REVISI I (FERBUARI 2019)

BERDASARKAN PERATURAN
MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA, NOMOR 28/PRT/M/2016
TENTANG PEDOMAN ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM
KEGIATAN
PENYUSUNAN ANALISA HARGA SATUAN BANGUNAN GEDUNG
PEKERJAAN
PENYUSUNAN ANALISA HARGA SATUAN PEKERJAAN PAKET 2 TAHUN ANGGARAN 2018
WILAYAH BAWAH
Kec. Slawi, Dukuhwaru, Lebaksiu, Talang, Adiwerna, Pangkah (Kecuali Dermasuci), Tarub, Dukuhturi,
Pagerbarang, Kedungbanteng, Kramat, Suradadi,
Warurejo, Balapulang (bawah), Margasari

1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m


A TENAGA 62,625.00
L.01 0.750 OH Pekerja 80,000.00 60,000.00
L.04 0.025 OH Mandor 105,000.00 2,625.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 62,625.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 62,620.00
2 A.2.3.1.2 1 m3 Menggali Tanah Biasa Sedalam 2 m
A TENAGA 76,725.00
L.01 0.900 OH Pekerja 80,000.00 72,000.00
L.04 0.045 OH Mandor 105,000.00 4,725.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 76,725.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 76,725.00
8 A.2.3.1.8 1 m3 Membuang Tanah sejauh 30 m'
A TENAGA 27,450.00
L.01 0.330 OH Pekerja 80,000.00 26,400.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 27,450.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 27,450.00
7 A.3.2.1.3a 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP (Batu belah 60%,Blonos 40%)
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 645,155.20
0.720 m3 Batu Belah 15/20 295,800.00 212,976.00
0.480 m3 Batu Blonos 273,300.00 131,184.00
136.000 Kg Portland Sement 1,120.00 152,320.00
0.544 m3 Pasir Pasang 273,300.00 148,675.20
C PERALATAN -
D JUMLAH A + B + C 855,905.20
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 855,905.20
15 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping
A TENAGA 109,590.00
L.01 0.780 OH Pekerja 80,000.00 62,400.00
L.02 0.390 OH Tukang Batu 100,000.00 39,000.00
L.03 0.039 OH Kepala Tukang 105,000.00 4,095.00
L.04 0.039 OH Mandor 105,000.00 4,095.00
B BAHAN 423,950.40
1.200 m3 Batu Belah 15/20 295,800.00 354,960.00
0.432 m3 Pasir Urug 159,700.00 68,990.40
C PERALATAN -
D JUMLAH A + B + C 533,540.40
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 533,540.40
5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 774,571.75
326.000 Kg Portland Semen 1,120.00 365,120.00
760.000 Kg Pasir Beton 218.21 165,842.86
1,029.000 Kg Kerikil (maksimum 30 mm) 226.30 232,858.89
215.000 ltr Air 50.00 10,750.00
C PERALATAN -
D JUMLAH A + B + C 945,726.75
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 945,726.75
6 A.4.1.1.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir
A TENAGA 13,755.00
L.01 0.070 OH Pekerja 80,000.00 5,600.00
L.02 0.070 OH Tukang Besi 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.004 OH Mandor 105,000.00 420.00
B BAHAN 123,750.00
10.500 Kg Besi Beton (polos/ulir) 11,500.00 120,750.00
0.150 Kg Kawat Beton 20,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 137,505.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 137,505.00
13 A.4.1.1.17b 1 Kg Pembesian dg Besi Polos atau Besi Ulir
A TENAGA 1,375.50
L.01 0.007 OH Pekerja 80,000.00 560.00
L.02 0.007 OH Tukang Besi 100,000.00 700.00
L.03 0.001 OH Kepala Tukang 105,000.00 73.50
L.04 0.000 OH Mandor 105,000.00 42.00
B BAHAN 12,375.00
1.050 Kg Besi Beton (polos/ulir) 11,500.00 12,075.00
0.015 Kg Kawat Beton 20,000.00 300.00
C PERALATAN -
D JUMLAH A + B + C 13,750.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 13,750.50
16 A.4.1.1.20 1 m2 Memasang Bekisting untuk Pondasi
A TENAGA 73,060.00
16

L.01 0.520 OH Pekerja 80,000.00 41,600.00


L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
HARGA
BAHAN/UPAH (Rp)
No. SNI KODE KOEFISIEN SAT. URAIAN JUMLAH (Rp)

B BAHAN 119,300.00
0.040 m3 Papan kayu pinus 2,800,000.00 112,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 192,360.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 192,360.00
16 A.4.1.1.20a 1 m2 Memasang Bekisting untuk Pondasi (papan kayu lokal)
A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 65,300.00
0.040 m3 Papan kayu lokal 1,450,000.00 58,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 138,360.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 138,360.00
17 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof
A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 133,300.00
0.045 m3 Papan kayu pinus 2,800,000.00 126,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 206,360.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 206,360.00
18 A.4.1.1.21b 1 m2 Memasang Bekisting untuk Sloof (papan kayu lokal, 2x pakai)
A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 39,425.00
0.023 m3 Papan kayu lokal 1,450,000.00 32,625.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.050 Ltr Minyak Bekisting 10,000.00 500.00
C PERALATAN -
D JUMLAH A + B + C 112,485.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 112,485.00
21 A.4.1.1.22b 1 m2 Memasang Bekisting untuk Kolom (2x pakai)
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 65,400.00
0.020 m3 Papan cetak pinus 2,800,000.00 56,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 158,130.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 158,130.00
23 A.4.1.1.22d 1 m2 Memasang Bekisting untuk Kolom (papan kayu lokal, 2x pakai)
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 38,400.00
0.020 m3 Papan kayu lokal 1,450,000.00 29,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 131,130.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 131,130.00
27 A.4.1.1.23b 1 m2 Memasang Bekisting untuk Balok (2x pakai)

A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 65,400.00
0.020 m3 Papan cetak pinus 2,800,000.00 56,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 158,130.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 182,750.00
0.350 Lbr Tripleks tebal 9mm 145,000.00 50,750.00
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 132,000.00
C PERALATAN -
D JUMLAH A + B + C 340,880.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 340,880.00
34 A.4.1.1.24a 1 m2 Memasang Bekisting untuk Lantai (papan kayu lokal)
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 224,650.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.015 m3 Balok Kayu lokal 2,100,000.00 31,500.00
0.350 Lbr tripleks tebal 9mm 145,000.00 50,750.00
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 132,000.00
C PERALATAN -
D JUMLAH A + B + C 317,380.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 317,380.00
36 A.4.1.1.26 1 m2 Memasang Bekisting untuk Tangga
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 179,650.00
0.030 m3 Kayu lokal papan 1,450,000.00 43,500.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.150 Ltr Minyak Bekisting 10,000.00 1,500.00
0.015 m3 Balok Kayu Lokal 2,100,000.00 31,500.00
0.350 Lbr Tripleks tebal 9mm 145,000.00 50,750.00
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 44,000.00
C PERALATAN -
D JUMLAH A + B + C 272,380.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 272,380.00
12 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium (4" silver ex. Alexindo)
A TENAGA 8,412.00
L.01 0.043 OH Pekerja 80,000.00 3,440.00
L.02 0.043 OH Tukang Besi 100,000.00 4,300.00
L.03 0.004 OH Kepala Tukang 105,000.00 451.50
L.04 0.002 OH Mandor 105,000.00 220.50
B BAHAN 111,350.00
1.100 m' Profil Allumunium 96,500.00 106,150.00
2.000 buah Skrup Fixer 800.00 1,600.00
0.060 Tube Sealant 60,000.00 3,600.00
C PERALATAN -
D JUMLAH A + B + C 119,762.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 119,762.00
HARGA
BAHAN/UPAH (Rp)
No. SNI KODE KOEFISIEN SAT. URAIAN JUMLAH (Rp)

13 A.4.2.1.12 1 m2 Pemasangan Pintu Allumunium Strip Lebar 8 cm (4" silver ex. Alexindo
A TENAGA 16,633.50
L.01 0.085 OH Pekerja 80,000.00 6,800.00
L.02 0.085 OH Tukang Besi 100,000.00 8,500.00
L.03 0.009 OH Kepala Tukang 105,000.00 892.50
L.04 0.004 OH Mandor 105,000.00 441.00
B BAHAN 833,400.00
4.400 m' Profil Allumunium 96,500.00 424,600.00
14.600 m' Allumunium Strip 28,000.00 408,800.00
C PERALATAN -
D JUMLAH A + B + C 850,033.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 850,033.50
14 A.4.2.1.13 1 m2 Pemasangan Pintu Kaca Rangka Allumunium
A TENAGA 16,770.00
L.01 0.085 OH Pekerja 80,000.00 6,800.00
L.02 0.085 OH Tukang Besi 100,000.00 8,500.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 478,850.00
4.400 m' Pintu Allumunium 98,500.00 433,400.00
4.500 m' Profil Kaca 6,500.00 29,250.00
0.270 tube Sealant 60,000.00 16,200.00
C PERALATAN -
D JUMLAH A + B + C 495,620.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 495,620.00
23 A.4.2.1.21 1 m2 Pemasangan Rangka Besi Hollow 1 x 36.36.0,3
mm; Modul 60x60 cm dinding plafond
A TENAGA 68,565.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 0.350 OH Tukang Besi 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 74,000.00
4.000 m' Rangka metal hollow 36.36.0,3 mm 9,250.00 37,000.00
1.000 **) Assesoris (perkuatan, dll) 37,000.00 37,000.00
**) 100% x rangka
C PERALATAN 15% -
D JUMLAH A + B + C 142,565.00
E OVERHEAD & PROFIT (maksimal 15%)
F HARGA SATUAN PEKERJAAN (D+E) 142,565.00
9 A.4.4.1.9 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 105,131.90
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
11.500 Kg Portland Semen 1,120.00 12,880.00
0.043 m3 Pasir Pasang 273,300.00 11,751.90
C PERALATAN -
D JUMLAH A + B + C 141,756.90
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 141,756.90
23 A.4.4.1.23 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
23

L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00


L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 231,885.50
30.000 Buah Terawang / Roster 7,000.00 210,000.00
11.000 kg Portland Semen 1,120.00 12,320.00
0.035 m3 Pasir Pasang 273,300.00 9,565.50
C PERALATAN -
D JUMLAH A + B + C 268,510.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 268,510.50
4 A.4.4.2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 13,548.00
6.240 Kg Portland Semen 1,120.00 6,988.80
0.024 m3 Pasir Pasang 273,300.00 6,559.20
C PERALATAN -
D JUMLAH A + B + C 55,698.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 55,698.00
14 A.4.4.3.35a 1 m2 Pemasangan Lantai Keramik 40 x 40 cm putih
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 84,698.50
6.625 Buah Ubin Keramik 40 x 40 cm putih 8,700.00 57,637.50
10.000 Kg Portland Semen 1,120.00 11,200.00
0.045 m3 Pasir Pasang 273,300.00 12,298.50
1.500 Kg Semen Warna 2,375.00 3,562.50
C PERALATAN -
D JUMLAH A + B + C 183,048.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 183,048.50
17 A.4.4.3.36a 1 m2 Pemasangan Lantai Keramik 20 x 20 cm anti selip
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 94,044.00
26.500 Buah Ubin Keramik 20 x 20 cm anti selip 2,500.00 66,250.00
10.400 Kg Portland Semen 1,120.00 11,648.00
1.620 Kg Semen Warna 2,375.00 3,847.50
0.045 m3 Pasir Pasang 273,300.00 12,298.50
C PERALATAN -
D JUMLAH A + B + C 192,394.00
E OVERHEAD & PROFIT (maksimal 15%)
15%
F HARGA SATUAN PEKERJAAN (D+E) 192,394.00
30 A.4.4.3.54 1 m2 Pemasangan Dinding Keramik 20x20 cm,warna
A TENAGA 126,450.00
L.01 0.900 OH Pekerja 80,000.00 72,000.00
L.02 0.450 OH Tukang Batu 100,000.00 45,000.00
L.03 0.045 OH Kepala Tukang 105,000.00 4,725.00
L.04 0.045 OH Mandor 105,000.00 4,725.00
B BAHAN 79,567.90
26.500 Buah Keramik 2,250.00 59,625.00
9.300 Kg Portland Semen 1,120.00 10,416.00
0.018 m3 Pasir Pasang 273,300.00 4,919.40
1.940 Kg Semen Warna 2,375.00 4,607.50
C PERALATAN -
D JUMLAH A + B + C 206,017.90
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 206,017.90
7 A.4.5.1.7 1 m2 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm
A TENAGA 14,050.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.050 OH Tukang Kayu 100,000.00 5,000.00
7

