4. Bahan Cetak
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
1 Bataco 10 x 20 x 40 cm BH Rp. 1,800
2 Buis Beton Dia. 1/2 30 cm BH Rp. 12,000
3 Buis Beton Dia. 20 cm BH Rp. 26,500
4 Buis Beton Dia. 40 cm BH Rp. 45,000
5 Buis Beton Dia. 60 cm BH Rp. 57,000
6 Buis Beton Dia. 80 cm BH Rp. 81,000
7 Lubang Angin 10 x 20 cm Buah Rp. 6,000
8 Lubang Angin 20 x 20 cm Buah Rp. 9,500
9 Lubang Angin 30 x 30 cm Buah Rp. 15,000
10 Paving blok biasa type bata t=8 cm BH Rp. 1,250
11 Paving blok press type bata t=8 cm BH Rp. 1,500
12 Paving blok press type berlian t=8 cm BH Rp. 1,250
5. Bahan Lantai
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
1 Beton grid pracetak M2
2 Keramik Cutting M2
3 Keramik KW I (Motif) M2 Rp. 117,500
4 Keramik KW I (Polos) M2 Rp. 69,500
5 Keramik KW II (Motif) M2 Rp. 69,500
1 Keramik KW II (Polos) M2 Rp. 48,500
1 Keramik Dinding Polos (20X25CM) M2 Rp. 77,000
2 Marmer 100/100 M2 Rp. 175,000
3 Marmer M2 Rp. 175,000
3 Porselin 11/11 Buah Rp. 700
4 Porselin 10/20 Buah Rp. 1,100
5 Porselin 20/20 Buah Rp. 2,200
2 Keramik Lantai Kelas Menengah (40x40cm) Buah Rp. 68,600
3 Keramik Lantai Kelas Menengah (20x20cm) KM Buah Rp. 79,000
4 Keramik Lantai Polos (40x40cm) Buah Rp. 13,183 Rp 79,100
5 Ubin Keramik 20/20 Buah Rp. 2,000
6 Ubin Keramik 10/33 Buah Rp. 1,700
7 Mozaik 30/30 Buah Rp. 2,200
8 Ubin Keramik artistik 10/20 Buah Rp. 1,150
9 Ubin Keramik artistik 10/10 Buah Rp. 600
10 Keramik artistik 5/20 Buah Rp. 600
11 Keramik artistik 10/20 Buah Rp. 1,150
10 Plint Keramik artistik 10/10 Buah Rp. 600
5 Plint Keramik 10/40 Buah Rp. 2,500
6 Plint Keramik artistik 5/20 Buah Rp. 600
7 Plint Internal Cove artistik 5 x 5/20 Buah Rp. 650
8 Ubin Abu-abu 20/20 Buah Rp. 1,200
9 Ubin Abu-abu 30/30 Buah Rp. 3,000
10 Ubin Abu-abu 40/40 Buah Rp. 5,000
11 Plint Ubin Abu-abu 15/20 Buah Rp. 600
12 Plint Ubin Abu-abu 15/30 Buah Rp. 900
13 Plint Ubin Abu-abu 10/40 Buah Rp. 1,250
14 Ubin Warna 20/20 Buah Rp. 1,450
15 Ubin Warna 30/30 Buah Rp. 3,100
16 Ubin Warna 40/40 Buah Rp. 5,500
17 Plint Ubin Warna 10/20 Buah Rp. 725
18 Plint Ubin Warna 10/30 Buah Rp. 1,200
19 Plint Ubin Warna 10/40 Buah Rp. 1,450
20 Ubin Teraso 30/30 Buah Rp. 4,000
21 Ubin Teraso 40/40 Buah Rp. 7,000
22 Plint Ubin Teraso 10/30 Buah Rp. 1,300
23 Plint Ubin Teraso 10/40 Buah Rp. 1,800
24 Ubin Granit 30/30 Buah Rp. 12,000
25 Ubin Granit 40/40 Buah Rp. 21,500
26 Plint Ubin Granit 10/30 Buah Rp. 4,000
27 Plint Ubin Granit 10/40 Buah Rp. 5,600
28 Ubin Teralux Kerang 30/30 Buah Rp. 13,000
29 Ubin Teralux Kerang 40/40 Buah Rp. 23,500
30 Plint Ubin Teralux Kerang 10/30 Buah Rp. 4,300
31 Plint Ubin Teralux Kerang 10/40 Buah Rp. 5,700
32 Ubin Teralux Marmer 30/30 Buah Rp. 13,800
33 Ubin Teralux Marmer 40/40 Buah Rp. 25,000
34 Ubin Teralux Marmer 60/60 Buah Rp. 5,500
35 Plint Ubin Teralux Marmer 10/30 Buah Rp. 4,600
36 Plint Ubin Teralux Marmer 10/40 Buah Rp. 6,200
37 Plint Ubin Teralux Marmer 10/60 Buah Rp. 9,200
38 Teraso Cor M3 Rp. 473,000
39 Batu Teraso Kg Rp. 3,700
40 Batu Granit Kg Rp. 800
40 Karpet M2 Rp. 65,500
41 Underlayer / rubber corrugated M2 Rp. 71,500
42 Batu Alam M2 Rp. 179,000
43 Gymfloor (Lantai Kayu) M2 Rp. 75,500
44 Vinyl 30/30 Buah Rp. 6,750
45 Vinyl karet 30/30 Buah Rp. 12,500
6. Bahan Besi
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
1 Besi Beton Polos Kg Rp. 13,000
2 Besi Beton Ulir Kg Rp. 12,000
2 Besi beton polos Dia. 6 (2.44 Kg) Kg Rp. 40,000
3 Besi beton polos Dia. 8 (4.73 Kg) Kg Rp. 65,000
4 Besi beton polos Dia. 10 (7.4 Kg) Kg Rp. 95,000
5 Besi beton polos Dia. 12 ( 10.6 Kg) Kg Rp. 120,000
6 Besi beton polos Dia. 14 (14.5 Kg) Kg Rp. 195,000
7 Besi Baja WF Kg Rp. 29,500
8 Besi Profil Kg Rp. 29,500
9 Besi Black steel (S40) Kg Rp. 29,500
10 Profil Alluminium "T" m Rp. 45,000
11 Profil Alluminium m Rp. 45,000
10 Besi canal Kg Rp. 29,500
11 Besi plat Baja Kg Rp. 500,000
12 Besi Plat ukuran 3 mm (1,2 x 2,4 x 3) lbr Rp. 907,500
13 Kawat Berduri rol Rp. 100,200
2 Kawat Beton Kg Rp. 28,000
3 Kawat Besi diameter 4 mm Kg Rp. 169,000
3 Kawat Las Kg Rp. 19,000
4 Kawat Nyamuk M2 Rp. 21,000
4 Kawat Bronjong 3 mm Kg Rp. 30,000
5 Kawat Bronjong 4 mm Kg Rp. 25,000
5 Jaring kawat baja dilas Kg Rp. 13,500
6 Besi Angkur Ø 8 mm Kg Rp. 13,500
6 Besi strip tebal 5 mm Kg Rp. 13,500
7 Besi strip 2 x 3 mm Kg Rp. 13,500
7 Baja strip (0,2 x 2) cm Kg Rp. 13,500
8 Baja strip Kg Rp. 35,000
8 Besi scuare tube m Rp. 5,000
9 Besi list kaca (1 x 1) cm m Rp. 200,000
9 Pintu gulung besi m2 Rp. 350,000
10 Pintu lipat baja Folding door M2 Rp. 175,000
10 Sunscreen alluminium M2 Rp. 250,000
11 Rolling door alluminium M2 Rp. 90,000
11 Alumunium strip M Rp. 35,000
12 Pintu Alumunium M Rp. 75,500
13 Profil kaca alluminium M Rp. 35,500
14 Jendela nako (rangka + kaca 5 mm) M2 Rp. 175,000
15 Rangka Atap Baja Ringan M2 Rp. 180,000
16 Genteng Multiroof M Rp. 45,000
7. Bahan Langit-langit
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
1 Calcibord 120 x 240 x 3,5 mm Lembar Rp. 72,600
2 Gypsum board 1200 x 2400 x 6 mm Lembar Rp. 90,500
3 Gypsum board 1200 x 2400 x 9 mm Lembar Rp. 127,000
4 Akustik 30/30 Lembar Rp. 13,500
5 Akustik 30/60 Lembar Rp. 27,000
6 Akustik 30/60 Lembar Rp. 27,000
7 Akustik 60/120 Lembar Rp. 108,000
2 Asbes semen (Eternit) Lembar Rp. 25,700
3 Formika Putih 120 x 240 cm Lembar Rp. 102,000
4 Formika Warna 120 x 240 cm Lembar Rp. 102,500
5 GRC 12 mm Lembar Rp. 250,000
6 GRC 6 mm Lembar Rp. 115,500
7 GRC 9 mm Lembar Rp. 165,000
8 Lem Kg Rp. 23,000
3 Lem Kayu Kg Rp. 37,500
4 Rangka langit langit baja ringan dan plafond Calsiboard M2 Rp. 104,000
5 Multipleks 120 x 240 x 12 mm Lembar Rp. 181,500
6 Multipleks 120 x 240 x 18 mm Lembar Rp. 245,000
7 Multipleks 120 x 240 x 4 mm Lembar Rp. 68,000
4 Multipleks 120 x 240 x 6 mm Lembar Rp. 105,000
5 Multipleks 120 x 240 x 9 mm Lembar Rp. 130,000
6 Teakwood 120 x 240 x 3 mm Lembar Rp. 102,000
7 Teakwood 120 x 240 x 4 mm Lembar Rp. 95,000
7 Plywood tebal 9 mm Lembar Rp. 125,000
7 Plywood tebal 6 mm Lembar Rp. 84,500
8 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar Rp. 95,000
9 Plywood 120 x 240 x 4 mm Lembar Rp. 90,500
8 Tripleks 120 x 240 x 2 mm Lembar Rp. 56,200
9 Tripleks 120 x 240 x 3 mm Lembar Rp. 65,900
10 List Gypsum Profil m Rp. 29,000
11 List Kayu Profil m Rp. 36,000
8. Bahan Pipa
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
1 Pipa GI Dia. 1 ½" M' Rp. 35,000
2 Pipa GI Dia. 1" M' Rp. 29,000
3 Pipa GI Dia. 1/2" M' Rp. 20,500
4 Pipa GI Dia. 10" M' Rp. 800,000
5 Pipa GI Dia. 2" M' Rp. 61,500
6 Pipa GI Dia. 3" M' Rp. 130,000
7 Pipa GI Dia. 3" M' Rp. 130,000
8 Pipa GI Dia. 3/4" M' Rp. 24,500
9 Pipa GI Dia. 4" M' Rp. 205,000
10 Pipa GI Dia. 6" M' Rp. 307,500
11 Pipa GI Dia. 8" M' Rp. 560,000
12 Pipa PVC Dia. 1" M' Rp. 9,000
13 Pipa PVC Dia. 1/2" Tipe AW M' Rp. 5,500
14 Pipa PVC Dia. 3/4" Tipe AW M' Rp. 8,400
15 Pipa PVC Dia. 1" Tipe AW M' Rp. 11,900
16 Pipa PVC Dia. 1 ½" Tipe AW M' Rp. 17,600
16 Pipa PVC Dia. 2" Tipe AW M' Rp. 22,000
17 Pipa PVC Dia. 2 ½" Tipe AW M' Rp. 31,700
18 Pipa PVC Dia. 3" Tipe AW M' Rp. 40,000
19 Pipa PVC Dia. 4" Tipe AW M' Rp. 63,100
21 Pipa PVC Dia. 6" M' Rp. 135,000
22 Pipa PVC Dia. 8" M' Rp. 225,000
20 Pipa PVC Dia. 2" Tipe D M' Rp. 12,500
22 Pipa PVC Dia. 2 ½" Tipe D M' Rp. 15,000
23 Pipa PVC Dia. 3" Tipe D M' Rp. 20,000
21 Pipa PVC Dia. 4" Tipe D M' Rp. 30,000
23 Waterstop PVC b = 150 mm (Talang b = 15 cm) M' Rp. 17,500
24 Waterstop PVC b = 200 mm (Talang b = 20 cm) M' Rp. 20,000
25 Waterstop PVC b = 230-320 mm (Talang b = 23-32 cm) M' Rp. 22,500
26 Pipa tidak bertekanan
9. Bahan Kaca
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
1 Kaca Polos 3 mm M2 Rp. 91,600
2 Kaca Polos 5 mm M2 Rp. 139,500
3 Kaca Polos 10 mm M2 Rp. 155,000
3 Kaca Raiben 5 mm M2 Rp. 151,000
4 Kaca Raiben 10 mm M2 Rp. 175,000
5 Kaca Raiben 12 mm M2 Rp. 185,000
6 Kaca Buram 3 mm M2 Rp. 95,000
7 Kaca Buram 5 mm M2 Rp. 135,000
8 Kaca Buram bermotif 3 mm M2 Rp. 125,000
9 Kaca Buram bermotif 5 mm M2 Rp. 155,000
9 Kaca Cermin 5 mm M2 Rp. 75,000
10 Kaca Wire Glass 5 mm M2 Rp. 150,000
11 Kaca Wire Glass 8 mm M2 Rp. 150,000
6 Kerangka Nako Daun Rp. 20,000
7 Kerangka Es 3 mm M2 Rp. 75,000
A Bahan
1 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 1.250 Rp. 45,000.00 Rp. 56,250.00
2 Portland Cement (PC) Kg 2.500 Rp. 1,705.00 Rp. 4,262.50
3 Seng Gelombang BJLS 20 Lembar 1.200 Rp. 61,000.00 Rp. 73,200.00
4 Pasir Beton (PB) M3 0.005 Rp. 214,833.00 Rp. 1,074.17
5 Kerikil beton (maks. 30 mm) M3 0.009 Rp. 248,795.00 Rp. 2,239.15
6 Kayu Kelas II (Kayu 5/7) M3 0.072 Rp. 6,500,000.00 Rp. 468,000.00
7 Paku 5 cm - 12 cm Kg 0.060 Rp. 20,000.00 Rp. 1,200.00
8 Meni Besi Kg 0.450 Rp. 32,883.00 Rp. 14,797.35
Jumlah Harga Bahan Rp. 621,023.17
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.020 Rp. 108,000.00 Rp. 2,160.00
Jumlah Harga Tenaga Rp. 49,680.00
A Bahan
1 Kayu Kelas II (Kayu 5/7) M3 0.012 Rp. 6,500,000.00 Rp. 78,000.00
2 Paku 5 cm - 12 cm Kg 2.500 Rp. 20,000.00 Rp. 50,000.00
3 Papan Kayu Kelas III M3 0.007 Rp. 4,500,000.00 Rp. 31,500.00
4
5
6
Jumlah Harga Bahan Rp. 159,500.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 18,060.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 6.667 Rp. 62,400.00 Rp. 416,020.80
2 Mandor OH 0.333 Rp. 108,000.00 Rp. 35,964.00
3
4
Jumlah Harga Tenaga Rp. 451,984.80
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 6.667 Rp. 62,400.00 Rp. 416,020.80
2 Mandor OH 0.333 Rp. 108,000.00 Rp. 35,964.00
3
4
Jumlah Harga Tenaga Rp. 451,984.80
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.750 Rp. 62,400.00 Rp. 46,800.00
2 Mandor OH 0.025 Rp. 108,000.00 Rp. 2,700.00
3
4
Jumlah Harga Tenaga Rp. 49,500.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
3
4
Jumlah Harga Tenaga Rp. 61,020.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.050 Rp. 62,400.00 Rp. 65,520.00
2 Mandor OH 0.067 Rp. 108,000.00 Rp. 7,236.00
3
4
Jumlah Harga Tenaga Rp. 72,756.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Mandor OH 0.032 Rp. 108,000.00 Rp. 3,456.00
3
4
Jumlah Harga Tenaga Rp. 65,856.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Mandor OH 0.060 Rp. 108,000.00 Rp. 6,480.00
3
4
Jumlah Harga Tenaga Rp. 100,080.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.200 Rp. 62,400.00 Rp. 74,880.00
2 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
3
4
Jumlah Harga Tenaga Rp. 79,740.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.050 Rp. 62,400.00 Rp. 3,120.00
2 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
3
4
Jumlah Harga Tenaga Rp. 3,660.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.330 Rp. 62,400.00 Rp. 20,592.00
2 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 21,672.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Mandor OH 0.008 Rp. 108,000.00 Rp. 900.00
3
4
Jumlah Harga Tenaga Rp. 16,500.00
A Bahan
1
2
3
4
5
6
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.500 Rp. 62,400.00 Rp. 31,200.00
2 Mandor OH 0.050 Rp. 108,000.00 Rp. 5,400.00
3
4
Jumlah Harga Tenaga Rp. 36,600.00
A Bahan
1 Pasir Urug M3 1.200 Rp. 95,733.00 Rp. 114,879.60
2
3
4
5
6
Jumlah Harga Bahan Rp. 114,879.60
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 19,800.00
A Bahan
1 Kapur Pasang (KP) M3 0.135 Rp. 17,500.00 Rp. 2,362.50
2 Pasir Pasang (PP) M3 0.400 Rp. 165,117.00 Rp. 66,046.80
3 Tanah Liat (TL) M3 0.948 Rp. 45,000.00 Rp. 42,660.00
4
5
6
Jumlah Harga Bahan Rp. 111,069.30
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Batu OH 0.400 Rp. 102,000.00 Rp. 40,800.00
3 Kepala Tukang Batu OH 0.040 Rp. 108,000.00 Rp. 4,320.00
4 Mandor OH 0.080 Rp. 108,000.00 Rp. 8,640.00
Jumlah Harga Tenaga Rp. 103,680.00
A Bahan
1 Kapur Pasang (KP) M3 0.248 Rp. 17,500.00 Rp. 4,340.00
2 Tanah Liat (TL) M3 1.240 Rp. 45,000.00 Rp. 55,800.00
3
4
5
6
Jumlah Harga Bahan Rp. 60,140.00
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Batu OH 0.400 Rp. 102,000.00 Rp. 40,800.00
3 Kepala Tukang Batu OH 0.040 Rp. 108,000.00 Rp. 4,320.00
4 Mandor OH 0.080 Rp. 108,000.00 Rp. 8,640.00
Jumlah Harga Tenaga Rp. 103,680.00
A Bahan
1 Ijuk Kg 6.000 Rp. 12,000.00 Rp. 72,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 72,000.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
3
4
Jumlah Harga Tenaga Rp. 10,980.00
A Bahan
1 Sirtu M3 1.200 Rp. 118,167.00 Rp. 141,800.40
2
3
4
5
6
Jumlah Harga Bahan Rp. 141,800.40
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Mandor OH 0.025 Rp. 108,000.00 Rp. 2,700.00
3
4
Jumlah Harga Tenaga Rp. 18,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 202.000 Rp. 1,705.00 Rp. 344,410.00
3 Pasir Pasang (PP) M3 0.485 Rp. 165,117.00 Rp. 80,081.75
4
5
6
Jumlah Harga Bahan Rp. 642,692.55
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 163.000 Rp. 1,705.00 Rp. 277,915.00
3 Pasir Pasang (PP) M3 0.520 Rp. 165,117.00 Rp. 85,860.84
4
5
6
Jumlah Harga Bahan Rp. 581,976.64
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 136.000 Rp. 1,705.00 Rp. 231,880.00
3 Pasir Pasang (PP) M3 0.544 Rp. 165,117.00 Rp. 89,823.65
4
5
6
Jumlah Harga Bahan Rp. 539,904.45
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 117.000 Rp. 1,705.00 Rp. 199,485.00
3 Pasir Pasang (PP) M3 0.561 Rp. 165,117.00 Rp. 92,630.64
4
5
6
Jumlah Harga Bahan Rp. 510,316.44
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 91.000 Rp. 1,705.00 Rp. 155,155.00
3 Pasir Pasang (PP) M3 0.584 Rp. 165,117.00 Rp. 96,428.33
4
5
6
Jumlah Harga Bahan Rp. 469,784.13
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Kapur Pasang (KP) M3 0.170 Rp. 17,500.00 Rp. 2,975.00
3 Semen Merah (SM) M3 0.170 Rp. 150,000.00 Rp. 25,500.00
4 Pasir Pasang (PP) M3 0.340 Rp. 165,117.00 Rp. 56,139.78
5
6
Jumlah Harga Bahan Rp. 302,815.58
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 61.000 Rp. 1,705.00 Rp. 104,005.00
3 Kapur Pasang (KP) M3 0.147 Rp. 17,500.00 Rp. 2,572.50
4 Pasir Pasang (PP) M3 0.492 Rp. 165,117.00 Rp. 81,237.56
5
6
Jumlah Harga Bahan Rp. 406,015.86
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Portland Cement (PC) Kg 41.000 Rp. 1,705.00 Rp. 69,905.00
3 Kapur Pasang (KP) M3 0.131 Rp. 17,500.00 Rp. 2,292.50
4 Pasir Pasang (PP) M3 0.523 Rp. 165,117.00 Rp. 86,356.19
5
6
Jumlah Harga Bahan Rp. 376,754.49
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 186,300.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 181,834.00 Rp. 218,200.80
2 Pasir Urug M3 0.432 Rp. 95,733.00 Rp. 41,356.66
3
4
5
6
Jumlah Harga Bahan Rp. 259,557.46
B Tenaga Kerja
1 Pekerja OH 0.780 Rp. 62,400.00 Rp. 48,672.00
2 Tukang Batu OH 0.390 Rp. 102,000.00 Rp. 39,780.00
3 Kepala Tukang Batu OH 0.039 Rp. 108,000.00 Rp. 4,212.00
4 Mandor OH 0.039 Rp. 108,000.00 Rp. 4,212.00
Jumlah Harga Tenaga Rp. 96,876.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 0.480 Rp. 181,834.00 Rp. 87,280.32
2 Portland Cement (PC) Kg 194.000 Rp. 1,705.00 Rp. 330,770.00
3 Pasir Beton (PB) M3 0.312 Rp. 214,833.00 Rp. 67,027.90
4 Kerikil alam (KR) M3 0.468 Rp. 177,500.00 Rp. 83,070.00
5 Besi beton Polos Kg 126.000 Rp. 20,050.00 Rp. 2,526,300.00
6 Kawat beton Kg 1.800 Rp. 24,000.00 Rp. 43,200.00
Jumlah Harga Bahan Rp. 3,137,648.22
B Tenaga Kerja
1 Pekerja OH 3.400 Rp. 62,400.00 Rp. 212,160.00
2 Tukang Batu OH 0.850 Rp. 102,000.00 Rp. 86,700.00
3 Kepala Tukang Batu OH 0.085 Rp. 108,000.00 Rp. 9,180.00
4 Mandor OH 0.170 Rp. 108,000.00 Rp. 18,360.00
Jumlah Harga Tenaga Rp. 326,400.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 0.450 Rp. 181,834.00 Rp. 81,825.30
2 Portland Cement (PC) Kg 194.000 Rp. 1,705.00 Rp. 330,770.00
3 Pasir Beton (PB) M3 0.312 Rp. 214,833.00 Rp. 67,027.90
4 Kerikil alam (KR) M3 0.468 Rp. 177,500.00 Rp. 83,070.00
5
6
Jumlah Harga Bahan Rp. 562,693.20
B Tenaga Kerja
1 Pekerja OH 2.400 Rp. 62,400.00 Rp. 149,760.00
2 Tukang Batu OH 0.800 Rp. 102,000.00 Rp. 81,600.00
3 Kepala Tukang Batu OH 0.080 Rp. 108,000.00 Rp. 8,640.00
4 Mandor OH 0.119 Rp. 108,000.00 Rp. 12,852.00
Jumlah Harga Tenaga Rp. 252,852.00
A Bahan
1 Portland Cement (PC) Kg 247.000 Rp. 1,705.00 Rp. 421,135.00
2 Pasir Beton (PB) kg 869.000 Rp. 153.45 Rp. 133,349.91
3 Kerikil beton (maks. 30 mm) kg 999.000 Rp. 184.29 Rp. 184,108.30
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 760,093.21
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) kg 276.000 Rp. 1,705.00 Rp. 470,580.00
2 Pasir Beton (PB) kg 828.000 Rp. 153.45 Rp. 127,058.37
3 Kerikil beton (maks. 30 mm) kg 1012.000 Rp. 184.29 Rp. 186,504.10
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 805,642.48
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 299.000 Rp. 1,705.00 Rp. 509,795.00
2 Pasir Beton (PB) kg 799.000 Rp. 153.45 Rp. 122,608.26
3 Kerikil beton (maks. 30 mm) kg 1017.000 Rp. 184.29 Rp. 187,425.57
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 841,328.83
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang Batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 230.000 Rp. 1,705.00 Rp. 392,150.00
2 Pasir Beton (PB) kg 0.638 Rp. 153.45 Rp. 97.88
3 Kerikil beton (maks. 30 mm) kg 0.761 Rp. 184.29 Rp. 140.20
4 Air Liter 200.000 Rp. 100.00 Rp. 20,000.00
5
6
Jumlah Harga Bahan Rp. 412,388.08
B Tenaga Kerja
1 Pekerja OH 1.200 Rp. 62,400.00 Rp. 74,880.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.060 Rp. 108,000.00 Rp. 6,480.00
Jumlah Harga Tenaga Rp. 103,920.00
A Bahan
1 Portland Cement (PC) Kg 326.000 Rp. 1,705.00 Rp. 555,830.00
2 Pasir Beton (PB) kg 760.000 Rp. 153.45 Rp. 116,623.63
3 Kerikil beton (maks. 30 mm) kg 0.762 Rp. 184.29 Rp. 140.47
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 694,094.10
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 352.000 Rp. 1,705.00 Rp. 600,160.00
2 Pasir Beton (PB) kg 731.000 Rp. 153.45 Rp. 112,173.52
3 Kerikil beton (maks. 30 mm) kg 1031.000 Rp. 184.29 Rp. 190,005.66
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 923,839.18
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang Batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 371.000 Rp. 1,705.00 Rp. 632,555.00
2 Pasir Beton (PB) kg 698.000 Rp. 153.45 Rp. 107,109.60
3 Kerikil beton (maks. 30 mm) kg 1047.000 Rp. 184.29 Rp. 192,954.34
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 954,118.94
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang Batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 384.000 Rp. 1,705.00 Rp. 654,720.00
2 Pasir Beton (PB) kg 692.000 Rp. 153.45 Rp. 106,188.88
3 Kerikil beton (maks. 30 mm) kg 1039.000 Rp. 184.29 Rp. 191,480.00
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 973,888.89
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang Batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 406.000 Rp. 1,705.00 Rp. 692,230.00
2 Pasir Beton (PB) kg 684.000 Rp. 153.45 Rp. 104,961.27
3 Kerikil beton (maks. 30 mm) kg 1026.000 Rp. 184.29 Rp. 189,084.20
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 1,007,775.47
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang Batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 413.000 Rp. 1,705.00 Rp. 704,165.00
2 Pasir Beton (PB) kg 681.000 Rp. 153.45 Rp. 104,500.91
3 Kerikil beton (maks. 30 mm) kg 1021.000 Rp. 184.29 Rp. 188,162.74
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 1,018,328.65
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang Batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 142,998.00
A Bahan
1 Portland Cement (PC) Kg 439.000 Rp. 1,705.00 Rp. 748,495.00
2 Pasir Beton (PB) kg 670.000 Rp. 153.45 Rp. 102,812.94
3 Kerikil beton (maks. 30 mm) kg 1006.000 Rp. 184.29 Rp. 185,398.35
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 1,058,206.28
B Tenaga Kerja
1 Pekerja OH 2.100 Rp. 62,400.00 Rp. 131,040.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.105 Rp. 108,000.00 Rp. 11,340.00
Jumlah Harga Tenaga Rp. 181,860.00
A Bahan
1 Portland Cement (PC) Kg 448.000 Rp. 1,705.00 Rp. 763,840.00
2 Pasir Beton (PB) kg 667.000 Rp. 153.45 Rp. 102,352.58
3 Kerikil beton (maks. 30 mm) kg 1000.000 Rp. 184.29 Rp. 184,292.59
4 Air Liter 215.000 Rp. 100.00 Rp. 21,500.00
5
6
Jumlah Harga Bahan Rp. 1,071,985.17
B Tenaga Kerja
1 Pekerja OH 2.100 Rp. 62,400.00 Rp. 131,040.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.105 Rp. 108,000.00 Rp. 11,340.00
Jumlah Harga Tenaga Rp. 181,860.00
A Bahan
1 Portland Cement (PC) Kg 400.000 Rp. 1,705.00 Rp. 682,000.00
2 Pasir Beton (PB) m3 0.480 Rp. 153.45 Rp. 73.66
3 Kerikil beton (maks. 30 mm) m3 0.800 Rp. 248,795.00 Rp. 199,036.00
4 Strorox -100 kG 1.200 Rp. 25,000.00 Rp. 30,000.00
5
6
Jumlah Harga Bahan Rp. 911,109.66
B Tenaga Kerja
1 Pekerja OH 2.100 Rp. 62,400.00 Rp. 131,040.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.105 Rp. 108,000.00 Rp. 11,340.00
Jumlah Harga Tenaga Rp. 181,860.00
A Bahan
1 Waterstop PVC b = 150 mm (Talang b = 15 cm) M' 1.050 Rp. 17,500.00 Rp. 18,375.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 18,375.00
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang batu OH 0.030 Rp. 102,000.00 Rp. 3,060.00
3 Kepala Tukang Batu OH 0.003 Rp. 108,000.00 Rp. 324.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 7,452.00
A Bahan
1 Waterstop PVC b = 200 mm (Talang b = 20 cm) M' 1.050 Rp. 20,000.00 Rp. 21,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 21,000.00
B Tenaga Kerja
1 Pekerja OH 0.070 Rp. 62,400.00 Rp. 4,368.00
2 Tukang batu OH 0.035 Rp. 102,000.00 Rp. 3,570.00
3 Kepala Tukang Batu OH 0.004 Rp. 108,000.00 Rp. 432.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 8,802.00
A Bahan
1 Waterstop PVC b = 230-320 mm (Talang b = 23- M' 1.050 Rp. 22,500.00 Rp. 23,625.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 23,625.00
B Tenaga Kerja
1 Pekerja OH 0.080 Rp. 62,400.00 Rp. 4,992.00
2 Tukang batu OH 0.040 Rp. 102,000.00 Rp. 4,080.00
3 Kepala Tukang Batu OH 0.004 Rp. 108,000.00 Rp. 432.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 9,936.00
A Bahan
1 Besi beton Polos Kg 1.050 Rp. 20,050.00 Rp. 21,052.50
2 Kawat beton Kg 0.015 Rp. 17.14 Rp. 0.26
3
4
5
6
Jumlah Harga Bahan Rp. 21,052.76
B Tenaga Kerja
1 Pekerja OH 0.0070 Rp. 62,400.00 Rp. 436.80
2 Tukang Besi OH 0.0070 Rp. 102,000.00 Rp. 714.00
3 Kepala Tukang Besi OH 0.0007 Rp. 108,000.00 Rp. 75.60
4 Mandor OH 0.0004 Rp. 108,000.00 Rp. 43.20
Jumlah Harga Tenaga Rp. 1,269.60
A Bahan
1 Besi beton Ulir Kg 1.050 Rp. 21,250.00 Rp. 22,312.50
2 Kawat beton Kg 0.015 Rp. 17.14 Rp. 0.26
3
4
5
6
Jumlah Harga Bahan Rp. 22,312.76
B Tenaga Kerja
1 Pekerja OH 0.0070 Rp. 62,400.00 Rp. 436.80
2 Tukang Besi OH 0.0070 Rp. 102,000.00 Rp. 714.00
3 Kepala Tukang Besi OH 0.0007 Rp. 108,000.00 Rp. 75.60
4 Mandor OH 0.0004 Rp. 108,000.00 Rp. 43.20
Jumlah Harga Tenaga Rp. 1,269.60
A Bahan
1 Besi beton Polos Kg 1.050 Rp. 20,050.00 Rp. 21,052.50
2 Kawat beton Kg 0.010 Rp. 17.14 Rp. 0.17
3
4
5
6
Jumlah Harga Bahan Rp. 21,052.67
B Tenaga Kerja
1 Pekerja OH 0.0050 Rp. 62,400.00 Rp. 312.00
2 Tukang Besi OH 0.0050 Rp. 102,000.00 Rp. 510.00
3 Kepala Tukang Besi OH 0.0005 Rp. 108,000.00 Rp. 54.00
4 Mandor OH 0.0003 Rp. 108,000.00 Rp. 32.40
Jumlah Harga Tenaga Rp. 908.40
A Bahan
1 Jaring kawat baja dilas Kg 1.020 Rp. 13,500.00 Rp. 13,770.00
2 Kawat beton Kg 0.050 Rp. 24,000.00 Rp. 1,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 14,970.00
B Tenaga Kerja
1 Pekerja OH 0.025 Rp. 62,400.00 Rp. 1,560.00
2 Tukang Besi OH 0.025 Rp. 102,000.00 Rp. 2,550.00
3 Kepala Tukang Besi OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.001 Rp. 108,000.00 Rp. 108.00
Jumlah Harga Tenaga Rp. 6,378.00
A Bahan
1 Kayu Kelas III M3 0.040 Rp. 3,500,000.00 Rp. 140,000.00
2 Paku 5 cm - 10 cm Kg 0.300 Rp. 20,000.00 Rp. 6,000.00
3 Minyak Begisting liter 0.100 Rp. 10,000.00 Rp. 1,000.00
4
5
6
Jumlah Harga Bahan Rp. 147,000.00
B Tenaga Kerja
1 Pekerja OH 0.520 Rp. 62,400.00 Rp. 32,448.00
2 Tukang Kayu OH 0.260 Rp. 102,000.00 Rp. 26,520.00
3 Kepala Tukang Kayu OH 0.026 Rp. 108,000.00 Rp. 2,808.00
4 Mandor OH 0.026 Rp. 108,000.00 Rp. 2,808.00
Jumlah Harga Tenaga Rp. 64,584.00
A Bahan
1 Kayu Kelas III M3 0.045 Rp. 3,500,000.00 Rp. 157,500.00
2 Paku 5 cm - 10 cm Kg 0.300 Rp. 20,000.00 Rp. 6,000.00
3 Minyak Begisting liter 0.100 Rp. 10,000.00 Rp. 1,000.00
4
5
6
Jumlah Harga Bahan Rp. 164,500.00
B Tenaga Kerja
1 Pekerja OH 0.520 Rp. 62,400.00 Rp. 32,448.00
2 Tukang Kayu OH 0.260 Rp. 102,000.00 Rp. 26,520.00
3 Kepala Tukang Kayu OH 0.026 Rp. 108,000.00 Rp. 2,808.00
4 Mandor OH 0.026 Rp. 108,000.00 Rp. 2,808.00
Jumlah Harga Tenaga Rp. 64,584.00
A Bahan
1 Kayu Kelas III M3 0.040 Rp. 3,500,000.00 Rp. 140,000.00
2 Paku 5 cm - 12 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
3 Minyak Begisting liter 0.200 Rp. 10,000.00 Rp. 2,000.00
4 Kayu kelas III M3 0.015 Rp. 3,500,000.00 Rp. 52,500.00
5 Plywood tebal 6 mm Lembar F Rp. 84,500.00 #VALUE!
6 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 1.000 Rp. 45,000.00 Rp. 45,000.00
Jumlah Harga Bahan #VALUE!
