Anda di halaman 1dari 41

DAFTAR HARGA BAHAN

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

HARGA SATUAN
NO URAIAN SAT. ( Rp )

I. BAHAN DASAR
1 Abu Batu M3 230,600
2 Batu Bata 3 x 11 x 22 (20) Bh 1,000
3 Batu kali pecah M3 128,500
4 Batu Blonos M3 108,500
5 Batu pecah dg mesin (0,5-<1 cm) (Screening) M3 230,600
6 Batu pecah dg mesin (1-2cm) M3 230,600
7 Batu pecah dg mesin (2-3 cm) M3 230,600
8 Batu pecah dg mesin (3-5 cm) M3 237,800
9 Batu pecah dg tangan (5-7 cm) M3 143,000
10 Batu pecah dg mesin (2/3 cm) per kg Kg 200
11 Filler Kg 1,700
12 Kerikil Sungai M3 52,750
13 Pasir M3 107,100
14 Pasir (Harga pasir per kg) Kg 77
15 Pasir Urug M3 82,100
16 PC Semen Abu - abu ( 50 Kg ) Kg 1,700
17 PC Semen Warna ( 40 Kg ) Kg 2,000
18 Sirtu M3 79,100
19 Tanah Urug M3 77,100
-
II. PENUTUP ATAP -
1 Asbes Gelombang (3,00x1,05)x4 mm (gelombang kecil) Lbr 79,600
2 Asbes Gelombang (2,70x1,05)x4 mm (gelombang kecil) Lbr 70,000
3 Asbes Gelombang (2,40x1,05)x4 mm (gelombang kecil) Lbr 65,000
4 Asbes Gelombang (2,10x1,05)x4 mm (gelombang kecil) Lbr 57,000
5 Asbes Gelombang (1,50x1,05)x4 mm (gelombang kecil) Lbr 42,000
6 Asbes Gelombang (2,40x1,08)x6 mm (gelombang kecil) Lbr 44,000
7 Asbes Gelombang (2,10x1,08)x6 mm (gelombang kecil) Lbr 39,000
8 Asbes Gelombang (1,80x1,08)x6 mm (gelombang kecil) Lbr 33,000
9 Asbes Gelombang (2,40x0,8)x3,5 mm (gelombang kecil) Lbr 44,600
10 Asbes Gelombang (2,10x0,8)x3,5 mm (gelombang kecil) Lbr 39,650
11 Asbes Gelombang (1,80x0,8)x3,5 mm (gelombang kecil) Lbr 33,300
12 Bubungan Asbes gelombang besar m' 45,000
13 Bubungan Asbes gelombang kecil m' 26,300
14 Bubungan Genteng keramik "KIA" Bh 8,000
15 Bubungan Genteng Morando Bh 8,640
16 Bubungan genteng pres jtw isi 4/m2 Bh 4,860
17 Bubungan genteng pres kebumen Bh 4,860
Hal. 1
HARGA SATUAN
NO URAIAN SAT. ( Rp )

18 Bubungan genteng kodok Bh 4,400


19 Genteng Keramik Glazur KIA isi 15/m2 warna muda Bh 8,000
20 Genteng Keramik Glazur KIA isi 14/m2 warna tua Bh 8,500

Hal. 2
HARGA SATUAN
NO URAIAN SAT. ( Rp )

21 Genteng Morando Glazur isi 20/m2 1550x20 Bh 3,800


22 Genteng Pres Jatiwangi isi 25/m2 750x25 Bh 2,200
23 Genteng Pres Kebumen Bh 2,600
24 Genteng Morando Natural isi 20/m2 oven 950x20 Bh 2,800
25 Genteng plentong Bh 2,000
14 Genteng plentong super Bh 2,500
25 Genteng kodok Bh 2,500
26 Genteng asbes Lbr 30,000
27 Glass Block Bh 20,000
28 Seng BJLS 20, uk 90 cm M' 29,450
29 Seng BJLS 30, Uk. 180 cm M' 56,650
20 Seng BJLS 20, Uk. 180 cm Lbr 39,550
29 Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 24 M' 39,500
30 Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28 Lbr 41,500
31 Seng Plat BJLS 20 M2 41,200
32 Seng Plat BJLS 30 M3 60,000
-
III. BAHAN KAYU -
1 Bambu Btg 12,800
2 Kayu Bakar M3 136,000
3 Kayu bengkirai 6/14 cm M3 10,597,000
4 Kayu Bengkir 5/7 cm M3 10,000,000
5 Kayu Bengkir 8/12 cm M3 10,454,000
6 Kayu Bengkir 4/6 cm M3 10,494,100
7 Kayu Bengkir 3/20 cm M3 10,926,000
8 Kayu Bengkir 10/20 cm M3 11,000,000
9 Kayu Papan bengkirai 2x20x400 M3 11,204,100
10 Kayu Papan jati M3 11,196,500
11 Kayu Jati 8/20 cm (perum) M3 10,951,400
12 Kayu Jati 3/20 cm (perum) M3 10,951,400
13 Kayu Jati 6/14 cm (perum) M3 10,951,400
14 Kayu Jati 5/7 cm (perum) M3 10,951,400
15 Kayu Jati 2/3 cm (perum) M3 10,951,400
16 Kayu Jati 8/20 cm (rakyat) M3 7,000,000
17 Kayu Jati 3/20 cm (rakyat) M3 7,000,000
18 Kayu Jati 6/14 cm (rakyat) M3 6,125,000
19 Kayu Jati 5/7 cm (rakyat) M3 6,500,000
20 Kayu Jati 2/3 cm (rakyat) M3 6,000,000
21 Kayu Papan kempas M3 6,653,000
22 Kayu Kempas 8/12 M3 6,492,350
23 Kayu Kempas 3/20 M3 6,088,900
24 Kayu Kempas 5/7 M3 4,847,725
25 Kayu Kempas 4/6 M3 4,847,725
26 Kayu Kempas 3/5 M3 5,335,000
27 Kayu Kempas 2/3 M3 4,847,725
28 Kayu Meranti 5/7 M3 3,878,200
29 Kayu Meranti 4/6 M3 3,878,200
Hal. 3
HARGA SATUAN
NO URAIAN SAT. ( Rp )

30 Kayu Meranti 3/5 M3 3,878,200


31 Kayu Meranti 2/3 M3 3,878,200
32 Kayu Papan kruing M3 7,313,000

Hal. 4
HARGA SATUAN
NO URAIAN SAT. ( Rp )

33 Kayu Kruing 8/12 M3 6,241,000


34 Kayu Kruing 3/20 M3 4,900,000
35 Kayu Kruing 5/7 M3 4,769,000
36 Kayu Kruing 4/6 M3 4,639,000
37 Kayu Kruing 3/5 M3 5,335,000
38 Kayu Kruing 2/3 M3 4,460,000
39 Kayu Papan Cetak Pinus M3 2,302,000
40 Kayu Stoot ( bambu ) 5 mtr Btg 12,800
41 Kayu Lokal 5/7 M3 2,560,000
42 Kayu Lokal 4/6 M3 3,185,000
43 Kayu Lokal 2/3 M3 2,060,000
44 Kayu Lokal Papan M3 903,750
45 Dolken kayu lokal M3 1,702,600
46 Dolken Kayu 8-10/400 cm Btg 18,300
-
IV. BAHAN PENUTUP DINDING / LANTAI -
1 Batu segi 6 tebal 10 cm abu - abu kecil M2 47,475
Batu segi 6 tebal 10 cm abu - abu sedang M2 52,750
Batu segi 6 tebal 10 cm abu - abu besar M2 79,125
2 Batu Tempel Sukabumi hijau M2 100,225
3 Batu Tempel Palimanan kuning M2 89,675
4 Batu Tempel ( Tidak Beraturan ) kecil M2 263,750
5 Batu Tempel ( Tidak Beraturan ) besar M2 126,600
6 Batu Candi 20/20, 5/20 M2 79,125
7 Batu Susun sirih Andesit (Jabar) 3x30x1,3 cm M2 100,225
8 Batu Susun sirih Templek M2 263,750
9 Batu Andesit (Candi Jawa Barat) 15x30cm Bakar M2 116,050
10 Batu Andesit (Candi Jawa Barat) 15x30cm Mesin M2 116,050
11 Batu Candi 20/40 M2 84,400
12 Batu Candi 15/30 M2 79,125
13 Granito Uk. 60 x 60 cm M2 120,000
14 Keramik 20/25, putih M2 57,498
15 Keramik 20/25, warna M2 57,339
16 Keramik 20/20, anti slip ( u/.lantai Km/wc) M2 59,265
17 Keramik 20/20, warna M2 63,696
18 Keramik 10/20, warna M2 60,926
19 Keramik 30/30 (putih polos) M2 50,110
20 Keramik 30/30, warna M2 50,640
21 Keramik 40/40, (putih polos) M2 52,750
22 Keramik 40/40, warna M2 59,080
23 Keramik 40/40, Anti Slip M3 64,800
24 Keramik Uk. 10 x 30 cm Plint Bh 12,200
25 Keramik Uk. 10 x 40 cm Plint Bh 15,200
26 Keramik Anti Slip 30x30 M2 70,600
27 Keramik lis Uk. 7 x 20 Bh 6,800
28 Keramik lis Uk. 13 x 40 Bh 14,100
29 Keramik kuku macan M' 8,000
Hal. 5
HARGA SATUAN
NO URAIAN SAT. ( Rp )

