Anda di halaman 1dari 299

DAFTAR HARGA SATUAN BAHAN DAN UPAH

TAHUN ANGGARAN 2015

HARGA
NO. URAIAN SATUAN SATUAN
Rp.
1 2 3 4

A. UPAH TENAGA :
1 Pekerja hari 100,000
2 Tukang Gali hari 130,000
3 Mandor hari 200,000
4 Tukang cat / plitur / batu hari 130,000
5 Kepala tukang cat / plitur / batu hari 150,000
6 Tukang kayu hari 130,000
7 Kepala tukang kayu hari 150,000
8 Tukang Besi hari 130,000
9 Kepala Tukang besi hari 150,000
10 Tukang Besi Profil hari 130,000
11 Kepala Tukang Besi Profil hari 150,000

B. B A H A N :
Kelompok Material Alam :
12 A i r liter 100
13 Tanah urug m³ 66,000
14 Tanah urug Pilihan m³ 75,000
15 Pasir urug m³ 86,000
16 Pasir batu (sirtu) m³ 65,000
17 Pasir pasang m³ 175,000
18 Pasir Beton m³ 240,000
19 Batu belah 15/20 m³ 185,000
20 Batu pecah tangan 2-3 cm (split) m³ 240,000
21 Batu bata buah 750

Kelompok Kayu
21 a. Kayu Kruing : Balok 8/15 m³ 3,400,000
b. Kayu Kruing : 5/7 & 4/6 m³ 3,400,000
c. Kayu Kruing : 3/4 & 3/5 m³ 3,400,000
d. Kayu Kruing : 2/3 m³ 3,400,000
22 a. Kayu Meranti : Balok 8/15 m³ 3,400,000
b. Kayu Meranti 5/7 & 4/6 (ikat) m³ 3,400,000
Kayu Meranti 5/7 & 4/6 (lepas) m³ 3,400,000
c. Kayu Meranti : 3/4 & 3/5 m³ 3,400,000
d. Kayu Meranti : 2/3 m³ 3,400,000
e. Papan Kayu Meranti ( 2 x 20 x 400 ) m³ 3,400,000
f. Papan Kayu Meranti ( 2 x 25 x 400 ) m³ 3,400,000
23 Kayu Kelas 2 m³ 3,400,000
24 Papan kayu Kelas 2 uk 2 x 20 x 200 m³ 1,600,000
25 GRC 4 mm 1,22 x 2,44 m, kalsiboard lbr 68,500
26 Gipsum Board lbr 68,500
27 Plywood 9 mm uk. 120 x 240 mm lbr 100,000
28 Plywood 12 mm uk. 120 x 240 mm lbr 140,000
29 Plywood 18 mm uk. 120 x 240 mm lbr 220,000
30 Ijuk kg 15,000
31 Dolken Ø 5 btg 15,000
32 Dolken Ø 12 btg 18,000
33 List Kayu Profil m' 19,000

Kelompok Besi / Baja :


34 P a k u kg 12,000

Harga Saruan Bahan dan Upah 1 dari 299


HARGA
NO. URAIAN SATUAN SATUAN
Rp.
1 2 3 4
35 P a k u Sekrup kg 20,200
36 Paku asbes gelombang kg 16,000
37 Paku sumbat kg 7,500
38 Paku Pancing kg 11,500
39 Besi beton/baja tulangan beton kg 8,000
40 Pintu PVC Biasa unit 250,000
41 Besi beton U-24 kg 7,500
42 Besi beton U-29 kg 7,500

43 Besi Strip ( tebal 5 mm, lebar 5 Cm ) kg 14,000


44 Bondex ( plat beton ) m² 130,000
45 Kawat beton (bindrad) kg 10,800
46 Wiremesh M6 m² 57,000
47 Kawat Las kg 35,000
48 Besi Hollo 4x4 cm m1 12,000
49 Besi Hollo 4x6 cm m1 14,500
50 Kran air standar buah 33,000
51 Kunci tanam 2 X Slagg buah 110,000
52 Engsel pintu Nylon buah 14,000
53 Engsel jendela Nylon buah 12,000
54 Kait angin 6" psg 16,000
55 G r e n d e l buah 15,000
56 Tarikan / Pegangan pintu buah 75,000
57 Espagnolet buah 35,000
58 Kabel NYM (3 x 2,5) m1 6,500
59 Solatif Kabel rol 10,000
60 Pipa Kabel m1 4,500
61 T.Dus bh 1,500
62 Inbouw - dus bh 2,000

Kelompok Lantai :
57 Keramik polos kw.1 ukuran 30 x 30 cm m² 60,000
58 Keramik motif kw.1 ukuran 30 x 30 cm m² 65,000
59 Keramik polos kw.1 ukuran 40 x 40 cm m² 57,000
60 Keramik motif kw.1 ukuran 40 x 40 cm m² 70,000
61 Keramik dinding polos kw.1 ukuran 20 x 25 cm m² 64,000
62 Keramik dinding motif kw.1 uikuran 20 x 25 cm m² 70,000
63 Keramik dinding polos kw 1 uk. 10 x 20 cm m² 57,000
64 Keramik Artistik 10/20 buah 9,750
65 Paving segi 4 warna tb. 8 cm (K. 200) m² 66,000
66 Paving segi 6 warna tb. 8 cm (K. 200) m² 66,000
67 Grefel beton Ø 20 cm buah 47,500
68 Grefel beton Ø 30 cm buah 65,500
69 Roster bata (10x20) buah 3,500
70 Pelat Beton Precast Ex. Hebel m² 324,000

Kelompok Atap :
70 Genteng pres lokal buah 1,500
71 Genteng pres jatiwangi buah 1,700
72 Kerpus genteng pres lokal buah 2,000
73 Kerpus genteng pres jatiwangi buah 3,315
74 Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm lbr 59,000
75 E t e r n i t lbr 15,000
76 Atap Polikarbonat; lebar = 120 cm tipis m' 197,000
77 Fiberglass gelombang uk. 180 x 80 cm lbr 63,000
Genteng Metal m2 60,000
Bubungan Genteng Metal m1 25,000
78 Fiberglass plat lebar 100 cm m' 45,000

Harga Saruan Bahan dan Upah 2 dari 299


HARGA
NO. URAIAN SATUAN SATUAN
Rp.
1 2 3 4

Kelompok Cat / Minyak :


79 Cat Warna ( Kayu ). kg 49,000
80 Cat Warna ( besi ). kg 50,000
81 Cat dasar ( meni kayu ) kg 34,000
82 Cat dasar ( meni besi ) kg 35,000
83 Cat tembok kg 26,000
84 Plamur Kayu kg 15,000
85 Plamur Tembok kg 16,000
86 Minyak cat kg 13,000
87 Minyak Bekisting ( olie bekas ) ltr 3,000
88 Politur kg 35,000
89 Politur Jadi kg 45,000
90 Dempul kg 34,000
91 Amplas lbr 4,000
92 Batu kambang (batu apung) kg 16,000
93 S o l a r ltr 7,100
94 Solar industri ltr 10,000
95 Minyak pelumas ltr 23,850
96 Kuas cat buah 11,000
97 Kuas cat 2" buah 5,000
98 Kuas cat 3" buah 9,000
99 Roll Cat buah 22,000
100 Residu / Soligium ltr 5,000
101 Lem Kayu kg 22,000
102 Lem Kuning kg 44,000
103 Wood Filler kg 42,000

Kelompok Cement, Kaca dan Lain-lain :


104 Portland Cement ( PC ) 50 kg zak 67,000
105 Portland Cement ( PC ) kg 1,340
106 Cement warna kg 3,500
107 Cement putih kg 2,500
108 Kaca bening tebal 3 mm m² 69,000
109 Kaca bening tebal 5 mm m² 83,000
110 Bak Mandi Fiberglass, volume 120 ltrr (kotak) buah 214,200
111 Kloset duduk / Monoblok " INA ", Putih Buah 306,000
112 Kloset jongkok INA, warna muda Buah 175,000
113 Floordrain (saringan buangan air KM/WC) buah 35,000
114 Wastafel Kw.1 pedes steel unit 350,000
115 Bak Cuci Stainless Steel 80 Cm Buah 255,000

KELOMPOK AIR BERSIH


116 Pipa PVC
Ukuran Ø ½" ( AW ) ex Wavin m' 3,375
Ukuran Ø ¾" ( AW ) ex Wavin m' 4,475
Ukuran Ø 1" ( AW ) ex Wavin m' 5,500
Ukuran Ø 1¼" ( AW ) ex Wavin m' 10,000
Ukuran Ø 1½" ( AW ) ex Wavin m' 13,240
Ukuran Ø 2" ( AW ) ex Wavin m' 16,700
Ukuran Ø 2½" ( AW ) ex Wavin m' 26,500
Ukuran Ø 3" ( AW ) ex Wavin m' 37,300
Ukuran Ø 4" ( AW ) ex Wavin m' 55,700
117 Seal Tape buah 2,650

Keterangan : Harga Satuan sudah termasuk PPN dan PPh

Harga Saruan Bahan dan Upah 3 dari 299


TAHUN ANGGARAN 2015

HARGA SAT JUMLAH


NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A. PEKERJAAN PERSIAPAN SNI 03-2835-2002
A.001 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank
Bahan
Kayu Kelas 2 Uk. 5/7 (ikat) 0.0100 m³ 3,400,000.00 34,000.00
Paku Biasa 2" - 5" 0.0200 kg 12,000.00 240.00
Kayu Papan Kelas 2 Uk. (2 x 20 x 400) 0.0070 m³ 1,600,000.00 11,200.00
Jumlah (1) 45,440.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 25,500.00
Jumlah (1) + (2) 70,940.00
A.002 Membersihkan 1 m² lapangan dan perataan
Pekerja 0.1000 OH 100,000.00 10,000.00
Mandor 0.0500 OH 200,000.00 10,000.00
Jumlah (2) 20,000.00
Jumlah (2) 20,000.00
A.003 Membongkar 1 m³ beton bertulang
Pekerja 6.6670 OH 100,000.00 666,700.00
Mandor 0.3330 OH 200,000.00 66,600.00
Jumlah 733,300.00
A.004 Membongkar 1 m³ dinding tembok bata merah
Pekerja 6.6670 OH 100,000.00 666,700.00
Mandor 0.0330 OH 200,000.00 6,600.00
Jumlah 673,300.00
A.005 Mengerjakan1 m² pengukuran kembali (site)
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang Kayu 0.0100 OH 130,000.00 1,300.00
Peralatan 0.5000 OH 1,000.00 500.00
Jumlah 3,800.00
A.006 Mengupas 1 m² plesteran
Pekerja 0.1250 OH 100,000.00 12,500.00
Mandor 0.0125 OH 200,000.00 2,500.00
Jumlah 15,000.00
A.007 Membongkar 1 m² plesteran dinding/ siaran
Pekerja 0.1250 OH 100,000.00 12,500.00
Mandor 0.0125 OH 200,000.00 2,500.00
Jumlah 15,000.00
A.008 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali)
Pekerja 0.5000 OH 100,000.00 50,000.00
Mandor 0.0500 OH 200,000.00 10,000.00
Jumlah 60,000.00
A.009 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali)
Pekerja 0.1000 OH 100,000.00 10,000.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah 12,000.00
A.010 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali)
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0200 OH 200,000.00 4,000.00
Jumlah 38,500.00

Analisa Pekerjaan 4 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
A.011 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
Pekerja 0.1500 OH 100,000.00 15,000.00
Tukang Kayu 0.0750 OH 130,000.00 9,750.00
Kepala Tukang 0.0075 OH 150,000.00 1,125.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah 28,875.00
A.012 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
Pekerja 4.0000 OH 100,000.00 400,000.00
Tukang Kayu 6.0000 OH 130,000.00 780,000.00
Kepala Tukang 0.6000 OH 150,000.00 90,000.00
Mandor 0.4000 OH 200,000.00 80,000.00
Jumlah 1,350,000.00
A.013 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)
Pekerja 4.0000 OH 100,000.00 400,000.00
Tukang Kayu 3.0000 OH 130,000.00 390,000.00
Mandor 0.2000 OH 200,000.00 40,000.00
Jumlah 830,000.00
A.014 Membongkar 1 m² plafond (bongkaran dipakai kembali)
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.3000 OH 130,000.00 39,000.00
Kepala Tukang 0.0300 OH 150,000.00 4,500.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah 55,500.00
A.015 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali)
Pekerja 0.1500 OH 100,000.00 15,000.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah 18,000.00
B. PEKERJAAN TANAH SNI
B.001 Menggali 1 m³ tanah biasa sedalam 1 meter
Tenaga
Pekerja 0.4000 OH 100,000.00 40,000.00
Mandor 0.0400 OH 200,000.00 8,000.00
Jumlah 48,000.00
B.002 Menggali 1 m³ tanah biasa sedalam 2 meter
Tenaga
Pekerja 0.5260 OH 100,000.00 52,600.00
Mandor 0.0526 OH 200,000.00 10,520.00
Jumlah 63,120.00
B.003 Menggali 1 m³ tanah keras sedalam 1 meter
Tenaga
Pekerja 0.6250 OH 100,000.00 62,500.00
Mandor 0.0625 OH 200,000.00 12,500.00
Jumlah 75,000.00
B.004 Membuang 1 m³ tanah sejauh 30 meter
Tenaga
Pekerja 0.3300 OH 100,000.00 33,000.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah 35,000.00
B.005 Mengurug kembali 1 m³ galian
Tenaga
Pekerja 0.2500 OH 100,000.00 25,000.00
Mandor 0.0083 OH 200,000.00 1,666.67
Jumlah 26,666.67
B.006 Memadatkan 1 m³ tanah (per 20 cm)
Tenaga
Pekerja 0.5000 OH 100,000.00 50,000.00
Mandor 0.0500 OH 200,000.00 10,000.00
Jumlah 60,000.00
B.007 Mengurug 1 m³ pasir urug
Bahan
Pasir Urug 1.2000 m³ 86,000.00 103,200.00
Jumlah (1) 103,200.00
Tenaga
Pekerja 0.3000 OH 100,000.00 30,000.00