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp. 108,000.00 Rp. 3,564.00
Jumlah Harga Tenaga Rp. 81,972.00
A Bahan
1 Kayu Kelas III M3 0.040 Rp. 3,500,000.00 Rp. 140,000.00
2 Paku 5 cm - 12 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
3 Minyak Begisting liter 0.200 Rp. 10,000.00 Rp. 2,000.00
4 Kayu kelas III M3 0.018 Rp. 3,500,000.00 Rp. 63,000.00
5 Plywood tebal 6 mm Lembar 0.350 Rp. 84,500.00 Rp. 29,575.00
6 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 1.000 Rp. 45,000.00 Rp. 45,000.00
Jumlah Harga Bahan Rp. 287,575.00
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp. 108,000.00 Rp. 3,564.00
Jumlah Harga Tenaga Rp. 81,972.00
A Bahan
1 Kayu Kelas III M3 0.040 Rp. 3,500,000.00 Rp. 140,000.00
2 Paku 5 cm - 12 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
3 Minyak Begisting liter 0.200 Rp. 10,000.00 Rp. 2,000.00
4 Kayu kelas III M3 0.015 Rp. 3,500,000.00 Rp. 52,500.00
5 Plywood tebal 6 mm Lembar 0.350 Rp. 84,500.00 Rp. 29,575.00
6 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 3.000 Rp. 45,000.00 Rp. 135,000.00
Jumlah Harga Bahan Rp. 367,075.00
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp. 108,000.00 Rp. 3,564.00
Jumlah Harga Tenaga Rp. 81,972.00
A Bahan
1 Kayu Kelas III M3 0.030 Rp. 3,500,000.00 Rp. 105,000.00
2 Paku 5 cm - 12 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
3 Minyak Begisting liter 0.200 Rp. 10,000.00 Rp. 2,000.00
4 Kayu kelas III M3 0.020 Rp. 3,500,000.00 Rp. 70,000.00
5 Plywood tebal 6 mm Lembar 0.350 Rp. 84,500.00 Rp. 29,575.00
6 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 3.000 Rp. 45,000.00 Rp. 135,000.00
7 Formite/penjaga jarak bekisting/spacer BH 4.000 Rp. 50,000.00 Rp. 200,000.00
Jumlah Harga Bahan Rp. 549,575.00
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp. 108,000.00 Rp. 3,564.00
Jumlah Harga Tenaga Rp. 81,972.00
A Bahan
1 Kayu Kelas III M3 0.030 Rp. 3,500,000.00 Rp. 105,000.00
2 Paku 5 cm - 12 cm Kg 0.400 Rp. 20,000.00 Rp. 8,000.00
3 Minyak Begisting liter 0.150 Rp. 10,000.00 Rp. 1,500.00
4 Kayu kelas III M3 0.015 Rp. 3,500,000.00 Rp. 52,500.00
5 Plywood tebal 6 mm Lembar 0.350 Rp. 84,500.00 Rp. 29,575.00
6 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 1.000 Rp. 45,000.00 Rp. 45,000.00
Jumlah Harga Bahan Rp. 241,575.00
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp. 108,000.00 Rp. 3,564.00
Jumlah Harga Tenaga Rp. 81,972.00
A Bahan
1 Papan Kayu Kelas III M3 0.026 Rp. 4,500,000.00 Rp. 118,800.00
2 Paku 5 cm - 12 cm Kg 0.600 Rp. 20,000.00 Rp. 12,000.00
3 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 0.500 Rp. 45,000.00 Rp. 22,500.00
4
5
6
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 15,864.00
A Bahan
1 Kayu kelas III M3 0.200 Rp. 3,500,000.00 Rp. 700,000.00
2 Paku 5 cm - 12 cm Kg 1.500 Rp. 20,000.00 Rp. 30,000.00
3 Minyak Begisting liter 0.400 Rp. 10,000.00 Rp. 4,000.00
4 Besi beton polos Kg 157.500 Rp. 20,050.00 Rp. 3,157,875.00
5 Kawat beton Kg 2.250 Rp. 24,000.00 Rp. 54,000.00
6 Portland Cement (PC) Kg 336.000 Rp. 1,705.00 Rp. 572,880.00
7 Pasir Beton (PB) M3 0.540 Rp. 214,833.00 Rp. 116,009.82
8 Kerikil beton (maks. 30 mm) M3 0.810 Rp. 248,795.00 Rp. 201,523.95
Jumlah Harga Bahan Rp. 4,836,288.77
B Tenaga Kerja
1 Pekerja OH 5.300 Rp. 62,400.00 Rp. 330,720.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Tukang Kayu OH 1.300 Rp. 102,000.00 Rp. 132,600.00
4 Tukang Besi OH 1.050 Rp. 102,000.00 Rp. 107,100.00
5 Kepala Tukang Batu OH 0.262 Rp. 108,000.00 Rp. 28,296.00
6 Mandor OH 0.265 Rp. 108,000.00 Rp. 28,620.00
Jumlah Harga Tenaga Rp. 655,386.00
A Bahan
1 Kayu kelas III M3 0.240 Rp. 3,500,000.00 Rp. 840,000.00
2 Paku 5 cm - 12 cm Kg 3.200 Rp. 20,000.00 Rp. 64,000.00
3 Minyak Begisting liter 1.600 Rp. 10,000.00 Rp. 16,000.00
4 Besi beton polos Kg 157.500 Rp. 20,050.00 Rp. 3,157,875.00
5 Kawat beton Kg 2.250 Rp. 24,000.00 Rp. 54,000.00
6 Portland Cement (PC) Kg 336.000 Rp. 1,705.00 Rp. 572,880.00
7 Pasir Beton (PB) M3 0.540 Rp. 214,833.00 Rp. 116,009.82
8 Kerikil beton (maks. 30 mm) M3 0.810 Rp. 248,795.00 Rp. 201,523.95
9 Kayu kelas III M3 0.160 Rp. 3,500,000.00 Rp. 560,000.00
10 Plywood tebal 6 mm Lembar 2.800 Rp. 84,500.00 Rp. 236,600.00
11 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 24.000 Rp. 45,000.00 Rp. 1,080,000.00
Jumlah Harga Bahan Rp. 6,898,888.77
B Tenaga Kerja
1 Pekerja OH 5.300 Rp. 62,400.00 Rp. 330,720.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Tukang Kayu OH 1.300 Rp. 102,000.00 Rp. 132,600.00
4 Tukang Besi OH 1.050 Rp. 102,000.00 Rp. 107,100.00
5 Kepala Tukang Batu OH 0.262 Rp. 108,000.00 Rp. 28,296.00
6 Mandor OH 0.265 Rp. 108,000.00 Rp. 28,620.00
Jumlah Harga Tenaga Rp. 655,386.00
A Bahan
1 Bata Merah Buah 140.000 Rp. 770.00 Rp. 107,800.00
2 Portland Cement (PC) Kg 43.500 Rp. 1,705.00 Rp. 74,167.50
3 Pasir Pasang (PP) M3 0.080 Rp. 165,117.00 Rp. 13,209.36
4
5
6
Jumlah Harga Bahan Rp. 195,176.86
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 63,240.00
A Bahan
1 Bata Merah Buah 140.000 Rp. 770.00 Rp. 107,800.00
2 Portland Cement (PC) Kg 32.950 Rp. 1,705.00 Rp. 56,179.75
3 Pasir Pasang (PP) M3 0.091 Rp. 165,117.00 Rp. 15,025.65
4
5
6
Jumlah Harga Bahan Rp. 179,005.40
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 63,240.00
A Bahan
1 Bata Merah Buah 140.000 Rp. 770.00 Rp. 107,800.00
2 Portland Cement (PC) Kg 26.550 Rp. 1,705.00 Rp. 45,267.75
3 Pasir Pasang (PP) M3 0.093 Rp. 165,117.00 Rp. 15,355.88
4
5
6
Jumlah Harga Bahan Rp. 168,423.63
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 63,240.00
A Bahan
1 Bata Merah Buah 140.000 Rp. 770.00 Rp. 107,800.00
2 Portland Cement (PC) Kg 22.200 Rp. 1,705.00 Rp. 37,851.00
3 Pasir Pasang (PP) M3 0.102 Rp. 165,117.00 Rp. 16,841.93
4
5
6
Jumlah Harga Bahan Rp. 162,492.93
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 63,240.00
A Bahan
1 Bata Merah Buah 140.000 Rp. 770.00 Rp. 107,800.00
2 Portland Cement (PC) Kg 18.500 Rp. 1,705.00 Rp. 31,542.50
3 Pasir Pasang (PP) M3 0.122 Rp. 165,117.00 Rp. 20,144.27
4
5
6
Jumlah Harga Bahan Rp. 159,486.77
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 63,240.00
A Bahan
1 Bata Merah Buah 140.000 Rp. 770.00 Rp. 107,800.00
2 Portland Cement (PC) Kg 10.080 Rp. 1,705.00 Rp. 17,186.40
3 Pasir Pasang (PP) M3 0.093 Rp. 165,117.00 Rp. 15,273.32
4 Kapur Pasang (KP) M3 0.028 Rp. 17,500.00 Rp. 481.25
5
6
Jumlah Harga Bahan Rp. 140,740.97
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 63,240.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 18.950 Rp. 1,705.00 Rp. 32,309.75
3 Pasir Pasang (PP) M3 0.038 Rp. 165,117.00 Rp. 6,274.45
4
5
6
Jumlah Harga Bahan Rp. 92,484.20
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 14.370 Rp. 1,705.00 Rp. 24,500.85
3 Pasir Pasang (PP) M3 0.040 Rp. 165,117.00 Rp. 6,604.68
4
5
6
Jumlah Harga Bahan Rp. 85,005.53
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 11.500 Rp. 1,705.00 Rp. 19,607.50
3 Pasir Pasang (PP) M3 0.043 Rp. 165,117.00 Rp. 7,100.03
4
5
6
Jumlah Harga Bahan Rp. 80,607.53
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 9.680 Rp. 1,705.00 Rp. 16,504.40
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4
5
6
Jumlah Harga Bahan Rp. 77,834.67
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 700.000 Rp. 770.00 Rp. 539,000.00
2 Portland Cement (PC) Kg 96.800 Rp. 1,705.00 Rp. 165,044.00
3 Pasir Pasang (PP) M3 0.450 Rp. 165,117.00 Rp. 74,302.65
4
5
6
Jumlah Harga Bahan Rp. 778,346.65
B Tenaga Kerja
1 Pekerja OH 3.000 Rp. 62,400.00 Rp. 187,200.00
2 Tukang Batu OH 1.000 Rp. 102,000.00 Rp. 102,000.00
3 Kepala Tukang Batu OH 0.100 Rp. 108,000.00 Rp. 10,800.00
4 Mandor OH 0.150 Rp. 108,000.00 Rp. 16,200.00
Jumlah Harga Tenaga Rp. 316,200.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 8.320 Rp. 1,705.00 Rp. 14,185.60
3 Pasir Pasang (PP) M3 0.049 Rp. 165,117.00 Rp. 8,090.73
4
5
6
Jumlah Harga Bahan Rp. 76,176.33
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 6.500 Rp. 1,705.00 Rp. 11,082.50
3 Pasir Pasang (PP) M3 0.050 Rp. 165,117.00 Rp. 8,255.85
4
5
6
Jumlah Harga Bahan Rp. 73,238.35
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Portland Cement (PC) Kg 4.500 Rp. 1,705.00 Rp. 7,672.50
3 Pasir Pasang (PP) M3 0.050 Rp. 165,117.00 Rp. 8,255.85
4 Kapur Pasang (KP) M3 0.015 Rp. 17,500.00 Rp. 262.50
5
6
Jumlah Harga Bahan Rp. 70,090.85
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Semen Merah (SM) M3 0.018 Rp. 150,000.00 Rp. 2,700.00
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Kapur Pasang (KP) M3 0.018 Rp. 17,500.00 Rp. 315.00
5
6
Jumlah Harga Bahan Rp. 59,887.11
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 770.00 Rp. 53,900.00
2 Semen Merah (SM) M3 0.014 Rp. 150,000.00 Rp. 2,100.00
3 Pasir Pasang (PP) M3 0.028 Rp. 165,117.00 Rp. 4,623.28
4 Kapur Pasang (KP) M3 0.014 Rp. 17,500.00 Rp. 245.00
5
6
Jumlah Harga Bahan Rp. 60,868.28
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 HB 20 Buah 12.500 Rp. 500.00 Rp. 6,250.00
2 Portland Cement (PC) Kg 30.320 Rp. 1,705.00 Rp. 51,695.60
3 Pasir Pasang (PP) M3 0.728 Rp. 165,117.00 Rp. 120,205.18
4 Besi Angkur Ø 8 mm Kg 0.280 Rp. 13,500.00 Rp. 3,780.00
5
6
Jumlah Harga Bahan Rp. 181,930.78
B Tenaga Kerja
1 Pekerja OH 0.350 Rp. 62,400.00 Rp. 21,840.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 40,704.00
A Bahan
1 HB 20 Buah 12.500 Rp. 500.00 Rp. 6,250.00
2 Portland Cement (PC) Kg 24.260 Rp. 1,705.00 Rp. 41,363.30
3 Pasir Pasang (PP) M3 0.772 Rp. 165,117.00 Rp. 127,470.32
4 Besi Angkur Ø 8 mm Kg 0.280 Rp. 13,500.00 Rp. 3,780.00
5
6
Jumlah Harga Bahan Rp. 178,863.62
B Tenaga Kerja
1 Pekerja OH 0.350 Rp. 62,400.00 Rp. 21,840.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 40,704.00
A Bahan
1 HB 15 Buah 12.500 Rp. 500.00 Rp. 6,250.00
2 Portland Cement (PC) Kg 22.740 Rp. 1,705.00 Rp. 38,771.70
3 Pasir Pasang (PP) M3 0.550 Rp. 165,117.00 Rp. 90,814.35
4 Besi Angkur Ø 8 mm Kg 0.280 Rp. 13,500.00 Rp. 3,780.00
5
6
Jumlah Harga Bahan Rp. 139,616.05
B Tenaga Kerja
1 Pekerja OH 0.320 Rp. 62,400.00 Rp. 19,968.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.016 Rp. 108,000.00 Rp. 1,728.00
Jumlah Harga Tenaga Rp. 35,232.00
A Bahan
1 HB 15 Buah 12.500 Rp. 500.00 Rp. 6,250.00
2 Portland Cement (PC) Kg 18.200 Rp. 1,705.00 Rp. 31,031.00
3 Pasir Pasang (PP) M3 0.582 Rp. 165,117.00 Rp. 96,098.09
4 Besi Angkur Ø 8 mm Kg 0.280 Rp. 13,500.00 Rp. 3,780.00
5
6
Jumlah Harga Bahan Rp. 137,159.09
B Tenaga Kerja
1 Pekerja OH 0.320 Rp. 62,400.00 Rp. 19,968.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.016 Rp. 108,000.00 Rp. 1,728.00
Jumlah Harga Tenaga Rp. 35,232.00
A Bahan
1 HB 10 Buah 12.500 Rp. 500.00 Rp. 6,250.00
2 Portland Cement (PC) Kg 15.160 Rp. 1,705.00 Rp. 25,847.80
3 Pasir Pasang (PP) M3 0.364 Rp. 165,117.00 Rp. 60,102.59
4 Besi Angkur Ø 8 mm Kg 0.280 Rp. 13,500.00 Rp. 3,780.00
5
6
Jumlah Harga Bahan Rp. 95,980.39
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 HB 10 Buah 12.500 Rp. 500.00 Rp. 6,250.00
2 Portland Cement (PC) Kg 12.130 Rp. 1,705.00 Rp. 20,681.65
3 Pasir Pasang (PP) M3 0.388 Rp. 165,117.00 Rp. 64,065.40
4 Besi Angkur Ø 8 mm Kg 0.280 Rp. 13,500.00 Rp. 3,780.00
5
6
Jumlah Harga Bahan Rp. 94,777.05
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Terawang (roster) Buah 30.000 Rp. 10,500.00 Rp. 315,000.00
2 Portland Cement (PC) Kg 14.000 Rp. 1,705.00 Rp. 23,870.00
3 Pasir Pasang (PP) M3 0.032 Rp. 165,117.00 Rp. 5,283.74
4
5
6
Jumlah Harga Bahan Rp. 344,153.74
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Terawang (roster) Buah 30.000 Rp. 10,500.00 Rp. 315,000.00
2 Portland Cement (PC) Kg 11.000 Rp. 1,705.00 Rp. 18,755.00
3 Pasir Pasang (PP) M3 0.035 Rp. 165,117.00 Rp. 5,779.10
4
5
6
Jumlah Harga Bahan Rp. 339,534.10
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Bata berongga ekspose Bh 70.000 Rp. 800.00 Rp. 56,000.00
2 Portland Cement (PC) Kg 14.000 Rp. 1,705.00 Rp. 23,870.00
3 Pasir Pasang (PP) M3 0.032 Rp. 165,117.00 Rp. 5,283.74
4
5
6
Jumlah Harga Bahan Rp. 85,153.74
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 15.504 Rp. 1,705.00 Rp. 26,434.32
2 Pasir Pasang (PP) M3 0.016 Rp. 165,117.00 Rp. 2,641.87
3
4
5
6
Jumlah Harga Bahan Rp. 29,076.19
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 10.224 Rp. 1,705.00 Rp. 17,431.92
2 Pasir Pasang (PP) M3 0.020 Rp. 165,117.00 Rp. 3,302.34
3
4
5
6
Jumlah Harga Bahan Rp. 20,734.26
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 7.776 Rp. 1,705.00 Rp. 13,258.08
2 Pasir Pasang (PP) M3 0.023 Rp. 165,117.00 Rp. 3,797.69
3
4
5
6
Jumlah Harga Bahan Rp. 17,055.77
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 6.240 Rp. 1,705.00 Rp. 10,639.20
2 Pasir Pasang (PP) M3 0.024 Rp. 165,117.00 Rp. 3,962.81
3
4
5
6
Jumlah Harga Bahan Rp. 14,602.01
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 5.184 Rp. 1,705.00 Rp. 8,838.72
2 Pasir Pasang (PP) M3 0.026 Rp. 165,117.00 Rp. 4,293.04
3
4
5
6
Jumlah Harga Bahan Rp. 13,131.76
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 4.416 Rp. 1,705.00 Rp. 7,529.28
2 Pasir Pasang (PP) M3 0.027 Rp. 165,117.00 Rp. 4,458.16
3
4
5
6
Jumlah Harga Bahan Rp. 11,987.44
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 3.936 Rp. 1,705.00 Rp. 6,710.88
2 Pasir Pasang (PP) M3 0.028 Rp. 165,117.00 Rp. 4,623.28
3
4
5
6
Jumlah Harga Bahan Rp. 11,334.16
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 3.456 Rp. 1,705.00 Rp. 5,892.48
2 Pasir Pasang (PP) M3 0.029 Rp. 165,117.00 Rp. 4,788.39
3
4
5
6
Jumlah Harga Bahan Rp. 10,680.87
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 5.760 Rp. 1,705.00 Rp. 9,820.80
2 Kapur Pasang (KP) M3 0.003 Rp. 17,500.00 Rp. 52.50
3 Pasir Pasang (PP) M3 0.013 Rp. 165,117.00 Rp. 2,146.52
4
5
6
Jumlah Harga Bahan Rp. 12,019.82
B Tenaga Kerja
1 Pekerja OH 0.360 Rp. 62,400.00 Rp. 22,464.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 37,944.00
A Bahan
1 Portland Cement (PC) Kg 3.000 Rp. 1,705.00 Rp. 5,115.00
2 Kapur Pasang (KP) M3 0.005 Rp. 17,500.00 Rp. 87.50
3 Pasir Pasang (PP) M3 0.020 Rp. 165,117.00 Rp. 3,302.34
4
5
6
Jumlah Harga Bahan Rp. 8,504.84
B Tenaga Kerja
1 Pekerja OH 0.360 Rp. 62,400.00 Rp. 22,464.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 37,944.00
A Bahan
1 Semen Merah (SM) M3 0.009 Rp. 150,000.00 Rp. 1,350.00
2 Kapur Pasang (KP) M3 0.009 Rp. 17,500.00 Rp. 157.50
3 Pasir Pasang (PP) M3 0.009 Rp. 165,117.00 Rp. 1,486.05
4
5
6
Jumlah Harga Bahan Rp. 2,993.55
B Tenaga Kerja
1 Pekerja OH 0.360 Rp. 62,400.00 Rp. 22,464.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 37,944.00
A Bahan
1 Semen Merah (SM) M3 0.007 Rp. 150,000.00 Rp. 1,050.00
2 Kapur Pasang (KP) M3 0.007 Rp. 17,500.00 Rp. 122.50
3 Pasir Pasang (PP) M3 0.015 Rp. 165,117.00 Rp. 2,476.76
4
5
6
Jumlah Harga Bahan Rp. 3,649.26
B Tenaga Kerja
1 Pekerja OH 0.360 Rp. 62,400.00 Rp. 22,464.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 37,944.00
A Bahan
1 Portland Cement (PC) Kg 13.632 Rp. 1,705.00 Rp. 23,242.56
2 Pasir Pasang (PP) M3 0.027 Rp. 165,117.00 Rp. 4,458.16
3
4
5
6
Jumlah Harga Bahan Rp. 27,700.72
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.022 Rp. 108,000.00 Rp. 2,376.00
Jumlah Harga Tenaga Rp. 49,896.00
A Bahan
1 Portland Cement (PC) Kg 10.368 Rp. 1,705.00 Rp. 17,677.44
2 Pasir Pasang (PP) M3 0.031 Rp. 165,117.00 Rp. 5,118.63
3
4
5
6
Jumlah Harga Bahan Rp. 22,796.07
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 40,188.00
A Bahan
1 Portland Cement (PC) Kg 8.320 Rp. 1,705.00 Rp. 14,185.60
2 Pasir Pasang (PP) M3 0.032 Rp. 165,117.00 Rp. 5,283.74
3
4
5
6
Jumlah Harga Bahan Rp. 19,469.34
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.022 Rp. 108,000.00 Rp. 2,376.00
Jumlah Harga Tenaga Rp. 49,896.00
A Bahan
1 Portland Cement (PC) Kg 6.912 Rp. 1,705.00 Rp. 11,784.96
2 Pasir Pasang (PP) M3 0.035 Rp. 165,117.00 Rp. 5,779.10
3
4
5
6
Jumlah Harga Bahan Rp. 17,564.06
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.022 Rp. 108,000.00 Rp. 2,376.00
Jumlah Harga Tenaga Rp. 49,896.00
A Bahan
1 Portland Cement (PC) Kg 5.888 Rp. 1,705.00 Rp. 10,039.04
2 Pasir Pasang (PP) M3 0.036 Rp. 165,117.00 Rp. 5,944.21
3
4
5
6
Jumlah Harga Bahan Rp. 15,983.25
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.022 Rp. 108,000.00 Rp. 2,376.00
Jumlah Harga Tenaga Rp. 49,896.00
A Bahan
1 Semen Merah (SM) M3 0.009 Rp. 150,000.00 Rp. 1,350.00
2 Kapur Pasang (KP) M3 0.009 Rp. 17,500.00 Rp. 157.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4
5
6
Jumlah Harga Bahan Rp. 4,479.61
B Tenaga Kerja
1 Pekerja OH 0.440 Rp. 62,400.00 Rp. 27,456.00
2 Tukang Batu OH 0.220 Rp. 102,000.00 Rp. 22,440.00
3 Kepala Tukang Batu OH 0.022 Rp. 108,000.00 Rp. 2,376.00
4 Mandor OH 0.022 Rp. 108,000.00 Rp. 2,376.00
Jumlah Harga Tenaga Rp. 54,648.00
A Bahan
1 Portland Cement (PC) Kg 5.184 Rp. 1,705.00 Rp. 8,838.72
2 Pasir Pasang (PP) M3 0.026 Rp. 165,117.00 Rp. 4,293.04
3
4
5
6
Jumlah Harga Bahan Rp. 13,131.76
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Batu OH 0.075 Rp. 102,000.00 Rp. 7,650.00
3 Kepala Tukang Batu OH 0.008 Rp. 108,000.00 Rp. 864.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 18,738.00
A Bahan
1 Portland Cement (PC) Kg 0.500 Rp. 1,705.00 Rp. 852.50
2 Pasir Pasang (PP) M3 0.013 Rp. 165,117.00 Rp. 2,146.52
3
4
5
6
Jumlah Harga Bahan Rp. 2,999.02
B Tenaga Kerja
1 Pekerja OH 0.080 Rp. 62,400.00 Rp. 4,992.00
2 Tukang Batu OH 0.400 Rp. 102,000.00 Rp. 40,800.00
3 Kepala Tukang Batu OH 0.040 Rp. 108,000.00 Rp. 4,320.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 50,544.00
A Bahan
1 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
2 Batu Granit Kg 15.000 Rp. 7,880.00 Rp. 118,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 135,250.00
B Tenaga Kerja
1 Pekerja OH 0.450 Rp. 62,400.00 Rp. 28,080.00
2 Tukang Batu OH 0.225 Rp. 102,000.00 Rp. 22,950.00
3 Kepala Tukang Batu OH 0.023 Rp. 108,000.00 Rp. 2,484.00
4 Mandor OH 0.023 Rp. 108,000.00 Rp. 2,484.00
Jumlah Harga Tenaga Rp. 55,998.00
A Bahan
1 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
2 Batu Teraso Kg 15.000 Rp. 3,680.00 Rp. 55,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 72,250.00
B Tenaga Kerja
1 Pekerja OH 0.450 Rp. 62,400.00 Rp. 28,080.00
2 Tukang Batu OH 0.225 Rp. 102,000.00 Rp. 22,950.00
3 Kepala Tukang Batu OH 0.023 Rp. 108,000.00 Rp. 2,484.00
4 Mandor OH 0.023 Rp. 108,000.00 Rp. 2,484.00
Jumlah Harga Tenaga Rp. 55,998.00
A Bahan
1 Portland Cement (PC) Kg 4.320 Rp. 1,705.00 Rp. 7,365.60
2 Pasir Pasang (PP) M3 0.006 Rp. 165,117.00 Rp. 990.70
3
4
5
6
Jumlah Harga Bahan Rp. 8,356.30
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 31,620.00
A Bahan
1 Portland Cement (PC) Kg 3.108 Rp. 1,705.00 Rp. 5,299.14
2
3
4
5
6
Jumlah Harga Bahan Rp. 5,299.14
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Batu OH 0.075 Rp. 102,000.00 Rp. 7,650.00
3 Kepala Tukang Batu OH 0.008 Rp. 108,000.00 Rp. 864.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 18,738.00
A Bahan
1 Portland Cement (PC) Kg 1.600 Rp. 1,705.00 Rp. 2,728.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 2,728.00
B Tenaga Kerja
1 Pekerja OH 0.070 Rp. 62,400.00 Rp. 4,368.00
2 Tukang Batu OH 0.035 Rp. 102,000.00 Rp. 3,570.00
3 Kepala Tukang Batu OH 0.004 Rp. 108,000.00 Rp. 432.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 8,802.00
A Bahan
1 Portland Cement (PC) Kg 6.340 Rp. 1,705.00 Rp. 10,809.70
2 Pasir Pasang (PP) M3 0.012 Rp. 165,117.00 Rp. 1,981.40
3
4
5
6
Jumlah Harga Bahan Rp. 12,791.10
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 37,260.00
A Bahan
1 Portland Cement (PC) Kg 3.250 Rp. 1,705.00 Rp. 5,541.25
2
3
4
5
6
Jumlah Harga Bahan Rp. 5,541.25
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 24,840.00
A Bahan
1 Kayu Kelas I M3 1.100 Rp. 8,000,000.00 Rp. 8,800,000.00
2 Paku 10 cm Kg 1.250 Rp. 20,000.00 Rp. 25,000.00
3 Lem kayu Kg 1.000 Rp. 25,000.00 Rp. 25,000.00
Jumlah Harga Bahan Rp. 8,850,000.00
B Tenaga Kerja
1 Pekerja OH 7.000 Rp. 62,400.00 Rp. 436,800.00
2 Tukang Kayu OH 21.000 Rp. 102,000.00 Rp. 2,142,000.00
3 Kepala Tukang Kayu OH 2.100 Rp. 108,000.00 Rp. 226,800.00
4 Mandor OH 0.350 Rp. 108,000.00 Rp. 37,800.00
Jumlah Harga Tenaga Rp. 2,843,400.00
A Bahan
1 Kayu Kelas II M3 1.200 Rp. 6,500,000.00 Rp. 7,800,000.00
2 Paku 10 cm Kg 1.250 Rp. 20,000.00 Rp. 25,000.00
3 Lem kayu Kg 1.000 Rp. 25,000.00 Rp. 25,000.00
4
5
6
Jumlah Harga Bahan Rp. 7,850,000.00
B Tenaga Kerja
1 Pekerja OH 6.000 Rp. 62,400.00 Rp. 374,400.00
2 Tukang Kayu OH 18.000 Rp. 102,000.00 Rp. 1,836,000.00
3 Kepala Tukang Kayu OH 1.800 Rp. 108,000.00 Rp. 194,400.00
4 Mandor OH 0.300 Rp. 108,000.00 Rp. 32,400.00
Jumlah Harga Tenaga Rp. 2,437,200.00
A Bahan
1 Papan kayu Kelas II M3 0.040 Rp. 5,000,000.00 Rp. 200,000.00
2 Paku 5 cm - 7 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 201,000.00
B Tenaga Kerja
1 Pekerja OH 0.350 Rp. 62,400.00 Rp. 21,840.00
2 Tukang Kayu OH 1.050 Rp. 102,000.00 Rp. 107,100.00
3 Kepala Tukang Kayu OH 0.105 Rp. 108,000.00 Rp. 11,340.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 142,224.00
A Bahan
1 Papan kayu Kelas III M3 0.040 Rp. 4,500,000.00 Rp. 180,000.00
2 Paku 5 cm - 7 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 181,000.00
B Tenaga Kerja
1 Pekerja OH 0.350 Rp. 62,400.00 Rp. 21,840.00
2 Tukang Kayu OH 1.050 Rp. 102,000.00 Rp. 107,100.00
3 Kepala Tukang Kayu OH 0.105 Rp. 108,000.00 Rp. 11,340.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 142,224.00
A Bahan
1 Papan kayu Kelas II M3 0.040 Rp. 5,000,000.00 Rp. 200,000.00
2 Lem Kayu Kg 0.500 Rp. 25,000.00 Rp. 12,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 212,500.00
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Kayu OH 3.000 Rp. 102,000.00 Rp. 306,000.00
3 Kepala Tukang Kayu OH 0.300 Rp. 108,000.00 Rp. 32,400.00
4 Mandor OH 0.050 Rp. 108,000.00 Rp. 5,400.00
Jumlah Harga Tenaga Rp. 406,200.00
A Bahan
1 Papan kayu Kelas II M3 0.024 Rp. 5,000,000.00 Rp. 120,000.00
2 Lem Kayu Kg 0.300 Rp. 25,000.00 Rp. 7,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 127,500.00
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Kayu OH 2.400 Rp. 102,000.00 Rp. 244,800.00
3 Kepala Tukang Kayu OH 0.240 Rp. 108,000.00 Rp. 25,920.00