Hal. 6
HARGA SATUAN
NO URAIAN SAT. ( Rp )

V. BAHAN CETAK -
1 Buis Beton 1/2 dia 20 cm m' 59,800
2 Buis Beton Ø 20 cm m' 59,800
3 Buis Beton Ø 30 cm m' 81,500
4 Buis Beton Ø 40 cm m' 108,700
5 Buis Beton Ø 50 cm m' 130,400
6 Buis Beton Ø 60 cm m' 163,000
7 Buis Beton Ø 80 cm m' 163,000
8 Paving Block tebal 6 cm abu - abu K175 M2 61,025
9 Paving Block tebal 6 cm warna K175 M2 71,575
10 Paving Block tebal 8 cm abu - abu K175 M2 81,550
11 Paving Block tebal 8 cm warna K175 M2 95,800
12 Paving Block tebal 6 cm abu - abu lokal M2 55,200
13 Paving Block tebal 6 cm warna lokal M2 58,400
14 Rooster bata Bh 18,000
15 Kansteen beton 10.20.50 Bh 17,700
16 Kansteen beton 8.10.25.50 Bh 24,000
17 Kansteen beton 8.15.30.50 Bh 27,200
18 Kansteen beton 8.15.30.50 Bh 31,400
19 Kansteen beton taman Bh 28,200
Bh -
VI. BAHAN BESI DAN ALUMINIUM -
1 Besi Beton polos Kg 10,100
2 Besi Beton ulir Kg 10,100
3 Besi Profil IWF Kg 12,000
4 Besi Profil Siku / U Kg 10,000
5 Besi Profil kanal CNP Kg 12,000
6 Besi Strip ( tebal 5mm, lebar 5 cm ) Kg 10,000
7 Besi plat bordes T = 2,3 mm (1,2 m' x 2,4 m') lbr 1,066,800
8 Besi plat bordes T = 3 mm (1,2 m' x 2,4 m') lbr 1,506,100
9 Besi plat bordes T = 5 mm (1,2 m' x 2,4 m') lbr 1,945,400
10 Besi plat bordes T = 6 mm (1,2 m' x 2,4 m') lbr 2,384,600
11 Besi Hollow 2x 4 cm, tbl. 2mm Pjg 6 m m' 9,300
12 Besi Hollow 2x 4 cm, tbl. 2mm Pjg 6 m Kg 12,900
13 Besi Hollow 3 x 3 cm, tbl. 2mm Pjg 6 m m' 9,300
14 Besi Hollow 3 x 3 cm, tbl. 2mm Pjg 6 m Kg 17,300
15 Kawat Beton Kg 20,000
16 Kawat Bronjong d4mm galvanis Kg 18,000
17 Kusen Aluminium uk. 4" M' 82,100
18 Plat alumunium 0,6 mm M2 80,960
19 Plat alumunium ( Aluminium Sheet ) 0,3 mm M2 6,300
-
VII. BAHAN PIPA DAN PIPA AIR BERSIH -
1 Knee Galvanis 1/2" Bh 5,000
2 Knee Galvanis 3/4" Bh 7,700
3 Knee Galvanis 1" Bh 12,200
4 Knee Galvanis 11/2" Bh 23,300
Hal. 7
HARGA SATUAN
NO URAIAN SAT. ( Rp )

5 Knee Galvanis 2" Bh 41,100


6 Knee Galvanis 2 1/2" Bh 62,700
7 Knee Galvanis 3" Bh 90,700

Hal. 8
HARGA SATUAN
NO URAIAN SAT. ( Rp )

8 Knee Galvanis 4" Bh 166,800


9 Overstock Galvanis 1" x 3/4" Bh 10,200
10 Knee PVC ø 1/2" Bh 3,000
11 Knee PVC ø 3/4" Bh 3,200
12 Knee PVC ø 1" Bh 4,300
13 Knee PVC ø 1 1/2" Bh 5,150
14 Knee PVC ø 2" Bh 5,300
15 Knee PVC ø 2 1/2" Bh 6,300
16 Knee PVC ø 3" ( AW ) Bh 9,785
17 Knee PVC ø 4" ( AW ) Bh 17,200
18 Knee pipa pVC (hitam) Ø 4" Bh 12,950
19 Pipa PVC ø 1/2" M' 10,700
20 Pipa PVC ø 3/4" M' 12,800
21 Pipa PVC ø 1" M' 17,300
22 Pipa PVC ø 1 1/2" M' 23,300
22 Pipa PVC ø 2" M' 21,000
23 Pipa PVC ø 2 1/2" M' 28,100
24 Pipa PVC ø 3" ( AW ) M' 40,700
25 Pipa PVC ø 4" ( AW ) M' 64,300
26 Pipa PVC ( hitam ) 4" M' 16,900
27 Klem PVC Ø 3/4" AW Bh 3,100
28 Pipa Galvanis 1/2" M' 30,600
29 Pipa Galvanis 3/4" M' 42,800
30 Pipa Galvanis 1" M' 55,100
31 Pipa Galvanis 11/2" M' 67,400
32 Pipa Galvanis 2" M' 79,600
33 Pipa Galvanis 2 1/2" M' 120,200
34 Pipa Galvanis 3" M' 203,200
35 Pipa Galvanis 4" M' 283,450
36 Pipa : Runcing dia 3/4" Bh 226,000
37 Pipa : BC dia 50 mm2 Bh 73,000
38 Pipa : Klem BC dia 50 mm2 Bh 9,800
39 Pipa : Sepatu Kabel dia 50 mm2 Bh 10,350
40 Seal tape Bh 3,050
PIPA AIR BERSIH -
A. PIPA PVC ( S - 12,5 ) -
1 Pipa uPVC Ø 1" ( S - 12,5 ) M' 9,700
2 Pipa uPVC Ø 1 1/2" ( S - 12,5 ) M' 19,650
3 Pipa uPVC Ø 2" ( S - 12,5 ) M' 29,000
4 Pipa uPVC Ø 3" ( S - 12,5 ) M' 60,550
5 Pipa uPVC Ø 4" ( S - 12,5 ) M' 88,850
6 Pipa uPVC Ø 6" ( S - 12,5 ) M' 190,000
7 Pipa uPVC Ø 8" ( S - 12,5 ) M' 296,800
8 Pipa uPVC Ø 10" ( S - 12,5 ) M' 468,200
B. PIPA POLYETYLINE ( PE - PN. 10 - SDR 17 ) -
1 Pipa PE Ø 1" M' 9,300
2 Pipa PE Ø 1 1/4" M' 13,950
Hal. 9
HARGA SATUAN
NO URAIAN SAT. ( Rp )

3 Pipa PE Ø 1 1/2" M' 22,100


4 Pipa PE Ø 2" M' 33,850
5 Pipa PE Ø 2 1/2" M' 53,900

Hal. 10
HARGA SATUAN
NO URAIAN SAT. ( Rp )