L.03 0.005 OH Kepala Tukang 105,000.00 525.00


L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 21,492.00
0.364 Lbr Gypsum Board 53,000.00 19,292.00
0.110 Kg Paku Sekrup 20,000.00 2,200.00
C PERALATAN -
D JUMLAH A + B + C 35,542.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 35,542.00
8 A.4.5.1.8 1 m2 Memasang Langit-langit Akustik Uk (60x120) cm & Berikut Rangka Allumunium
A TENAGA -
L.01 0.500 OH Pekerja -
L.02 0.500 OH Tukang Kayu -
L.03 0.050 OH Kepala Tukang -
L.04 0.025 OH Mandor -
B BAHAN -
3.600 m' Profil Allumunium "T" -
0.150 kg Kawat Ø 4 mm -
1.050 bh Ramset -
1.500 lmb Akustik 60 x 120 cm -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (maksimal 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
3 A.4.5.2.2a 1 m2 Pemasangan Atap Genteng press jatiwangi

A TENAGA 21,180.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 60,000.00
25.000 Buah Genteng press jatiwangi 2,400.00 60,000.00
C PERALATAN -
D JUMLAH A + B + C 81,180.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 81,180.00
9 A.4.5.2.5a 1 m' Pemasangan Genteng Bubung Press Jatiwangi
A TENAGA 54,310.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.002 OH Mandor 105,000.00 210.00
HARGA
BAHAN/UPAH (Rp)
No. SNI KODE KOEFISIEN SAT. URAIAN JUMLAH (Rp)

B BAHAN 43,705.60
4.000 Buah Genteng Bubung Press Jatiwangi 6,500.00 26,000.00
8.000 Kg Portland Semen 1,120.00 8,960.00
0.032 m3 Pasir Pasang 273,300.00 8,745.60
C PERALATAN -
D JUMLAH A + B + C 98,015.60
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 98,015.60
30 A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal polos
A TENAGA 28,100.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 48,390.00
1.020 m2 Genteng Metal polos 44,500.00 45,390.00
0.200 Kg Paku Biasa Ø ½" - 1" (sekrup) 15,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 76,490.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 76,490.00
34 A.4.5.2.37 1 m' Pemasangan Nok Genteng Metal
A TENAGA 37,940.00
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
34

L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00


L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 30,450.00
1.100 Buah Nok Genteng polos 27,000.00 29,700.00
0.050 Kg Paku Biasa Ø ½" - 1" (sekrup) 15,000.00 750.00
C PERALATAN -
D JUMLAH A + B + C 68,390.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 68,390.00
15 A.4.6.1.15 1 m3 Pemasangan konstruksi Gording, Kayu Kruing
A TENAGA 1,000,200.00
L.01 2.400 OH Pekerja 80,000.00 192,000.00
L.02 7.200 OH Tukang Kayu 100,000.00 720,000.00
L.03 0.720 OH Kepala Tukang 105,000.00 75,600.00
L.04 0.120 OH Mandor 105,000.00 12,600.00
B BAHAN 8,538,000.00
1.100 m3 Kayu Kruing, balok 7,500,000.00 8,250,000.00
15.000 Kg Besi Strip 15,000.00 225,000.00
3.000 Kg Paku Biasa 2" - 5" 21,000.00 63,000.00
C PERALATAN -
D JUMLAH A + B + C 9,538,200.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 9,538,200.00
16 A.4.6.1.16 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu kruing
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 87,562.00
0.014 m3 Kayu kruing, Kaso-kaso (5x7) cm 4,730,000.00 66,220.00
0.004 m3 Kayu Kruing, Reng (2x3) cm 4,470,000.00 16,092.00
0.250 Kg Paku Biasa 2" - 5" 21,000.00 5,250.00
C PERALATAN -
D JUMLAH A + B + C 107,137.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 107,137.00
17 A.4.6.1.16a 1 m2 Pemasangan Rangka Atap Genteng Press Jatiwangi, Kayu kruing
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 87,562.00
0.014 m3 Kayu kruing, Kaso-kaso (5x7) cm 4,730,000.00 66,220.00
0.004 m3 Kayu Kruing, Reng (2x3) cm 4,470,000.00 16,092.00
0.250 Kg Paku Biasa 2" - 5" 21,000.00 5,250.00
C PERALATAN -
D JUMLAH A + B + C 107,137.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 107,137.00
XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA
1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa
A TENAGA 52,375.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.500 OH Tukang Kayu 100,000.00 50,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 70,000.00
1.000 Buah Kunci Tanam Biasa 70,000.00 70,000.00
C PERALATAN -
D JUMLAH A + B + C 122,375.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 122,375.00
2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi
A TENAGA 51,187.50
L.01 0.005 OH Pekerja 80,000.00 400.00
L.02 0.500 OH Tukang Kayu 100,000.00 50,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.003 OH Mandor 105,000.00 262.50
B BAHAN 70,000.00
1.000 Buah Kunci Tanam Kamar Mandi 70,000.00 70,000.00
C PERALATAN -
D JUMLAH A + B + C 121,187.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 121,187.50
4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu
A TENAGA 18,562.50
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.008 OH Mandor 105,000.00 787.50
HARGA
BAHAN/UPAH (Rp)
No. SNI KODE KOEFISIEN SAT. URAIAN JUMLAH (Rp)

B BAHAN 25,000.00
1.000 Buah Engsel pintu 25,000.00 25,000.00
C PERALATAN -
D JUMLAH A + B + C 43,562.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 43,562.50
5 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu
A TENAGA 12,375.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 8,500.00
1.000 Buah Engsel Jendela 8,500.00 8,500.00
C PERALATAN -
D JUMLAH A + B + C 20,875.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 20,875.00
6 A.4.6.2.7 1 Buah Pemasangan Engsel Angin
A TENAGA 30,152.50
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.001 OH Mandor 105,000.00 52.50
B BAHAN 16,000.00
1.000 Buah Engsel Angin 16,000.00 16,000.00
C PERALATAN -
D JUMLAH A + B + C 46,152.50
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 46,152.50
7 A.4.6.2.9 1 Buah Pemasangan Kait Angin
A TENAGA 18,615.00
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 15,000.00
1.000 Buah Kait Angin 15,000.00 15,000.00
C PERALATAN -
D JUMLAH A + B + C 33,615.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 33,615.00
9 A.4.6.2.11 1 Buah Pemasangan Kunci Selot
A TENAGA 23,805.00
L.01 0.020 OH Pekerja 80,000.00 1,600.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
HARGA
BAHAN/UPAH (Rp)
No. SNI KODE KOEFISIEN SAT. URAIAN JUMLAH (Rp)

L.04 0.001 OH Mandor 105,000.00 105.00


B BAHAN 20,000.00
1.000 Buah Kunci Selot 20,000.00 20,000.00
C PERALATAN -
D JUMLAH A + B + C 43,805.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 43,805.00
14 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm
A TENAGA 17,853.75
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.001 OH Mandor 105,000.00 78.75
B BAHAN 165,000.00
1.100 m2 Kaca tebal 5mm 150,000.00 165,000.00
C PERALATAN -
D JUMLAH A + B + C 182,853.75
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 182,853.75
4 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
A TENAGA 7,445.00
L.01 0.070 OH Pekerja 80,000.00 5,600.00
L.02 0.009 OH Tukang Cat 100,000.00 900.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.003 OH Mandor 105,000.00 315.00
HARGA
BAHAN/UPAH (Rp)
No. SNI KODE KOEFISIEN SAT. URAIAN JUMLAH (Rp)

B BAHAN 33,230.00
0.200 kg Cat Menie 35,000.00 7,000.00
0.150 kg Plamuur 25,000.00 3,750.00
0.170 kg Cat Dasar 35,000.00 5,950.00
0.260 kg Cat Penutup 55,000.00 14,300.00
0.010 bh Kuas 63,000.00 630.00
0.030 kg Pengencer 20,000.00 600.00
0.200 lbr Amplas 5,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 40,675.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 40,675.00
2 A.5.1.1.2 1 Unit Pemasangan Closet Jongkok Porselen
A TENAGA 404,300.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 1.500 OH Tukang Batu 100,000.00 150,000.00
L.03 1.500 OH Kepala Tukang 105,000.00 157,500.00
L.04 0.160 OH Mandor 105,000.00 16,800.00
B BAHAN 164,453.00
1.000 Buah Kloset Jongkok 155,000.00 155,000.00
6.000 Kg Portland Semen 1,120.00 6,720.00
0.010 m3 Pasir Pasang 273,300.00 2,733.00
C PERALATAN -
D JUMLAH A + B + C 568,753.00
E OVERHEAD & PROFIT (maksimal 15%) 15%
F HARGA SATUAN PEKERJAAN (D+E) 568,753.00
PERHITUNGAN VOLUME PEKERJAAN

Kegiatan : Dana Desa


Pekerjaan : Pembangunan Gedung Perpustakaan Desa
Lokasi : Desa Balapulang Wetan
TA : 2019

NO GAMBAR SKETSA PERHITUNGAN VOLUME


I PEK. PERSIAPAN
1. Pembersihan Lahan
Taksir = 1.00 LS

2 Pengukuran dan Bowplank


Taksir = 1.00 LS
LANTAI 1
FOOTPLAT DAN KOLOM BARU
II PEKERJAAN BONGKARAN
1 Galian Tanah K
Panjang 9.30 m 0.70 8.70
Lebar 0.30 m 0.70 0.8
Tinggi 0.10 m 1.60 0.70
Jumlah 2.00 bh 2.00
volume 0.56 m3 1.57 4.872 7.00 m3

III PEKERJAAN PAS. BATU BELAH


Pas. Batu kosong 0.20 6.00 9.30 11.16
Pas. Batu Kali 8.70 0.30 0.60 0.80 3.13

IV PEKERJAAN BETON
BEKISTING foot plat kolom bawah sloof
Keliling 4 m 1.2 9.30
Tinggi 0.35 m 1.65 0.25
Jumlah 2 bh 2 2
Volume 2.8 m2 3.96 m2 4.65 m2
Beton
Panjang/KEL 1.00 m 0.30 9.30
Lebar 1.00 m 0.30 0.20
Tinggi 0.35 m 1.65 0.25
Jumlah 2.00 bh 2.00
Volume 0.70 m3 0.297 0.47
Pembesian
dia Æ 16 48.5 1.578 48 1.578 46.50 0.888
panjang ring Æ 8 31.2 0.395 41.85 0.395
jumlah 2 2
Volume 153.066 151.488 41.29
Volume 24.648 16.53

