PEKERJAAN :
LOKASI : KOTA TEGAL
TAHUN ANGGARAN : 2018
SUMBER DANA : APBN
HARGA SATUAN
NO URAIAN SAT.
( Rp )
PENUTUP ATAP
Bubungan Genteng keramik "KIA" Bh 32,833.33
Bubungan Genteng keramik pertigaan "KIA" Bh 137,500.00
Bubungan Genteng Morando natural Bh 6,625.00
Bubungan Genteng Morando glatsur Bh 11,375.00
Genteng Keramik Glazur KIA isi 15/m2 warna muda Bh 10,750.00
Genteng Keramik Glazur KIA isi 14/m2 warna tua Bh 11,750.00
Genteng Morando Glazur isi 20/m2 1550x20 Bh 3,997.50
Genteng Pres Jatiwangi isi 25/m2 750x25 Bh 2,150.00
Genteng Pres Kebumen Bh 2,650.00
Genteng Morando Natural isi 20/m2 oven 950x20 Bh 3,066.67
Atap Sirap bh 1,400.00
Glass Block Bh 22,250.00
Seng BJLS 30, Uk. 55 cm M' 23,125.00
Seng BJLS 20, Uk. 180 cm Lbr 43,500.00
Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 24 M' 47,000.00
Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28 Lbr 48,500.00
Seng Plat BJLS 20 M2 27,250.00
Seng Plat BJLS 30 M2 36,375.00
Galvalum gelombang M2 67,100.00
HARGA SATUAN
NO URAIAN SAT.
( Rp )
Nok Galvalum Bh 38,720.00
Seng BJLS 20, uk 90 cm M' 26,851.00
Alumunium foil M2 8,250.00
HARGA SATUAN
NO URAIAN SAT.
( Rp )
BAHAN KAYU
Bambu Btg 25,000.00
Kayu Bakar M3 185,416.67
Kayu Papan kruing M3 6,500,000.00
Kayu Kruing 8/12 M3 6,470,000.00
Kayu Kruing 6/12 M3 6,350,000.00
Kayu Kruing 3/20 M3 7,190,000.00
Kayu Kruing 5/7 M3 4,730,000.00
Kayu Kruing 4/6 M3 4,470,000.00
Kayu Kruing 3/5 M3 5,575,000.00
Kayu Kruing 2/3 M3 4,470,000.00
Kayu Papan Cetak Pinus M3 2,337,500.00
Kayu Stoot ( bambu ) 5 mtr Btg 25,000.00
Kayu Lokal 5/7 M3 1,260,050.00
Kayu Lokal 4/6 M3 1,863,300.00
Kayu Lokal 2/3 M3 2,672,200.00
Kayu Lokal Papan M3 1,615,900.00
Dolken kayu lokal M3 1,540,000.00
Dolken Kayu Galam 8-10/400 cm Btg 58,750.00
Dolken Kayu Lokal 8-10/400 cm Btg 43,750.00
BAHAN FINISHING
Amplas Lbr 3,500.00
Plamur Kayu Kg 31,875.00
Plamur tembok Kg 18,460.00
Cat Besi Kg 53,500.00
Cat Kayu Kg 54,187.50
Cat Tembok Kg 16,500.00
Cat Tembok (setara Catylac) Kg 26,666.67
Cat Tembok exterior weathershield Kg 170,500.00
Kuas 3" Bh 11,000.00
Menie Besi Kg 32,000.00
Menie kayu Kg 22,300.00
Minyak Cat Ltr 21,625.00
BAHAN KACA
Kaca bening 5 mm M2 126,666.67
Kaca ryban 5 mm M2 141,666.67
Kaca Es M2 80,000.00
Kaca Bening 12 mm M2 306,300.00
Kaca Buram 12 mm M2 298,000.00
Kaca Cermin tebal 5mm M2 158,800.00
Kaca nako M2 -
Kaca one way M2 490,100.00
Kaca tebal 3 mm M2 60,000.00
Kaca tebal 8 mm M2 -
Kaca, cermin tebal 8 mm M2 -
Kaca cermin, tebal 6 mm M2 -
Kaca Wireglass M2 -
Profil Kaca M' 3,000.00
SEPATU KABEL
Sepatu Kabel AL/CU Ring 50 Bh
Sepatu Kabel AL/CU Ring 70 Bh
Sepatu Kabel AL/CU Ring 95 Bh
Sepatu Kabel AL/CU Ring 120 Bh
Sepatu Kabel AL/CU Ring 150 Bh
Sepatu Kabel AL/CU Ring 185 Bh
Sepatu Kabel AL/CU Ring 240 Bh
Sepatu Kabel AL/CU Kepala 50 Bh
Sepatu Kabel AL/CU Kepala 70 Bh
Sepatu Kabel AL/CU Kepala 95 Bh
Sepatu Kabel AL/CU Kepala 120 Bh
Sepatu Kabel AL/CU Kepala 150 Bh
Sepatu Kabel AL/CU Kepala 185 Bh
Sepatu Kabel AL/CU Kepala 240 Bh
Sepatu Kabel AL/AL 35 Bh
Sepatu Kabel AL/AL 50 Bh
Sepatu Kabel AL/AL 70 Bh
Sepatu Kabel AL/AL 95 Bh
Sepatu Kabel AL/AL 120 Bh
Sepatu Kabel AL/AL 150 Bh
Sepatu Kabel AL/AL 240 Bh
HARGA SATUAN
NO URAIAN SAT.