6 Pipa PE Ø 3" M' 75,600


7 Pipa PE Ø 4" M' 161,500
8 Pipa PE Ø 5" M' 207,600
9 Pipa PE Ø 6" M' 207,600
10 Pipa PE Ø 8" M' 299,000
11 Pipa PE Ø 9" M' 531,300
12 Pipa PE Ø 10" M' 822,950
C. PIPA MEDIUM GALVANIZED -
1 Pipa Medium Galvanized Ø 1/2 " M' 44,700
2 Pipa Medium Galvanized Ø 3/4 " M' 56,350
3 Pipa Medium Galvanized Ø 1 " M' 93,200
4 Pipa Medium Galvanized Ø 1 1/2 " M' 132,000
5 Pipa Medium Galvanized Ø 2 " M' 183,000
6 Pipa Medium Galvanized Ø 3 " M' 307,900
7 Pipa Medium Galvanized Ø 4 " M' 467,700
8 Pipa Medium Galvanized Ø 6 " M' 678,000
9 Pipa Medium Galvanized Ø 8 " M' 1,032,000
D. ACCESSORIES PIPA -
1 Fitting PVC DN 63 x 63 mm Bh 159,300
2 Fitting PVC DN 90 x 90 mm Bh 251,000
3 Fitting PVC DN 90 x 63 mm Bh 223,100
4 Fitting PVC DN 110 x 110 mm Bh 418,350
5 Fitting PVC DN 110 x 90 mm Bh 378,200
6 Fitting PVC DN 110 x 63 mm Bh 339,100
7 Fitting PVC DN 160 x 160 mm Bh 772,700
8 Fitting PVC DN 160 x 110 mm Bh 670,450
9 Fitting PVC DN 160 x 90 mm Bh 605,000
10 Fitting PVC DN 160 x 63 mm Bh 520,600
11 Fitting PVC DN 200 x 200 mm Bh 1,783,000
12 Fitting PVC DN 200 x 160 mm Bh 1,601,200
13 Fitting PVC DN 200 x 110 mm Bh 1,326,600
14 Fitting PVC DN 200 x 90 mm Bh 1,377,100
15 Fitting PVC DN 250 x 250 mm Bh 1,245,200
16 PVC Reducer Socket RR Joint uk. DN 90 x 63 mm Bh 61,100
17 PVC Reducer Socket RR Joint uk. DN 110 x 90 mm Bh 86,000
18 PVC Reducer Socket RR Joint uk. DN 110 x 63 mm Bh 87,200
19 PVC Reducer Socket RR Joint uk. DN 160 x 110 mm Bh 167,300
20 PVC Reducer Socket RR Joint uk. DN 200 x 160 mm Bh 268,900
21 PVC Reducer Socket RR Joint uk. DN 250 x 200 mm Bh 527,900
22 Long Bend All Socket RR Joint 90º DN. 63 mm Bh 37,300
23 Long Bend All Socket RR Joint 90º DN. 75 mm Bh 50,200
24 Long Bend All Socket RR Joint 90º DN. 90 mm Bh 73,500
25 Long Bend All Socket RR Joint 90º DN. 110 mm Bh 138,200
26 Long Bend All Socket RR Joint 90º DN. 140 mm Bh 213,800
27 Long Bend All Socket RR Joint 90º DN. 160 mm Bh 320,200
28 Long Bend All Socket RR Joint 90º DN. 200 mm Bh 650,900
29 Long Bend All Socket RR Joint 90º DN. 250 mm Bh 1,182,400
Hal. 11
HARGA SATUAN
NO URAIAN SAT. ( Rp )

30 Long Bend All Socket RR Joint 45º DN. 63 mm Bh 38,200


31 Long Bend All Socket RR Joint 45º DN. 75 mm Bh 42,500
32 Long Bend All Socket RR Joint 45º DN. 90 mm Bh 64,200

Hal. 12
HARGA SATUAN
NO URAIAN SAT. ( Rp )

33 Long Bend All Socket RR Joint 45º DN. 110 mm Bh 102,900


34 Long Bend All Socket RR Joint 45º DN. 140 mm Bh 169,750
35 Long Bend All Socket RR Joint 45º DN. 160 mm Bh 276,900
36 Long Bend All Socket RR Joint 45º DN. 200 mm Bh 459,100
37 Long Bend All Socket RR Joint 45º DN. 250 mm Bh 851,500
38 Long Bend All Socket RR Joint 22,5º DN. 63 mm Bh 28,600
39 Long Bend All Socket RR Joint 22,5º DN. 75 mm Bh 37,300
40 Long Bend All Socket RR Joint 22,5º DN. 90 mm Bh 55,500
41 Long Bend All Socket RR Joint 22,5º DN. 110 mm Bh 87,500
42 Long Bend All Socket RR Joint 22,5º DN. 140 mm Bh 140,500
43 Long Bend All Socket RR Joint 22,5º DN. 160 mm Bh 235,600
44 Long Bend All Socket RR Joint 22,5º DN. 200 mm Bh 391,500
45 Long Bend All Socket RR Joint 22,5º DN. 250 mm Bh 686,000
46 Flanges Socket RR Joint DN. 63 mm Bh 113,100
47 Flanges Socket RR Joint DN. 90 mm Bh 156,100
48 Flanges Socket RR Joint DN. 110 mm Bh 195,200
49 Flanges Socket RR Joint DN. 160 mm Bh 329,100
50 Flanges Socket RR Joint DN. 200 mm Bh 516,100
51 Flanges Socket RR Joint DN. 250 mm Bh 803,100
52 CI Gte Valve Flanged Flat Body "AFT" Ø 40 mm Bh 989,500
53 CI Gte Valve Flanged Flat Body "AFT" Ø 50 mm Bh 1,095,800
54 CI Gte Valve Flanged Flat Body "AFT" Ø 80 mm Bh 1,593,900
55 CI Gte Valve Flanged Flat Body "AFT" Ø 100 mm Bh 2,125,200
56 CI Gte Valve Flanged Flat Body "AFT" Ø 150 mm Bh 3,453,450
57 CI Gte Valve Flanged Flat Body "AFT" Ø 200 mm Bh 5,512,200
58 CI Gte Valve Flanged Flat Body "AFT" Ø 250 mm Bh 8,301,500
59 Giboult Joint Cast Iron PN. 10 uk. 50 mm Bh 237,000
60 Giboult Joint Cast Iron PN. 10 uk. 80 mm Bh 285,500
61 Giboult Joint Cast Iron PN. 10 uk. 100 mm Bh 342,600
62 Giboult Joint Cast Iron PN. 10 uk. 150 mm Bh 541,900
63 Giboult Joint Cast Iron PN. 10 uk. 200 mm Bh 670,700
64 Giboult Joint Cast Iron PN. 10 uk. 250 mm Bh 890,900
65 Tangki air (Hidran Umum) uk. 1000 ltr Bh 3,187,800
66 Tangki air (Hidran Umum) uk. 2000 ltr Bh 6,508,425
67 Tangki air (Hidran Umum) uk. 3000Cast Iron ( CI ) Bh 7,438,200
68 All Flange Tee uk. 50 x 50 mm Cast Iron ( CI ) Bh 317,500
69 All Flange Tee uk. 75 x 75 mm Cast Iron ( CI ) Bh 454,700
70 All Flange Tee uk. 100 x 50 mm Cast Iron ( CI ) Bh 526,900
71 All Flange Tee uk. 100 x 75 mm Cast Iron ( CI ) Bh 541,300
72 All Flange Tee uk. 100 x 100 mm Cast Iron ( CI ) Bh 577,500
73 All Flange Tee uk. 150 x 50 mm Cast Iron ( CI ) Bh 815,600
74 All Flange Tee uk. 150 x 75 mm Cast Iron ( CI ) Bh 830,100
75 All Flange Tee uk. 150 x 100 mm Cast Iron ( CI ) Bh 858,900
76 All Flange Tee uk. 150 x 150 mm Cast Iron ( CI ) Bh 945,700
77 All Flange Tee uk. 200 x 75 mm Cast Iron ( CI ) Bh 1,219,900
78 All Flange Tee uk. 200 x 100 mm Cast Iron ( CI ) Bh 1,248,800
79 All Flange Tee uk. 200 x 150 mm Cast Iron ( CI ) Bh 1,321,000
Hal. 13
HARGA SATUAN
NO URAIAN SAT. ( Rp )

80 All Flange Tee uk. 200 x 200 mm Cast Iron ( CI ) Bh 1,443,800


81 All Flange Bend 90º uk. 50 mm Cast Iron ( CI ) Bh 216,500
82 All Flange Bend 90º uk. 75 mm Cast Iron ( CI ) Bh 317,500

Hal. 14
HARGA SATUAN
NO URAIAN SAT. ( Rp )

