100.00 6,093.50
Jumlah harga bahan 165,718.50
B. Tenaga
Pekerja 0.700 OH 55,000.00 38,500.00
Tukang Batu 0.350 OH 68,000.00 23,800.00
Kepala Tukang 0.035 OH 75,000.00 2,625.00
Mandor 0.035 OH 80,000.00 2,800.00
Jumlah harga tenaga 67,725.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 233,443.50
E. Overhead and profit 15 % 35,016.53
F. Harga satuan pekerjaan ( D + E ) 268,460.03
A.4.4.3.60 Memasang 1 m² wallpaper lebar 50 cm
A. Bahan
Wallpaper 2.200 m² 36,600.00 80,520.00
Lem 0.250 kg 35,000.00 8,750.00
Jumlah harga bahan 89,270.00
B. Tenaga
Pekerja 0.350 OH 55,000.00 19,250.00
Tukang Batu 0.175 OH 68,000.00 11,900.00
Kepala Tukang 0.017 OH 75,000.00 1,275.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 32,585.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 121,855.00
E. Overhead and profit 15 % 18,278.25
F. Harga satuan pekerjaan ( D + E ) 140,133.25
A.4.4.3.63 Memasang 1 m' Plint kayu kelas I tebal 2 cm, lebar 10 cm ( kayu Jati )
A. Bahan
Papan kayu kelas I 0.003 m³ 16,673,400.00 50,020.20
Paku / skrup 5 cm 0.050 kg 13,600.00 680.00
Jumlah harga bahan 50,700.20
B. Tenaga
Pekerja 0.120 OH 55,000.00 6,600.00
Tukang kayu 0.120 OH 68,000.00 8,160.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 16,140.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 66,840.20
E. Overhead and profit 15 % 10,026.03
F. Harga satuan pekerjaan ( D + E ) 76,866.23
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1 1 m² mengorek atau mengikis cat tembok cara manual
A. Bahan
soda api padat 0.050 Buah 5,200.00 260.00
Jumlah harga bahan 260.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 8,490.00
C. Peralatan -

223 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,750.00
E. Overhead and profit 15 % 1,312.50
F. Harga satuan pekerjaan ( D + E ) 10,062.50
A.4.7.1.2 1 m² mencuci bidang permukaan tembok lama dengan sabun
A. Bahan
Sabun 0.050 kg 6,400.00 320.00
Jumlah harga bahan 320.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 8,490.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,810.00
E. Overhead and profit 15 % 1,321.50
F. Harga satuan pekerjaan ( D + E ) 10,131.50
A.4.7.1.3 1 m² mengorek karat pada permukaan baja cara manual
A. Bahan
Sabun 0.050 Buah 6,400.00 320.00
Jumlah harga bahan 320.00
B. Tenaga
Pekerja 0.150 OH 55,000.00 8,250.00
Mandor 0.008 OH 80,000.00 640.00
Jumlah harga tenaga 8,890.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 9,210.00
E. Overhead and profit 15 % 1,381.50
F. Harga satuan pekerjaan ( D + E ) 10,591.50
A.4.7.1.4 1 m² mengecat bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
A. Bahan
Cat menie 0.200 kg 23,000.00 4,600.00
Plamur 0.150 kg 11,500.00 1,725.00
Cat dasar 0.170 kg 26,100.00 4,437.00
Cat penutup 0.260 kg 54,900.00 14,274.00
kuas cat 3' 0.010 bh 9,400.00 94.00
minyak cat ( pengencer ) 0.030 kg 15,700.00 471.00
Ampelas 0.200 lbr 3,100.00 620.00
Jumlah harga bahan 26,221.00
B. Tenaga
Pekerja 0.070 OH 55,000.00 3,850.00
Tukang Cat 0.090 OH 68,000.00 6,120.00
Kepala Tukang 0.006 OH 75,000.00 450.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 10,660.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 36,881.00
E. Overhead and profit 15 % 5,532.15
F. Harga satuan pekerjaan ( D + E ) 42,413.15
A.4.7.1.5 1 m² mengecat bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup )
A. Bahan
Cat menie 0.200 kg 23,000.00 4,600.00
Plamur 0.150 kg 11,500.00 1,725.00
Cat dasar 0.170 kg 26,100.00 4,437.00
Cat penutup 0.350 kg 54,900.00 19,215.00
kuas cat 3' 0.010 bh 9,400.00 94.00
minyak cat ( pengencer ) 0.030 kg 15,700.00 471.00
Ampelas 0.200 lbr 3,100.00 620.00
Jumlah harga bahan 31,162.00
B. Tenaga
Pekerja 0.070 OH 55,000.00 3,850.00
Tukang Cat 0.105 OH 68,000.00 7,140.00
Kepala Tukang 0.004 OH 75,000.00 300.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 11,530.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 42,692.00
E. Overhead and profit 15 % 6,403.80

224 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F. Harga satuan pekerjaan ( D + E ) 49,095.80
A.4.7.1.6 1 m² Pelaburan bidang kayu dengan teak oil
A. Bahan
Teak oil 0.360 Buah 73,800.00 26,568.00
Jumlah harga bahan 26,568.00
B. Tenaga
Pekerja 0.040 OH 55,000.00 2,200.00
Tukang Cat 0.063 OH 68,000.00 4,284.00
Kepala Tukang 0.063 OH 75,000.00 4,725.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 11,449.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 38,017.00
E. Overhead and profit 15 % 5,702.55
F. Harga satuan pekerjaan ( D + E ) 43,719.55
A.4.7.1.7 1 m² pelaburan bidang kayu dengan pelitur 2 lapis menggunakan kuas
A. Bahan
Politur 0.150 ltr 62,800.00 9,420.00
Politur Jadi 0.372 ltr 73,800.00 27,453.60
Ampelas 2.000 lbr 3,100.00 6,200.00
Jumlah harga bahan 43,073.60
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Cat 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.013 OH 80,000.00 1,040.00
Jumlah harga tenaga 33,665.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 76,738.60
E. Overhead and profit 15 % 11,510.79
F. Harga satuan pekerjaan ( D + E ) 88,249.39
A.4.7.1.8 1 m² pelapisan bidang kayu dengan reside / ter
A. Bahan
residu / ter 0.350 ltr 15,700.00 5,495.00
Jumlah harga bahan 5,495.00
B. Tenaga
Pekerja 0.100 OH 55,000.00 5,500.00
Mandor 0.006 OH 80,000.00 480.00
Jumlah harga tenaga 5,980.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 11,475.00
E. Overhead and profit 15 % 1,721.25
F. Harga satuan pekerjaan ( D + E ) 13,196.25
A.4.7.1.9 1 m² pelapisan bidang kayu dengan dengan vernis
A. Bahan
Vernis 0.150 ltr 36,600.00 5,490.00
Ampelas 0.100 lbr 3,100.00 310.00
Dempul 0.100 kg 35,500.00 3,550.00
Jumlah harga bahan 9,350.00
B. Tenaga
Pekerja 0.160 OH 55,000.00 8,800.00
Tukang Cat 0.160 OH 68,000.00 10,880.00
Kepala Tukang 0.016 OH 75,000.00 1,200.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 21,120.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 30,470.00
E. Overhead and profit 15 % 4,570.50
F. Harga satuan pekerjaan ( D + E ) 35,040.50
A.4.7.1.10 1 m² pengecetan tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
A. Bahan
plamir tembok 0.100 kg 11,500.00 1,150.00
cat dasar 0.100 kg 26,100.00 2,610.00
cat tembok 0.260 kg 26,100.00 6,786.00
Jumlah harga bahan 10,546.00
B. Tenaga
Pekerja 0.020 OH 55,000.00 1,100.00
Tukang Cat 0.063 OH 68,000.00 4,284.00

225 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0063 OH 75,000.00 472.50
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 6,096.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 16,642.50
E. Overhead and profit 15 % 2,496.38
F. Harga satuan pekerjaan ( D + E ) 19,138.88
A.4.7.1.10.a 1 m² pengecetan plafond baru menggunakan perancah ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
A. Bahan
plamir tembok 0.100 kg 11,500.00 1,150.00
cat dasar 0.100 kg 26,100.00 2,610.00
cat tembok 0.260 kg 26,100.00 6,786.00
Perancah kayu 0.002 3m 1,936,900.00 3,873.80
Jumlah harga bahan 14,419.80
B. Tenaga
Pekerja 0.020 OH 55,000.00 1,100.00
Tukang Cat 0.063 OH 68,000.00 4,284.00
Kepala Tukang 0.0063 OH 75,000.00 472.50
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 6,096.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 20,516.30
E. Overhead and profit 15 % 3,077.45
F. Harga satuan pekerjaan ( D + E ) 23,593.75
A.4.7.1.11 1 m² pengecetan tembok lama ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )
A. Bahan
cat tembok 0.120 kg 26,100.00 3,132.00
Kuas 4" 0.018 Buah 15,700.00 282.60
Jumlah harga bahan 3,414.60
B. Tenaga
Pekerja 0.028 OH 55,000.00 1,540.00
Tukang Cat 0.042 OH 68,000.00 2,856.00
Kepala Tukang 0.004 OH 75,000.00 315.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 4,951.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 8,365.60
E. Overhead and profit 15 % 1,254.84
F. Harga satuan pekerjaan ( D + E ) 9,620.44
A.4.7.1.15 1 m² pemasangan wallpaper
A. Bahan
Wallpaper 1.200 m² 36,600.00 43,920.00
Lem 0.200 kg 35,000.00 7,000.00
Jumlah harga bahan 50,920.00
B. Tenaga
Pekerja 0.020 OH 55,000.00 1,100.00
Tukang Cat 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.0025 OH 80,000.00 200.00
Jumlah harga tenaga 16,400.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 67,320.00
E. Overhead and profit 15 % 10,098.00
F. Harga satuan pekerjaan ( D + E ) 77,418.00
A.4.7.1.16 1 m² melapis meni pada permukaan baja
A. Bahan
Meni besi 0.100 kg 23,000.00 2,300.00
kuas cat 3' 0.010 bh 9,400.00 94.00
Jumlah harga bahan 2,394.00
B. Tenaga
Pekerja 0.020 OH 55,000.00 1,100.00
Tukang Cat 0.200 OH 68,000.00 13,600.00
Kepala Tukang 0.020 OH 75,000.00 1,500.00
Mandor 0.0025 OH 80,000.00 200.00
Jumlah harga tenaga 16,400.00
C. Peralatan -

Jumlah harga peralatan -

226 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. Jumlah ( A + B + C ) 18,794.00
E. Overhead and profit 15 % 2,819.10
F. Harga satuan pekerjaan ( D + E ) 21,613.10
A.4.7.1.17 1 m² melapis meni pada permukaan baja menggunakan perancah
A. Bahan
Meni besi 0.100 kg 23,000.00 2,300.00
minyak cat 0.010 ltr 15,700.00 157.00
kuas cat 3' 0.010 bh 9,400.00 94.00
Perancah kayu 0.002 3m 1,936,900.00 3,873.80
Jumlah harga bahan 6,424.80
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Cat 0.225 OH 68,000.00 15,300.00
Kepala Tukang 0.0225 OH 75,000.00 1,687.50
Mandor 0.0075 OH 80,000.00 600.00
Jumlah harga tenaga 31,337.50
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 37,762.30
E. Overhead and profit 15 % 5,664.35
F. Harga satuan pekerjaan ( D + E ) 43,426.65
A.4.7.1.18 1 m² Pengecatan permukaan baja galvanis secara manual 4 lapis
A. Bahan
Meni besi A 0.100 kg 23,000.00 2,300.00
Meni besi B 0.100 kg 23,000.00 2,300.00
Cat 0.080 kg 54,700.00 4,376.00
kuas cat 3' 0.010 bh 9,400.00 94.00
minyak cat 0.010 ltr 15,700.00 157.00
Jumlah harga bahan 9,227.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Cat 0.250 OH 68,000.00 17,000.00
Kepala Tukang 0.025 OH 75,000.00 1,875.00
Mandor 0.0013 OH 80,000.00 104.00
Jumlah harga tenaga 32,729.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 41,956.00
E. Overhead and profit 15 % 6,293.40
F. Harga satuan pekerjaan ( D + E ) 48,249.40
A.4.7.1.19 1 m² Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A. Bahan
Cat 0.300 kg 54,700.00 16,410.00
kuas cat 3' 0.010 bh 9,400.00 94.00
minyak cat 0.010 ltr 15,700.00 157.00
Jumlah harga bahan 16,661.00
B. Tenaga
Pekerja 0.060 OH 55,000.00 3,300.00
Tukang Cat 0.060 OH 68,000.00 4,080.00
Kepala Tukang 0.012 OH 75,000.00 900.00
Mandor 0.003 OH 80,000.00 240.00
Jumlah harga tenaga 8,520.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 25,181.00
E. Overhead and profit 15 % 3,777.15
F. Harga satuan pekerjaan ( D + E ) 28,958.15
A.4.7.1.20 1 m² Pengecatan permukaan baja galvanis secara manual sistem 3 lapis cat
A. Bahan
Cat dasar 0.110 kg 23,000.00 2,530.00
Cat antara 0.170 kg 23,000.00 3,910.00
Cat penutup 0.080 kg 54,700.00 4,376.00
kuas cat 3' 0.010 bh 9,400.00 94.00
minyak cat 0.010 ltr 15,700.00 157.00
Jumlah harga bahan 11,067.00
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Cat 0.800 OH 68,000.00 54,400.00
Kepala Tukang 0.080 OH 75,000.00 6,000.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 82,560.00
C. Peralatan -