Analisa Pekerjaan 5 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 32,000.00
Jumlah (1) + (2) 135,200.00
B.008 Memasang 1 m² lapisan ijuk tebal 10 cm
Bahan
Ijuk 6.0000 kg 15,000.00 90,000.00
Jumlah (1) 90,000.00
Tenaga
Pekerja 0.1500 OH 100,000.00 15,000.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah (2) 18,000.00
Jumlah (1) + (2) 108,000.00
B.009 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunan
Bahan
Sirtu 1.2000 m³ 65,000.00 78,000.00
Jumlah (1) 78,000.00
Tenaga
Pekerja 0.2500 OH 100,000.00 25,000.00
Mandor 0.0250 OH 200,000.00 5,000.00
Jumlah (2) 30,000.00
Jumlah (1) + (2) 108,000.00
C. PEKERJAAN PONDASI SNI 03-2836-2002
C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP
Bahan
Batu Belah 15/20 1.2000 m³ 185,000.00 222,000.00
Portland Cement (PC) 202.0000 kg 1,340.00 270,680.00
Pasir Pasang (PP) 0.4850 m³ 175,000.00 84,875.00
Jumlah (1) 577,555.00
Tenaga
Pekerja 1.5000 OH 100,000.00 150,000.00
Tukang Batu 0.6000 OH 130,000.00 78,000.00
Kepala Tukang 0.0600 OH 150,000.00 9,000.00
Mandor 0.0750 OH 200,000.00 15,000.00
Jumlah (2) 252,000.00
Jumlah (1) + (2) 829,555.00
C.002 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP
Bahan
Batu Belah 15/20 1.2000 m³ 185,000.00 222,000.00
Portland Cement (PC) 136.0000 kg 1,340.00 182,240.00
Pasir Pasang (PP) 0.5440 m³ 175,000.00 95,200.00
Jumlah (1) 499,440.00
Tenaga
Pekerja 1.5000 OH 100,000.00 150,000.00
Tukang Batu 0.6000 OH 130,000.00 78,000.00
Kepala Tukang 0.0600 OH 150,000.00 9,000.00
Mandor 0.0750 OH 200,000.00 15,000.00
Jumlah (2) 252,000.00
Jumlah (1) + (2) 751,440.00
C.003 Memasang 1 m³ batu kosong (aanstamping)
Bahan
Batu Belah 15/20 1.2000 m³ 185,000.00 222,000.00
Pasir Urug 0.4320 m³ 86,000.00 37,152.00
Jumlah (1) 259,152.00
Tenaga
Pekerja 0.7800 OH 100,000.00 78,000.00
Tukang Batu 0.3900 OH 130,000.00 50,700.00
Kepala Tukang 0.0390 OH 150,000.00 5,850.00
Mandor 0.0390 OH 200,000.00 7,800.00
Jumlah (2) 142,350.00
Jumlah (1) + (2) 401,502.00

Analisa Pekerjaan 6 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
D. PEKERJAAN DINDING SNI 03-2837-2002
D.001 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 3 PP
Bahan
Bata Merah 70.0000 buah 750.00 52,500.00
Portland Cement (PC) 14.3700 kg 1,340.00 19,255.80
Pasir Pasang (PP) 0.0400 m³ 175,000.00 7,000.00
Jumlah (1) 78,755.80
Tenaga
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang Batu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah (2) 47,500.00
Jumlah (1) + (2) 126,255.80
D.002 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 5 PP
Bahan
Bata Merah 70.0000 buah 750.00 52,500.00
Portland Cement (PC) 9.6800 kg 1,340.00 12,971.20
Pasir Pasang (PP) 0.0450 m³ 175,000.00 7,875.00
Jumlah (1) 73,346.20
Tenaga
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang Batu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah (2) 47,500.00
Jumlah (1) + (2) 120,846.20
D.003 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP
Bahan
Bata Terawang / Roster 30.0000 buah 3,500.00 105,000.00
Portland Cement (PC) 14.0000 kg 1,340.00 18,760.00
Pasir Pasang (PP) 0.0320 m³ 175,000.00 5,600.00
Jumlah (1) 129,360.00
Tenaga
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang Batu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah (2) 47,500.00
Jumlah (1) + (2) 176,860.00
E. PEKERJAAN PLESTERAN SNI 03-2837-2002
E.001 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC) 7.7760 kg 1,340.00 10,419.84
Pasir Pasang (PP) 0.0230 m³ 175,000.00 4,025.00
Jumlah (1) 14,444.84
Tenaga
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Batu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 43,750.00
Jumlah (1) + (2) 58,194.84
E.002 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm
Bahan
Portland Cement (PC) 5.1840 kg 1,340.00 6,946.56
Pasir Pasang (PP) 0.0260 m³ 175,000.00 4,550.00
Jumlah (1) 11,496.56
Tenaga
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Batu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 43,750.00

Analisa Pekerjaan 7 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah (1) + (2) 55,246.56

Analisa Pekerjaan 8 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
E.003 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC) 7.0700 kg 1,340.00 9,473.80
Pasir Pasang (PP) 0.0210 m³ 175,000.00 3,675.00
Jumlah (1) 13,148.80
Tenaga
Pekerja 0.2600 OH 100,000.00 26,000.00
Tukang Batu 0.2000 OH 130,000.00 26,000.00
Kepala Tukang 0.0200 OH 150,000.00 3,000.00
Mandor 0.0130 OH 200,000.00 2,600.00
Jumlah (2) 57,600.00
Jumlah (1) + (2) 70,748.80
E.004 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement (PC) 6.3400 kg 1,340.00 8,495.60
Pasir Pasang (PP) 0.0120 m³ 175,000.00 2,100.00
Jumlah (1) 10,595.60
Tenaga
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang Batu 0.1400 OH 130,000.00 18,200.00
Kepala Tukang 0.0140 OH 150,000.00 2,100.00
Mandor 0.0150 OH 200,000.00 3,000.00
Jumlah (2) 53,300.00
Jumlah (1) + (2) 63,895.60
E.005 Memasang 1 m² acian
Bahan
Portland Cement (PC) 3.2500 kg 1,340.00 4,355.00
Jumlah (1) 4,355.00
Tenaga
Pekerja 0.1500 OH 100,000.00 15,000.00
Tukang Batu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0080 OH 200,000.00 1,600.00
Jumlah (2) 31,100.00
Jumlah (1) + (2) 35,455.00
F. PEKERJAAN KAYU SNI 03-3434-2002
F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu 1.2000 m³ 3,400,000.00 4,080,000.00
Paku 10 cm 1.2500 kg 12,000.00 15,000.00
Lem Kayu 1.0000 kg 22,000.00 22,000.00
Jumlah (1) 4,117,000.00
Tenaga
Pekerja 6.0000 OH 100,000.00 600,000.00
Tukang Kayu 18.0000 OH 130,000.00 2,340,000.00
Kepala Tukang 2.0000 OH 150,000.00 300,000.00
Mandor 0.3000 OH 200,000.00 60,000.00
Jumlah (2) 3,300,000.00
Jumlah (1) + (2) 7,417,000.00
F.002 Membuat dan memasang 1 m² daun pintu panel; Kayu Kruing
Bahan
Papan Kayu Kruing 0.0400 m³ 3,400,000.00 136,000.00
Lem Kayu 0.5000 kg 22,000.00 11,000.00
Jumlah (1) 147,000.00
Tenaga
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Kayu 2.5000 OH 130,000.00 325,000.00
Kepala Tukang 0.2500 OH 150,000.00 37,500.00
Mandor 0.0500 OH 200,000.00 10,000.00
Jumlah (2) 472,500.00
Jumlah (1) + (2) 619,500.00

Analisa Pekerjaan 9 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F.003 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Kruing
Bahan
Papan Kayu Kruing 0.0240 m³ 3,400,000.00 81,600.00
Lem Kayu 0.3000 kg 22,000.00 6,600.00
Jumlah (1) 88,200.00
Tenaga
Pekerja 0.8000 OH 100,000.00 80,000.00
Tukang Kayu 2.0000 OH 130,000.00 260,000.00
Kepala Tukang 0.2000 OH 150,000.00 30,000.00
Mandor 0.0400 OH 200,000.00 8,000.00
Jumlah (2) 378,000.00
Jumlah (1) + (2) 466,200.00
F.004 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Kruing
Bahan
Papan Kayu Kruing 0.0640 m³ 3,400,000.00 217,600.00
Lem Kayu 0.5000 kg 22,000.00 11,000.00
Jumlah (1) 228,600.00
Tenaga
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Kayu 3.0000 OH 130,000.00 390,000.00
Kepala Tukang 0.3000 OH 150,000.00 45,000.00
Mandor 0.0500 OH 200,000.00 10,000.00
Jumlah (2) 545,000.00
Jumlah (1) + (2) 773,600.00
F.005 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu 0.0600 m³ 3,400,000.00 204,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 12,000.00 1,800.00
Jumlah (1) 205,800.00
Tenaga
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang Kayu 2.0000 OH 130,000.00 260,000.00
Kepala Tukang 0.2000 OH 150,000.00 30,000.00
Mandor 0.0250 OH 200,000.00 5,000.00
Jumlah (2) 345,000.00
Jumlah (1) + (2) 550,800.00
F.006 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu 1.1000 m³ 3,400,000.00 3,740,000.00
Besi Strip 5 mm 15.0000 kg 14,000.00 210,000.00
Paku 12 cm 5.6000 kg 12,000.00 67,200.00
Jumlah (1) 4,017,200.00
Tenaga
Pekerja 4.0000 OH 100,000.00 400,000.00
Tukang Kayu 12.0000 OH 130,000.00 1,560,000.00
Kepala Tukang 1.2000 OH 150,000.00 180,000.00
Mandor 0.2000 OH 200,000.00 40,000.00
Jumlah (2) 2,180,000.00
Jumlah (1) + (2) 6,197,200.00
F.007 Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu 1.1000 m³ 3,400,000.00 3,740,000.00
Besi Strip 5 mm 15.0000 kg 14,000.00 210,000.00
Paku 12 cm 3.0000 kg 12,000.00 36,000.00
Jumlah (1) 3,986,000.00
Tenaga
Pekerja 2.4000 OH 100,000.00 240,000.00
Tukang Kayu 7.2000 OH 130,000.00 936,000.00
Kepala Tukang 0.7200 OH 150,000.00 108,000.00
Mandor 0.1200 OH 200,000.00 24,000.00
Jumlah (2) 1,308,000.00
Jumlah (1) + (2) 5,294,000.00

Analisa Pekerjaan 10 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
F.008 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm 0.0120 m³ 3,400,000.00 40,800.00
Reng (2 x 3) cm 0.0036 m³ 3,400,000.00 12,240.00
Paku 5 cm & 10 cm 0.2500 kg 12,000.00 3,000.00
Jumlah (1) 56,040.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 25,500.00
Jumlah (1) + (2) 81,540.00
F.009 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm 0.0163 m³ 3,400,000.00 55,420.00
Paku 7 cm - 10 cm 0.2500 kg 12,000.00 3,000.00
Jumlah (1) 58,420.00
Tenaga
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.3000 OH 130,000.00 39,000.00
Kepala Tukang 0.0300 OH 150,000.00 4,500.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 65,500.00
Jumlah (1) + (2) 123,920.00
F.010 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu (2 x 20 x 400) 0.0110 m³ 3,400,000.00 37,400.00
Paku 5 cm - 7 cm 0.0500 kg 12,000.00 600.00
Jumlah (1) 38,000.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.2000 OH 130,000.00 26,000.00
Kepala Tukang 0.0250 OH 150,000.00 3,750.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 40,750.00
Jumlah (1) + (2) 78,750.00
F.011 Memasang 1 m' list plafond kayu profil
Bahan
List Kayu Profil 1.0500 m' 19,000.00 19,950.00
Jumlah (1) 19,950.00
Tenaga
Pekerja 0.0210 OH 100,000.00 2,100.00
Tukang Kayu 0.0210 OH 130,000.00 2,730.00
Kepala Tukang 0.0020 OH 150,000.00 300.00
Mandor 0.0010 OH 200,000.00 200.00
Jumlah (2) 5,330.00
Jumlah (1) + (2) 25,280.00
F.012 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu (2 x 20 x 400) 0.0044 m³ 3,400,000.00 14,960.00
Paku 5 cm - 10 cm 0.0100 kg 12,000.00 120.00
Jumlah (1) 15,080.00
Tenaga
Pekerja 0.0700 OH 100,000.00 7,000.00
Tukang Kayu 0.2000 OH 130,000.00 26,000.00
Kepala Tukang 0.0200 OH 150,000.00 3,000.00
Mandor 0.0040 OH 200,000.00 800.00
Jumlah (2) 36,800.00
Jumlah (1) + (2) 51,880.00