PENINGGIAN KOLOM LAMA DAN BARU


BEKISTING kolom lm kolom
Keliling 1.2 1.2
Tinggi 1.8 3.8
Jumlah 8 2
Volume 17.28 m2 9.12 m2
Beton
Panjang/KEL 0.30 0.30
Lebar 0.30 0.30
Tinggi 1.80 3.80
Jumlah 8.00 2.00
Volume 1.296 M3 0.684 M3
Pembesian
dia Æ 16 42 1.578
panjang ring Æ 8 27.3 0.395
jumlah 2
Volume 132.552
Volume 21.567

PASANGAN BATA Keliling (14+4,5+14+4,5) 37 tinggi 3.75 138.75


pe - an plong 9.6
pintu 4
jendela 7.2
boven 1.44
MAKA 199.8 M2
PLESTERAN 399.6 m2

BALOK UTAMA (20/35) BEKISTING balok


D16 5 BUAH Keliling 0.70
D12 2 BUAH Tinggi
Jumlah 5
Volume 3.50 m2
Beton
Panjang/KEL
Lebar 0.20
Tinggi 0.25
Jumlah 5.00
Volume 0.25 M3
Pembesian
dia Æ 16 162.50 1.578
dia Æ 12 65.00 0.888
panjang ring Æ 8 178.75 0.395
Volume 256.43 57.72
Volume 70.61
VOL TOTAL 384.75
RING BALOK + Balok anak (20/25) BEKISTING balok
D12 6 BUAH Keliling 0.50
panjang 42
Jumlah
Volume 21.00 m2
Beton
Panjang/KEL
Lebar 0.20
Tinggi 0.15
Panjang 42.00
Volume 1.26 M3
Pembesian
dia Æ 12 252.00 0.888
panjang ring Æ 8 189.00 0.395
Volume 223.78
Volume 74.66 x 2 447.55
149.31
PEKERJAAN LANTAI 2

KOLOM PRAKTIS
BEKISTING kolom
Keliling 0.6
Tinggi 3.5
Jumlah 10
Volume 21 m2
Beton
Panjang/KEL 0.15
Lebar 0.15
Tinggi 3.50
Jumlah 10.00
Volume 0.7875 M3
Pembesian
dia Æ 12 140 0.888
panjang ring Æ 8 12.25 0.395
jumlah 10
Volume 1243.2
Volume 48.3875
VOL TOTAL 1291.588
PASANGAN BATA Keliling (11,6+4,5+11,6+4,5) 37 tinggi 3.25 120.25
pe - an plong 9.6
pintu 4
jendela 7.2
boven 1.44
MAKA 173.16 M2
PLESTERAN 346.32 m2

RING BALOK (15/20) BEKISTING balok


D12 4 BUAH Keliling 37.00
Tinggi 0.2
Jumlah 2
Volume 14.80 m2
Beton
Panjang/KEL
Lebar 0.15
Tinggi 0.20
Keliling 37.00
Volume 1.11 M3
Pembesian
dia Æ 16
dia Æ 12 148.00 0.888 131.42
panjang ring Æ 8 129.50 0.395 51.15
Volume - 182.58
Volume 182.58
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan : Dana Desa
Pekerjaan : Pembangunan Gedung Perpustakaan Desa
Lokasi : Desa Balapulang Wetan
TA : 2019

Analisa Harga Jumlah Jumlah


No Uraian Pekerjaan yang Volume Satuan Satuan Harga Semua
dipakai (Rp) (Rp) (Rp)
LANTAI 1
I PEK. PERSIAPAN
1 Papan Nama Kegiatan Taksir 1.00 ls 250,000.00 250,000.00
2 Pengukuran dan Bouwplank Taksir 1.00 ls 500,000.00 500,000.00
3 Pembersihan lahan Taksir 1.00 ls 672,000.00 672,000.00
Jumlah 1,422,000.00
II PEK. TANAH
1 Galian Tanah A.2.3.1.1. 7.00 m3 62,620.00 438,214.76
438,214.76
III PAS. PONDASI BATU KALI
1 Pas. Batu Kosong A.3.2.1.9. 11.16 m3 533,540.40 5,954,310.86
2 Pas. Batu Kali 1:4 A.3.2.1.2.b 3.13 m3 855,905.20 2,680,695.09
8,635,005.95
IV PEKERJAAN BETON
1 Lantai Kerja A.4.1.1.5. 0.2 m3 945,726.75 189,145.35
foot plat
1 Bekisting fp A.4.1.1.20. 2.80 m2 192,360.00 538,608.00
2 Membuat Beton K-175 A.4.1.1.5. 0.70 m3 945,726.75 662,008.73
3 Pembesian A.4.1.1.17b. 153.07 kg 13,750.50 2,104,734.03
Kolom Baru
1 Bekisting kolom (2x pakai) A.4.1.1.22b. 9.12 m2 158,130.00 1,442,145.60
2 Membuat Beton K-175 A.4.1.1.5. 0.68 m3 945,726.75 646,877.10
3 Pembesian A.4.1.1.17b. 154.12 kg 13,750.50 2,119,213.31
Kolom Lama
1 Bekisting kolom (2x pakai) A.4.1.1.22b. 17.28 m2 158,130.00 2,732,486.40
2 Membuat Beton K-175 A.4.1.1.5. 1.30 m3 945,726.75 1,225,661.87
Sloof Baru
1 Bekisting sloof A.4.1.1.21a. 4.65 m2 112,485.00 523,055.25
2 Membuat Beton K-175 A.4.1.1.5. 0.47 m3 945,726.75 439,762.94
3 Pembesian A.4.1.1.17b. 57.82 kg 13,750.50 795,091.72
Balok Utama
1 Bekisting balok (2x pakai) A.4.1.1.23b 3.50 m2 340,880.00 1,193,080.00
2 Membuat Beton K-175 A.4.1.1.5. 1.26 m3 945,726.75 1,191,615.71
3 Pembesian A.4.1.1.17b. 384.75 kg 13,750.50 5,290,522.06
4 Dak lantai
Pemasangan begisting utk lantai A.4.1.1.24a 68.60 m3 317,380.00 21,772,268.00
Membuat Beton K-175 A.4.1.1.5. 10.12 kg 945,726.75 9,569,241.55
Pembesian A.4.1.1.17b. 1,497.52 m2 13,750.50 20,591,692.76
Ring balok + Balok anak
1 Bekisting balok (2x pakai) A.4.1.1.23b 42.00 m2 340,880.00 14,316,960.00
2 Membuat Beton K-175 A.4.1.1.5. 2.52 m3 945,726.75 2,383,231.41
3 Pembesian A.4.1.1.17b. 596.86 kg 13,750.50 8,207,150.93
TANGGA
Bekisting A.4.1.1.23b 11.46 m2 340,880.00 3,906,484.80
Membuat Beton K-175 A.4.1.1.5. 1.50 m3 945,726.75 1,418,590.13
Pembesian A.4.1.1.17b. 173.86 kg 13,750.50 2,390,623.43

Jumlah 105,650,251.07

V PEKERJAAN PASANGAN
1 Pasangan Batu Bata 1:4 A.4.4.1.9 199.80 m2 141,756.90 28,323,028.62
2 Plesteran 1:4 A.4.4.2.4 399.60 m2 55,698.00 22,256,920.80
3 Pasang Pintu Tunggal Aluminium dan kusennya Taksir 2.00 bh 2,800,000.00 5,600,000.00
4 Pasang jendela tunggal dan kusennya Taksir 8.00 bh 1,500,000.00 12,000,000.00
5 Pasang boven Aluminium Taksir 13.00 bh 375,000.00 4,875,000.00
6 Pasang plafond rangka hollow flat (anggaran berikutnya) Taksir 91.00 m2 175,000.00 15,925,000.00
7 Pasang keramik lantai 40x40 A.4.4.3.35a 91.00 m2 183,048.50 16,657,413.50
8 Pekerjaan Kelistrikan
Penempatan Titik Lampu Taksir 6.00 titik 60,000.00 360,000.00
Penempatan Titik saklar tunggal Taksir 2.00 titik 80,000.00 160,000.00
Penempatan Titik saklar ganda Taksir 2.00 titik 80,000.00 160,000.00
Penempatan Titik Stop Kontak Taksir 3.00 titik 80,000.00 240,000.00
Peralatan (t. downlight, Kabel, lampu dsb) 300% Taksir 4.00 2,280,000.00
9 Pengecatan dinding baru (anggaran berikutnya) A.4.7.1.10 m2 21.996,50 #VALUE!

Jumlah #VALUE!
PEKERJAAN LANTAI 2
I kolom praktis
1 Bekisting kolom (2x pakai) A.4.1.1.22b. 21.00 m2 158,130.00 3,320,730.00
2 Membuat Beton K-175 A.4.1.1.5. 0.79 m3 945,726.75 744,759.82
3 Pembesian A.4.1.1.17b. 1,339.98 kg 13,750.50 18,425,326.24
Jumlah 22,490,816.05
II PEKERJAAN PASANGAN
1 Pasangan Batu Bata 1:4 A.4.4.1.9 173.16 m2 141,756.90 24,546,624.80
2 Plesteran 1:4 (anggaran berikutnya) A.4.4.2.4 m2 55,698.00 0.00
3 Pasang Pintu Tunggal Aluminium dan kusennya Taksir bh 2,800,000.00 0.00
4 Pasang jendela tunggal dan kusennya Taksir bh 1,500,000.00 0.00
5 Pasang boven Aluminium Taksir bh 375,000.00 0.00
6 Pasang plafond rangka hollow flat Taksir m2 175,000.00 0.00
7 Pasang keramik lantai 40x40 (anggaran berikutnya) A.4.4.3.35a m2 183,048.50 0.00
8 Pekerjaan Kelistrikan (anggaran berikutnya)
Penempatan Titik Lampu Taksir titik 60,000.00 0.00
Penempatan Titik saklar tunggal Taksir titik 80,000.00 0.00
Penempatan Titik saklar ganda Taksir titik 80,000.00 0.00
Penempatan Titik Stop Kontak Taksir titik 80,000.00 0.00
Peralatan (t. downlight, Kabel, lampu dsb) 300% Taksir
9 Pengecatan dinding baru (anggaran berikutnya) A.4.7.1.10 m2 21.996,50 #VALUE!
10 Pasang atap rangka baja ringan berikut atapnya Taksir 75.4 m2 200,000.00 15,080,000.00
Ring balok + Balok anak
1 Bekisting balok (2x pakai) A.4.1.1.22b. 14.80 m2 158,130.00 2,340,324.00
2 Membuat Beton K-175 A.4.1.1.5. 1.11 m3 945,726.75 1,049,756.69
3 Pembesian A.4.1.1.17b. 182.58 kg 13,750.50 2,510,518.16
Jumlah #VALUE!

Jumlah (I+II+III) Rp. #VALUE!


JUMLAH TOTAL #VALUE!
JUMLAH DIBULATKAN #VALUE!