227 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah harga peralatan -
D. Jumlah ( A + B + C ) 93,627.00
E. Overhead and profit 15 % 14,044.05
F. Harga satuan pekerjaan ( D + E ) 107,671.05
A.4.7.1.21 1 m² Pengecatan permukaan baja galvanis secara semprot 3 lapis cat mutakhir
A. Bahan
Cat dasar 0.300 kg 23,000.00 6,900.00
minyak cat 0.010 ltr 15,700.00 157.00
Jumlah harga bahan 7,057.00
B. Tenaga
Pekerja 0.400 OH 55,000.00 22,000.00
Tukang Cat 0.700 OH 68,000.00 47,600.00
Kepala Tukang 0.070 OH 75,000.00 5,250.00
Mandor 0.002 OH 80,000.00 160.00
Jumlah harga tenaga 75,010.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 82,067.00
E. Overhead and profit 15 % 12,310.05
F. Harga satuan pekerjaan ( D + E ) 94,377.05
O. PEKERJAAN PAVING, JALAN DAN LAIN-LAIN HSPK
O.001 Memasang 1 m² paving block natural segi empat; tebal 6 cm
Bahan
Paving Segi Empat Natural; tebal 6 cm 1.010 m² 63,700.00 64,337.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 73,227.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 126,727.00
O.001.a Memasang 1 m² paving block natural segi empat; tebal 6 cm
A. Bahan
Paving Segi Empat Natural; tebal 6 cm 1.010 m² 63,700.00 64,337.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah harga bahan 73,227.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah harga tenaga 53,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 126,727.00
E. Profit 10 % 12,672.70
F. Harga satuan pekerjaan ( D + E ) 139,399.70
O.002 Memasang 1 m² paving block natural segi empat manggunakan bahan lama
Bahan
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 8,890.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 62,390.00
O.002.a Memasang 1 m² paving block natural segi empat manggunakan bahan lama
A. Bahan
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah harga bahan 8,890.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah harga tenaga 53,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 62,390.00

228 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E. Profit 10 % 6,239.00
F. Harga satuan pekerjaan ( D + E ) 68,629.00
O.003 Memasang 1 m² paving block natural segi enam; tebal 6 cm
A. Bahan
Paving Segi Enam Natural; tebal 6 cm 1.010 m² 63,700.00 64,337.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 73,227.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 126,727.00
O.003.a Memasang 1 m² paving block natural segi enam; tebal 6 cm
A. Bahan
Paving Segi Enam Natural; tebal 6 cm 1.010 m² 63,700.00 64,337.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah harga bahan 73,227.00
B. Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah harga tenaga 53,500.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 126,727.00
E. Profit 10 % 12,672.70
F. Harga satuan pekerjaan ( D + E ) 139,399.70
O.004 Memasang 1 m² paving block natural segi enam menggunakan bahan lama
Bahan
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 8,890.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 62,390.00
O.005 Memasang 1 m² paving block warna segi empat; tebal 6 cm
Bahan
Paving Segi Empat Warna; tebal 6 cm 1.0100 m² 69,000.00 69,690.00
Pasir Urug 0.1000 m³ 88,900.00 8,890.00
Jumlah (1) 78,580.00
Tenaga
Pekerja 0.2500 OH 55,000.00 13,750.00
Tukang Batu 0.5000 OH 68,000.00 34,000.00
Kepala Tukang 0.0500 OH 75,000.00 3,750.00
Mandor 0.0250 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 132,080.00
O.006 Memasang 1 m² paving block warna segi enam; tebal 6 cm
Bahan
Paving Segi Enam Warna; tebal 6 cm 1.010 m² 69,000.00 69,690.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 78,580.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 132,080.00
O.007 Memasang 1 m² paving block segi empat natural; tebal 6 cm ( K. 175 )
Bahan
Paving Segi Empat natural ; tebal 6 cm 1.010 m² 83,300.00 84,133.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 93,023.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00

229 dari 300


HARGA SAT JUMLAH
NO URAIAN PEKERJAAN KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah (2) 53,500.00
Jumlah (1) + (2) 146,523.00
O.008 Memasang 1 m² paving block segi empat natural; tebal 8 cm ( K. 175 )
Bahan
Paving Segi Empat natural; tebal 8 cm 1.010 m² 95,500.00 96,455.00
Pasir Urug 0.100 m³ 88,900.00 8,890.00
Jumlah (1) 105,345.00
Tenaga
Pekerja 0.250 OH 55,000.00 13,750.00
Tukang Batu 0.500 OH 68,000.00 34,000.00
Kepala Tukang 0.050 OH 75,000.00 3,750.00
Mandor 0.025 OH 80,000.00 2,000.00
Jumlah (2) 53,500.00
Jumlah (1) + (2) 158,845.00
O.009 Memasang 1 m' kansteen beton cetak 10 x 20 x 40 cm
Bahan
Galian Tanah (B.001) 0.0120 m³ 49,737.50 596.85
Spesi 1 PC : 3 PP (E.003) 0.0043 m³ 49,966.51 214.86
Kansteen Beton Cetak 10 x 20 x 40 cm 2.5000 bh 26,100.00 65,250.00
Upah Kerja Pasang Kansteen 1.0000 ls 10,000.00 10,000.00
Jumlah 76,061.71
O.009.a Memasang 1 m' kansteen beton cetak 10 x 20 x 40 cm
A. Bahan
Galian Tanah (B.001) 0.0120 m³ 21,792.50 -
Spesi 1 PC : 3 PP (E.003) 0.0043 m³ 46,376.63 -
Kansteen Beton Cetak 10 x 20 x 40 cm 2.5000 bh 26,100.00 65,250.00
Jumlah harga bahan 65,250.00
B. Tenaga
Upah Kerja Pasang Kansteen 1.0000 ls 10,000.00 10,000.00
Jumlah harga tenaga 10,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 75,250.00
E. Profit 10 % 7,525.00
F. Harga satuan pekerjaan ( D + E ) 82,775.00
O.010 Memasang 1 m' kansteen beton cetak 15 x 30 x 60 cm
Bahan
Galian Tanah (B.001) 0.0120 m³ 49,737.50 596.85
Spesi 1 PC : 3 PP (E.003) 0.0043 m³ 49,966.51 214.86
Kansteen Beton Cetak 15 x 30 x 60 cm 1.6700 bh 41,800.00 69,806.00
Upah Kerja Pasang Kansteen 1.0000 ls 10,000.00 10,000.00
Jumlah 80,617.71
O.010.a Memasang 1 m' kansteen beton cetak 15 x 30 x 60 cm
A. Bahan
Galian Tanah (B.001) 0.0120 m³ 21,792.50 -
Spesi 1 PC : 3 PP (E.003) 0.0043 m³ 46,376.63 -
Kansteen Beton Cetak 15 x 30 x 60 cm 1.6700 bh 41,800.00 69,806.00
Jumlah harga bahan 69,806.00
B. Tenaga
Upah Kerja Pasang Kansteen 1.0000 ls 10,000.00 10,000.00
Jumlah harga tenaga 10,000.00
C. Peralatan -

Jumlah harga peralatan -


D. Jumlah ( A + B + C ) 79,806.00
E. Profit 10 % 7,980.60
F. Harga satuan pekerjaan ( D + E ) 87,786.60

230 dari 300


DAFTAR HARGA SATUAN UPAH
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Tenaga Kerja Harga Satuan ( Rp ) Satuan

1 Pekerja 60,000.00 Orang / Hari / 8 Jam


2 Tukang Gali 75,000.00 Orang / Hari / 8 Jam
3 Tukang Batu 75,000.00 Orang / Hari / 8 Jam
4 Kepala Tukang Batu 84,375.00 Orang / Hari / 8 Jam
5 Tukang Kayu 75,000.00 Orang / Hari / 8 Jam
6 Kepala Tukang Kayu 84,375.00 Orang / Hari / 8 Jam
7 Tukang Besi Profil / Tukang Las 75,000.00 Orang / Hari / 8 Jam
8 Kepala Tukang Besi Profil / Tukang Las 84,375.00 Orang / Hari / 8 Jam
9 Tukang Besi Beton 75,000.00 Orang / Hari / 8 Jam
10 Kepala Tukang Besi Beton 84,375.00 Orang / Hari / 8 Jam
11 Tukang Cat 75,000.00 Orang / Hari / 8 Jam
12 Kepala Tukang Cat 84,375.00 Orang / Hari / 8 Jam
13 Mandor 109,687.50 Orang / Hari / 8 Jam
14 Mekanik 109,687.50 Orang / Hari / 8 Jam
15 Operator 109,687.50 Orang / Hari / 8 Jam
16 Pembantu Operator 60,000.00 Orang / Hari / 8 Jam
17 Supir Truk 84,375.00 Orang / Hari / 8 Jam
18 Kenek Truk 60,000.00 Orang / Hari / 8 Jam
19 Penjaga Malam 75,000.00 Orang / Hari / 8 Jam
DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

JENIS AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADI


1 Pasir urug m3 100,000.00
2 Sirtu m3 135,000.00
3 Pasir Beton m3 172,500.00
4 Pasir Pasang m3 174,100.00
5 Semen Portland Kg 1,450.00
6 Batu Pecah Mesin 2/3 m3 211,100.00
7 Koral Beton 2/3 cm m3 327,300.00
8 Kerikil m3 182,500.00
9 Agregat Kasar m3 185,000.00
10 Aspal kg 9,000.00
11 Batu kali m3 187,500.00
12 bata merah bh 900.00

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA


13 Minyak bekisting Liter 20,000.00
14 Solar Liter 18,500.00
15 Minyak Pelumas Liter 40,000.00
16 Cat tembok eksterior Kg 58,000.00
17 Cat besi setara ICI Kg 70,000.00
18 Cat dasar alkali Kg 13,000.00
19 Rol cat Bh 18,000.00
20 Ampelas Lbr 7,500.00

BAHAN KAYU BERIKUT BAHAN JADINYA


21 Kayu Balok Borneo Super m3 3,200,000.00
22 Kayu Papan Borneo Super m3 3,200,000.00
23 Kayu Balok Terentang m3 2,340,000.00
24 Kayu Papan Terentang m3 2,550,000.00
25 Kayu Dolken dia 8-10 panjang 4 m m3 5,800.00
26 Kayu Meranti Batu 5/7 (ikat) m3 3,664,500.00
27 Plywood 4 mm bh 99,400.00
28 Multipleks 9 mm lbr 131,900.00
29 Multipleks 12 mm lbr 170,100.00
DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

30 Dolken 7 - 10 btg 16,000.00


DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

BAHAN KAYU LAPIS


31 Conwood Lap Siding BG bh 130,000.00

BAHAN LANTAI DAN PELAPIS DINDING


32 Batu andesit 20 x 20 cm m2 125,000.00
33 Batu tempel m2 98,000.00
34 Paving Segi Empat natural/warna; tebal 8 cm m2 120,000.00
35 Guiding Block Type 1 bh 24,000.00
36 Guiding Block Type 2 bh 24,000.00
37 Keramik Motif Batu 40x40 m2 110,000.00

BAHAN SALURAN AIR KOTOR / BERSIH


38 Pipa besi 3'' m' 135,000.00
39 Kran air bh 125,000.00
40 Seal tape bh 7,500.00
41 Pipa PE 5'' m' 160,000.00
42 Pipa PVC 4'' m' 36,000.00

BAHAN LOGAM DAN BAHAN JADINYA


43 Baja Tulangan U 32 Ulir kg 8,400.00
44 Baja Tulangan U 24 Polos kg 8,400.00
45 Baja Tulangan U 39 Ulir kg 8,400.00
46 Kawat Beton kg 20,000.00
47 Seng plat lbr 58,400.00
48 Seng Gelombang BJLS 32 lbr 50,000.00
49 Meni Besi kg 26,500.00
50 Plat Besi kg 14,600.00
51 Kawat Las kg 24,500.00
52 Steel pipe dia 114 mm m' 310,472.50
53 Pipa Stainless Steel m' 454,000.00

BAHAN KACA
54 Jendela naco bh 15,000.00
DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