Analisa Pekerjaan 11 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
G. PEKERJAAN BETON RSNI-T-13-2002
G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR
Bahan
Portland Cement (PC) 218.0000 kg 1,340.00 292,120.00
Pasir Beton (PB) 0.5200 m³ 240,000.00 124,800.00
Koral Beton (maksimum 30 mm) 0.8700 m³ 240,000.00 208,800.00
Jumlah (1) 625,720.00
Tenaga
Pekerja 1.6500 OH 100,000.00 165,000.00
Tukang Batu 0.2500 OH 130,000.00 32,500.00
Kepala Tukang 0.0250 OH 150,000.00 3,750.00
Mandor 0.0800 OH 200,000.00 16,000.00
Jumlah (2) 217,250.00
Jumlah (1) + (2) 842,970.00
G.002 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR
Bahan
Portland Cement (PC) 10.0000 kg 1,340.00 13,400.00
Pasir Beton (PB) 0.0260 m³ 240,000.00 6,240.00
Koral Beton (maksimum 30 mm) 0.0440 m³ 240,000.00 10,560.00
Jumlah (1) 30,200.00
Tenaga
Pekerja 1.1500 OH 100,000.00 115,000.00
Tukang Batu 0.0200 OH 130,000.00 2,600.00
Kepala Tukang 0.0020 OH 150,000.00 300.00
Mandor 0.0060 OH 200,000.00 1,200.00
Jumlah (2) 119,100.00
Jumlah (1) + (2) 149,300.00
G.003 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66
Bahan
Portland Cement (PC) 326.0000 kg 1,340.00 436,840.00
Pasir Beton (PB) 0.5429 m³ 240,000.00 130,285.71
Koral Beton (maksimum 30 mm) 0.7622 m³ 240,000.00 182,933.33
Air 215.0000 liter 100.00 21,500.00
Jumlah (1) 771,559.05
Tenaga
Pekerja 1.6500 OH 100,000.00 165,000.00
Tukang Batu 0.2750 OH 130,000.00 35,750.00
Kepala Tukang 0.0280 OH 150,000.00 4,200.00
Mandor 0.0830 OH 200,000.00 16,600.00
Jumlah (2) 221,550.00
Jumlah (1) + (2) 993,109.05
G.004 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58
Bahan
Portland Cement (PC) 371.0000 kg 1,340.00 497,140.00
Pasir Beton (PB) 0.4986 m³ 240,000.00 119,657.14
Koral Beton (maksimum 30 mm) 0.7756 m³ 240,000.00 186,133.33
Air 215.0000 liter 100.00 21,500.00
Jumlah (1) 824,430.48
Tenaga
Pekerja 1.6500 OH 100,000.00 165,000.00
Tukang Batu 0.2750 OH 130,000.00 35,750.00
Kepala Tukang 0.0280 OH 150,000.00 4,200.00
Mandor 0.0830 OH 200,000.00 16,600.00
Jumlah (2) 221,550.00
Jumlah (1) + (2) 1,045,980.48

Analisa Pekerjaan 12 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
G.005 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56
Bahan
Portland Cement (PC) 384.0000 kg 1,340.00 514,560.00
Pasir Beton (PB) 0.4943 m³ 240,000.00 118,628.57
Koral Beton (maksimum 30 mm) 0.7696 m³ 240,000.00 184,711.11
Air 215.0000 liter 100.00 21,500.00
Jumlah (1) 839,399.68
Tenaga
Pekerja 1.6500 OH 100,000.00 165,000.00
Tukang Batu 0.2750 OH 130,000.00 35,750.00
Kepala Tukang 0.0280 OH 150,000.00 4,200.00
Mandor 0.0830 OH 200,000.00 16,600.00
Jumlah (2) 221,550.00
Jumlah (1) + (2) 1,060,949.68
G.006 Pembesian 1 kg dengan besi polos atau besi ulir
Bahan
Besi Beton (polos/ulir) 1.0500 kg 8,000.00 8,400.00
Kawat Beton 0.0150 kg 10,800.00 162.00
Jumlah (1) 8,562.00
Tenaga
Pekerja 0.0070 OH 100,000.00 700.00
Tukang Besi 0.0070 OH 130,000.00 910.00
Kepala Tukang 0.0007 OH 150,000.00 105.00
Mandor 0.0004 OH 200,000.00 80.00
Jumlah (2) 1,795.00
Jumlah (1) + (2) 10,357.00
G.007 Memasang 10 kg jaring kawat baja /wiremesh
Bahan
Jaring Kawat Baja dilas/wiremesh 10.2000 kg 57,000.00 581,400.00
Kawat Beton 0.0500 kg 10,800.00 540.00
Jumlah (1) 581,940.00
Tenaga
Pekerja 0.0250 OH 100,000.00 2,500.00
Tukang Besi 0.0250 OH 130,000.00 3,250.00
Kepala Tukang 0.0250 OH 150,000.00 3,750.00
Mandor 0.0010 OH 200,000.00 200.00
Jumlah (2) 9,700.00
Jumlah (1) + (2) 591,640.00
G.008 Memasang 1 m² bekisting untuk pondasi
Bahan
Kayu Kelas 2 0.0400 m³ 3,400,000.00 136,000.00
Paku 5 cm - 10 cm 0.3000 kg 12,000.00 3,600.00
Minyak Bekisting 0.1000 liter 3,000.00 300.00
Jumlah (1) 139,900.00
Tenaga
Pekerja 0.5200 OH 100,000.00 52,000.00
Tukang Kayu 0.2600 OH 130,000.00 33,800.00
Kepala Tukang 0.0260 OH 150,000.00 3,900.00
Mandor 0.0260 OH 200,000.00 5,200.00
Jumlah (2) 94,900.00
Jumlah (1) + (2) 234,800.00
G.009 Memasang 1 m² bekisting untuk sloof
Bahan
Kayu Kelas 2 0.0450 m³ 3,400,000.00 153,000.00
Paku 5 cm - 10 cm 0.3000 kg 12,000.00 3,600.00
Minyak Bekisting 0.1000 liter 3,000.00 300.00
Jumlah (1) 156,900.00
Tenaga
Pekerja 0.5200 OH 100,000.00 52,000.00
Tukang Kayu 0.2600 OH 130,000.00 33,800.00
Kepala Tukang 0.0260 OH 150,000.00 3,900.00
Mandor 0.0260 OH 200,000.00 5,200.00
Jumlah (2) 94,900.00

Analisa Pekerjaan 13 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah (1) + (2) 251,800.00

Analisa Pekerjaan 14 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
G.010 Memasang 1 m² bekisting untuk kolom
Bahan
Kayu Kelas 2 0.0400 m³ 3,400,000.00 136,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00 4,800.00
Minyak Bekisting 0.2000 liter 3,000.00 600.00
Balok Kayu Meranti Batu 5/7 0.0150 m³ 3,400,000.00 51,000.00

Plywood tebal 9 mm 0.3500 lembar 100,000.00 35,000.00


Dolken Ø (8-10) cm 8.0000 m' 18,000.00 144,000.00
Jumlah (1) 371,400.00
Tenaga
Pekerja 0.6600 OH 100,000.00 66,000.00
Tukang Kayu 0.3300 OH 130,000.00 42,900.00
Kepala Tukang 0.0330 OH 150,000.00 4,950.00
Mandor 0.0330 OH 200,000.00 6,600.00
Jumlah (2) 120,450.00
Jumlah (1) + (2) 491,850.00
G.011 Memasang 1 m² bekisting untuk balok
Bahan
Kayu Kelas 2 0.0400 m³ 3,400,000.00 136,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00 4,800.00
Minyak Bekisting 0.2000 liter 3,000.00 600.00
Balok Kayu Meranti Batu 5/7 0.0180 m³ 3,400,000.00 61,200.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00 35,000.00
Dolken Ø (8-10) cm 8.0000 m' 18,000.00 144,000.00
Jumlah (1) 381,600.00
Tenaga
Pekerja 0.6600 OH 100,000.00 66,000.00
Tukang Kayu 0.3300 OH 130,000.00 42,900.00
Kepala Tukang 0.0330 OH 150,000.00 4,950.00
Mandor 0.0330 OH 200,000.00 6,600.00
Jumlah (2) 120,450.00
Jumlah (1) + (2) 502,050.00
G.012 Memasang 1 m² bekisting untuk lantai
Bahan
Kayu Pinus/Kayu Rawa 0.0400 m³ 1,600,000.00 64,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00 4,800.00
Minyak Bekisting 0.2000 liter 3,000.00 600.00
Balok Kayu Meranti Batu 5/7 0.0150 m³ 1,600,000.00 24,000.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00 35,000.00
Dolken Ø (8-10) cm 24.0000 m' 18,000.00 432,000.00
Jumlah (1) 560,400.00
Tenaga
Pekerja 0.6600 OH 100,000.00 66,000.00
Tukang Kayu 0.3300 OH 130,000.00 42,900.00
Kepala Tukang 0.0330 OH 150,000.00 4,950.00
Mandor 0.0330 OH 200,000.00 6,600.00
Jumlah (2) 120,450.00
Jumlah (1) + (2) 680,850.00
G.013 Memasang 1 m² bekisting untuk tangga
Bahan
Kayu Pinus/Kayu Rawa 0.0300 m³ 3,400,000.00 102,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00 4,800.00
Minyak Bekisting 0.1500 liter 3,000.00 450.00
Balok Kayu Meranti Batu 5/7 0.0150 m³ 3,400,000.00 51,000.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00 35,000.00
Dolken Ø (8-10) cm 8.0000 m' 18,000.00 144,000.00
Jumlah (1) 337,250.00

Analisa Pekerjaan 15 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Tenaga
Pekerja 0.6600 OH 100,000.00 66,000.00
Tukang Kayu 0.3300 OH 130,000.00 42,900.00
Kepala Tukang 0.0330 OH 150,000.00 4,950.00
Mandor 0.0330 OH 200,000.00 6,600.00
Jumlah (2) 120,450.00
Jumlah (1) + (2) 457,700.00

Analisa Pekerjaan 16 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
G.014 Memasang 1 m² plat beton "bondex"
Bahan
Bondex 1.0100 m2 130,000.00 131,300.00
Kawat Las 0.1000 kg 35,000.00 3,500.00
Jumlah (1) 134,800.00
Tenaga
Pekerja 0.0500 OH 100,000.00 5,000.00
Tukang Besi 0.0300 OH 130,000.00 3,900.00
Mandor 0.0100 OH 200,000.00 2,000.00
Shear Connector 1.0000 ls 1,200.00 1,200.00
Jumlah (2) 12,100.00
Jumlah (1) + (2) 146,900.00
G.015 Pembesian 1 kg dengan besi beton U-24
Bahan
Besi Beton U-24 1.0500 kg 7,500.00 7,875.00
Kawat Beton 0.0150 kg 10,800.00 162.00
Jumlah (1) 8,037.00
Tenaga
Pekerja 0.0400 OH 100,000.00 4,000.00
Tukang Besi 0.0150 OH 130,000.00 1,950.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0075 OH 200,000.00 1,500.00
Peralatan, Spancer 0.0200 lot 1,000.00 20.00
Jumlah (2) 9,720.00
Jumlah (1) + (2) 17,757.00
G.016 Pembesian 1 kg dengan besi beton U-29
Bahan
Besi Beton U-29 1.0500 kg 7,500.00 7,875.00
Kawat Beton 0.0150 kg 10,800.00 162.00
Jumlah (1) 8,037.00
Tenaga
Pekerja 0.0400 OH 100,000.00 4,000.00
Tukang Besi 0.0150 OH 130,000.00 1,950.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0075 OH 200,000.00 1,500.00
Peralatan, Spancer 0.0200 lot 1,000.00 20.00
Jumlah (2) 9,720.00
Jumlah (1) + (2) 17,757.00
G.017 Memasang 1 m² bekisting dengan papan
Bahan
Kayu Kelas 2 0.0240 m³ 3,400,000.00 81,600.00
Paku 5 cm - 12 cm 0.3000 kg 12,000.00 3,600.00
Minyak Bekisting 0.1000 liter 3,000.00 300.00
Balok Kayu Meranti Batu 5/7 0.0240 m³ 3,400,000.00 81,600.00
Jumlah (1) 167,100.00
Tenaga
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang Kayu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.1500 OH 150,000.00 22,500.00
Mandor 0.0500 OH 200,000.00 10,000.00
Pekerja (bongkar cetakan) 0.1500 OH 100,000.00 15,000.00
Jumlah (2) 97,000.00
Jumlah (1) + (2) 264,100.00
G.018 Memasang 1 m² Pelat Beton Precast t. 12 cm
Bahan
Pelat Beton Ex. Hebel 1.0500 m2 324,000.00 340,200.00
Jumlah (1) 340,200.00
Tenaga
Upah Angkut 1.0000 m2 12,857.14 12,857.14
Upah Bongkar 1.0000 m2 15,000.00 15,000.00
Upah Pasang 1.0000 m2 35,000.00 35,000.00
Jumlah (2) 62,857.14
Jumlah (1) + (2) 403,057.14