Balapulang, Mei 2019


Mengetahui Mengetahui : Di buat oleh
Koordinator PPKD Balapulang Wetan Kepala Desa Balapulang Wetan PKA Desa Balapulang Wetan

M. MANSYUR ICHWANTO SUAEDI MUCH. CHAMDAN SALIM


MATERIAL DAN UPAH
KEGIATAN : Dana Desa
PEKERJAAN : Pembangunan Gedung Perpustakaan Desa
LOKASI : Desa Balapulang Wetan
TAHUN ANGGARAN : 2019

Harga
No Uraian Pekerjaan Volume Satuan Satuan
(Rp)

I PEK. PERSIAPAN
1 Papan Nama Kegiatan 1.00 ls 250,000.00
2 Pengukuran dan Bouwplank 1.00 ls 500,000.00
3 Pembersihan lahan 1.00 ls 672,000.00

MATERIAL
Pas. Pondasi batu kali
Pas. Batu Kosong
Batu kali/blonos 13.39 m3 295,800.00
Pasir urug 4.82 m3 159,700.00
Pas. Batu Kali
Batu Belah 2.26 295,800.00
Batu kali/blonos 1.50 273,300.00
Semen Portland 425.95 1,120.00
Pasir Pasang 1.70 273,300.00

II PEKERJAAN BETON
Lantai Kerja
Semen Portland 65.20 1,120.00
Pasir 152.00 218.21
Kerikil (maksimum 30 mm) 205.80 226.30
Air 43.00 50.00
FOOT PLAT
BEGISTING
Papan kayu lokal 0.11 m2 2,800,000.00
Paku Biasa 5 - 12 cm 0.84 Kg 21,000.00
Minyak Bekisting 0.28 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 228.20 Kg 1,120.00
Pasir 532.00 Kg 218.21
Kerikil (maksimum 30 mm) 720.30 Kg 226.30
Air 150.50 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 160.72 Kg 11,500.00
Kawat Beton 2.30 Kg 20,000.00
KOLOM BARU
BEGISTING
Papan kayu lokal 0.18 m2 2,800,000.00
Paku Biasa 5 - 12 cm 3.65 Kg 21,000.00
Minyak Bekisting 0.91 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 222.98 Kg 1,120.00
Pasir 519.84 Kg 218.21
Kerikil (maksimum 30 mm) 703.84 Kg 226.30
Air 147.06 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 161.82 Kg 11,500.00
Kawat Beton 2.31 Kg 20,000.00
KOLOM LAMA
BEGISTING
Papan kayu lokal 0.35 m2 1,450,000.00
Paku Biasa 5 - 12 cm 6.91 Kg 21,000.00
Minyak Bekisting 1.73 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 422.50 Kg 1,120.00
Pasir 984.96 Kg 218.21
Kerikil (maksimum 30 mm) 1,333.58 Kg 226.30
Air 278.64 ltr 50.00
SLOOF BARU
BEGISTING
Papan kayu lokal 0.10 m2 2,800,000.00
Paku Biasa 5 - 12 cm 1.40 Kg 21,000.00
Minyak Bekisting 0.23 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 151.59 Kg 1,120.00
Pasir 353.40 Kg 218.21
Kerikil (maksimum 30 mm) 478.49 Kg 226.30
Air 99.98 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 60.71 Kg 11,500.00
Kawat Beton 0.87 Kg 20,000.00

BALOK UTAMA
BEGISTING
Papan kayu lokal 0.07 m2 2,800,000.00
Paku Biasa 5 - 12 cm 1.40 Kg 21,000.00
Minyak Bekisting 0.35 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 410.76 Kg 1,120.00
Pasir 957.60 Kg 218.21
Kerikil (maksimum 30 mm) 1,296.54 Kg 226.30
Air 270.90 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 403.99 Kg 11,500.00
Kawat Beton 5.77 Kg 21,000.00
DAK LANTAI
BEGISTING
Paku Biasa 2" - 5" 27.44 m2 21,000.00
Minyak Bekisting 13.72 Kg 10,000.00
Balok Kayu lokal 1.03 ltr 2,100,000.00
tripleks tebal 9mm 24.01 145,000.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m 411.60 22,000.00

MEMBUAT BETON K-175


Semen Portland 3,298.60 Kg 1,120.00
Pasir 7,689.98 Kg 218.21
Kerikil (maksimum 30 mm) 10,411.83 Kg 226.30
Air 2,175.46 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 1,572.40 Kg 11,500.00
Kawat Beton 22.46 Kg 20,000.00

RING BALOK + BALOK ANAK


BEGISTING
Papan kayu lokal 0.84 m2 2,800,000.00
Paku Biasa 5 - 12 cm 16.80 Kg 21,000.00
Minyak Bekisting 4.20 ltr 10,000.00
triplek tebal 9mm 14.70 145,000.00
Dolken kayu galam 252.00 22,000.00
MEMBUAT BETON K-175
Semen Portland 821.52 Kg 1,120.00
Pasir 1,915.20 Kg 218.21
Kerikil (maksimum 30 mm) 2,593.08 Kg 226.30
Air 541.80 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 626.71 Kg 11,500.00
Kawat Beton 8.95 Kg 20,000.00
TANGGA
BEGISTING
Papan kayu lokal 0.23 m2 2,800,000.00
Paku Biasa 5 - 12 cm 4.58 Kg 21,000.00
Minyak Bekisting 1.15 ltr 10,000.00
triplek tebal 9mm 4.01 145,000.00
Dolken kayu galam 68.76 22,000.00
MEMBUAT BETON K-175
Semen Portland 489.00 Kg 1,120.00
Pasir 1,140.00 Kg 218.21
Kerikil (maksimum 30 mm) 1,543.50 Kg 226.30
Air 322.50 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 182.55 Kg 11,500.00
Kawat Beton 2.61 Kg 20,000.00
V PEKERJAAN PASANGAN
1 Pasangan Batu Bata 1:4
Bata Merah 5 x 11 x 22 13,986.00 1,150.00
Portland Semen 2297.7 1,120.00
Pasir Pasang 8.5914 273,300.00

2 Plesteran
Portland Semen 2493.504 1,120.00
Pasir Pasang 9.5904 273,300.00
3 Pasang Pintu Tunggal Aluminium dan kusennya 2 2,800,000.00
4 Pasang jendela tunggal dan kusennya 8 1,500,000.00
5 Pasang boven Aluminium 13 375,000.00
6 Pasang plafond rangka hollow flat 91 175,000.00
7 Pasang keramik lantai 40x40 (anggaran berikutnya)
Ubin Keramik 40 x 40 cm putih 602.875 8,700.00

Portland Semen 910 1,120.00

Pasir Pasang 4.095 273,300.00

Semen Warna 136.5 2,375.00

8 Pekerjaan Kelistrikan
Penempatan Titik Lampu 6.00 titik 60,000.00
Penempatan Titik saklar tunggal 2.00 titik 80,000.00
Penempatan Titik saklar ganda 2.00 titik 80,000.00
Penempatan Titik Stop Kontak 3.00 titik 80,000.00
Peralatan (t. downlight, Kabel, lampu dsb) 300% 4.00
9 Pengecatan dinding baru (anggaran berikutnya) m2 0.00

PEKERJAAN LANTAI 2
I kolom praktis
1 Bekisting kolom (2x pakai)
Papan cetak pinus 0.42 2,800,000.00
Paku Biasa 2" - 5" 8.4 21,000.00
Minyak Bekisting 2.1 10,000.00

2 Membuat beton K-175


Portland Semen 256.725 1,120.00
Pasir Beton 598.5 218.21
Kerikil (maksimum 30 mm) 810.3375 226.30
Air 169.3125 50.00

3 Pembesian

Besi beton 1,406.97 11,500.00


Kawat beton 20.10 20,000.00
II Pekerjaan Pasangan
Pasangan Batu Bata 1:4
Bata Merah 5 x 11 x 22 12,121.20 1,150.00
Portland Semen 1,991.34 1,120.00
Pasir Pasang 7.45 273,300.00

RING BALOK
BEGISTING
Papan kayu lokal 0.30 m2 2,800,000.00
Paku Biasa 5 - 12 cm 5.92 Kg 21,000.00
Minyak Bekisting 1.48 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 361.86 Kg 1,120.00
Pasir 843.60 Kg 218.21
Kerikil (maksimum 30 mm) 1,142.19 Kg 226.30
Air 238.65 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 191.71 Kg 11,500.00
Kawat Beton 2.74 Kg 20,000.00
10 Pasang atap rangka baja ringan berikut atapnya 75.4 m2 200,000.00

IV UPAH TENAGA
I PEK. TANAH 11.09
Pek. Galian
1 Pekerja 5.25 OH 80,000.00
2 Mandor 0.17 OH 105,000.00
II Pas. Pondasi batu kali
Pas. Batu Kosong
Pekerja 8.70 80,000.00
Tukang Batu 4.35 100,000.00
Kepala Tukang 0.44 105,000.00
Mandor 0.44 105,000.00
Pas. Batu Kali
Pekerja 4.70 80,000.00
Tukang Batu 2.35 100,000.00
Kepala Tukang 0.23 105,000.00
Mandor 0.23 105,000.00
LANTAI KERJA
Pekerja 0.33 80,000.00
Tukang Batu 0.06 100,000.00
Kepala Tukang 0.01 105,000.00
Mandor 0.02 105,000.00
FOOT PLAT
BEGISTING
Pekerja 1.46 OH 80,000.00
Tukang Kayu 0.73 OH 100,000.00
Kepala Tukang 0.07 OH 105,000.00
Mandor 0.07 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
1 Pekerja 1.16 OH 80,000.00
2 Tukang Batu 0.19 OH 100,000.00
3 Kepala Tukang 0.02 OH 105,000.00
4 Mandor 0.06 OH 105,000.00

PEMBESIAN
Pekerja 1.07 OH 80,000.00
Tukang Besi 1.07 OH 100,000.00
Kepala Tukang 0.11 OH 105,000.00
Mandor 0.06 OH 105,000.00
KOLOM BARU
BEGISTING
Pekerja 6.02 OH 80,000.00
Tukang Kayu 3.01 OH 100,000.00
Kepala Tukang 0.30 OH 105,000.00
Mandor 0.30 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 1.13 OH 80,000.00
Tukang Batu 0.19 OH 100,000.00
Kepala Tukang 0.02 OH 105,000.00
Mandor 0.06 OH 105,000.00

PEMBESIAN
Pekerja 1.08 OH 80,000.00
Tukang Besi 1.08 OH 100,000.00
Kepala Tukang 0.11 OH 105,000.00
Mandor 0.06 OH 105,000.00
KOLOM LAMA
BEGISTING
Pekerja 11.40 OH 80,000.00
Tukang Kayu 5.70 OH 100,000.00
Kepala Tukang 0.57 OH 105,000.00
Mandor 0.57 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 2.14 OH 80,000.00
Tukang Batu 0.36 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.11 OH 105,000.00

SLOOF BARU
BEGISTING
Pekerja 2.42 OH 80,000.00
Tukang Kayu 1.21 OH 100,000.00
Kepala Tukang 0.12 OH 105,000.00
Mandor 0.12 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 0.77 OH 80,000.00
Tukang Batu 0.13 OH 100,000.00
Kepala Tukang 0.01 OH 105,000.00
Mandor 0.04 OH 105,000.00

PEMBESIAN
Pekerja 0.40 OH 80,000.00
Tukang Besi 0.40 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.02 OH 105,000.00
BALOK UTAMA
BEGISTING
Pekerja 2.31 OH 80,000.00
Tukang Kayu 1.16 OH 100,000.00
Kepala Tukang 0.12 OH 105,000.00
Mandor 0.12 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 2.08 OH 80,000.00
Tukang Batu 0.35 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.10 OH 105,000.00