( Rp )
Sepatu Kabel CU/CU 35 Bh
Sepatu Kabel CU/CU 50 Bh
Sepatu Kabel CU/CU 70 Bh
Sepatu Kabel CU/CU 95 Bh
Sepatu Kabel CU/CU 150 Bh
Sepatu Kabel CU/CU 240 Bh
TIANG BETON
C 7M-100 daN+E 7M-100 daN+E Btg
C 9M-100 daN+E 9M-100 daN+E Btg
C 9M-200 daN+E 9M-200 daN+E Btg
C 11M-200 daN+E 11M-200 daN+E Btg
C 11M-350 daN+E 11M-350 daN+E Btg
C 12M-200 daN+E 12M-200 daN+E Btg
C 12M-350 daN+E 12M-350 daN+E Btg
C 12M-500 daN+E 12M-500 daN+E Btg
C 13M-350 daN+E 13M-350 daN+E Btg
C 13M-500 daN+E 13M-500 daN+E Btg
C 14M-350 daN+E 14M-350 daN+E Btg
C 14M-500 daN+E 14M-500 daN+E Btg
ABSW
Load Break switch 20 KV-630A 20 KV, 630 A Set
Load Break switch 20 KV-630A (Motorized)SF 20 KV, 630 A Set
6 lengkap dengan kontrol
D.S
Disconnecting Switch 20 KV-630 A 20 KV, 630 A Set
ARESTER
Lightning Arester 20 KV, 5 KA 20 KV, 5 KA. Bh
Lightning Arester 20 KV, 10 KA 20 KV, 10 KA Bh
CAPACITOR POLE MOUNTED
Micro Cap Controller Bh
Current Sensor Bh
ACCESSORIES APP
Kawat Segel Roll
Timah segel Kg
Service wedge Clamp 616 Set
Service wedge Clamp 625 Set
PEKERJAAN KABEL TANAH
Terminating kabel 3 x 300 mm2 ID 3 x 300 mm2 Set
Terminating kabel 1 x 300 mm2 ID 1 x 300 mm2 Set
Terminating kabel 3 x 300 mm2 OD 3 x 300 mm2 Set
Terminating kabel 1 x 300 mm2 OD 1 x 300 mm2 Set
Terminating kabel 3 X 240 mm2 ID 3 x 240 mm2 Set
Terminating kabel 1 x 240 mm2 ID 1 x 240 mm2 Set
Terminating kabel 3 x 240 mm2 OD 3 x 240 mm2 Set
Terminating kabel 1 x 240 mm2 OD 1 x 240 mm2 Set
Terminating kabel 3 x 95 mm2 ID 3 x 95 mm2 Set
Terminating kabel 1 x 95 mm2 ID 1 x 95 mm2 Set
Terminating kabel 3 x 95 mm2 OD 3 x 95 mm2 Set
Terminating kabel 1 x 95 mm2 OD 1 x 95 mm2 Set
Jointing Raychem 24 kV 3 x 300 mm2 (Armoured) OD 3 x 300 mm2 Set
Jointing Raychem 24 kV x 300 mm2 (Unarmoured) ID 3 x 1 x 300 mm2 Set
Jointing Raychem 24 kV 3 x 240 mm2 (Armoured) OD 3 x 240 mm2 Set
Jointing Raychem 24 kV 1 x 240 mm2 (Unarmoured) ID 3 x 1 x 240 mm2 Set
Jointing Raychem 24 kV 3 x 95 mm2 (Armoured) OD 3 x 95 mm2 Set
HARGA SATUAN
NO URAIAN SAT.