Analisa Pekerjaan 17 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002
H.001 Memasang 1 m² atap genteng palentong kecil
Bahan
Genteng Palentong 25.0000 bh 1,500.00 37,500.00
Jumlah (1) 37,500.00
Tenaga
Pekerja 0.1500 OH 100,000.00 15,000.00
Tukang Kayu 0.0750 OH 130,000.00 9,750.00
Kepala Tukang 0.0080 OH 150,000.00 1,200.00
Mandor 0.0080 OH 200,000.00 1,600.00
Jumlah (2) 27,550.00
Jumlah (1) + (2) 65,050.00
H.002 Memasang 1 m² rooflight fibreglass (180 x 90) cm
Bahan
Rooflight Fibreglass 0.6000 lbr 63,000.00 37,800.00
Paku Biasa 2" - 5" 0.0500 kg 12,000.00 600.00
Jumlah (1) 38,400.00
Tenaga
Pekerja 0.1400 OH 100,000.00 14,000.00
Tukang Kayu 0.0670 OH 130,000.00 8,710.00
Kepala Tukang 0.0070 OH 150,000.00 1,050.00
Mandor 0.0070 OH 200,000.00 1,400.00
Jumlah (2) 25,160.00
Jumlah (1) + (2) 63,560.00
H.003 Memasang 1 m² atap genteng pres jatiwangi
Bahan
Genteng Pres Jatiwangi 25.0000 bh 1,700.00 42,500.00
Jumlah (1) 42,500.00
Tenaga
Pekerja 0.1500 OH 100,000.00 15,000.00
Tukang Kayu 0.0750 OH 130,000.00 9,750.00
Kepala Tukang 0.0080 OH 150,000.00 1,200.00
Mandor 0.0080 OH 200,000.00 1,600.00
Jumlah (2) 27,550.00
Jumlah (1) + (2) 70,050.00
H.004 Memasang 1 m' genteng bubung pres jatiwangi
Bahan
Genteng Bubung Jatiwangi 4.0000 bh 3,315.00 13,260.00
Portland Cement (PC) 8.0000 kg 1,340.00 10,720.00
Pasir Pasang 0.0320 m³ 175,000.00 5,600.00
Jumlah (1) 29,580.00
Tenaga
Pekerja 0.4000 OH 100,000.00 40,000.00
Tukang Kayu 0.2000 OH 130,000.00 26,000.00
Kepala Tukang 0.0200 OH 150,000.00 3,000.00
Mandor 0.0020 OH 200,000.00 400.00
Jumlah (2) 69,400.00
Jumlah (1) + (2) 98,980.00
H.005 Memasang 1 m' Pasangan Flasing seng
Bahan
Seng BJLS 30 0.5000 lbr 59,000.00 29,500.00
Jumlah (1) 29,500.00
Tenaga
Pekerja 0.4000 OH 100,000.00 40,000.00
Tukang Kayu 0.2000 OH 65,000.00 13,000.00
Kepala Tukang 0.0200 OH 150,000.00 3,000.00
Mandor 0.0200 OH 200,000.00 4,000.00
Jumlah (2) 60,000.00
Jumlah (1) + (2) 89,500.00

Analisa Pekerjaan 18 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
H.006 Memasang 1 m2 Pasangan Genteng Metal
Bahan
Genteng Metal 1.0200 m2 60,000.00 61,200.00
Paku 0.2000 Kg 12,000.00 2,400.00
Jumlah (1) 63,600.00
Tenaga
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 36,500.00
Jumlah (1) + (2) 100,100.00

H.007 Memasang 1 m' Pasangan Bubungan Genteng Metal


Bahan
Genteng Metal 1.1000 m2 25,000.00 27,500.00
Paku 0.0500 Kg 12,000.00 600.00
Jumlah (1) 28,100.00
Tenaga
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 36,500.00
Jumlah (1) + (2) 64,600.00
I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002
I.001 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
Bahan
Gypsum Board 0.3640 lembar 68,500.00 24,934.00
Paku Sekrup 0.1100 kg 20,200.00 2,222.00
Jumlah (1) 27,156.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.0500 OH 130,000.00 6,500.00
Kepala Tukang 0.0050 OH 150,000.00 750.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 18,250.00
Jumlah (1) + (2) 45,406.00
I.002 Memasang 1 m² langit-langit GRC board uk. (120 x 240) cm, tebal 4 mm
Bahan
GRC Board 0.3640 lembar 68,500.00 24,934.00
Paku Sekrup 0.1100 kg 20,200.00 2,222.00
Jumlah (1) 27,156.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.0500 OH 130,000.00 6,500.00
Kepala Tukang 0.0050 OH 150,000.00 750.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 18,250.00
Jumlah (1) + (2) 45,406.00
I.003 Memasang 1 m² Rangka langit-langit besi hollo 4x4 & 4x6 cm
Bahan
Hollo 4x4 cm 3.0000 m1 12,000.00 36,000.00
Hollo 4x6 cm 2.0000 m1 14,500.00 29,000.00
Paku Sekrup 0.1100 kg 20,200.00 2,222.00
Jumlah (1) 67,222.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.0500 OH 130,000.00 6,500.00
Kepala Tukang 0.0050 OH 150,000.00 750.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 18,250.00
Jumlah (1) + (2) 85,472.00

Analisa Pekerjaan 19 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
I.004 Memasang 1 m' list kayu profil
Bahan
List Kayu Profil 1.0500 m' 19,000.00 19,950.00
Paku Triplek 0.0100 kg 12,000.00 120.00
Jumlah (1) 20,070.00
Tenaga
Pekerja 0.0500 OH 100,000.00 5,000.00
Tukang Kayu 0.0500 OH 130,000.00 6,500.00
Kepala Tukang 0.0050 OH 150,000.00 750.00
Mandor 0.0030 OH 200,000.00 600.00
Jumlah (2) 12,850.00
Jumlah (1) + (2) 32,920.00
J. PEKERJAAN SANITASI SNI
J.001 Memasang 1 buah kloset duduk/monoblok
Bahan
Kolset Duduk/Monblok 1.0000 bh 2,000,000.00 2,000,000.00
Perlengkapan 6% harga kloset 120,000.00 120,000.00
Jumlah (1) 2,000,000.00
Tenaga
Pekerja 3.3000 OH 100,000.00 330,000.00
Tukang Batu 1.1000 OH 130,000.00 143,000.00
Kepala Tukang 0.0010 OH 150,000.00 150.00
Mandor 0.1600 OH 200,000.00 32,000.00
Jumlah (2) 505,150.00
Jumlah (1) + (2) 2,505,150.00
J.002 Memasang 1 buah kloset jongkok porselen
Bahan
Kloset Jongkok Porselen 1.0000 bh 175,000.00 175,000.00
Portland Cement (PC) 6.0000 kg 1,340.00 8,040.00
Pasir Pasang 0.0100 m³ 175,000.00 1,750.00
Jumlah (1) 184,790.00
Tenaga
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Batu 1.5000 OH 130,000.00 195,000.00
Kepala Tukang 1.5000 OH 150,000.00 225,000.00
Mandor 0.1600 OH 200,000.00 32,000.00
Jumlah (2) 552,000.00
Jumlah (1) + (2) 736,790.00
J.003 Memasang 1 buah wastafel
Bahan
Wastafel 1.0000 bh 1,500,000.00 1,500,000.00
Perlengkapan 12% harga wastafel 180,000.00 180,000.00
Portland Cement (PC) 6.0000 kg 1,340.00 8,040.00
Pasir Pasang 0.0100 m³ 175,000.00 1,750.00
Jumlah (1) 1,689,790.00
Tenaga
Pekerja 1.2000 OH 100,000.00 120,000.00
Tukang Batu 1.4500 OH 130,000.00 188,500.00
Kepala Tukang 0.1500 OH 150,000.00 22,500.00
Mandor 0.1000 OH 200,000.00 20,000.00
Jumlah (2) 351,000.00
Jumlah (1) + (2) 2,040,790.00
J.004 Memasang 1 buah bak mandi fibreglass volume 0,30 m³
Bahan
Bak Fibreglass 1.0000 bh 214,200.00 214,200.00
Perlengkapan 18% harga bak 38,556.00 38,556.00
Jumlah (1) 252,756.00
Tenaga
Pekerja 1.8000 OH 100,000.00 180,000.00
Tukang Batu 2.7000 OH 130,000.00 351,000.00
Kepala Tukang 0.5400 OH 150,000.00 81,000.00
Mandor 0.1100 OH 200,000.00 22,000.00
Jumlah (2) 634,000.00
Jumlah (1) + (2) 886,756.00

Analisa Pekerjaan 20 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
J.005 Memasang 1 buah bak mandi batu bata volume 0,30 m³
Bahan
Bata Merah 5 x 12 x 22 cm 303.0303 bh 750.00 227,272.73
Portland Cement (PC) 120.0000 kg 1,340.00 160,800.00
Pasir Pasang 0.3000 m³ 175,000.00 52,500.00
Keramik Dinding 10x20 cm 4.3560 m² 57,000.00 248,292.00
Semen Nat 6.0000 kg 3,500.00 21,000.00
Jumlah (1) 709,864.73
Tenaga
Pekerja 6.0000 OH 100,000.00 600,000.00
Tukang Batu 3.0000 OH 130,000.00 390,000.00
Kepala Tukang 0.3000 OH 150,000.00 45,000.00
Mandor 0.3000 OH 200,000.00 60,000.00
Jumlah (2) 1,095,000.00
Jumlah (1) + (2) 1,804,864.73
J.006 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm
Bahan
Bata Merah 5 x 12 x 22 cm 109.8485 bh 750.00 82,386.36
Portland Cement (PC) 44.0000 kg 1,340.00 58,960.00
Pasir Pasang 0.0700 m³ 175,000.00 12,250.00
Batu Kerikil 0.0700 m³ 240,000.00 16,800.00
Besi Beton 1.6000 kg 8,000.00 12,800.00
Pasir Beton 0.0600 m³ 175,000.00 10,500.00
Jumlah (1) 193,696.36
Tenaga
Pekerja 3.2000 OH 100,000.00 320,000.00
Tukang Batu 1.0150 OH 130,000.00 131,950.00
Kepala Tukang 0.0015 OH 150,000.00 225.00
Mandor 0.0160 OH 200,000.00 3,200.00
Jumlah (2) 455,375.00
Jumlah (1) + (2) 649,071.36
J.007 Memasang 1 m' pipa PVC tipe AW Ø ½"
Bahan
Pipa PVC 1.2000 m' 3,375.00 4,050.00
Perlengkapan 35% harga pipa 1,181.25 1,181.25
Jumlah (1) 5,231.25
Tenaga
Pekerja 0.0360 OH 100,000.00 3,600.00
Tukang Batu 0.0600 OH 130,000.00 7,800.00
Kepala Tukang 0.0060 OH 150,000.00 900.00
Mandor 0.0018 OH 200,000.00 360.00
Jumlah (2) 12,660.00
Jumlah (1) + (2) 17,891.25
J.008 Memasang 1 m' pipa PVC tipe AW Ø ¾"
Bahan
Pipa PVC 1.2000 m' 4,475.38 5,370.46
Perlengkapan 35% harga pipa 1,566.38 1,566.38
Jumlah (1) 6,936.85
Tenaga
Pekerja 0.0360 OH 100,000.00 3,600.00
Tukang Batu 0.0600 OH 130,000.00 7,800.00
Kepala Tukang 0.0060 OH 150,000.00 900.00
Mandor 0.0018 OH 200,000.00 360.00
Jumlah (2) 12,660.00
Jumlah (1) + (2) 19,596.85

Analisa Pekerjaan 21 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
J.009 Memasang 1 m' pipa PVC tipe AW Ø 1"
Bahan
Pipa PVC 1.2000 m' 5,499.85 6,599.82
Perlengkapan 35% harga pipa 1,924.95 1,924.95
Jumlah (1) 8,524.76
Tenaga
Pekerja 0.0360 OH 100,000.00 3,600.00
Tukang Batu 0.0600 OH 130,000.00 7,800.00
Kepala Tukang 0.0060 OH 150,000.00 900.00
Mandor 0.0018 OH 200,000.00 360.00
Jumlah (2) 12,660.00
Jumlah (1) + (2) 21,184.76
J.010 Memasang 1 m' pipa PVC tipe AW Ø 1½"
Bahan
Pipa PVC 1.2000 m' 13,240.38 15,888.46
Perlengkapan 35% harga pipa 4,634.13 4,634.13
Jumlah (1) 20,522.60
Tenaga
Pekerja 0.0360 OH 100,000.00 3,600.00
Tukang Batu 0.0600 OH 130,000.00 7,800.00
Kepala Tukang 0.0060 OH 150,000.00 900.00
Mandor 0.0018 OH 200,000.00 360.00
Jumlah (2) 12,660.00
Jumlah (1) + (2) 33,182.60
J.011 Memasang 1 m' pipa PVC tipe AW Ø 2"
Bahan
Pipa PVC 1.2000 m' 16,700.23 20,040.28
Perlengkapan 35% harga pipa 5,845.08 5,845.08
Jumlah (1) 25,885.36
Tenaga
Pekerja 0.0540 OH 100,000.00 5,400.00
Tukang Batu 0.0900 OH 130,000.00 11,700.00
Kepala Tukang 0.0090 OH 150,000.00 1,350.00
Mandor 0.0027 OH 200,000.00 540.00
Jumlah (2) 18,990.00
Jumlah (1) + (2) 44,875.36
J.012 Memasang 1 m' pipa PVC tipe AW Ø 2½"
Bahan
Pipa PVC 1.2000 m' 26,499.77 31,799.72
Perlengkapan 35% harga pipa 9,274.92 9,274.92
Jumlah (1) 41,074.64
Tenaga
Pekerja 0.0360 OH 100,000.00 3,600.00
Tukang Batu 0.0600 OH 130,000.00 7,800.00
Kepala Tukang 0.0060 OH 150,000.00 900.00
Mandor 0.0018 OH 200,000.00 360.00
Jumlah (2) 12,660.00
Jumlah (1) + (2) 53,734.64
J.013 Memasang 1 m' pipa PVC tipe AW Ø 3"
Bahan
Pipa PVC 1.2000 m' 37,299.77 44,759.72
Perlengkapan 35% harga pipa 13,054.92 13,054.92
Jumlah (1) 57,814.64
Tenaga
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang Batu 0.1350 OH 130,000.00 17,550.00
Kepala Tukang 0.0135 OH 150,000.00 2,025.00
Mandor 0.0041 OH 200,000.00 820.00
Jumlah (2) 28,495.00
Jumlah (1) + (2) 86,309.64

