DAFTAR HARGA SATUAN UPAH PEKERJA

KOTA BEKASI
PROVINSI JAWA BARAT

NO. JENIS PEKERJA SATUAN HARGA(Rp.)


1 Pekerja Orang/Hari 126,000
2 Pekerja Tak Terlatih Orang/Hari 116,000
3 Tukang Orang/Hari 165,000
4 Kepala Tukang Orang/Hari 210,000
5 Mandor Orang/Hari 173,000
6 Operator Orang/Hari 187,000
7 Pembantu Operator Orang/Hari 136,000
8 Sopir/DRIVER Orang/Hari 165,000
9 Pembantu Sopir/Driver Orang/Hari 127,000
10 Mekanik Orang/Hari 187,000
11 Pembantu Mekanik Orang/Hari 136,000
DAFTAR HARGA SATUAN BAHAN BANGUNAN
KOTA BEKASI
PROVINSI JAWA BARAT

NO. JENIS BAHAN SAT HARGA(Rp.)


1 Pasir Pasang m3 312,839
2 Pasir Beton(Kasar) m3 314.959
3 asir Halus (untuk HRS) m3 330,884
4 Pasir Urug (ada unsur lempung) m3 216,846
5 Pasir Urug m3 318,040
6 Batu Kali m3 313,249
7 Batu Bata bh 900
8 Batu Belah/Kerakal m3 323,701
9 Gravel m3 -
10 Sirtu m3 214,264
11 Bahan Tanah Timbunan m3 54,673
12 Bahan Pilihan m3 85,687
13 Batu Kapur m3 258,150
14 Batu Bara m3 -
15 Agregat Kasar m3 417,430
16 Agregat Halus m3 417,430
17 Agregat Pecah Mesin 0-5 mm m3 417,430
18 Agregat Pecah Mesin 5-10 & 10-20 mm m3 417,430
19 Agregat Pecah Mesin 20-30 mm m3 417,430
20 Filler kg 992
21 Bahan Agr.Base Kelas A m3 462,060
22 Bahan Agr.Base Kelas B m3 348,836
23 Bahan Agr.Base Kelas C m3 285,574
24 Bahan Agr.Base Kelas C m3 -
25 Chipping m3 417,430
26 Chipping(kg) m3 221
27 Semen/PC(50kg) zak 56,083
28 Semen/PC(kg) kg 2,065
29 Semen Berwarna kg 14,320
30 Besi Beto kg 12,256
31 Kawat Beton kg 16,283
32 Kawat Bronjong kg 14,280
33 Paku kg 17,296
34 Baja Tulangan (Rata-rata) kg 8,744
35 Baja Tulangan Polos (Rata-rata) kg 8,585
36 Baja Tulangan Ø8(Polos) kg 8,528
37 Baja Tulangan Ø10(Polos) kg 8,306
38 Baja Tulangan Ø12(Polos) kg 8,012
39 Baja Tulangan Ø16(Polos) kg 8,245
40 Baja Tulangan Ø19(Polos) kg 8,890
41 Baja Tulangan Ø22(Polos) kg 9,023
42 Baja Tulangan Ø25(Polos) kg 9,019
43 Baja Tulangan Ulir (Rata-rata) kg 8,903
44 Baja Tulangan Ø10(Ulir) kg 8,127
45 Baja Tulangan Ø13(Ulir) kg 9,015
46 Baja Tulangan Ø16(Ulir) kg 9,008
47 Baja Tulangan Ø19(Ulir) kg 8,793
48 Baja Tulangan Ø22(Ulir) kg 9,262
49 Baja Tulangan Ø 25(Ulir) kg 9,216
50 Kawat Las dos 108,462
51 Pipa Baja kg 21,933
52 Baja Struktur kg 23,255
53 Baja Bergelombang kg 15,299
54 Seng Gelombang 0,3 mmx 80 cm x 210 cm lbr 51,974
55 Kayu Perancah m3 3,234,128
56 Cerucuk Dolken Ø8-10 cm btg 20,652
57 Cerucuk Dolken Ø10-15 cm btg 36,863
58 Cerucuk Bambu Ø8-10 cm btg 25,470
59 Multipleks uk.122x242x12 mm lbr 167,732
60 Multipleks uk. 122x242x9 mm lbr 116,966
61 Triplek lbr 59,890
62 Kayu Acuan m3 3,467,823
63 Beton Ready Mix BO m3 672,480
64 Beton Ready Mix K-125(fc'10,375 mpa) m3 707,072
65 Beton Ready Mix K-175 (fc'14,53 mpa) m3 741,071
66 Beton Ready Mix K-225(fc'18,68 mpa) m3 766,447
67 Beton Ready Mix K-300(fc'24,90 mpa) m3 813,688
68 Beton Ready Mix K-350 (fc'29,05 mpa) m3 846,215
69 Beton Ready Mix K-350(fc'29,05 mpa) Fast Track (≤ 24 jam) m3 1,871,587