( Rp )
Jointing Raychem 24 kV 1 x 95 mm2 (Unarmoured) OD 3 x 1 x 95 mm2 Set
Klem beugel bevesteging 8 x 6" 8 x 6" Bh
BAHAN SANITAIR
Floor Drain / Saringan pembuang pada lantai KM/WC Bh 26,120.00
Kloset Jongkok INA warna muda Bh 132,160.00
Tegal, 2018
Dibuat Oleh :
Konsultan Perencana
CV. CITRA VASTU VIDYA
Tegal, 2018
Dibuat Oleh :
Konsultan HARGA SATUAN
NO URAIAN SAT. Perencana
CV. CITRA VASTU VIDYA( Rp )
IMRON, ST, MT
Direktur
DAFTAR HARGA SATUAN UPAH TENAGA
PEKERJAAN : 0
LOKASI : KOTA TEGAL
TAHUN ANGGARAN : 2018
SUMBER DANA : APBN
1 Pekerja OH 60,000.00
2 Tukang gali OH 60,000.00
3 Mandor OH 70,000.00
4 Tukang cat/ plitur / batu OH 75,000.00
5 Kepala tukang cat/ plitur / batu OH 75,000.00
6 Tukang kayu OH 80,000.00
7 Kepala tukang kayu OH 80,000.00
8 Tukang Besi / ledeng OH 75,000.00
9 Kepala Tukang besi / ledeng OH 75,000.00
10 Tukang Besi Profil OH 70,000.00
11 Kepala Tukang besi Profil OH 75,000.00
12 Mekanik OH 87,500.00
13 Mekanik Pembantu OH 62,500.00
14 Operator terlatih/ masinis OH 102,500.00
15 Operator kurang terlatih OH 77,500.00
16 Pembantu operator/ pemb. masinis OH 67,500.00
17 Sopir truk OH 105,000.00
18 Sopir personil OH 85,000.00
19 Pembantu sopir OH 60,000.00
12 Buruh lapangan tak terlatih OH 55,000.00
13 Buruh lapangan semi terlatih OH 57,500.00
14 Buruh lapangan terlatih OH 60,000.00
23 Tukang masak aspal OH 63,750.00
23 Mandor pengaspalan 74,000.00
24 Penjaga malam OH 55,000.00
Tegal, 2018
Dibuat Oleh :
Konsultan Perencana
CV. CITRA VASTU VIDYA
IMRON, ST, MT
Direktur
DAFTAR SATUAN PERALATAN
KEGIATAN : 0
PEKERJAAN : KOTA TEGAL
LOKASI : 2018
TAHUN ANGGARAN : APBN
BIAYA
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 60,000.00 198,000.00
Tukang Batu L.02 OH 1.100 75,000.00 82,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.160 70,000.00 11,200.00
JUMLAH TENAGA KERJA 292,450.00
B BAHAN
Kloset duduk VISION CW 826J (TOTO) Unit 1.000 7,230,000.00 7,230,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 60,000.00 60,000.00
Tukang Batu L.02 OH 1.000 75,000.00 75,000.00
Kepala Tukang L.03 OH 0.100 75,000.00 7,500.00
Mandor L.04 OH 0.050 70,000.00 3,500.00
JUMLAH TENAGA KERJA 146,000.00
B BAHAN
Urinoir Unit 1.000 350,000.00 350,000.00
Semen Portland Kg 6.000 1,002.00 6,012.00
Pasir Pasang M3 0.010 221,412.50 2,214.13
Perlengkapan 30 % Urinoir Ls 0.300 350,000.00 105,000.00
JUMLAH HARGA BAHAN 463,226.13
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 60,000.00 72,000.00
Tukang Batu L.02 OH 1.450 75,000.00 108,750.00
Kepala Tukang L.03 OH 0.150 75,000.00 11,250.00
Mandor L.04 OH 0.060 70,000.00 4,200.00
JUMLAH TENAGA KERJA 196,200.00
B BAHAN
Wastafel Unit 1.200 225,000.00 270,000.00
Semen Portland Kg 6.000 1,002.00 6,012.00
Pasir Pasang M3 0.010 221,412.50 2,214.13
Perlengkapan 12 % Wastafel Ls 0.120 225,000.00 27,000.00
JUMLAH HARGA BAHAN 305,226.13
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 60,000.00 72,000.00
Tukang Batu L.02 OH 1.450 75,000.00 108,750.00
Kepala Tukang L.03 OH 0.150 75,000.00 11,250.00
Mandor L.04 OH 0.060 70,000.00 4,200.00
JUMLAH TENAGA KERJA 196,200.00
B BAHAN
Wastafel L38V1 W/PIV Unit 1.200 625,000.00 750,000.00
Semen Portland Kg 6.000 1,002.00 6,012.00
Pasir Pasang M3 0.010 221,412.50 2,214.13
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 60,000.00 180,000.00
Tukang Batu L.02 OH 4.500 75,000.00 337,500.00
Kepala Tukang L.03 OH 0.050 75,000.00 3,750.00
Mandor L.04 OH 0.900 70,000.00 63,000.00
JUMLAH TENAGA KERJA 584,250.00
B BAHAN
Bak Air Fibreglass Unit 1.000 # #VALUE!