Analisa Pekerjaan 22 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
J.014 Memasang 1 m' pipa PVC tipe AW Ø 4"
Bahan
Pipa PVC 1.2000 m' 55,700.46 66,840.55
Perlengkapan 35% harga pipa 19,495.16 19,495.16
Jumlah (1) 86,335.72
Tenaga
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang Batu 0.1350 OH 130,000.00 17,550.00
Kepala Tukang 0.0135 OH 150,000.00 2,025.00
Mandor 0.0041 OH 200,000.00 820.00
Jumlah (2) 28,495.00
Jumlah (1) + (2) 114,830.72
J.015 Memasang 1 buah bak cuci piring satinless steel
Bahan
Bak Cuci Satinless Steel 1.0000 bh 255,000.00 255,000.00
Water Drain + Aksesoris 1.0000 set 89,250.00 89,250.00
Jumlah (1) 344,250.00
Tenaga
Pekerja 0.0300 OH 100,000.00 3,000.00
Tukang Batu 0.3000 OH 130,000.00 39,000.00
Kepala Tukang 0.0300 OH 150,000.00 4,500.00
Mandor 0.0015 OH 200,000.00 300.00
Jumlah (2) 46,800.00
Jumlah (1) + (2) 391,050.00
J.016 Memasang 1 buah kran Ø ¾" atau ½"
Bahan
Kran Air 1.0000 bh 150,000.00 150,000.00
Seal Tape 0.0250 bh 2,650.00 2,650.00
Jumlah (1) 152,650.00
Tenaga
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang Batu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 16,500.00
Jumlah (1) + (2) 169,150.00
J.017 Memasang 1 buah floordrain
Bahan
Floordrain 1.0000 bh 100,000.00 100,000.00
Jumlah (1) 100,000.00
Tenaga
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang Batu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 16,500.00
Jumlah (1) + (2) 116,500.00
J.018 Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor tipe kecil)
Galian Tanah 4.5000 m³ 48,000.00 216,000.00
Urugan Pasir urug 0.2142 m³ 135,200.00 28,959.84
Lantai kerja beton 2.2500 m² 149,300.00 335,925.00
Pas. Batu bata 1 PC : 3 PS + Plesteran 15.0000 m² 126,255.80 1,893,837.00
Plat beton penutup & balok 0.3375 m³ 993,109.05 335,174.30
Pipa PVC 4" jenis AW + sambungan 9.0000 m³ 114,830.72 1,033,476.44
Pipa PVC AW 1 1/2" 1.2000 m' 33,182.60 39,819.12
Galian tanah untuk rembesan 3.3750 m³ 48,000.00 162,000.00
Pasang Ijuk 5.4000 kg 108,000.00 583,200.00
Urugan kerikil 3-5 cm. 1.0500 m³ 108,000.00 113,400.00
Pipa PVC 4" berlobang jenis AW 5.0000 m' 114,830.72 574,153.58
Urugan kembali perataan tanah 1.1250 m³ 26,666.67 30,000.00
Tambahan upah 0.0920 ls 500,000.00 46,000.00
Jumlah 5,391,945.27

Analisa Pekerjaan 23 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002
K.001 Mengerjakan 1 cm pengelasan dengan las listrik
Bahan
Kawat Las Listrik 0.04 kg 35,000.00 1,400.00
Solar 0.0300 ltr 7,100.00 213.00
Minyak Pelumas 0.0040 ltr 23,850.00 95.40
Jumlah (1) 1,708.40
Tenaga
Pekerja 0.0040 OH 100,000.00 400.00
Tukang Besi 0.0020 OH 130,000.00 260.00
Kepala Tukang 0.0002 OH 150,000.00 30.00
Mandor 0.0002 OH 200,000.00 40.00
Sewa Alat 0.0170 Jam 75,000.00 1,275.00
Jumlah (2) 2,005.00
Jumlah (1) + (2) 3,713.40
K.002 Memasang 1 m² pintu alumunium/ PVC
Bahan
Pintu Alumunium/ PVC 1.0000 m² 250,000.00 250,000.00
Jumlah (1) 250,000.00
Tenaga
Pekerja 1.0500 OH 100,000.00 105,000.00
Tukang Besi 1.0500 OH 130,000.00 136,500.00
Kepala Tukang 0.1050 OH 150,000.00 15,750.00
Mandor 0.0052 OH 200,000.00 1,040.00
Jumlah (2) 258,290.00
Jumlah (1) + (2) 508,290.00
K.003 Memasang 1 m² terali besi
Bahan
Besi Strip 2 x 3 11.5000 m' 14,000.00 161,000.00
Pengelasan 27.0800 cm 3,713.40 100,558.87
Jumlah (1) 261,558.87
Tenaga
Pekerja 1.6700 OH 100,000.00 167,000.00
Tukang Las 1.6700 OH 130,000.00 217,100.00
Kepala Tukang 0.1670 OH 150,000.00 25,050.00
Mandor 0.0830 OH 200,000.00 16,600.00
Jumlah (2) 425,750.00
Jumlah (1) + (2) 687,308.87
K.004 Memasang 1 m' talang datar seng BJLS 28
Bahan
Seng Plat 3' x 6 ' BJLS 28 0.5000 lbr 59,000.00 29,500.00
Paku Biasa ½" - 1" atau sekrup 0.0150 kg 12,000.00 180.00
Kayu Kalimantan Papan 0.0190 m³ 3,400,000.00 64,600.00
Jumlah (1) 94,280.00
Tenaga
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.4000 OH 130,000.00 52,000.00
Kepala Tukang 0.0250 OH 150,000.00 3,750.00
Mandor 0.0100 OH 200,000.00 2,000.00
Jumlah (2) 77,750.00
Jumlah (1) + (2) 172,030.00
L. PEKERJAAN KUNCI DAN KACA
L.001 Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa 1.0000 bh 110,000.00 110,000.00
Jumlah (1) 110,000.00
Tenaga
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang Kayu 0.5000 OH 130,000.00 65,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 68,500.00
Jumlah (1) + (2) 178,500.00

Analisa Pekerjaan 24 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
L.002 Memasang 1 buah kunci tanam kamar mandi
Bahan
Kunci Tanam Kamar Mandi 1.0000 bh 110,000.00 110,000.00
Jumlah (1) 110,000.00
Tenaga
Pekerja 0.0050 OH 100,000.00 500.00
Tukang Kayu 0.5000 OH 130,000.00 65,000.00
Kepala Tukang 0.0050 OH 150,000.00 750.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 66,750.00
Jumlah (1) + (2) 176,750.00
L.003 Memasang 1 buah engsel pintu
Bahan
Engsel Pintu 1.0000 bh 14,000.00 14,000.00
Jumlah (1) 14,000.00
Tenaga
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang Kayu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0008 OH 200,000.00 150.00
Jumlah (2) 23,400.00
Jumlah (1) + (2) 37,400.00
L.004 Memasang 1 buah engsel jendela kupu-kupu
Bahan
Engsel Jendela Kupu-Kupu 1.0000 bh 12,000.00 12,000.00
Jumlah (1) 12,000.00
Tenaga
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang Kayu 0.1000 OH 130,000.00 13,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0005 OH 200,000.00 100.00
Jumlah (2) 15,600.00
Jumlah (1) + (2) 27,600.00
L.005 Memasang 1 buah kait angin
Bahan
Kait Angin 1.0000 bh 16,000.00 16,000.00
Jumlah (1) 16,000.00
Tenaga
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang Kayu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0008 OH 200,000.00 150.00
Jumlah (2) 23,400.00
Jumlah (1) + (2) 39,400.00
L.006 Memasang 1 buah kunci selot
Bahan
Kunci Selot / Gerendel 1.0000 bh 15,000.00 15,000.00
Jumlah (1) 15,000.00
Tenaga
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang Kayu 0.2000 OH 130,000.00 26,000.00
Kepala Tukang 0.0200 OH 150,000.00 3,000.00
Mandor 0.0010 OH 200,000.00 200.00
Jumlah (2) 31,200.00
Jumlah (1) + (2) 46,200.00
L.007 Memasang 1 buah pegangan pintu / door holder
Bahan
Pegangan Pintu 1.0000 bh 75,000.00 75,000.00
Jumlah (1) 75,000.00
Tenaga
Pekerja 0.0500 OH 100,000.00 5,000.00
Tukang Kayu 0.5000 OH 130,000.00 65,000.00
Kepala Tukang 0.0500 OH 150,000.00 7,500.00
Mandor 0.0025 OH 200,000.00 500.00

Analisa Pekerjaan 25 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
Jumlah (2) 78,000.00
Jumlah (1) + (2) 153,000.00
L.008 Memasang 1 buah Espagnolet
Bahan
Espagnolet 1.0000 bh 35,000.00 35,000.00
Jumlah (1) 35,000.00
Tenaga
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang Kayu 0.5000 OH 130,000.00 65,000.00
Kepala Tukang 0.0100 OH 150,000.00 1,500.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 68,500.00
Jumlah (1) + (2) 103,500.00
L.009 Memasang 1 buah Grendel Jendela
Bahan
Grendel 1.0000 bh 15,000.00 15,000.00
Jumlah (1) 15,000.00
Tenaga
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang Kayu 0.2000 OH 130,000.00 26,000.00
Kepala Tukang 0.0200 OH 150,000.00 3,000.00
Mandor 0.0010 OH 200,000.00 200.00
Jumlah (2) 31,200.00
Jumlah (1) + (2) 46,200.00
L.010 Memasang 1 m² kaca; tebal 3 mm
Bahan
Kaca 1.1000 m² 69,000.00 75,900.00
Jumlah (1) 75,900.00
Tenaga
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang Kayu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0008 OH 200,000.00 150.00
Jumlah (2) 23,400.00
Jumlah (1) + (2) 99,300.00
L.011 Memasang 1 m² kaca; tebal 5 mm
Bahan
Kaca 1.1000 m² 83,000.00 91,300.00
Jumlah (1) 91,300.00
Tenaga
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang Kayu 0.1500 OH 130,000.00 19,500.00
Kepala Tukang 0.0150 OH 150,000.00 2,250.00
Mandor 0.0008 OH 200,000.00 150.00
Jumlah (2) 23,400.00
Jumlah (1) + (2) 114,700.00
M. PEKERJAAN PENUTUP LANTAI DAN DINDING SNI-Pt-T2000-C
M.001 Memasang 1 m² lantai keramik ukuran 30 x 30 cm
Bahan
Ubin Keramik 60 x 60 cm 1.0000 m² 100,000.00 100,000.00
Portland Cement (PC) 10.0000 kg 1,340.00 13,400.00
Pasir Pasang 0.0450 m³ 175,000.00 7,875.00
Semen Warna 1.5000 kg 3,500.00 5,250.00
Jumlah (1) 126,525.00
Tenaga
Pekerja 0.2500 OH 100,000.00 25,000.00
Tukang Batu 0.1200 OH 130,000.00 15,600.00
Kepala Tukang 0.0120 OH 150,000.00 1,800.00
Mandor 0.0130 OH 200,000.00 2,600.00
Jumlah (2) 45,000.00
Jumlah (1) + (2) 171,525.00

Analisa Pekerjaan 26 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
M.002 Memasang 1 m' plint keramik ukuran 10 x 20 cm
Bahan
Plint Keramik Artistik 5.3000 bh 9,750.00 51,675.00
Portland Cement (PC) 1.1400 kg 1,340.00 1,527.60
Pasir Pasang 0.0030 m³ 175,000.00 525.00
Semen Warna 0.0250 kg 3,500.00 87.50
Jumlah (1) 53,815.10
Tenaga
Pekerja 0.0900 OH 100,000.00 9,000.00
Tukang Batu 0.0900 OH 130,000.00 11,700.00
Kepala Tukang 0.0090 OH 150,000.00 1,350.00
Mandor 0.0050 OH 200,000.00 1,000.00
Jumlah (2) 23,050.00
Jumlah (1) + (2) 76,865.10
M.003 Memasang 1 m² dinding keramik ukuran 20 x 20 cm
Bahan
Keramik 1.0000 m² 64,000.00 64,000.00
Portland Cement (PC) 9.3000 kg 1,340.00 12,462.00
Pasir Pasang 0.0180 m³ 175,000.00 3,150.00
Semen Warna 1.9400 kg 3,500.00 6,790.00
Jumlah (1) 86,402.00
Tenaga
Pekerja 0.6000 OH 100,000.00 60,000.00
Tukang Batu 0.4500 OH 130,000.00 58,500.00
Kepala Tukang 0.0450 OH 150,000.00 6,750.00
Mandor 0.0300 OH 200,000.00 6,000.00
Jumlah (2) 131,250.00
Jumlah (1) + (2) 217,652.00
M.004 Memasang 1 m² lantai keramik ukuran 40 x 40 cm
Bahan
Ubin Keramik Motif 40 x 40 cm 1.0000 m² 70,000.00 70,000.00
Portland Cement (PC) 9.8000 kg 1,340.00 13,132.00
Pasir Pasang 0.0450 m³ 175,000.00 7,875.00
Semen Warna 1.3000 kg 3,500.00 4,550.00
Jumlah (1) 95,557.00
Tenaga
Pekerja 0.2500 OH 100,000.00 25,000.00
Tukang Batu 0.1200 OH 130,000.00 15,600.00
Kepala Tukang 0.0120 OH 150,000.00 1,800.00
Mandor 0.0130 OH 200,000.00 2,600.00
Jumlah (2) 45,000.00
Jumlah (1) + (2) 140,557.00
N. PEKERJAAN PENGECATAN SNI
N.001 Mendempul dan Menggosok 1 m² kayu
Bahan
Dempul Jadi 0.0800 kg 34,000.00 2,720.00
Minyak Cat 0.0200 kg 13,000.00 260.00
Batu Apung 0.0100 kg 16,000.00 160.00
Jumlah (1) 3,140.00
Tenaga
Pekerja 0.0400 OH 100,000.00 4,000.00
Tukang Cat 0.0400 OH 130,000.00 5,200.00
Kepala Tukang 0.0040 OH 150,000.00 600.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 10,300.00
Jumlah (1) + (2) 13,440.00