PEMBESIAN
Pekerja 2.69 OH 80,000.00
Tukang Besi 2.69 OH 100,000.00
Kepala Tukang 0.27 OH 105,000.00
Mandor 0.15 OH 105,000.00
DAK LANTAI
BEGISTING
Pekerja 45.28 OH 80,000.00
Tukang Kayu 22.64 OH 100,000.00
Kepala Tukang 2.26 OH 105,000.00
Mandor 2.26 OH 105,000.00

beton K-175
Pekerja 16.70 OH 80,000.00
Tukang Batu 2.78 OH 100,000.00
Kepala Tukang 0.28 OH 105,000.00
Mandor 0.84 OH 105,000.00

PEMBESIAN
Pekerja 10.48 OH 80,000.00
Tukang Besi 10.48 OH 100,000.00
Kepala Tukang 1.05 OH 105,000.00
Mandor 0.60 OH 105,000.00
RING BALOK + BALOK ANAK
BEGISTING
Pekerja 27.72 OH 80,000.00
Tukang Kayu 13.86 OH 100,000.00
Kepala Tukang 1.39 OH 105,000.00
Mandor 1.39 OH 105,000.00

Beton k-175
Pekerja 4.16 OH 80,000.00
Tukang Batu 0.69 OH 100,000.00
Kepala Tukang 0.07 OH 105,000.00
Mandor 0.21 OH 105,000.00

PEMBESIAN
Pekerja 4.18 OH 80,000.00
Tukang Besi 4.18 OH 100,000.00
Kepala Tukang 0.42 OH 105,000.00
Mandor 0.24 OH 105,000.00
TANGGA
BEGISTING
Pekerja 7.56 OH 80,000.00
Tukang Kayu 3.78 OH 100,000.00
Kepala Tukang 0.38 OH 105,000.00
Mandor 0.38 OH 105,000.00

Beton k-175
Pekerja 2.48 OH 80,000.00
Tukang Batu 0.41 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.12 OH 105,000.00

PEMBESIAN
Pekerja 1.22 OH 80,000.00
Tukang Besi 1.22 OH 100,000.00
Kepala Tukang 0.12 OH 105,000.00
Mandor 0.07 OH 105,000.00
V PEKERJAAN PASANGAN
Pasangan Batu Bata
Pekerja 59.94 80,000.00
Tukang Batu 19.98 100,000.00
Kepala Tukang 1.998 105,000.00
Mandor 2.997 105,000.00

Plesteran
Pekerja 119.88 80,000.00
Tukang Batu 59.94 100,000.00
Kepala Tukang 5.994 105,000.00
Mandor 5.994 105,000.00

Pasang keramik lantai


Pekerja 63.7 80,000.00
Tukang Batu 31.85 100,000.00
Kepala Tukang 3.185 105,000.00
Mandor 3.185 105,000.00

PEKERJAAN LANTAI 2
KOLOM PRAKTIS

begisting
Pekerja 13.86 OH 80,000.00
Tukang Kayu 6.93 OH 100,000.00
Kepala Tukang 0.69 OH 105,000.00
Mandor 0.69 OH 105,000.00
BETON K-175
Pekerja 1.30 80,000.00

Tukang batu 0.22 100,000.00

Kepala Tukang 0.02 105,000.00

Mandor 0.07 105,000.00

Pembesian
Pekerja 9.38 80,000.00

Tukang besi 9.38 100,000.00

Kepala Tukang 0.94 105,000.00

Mandor 0.54 105,000.00

Pasangan batu bata 1:4


Pekerja 59.94 80,000.00

Tukang batu 19.98 100,000.00

Kepala Tukang 2.00 105,000.00

Mandor 3.00 105,000.00

RING BALOK + BALOK ANAK


BEGISTING
Pekerja 9.77 OH 80,000.00
Tukang Kayu 4.88 OH 100,000.00
Kepala Tukang 0.49 OH 105,000.00
Mandor 0.49 OH 105,000.00

Beton k-175
Pekerja 1.83 OH 80,000.00
Tukang Batu 0.31 OH 100,000.00
Kepala Tukang 0.03 OH 105,000.00
Mandor 0.09 OH 105,000.00

PEMBESIAN
Pekerja 1.28 OH 80,000.00
Tukang Besi 1.28 OH 100,000.00
Kepala Tukang 0.13 OH 105,000.00
Mandor 0.07 OH 105,000.00

TERBILANG : LIMA PULUH DUA JUTA DUA RATUS LIMA PULUH RIBU RUPIAH

Mengetahui Mengetahui :
Koordinator PPKD Balapulang Wetan Kepala Desa Balapulang Wetan

M. MANSYUR ICHWANTO SUAEDI

...........................
PAH

ustakaan Desa

Jumlah Jumlah
Harga Semua
(Rp) (Rp)

250,000.00
500,000.00
672,000.00
1,422,000.00

3,961,353.60
769,932.86 5,954,310.86
4,731,286.46
667,040.83 2,680,695.09
410,868.29
477,066.24
465,650.73 2,020,626.09

73,024.00
33,167.92 189,145.46
46,572.54
2,150.00 154,914.46

313,600.00 538,608.00
17,640.00
2,800.00

255,584.00
116,087.72
163,003.89
7,525.00 0

1,848,271.95
45,919.80 2,770,432.36

510,720.00 3092727.27
76,608.00
9,120.00

249,742.08
113,434.29
159,278.09
7,353.00

1,860,986.93
46,235.70 3,033,478.08

501,120.00 3092727.27
145,152.00
17,280.00 663,552.00

473,195.52
214,928.12
301,790.06
13,932.00 1,003,845.70

276,374.00
29,295.00
2,325.00 307,994.00

169,780.80
77,115.41
108,281.16
4,998.75 360,176.12 PPH

698,209.71 0
17,346.83 715,556.53

196,000.00
29,400.00
3,500.00 228,900.00

460,051.20
208,957.90
293,407.00
13,545.00 975,961.10 PPH

4,645,871.34 0 0
121,196.64

576,240.00
137,200.00
2,160,900.00
3,481,450.00
9,055,200.00

3,694,430.21
1,678,031.41
2,356,197.94
108,772.80 PPN PPH

18,082,592.64 0 0
449,256.96

11.09
2,352,000.00
352,800.00 3.65805
42,000.00 0.11085
2,131,500.00
5,544,000.00

920,102.40
417,915.79
586,814.00
27,090.00

7,207,108.65
179,058.60

0.00
641,760.00
96,264.00 0
11,460.00 0
581,595.00
1,512,720.00

547,680.00
248,759.40
349,294.05
16,125.00

2,099,325.69
52,157.16

16,083,900.00
2,573,424.00
2,348,029.62

2,792,724.48
2,621,056.32
5,600,000.00
12,000,000.00
4,875,000.00
15,925,000.00

5,245,012.50
1,019,200.00
1,119,163.50
324,187.50 7,707,563.50

360,000.00
160,000.00
160,000.00
240,000.00
2,280,000.00
0.00

1,176,000.00
176,400.00
21,000.00

287,532.00
130,598.69
183,379.38
8,465.63

16,180,198.13
401,992.50

13,939,380.00
2,230,300.80
2,034,959.00

828,800.00
124,320.00
14,800.00

405,283.20
184,081.96
258,477.60
11,932.50

2,204,611.24
54,772.95
15,080,000.00
222,517,576.07

419,880.00
18,369.75

696,384.00
435,240.00
45,700.20
45,700.20
1,223,024.40 5,954,310.86
375,840.00
234,900.00
24,664.50
24,664.50 660,069.00

26,400.00
5,500.00
588.00
1,743.00 34,231.00

116,480.00
72,800.00
7,644.00
7,644.00

92,400.00
19,250.00
2,058.00
6,100.50

85,716.96
107,146.20
11,250.35
6,428.77 534,918.78

481,536.00
300,960.00
31,600.80
31,600.80

90,288.00
18,810.00
2,010.96
5,961.06

86,306.64
107,883.30
11,327.75
6,473.00

912,384.00
570,240.00
59,875.20
59,875.20 1,602,374.40
171,072.00
35,640.00
3,810.24
11,294.64 221,816.88

193,440.00
120,900.00
12,694.50
12,694.50 339,729.00

61,380.00
12,787.50
1,367.10
4,052.48 79,587.08

32,380.74
40,475.93
4,249.97
2,428.56 79,535.19

184,800.00
115,500.00
12,127.50
12,127.50

166,320.00
34,650.00
3,704.40
10,980.90

215,460.70
269,325.88
28,279.22
16,159.55

3,622,080.00
2,263,800.00
237,699.00
237,699.00
240,745,001.80

1,335,628.80
278,256.00
29,748.10
88,181.86

838,612.99
1,048,266.24
110,067.96
62,895.97

2,217,600.00
1,386,000.00
145,530.00
145,530.00

332,640.00
69,300.00
7,408.80
21,961.80

334,242.72
417,803.40
43,869.36
25,068.20

605,088.00
378,180.00
39,708.90
39,708.90

198,000.00
41,250.00
4,410.00
13,072.50
97,360.03
121,700.04
12,778.50
7,302.00

4,795,200.00
1,998,000.00
209,790.00
314,685.00

9,590,400.00
5,994,000.00
629,370.00
629,370.00

5,096,000.00
3,185,000.00
334,425.00
334,425.00

1,108,800.00
693,000.00
72,765.00
72,765.00

103,950.00
21,656.25
2,315.25
6,863.06

750,386.00
937,982.50
98,488.16
56,278.95

4,795,200.00
1,998,000.00
209,790.00
314,685.00
781,440.00
488,400.00
51,282.00
51,282.00

146,520.00
30,525.00
3,263.40
9,673.65

102,242.84
127,803.55
13,419.37
7,668.21
JUMLAH 70,483,288.70

JUMLAH TOTAL 293,000,864.77


PEMBULATAN 293,000,000.00
LIMA PULUH RIBU RUPIAH

Balapulang, Mei 2019


Di buat oleh
PKA Desa Balapulang Wetan

MUCH. CHAMDAN SALIM

...........................
PERHITUNGAN VOLUME PEKERJAAN

Kegiatan : Pembangunan TPQ


Pekerjaan : Pembangunan TPQ Desa Tembok Kidul
Lokasi : Desa Tembok Kidul
TA : 2019

NO GAMBAR SKETSA PERHITUNGAN VOLUME


I PEK. PERSIAPAN
1. Pembersihan Lahan
Taksir =

2 Pengukuran dan Bowplank


Taksir =
BASEMENT
FOOTPLAT DAN KOLOM BARU
II PEKERJAAN FOOTPLAT
1 Galian Tanah K
Panjang 0.80
Lebar 0.80
Tinggi 1.60
Jumlah 24.00
volume 24.58

III PEKERJAAN PAS. BATU BELA T


Pas. Batu kosong 0.20
Pas. Batu Kali 0.60
LB
IV PEKERJAAN BETON
BEKISTING foot plat
Keliling 3.2
Tinggi 0.35
Jumlah 24
Volume 26.88
Beton
Panjang/KEL 1.00
Lebar 1.00
Tinggi 0.35
Jumlah 24.00
Volume 8.40

Pembesian FP + KOLOM
dia Æ 16 52.4
panjang ring Æ 8 35.1
jumlah 24
Volume 2317.2408
Volume

KOLOM LANTAI 1
BEKISTING
Keliling
Tinggi
Jumlah
Volume
Beton
Panjang/KEL
Lebar
Tinggi
Jumlah
Volume
Pembesian
dia Æ 16
panjang ring Æ 8
jumlah
Volume
Volume