70 Beton Ready Mix K-350(fc'29,05 mpa) Fast Track(1-3 hari) m3 1,484.362
71 Beton Ready Mix K-350(fc'29,05 mpa)Fast Track(4-7 hari) m3 1,262,353
72 Beton Ready Mix K-400 (fc'33,20 mpa) m3 885,067
73 Beton Ready Mix K-500(fc'41,50 mpa m3 958,820
74 Aspal kg 19,619
75 Aspal Dingin (Cold Mix Asphalt) kg 11,358
76 Asbuton Halus ton 5,881,104
77 Asphalt Trade Base(ATB) ton 1,293,460
78 Laston(Asphalt Concrete) ton 1,443.110
79 Hot Roll Sheet(HRS) ton 1,370,353
80 Sand Sheet ton 1,559,690
81 Kerosen/Minyak Tanah Itr 10,560
82 Bensin Itr 7,650
83 Solar Itr 9,600
84 Minyak Pelumas/Olie Itr 53,695
85 Minyak Fluks Itr 19619
86 Pipa Galvanis Dia 3" m' 55,428
87 Pipa Galvanis Dia 1" m' 19,077
88 Pipa Galvanis Dia 1,5 m' 28,241
89 Pipa Galvanis Dia 2" m' 35,351
90 Pipa Galvanis Dia.1.6" btg 171,927
91 Pipa Porus m' 56,793
92 Pipa Beton Precast tdk Bertulang Ø 30 cm,125 cm bh 217,547
93 Pipa Beton Precast tdk Bertulang Ø40 cm,125 cm bh 294,722
94 Pipa Beton Precast tdk Bertulang Ø50 cm,125 cm bh 482,536
95 Pipa Beton Precast tdk Bertulang Ø60 cm,250 cm bh 1,205,070
96 Pipa Beton Precast tdk Bertulang Ø80 cm,250 cm bh 1,890,918
97 Pipa Beton Precast tdk Bertulang Ø 90 cm,250 cm bh 2,553,414
98 Pipa Beton Precast tdk Bertulang Ø100 cm,250 cm bh 3,028,686
99 Pipa Beton Precast tdk Bertulang Ø120 cm,250 cm bh -
100 Pipa Beton Precast tdk Bertulang Ø150 cm,250 cm bh -
101 Pipa Beton Precast Bertulang Ø30 cm,250 cm bh 523,757
102 Pipa Beton Precast Bertulang Ø 40 cm,250 cm bh 731,353
103 Pipa Beton Precast Bertulang Ø50 cm,250 cm bh 1,105,593
104 Pipa Beton Precast Bertulang Ø60 cm,250 cm bh 1,470,173
105 Pipa Beton Precast Bertulang Ø 70 cm,250 cm bh 1,657,817
106 Pipa Beton Precast Bertulang Ø80 cm,250 cm bh 2,294,461
107 Pipa Beton Precast Bertulang Ø90 cm,250 cm bh 2,534,450
108 Pipa Beton Precast Bertulang Ø100 cm,250 cm bh 3,230,470
109 Pipa Beton Precast Bertulang Ø120 cm,250 cm bh 5,069,623
110 Pipa Beton Precast Bertulang Ø130 cm,250 cm bh 6,063,643
111 Pipa Beton Precast Bertulang Ø150 cm,250 cm bh 6,967,237
112 Cat kg 16,526
113 Assetilline botol -
114 Oxygen botol -
115 Bahan pengawet:kreosot ltr -
116 Joint Sealent kg 63,862
117 Cat Marka(Non Thermoplas) kg 68,409
118 Cat Marka (Thermoplastic) kg 69,199
119 Plastik Filter m2 25,778
120 Geotextile m2 41,847
121 Thinner ltr 25,190
122 Glass Bead kg 25,815
123 Pelat Rambu(Eng.Grade) bh 351,084
124 Pelat Rambu (High I. Grade) bh 279,094
125 Rel Pengaman m' 574,317
126 Gebalan Rumpu m2 14,618
127 Mata Kucing bh 124,537
128 Kansteen 15.25.40 bh 34,075
129 Kansteen 13.20.40 bh 23,749
130 Kansteen 13.20.40 bh 36,141
131 Kansteen 20.25.60 bh 64,021
132 Kansteen 30.25.60 bh 96,031
133 Kansteen 40.30.15(Type S) bh 39,238
134 Paving Block 8.10.20 (Press Hydraulix/Press Mesin) m2 144,564
135 Paving Block 6.10.20(Press Hydraulix/Press Mesin) m2 129,075
136 Matras Concrete bh 493,329
137 Marmer bh 149,727
138 Keramik Berwarna 30x30 m2 46,762