83 All Flange Bend 90º uk. 100 mm Cast Iron ( CI ) Bh 404,000


84 All Flange Bend 90º uk. 150 mm Cast Iron ( CI ) Bh 721,900
85 All Flange Bend 90º uk. 200 mm Cast Iron ( CI ) Bh 996,100
86 All Flange Bend 90º uk. 250 mm Cast Iron ( CI ) Bh 1,443,800
87 All Flange Bend 45º uk. 50 mm Cast Iron ( CI ) Bh 223,800
88 All Flange Bend 45º uk. 75 mm Cast Iron ( CI ) Bh 332,000
89 All Flange Bend 45º uk. 100 mm Cast Iron ( CI ) Bh 404,100
90 All Flange Bend 45º uk. 150 mm Cast Iron ( CI ) Bh 692,900
91 All Flange Bend 45º uk. 200 mm Cast Iron ( CI ) Bh 1,025,000
92 All Flange Bend 45º uk. 250 mm Bh 1,530,100
93 All Flange Reducer uk. 80 x 50 mm Bh 252,650
94 All Flange Reducer uk. 100 x 50 mm Bh 274,200
95 All Flange Reducer uk. 100 x 80 mm Bh 288,750
96 All Flange Reducer uk. 150 x 80 mm Bh 498,000
97 All Flange Reducer uk. 150 x 100 mm Bh 526,900
98 All Flange Reducer uk. 200 x 75 mm Bh 613,600
99 All Flange Reducer uk. 200 x 100 mm Bh 649,600
100 All Flange Reducer uk. 200 x 150 mm Bh 685,700
101 All Flange Reducer uk. 250 x 75 mm Bh 887,900
102 All Flange Reducer uk. 250 x 100 mm Bh 901,800
103 All Flange Reducer uk. 250 x 150 mm Bh 938,400
104 All Flange Reducer uk. 250 x 200 mm Bh 1,032,300
105 Wall Pipe uk. 100 x 0.50 mm Bh 822,900
106 Wall Pipe uk. 150 x 0.50 mm Bh 1,155,000
107 Wall Pipe uk. 200 x 0.50 mm Bh 1,790,200
108 Wall Pipe uk. 250 x 0.50 mm Bh 2,324,400
109 Giboult Joint uk. 50 mm Bh 180,500
110 Giboult Joint uk. 75 mm Bh 274,200
111 Giboult Joint uk. 100 mm Bh 345,200
112 Giboult Joint uk. 150 mm Bh 541,300
113 Giboult Joint uk. 200 mm Bh 810,800
114 Giboult Joint uk. 250 mm Bh 1,176,600
115 Bend All Socket 90º uk. 50 mm Bh 454,700
116 Bend All Socket 90º uk. 100 mm Bh 456,600
117 Bend All Socket 90º uk. 150 mm Bh 721,900
118 Bend All Socket 90º uk. 200 mm Bh 1,624,100
119 Bend All Socket 90º uk. 250 mm Bh 2,526,500
120 Air Relief Valve ( CI ) DN 50 mm Bh 1,713,400
121 Air Relief Valve ( CI ) DN 80 mm Bh 1,177,900
122 Air Relief Valve ( CI ) DN 100 mm Bh 4,316,800
123 Air Relief Valve ( CI ) DN 150 mm Bh 8,633,600
124 Air Relief Valve ( CI ) DN 200 mm Bh 13,402,000
-
VIII. BAHAN LANGIT - LANGIT -
1 Asbes Plat tebal 6 mm (1,00 x 1,00) Lbr 22,000
2 Bilik bambu M2 -
3 Eternit 1 x 1 m2 t = 4 mm Djabesmen / harflex m2 17,650
Hal. 15
HARGA SATUAN
NO URAIAN SAT. ( Rp )

4 Eternit (saflex) 1 x 1 m2, t = 5 mm m2 16,900


5 Gypsum uk. 1,2 x 2,4 tebal 9mm Lbr 66,200
6 Lis gypsum m' 15,800

Hal. 16
HARGA SATUAN
NO URAIAN SAT. ( Rp )

7 Lis kayu profil M' 5,100


8 Lis kayu 2/4 M' 5,100
9 Triplek 1.2 x 2.4 tbl = 3 mm Lbr 52,500
10 Triplek 1.2 x 2.4 tbl = 4 mm Lbr 62,650
11 Triplek 1.2 x 2.4 tbl = 6 mm Lbr 79,125
12 Triplek 0.9 x 2.1 uk pintu tbl 4 mm Lbr 55,500
13 Triplek 0.9 x 2.1 uk pintu tbl 3 mm Lbr 45,900
-
IX. BAHAN FINISHING -
1 Amplas Lbr 2,900
2 Coating Heritage alami Ltr 62,200
3 Dempul kayu Kg 22,630
4 Plamur Kayu Kg 22,360
5 Plamur tembok Kg 20,600
6 Cat Besi Kg 48,350
7 Cat Kayu Kg 49,860
8 Cat Tembok Kg 23,900
9 Cat Tembok exterior Kg 77,000
10 Flinkote Kg 25,000
11 Kuas 3" Bh 6,970
12 Kuas 2" Bh 5,275
13 Lem kayu Kg 25,400
14 Lem Kuning Kg 49,000
15 Lem Putih Kg 25,400
16 Menie Besi Kg 24,500
17 Menie kayu Kg 24,500
18 Minyak Cat Ltr 19,400
19 Rol Cat Bh 18,300
20 Vernis Batu alam Ltr 63,650
-
X. BAHAN KACA -
1 Kaca bening 5 mm M2 87,000
2 Kaca ryban 5 mm M2 105,000
4 Kaca Bening 12 mm M2 285,900
5 Kaca Cermin tebal 5mm M2 231,500
6 Kaca one way M2 490,100
-
XI BAHAN INSTALASI LISTRIK -
HARDWARE JARINGAN 20 KV -
1 Armour Rod # for 35 mm2 Set 30,200
2 Armour Rod # for 50 mm2 Set 45,400
3 Armour Rod # for 70 mm2 Set 60,500
4 Armour Rod # for 150 mm2 Set 80,800
5 Armour Rod # for 240 mm2 Set 121,250
6 Armour Tape 1/4" wide Mtr 5,900
7 Aluminium connector Bh 26,400
8 Armour rod # for AAAC 70 mm2 Set 55,050
Hal. 17
HARGA SATUAN
NO URAIAN SAT. ( Rp )

9 Amor rod tapping Set 16,900


10 Amor tape m 3,700
11 Anchor rod 5/8 x 7" Bh 87,550

Hal. 18
HARGA SATUAN
NO URAIAN SAT. ( Rp )

12 Anchor rod 3/4 x 8" Bh 88,200


13 Anchor rod 3/4 x 7" Bh 88,200
14 Anchor Expanding 8.000 lbs Bh 102,050
15 Anchor Expanding 10.000 lbs Bh 103,300
16 Angle clamp primer Bh 2,100
17 Bolt eye 5/8 x 10" Bh 16,650
18 Bolt eye 5/8 x 12" Bh 16,650
19 Bolt eye 5/8 x ridg length" Bh 16,000
20 Bolt Machine 5/8" x ( 14" s/d 22" ) Bh 21,100
21 Bolt Machine 5/8 x 8" Bh 16,900
22 Bolt Machine 5/8 x 9" Bh 14,420
23 Bolt Machine 5/8 x 10" Bh 19,050
24 Bolt Machine 5/8 x 12" Bh 17,600
25 Bolt cariage 1/2" x 3/4" Bh 4,000
26 Bolt Single Up Side 5/8" x 8" Bh 26,900
27 Bolt Single Up Side 5/8" x 9" Bh 27,800
28 Bolt Single Up Side 5/8" x 10" Bh 30,200
29 Bolt Single Up Side 5/8" x 12" Bh 26,500
30 Bolt Double Up Side 5/8" x (14" s/d 22" ) Bh 36,900
31 Bolt Double Up Side 5/8" x 10" Bh 27,600
32 Bolt Double Up Side 5/8" x 12" Bh 28,700
33 Bolt Double Up Side 5/8" x 9" Bh 26,600
34 Bolt Double Up Side 5/8" x 8" Bh 25,600
35 Bolt Double Arming 5/8" x (16" s/d 24" ) Bh 22,500
36 Bolt Double Arming 5/8" x 10" Bh 27,150
37 Bolt Double Arming 5/8" x 12" Bh 29,200
38 Bolt Double Arming 5/8" x 14" Bh 31,200
39 Bimetalic Connector ( 35 s/d 240 ) mm2 Bh 40,400
40 Brace steel 550 mm Bh 21,950
41 Brace steel 770 mm Bh 26,400
42 Brace steel 1,262 mm Bh 82,430
43 Bracket center Bh 42,850
44 Bracket Secondary / Bracket Insulated Bh 18,540
45 Brecket transformer Bh 334,750
46 Bracket Extension For cut out Bh 60,500
47 Bracket band segment vertical plat(Hot dip galvanis Bh 368,760
48 Center Bracket 6 KN Bh 67,300
49 Center Bracket 12,5 KN Bh 79,900
50 Caterpain Bh 3,200
51 Clamp bougel Bh 13,150
52 Clamp ground rod Bh 13,900
53 Clamp ground wire Bh 13,900
54 Clamp hot line top assembly Bh 149,350
55 Clamp Hot line ( 35 mm2 s/d 70 mm2) Bh 64,600
56 Clamp Hot line ( 150 mm2 s/d 240 mm2) Bh 110,200
57 Clamp Loop Dead End / LC ( 35 s/d 240 ) mm2 Bh 25,770
58 Clevis Swinging Secondary Bh 19,050
Hal. 19
HARGA SATUAN
NO URAIAN SAT. ( Rp )

59 Compression Connector H Type 150 mm2 / 240 mm2 Bh 40,000


60 Compression Connector H Type 240 mm2 / 240 mm2 Bh 43,280
61 Compression Connector H Type 50 mm2 / 70 mm2 Bh 24,720

Hal. 20
HARGA SATUAN
NO URAIAN SAT. ( Rp )