PASANGAN BATA Keliling


pe - an plong
pintu 8
jendela 25.2
boven 10.4
MAKA 454.05
PLESTERAN 908.10

BALOK UTAMA (20/35) BEKISTING balok


D16 5 BUAH Keliling 0.90
D12 2 BUAH PANJANG 8
Jumlah 3
Volume 21.60
Beton
Panjang/KEL
Lebar 0.20
Tinggi 0.25
PANJANG 18.00
Volume 0.90
Pembesian
dia Æ 16 90.00
dia Æ 12 36.00
panjang ring Æ 8 99.00
Volume 142.02
Volume 39.11
VOL TOTAL 213.09
RING BALOK + Balok anak (20/25) BEKISTING balok
D12 6 BUAH Keliling 0.70
panjang 42
Jumlah
Volume 29.40
Beton
Panjang/KEL
Lebar 0.20
Tinggi 0.15
Panjang 42.00
Volume 1.26
Pembesian
dia Æ 12 252.00
panjang ring Æ 8 189.00
Volume
Volume 74.66

PEKERJAAN LANTAI 2

KOLOM PRAKTIS
BEKISTING
Keliling
Tinggi
Jumlah
Volume
Beton
Panjang/KEL
Lebar
Tinggi
Jumlah
Volume
Pembesian
dia Æ 12
panjang ring Æ 8
jumlah
Volume
Volume
VOL TOTAL
PASANGAN BATA Keliling
pe - an plong 8
pintu 25.2
BOVEN 10.4
boven
MAKA 427.15
PLESTERAN 854.3

RING BALOK (15/20) BEKISTING balok


D12 4 BUAH Keliling 100.50
Tinggi 0.2
Jumlah 2
Volume 40.20
Beton
Panjang/KEL
Lebar 0.15
Tinggi 0.20
Keliling 100.50
Volume 3.02
Pembesian
dia Æ 16
dia Æ 12 402.00
panjang ring Æ 8 351.75
Volume -
Volume 495.92
OLUME PEKERJAAN

81
61
62
204

PERHITUNGAN VOLUME
..
..
1.00 LS

18.66667
1.00 LS

m
m
m
bh
m3

L Pj
0.80 110.50 17.68 M3
0.30 110.50 0.50 49.73 M3
LA
0
kolom bawah sloof
m 1.2 134.50
m 3.85 0.25
bh 24 1
m2 110.88 m2 33.625 m2

m 0.30 110.50
m 0.30 0.20
m 3.85 0.25
bh 24.00
m3 8.316 m3 5.53 m3

P + KOLOM
1.578 552.50 0.888
0.395 497.25 0.395 6.35
490.62
196.41

kolom
1.2
3.7
24
106.56 m2

0.30
0.30
3.70
24.00
0 M3 7.992 M3

32.8 1.578
26.65 0.395 6.35
24.00
1,242.20
252.642

134.50 tinggi 3.7 497.65

M2
m2

m2

M3

1.578
0.888
0.395
31.97

m2

M3

0.888
0.395
223.78
x 2 447.55
149.31

kolom
0.3
3.5
24
25.2 m2

0.15
0.15
3.50
24.00
1.89 M3

140 0.888
12.25 0.395
24
2983.68
116.13
3099.81
134.50 tinggi 3.5 470.75
M2
m2

m2

M3

0.888 356.98
0.395 138.94
495.92
..
..

X 1.2 3.84

20 bh
Volume - m2
0.333333
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan : Pembangunan TPQ
Pekerjaan : Pembangunan TPQ Desa Tembok Kidul
Lokasi : Desa Tembok Kidul
TA : 2019

Analisa Harga Jumlah Jumlah


No Uraian Pekerjaan yang Volume Satuan Satuan Harga Semua
dipakai (Rp) (Rp) (Rp)
BASEMENT
I PEK. PERSIAPAN
1 Papan Nama Kegiatan Taksir 1.00 ls 250,000.00 250,000.00
2 Pengukuran dan Bouwplank Taksir 1.00 ls 500,000.00 500,000.00
3 Pembersihan lahan Taksir 1.00 ls 672,000.00 672,000.00
Jumlah 1,422,000.00
II PEK. TANAH
1 Galian Tanah A.2.3.1.1. 24.58 m3 62,620.00 1,538,949.12
1,538,949.12
III PAS. PONDASI BATU KALI
1 Pas. Batu Kosong A.3.2.1.9. 17.68 m3 533,540.40 9,432,994.27
2 Pas. Batu Kali 1:4 A.3.2.1.2.b 49.73 m3 855,905.20 42,559,886.07
51,992,880.34
IV PEKERJAAN BETON
1 Lantai Kerja A.4.1.1.5. 1.536 m3 945,726.75 1,452,636.29
foot plat
1 Bekisting fp A.4.1.1.20. 26.88 m2 192,360.00 5,170,636.80
2 Membuat Beton K-175 A.4.1.1.5. 8.40 m3 945,726.75 7,944,104.70
3 Pembesian A.4.1.1.17b. 2,317.24 kg 13,750.50 31,863,219.62
Kolom Baru
1 Bekisting kolom (2x pakai) A.4.1.1.22b. 106.56 m2 158,130.00 16,850,332.80
2 Membuat Beton K-175 A.4.1.1.5. 7.99 m3 945,726.75 7,558,248.19
3 Pembesian (SUDAH TERHITUNG DI FOOTPLAT) A.4.1.1.17b. 1,494.84 kg 13,750.50 20,554,846.92
Sloof Baru
1 Bekisting sloof A.4.1.1.21a. 33.63 m2 112,485.00 3,782,308.13
2 Membuat Beton K-175 A.4.1.1.5. 5.53 m3 945,726.75 5,225,140.29
3 Pembesian A.4.1.1.17b. 687.03 kg 13,750.50 9,447,057.58
Balok Utama
1 Bekisting balok (2x pakai) A.4.1.1.23b 21.60 m2 340,880.00 7,363,008.00
2 Membuat Beton K-175 A.4.1.1.5. 0.90 m3 945,726.75 851,154.08
3 Pembesian A.4.1.1.17b. 213.09 kg 13,750.50 2,930,135.30
4 Dak lantai
Pemasangan begisting utk lantai A.4.1.1.24a 186.75 M2 317,380.00 59,270,715.00
Membuat Beton K-175 A.4.1.1.5. 22.41 M3 945,726.75 21,193,736.47
Pembesian A.4.1.1.17b. 1,658.34 kg 13,750.50 22,803,004.17
Ring balok + Balok anak
1 Bekisting balok (2x pakai) A.4.1.1.23b 29.40 m2 340,880.00 10,021,872.00
2 Membuat Beton K-175 A.4.1.1.5. 1.26 m3 945,726.75 1,191,615.71
3 Pembesian A.4.1.1.17b. 596.86 kg 13,750.50 8,207,150.93
TANGGA
Bekisting A.4.1.1.17b. 5.73 m2 340,880.00 1,953,242.40
Membuat Beton K-175 A.4.1.1.5. 0.75 m3 945,726.75 709,295.06
Pembesian A.4.1.1.21a. 86.93 kg 13,750.50 1,195,311.71

Jumlah 247,538,772.14
LANTAI I
Kolom Baru
1 Bekisting kolom (2x pakai) A.4.1.1.22b. 106.56 m2 158,130.00 16,850,332.80
2 Membuat Beton K-175 A.4.1.1.5. 7.99 m3 945,726.75 7,558,248.19
3 Pembesian A.4.1.1.17b. 1,494.84 kg 13,750.50 20,554,846.92
Balok Utama
1 Bekisting balok (2x pakai) A.4.1.1.23b 21.60 m2 340,880.00 7,363,008.00
2 Membuat Beton K-175 A.4.1.1.5. 0.90 m3 945,726.75 851,154.08
3 Pembesian A.4.1.1.17b. 213.09 kg 13,750.50 2,930,135.30
4 Dak lantai
Pemasangan begisting utk lantai A.4.1.1.24a 186.75 M2 317,380.00 59,270,715.00
Membuat Beton K-175 A.4.1.1.5. 22.41 M3 945,726.75 21,193,736.47
Pembesian A.4.1.1.17b. 1,658.34 kg 13,750.50 22,803,004.17
Ring balok + Balok anak
1 Bekisting balok (2x pakai) A.4.1.1.23b 29.40 m2 340,880.00 10,021,872.00
2 Membuat Beton K-175 A.4.1.1.5. 1.26 m3 945,726.75 1,191,615.71
3 Pembesian A.4.1.1.17b. 596.86 kg 13,750.50 8,207,150.93

TANGGA
Bekisting A.4.1.1.23b 11.46 m2 340,880.00 3,906,484.80
Membuat Beton K-175 A.4.1.1.5. 1.50 m3 945,726.75 1,418,590.13
Pembesian A.4.1.1.17b. 173.86 kg 13,750.50 2,390,623.43

Jumlah 186,511,517.91
V PEKERJAAN PASANGAN
1 Pasangan Batu Bata 1:4 A.4.4.1.9 454.05 m2 141,756.90 64,364,720.45
2 Plesteran 1:4 A.4.4.2.4 908.10 m2 55,698.00 50,579,353.80
3 Pasang Pintu Tunggal Aluminium dan kusennya Taksir 4.00 bh 2,800,000.00 11,200,000.00
4 Pasang jendela dua dan kusennya Taksir 5.00 bh 2,500,000.00 12,500,000.00
5 Pasang jendela tiga dan kusennya Taksir 7.00 bh 3,250,000.00 22,750,000.00
5 Pasang boven Aluminium Taksir 13.00 bh 475,000.00 6,175,000.00
6 Pasang plafond rangka hollow flat (anggaran berikutnya) Taksir 168.75 m2 175,000.00 29,531,250.00
7 Pasang keramik lantai 40x40 A.4.4.3.35a 168.75 m2 183,048.50 30,889,434.38
8 Pekerjaan Kelistrikan
Penempatan Titik Lampu Taksir 12.00 titik 60,000.00 720,000.00
Penempatan Titik saklar tunggal Taksir 4.00 titik 80,000.00 320,000.00
Penempatan Titik saklar ganda Taksir 4.00 titik 80,000.00 320,000.00
Penempatan Titik Stop Kontak Taksir 6.00 titik 80,000.00 480,000.00
Peralatan (t. downlight, Kabel, lampu dsb) 300% Taksir 4.00 4,560,000.00
9 Pengecatan dinding baru (anggaran berikutnya) A.4.7.1.10 908.10 m2 21.996,50 #VALUE!

Jumlah #VALUE!
LANTAI 2
I kolom praktis
1 Bekisting kolom (2x pakai) A.4.1.1.22b. 25.20 m2 158,130.00 3,984,876.00
2 Membuat Beton K-175 A.4.1.1.5. 1.89 m3 945,726.75 1,787,423.56
3 Pembesian A.4.1.1.17b. 3,099.81 kg 13,750.50 42,623,937.41
Jumlah 48,396,236.96
II PEKERJAAN PASANGAN
1 Pasangan Batu Bata 1:4 A.4.4.1.9 173.16 m2 141,756.90 24,546,624.80
2 Plesteran 1:4 A.4.4.2.4 854.30 m2 55,698.00 47,582,801.40
3 Pasang Pintu Tunggal Aluminium dan kusennya Taksir 4.00 bh 2,800,000.00 11,200,000.00
4 Pasang jendela dua dan kusennya Taksir 5.00 bh 2,500,000.00 12,500,000.00
Pasang jendela tiga dan kusennya Taksir 7.00 bh 3,250,000.00 22,750,000.00
5 Pasang boven Aluminium Taksir 13.00 bh 475,000.00 6,175,000.00
6 Pasang plafond rangka hollow flat (anggaran berikutnya) Taksir 168.75 m2 175,000.00 29,531,250.00
7 Pasang keramik lantai 40x40 0 168.75 m2 10,416.00 1,757,700.00
8 Pekerjaan Kelistrikan
Penempatan Titik Lampu Taksir 12.00 titik 60,000.00 720,000.00
Penempatan Titik saklar tunggal Taksir 4.00 titik 80,000.00 320,000.00
Penempatan Titik saklar ganda Taksir 4.00 titik 80,000.00 320,000.00
Penempatan Titik Stop Kontak Taksir 6.00 titik 80,000.00 480,000.00
Peralatan (t. downlight, Kabel, lampu dsb) 300% Taksir 4.00 4,560,000.00
9 Pengecatan dinding baru (anggaran berikutnya) A.4.7.1.10 908.10 m2 21.996,50 #VALUE!
10 Pasang atap rangka baja ringan berikut atapnya Taksir 250 m2 225,000.00 56,250,000.00
Ring balok + Balok anak
1 Bekisting balok (2x pakai) A.4.1.1.22b. 29.40 m2 158,130.00 4,649,022.00
2 Membuat Beton K-175 A.4.1.1.5. 1.26 m3 945,726.75 1,191,615.71
3 Pembesian A.4.1.1.17b. 596.86 kg 13,750.50 8,207,150.93
Jumlah #VALUE!