4 Mandor OH 0.040 Rp. 108,000.00 Rp. 4,320.00
Jumlah Harga Tenaga Rp. 324,960.00
A Bahan
1 Papan kayu Kelas II M3 0.064 Rp. 5,000,000.00 Rp. 320,000.00
2 Lem Kayu Kg 0.500 Rp. 25,000.00 Rp. 12,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 332,500.00
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Kayu OH 3.000 Rp. 102,000.00 Rp. 306,000.00
3 Kepala Tukang Kayu OH 0.300 Rp. 108,000.00 Rp. 32,400.00
4 Mandor OH 0.050 Rp. 108,000.00 Rp. 5,400.00
Jumlah Harga Tenaga Rp. 406,200.00
A Bahan
1 Papan kayu Kelas II M3 0.025 Rp. 5,000,000.00 Rp. 125,000.00
2 Paku 1 cm - 2,5 cm Kg 0.030 Rp. 20,000.00 Rp. 600.00
3 Lem Kayu Kg 0.500 Rp. 25,000.00 Rp. 12,500.00
4 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.000 Rp. 68,000.00 Rp. 68,000.00
5
6
Jumlah Harga Bahan Rp. 206,100.00
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Kayu OH 2.100 Rp. 102,000.00 Rp. 214,200.00
3 Kepala Tukang Kayu OH 0.210 Rp. 108,000.00 Rp. 22,680.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 284,340.00
A Bahan
1 Papan kayu Kelas II M3 0.026 Rp. 5,000,000.00 Rp. 128,000.00
2 Paku 1 cm - 2,5 cm Kg 0.030 Rp. 20,000.00 Rp. 600.00
3 Lem Kayu Kg 0.500 Rp. 25,000.00 Rp. 12,500.00
4 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.000 Rp. 68,000.00 Rp. 68,000.00
5
6
Jumlah Harga Bahan Rp. 209,100.00
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Kayu OH 2.400 Rp. 102,000.00 Rp. 244,800.00
3 Kepala Tukang Kayu OH 0.240 Rp. 108,000.00 Rp. 25,920.00
4 Mandor OH 0.040 Rp. 108,000.00 Rp. 4,320.00
Jumlah Harga Tenaga Rp. 324,960.00
A Bahan
1 Papan kayu Kelas II M3 0.060 Rp. 5,000,000.00 Rp. 300,000.00
2 Paku 1 cm - 2,5 cm Kg 0.150 Rp. 20,000.00 Rp. 3,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 303,000.00
B Tenaga Kerja
1 Pekerja OH 0.670 Rp. 62,400.00 Rp. 41,808.00
2 Tukang Kayu OH 2.000 Rp. 102,000.00 Rp. 204,000.00
3 Kepala Tukang Kayu OH 0.200 Rp. 108,000.00 Rp. 21,600.00
4 Mandor OH 0.335 Rp. 108,000.00 Rp. 36,180.00
Jumlah Harga Tenaga Rp. 303,588.00
A Bahan
1 Papan kayu Kelas I M3 0.025 Rp. 8,500,000.00 Rp. 212,500.00
2 Paku 1 cm - 2,5 cm Kg 0.030 Rp. 20,000.00 Rp. 600.00
3 Lem Kayu Kg 0.300 Rp. 25,000.00 Rp. 7,500.00
4 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.000 Rp. 68,000.00 Rp. 68,000.00
5
6
Jumlah Harga Bahan Rp. 288,600.00
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Kayu OH 2.400 Rp. 102,000.00 Rp. 244,800.00
3 Kepala Tukang Kayu OH 0.240 Rp. 108,000.00 Rp. 25,920.00
4 Mandor OH 0.040 Rp. 108,000.00 Rp. 4,320.00
Jumlah Harga Tenaga Rp. 324,960.00
A Bahan
1 Papan kayu Kelas II M3 0.025 Rp. 5,000,000.00 Rp. 125,000.00
2 Paku 1 cm - 2,5 cm Kg 0.030 Rp. 20,000.00 Rp. 600.00
3 Lem Kayu Kg 0.800 Rp. 25,000.00 Rp. 20,000.00
4 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.000 Rp. 68,000.00 Rp. 68,000.00
5 Formika Putih 120 x 240 cm Lembar 0.500 Rp. 115,000.00 Rp. 57,500.00
6
Jumlah Harga Bahan Rp. 271,100.00
B Tenaga Kerja
1 Pekerja OH 0.850 Rp. 62,400.00 Rp. 53,040.00
2 Tukang Kayu OH 2.550 Rp. 102,000.00 Rp. 260,100.00
3 Kepala Tukang Kayu OH 0.255 Rp. 108,000.00 Rp. 27,540.00
4 Mandor OH 0.043 Rp. 108,000.00 Rp. 4,644.00
Jumlah Harga Tenaga Rp. 345,324.00
A Bahan
1 kayu Kelas II M3 1.100 Rp. 6,500,000.00 Rp. 7,150,000.00
2 Besi strip tebal 5 mm Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
3 Paku 12 cm Kg 5.600 Rp. 20,000.00 Rp. 112,000.00
4
5
6
Jumlah Harga Bahan Rp. 7,464,500.00
B Tenaga Kerja
1 Pekerja OH 4.000 Rp. 62,400.00 Rp. 249,600.00
2 Tukang Kayu OH 12.000 Rp. 102,000.00 Rp. 1,224,000.00
3 Kepala Tukang Kayu OH 1.200 Rp. 108,000.00 Rp. 129,600.00
4 Mandor OH 0.200 Rp. 108,000.00 Rp. 21,600.00
Jumlah Harga Tenaga Rp. 1,624,800.00
A Bahan
1 Kayu Kelas I M3 1.200 Rp. 8,000,000.00 Rp. 9,600,000.00
2 Besi strip tebal 5 mm Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
3 Paku 12 cm Kg 5.600 Rp. 20,000.00 Rp. 112,000.00
4
5
6
Jumlah Harga Bahan Rp. 9,914,500.00
B Tenaga Kerja
1 Pekerja OH 6.700 Rp. 62,400.00 Rp. 418,080.00
2 Tukang Kayu OH 20.100 Rp. 102,000.00 Rp. 2,050,200.00
3 Kepala Tukang Kayu OH 2.010 Rp. 108,000.00 Rp. 217,080.00
4 Mandor OH 0.335 Rp. 108,000.00 Rp. 36,180.00
Jumlah Harga Tenaga Rp. 2,721,540.00
A Bahan
1 Kayu Kelas II M3 1.100 Rp. 6,500,000.00 Rp. 7,150,000.00
2 Besi strip tebal 5 mm Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
3 Paku 12 cm Kg 3.000 Rp. 20,000.00 Rp. 60,000.00
4
5
6
Jumlah Harga Bahan Rp. 7,412,500.00
B Tenaga Kerja
1 Pekerja OH 2.400 Rp. 62,400.00 Rp. 149,760.00
2 Tukang Kayu OH 7.200 Rp. 102,000.00 Rp. 734,400.00
3 Kepala Tukang Kayu OH 0.720 Rp. 108,000.00 Rp. 77,760.00
4 Mandor OH 0.120 Rp. 108,000.00 Rp. 12,960.00
Jumlah Harga Tenaga Rp. 974,880.00
A Bahan
1 Kaso-kaso (5 x 7) cm Kayu Kelas II m3 0.014 Rp. 6,500,000.00 Rp. 91,000.00
2 Reng (2 x 3) cm Kayu Kelas II m3 0.004 Rp. 6,500,000.00 Rp. 23,400.00
3 Paku 5 cm dan 10 cm kg 0.250 Rp. 20,000.00 Rp. 5,000.00
4
5
6
Jumlah Harga Bahan Rp. 119,400.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 18,060.00
A Bahan
1 Kaso-kaso (5 x 7) cm Kayu Kelas II m3 0.014 Rp. 6,500,000.00 Rp. 91,000.00
2 Reng (2 x 3) cm Kayu Kelas II m3 0.007 Rp. 6,500,000.00 Rp. 46,800.00
3 Paku 5 cm dan 10 cm kg 0.250 Rp. 20,000.00 Rp. 5,000.00
4
5
6
Jumlah Harga Bahan Rp. 142,800.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 18,060.00
A Bahan
1 Kayu Kelas II M3 0.165 Rp. 6,500,000.00 Rp. 1,072,500.00
2 Paku 5 cm sampai 10 cm Kg 0.200 Rp. 20,000.00 Rp. 4,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 1,076,500.00
B Tenaga Kerja
1 Pekerja OH 0.120 Rp. 62,400.00 Rp. 7,488.00
2 Tukang Kayu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Kayu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 21,672.00
A Bahan
1 Kaso-kaso (5 x 7) cm Kayu Kelas II m3 0.015 Rp. 6,500,000.00 Rp. 100,100.00
2 Paku 7 cm - 10 cm Kg 0.200 Rp. 20,000.00 Rp. 4,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 104,100.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.300 Rp. 102,000.00 Rp. 30,600.00
3 Kepala Tukang Kayu OH 0.030 Rp. 108,000.00 Rp. 3,240.00
4 Mandor OH 0.075 Rp. 108,000.00 Rp. 8,100.00
Jumlah Harga Tenaga Rp. 51,300.00
A Bahan
1 Kaso-kaso (5 x 7) cm Kayu Kelas II m3 0.016 Rp. 6,500,000.00 Rp. 105,950.00
2 Paku 7 cm - 10 cm Kg 0.250 Rp. 20,000.00 Rp. 5,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 110,950.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Kayu OH 0.300 Rp. 102,000.00 Rp. 30,600.00
3 Kepala Tukang Kayu OH 0.030 Rp. 108,000.00 Rp. 3,240.00
4 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 47,400.00
A Bahan
1 Papan Kayu Kelas II M3 0.011 Rp. 5,000,000.00 Rp. 54,000.00
2 Paku 5 cm dan 7 cm Kg 0.100 Rp. 20,000.00 Rp. 2,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 56,000.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 29,340.00
A Bahan
1 Papan Kayu Kelas II M3 0.011 Rp. 5,000,000.00 Rp. 55,000.00
2 Paku 5 cm dan 7 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 56,000.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 29,340.00
A Bahan
1 Kayu Kelas II M3 0.028 Rp. 6,500,000.00 Rp. 182,000.00
2 Paku 5 cm dan 7 cm Kg 0.150 Rp. 20,000.00 Rp. 3,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 185,000.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Kayu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 60,984.00
A Bahan
1 Kayu Kelas II M3 0.028 Rp. 6,500,000.00 Rp. 182,000.00
2 Paku 5 cm dan 10 cm kg 0.150 Rp. 20,000.00 Rp. 3,000.00
3 Teakwood 120 x 240 x 4 mm Lembar 0.860 Rp. 95,000.00 Rp. 81,700.00
4 Lem Kayu Kg 0.560 Rp. 25,000.00 Rp. 14,000.00
5
6
Jumlah Harga Bahan Rp. 280,700.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Kayu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 60,984.00
A Bahan
1 Kayu Kelas II M3 0.028 Rp. 6,500,000.00 Rp. 182,000.00
2 Paku 5 cm dan 10 cm kg 0.150 Rp. 20,000.00 Rp. 3,000.00
3 Plywood 120 x 240 x 4 mm Lembar 0.860 Rp. 95,000.00 Rp. 81,700.00
4 Lem Kayu Kg 0.560 Rp. 25,000.00 Rp. 14,000.00
5
6
Jumlah Harga Bahan Rp. 280,700.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Kayu OH 0.600 Rp. 102,000.00 Rp. 61,200.00
3 Kepala Tukang Kayu OH 0.060 Rp. 108,000.00 Rp. 6,480.00
4 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 81,240.00
A Bahan
1 Papan Kayu Kelas I M3 0.007 Rp. 8,500,000.00 Rp. 59,500.00
2 Paku 5 cm dan 10 cm kg 0.100 Rp. 20,000.00 Rp. 2,000.00
3 Paku skrup 10 cm Kg 0.150 Rp. 20,000.00 Rp. 3,000.00
4
5
6
Jumlah Harga Bahan Rp. 64,500.00
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Kayu OH 1.800 Rp. 102,000.00 Rp. 183,600.00
3 Kepala Tukang Kayu OH 0.180 Rp. 108,000.00 Rp. 19,440.00
4 Mandor OH 0.030 Rp. 108,000.00 Rp. 3,240.00
Jumlah Harga Tenaga Rp. 243,720.00
A Bahan
1 Plywood 120 x 240 x 4 mm Lembar 0.400 Rp. 95,000.00 Rp. 38,000.00
2 Paku 1cm dan 2.5 cm kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 39,000.00
B Tenaga Kerja
1 Pekerja OH 0.025 Rp. 62,400.00 Rp. 1,560.00
2 Tukang Kayu OH 0.075 Rp. 102,000.00 Rp. 7,650.00
3 Kepala Tukang Kayu OH 0.008 Rp. 108,000.00 Rp. 864.00
4 Mandor OH 0.001 Rp. 108,000.00 Rp. 108.00
Jumlah Harga Tenaga Rp. 10,182.00
A Bahan
1 Bilik bambu M2 1.500 Rp. 25,000.00 Rp. 37,500.00
2 Kaso-kaso (5 x 7) cm Kayu Kelas III m3 0.014 Rp. 3,500,000.00 Rp. 49,000.00
3 Paku Kg 0.012 Rp. 20,000.00 Rp. 240.00
4 List kayu 2/4 M1 0.003 Rp. 15,000.00 Rp. 45.00
5
6
Jumlah Harga Bahan Rp. 86,785.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 12,420.00
A Bahan
1 Ubin abu-abu 40/40 Buah 6.630 Rp. 4,710.00 Rp. 31,227.30
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4
5
6
Jumlah Harga Bahan Rp. 55,366.57
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Ubin abu-abu 30/30 Buah 11.870 Rp. 2,650.00 Rp. 31,455.50
2 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4
5
6
Jumlah Harga Bahan Rp. 55,935.77
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.130 Rp. 102,000.00 Rp. 13,260.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 32,292.00
A Bahan
1 Ubin abu-abu 20/20 Buah 26.500 Rp. 1,180.00 Rp. 31,270.00
2 Portland Cement (PC) Kg 10.400 Rp. 1,705.00 Rp. 17,732.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4
5
6
Jumlah Harga Bahan Rp. 56,432.27
B Tenaga Kerja
1 Pekerja OH 0.270 Rp. 62,400.00 Rp. 16,848.00
2 Tukang Batu OH 0.135 Rp. 102,000.00 Rp. 13,770.00
3 Kepala Tukang Batu OH 0.014 Rp. 108,000.00 Rp. 1,512.00
4 Mandor OH 0.014 Rp. 108,000.00 Rp. 1,512.00
Jumlah Harga Tenaga Rp. 33,642.00
A Bahan
1 Ubin warna 40/40 Buah 6.630 Rp. 5,460.00 Rp. 36,199.80
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.300 Rp. 17,900.00 Rp. 23,270.00
5
6
Jumlah Harga Bahan Rp. 83,609.07
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Ubin warna 30/30 Buah 11.870 Rp. 3,080.00 Rp. 36,559.60
2 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 87,889.86
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.130 Rp. 102,000.00 Rp. 13,260.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 32,292.00
A Bahan
1 Ubin warna 20/20 Buah 26.500 Rp. 1,370.00 Rp. 36,305.00
2 Portland Cement (PC) Kg 10.400 Rp. 1,705.00 Rp. 17,732.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.620 Rp. 17,900.00 Rp. 28,998.00
5
6
Jumlah Harga Bahan Rp. 90,465.27
B Tenaga Kerja
1 Pekerja OH 0.270 Rp. 62,400.00 Rp. 16,848.00
2 Tukang Batu OH 0.135 Rp. 102,000.00 Rp. 13,770.00
3 Kepala Tukang Batu OH 0.014 Rp. 108,000.00 Rp. 1,512.00
4 Mandor OH 0.014 Rp. 108,000.00 Rp. 1,512.00
Jumlah Harga Tenaga Rp. 33,642.00
A Bahan
1 Ubin Teraso 40/40 Buah 6.630 Rp. 6,720.00 Rp. 44,553.60
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.300 Rp. 17,900.00 Rp. 23,270.00
5
6
Jumlah Harga Bahan Rp. 91,962.86
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Ubin Teraso 30/30 Buah 11.870 Rp. 3,780.00 Rp. 44,868.60
2 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 96,198.86
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.130 Rp. 102,000.00 Rp. 13,260.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 32,292.00
A Bahan
1 Ubin Granit 40/40 Buah 6.630 Rp. 21,000.00 Rp. 139,230.00
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.300 Rp. 17,900.00 Rp. 23,270.00
5
6
Jumlah Harga Bahan Rp. 186,639.27
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Ubin Granit 30/30 Buah 11.870 Rp. 11,820.00 Rp. 140,303.40
2 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 191,633.66
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.130 Rp. 102,000.00 Rp. 13,260.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 32,292.00
A Bahan
1 Ubin Teralux Kerang 40/40 Buah 6.630 Rp. 22,680.00 Rp. 150,368.40
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.300 Rp. 17,900.00 Rp. 23,270.00
5
6
Jumlah Harga Bahan Rp. 197,777.66
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Ubin Teralux Kerang 30/30 Buah 11.870 Rp. 12,760.00 Rp. 151,461.20
2 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 202,791.46
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.130 Rp. 102,000.00 Rp. 13,260.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 32,292.00
A Bahan
1 Ubin Teralux Marmer 60/60 Buah 3.100 Rp. 54,810.00 Rp. 169,911.00
2 Portland Cement (PC) Kg 9.600 Rp. 1,705.00 Rp. 16,368.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 220,559.27
B Tenaga Kerja
1 Pekerja OH 0.240 Rp. 62,400.00 Rp. 14,976.00
2 Tukang Batu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Batu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.012 Rp. 108,000.00 Rp. 1,296.00
Jumlah Harga Tenaga Rp. 29,808.00
A Bahan
1 Ubin Teralux Marmer 40/40 Buah 6.630 Rp. 24,360.00 Rp. 161,506.80
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.300 Rp. 17,900.00 Rp. 23,270.00
5
6
Jumlah Harga Bahan Rp. 208,916.07
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Ubin Teralux Marmer 30/30 Buah 11.870 Rp. 13,710.00 Rp. 162,737.70
2 Portland Cement (PC) Kg 10.000 Rp. 1,705.00 Rp. 17,050.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 214,067.96
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.130 Rp. 102,000.00 Rp. 13,260.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 32,292.00
A Bahan
1 Plint Ubin Abu-Abu 15/20 Buah 5.300 Rp. 590.00 Rp. 3,127.00
2 Portland Cement (PC) Kg 1.650 Rp. 1,705.00 Rp. 2,813.25
3 Pasir Pasang (PP) M3 0.004 Rp. 165,117.00 Rp. 660.47
4
5
6
Jumlah Harga Bahan Rp. 6,600.72
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Abu-Abu 15/30 Buah 3.530 Rp. 890.00 Rp. 3,141.70
2 Portland Cement (PC) Kg 1.240 Rp. 1,705.00 Rp. 2,114.20
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4
5
6
Jumlah Harga Bahan Rp. 5,751.25
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Abu-Abu 10/40 Buah 2.650 Rp. 1,180.00 Rp. 3,127.00
2 Portland Cement (PC) Kg 1.240 Rp. 1,705.00 Rp. 2,114.20
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4
5
6
Jumlah Harga Bahan Rp. 5,736.55
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Warna 10/20 Buah 5.300 Rp. 690.00 Rp. 3,657.00
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 7,886.05
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Warna 10/30 Buah 3.530 Rp. 1,030.00 Rp. 3,635.90
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 7,864.95
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Warna 10/40 Buah 2.650 Rp. 1,370.00 Rp. 3,630.50
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 7,859.55
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teraso 10/30 Buah 3.530 Rp. 1,260.00 Rp. 4,447.80
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 8,676.85
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teraso 10/40 Buah 2.650 Rp. 1,680.00 Rp. 4,452.00
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 8,681.05
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Granit 10/40 Buah 2.650 Rp. 5,250.00 Rp. 13,912.50
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 18,141.55
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Granit 10/30 Buah 3.530 Rp. 3,940.00 Rp. 13,908.20
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 18,137.25
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teralux Kerang 10/40 Buah 2.650 Rp. 5,670.00 Rp. 15,025.50
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 19,254.55
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teralux Kerang 10/30 Buah 3.530 Rp. 4,260.00 Rp. 15,037.80
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 19,266.85
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teralux Marmer 10/60 Buah 1.700 Rp. 9,140.00 Rp. 15,538.00
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 19,767.05
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teralux Marmer 10/40 Buah 2.650 Rp. 6,090.00 Rp. 16,138.50
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 20,367.55
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Ubin Teralux Marmer 10/30 Buah 3.530 Rp. 4,570.00 Rp. 16,132.10
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 20,361.15
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Teraso Cor M3 0.036 Rp. 472,500.00 Rp. 17,010.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 17,010.00
B Tenaga Kerja
1 Pekerja OH 0.360 Rp. 62,400.00 Rp. 22,464.00
2 Tukang Batu OH 0.180 Rp. 102,000.00 Rp. 18,360.00
3 Kepala Tukang Batu OH 0.018 Rp. 108,000.00 Rp. 1,944.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 44,712.00
A Bahan
1 Ubin keramik artistik 10/20 Buah 53.000 Rp. 1,100.00 Rp. 58,300.00
2 Portland Cement (PC) Kg 8.190 Rp. 1,705.00 Rp. 13,963.95
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 2.750 Rp. 17,900.00 Rp. 49,225.00
5
6
Jumlah Harga Bahan Rp. 128,919.22
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Ubin keramik artistik 10/10 Buah 106.000 Rp. 550.00 Rp. 58,300.00
2 Portland Cement (PC) Kg 8.190 Rp. 1,705.00 Rp. 13,963.95
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 3.200 Rp. 17,900.00 Rp. 57,280.00
5
6
Jumlah Harga Bahan Rp. 136,974.22
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Ubin Keramik 33/33 Buah 10.000 Rp. 7,764.57 Rp. 77,645.70
2 Portland Cement (PC) Kg 8.190 Rp. 1,705.00 Rp. 13,963.95
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.620 Rp. 13,425.00 Rp. 21,748.50
5
6
Jumlah Harga Bahan Rp. 120,788.42
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Keramik 40/40 (Polish) Buah 6.875 Rp. 11,408.00 Rp. 78,430.00
2 Portland Cement (PC) Kg 8.190 Rp. 1,705.00 Rp. 13,963.95
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.620 Rp. 13,425.00 Rp. 21,748.50
5
6
Jumlah Harga Bahan Rp. 121,572.72
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Keramik 40/40 (UnPolish) Buah 6.875 Rp. 12,704.00 Rp. 87,340.00
2 Portland Cement (PC) Kg 8.190 Rp. 1,705.00 Rp. 13,963.95
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.620 Rp. 13,425.00 Rp. 21,748.50
5
6
Jumlah Harga Bahan Rp. 130,482.72
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Ubin Keramik 20/20 Buah 26.500 Rp. 2,852.00 Rp. 75,578.00
2 Portland Cement (PC) Kg 10.400 Rp. 1,705.00 Rp. 17,732.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 1.620 Rp. 13,425.00 Rp. 21,748.50
5
6
Jumlah Harga Bahan Rp. 122,488.77
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Ubin Keramik 10/33 Buah 33.000 Rp. 1,630.00 Rp. 53,790.00
2 Portland Cement (PC) Kg 9.800 Rp. 1,705.00 Rp. 16,709.00
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 4.370 Rp. 17,900.00 Rp. 78,223.00
5
6
Jumlah Harga Bahan Rp. 156,152.27
B Tenaga Kerja
1 Pekerja OH 1.050 Rp. 62,400.00 Rp. 65,520.00
2 Tukang Batu OH 0.525 Rp. 102,000.00 Rp. 53,550.00
3 Kepala Tukang Batu OH 0.053 Rp. 108,000.00 Rp. 5,724.00
4 Mandor OH 0.053 Rp. 108,000.00 Rp. 5,724.00
Jumlah Harga Tenaga Rp. 130,518.00
A Bahan
1 Mozaik 30/30 Buah 11.870 Rp. 2,080.00 Rp. 24,689.60
2 Portland Cement (PC) Kg 14.150 Rp. 1,705.00 Rp. 24,125.75
3 Pasir Pasang (PP) M3 0.039 Rp. 165,117.00 Rp. 6,439.56
4 Semen warna Kg 2.000 Rp. 17,900.00 Rp. 35,800.00
5
6
Jumlah Harga Bahan Rp. 91,054.91
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Plint Keramik Artistik 10/20 Buah 1.667 Rp. 1,100.00 Rp. 1,833.33
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.025 Rp. 17,900.00 Rp. 447.50
5
6
Jumlah Harga Bahan Rp. 4,719.88
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Keramik Artistik 10/10 Buah 10.600 Rp. 550.00 Rp. 5,830.00
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.050 Rp. 17,900.00 Rp. 895.00
5
6
Jumlah Harga Bahan Rp. 9,164.05
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Keramik Artistik 5/20 Buah 5.300 Rp. 550.00 Rp. 2,915.00
2 Portland Cement (PC) Kg 0.570 Rp. 1,705.00 Rp. 971.85
3 Pasir Pasang (PP) M3 0.002 Rp. 165,117.00 Rp. 247.68
4 Semen warna Kg 0.013 Rp. 17,900.00 Rp. 232.70
5
6
Jumlah Harga Bahan Rp. 4,367.23
B Tenaga Kerja
1 Pekerja OH 0.090 Rp. 62,400.00 Rp. 5,616.00
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,308.00
A Bahan
1 Plint Internal Cove Artistik 5 x 5/20 Buah 5.300 Rp. 580.00 Rp. 3,074.00
2 Portland Cement (PC) Kg 1.140 Rp. 1,705.00 Rp. 1,943.70
3 Pasir Pasang (PP) M3 0.003 Rp. 165,117.00 Rp. 495.35
4 Semen warna Kg 0.100 Rp. 17,900.00 Rp. 1,790.00
5
6
Jumlah Harga Bahan Rp. 7,303.05
B Tenaga Kerja
1 Pekerja OH 0.750 Rp. 62,400.00 Rp. 46,800.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.038 Rp. 108,000.00 Rp. 4,104.00
Jumlah Harga Tenaga Rp. 135,504.00
A Bahan
1 Marmer 100/100 M2 1.060 Rp. 918,100.00 Rp. 973,186.00
2 Portland Cement (PC) Kg 8.190 Rp. 1,705.00 Rp. 13,963.95
3 Pasir Pasang (PP) M3 0.045 Rp. 165,117.00 Rp. 7,430.26
4 Semen warna Kg 0.650 Rp. 17,900.00 Rp. 11,635.00
5
6
Jumlah Harga Bahan Rp. 1,006,215.22
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Karpet M2 1.050 Rp. 65,000.00 Rp. 68,250.00
2 Lem Kg 0.350 Rp. 22,500.00 Rp. 7,875.00
3
4
5
6
Jumlah Harga Bahan Rp. 76,125.00
B Tenaga Kerja
1 Pekerja OH 0.170 Rp. 62,400.00 Rp. 10,608.00
2 Tukang Kayu OH 0.170 Rp. 102,000.00 Rp. 17,340.00
3 Kepala Tukang Kayu OH 0.017 Rp. 108,000.00 Rp. 1,836.00
4 Mandor OH 0.009 Rp. 108,000.00 Rp. 972.00
Jumlah Harga Tenaga Rp. 30,756.00
A Bahan
1 Underlayer / rubber corrugated M2 1.050 Rp. 70,000.00 Rp. 73,500.00
2 Lem Kg 0.350 Rp. 22,500.00 Rp. 7,875.00
3
4
5
6
Jumlah Harga Bahan Rp. 81,375.00
B Tenaga Kerja
1 Pekerja OH 0.120 Rp. 62,400.00 Rp. 7,488.00