Perlengkapan 12% Ls 0.120 # #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 60,000.00 3,240.00
Tukang Batu L.02 OH 0.090 75,000.00 6,750.00
Kepala Tukang L.03 OH 0.009 75,000.00 675.00
Mandor L.04 OH 0.027 70,000.00 1,890.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa Galvanis ½" M 1.200 20,460.00 24,552.00
Perlengkapan 35% x pipa Ls 0.350 20,460.00 7,161.00
JUMLAH HARGA BAHAN 31,713.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 60,000.00 3,240.00
Tukang Batu L.02 OH 0.090 75,000.00 6,750.00
Kepala Tukang L.03 OH 0.009 75,000.00 675.00
Mandor L.04 OH 0.027 70,000.00 1,890.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa GIP medium class A Ø ½" M 1.200 44,700.00 53,640.00
Perlengkapan 35% x pipa Ls 0.350 44,700.00 15,645.00
JUMLAH HARGA BAHAN 69,285.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 60,000.00 3,240.00
Tukang Batu L.02 OH 0.090 75,000.00 6,750.00
Kepala Tukang L.03 OH 0.009 75,000.00 675.00
Mandor L.04 OH 0.027 70,000.00 1,890.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa Galvanis 3/4" M 1.200 28,620.00 34,344.00
Perlengkapan 35% x pipa Ls 0.350 28,620.00 10,017.00
JUMLAH HARGA BAHAN 44,361.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 60,000.00 3,240.00
Tukang Batu L.02 OH 0.090 75,000.00 6,750.00
Kepala Tukang L.03 OH 0.009 75,000.00 675.00
Mandor L.04 OH 0.027 70,000.00 1,890.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa GIP medium 3/4" M 1.200 56,350.00 67,620.00
Perlengkapan 35% x pipa Ls 0.350 56,350.00 19,722.50
JUMLAH HARGA BAHAN 87,342.50
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 60,000.00 3,240.00
Tukang Batu L.02 OH 0.090 75,000.00 6,750.00
Kepala Tukang L.03 OH 0.009 75,000.00 675.00
Mandor L.04 OH 0.027 70,000.00 1,890.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa Galvanis 1" M 1.200 31,410.00 37,692.00
Perlengkapan 35% x pipa Ls 0.350 31,410.00 10,993.50
JUMLAH HARGA BAHAN 48,685.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 60,000.00 3,240.00
Tukang Batu L.02 OH 0.090 75,000.00 6,750.00
Kepala Tukang L.03 OH 0.009 75,000.00 675.00
Mandor L.04 OH 0.027 70,000.00 1,890.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa GIP medium class A 1" M 1.200 93,200.00 111,840.00
Perlengkapan 35% x pipa Ls 0.350 93,200.00 32,620.00
JUMLAH HARGA BAHAN 144,460.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 60,000.00 6,480.00
Tukang Batu L.02 OH 0.180 75,000.00 13,500.00
Kepala Tukang L.03 OH 0.018 75,000.00 1,350.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 21,680.00
B BAHAN
Pipa Galvanis 1 ½" M 1.200 35,000.00 42,000.00
Perlengkapan 35% x pipa Ls 0.350 35,000.00 12,250.00
JUMLAH HARGA BAHAN 54,250.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 60,000.00 6,480.00
Tukang Batu L.02 OH 0.180 75,000.00 13,500.00
Kepala Tukang L.03 OH 0.018 75,000.00 1,350.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 21,680.00
B BAHAN
Pipa GIP medium class A 1 ½" M 1.200 132,000.00 158,400.00
Perlengkapan 35% x pipa Ls 0.350 132,000.00 46,200.00