Analisa Pekerjaan 27 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
N.002 Mengecat 1 m² bidang kayu lama
Bahan
Plamir 0.1500 kg 15,000.00 2,250.00
Cat Dasar 0.1700 kg 34,000.00 5,780.00
Cat Penutup 0.1700 kg 49,000.00 8,330.00
Jumlah (1) 16,360.00
Tenaga
Pekerja 0.0700 OH 100,000.00 7,000.00
Tukang Cat 0.0750 OH 130,000.00 9,750.00
Kepala Tukang 0.0075 OH 150,000.00 1,125.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 18,375.00
Jumlah (1) + (2) 34,735.00
N.003 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni 0.2000 kg 34,000.00 6,800.00
Plamir 0.1500 kg 15,000.00 2,250.00
Cat Dasar 0.1700 kg 34,000.00 5,780.00
Cat Penutup 0.2600 kg 49,000.00 12,740.00
Jumlah (1) 27,570.00
Tenaga
Pekerja 0.0700 OH 100,000.00 7,000.00
Tukang Cat 0.0090 OH 130,000.00 1,170.00
Kepala Tukang 0.0060 OH 150,000.00 900.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 9,570.00
Jumlah (1) + (2) 37,140.00
N.004 Melabur 1 m² bidang kayu dengan politur
Bahan
Politur 0.2000 kg 35,000.00 7,000.00
Politur Jadi 0.1500 kg 45,000.00 6,750.00
Ampelas 2.0000 lbr 4,000.00 8,000.00
Jumlah (1) 21,750.00
Tenaga
Tukang Cat 0.0600 OH 130,000.00 7,800.00
Kepala Tukang 0.0160 OH 150,000.00 2,400.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 10,700.00
Jumlah (1) + (2) 32,450.00
N.005 Melabur 1 m² bidang kayu dengan cat residu
Bahan
Residu 0.3500 ltr 5,000.00 1,750.00
Jumlah (1) 1,750.00
Tenaga
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Cat 0.0000 OH 130,000.00 -
Kepala Tukang 0.0000 OH 150,000.00 -
Mandor 0.0060 OH 200,000.00 1,200.00
Jumlah (2) 11,200.00
Jumlah (1) + (2) 12,950.00
N.006 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Plamir 0.1000 kg 16,000.00 1,600.00
Cat Dasar 0.1000 kg 26,000.00 2,600.00
Cat Penutup 0.2600 kg 26,000.00 6,760.00
Jumlah (1) 10,960.00
Tenaga
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang Cat 0.0630 OH 130,000.00 8,190.00
Kepala Tukang 0.0063 OH 150,000.00 945.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 11,635.00
Jumlah (1) + (2) 22,595.00

Analisa Pekerjaan 28 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
N.007 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Dasar 0.1200 kg 26,000.00 3,120.00
Cat Penutup 0.1800 kg 26,000.00 4,680.00
Jumlah (1) 7,800.00
Tenaga
Pekerja 0.0280 OH 100,000.00 2,800.00
Tukang Cat 0.0420 OH 130,000.00 5,460.00
Kepala Tukang 0.0042 OH 150,000.00 630.00
Mandor 0.0025 OH 200,000.00 500.00
Jumlah (2) 9,390.00
Jumlah (1) + (2) 17,190.00
O. PEKERJAAN PAVING, JALAN DAN LAIN-LAIN HSPK
O.001 Memasang 1 m² paving block warna segi empat; tebal 8 cm
Bahan
Paving Segi Empat Warna; tebal 8 cm 1.0100 m² 66,000.00 66,660.00
Pasir Urug 0.1000 m³ 86,000.00 8,600.00
Jumlah (1) 75,260.00
Tenaga
Pekerja 0.2500 OH 100,000.00 25,000.00
Tukang Batu 0.5000 OH 130,000.00 65,000.00
Kepala Tukang 0.0500 OH 150,000.00 7,500.00
Mandor 0.0250 OH 200,000.00 5,000.00
Jumlah (2) 102,500.00
Jumlah (1) + (2) 177,760.00
O.002 Memasang 1 m² paving block warna segi enam; tebal 8 cm
Bahan
Paving Segi Enam Warna; tebal 8 cm 1.0100 m² 66,000.00 66,660.00
Pasir Urug 0.1000 m³ 86,000.00 8,600.00
Jumlah (1) 75,260.00
Tenaga
Pekerja 0.2500 OH 100,000.00 25,000.00
Tukang Batu 0.5000 OH 130,000.00 65,000.00
Kepala Tukang 0.0500 OH 150,000.00 7,500.00
Mandor 0.0250 OH 200,000.00 5,000.00
Jumlah (2) 102,500.00
Jumlah (1) + (2) 177,760.00
O.003 Mengerjakan 1 m' saluran grefel beton 1/2 20 cm + pasangan
Bahan
Galian Tanah (B.001) 0.1500 m³ 48,000.00 7,200.00
Grefel Beton Ø 20 cm 1.0000 bh 47,500.00 47,500.00
Pas. Bata + Plesteran 1:3 (D.010 + E. 002) 0.5000 m² 184,450.64 92,225.32
Upah Kerja 0.1500 ls 7,500.00 1,125.00
Jumlah 148,050.32
O.004 Mengerjakan 1 m' saluran grefel beton 1/2 30 cm + pasangan
Bahan
Galian Tanah (B.001) 0.1500 m³ 48,000.00 7,200.00
Grefel Beton Ø 30 cm 1.0000 bh 65,500.00 65,500.00
Pas. Bata + Plesteran 1:3 (D.010 + E. 002) 0.5000 m² 184,450.64 92,225.32
Upah Kerja 0.1500 ls 7,500.00 1,125.00
Jumlah 166,050.32
EL.001 Mengerjakan 1 Titik Pas. Titik Lampu/Daya
Bahan
Kabel NYM (3 x 2,5) 8.2440 m1 6,500.00 53,586.00
Solatif Kabel 0.3330 rol 10,000.00 3,330.00
Pipa Kabel 1.5000 m1 4,500.00 6,750.00
T.Dus 1.0000 bh 1,500.00 1,500.00
Inbouw - dus 1.0000 bh 2,000.00 2,000.00
Jumlah (1) 67,166.00
Jumlah 134,332.00
Tenaga
Upah Kerja 1.0000 ls 55,000.00 55,000.00
Jumlah (2) 55,000.00
Jumlah (1) + (2) 189,332.00

Analisa Pekerjaan 29 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
P. PEKERJAAN PERABOT/MEBEULAIR
M - 02 Mengerjakan 1 bh Meja Siswa
Bahan
Kayu Kelas 1 uk. 4/6 0.0095 m3 3,400,000.00 32,313.60
Papan Kelas 1 uk. 3/30 0.0210 m3 3,400,000.00 71,374.50
N.001 Mendempul bidang kayu 1.2938 m2 13,440.00 17,388.00
N.004 Melabur bidang kayu dengan Politur/Vernis 1.2938 m2 32,450.00 41,982.19
Paku 0.0450 kg 12,000.00 540.00
Lem kayu 0.0450 kg 22,000.00 990.00
Jumlah (1) 164,588.29
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 164,588.29 32,917.66
Jumlah (2) 32,917.66
Jumlah (1) + (2) 197,000.00
K - 02 Mengerjakan 1 bh Kursi Siswa
Bahan
Kayu Kelas 1 uk. 4/6 0.0087 m3 3,400,000.00 29,566.94
Papan Kelas 1 uk. 3/30 0.0082 m3 3,400,000.00 27,843.45
N.001 Mendempul bidang kayu 1.1341 m2 13,440.00 15,242.88
N.004 Melabur bidang kayu dengan Politur/Vernis 1.1341 m2 32,450.00 36,802.92
Paku 0.0305 kg 12,000.00 366.00
Lem kayu 0.0305 kg 22,000.00 671.00
Jumlah (1) 110,493.19
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 110,493.19 22,098.64
Jumlah (2) 22,098.64
Jumlah (1) + (2) 132,000.00
M - 01 Mengerjakan 1 bh Meja Guru
Bahan
Kayu Kelas 1 uk. 4/6 0.0077 m3 3,400,000.00 26,030.40
Papan Kelas 1 uk. 3/30 0.0257 m3 3,400,000.00 87,235.50
N.001 Mendempul bidang kayu 1.3338 m2 13,440.00 17,925.60
N.004 Melabur bidang kayu dengan Politur/Vernis 1.3338 m2 32,450.00 43,280.19
L.004 Engsel 0.5500 bh 27,600.00 15,180.00
Paku 0.0550 kg 12,000.00 660.00
Lem kayu 0.0550 kg 22,000.00 1,210.00
Jumlah (1) 191,521.69
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 191,521.69 38,304.34
Jumlah (2) 38,304.34
Jumlah (1) + (2) 229,000.00
K - 01 Mengerjakan 1 bh Kursi Guru
Bahan
Kayu Kelas 1 uk. 4/6 0.0086 m3 3,400,000.00 29,082.24
Papan Kelas 1 uk. 3/30 0.0090 m3 3,400,000.00 30,600.00
N.001 Mendempul bidang kayu 1.1628 m2 13,440.00 15,628.03
N.004 Melabur bidang kayu dengan Politur/Vernis 1.1628 m2 32,450.00 37,732.86
Paku 0.0300 kg 12,000.00 360.00
Lem kayu 0.0300 kg 22,000.00 660.00
Jumlah (1) 114,063.13
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 114,063.13 22,812.63
Jumlah (2) 22,812.63
Jumlah (1) + (2) 136,000.00

Analisa Pekerjaan 30 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
P - 01 Mengerjakan 1 bh Papan Tulis Hitam 1.20 x 2.40 m
Bahan
Kayu Kelas 1 uk. 4/4 0.0127 m3 3,400,000.00 43,084.80
Plywood t. 9 mm 1.0000 lbr 100,000.00 100,000.00
N.001 Mendempul bidang kayu 4.1472 m2 13,440.00 55,738.37
N.004 Melabur bidang kayu dengan cat 4.1472 m2 32,450.00 134,576.64
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00 1,400.00
Jumlah (1) 338,199.81
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 338,199.81 67,639.96
Jumlah (2) 67,639.96
Jumlah (1) + (2) 405,000.00
L - 01 Mengerjakan 1 bh Lemari Penyimpan Uk. 90x50x180
Bahan
Kayu Kelas 1 uk. 5/7 0.0441 m3 3,400,000.00 149,940.00
Kayu Kelas 1 uk. 4/6 0.0634 m3 3,400,000.00 215,424.00
Papan Kelas 1 uk. 3/30 0.1224 m3 3,400,000.00 416,160.00
Plywood t. 18 mm 1.6200 m2 76,388.89 123,750.00
I.004 List kayu 4x4 4.0000 m1 32,920.00 131,680.00
N.001 Mendempul bidang kayu 7.5600 m2 13,440.00 101,606.40
N.004 Melabur bidang kayu dengan Politur/Vernis 7.5600 m2 32,450.00 245,322.00
L.004 Engsel 2.0000 bh 27,600.00 55,200.00
Handle Lemari 2.0000 bh 5,000.00 10,000.00
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00 1,400.00
Jumlah (1) 1,453,882.40
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 1,453,882.40 290,776.48
Jumlah (2) 290,776.48
Jumlah (1) + (2) 1,744,000.00
M - 08 Mengerjakan 1 bh Meja Kerja/Konter
Bahan
Kayu Kelas 1 uk. 4/6 0.0235 m3 3,400,000.00 79,968.00
Papan Kelas 1 uk. 3/30 0.0720 m3 3,400,000.00 244,800.00
Plywood t. 18 mm 1.8100 m2 76,388.89 138,263.89
N.001 Mendempul bidang kayu 5.1900 m2 13,440.00 69,753.60
N.004 Melabur bidang kayu dengan Politur/Vernis 5.1900 m2 32,450.00 168,415.50
L.004 Engsel 1.0000 bh 27,600.00 27,600.00
Handle Lemari 1.0000 bh 5,000.00 5,000.00
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00 1,400.00
Jumlah (1) 738,600.99
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 738,600.99 147,720.20
Jumlah (2) 147,720.20
Jumlah (1) + (2) 886,000.00
M - 10 Mengerjakan 1 bh Meja Baca
Bahan
Kayu Kelas 1 uk. 4/6 0.0242 m3 3,400,000.00 82,416.00
Papan Kelas 1 uk. 3/30 0.0114 m3 3,400,000.00 38,760.00
Plywood t. 18 mm 0.8800 m2 76,388.89 67,222.22
N.001 Mendempul bidang kayu 2.7750 m2 13,440.00 37,296.00
N.004 Melabur bidang kayu dengan Politur/Vernis 2.7750 m2 32,450.00 90,048.75
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Jumlah (1) 319,142.97
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 319,142.97 63,828.59
Jumlah (2) 63,828.59
Jumlah (1) + (2) 382,000.00