62 Compression Connector H Type 70 mm2 / 150 mm2 Bh 37,000


63 Compression Connector H Type 70 mm2 / 70 mm2 Bh 28,600
64 Compression Terminal Lug 35 mm2 Bh 36,050
65 Compression Terminal Lug 50 mm2 Bh 10,600
66 Compression Terminal Lug 70 mm2 Bh 13,300
67 Compression Terminal Lug 150 mm2 Bh 25,400
68 Compression Terminal Lug 240 mm2 Bh 31,800
69 Cross Arm Steel 1.500 mm (UNSP 10) galvanis Bh 269,600
70 Cross Arm Steel 2000 mm (UNSP 10) galvanis Bh 359,500
71 Cross Arm Steel 3000 mm (UNSP 10) galvanis Bh 539,400
72 Dead End Assembly ( CJ6-T) Bh 73,140
73 Distribusi trafo CSP 50 KVA Unit 33,359,700
74 Distribusi trafo CSP 25 KVA Unit 31,953,100
75 Distribusi trafo CST 105 / CG 1 Phase 50 KVA Unit 27,912,500
76 Distribusi trafo CST 106 / CG 3 Phase 50 KVA Unit 36,540,000
77 Distribusi trafo CST 106 / CG 3 Phase 100 KVA Unit 44,152,500
78 Distribusi trafo CST 106 / CG 3 Phase 160 KVA Unit 68,005,000
79 Freeformed Guy Wire 22 mm2 Bh 27,600
80 Freeformed Guy Wire 35 mm2 Bh 32,800
81 Freeformed Guy Wire 70 mm2 Bh 38,200
82 Fuse Cut Out 20 KV, 100A Bh 1,133,000
83 Fuse Link 3A Bh 36,900
84 Fuse Link 6A Bh 36,900
85 Fuse Link 8A Bh 36,900
86 Fuse Link 10A Bh 36,900
87 Fuse Link 15A Bh 36,900
88 Fuse Link 20A Bh 47,100
89 Fuse Link 25A Bh 47,100
90 Fuse Link 30A Bh 47,100
91 Fuse Link 50A Bh 60,500
92 Fuse Link 60A Bh 60,500
93 Fuse Link 65A Bh 60,500
94 Fuse Link 80A Bh 60,500
95 Fuse Link 100A Bh 50,400
96 NT Fuse 63 - 100 A lengkap size 0 Bh 74,000
97 NT Fuse 63 - 100 A lengkap size 1 Bh 94,300
98 NT Fuse 63 - 100 A lengkap size 2 Bh 114,400
99 NT Fuse 63 - 100 A lengkap size 3 Bh 148,200
100 Guy Attachment / Guy hok Bh 12,800
101 Guy wire SM 7 strad m 7,000
102 Guy wire 22 mm2 Bh 8,450
103 Guy wire 35 mm2 Bh 12,400
104 Guy wire 70 mm2 Bh 22,500
105 Ground rod 5/8" x 8 " steel Bh 73,500
106 Ground Wire CU 16 mm2 Bh 23,200
107 Ground Wire CU 25 mm2 Bh 36,900
108 Ground Wire CU 50 mm2 Bh 67,300
Hal. 21
HARGA SATUAN
NO URAIAN SAT. ( Rp )

109 Grounding Iron Plate Form Plat / Eart safety mats Bh 1,138,400
110 Ground rod and Washer Bh 11,300
111 Ground rod 5/8" x 8 " Cooper weld Bh 119,800

Hal. 22
HARGA SATUAN
NO URAIAN SAT. ( Rp )

112 Insulating tape Bh 23,300


113 Insulator suspension 10 KVA Bh 215,000
114 Insulator starint road Bh 28,100
115 Isolator Tumpu ( Line Post ) 20 KV Bh 215,600
116 Isolator Tumpu ( Pin Post ) 20 KV Bh 215,600
117 Isolator tarik ( Suspension ) 20 KV Bh 245,200
118 Isolator tarik ( Suspension ) 20 KV Komplit dng Strain Clamp Bh 377,400
119 Joint sleeve 35 mm2 Bh 26,950
120 Joint sleeve 50 mm2 Bh 31,900
121 Joint sleeve 70 mm2 Bh 33,700
122 Joint sleeve 150 mm2 Bh 96,900
123 Joint sleeve 240 mm2 Bh 118,600
124 Kousen Bh 4,000
125 Large Angle Assembly ( CJ7-T) Bh 106,200
126 Lock Nut 5/8" Bh 9,900
127 LCC 240 mm2 Bh 191,900
128 Nut eye 5/8" Bh 9,800
129 Nut Timble Eye 5/8" Bh 15,000
130 Oval eye bolt 5/8" x 8" Bh 20,950
131 Oval eye bolt 5/8" x 9" Bh 11,100
132 Oval eye bolt 5/8" x (14 s/d 22") Bh 22,800
133 Oval eye bolt 5/8" x 10" Bh 16,750
134 Oval eye bolt 5/8" x 12" Bh 18,000
135 Oval Eye Nut 5/8" Bh 19,096
136 Paralel Group Clamp(150-70 mm2/35-16 mm2) Bh 23,300
137 Pin Adapater insulator Bh 31,000
138 Plastic Strap for Clamping Bh 2,060
139 Pole band Double rack 3" atau 3 1/2" Bh 26,200
140 Pole band Double rack 4" atau 4 1/2" Bh 27,470
141 Pole band Double rack 5" atau 5 1/2" Bh 28,900
142 Pole band Double rack 6" atau 6 1/2" Bh 30,200
143 Pole band Double rack 7" atau 7 1/2" Bh 45,700
144 Pole band Double rack 8" atau 8 1/2" Bh 51,550
145 Pole band Double rack 9" s/d 12" Bh 36,900
146 Pole band Double Side 3" atau 3 1/2" Bh 30,200
147 Pole band Double Side 4" atau 4 1/2" Bh 32,200
148 Pole band Double Side 5" atau 5 1/2" Bh 34,300
149 Pole band Double Side 6" atau 6 1/2" Bh 36,300
150 Pole band Double Side 7" atau 7 1/2" Bh 50,600
151 Pole band Double Side 8" atau 8 1/2" Bh 56,200
152 Pole band Double Side 9" s/d 12" Bh 44,400
153 Pole band Single rack 3" atau 3 1/2" Bh 24,200
154 Pole band Single rack 4" atau 4 1/2" Bh 25,500
155 Pole band Single rack 5" atau 5 1/2" Bh 26,900
156 Pole band Single rack 6" atau 6 1/2" Bh 28,200
157 Pole band Single rack 7" atau 7 1/2" Bh 29,500
158 Pole band Single rack 8" atau 8 1/2" Bh 30,900
Hal. 23
HARGA SATUAN
NO URAIAN SAT. ( Rp )

159 Pole band Single rack 9" s/d 12" Bh 35,000


160 Pole Band Single rack 10" Bh 45,500
161 Pole band Single Up Side 3" atau 3 1/2" Bh 28,200

Hal. 24
HARGA SATUAN
NO URAIAN SAT. ( Rp )

162 Pole band Single Up Side 4" atau 4 1/2" Bh 30,200


163 Pole band Single Up Side 5" atau 5 1/2" Bh 32,200
164 Pole band Single Up Side 6" atau 6 1/2" Bh 34,300
165 Pole band Single Up Side 7" atau 7 1/2" Bh 47,300
166 Pole band Single Up Side 8" atau 8 1/2" Bh 52,400
167 Pole band Single Up Side 9" s/d 12" Bh 42,300
168 Primary Angle Clamp ( 35 s/d 70) mm2 Bh 56,650
169 Primary Angle Clamp ( 150 s/d 240 ) mm2 Bh 60,500
170 Primary Dead End Clamp ( 35 s/d 70) mm2 Bh 67,300
171 Primary Dead End ( 150 s/d 240 ) mm2 Bh 94,300
172 Shackle Anchor 5/8" Bh 18,000
173 Side Bracket Bh 69,300
174 Split bolt connector Bh 23,100
175 Split plastic sleeve Bh 2,100
176 Spol Insulator ANSI 53-2 Bh 36,050
177 Spol Insulator ANSI 53-4 Bh 41,200
178 Stainless Steel Strap 20 x 0,7 mm Mtr 10,900
179 Stainless Steel Strap Bh 2,800
180 Strap for clamping Bh 2,650
181 Steel L 70 x 70 x 7 x 1.000 mm galvanis Bh 20,600
182 Steel L 70 x 70 x 7 x 1.262 mm galvanis Bh 215,200
183 Steel L 70 x 70 x 7 x 780 mm galvanis Bh 107,200
184 Stopping Buckle / Yokes Bh 2,100
185 Suspension / Small Angle Assembly ( CJ5-T) Bh 33,100
186 Tap Connector ( 35s/d 70) mm2 Bh 5,200
187 Tap Connector ( 35s/d 150) mm2 Bh 13,600
188 Tap Connector ( 70 s/d 150 ) mm2 Bh 18,300
189 Tap Connector ( 70 s/d 240 ) mm2 Bh 23,200
190 Three Bolt Clamp Bh 38,100
191 Tie Wire # 4 / Alluminium Bonding Wire # 20 Mtr 6,600
192 Washer Square 2 1/4" Bh 3,200
193 Washer Square 2 1/2" Bh 3,200
194 Washer Round 3/8" Bh 1,500
195 Penghalang panjat Bh 88,100
196 Papan tanda bahaya 5 Watt Bh 17,600
197 Lampu TL 10 Watt Bh 12,100
198 Lampu TL 15 Watt Bh 16,100
199 Lampu TL 18 Watt Bh 18,700
200 Lampu TL 20 Watt Bh 22,800
201 Lampu TL 36 Watt Bh 24,100
202 Lampu TL 40 Watt Bh 26,900
203 ML 100 Watt Bh 6,600
204 ML 160 Watt Bh 202,100
205 ML 250 Watt Bh 188,600
206 ML 250 Watt Bh 336,500
207 SON 70 Watt Bh 417,700
208 SON 150 Watt Bh 269,500
Hal. 25
HARGA SATUAN
NO URAIAN SAT. ( Rp )