Jumlah (I+II+III) Rp. #VALUE!


JUMLAH TOTAL #VALUE!
JUMLAH DIBULATKAN #VALUE!

Tembok Kidul, Juni 2019


Mengetahui Mengetahui : Di buat oleh
MATERIAL DAN UPAH
KEGIATAN : Dana Desa
PEKERJAAN : Pembangunan Gedung Perpustakaan Desa
LOKASI : Desa Balapulang Wetan
TAHUN ANGGARAN : 2019

Harga
No Uraian Pekerjaan Volume Satuan Satuan
(Rp)

I PEK. PERSIAPAN
1 Papan Nama Kegiatan 1.00 ls 250,000.00
2 Pengukuran dan Bouwplank 1.00 ls 500,000.00
3 Pembersihan lahan 1.00 ls 672,000.00

MATERIAL
Pas. Pondasi batu kali
Pas. Batu Kosong
Batu kali/blonos 13.39 m3 295,800.00
Pasir urug 4.82 m3 159,700.00
Pas. Batu Kali
Batu Belah 2.26 295,800.00
Batu kali/blonos 1.50 273,300.00
Semen Portland 425.95 1,120.00
Pasir Pasang 1.70 273,300.00

II PEKERJAAN BETON
Lantai Kerja
Semen Portland 65.20 1,120.00
Pasir 152.00 218.21
Kerikil (maksimum 30 mm) 205.80 226.30
Air 43.00 50.00
FOOT PLAT
BEGISTING
Papan kayu lokal 0.11 m2 2,800,000.00
Paku Biasa 5 - 12 cm 0.84 Kg 21,000.00
Minyak Bekisting 0.28 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 228.20 Kg 1,120.00
Pasir 532.00 Kg 218.21
Kerikil (maksimum 30 mm) 720.30 Kg 226.30
Air 150.50 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 160.72 Kg 11,500.00
Kawat Beton 2.30 Kg 20,000.00
KOLOM BARU
BEGISTING
Papan kayu lokal 0.18 m2 2,800,000.00
Paku Biasa 5 - 12 cm 3.65 Kg 21,000.00
Minyak Bekisting 0.91 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 222.98 Kg 1,120.00
Pasir 519.84 Kg 218.21
Kerikil (maksimum 30 mm) 703.84 Kg 226.30
Air 147.06 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 161.82 Kg 11,500.00
Kawat Beton 2.31 Kg 20,000.00
KOLOM LAMA
BEGISTING
Papan kayu lokal 0.35 m2 1,450,000.00
Paku Biasa 5 - 12 cm 6.91 Kg 21,000.00
Minyak Bekisting 1.73 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 422.50 Kg 1,120.00
Pasir 984.96 Kg 218.21
Kerikil (maksimum 30 mm) 1,333.58 Kg 226.30
Air 278.64 ltr 50.00
SLOOF BARU
BEGISTING
Papan kayu lokal 0.10 m2 2,800,000.00
Paku Biasa 5 - 12 cm 1.40 Kg 21,000.00
Minyak Bekisting 0.23 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 151.59 Kg 1,120.00
Pasir 353.40 Kg 218.21
Kerikil (maksimum 30 mm) 478.49 Kg 226.30
Air 99.98 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 60.71 Kg 11,500.00
Kawat Beton 0.87 Kg 20,000.00

BALOK UTAMA
BEGISTING
Papan kayu lokal 0.07 m2 2,800,000.00
Paku Biasa 5 - 12 cm 1.40 Kg 21,000.00
Minyak Bekisting 0.35 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 410.76 Kg 1,120.00
Pasir 957.60 Kg 218.21
Kerikil (maksimum 30 mm) 1,296.54 Kg 226.30
Air 270.90 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 403.99 Kg 11,500.00
Kawat Beton 5.77 Kg 21,000.00
DAK LANTAI
BEGISTING
Paku Biasa 2" - 5" 27.44 m2 21,000.00
Minyak Bekisting 13.72 Kg 10,000.00
Balok Kayu lokal 1.03 ltr 2,100,000.00
tripleks tebal 9mm 24.01 145,000.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m 411.60 22,000.00

MEMBUAT BETON K-175


Semen Portland 3,298.60 Kg 1,120.00
Pasir 7,689.98 Kg 218.21
Kerikil (maksimum 30 mm) 10,411.83 Kg 226.30
Air 2,175.46 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 1,572.40 Kg 11,500.00
Kawat Beton 22.46 Kg 20,000.00

RING BALOK + BALOK ANAK


BEGISTING
Papan kayu lokal 0.84 m2 2,800,000.00
Paku Biasa 5 - 12 cm 16.80 Kg 21,000.00
Minyak Bekisting 4.20 ltr 10,000.00
triplek tebal 9mm 14.70 145,000.00
Dolken kayu galam 252.00 22,000.00
MEMBUAT BETON K-175
Semen Portland 821.52 Kg 1,120.00
Pasir 1,915.20 Kg 218.21
Kerikil (maksimum 30 mm) 2,593.08 Kg 226.30
Air 541.80 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 626.71 Kg 11,500.00
Kawat Beton 8.95 Kg 20,000.00
TANGGA
BEGISTING
Papan kayu lokal 0.23 m2 2,800,000.00
Paku Biasa 5 - 12 cm 4.58 Kg 21,000.00
Minyak Bekisting 1.15 ltr 10,000.00
triplek tebal 9mm 4.01 145,000.00
Dolken kayu galam 68.76 22,000.00
MEMBUAT BETON K-175
Semen Portland 489.00 Kg 1,120.00
Pasir 1,140.00 Kg 218.21
Kerikil (maksimum 30 mm) 1,543.50 Kg 226.30
Air 322.50 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 182.55 Kg 11,500.00
Kawat Beton 2.61 Kg 20,000.00
V PEKERJAAN PASANGAN
1 Pasangan Batu Bata 1:4
Bata Merah 5 x 11 x 22 13,986.00 1,150.00
Portland Semen 2297.7 1,120.00
Pasir Pasang 8.5914 273,300.00

2 Plesteran
Portland Semen 2493.504 1,120.00
Pasir Pasang 9.5904 273,300.00
3 Pasang Pintu Tunggal Aluminium dan kusennya 2 2,800,000.00
4 Pasang jendela tunggal dan kusennya 8 1,500,000.00
5 Pasang boven Aluminium 13 375,000.00
6 Pasang plafond rangka hollow flat 91 175,000.00
7 Pasang keramik lantai 40x40 (anggaran berikutnya)
Ubin Keramik 40 x 40 cm putih 602.875 8,700.00

Portland Semen 910 1,120.00

Pasir Pasang 4.095 273,300.00

Semen Warna 136.5 2,375.00

8 Pekerjaan Kelistrikan
Penempatan Titik Lampu 6.00 titik 60,000.00
Penempatan Titik saklar tunggal 2.00 titik 80,000.00
Penempatan Titik saklar ganda 2.00 titik 80,000.00
Penempatan Titik Stop Kontak 3.00 titik 80,000.00
Peralatan (t. downlight, Kabel, lampu dsb) 300% 4.00
9 Pengecatan dinding baru (anggaran berikutnya) m2 0.00

PEKERJAAN LANTAI 2
I kolom praktis
1 Bekisting kolom (2x pakai)
Papan cetak pinus 0.42 2,800,000.00
Paku Biasa 2" - 5" 8.4 21,000.00
Minyak Bekisting 2.1 10,000.00

2 Membuat beton K-175


Portland Semen 256.725 1,120.00
Pasir Beton 598.5 218.21
Kerikil (maksimum 30 mm) 810.3375 226.30
Air 169.3125 50.00

3 Pembesian

Besi beton 1,406.97 11,500.00


Kawat beton 20.10 20,000.00
II Pekerjaan Pasangan
Pasangan Batu Bata 1:4
Bata Merah 5 x 11 x 22 12,121.20 1,150.00
Portland Semen 1,991.34 1,120.00
Pasir Pasang 7.45 273,300.00

RING BALOK
BEGISTING
Papan kayu lokal 0.30 m2 2,800,000.00
Paku Biasa 5 - 12 cm 5.92 Kg 21,000.00
Minyak Bekisting 1.48 ltr 10,000.00
MEMBUAT BETON K-175
Semen Portland 361.86 Kg 1,120.00
Pasir 843.60 Kg 218.21
Kerikil (maksimum 30 mm) 1,142.19 Kg 226.30
Air 238.65 ltr 50.00
PEMBESIAN
Besi Beton (Polos/Ulir) 191.71 Kg 11,500.00
Kawat Beton 2.74 Kg 20,000.00
10 Pasang atap rangka baja ringan berikut atapnya 75.4 m2 200,000.00

IV UPAH TENAGA
I PEK. TANAH 11.09
Pek. Galian
1 Pekerja 5.25 OH 80,000.00
2 Mandor 0.17 OH 105,000.00
II Pas. Pondasi batu kali
Pas. Batu Kosong
Pekerja 8.70 80,000.00
Tukang Batu 4.35 100,000.00
Kepala Tukang 0.44 105,000.00
Mandor 0.44 105,000.00
Pas. Batu Kali
Pekerja 4.70 80,000.00
Tukang Batu 2.35 100,000.00
Kepala Tukang 0.23 105,000.00
Mandor 0.23 105,000.00
LANTAI KERJA
Pekerja 0.33 80,000.00
Tukang Batu 0.06 100,000.00
Kepala Tukang 0.01 105,000.00
Mandor 0.02 105,000.00
FOOT PLAT
BEGISTING
Pekerja 1.46 OH 80,000.00
Tukang Kayu 0.73 OH 100,000.00
Kepala Tukang 0.07 OH 105,000.00
Mandor 0.07 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
1 Pekerja 1.16 OH 80,000.00
2 Tukang Batu 0.19 OH 100,000.00
3 Kepala Tukang 0.02 OH 105,000.00
4 Mandor 0.06 OH 105,000.00

PEMBESIAN
Pekerja 1.07 OH 80,000.00
Tukang Besi 1.07 OH 100,000.00
Kepala Tukang 0.11 OH 105,000.00
Mandor 0.06 OH 105,000.00
KOLOM BARU
BEGISTING
Pekerja 6.02 OH 80,000.00
Tukang Kayu 3.01 OH 100,000.00
Kepala Tukang 0.30 OH 105,000.00
Mandor 0.30 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 1.13 OH 80,000.00
Tukang Batu 0.19 OH 100,000.00
Kepala Tukang 0.02 OH 105,000.00
Mandor 0.06 OH 105,000.00

