JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp. )
1 2 3
1 2 3 4
I PEKERJAAN PERSIAPAN
1 1 M' Pagar Sementara
dari seng gelombang, tinggi 2 m
0.0300 M3 1,25 Btg. Kayu Begesting 6x10 1,000,000.00 30,000.00
2.5000 Kg Semen Portland 1,350.00 3,375.00
1.2000 Lbr Seng gelombang 3" - 5" 99,618.75 119,542.50
0.0050 M3 Pasir Beton 110,000.00 550.00
0.0090 M3 Koral beton 225,000.00 2,025.00
0.0720 M3 Kayu Meranti Usuk 5/7 5,686,359.00 409,417.85
0.0600 Kg Paku Biasa 5-7 cm 28,557.38 1,713.44
0.4500 Kg Meni besi 32,077.24 14,434.76
0.4000 Oh Tukang Kayu 75,000.00 30,000.00
0.2000 Oh Pekerja 50,000.00 10,000.00
0.0200 Oh Kepala Tukang 80,000.00 1,600.00
0.0200 Oh Mandor 85,000.00 1,700.00
Total : 43,300.00 581,058.55 624,358.55
Overhead & Profit 10 % 62,435.85
Harga Satuan Pekerjaan 686,794.40
2 1 M' Pengukuran & Pemasangan Bouwplank
0.0100 M3 Kayu Usuk 5/7 Kayu Begesting 1,000,000.00 10,000.00
0.0200 Kg Paku Biasa 5-7 cm 28,557.38 571.15
0.0070 M3 Kayu papan Begesting 3/20 1,000,000.00 7,000.00
0.0500 Oh Tukang Kayu 75,000.00 3,750.00
0.0500 Oh Pekerja 50,000.00 2,500.00
0.0050 Oh Kepala Tukang 80,000.00 400.00
0.0050 Oh Mandor 85,000.00 425.00
Total : 7,075.00 17,571.15 24,646.15
Overhead & Profit 10 % 2,464.61
Harga Satuan Pekerjaan 27,110.76
3 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran
0.0300 M3 1,25 Btg. Kayu Begesting 6x10 1,000,000.00 30,000.00
0.1800 M3 Kayu Usuk 5/7 Kayu Begesting 1,000,000.00 180,000.00
0.0800 Kg Paku Biasa 5-7 cm 28,557.38 2,284.59
1.1000 Kg Besi Strip 26,202.75 28,823.03
35.0000 Kg Semen Portland 1,350.00 47,250.00
0.1500 M3 Pasir Pasang 175,000.00 26,250.00
0.1000 M3 Pasir Beton 110,000.00 11,000.00
0.1500 M3 Koral Beton 225,000.00 33,750.00
30.0000 Bh Bata Merah 1,653.75 49,612.50
0.2500 Lbr Seng plat 58,805.25 14,701.31
0.2000 Bh Jendela nako 142,756.69 28,551.34
0.0800 M2 Kaca polos 110,000.00 8,800.00
0.1500 Bh Kunci tanam 195,000.00 29,250.00
0.0600 Lbr Plywood 4 mm 83,076.00 4,984.56
2.0000 Oh Tukang Kayu 75,000.00 150,000.00
1.0000 Oh Tukang Batu 70,000.00 70,000.00
2.0000 Oh Pekerja 50,000.00 100,000.00
0.3000 Oh Kepala Tukang 80,000.00 24,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
Total : 348,250.00 495,257.33 843,507.33
Overhead & Profit 10 % 84,350.73
Harga Satuan Pekerjaan 927,858.06