209 SON 250 Watt Bh 363,800


210 SON 400 Watt Bh 43,300
211 BALAST / TRAFO Bh 296,500

Hal. 26
HARGA SATUAN
NO URAIAN SAT. ( Rp )

212 HPL 50 watt Bh -


213 HPL 70 watt Bh 269,500
214 HPL 80 watt Bh 269,500
215 HPL 125 watt Bh 283,000
216 HPL 250 watt Bh 296,500
217 HPL 400 watt Bh 350,400
218 Contactor 25 Ampere Bh 148,200
219 Contactor 35 Ampere Bh 229,000
220 Contactor 16 Ampere Bh 229,000
221 Ignitor SN 58 Bh 6,600
222 Kapasitor Bh 134,700
223 MCB 6-16 Ampere Bh 113,500
224 17-35 Ampere Bh 67,300
225 Lebih dari 63 Ampere Bh 80,800
226 Megnetic Switch MS 10 Ampere Bh 309,900
227 20 Ampere Bh 1,078,200
228 29 Ampere Bh 1,347,800
229 35 Ampere Bh 1,887,000
230 50 Ampere Bh 2,021,800
231 65 Ampere Bh 2,695,700
232 95 Ampere Bh 4,043,600
233 125 Ampere Bh 5,661,000
234 150 Ampere Bh 8,761,100
235 220 Ampere Bh 9,435,100
236 Stop kontak outbow Bh 12,804,700
237 outbow Bh 20,150
238 In bow Bh 107,800
239 In bow Bh 1,900
240 In bow Bh 67,300
241 In bow Bh 47,100
242 Saklar Engkel outbow Bh 40,400
243 In bow Bh 20,150
244 Staker Biasa / tanopa arde Bh 18,700
245 dengan arde Bh 4,000
246 Klem U Bh 16,100
247 Klem Kabel Bh 13,400
248 Fitting Plafon Pak 13,400
249 Gantung Bh 8,600
250 NYM Uk. 2x2,5 m Bh 4,550
251 NYM Uk. 2x4m m' 9,300
252 NYM Uk. 4x4m m' 20,100
253 NYY Uk. 3x2,5 m m' 9,300
254 NYY Uk. 2x4 mm m' 14,700
255 NYY Uk. 3x4 mm m' 16,100
256 NYY Uk. 4x4 mm m' 21,500
257 NYY Uk. 4x6 mm m' 26,900
258 DX / Twisted m' 53,800
Hal. 27
HARGA SATUAN
NO URAIAN SAT. ( Rp )

259 LVTC 2x70 +N.50 m' 14,700


260 LVTC 2x35 +N.50 m' 53,800
261 Isolasi keci Bh 2,650

Hal. 28
HARGA SATUAN
NO URAIAN SAT. ( Rp )

262 Isolasi besar Bh 10,700


263 Test pen Bh 20,150
264 Fotosel ( otomat ) Bh 202,000
265 Modul Lampu amar Bh 242,500
266 Modul Traffic Light Bh 3,369,600
267 Tangga Aluminium Lipat P 8 meter Bh 5,391,400
268 Klem Pole Band Bh 175,150
269 Pal Bantu RS 9 Bh 2,021,800
270 Konsol panjang 6 meter Æ 2 " tebal 3 mm Medium A Bh 673,900
271 Konsol panjang 6 meter Æ 2 " tebal 2 mm Medium A Bh 606,500
272 Pool Massa Bh 121,250
273 Kap lampu Son 250 Watt Lengkap Bh 3,774,000
274 Kap lampu Son 250 Watt Type SMR 511 Bh 1,010,900
275 Kap lampu TL isi 2 Bh 606,500
276 Kap Lampu Caping LHE Bh 1,077,000
277 Sekering Bh 33,600
278 Fiting SON Bh 53,800
279 T Doos Bh 6,600
280 Stop kontak AC Bh 80,800
281 Contak cleaner Bh 33,600
282 Jek AC Bh 26,900
283 Pal bantu berornamen Bh 5,484,100
284 Tambang plastik besar m' 3,800
285 Sayang bambu komplit Set 127,900
286 Martil / palu 5 Kg Bh 33,600
287 Bor listrik Bh 1,213,000
288 Mata bor Set 269,500
289 Digger Tanah Bh 202,100
-
Pemasangan Jaringan Listrik -
290 KWH Meter 1 phasa 220 v, 5 / 20 A, st 1 F,5/2 Bh 204,200
291 KWH Meter 1 Phasa 220 v, 20/60A, st 1 F,20/ Bh 166,300
292 KWH Meter 1 Phasa 220 v, 50/100 A, st 1 F,50/ Bh 297,700
293 KWH Meter 3 Phasa 220/380 v,5/20 A, st 3 F,5/2 Bh 1,199,550
294 KWH Meter 3 Phasa 220/380 v,20/60 A, st 3 F,20/ Bh 1,266,700
295 KWH Meter 3 Phasa 220/380 v,50/100A, st 3 F,50/ Bh 1,347,300
296 KWH Meter 3 Phasa 220/380 v,5/20 A, DT 3 F,5/2 Bh 1,546,800
297 KWH Meter 3 Phasa 220/380 v,20/60 A, DT 3 F,20/ Bh 1,616,800
298 KWH Meter 3 Phasa 220/380 v,50/100 A, DT 3 F,50/ Bh 1,751,500
299 KVARH Meter 3 Ph 220/380 v,5/20 A, ST 3 F,5/2 Bh 1,198,800
300 KVARH Meter 3 Ph 220/380 v,20/60 A, ST 3 F,20/ Bh 1,266,700
301 KVARH Meter 3 Ph 220/380 v,50/100 A, ST 3 F,50/ Unit 1,347,300
302 KWH Meter 3 Phasa 57, 7/100 v, /5A, ST 3 F,/5 A Unit 1,226,400
303 KWH Meter 3 Phasa 57, 7/100 v, /5A, DT 3 F, /5 Bh 1,549,900
KOTAK APP -
304 Kotak APP Type Lipat, lengkap Type I L Bh 50,300
305 Kotak APP Type III Lipat, lengkap Type III Bh 235,800
Hal. 29
HARGA SATUAN
NO URAIAN SAT. ( Rp )

306 Kotak APP TR Type IV Tanpa Topi, lengkap Type IV Bh 4,717,550


307 Kotak APP TR Type I A Single tarif lengkap Type I Bh 5,822,700

Hal. 30
HARGA SATUAN
NO URAIAN SAT. ( Rp )