JUMLAH HARGA BAHAN 204,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Kran Air ½" bh 1.000 18,600.00 18,600.00
Sealtape bh 0.025 3,300.00 82.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Kran Tembok T23 B13 (TOTO) bh 1.000 300,000.00 300,000.00
Sealtape bh 0.025 3,300.00 82.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Jet washer THX 20 NBPIV bh 1.000 283,000.00 283,000.00
Sealtape bh 0.025 3,300.00 82.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Shower spray TX432SD (TOTO) bh 1.000 1,770,000.00 1,770,000.00
Sealtape bh 0.025 3,300.00 82.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 60,000.00 2,160.00
Tukang Batu L.02 OH 0.060 75,000.00 4,500.00
Kepala Tukang L.03 OH 0.006 75,000.00 450.00
Mandor L.04 OH 0.002 70,000.00 140.00
JUMLAH TENAGA KERJA 7,250.00
B BAHAN
Pipa PVC 3/4" M 1.200 6,458.33 7,750.00
Perlengkapan 35% x pipa Ls 0.350 6,458.33 2,260.42
JUMLAH HARGA BAHAN 10,010.41
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 60,000.00 4,860.00
Tukang Batu L.02 OH 0.135 75,000.00 10,125.00
Kepala Tukang L.03 OH 0.014 75,000.00 1,012.50
Mandor L.04 OH 0.004 70,000.00 280.00
JUMLAH TENAGA KERJA 16,277.50
B BAHAN
Pipa PVC 3" M 1.200 38,458.33 46,150.00
Perlengkapan 35% x pipa Ls 0.350 38,458.33 13,460.42
JUMLAH HARGA BAHAN 59,610.41
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 60,000.00 4,860.00
Tukang Batu L.02 OH 0.135 75,000.00 10,125.00
Kepala Tukang L.03 OH 0.014 75,000.00 1,012.50
Mandor L.04 OH 0.004 70,000.00 280.00
JUMLAH TENAGA KERJA 16,277.50
B BAHAN
Pipa PVC 4" M 1.200 63,625.00 76,350.00
Perlengkapan 35% x pipa Ls 0.350 63,625.00 22,268.75
JUMLAH HARGA BAHAN 98,618.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 60,000.00 4,860.00
Tukang Batu L.02 OH 0.135 75,000.00 10,125.00
Kepala Tukang L.03 OH 0.014 75,000.00 1,012.50
Mandor L.04 OH 0.004 70,000.00 280.00
JUMLAH TENAGA KERJA 16,277.50
B BAHAN
Pipa PVC 5" M 1.200 97,400.00 116,880.00
Perlengkapan 35% x pipa Ls 0.350 97,400.00 34,090.00
JUMLAH HARGA BAHAN 150,970.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Floor Drain TX1AN (TOTO) bh 1.000 377,000.00 377,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Paper holder TX11B (TOTO) bh 1.000 310,000.00 310,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 60,000.00 600.00
Tukang Batu L.02 OH 0.100 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.005 70,000.00 350.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
Double robe Hook TS118WS (TOTO) bh 1.000 310,000.00 217,000.00
URAIAN : ANGGAPAN/ASUMSI :
1. Bahan timbunan yang baik dihampar dengan tena 1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m bahu jalan)
orang 2. Matrial pilihan dikirim sampai tempat buruhan oleh levelansir
2. Pemadatan bahu jalan dengan Plat Vibrator Stam 3. Levelansir meletakan matrial timbunan sepanjang bahu jalan
4. 10 cm tembunan padat dibutuhkan pada 1 m lebar bahu jalan
5. Penghamparan timbunan dengan tenaga manusia
6. Pemadatan dengan Plate Vibrator Stamper
PEKERJA VOL HARI KODE TOTAL VOL UPAH BIAYA SUB TOTAL
(org.hari) Rp./hari/orang (Rp.) (Rp.)