4 1 M2 Pembuatan Gudang Semen dan alat - alat
0.0408 Btg 1,7 Btg. Kayu Begesting 6x10 1,000,000.00 40,800.00
0.2100 M3 Kayu Usuk 5/7 Kayu Begesting 1,000,000.00 210,000.00
0.3000 Kg Paku Biasa 5-7 cm 28,557.38 8,567.21
10.5000 Kg Semen Portland 1,350.00 14,175.00
0.0300 M3 Pasir Beton 110,000.00 3,300.00
0.0500 M3 Koral Beton 225,000.00 11,250.00
1.5000 Lbr Seng gelombang BJLS 32 99,618.75 149,428.13
2.0000 Oh Tukang Kayu 75,000.00 150,000.00
1.0000 Oh Pekerja 50,000.00 50,000.00
0.2000 Oh Kepala Tukang 80,000.00 16,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
Total : 220,250.00 437,520.34 657,770.34
Overhead & Profit 10 % 65,777.03
Harga Satuan Pekerjaan 723,547.37
5 1 M2 Pembuatan rumah jaga/ konstruksi kayu
0.0720 M3 3 Btg. Kayu Begesting 6x10 1,000,000.00 72,000.00
0.2760 M3 Kayu Usuk 5/7 Kayu Begesting 1,000,000.00 276,000.00
0.7000 Kg Paku Biasa 5-7 cm 28,557.38 19,990.16
1.5000 Lbr Seng gelombang BJLS 32 99,618.75 149,428.13
1.5000 Oh Tukang Kayu 75,000.00 112,500.00
1.0000 Oh Pekerja 50,000.00 50,000.00
0.1500 Oh Kepala Tukang 80,000.00 12,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
Total : 178,750.00 517,418.29 696,168.29
Overhead & Profit 10 % 69,616.83
Harga Satuan Pekerjaan 765,785.12
6 1 M2 Membersihkan lapangan dan peralatan
0.1000 Oh Pekerja 50,000.00 5,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
Total : 9,250.00 9,250.00
Overhead & Profit 10 % 925.00
Harga Satuan Pekerjaan 10,175.00
7 1 M2 Pembuatan bedeng pekerja
0.0300 M3 1,25 Btg. Kayu Begesting 6x10 1,000,000.00 30,000.00
0.1860 M3 Kayu Usuk 5/7 Kayu Begesting 1,000,000.00 186,000.00
0.3000 Kg Paku Biasa 5-7 cm 28,557.38 8,567.21
18.0000 Kg Semen Portland 1,350.00 24,300.00
0.0300 M3 Pasir Beton 110,000.00 3,300.00
0.0500 M3 Koral Beton 225,000.00 11,250.00
1.5000 Lbr Seng gelombang BJLS 32 99,618.75 149,428.13
1.3500 Lbr Plywood 4 mm 83,076.00 112,152.60
2.0000 Oh Tukang Kayu 75,000.00 150,000.00
1.0000 Oh Pekerja 50,000.00 50,000.00
0.2000 Oh Kepala Tukang 80,000.00 16,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
Total : 220,250.00 524,997.94 745,247.94
Overhead & Profit 10 % 74,524.79
Harga Satuan Pekerjaan 819,772.73
8 1 M2 Pembuatan bak adukan (40 x 50 x 25) cm
0.0360 M3 Kayu Begesting 1,000,000.00 36,000.00
0.0800 Kg Paku Biasa 5-7 cm 28,557.38 2,284.59