55 Kaca polos m2 88,900.00


DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

BAHAN PAKU DAN MUR BAUT


56 Paku 4 s/d 7 cm kg 18,000.00
57 Paku 8 s/d 12 cm kg 18,000.00
58 Paku Skrup kg 18,000.00
59 Paku Skrup 12-4x50, 10x16-16 bh 2,000.00
60 Paku biasa kg 13,600.00
61 Besi Strip kg 17,000.00
62 Angkur besi + Baut dia. 19 mm bh 70,000.00
63 Skrup Fixer bh 250.00
64 Mur + Baut dia. 16 mm bh 30,000.00

BAHAN PENUTUP ATAP


65 Genteng CTI Shingles Bitumen Tipe CT3 m2 275,000.00
66 Starter CTI Shingles Bitumen m2 260,000.00
67 Underlayer @ 1 roll = 1 m x 50 m roll 756,000.00
68 Kelengkapan pemasangan bitumen Unit 64,550.00

BAHAN MEKANIKAL ELEKTRIKAL


69 Peralatan Air Mancur Ls 4,200,000.00
70 Pasangan PLN Daya. 4400 VA Ls 6,500,000.00
71 Kabel NYY 3x2.5 mm2 M1 10,000.00
72 Selotip Roll 4,000.00
73 Pipa listrik Btg 2,000.00
74 T-Dus Bh 2,500.00
75 Inbow Dus Bh 25,000.00
76 Saklar seri Legrand Bh 39,000.00
77 Lampu Sorot BE040 bh 225,000.00
78 MCB 20A bh 51,000.00
79 Lampu PJU bh 950,000.00
DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

BAHAN ALAT PENGGANTUNG / KUNCI


80 Kunci tanam bh 78,500.00

BAHAN LAIN-LAIN
81 Beton Ready Mix K-175 m3 800,000.00
82 Beton Ready Mix K-225 m3 875,000.00
83 Beton Ready Mix K-250 m3 1,110,000.00
84 Beton Ready Mix K-275 m3 1,175,000.00
85 Beton Ready Mix K-300 m3 1,210,000.00
86 Beton Ready Mix K-350 m3 1,280,000.00
87 Uditch 40 pcs 605,000.00
88 Uditch 80 pcs 970,000.00
89 Cover Uditch 80 Heavy Duty pcs 800,000.00
90 Pembuatan Buah Durian dari Perunggu bh 325,000,000.00
91 Pembuatan Keong Binga dan Ikan dari Perunggu bh 230,000,000.00
92 Pembuatan Buah Perahu dari Perunggu bh 665,000,000.00
93 Pot Bunga bh 250,000.00
94 Tali Rantai m' 565,000.00
95 Jangkar unit 5,000,000.00
96 Kansteen Beton Cetak bh 39,000.00
97 Sealent m' 7,500.00
98 Waterprofing Ls 3,280,000.00
99 Ornamen Tugu Ls 17,000,000.00
100 Tanaman Top Soil Ls 8,000,000.00
101 Pupuk kandang krg 30,000.00
102 Rumput jepang m2 25,000.00
103 Furadan kg 30,000.00
104 Tanaman Bunga bh 200,000.00
105 Batu Bollard bh 560,000.00
106 Bor Lubang Strauszpaal Ø 60 m' 150,000.00
107 Tiang lampu PJU Custom bh 4,560,000.00
108 Cover Manhole bh 1,800,000.00
109 Tutup Grill bh 475,000.00
DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Satuan ( Rp )

110 Kursi taman bh 950,000.00


111 Lampu taman gantung bh 370,000.00
112 Keranjang sampah bh 650,000.00
113 Parkir sepeda rental bh 550,000.00
114 Aksesoris dan decoratif lampu serta tulisan Tanjung kelayang unit 1,356,000.00
115 Plat Acsesoris m 25,000.00

Upah Pasang
116 Upah kerja Kansteen ls 11,000.00
117 Upah kerja armatur dan instalasi listrik ls 210,000.00
118 Upah Pasang Lampu sorot ls 10,000.00
119 Upah Pasang Sekring MCB ls 200,000.00
120 Upah Cuting Laser Tembaga cm2 520.00
DINAS PEKERJAAN UMUM DAN TATA RUANG
KABUPATEN BREBES

DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN GEDUNG


TAHUN ANGGARAN 2016

NO. URAIAN SATUAN

1 2 3

A. UPAH TENAGA :
1 Pekerja hari
2 Tukang gali hari
3 Mandor Lapangan hari
4 Tukang cat / plitur / batu hari
5 Kepala tukang cat / plitur / batu hari
6 Tukang kayu hari
7 Kepala tukang kayu hari
8 Tukang Besi hari
9 Kepala Tukang besi hari
10 Tukang Besi Profil hari
11 Kepala Tukang Besi Profil hari
12 Tukang las biasa hari
13 Tukang las konstruksi hari
14 Tukang khusus allumunium hari
15 Tukang allumunium / kaca hari
16 Tukang Instalasi hari
17 Mekanik terlatih hari
18 Mekanik Pembantu hari
19 Operator terlatih / masinis hari
20 Operator kurang terlatih hari
21 Pembantu operator / pemb. Masinis hari
22 Sopir Material / Truck hari
23 Sopir personil hari
24 Pembantu Sopir / Kenek hari
25 Buruh lapangan tak terlatih hari
26 Buruh lapangan kurang terlatih hari
27 Buruh lapangan terlatih hari
28 Tukang masak aspal hari
29 Penjaga malam hari
30 Sewa Bekisting jalan m²
31 Sewa Skafolding set/hari
32 Sewa Mesin Gilas, alat tahun ke VII ( 8 - 10 ton ) + bahan bakar hari
33 Sewa Mesin Gilas, alat tahun ke V ( 6 - 8 ton ) + bahan bakar hari
34 Sewa Mesin Gila Tandem Roller 2,5 ton + bahan bakar hari
35 Sewa Mesin Gila Tandem Roller 1,5 ton + bahan bakar hari
36 Sewa Excavator EX 100, EX 200 + bahan bakar Jam
37 Sewa Dump Truck, alat tahun ke V ( 5 ton ) + bahan bakar hari
38 Sewa Mesin Gilas (Walls) + bahan bakar (25) hari bulan
Harga Saruan Bahan dan Upah 2016 239 dari 300
NO. URAIAN SATUAN

1 2 3
39 Sewa Mesin Concrate Pump beton hari
40 Sewa Ponton hari
41 Sewa Vibrator hari

B. BAHAN:
Kelompok Material Alam :
42 Air liter
43 Tanah urug m³
44 Tanah urug Pilihan m³
45 Pasir urug m³
46 Pasir batu (sirtu) m³
47 Pasir pasang m³
48 Pasir pasang Muntilan ( ditempat ) m³
49 Batu blonos m³
50 Batu belah 10/15 m³
51 Batu pecah tangan 5-7 cm m³
52 Batu pecah tangan 3-5 cm m³
53 Batu pecah tangan 3-4 cm m³
54 Batu pecah tangan 2-3 cm (split) m³
55 Batu pecah mesin 2-3 cm m³
56 Batu pecah mesin 3-4 cm m³
57 Batu pecah mesin 1-2 cm m³
58 Batu pecah mesin 0,5-1 cm m³
59 Abu batu m³
60 Batu Tempel Palimanan Hijau m²
61 Batu Tempel Palimanan Kuning m²
62 Batu Tempel (Tidak Beraturan) Kecil m²
63 Batu Tempel (Tidak Beraturan) Besar m²
64 Batu Candi Tempel 20 x 20, 5/20 m²
65 Batu Hitam serit motif diagonal
Ukuran 10 X 20 cm m²
Ukuran 10 X 30 cm m²
Ukuran 15 X 30 cm m²
Ukuran 20 X 40 cm m²
66 Batu Hitam serit lurus
Ukuran 10 X 20 cm m²
Ukuran 10 X 30 cm m²
Ukuran 15 X 30 cm m²
Ukuran 20 X 40 cm m²
67 Batu Hitam serit motif horizontal dan vertikal
Ukuran 10 X 20 cm m²
Ukuran 10 X 30 cm m²
Ukuran 15 X 30 cm m²
Ukuran 20 X 40 cm m²
68 Batu Hitam serit motif horizontal
Ukuran 10 X 20 cm m²
Ukuran 10 X 30 cm m²
Ukuran 15 X 30 cm m²
Ukuran 20 X 40 cm m²
Ukuran 30 X 30 cm m²

Harga Saruan Bahan dan Upah 2016 240 dari 300


NO. URAIAN SATUAN

1 2 3
Ukuran 30 X 60 cm m²
69 Batu Hitam serit motif lurus
Ukuran 15 X 30 cm m²
Ukuran 20 X 40 cm m²
70 Batu Tempel hitam permukaan kasar
Ukuran 10 X 10 cm m²
Ukuran 10 X 20 cm m²
71 Batu tempel hitam tidak beraturan Ø 10 - 30 cm m²
Batu tempel kuning tidak beraturan Ø 10 - 30 cm m²
72 Batu hitam list profil
Ukuran 5 X 7 X 40 cm btg
Ukuran 5 X 7 X 50 cm btg
Ukuran 5 X 5 X 40 cm btg
Ukuran 5 X 5 X 50 cm btg
73 Kerikil sungai (tidak disaring) royalti m³
74 Batu kali besar royalti m³
75 Pasir ( Quary ) m³
76 Batu kali ( Quary ) m³
77 Batu bata buah
78 Batu bata ringan ( Hebel ) m3
79 Batako (conblock) buah
80 Kapur m³

Kelompok Kayu
81 a. Kayu Jati Klas 2 : Balok 8/15 m³
b. Kayu Jati Klas 3 : Balok 8/15 m³
c. Papan kayu jati m³
82 a. Kayu Kamper : Balok 8/15 m³
b. Kayu Kamper : 5/7 & 4/6 m³
c. Kayu Kamper : 3/4 & 3/5 m³
d. Kayu Kamper : 2/3 m³
e. Papan kamper m³
83 a. Kayu Bangkirai : Balok 8/15 m³
b. Kayu Bangkirai : 5/7 & 4/6 (ikat) m³
Kayu Bangkirai : 5/7 & 4/6 (lepas) m³
c. Kayu Bangkirai : 3/4 & 3/5 m³
d. Kayu Bangkirai : 2/3 m³
e. Papan bangkirai ( 2 x 20 x 400 ) m³
f. Papan bangkirai ( 2 x 25 x 400 ) m³
g. Papan bangkirai ( 2 x 30 x 400 ) m³
84 a. Kayu Kruing : Balok 8/15 m³
b. Kayu Kruing : 5/7 & 4/6 m³
c. Kayu Kruing : 3/4 & 3/5 m³
d. Kayu Kruing : 2/3 m³
e. Papan Kruing ( 2 x 20 x 400 ) m³
85 a. Kayu Kalimantan ( Meranti Batu ) : Balok 8/15 m³
b. Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (ikat) m³
Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (lepas) m³
c. Kayu Kalimantan ( Meranti Batu ) : 3/4 & 3/5 m³
d. Kayu Kalimantan ( Meranti Batu ) : 2/3 m³

Harga Saruan Bahan dan Upah 2016 241 dari 300


NO. URAIAN SATUAN

1 2 3
e. Papan Meranti Batu ( 2 x 20 x 400 ) m³
f. Papan Meranti Batu ( 2 x 25 x 400 ) m³