MATERIAL 7,542,500.00
JUMLAH 13,874,395.11
PEKERJAAN 0
LOKASI KOTA TEGAL
TAHUN ANGGARAN 2018
SUMBER DANA APBN
PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.563 60,000.00 33,780.00
Mandor L.04 OH 0.056 70,000.00 3,941.00
JUMLAH TENAGA KERJA 37,721.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator OH 0.105 102,500.00 10,762.50
Pembantu operator OH 0.105 67,500.00 7,087.50
Sopir OH 0.105 105,000.00 11,025.00
Pembantu sopir OH 0.105 60,000.00 6,300.00
Pekerja L.01 OH 0.210 60,000.00 12,600.00
Mandor L.04 OH 0.053 70,000.00 3,675.00
JUMLAH TENAGA KERJA 16,275.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.950 60,000.00 57,000.00
Mandor L.04 OH 0.048 70,000.00 3,325.00
JUMLAH TENAGA KERJA 60,325.00
B BAHAN
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2018
PEKERJAAN : 0
LOKASI : KOTA TEGAL
TAHUN ANGGARAN : 2018
SUMBER DANA : -
Harga
No Kode Uraian Pekerjaan Satuan Satuan
(Rp.)
PEKERJAAN TANAH
1 A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m m3 43,379.15
2 A.2.3.1.3a. Penggalian 1 m3 tanah kontruksi menggunakan alat berat m3 108,145.36
3 A.2.3.1.8b. Pemindahan 1 m3 tanah sejauh 200 meter m3 69,373.75
4 A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah m3 19,262.50
5 A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug m3 211,255.00
6 A.2.3.1.14 Pengurugan 1 m3 sirtu m3 301,242.50
PEKERJAAN PONDASI
1 A.3.2.1.2a Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP (Batu belah 60%,Blonos 40%) m3 812,474.31
2 A.3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping) m3 434,590.75
PEKERJAAN BETON
1 A.4.1.1.4 Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 773,004.30
2 A.4.1.1.5 Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 905,324.97
3 A.4.1.1.7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 949,924.70
4 A.4.1.1.8 Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 957,281.85
5 A.4.1.1.9. Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52 m3 989,419.23
6 A.4.1.1.10. Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48 m3 1,062,404.12
7 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 10 kg 122,380.07
8 A.4.1.1.17a Pembesian dengan besi polos atau besi ulir kg 12,238.01
9 A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi m2 169,878.00
10 A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof m2 93,901.81
11 A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom m2 231,932.00
12 A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok m2 240,513.88
13 A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai m2 367,057.00
14 A.4.1.1.25a Pemasangan 1 m2 bekisting untuk dinding m2 318,522.98
15 A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga m2 232,794.50
PEKERJAAN PLESTERAN
1 A.4.4.2.3 Pemasangan 1m² plesteran 1 PC :3 PP tebal 15 mm (Termasuk acian) m2 50,955.40
Harga
No Kode Uraian Pekerjaan Satuan Satuan
(Rp.)
2 A.4.4.2.5 Pemasangan 1m² plesteran 1 PC :5 PP tebal 15 mm (Termasuk acian) m2 48,732.51
3 A.4.4.2.20 Pemasangan 1m¹ plesteran profil PP lebar 10 cm m2 21,521.52
Harga
No Kode Uraian Pekerjaan Satuan Satuan
(Rp.)
PEKERJAAN PENUTUP LANTAI DAN DINDING
1 A.4.4.3.35 Pemasangan 1m² lantai keramik ukuran 30cm x 30cm m2 158,713.39
2 A.4.4.3.35.a Pemasangan 1m² lantai kermaik ukuran 40cm x 40cm (Putih polos) m2 171,975.33
3 A.4.4.3.35.b Pemasangan 1m² lantai kermaik ukuran 40cm x 40cm (Anti selip) m2 186,140.94
4 A.4.4.3.36 Pemasangan 1m² lantai keramik ukuran 20cm x 20cm (anti slip) m2 180,696.52
5 A.4.4.3.37 Pemasangan 1m¹ plint keramik ukuran 10cm x 40cm m1 58,607.90
6 A.4.4.3.37.a Pemasangan 1m¹ Step nozing keramik ukuran 10cm x 40cm m1 77,400.82
7 A.4.4.3.54.a Pemasangan 1m² dinding keramik 20 cm x 25 cm m2 188,824.14
8 A.4.4.3.58 Pemasangan 1m² dinding batu tempel hitam m2 191,788.88
PEKERJAAN PLAFOND
1 A.4.5.1.7 Memasang 1 m2 Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm m2 38,058.79
2 A.4.5.1.9.a Pemasangan 1 m' List Langit-Langit Gypsum m1 32,090.75
PEKERJAAN ATAP
1 A.4.5.2.2b. Pemasangan 1 m2 Atap Genteng Morando Glazur m2 110,095.25
2 A.4.5.2.4b. Pemasangan 1 m' Genteng Bubung Morando Glazur m1 129,508.63
3 A.4.5.2.42 Pemasangan 1 m2 Alumunium Foil/sisalation m2 25,699.63
PEKERJAAN KAYU
A.4.6.1.16b. Pemasangan 1 m² rangka atap genteng keramik/morando, kayu kruing m2 138,276.00
1 A.4.6.1.22 Pemasangan 1 m' lisplank ukuran (3 x 20 ), kayu kruing m2 116,784.80
PEKERJAAN PENGECATAN
1 A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m2 20,761.53
2 A.4.7.1.10.a Pengecetan 1m2 plafond baru menggunakan perancah ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat m2 26,137.78
3 A.4.7.1.10.b Pengecatan 1 m2 tembok eksterior weathershield (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penu m2 80,308.53
4 A.4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m2 15,358.25
Tegal, 2018
Dibuat Oleh :
Konsultan Perencana
CV. CITRA VASTU VIDYA
IMRON, ST, MT
Direktur
RENCANA ANGGARAN BIAYA ( RAB )