Analisa Pekerjaan 31 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)
L - 03/04 Mengerjakan 1 bh Rak Penitipan Barang Uk. 40x120x180
Bahan
Kayu Kelas 1 uk. 4/6 0.0288 m3 3,400,000.00 97,920.00
Papan Kelas 1 uk. 2/30 0.0672 m3 3,400,000.00 228,480.00
Papan Kelas 1 uk. t. 5 cm, untuk alas lemari 0.0240 m3 3,400,000.00 81,600.00
Plywood t. 9 mm 2.1600 m2 34,722.22 75,000.00
I.004 List kayu 4x4 3.0000 m1 32,920.00 98,760.00
N.001 Mendempul bidang kayu 6.2000 m2 13,440.00 83,328.00
N.004 Melabur bidang kayu dengan Politur/Vernis 6.2000 m2 32,450.00 201,190.00
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00 1,400.00
Jumlah (1) 871,078.00
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 871,078.00 174,215.60
Jumlah (2) 174,215.60
Jumlah (1) + (2) 1,045,000.00
L - 05 Mengerjakan 1 bh Rak Majalah satu muka Uk. 40x120x180
Bahan
Kayu Kelas 1 uk. 4/6 0.0413 m3 3,400,000.00 140,352.00
Papan Kelas 1 uk. 3/30 0.1044 m3 3,400,000.00 354,960.00
Papan Kelas 1 uk. t. 5 cm, untuk alas lemari 0.0240 m3 3,400,000.00 81,600.00
Plywood t. 9 mm 2.1600 m2 34,722.22 75,000.00
I.004 List kayu 4x4 4.8000 m1 32,920.00 158,016.00
N.001 Mendempul bidang kayu 7.6894 m2 13,440.00 103,345.92
N.004 Melabur bidang kayu dengan Politur/Vernis 7.6894 m2 32,450.00 249,521.96
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00 1,400.00
Jumlah (1) 1,167,595.88
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 1,167,595.88 233,519.18
Jumlah (2) 233,519.18
Jumlah (1) + (2) 1,401,000.00
L - 06 Mengerjakan 1 bh Rak Buku dua muka Uk. 2 x 40x120x180
Bahan
Kayu Kelas 1 uk. 4/6 0.0619 m3 3,400,000.00 210,528.00
Papan Kelas 1 uk. 3/30 0.1044 m3 3,400,000.00 354,960.00
Papan Kelas 1 uk. t. 5 cm, untuk alas lemari 0.0360 m3 3,400,000.00 122,400.00
I.004 List kayu 4x4 7.2000 m1 32,920.00 237,024.00
N.001 Mendempul bidang kayu 11.5341 m2 13,440.00 155,018.88
N.004 Melabur bidang kayu dengan Politur/Vernis 11.5341 m2 32,450.00 374,282.94
Paku 0.1000 kg 12,000.00 1,200.00
Lem kayu 0.1000 kg 22,000.00 2,200.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00 1,400.00
Jumlah (1) 1,459,013.82
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 1,459,013.82 291,802.76
Jumlah (2) 291,802.76
Jumlah (1) + (2) 1,750,000.00

L - 06 Memasang 1 m kusen pintu alumunium


Bahan
Profil Alumunium 1.1000 m 100,000.00 110,000.00
Skrup 2.0000 bh -
Sealent 10.8000 tube 40,000.00 432,000.00
I.004
N.001 Tenaga
N.004 Pekerja 0.0430 oh 80,000.00 3,440.00
Tukang 0.0430 oh 100,000.00 4,300.00
Kepala Tukang 0.0043 oh 120,000.00 516.00
Mandor 0.0021 oh 150,000.00 315.00
Jumlah (1) 550,571.00

Analisa Pekerjaan 32 dari 299


HARGA SAT JUMLAH
NO KOEF SAT
Rp. Rp.
1 2 3 4 5 6=(3x5)

lot 550,571.00 -
Jumlah (2) -
Jumlah (1) + (2) 550,000.00

L - 06 Memasang 1 m pintu kaca rangka alumunium


Bahan
pintu Alumunium 4.4000 m 100,000.00 440,000.00
Profil kaca 4.5000 bh -
Sealent 0.2700 tube 40,000.00 10,800.00
I.004
N.001 Tenaga
N.004 Pekerja 0.0850 oh 80,000.00 6,800.00
Tukang 0.0850 oh 100,000.00 8,500.00
Kepala Tukang 0.0090 oh 120,000.00 1,080.00
Mandor 0.0050 oh 150,000.00 750.00
Jumlah (1) 467,930.00

lot 467,930.00 -
Jumlah (2) -
Jumlah (1) + (2) 467,000.00

Analisa Pekerjaan 33 dari 299


90,701.56
106,203.80

70,748.80 106,203.80

Analisa Pekerjaan 34 dari 299


kebutuhan pengeco

volume balok lebar tinggi


20/50 20/38 0.2 0.38
15/50 15/38 0.15 0.38
15/40 15/28 0.15 0.28

volume plat beton


5.5 0.12

Analisa Pekerjaan 35 dari 299


K 225

semen (50 KG)


pasir BETON
kerikil

K 250
semen (50 KG)
pasir BETON
kerikil

Analisa Pekerjaan 36 dari 299


0.703677265
0.0211
0.0467
2.8750
2.8750
0.1000
0.1000

0.0143
0.0134
1.8593
1.8593
0.0500
0.0500

Analisa Pekerjaan 37 dari 299


17.2 4.3
3.48

2,700,836.48

Analisa Pekerjaan 38 dari 299


kebutuhan pengecoran segmen 1

panjang volume beton kebutuhan volume


34 2.584 untuk
17.5 0.9975 pengecoran
12 0.504

volume
12 7.92

Analisa Pekerjaan 39 dari 299


volume total 12.0055 13.20605
biaya

4899.44455 98.0 ZAK 55,000 5,389,389.0


6.584159214286 0.7 TRUK 1,650,000 1,207,095.9
10.24202544444 1.3 TRUK 1,850,000 2,460,746.4 +
9,057,231.2
atau
5071.1232 101.4 ZAK 55,000 5,578,235.5
6.527561857143 0.8 TRUK 1,650,000 1,398,763.3
10.16376737037 1.3 TRUK 1,850,000 2,441,944.1 +
9,418,942.9

JENIS BALOK
balok 20/70
balok 20/50
balok 15/50
PLAT LANTAI
X
y
WIREMESH M8

Analisa Pekerjaan 40 dari 299


kebutuhan pengecoran segmen 2

balok lebar tinggi panjang volume beton


20/70 20/58 0.2 0.58 9 1.044
20/50 20/38 0.2 0.38 27 2.052
15/50 15/38 0.15 0.38 9 0.513

plat beton
6 0.12 9 6.48

Analisa Pekerjaan 41 dari 299


volume total 10.089 11.0979
K 225

semen (50 KG) 4117.3209 82.3 ZAK 55,000


pasir BETON 5.533095857143 0.6 TRUK 1,650,000
kerikil 8.607038 1.1 TRUK 1,850,000

K 250
semen (50 KG) 4261.5936 85.2 ZAK 55,000
pasir BETON 5.485533428571 0.7 TRUK 1,650,000
kerikil 8.541272666667 1.1 TRUK 1,850,000

kebutuhan pembesian -segmen 2

kebutuhan besi dalam batang


jumlah tulangan
panjang (mtr)
utama (bh)
Cincin (cm) panjang besi 8 10 12 13
9 10 165 12 8.25
27 8 125 12 18.75
9 8 115 12 5.75

6 12 30
9 12 30
9 X 6 10

33 60 0 0
BATANG BATANG

TOTAL KEBUTUHAN UNTUK PENGECORAN SEGMEN 2

BESI 16 26 BATANG
BESI 8 33 BATANG
BESI 10 60 BATANG
WIREMESH M8 6 Lembar

SEMEN 85.2 ZAK


PASIR COR 0.7 TRUK
SPLIT/KERIKIL 1.1 TRUK

Analisa Pekerjaan 42 dari 299


kebutu

kebutuhan volume balok lebar


untuk 20/50 20/38 0.2
pengecoran 15/40 15/28 0.15
15/50 15/38 0.15

volume plat beton


4.5

Analisa Pekerjaan 43 dari 299


biaya K 225

4,529,053.0
1,014,400.9
2,067,924.7 +
7,611,378.6
atau K 250
4,687,753.0
1,175,471.4
2,052,124.0 +
7,915,348.4

kebutu

dalam batang
WIREMESH jumlah tulangan
16 M8
JENIS BALOK panjang (mtr)
utama (bh)
Cincin (cm)
balok 20/50 28.5 8 125
19 balok 15/40 12 6 95
7 balok 15/50 16.5 8 115
PLAT LANTAI
X 12
y 4.5
5.4 WIREMESH M8 12 X 4.5

26 5.40
+
BATANG

TOTAL KEBUTUHAN UNTUK PENGECORAN SEGMEN 2&3


BESI 16 58 BATANG sudah

Analisa Pekerjaan 44 dari 299


BESI 8 69 BATANG sudah

Analisa Pekerjaan 45 dari 299


BESI 10 120 BATANG sudah

BESI 13 7 BATANG sudah


WIREMESH M8 12 lembar BELUM
SEMEN 170.5 ZAK BELUM
PASIR COR 1.4 TRUK BELUM
SPLIT/KERIKIL 2.2 TRUK BELUM
KASO 5/7 1.0 M3 BELUM
BAMBU 40.0 BATANG BELUM
MULTI 9MM 30.0 LEMBAR BELUM

AREA SEGMEN 1
(SUDAH DICOR)

KIBLAT
AREA SEGMEN 2

AREA SEGMEN 3

Analisa Pekerjaan 46 dari 299


kebutuhan pengecoran segmen 3

tinggi panjang volume beton


0.38 28.5 2.166
0.28 12 0.504
0.38 16.5 0.9405

0.12 12 6.48

Analisa Pekerjaan 47 dari 299


volume total 10.0905 11.09955
biaya

semen (50 KG) 4117.93305 82.4 ZAK 55,000 4,529,726.4


pasir BETON 5.5339185 0.6 TRUK 1,650,000 1,014,551.7
kerikil 8.608317666667 1.1 TRUK 1,850,000 2,068,232.2 +
7,612,510.2
atau
semen (50 KG) 4262.2272 85.2 ZAK 55,000 4,688,449.9
pasir BETON 5.486349 0.7 TRUK 1,650,000 1,175,646.2
kerikil 8.542542555556 1.1 TRUK 1,850,000 2,052,429.1 +
7,916,525.2

kebutuhan pembesian -segmen 3

kebutuhan besi dalam batang


WIREMESH
panjang besi 8 10 12 13 16 M8
12 19.79166666667 20
12 6.333333333333 7
12 10.54166666667 12

12 30
12 30
10 5.4

37 60 0 7 32 5.40
+
BATANG BATANG BATANG

TOTAL KEBUTUHAN UNTUK PENGECORAN SEGMEN 3

BESI 16 32 BATANG
BESI 8 37 BATANG
BESI 10 60 BATANG
BESI 13 7 BATANG
WIREMESH M8 6 lembar
SEMEN 85.2 ZAK
PASIR COR 0.7 TRUK
SPLIT/KERIKIL 1.1 TRUK

Estimasi Kebutuhan pengecoran dak beton Tahap 2


mesjid BAITURRAHMAN-SMKN 5 BANDUNG

Analisa Pekerjaan 48 dari 299


minggu, 3 oktober 2020 400000 20

Analisa Pekerjaan 49 dari 299


item kebutuhan satuan kebutuhan biaya status deskripsi

estimasi upah 20 orang @ 400000 8,000,000


konsumsi pagi
air gula kopi sudah ada donasi
makan siang sudah ada donasi liwet
cemilan siang-sore
makan sore
air dan minuman energi
makan malam
cemilan malam

kegiatan pengecoran akan dilakukan mulai jam 7 pagi s/d selesai (kemungkinan malam hari)

Analisa Pekerjaan 50 dari 299


kebutuhan pengecoran KOLOM, BALOK, PLAT L

volume KOLOM DAN BALOK lebar tinggi panjang volume beton


KOLOM 30/35 0.3 0.35 4 8.4

b. utama BALOK 15/40 0.15 0.4 74 4.44


mimbar 15/40 0.15 0.4 22 1.32
volume plat beton (CANOPY)
CANOPY 1 0.1 53 5.3

Analisa Pekerjaan 51 dari 299


MIMBAR 2 0.1 9 1.8

volume total 21.26


K 225

semen (50 KG) 8676.206 173.5


pasir BETON 11.65959142857 1.3
kerikil 18.13714222222 2.4

K 250
semen (50 KG) 8980.224 179.6
pasir BETON 11.55936571429 1.5
kerikil 17.99855851852 2.3

kebutuhan pembesian KOLOM, BALOK, PLAT LT

kebutuhan besi da
jumlah tulangan
JENIS BALOK panjang (mtr)
utama (bh)
Cincin (cm) panjang besi 8 10
kolom 30/35 80 8 115 12 51.1
balok 15/40 96 6 95 12 50.7
canopy
X 53 12 29.4
y 1 12 29.4
WIREMESH M8 53 X 1 10
mimbar
X 9 12 10.0
y 2 12 10.0
WIREMESH M8 9 X 2 10

102 79
BATANG BATANG

TOTAL KEBUTUHAN UNTUK PENGECORAN + PEMBESI


KOLOM, BALOK, PLAT LT2
BESI 16 0 BATANG
BESI 8 102 BATANG
BESI 10 79 BATANG
BESI 13 103 BATANG
WIREMESH M8 7.10 lembar
SEMEN 179.6 ZAK
PASIR COR 1.5 TRUK
SPLIT/KERIKIL 2.3 TRUK

Analisa Pekerjaan 52 dari 299


engecoran KOLOM, BALOK, PLAT LT2

(20 UNIT)

Analisa Pekerjaan 53 dari 299


23.386
biaya

ZAK 55,000 9,543,826.6


TRUK 1,650,000 2,137,591.8
TRUK 1,850,000 4,357,625.1 +
16,039,043.4
atau
ZAK 55,000 9,878,246.4
TRUK 1,650,000 2,477,006.9
TRUK 1,850,000 4,324,329.0 +
16,679,582.3

pembesian KOLOM, BALOK, PLAT LT2

kebutuhan besi dalam batang


WIREMESH
12 13 16 M8
54.3
49.0

5.3

1.8

0 103 0 7.10
+
BATANG

OTAL KEBUTUHAN UNTUK PENGECORAN + PEMBESIAN


KOLOM, BALOK, PLAT LT2

Analisa Pekerjaan 54 dari 299


ANALISA HARGA SATUAN PEKERJAAN
KOTA BANDUNG
TAHUN ANGGARAN 2015

Kode3 NO. URAIAN KOEF SAT. HARGA SAT.