Harga Saruan Bahan dan Upah 2016 242 dari 300


NO. URAIAN SATUAN

1 2 3
86 a. Kayu Kempas : Balok 8/15 m³
b. Kayu Kempas Ukuran 5/7 & 4/6 (ikat) m³
Kayu Kempas Ukuran 5/7 & 4/6 (lepas) m³
c. Kayu Kempas Ukuran 3/4 & 3/5 m³
d. Kayu Kempas Ukuran 2/3 m³
e. Papan Kempas m³
87 a. Kayu Punak : Balok 8/15 m³
b. Kayu Punak Ukuran 5/7 & 4/6 (ikat) m³
Kayu Punak Ukuran 5/7 & 4/6 (lepas) m³
c. Papan Punak m³
88 a. Kayu Glugu : Balok 12/12 ( prapatan ) m'
Kayu Glugu : Balok 12/12 ( prapatan ) m³
b. Kayu Glugu 5/7 & 4/6 ( lepas ) m'
Kayu Glugu 5/7 & 4/6 ( lepas ) m³
89 Kayu Rawa (Pinus) m³
90 Papan Cetak ( kayu pinus ) uk 2 x 20 x 200 m³
91 Kayu lokal sekwalitas Laban / sengon merah m³
92 Kayu tahun m³
93 Kayu bakar m³
94 Kayu stoot btg
95 Alat - alat bantu ( @ 3 alat ) set
96 Kayu untuk perancah ( kayu pinus / rawa ) m3
97 Kayu Struktural ( jati klas 2 ) m3
98 Tripleks tebal 3 mm uk. 120 x 240 cm lbr
99 Tripleks tebal 4 mm uk. 120 x 240 cm lbr
100 Tripleks tebal 6 mm uk. 120 x 240 cm lbr
101 Tripleks tebal 8 mm uk. 120 x 240 cm lbr
102 Tripleks tebal 3 mm uk. 90 x 210 cm (uk. Pintu) lbr
103 Tripleks tebal 4 mm uk. 90 x 210 cm (uk. Pintu) lbr
104 Tripleks melaminto tebal 3 mm uk. 120 x 240 cm putih lbr
105 Teakwood tebal 3 mm uk. 90 x 120 cm lbr
106 Teakwood tebal 4 mm uk. 90 x 210 cm lbr
107 Teakwood tebal 3 mm uk. 120 x240 cm lbr
108 Teakwood tebal 4 mm uk. 120 x240 cm lbr
109 Multipleks 9 mm lbr
110 Multipleks 12 mm lbr
111 Multipleks 15 mm lbr
112 Multipleks 18 mm lbr
113 Hardpleks uk. 0,5 x 2 m lbr
114 Hardpleks 0,35 mm 1,22 x 2,44 m (tahan api) lbr
115 Plywood 3 mm uk. 90 x 220 cm lbr
116 Plywood 4 mm uk. 120 x 240 mm lbr
117 Plywood 9 mm uk. 120 x 240 mm lbr
118 HPL ( HIGH PRESSURE LAMINATED ) GLOSSY / METAL m²
119 HPL ( HIGH PRESSURE LAMINATED ) MOTIF KAYU m²
120 ACP ( ALUMUNIUM COMPOSITE PANEL ) TB. 4 MM m²
121 Formika uk. Pintu lbr
122 Ijuk kg
123 Dolken Ø 5 m'
124 Dolken Ø 8 - 10 m'

Harga Saruan Bahan dan Upah 2016 243 dari 300


NO. URAIAN SATUAN

1 2 3
125 Dolken Ø 12 m'
126 List Kayu Profil m'
127 Bambu Ø 7 - 10 Btg
128 Bambu Ø10 - 12 Btg
129 Gribig bambu polos m2
130 Gribig bambu motif m2

Kelompok Besi / Baja :


131 Paku kg
132 Paku skrup ( utk Gypsum) kg
133 Skrup vixer bh
134 Paku asbes gelombang kg
135 Paku sumbat kg
136 Paku Pancing kg
137 Besi beton/baja tulangan beton kg
138 Kanopi ( Besi Tempa ) m²
139 Kanopi Rangka besi hollow atap galvalume 0,35 mm terpasang m²
140 Folding Gate d : 4 m²
141 Folding Gate d : 5 m²
142 Folding Gate d : 8 m²
143 Folding door tb. 1 cm bahan plastik / PVC m²
144 Rolling Door Aluminium m²
145 Rolling Door Galvalume m²
146 Rolling Door Besi m²
147 Vertical Blind m²
148 Vertical Blind / tirai vertikal ( Polyester/Fiberglass ) m²
149 Profil allumunium m'

Harga Saruan Bahan dan Upah 2016 244 dari 300


NO. URAIAN SATUAN

1 2 3
150 Alumunium plat m²
151 Pintu Stainlessteel terpasang m²
152 Pagar Stainlessteel terpasang m²
153 Pintu Besi Hollow terpasang m²
154 Pagar Besi Hollow terpasang m²
155 Bondex ( plat beton ) kg
156 Besi beton U-24 kg
157 Besi beton U-29 kg
158 Besi Strip ( tebal 5 mm, lebar 5 Cm ) kg
159 Besi Hollow kg
160 Kawat beton (bindrad) kg
161 Baja struktur jembatan rangka kg
162 Wiremesh - M4 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
163 Wiremesh - M5 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
164 Wiremesh - M6 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
165 Wiremesh - M7 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
166 Wiremesh - M8 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
167 Wiremesh - M9 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
168 Wiremesh - M10 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
169 Wiremesh - M12 ukuran = 2.10 x 5.40 m' ( uk. Roll = 2.10 x 50 m' ) Lembar
170 Tiang Pancang Bulat Berongga Mutu Beton K. 600
1 Spun Pile Dia. 30 Kelas A2 Pj. 6 - 12 m m'
Spun Pile Dia. 30 Kelas A3 Pj. 6 - 14 m m'
Spun Pile Dia. 30 Kelas B0 Pj. 6 - 14 m m'
Spun Pile Dia. 30 Kelas C0 Pj. 6 - 14 m m'
2 Spun Pile Dia. 35 Kelas A1 Pj. 6 - 13 m m'
Spun Pile Dia. 35 Kelas A3 Pj. 6 - 14 m m'
Spun Pile Dia. 35 Kelas B0 Pj. 6 - 14 m m'
Spun Pile Dia. 35 Kelas C0 Pj. 6 - 14 m m'
3 Spun Pile Dia. 40 Kelas A2 Pj. 6 - 14 m m'
Spun Pile Dia. 40 Kelas A3 Pj. 6 - 14 m m'
Spun Pile Dia. 40 Kelas B0 Pj. 6 - 14 m m'
Spun Pile Dia. 40 Kelas C0 Pj. 6 - 14 m m'
4 Spun Pile Dia. 45 Kelas A1 Pj. 6 - 14 m m'
Spun Pile Dia. 45 Kelas A2 Pj. 6 - 14 m m'
Spun Pile Dia. 45 Kelas A3 Pj. 6 - 14 m m'
Spun Pile Dia. 45 Kelas B0 Pj. 6 - 14 m m'
Spun Pile Dia. 45 Kelas C0 Pj. 6 - 14 m m'
5 Spun Pile Dia. 50 Kelas A1 Pj. 6 - 14 m m'
Spun Pile Dia. 50 Kelas A2 Pj. 6 - 14 m m'
Spun Pile Dia. 50 Kelas A3 Pj. 6 - 14 m m'
Spun Pile Dia. 50 Kelas B0 Pj. 6 - 14 m m'
Spun Pile Dia. 50 Kelas C0 Pj. 6 - 14 m m'
6 Spun Pile Dia. 60 Kelas A1 Pj. 6 - 14 m m'
Spun Pile Dia. 60 Kelas A2 Pj. 6 - 14 m m'
Spun Pile Dia. 60 Kelas A3 Pj. 6 - 14 m m'
Spun Pile Dia. 60 Kelas B0 Pj. 6 - 14 m m'
Spun Pile Dia. 60 Kelas C0 Pj. 6 - 14 m m'
171 Tiang Pancang Kotak Masif Mutu Beton K. 500
1 Square Pile 25 x 25 Kelas A Pj. 6 - 10 m m'

Harga Saruan Bahan dan Upah 2016 245 dari 300


NO. URAIAN SATUAN

1 2 3
Square Pile 25 x 25 Kelas B Pj. 6 - 11 m m'
2 Square Pile 30 x 30 Kelas A Pj. 6 - 11 m m'
Square Pile 30 x 30 Kelas B Pj. 6 - 12 m m'
3 Square Pile 35 x 35 Kelas A Pj. 6 - 12 m m'
Square Pile 35 x 35 Kelas B Pj. 6 - 12 m m'
4 Square Pile 40 x 40 Kelas A Pj. 6 - 12 m m'
Square Pile 40 x 40 Kelas B Pj. 6 - 12 m m'
5 Square Pile 45 x 45 Kelas A Pj. 6 - 12 m m'
Square Pile 45 x 45 Kelas B Pj. 6 - 12 m m'
6 Square Pile 50 x 50 Kelas A Pj. 6 - 12 m m'
Square Pile 50 x 50 Kelas B Pj. 6 - 12 m m'
172 Tiang Pancang Kotak Berongga Mutu Beton K. 600
1 Spun Square Pile Dia. 40 x 40 Kelas A2 Pj. 6 - 13 m m'
Spun Square Pile Dia. 40 x 40 Kelas A3 Pj. 6 - 14 m m'
Spun Square Pile Dia. 40 x 40 Kelas B0 Pj. 6 - 14 m m'
Spun Square Pile Dia. 40 x 40 Kelas C0 Pj. 6 - 14 m m'
2 Spun Square Pile Dia. 45 x 45 Kelas A1 Pj. 6 - 13 m m'
Spun Square Pile Dia. 45 x 45 Kelas A2 Pj. 6 - 13 m m'
Spun Square Pile Dia. 45 x 45 Kelas A3 Pj. 6 - 14 m m'
Spun Square Pile Dia. 45 x 45 Kelas B0 Pj. 6 - 14 m m'
Spun Square Pile Dia. 45 x 45 Kelas C0 Pj. 6 - 14 m m'
173 Tiang Pancang Segi Tiga Mutu Beton K. 500
1 Triangle Pile 280 Kelas A Pj. 6 - 8 m m'
Triangle Pile 280 Kelas B Pj. 6 - 8 m m'
2 Triangle Pile 320 Kelas A Pj. 6 - 8 m m'
Triangle Pile 320 Kelas B Pj. 6 - 8 m m'
174 Kawat bronjong Ø 4 mm ( Manual ) kg

Harga Saruan Bahan dan Upah 2016 246 dari 300


NO. URAIAN SATUAN

1 2 3
175 Kawat bronjong Ø 3 mm ( Pabrikasi ) unit/m3
176 Kawat bronjong Ø 2,70 mm ( Pabrikasi ) unit/m3
177 Kawat bronjong Ø 2,7 mm ( Pabrikasi ) untuk Air Asin/Payau unit/m3
178 Kawat Las kg
179 Kawat Las Listrik RD 26 kg
180 Kawat Las Listrik RB 26 kg
181 Baja plat kg
182 Baja baud - baud/ baud beugel kg
183 Rangka atap baja ringan type UK 75 terpasang jarak Kuda2 1,00M m2
184 Rangka atap baja ringan type C. 75 dan Z.75 terpasang Jarak Kuda2 1,00M m2
185 Besi kanal C kg
186 Besi siku L kg
187 Besi IWF kg
188 Elastomir buah
189 Kawat kasa / nyamuk m²
190 Kawat galvanis Q 1 mm m'
191 Baut 15 mm bh
192 Kawat Harmonika m²
193 Kawat duri rol
194 Kawat baja kg
195 Shower stainless kualitas baik buah
196 Shower standart buah
197 Kran air standar buah
198 Kran air kualitas baik kuningan buah
199 Pintu almunium kualitas baik unit
200 Pintu Frameless Uk. 210 x 80 cm tbl. 12 mm ( Tempered ) unit
201 Pintu Patchfitting Uk. 210 x 80 cm tbl. 12 mm unit
202 Bak cuci almunium standart unit
203 Kunci tanam 3 X Slog buah
204 Kunci tanam kwalitas baik kuningan buah
205 Kunci Slot buah
206 Kunci Silinder buah
207 Kunci Lemari buah
208 Engsel pintu Nylon buah
209 Engsel pintu kuningan buah
210 Engsel jendela Nylon buah
211 Engsel jendela kuningan buah
212 Kait angin 6" psg
213 Kait angin 8" psg
214 Kait angin 10" psg
215 Hak angin psg
216 Hak angin kuningan psg
217 Spring knip buah
218 Door closer unit
219 Door holder unit
220 Door stop unit
221 Grendel jendela buah
222 Grendel pintu ( pendek ) buah
223 Grendel pintu ( panjang ) buah
224 Tarikan / Pegangan pintu buah

Harga Saruan Bahan dan Upah 2016 247 dari 300


NO. URAIAN SATUAN

1 2 3
225 Tarikan / Pegangan pintu stainlessteel standart buah
226 Tarikan / Pegangan pintu stainlessteel 60 cm buah
227 Rel pintu dorong unit
228 Tangki air fiberglas Isi : 250 ltr unit
229 Tangki air fiberglas Isi : 500 ltr unit
230 Tangki air fiberglas Isi : 700 ltr unit
231 Tangki air fiberglas Isi : 1000 ltr unit
232 Pagar BRC Galvanis 90 x 240 cm lbr
233 Pagar BRC Galvanis 120 x 240 cm lbr
234 Tiang BRC Galvanis panjang 120 cm btg
235 Tiang BRC Galvanis panjang 150 cm btg
236 Pintu PVC biasa/polos (lengkap; kusen + daun) unit
237 Pintu PVC motif (lengkap; kusen + daun) unit
238 Kosen Almunium 4" Coklat m'
239 Kosen Almunium 4" Putih m'
240 Pintu Kaca Rayban Alumunium 4" Putih unit
241 Pintu Kaca Bening Alumunium 4" Putih unit
242 Formite / penjaga jarak bekisting / spacer buah
243 Mur Baut Panjang buah
244 Mur Baut Pendek buah