1.0000 Btg Kaso 5/7 17,500.00 17,500.00
0.3000 Oh Tukang kayu 75,000.00 22,500.00
0.0300 Oh Kepala Tukang Kayu 85,000.00 2,550.00
Total : 25,050.00 55,784.59 80,834.59
Overhead & Profit 10 % 8,083.46
Harga Satuan Pekerjaan 88,918.05
9 1 M2 Pembuatan Steger dari Bambu
1.2500 btng Bambu diameter 6-8/600 cm 2,083.33 2,604.17
0.1860 Kg Tali Ijuk 52,933.78 9,845.68
2.0000 Oh Tukang Kayu 75,000.00 150,000.00
1.0000 Oh Pekerja 50,000.00 50,000.00
0.2000 Oh Kepala Tukang 80,000.00 16,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
220,250.00 12,449.85 232,699.85
Overhead & Profit 10 % 23,269.98
Harga Satuan Pekerjaan 255,969.83
10 1 M2 Pembuatan jalan sementara
0.1500 M3 Batu belah 15/20 110,000.00 16,500.00
0.0900 M3 Batu pecah 5/7 224,477.27 20,202.95
0.0100 M3 Pasir pasang 175,000.00 1,750.00
1.0000 Oh Pekerja 50,000.00 50,000.00
0.0500 Oh Mandor 85,000.00 4,250.00
Total : 54,250.00 38,452.95 92,702.95
Overhead & Profit 10 % 9,270.30
Harga Satuan Pekerjaan 101,973.25
11 1 M3 Bongkaran Beton Bertulang
13.3340 Oh Pekerja 50,000.00 666,700.00
0.6660 Oh Mandor 85,000.00 56,610.00
Total : 723,310.00 723,310.00
Overhead & Profit 10 % 72,331.00
Harga Satuan Pekerjaan 795,641.00
12 1 M3 Bongkaran Dinding tembok bata merah
6.6670 Oh Pekerja 50,000.00 333,350.00
0.3330 Oh Mandor 85,000.00 28,305.00
Total : 361,655.00 361,655.00
Overhead & Profit 10 % 36,165.50
Harga Satuan Pekerjaan 397,820.50
II PEKERJAAN TANAH
1 1 M3 Galian Tanah biasa sedalam 1 meter
0.7500 Oh Pekerja 50,000.00 37,500.00
0.0250 Oh Mandor 85,000.00 2,125.00
Total : 39,625.00 39,625.00
Overhead & Profit 10 % 3,962.50
Harga Satuan Pekerjaan 43,587.50
2 1 M3 Galian Tanah biasa sedalam 2 meter
0.9000 Oh Pekerja 50,000.00 45,000.00
0.0450 Oh Mandor 85,000.00 3,825.00
Total : 48,825.00 48,825.00
Overhead & Profit 10 % 4,882.50
Harga Satuan Pekerjaan 53,707.50
IV PEKERJAAN DINDING
1 1 M2 Pas. Bata merah (5x11x22) cm, 1Pc : 2Ps
70.0000 Bh Bata merah 5 x 11 x 22 cm 1,653.75 115,762.50
18.9500 Kg Semen Portland 1,350.00 25,582.50
0.0380 M3 Pasir pasang 175,000.00 6,650.00
0.3000 Oh Pekerja 50,000.00 15,000.00
0.1000 Oh Tukang Batu 70,000.00 7,000.00
0.0100 Oh Kepala Tukang 80,000.00 800.00
0.0150 Oh Mandor 85,000.00 1,275.00
24,075.00 147,995.00 172,070.00
Overhead & Profit 10 % 17,207.00