1 2 3 4
I PEKERJAAN BONGKARAN
1 Pek. Bongkar Kusen Pintu 1.00 Bh Taksir
2 Pek. Bongkar Glasblok 1.00 Pkt Taksir
3 Pek. Bongkar + Pasang Jendela 1.00 Pkt Taksir
JUMLAH I
2 PEKERJAAN TANAH
1 Pek. Galian Tanah 6.85 m3 A.2.3.1.1.
2 Pek. Urug Tanah kembali 2.28 m3 A.2.3.1.9.
3 Pek.Peninggian lantai Pasir urug 21.97 m3 A.2.3.1.11.
JUMLAH I
II PEKERJAAN PONDASI
1 Pas. Pondasi batu kosong 2.11 m3 A.3.2.1.9.
2 Pas. Pondasi batu belah 5.14 m3 A.3.2.1.2a.
3 Pek. Urugan Pasir Pondasi 1.06 m3 A.2.3.1.11.
JUMLAH II
III PEKERJAAN BETON
1 Pek. Pembesian Sloof 15 x 20 79.48 kg A.4.1.1.17.a
2 Pek. Pembesian Kolom 15 x 15 43.19 kg A.4.1.1.17.a
3 Pek. Pembesian Ringbalk 15 x 15 73.68 kg A.4.1.1.17.a
4 Pek. bekisting Sloof 5.83 m2 A.4.1.1.21.
5 Pek. Bekisting Kolom 14.80 m2 A.4.1.1.22.
6 Pek. Bekisting Ringbalk 5.83 m2 A.4.1.1.22.
7 Pek. Pengecoran sloof (k225) 0.44 m3 A.4.1.1.7.
8 Pek. Pengecoran Kolom (k225) 0.33 m3 A.4.1.1.7.
9 Pek. Pengecoran Ringbalk ( K225) 0.33 m3 A.4.1.1.7.
JUMLAH III
IV PEKERJAAN PASANGAN
1 Pek. Pas batu bata 53.95 m2 A.4.4.1.8.
2 Pek. Pas Plesteran & Acian 40.21 m2 A.4.4.2.3.
JUMLAH IV
V PEKERJAAN LANTAI KERAMIK
1 Pek. Lantai Keramik 40 x 40 39.02 m2 A.4.4.3.35.a
2 Pek. Lantai Keramik KM 20 x 20 3.70 m2 A.4.4.3.36.
3 Pek. Keramik Dinding 20 x 25 7.64 m2 A.4.4.3.54.a
JUMLAH V
VI PEKERJAAN KUSEN PINTU & JENDELA
1 Pasang kusen Kupu tarung 6.00 m' Taksir
2 Pasang kusen pintu tunggal 5.00 m' Taksir
3 Pasang daun pintu kupu tarung (jati) 3.20 m2 Taksir
4 Pasang daun pintu tunggal 2.00 bh Taksir
5 Pasang peralatan pintu kupu tarung (engsel, handle dan selot) 1.00 bh Taksir
6 Pasang peralatan pintu tunggal (engsel dan selot) 1.00 bh Taksir
7 Pasang kusen J2 13.80 m' Taksir
8 Pasang daun J2 + engsel dan kaca 2.00 bh Taksir
9 Pasang pintu KM/WC 1.00 bh Taksir
10 Pasang Glassblock 8.00 bh Taksir
JUMLAH VI
VII PEKERJAAN PLAFON
1 Pek Rangka Hollow Plafond 54.59 m2 A.4.2.1.21.a
2 Pas.papan gypsum board 9 mm 42.72 m2 A.4.5.1.7
3 Pas. Papan Backdrop Gypsum Board 9 mm 11.87 m2 A.4.5.1.7
4 Pek. Compon Papan Gypsum Board
5 Pengecetan 1m2 plafond baru 54.59 m2 A.4.7.1.10.b
5 Pek. Lis Plafond 10 cm 43.76 m' A.4.5.1.9.a
JUMLAH VII
VIII PEKERJAAN PENGECETAN
1 Pek. Pengecetan 46.21 m2 A.4.7.1.10.