Kelompok Lantai :
245 Keramik polos kw.1 ukuran 20 x 20 cm (antislip) m²
246 Keramik motif kw.1 ukuran 20 x 20 cm (antislip) m²
247 Keramik motif kw.1 ukuran 25 x 25 cm (antislip) m²
248 Keramik motif kw.1 ukuran 25 x 25 cm (antislip) Ex. Roman m²
249 Keramik Dinding motif kw.1 ukuran 25 x 40 cm m²
250 Keramik Dinding motif kw.1 ukuran 25 x 60 cm m²
251 Keramik polos kw.1 ukuran 30 x 30 cm m²
252 Keramik motif kw.1 ukuran 30 x 30 cm m²
253 Keramik granit kw.1 ukuran 30 x 30 cm m²
254 Keramik motif kw.1 ukuran 30 x 60 cm m²
255 Keramik motif kw.1 ukuran 30 x 60 cm Ex. Roman m²
256 Keramik polos kw.1 ukuran 40 x 40 cm m²
257 Keramik motif kw.1 ukuran 40 x 40 cm m²
258 Keramik granit kw.1 ukuran 40 x 40 cm m²
259 Keramik polos kw.1 ukuran 60 x 60 cm m²
260 Keramik motif kw.1 ukuran 60 x 60 cm m²
261 Keramik granit kw.1 ukuran 60 x 60 cm m²
262 Granite Tile Uk. 60 x 60 cm single loading m²
263 Granite Tile Uk. 60 x 60 cm double loading ex. Platinum m²
264 Keramik interlock m²
265 Granite Alam m²
266 Keramik dinding polos kw.1 ukuran 20 x 25 cm m²
267 Keramik dinding motif kw.1 ukuran 20 x 25 cm m²
268 Keramik dinding granit kw.1 ukuran 20 x 25 cm m²
269 Keramik dinding kw.1 ukuran 30 x 60 cm m²
270 Keramik Artistik 10/20 buah
271 Keramik Artistik 10/30 buah
272 List keramik motif 5 x 20 cm buah

Harga Saruan Bahan dan Upah 2016 248 dari 300


NO. URAIAN SATUAN

1 2 3
273 List keramik motif 5 x 25 cm buah
274 Plint keramik motif 10 x 40 cm buah
275 Plint keramik motif 10 x 60 cm buah
276 Porselen (11 x 11) cm m²
277 Karpet talang m²
278 Karpet meteran standar ( Polipropylene biasa tb. 2 mm ) m²
279 Karpet meteran salur ( Polipropylene salur/gelombang tb. 3 mm ) m²
280 Karpet sajadah ( Polipropylene motif tb. 10 mm ) m²
281 Karpet Tile m²
282 Wallpaper standart ( vynil waterproof ex. lokal/china ) m²
283 Wallpaper timbul ( vynil waterproof motif timbul ex. china ) m²
284 Wallpaper standart ( vynil water ex lokal/china ) m²
285 Stepnosing ( anti slip tangga keramik ) 5 x 40 cm m²
286 Stepnosing ( anti slip tangga keramik ) 8 x 40 cm m²
287 Stepnosing ( anti slip tangga keramik ) 8 x 60 cm m²
288 Paving segi 4 natural tb. 6 cm (Lokal) m²
289 Paving segi 6 natural tb. 6 cm (Lokal) m²
290 Paving segi 4 warna tb. 6 cm m²
291 Paving segi 6 warna tb. 6 cm m²
292 Paving blok natural tb. 6 cm (Magelang) / (K.175) m²
293 Paving blok natural tb. 8 cm (Magelang) / (K.175) m²
294 Paving blok motif (warna) tb. 6 cm (Magelang) / (K.175) m²
295 Paving blok motif (warna) tb. 8 cm (Magelang) / (K.175) m²
296 Kansteen beton cetak 10 x 20 x 50 cm buah
297 Kansteen beton cetak 10 x 20 x 40 cm buah
298 Kansteen beton cetak 15 x 30 x 60 cm buah
299 Roster bata (10x20) buah
300 Roster beton (10x20) buah
301 Roster keramik (20x20) buah
302 Roster kayu Jati (20x20) buah
303 Palu karet buah

Kelompok Atap :
304 Genteng pres lokal buah
305 Genteng Palentong pres Jatiwangi buah
306 Genteng Palentong besar ( Super ) pres Jatiwangi buah
307 Genteng kodok pres jatiwangi buah
308 Genteng beton polos buah
309 Genteng pres morando biasa buah
310 Genteng pres morando glasur buah
311 Genteng metal / multiroof berserabut barpasir m²
312 Genteng metal / multiroof polos m²
313 Genteng keramik ex. KIA m²
314 Kerpus genteng pres lokal buah
315 Kerpus genteng pres Jatiwangi buah
316 Kerpus genteng kodok glazuur buah
317 Kerpus genteng palentong besar buah
318 Kerpus genteng beton polos buah
319 Kerpus genteng morando biasa buah
320 Kerpus genteng pres morando glasur buah

Harga Saruan Bahan dan Upah 2016 249 dari 300


NO. URAIAN SATUAN

1 2 3
321 Kerpus genteng metal polos m'
322 Kerpus genteng metal ( Berpasir ) m'
323 Kerpus genteng keramik buah
324 Atap galvalume / Zincalum 0,30 mm m²
325 Atap Onduline ( 200 x 95 x 0,3 ) cm lbr
326 Nok Onduline ( 90 x 50 x 0,3 ) cm lbr
327 Paku Onduline buah
328 Asbes gelombang besar (200 x 110 x 5,2) lbr
329 Asbes gelombang kecil ( 300 x 105 ) lbr
330 Asbes gelombang kecil ( 270 x 105 ) lbr
331 Asbes gelombang kecil ( 240 x 105 ) lbr
332 Asbes gelombang kecil ( 210 x 105 ) lbr
333 Asbes gelombang kecil ( 200 x 105 ) lbr
334 Asbes gelombang kecil ( 180 x 105 ) lbr
335 Asbes gelombang kecil ( 150 x 105 ) lbr
336 Asbes gelombang kecil ( 180 x 90 ) lbr
337 Kerpus asbes gelombang besar teb. 5 mm lbr
338 Kerpus asbes gelombang kecil teb. 4 mm lbr
339 Seng gelombang (210 x 80 x 0.2 cm) lbr
340 Seng gelombang 3'-6' (90 x 180 x 0.2 cm) lbr
341 Seng Plat BJLS 30 lebar 90 cm ; panjang 180 cm lbr
342 Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm lbr
343 Seng Plat BJLS 30 lebar 30 cm ; panjang 180 cm lbr
344 Eternit m²
345 Kalsibot 4 mm 120 x 240 cm lbr
346 Gypsum board 120 x 240 x 9 mm lbr
347 List Gipsum Profil 15 cm Pj. 2.00 m' m'
348 List Gipsum profil 10 cm Pj. 2.00 m' m'
349 Kompon board ( 1 zak = 20 kg ) kg
350 Lisplang GRC lebar 20 cm panjang 4.00 m m'
351 Lisplang GRC lebar 30 cm panjang 4.00 m m'
352 Partisi GRC 2 muka 240 x 120 ex. Jayaboard+rangka hollow galvanis 3 mm ) m²
353 Partisi kaca 8 mm framed natural ( framed alumunium 4/4 ) m²
354 Partisi kaca 8 mm framed coklat ( framed alumunium 4/4 ) m²
355 Partisi kaca 8 mm framed coated ( framed alum. 4/4 ) fin coating ducco warn m²
356 Partisi multiplek 9 mm 1 muka, artistik 1 ( rangka kayu 4/6 fin decosheet ) m²
357 Partisi multiplek 9 mm 1 muka, artistik 2 ( rangka kayu 4/6 fin HPLboard ) m²
358 Woodplank 0.20 x 4.00 m kg
359 Woodplank 0.30 x 4.00 m kg
360 Fiberglass gelombang uk. 180 x 80 cm lbr
361 Fiberglass gelombang uk. 210 x 80 cm m'
362 Alumunium foil m²

Kelompok Cat / Minyak :


363 Cat Warna ( Kayu ). kg
364 Cat Warna ( besi ). kg
365 Cat dasar ( meni kayu ) kg
366 Cat dasar ( meni besi ) kg
367 Cat jembatan ( besi ) kg
368 Cat genteng ( 1 Klg = 4 kg ) kg

Harga Saruan Bahan dan Upah 2016 250 dari 300


NO. URAIAN SATUAN

1 2 3
369 Cat tembok / cat dasar kg
370 Cat Tembok Luar ( Wheather Shield ) kg
371 Cat Tembok pelapis anti bocor kg
372 Cat brown kg
373 Vernis ltr
374 Plamur Kayu kg
375 Plamur Tembok kg
376 Flincote kg
377 Minyak cat kg
378 Minyak Terpentin kg
379 Minyak Bekisting ( olie bekas ) ltr
380 Politur kg
381 Politur jadi kg
382 Dempul kg
383 Amplas lbr
384 Batu kambang (batu apung) kg
385 Sirlak kg
386 Spirtus ltr
387 Teer kg
388 Aspal bitumen (kemasan ) kg
389 Aspal curah kg
390 Kerosine / minyak aspal ltr
391 Modifieer ltr
392 Ol ie ltr
393 Solar ltr
394 Solar industri ltr
395 Minyak tanah ltr
396 Minyak pelumas ltr
397 Plastik m²
398 Kantung Plastik 60 x 40 x 20 cm bh
399 Karung goni 75 x 110 cm bh
400 Sewa karung goni bh
401 Hydraulic Oil ltr
402 Grease ltr
403 Minyak Transmisi ltr
404 Bensin / premium ltr
405 Stemvet kg
406 Shear Connector ls
407 Oker Putih kg
408 Melamik kg
409 Kuas cat 2" buah
410 Kuas cat 3" buah
411 Kuas cat 4" buah
412 Sikat Baja buah
413 Kapek buah
414 Roll Cat buah
415 Residu / Soligium ltr
416 Soda Api kg
417 Sabun kg
418 Sealant tube

Harga Saruan Bahan dan Upah 2016 251 dari 300


NO. URAIAN SATUAN

1 2 3
419 Lem Kayu kg
420 Lem Kuning kg
421 Wood Filler kg

Kelompok Cement, Kaca dan Lain-lain :


422 Portland Cement ( PC ) 50 kg zak
423 Portland Cement ( PC ) kg
424 Cement warna kg
425 Cement putih kg
426 Beton B0 (ready mix) m³
427 Beton K 100 (ready mix) m³
428 Beton K 125 (ready mix) m³
429 Beton K 150 (ready mix) m³
430 Beton K 175 (ready mix) m³
431 Beton K 200 (ready mix) m³
432 Beton K 225 (ready mix) m³
433 Beton K 250 (ready mix) m³
434 Beton K 275 (ready mix) m³
435 Beton K 300 (ready mix) m³
436 Beton K 325 (ready mix) m³
437 Beton K 350 (ready mix) m³
438 Beton K 375 (ready mix) m³
439 Beton K 400 (ready mix) m³
440 Beton K 425 (ready mix) m³
441 Beton K 450 (ready mix) m³
442 Beton K 475 (ready mix) m³
443 Beton K 500 (ready mix) m³
444 Geotextile woven m²
445 Geotextile non woven m²
446 Karung Goni 75 x 110 cm bh
447 Pagar Beton Precast Bertulang Tinggi 160 cm m'
448 Pagar Beton Precast Bertulang Tinggi 200 cm m'
449 Pagar Beton Precast Bertulang Tinggi 240 cm m'
450 Pagar Beton Precast Bertulang Tinggi 280 cm m'
451 Pagar Beton Precast Bertulang Tinggi 320 cm m'
452 Kawat Duri Tinggi 50 cm+Besi siku 40.40.3 mm ( 4 Lajur ) m'
453 Kawat Duri Tinggi 50 cm+Besi siku 40.40.3 mm ( 5 Lajur ) m'
454 Kawat Duri Tinggi 50 cm+Besi siku 40.40.3 mm ( 6 Lajur ) m'
455 Panel Beton Bertulang Uk. 240x40x5 cm lbr
456 Tiang Beton Bertulang Uk. 225x18x17 cm btg
457 Tiang Beton Bertulang Uk. 280x18x17 cm btg
458 Tiang Beton Bertulang Uk. 320x18x17 cm btg
459 Tiang Beton Bertulang Uk. 370x18x17 cm btg
460 Tiang Beton Bertulang Uk. 425x18x17 cm btg
461 Tiang pancang Ø 30 cm panjang 6.00 - 8.00 m btg
462 Tiang pancang Ø 40 cm panjang 9.00 - 10.00 m btg
463 Tiang pancang Ø 50 cm panjang 12.00 - 14.00 m btg
464 Tiang pancang Ø 60 cm panjang 15.00 - 16.00 m btg
465 Kaca bening tebal 3 mm m²
466 Kaca bening tebal 5 mm m²