Harga Satuan Pekerjaan 189,277.00
Type B p=13.8 m
Type E
- timur dan utara P= 9+8.75=17.75
gambar:
Type D
- detail D pojok timur selatan ( P=4.40+4.1=8.5)
gambar:
2 Pek. Urugan pasir di bawah pondasi menerus
- tipe A ( barat dan selatan)
- tipe A (utara dan tengah)
- tipe B Podium depan
- tipe D pojok timur dan selatan
- tipe E timur dan utara dan selatan P=23.25
- +
gelang
gelang Ø8-15
stek
gelang
gelang
- jurai (
gelang
- jurai Ø16
Ø13
gelang
begesting jurai (
- pemucu (
Ø13
gelang
Ø13
gelang Ø8-15
2 Ø13
sambungan
extra atas
sambungan
Ø13
gelangØ8-125
Ø13
gelangØ8-125
gelangØ8-125
2Ø16
gelangØ8-125
- jurai 4Ø16
2Ø13
gelangØ8-125
gelangØ8-125
PERHITUNGAN
3
28 + 14 ) x 2=
8.5 x 1.375 x 1
total galian
35.5 x 0.8 x 0.05
34.5 x 0.8 x 0.05
13.8 x 0.78 x 0.05
8.5 x 1.2 x 0.05
23.5 x 0.975 x 0.05
10 x 9 = 90
6 x 9.6 = 57.6
3 x 10.6 = 31.8
1 x 7 = 7
186.4
20 x 9x 3.14 x 0.15 ²
vol Ø13
9.4 x 1.3 ² x 20 x 0.616225 x 8
gelangØ8
20 x 0.8 ² x 1 9x 0.616225
0.15
94.4 x 0.35 x 2
20 x 0.35 ² x 5.3
12Ø16
20 x 1.6 ² x 12 x 0.616225 x 6
stek Ø16-12
20 x 1.6 ² x 2x 0.616225 x 2
gelangØ8-15
20 x 0.8 ² x 5.7 x 0.616225 x 1.3
0.15
20 x 4 x 0.35 x 4.95
16 x 0.2 x 0.3 x 2
8Ø16
16 x 1.6 ² x 2.5 x 0.616225 x 8
gelang Ø8-15
16 x 0.8 ² x 2.5 x 0.616225 x 0.95
0.15
16 x 2 x 0.5 x 2
71 x 0.3 x 0.4
70.4 x 1.1
= 2x 20 + 2x 5.5
= 51 x 0.25 x 0.4
= 2x 20.25 + 2x 5.75 = 52
8Ø16
8 x 52.8 x 1.6 ² x 0.616225
extra atas dan bawah
2 x 2x 1.6 ² x 0.616225 x 0.6 x 14
sambungan
6 x 0.8 x 1.6 ² x 0.616225
Ø13
2 x 52.8 x 1.3 ² x 0.616225
gelangØ8-125
52.8 x 1.25 x 0.8 ² x 0.616225
0.125
51 x 0.7
12 x 5x 0.2 x 0.25
4 x 5.6 x 0.2 x 0.25
Ø13
12 x 5.2 x 1.3 ² x 0.616225 x 2
2Ø16
12 x 5.2 x 1.6 ² x 0.616225 x 4
gelangØ8-125
12.00 x 5.2 x 0.8 ² x 0.616225 x 0.85
0.125
4Ø16
4.00 x 6x 1.6 ² x 0.616225 x 4
2Ø13
4.00 x 6x 1.3 ² x 0.616225 x 2
gelangØ8-125
4.00 x 6x 0.8 ² x 0.616225 x 0.85
0.125
12 x 5.2 ) + ( 6x 4 )) 0.9
16 x 0.2 x 0.4
x 2+ 12.35 x 2+ 8x 0.25
20 x 0.35 = 72.4
72.4 x 0.15 x 0.25
72.4 x 0.65
VOLUME SAT.
84.00 84 m'
1.00 1 bh
22.72 22.72
41.40 41.40
8.6112
36.69 36.68925
11.88 11.88525
11.69 11.6875
112.50 112.49675 m3
1.44 1.42
1.38 1.38
0.51 0.51
1.15 1.145625
4.46 4.455625 m3
0.36 0.36 m3
36.66 37.5 m3
5.68 5.68
5.52 5.52
2.34 2.3375
5.64 5.64
17.15 17.1465
16.66 16.6635