139 Karung bh 2,693
140 Plastic Sheet m2 4,978
141 Concrete Treated Base(CTB) m3 722,820
142 Gorong2 Buis Beton,Ø30 cm;P=100 cm m' 103,260
143 Gorong2 Buis Beton,Ø40 cm;P=100cm m' 129,075
144 Gorong2 Buis Beton,Ø50 cm;P=100 cm m' 196,194
145 Gorong Buis Beton,Ø60 cm;P=100 cm m' 263,313
146 Gorong2 Buis Beton (1/2),ØU 30 cm;P=100 cm m' 72,282
147 Gorong2 Buis Beton(1/2),ØU 40 cm;P=100 cm m' 87,771
148 Gorong2 Buis Beton (1/2),ØU 50 cm;P=100 cm m' 134,238
149 Gorong2 Buis Beton(1/2),ØU 60 cm;P=100 cm m' 180,705
150 Kawat Bronjong Pabrikasi 0,5x1x2m bh 335,595
151 Casing bh 63,862
152 Box Culvert BC 400 x 400 HD bh 948,131
153 Box Culvert BC 500x 500 HD bh 1,334,035
154 Box Culvert BC 600 x 600 HD bh 1,680,231
155 Box Culvert BC 800 x 800 HD bh 2,620,959
156 Box Culvert BC 1000x1000 HD bh 3,508,862
157 Box Culvert BC 1200 x 1200 HD bh 4,707,127
158 Box Culvert BC 1400x 1400 HD bh 5,804.464
159 Box Culvert BC 1500x1500 HD bh 7,352.962
160 Box Culvert BC 1600 x 1600 HD bh 7,803,217
161 Box Culvert BC 1800 x 1800 HD bh 7,997.590
162 Box Culvert BC 2000x 2000 HD bh 11,138.595
163 Box Culvert BC 3000x 3000 HD bh 31,607,886
164 Box Culvert BC 4000x 3000 HD bh 38,823.69
165 Box Culvert BC 4000x3500 HD bh 50,755.387
166 Box Culvert BC 4000x 4000 HD bh 56,183,766
167 Saluran Terbuka Tipe U-Ditch 300/300;P=120 cm bh 317,384
168 Saluran Terbuka Tipe U-Ditch 400/400;P=120 cm bh 475,189
169 Saluran Terbuka Tipe U-Ditch 500/500;P=120cm bh 655,252
170 Saluran Terbuka Tipe U-Ditch 600/600;P=120cm bh 842,619
171 Saluran Terbuka Tipe U-Ditch 800/800;P=120cm bh 1,196,310
172 Saluran Terbuka Tipe U-Ditch 800/1000;P=120 cm bh 1,411,857
173 Saluran Terbuka Tipe U-Ditch 800/1200:P=120 cm bh 1,654,328
174 Saluran Terbuka Tipe U-Ditch 1000/1000;P=120 cm bh 1,862,417
175 Saluran Terbuka Tipe U-Ditch 1200/1200;P=120 cm bh 2,649,715
176 Saluran Terbuka Tipe U-Ditch 1400/1400;P=120 cm bh 3,829,524
177 Saluran Terbuka Tipe U-Ditch 1500/1500:P=120 cm bh 4,338,343
178 Saluran Terbuka Tipe U-Ditch 1600/1600;P=120 cm bh 5,043,190
179 Saluran Terbuka Tipe U-Ditch 1800/1800;P=120 cm bh 5,529,108
180 Saluran Terbuka Tipe U-Ditch 2000/2000;P=120 cm bh 8,279,489
181 Tutup U-Ditch 300/600(Light Duty) bh 97,482
182 Tutup U-Ditch 400/600(Light Duty) bh 132,036
183 Tutup U-Ditch 500/600(Light Duty) bh 177,736
184 Tutup U-Ditch 600/600(Light Duty) bh 219,094
185 Tutup U-Ditch 800/600(Light Duty) bh 283,243
186 Tutup U-Ditch 1000/600(Light Duty) bh 363,657
187 Tutup U-Ditch 1200/600(Light Duty) bh 476,665
188 Tutup U-Ditch 1400/600(Light Duty) bh 597,100
189 Tutup U-Ditch 1600/600(Light Duty) bh 794,482
190 Tutup U-Ditch 300/600(Heavy Duty) bh 130,880
191 Tutup U-Ditch 400/600(Heavy Duty) bh 171,430
192 Tutup U-Ditch 400/600(Heavy Duty) bh 237,753
193 Tutup U-Ditch 600/600(Heavy Duty) bh 289,452
194 Tutup U-Ditch 800/600(Heavy Duty) bh 421,033
195 Tutup U-Ditch 1000/600(Heavy Duty) bh 552,706