2 Tukang Kayu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Kayu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 21,672.00
A Bahan
1 Parquet M2 1.050 Rp. 75,000.00 Rp. 78,750.00
2 Lem Kg 0.600 Rp. 22,500.00 Rp. 13,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 92,250.00
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Kayu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Kayu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Gymfloor (Lantai Kayu) M2 1.050 Rp. 75,000.00 Rp. 78,750.00
2 Lem Kg 0.600 Rp. 22,500.00 Rp. 13,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 92,250.00
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Kayu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Kayu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Porselin 11/11 Buah 86.000 Rp. 629.20 Rp. 54,111.20
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 1.500 Rp. 17,900.00 Rp. 26,850.00
5
6
Jumlah Harga Bahan Rp. 99,789.81
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Batu OH 0.500 Rp. 102,000.00 Rp. 51,000.00
3 Kepala Tukang Batu OH 0.050 Rp. 108,000.00 Rp. 5,400.00
4 Mandor OH 0.050 Rp. 108,000.00 Rp. 5,400.00
Jumlah Harga Tenaga Rp. 124,200.00
A Bahan
1 Porselin 10/20 Buah 53.000 Rp. 1,040.00 Rp. 55,120.00
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 2.750 Rp. 17,900.00 Rp. 49,225.00
5
6
Jumlah Harga Bahan Rp. 123,173.61
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Tukang Batu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Batu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
Jumlah Harga Tenaga Rp. 111,780.00
A Bahan
1 Porselin 20/20 Buah 26.500 Rp. 3,504.00 Rp. 92,856.00
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 1.940 Rp. 13,425.00 Rp. 26,044.50
5
6
Jumlah Harga Bahan Rp. 137,729.11
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Tukang Batu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Batu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
Jumlah Harga Tenaga Rp. 111,780.00
A Bahan
1 Keramik artistik 10/20 Buah 53.000 Rp. 1,100.00 Rp. 58,300.00
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 2.750 Rp. 17,900.00 Rp. 49,225.00
5
6
Jumlah Harga Bahan Rp. 126,353.61
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Tukang Batu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Batu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
Jumlah Harga Tenaga Rp. 111,780.00
A Bahan
1 Keramik artistik 5/20 Buah 106.000 Rp. 1,100.00 Rp. 116,600.00
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 2.900 Rp. 17,900.00 Rp. 51,910.00
5
6
Jumlah Harga Bahan Rp. 187,338.61
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Tukang Batu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Batu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
Jumlah Harga Tenaga Rp. 111,780.00
A Bahan
1 Keramik artistik 10/20 Buah 53.000 Rp. 1,100.00 Rp. 58,300.00
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 2.750 Rp. 17,900.00 Rp. 49,225.00
5
6
Jumlah Harga Bahan Rp. 126,353.61
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Tukang Batu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Batu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
Jumlah Harga Tenaga Rp. 111,780.00
A Bahan
1 Keramik 40/40 Buah 6.250 Rp. 11,408.00 Rp. 71,300.00
2 Portland Cement (PC) Kg 9.300 Rp. 1,705.00 Rp. 15,856.50
3 Pasir Pasang (PP) M3 0.018 Rp. 165,117.00 Rp. 2,972.11
4 Semen warna Kg 1.940 Rp. 13,425.00 Rp. 26,044.50
5
6
Jumlah Harga Bahan Rp. 116,173.11
B Tenaga Kerja
1 Pekerja OH 0.900 Rp. 62,400.00 Rp. 56,160.00
2 Tukang Batu OH 0.450 Rp. 102,000.00 Rp. 45,900.00
3 Kepala Tukang Batu OH 0.045 Rp. 108,000.00 Rp. 4,860.00
4 Mandor OH 0.045 Rp. 108,000.00 Rp. 4,860.00
Jumlah Harga Tenaga Rp. 111,780.00
A Bahan
1 Marmer 100/100 M2 1.020 Rp. 918,100.00 Rp. 936,462.00
2 Paku 12 cm Buah 3.003 Rp. 20,000.00 Rp. 60,060.00
3 Portland Cement (PC) Kg 12.440 Rp. 1,705.00 Rp. 21,210.20
4 Pasir Pasang (PP) M3 0.025 Rp. 165,117.00 Rp. 4,127.93
5 Semen warna Kg 0.650 Rp. 17,900.00 Rp. 11,635.00
6
Jumlah Harga Bahan Rp. 1,033,495.13
B Tenaga Kerja
1 Pekerja OH 1.300 Rp. 62,400.00 Rp. 81,120.00
2 Tukang Batu OH 0.650 Rp. 102,000.00 Rp. 66,300.00
3 Kepala Tukang Batu OH 0.065 Rp. 108,000.00 Rp. 7,020.00
4 Mandor OH 0.065 Rp. 108,000.00 Rp. 7,020.00
Jumlah Harga Tenaga Rp. 161,460.00
A Bahan
1 Granit M2 1.020 Rp. 178,000.00 Rp. 181,560.00
2 Paku 12 cm Buah 3.003 Rp. 20,000.00 Rp. 60,060.00
3 Portland Cement (PC) Kg 12.440 Rp. 1,705.00 Rp. 21,210.20
4 Pasir Pasang (PP) M3 0.025 Rp. 165,117.00 Rp. 4,127.93
5 Semen warna Kg 0.650 Rp. 17,900.00 Rp. 11,635.00
6
Jumlah Harga Bahan Rp. 278,593.13
B Tenaga Kerja
1 Pekerja OH 1.300 Rp. 62,400.00 Rp. 81,120.00
2 Tukang Batu OH 0.650 Rp. 102,000.00 Rp. 66,300.00
3 Kepala Tukang Batu OH 0.065 Rp. 108,000.00 Rp. 7,020.00
4 Mandor OH 0.065 Rp. 108,000.00 Rp. 7,020.00
Jumlah Harga Tenaga Rp. 161,460.00
A Bahan
1 Bata pelapis dinding Buah 63.000 Rp. 800.00 Rp. 50,400.00
2 Portland Cement (PC) Kg 12.440 Rp. 1,705.00 Rp. 21,210.20
3 Pasir Pasang (PP) M3 0.025 Rp. 165,117.00 Rp. 4,127.93
4 Semen warna Kg 2.750 Rp. 17,900.00 Rp. 49,225.00
5
6
Jumlah Harga Bahan Rp. 124,963.13
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Batu OH 0.500 Rp. 102,000.00 Rp. 51,000.00
3 Kepala Tukang Batu OH 0.050 Rp. 108,000.00 Rp. 5,400.00
4 Mandor OH 0.050 Rp. 108,000.00 Rp. 5,400.00
Jumlah Harga Tenaga Rp. 124,200.00
A Bahan
1 Batu paras M2 1.100 Rp. 125,000.00 Rp. 137,500.00
2 Portland Cement (PC) Kg 11.750 Rp. 1,705.00 Rp. 20,033.75
3 Pasir Pasang (PP) M3 0.035 Rp. 165,117.00 Rp. 5,779.10
4
5
6
Jumlah Harga Bahan Rp. 163,312.85
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Batu Tempel Hitam M2 1.100 Rp. 110,000.00 Rp. 121,000.00
2 Portland Cement (PC) Kg 11.750 Rp. 1,705.00 Rp. 20,033.75
3 Pasir Pasang (PP) M3 0.035 Rp. 165,117.00 Rp. 5,779.10
4
5
6
Jumlah Harga Bahan Rp. 146,812.85
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Beton grid pracetak M2 1.100 Rp. 50,000.00 Rp. 55,000.00
2 Portland Cement (PC) Kg 11.750 Rp. 1,705.00 Rp. 20,033.75
3 Pasir Pasang (PP) M3 0.035 Rp. 165,117.00 Rp. 5,779.10
4
5
6
Jumlah Harga Bahan Rp. 80,812.85
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp. 108,000.00 Rp. 3,780.00
Jumlah Harga Tenaga Rp. 86,940.00
A Bahan
1 Vinyl 30/30 Buah 11.870 Rp. 6,750.00 Rp. 80,122.50
2 Lem Vinyl Kg 0.350 Rp. 22,500.00 Rp. 7,875.00
3
4
5
6
Jumlah Harga Bahan Rp. 87,997.50
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 27,144.00
A Bahan
1 Wall Paper M2 2.200 Rp. 25,000.00 Rp. 55,000.00
2 Lem Kg 0.250 Rp. 22,500.00 Rp. 5,625.00
3
4
5
6
Jumlah Harga Bahan Rp. 60,625.00
B Tenaga Kerja
1 Pekerja OH 0.350 Rp. 62,400.00 Rp. 21,840.00
2 Tukang Kayu OH 0.175 Rp. 102,000.00 Rp. 17,850.00
3 Kepala Tukang Kayu OH 0.017 Rp. 108,000.00 Rp. 1,836.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 41,742.00
A Bahan
1 Floor hardener Kg 5.000 Rp. 15,000.00 Rp. 75,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 75,000.00
B Tenaga Kerja
1 Pekerja OH 0.120 Rp. 62,400.00 Rp. 7,488.00
2 Tukang Kayu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Kayu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 21,672.00
A Bahan
1 Vinyl Karet 30/30 Buah 1.760 Rp. 12,500.00 Rp. 22,000.00
2 Lem Vinyl Kg 0.080 Rp. 22,500.00 Rp. 1,800.00
3
4
5
6
Jumlah Harga Bahan Rp. 23,800.00
B Tenaga Kerja
1 Pekerja OH 0.080 Rp. 62,400.00 Rp. 4,992.00
2 Tukang Kayu OH 0.080 Rp. 102,000.00 Rp. 8,160.00
3 Kepala Tukang Kayu OH 0.008 Rp. 108,000.00 Rp. 864.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 14,448.00
A Bahan
1 Papan kayu kelas II M3 0.003 Rp. 5,000,000.00 Rp. 15,000.00
2 Paku skrup 5 cm Kg 0.050 Rp. 17,500.00 Rp. 875.00
3
4
5
6
Jumlah Harga Bahan Rp. 15,875.00
B Tenaga Kerja
1 Pekerja OH 0.120 Rp. 62,400.00 Rp. 7,488.00
2 Tukang Kayu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Kayu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 21,672.00
A Bahan
1 Asbes Semen (Eternit) Lembar 1.100 Rp. 16,000.00 Rp. 17,600.00
2 Paku 1 cm - 2,5 cm Kg 0.010 Rp. 20,000.00 Rp. 200.00
3
4
5
6
Jumlah Harga Bahan Rp. 17,800.00
B Tenaga Kerja
1 Pekerja OH 0.030 Rp. 62,400.00 Rp. 1,872.00
2 Tukang Kayu OH 0.070 Rp. 102,000.00 Rp. 7,140.00
3 Kepala Tukang Kayu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 10,200.00
A Bahan
1 Akustik 30/30 Lembar 12.000 Rp. 13,500.00 Rp. 162,000.00
2 Paku 1 cm - 2,5 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 163,000.00
B Tenaga Kerja
1 Pekerja OH 0.120 Rp. 62,400.00 Rp. 7,488.00
2 Tukang Kayu OH 0.120 Rp. 102,000.00 Rp. 12,240.00
3 Kepala Tukang Kayu OH 0.012 Rp. 108,000.00 Rp. 1,296.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 21,672.00
A Bahan
1 Akustik 30/60 Lembar 5.800 Rp. 27,000.00 Rp. 156,600.00
2 Paku 1 cm - 2,5 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 157,600.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 18,060.00
A Bahan
1 Akustik 60/120 Lembar 1.500 Rp. 108,000.00 Rp. 162,000.00
2 Paku 1 cm - 2,5 cm Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 163,000.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 18,060.00
A Bahan
1 Tripleks 120 x 240 x 3 mm Lembar 0.375 Rp. 48,000.00 Rp. 18,000.00
2 Paku 1 cm - 2,5 cm Kg 0.030 Rp. 20,000.00 Rp. 600.00
3
4
5
6
Jumlah Harga Bahan Rp. 18,600.00
B Tenaga Kerja
1 Pekerja OH 0.070 Rp. 62,400.00 Rp. 4,368.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 16,188.00
A Bahan
1 Papan Kayu Kelas II M3 0.015 Rp. 5,000,000.00 Rp. 75,000.00
2 Paku 1 cm - 2,5 cm Kg 0.010 Rp. 20,000.00 Rp. 200.00
3
4
5
6
Jumlah Harga Bahan Rp. 75,200.00
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Kayu OH 0.800 Rp. 102,000.00 Rp. 81,600.00
3 Kepala Tukang Kayu OH 0.080 Rp. 108,000.00 Rp. 8,640.00
4 Mandor OH 0.040 Rp. 108,000.00 Rp. 4,320.00
Jumlah Harga Tenaga Rp. 144,480.00
A Bahan
1 Gypsum board 1200 x 2400 x 9 mm Lembar 0.364 Rp. 85,000.00 Rp. 30,940.00
2 Paku sekrup Kg 0.110 Rp. 20,000.00 Rp. 2,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 33,140.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 12,420.00
A Bahan
1 Gypsum board 1200 x 2400 x 6 mm Lembar 0.364 Rp. 75,000.00 Rp. 27,300.00
2 Paku sekrup Kg 0.110 Rp. 20,000.00 Rp. 2,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 29,500.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 12,420.00
A Bahan
1 Calcibord 120 x 240 x 3,5 mm Lembar 0.364 Rp. 75,000.00 Rp. 27,300.00
2 Paku sekrup Kg 0.110 Rp. 20,000.00 Rp. 2,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 29,500.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 12,420.00
A Bahan
1 List Gypsum Profil m 1.050 Rp. 32,450.00 Rp. 34,072.50
2 Tepung Gypsum Kg 0.150 Rp. 5,000.00 Rp. 750.00
3
4
5
6
Jumlah Harga Bahan Rp. 34,822.50
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Kayu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Kayu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 10,836.00
A Bahan
1 Profil Alluminium "T" m 3.600 Rp. 45,000.00 Rp. 162,000.00
2 Kawat Besi Diameter 4 mm Kg 0.150 Rp. 50,000.00 Rp. 7,500.00
3 Ramset Buah 1.050 Rp. 12,500.00 Rp. 13,125.00
4 Akustik 60/120 lembar 1.500 Rp. 108,000.00 Rp. 162,000.00
5
6
Jumlah Harga Bahan Rp. 344,625.00
B Tenaga Kerja
1 Pekerja OH 0.500 Rp. 62,400.00 Rp. 31,200.00
2 Tukang Kayu OH 0.500 Rp. 102,000.00 Rp. 51,000.00
3 Kepala Tukang Kayu OH 0.050 Rp. 108,000.00 Rp. 5,400.00
4 Mandor OH 0.025 Rp. 108,000.00 Rp. 2,700.00
Jumlah Harga Tenaga Rp. 90,300.00
A Bahan
1 List kayu Profil m 1.050 Rp. 5,000.00 Rp. 5,250.00
2 Paku 1 cm - 2,5 cm Kg 0.010 Rp. 20,000.00 Rp. 200.00
3
4
5
6
Jumlah Harga Bahan Rp. 5,450.00
B Tenaga Kerja
1 Pekerja OH 0.050 Rp. 62,400.00 Rp. 3,120.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 9,084.00
A Bahan
1 Besi Profil Kg 1.150 Rp. 25,000.00 Rp. 28,750.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 28,750.00
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Besi OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Besi OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 10,836.00
A Bahan
1 Besi Baja WF Kg 1.150 Rp. 25,000.00 Rp. 28,750.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 28,750.00
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Besi OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Besi OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 10,836.00
A Bahan
1 Solar Liter 1.000 Rp. 4,500.00 Rp. 4,500.00
2 Minyak Pelumas liter 0.100 Rp. 19,500.00 Rp. 1,950.00
3
4
5
6
Jumlah Harga Bahan Rp. 6,450.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Besi OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Besi OH 0.001 Rp. 108,000.00 Rp. 108.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 17,088.00
C ALAT
1 Sewa Alat Jam 0.800 Rp. 100,000.00 Rp. 80,000.00
Jumlah Harga Alat Rp. 80,000.00
A Bahan
1 Besi siku 30.30.3 Kg 15.000 Rp. 25,000.00 Rp. 375,000.00
2 Besi plat baja Kg 32.800 Rp. 500,000.00 Rp. 16,400,000.00
3 Kawat Las Kg 0.050 Rp. 19,000.00 Rp. 950.00
4
5
6
Jumlah Harga Bahan Rp. 16,775,950.00
B Tenaga Kerja
1 Pekerja OH 1.050 Rp. 62,400.00 Rp. 65,520.00
2 Tukang Besi OH 1.050 Rp. 102,000.00 Rp. 107,100.00
3 Kepala Tukang Besi OH 0.105 Rp. 108,000.00 Rp. 11,340.00
4 Mandor OH 0.052 Rp. 108,000.00 Rp. 5,616.00
Jumlah Harga Tenaga Rp. 189,576.00
A Bahan
1 Kawat Las Kg 0.040 Rp. 19,000.00 Rp. 760.00
2 Solar Liter 0.030 Rp. 4,500.00 Rp. 135.00
3 Minyak Pelumas liter 0.004 Rp. 19,500.00 Rp. 78.00
4
5
6
Jumlah Harga Bahan Rp. 973.00
B Tenaga Kerja
1 Pekerja OH 0.004 Rp. 62,400.00 Rp. 249.60
2 Tukang Las OH 0.002 Rp. 110,400.00 Rp. 220.80
3 Kepala Tukang Las OH 0.0002 Rp. 127,200.00 Rp. 25.44
4 Mandor OH 0.0002 Rp. 108,000.00 Rp. 21.60
Jumlah Harga Tenaga Rp. 517.44
C Alat
1 Sewa Alat Jam 0.017 Rp. 42,857.14 Rp. 728.57
Jumlah Harga Alat Rp. 728.57
A Bahan
1 Besi scuare tube m 4.760 Rp. 5,000.00 Rp. 23,800.00
2 Besi list kaca (1 x 1) cm m 4.522 Rp. 200,000.00 Rp. 904,400.00
3 Pengelasan cm 20.000 Rp -
4
5
6
Jumlah Harga Bahan Rp. 928,200.00
B Tenaga Kerja
1 Pekerja OH 0.650 Rp. 62,400.00 Rp. 40,560.00
2 Tukang Besi OH 0.650 Rp. 102,000.00 Rp. 66,300.00
3 Kepala Tukang Besi OH 0.065 Rp. 108,000.00 Rp. 7,020.00
4 Mandor OH 0.032 Rp. 108,000.00 Rp. 3,456.00
Jumlah Harga Tenaga Rp. 117,336.00
A Bahan
1 Pintu gulung besi m2 1.000 Rp. 350,000.00 Rp. 350,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 350,000.00
B Tenaga Kerja
1 Pekerja OH 1.200 Rp. 62,400.00 Rp. 74,880.00
2 Tukang Besi OH 1.200 Rp. 102,000.00 Rp. 122,400.00
3 Kepala Tukang Besi OH 0.120 Rp. 108,000.00 Rp. 12,960.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 210,888.00
A Bahan
1 Pintu lipat baja Folding door M2 1.000 Rp. 175,000.00 Rp. 175,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 175,000.00
B Tenaga Kerja
1 Pekerja OH 0.440 Rp. 62,400.00 Rp. 27,456.00
2 Tukang Besi OH 0.440 Rp. 102,000.00 Rp. 44,880.00
3 Kepala Tukang Besi OH 0.044 Rp. 108,000.00 Rp. 4,752.00
4 Mandor OH 0.022 Rp. 108,000.00 Rp. 2,376.00
Jumlah Harga Tenaga Rp. 79,464.00
A Bahan
1 Sunscreen alluminium M2 1.000 Rp. 250,000.00 Rp. 250,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 250,000.00
B Tenaga Kerja
1 Pekerja OH 0.080 Rp. 62,400.00 Rp. 4,992.00
2 Tukang Besi OH 0.800 Rp. 102,000.00 Rp. 81,600.00
3 Kepala Tukang Besi OH 0.080 Rp. 108,000.00 Rp. 8,640.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 95,664.00
A Bahan
1 Rolling door alluminium M2 1.000 Rp. 75,000.00 Rp. 75,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 75,000.00
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Besi OH 1.000 Rp. 102,000.00 Rp. 102,000.00
3 Kepala Tukang Besi OH 0.100 Rp. 108,000.00 Rp. 10,800.00
4 Mandor OH 0.050 Rp. 108,000.00 Rp. 5,400.00
Jumlah Harga Tenaga Rp. 180,600.00
A Bahan
1 Profil Alluminium "T" m 1.100 Rp. 85,750.00 Rp. 94,325.00
2 Skrup fixer Buah 2.000 Rp. 13,500.00 Rp. 27,000.00
3 Sealant Tube 0.060 Rp. 15,000.00 Rp. 900.00
4
5
6
Jumlah Harga Bahan Rp. 122,225.00
B Tenaga Kerja
1 Pekerja OH 0.043 Rp. 62,400.00 Rp. 2,683.20
2 Tukang Besi OH 0.043 Rp. 102,000.00 Rp. 4,386.00
3 Kepala Tukang Besi OH 0.004 Rp. 108,000.00 Rp. 464.40
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 226.80
Jumlah Harga Tenaga Rp. 7,760.40
A Bahan
1 Profil Alluminium m 4.400 Rp. 45,000.00 Rp. 198,000.00
2 Alumunium strip M 14.600 Rp. 35,000.00 Rp. 511,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 709,000.00
B Tenaga Kerja
1 Pekerja OH 0.085 Rp. 62,400.00 Rp. 5,304.00
2 Tukang Besi OH 0.085 Rp. 102,000.00 Rp. 8,670.00
3 Kepala Tukang Besi OH 0.009 Rp. 108,000.00 Rp. 918.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 453.60
Jumlah Harga Tenaga Rp. 15,345.60
A Bahan
1 Pintu Alumunium M 4.400 Rp. 75,500.00 Rp. 332,200.00
2 Profil kaca alluminium M 4.500 Rp. 35,500.00 Rp. 159,750.00
3 Sealant Tube 0.270 Rp. 15,000.00 Rp. 4,050.00
4
5
6
Jumlah Harga Bahan Rp. 496,000.00
B Tenaga Kerja
1 Pekerja OH 0.085 Rp. 62,400.00 Rp. 5,304.00
2 Tukang Besi OH 0.085 Rp. 102,000.00 Rp. 8,670.00
3 Kepala Tukang Besi OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 15,486.00
A Bahan
1 Venetions blinds dan vertical blinds (tirai) M2 1.000 Rp. 125,000.00 Rp. 125,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 125,000.00
B Tenaga Kerja
1 Pekerja OH 0.350 Rp. 62,400.00 Rp. 21,840.00
2 Tukang Besi OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Besi OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.018 Rp. 108,000.00 Rp. 1,944.00
Jumlah Harga Tenaga Rp. 63,264.00
A Bahan
1 Besi strip 2 x 3 mm Kg 6.177 Rp. 13,500.00 Rp. 83,389.50
2 Pengelasan Cm 27.080 Rp - Rp -
3
4
5
6
Jumlah Harga Bahan Rp. 83,389.50
B Tenaga Kerja
1 Pekerja OH 1.670 Rp. 62,400.00 Rp. 104,208.00
2 Tukang Besi OH 1.670 Rp. 102,000.00 Rp. 170,340.00
3 Kepala Tukang Besi OH 0.167 Rp. 108,000.00 Rp. 18,036.00
4 Mandor OH 0.083 Rp. 108,000.00 Rp. 8,964.00
Jumlah Harga Tenaga Rp. 301,548.00
A Bahan
1 Kawat nyamuk M2 1.100 Rp. 28,200.00 Rp. 31,020.00
2 Pengelasan Cm 11.110 Rp - Rp -
3 Baja strip (0,2 x 2) cm Kg 1.716 Rp. 13,500.00 Rp. 23,166.00
4
5
6
Jumlah Harga Bahan Rp. 54,186.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Besi OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Besi OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 540.00
Jumlah Harga Tenaga Rp. 18,060.00
A Bahan
1 Jendela nako (rangka + kaca 5 mm) M2 1.100 Rp. 175,000.00 Rp. 192,500.00
2 Paku skrup 1 cm - 2,5 cm Buah 10.000 Rp. 250.00 Rp. 2,500.00
3 Baja strip Kg 7.000 Rp. 35,000.00 Rp. 245,000.00
4
5
6
Jumlah Harga Bahan Rp. 440,000.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Besi OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Besi OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.001 Rp. 108,000.00 Rp. 108.00
Jumlah Harga Tenaga Rp. 35,148.00
A Bahan
1 Seng Plat BJLS 28 M 1.050 Rp. 81,200.00 Rp. 85,260.00
2 Paku 1 cm - 2,5 cm Kg 0.015 Rp. 20,000.00 Rp. 300.00
3 Papan Kayu Kelas II M3 0.019 Rp. 5,000,000.00 Rp. 95,000.00
4
5
6
Jumlah Harga Bahan Rp. 180,560.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Kayu OH 0.400 Rp. 102,000.00 Rp. 40,800.00
3 Kepala Tukang Kayu OH 0.025 Rp. 108,000.00 Rp. 2,700.00
4 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 57,060.00
A Bahan
1 Seng Plat BJLS 30 m 1.050 Rp. 95,100.00 Rp. 99,855.00
2 Paku 1 cm - 2,5 cm Kg 0.010 Rp. 20,000.00 Rp. 200.00
3 Baja strip Kg 0.500 Rp. 35,000.00 Rp. 17,500.00
4
5
6
Jumlah Harga Bahan Rp. 117,555.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.300 Rp. 102,000.00 Rp. 30,600.00
3 Kepala Tukang Kayu OH 0.030 Rp. 108,000.00 Rp. 3,240.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 44,064.00
A Bahan
1 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 250.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
3
4
Jumlah Harga Tenaga Rp. 10,224.00
A Bahan
1 Plamir tembok Kg 0.100 Rp. 10,700.00 Rp. 1,070.00
2 Amplas Lembar 0.500 Rp. 5,000.00 Rp. 2,500.00
3 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
4
5
6
Jumlah Harga Bahan Rp. 3,820.00
B Tenaga Kerja
1 Pekerja OH 0.020 Rp. 62,400.00 Rp. 1,248.00
2 Tukang Cat OH 0.030 Rp. 102,000.00 Rp. 3,060.00
3 Kepala Tukang Cat OH 0.003 Rp. 114,000.00 Rp. 342.00
4 Mandor OH 0.001 Rp. 108,000.00 Rp. 108.00
Jumlah Harga Tenaga Rp. 4,758.00
A Bahan
1 Plamir tembok Kg Rp. 10,700.00 Rp -
2 Cat Tembok Mutu Menengah Kg 0.240 Rp. 65,900.00 Rp. 15,816.00
3 Amplas Lembar Rp. 5,000.00 Rp -
4 Kuas Bh. 0.015 Rp. 16,450.00 Rp. 246.75
5 Kape Buah Rp. 5,000.00 Rp -
6
Jumlah Harga Bahan Rp. 16,062.75
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Cat OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Cat OH 0.005 Rp. 114,000.00 Rp. 570.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 9,738.00
A Bahan
1 Plamir tembok Kg Rp. 10,700.00 Rp -
2 Cat Tembok Mutu Menengah Kg 0.470 Rp. 65,900.00 Rp. 30,973.00
3 Amplas Lembar Rp. 5,000.00 Rp -
4 Roll Cat Buah 0.010 Rp. 30,300.00 Rp. 303.00
5 Kape Buah Rp. 5,000.00 Rp -
6
Jumlah Harga Bahan Rp. 31,276.00
B Tenaga Kerja
1 Pekerja OH 0.040 Rp. 62,400.00 Rp. 2,496.00
2 Tukang Cat OH 0.030 Rp. 102,000.00 Rp. 3,060.00
3 Kepala Tukang Cat OH 0.003 Rp. 114,000.00 Rp. 342.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 6,114.00
A Bahan
1 Cat Genteng Kg 0.240 Rp. 69,300.00 Rp. 16,632.00
2 Kuas Bh. 0.015 Rp. 16,450.00 Rp. 246.75
B Tenaga Kerja
1 Pekerja OH 0.210 Rp. 62,400.00 Rp. 13,104.00
2 Tukang Cat OH 0.058 Rp. 102,000.00 Rp. 5,916.00
3 Kepala Tukang Cat OH 0.005 Rp. 114,000.00 Rp. 570.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 19,914.00
A Bahan
1 Plamir tembok Kg 0.050 Rp. 10,700.00 Rp. 535.00
2 Cat Tembok Mutu Menengah Kg 0.240 Rp. 65,900.00 Rp. 15,816.00
3 Amplas Lembar 0.000 Rp. 5,000.00 Rp -
4 Kuas Bh. 0.015 Rp. 16,450.00 Rp. 246.75
5 Kape Buah 0.000 Rp. 5,000.00 Rp -
6
Jumlah Harga Bahan Rp. 16,597.75
B Tenaga Kerja
1 Pekerja OH 0.210 Rp. 62,400.00 Rp. 13,104.00
2 Tukang Cat OH 0.058 Rp. 102,000.00 Rp. 5,916.00
3 Kepala Tukang Cat OH 0.005 Rp. 114,000.00 Rp. 570.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 19,914.00
A Bahan
1 Plamir tembok Kg 0.050 Rp. 10,700.00 Rp. 535.00