44.13 44.134125
4.04 4.0375
20.85 20.85525
10.71 10.7124375
186.40 186.4 m3
12.71 12.717 m3
= 1566.30 1566.296056
473.27 473.2608
2039.57 2039.556856 m3
0.44 0.432
2.88 2.88 m3
757.22 757.21728 kg
19.20 19.2 m2
8.26 8.26 m3
966.39 966.3985536
212.65 212.6580151
295.28 273.0188971
1452.07 1452.075466 kg
66.08 66.08 m2
12.98 12.985 m3
2271.65 2271.65184
126.21 126.20288
389.65 389.651392
2787.51 2787.506112 kg
138.60 138.6 m2
1.92 1.92 m3
504.81 504.81152
99.91 99.91061333
604.72 604.7221333 kg
32.00 32 m2
7.68 7.68
2.04 2.04
9.72 9.72 m3
1726.45 1726.455398
189.95 189.9550536
321.82 321.817344
412.68 412.6834176
45.41 45.4059229
80.46 80.454336
2776.77 2776.771473 kg
99.84 99.84
26.52 26.52
126.38 126.36 m2
1.52 1.52
0.40 0.4
1.92 1.92 m3
287.74 287.7425664
31.66 31.6591756
59.95 59.946368
71.94 71.9356416
7.92 7.9147939
14.99 14.986592
474.20 474.1851375 kg
24.70 24.7
2.00 2.00
26.70 26.70
8.52 8.52 m3
976.81 976.8102912
37.86 37.860864
37.86 37.860864
329.67 329.6734733
161.22 161.2118547
30.29 30.2886912
1573.71 1573.706038 kg
77.44 77.44 m2
5.10 5.1 m3
666.35 666.3512064
53.01 53.0052096
7.57 7.5721728
109.97 109.9739784
208.24 208.234752
1045.14 1045.137319 kg
55.44 55.44 m2
2.57 2.575 m3
339.49 339.4857472
112.05 112.0568189
138.12 138.1132768
589.66 589.6558429 kg
35.70 35.7 m2
0.73 0.73 m3
149.55 149.55
39.15 39.15444352
188.70 188.70 kg
10.95 10.95
3.00 3
1.12 1.12
4.12 4.12 m3
129.97 129.9692472
393.75 393.75
167.35 167.3450189
151.44 151.44
49.99 49.99
64.36 64.3634688
956.86 956.86 kg
77.76 77.76 m2
1.28 1.28
79.04 79.04
2.72 2.715
0.06 0.06 m3
2.78
301.60 301.5953044
171.32 171.3204096
472.92 472.915714 kg
47.06 47.06 m2
124 124 bh
RENCANA ANGGARAN BIAYA (RAB)
= 25,180,351.00
BACK UP DATA
Type E
- timur dan utara P= 9.1+9.7=18.8 18.8 x 0.975 x 2.12 = 36.86
- sisi selatan dibarat type D P=5.5 (E') 5.5 x 0.975 x 0.8 = 4.29
Type D
- detail D pojok timur selatan ( P=4.40+4.2=8.6) 8.6 x 1.375 x 1 = 11.82
Type H
Undag(P=5+2,3 =7.3) 7.3 x 0.4 x 0.3 = 0.88
- Undag type D bagian selatan dan timur P= 4.2+ 292 =7,12 7.12 x 0.6 x 0.4 = 1.71
- tipe E timur dan utara dan selatan dibarat T D P=18.8 + 5.5=24.3 24.3 x 0.975 x 0.05 = 1.18
- tipe G (barat +selatan+utara) bataran 48.1 x 0.6 x 0.05 = 1.56
total urugan pasir 6.59 6.59 m3