196 Tutup U-Ditch 1200/600(Heavy Duty) bh 673,557
197 Tutup U-Ditch 1400/600(Heavy Duty) bh 819,756
198 Tutup U-Ditch 1600/600(Heavy Duty) bh 1,108.444
199 Tutup Manhole BesiØ60;t=1,5cm;w=62kg bh 755,346
200 Tutup Manhole Besi Ø90;t=1,5cm;w=97 kg bh 786,841
201 Sheet Pile Corrugated Type W-325-A-1000 P:8-13,K-700 m' 667,575
202 Sheet Pile Corrugated Type W-325-B-1000 P:8-14,K-700 m' 697,521
203 Sheet Pile Corrugated Type W-350-A-1000 P:9-15,K-700 m' 755,346
204 Sheet Pile Corrugated Type W-350-B-1000 P:10-15,K-700 m' 786,841
205 Sheet Pile Corrugated Type W-400-A-1000 P:10-16,K-700 m' 928,302
206 Sheet Pile Corrugated Type W-400-B-1000 P:11-16,K-700 m' 867,900
207 Sheet Pile Corrugated Type W-450-A-1000 P:11-17,K-700 m 951,540
208 Sheet Pile Corrugated Type W-450-B-1000 P:12-17,K-700 m' 1,003,687
209 Flat Sheet Pile 50x 32,K-500 m' 824,014
210 Flat Sheet Pile 50x 22,K-500 m 566,897
211 Vinyl Sheet Pile Type GW-270/5,5 P:6 m'(Trapezoid) m' -
212 Vinyl Sheet Pile Type GW-270/5,5 P:12 m'(Trapezoid) m'
213 Vinyl Sheet Pile Type GW-537/5,5 P:6m' m'
214 Vinyl Sheet Pile Type GW-537/5,5P:12m' m' -
215 Vinyl Sheet Pile Type GW-53775,5 P:12m' m' -
216 Vinyl Sheet Pile Type GW-300/5,5 P:6m' m' -
217 Vinyl Sheet Pile Type GW-300/5,5 P:12m' m' -
218 Vinyl Sheet Pile Type GW-460/5,5 P:6m' m' -
219 Vinyl Sheet Pile Type GW-460/5,5 P:12m' m' -
220 Vinyl Sheet Pile Type D-Hex P:6m' m'
221 Vinyl Sheet Pile Type D-Hex P:12 m' m'
222 Tiang Pancang Type A2-300-6 s/d 8,Segmen Bottom m' 317,874
223 Tiang Pancang Type A2-300-6 s/d 8,Segmen Bottom Pencil m' 276,110
224 Tiang Pancang Type A2-300-6 s/d 8,Segmen Middle m' 299,312
225 Tiang Pancang Type A2-400-6 s/d 8,Segmen Bottom m' 527,912
226 Tiang Pancang Type A2-400-6 s/d 8,Segmen Bottom Pencil m' 449,024
227 Tiang Pancang Type A2-400-6 s/d 8,Segmen Middle m' 502,389
228 Pipa PVC D. 1,5" m' 12,156
229 Pipa PVC D.3" m' 24,160
230 Pipa PVC D.6" m' 79,263
231 Baja Anyaman kg 20,652
232 Fitting & Support/Reducer bh 11,358
233 Non Shrinkage Mortar kg 2,099
234 Epoxy Premarking Itr 42,648
235 Epoxy Adhesive Itr 152,252
236 Bearing Pad Elastomer bh 1,128,747
237 Expansion Joint Type Asphaltic Plug m' 1,238,632
238 Girder Type I,21,60 m H=125cm bh 121,800,000
239 Girder Type 1,47,80mH=230 cm bh 503,000,000
240 Plat Lantai(Floordeck), tebal 0,65 mm m2 95,120
241 Plat Lantai(Floordeck),tebal 0,75 mm m2 103,917
242 Plat Lantai (Floordeck,tebal 1,00 mm m2 156,611
243 Wiremesh M8 lbr 567,109
244 Wiremesh M10 lbr 884,097
245 Sewa Jembatan Bailey(Bentang 12 m;Lebar 5 m) bulan 410,314,000
246 Sewa Container 20 Ft bulan 2,581,500
247 Sewa Container 40 Ft bulan 3,097,800
248 Tali ljuk m' 3,573
249 Voided Slab L 8,6;H=0,6;K-500(termasuk Strand) bh 41,000.000
250 Voided Slab L 12,6;H=0,62;K-500(termasuk Strand) bh 58,000,000
251 oided Slab L 15,6;H=0,74;K-600(termasuk Strand) bh 85,400,000
252 Voided Slab L 18,6;H=0,74;K-600 (termasuk Strand) bh 104,000,000