2 Cat Tembok Mutu Menengah Kg 0.470 Rp. 65,900.00 Rp. 30,973.00
3 Amplas Lembar 0.000 Rp. 5,000.00 Rp -
4 Roll Cat Buah 0.010 Rp. 30,300.00 Rp. 303.00
5 Kape Buah 0.000 Rp. 5,000.00 Rp -
6
Jumlah Harga Bahan Rp. 31,811.00
B Tenaga Kerja
1 Pekerja OH 0.190 Rp. 62,400.00 Rp. 11,856.00
2 Tukang Cat OH 0.038 Rp. 102,000.00 Rp. 3,876.00
3 Kepala Tukang Cat OH 0.003 Rp. 114,000.00 Rp. 342.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 16,290.00
A Bahan
1 Plamir tembok Kg 0.100 Rp. 10,700.00 Rp. 1,070.00
2 Cat Tembok Mutu Menengah Kg 0.240 Rp. 65,900.00 Rp. 15,816.00
3 Amplas Lembar 0.050 Rp. 5,000.00 Rp. 250.00
4 Kuas Bh. 0.015 Rp. 16,450.00 Rp. 246.75
5 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
6
Jumlah Harga Bahan Rp. 17,632.75
B Tenaga Kerja
1 Pekerja OH 0.080 Rp. 62,400.00 Rp. 4,992.00
2 Tukang Cat OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Cat OH 0.006 Rp. 114,000.00 Rp. 684.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 12,228.00
A Bahan
1 Plamir tembok Kg 0.100 Rp. 10,700.00 Rp. 1,070.00
2 Cat Tembok Mutu Menengah Kg 0.470 Rp. 65,900.00 Rp. 30,973.00
3 Amplas Lembar 0.500 Rp. 5,000.00 Rp. 2,500.00
4 Roll Cat Buah 0.010 Rp. 30,300.00 Rp. 303.00
5 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
6
Jumlah Harga Bahan Rp. 35,096.00
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Cat OH 0.040 Rp. 102,000.00 Rp. 4,080.00
3 Kepala Tukang Cat OH 0.004 Rp. 114,000.00 Rp. 456.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 324.00
Jumlah Harga Tenaga Rp. 8,604.00
A Bahan
1 Plamir tembok Kg - Rp. 10,700.00 Rp -
2 Cat Tembok Mutu Menengah Kg 0.470 Rp. 65,900.00 Rp. 30,973.00
3 Amplas Lembar - Rp. 5,000.00 Rp -
4 Roll Cat Buah 0.010 Rp. 30,300.00 Rp. 303.00
5 Kape Buah - Rp. 5,000.00 Rp -
6
Jumlah Harga Bahan Rp. 31,276.00
B Tenaga Kerja
1 Pekerja OH 0.040 Rp. 62,400.00 Rp. 2,496.00
2 Tukang Cat OH 0.030 Rp. 102,000.00 Rp. 3,060.00
3 Kepala Tukang Cat OH 0.003 Rp. 114,000.00 Rp. 342.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 6,114.00
A Bahan
1 Meni kayu Kg 0.170 Rp. 24,200.00 Rp. 4,114.00
2 Plamir kayu Kg 0.080 Rp. 30,900.00 Rp. 2,472.00
3 Amplas Lembar 2.000 Rp. 5,000.00 Rp. 10,000.00
4 Cat Dasar Kayu Kg 0.170 Rp. 15,000.00 Rp. 2,550.00
5 Cat Kayu Mutu Menengah Kg 0.300 Rp. 69,600.00 Rp. 20,880.00
6 Minyak Cat Liter 0.500 Rp. 11,500.00 Rp. 5,750.00
7 Kuas Bh. 0.065 Rp. 16,450.00 Rp. 1,069.25
Jumlah Harga Bahan Rp. 46,835.25
B Tenaga Kerja
1 Pekerja OH 0.225 Rp. 62,400.00 Rp. 14,040.00
2 Tukang Kayu OH 0.335 Rp. 102,000.00 Rp. 34,170.00
3 Kepala Tukang Kayu OH 0.034 Rp. 108,000.00 Rp. 3,618.00
4 Mandor OH 0.012 Rp. 108,000.00 Rp. 1,296.00
Jumlah Harga Tenaga Rp. 53,124.00
A Bahan
1 Meni kayu Kg 0.000 Rp. 24,200.00 Rp -
2 Plamir kayu Kg 0.000 Rp. 30,900.00 Rp -
3 Amplas Lembar 1.000 Rp. 5,000.00 Rp. 5,000.00
4 Cat Dasar Kayu Kg 0.000 Rp. 15,000.00 Rp -
5 Cat Kayu Mutu Menengah Kg 0.300 Rp. 69,600.00 Rp. 20,880.00
6 Minyak Cat Liter 0.200 Rp. 11,500.00 Rp. 2,300.00
7 Kuas Bh. 0.020 Rp. 16,450.00 Rp. 329.00
Jumlah Harga Bahan Rp. 28,509.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 27,144.00
A Bahan
1 Amplas Lembar 0.500 Rp. 5,000.00 Rp. 2,500.00
2 Sikat Baja Buah 0.050 Rp. 14,000.00 Rp. 700.00
3 Soda Api Kg 0.050 Rp. 25,000.00 Rp. 1,250.00
4
5
6
Jumlah Harga Bahan Rp. 4,450.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
3
4
Jumlah Harga Tenaga Rp. 20,340.00
A Bahan
1 Meni Besi Kg 0.100 Rp. 32,883.00 Rp. 3,288.30
2 Minyak Cat Liter 0.100 Rp. 11,500.00 Rp. 1,150.00
3 Amplas Lembar 0.050 Rp. 5,000.00 Rp. 250.00
4 Kuas Bh. 0.015 Rp. 16,450.00 Rp. 246.75
5
6
Jumlah Harga Bahan Rp. 4,935.05
B Tenaga Kerja
1 Pekerja OH 0.075 Rp. 62,400.00 Rp. 4,680.00
2 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
3
4
Jumlah Harga Tenaga Rp. 5,112.00
A Bahan
1 Cat Besi Kg 0.200 Rp. 75,500.00 Rp. 15,100.00
2 Minyak Cat Liter 0.100 Rp. 11,500.00 Rp. 1,150.00
3 Kuas Bh. 0.020 Rp. 16,450.00 Rp. 329.00
4
5
6
Jumlah Harga Bahan Rp. 16,579.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Cat OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Cat OH 0.015 Rp. 114,000.00 Rp. 1,710.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 27,234.00
A Bahan
1 Teak Oil Liter 0.100 Rp. 12,000.00 Rp. 1,200.00
2 Amplas Lembar 0.500 Rp. 5,000.00 Rp. 2,500.00
3 Kuas Bh. 0.015 Rp. 16,450.00 Rp. 246.75
4
5
6
Jumlah Harga Bahan Rp. 3,946.75
B Tenaga Kerja
1 Tukang Cat OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Cat OH 0.010 Rp. 114,000.00 Rp. 1,140.00
3
4
Jumlah Harga Tenaga Rp. 11,340.00
A Bahan
1 Wood Filler Kg 0.100 Rp. 20,000.00 Rp. 2,000.00
2 Politur Liter 0.200 Rp. 8,400.00 Rp. 1,680.00
3 Amplas Lembar 1.000 Rp. 5,000.00 Rp. 5,000.00
4 Kuas Bh. 0.020 Rp. 16,450.00 Rp. 329.00
5
6
Jumlah Harga Bahan Rp. 9,009.00
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Politur OH 0.250 Rp. 98,400.00 Rp. 24,600.00
3 Kepala Tukang Politur OH 0.025 Rp. 114,000.00 Rp. 2,850.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 44,454.00
A Bahan
1 Vernis Liter 0.300 Rp. 30,500.00 Rp. 9,150.00
2 Amplas Lembar 0.500 Rp. 5,000.00 Rp. 2,500.00
3 Kuas Bh. 0.020 Rp. 16,450.00 Rp. 329.00
4
5
6
Jumlah Harga Bahan Rp. 11,979.00
B Tenaga Kerja
1 Tukang Politur OH 0.100 Rp. 98,400.00 Rp. 9,840.00
2 Kepala Tukang Politur OH 0.010 Rp. 114,000.00 Rp. 1,140.00
3
4
Jumlah Harga Tenaga Rp. 10,980.00
A Bahan
1 Residu (Teer) Liter 0.350 Rp. 9,500.00 Rp. 3,325.00
2 Minyak Tanah (Karosene) Ltr 0.030 Rp. 3,750.00 Rp. 112.50
3 Kuas Bh. 0.020 Rp. 16,450.00 Rp. 329.00
4
5
6
Jumlah Harga Bahan Rp. 3,766.50
B Tenaga Kerja
1 Tukang Cat OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Cat OH 0.010 Rp. 114,000.00 Rp. 1,140.00
3
4
Jumlah Harga Tenaga Rp. 11,340.00
A Bahan
1 Genteng Pejaten Buah 25.000 Rp. 3,500.00 Rp. 87,500.00
2 Cat Genteng
3
4
5
6
Jumlah Harga Bahan Rp. 87,500.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.075 Rp. 102,000.00 Rp. 7,650.00
3 Kepala Tukang Kayu OH 0.0075 Rp. 108,000.00 Rp. 810.00
4 Mandor OH 0.0075 Rp. 108,000.00 Rp. 810.00
Jumlah Harga Tenaga Rp. 18,630.00
A Bahan
1 Genteng beton Buah 10.000 Rp. 6,933.00 Rp. 69,330.00
2 Paku Kg 0.030 Rp. 20,000.00 Rp. 600.00
3
4
5
6
Jumlah Harga Bahan Rp. 69,930.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 24,840.00
A Bahan
1 Bubungan Genteng Pejaten Buah 5.000 Rp. 3,500.00 Rp. 17,500.00
2 Portland Cement (PC) Kg 10.800 Rp. 1,705.00 Rp. 18,414.00
3 Pasir Pasang (PP) M3 0.320 Rp. 165,117.00 Rp. 52,837.44
4
5
6
Jumlah Harga Bahan Rp. 88,751.44
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 47,736.00
A Bahan
1 Bubungan genteng beton Buah 3.500 Rp. 7,533.00 Rp. 26,365.50
2 Portland Cement (PC) Kg 10.800 Rp. 1,705.00 Rp. 18,414.00
3 Semen warna Kg 1.000 Rp. 17,900.00 Rp. 17,900.00
4 Pasir Pasang (PP) M3 0.320 Rp. 165,117.00 Rp. 52,837.44
5 Paku Kg 0.050 Rp. 20,000.00 Rp. 1,000.00
6
Jumlah Harga Bahan Rp. 116,516.94
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 47,736.00
A Bahan
1 Asbes gelombang 105 x 240 Lembar 0.440 Rp. 59,000.00 Rp. 25,960.00
2 Paku asbes/seng gelombang (Angkur) Buah 2.000 Rp. 1,000.00 Rp. 2,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 27,960.00
B Tenaga Kerja
1 Pekerja OH 0.140 Rp. 62,400.00 Rp. 8,736.00
2 Tukang Kayu OH 0.067 Rp. 102,000.00 Rp. 6,834.00
3 Kepala Tukang Kayu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.007 Rp. 108,000.00 Rp. 756.00
Jumlah Harga Tenaga Rp. 17,082.00
A Bahan
1 Asbes gelombang 92 x 180 Lembar 0.670 Rp. 45,050.00 Rp. 30,183.50
2 Paku asbes/seng gelombang (Angkur) Buah 2.000 Rp. 1,000.00 Rp. 2,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 32,183.50
B Tenaga Kerja
1 Pekerja OH 0.140 Rp. 62,400.00 Rp. 8,736.00
2 Tukang Kayu OH 0.067 Rp. 102,000.00 Rp. 6,834.00
3 Kepala Tukang Kayu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.007 Rp. 108,000.00 Rp. 756.00
Jumlah Harga Tenaga Rp. 17,082.00
A Bahan
1 Seng Gelombang BJLS 20 Lembar 0.700 Rp. 61,000.00 Rp. 42,700.00
2 Paku asbes/seng gelombang (Angkur) Buah 2.000 Rp. 1,000.00 Rp. 2,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 44,700.00
B Tenaga Kerja
1 Pekerja OH 0.140 Rp. 62,400.00 Rp. 8,736.00
2 Tukang Kayu OH 0.067 Rp. 102,000.00 Rp. 6,834.00
3 Kepala Tukang Kayu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.007 Rp. 108,000.00 Rp. 756.00
Jumlah Harga Tenaga Rp. 17,082.00
A Bahan
1 Bubungan Asbes gelombang 92 cm Lembar 1.200 Rp. 40,900.00 Rp. 49,080.00
2 Paku asbes/seng gelombang (Angkur) Buah 4.000 Rp. 1,000.00 Rp. 4,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 53,080.00
B Tenaga Kerja
1 Pekerja OH 0.084 Rp. 62,400.00 Rp. 5,241.60
2 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 19,827.60
A Bahan
1 Bubungan Asbes gelombang 105 cm Lembar 1.050 Rp. 40,900.00 Rp. 42,945.00
2 Paku asbes/seng gelombang (Angkur) Buah 4.000 Rp. 1,000.00 Rp. 4,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 46,945.00
B Tenaga Kerja
1 Pekerja OH 0.084 Rp. 62,400.00 Rp. 5,241.60
2 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 432.00
Jumlah Harga Tenaga Rp. 19,827.60
A Bahan
1 Seng Plat BJLS 20 Lembar 0.400 Rp. 64,100.00 Rp. 25,640.00
2 Paku seng Kg 0.060 Rp. 20,500.00 Rp. 1,230.00
3 Kayu kelas II M3 0.004 Rp. 6,500,000.00 Rp. 26,000.00
4
5
6
Jumlah Harga Bahan Rp. 52,870.00
B Tenaga Kerja
1 Pekerja OH 0.125 Rp. 62,400.00 Rp. 7,800.00
2 Tukang Kayu OH 0.250 Rp. 102,000.00 Rp. 25,500.00
3 Kepala Tukang Kayu OH 0.025 Rp. 108,000.00 Rp. 2,700.00
4 Mandor OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 36,648.00
A Bahan
1 Genteng Keramik Buah 13.800 Rp. 19,100.00 Rp. 263,580.00
2 Paku Ulir Buah 7.000 Rp. 1,600.00 Rp. 11,200.00
3
4
5
6
Jumlah Harga Bahan Rp. 274,780.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 30,480.00
A Bahan
1 Bubungan genteng keramik Buah 3.900 Rp. 35,000.00 Rp. 136,500.00
2 Portland Cement (PC) Kg 5.100 Rp. 1,705.00 Rp. 8,695.50
3 Pasir Pasang (PP) M3 0.040 Rp. 165,117.00 Rp. 6,604.68
B Tenaga Kerja
1 Pekerja OH 0.400 Rp. 62,400.00 Rp. 24,960.00
2 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 216.00
Jumlah Harga Tenaga Rp. 47,736.00
A Bahan
1 Kunci Tanam Antik Buah 1.000 Rp. 200,000.00 Rp. 200,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 200,000.00
B Tenaga Kerja
1 Tukang Kayu OH 0.600 Rp. 102,000.00 Rp. 61,200.00
2 Kepala Tukang Kayu OH 0.060 Rp. 108,000.00 Rp. 6,480.00
3
4
Jumlah Harga Tenaga Rp. 67,680.00
A Bahan
1 Kunci Tanam Biasa Buah 1.000 Rp. 75,000.00 Rp. 75,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 75,000.00
B Tenaga Kerja
1 Tukang Kayu OH 0.500 Rp. 102,000.00 Rp. 51,000.00
2 Kepala Tukang Kayu OH 0.050 Rp. 108,000.00 Rp. 5,400.00
3
4
Jumlah Harga Tenaga Rp. 56,400.00
A Bahan
1 Kunci Silinder Buah 1.000 Rp. 35,000.00 Rp. 35,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 35,000.00
B Tenaga Kerja
1 Tukang Kayu OH 0.600 Rp. 102,000.00 Rp. 61,200.00
2 Kepala Tukang Kayu OH 0.060 Rp. 108,000.00 Rp. 6,480.00
3
4
Jumlah Harga Tenaga Rp. 67,680.00
A Bahan
1 Kunci Slot Buah 1.000 Rp. 55,000.00 Rp. 55,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 55,000.00
B Tenaga Kerja
1 Tukang Kayu OH 0.250 Rp. 102,000.00 Rp. 25,500.00
2 Kepala Tukang Kayu OH 0.025 Rp. 108,000.00 Rp. 2,700.00
3
4
Jumlah Harga Tenaga Rp. 28,200.00
A Bahan
1 Engsel nilon Buah 1.000 Rp. 16,100.00 Rp. 16,100.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 16,100.00
B Tenaga Kerja
1 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
2 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
3
4
Jumlah Harga Tenaga Rp. 14,154.00
A Bahan
1 Engsel Biasa Buah 1.000 Rp. 14,100.00 Rp. 14,100.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 14,100.00
B Tenaga Kerja
1 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 11,280.00
A Bahan
1 Kait Angin Kecil Buah 1.000 Rp. 12,350.00 Rp. 12,350.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 12,350.00
B Tenaga Kerja
1 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 11,280.00
A Bahan
1 Door Closer Buah 1.000 Rp. 150,000.00 Rp. 150,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 150,000.00
B Tenaga Kerja
1 Tukang Kayu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
2 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
3
4
Jumlah Harga Tenaga Rp. 22,560.00
A Bahan
1 Door Holder Buah 1.000 Rp. 30,000.00 Rp. 30,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 30,000.00
B Tenaga Kerja
1 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 11,280.00
A Bahan
1 Door Stop Buah 1.000 Rp. 37,950.00 Rp. 37,950.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 37,950.00
B Tenaga Kerja
1 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
2 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
3
4
Jumlah Harga Tenaga Rp. 14,154.00
A Bahan
1 Rel Pintu Buah 1.000 Rp. 22,500.00 Rp. 22,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 22,500.00
B Tenaga Kerja
1 Pekerja OH 0.080 Rp. 62,400.00 Rp. 4,992.00
2 Tukang Besi OH 0.800 Rp. 102,000.00 Rp. 81,600.00
3 Kepala Tukang Besi OH 0.080 Rp. 108,000.00 Rp. 8,640.00
4 Mandor OH 0.040 Rp. 108,000.00 Rp. 4,320.00
Jumlah Harga Tenaga Rp. 99,552.00
A Bahan
1 Grendel Besar Buah 1.000 Rp. 17,500.00 Rp. 17,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 17,500.00
B Tenaga Kerja
1 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 11,280.00
A Bahan
1 Kaca Polos 3 mm M2 1.100 Rp. 113,500.00 Rp. 124,850.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 124,850.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Polos 5 mm M2 1.100 Rp. 167,700.00 Rp. 184,470.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 184,470.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Polos 10 mm M2 1.100 Rp. 335,400.00 Rp. 368,940.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 368,940.00
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Kaca Raiben 5 mm M2 1.100 Rp. 189,500.00 Rp. 208,450.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 208,450.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Raiben 10 mm M2 1.100 Rp. 379,000.00 Rp. 416,900.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 416,900.00
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Kaca Raiben 12 mm M2 1.100 Rp. 425,000.00 Rp. 467,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 467,500.00
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Tukang Kayu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Kayu OH 0.013 Rp. 108,000.00 Rp. 1,404.00
4 Mandor OH 0.013 Rp. 108,000.00 Rp. 1,404.00
Jumlah Harga Tenaga Rp. 31,158.00
A Bahan
1 Kaca Buram 3 mm M2 1.100 Rp. 95,000.00 Rp. 104,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 104,500.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Buram 5 mm M2 1.100 Rp. 135,000.00 Rp. 148,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 148,500.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Buram Bermotif 3 mm M2 1.100 Rp. 125,000.00 Rp. 137,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 137,500.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Buram Bermotif 5 mm M2 1.100 Rp. 155,000.00 Rp. 170,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 170,500.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Cermin 5 mm M2 1.100 Rp. 75,000.00 Rp. 82,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 82,500.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Wire Glass 5 mm M2 1.100 Rp. 150,000.00 Rp. 165,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 165,000.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Wire Glass 8 mm M2 1.100 Rp. 150,000.00 Rp. 165,000.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 165,000.00
B Tenaga Kerja
1 Pekerja OH 0.160 Rp. 62,400.00 Rp. 9,984.00
2 Tukang Kayu OH 0.160 Rp. 102,000.00 Rp. 16,320.00
3 Kepala Tukang Kayu OH 0.016 Rp. 108,000.00 Rp. 1,728.00
4 Mandor OH 0.008 Rp. 108,000.00 Rp. 864.00
Jumlah Harga Tenaga Rp. 28,896.00
A Bahan
1 Kaca Polos 5 mm M2 1.020 Rp. 167,700.00 Rp. 171,054.00
2 Kerangka Nako Daun 7.000 Rp. 20,000.00 Rp. 140,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 311,054.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Kayu OH 0.300 Rp. 102,000.00 Rp. 30,600.00
3 Kepala Tukang Kayu OH 0.030 Rp. 108,000.00 Rp. 3,240.00
4 Mandor OH 0.015 Rp. 108,000.00 Rp. 1,620.00
Jumlah Harga Tenaga Rp. 54,180.00
A Bahan
1 Kloset Duduk Buah 1.000 Rp. 2,021,250.00 Rp. 2,021,250.00
2 Perlengkapan (Support) 6% harga kloset Ls 6.0% Rp. 2,021,250.00 Rp. 121,275.00
3
4
5
6
Jumlah Harga Bahan Rp. 2,142,525.00
B Tenaga Kerja
1 Pekerja OH 3.300 Rp. 62,400.00 Rp. 205,920.00
2 Tukang Batu OH 1.100 Rp. 102,000.00 Rp. 112,200.00
3 Kepala Tukang Batu OH 0.1600 Rp. 108,000.00 Rp. 17,280.00
4 Mandor OH 0.0075 Rp. 108,000.00 Rp. 810.00
Jumlah Harga Tenaga Rp. 336,210.00
A Bahan
1 Kloset Jongkok Porselin Buah 1.000 Rp. 90,000.00 Rp. 90,000.00
2 Portland Cement (PC) Kg 6.000 Rp. 1,705.00 Rp. 10,230.00
3 Pasir Pasang (PP) M3 0.010 Rp. 165,117.00 Rp. 1,651.17
4
5
6
Jumlah Harga Bahan Rp. 101,881.17
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Batu OH 1.500 Rp. 102,000.00 Rp. 153,000.00
3 Kepala Tukang Batu OH 0.150 Rp. 108,000.00 Rp. 16,200.00
4 Mandor OH 0.160 Rp. 108,000.00 Rp. 17,280.00
Jumlah Harga Tenaga Rp. 248,880.00
A Bahan
1 Kloset Jongkok Teraso Buah 1.000 Rp. 48,000.00 Rp. 48,000.00
2 Bata Merah Buah 7.000 Rp. 770.00 Rp. 5,390.00
3 Portland Cement (PC) Kg 6.000 Rp. 1,705.00 Rp. 10,230.00
4 Pasir Pasang (PP) M3 0.010 Rp. 165,117.00 Rp. 1,651.17
5
6
Jumlah Harga Bahan Rp. 65,271.17
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Batu OH 1.500 Rp. 102,000.00 Rp. 153,000.00
3 Kepala Tukang Batu OH 0.300 Rp. 108,000.00 Rp. 32,400.00
4 Mandor OH 0.110 Rp. 108,000.00 Rp. 11,880.00
Jumlah Harga Tenaga Rp. 259,680.00
A Bahan
1 Urinoir Porselin Buah 1.000 Rp. 400,000.00 Rp. 400,000.00
2 Perlengkapan (Support) 6% harga kloset Ls 30.000% Rp. 400,000.00 Rp. 120,000.00
3 Portland Cement (PC) Kg 6.000 Rp. 1,705.00 Rp. 10,230.00
4 Pasir Pasang (PP) M3 0.010 Rp. 165,117.00 Rp. 1,651.17
5
6
Jumlah Harga Bahan Rp. 531,881.17
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Batu OH 1.000 Rp. 102,000.00 Rp. 102,000.00
3 Kepala Tukang Batu OH 0.100 Rp. 108,000.00 Rp. 10,800.00
4 Mandor OH 0.100 Rp. 108,000.00 Rp. 10,800.00
Jumlah Harga Tenaga Rp. 186,000.00
A Bahan
1 Wastafel Buah 1.000 Rp. 840,000.00 Rp. 840,000.00
2 Perlengkapan (Support) 6% harga kloset Ls 12.00% Rp. 840,000.00 Rp. 100,800.00
3 Portland Cement (PC) Kg 6.000 Rp. 1,705.00 Rp. 10,230.00
4 Pasir Pasang (PP) M3 0.010 Rp. 165,117.00 Rp. 1,651.17
5
6
Jumlah Harga Bahan Rp. 952,681.17
B Tenaga Kerja
1 Pekerja OH 1.200 Rp. 62,400.00 Rp. 74,880.00
2 Tukang Batu OH 1.450 Rp. 102,000.00 Rp. 147,900.00
3 Kepala Tukang Batu OH 0.150 Rp. 108,000.00 Rp. 16,200.00
4 Mandor OH 0.100 Rp. 108,000.00 Rp. 10,800.00
Jumlah Harga Tenaga Rp. 249,780.00
A Bahan
1 Bak Mandi Teraso 50 x 50 x 50 Buah 1.000 Rp. 257,500.00 Rp. 257,500.00
2 Semen Warna Kg 6.000 Rp. 17,900.00 Rp. 107,400.00
3 Pasir Pasang (PP) M3 0.010 Rp. 165,117.00 Rp. 1,651.17
4
5
6
Jumlah Harga Bahan Rp. 366,551.17
B Tenaga Kerja
1 Pekerja OH 2.100 Rp. 62,400.00 Rp. 131,040.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.070 Rp. 108,000.00 Rp. 7,560.00
4 Mandor OH 0.110 Rp. 108,000.00 Rp. 11,880.00
Jumlah Harga Tenaga Rp. 226,980.00
A Bahan
1 Bak Fiberglass 0,30 M3 Buah 1.000 Rp. 250,000.00 Rp. 250,000.00
2 Perlengkapan (Support) 6% harga kloset Ls 18.00% Rp. 250,000.00 Rp. 45,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 295,000.00
B Tenaga Kerja
1 Pekerja OH 1.800 Rp. 62,400.00 Rp. 112,320.00
2 Tukang Batu OH 2.700 Rp. 102,000.00 Rp. 275,400.00
3 Kepala Tukang Batu OH 0.540 Rp. 108,000.00 Rp. 58,320.00
4 Mandor OH 0.110 Rp. 108,000.00 Rp. 11,880.00
Jumlah Harga Tenaga Rp. 457,920.00
A Bahan
1 Bata merah Buah 280.000 Rp. 770.00 Rp. 215,600.00
2 Portland Cement (PC) Kg 120.000 Rp. 1,705.00 Rp. 204,600.00
3 Pasir Pasang (PP) M3 0.300 Rp. 165,117.00 Rp. 49,535.10
4 Keramik KW II (Polos) M2 4.356 Rp. 79,400.00 Rp. 345,866.40
5 Semen warna Kg 6.000 Rp. 17,900.00 Rp. 107,400.00
6
Jumlah Harga Bahan Rp. 923,001.50
B Tenaga Kerja
1 Pekerja OH 6.000 Rp. 62,400.00 Rp. 374,400.00
2 Tukang Batu OH 3.000 Rp. 102,000.00 Rp. 306,000.00
3 Kepala Tukang Batu OH 0.300 Rp. 108,000.00 Rp. 32,400.00
4 Mandor OH 0.300 Rp. 108,000.00 Rp. 32,400.00
Jumlah Harga Tenaga Rp. 745,200.00
A Bahan
1 Bak Fiberglass 1,00 M3 Buah 1.000 Rp. 270,000.00 Rp. 270,000.00
2 Perlengkapan (Support) 6% harga kloset Ls 12.00% Rp. 270,000.00 Rp. 32,400.00
3
4
5
6
Jumlah Harga Bahan Rp. 302,400.00
B Tenaga Kerja
1 Pekerja OH 3.000 Rp. 62,400.00 Rp. 187,200.00
2 Tukang Batu OH 4.500 Rp. 102,000.00 Rp. 459,000.00
3 Kepala Tukang Batu OH 0.900 Rp. 108,000.00 Rp. 97,200.00
4 Mandor OH 0.900 Rp. 108,000.00 Rp. 97,200.00
Jumlah Harga Tenaga Rp. 840,600.00
A Bahan
1 Buis Beton Dia. 20 cm BH 1.100 Rp. 42,750.00 Rp. 47,025.00
2 Bata merah Buah 18.900 Rp. 770.00 Rp. 14,553.00
3 Portland Cement (PC) Kg 3.920 Rp. 1,705.00 Rp. 6,683.60
4 Pasir Pasang (PP) M3 0.056 Rp. 165,117.00 Rp. 9,246.55
5 Pasir Urug M3 0.024 Rp. 95,733.00 Rp. 2,297.59
6
Jumlah Harga Bahan Rp. 79,805.74
B Tenaga Kerja
1 Pekerja OH 0.140 Rp. 62,400.00 Rp. 8,736.00
2 Tukang Batu OH 0.070 Rp. 102,000.00 Rp. 7,140.00
3 Kepala Tukang Batu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.007 Rp. 108,000.00 Rp. 756.00
Jumlah Harga Tenaga Rp. 17,388.00
A Bahan
1 Buis Beton Dia. 60 cm BH 1.100 Rp. 106,950.00 Rp. 117,645.00
2 Bata merah Buah 385.000 Rp. 770.00 Rp. 296,450.00
3 Portland Cement (PC) Kg 10.300 Rp. 1,705.00 Rp. 17,561.50
4 Pasir Pasang (PP) M3 0.061 Rp. 165,117.00 Rp. 10,072.14
5 Pasir Urug M3 0.069 Rp. 95,733.00 Rp. 6,605.58
6
Jumlah Harga Bahan Rp. 448,334.21
B Tenaga Kerja
1 Pekerja OH 0.380 Rp. 62,400.00 Rp. 23,712.00
2 Tukang Batu OH 0.190 Rp. 102,000.00 Rp. 19,380.00
3 Kepala Tukang Batu OH 0.019 Rp. 108,000.00 Rp. 2,052.00
4 Mandor OH 0.019 Rp. 108,000.00 Rp. 2,052.00
Jumlah Harga Tenaga Rp. 47,196.00
A Bahan
1 Bata merah Buah 101.500 Rp. 770.00 Rp. 78,155.00
2 Portland Cement (PC) Kg 44.000 Rp. 1,705.00 Rp. 75,020.00
3 Pasir Pasang (PP) M3 0.070 Rp. 165,117.00 Rp. 11,558.19