Harga Saruan Bahan dan Upah 2016 252 dari 300


NO. URAIAN SATUAN

1 2 3
467 Kaca bening tebal 8 mm m²
468 Kaca bening tebal 10 mm m²
469 Kaca rayban tebal 5 mm m²
470 Kaca buram tebal 5 mm m²
471 Jendelan naco buah
472 Profil kaca m'
473 Glassblock buah
474 Bak Mandi Fiberglass, volume 120 ltrr (sudut) buah
475 Closet Jongkok KIA buah
476 Closet duduk standart - 1 ( monoblock manual ) unit
477 Closet duduk standart - 2 ( Monoblok single flush dimensi bowl) unit
478 Closet duduk costum ( Superior double jet flush dimensi bowl ) unit
479 Closet duduk monoblock buah
480 Kloset duduk / Monoblok " INA ", Putih Buah
481 Kloset duduk / Monoblok " INA ", Warna Tua Buah
482 Kloset duduk / Monoblok + pembilas otomatis " INA " Buah
483 Kloset jongkok INA, warna tua Buah
484 Kloset jongkok INA, warna muda Buah
485 Urinoir Otomatis buah
486 Floordrain (saringan buangan air KM/WC) buah
487 Floordrain Stainless Steel (saringan buangan air KM/WC) buah
488 Floordrain Stainless Steel (+ waste filter) buah
489 Wastafel Kw.1 pedes steel unit
490 Wastafel standart - 1 ( model gantung marble ) unit
491 Wastafel standart - 2 ( model gantung marble panas dingin ) unit
492 Bak Cuci Stainless Steel lengkap Buah
493 Bathtub standart - 1 unit
494 Bathtub standart - 2 unit
495 Bathtub costum unit

Kelompok Gorong - gorong


496 Gorong - gorong diam' 20 cm m'
497 Gorong - gorong diam' U. 20 cm m'
498 Gorong - gorong diam' 30 cm m'
499 Gorong - gorong diam' U. 30 cm m'
500 Gorong - gorong diam' 40 cm m'
501 Gorong - gorong diam' 50 cm m'
502 Gorong - gorong diam' 60 cm m'
503 Gorong - gorong diam' 80 cm ( Pj. 50 cm ) m'
504 Gorong - gorong diam' 90 cm ( Pj. 50 cm ) m'
505 Gorong - gorong diam' 100 cm ( Pj. 50 cm ) m'

KELOMPOK AIR BERSIH


506 Pipa GI SNI
Ukuran ½" m'
Ukuran ¾" m'
Ukuran 1" m'
Ukuran 1½" m'
Ukuran 2" m'
Ukuran 2½" m'

Harga Saruan Bahan dan Upah 2016 253 dari 300


NO. URAIAN SATUAN

1 2 3
Ukuran 3" m'
Ukuran 4" m'

507 Pipa PVC


Ukuran Ø ½" ( AW ) ex Wavin m'
Ukuran Ø ¾" ( AW ) ex Wavin m'
Ukuran Ø 1" ( AW ) ex Wavin m'
Ukuran Ø 1¼" ( AW ) ex Wavin m'
Ukuran Ø 1½" ( AW ) ex Wavin m'
Ukuran Ø 2" ( AW ) ex Wavin m'
Ukuran Ø 2½" ( AW ) ex Wavin m'
Ukuran Ø 3" ( AW ) ex Wavin m'
Ukuran Ø 4" ( AW ) ex Wavin m'
Ukuran Ø 5" ( AW ) ex Wavin m'
Ukuran Ø 6" ( AW ) ex Wavin m'
Ukuran Ø 10" ( AW ) ex Wavin m'
Ukuran Ø 12" ( AW ) ex Wavin m'
508 Pipa PVC ( hitam ) 4" m'
509 Dop PVC ukuran 15 buah
510 Dop PVC ukuran 20 buah
511 Dop PVC ukuran 25 buah
512 Dop PVC ukuran 32 buah
513 Dop PVC ukuran 40 buah
514 Pipa PVC SNI Air Bersih
S 10 Tekanan Nominal 10 BAR ( 1,0 Mpa )
Ukuran Ø ½" m'
Ukuran Ø ¾" m'
Ukuran Ø 1" m'
Ukuran Ø 1 ¼" m'
Ukuran Ø 1 ½" m'
S 12,5 Tekanan Nominal 10 BAR ( 1,0 Mpa )
Ukuran Ø 2" m'
Ukuran Ø 3" m'
Ukuran Ø 4" m'
Ukuran Ø 6" m'
515 Seal Tape / TBA ( isi 1 pak = 50 bh ) pak
516 Seal Tape buah
517 Lem Isarplas tube

KELOMPOK LAMPU - LAMPU


518 Instalasi Titik Lampu unit
519 Lampu Pijar 25 Watt buah
520 Lampu SL 18 Watt ( CFL ) buah
521 Lampu TL 20 Watt ( Lengkap ) buah
522 Lampu TL 20 Watt Double ( Lengkap ) buah
523 Lampu TL 40 Watt ( Lengkap ) buah
524 Lampu TL 40 Watt Double ( Lengkap ) buah
525 Stop Kontak buah
526 Stop Kontak AC buah
527 Sakelar Tunggal buah

Harga Saruan Bahan dan Upah 2016 254 dari 300


NO. URAIAN SATUAN

1 2 3
528 Sakelar Ganda buah
529 Armatur buah
530 Downlight buah
531 Penangkal Petir buah
532 Kabel Penangkal Petir m'
533 Box Panel unit
534 Box Sekering unit
535 MCB 6 - 10 A unit

KELOMPOK LAMPU - LAMPU


Peralatan Jaringan Listrik
536 Fitting Plafon Broco buah
537 Isolasi Besar buah
538 Kabel NYM 2 x 1,5 mm m
539 Kabel NYM 2 x 4 mm m
540 Kabel NYM 3 x 1,5 mm m
541 Kabel NYM 3 x 2,5 mm m
542 Kabel NYY 2 x 1,5 mm m
543 Kabel NYY 2 x 2,5 mm m
544 Kabel NYY 2 x 4 mm m
545 Ignitor SN 58 buah
546 Capasitor 30 UF CP 30 ET 28 buah
547 MCB. 6 A buah
548 MCB. 10 A buah
549 MCB. 40 A buah
550 BOX MCB isi 1 buah
551 Pal Pembantu Type CN1-t.8 M' - t.8,5 M' buah
552 Pal Penambat type t.8 M' buah
553 Kawat BC 16 mm buah
554 Konsol pipa besi o 2" P.6 M' buah
555 Konsol pipa besi o 2" P.3 M' buah
556 Klem pipa besi stripp 5 x 4 mm set
557 Band/mur konsol buah
558 Band/mur clem buah
559 Lampu HPLN 250 watt buah
560 Lampu HPLN 125 watt buah
561 Lampu TLD 36 watt buah
562 Trafo TL 40 watt buah
563 Kabel twested 2 x 10 mm m
564 Kabel twested 2 x 16 mm m
565 Pal pembantu Type CN2-t.8 M' unit
566 (dengan variasi allminium dan beton cor)
567 Pal pembantu Type CN1-t.8 M' unit
568 (dengan variasi allminium dan beton cor)
569 Lampu Son H.220 watt buah
570 Lampu Son T 250 watt buah
571 Lampu Son E 250 watt buah
572 Trafo HPLN 80 watt buah
573 Transformer HPL 250 watt buah
574 Transformer HPL 150 watt buah

Harga Saruan Bahan dan Upah 2016 255 dari 300


NO. URAIAN SATUAN

1 2 3
575 Fotocell 6 Ampere buah
576 Fotocell 10 Ampere buah
577 Fitting Gantung 5 W buah
578 Kaki TL + Tempat stater buah
579 Kabel PVC m
580 Lampu colour 5 watt buah
581 Box Lampu HPIT 400 W buah
582 Armatur TMR.524.2 x 36 W buah
583 Armatur SHR.822 150 W buah
584 Fitting Lampu SON (fitting keramik) gantung buah
585 Fitting Lampu SON (fitting keramik) tempel buah
586 Lampu HPI-T 250W E40.SLV/12 buah
587 Lampu HPI-T PLUS 400W .SLV/12 buah
588 Lampu HPI-T 200W buah
589 Tiang Lampu Poligonal 6 meter Type CN1 buah
590 Tiang Lampu Poligonal 7 meter Type CN1 buah
591 Tiang Lampu Poligonal 8 meter Type CN1 buah
592 Tiang Lampu Poligonal 9 meter Type CN1 buah
593 Tiang Lampu Poligonal 10 meter Type CN1 buah
594 Tiang Lampu Poligonal 11 meter Type CN1 buah
595 Tiang Lampu Poligonal 12 meter Type CN1 buah
596 Tiang Lampu Poligonal 13 meter Type CN1 buah
597 Tiang Lampu Poligonal 6 meter Type CN2 buah
598 Tiang Lampu Poligonal 7 meter Type CN2 buah
599 Tiang Lampu Poligonal 8 meter Type CN2 buah
600 Tiang Lampu Poligonal 9 meter Type CN2 buah
601 Tiang Lampu Poligonal 10 meter Type CN2 buah
602 Tiang Lampu Poligonal 11 meter Type CN2 buah
603 Tiang Lampu Poligonal 12 meter Type CN2 buah
604 Tiang Lampu Poligonal 13 meter Type CN2 buah
605 Pal Pembantu PJU Mini t.6 buah
606 Armature Lampu PJU Mini Essensial E-27 set
607 Konsol pipa besi o 2" P.1,5 M'
608 Konsol pipa besi o 2" P.2 M'
609 Konsol pipa besi o 2" P.3 M'

Lampu Slang
610 Lampu Slang 3 wire warna set
611 Lampu Slang 3 wire multi warna set
612 Lampu Slang LED (one color) set
613 Lampu Slang LED 3 Color set
614 Lampu Slang LED multi Color set
615 Controller buah
616 Klem lampu slang 12 mm buah
617 Contactor 50 A buah
618 Timer lampu dekoratif AC / DC buah
619 Luck nut 5/8 buah
620 Panel Control Star Deltra 7,5 kW x 3 phase - 380/660 volt buah
621 Rel NCB buah
622 Saklar Engkel Broco buah

Harga Saruan Bahan dan Upah 2016 256 dari 300


NO. URAIAN SATUAN

1 2 3
623 Saklar seri Broco buah
624 Stop kontak Broco buah
625 Stop Kontak AC Broco buah
626 Saklar Engkel In Bow buah
627 Stainless stell strap buah
628 Stop Kontak In Bow buah
629 Terminal nol buah
630 Tap Connector 6-25/6-25 buah
631 Tap Connector 6-25/35-70 buah
632 Stater S-10 buah

Armateur
633 SPP186 SON-T-70 220 50Hz GB GR S set
634 SPP186 SON-T150 220 50Hz GB GR S set
635 SPP186 SON-T250 220 50Hz GB GR S set

Lampu Sorot
635 MVF028 1xSON-T/HPI-T 1000W MB set
636 MVF028 1xSON-T/HPI-T 1000W WB set
637 MVP507 1xSON-T 1000W WB set
638 MVP507 1xHPI-T 1000W WB set
639 MVF024 HPI-T/SON-T 1000W WB set
640 MVF024 HPI-T/SON-T 1000W MB set
641 SMF383 1xSON-T 250W SYMMETRIC set
642 SMF383 1xSON-T 400W SYMMETRIC set
643 MMF383 1xHPI-T 250W SYMMETRIC set
644 MMF383 1xHPI-T 400W SYMMETRIC set
645 SMF283 1xSON PLUS 70W SYMMETRIC set
646 SMF283 1xSON PLUS 150W SYMMETRIC set
647 MMF283 1xMHN-TD 70W SYMMETRIC set
648 MMF283 1xMHN-TD 150W SYMMETRIC set
649 SMF383 1xSON-T 400W ASYMMETRIC set
650 SMF383 1xSON-T 250W ASYMMETRIC set
651 MMF383 1xHPI-T 400W ASYMMETRIC set
652 MMF383 1xHPI-T 250W ASYMMETRIC set
653 SMF283 1xSON PLUS 70W ASYMMETRIC set
654 SMF283 1xSON PLUS 150W ASYMMETRIC set
655 MMF283 1xMHN-TD 70W ASYMMETRIC set
656 MMF283 1xMHN-TD 150W ASYMMETRIC set
657 RVP350 SON-T 250W IC 220V 50HZ S SP set
658 RVP350 SON-T 400W IC 220V 50HZ S SP set
659 RVP350 HPI-T 250W IC 220V 50HZ S SP set
660 RVP350 HPI-T 400W IC 220V 50HZ S SP set
661 RVP250 MHN-TD 70W IC 220V 50HZ S SP set
662 RVP250 MHN-TD 150W IC 220V 50HZ S SP set
663 RVP250 SON-T 70W IC 220V 50HZ S SP set
664 RVP250 SON-T 150W IC 220V 50HZ S SP set
665 RVP350 SON-T 250W IC 220V 50HZ A SP set
666 RVP350 SON-T 400W IC 220V 50HZ A SP set
667 RVP350 HPI-T 250W IC 220V 50HZ A SP set