DAFTAR HARGA SATUAN SEWA ALAT BERAT


KOTA BEKASI
PROVINSI JAWA BARAT

NO. JENIS PERALATAN SAT HARGA(Rp.)


1 ASPHALT MIXING PLANT 294,0 60,0 T/Jam Jam 6,598,021
2 ASPHALT FINISHER 72,4 10,0 Ton Jam 661,374
3 ASPHALT SPRAYER 4,0 850,0 Liter Jam 70,081
4 BULLDOZER 100-150 HP 155,0 Jam 545,398
5 COMPRESSOR 4000-6500 LIM 60,0 5.000,0 CPM/(L/m) Jam 221,524
6 CONCRETE MIXER 0.3-0.6 M3 20,0 500,0 Liter Jam 174,675
7 CRANE 10-15 TON 138,0 15,0 Ton Jam 522,301
8 DUMP TRUCK 3.5 TO 100,0 3,5 Ton Jam 323,934
9 DUMP TRUCK 10 TON 135,0 10,0 Ton Jam 427,435
10 EXCAVATOR 80-140 HP 133,0 0,9 M3 Jam 535,316
11 FLAT BED TRUCK 3-4 M3 190,0 5,0 ton Jam 564,922
12 GENERATOR SET 180,0 135,0 KVA Jam 548,126
13 MOTOR GRADER>100 HP 135,0 10.800,0 Jam 488,363
14 TRACK LOADER 75-100 HP 70,0 0,8 M3 Jam 306,331
15 WHEEL LOADER 1.0-1.6 M3 96,0 1,5 M3 Jam 377,785
16 THREE WHEEL ROLLER 6-8 T 55,0 8,0 Ton Jam 239,762
17 TANDEM ROLLER 6-8 T 82,0 8,1 Ton Jam 406,380
18 TIRE ROLLER 8-10 T 100,5 9,0 Ton Jam 434,998
19 VIBRATORY ROLLER 5-8 T 82,0 7,1 Ton Jam 354,120
20 CONCRETE VIBRATOR 5,5 25,0 Jam 65,312
21 STONE CRUSHER 220,0 50,0 T/Jam Jam 785,607
22 WATER PUMP 70-100 mm 6,0 Jam 63,452
23 WATER TANKER 3000-4500 L. 100,0 4.000,0 Liter Jam 322,004
24 PEDESTRIAN ROLLER 8,8 835,0 Ton Jam 99,902
25 TAMPER 4,7 121,0 Ton Jam 65,690
26 JACK HAMMER 1.330,0 Jam 57,729
27 FULVI MIXER 345,0 2.005,0 Jam 1,396,679
28 CONCRETE PUMP 100,0 8,0 M3 Jam 315,155
29 TRAILER 20 TON 175,0 20,0 Ton Jam 580,918
30 PILE DRIVER+HAMMER (2,5 Ton) 25,0 2,5 Ton Jam 235,115
31 PILE DRIVER+HAMMER (15 Ton) 150,0 15,0 Ton Jam 696,333
32 CRANE ON TRACK 35 TON 125,0 35,0 Ton Jam 480,818
33 WELDING SET 40,0 250,0 Amp Jam 153,332
34 BORE PILE MACHINE 150,0 3,0 Meter Jam 758,055
35 ASPHALT LIQUID MIXER 5,0 1.000,0 Liter Jam 61,344
36 TRONTON 150,0 15,0 Ton Jam 598,770