4 Kerikil alam (KR) M3 0.070 Rp. 177,500.00 Rp. 12,425.00
5 Besi Beton Polos Kg 1.600 Rp. 20,050.00 Rp. 32,080.00
6 Pasir beton (PB) M3 0.060 Rp. 214,833.00 Rp. 12,889.98
Jumlah Harga Bahan Rp. 222,128.17
B Tenaga Kerja
1 Pekerja OH 3.200 Rp. 62,400.00 Rp. 199,680.00
2 Tukang Batu OH 1.015 Rp. 102,000.00 Rp. 103,530.00
3 Kepala Tukang Batu OH 0.0015 Rp. 108,000.00 Rp. 162.00
4 Mandor OH 0.016 Rp. 108,000.00 Rp. 1,728.00
Jumlah Harga Tenaga Rp. 305,100.00
A Bahan
1 Bata merah Buah 175.000 Rp. 770.00 Rp. 134,750.00
2 Portland Cement (PC) Kg 77.000 Rp. 1,705.00 Rp. 131,285.00
3 Pasir Pasang (PP) M3 0.130 Rp. 165,117.00 Rp. 21,465.21
4 Kerikil alam (KR) M3 0.020 Rp. 177,500.00 Rp. 3,550.00
5 Besi Beton Polos Kg 2.600 Rp. 20,050.00 Rp. 52,130.00
6 Pasir beton (PB) M3 0.090 Rp. 214,833.00 Rp. 19,334.97
Jumlah Harga Bahan Rp. 362,515.18
B Tenaga Kerja
1 Pekerja OH 1.420 Rp. 62,400.00 Rp. 88,608.00
2 Tukang Batu OH 0.473 Rp. 102,000.00 Rp. 48,246.00
3 Kepala Tukang Batu OH 0.0470 Rp. 108,000.00 Rp. 5,076.00
4 Mandor OH 0.071 Rp. 108,000.00 Rp. 7,668.00
Jumlah Harga Tenaga Rp. 149,598.00
A Bahan
1 Bata merah Buah 259.700 Rp. 770.00 Rp. 199,969.00
2 Portland Cement (PC) Kg 114.000 Rp. 1,705.00 Rp. 194,370.00
3 Pasir Pasang (PP) M3 0.184 Rp. 165,117.00 Rp. 30,381.53
4 Kerikil alam (KR) M3 0.033 Rp. 177,500.00 Rp. 5,857.50
5 Besi Beton Polos Kg 4.850 Rp. 20,050.00 Rp. 97,242.50
6 Pasir beton (PB) M3 0.120 Rp. 214,833.00 Rp. 25,779.96
Jumlah Harga Bahan Rp. 553,600.49
B Tenaga Kerja
1 Pekerja OH 2.260 Rp. 62,400.00 Rp. 141,024.00
2 Tukang Batu OH 0.720 Rp. 102,000.00 Rp. 73,440.00
3 Kepala Tukang Batu OH 0.0720 Rp. 108,000.00 Rp. 7,776.00
4 Mandor OH 0.108 Rp. 108,000.00 Rp. 11,664.00
Jumlah Harga Tenaga Rp. 233,904.00
A Bahan
1 Pipa GI Dia. 1/2" M' 1.200 Rp. 8,200.00 Rp. 9,840.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 8,200.00 Rp. 2,870.00
3
4
5
6
Jumlah Harga Bahan Rp. 12,710.00
B Tenaga Kerja
1 Pekerja OH 0.054 Rp. 62,400.00 Rp. 3,369.60
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.027 Rp. 108,000.00 Rp. 2,916.00
Jumlah Harga Tenaga Rp. 16,437.60
A Bahan
1 Pipa GI Dia. 3/4" M' 1.200 Rp. 13,000.00 Rp. 15,600.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 13,000.00 Rp. 4,550.00
3
4
5
6
Jumlah Harga Bahan Rp. 20,150.00
B Tenaga Kerja
1 Pekerja OH 0.054 Rp. 62,400.00 Rp. 3,369.60
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.027 Rp. 108,000.00 Rp. 2,916.00
Jumlah Harga Tenaga Rp. 16,437.60
A Bahan
1 Pipa GI Dia. 1" M' 1.200 Rp. 23,000.00 Rp. 27,600.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 23,000.00 Rp. 8,050.00
3
4
5
6
Jumlah Harga Bahan Rp. 35,650.00
B Tenaga Kerja
1 Pekerja OH 0.054 Rp. 62,400.00 Rp. 3,369.60
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.027 Rp. 108,000.00 Rp. 2,916.00
Jumlah Harga Tenaga Rp. 16,437.60
A Bahan
1 Pipa GI Dia. 1 ½" M' 1.200 Rp. 40,000.00 Rp. 48,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 40,000.00 Rp. 14,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 62,000.00
B Tenaga Kerja
1 Pekerja OH 0.108 Rp. 62,400.00 Rp. 6,739.20
2 Tukang Batu OH 0.180 Rp. 102,000.00 Rp. 18,360.00
3 Kepala Tukang Batu OH 0.018 Rp. 108,000.00 Rp. 1,944.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 583.20
Jumlah Harga Tenaga Rp. 27,626.40
A Bahan
1 Pipa GI Dia. 3" M' 1.200 Rp. 61,000.00 Rp. 73,200.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 61,000.00 Rp. 21,350.00
3
4
5
6
Jumlah Harga Bahan Rp. 94,550.00
B Tenaga Kerja
1 Pekerja OH 0.108 Rp. 62,400.00 Rp. 6,739.20
2 Tukang Batu OH 0.180 Rp. 102,000.00 Rp. 18,360.00
3 Kepala Tukang Batu OH 0.018 Rp. 108,000.00 Rp. 1,944.00
4 Mandor OH 0.005 Rp. 108,000.00 Rp. 583.20
Jumlah Harga Tenaga Rp. 27,626.40
A Bahan
1 Pipa GI Dia. 4" M' 1.200 Rp. 225,000.00 Rp. 270,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 225,000.00 Rp. 78,750.00
3
4
5
6
Jumlah Harga Bahan Rp. 348,750.00
B Tenaga Kerja
1 Pekerja OH 0.135 Rp. 62,400.00 Rp. 8,424.00
2 Tukang Batu OH 0.225 Rp. 102,000.00 Rp. 22,950.00
3 Kepala Tukang Batu OH 0.023 Rp. 108,000.00 Rp. 2,430.00
4 Mandor OH 0.007 Rp. 108,000.00 Rp. 734.40
Jumlah Harga Tenaga Rp. 34,538.40
A Bahan
1 Pipa PVC Dia. 1/2" Tipe AW M' 1.200 Rp. 6,300.00 Rp. 7,560.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 6,300.00 Rp. 2,205.00
3
4
5
6
Jumlah Harga Bahan Rp. 9,765.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 194.40
Jumlah Harga Tenaga Rp. 9,208.80
A Bahan
1 Pipa PVC Dia. 3/4" Tipe AW M' 1.200 Rp. 8,700.00 Rp. 10,440.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 8,700.00 Rp. 3,045.00
3
4
5
6
Jumlah Harga Bahan Rp. 13,485.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 194.40
Jumlah Harga Tenaga Rp. 9,208.80
A Bahan
1 Pipa PVC Dia. 1" Tipe AW M' 1.200 Rp. 11,600.00 Rp. 13,920.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 11,600.00 Rp. 4,060.00
3
4
5
6
Jumlah Harga Bahan Rp. 17,980.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 194.40
Jumlah Harga Tenaga Rp. 9,208.80
A Bahan
1 Pipa PVC Dia. 1 ½" Tipe AW M' 1.200 Rp. 17,400.00 Rp. 20,880.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 17,400.00 Rp. 6,090.00
3
4
5
6
Jumlah Harga Bahan Rp. 26,970.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 194.40
Jumlah Harga Tenaga Rp. 9,208.80
A Bahan
1 Pipa PVC Dia. 2" Tipe AW M' 1.200 Rp. 25,000.00 Rp. 30,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 25,000.00 Rp. 8,750.00
3
4
5
6
Jumlah Harga Bahan Rp. 38,750.00
B Tenaga Kerja
1 Pekerja OH 0.054 Rp. 62,400.00 Rp. 3,369.60
2 Tukang Batu OH 0.090 Rp. 102,000.00 Rp. 9,180.00
3 Kepala Tukang Batu OH 0.009 Rp. 108,000.00 Rp. 972.00
4 Mandor OH 0.003 Rp. 108,000.00 Rp. 291.60
Jumlah Harga Tenaga Rp. 13,813.20
A Bahan
1 Pipa PVC Dia. 2 ½" Tipe AW M' 1.200 Rp. 36,200.00 Rp. 43,440.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 36,200.00 Rp. 12,670.00
3
4
5
6
Jumlah Harga Bahan Rp. 56,110.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 194.40
Jumlah Harga Tenaga Rp. 9,208.80
A Bahan
1 Pipa PVC Dia. 2 ½" Tipe D M' 1.200 Rp. 15,000.00 Rp. 18,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 15,000.00 Rp. 5,250.00
3
4
5
6
Jumlah Harga Bahan Rp. 23,250.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp. 108,000.00 Rp. 194.40
Jumlah Harga Tenaga Rp. 9,208.80
A Bahan
1 Pipa PVC Dia. 3" Tipe AW M' 1.200 Rp. 50,000.00 Rp. 60,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 50,000.00 Rp. 17,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 77,500.00
B Tenaga Kerja
1 Pekerja OH 0.081 Rp. 62,400.00 Rp. 5,054.40
2 Tukang Batu OH 0.135 Rp. 102,000.00 Rp. 13,770.00
3 Kepala Tukang Batu OH 0.135 Rp. 108,000.00 Rp. 14,580.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 442.80
Jumlah Harga Tenaga Rp. 33,847.20
A Bahan
1 Pipa PVC Dia. 3" Tipe D M' 1.200 Rp. 20,000.00 Rp. 24,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 20,000.00 Rp. 7,000.00
3
4
5
6
Jumlah Harga Bahan Rp. 31,000.00
B Tenaga Kerja
1 Pekerja OH 0.081 Rp. 62,400.00 5054.4
2 Tukang Batu OH 0.135 Rp. 102,000.00 Rp. 13,770.00
3 Kepala Tukang Batu OH 0.135 Rp. 108,000.00 Rp. 14,580.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 442.80
Jumlah Harga Tenaga Rp. 33,847.20
A Bahan
1 Pipa PVC Dia. 4" Tipe AW M' 1.200 Rp. 81,200.00 Rp. 97,440.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 81,200.00 Rp. 28,420.00
3
4
5
6
Jumlah Harga Bahan Rp. 125,860.00
B Tenaga Kerja
1 Pekerja OH 0.081 Rp. 62,400.00 Rp. 5,054.40
2 Tukang Batu OH 0.135 Rp. 102,000.00 Rp. 13,770.00
3 Kepala Tukang Batu OH 0.135 Rp. 108,000.00 Rp. 14,580.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 442.80
Jumlah Harga Tenaga Rp. 33,847.20
A Bahan
1 Pipa PVC Dia. 4" Tipe D M' 1.200 Rp. 30,000.00 Rp. 36,000.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 30,000.00 Rp. 10,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 46,500.00
B Tenaga Kerja
1 Pekerja OH 0.081 Rp. 62,400.00 Rp. 5,054.40
2 Tukang Batu OH 0.135 Rp. 102,000.00 Rp. 13,770.00
3 Kepala Tukang Batu OH 0.135 Rp. 108,000.00 Rp. 14,580.00
4 Mandor OH 0.004 Rp. 108,000.00 Rp. 442.80
Jumlah Harga Tenaga Rp. 33,847.20
A Bahan
1 Bak Cuci stainless steel Buah 1.000 Rp. 255,000.00 Rp. 255,000.00
2 Water drain + asesoris Set 1.000 Rp. 25,500.00 Rp. 25,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 280,500.00
B Tenaga Kerja
1 Tukang Cat OH 0.300 Rp. 102,000.00 Rp. 30,600.00
2 Kepala Tukang Batu OH 0.030 Rp. 108,000.00 Rp. 3,240.00
3
4
Jumlah Harga Tenaga Rp. 33,840.00
A Bahan
1 Bak Cuci Piring Teraso Buah 1.000 Rp. 200,000.00 Rp. 200,000.00
2 Water drain + asesoris Set 1.000 Rp. 20,000.00 Rp. 20,000.00
3 Portland Cement (PC) Kg 20.000 Rp. 1,705.00 Rp. 34,100.00
4 Pasir Pasang (PP) M3 0.050 Rp. 165,117.00 Rp. 8,255.85
5
6
Jumlah Harga Bahan Rp. 262,355.85
B Tenaga Kerja
1 Tukang Cat OH 0.500 Rp. 102,000.00 Rp. 51,000.00
2 Kepala Tukang Batu OH 0.050 Rp. 108,000.00 Rp. 5,400.00
3
4
Jumlah Harga Tenaga Rp. 56,400.00
A Bahan
1 Kran Air Dia. 1/2" Buah 1.000 Rp. 75,000.00 Rp. 75,000.00
2 Seal tape Buah 1.000 Rp. 2,500.00 Rp. 2,500.00
3
4
5
6
Jumlah Harga Bahan Rp. 77,500.00
B Tenaga Kerja
1 Tukang Cat OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 11,280.00
A Bahan
1 Floor drain Buah 1.000 Rp. 73,500.00 Rp. 73,500.00
2
3
4
5
6
Jumlah Harga Bahan Rp. 73,500.00
B Tenaga Kerja
1 Tukang Cat OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
3
4
Jumlah Harga Tenaga Rp. 11,280.00
A Tenaga Kerja
1 Pekerja OH 6.667 Rp. 62,400.00 Rp. 416,020.80
2 Mandor OH 0.333 Rp - Rp -
Jumlah Harga Tenaga Rp. 416,020.80
A Tenaga Kerja
1 Pekerja OH 6.667 Rp. 62,400.00 Rp. 416,020.80
2 Mandor OH 0.333 Rp - Rp -
Jumlah Harga Tenaga Rp. 416,020.80
A Bahan
1
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.750 Rp. 62,400.00 Rp. 46,800.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 46,800.00
A Bahan
1
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 62,400.00
A Bahan
1
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Mandor OH 0.060 Rp - Rp -
Jumlah Harga Tenaga Rp. 93,600.00
A Bahan
1
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 1.200 Rp. 62,400.00 Rp. 74,880.00
2 Mandor OH 0.045 Rp - Rp -
Jumlah Harga Tenaga Rp. 74,880.00
B Tenaga Kerja
1 Pekerja OH 0.250 Rp. 62,400.00 Rp. 15,600.00
2 Mandor OH 0.000 Rp - Rp -
Jumlah Harga Tenaga Rp. 15,600.00
A Bahan
1
Jumlah Harga Bahan Rp -
B Tenaga Kerja
1 Pekerja OH 0.500 Rp. 62,400.00 Rp. 31,200.00
2 Mandor OH 0.050 Rp - Rp -
Jumlah Harga Tenaga Rp. 31,200.00
A Bahan
1 Pasir Urug M3 1.200 Rp. 72,300.00 Rp. 86,760.00
Jumlah Harga Bahan Rp. 86,760.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 18,720.00
A Bahan
1 Tanah Urug Pilihan #N/A 1.200 Rp. 74,000.00 Rp. 88,800.00
Jumlah Harga Bahan Rp. 88,800.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 18,720.00
A Bahan
1 Sirtu M3 1.200 Rp. 77,000.00 Rp. 92,400.00
Jumlah Harga Bahan Rp. 92,400.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 18,720.00
A Bahan
1 Sirtu M3 0.055 Rp. 77,000.00 Rp. 4,235.00
Jumlah Harga Bahan Rp. 4,235.00
B Tenaga Kerja
1 Pekerja OH 0.010 Rp. 62,400.00 Rp. 624.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 624.00
C Alat
1 Three Wheel Roller 6 - 8 TON Hari 0.00056 Rp. 800,000.00 Rp. 448.00
A Bahan
1 Sirtu M3 0.180 Rp. 77,000.00 Rp. 13,860.00
Jumlah Harga Bahan Rp. 13,860.00
B Tenaga Kerja
1 Pekerja OH 0.057 Rp. 62,400.00 Rp. 3,556.80
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 3,556.80
C Alat
1 Three Wheel Roller 6 - 8 TON Hari 0.00056 Rp. 800,000.00 Rp. 448.00
A Bahan
1 Sirtu M3 0.180 Rp. 77,000.00 Rp. 13,860.00
Jumlah Harga Bahan Rp. 13,860.00
B Tenaga Kerja
1 Pekerja OH 0.057 Rp. 62,400.00 Rp. 3,556.80
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 3,556.80
C Alat
1 Three Wheel Roller 6 - 8 TON Hari 0.00056 Rp. 800,000.00 Rp. 448.00
A Bahan
1 Batu kali alam M3 0.2400 Rp. 130,000.00 Rp. 31,200.00
Jumlah Harga Bahan Rp. 31,200.00
B Tenaga Kerja
1 Pekerja OH 0.0375 Rp. 62,400.00 Rp. 2,340.00
2 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 2,340.00
A Bahan
1 Batu Pecah 3/5 cm M3 0.040 Rp. 156,000.00 Rp. 6,240.00
2 Batu Pecah 2/3 cm M3 0.022 Rp. 242,000.00 Rp. 5,324.00
3 Batu Pecah 1/2 cm M3 0.011 Rp. 250,000.00 Rp. 2,750.00
4 Pasir Pasang (PP) M3 0.003 Rp. 150,000.00 Rp. 450.00
5 Aspal (Aspal Concrete) kg 4.450 Rp. 14,200.00 Rp. 63,190.00
6 Minyak Tanah Ltr 0.321 Rp. 10,000.00 Rp. 3,210.00
C ALAT
1 THREE WHEEL ROLLER 6 - 8 TON Hari 0.00224 Rp. 800,000.00 Rp. 1,792.00
2 Mob dan Demob Ls 1.000 Rp. 4,000,000.00 Rp. 4,000,000.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Portland Cement (PC) Zak 2.720 Rp. 73,000.00 Rp. 198,560.00
3 Pasir Pasang (PP) M3 0.544 Rp. 150,000.00 Rp. 81,600.00
Jumlah Harga Bahan Rp. 460,160.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 178,200.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Portland Cement (PC) Kg 117.000 Rp. 73,000.00 Rp. 8,541,000.00
3 Pasir Pasang (PP) M3 0.561 Rp. 150,000.00 Rp. 84,150.00
4
5
6
Jumlah Harga Bahan Rp. 8,805,150.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp - Rp -
Jumlah Harga Tenaga Rp. 178,200.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Portland Cement (PC) Kg 91.000 Rp. 73,000.00 Rp. 6,643,000.00
3 Pasir Pasang (PP) M3 0.584 Rp. 150,000.00 Rp. 87,600.00
4
5
6
Jumlah Harga Bahan Rp. 6,910,600.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp - Rp -
Jumlah Harga Tenaga Rp. 178,200.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Kapur Pasang (KP) M3 0.170 Rp. 17,000.00 Rp. 2,890.00
3 Semen Merah (SM) M3 0.170 Rp. 150,000.00 Rp. 25,500.00
4 Pasir Pasang (PP) M3 0.340 Rp. 150,000.00 Rp. 51,000.00
5
6
Jumlah Harga Bahan Rp. 259,390.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp - Rp -
Jumlah Harga Tenaga Rp. 178,200.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Portland Cement (PC) Kg 61.000 Rp. 73,000.00 Rp. 4,453,000.00
3 Kapur Pasang (KP) M3 0.147 Rp. 17,000.00 Rp. 2,499.00
4 Pasir Pasang (PP) M3 0.492 Rp. 150,000.00 Rp. 73,800.00
5
6
Jumlah Harga Bahan Rp. 4,709,299.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp - Rp -
Jumlah Harga Tenaga Rp. 178,200.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Portland Cement (PC) Kg 41.000 Rp. 73,000.00 Rp. 2,993,000.00
3 Kapur Pasang (KP) M3 0.131 Rp. 17,000.00 Rp. 2,227.00
4 Pasir Pasang (PP) M3 0.523 Rp. 150,000.00 Rp. 78,450.00
5
6
Jumlah Harga Bahan Rp. 3,253,677.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp. 62,400.00 Rp. 93,600.00
2 Tukang Batu OH 0.750 Rp. 102,000.00 Rp. 76,500.00
3 Kepala Tukang Batu OH 0.075 Rp. 108,000.00 Rp. 8,100.00
4 Mandor OH 0.075 Rp - Rp -
Jumlah Harga Tenaga Rp. 178,200.00
A Bahan
1 Batu belah 15 cm / 20 cm M3 1.200 Rp. 150,000.00 Rp. 180,000.00
2 Pasir Urug M3 0.432 Rp. 72,300.00 Rp. 31,233.60
Jumlah Harga Bahan Rp. 211,233.60
B Tenaga Kerja
1 Pekerja OH 0.780 Rp. 62,400.00 Rp. 48,672.00
2 Tukang Batu OH 0.390 Rp. 102,000.00 Rp. 39,780.00
3 Kepala Tukang Batu OH 0.039 Rp. 108,000.00 Rp. 4,212.00
4 Mandor OH 0.039 Rp - Rp -
Jumlah Harga Tenaga Rp. 92,664.00
B Tenaga Kerja
1 Pekerja OH 1.200 Rp. 62,400.00 Rp. 74,880.00
2 Tukang Batu OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang batu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.060 Rp - Rp -
Jumlah Harga Tenaga Rp. 97,440.00
B Tenaga Kerja
1 Pekerja OH 1.650 Rp. 62,400.00 Rp. 102,960.00
2 Tukang Batu OH 0.275 Rp. 102,000.00 Rp. 28,050.00
3 Kepala Tukang batu OH 0.028 Rp. 108,000.00 Rp. 3,024.00
4 Mandor OH 0.083 Rp - Rp -
Jumlah Harga Tenaga Rp. 134,034.00
B Tenaga Kerja
1 Pekerja OH 0.520 Rp. 62,400.00 Rp. 32,448.00
2 Tukang Kayu OH 0.260 Rp. 102,000.00 Rp. 26,520.00
3 Kepala Tukang Kayu OH 0.026 Rp. 108,000.00 Rp. 2,808.00
4 Mandor OH 0.026 Rp - Rp -
Jumlah Harga Tenaga Rp. 61,776.00
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp - Rp -
Jumlah Harga Tenaga Rp. 78,408.00
A Bahan
1 Kayu Papan Begesting M3 0.040 Rp. 2,031,200.00 Rp. 81,248.00
2 Paku 5 cm - 12 cm Kg 0.400 Rp. 18,100.00 Rp. 7,240.00
3 Minyak Begisting liter 0.200 Rp. 6,000.00 Rp. 1,200.00
4 Kayu kelas II M3 0.015 Rp. 4,000,000.00 Rp. 60,000.00
5 Plywood tebal 6 mm Lembar 0.350 Rp. 84,500.00 Rp. 29,575.00
6 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang 6.000 Rp. 8,000.00 Rp. 48,000.00
Jumlah Harga Bahan Rp. 227,263.00
B Tenaga Kerja
1 Pekerja OH 0.660 Rp. 62,400.00 Rp. 41,184.00
2 Tukang Kayu OH 0.330 Rp. 102,000.00 Rp. 33,660.00
3 Kepala Tukang Kayu OH 0.033 Rp. 108,000.00 Rp. 3,564.00
4 Mandor OH 0.033 Rp - Rp -
Jumlah Harga Tenaga Rp. 78,408.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 625.00 Rp. 43,750.00
2 Portland Cement (PC) Kg 14.370 Rp. 73,000.00 Rp. 1,049,010.00
3 Pasir Pasang (PP) M3 0.040 Rp. 150,000.00 Rp. 6,000.00
Jumlah Harga Bahan Rp. 1,098,760.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp - Rp -
Jumlah Harga Tenaga Rp. 30,000.00
A Bahan
1 Bata Merah Buah 70.000 Rp. 625.00 Rp. 43,750.00
2 Portland Cement (PC) Kg 9.680 Rp. 73,000.00 Rp. 706,640.00
3 Pasir Pasang (PP) M3 0.045 Rp. 150,000.00 Rp. 6,750.00
Jumlah Harga Bahan Rp. 757,140.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.015 Rp - Rp -
Jumlah Harga Tenaga Rp. 30,000.00
A Bahan
1 Portland Cement (PC) Kg 7.776 Rp. 73,000.00 Rp. 567,648.00
2 Pasir Pasang (PP) M3 0.023 Rp. 150,000.00 Rp. 3,450.00
Jumlah Harga Bahan Rp. 571,098.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.015 Rp - Rp -
Jumlah Harga Tenaga Rp. 35,640.00
A Bahan
1 Portland Cement (PC) Zak 0.104 Rp. 73,000.00 Rp. 7,568.64
2 Pasir Pasang (PP) M3 0.026 Rp. 150,000.00 Rp. 3,900.00
Jumlah Harga Bahan Rp. 11,468.64
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Batu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 35,640.00
A Bahan
1 Portland Cement (PC) Zak 0.127 Rp. 73,000.00 Rp. 9,256.40
2 Pasir Pasang (PP) M3 0.012 Rp. 150,000.00 Rp. 1,800.00
Jumlah Harga Bahan Rp. 11,056.40
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Batu OH 0.140 Rp. 102,000.00 Rp. 14,280.00
3 Kepala Tukang Batu OH 0.014 Rp. 108,000.00 Rp. 1,512.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 34,512.00
A Bahan
1 Portland Cement (PC) Zak 0.065 Rp. 73,000.00 Rp. 4,745.00
Jumlah Harga Bahan Rp. 4,745.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Batu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 23,760.00
A Bahan
1 Kayu Kelas II M3 1.200 Rp. 4,000,000.00 Rp. 4,800,000.00
2 Paku 10 cm Kg 1.250 Rp. 18,100.00 Rp. 22,625.00
3 Lem kayu Kg 1.000 Rp. 37,500.00 Rp. 37,500.00
Jumlah Harga Bahan Rp. 4,860,125.00
B Tenaga Kerja
1 Pekerja OH 6.000 Rp. 62,400.00 Rp. 374,400.00
2 Tukang Kayu OH 18.000 Rp. 102,000.00 Rp. 1,836,000.00
3 Kepala Tukang Kayu OH 1.800 Rp. 108,000.00 Rp. 194,400.00
4 Mandor OH 0.300 Rp - Rp -
Jumlah Harga Tenaga Rp. 2,404,800.00
A Bahan
1 Papan kayu Kelas II M3 0.040 Rp. 4,166,600.00 Rp. 166,664.00
2 Lem Kayu Kg 0.500 Rp. 37,500.00 Rp. 18,750.00
Jumlah Harga Bahan Rp. 185,414.00
B Tenaga Kerja
1 Pekerja OH 1.000 Rp. 62,400.00 Rp. 62,400.00
2 Tukang Kayu OH 3.000 Rp. 102,000.00 Rp. 306,000.00
3 Kepala Tukang Kayu OH 0.300 Rp. 108,000.00 Rp. 32,400.00
4 Mandor OH 0.050 Rp - Rp -
Jumlah Harga Tenaga Rp. 400,800.00
A Bahan
1 Papan kayu Kelas II M3 0.024 Rp. 4,166,600.00 Rp. 99,998.40
2 Lem Kayu Kg 0.300 Rp. 37,500.00 Rp. 11,250.00
Jumlah Harga Bahan Rp. 111,248.40
B Tenaga Kerja
1 Pekerja OH 0.800 Rp. 62,400.00 Rp. 49,920.00
2 Tukang Kayu OH 2.400 Rp. 102,000.00 Rp. 244,800.00
3 Kepala Tukang Kayu OH 0.240 Rp. 108,000.00 Rp. 25,920.00
4 Mandor OH 0.040 Rp - Rp -
Jumlah Harga Tenaga Rp. 320,640.00
A Bahan
1 Papan kayu Kelas II M3 0.026 Rp. 4,166,600.00 Rp. 108,331.60
2 Paku Kg 0.150 Rp. 18,100.00 Rp. 2,715.00
Jumlah Harga Bahan Rp. 111,046.60
B Tenaga Kerja
1 Pekerja OH 0.040 Rp. 62,400.00 Rp. 2,496.00
2 Tukang Kayu OH 1.200 Rp. 102,000.00 Rp. 122,400.00
3 Kepala Tukang Kayu OH 0.300 Rp. 108,000.00 Rp. 32,400.00
4 Mandor OH 0.050 Rp - Rp -
Jumlah Harga Tenaga Rp. 157,296.00
A Bahan
1 Papan Kayu Kelas II M3 0.019 Rp. 4,166,600.00 Rp. 79,165.40
2 Paku 1 cm - 2,5 cm Kg 0.030 Rp. 18,100.00 Rp. 543.00
3 Lem Kayu Kg 0.300 Rp. 37,500.00 Rp. 11,250.00
4 Teakwood 120 x 240 x 3 mm Lembar 1.000 Rp. 102,000.00 Rp. 102,000.00
Jumlah Harga Bahan Rp. 192,958.40
B Tenaga Kerja
1 Pekerja OH 0.600 Rp. 62,400.00 Rp. 37,440.00
2 Tukang Kayu OH 2.000 Rp. 102,000.00 Rp. 204,000.00
3 Kepala Tukang Kayu OH 0.200 Rp. 108,000.00 Rp. 21,600.00
4 Mandor OH 0.030 Rp - Rp -
Jumlah Harga Tenaga Rp. 263,040.00
A Bahan
1 Paku 1 cm - 2,5 cm Kg 0.015 Rp. 18,100.00 Rp. 271.50
2 Teakwood 120 x 240 x 3 mm Lembar 1.000 Rp. 102,000.00 Rp. 102,000.00
Jumlah Harga Bahan Rp. 102,271.50
B Tenaga Kerja
1 Pekerja OH 0.300 Rp. 62,400.00 Rp. 18,720.00
2 Tukang Kayu OH 1.000 Rp. 102,000.00 Rp. 102,000.00
3 Kepala Tukang Kayu OH 0.100 Rp. 108,000.00 Rp. 10,800.00
4 Mandor OH 0.015 Rp - Rp -
Jumlah Harga Tenaga Rp. 131,520.00
A Bahan
1 Kayu Kelas II M3 1.100 Rp. 4,000,000.00 Rp. 4,400,000.00
2 Besi strip tebal 5 mm Kg 15.000 Rp. 11,000.00 Rp. 165,000.00
3 Paku 12 cm Kg 3.000 Rp. 18,100.00 Rp. 54,300.00
Jumlah Harga Bahan Rp. 4,619,300.00
B Tenaga Kerja
1 Pekerja OH 2.400 Rp. 62,400.00 Rp. 149,760.00
2 Tukang Kayu OH 7.200 Rp. 102,000.00 Rp. 734,400.00
3 Kepala Tukang Kayu OH 0.720 Rp. 108,000.00 Rp. 77,760.00
4 Mandor OH 0.120 Rp - Rp -
Jumlah Harga Tenaga Rp. 961,920.00
A Bahan
1 Kayu Kelas II m3 1.100 Rp. 4,000,000.00 Rp. 4,400,000.00
3 Paku 5 cm dan 10 cm kg 0.800 Rp. 18,100.00 Rp. 14,480.00
Jumlah Harga Bahan Rp. 4,414,480.00
B Tenaga Kerja
1 Pekerja OH 4.000 Rp. 62,400.00 Rp. 249,600.00
2 Tukang Kayu OH 12.000 Rp. 102,000.00 Rp. 1,224,000.00
3 Kepala Tukang Kayu OH 1.200 Rp. 108,000.00 Rp. 129,600.00
4 Mandor OH 0.200 Rp - Rp -
Jumlah Harga Tenaga Rp. 1,603,200.00
A Bahan
1 Kaso-kaso (5 x 7) cm Kayu Kelas II m3 0.014 Rp. 4,000,000.00 Rp. 56,000.00
2 Reng (4 x 3) cm Kayu Kelas II m3 0.007 Rp. 4,000,000.00 Rp. 28,800.00
3 Paku 5 cm dan 10 cm kg 0.250 Rp. 18,100.00 Rp. 4,525.00
Jumlah Harga Bahan Rp. 89,325.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp - Rp -
Jumlah Harga Tenaga Rp. 17,520.00
A Bahan
1 Kaso-kaso (5 x 7) cm Kayu Kelas II m3 0.012 Rp. 4,000,000.00 Rp. 48,000.00