2 Pek. Pemasangan Walpaper 36.71 m2 Taksir
JUMLAH VII
IX PEKERJAAN INSTALASI AIR
1 Pek. Instalasi Air Kotor Pipa 3'' AW 8.00 m' A.5.1.1.31
2 Pek. Instalasi Air Bersih Pipa 3/4" AW 12.00 m' A.5.1.1.26
3 Pas. Wastafel American Standar 1.00 pkt Taksir
4 Pas. Kran 3/4 1.00 Bh Taksir
5 Pas. Sower Tanam KM 1.00 Bh Taksir
6 Pas. Closet Duduk American Standar 1.00 Bh Taksir
JUMLAH VII
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Saklar Seri Broco 2.00 Bh Taksir
2 Pas. Saklar Engkel 1.00 Bh Taksir
3 Pas. Stop Kontak AC Broco 2.00 Bh Taksir
4 Pas. Stop Kontak 2.00 Bh Taksir
5 Pas. Exshaus KM 1.00 Bh Taksir
6 Pas. Instalasi Listrik Kable Kitani 2.00 Roll Taksir
7 Pas. Lampu Downlight 5" (dan fittingnya) 3.00 Bh Taksir
8 Pas. Lampu Downlight 3.5'' (dan fittingnya) 2.00 Bh Taksir
JUMLAH IX
JUMLAH TOTAL
RAB )
5 6 ( 3*5)
Rp 150,000 Rp 150,000
Rp 50,000 Rp 50,000
Rp 100,000 Rp 100,000
Rp 300,000
Rp 43379.15 Rp 297338.05
Rp 19262.50 Rp 44010.96
Rp 211255.00 Rp 4641536.42
Rp 4,982,885
Rp 434,591 Rp 917,073
Rp 812,474 Rp 4,173,477
Rp 211,255 Rp 222,895
Rp 5,313,446
Rp 12,238 Rp 972,719
Rp 12,238 Rp 528,515
Rp 12,238 Rp 901,738
Rp 93,902 Rp 547,635
Rp 231,932 Rp 3,432,594
Rp 231,932 Rp 1,352,627
Rp 949,925 Rp 415,497
Rp 949,925 Rp 316,325
Rp 949,925 Rp 311,623
Rp 8,779,274
Rp 136,224 Rp 7,348,714
Rp 50,955 Rp 2,048,764
Rp 9,397,478
Rp 171,975 Rp 6,710,220
Rp 180,697 Rp 668,577
Rp 188,824 Rp 1,443,372
Rp 8,822,168
Rp 750,000 4,500,000
Rp 750,000 3,750,000
Rp 850,000 2,720,000
Rp 850,000 1,700,000
Rp 1,000,000 1,000,000
Rp 650,000 650,000
Rp 750,000 10,350,000
Rp 800,000 1,600,000
Rp 350,000 350,000
Rp 25,000 200,000
Rp 22,320,000
Rp 141,605 Rp 7,730,061
Rp 38,059 Rp 1,625,814
Rp 38,059 Rp 451,769
Rp Rp
Rp 20,762 Rp 1,133,347
Rp 32,091 Rp 1,404,291
Rp 12,345,282
Rp 20,762 Rp 959,359
Rp 47,500 Rp 1,743,654
Rp 2,703,013
Rp 87,271 Rp 698,169
Rp 19,849 Rp 238,194
Rp 850,000 Rp 850,000
Rp 25,000 Rp 25,000
Rp 735,000 Rp 735,000
Rp 1,875,000 Rp 1,875,000
Rp 4,421,362
Rp 50,000 Rp 100,000
Rp 100,000 Rp 100,000
Rp 50,000 Rp 100,000
Rp 50,000 Rp 100,000
Rp 750,000 Rp 750,000
Rp 500,000 Rp 1,000,000
Rp 125,000 Rp 375,000
Rp 150,000 Rp 300,000
Rp 2,825,000
RP 82,209,909