37 COLD MILLING 248,0 1.000,0 m Jam 1,340,152
38 ROCK DRILL BREAKER 3,0 Jam 204,735
39 COLD RECYCLER 900,0 2,2 M Jam 4,861,592
40 HOT RECYCLER 400,0 3,0 M Jam 5,117,088
41 AGGREGAT(CHIP) SPREADER 115,0 3,5 M Jam 473,345
42 ASPHALT DISTRIBUTOR 115,0 4.000,0 Liter Jam 398,345
43 SLIP FORM PAVE 105,02,5M Jam 487,634
44 CONCRETE BREAKER 290,0 20,0 m3/jam Jam 862,679
45 ASPHALT TANKER 190,0 4.000,0 liter Jam 573,408
46 CEMENT TANKER 190,0 4.000,0 liter Jam 535,008
47 CONCRETE MIXER (350) 20,0 350,0 liter Jam 100,785
48 VIBRATING RAMMER 4,2 80,0 KG Jam 61,776
49 TRUK MIXER(AGITATOR)220,0 5,0 M3 Jam 645,724
50 BORE PILE MACHINE 125,0 60,0 CM Jam 474,220
51 CRANE ON TRACK 75-100 TON Jam 622,019
52 BLENDING EQUIPMENT 50,0 30,0 Ton Jam 176,937
53 ASPHALT LIQUID MIXER 40,0 20.000,0 Liter Jam 138,018
54 TRUCK PICK UP 1,0 Ton Jam 111,821
55 CONCRETE CUTTER 5,5 25,0 Ton Jam 61,880
56 MINI BORE PILE MACHINE 5,5 25,0 Ton Jam 103,557
57 CRANE 100-150 TON Jam 992,132
58 LINE MARKER TRUCK Jam 360,123
59 FLAT BED TRUCK W/ CRANE 4 TON Jam 264,428
60 TRAVELLER BEAM SET Jam 965,074
61 HYDRAULIC JACK 150 TON Jam 274,529
62 SINGLE CAGE ELEVATOR(HOIST) Jam 205,547
63 LAUNCHING GIRDER Jam 15,714,530
64 BACK HOE Jam 215,354

DAFTAR HARGA SATUAN BANGUNAN GEDUNG NEGARA


KOTA BEKASI
PROVINSI JAWA BARAT
NO. JENIS BANGUNAN SATUAN HARGA(Rp.)
1 Gedung Negara Sederhana m 4,260,000
2 Gedung Negara Tidak Sederhana m 5,620,000
3 Rumah Negara Tipe A m 5,590,000
4 Rumah Negara Tipe B m 5,370,000
5 Rumah Negara Tipe C m 4,230,000
6 Pagar Gedung Negara Depan,T:1,5m m 2,540,000
7 Pagar Gedung Negara Belakang,T:3m m 2,200,000
8 Pagar Gedung Negara Samping,T:2m m 2,100,000
9 Pagar Rumah Negara Depan,T:1,5m m 2,320,000
10 Pagar Rumah Negara Belakang, T:2,5m m 1,390,000
11 Pagar Rumah Negara Samping,T:2m m 1,310,000