Harga Saruan Bahan dan Upah 2016 257 dari 300


NO. URAIAN SATUAN

1 2 3
668 RVP350 HPI-T 400W IC 220V 50HZ A SP set
669 RVP250 MHN-TD 70W IC 220V 50HZ A SP set
670 RVP250 MHN-TD 150W IC 220V 50HZ A SP set
671 RVP250 SON-T 70W IC 220V 50HZ A SP set
672 RVP250 SON-T 150W IC 220V 50HZ A SP set
673 XGP388 220-240V ac A/AF set
674 XGP388 48VDC A set
675 XGP500 1000-240V ac A (K2) set
676 ZGB388 100-240VAC 50-60HZ/48VDC Control set
677 ZGL388 LIGHT SENSOR set
678 Spot Light Lamp 10 W buah
679 Spot Light Lamp 30 W buah
680 Spot Light Lamp 50 W buah
681 Spot Light Lamp 100 W buah
682 Spot Light Lamp 10 W (RGB) buah
683 Floodlight Lamp 10 W buah
684 Floodlight Lamp 30 W buah
685 Floodlight Lamp 50 W buah
686 Floodlight Lamp 100 W buah
687 Floodlight Lamp 10 W buah
688 Floodlight Lamp 30 W buah
689 Floodlight Lamp 50 W buah
690 Floodlight Lamp 100 W buah

KELOMPOK TANAMAN HIAS, PENGHIJAUAN, PERALATAN KEBERSIHAN DAN PERTAMANAN


691 Bougenvile batang
692 Stockmas batang
693 Nusa Indah batang
694 Aponika batang
695 Taiwan batang
696 Soka biasa batang
697 Soka Jepang batang
698 Cemara udang batang
699 Cemara bangkok batang
700 Cemara Kipas batang
701 Krokot merah batang
702 Rumput Manila batang
703 Rumput Jepang batang
704 Puring batang
705 Pakis kelabang batang
706 Lili paris batang
707 Pangkas rambut batang
708 Tapak dara batang
709 Palm kuning batang
710 Palm merah batang
711 Palem botol batang
712 Stik mas batang
713 Soka kerdil batang
714 Crokot batang
715 Cicas batang

Harga Saruan Bahan dan Upah 2016 258 dari 300


NO. URAIAN SATUAN

1 2 3
716 Agave batang
717 Aantana batang
718 Palem raja =
1,50 meter batang
2,00 meter batang
2,50 meter batang
3,00 meter batang
4,00 meter batang
719 Glodogan biasa
0,75 meter batang
1,00 meter batang
1,50 meter batang
2,00 meter batang

Harga Saruan Bahan dan Upah 2016 259 dari 300


NO. URAIAN SATUAN

1 2 3
720 Glodogan tiang
1,50 meter batang
2,00 meter batang
2,50 meter batang
721 Machoni
1,00 meter batang
1,50 meter batang
2,00 meter batang
2,50 meter batang
722 Genetri
2,00 meter batang
2,50 meter batang
3,00 meter batang
4,00 meter batang
723 Tanjung
1,50 meter batang
2,00 meter batang
2,50 meter batang
724 Angsana
1,50 meter batang
2,00 meter batang
2,50 meter batang
725 Beringin korea batang
726 Palm kipas batang
727 Srigadin batang
728 Samsi pera batang
729 Bahagia batang
730 Siklok batang
731 Pisang kipas batang
732 Mucir batang
733 Walisongo batang
734 Teh-tehan batang
735 Pisang begonia batang
736 Kamboja batang
737 Katus duri batang
738 Melati batang
739 Pilu dendan batang

Kelompok Palm
740 Palem ekor tupai 2,50 meter batang
741 Palem raja 2,00 meter batang
742 Palem waregu 1,00 meter batang
743 Palem kuning 1,00 meter batang
744 Palem putri 2,00 meter batang
745 Palem merah 1,50 meter batang
746 Palem sadeng 2,00 meter batang
747 Palem kurma 1,50 meter batang
748 Kelapa gading 1,50 meter batang
749 Kelapa sawit 1,50 meter batang
750 Palem phoniex 1,00 meter batang

Harga Saruan Bahan dan Upah 2016 260 dari 300


NO. URAIAN SATUAN

1 2 3

Kelompok Pohon Pelindung / Perdu


751 Pohon kupu-kupu ungu 2,00 meter batang
752 Pohon dadap merah 2,00 meter batang
753 Pohon mahoni 2,50 meter batang
754 Ketapang kencana 1,50 meter batang
755 Pohon bintaro 2,50 meter batang
756 Pohon sapu tangan 2,00 meter batang
757 Glodog tiang/pecut 2,00 meter batang
758 Ape buya 2,50 meter batang
759 Biola cantik 2,50 meter batang
760 Matoa 2,50 meter batang
761 Sawo kecik tinggi 2 meter batang
762 Flamboyan Diameter batang 7-8 c m batang
763 Tabibuya diameter batang 10 cm batang
764 Beringin putih Tinggi 3 meter batang
765 pandan bali tingg 2 m cabang batang
766 Flamboyan Tinggi + 1 meter (biji) batang
767 Flamboyan Tinggi + 1,5 meter (stek) batang
768 Trembesi Tinggi 1,5 m batang
769 Akasia tinggi 1,5 m batang
770 Nagasari tinggi 1,5 m batang
771 Pakis Brasil tinggi 1,5 m batang
772 Johar tinggi 1,5 m batang
773 Sapu tangan tinggi 1,5 m batang

Harga Saruan Bahan dan Upah 2016 261 dari 300


NO. URAIAN SATUAN

1 2 3
Kelompok Obat dan Alat Pertamanan
766 Kompos kandang kg
767 Kompos pusri kg
768 NPK kg
769 Pusri kg
770 KCL kg
771 Gunting pangkas kecil buah
772 Prekul buah
773 Pisau mesin potong rumput gendong buah
774 Pisau mesin potong rumput dorong buah
775 Gempok buah
776 Rantai buah
777 Tangga pemangkas pohon pelindung buah
778 Ekrak / serok buah
779 Garok besi buah
780 Kranjang sampah buah
781 Cakar besi buah
782 Pancong buah
783 Skop buah
784 Arit buah
785 Sekrap buah
786 Cungkir besi buah
787 Asahan buah
788 Sapu lidi buah
789 Gerobak sampah buah
790 Becak Sampah buah
791 Kontainer buah
792 Jala Sampah buah
793 Gergaji Mesin buah
794 Pisau Gergaji buah
795 Sepatu BOOT pasang
796 Sarung Tangan pasang
797 Topi buah
798 Masker buah
799 Jas Hujan buah
800 Obat Lalat ltr
801 Herbisida ltr
802 Obat kompos ltr
803 Gunting pangkas besar buah
804 Gunting pangkas sedang buah
805 Mesin potong rumput dorong buah
806 Mesin potong rumput gendong buah
807 Ember plastik / jembung buah
808 Slang plastik biasa buah
809 Slang plastik spiral buah
810 Slang pembuangan buah
811 Gergaji mesin besar buah
812 Gergaji mesin sedang buah
813 Gergaji mesin kecil buah
814 Mesin Diesel " HONDA " 5.5 PK buah

Harga Saruan Bahan dan Upah 2016 262 dari 300


NO. URAIAN SATUAN

1 2 3
815 Cangkul buah

Harga Saruan Bahan dan Upah 2016 263 dari 300


RJAAN GEDUNG

HARGA
BAHAN
( Rp. )
4

55,000
55,000
80,000
68,000
75,000
68,000
75,000
68,000
75,000
68,000
75,000
68,000
80,000
68,000
68,000
68,000
75,000
68,000
100,000
80,000
68,000
68,000
68,000
65,000
55,000
60,000
65,000
65,000
60,000
66,000
6,000
418,000
418,000
334,000
289,000
150,000
418,000
9,867,000
Harga Saruan Bahan dan Upah 2016 264 dari 300
HARGA
BAHAN
( Rp. )
4
4,247,000
360,000
250,000

50
88,900
115,100
88,900
130,800
174,100
175,200
172,000
196,700
225,100
225,100
225,100
367,300
367,300
367,300
364,500
367,300
367,300
157,000
136,100
125,600
130,800
136,100

130,800
130,800
141,300
141,300

130,800
130,800
141,300
141,300

130,800
130,800
141,300
141,300

109,900
120,400
125,600
141,300
157,000

Harga Saruan Bahan dan Upah 2016 265 dari 300


HARGA
BAHAN
( Rp. )
4
157,000

151,800
130,800

68,000
68,000
85,800
73,200

52,300
50,200
47,100
47,100
48,300
48,300
48,300
48,300
900
889,900
4,700
505,100

16,569,700
14,448,600
16,673,400
9,998,900
8,894,200
8,894,200
8,894,200
11,114,900
9,449,100
8,337,200
8,337,200
7,781,300
7,781,300
8,894,200
8,894,200
8,894,200
6,999,700
6,179,900
6,179,900
6,179,900
7,276,600
4,711,500
3,664,500
3,664,500
3,664,500
3,664,500

Harga Saruan Bahan dan Upah 2016 266 dari 300


HARGA
BAHAN
( Rp. )
4
4,771,500
4,771,500

Harga Saruan Bahan dan Upah 2016 267 dari 300


HARGA
BAHAN
( Rp. )
4
6,282,000
5,235,000
5,235,000
5,235,000
5,235,000
6,805,500
6,282,000
5,235,000
5,235,000
6,805,500
31,400
2,181,200
18,900
5,384,500
1,832,200
2,654,700
2,303,400
1,799,000
347,300
12,700
47,100
1,936,900
14,134,500
53,300
64,400
77,000
109,900
41,800
50,200
83,700
71,100
83,700
94,200
99,400
131,900
170,100
202,500
225,100
18,800
50,200
73,200
99,400
157,000
163,500
65,400
299,900
106,000
18,300
3,100
5,800

Harga Saruan Bahan dan Upah 2016 268 dari 300


HARGA
BAHAN
( Rp. )
4
9,400
4,100
18,000
26,100
8,400
14,300

13,600
19,600
310
31,400
13,000
15,100
9,800
1,269,900
541,800
598,800
631,300
721,300
1,200,000
523,500
361,200
337,100
106,700
95,500
60,700

Harga Saruan Bahan dan Upah 2016 269 dari 300


HARGA
BAHAN
( Rp. )
4
68,000
1,884,600
1,256,400
628,200
471,100
165,400
9,800
9,800
17,000
11,500
17,200
30,000
158,200
236,700
331,300
451,300
589,300
764,500
942,900
1,373,000

266,300
281,500
307,200
344,500
337,500
353,900
389,600
428,600
439,200
454,300
505,700
563,000
516,200
543,100
571,100
598,000
689,800
655,200
683,300
724,200
739,400
850,300
858,000
875,000
930,000
1,035,000
1,121,000

290,800

Harga Saruan Bahan dan Upah 2016 270 dari 300


HARGA
BAHAN
( Rp. )
4
323,500
392,400
438,000
523,300
579,300
658,800
739,400
843,300
912,200
1,024,400
1,115,500

584,000
599,200
653,900
717,200
692,600
720,700
749,900
777,900
878,400

196,200
213,700
248,800
266,300
11,500

Harga Saruan Bahan dan Upah 2016 271 dari 300


HARGA
BAHAN
( Rp. )
4
428,400
342,300
586,300
21,400
24,200
25,100
14,600
21,900
234,700
193,800
12,500
12,500
12,500
581,000
15,700
22,500
4,100
31,400
68,000
4,600
418,800
89,900
41,800
146,500
732,900
5,758,500
7,852,500
293,100
78,500
172,700
83,700
43,900
10,600
15,700
20,900
16,200
21,400
7,300
8,800
20,900
24,000
8,300
17,000
780,000
300,000
80,000
9,900
9,900
19,800
41,800

Harga Saruan Bahan dan Upah 2016 272 dari 300


HARGA
BAHAN
( Rp. )
4
157,000
418,800
172,700
837,600
1,047,000
1,256,400
1,675,200
293,100
314,100
26,100
41,800
198,900
366,400
91,000
78,500
1,256,400
1,214,500
1,900
2,000
1,600

55,400
59,600
60,700
104,700
68,000
83,700
53,600
55,400
162,200
120,900
171,100
58,800
66,200
167,500
140,000
146,500
167,500
167,500
246,700
254,800
1,486,600
65,400
71,100
126,600
120,900
4,100
9,000
3,600