308 Kotak APP TR Double Tarif, lengkap Double t Bh 6,038,400


309 Kotak APP TM, lengkap TM Bh 5,607,000
TRANSFORMATOR -
310 Trafo 1 Phasa CSP 12,7 KV/B2 50 KVA Bh 32,427,490
311 Trafo 3 Phasa 20 KV/B2 50 KVA Bh 41,252,200
312 Trafo 3 Phasa 20 KV/B2 100 KV Bh 50,805,400
313 Trafo 3 Phasa 20 KV/B2 160 KV Bh 70,900,760
314 Trafo 3 Phasa 20 KV/B2 200 KV Bh 81,618,230
315 Trafo 3 Phasa 20 KV/B2 250 KV Bh 90,687,000
316 Trafo 3 Phasa 20 KV/B2 315 KV Bh 91,374,000
317 Trafo 3 Phasa 20 KV/B3 400 KV Bh 97,007,600
318 Trafo 3 Phasa 20 KV/B2 630 KV Bh 141,946,800
KONDUKTOR -
319 AAAC 25 mm2 25 mm2 Mtr 22,000
320 AAAC 35 mm2 35 mm2 Mtr 27,500
321 AAAC 50 mm2 50 mm2 Mtr 38,500
322 AAAC 70 mm2 70 mm2 Mtr 49,500
323 AAAC 150 mm2 150 mm Mtr 82,500
324 AAAC 240 mm2 240 mm Mtr 93,500
325 AAAC/S 150 mm2 150 mm Mtr 88,000
326 AAAC/S 240 mm2 240 mm Mtr 110,000
327 ACSR 70 mm2 70 mm2 Mtr 14,850
328 ACSR 150 mm2 150 mm Mtr 31,700
329 ACSR 240 mm2 240 mm Mtr 51,900
KABEL TM/TR -
330 NFA2X-T 2 x 35 + N 50 mm2 2x35+N Mtr 23,100
331 NFA2X-T 2 x 70 + N 50 mm2 2x70+N Mtr 35,600
332 NFA2X-T 3 x 70 + N 50 mm2 3x70+N Mtr 45,900
333 NFA2X 2 x 10 mm2 2x10 m Mtr 4,300
334 NFA2X 2 x 16 mm2 2x16 m Mtr 6,900
335 NFA2X 2 x 25 mm2 2x25 m Mtr 9,100
336 NFA2X 4 x 10 mm2 4x10 m Mtr 9,500
337 NFA2X 4 x 16 mm2 4x16 m Mtr 13,600
338 NFA2X 4 x 25 mm2 4x25 m Mtr 18,450
339 Kabel NYFGBY 4 x 4 mm2 4x4 mm Mtr 37,000
340 Kabel NYFGBY 4 x 50 mm2 CU 4x50 m Mtr 271,600
341 Kabel NYFGBY 4 x 95 mm2 CU 4x95 m Mtr 514,950
342 Kabel NYFGBY 4 x 150 mm2 CU 4x150 Mtr 798,500
343 Kabel NYY 1X 150 mm2 1x150 Mtr 167,100
344 Kabel NA2XSEFGbY 20 KV, 3 X 150 mm2 3x150 Mtr 367,000
345 Kabel NA2XSY 20 KV, 1 X 240 mm2 1x240 Mtr 122,100
346 Kabel NA2XSEYBY 20 KV, 3 X 240 mm2 3x240 Mtr 421,700
347 Kabel NA2XSY 20 KV, 1 X 150 mm2 1x120 Mtr 100,700
348 Kabel NA2XSEYBY 20 KV, 3 X 300 mm2 3x300 Mtr 487,400
349 Kabel NA2XSY 20 KV, 1 X 70 mm2 1x95 m Mtr 71,610
350 Kabel NA2XSEYBY 20 KV, 3 X 95 mm2 3x95 m Mtr 259,390
351 Kabel NA2XS2Y 20 KV, 1 X 150 mm2 1x150 Mtr 100,700
Hal. 31
HARGA SATUAN
NO URAIAN SAT. ( Rp )

352 Kabel NA2XS2Y 20 KV, 1 X 240 mm2 1x240 Mtr 122,000


353 Kabel NA2XS2Y 20 KV, 1 X 300 mm2 1x300 Mtr 135,500
354 Kabel NFA2XSY-T-3 X 240+50 mm2,20 KV 3x240 Mtr 334,800

Hal. 32
HARGA SATUAN
NO URAIAN SAT. ( Rp )

355 Kabel NYA Fleksibel 2,5 mm2 2,5 mm2 Mtr 2,400
356 Kabel NYA Fleksibel 4 mm2 4 mm2 Mtr 5,400
357 Kabel NYA Fleksibel 6 mm2 6 mm2 Mtr 7,950
358 Kabel NYA Fleksibel 10 mm2 10 mm2 Mtr 12,730
359 Kabel NYA Fleksibel 16 mm2 16 mm2 Mtr 13,050
360 Kabel LVTC Ukuran 3 x 35 + N.25 Mtr 27,400
361 Kabel LVTC Ukuran 3 x 70 + N.25 Mtr 39,100
-
SEPATU KABEL -
362 Sepatu Kabel AL/CU Ring 50 Bh 64,600
363 Sepatu Kabel AL/CU Ring 70 Bh 68,200
364 Sepatu Kabel AL/CU Ring 95 Bh 71,700
365 Sepatu Kabel AL/CU Ring 120 Bh 81,900
366 Sepatu Kabel AL/CU Ring 150 Bh 87,700
367 Sepatu Kabel AL/CU Ring 185 Bh 111,200
368 Sepatu Kabel AL/CU Ring 240 Bh 128,300
369 Sepatu Kabel AL/CU Kepala 50 Bh 48,400
370 Sepatu Kabel AL/CU Kepala 70 Bh 52,500
371 Sepatu Kabel AL/CU Kepala 95 Bh 55,050
372 Sepatu Kabel AL/CU Kepala 120 Bh 57,900
373 Sepatu Kabel AL/CU Kepala 150 Bh 66,400
374 Sepatu Kabel AL/CU Kepala 185 Bh 81,150
375 Sepatu Kabel AL/CU Kepala 240 Bh 85,000
376 Sepatu Kabel AL/AL 35 Bh 9,200
377 Sepatu Kabel AL/AL 50 Bh 9,800
378 Sepatu Kabel AL/AL 70 Bh 9,800
379 Sepatu Kabel AL/AL 95 Bh 11,550
380 Sepatu Kabel AL/AL 120 Bh 14,500
381 Sepatu Kabel AL/AL 150 Bh 19,800
382 Sepatu Kabel AL/AL 240 Bh 26,200
383 Sepatu Kabel CU/CU 35 Bh 21,100
384 Sepatu Kabel CU/CU 50 Bh 23,800
385 Sepatu Kabel CU/CU 70 Bh 30,650
386 Sepatu Kabel CU/CU 95 Bh 38,000
387 Sepatu Kabel CU/CU 150 Bh 61,200
388 Sepatu Kabel CU/CU 240 Bh 107,150
TIANG BETON -
389 C 7M-100 daN+E 7M-100 Btg 1,703,600
390 C 9M-100 daN+E 9M-100 Btg 2,226,840
391 C 9M-200 daN+E 9M-200 Btg 2,585,000
392 C 11M-200 daN+E 11M-20 Btg 3,740,000
393 C 11M-350 daN+E 11M-35 Btg 4,345,000
394 C 12M-200 daN+E 12M-20 Btg 4,294,290
395 C 12M-350 daN+E 12M-35 Btg 4,688,100
396 C 12M-500 daN+E 12M-50 Btg 5,450,400
397 C 13M-350 daN+E 13M-35 Btg 5,712,630
398 C 13M-500 daN+E 13M-50 Btg 6,093,780
Hal. 33
HARGA SATUAN
NO URAIAN SAT. ( Rp )

399 C 14M-350 daN+E 14M-35 Btg 6,455,200


400 C 14M-500 daN+E 14M-50 Btg 7,133,280

Hal. 34
HARGA SATUAN
NO URAIAN SAT. ( Rp )

ABSW -
401 Load Break switch 20 KV-630A 20 KV, Set 23,586,900
402 Load Break switch 20 KV-630A (Motorized)SF 20 KV, Set 172,527,800
403 6 lengkap dengan kontrol -
D.S -
404 Disconnecting Switch 20 KV-630 A 20 KV, Set 10,108,250
ARESTER -
405 Lightning Arester 20 KV, 5 KA 20 KV, Bh 724,300
406 Lightning Arester 20 KV, 10 KA 20 KV, Bh 826,200
CAPACITOR POLE MOUNTED -
407 Micro Cap Controller Bh 24,814,450
408 Current Sensor Bh 17,717,900
ACCESSORIES APP -
409 Kawat Segel Roll 80,800
410 Timah segel Kg 60,400
411 Service wedge Clamp 616 Set 3,600
412 Service wedge Clamp 625 Set 4,900
PEKERJAAN KABEL TANAH -
413 Terminating kabel 3 x 300 mm2 ID 3 x 300 Set 4,177,800
414 Terminating kabel 1 x 300 mm2 ID 1 x 300 Set 2,559,950
415 Terminating kabel 3 x 300 mm2 OD 3 x 300 Set 4,986,230
416 Terminating kabel 1 x 300 mm2 OD 1 x 300 Set 2,897,300
417 Terminating kabel 3 X 240 mm2 ID 3 x 240 Set 3,778,925
418 Terminating kabel 1 x 240 mm2 ID 1 x 240 Set 3,371,540
419 Terminating kabel 3 x 240 mm2 OD 3 x 240 Set 5,379,800
420 Terminating kabel 1 x 240 mm2 OD 1 x 240 Set 3,805,400
421 Terminating kabel 3 x 95 mm2 ID 3 x 95 Set 2,844,200
422 Terminating kabel 1 x 95 mm2 ID 1 x 95 Set 240,175
423 Terminating kabel 3 x 95 mm2 OD 3 x 95 Set 4,177,800
424 Terminating kabel 1 x 95 mm2 OD 1 x 95 Set 3,182,700
425 Jointing Raychem 24 kV 3 x 300 mm2 (Armoured) OD3 x 300 Set 4,295,200
426 Jointing Raychem 24 kV x 300 mm2 (Unarmoured) I 3 x 1 x Set 4,447,200
427 Jointing Raychem 24 kV 3 x 240 mm2 (Armoured) OD3 x 240 Set 473,950
428 Jointing Raychem 24 kV 1 x 240 mm2 (Unarmoured) 3 x 1 x Set 4,380,450
429 Jointing Raychem 24 kV 3 x 95 mm2 (Armoured) OD 3 x 95 Set 4,380,450
430 Jointing Raychem 24 kV 1 x 95 mm2 (Unarmoured) 3 x 1 x Set 3,705,700
431 Klem beugel bevesteging 8 x 6" 8 x 6" Bh 30,230
-
XII. ALAT - ALAT PENGUNCI & PENGGANTUNG -
1 Door holder / Pegangan pintu Bh 25,200
2 Engsel angin Bh 14,300
3 Engsel Jendela Kuning Bh 14,800
4 Engsel Pintu Kuning Bh 18,780
6 Grendel jendela kuning Psg 9,700
8 Grendel pintu kuning Psg 9,850
9 Grendel pintu biasa Bh 7,300
10 Hak angin kuning Bh 18,300
Hal. 35
HARGA SATUAN
NO URAIAN SAT. ( Rp )