2 Paku 7 cm - 10 cm Kg 0.100 Rp. 18,100.00 Rp. 1,810.00
Jumlah Harga Bahan Rp. 49,810.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.250 Rp. 102,000.00 Rp. 25,500.00
3 Kepala Tukang Kayu OH 0.025 Rp. 108,000.00 Rp. 2,700.00
4 Mandor OH 0.075 Rp - Rp -
Jumlah Harga Tenaga Rp. 37,560.00
A Bahan
1 Papan Kayu Kelas II M3 0.017 Rp. 4,166,600.00 Rp. 71,665.52
2 Paku 5 cm dan 7 cm Kg 0.006 Rp. 18,100.00 Rp. 108.60
Jumlah Harga Bahan Rp. 71,774.12
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.005 Rp - Rp -
Jumlah Harga Tenaga Rp. 17,520.00
A Bahan
1 Keramik Lantai Polos (30x30cm) Buah 11.870 Rp. 7,100.00 Rp. 84,277.00
2 Portland Cement (PC) Kg 10.000 Rp. 73,000.00 Rp. 730,000.00
3 Pasir Pasang (PP) M3 0.045 Rp. 150,000.00 Rp. 6,750.00
4 Semen warna Kg 1.500 Rp. 9,975.00 Rp. 14,962.50
Jumlah Harga Bahan Rp. 835,989.50
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp - Rp -
Jumlah Harga Tenaga Rp. 83,160.00
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp - Rp -
Jumlah Harga Tenaga Rp. 83,160.00
A Bahan
1 Keramik Lantai (20x20cm) Buah 26.500 Rp. 3,124.00 Rp. 82,786.00
2 Portland Cement (PC) Kg 10.400 Rp. 73,000.00 Rp. 759,200.00
3 Pasir Pasang (PP) M3 0.045 Rp. 150,000.00 Rp. 6,750.00
4 Semen warna Kg 1.620 Rp. 9,975.00 Rp. 16,159.50
Jumlah Harga Bahan Rp. 864,895.50
B Tenaga Kerja
1 Pekerja OH 0.700 Rp. 62,400.00 Rp. 43,680.00
2 Tukang Batu OH 0.350 Rp. 102,000.00 Rp. 35,700.00
3 Kepala Tukang Batu OH 0.035 Rp. 108,000.00 Rp. 3,780.00
4 Mandor OH 0.035 Rp - Rp -
Jumlah Harga Tenaga Rp. 83,160.00
A Bahan
1 Portland Cement (PC) Kg 10.000 Rp. 73,000.00 Rp. 730,000.00
2 Pasir Pasang (PP) M3 0.022 Rp. 150,000.00 Rp. 3,225.00
Jumlah Harga Bahan Rp. 733,225.00
B Tenaga Kerja
1 Pekerja OH 0.260 Rp. 62,400.00 Rp. 16,224.00
2 Tukang Batu OH 0.125 Rp. 102,000.00 Rp. 12,750.00
3 Kepala Tukang Batu OH 0.013 Rp. 108,000.00 Rp. 1,350.00
4 Mandor OH 0.013 Rp - Rp -
Jumlah Harga Tenaga Rp. 30,324.00
A Bahan
1 Keramik Lantai Polos (40x40cm) Buah 1.000 Rp. 13,183.33 Rp. 13,183.33
2 Paku 12 cm Buah 3.003 Rp. 18,100.00 Rp. 54,354.30
3 Portland Cement (PC) Kg 9.300 Rp. 73,000.00 Rp. 678,900.00
4 Pasir Pasang (PP) M3 0.018 Rp. 150,000.00 Rp. 2,700.00
5 Semen warna Kg 0.650 Rp. 13,300.00 Rp. 8,645.00
6
Jumlah Harga Bahan Rp. 757,782.63
B Tenaga Kerja
1 Pekerja OH 1.300 Rp. 62,400.00 Rp. 81,120.00
2 Tukang Batu OH 0.650 Rp. 102,000.00 Rp. 66,300.00
3 Kepala Tukang Batu OH 0.065 Rp. 108,000.00 Rp. 7,020.00
4 Mandor OH 0.065 Rp - Rp -
Jumlah Harga Tenaga Rp. 154,440.00
A Bahan
1 Asbes Semen (Eternit) Lembar 1.100 Rp. 25,700.00 Rp. 28,270.00
2 Paku 1 cm - 2,5 cm Kg 0.010 Rp. 18,100.00 Rp. 181.00
Jumlah Harga Bahan Rp. 28,451.00
B Tenaga Kerja
1 Pekerja OH 0.030 Rp. 62,400.00 Rp. 1,872.00
2 Tukang Kayu OH 0.070 Rp. 102,000.00 Rp. 7,140.00
3 Kepala Tukang Kayu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.004 Rp - Rp -
Jumlah Harga Tenaga Rp. 9,768.00
A Bahan
1 Calcibord 120 x 240 x 3,5 mm Lembar 0.364 Rp. 72,600.00 Rp. 26,426.40
2 Paku sekrup Kg 0.030 Rp. 23,400.00 Rp. 702.00
Jumlah Harga Bahan Rp. 27,128.40
B Tenaga Kerja
1 Pekerja OH 0.100 Rp. 62,400.00 Rp. 6,240.00
2 Tukang Kayu OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Kayu OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.005 Rp - Rp -
Jumlah Harga Tenaga Rp. 11,880.00
A Bahan
1 List Gypsum Profil m 1.050 Rp. 29,000.00 Rp. 30,450.00
2 Tepung Gypsum Kg 0.150 Rp. 5,000.00 Rp. 750.00
Jumlah Harga Bahan Rp. 31,200.00
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Kayu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Kayu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.003 Rp - Rp -
Jumlah Harga Tenaga Rp. 10,512.00
A Bahan
1 Jendela nako (rangka + kaca 5 mm) M2 1.100 Rp. 175,000.00 Rp. 192,500.00
2 Paku skrup 1 cm - 2,5 cm Buah 10.000 Rp. 250.00 Rp. 2,500.00
3 Baja strip Kg 7.000 Rp. 35,000.00 Rp. 245,000.00
Jumlah Harga Bahan Rp. 440,000.00
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Besi OH 0.200 Rp. 102,000.00 Rp. 20,400.00
3 Kepala Tukang Besi OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.001 Rp - Rp -
Jumlah Harga Tenaga Rp. 35,040.00
A Bahan
1 Seng Plat BJLS 28 M 1.050 Rp. 68,700.00 Rp. 72,135.00
2 Paku 1 cm - 2,5 cm Kg 0.015 Rp. 18,100.00 Rp. 271.50
3 Papan Kayu Kelas II M3 0.019 Rp. 4,166,600.00 Rp. 79,165.40
Jumlah Harga Bahan Rp. 151,571.90
B Tenaga Kerja
1 Pekerja OH 0.200 Rp. 62,400.00 Rp. 12,480.00
2 Tukang Kayu OH 0.400 Rp. 102,000.00 Rp. 40,800.00
3 Kepala Tukang Kayu OH 0.025 Rp. 108,000.00 Rp. 2,700.00
4 Mandor OH 0.010 Rp - Rp -
Jumlah Harga Tenaga Rp. 55,980.00
A Bahan
1 Seng Plat BJLS 30 m 1.050 Rp. 81,200.00 Rp. 85,260.00
2 Paku 1 cm - 2,5 cm Kg 0.010 Rp. 18,100.00 Rp. 181.00
3 Baja strip Kg 0.500 Rp. 35,000.00 Rp. 17,500.00
Jumlah Harga Bahan Rp. 102,941.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.300 Rp. 102,000.00 Rp. 30,600.00
3 Kepala Tukang Kayu OH 0.030 Rp. 108,000.00 Rp. 3,240.00
4 Mandor OH 0.008 Rp - Rp -
Jumlah Harga Tenaga Rp. 43,200.00
A Bahan
1 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
Jumlah Harga Bahan Rp. 250.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Mandor OH 0.008 Rp - Rp -
Jumlah Harga Tenaga Rp. 9,360.00
A Bahan
1 Plamir tembok Kg 0.100 Rp. 28,700.00 Rp. 2,870.00
2 Amplas Lembar 0.500 Rp. 3,400.00 Rp. 1,700.00
3 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
Jumlah Harga Bahan Rp. 4,820.00
B Tenaga Kerja
1 Pekerja OH 0.020 Rp. 62,400.00 Rp. 1,248.00
2 Tukang Cat OH 0.030 Rp. 102,000.00 Rp. 3,060.00
3 Kepala Tukang Cat OH 0.003 Rp. 108,000.00 Rp. 324.00
4 Mandor OH 0.001 Rp - Rp -
Jumlah Harga Tenaga Rp. 4,632.00
A Bahan
1 Plamir tembok Kg Rp. 28,700.00 Rp -
2 Cat Tembok Mutu Menengah Kg 0.240 Rp. 48,300.00 Rp. 11,592.00
3 Amplas Lembar Rp. 3,400.00 Rp -
4 Kuas Bh. 0.015 Rp. 8,500.00 Rp. 127.50
5 Kape Buah Rp. 5,000.00 Rp -
Jumlah Harga Bahan Rp. 11,719.50
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Cat OH 0.050 Rp. 102,000.00 Rp. 5,100.00
3 Kepala Tukang Cat OH 0.005 Rp. 108,000.00 Rp. 540.00
4 Mandor OH 0.003 Rp - Rp -
Jumlah Harga Tenaga Rp. 9,384.00
A Bahan
1 Plamir tembok Kg 0.100 Rp. 28,700.00 Rp. 2,870.00
2 Cat Tembok Mutu Menengah Kg 0.470 Rp. 48,300.00 Rp. 22,701.00
3 Amplas Lembar 0.500 Rp. 3,400.00 Rp. 1,700.00
4 Roll Cat Buah 0.010 Rp. 21,800.00 Rp. 218.00
5 Kape Buah 0.050 Rp. 5,000.00 Rp. 250.00
6
Jumlah Harga Bahan Rp. 27,739.00
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Cat OH 0.040 Rp. 102,000.00 Rp. 4,080.00
3 Kepala Tukang Cat OH 0.004 Rp. 108,000.00 Rp. 432.00
4 Mandor OH 0.003 Rp - Rp -
Jumlah Harga Tenaga Rp. 8,256.00
A Bahan
1 Plamir tembok Kg -Rp. 28,700.00 Rp -
2 Cat Tembok Mutu Menengah Kg 0.470 Rp. 48,300.00 Rp. 22,701.00
3 Amplas Lembar - Rp. 3,400.00 Rp -
4 Roll Cat Buah 0.010 Rp. 21,800.00 Rp. 218.00
5 Kape Buah - Rp. 5,000.00 Rp -
Jumlah Harga Bahan Rp. 22,919.00
B Tenaga Kerja
1 Pekerja OH 0.040 Rp. 62,400.00 Rp. 2,496.00
2 Tukang Cat OH 0.030 Rp. 102,000.00 Rp. 3,060.00
3 Kepala Tukang Cat OH 0.003 Rp. 108,000.00 Rp. 324.00
4 Mandor OH 0.002 Rp - Rp -
Jumlah Harga Tenaga Rp. 5,880.00
A Bahan
1 Meni kayu Kg 0.170 Rp. 42,300.00 Rp. 7,191.00
2 Plamir kayu Kg 0.080 Rp. 21,800.00 Rp. 1,744.00
3 Amplas Lembar 2.000 Rp. 3,400.00 Rp. 6,800.00
4 Cat Dasar Kayu Kg 0.170 Rp. 42,300.00 Rp. 7,191.00
5 Cat Kayu Mutu Menengah Kg 0.300 Rp. 64,500.00 Rp. 19,350.00
6 Minyak Cat Liter 0.500 Rp. 12,500.00 Rp. 6,250.00
7 Kuas Bh. 0.065 Rp. 8,500.00 Rp. 552.50
Jumlah Harga Bahan Rp. 49,078.50
B Tenaga Kerja
1 Pekerja OH 0.225 Rp. 62,400.00 Rp. 14,040.00
2 Tukang Kayu OH 0.335 Rp. 102,000.00 Rp. 34,170.00
3 Kepala Tukang Kayu OH 0.034 Rp. 108,000.00 Rp. 3,618.00
4 Mandor OH 0.012 Rp - Rp -
Jumlah Harga Tenaga Rp. 51,828.00
A Bahan
1 Meni kayu Kg 0.000 Rp. 42,300.00 Rp -
2 Plamir kayu Kg 0.000 Rp. 21,800.00 Rp -
3 Amplas Lembar 1.000 Rp. 3,400.00 Rp. 3,400.00
4 Cat Dasar Kayu Kg 0.000 Rp. 42,300.00 Rp -
5 Cat Kayu Mutu Menengah Kg 0.300 Rp. 64,500.00 Rp. 19,350.00
6 Minyak Cat Liter 0.200 Rp. 12,500.00 Rp. 2,500.00
7 Kuas Bh. 0.020 Rp. 8,500.00 Rp. 170.00
Jumlah Harga Bahan Rp. 25,420.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.008 Rp - Rp -
Jumlah Harga Tenaga Rp. 26,280.00
A Bahan
1 Cat Dasar Kg 0.120 Rp. 48,300.00 Rp. 5,796.00
2 Cat Tembok Mutu Menengah Kg 0.180 Rp. 48,300.00 Rp. 8,694.00
Jumlah Harga Bahan Rp. 14,490.00
B Tenaga Kerja
1 Pekerja OH 0.028 Rp. 62,400.00 Rp. 1,747.20
2 Tukang Cat OH 0.042 Rp. 102,000.00 Rp. 4,284.00
3 Kepala Tukang Cat OH 0.004 Rp. 108,000.00 Rp. 453.60
4 Mandor OH 0.003 Rp - Rp -
Jumlah Harga Tenaga Rp. 6,484.80
A Bahan
1 Plamir Tembok Kg 0.100 Rp. 28,700.00 Rp. 2,870.00
2 Cat Dasar Kg 0.100 Rp. 48,300.00 Rp. 4,830.00
3 Cat Tembok Mutu Menengah Kg 0.260 Rp. 48,300.00 Rp. 12,558.00
Jumlah Harga Bahan Rp. 20,258.00
B Tenaga Kerja
1 Pekerja OH 0.020 Rp. 62,400.00 Rp. 1,248.00
2 Tukang Cat OH 0.063 Rp. 102,000.00 Rp. 6,426.00
3 Kepala Tukang Cat OH 0.006 Rp. 108,000.00 Rp. 680.40
4 Mandor OH 0.003 Rp - Rp -
Jumlah Harga Tenaga Rp. 8,354.40
A Bahan
1 Meni Kayu Kg 0.200 Rp. 42,300.00 Rp. 8,460.00
2 Plamir Kayu Kg 0.150 Rp. 21,800.00 Rp. 3,270.00
3 Cat Dasar Kg 0.170 Rp. 64,500.00 Rp. 10,965.00
4 Cat Kayu Mutu Menengah Kg 0.260 Rp. 64,500.00 Rp. 16,770.00
Jumlah Harga Bahan Rp. 39,465.00
B Tenaga Kerja
1 Pekerja OH 0.070 Rp. 62,400.00 Rp. 4,368.00
2 Tukang Cat OH 0.009 Rp. 102,000.00 Rp. 918.00
3 Kepala Tukang Cat OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.003 Rp - Rp -
Jumlah Harga Tenaga Rp. 5,934.00
A Bahan
1 Vernis Liter 0.300 Rp. 30,500.00 Rp. 9,150.00
2 Amplas Lembar 0.500 Rp. 3,400.00 Rp. 1,700.00
3 Kuas Bh. 0.020 Rp. 8,500.00 Rp. 170.00
Jumlah Harga Bahan Rp. 11,020.00
B Tenaga Kerja
1 Tukang Politur OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Politur OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 11,280.00
A Bahan
1 Residu (Teer) Liter 0.350 Rp. 9,000.00 Rp. 3,150.00
2 Minyak Tanah (Karosene) Ltr 0.030 Rp -
3 Kuas Bh. 0.020 Rp -
Jumlah Harga Bahan Rp. 3,150.00
B Tenaga Kerja
1 Tukang Cat OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Cat OH 0.006 Rp. 108,000.00 Rp. 648.00
Jumlah Harga Tenaga Rp. 10,848.00
A Bahan
1 Genteng Pejaten (sudah dicat) bh 25.000 Rp. 2,000.00 Rp. 50,000.00
Jumlah Harga Bahan Rp. 50,000.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.075 Rp. 102,000.00 Rp. 7,650.00
3 Kepala Tukang Kayu OH 0.0075 Rp. 108,000.00 Rp. 810.00
4 Mandor OH 0.0075 Rp - Rp -
Jumlah Harga Tenaga Rp. 17,820.00
A Bahan
1 Bubungan Genteng Pejaten Buah 5.000 Rp. 3,000.00 Rp. 15,000.00
2 Portland Cement (PC) Kg 10.800 Rp. 73,000.00 Rp. 788,400.00
3 Pasir Pasang (PP) M3 0.028 Rp. 150,000.00 Rp. 4,200.00
Jumlah Harga Bahan Rp. 807,600.00
B Tenaga Kerja
1 Pekerja OH 0.220 Rp. 62,400.00 Rp. 13,728.00
2 Tukang Kayu OH 0.122 Rp. 102,000.00 Rp. 12,399.80
3 Kepala Tukang Kayu OH 0.020 Rp. 108,000.00 Rp. 2,160.00
4 Mandor OH 0.002 Rp - Rp -
Jumlah Harga Tenaga Rp. 28,287.80
B Tenaga Kerja
1 Pekerja OH 0.060 Rp. 62,400.00 Rp. 3,744.00
2 Tukang Kayu OH 0.600 Rp. 102,000.00 Rp. 61,200.00
3 Kepala Tukang Kayu OH 0.060 Rp. 108,000.00 Rp. 6,480.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 71,424.00
B Tenaga Kerja
1 Pekerja OH 0.010 Rp. 62,400.00 Rp. 624.00
2 Tukang Kayu OH 0.500 Rp. 102,000.00 Rp. 51,000.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 52,704.00
B Tenaga Kerja
1 Pekerja OH 0.015 Rp. 62,400.00 Rp. 936.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 17,856.00
A Bahan
1 Engsel Jendela bh 1.000 Rp. 29,000.00 Rp. 29,000.00
Jumlah Harga Bahan Rp. 29,000.00
B Tenaga Kerja
1 Pekerja OH 0.010 Rp. 62,400.00 Rp. 624.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 11,904.00
A Bahan
1 Kait Angin Kecil Buah 1.000 Rp. 11,200.00 Rp. 11,200.00
Jumlah Harga Bahan Rp. 11,200.00
B Tenaga Kerja
1 Pekerja OH 0.015 Rp. 62,400.00 Rp. 936.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH Rp - Rp -
Jumlah Harga Tenaga Rp. 17,856.00
A Bahan
1 Grendel Pintu bh 1.000 Rp. 18,500.00 Rp. 18,500.00
Jumlah Harga Bahan Rp. 18,500.00
B Tenaga Kerja
1 Pekerja OH 0.010 Rp. 62,400.00 Rp. 624.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.0005 Rp - Rp -
Jumlah Harga Tenaga Rp. 11,904.00
A Bahan
1 Grendel Jendela bh 1.000 Rp. 6,200.00 Rp. 6,200.00
Jumlah Harga Bahan Rp. 6,200.00
B Tenaga Kerja
1 Pekerja OH 0.010 Rp. 62,400.00 Rp. 624.00
2 Tukang Kayu OH 0.100 Rp. 102,000.00 Rp. 10,200.00
3 Kepala Tukang Kayu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
4 Mandor OH 0.0005 Rp - Rp -
Jumlah Harga Tenaga Rp. 11,904.00
A Bahan
1 Kaca Polos 3 mm M2 1.100 Rp. 91,600.00 Rp. 100,760.00
Jumlah Harga Bahan Rp. 100,760.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.001 Rp - Rp -
Jumlah Harga Tenaga Rp. 26,280.00
A Bahan
1 Kaca Polos 5 mm M2 1.100 Rp. 139,500.00 Rp. 153,450.00
Jumlah Harga Bahan Rp. 153,450.00
B Tenaga Kerja
1 Pekerja OH 0.150 Rp. 62,400.00 Rp. 9,360.00
2 Tukang Kayu OH 0.150 Rp. 102,000.00 Rp. 15,300.00
3 Kepala Tukang Kayu OH 0.015 Rp. 108,000.00 Rp. 1,620.00
4 Mandor OH 0.001 Rp - Rp -
Jumlah Harga Tenaga Rp. 26,280.00
A Bahan
1 Buis Beton Dia. 1/2 30 cm M 1.100 Rp. 12,000.00 Rp. 13,200.00
2 Bata merah Buah 18.900 Rp. 625.00 Rp. 11,812.50
3 Portland Cement (PC) Kg 3.920 Rp. 73,000.00 Rp. 286,160.00
4 Pasir Pasang (PP) M3 0.056 Rp. 150,000.00 Rp. 8,400.00
5 Pasir Urug M3 0.024 Rp. 72,300.00 Rp. 1,735.20
Jumlah Harga Bahan Rp. 321,307.70
B Tenaga Kerja
1 Pekerja OH 0.140 Rp. 62,400.00 Rp. 8,736.00
2 Tukang Batu OH 0.070 Rp. 102,000.00 Rp. 7,140.00
3 Kepala Tukang Batu OH 0.007 Rp. 108,000.00 Rp. 756.00
4 Mandor OH 0.007 Rp - Rp -
Jumlah Harga Tenaga Rp. 16,632.00
A Bahan
1 Pipa PVC Dia. 3/4" Tipe AW M' 1.200 Rp. 8,400.00 Rp. 10,080.00
2 Perlengkapan (Support) 35% harga kloset Ls 35.00% Rp. 8,400.00 Rp. 2,940.00
Jumlah Harga Bahan Rp. 13,020.00
B Tenaga Kerja
1 Pekerja OH 0.036 Rp. 62,400.00 Rp. 2,246.40
2 Tukang Batu OH 0.060 Rp. 102,000.00 Rp. 6,120.00
3 Kepala Tukang Batu OH 0.006 Rp. 108,000.00 Rp. 648.00
4 Mandor OH 0.002 Rp - Rp -
Jumlah Harga Tenaga Rp. 9,014.40
A Bahan
1 Kran Air Dia. 1/2" Buah 1.000 Rp. 40,700.00 Rp. 40,700.00
2 Seal tape Buah 1.000 Rp. 2,500.00 Rp. 2,500.00
Jumlah Harga Bahan Rp. 43,200.00
B Tenaga Kerja
1 Tukang Cat OH 0.100 Rp. 102,000.00 Rp. 10,200.00
2 Kepala Tukang Batu OH 0.010 Rp. 108,000.00 Rp. 1,080.00
Jumlah Harga Tenaga Rp. 11,280.00
KODE
NO. URAIAN PEKERJAAN SATUAN HARGA SATUAN
ANALISA
1 A.4 Pengukuran dan pemasangan bowplang M' #REF!
2 A.8 Pembersihan lokasi M2 #REF!
3 B.1 Galian tanah biasa M3 #REF!
4 B.9 Urugan kembali tanah bekas galian M3 #REF!
5 B.10 Pemadatan tanah peninggian lantai M3 #REF!
6 B.11 Urugan pasir bawah lantai dan pondasi M3 #REF!
7 B.11a Urugan tanah peninggian lantai M3 #REF!
8 C.6 Pasang pondasi batu kali 1 Pc : 5 Ps M3 #REF!
9 C.14 Pondasi batu kosong M3 #REF!
10 D.3 Pasangan bata merah tebal 1 bata. 1 Pc : 3 Ps M2 #REF!
11 D.10 Pasangan bata merah tebal ½ bata. 1 Pc : 3 Ps (Trastram) M2 #REF!
12 D.12 Pasangan bata merah tebal ½ bata. 1 Pc : 5 Ps M2 #REF!
13 D.12a Pasangan bata merah tebal 1bata 1 Pc : 5 Ps M2 #REF!
14 D.25 Pasangan dinding roster terawang (25*40cm) M2 #REF!
15 E.3 Plesteran trasram 1 Pc : 3 Ps tebal 15 mm M2 #REF!
16 E.5 Plesteran 1 Pc : 5 Ps tebal 15 mm. M2 #REF!
17 E.10 Plesteran 1/2 Pc : 1 Kp : 4 Ps tebal 15 mm. M2 #REF!
18 E.30 Plesteran Beton 1Pc : 3 Ps tebal 15 mm. M2 #REF!
19 E.35 Plesteran siar 1Pc : 2 Ps M2 #REF!
20 F.2 Kusen pintu dan jendela kayu klas II M2 #REF!
21 F.8 Pintu panel kayu klas II M3 #REF!
22 F.10 Daun jendela kaca kayu klas II M3 #REF!
23 F.8 Pintu Tripleks Lapis Almunium M3 #REF!
24 F.27 Kuda-kuda dan konsol kayu klas I M3 #REF!
25 F.35 Usuk + reng genteng beton kayu klas II M3 #REF!
26 F.39 Rangka langit-langit kayu klas II M2 #REF!
27 F.47 Lisplang (3/20) kayu klas II M2 #REF!
28 F.48a Papan reuter (3/20) kayu klas II M2 #REF!
29 F.60 List gypsum M2 #REF!
30 G.1 Beton rabat 1 Pc : 3 Ps : 5 Kr M2 #REF!
31 G.39 Sloof 15/20 cm beton bertulang - 1 pc : 2 ps : 3 kr M3 #REF!
32 G.40 Kolom praktis 13/13 cm beton bertulang 1pc:2 ps: 3kr M3 #REF!
33 G.40a Kolom 15/15 cm beton bertulang - 1 pc : 2 ps : 3 kr M3 #REF!
34 G.41c Ringbalk 13/15 cm beton bertulang - 1 pc : 2 ps : 3 kr M3 #REF!
35 G.41f Balok gewel 10/13 cm beton bertulang - 1 pc : 2 ps : 3 kr M3 #REF!
36 H.2 Atap genteng Pejaten M2 #REF!
37 H.2a Bubungan genteng pejaten M2 #REF!
38 I.24 Langit-langit kalsiboard M2 #REF!
39 K.18 Seng talang M2 #REF!
40 L.2 Kunci pintu klas menengah BH #REF!
41 L.6.5 Engsel pintu klas menengah BH #REF!
42 L.6 Engsel jendela klas menengah BH #REF!
43 L.9 Hak angin kecil klas menengah BH #REF!
44 L.9a Hak angin besar klas menengah BH #REF!
45 L.9b Grendel besar klas menengah (untuk pintu) BH #REF!
46 L.9c Grendel kecil klas menengah (untuk jendela) BH #REF!
47 L.9d Expagnolet klas menengah BH #REF!
48 L.16 Kaca polos tebal 3 mm M2 #REF!
49 M.47 Lantai keramik 30 x 30 cm putih klas menengah M2 #REF!
50 M.47a Lantai keramik 30 x 30 cm warna krem klas menengah M2 #REF!
51 M.47b Lantai keramik 30 x 30 cm warna coklat muda klas menengah M2 #REF!
52 M.47c Lantai keramik 30 x 30 cm warna coklat muda klas menengah M2 #REF!
53 M.44 Lantai keramik bermotif 20/20 cm klas menengah M2 #REF!
54 M.44a Lantai keramik bermotif 20/20 cm warna krem klas menengah M2 #REF!
55 M.68 Dinding keramik bermotif 20/25 cm klas menengah M2 #REF!
56 N.8 Cat kayu klas menengah (3xcat) M2 #REF!
57 N.12 Pengetiran M2 #REF!
58 N.14 Cat tembok/plafond baru klas menengah (3xcat) M2 #REF!
59 N.15 Cat genteng klas menengah M2 #REF!
60 J.6.17b Septiktank UNIT #REF!
61 J.17c Sumur Resapan UNIT #REF!
62 G.42 Pasangan Paving block M2 #REF!
63 D.10.a Pasangan lantai lapis 1/2 bata 1 Pc : 3 Ps M2 #REF!
64 F. 11 Pasangan jalusi papan kayu klas II M2 #REF!
5. Yance
1.
2.
3.
4. I Dewa
H.
Zainudin,
Sandiartha,
Ratnadi
Hendra
GdeSE
Suteja,BE
Dirra,SE
Ssos
PERHITUNGAN VOLUME PEKERJAAN
DIMENSI
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH
VOLUME SATUAN
(M) (M) (M) (BH)
I. PEKERJAAN PERSIAPAN
1 Panjang Pondasi 32.40 32.400 M'
2 Listrik untuk penerangan LS
3 Sumur Gali LS
64.800 M3
4 Pemadatan tanah peninggian lantai x 0.000 M3
5 Pasir urug
a. Bawah pondasi 32.40 x 0.60 x 0.10 1.944 M3
b. Peninggian lantai 7.00 x 6.00 x 0.05 0.350 M3
Total pasir urug 2.294 M3
3.897
IV PEKERJAAN LANTAI DAN PLAFOND
1 Keramik Lantai Dan Tangga ( 40/40) LUASAN DIDAPAT DARI AUTOCAD 45.000 M2
2 Keramik dinding KM/WC(20/20) x x 0.000
3 Keramik lantai KM/WC(20/20) 0.000
x x M2
a. KM/WC 1,2,3 M2
Luas total keramik KM/WC 0.000 M2
4 Keramik dinding bermotif KM/WC (20/25) M2
5 Pasangan batu palimanan polyline 0.00 x 0.00 x 0.00 M2
Pasangan batu palimanan bermotif M2
6 Plafond kalsiboard M2
a. Ruangan 6.00 x 6.00 36.000 M2
b. Teras x 0.000 M2
Luas total plafond kalsiboard LUASAN DIDAPAT DARI AUTOCAD 36.000 M2
8 Rangka langit-langit 36.000 M2
9 Lis plafond gypsium M'
VI PEKERJAAN PASANGAN
1 Pasangan batu kosong 32.40 x 0.60 x 0.10 1.944 M3
2 Pasangan pondasi batu kali 32.40 x 0.55 x 1.30 23.166 M3
Pasangan pondasi batu kali Peninggian Lokasi 8.00 x 0.55 x 1.30 5.720 M3
Pasangan pondasi batu kali Peninggian Lokasi 6.00 x 0.40 x 0.40 0.960 M3
3 Pasangan bata Lantai 1 DIHITUNG MENGGUNAKAN APLIKASI 3D 72.950 M2
4 Pasangan bata Lantai 2
5 Pasangan Roster
a. Pasangan bata tembok
- Luas kotor = M2
- Luas bersih = luas kotor-luasan kusen pd tembok baru 72.95 - - 1.00 72.950 M2
b. Pasangan bata gewel
DIMENSI
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH
VOLUME SATUAN
(M) (M) (M) (BH)
Total luas pasangan dinding bata 72.950 M2
HARGA
NO. URAIAN SATUAN VOLUME JUMLAH
SATUAN
I. PEKERJAAN PERSIAPAN
0.00
2. Urugan kembali tanah bekas galian 2.187 m3 0.00
a. Pekerja 0.192 OH 0.00 0.00
0.00
3. Urugan tanah peninggian lantai 64.800 m3
a. Timbunan Pilihan 1.200 M3 77.70 135,000.00 10,489,500.00
b. Pekerja 0.300 OH 0.00
10,489,500.00
4. Urugan pasir bawah lantai dan pondasi 2.294 m3
a. Pasir urug 1.200 M3 2.00 150,000.00 300,000.00
b. Pekerja 0.300 OH 0.00
300,000.00
360,000.00
2. Pas. pondasi batu kali 1 Pc : 5 Ps 29.846 m3
a. Batu belah 15 cm / 20 cm 1.100 M3 32.00 180,000.00 5,760,000.00
b. Portland Cement (PC) 2.720 Zak 81.10 78,000.00 6,325,800.00
c. Pasir Pasang (PP) 0.544 M3 16.30 180,000.00 2,934,000.00
d. Pekerja 1.500 OH 0.00
e. Tukang batu 0.750 OH 0.00
15,019,800.00
HARGA
NO. URAIAN SATUAN VOLUME JUMLAH
SATUAN
6,280,200.00
5. Memasang Paving Blok Type Hexagonal ( Segi Enam ) m2
a. Paving Block Hexagon Segi Enam 6 Cm 50.000 Bh 0.00 1,550.00 0.00
b. Pasir Urug 0.089 M3 0.00 150,000.00 0.00
c. Pekerja 0.250 OH 0.00 0.00
d. Tukang Batu 0.250 OH 0.00 0.00
0.00
7,534,000.00
5 Balok Latei 10/10 7.000 m'
a. Kayu kelas III 0.002 M3 0.10 4,000,000.00 400,000.00
b Paku 5 cm - 12 cm 0.010 Kg 1.00 25,000.00 25,000.00
c. Besi beton polos Dia. 6 (2.44 Kg) Lonjor 1.00 40,000.00 40,000.00
d. Besi beton polos Dia. 8 (4.73 Kg) Lonjor 3.00 65,000.00 195,000.00
e. Kawat beton 0.450 Kg 3.10 28,000.00 86,800.00
f. Portland Cement (PC) 0.080 Zak 0.90 78,000.00 70,200.00
g. Pasir Beton (PB) 0.006 M3 0.10 200,000.00 20,000.00
h. Kerikil pecah chrusher (maks. 30 mm) 0.009 M3 0.10 400,000.00 40,000.00
i. Pekerja 0.180 OH 0.00
j. Tukang Batu 0.020 OH 0.00
HARGA
NO. URAIAN SATUAN VOLUME JUMLAH
SATUAN
k. Tukang Kayu 0.020 OH 0.00
l. Tukang Besi 0.020 OH 0.00
877,000.00
Sub total 5 21,470,700.00
VI. PEKERJAAN LANTAI DAN PLAFOND
1. Lantai keramik 40 x 40 cm 45.000 m2
a. Keramik Lantai Kelas Menengah (40x40cm) Polos 6.875 Bh 309.00 17,000.00 5,253,000.00
b. Portland Cement (PC) 0.164 Zak 7.00 78,000.00 546,000.00
c. Pasir pasang (PP) 0.045 M3 2.00 180,000.00 360,000.00
d. Semen warna 0.405 Kg 18.00 17,900.00 322,200.00
e. Pekerja 0.500 OH 0.00
f. Tukang batu 0.300 OH 0.00
6,481,200.00
4. Plafond Rangka Hollow Finishing Gypsumboard 9m 36.000 m2
a. Rangka Plafond Hollow 2/4 dan 4/4 M2 36.00 110,000.00 3,960,000.00
b. Penutup Plafond Gypsum Board ukuran (1200x2400x9)MM M2 36.00 35,000.00 1,260,000.00
5,220,000.00
34,100,000.00
Harga Jumlah
Jumlah
No. Kebutuhan Satuan Satuan Harga
Kebutuhan
Rp. Rp.