3 Pek. Urugan pasir di bawah pondasi setempat 20 x 0.6 x 0.6 x 0.05 = 0.36 0.36 m3
4 Pek. Urugan kembali tanah Pondasi menerus 1 x 146.30 = 48.58
3
Pek. Urugan Tanah Peninggian lantai p=17 ; L= 8.75; T=0.2 17 x 8.75 x 0.2 = 29.75
Pek. Urugan Tanah Kembali sepanjang bataran P=48,1. L=0.30. T=0.8 48.1 x 0.3 x 0.8 11.54
Pek. Urugan kembali podium P= 9 ; L= 8.75 ; T = .30 9 x 8.75 x 0.3 23.62
Pek. Urugan tanah di tipe D ( P=4.0 , L= 420 , T=2.75) 3.4 x 4.2 x 2.75 39.27
152.76 152.76 m3
Type D sisi selatan p= 4.2 , t= (3,0 + 2,0)/2+0.75+0.17=3.42 4.2 ( 1.37 + 0.975 ) 3.42 = 17.64
2
- tipe E timur dan utara dan selatan dibarat T D P=18.8 + 5.5=24.3 24.3 ( 0.975 x 0.92 ) 0.92 = 21.18
P= 9.1+9.7+5,5 2
2 Pek. Beton file cap 60X 60 ( K 275 ) 20 x 0.6 x 0.6 x 0.4 = 2.88 2.88 m3
Pek. Pembesian file cap 60 X 60 1.2 x 20 x 1.58 x 20 = 758.40 758.40 kg
Pek. Begesting file cap 60 X 60 ( 2x pakai ) 20 x 4 x 0.6 x 0.4 = 19.20 19.20 m2
3 Pek. Beton Sloof 25/35 (K 275) P= (26.35X2)+( 4X 12) -(20 X 0.35) = 93.7 93.7 x 0.25 x 0.35 = 8.20 8.20 m3
6 Pek. Beton Balok 25/50 (K 275) B5-B5' ( 0.3 + 0.5 ) x 0.25 x 4.8 x 16 = 7.68
2
- jurai ( 0.3 + 0.5 ) x 4x 0.25 x 5.1 = 2.04
2 9.72 9.72 m3
Pek. Pembesian Balok 25/50 B5-B5' Ø16
16 x 12 x 1.58 x 5.7 = 1729.15
Ø13
16 x 2x 1.04 x 5.7 = 189.70
gelang
16 x 5.1 x 0.395 x 1.25 = 322.32
0.125
- jurai Ø16 4 x 12 x 1.58 x 5.45 = 413.33
Ø13 4 x 2x 1.04 x 5.45 = 45.34
gelang Ø8-15
4 x 5.1 x 0.395 x 1.25 = 80.58
0.125 2780.42 2780.42 kg
Pek. Begesting Balok 25/50 B5-B5' ( 0.5 + 0.3 + 0.25 ) x 2x 16 x 4.8 = 99.84
2
begesting jurai ( 0.3 + 0.5 + 0.25 ) x 2x 4x 5.1 = 26.52
2
126.36 126.36 m2
7 Pek. Beton Balok 25/50 (K 275) B5A
( 0.3 + 0.5 ) x 16 x 0.25 x 0.95 = 1.52
2
- pemucu ( 0.3 + 0.5 ) x 4x 0.25 x 1 = 0.40
2 1.92 1.92 m3
Pek. Pembesian Balok 25/50 B5A Ø16
16 x 12 x 0.95 x 1.58 = 288.19
Ø13
16 x 2 x 0.95 x 1.04 = 31.62
gelangØ8-125
16 x 0.95 x 1.25 x 0.395 = 60.04
0.125
pemucu konsul bawah Ø16
- pembesian 4 x 12 x 0.95 x 1.58 = 71.94
Ø13
4 x 2 x 0.95 x 1.04 = 7.91
gelang Ø8-15
4 x 0.95 x 1.25 x 0.395 = 15.01
0.125
474.71 474.71 kg
Pek. Begisting kuda kuda 25x50 B5A ( 0.5 + 0.3 + 0.25 ) x 2x 20 x 0.95 = 24.70
2
+ 20 x 0.25 x 0.4 2.00
26.70 26.70 m2
83 x 8 x 1.58 = 1049.12
extra atas 2 x 0.7 x 20 x 1.58 = 44.24
extra bawah 2 x 0.7 x 20 x 1.58 = 44.24