11 Hak angin biasa Bh 7,300


12 Kunci tanam 2 slag Bh 85,700
14 Kunci lemari Bh 11,400

Hal. 36
HARGA SATUAN
NO URAIAN SAT. ( Rp )

15 Kunci selot Bh 90,000


16 Kunci silinder Bh 73,500
-
XIII. BAHAN SANITAIR -
1 Bak cuci stainless steel Royal Bh 211,250
2 Bak cuci stainless steel Viega ( 1.00 x 0.90 ) m2 Bh 208,300
3 Bak cuci stainless steel 80 cm Bh 183,750
5 Bak mandi fiber glass, vol 120 ltr sudut Bh 219,600
6 Bak mandi fiber glass, vol 120 ltr kotak Bh 231,800
7 Bak mandi fiber glass, vol 150 ltr Bh 263,750
9 Bak Tandon air fiber isi 500 Ltr Bh 919,000
10 Bak Tandon air fiber isi 1000 Ltr Bh 1,250,000
11 Floor Drain / Saringan pembuang pada lantai KM/WC Bh 13,800
12 Kloset duduk / Monoblok "INA", Putih Bh 1,522,900
13 Kloset duduk / Monoblok "INA", Warna Tua Bh 1,470,400
15 Kloset duduk Colour Bh 425,500
16 Kloset Jongkok INA warna tua Bh 147,000
17 Kloset Jongkok INA warna muda Bh 138,000
18 Stop Kran 1/2" Bh 13,600
19 Stop Kran 3/4" Bh 15,000
20 Wastafel Colour Bh 224,500
-
XIV. ALAT PENGIKAT KAYU -
1 Baut Salang kuda2 Kg 21,900
2 Baut lawa - lawa Bh 15,825
3 Paku (Reng, Usuk, Plafond) Kg 20,750
4 Paku 12 cm Bh 300
5 Paku Asbes Kg 25,600
6 Paku sekrup Bh 1,500
7 Paku sekrup Kg 24,500
8 Paku skrup fixer Bh 1,500
9 Paku Sekrup Asbes Bh 1,200
10 Paku Payung Kg 23,900
11 Paku Keling Kg 25,400
12 Paku Eternit Kg 32,560
13 Paku Pancing Kg 45,300
-
XV. LAIN - LAIN -
1 Anti Rayap Ltr 25,000
2 Air Ltr 100
3 Aspal curah Kg 9,425
4 Aspal Drum Kg 11,110
5 Alat Bantu Set 50,000
7 Elastomer strip uk. 30 x 30 Bh 1,195,000
8 Elastomer strip uk. 20 x 20 Bh 857,700
9 Gebalan rumput M2 33,300
10 Geotextile M2 24,200
Hal. 37
HARGA SATUAN
NO URAIAN SAT. ( Rp )

11 Ijuk Kg 42,800
14 Minyak Bekisting Ltr 18,300
15 Minyak flux Ltr 17,700

Hal. 38
HARGA SATUAN
NO URAIAN SAT. ( Rp )

16 Minyak pelumas Ltr 35,000


17 Minyak Tanah Ltr 11,950
18 Minyak Bakar Ltr 9,550
19 Minyak solar Ltr 5,500
20 Minyak solar industri Ltr 11,600
21 Minyak bensin Ltr 6,500
23 Sealent Tube 30,500
25 Soda api Kg 24,500
25 Sabun Kg 10,900

CATATAN : #REF!
- Harga sudah termasuk keuntungan
pemborong #REF!
- Harga belum termasuk PPN 10% #REF!

#REF!
#REF!
#REF!

Hal. 39
KEBUTUHAN MATERIAL (MATERIAL START)
KEGIATAN : SILPA
PEKERJAAN : PEMBANGUNAN DRAINASE RW. 05
LOKASI : DESA PENER KEC. PANGKAH
TAHUN ANGGARAN : 2017
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA PPN PPh
( Rp ) ( Rp )
PEMBANGUNAN RUANG TUNGGU TK
I Persiapan
1 Pembersihan Lahan 1.00 pkt Rp 200,000 Rp 200,000
2 Pemasangan Patok Profil 1.00 pkt Rp 211,000 Rp 211,000
jUMLAH I Rp 411,000
II Material
1 Batu Belah 134.00 m3 Rp 222,200 Rp 29,774,800 Rp 2,977,480 Rp 446,622
2 Besi Beton 1,832.00 kg Rp 10,000 Rp 18,320,000 Rp 1,665,455
3 Kawat Beton 26.00 kg Rp 17,000 Rp 442,000
4 Kerikil (maksimum 30mm) 17,225.00 kg Rp 220 Rp 3,789,500 Rp 378,950 Rp 56,843
5 Paku Biasa 5-12 cm 6.50 kg Rp 15,000 Rp 97,500
6 Papan Cetak Pinus 0.50 m3 Rp 2,994,000 Rp 1,497,000 Rp 136,091
7 Pasir Beton 12,715.00 kg Rp 160 Rp 2,034,400 Rp 203,440 Rp 30,516
8 Pasir Pasang 63.50 kg Rp 176,000 Rp 11,176,000 Rp 1,117,600 Rp 335,280
9 Pasir Urug 26.00 m3 Rp 80,000 Rp 2,080,000 Rp 62,400
10 Balok Kayu Lokal 0.20 kg Rp 1,260,000 Rp 252,000
11 Semen Portland 25,534.00 m3 Rp 1,200 Rp 30,640,800 Rp 2,785,527 Rp 459,612
12 Triplek 9 mm 5.00 lbr Rp 118,000 Rp 590,000
13 Ember 10.00 bh Rp 10,000 Rp 100,000
JUMLAH II 100,794,000

II UPAH TENAGA
1 Pekerja 467 oh 65,000.00 Rp 30,355,000
2 Tukang Batu 139 oh 80,000.00 Rp 11,120,000

JUMLAH III 41,475,000


III BIAYA OPERASIONAL
1 Honorarium Timlak Kegiatan
Penanggungjawab 1 15 keg Rp 55,000 Rp 825,000
Ketua 1 15 keg Rp 45,000 Rp 675,000
Sekretaris 1 15 keg Rp 35,000 Rp 525,000
Anggota 4 15 keg Rp 30,000 Rp 1,800,000 Rp 229,500
2 Jasa Perencanaan / Gambar 0 keg 500,000 -
2 Honor Penerima Hasil Pekerjaan
Ketua 1 1 keg Rp 120,000 Rp 120,000
Sekretaris 1 1 keg Rp 100,000 Rp 100,000
Anggota 1 1 keg Rp 80,000 Rp 80,000 Rp 18,000
3 Alat Tulis Kantor
HVS 70 gr 5 rim Rp 60,400 302,000
Snalheckter plastik 10 bh Rp 14,200 142,000
Buku Folio 2 bh Rp 20,800 41,600
Stopmap kertas 14 bh Rp 1,000 14,000
Buku Kwitansi 5 bh Rp 12,000 60,000
Tinta Printer 3 bh Rp 55,000 165,000
Isi Staples Besar 2 bh Rp 3,400 6,800
lem kertas tanggung 2 btl Rp 9,300 18,600
5 Benda Pos
Meterai @ 6.000 19 lb Rp 6,000 114,000
Meterai @ 3.000 12 lb Rp 3,000 36,000
6 Foto copy dan penggandaan 2000 lb Rp 250 500,000 Rp 20,000
7 Dokumentasi 20 lb Rp 5,000 100,000
8 Konsumsi rapat 135 dus Rp 7,000 945,000 Rp 37,800
9 Belanja Prasasti 1 bh Rp 500,000 500,000
10 Papan nama Proyek 1 bh Rp 250,000 250,000
JUMLAH IV 7,320,000 9,264,543 1,696,573
Jumlah I - IV 150,000,000
TERBILANG : LIMA PULUH LIMA JUTA RUPIAH,-

Pener, 25 September 2017


Ketua
Kepala Desa Pener Tim Pelaksana Kegiatan

SURIP WIDODO AKHMAD ZAENI, S.Pd


12,715.75

142,269,000.00

229,500 3,825,000.00

750,000.00
-
75,633,800
21,000,000
96,633,800

53.50
150,000.00
-

135.00

10,961,115 113531416.8 #REF!


150,000,000.00

PAJAK

Anda mungkin juga menyukai