Harga Saruan Bahan dan Upah 2016 273 dari 300


HARGA
BAHAN
( Rp. )
4
6,200
10,000
15,000
28,500
15,700
43,900
68,000
78,500
314,100
36,600
115,100
36,600
18,300
20,900
26,100
63,700
63,700
69,000
69,000
83,300
95,500
96,100
108,300
36,600
26,100
41,800
5,200
5,200
41,800
33,600
10,400

1,700
2,400
3,500
2,300
8,500
2,800
4,900
99,400
62,800
14,700
2,300
3,900
5,800
6,100
5,800
4,700
7,400

Harga Saruan Bahan dan Upah 2016 274 dari 300


HARGA
BAHAN
( Rp. )
4
42,400
74,300
26,500
63,700
131,900
88,900
850
90,200
100,800
84,900
74,300
69,000
60,000
63,700
53,000
42,400
47,700
37,100
58,400
50,000
58,400
31,800
49,500
18,800
53,000
66,300
15,900
12,700
5,000
63,700
100,800
180,500
350,400
382,200
445,900
339,800
398,000
71,100
143,300
53,000
74,300
10,000

54,900
54,700
23,000
23,000
57,500
26,100

Harga Saruan Bahan dan Upah 2016 275 dari 300


HARGA
BAHAN
( Rp. )
4
26,100
157,000
37,000
36,600
36,600
11,500
11,500
31,400
15,700
7,800
3,100
62,800
73,800
35,500
3,100
5,200
120,400
10,400
16,000
9,463
7,387
8,824
9,500
33,500
5,650
8,107
9,463
33,500
8,300
1,200
12,500
3,125
41,800
26,100
41,800
7,050
54,500
15,700
10,400
65,400
6,200
9,400
15,700
14,100
5,200
23,000
15,700
21,900
6,400
15,700

Harga Saruan Bahan dan Upah 2016 276 dari 300


HARGA
BAHAN
( Rp. )
4
18,300
35,000
28,700

67,000
1,340
13,600
3,100
950,100
965,800
967,300
986,700
997,200
1,007,700
1,023,400
1,044,300
1,075,000
1,085,000
1,099,300
1,123,600
1,172,600
1,243,300
1,245,900
1,282,500
1,319,200
1,355,800
14,100
31,400
12,500
302,400
378,000
453,600
529,200
604,800
66,300
74,000
90,800
106,400
213,300
270,400
309,100
357,400
410,500
3,141,000
3,978,600
5,758,500
7,014,900
88,900
88,900

Harga Saruan Bahan dan Upah 2016 277 dari 300


HARGA
BAHAN
( Rp. )
4
140,000
200,000
115,100
115,100
15,000
35,500
23,000
209,400
256,500
376,900
994,600
7,119,600
481,600
481,600
513,000
1,308,700
167,500
149,000
1,256,400
14,300
24,600
167,500
628,200
628,200
1,465,800
183,200
1,151,700
2,931,600
21,987,000

73,200
41,800
99,400
52,300
146,500
177,900
209,400
146,500
167,500
209,400

16,700
20,900
26,100
42,900
52,300
65,400

Harga Saruan Bahan dan Upah 2016 278 dari 300


HARGA
BAHAN
( Rp. )
4
85,800
109,900

4,900
6,800
9,300
13,900
16,000
20,500
29,900
40,500
66,700
111,200
157,000
404,100
570,000
11,700
2,600
1,200
1,800
2,700
3,200

4,900
7,500
9,900
14,600
22,500

28,900
60,400
87,700
187,800
16,500
2,600
7,300

175,000
10,000
35,000
97,800
172,700
107,100
213,000
15,600
69,100
15,700

Harga Saruan Bahan dan Upah 2016 279 dari 300


HARGA
BAHAN
( Rp. )
4
18,400
366,400
50,000
77,100
52,000
42,600
65,000
75,000

19,000
11,000
7,000
17,000
13,000
15,000
11,000
15,000
21,000
61,000
61,000
56,000
56,000
79,000
7,600
2,613,000
2,221,000
23,000
685,000
431,000
84,000
3,900
7,700
86,000
39,500
21,000
39,000
6,000
8,700
5,329,000

4,702,000

280,000
175,000
170,000
175,000
236,000
214,000

Harga Saruan Bahan dan Upah 2016 280 dari 300


HARGA
BAHAN
( Rp. )
4
107,000
152,000
3,100
7,200
214,000
718,000
395,000
366,000
934,000
29,000
25,000
237,000
251,000
-
3,330,000
3,853,000
4,375,000
4,898,000
6,138,000
6,791,000
7,444,000
8,098,000
4,114,000
4,636,000
5,159,000
5,681,000
6,857,000
7,510,000
8,163,000
8,816,000
1,592,000
750,000
196,000
239,000
432,000

2,442,000
2,442,000
1,632,000
2,938,000
3,787,000
172,000
8,700
897,000
431,000
86,000
2,920,000
29,000
16,000

Harga Saruan Bahan dan Upah 2016 281 dari 300


HARGA
BAHAN
( Rp. )
4
21,000
17,000
86,000
14,000
416,000
16,000
54,000
12,000
25,000
5,800

1,971,000
2,371,000
2,803,000

16,176,000
16,176,000
18,606,000
38,175,000
21,734,000
21,734,000
3,504,000
4,191,000
3,399,000
3,667,000
3,241,000
3,551,000
2,589,000
2,816,000
4,877,000
4,362,000
4,428,000
4,204,000
3,241,000
3,556,000
3,509,000
3,685,000
1,724,000
1,868,000
1,652,000
1,724,000
1,365,000
1,509,000
1,580,000
1,580,000
1,724,000
1,868,000
1,652,000

Harga Saruan Bahan dan Upah 2016 282 dari 300


HARGA
BAHAN
( Rp. )
4
1,724,000
1,365,000
1,509,000
1,580,000
1,580,000
12,228,000
12,228,000
12,228,000
16,623,000
562,000
179,000
487,000
596,000
2,011,000
358,000
179,000
487,000
596,000
2,154,000
860,000
2,153,000
2,872,000
5,386,000

HAN DAN PERTAMANAN


47,000
17,500
58,000
17,500
17,500
35,000
35,000
243,000
125,000
42,000
17,500
51,000
51,000
35,000
58,000
35,000
47,000
41,000
59,000
198,000
146,000
293,000
23,000
17,500
292,000

Harga Saruan Bahan dan Upah 2016 283 dari 300


HARGA
BAHAN
( Rp. )
4
123,000
29,000

107,000
262,000
385,000
462,000
656,000

58,000
80,000
122,000
1,534,000

Harga Saruan Bahan dan Upah 2016 284 dari 300


HARGA
BAHAN
( Rp. )
4

122,000
154,000
212,000

37,000
42,000
80,000
106,000

80,000
101,000
107,000
119,000

74,000
85,000
159,000

42,000
58,000
106,000
96,000
29,000
29,000
29,000
29,000
48,000
173,000
17,000
29,000
48,000
48,000
67,000
29,000
23,000
46,000

388,000
298,000
45,000
58,000
324,000
518,000
2,397,000
9,716,000
528,000
2,332,000
194,000

Harga Saruan Bahan dan Upah 2016 285 dari 300


HARGA
BAHAN
( Rp. )
4

155,000
117,000
259,000
337,000
168,000
246,000
227,000
583,000
233,000
233,000
194,000
162,000
324,000
1,101,000
777,000
64,000
70,000
42,000
74,000
170,000
53,000
53,000
53,000

Harga Saruan Bahan dan Upah 2016 286 dari 300


HARGA
BAHAN
( Rp. )
4

2,000
3,300
13,500
7,500
10,000
35,000
52,000
178,000
814,000
19,000
10,000
3,994,000
17,000
167,000
16,500
135,000
58,000
65,000
30,000
17,000
133,000
27,000
10,000
2,661,000
4,410,000
31,857,000
796,000
17,100,000
204,000
142,500
62,000
62,000
28,500
68,000
1,354,000
55,000
80,000
170,000
170,000
17,748,000
13,310,000
476,000
31,000
27,000
78,900
19,967,000
15,529,000
13,310,000
8,440,000

Harga Saruan Bahan dan Upah 2016 287 dari 300


HARGA
BAHAN
( Rp. )
4
45,000

Harga Saruan Bahan dan Upah 2016 288 dari 300


DAFTAR HARGA SATUAN BAHAN
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

No. Jenis Material Satuan Harga Sewa/jam ( Rp )

1 Excavator Unit 450,000 /jam


2 Concrete Pump Unit 180,000 /m3
3 Dump Truck Unit 225,000 /jam
4 Hiab Truck Crane Unit 450,000 /jam
5 Light Roller Unit 225,000 /jam
6 Alat Las Unit 65,000 /jam
SCHEDULE KERJA / CURVE S / DIAGRAM BALOK

Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

BOBOT
NO URAIAN KEGIATAN Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bul
(%)
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1

I PEKERJAAN PERSIAPAN
0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Err:509 Err:509
0 0
0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 #REF! #REF! #REF!
0 0 #REF!
0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Bobot (%) #REF! #REF! #REF! #REF! #REF! #DIV/0! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Bobot Komulatif (%) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
/ CURVE S / DIAGRAM BALOK

Bulan 5 Bulan 6 Bulan 7 Bulan 8


2 3 4 1 2 3 4 1 2 3 4 1 2

#REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jakarta, __ Februari 2018
NAMA PT.

NAMA DIREKTUR
Direktur
DAFTAR BARANG IMPOR
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

NO. URAIAN SPESIFIKASI TEKNIK SAT. QUANTITY KETERANGAN

TIDAK ADA

Jakarta, __ Februari 2018


NAMA PT.

NAMA DIREKTUR
Direktur
DAFTAR SUBKONTRAKTOR
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

URAIAN HARGA BERDASARKAN PROSENTASE


NO. KETERANGAN
PEKERJAAN YANG DI SUBKON HARGA PENAWARAN (%)

TIDAK ADA

Jakarta, __ Februari 2018


NAMA PT.

NAMA DIREKTUR
Direktur
SPESIFIKASI TEKNIS
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

DAFTAR
NO. SPESIFIKASI TEKNIS KETERANGAN
BAHAN / MATERIAL

Sesuai Spesifikasi Teknik


dari
RKS Dokumen Lelang

Jakarta, __ Februari 2018


NAMA PT.

NAMA DIREKTUR
Direktur
DAFTAR UJI MUTU
Err:509 Err:509
PEKERJAAN : PENGEMBANGAN KAWASAN BUKIT CINTA, RAWA PENING
LOKASI : KABUPATEN SEMARANG, JAWA TENGAH
THN ANGGARAN : 2018/2019

DAFTAR
NO. SPESIFIKASI TEKNIS KETERANGAN
BAHAN / MATERIAL

Sesuai Spesifikasi Teknik


dari
RKS Dokumen Lelang

Jakarta, __ Februari 2018


NAMA PT.

NAMA DIREKTUR
Direktur
REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
Format dan Perhitungan Tingkat Komponen Dalam Negeri (TKDN) Gabungan Barang dan Jasa
(Berdasarkan Peraturan Menteri Perindutrian RI yang berlaku) *)
PEMBANGUNAN KSPN TANJUNG KELAYANG BANGKA BELITUNG, PROVINSI BANGKA BELITUNG

Nilai Gabungan Barang/Jasa (Rp)


Uraian Pekerjaan Total
DN LN
Ribu (Rp) % KDN
(1) (2) (3) (4) (5)

Barang
I. Material Langsung (Bahan baku) - - - #DIV/0!
II. Peralatan (Barang jadi) - - - #DIV/0!
A. Sub Total Barang - - - #DIV/0!
Jasa
III. Manajemen Proyek dan Perekayasaan - - - #DIV/0!
IV. Alat Kerja / Fasilitas Kerja - - - #DIV/0!
V. Konstruksi dan Fabrikasi - - - #DIV/0!
VI. Jasa Umum - - - #DIV/0!
B. Sub Total Jasa - - - #DIV/0!
C. TOTAL Biaya (A + B) - -

Formulasi perhitungan
Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3B)
% TKDN (Gabungan Barang dan Jasa) =
% TKDN (Gabungan Barang dan Jasa) =
Nilai Gabungan Barang dan Jasa (6C)

Nilai Jasa Total (5C) - Nilai Jasa Luar Negeri (5B)


=
Nilai Gabungan Barang dan Jasa (6C)
Jakarta, __ Februari
NAMA PT.

NAMA DIREKT
Direktur
GKAT KOMPONEN DALAM NEGERI (TKDN)
Dalam Negeri (TKDN) Gabungan Barang dan Jasa
eri Perindutrian RI yang berlaku) *)
BANGKA BELITUNG, PROVINSI BANGKA BELITUNG

Nilai Gabungan Barang/Jasa (Rp) TKDN

Total Barang /
Jasa Gabungan
% KDN
(5) (6) (7)

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0!
Jakarta, __ Februari 2018