gelangØ8-125 77.4 x 1.35 x 0.395 = 330.19
0.125
2 Ø13 83 x 2 x 1.04 = 172.64
1640.43 1640.43 kg
10 Pek. Beton Ring Balok 20/25 (K 275) B3 51.5 x 0.2 x 0.25 = 2.57 2.57 m3
Pek. Pembesian Ring balok 20/25 B3 Ø16+sambungan
53.8 x 4 x 1.58 = 340.02
Ø13
53.8 x 2 x 1.04 = 111.90
gelangØ8-125
51.5 x 0.85 x 0.395 = 138.33
0.125 590.25 590.25 kg
Pek. Begesting ring Balok 20/25 51 x 0.7 = 35.70 35.70 m2
11 Pek. Beton Balok Nok 20/25 (K 275) B4 14.6 x 0.2 x 0.25 = 0.73 0.73 m3
Pek. Pembesian balok nok 20/25 B4 6Ø13
15.80 x 6 x 1.58 = 149.78
gelangØ8-125
14.6 x 0.85 x 0.395 = 39.22
0.125 189.00 189.00 kg
Pek. Begesting Balok nok 20/25 14.6 x 0.75 = 10.95 10.95 m2
Type E
- timur dan utara P= 9.1+9.7=18.8 18.8 x 0.975 x 2.12 = 36.86
- sisi selatan dibarat type D P=5.5 (E') 5.5 x 0.975 x 0.8 = 4.29
Type D
- detail D pojok timur selatan ( P=4.40+4.2=8.6) 8.6 x 1.375 x 1 = 11.82
Type H
Undag(P=5+2,3 =7.3) 7.3 x 0.4 x 0.3 =
- Undag type D bagian selatan dan timur P= 4.2+ 292 =7,12 7.12 x 0.6 x 0.4 =
- tipe E timur dan utara dan selatan dibarat T D P=18.8 + 5.5=24.3 24.3 x 0.975 x 0.05 = 1.18
- tipe G (barat +selatan+utara) bataran 48.1 x 0.65 x 0.05 =
total urugan pasir 4.50 4.50 m3
3 Pek. Urugan pasir di bawah pondasi setempat 20 x 0.6 x 0.6 x 0.05 = 0.36 0.36 m3
4 Pek. Urugan kembali tanah Pondasi menerus 1 x 114.33 = 48.58
3
Pek. Urugan Tanah Peninggian lantai p=17 ; L= 8.75; T=0.2 17 x 8.75 x 0.2 =
Pek. Urugan Tanah Kembali sepanjang bataran P=48,1. L=0.30. T=0.8 48.1 x 0.3 x 0.8
Pek. Urugan kembali podium P= 9 ; L= 8.75 ; T = .30 9 x 8.75 x 0.3
Pek. Urugan tanah di tipe D ( P=4.0 , L= 420 , T=2.75) 3.4 x 4.2 x 2.75 39.27
87.85 87.85 m3
5 Pek. Pasangan batu kosong batu kali
- tipe A ( barat dan selatan) 35.5 x 0.8 x 0.2 = 5.68
- tipe A1 (utara dan tengah) 34.5 x 0.8 x 0.2 = 5.52
- tipe B Podium depan 13.5 x 0.78 x 0.2 =
- tipe D sisi timur dan selatan (Pojok) P=8.6 m 8.6 x 1.375 x 0.2 = 2.36
- tipe E timur dan utara dan selatan dibarat T D P=18.8 + 5.5=24.3 24.3 x 1.2 x 0.2 = 5.78
- tipe G (barat+selatan+utara) bataran 48.1 x 0.65 x 0.2 =
total pas.batu kosong 19.34 19.34 m3
6 Pek. Pasangan pondasi batu kali 1 : 5
- tipe A ( barat dan selatan) 35.5 ( 0.75 + 0.3 ) 0.92 = 17.15
2
- tipe A1 (utara dan tengah) 34.5 ( 0.75 + 0.3 ) 0.92 = 16.66
2
- tipe B Podium depan 13.5 ( 0.75 + 0.3 ) 1.97 =