A Bahan
1 Paku 5 cm - 12 cm Kg 13.50 Rp. 25,000.00 Rp. 337,500.00
2 Besi beton polos Dia. 6 (2.44 Kg) Lonjor 38.00 Rp. 40,000.00 Rp. 1,520,000.00
3 Besi beton polos Dia. 8 (4.73 Kg) Lonjor 3.00 Rp. 65,000.00 Rp. 195,000.00
4 Besi beton polos Dia. 10 (7.4 Kg) Lonjor 40.00 Rp. 95,000.00 Rp. 3,800,000.00
5 Besi beton polos Dia. 12 ( 10.6 Kg) Kg 13.00 Rp. 120,000.00 Rp. 1,560,000.00
6 Kawat beton Kg 14.00 Rp. 28,000.00 Rp. 392,000.00
7 Portland Cement (PC) Zak 164.00 Rp. 78,000.00 Rp. 12,792,000.00
8 Pasir Beton (PB) M3 4.20 Rp. 200,000.00 Rp. 840,000.00
9 Kerikil pecah chrusher (maks. 30 mm) M3 5.80 Rp. 400,000.00 Rp. 2,320,000.00
10 Kayu kelas III M3 1.08 Rp. 4,000,000.00 Rp. 4,320,000.00
11 Multipleks 120 x 240 x 9 mm Lembar 18.00 Rp. 130,000.00 Rp. 2,340,000.00
12 Perancah Bambu Sedang Batang 21.00 Rp. 25,000.00 Rp. 525,000.00
13 Pasir Pasang (PP) M3 25.30 Rp. 180,000.00 Rp. 4,554,000.00
14 Bata merah Buah 5,096.00 Rp. 900.00 Rp. 4,586,400.00
15 Paving Block Hexagon Segi Enam 6 Cm Bh - Rp. 1,550.00 Rp -
16 Batu belah 15 cm / 20 cm M3 34.00 Rp. 180,000.00 Rp. 6,120,000.00
17 Pasir urug M3 2.00 Rp. 150,000.00 Rp. 300,000.00
18 Timbunan Pilihan M3 77.70 Rp. 135,000.00 Rp. 10,489,500.00
19 Kayu Papan Begesting M3 0.20 Rp. 4,000,000.00 Rp. 800,000.00
20 Usuk 5/7 cm Kls III Batang 8.00 Rp. 45,000.00 Rp. 360,000.00
21 Keramik Lantai Kelas Menengah (40x40cm) Polos Bh 309.00 Rp. 17,000.00 Rp. 5,253,000.00
22 Keramik Lantai Kelas Menengah (40x40cm) KM Motif Bh - Rp. 15,000.00 Rp -
23 Semen warna Kg 18.00 Rp. 17,900.00 Rp. 322,200.00
24 Benang sipat Bh 2.00 Rp. 4,700.00 Rp. 9,400.00
25 Rangka Plafond Hollow 2/4 dan 4/4 M2 36.00 Rp. 110,000.00 Rp. 3,960,000.00
26 Penutup Plafond Gypsum Board ukuran (1200x2400x9 M2 36.00 Rp. 35,000.00 Rp. 1,260,000.00
27 List Plafond Gypsum - Rp -
28 Daun Pintu Aluminium Geser Frame Ganda ( P2 ) Bh 1.00 Rp. 4,000,000.00 Rp. 4,000,000.00
29 Kusen dan Daun Pintu Aluminium 1/2 Kaca Tunggal ( P1 Bh - Rp. 2,200,000.00 Rp -
30 Pintu Fiber KM ( PKM ) Bh - Rp. 450,000.00 Rp -
31 Pintu Harmonika m2 14.40 Rp. 1,500,000.00 Rp. 21,600,000.00
32 Pagar Depan Besi Hollow Galvanis m2 - Rp. 650,000.00 Rp -
33 Jendela Aluminium Ganda ( J2A ) Bh - Rp. 2,000,000.00 Rp -
34 Jendela Full Kaca Depan 10 Lubang Bh 10.00 Rp. 850,000.00 Rp. 8,500,000.00
35 Kapur / Mil 20 kg zak 36.00 Rp. 35,000.00 Rp. 1,260,000.00
36 Plamir tembok Kg 36.00 Rp. 35,000.00 Rp. 1,260,000.00
37 Amplas Lembar - Rp. 4,000.00 Rp -
38 Kape Buah 8.00 Rp. 7,000.00 Rp. 56,000.00
39 Cat Tembok Mutu Baik Kg 65.00 Rp. 75,000.00 Rp. 4,875,000.00
40 Rangka Pokok baja ringan C 75. 0.75 M 58.00 Rp. 17,500.00 Rp. 1,015,000.00
41 rangka Web baja ringan C 75. 0.75 M 84.00 Rp. 17,500.00 Rp. 1,470,000.00
42 Baut ( screw driver ) Biji 840.00 Rp. 500.00 Rp. 420,000.00
43 Dynabolt Biji 21.00 Rp. 6,000.00 Rp. 126,000.00
44 Reng B-30 T=0.4 Galvanis M 105.00 Rp. 8,000.00 Rp. 840,000.00
45 Rangka Nok dan Jurai C 75. 0.75 M - Rp. 17,500.00 Rp -
46 Spandek 0.30 M 63.00 Rp. 50,000.00 Rp. 3,150,000.00
47 Bubungan Spandek M - Rp. 30,000.00 Rp -
48 Screw Cteks 10x16.16 Biji 252.00 Rp. 650.00 Rp. 163,800.00
49 Rangka Calsiplank M 6.00 Rp. 17,500.00 Rp. 105,000.00
50 Calsiplank 20 cm motif M 6.00 Rp. 20,000.00 Rp. 120,000.00
51 Baut Calsiplank ( screw driver ) Biji 24.00 Rp. 550.00 Rp. 13,200.00
52 Bahan Instalasi Ls 1.00 Rp. 1,500,000.00 Rp. 1,500,000.00
53 Lampu Set TL 36 watt Komplit 6.00 Rp. 350,000.00 Rp. 2,100,000.00
54 Lampu 9 Watt Bh - Rp. 35,000.00 Rp -
55 Titik Lampu Buah 6.00 Rp. 100,000.00 Rp. 600,000.00
56 Saklar Tunggal Buah - Rp. 22,000.00 Rp -
57 Saklar Dobel Bh 3.00 Rp. 25,000.00 Rp. 75,000.00
58 Stop kontak Bh 3.00 Rp. 25,000.00 Rp. 75,000.00
59 Pemasangan KWH minimal 1300 W Unit 1.00 Rp. 3,000,000.00 Rp. 3,000,000.00
60 Closed jongkok kelas menengah Ls - Rp. 150,000.00 Rp -
61 Bak mandi fiber Bh - Rp. 300,000.00 Rp -
Harga Jumlah
Jumlah
No. Kebutuhan Satuan Satuan Harga
Kebutuhan
Rp. Rp.
62 Pipa PVC AW diameter 1/2" Lonjor - Rp. 30,000.00 Rp -
63 Sambungan L 1/2'' Bh - Rp. 4,000.00 Rp -
64 Lem Pipa Bh - Rp. 20,000.00 Rp -
65 Pipa PVC 4'' kualitas C (pembuangan Air Kotor dan Clos Lonjor - Rp. 90,000.00 Rp -
66 Sambungan L 4'' Bh - Rp. 6,000.00 Rp -
67 Kran diameter ½" Bh - Rp. 35,000.00 Rp -
68 Septictank ( 2 x buis Dia. 0.80 ) Unit - Rp. 500,000.00 Rp -
69 Sumur peresapan ( 1 x buis Dia. 0.80 ) Unit - Rp. 300,000.00 Rp -
70 Kanopi Rangka Besi siku 5x5 penutup Spandek m2 13.20 Rp. 800,000.00 Rp. 10,560,000.00
71 Plank rangka galvanis Finishing Plat Galvanis Dicat m2 5.20 Rp. 800,000.00 Rp. 4,160,000.00
72 Banner m2 - Rp. 60,000.00 Rp -
REKAPITULASI
Terbilang
( ) ( SULMAN )
Mengetahui
Kepala Desa Pringgabaya Utara
( ZULKARNAEN )
REKAPITULASI
RENCANA ANGGARAN BIAYA
( TOTAL BIAYA KEGIATAN )
TOTAL
KOLOM Ø BESI PANJANG JML PANJAN LONJOR HSD TOTAL
G
BESI Ø12 0 0.00 90000 -
BESI Ø10 8 4 32 3.00 60000 180,000
20/20
BESI Ø8 0 0.00 45000 -
BESI Ø6 0.62 53 132 12.00 35000 420,000
600,000
TOTAL
KOLOM Ø BESI PANJANG JML PANJAN LONJOR HSD TOTAL
G
BESI Ø12 0 0.00 90000 -
BESI Ø10 3.5 34 476 40.00 60000 2,400,000
13/13
BESI Ø8 0 0.00 45000 -
BESI Ø6 0.34 23 272 24.00 35000 840,000
3,240,000
SLOOF
TOTAL
KOLOM Ø BESI PANJANG JML PANJAN LONJOR HSD TOTAL
G
BESI Ø12 #REF! 4.00 #REF! #REF! 90000 #REF!
BESI Ø10 #REF! 2.00 #REF! #REF! 60000 #REF!
20/30
BESI Ø8 0.00 45000 -
BESI Ø6 #REF! #REF! #REF! #REF! 35000 #REF!
#REF!
BALOK
TOTAL
KOLOM Ø BESI PANJANG JML PANJAN LONJOR HSD TOTAL
G
BESI Ø12 0.00 4.00 0.00 0.00 90000 -
BESI Ø10 0.00 2.00 0.00 0.00 60000 -
20/30
BESI Ø8 0.00 45000 -
BESI Ø6 0.00 0.00 0.00 0.00 35000 -
-
RING BALOK
TOTAL
KOLOM Ø BESI PANJANG JML PANJAN LONJOR HSD TOTAL
G
BESI Ø12 0.00 0.00 90000 -
BESI Ø10 0.00 0.00 60000 -
13/15
BESI Ø8 #REF! 4.00 #REF! #REF! 45000 #REF!
BESI Ø6 #REF! #REF! #REF! #REF! 35000 #REF!
#REF!
Harga
No. Uraian Satuan volume Jumlah
Satuan
(Rp.)
I. UPAH
Sub Total 1 -
II. BAHAN
Sub Total 2 -
III. ALAT
1 Pekerjaan Persiapan ls - ls #REF!
dan Pengukuran
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Tukang Batu hok 0.00 #REF! #REF!
2 Pekerja hok 0.00 #REF! #REF!
II. BAHAN
1 Kayu Papan Begesting m3 0.20 4,000,000.00 800,000
2 Usuk 5/7 cm Kls III Batang 8.00 45,000.00 360,000
3 Paku 5 cm - 12 cm Kg 1.00 25,000.00 25,000
III. ALAT
Sub Total 3 -
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.0 #REF! #REF!
II. BAHAN
Sub Total 2 -
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 #REF! #REF!
II. BAHAN
Sub Total 2 -
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 #REF! #REF!
II. BAHAN
1 Tanah Urug m3 77.70 40,000.00 3,108,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
II. BAHAN
Sub Total 2 -
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 #REF! #REF!
II. BAHAN
1 Pasir Urug m3 2.00 50,000.00 100,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 #REF! #REF!
2 Tukang hok 0.00 #REF! #REF!
II. BAHAN
1 Batu belah 15 cm / 20 cm m3 2.00 80,000.00 160,000
2 #REF! m3 #REF! 50,000.00 #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 #REF! #REF!
2 Tukang hok 0.00 #REF! #REF!
-
II. BAHAN
1 Batu belah 15 cm / 20 cm m3 32.00 180,000.00 5,760,000
2 Portland Cement (PC) zak 81.10 78,000.00 6,325,800
3 Pasir Pasang (PP) m3 16.30 180,000.00 2,934,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 0.00 -
2 Tukang hok 0.00 0.00 -
II. BAHAN
1 Bata merah bh 5,096.00 900.00 4,586,400
2 Portland Cement (PC) zak 14.10 78,000.00 1,099,800
3 Pasir Pasang (PP) m3 3.30 180,000.00 594,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) 6,280,200
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 0.00 -
2 Tukang hok 0.00 0.00 -
II. BAHAN
1 Batu Alam m2 0.00 179,000.00 -
2 Portland Cement (PC) Zak 0.00 78,000.00 -
3 Pasir Pasang (PP) M3 0.00 180,000.00 -
4 Semen warna Kg 0.00 17,900.00 -
Sub Total 2 -
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) -
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 0.00 -
2 Tukang hok 0.00 0.00 -
II. BAHAN
1 Bata merah Buah 5,096.00 900.00 4,586,400
2 Portland Cement (PC) Zak 14.10 78,000.00 1,099,800
3 Pasir Pasang (PP) M3 3.30 180,000.00 594,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) 6,280,200
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Provinsi : Nusa Tenggara Barat No. RAB : 13
Kabupaten : Lombok Timur Jenis Kegiatan :
Bangunan : Rumah tinggal 2 Lantai Item Pekerjaan : Plesteran 1 Pc : 5 Ps tebal 15 mm.
Ukuran : #REF! Volume : 146
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 0.00 -
2 Tukang hok 0.00 0.00 -
II. BAHAN
1 #REF! zak 18.90 78,000.00 1,474,200
2 #REF! m3 3.70 180,000.00 666,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) 2,140,200
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! 0.00 #REF!
2 Tukang hok #REF! 0.00 #REF!
II. BAHAN
1 Portland Cement (PC) zak #REF! 78,000.00 #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 0.00 -
2 Tukang hok 0.00 0.00 -
3 Mandor hok
II. BAHAN
1 Portland Cement (PC) zak 13.80 78,000.00 1,076,400
2 Pasir Beton (PB) m3 1.70 200,000.00 340,000
3 Kerikil pecah chrusher ( m3 2.00 400,000.00 800,000
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) 2,216,400
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! 0.00 #REF!
2 Tukang hok #REF! 0.00 #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! zak #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! 100,000.00 #REF!
II. BAHAN
1 Kayu KayuKayu Perancah #REF! 21.86 #REF! #REF!
2 Paku PakuPaku Biasa 1" - #REF! 218.56 #REF! #REF!
3 MinyaMinyMinyak Bekisti #REF! 109.28 #REF! #REF!
4 Tripl Trip Triplek 122x2 #REF! 191.24 #REF! #REF!
5 Kaso KasoKaso lanan 5/7 #REF! 9.29 #REF! #REF!
6 Besi BesiBesi beton < 1 #REF! 4,371.20 #REF! #REF!
7 KawatKawaKawat ikat beto #REF! 98.35 #REF! #REF!
8 SemeSemSemen zak 293.74 #REF! #REF!
9 Pasir PasiPasir cor m3 22.73 #REF! #REF!
10 Kerik Keri Kerikil Pecah c m3 34.10 #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
I. UPAH
1 Pekerja hok #REF! #REF! #REF!
2 Tukang hok #REF! #REF! #REF!
3 Mandor hok #REF! 100,000.00 #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
9 #REF! #REF! #REF! #REF! #REF!
10 #REF! #REF! #REF! #REF! #REF!
III. ALAT
Sub Total 3 -
JUMLAH BIAYA ( I + II + III ) #REF!
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan volume Jumlah
Satuan
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
2 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
2 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
-
II. BAHAN
1 #REF! bh #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! bh #REF! #REF! #REF!
2 #REF! zak #REF! #REF! #REF!
3 #REF! m3 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
2 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! lbr #REF! #REF! #REF!
2 #REF! kg #REF! #REF! #REF!
3 #REF! m3 #REF! #REF! #REF!
4 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
2 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
2 Pintu panel lapis Aluminium M2 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m2 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 0.00 0.00 -
2 #REF! hok 0.00 0.00 -
II. BAHAN
1 Keramik Lantai Kelas m2 309.00 17,000.00 5,253,000
Menengah (40x40cm) Polos
2 Portland Cement (PC) zak 7.00 78,000.00 546,000
3 Pasir pasang (PP) m3 2.00 180,000.00 360,000
4 Semen warna kg 18.00 17,900.00 322,200
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m2 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m2 #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! m3 #REF! #REF! #REF!
2 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
II. BAHAN
1 #REF! lbr #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Kusen dan Daun Pintu Alumini hok 0.00 2,200,000.00 0.00
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 Daun Pintu Aluminium Geser m' 1.00 4,000,000.00 4,000,000.00
Frame Ganda ( P2 )
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Kape HOK 8.00 #REF! #REF!
2 Cat Tembok Mutu Baik HOK 65.00 #REF! #REF!
II. BAHAN
1 Plamir tembok Zak 36.00 35,000.00 1,260,000
2 Amplas Lembar 0.00 4,000.00 -
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja HOK #REF! #REF!
2 Tukang HOK #REF! #REF!
II. BAHAN
1 #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! HOK #REF! #REF! #REF!
2 0.00 HOK 0.00 0.00 -
Sub Total 1 #REF! #REF!
II. BAHAN
1 #REF! BH #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Keramik Lantai (20x20cm) HOK 0.00 #N/A #N/A
2 Keramik Dinding Polos (20X2 HOK 0.00 #N/A #N/A
II. BAHAN
1 Keramik Lantai Polos BH 0.00 #N/A #N/A
(30x30cm)
Sub Total 2 #N/A
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 0.00 HOK 0.00 0.00 -
2 0.00 HOK 0.66 0.00 -
II. BAHAN
1 0.00 BH 0.00 0.00 -
III. ALAT
Sub Total 3 0.00
JUMLAH BIAYA ( I + II + III ) 0.00
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 0.00 HOK 0.00 0.00 -
2 0.00 HOK 0.00 0.00 -
II. BAHAN
1 0.00 BH 0.00 0.00 -
III. ALAT
I. UPAH
1 0.00 HOK 0.00 0.00 -
2 0.00 HOK 0.00 0.00 -
II. BAHAN
1 0.00 BH 0.00 0.00 -
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! HOK #REF! #REF! #REF!
2 #REF! HOK #REF! #REF! #REF!
II. BAHAN
1 #REF! BH #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! HOK #REF! #REF! #REF!
2 #REF! HOK #REF! #REF! #REF!
II. BAHAN
1 #REF! BH #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! HOK #REF! #REF! #REF!
2 #REF! HOK #REF! #REF! #REF!
II. BAHAN
1 #REF! BH #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! HOK #REF! #REF! #REF!
2 #REF! HOK #REF! #REF! #REF!
II. BAHAN
1 #REF! BH #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! HOK #REF! #REF! #REF!
2 #REF! HOK #REF! #REF! #REF!
II. BAHAN
1 #REF! BH #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
Sub Total 1
II. BAHAN
1 Bahan Instalasi BH 1.00 1,500,000.00 1,500,000
2 #REF! BH #REF! #REF! #REF!
3 Sakl TITIK 0.00 22,000.00 -
4 ar
### BH #REF! #REF! #REF!
5 Tun
### BH #REF! #REF! #REF!
6 ggal
### BH #REF! #REF! #REF!
7 ### UNIT 1 2500000 2,500,000
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
2 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! kg #REF! #REF! #REF!
-
2 #REF! kg #REF! #REF! #REF!
3 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 #REF! hok #REF! #REF! #REF!
II. BAHAN
1 #REF! kg #REF! #REF! #REF!
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Kape hok 8.00 7,000.00 56,000
2 Cat Tembok Mutu Baik hok 65.00 75,000.00 4,875,000
II. BAHAN
1 Plamir tembok kg 36.00 35,000.00 1,260,000
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
II. BAHAN
1 #REF! bh #REF! #REF! #REF!
2 #REF! bh #REF! #REF! #REF!
3 #REF! m' #REF! #REF! #REF!
4 #REF! m' #REF! #REF! #REF!
5 #REF! m' #REF! #REF! #REF!
6 #REF! bh #REF! #REF! #REF!
7 #REF! bh #REF! #REF! #REF!
8 #REF! Unit #REF! #REF! #REF!
9 #REF! Unit #REF! #REF! #REF!
12 #REF! Unit #REF! #REF! #REF!
III. ALAT
RENCANA ANGGARAN BIAYA ( RAB ) DETAIL
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 8.39 40,000.00 335,445.46
2 Tukang hok 2.64 55,000.00 145,418.26
II. BAHAN
1 #REF! m3 0.19 1,000,000.00 192,834.00
2 #REF! kg 1.29 13,000.00 16,712.28
3 #REF! kg 594.67 7,500.00 4,460,029.46
4 #REF! kg 8.92 9,000.00 80,280.53
5 #REF! zak 28.80 51,000.00 1,468,623.74
6 #REF! m3 2.31 70,000.00 161,980.56
7 #REF! m3 3.47 115,000.00 399,166.38
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 11.12 40,000.00 444,630.40
2 Tukang hok 3.50 55,000.00 192,750.80
II. BAHAN
1 #REF! m3 0.26 1,000,000.00 255,600.00
2 #REF! kg 1.70 13,000.00 22,152.00
3 #REF! kg 1,339.36 7,500.00 10,045,234.95
4 #REF! kg 20.09 9,000.00 180,814.23
5 #REF! zak 38.17 51,000.00 1,946,649.60
6 #REF! m3 3.07 70,000.00 214,704.00
7 #REF! m3 4.60 115,000.00 529,092.00
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 10.39 40,000.00 415,666.80
2 Tukang hok 3.28 55,000.00 180,194.85
II. BAHAN
1 #REF! m3 0.24 1,000,000.00 238,950.00
2 #REF! kg 1.59 13,000.00 20,709.00
3 #REF! kg 736.89 7,500.00 5,526,639.70
4 #REF! kg 11.05 9,000.00 99,479.51
5 #REF! zak 35.68 51,000.00 1,819,843.20
6 #REF! m3 2.87 70,000.00 200,718.00
7 #REF! m3 4.30 115,000.00 494,626.50
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
II. BAHAN
1 #REF! m3 3.73 1,000,000.00 3,729,792.00
2 #REF! kg 49.73 12,000.00 596,766.72
3 #REF! kg 790.41 13,800.00 10,907,590.21
4 #REF! kg 34.97 9,000.00 314,701.20
5 #REF! zak 5,019.68 1,050.00 5,270,662.32
6 #REF! m3 8.08 75,000.00 606,091.20
7 #REF! m3 12.12 115,000.00 1,394,009.76
8 #REF! #REF! 43.51 100,000.00 4,351,424.00
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
II. BAHAN
1 #REF! m3 3.73 1,000,000.00 3,729,792.00
2 #REF! kg 49.73 12,000.00 596,766.72
3 #REF! kg 790.41 13,800.00 10,907,590.21
4 #REF! kg 34.97 9,000.00 314,701.20
5 #REF! zak 5,019.68 1,050.00 5,270,662.32
6 #REF! m3 8.08 75,000.00 606,091.20
7 #REF! m3 12.12 115,000.00 1,394,009.76
8 #REF! #REF! 43.51 100,000.00 4,351,424.00
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
Sub Total 1 41.40 1,816,175.59
II. BAHAN
1 #REF! m3 3.73 1,000,000.00 3,729,792.00
2 #REF! kg 49.73 12,000.00 596,766.72
3 #REF! kg 790.41 13,800.00 10,907,590.21
4 #REF! kg 34.97 9,000.00 314,701.20
5 #REF! zak 5,019.68 1,050.00 5,270,662.32
6 #REF! m3 8.08 75,000.00 606,091.20
7 #REF! m3 12.12 115,000.00 1,394,009.76
8 #REF! 0 43.51 100,000.00 4,351,424.00
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
II. BAHAN
1 #REF! m3 3.73 1,000,000.00 3,729,792.00
2 #REF! kg 49.73 12,000.00 596,766.72
3 #REF! kg 790.41 13,800.00 10,907,590.21
4 #REF! kg 34.97 9,000.00 314,701.20
5 #REF! zak 5,019.68 1,050.00 5,270,662.32
6 #REF! m3 8.08 75,000.00 606,091.20
7 #REF! m3 12.12 115,000.00 1,394,009.76
8 #REF! 0 43.51 100,000.00 4,351,424.00
III. ALAT
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
II. BAHAN
1 #REF! m3 3.73 1,000,000.00 3,729,792.00
2 #REF! kg 49.73 12,000.00 596,766.72
3 #REF! kg 790.41 13,800.00 10,907,590.21
4 #REF! kg 34.97 9,000.00 314,701.20
5 #REF! zak 5,019.68 1,050.00 5,270,662.32
6 #REF! m3 8.08 75,000.00 606,091.20
7 #REF! m3 12.12 115,000.00 1,394,009.76
8 #REF! 0 43.51 100,000.00 4,351,424.00
III. ALAT
Sub Total 3 0.00
JUMLAH BIAYA ( I + II + III ) 28,987,213.01
Harga
No. Uraian Satuan
Satuan
Total Jumlah
(Rp.)
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
II. BAHAN
1 Kayu Perancah m3 3.73 1,000,000.00 3,729,792.00
2 Paku Biasa 1" - 4" kg 49.73 12,000.00 596,766.72
3 Minyak Bekisting kg 790.41 13,800.00 10,907,590.21
4 Triplek 122x242x9 mm kg 34.97 9,000.00 314,701.20
5 Kaso lanan 5/7 (2x pakai) 5 zak 5,019.68 1,050.00 5,270,662.32
6 Besi beton < 16 mm m3 8.08 75,000.00 606,091.20
7 Kawat ikat beton m3 12.12 115,000.00 1,394,009.76
8 Semen 0 43.51 100,000.00 4,351,424.00
III. ALAT
I. UPAH
1 Pekerja hok 30.72 40,000.00 1,228,966.46
2 Tukang hok 10.68 55,000.00 587,209.13
II. BAHAN
1 #REF! m3 3.73 1,000,000.00 3,729,792.00
2 #REF! kg 49.73 12,000.00 596,766.72
3 #REF! kg 790.41 13,800.00 10,907,590.21
4 #REF! kg 34.97 9,000.00 314,701.20
5 #REF! zak 5,019.68 1,050.00 5,270,662.32
6 #REF! m3 8.08 75,000.00 606,091.20
7 #REF! m3 12.12 115,000.00 1,394,009.76
8 #REF! 0 43.51 100,000.00 4,351,424.00
III. ALAT
REKAPITULASI
RENCANA ANGGARAN BIAYA
( BIAYA PNPM DAN SWADAYA )
BIAYA ( Rp. )
NO. URAIAN PEKERJAAN SAT. VOL.
PNPM SWADAYA JUMLAH
I. PEKERJAAN PERSIAPAN
1. #REF! #REF! - #REF! #REF! #REF!
2. Pengukuran dan pemasangan bowplang m' 32.40 #REF! #REF! #REF!
VI. ###
1. #REF! #REF! #REF! #REF! #REF! #REF!
2. #REF! #REF! #REF! #REF! #REF! #REF!
3. #REF! #REF! #REF! #REF! #REF! #REF!
4. #REF! #REF! #REF! #REF! #REF! #REF!
5. #REF! #REF! #REF! #REF! #REF! #REF!
6. #REF! #REF! #REF! #REF! #REF! #REF!
7. #REF! #REF! #REF! #REF! #REF! #REF!
VII. ###
1. #REF! #REF! #REF! #REF! #REF! #REF!
2. #REF! #REF! #REF! #REF! #REF! #REF!
3. #REF! #REF! #REF! #REF! #REF! #REF!
4. #REF! #REF! #REF! #REF! #REF! #REF!
5. #REF! #REF! #REF! #REF! #REF! #REF!
IX. ###
1. #REF! #REF! #REF! #REF! #REF! #REF!
2. #REF! #REF! #REF! #REF! #REF! #REF!
3. #REF! Bh #REF! #REF! #REF! #REF!
4. #REF! Bh #REF! #REF! #REF! #REF!
5. #REF! Bh #REF! #REF! #REF! #REF!
6. #REF! Bh #REF! #REF! #REF! #REF!
7. #REF! Bh #REF! #REF! #REF! #REF!
XII. ###
1. #REF! #REF! #REF! #REF! 0.00 #REF!
2. #REF! #REF! #REF! #REF! 0.00 #REF!
3. #REF! #REF! #REF! #REF! 0.00 #REF!
4. #REF! #REF! #REF! #REF! 0.00 #REF!
5. #REF! #REF! #REF! #REF! 0.00 #REF!
6. #REF! #REF! #REF! #REF! 0.00 #REF!
7. #REF! #REF! #REF! #REF! 0.00 #REF!
8. #REF! #REF! #REF! #REF! 0.00 #REF!
9. #REF! #REF! #REF! #REF! 0.00 #REF!
10. Pompa Air #REF! 1.00 750,000.00 0.00 750,000.00
11. Sumur Gali #REF! 1.00 1,500,000.00 0.00 1,500,000.00
12 Wastafel #REF! 1.00 600,000.00 0.00 600,000.00
SUB TOTAL (PEKERJAAN INSTALSI AIR DAN SANITAIR) #REF! 0.00 #REF!
XIII. ###
1. #REF! #REF! #REF! #REF! 0.00 #REF!
2. #REF! BH #REF! #REF! 0.00 #REF!
3. #REF! BH #REF! #REF! 0.00 #REF!
4. #REF! BH #REF! #REF! 0.00 #REF!
5. #REF! BH #REF! #REF! 0.00 #REF!
Disetujui Oleh :
PJOK Dibuat Oleh :
#REF! #REF!
#REF! #REF! -
-
#REF!
-
-
#REF! #REF! -
#REF! #REF! -
0.107 #REF! -
1.000 #REF! #REF!
#REF! #REF! -
-
#REF!
-
- PEKERJAAN PASANGAN
#REF! #REF! #REF! #REF! #REF! #REF! 1 30,000 58,320
#REF! #REF! #REF! #REF! #REF! #REF! 2 30,000 895,380
#REF! #REF! #REF! #REF! #REF! #REF! 3 8,000 -
#REF! #REF! #REF! #REF! #REF! #REF! 4 8,000 583,600
- -
- -
#REF! -
- -
- -
#REF! #REF! #REF! #REF! #REF! 10,350 #REF!
#REF! #REF! #REF! #REF! - 10,350 1,510,065
- -
#REF! -
- -
- PEKERJAAN BETON BERTULANG -
#REF! #REF! #REF! #REF! - 20,000 56,400
#REF! #REF! #REF! #REF! #REF! #REF! 2 50,000 #REF!
#REF! #REF! #REF! #REF! #REF! 50,000 #REF!
#REF! #REF! #REF! #REF! #REF! 50,000 #REF!
#REF! #REF! #REF! #REF! #REF! 50,000 #REF!
-
#REF! -
- -
- -
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! 5,000 #REF!
#REF! #REF! #REF! #REF! #REF! 20,000 #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
- -
#REF! -
- -
- -
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
- -
#REF! -
- -
- -
#REF! #REF! #REF! #REF! - 16,000 720,000
#REF! #REF! #REF! #REF! #REF! 16,000 #REF!
#REF! #REF! #REF! #REF! #REF! 16,000 #REF!
#REF! #REF! #REF! #REF! #REF! 16,000 #REF!
#REF! #REF! #REF! #REF! #REF!
0.188 #REF! #REF! #REF! #REF!
#REF! #REF! #DIV/0! #DIV/0! #DIV/0!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
152.000 #REF!
1,184,210.526 #REF!
#REF!
#REF!
#REF!
#REF!
RENCANA ANGGARAN BIAYA REVISI 1
( DETAIL )
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN
PEKERJAAN : PEMBANGUNAN GEDUNG POSKESDES FORM : 02
DESA : MADAYIN VOLUME : 1 UNIT
KECAMATAN : SAMBELIA LOKASI : DESA MADAYIN
KABUPATEN : LOMBOK TIMUR
SUMBER DANA: DANA DESA ( DD )
HARGA
NO. URAIAN SATUAN VOLUME JUMLAH
SATUAN
I. PEKERJAAN PERSIAPAN
2,032,500.00
2. Urugan kembali tanah bekas galian 9.037 m3
a. Pekerja 0.192 OH 1.00 75,000.00 75,000.00
75,000.00
3. Urugan tanah peninggian lantai 68.063 m3
a. Timbunan Pilihan 1.200 M3 81.60 65,000.00 5,304,000.00
b. Pekerja 0.300 OH 20.00 75,000.00 1,500,000.00
6,804,000.00
4. Urugan pasir bawah lantai dan pondasi 3.443 m3
a. Pasir urug 1.200 M3 4.00 75,000.00 300,000.00
b. Pekerja 0.300 OH 1.00 75,000.00 75,000.00
375,000.00
1,962,500.00
2. Pas. pondasi batu kali 1 Pc : 5 Ps 36.146 m3
a. Batu belah 15 cm / 20 cm 1.100 M3 39.00 155,000.00 6,045,000.00
b. Portland Cement (PC) 2.720 Zak 98.30 73,000.00 7,175,900.00
c. Pasir Pasang (PP) 0.544 M3 19.60 150,000.00 2,940,000.00
d. Pekerja 1.500 OH 54.00 75,000.00 4,050,000.00
e. Tukang batu 0.750 OH 26.40 125,000.00 3,300,000.00
23,510,900.00
3. Pas. bata merah tebal 1 bata. 1 Pc : 5 Ps (Trastram) m2
a. Bata merah 140.000 Buah 0.00 700.00 0.00
b. Portland Cement (PC) 0.387 Zak 0.00 73,000.00 0.00
c. Pasir Pasang (PP) 0.090 M3 0.00 150,000.00 0.00
d. Pekerja 0.300 OH 0.00 75,000.00 0.00
e. Tukang batu 0.100 OH 0.00 125,000.00 0.00
0.00
HARGA
NO. URAIAN SATUAN VOLUME JUMLAH
SATUAN
33,858,800.00
5. Memasang Roster Ukuran (12 X 11 X 24) CM. CAMP. 1 PC : 4 PP m2
a. Loster Beton 10x30 Cm 30.000 Buah 0.00 10,000.00 0.00
b. Portland Cement (PC) 0.220 Zak 0.00 73,000.00 0.00
c. Pasir Pasang (PP) 0.035 M3 0.00 150,000.00 0.00
d. Pekerja 0.300 OH 0.00 75,000.00 0.00
e. Tukang batu 0.100 OH 0.00 125,000.00 0.00
0.00
2,727,850.00
22,465,800.00
2. Keramik Lantai dan dinding KM 20 x 20 cm 26.700 m2
a. Keramik Lantai Kelas Menengah (20x20cm) KM 26.500 Buah 708.00 3,200.00 2,265,600.00
b. Portland Cement (PC) 0.208 Zak 6.00 73,000.00 438,000.00
c. Pasir pasang (PP) 0.045 M3 1.00 150,000.00 150,000.00
d. Semen warna 0.324 Kg 9.00 17,900.00 161,100.00
e. Pekerja 0.500 OH 13.00 75,000.00 975,000.00
f. Tukang batu 0.300 OH 8.00 125,000.00 1,000,000.00
4,989,700.00
4. Plafond Rangka Hollow Finishing Kalsiboard 131.000 m2
a. Rangka Plafond Hollow 2/4 dan 4/4 M2 131.00 100,000.00 13,100,000.00
b. Penutup Plafond Gypsum Board ukuran (1200x2400x9)MM M2 44.00 30,000.00 1,320,000.00
c. List Plafond Gypsum M' 60.00 20,000.00 1,200,000.00
15,620,000.00
29,400,000.00