PEMBESIAN
Pekerja 1.08 OH 80,000.00
Tukang Besi 1.08 OH 100,000.00
Kepala Tukang 0.11 OH 105,000.00
Mandor 0.06 OH 105,000.00
KOLOM LAMA
BEGISTING
Pekerja 11.40 OH 80,000.00
Tukang Kayu 5.70 OH 100,000.00
Kepala Tukang 0.57 OH 105,000.00
Mandor 0.57 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 2.14 OH 80,000.00
Tukang Batu 0.36 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.11 OH 105,000.00

SLOOF BARU
BEGISTING
Pekerja 2.42 OH 80,000.00
Tukang Kayu 1.21 OH 100,000.00
Kepala Tukang 0.12 OH 105,000.00
Mandor 0.12 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 0.77 OH 80,000.00
Tukang Batu 0.13 OH 100,000.00
Kepala Tukang 0.01 OH 105,000.00
Mandor 0.04 OH 105,000.00

PEMBESIAN
Pekerja 0.40 OH 80,000.00
Tukang Besi 0.40 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.02 OH 105,000.00
BALOK UTAMA
BEGISTING
Pekerja 2.31 OH 80,000.00
Tukang Kayu 1.16 OH 100,000.00
Kepala Tukang 0.12 OH 105,000.00
Mandor 0.12 OH 105,000.00

Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
Pekerja 2.08 OH 80,000.00
Tukang Batu 0.35 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.10 OH 105,000.00

PEMBESIAN
Pekerja 2.69 OH 80,000.00
Tukang Besi 2.69 OH 100,000.00
Kepala Tukang 0.27 OH 105,000.00
Mandor 0.15 OH 105,000.00
DAK LANTAI
BEGISTING
Pekerja 45.28 OH 80,000.00
Tukang Kayu 22.64 OH 100,000.00
Kepala Tukang 2.26 OH 105,000.00
Mandor 2.26 OH 105,000.00

beton K-175
Pekerja 16.70 OH 80,000.00
Tukang Batu 2.78 OH 100,000.00
Kepala Tukang 0.28 OH 105,000.00
Mandor 0.84 OH 105,000.00

PEMBESIAN
Pekerja 10.48 OH 80,000.00
Tukang Besi 10.48 OH 100,000.00
Kepala Tukang 1.05 OH 105,000.00
Mandor 0.60 OH 105,000.00
RING BALOK + BALOK ANAK
BEGISTING
Pekerja 27.72 OH 80,000.00
Tukang Kayu 13.86 OH 100,000.00
Kepala Tukang 1.39 OH 105,000.00
Mandor 1.39 OH 105,000.00
Beton k-175
Pekerja 4.16 OH 80,000.00
Tukang Batu 0.69 OH 100,000.00
Kepala Tukang 0.07 OH 105,000.00
Mandor 0.21 OH 105,000.00

PEMBESIAN
Pekerja 4.18 OH 80,000.00
Tukang Besi 4.18 OH 100,000.00
Kepala Tukang 0.42 OH 105,000.00
Mandor 0.24 OH 105,000.00
TANGGA
BEGISTING
Pekerja 7.56 OH 80,000.00
Tukang Kayu 3.78 OH 100,000.00
Kepala Tukang 0.38 OH 105,000.00
Mandor 0.38 OH 105,000.00

Beton k-175
Pekerja 2.48 OH 80,000.00
Tukang Batu 0.41 OH 100,000.00
Kepala Tukang 0.04 OH 105,000.00
Mandor 0.12 OH 105,000.00

PEMBESIAN
Pekerja 1.22 OH 80,000.00
Tukang Besi 1.22 OH 100,000.00
Kepala Tukang 0.12 OH 105,000.00
Mandor 0.07 OH 105,000.00
V PEKERJAAN PASANGAN
Pasangan Batu Bata
Pekerja 59.94 80,000.00
Tukang Batu 19.98 100,000.00
Kepala Tukang 1.998 105,000.00
Mandor 2.997 105,000.00

Plesteran
Pekerja 119.88 80,000.00
Tukang Batu 59.94 100,000.00
Kepala Tukang 5.994 105,000.00
Mandor 5.994 105,000.00

Pasang keramik lantai


Pekerja 63.7 80,000.00
Tukang Batu 31.85 100,000.00
Kepala Tukang 3.185 105,000.00
Mandor 3.185 105,000.00

PEKERJAAN LANTAI 2
KOLOM PRAKTIS

begisting
Pekerja 13.86 OH 80,000.00
Tukang Kayu 6.93 OH 100,000.00
Kepala Tukang 0.69 OH 105,000.00
Mandor 0.69 OH 105,000.00
BETON K-175
Pekerja 1.30 80,000.00

Tukang batu 0.22 100,000.00

Kepala Tukang 0.02 105,000.00

Mandor 0.07 105,000.00

Pembesian
Pekerja 9.38 80,000.00

Tukang besi 9.38 100,000.00

Kepala Tukang 0.94 105,000.00

Mandor 0.54 105,000.00

Pasangan batu bata 1:4


Pekerja 59.94 80,000.00

Tukang batu 19.98 100,000.00

Kepala Tukang 2.00 105,000.00

Mandor 3.00 105,000.00

RING BALOK + BALOK ANAK


BEGISTING
Pekerja 9.77 OH 80,000.00
Tukang Kayu 4.88 OH 100,000.00
Kepala Tukang 0.49 OH 105,000.00
Mandor 0.49 OH 105,000.00

Beton k-175
Pekerja 1.83 OH 80,000.00
Tukang Batu 0.31 OH 100,000.00
Kepala Tukang 0.03 OH 105,000.00
Mandor 0.09 OH 105,000.00

PEMBESIAN
Pekerja 1.28 OH 80,000.00
Tukang Besi 1.28 OH 100,000.00
Kepala Tukang 0.13 OH 105,000.00
Mandor 0.07 OH 105,000.00

TERBILANG : LIMA PULUH DUA JUTA DUA RATUS LIMA PULUH RIBU RUPIAH

Mengetahui Mengetahui :
Koordinator PPKD Balapulang Wetan Kepala Desa Balapulang Wetan

M. MANSYUR ICHWANTO SUAEDI

...........................
PAH

ustakaan Desa

Jumlah Jumlah
Harga Semua
(Rp) (Rp)

250,000.00
500,000.00
672,000.00
1,422,000.00

3,961,353.60
769,932.86 5,954,310.86
4,731,286.46
667,040.83 2,680,695.09
410,868.29
477,066.24
465,650.73 2,020,626.09

73,024.00
33,167.92 189,145.46
46,572.54
2,150.00 154,914.46

313,600.00 538,608.00
17,640.00
2,800.00
255,584.00
116,087.72
163,003.89
7,525.00 0

1,848,271.95
45,919.80 2,770,432.36

510,720.00 3092727.27
76,608.00
9,120.00

249,742.08
113,434.29
159,278.09
7,353.00

1,860,986.93
46,235.70 3,033,478.08

501,120.00 3092727.27
145,152.00
17,280.00 663,552.00

473,195.52
214,928.12
301,790.06
13,932.00 1,003,845.70

276,374.00
29,295.00
2,325.00 307,994.00

169,780.80
77,115.41
108,281.16
4,998.75 360,176.12 PPH

698,209.71 0
17,346.83 715,556.53

196,000.00
29,400.00
3,500.00 228,900.00

460,051.20
208,957.90
293,407.00
13,545.00 975,961.10 PPH

4,645,871.34 0 0
121,196.64

576,240.00
137,200.00
2,160,900.00
3,481,450.00
9,055,200.00

3,694,430.21
1,678,031.41
2,356,197.94
108,772.80 PPN PPH

18,082,592.64 0 0
449,256.96

11.09
2,352,000.00
352,800.00 3.65805
42,000.00 0.11085
2,131,500.00
5,544,000.00

920,102.40
417,915.79
586,814.00
27,090.00

7,207,108.65
179,058.60

0.00
641,760.00
96,264.00 0
11,460.00 0
581,595.00
1,512,720.00

547,680.00
248,759.40
349,294.05
16,125.00

2,099,325.69
52,157.16

16,083,900.00
2,573,424.00
2,348,029.62

2,792,724.48
2,621,056.32
5,600,000.00
12,000,000.00
4,875,000.00
15,925,000.00

5,245,012.50
1,019,200.00
1,119,163.50
324,187.50 7,707,563.50

360,000.00
160,000.00
160,000.00
240,000.00
2,280,000.00
0.00

1,176,000.00
176,400.00
21,000.00

287,532.00
130,598.69
183,379.38
8,465.63

16,180,198.13
401,992.50

13,939,380.00
2,230,300.80
2,034,959.00

828,800.00
124,320.00
14,800.00

405,283.20
184,081.96
258,477.60
11,932.50

2,204,611.24
54,772.95
15,080,000.00
222,517,576.07

419,880.00
18,369.75
696,384.00
435,240.00
45,700.20
45,700.20
1,223,024.40 5,954,310.86
375,840.00
234,900.00
24,664.50
24,664.50 660,069.00

26,400.00
5,500.00
588.00
1,743.00 34,231.00

116,480.00
72,800.00
7,644.00
7,644.00

92,400.00
19,250.00
2,058.00
6,100.50

85,716.96
107,146.20
11,250.35
6,428.77 534,918.78

481,536.00
300,960.00
31,600.80
31,600.80
90,288.00
18,810.00
2,010.96
5,961.06

86,306.64
107,883.30
11,327.75
6,473.00

912,384.00
570,240.00
59,875.20
59,875.20 1,602,374.40

171,072.00
35,640.00
3,810.24
11,294.64 221,816.88

193,440.00
120,900.00
12,694.50
12,694.50 339,729.00

61,380.00
12,787.50
1,367.10
4,052.48 79,587.08

32,380.74
40,475.93
4,249.97
2,428.56 79,535.19
184,800.00
115,500.00
12,127.50
12,127.50

166,320.00
34,650.00
3,704.40
10,980.90

215,460.70
269,325.88
28,279.22
16,159.55

3,622,080.00
2,263,800.00
237,699.00
237,699.00
240,745,001.80

1,335,628.80
278,256.00
29,748.10
88,181.86

838,612.99
1,048,266.24
110,067.96
62,895.97

2,217,600.00
1,386,000.00
145,530.00
145,530.00
332,640.00
69,300.00
7,408.80
21,961.80

334,242.72
417,803.40
43,869.36
25,068.20

605,088.00
378,180.00
39,708.90
39,708.90

198,000.00
41,250.00
4,410.00
13,072.50

97,360.03
121,700.04
12,778.50
7,302.00

4,795,200.00
1,998,000.00
209,790.00
314,685.00

9,590,400.00
5,994,000.00
629,370.00
629,370.00

5,096,000.00
3,185,000.00
334,425.00
334,425.00

1,108,800.00
693,000.00
72,765.00
72,765.00

103,950.00
21,656.25
2,315.25
6,863.06

750,386.00
937,982.50
98,488.16
56,278.95

4,795,200.00
1,998,000.00
209,790.00
314,685.00

781,440.00
488,400.00
51,282.00
51,282.00

146,520.00
30,525.00
3,263.40
9,673.65

102,242.84
127,803.55
13,419.37
7,668.21
JUMLAH 70,483,288.70

JUMLAH TOTAL 293,000,864.77


PEMBULATAN 293,000,000.00
LIMA PULUH RIBU RUPIAH

Balapulang, Mei 2019


Di buat oleh
PKA Desa Balapulang Wetan

MUCH. CHAMDAN SALIM

...........................