2
-
- tipe D po sisi timiur : p=4.60 t=3.75+0,17=3,92 4.6 ( 1.37 + 0.975 ) 3.92 = 21.14
2
bataran + 4.6 ( 0.3 + 0.675 ) 1.05 =
2
Type D sisi selatan p= 4.4 , t= (3,0 + 2,0)/2+0.75+0.17=3.42 4.4 ( 1.37 + 0.975 ) 3.42 = 17.64
2
- tipe E timur dan utara dan selatan dibarat T D P=18.8 + 5.5=24.3 14.92 ( 0.975 x 0.92 ) 0.92 = 13.00
P= 9+8,75+5,5 2
2 Pek. Beton file cap 60X 60 ( K 275 ) 20 x 0.6 x 0.6 x 0.4 = 2.88 2.88 m3
Pek. Pembesian file cap 60 X 60 1.2 x 20 x 1.58 x 20 = 758.40 758.40 kg
Pek. Begesting file cap 60 X 60 ( 2x pakai ) 20 x 4 x 0.6 x 0.4 = 19.20 19.20 m2
3 Pek. Beton Sloof 25/35 (K 275) P= (26.35X2)+( 4X 12) -(20 X 0.35) = 93.7 93.7 x 0.25 x 0.35 = 8.20 8.20 m3
6 Pek. Beton Balok 25/50 (K 275) B5-B5' ( 0.3 + 0.5 ) x 0.25 x 4.8 x 16 = 7.68
2
- jurai ( 0.3 + 0.5 ) x 4x 0.25 x 5.1 = 2.04
2 9.72 9.72 m3
Pek. Pembesian Balok 25/50 B5-B5' Ø16
16 x 12 x 1.58 x 5.7 = 1729.15
Ø13
16 x 2x 1.04 x 5.7 = 189.70
gelang
16 x 5.1 x 0.395 x 1.25 = 322.32
0.125
- jurai Ø16 4 x 12 x 1.58 x 5.45 = 413.33
Ø13 4 x 2x 1.04 x 5.45 = 45.34
gelang Ø8-15
4 x 5.1 x 0.395 x 1.25 = 80.58
0.125 2780.42 2780.42 kg
Pek. Begesting Balok 25/50 B5-B5' ( 0.5 + 0.3 + 0.25 ) x 2x 16 x 4.8 = 99.84
2
begesting jurai ( 0.3 + 0.5 + 0.25 ) x 2x 4x 5.1 = 26.52
2
126.36 126.36 m2
7 Pek. Beton Balok 25/50 (K 275) B5A
( 0.3 + 0.5 ) x 16 x 0.25 x 0.95 = 1.52
2
- pemucu ( 0.3 + 0.5 ) x 4x 0.25 x 1 = 0.40
2 1.92 1.92 m3
Pek. Pembesian Balok 25/50 B5A Ø16
16 x 12 x 0.95 x 1.58 = 288.19
Ø13
16 x 2 x 0.95 x 1.04 = 31.62
gelangØ8-125
16 x 0.95 x 1.25 x 0.395 = 60.04
0.125
pemucu konsul bawah Ø16
- pembesian 4 x 12 x 0.95 x 1.58 = 71.94
Ø13
4 x 2 x 0.95 x 1.04 = 7.91
gelang Ø8-15
4 x 0.95 x 1.25 x 0.395 = 15.01
0.125
474.71 474.71 kg
Pek. Begisting kuda kuda 25x50 B5A ( 0.5 + 0.3 + 0.25 ) x 2x 20 x 0.95 = 24.70 m2
2
+ 20 x 0.25 x 0.4 2.00
26.70
83 x 8 x 1.58 = 1049.12
extra atas 2 x 0.7 x 20 x 1.58 = 44.24
extra bawah 2 x 0.7 x 20 x 1.58 = 44.24
gelangØ8-125 77.4 x 1.35 x 0.395 = 330.19
0.125
2 Ø13 83 x 2 x 1.04 = 172.64
1640.43 1640.43 kg
10 Pek. Beton Ring Balok 20/25 (K 275) B3 51.5 x 0.2 x 0.25 = 2.57 2.57 m3
Pek. Pembesian Ring balok 20/25 B3 Ø16+sambungan
53.8 x 4 x 1.58 = 340.02
Ø13
53.8 x 2 x 1.04 = 111.90
gelangØ8-125
51.5 x 0.85 x 0.395 = 138.33
0.125 590.25 590.25 kg