1 2 3 4 5

A001 1 M2 PEK. PENGUKURAN KEMBALI (SITE)


PK05 Tukang Batu Terampil 0.0100 org
PK03 Pekerja Terampil 0.0200 org
LL01 Peralatan 0.5000 lot
Jumlah
A002 1 M1 PEK. PASANGAN BOUWPLANK
BF05 Kayu Borneo Super 0.0100 m³
BS02 Paku 5 - 7 0.0380 kg
LL02 Ongkos Pasang 0.1550 ls
Jumlah
A003 1 M2 LOS KERJA / GUDANG
BF05 Kayu Borneo Super 0.1000 m³
BS02 Paku 5 - 7 0.2500 kg
CC31 Seng Glb BJLS 30 1.1000 lbr
BJ01 Triplex 3 mm 0.5000 lbr
BA34 PC (50 kg) 0.1000 zak
LL03 Peralatan 0.0250 lot
LL04 Ongkos Pasang 0.1250 ls
Jumlah
A004 1 M2 PEK. KANTOR DIREKSI
BF05 Kayu Borneo Super 0.1000 m³
BS02 Paku 5 - 7 0.2500 kg
CC31 Seng Glb BJLS 28 ( 80 x 180 cm ) 1.1000 lbr
BJ01 Triplex 3 mm 0.5000 lbr
BA34 PC (50 kg) 0.1000 zak
BA04 Pasir pasang 0.2500 m³
BA23 Bata merah 70.0000 bh
LL05 Peralatan 0.0200 lot
LL06 Ongkos Pasang 0.1500 ls
Jumlah
A005 1 M2 PAPAN NAMA PROYEK

BF05 Kayu Borneo Super 0.1300 m³

BS02 Paku 5 - 7 0.2500 kg

Cat Minyak 1.0000 ls

LL07 Penulisan 0.1250 ls

Ongkos Pasang 0.1250 ls

Jumlah

A006 1 M2 PAGAR PENGAMAN PROYEK

CC31 Seng Glb BJLS 28 ( 80 x 180 ) 1.4300 lbr

BF05 Kayu Borneo Super 0.0360 m³

BS02 Paku 5 - 7 0.2000 kg

Pengecatan cat minyak 2 x bag. luar 1.8000 m²

LL08 Ongkos Pasang 0.2000 ls

Jumlah

A007 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 1 M'

PK03A Tukang Gali 0.4000 org

PK19 Mandor 0.0400 org

LL09 Alat Bantu 0.0500 lot

Jumlah

A008 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2 M'

PK03A Tukang Gali 0.5260 org

PK19 Mandor 0.0520 org

LL10 Alat Bantu 0.0500 lot

Jumlah

A009 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 3 M'

PK03A Tukang Gali 0.7350 org

PK19 Mandor 0.0730 org

LL11 Alat Bantu 0.0500 lot

Jumlah

A010 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 4 M'

PK03A Tukang Gali 0.9440 org

PK19 Mandor 0.0940 org


LL12 Alat Bantu 0.0500 lot

Jumlah

A011 1 M3 PEK.GALIAN TANAH BIASA KEDALAMAN 5 M1

PK03A Tukang Gali 1.1530 org

PK19 Mandor 0.1150 org

LL13 Alat Bantu 0.0500 lot

Jumlah

A012 1 M3 PEK.GALIAN TANAH BERBATU / TANAH KERAS MAX KEDALAMAN 1 M

PK03A Tukang Gali 0.6250 org

PK19 Mandor 0.1250 org

LL14 Alat Bantu 0.2500 lot

Jumlah

A013 1 M3 PEK.GALIAN TANAH CADAS MAX KEDALAMAN 1 M

PK03A Tukang Gali 0.7500 org

PK19 Mandor 0.1250 org

LL15 Alat Bantu 0.2500 lot

Jumlah

A014 1 M3 PEK.GALIAN TANAH LUMPUR MAX KEDALAMAN 1 M

PK03A Tukang Gali 0.5250 org

PK19 Mandor 0.1250 org

LL16 Alat Bantu 0.2500 lot

Jumlah

A015 1 M2 PEK. STRIPING TANAH TEBAL = 20 CM

PK03A Tukang Gali 0.0500 org

PK19 Mandor 0.0050 org

LL17 Alat Bantu 0.3500 lot

Jumlah

A016 1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 METER

PK03A Tukang Gali 0.2500 org

PK19 Mandor 0.0500 org

LL18 Alat Bantu 0.1000 lot

Jumlah

A017 1 M3 URUGAN TANAH KEMBALI


PK03A Tukang Gali 0.1920 org

PK19 Mandor 0.0190 org

LL19 Alat Bantu 0.1000 lot

Jumlah

A018 1 M3 PEK. PEMADATAN TANAH SETIAP 20 CM

PK03A Tukang Gali 0.5000 org

PK19 Mandor 0.0500 org

LL20 Alat Bantu ( Sewa Stamper ) 0.1250 lot

Jumlah

A019 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TS : 7 TL

BA04 Pasir Pasang 0.3300 m³

BA40 Kapur Padam 0.1000 m³

BA43 Tanah liat 0.7630 m³

PK03A Tukang Gali 0.8330 org

PK19 Mandor 0.0083 org

Jumlah

A020 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TL

BA40 Kapur Padam 0.2000 m³

BA43 Tanah liat 1.0000 m³

PK03A Tukang Gali 0.8330 org

PK06 Kep.tukang batu 0.4100 org

PK19 Mandor 0.0830 org

Jumlah

A021 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TS

BA04 Pasir Pasang 1.0000 m³

BA40 Kapur Padam 0.2000 m³

PK03A Tukang Gali 0.8330 org

PK06 Kep.tukang batu 0.0410 org

PK19 Mandor 0.0830 org

Jumlah

A022 1 M2 PEK. PEMASANGAN LAPISAN INJUK T = 10 CM

BN15 Injuk 6.0000 kg

PK01 Pekerja 0.1500 org


PK19 Mandor 0.0150 org

Jumlah

A023 1 M3 PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CM

BA02 Sirtu ( Membeli Sirtu ) 1.2000 m³

PK03A Tukang Gali 0.2500 org

PK19 Mandor 0.0250 org

LL21 Alat Bantu ( Pek. Pemadatan Tanah 1 m3 ) 0.1000 lot

Jumlah

A024 1 M2 PEK. PEMBUATAN JALAN SEMENTARA TEBAL 20 CM

BA12 Batu Belah 0.2500 m³

BA14 Kerikil 0.0300 m³

BA04 Pasir Pasang 0.0500 m³

PK03A Tukang Gali 0.5000 org

PK19 Mandor 0.1000 org

LL22 Alat Bantu ( Pek. Pemadatan Tanah 1 m2 ) 0.0600 lot

Jumlah

A025 1 M3 PEK.GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'


PK03A Tukang Gali 1.1500 org
PK19 Mandor 0.0250 org
LL23 Alat Bantu 0.2000 lot
Jumlah
A026 1 M3 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (5000M3)

Pek. Galian ( 10 org ) 50 % 0.6000 m³

Pek. Galian tanah berbatu ( 10 org ) 50 % 0.6000 m³

Pek. Grading Plant ( 10 org ) 50 % 5.0000 m²

LL24 Beli Tanah + Angkut Max 10 Km 1.2000 m³

Jumlah

A027 1 M3 PASANGAN PASIR URUG

BA01 Pasir Urug 1.2000 m³

PK01 Pekerja 0.1500 org

PK19 Mandor 0.0100 org

Jumlah

A028 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL


BA34 PC (50 kg) 3.9560 zak
BA05 Pasir beton 0.5500 m³
BA09 Split Pecah mesin 2/3 0.9300 m³
PK01 Pekerja 2.0000 org
PK06 Kep. Tukang Batu 0.0500 org
PK19 Mandor 0.0100 org
LL25 Peralatan 0.0750 lot
Jumlah
A029 1 M3 PAS. BETON CYCLOOF + 40% BATU BELAH

BA12 Batu Belah 40% 0.4800 m³

Adukan Beton Site mix K-175 0.6000 m³

Upah Kerja 0.0400 ls

Jumlah

A030 1 M3 COR BETON SITE MIX K 175


BA34 Semen PC (50 kg) 6.8000 zak
BA09 Split pecah mesin 2/3 0.8300 m³
BA05 Pasir Beton 0.5400 m³
PK01 Pekerja 1.5000 org
PK06 Kep. tukang batu 0.0500 org
PK19 Mandor 0.0100 org
LL26 Peralatan 0.0700 lot
Jumlah

A031 1 M3 COR BETON SITE MIX K 225


BA34 Semen PC (50 kg) 7.8960 zak
BA09 Split pecah mesin 2/3 0.8100 m³
BA05 Pasir beton 0.4900 m³
PK01 Pekerja 1.5000 org
PK06 Kepala tk. batu 0.0500 org
PK19 Mandor 0.0100 org
LL27 Peralatan 0.0700 lot
Jumlah
A032 1 M3 COR BETON SITE MIX K 300
BA34 Semen PC (50 kg) 8.6960 zak
BA09 Split pecah mesin 2/3 0.8100 m³
BA05 Pasir beton 0.4900 m³
PK01 Pekerja 1.5000 org
PK06 Kepala tk. batu 0.0500 org
PK19 Mandor 0.0100 org
LL28 Peralatan 0.7000 lot
Jumlah
A033 1 M3 COR BETON K-175 READY MIX MIN 6 M3 BERIKUT SLANG
BA39 Adukan K-175 Readymix 1.0000 m³
PK01 Pekerja 2.5000 org
PK06 Kep. tukang batu 0.1000 org
PK19 Mandor 0.0100 org
LL29 Alat bantu ( Slang + Tes Lab ) 0.0450 lot
Jumlah
A034 1 M3 COR BETON K-225 READY MIX MIN 6 M3 BERIKUT SLANG
BA38 Adukan K-225 Readymix 1.0000 m³
PK01 Pekerja 2.5000 org
PK06 Kep. tukang batu 0.1000 org
PK19 Mandor 0.0100 org
LL30 Alat bantu ( Slang + Tes Lab ) 0.0450 lot
Jumlah
A035 1 M3 COR BETON K-300 READY MIX MIN 6 M3 BERIKUT SLANG
BA37 Adukan K-300 Readymix 1.0000 m³
PK01 Pekerja 2.5000 org
PK06 Kep. tukang batu 0.1000 org
PK19 Mandor 0.0100 org
LL31 Alat bantu ( Slang + Tes Lab ) 0.0450 lot
Jumlah

A036 1 KG BESI BETON TERPASANG U - 24

BP01 Besi Beton rata - rata 1.0500 kg

BP11 Kawat Beton 0.0100 kg

PK14 Tk. Besi Beton terampil 0.0150 org

PK15 Kepala Tukang Besi terampil 0.0100 org

PK19 Mandor 0.0050 org

LL32 Peralatan, Spancer 0.0200 lot

Jumlah

A037 1 KG BESI BETON TERPASANG U - 39

BP01 Besi Beton rata - rata 1.0500 kg


BP11 Kawat Beton 0.0100 kg

PK14 Tk. Besi Beton terampil 0.0160 org

PK15 Kepala Tukang Besi terampil 0.0110 org

PK19 Mandor 0.0050 org

LL33 Peralatan, Spancer 0.0200 lot

Jumlah

A038 1 KG PEK. ERECTION KONST KUDA-KUDA BESI

PK03 Pekerja terampil 0.0010 org

PK17 Tukang besi profil terampil 0.0010 org

PK18 Kepala tukang besi profil 0.0002 org

PK19 Mandor 0.0001 org

PK20 Operator alat besar 0.0002 org

PK21 Pembantu operator 0.0200 org

LL35 Sewa alat 0.0002 ls

CP04 Bahan bakar solar 0.0100 lt

CP07 Pelumas 0.0010 lt

LL34 Alat bantu 0.0002 lot

Jumlah

A039 1 KG PEKERJAAN BAJA IWF EX DN


BP05 Besi IWF ex DN SII 1.0500 kg
PK03 Pekerja Terampil 0.0600 org
PK17 Tukang besi profil terampil 0.0040 org
PK18 Kepala tukang besi profil 0.0010 org
PK19 Mandor 0.0002 org
LL36 Peralatan ( Oksigen , Solar , Elpiji, kawat las, dan d 0.1250 lot
Jumlah
A040 1 KG PEKERJAAN BAJA EX JAPAN

BP06 Besi IWF ex Japan 1.0500 kg

PK03 Pekerja Terampil 0.0600 org

PK17 Tukang besi profil terampil 0.0040 org

PK18 Kepala tukang besi profil 0.0010 org

PK19 Mandor 0.0002 org

LL37 Peralatan ( Oksigen , Solar , Elpiji, kawat las, dan d 0.1250 lot
Jumlah

A041 1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN


BP07 Besi profil / besi siku ex DN 1.0500 kg
PK03 Pekerja Terampil 0.0600 org
PK17 Tukang besi profil terampil 0.0040 org
PK18 Kepala tukang besi profil 0.0010 org
PK19 Mandor 0.0002 org
LL38 Peralatan ( Oksigen , Solar , Elpiji, kawat las, dan d 0.1250 lot
Jumlah
A042 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM
BP22 Kawat las listrik 0.0400 kg
CP04 Bahan bakar solar 0.0300 lt
CP07 Pelumas 0.0040 lt
PK03 Pekerja Terampil 0.0040 org
PK17 Tukang besi profil terampil 0.0020 org
PK18 Kepala tukang besi profil 0.0020 org
PK19 Mandor 0.0010 org
LL39 Alat bantu ( Mesin Las Listrik ) 0.2500 lot
Jumlah
A043 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR

PK03 Pekerja Terampil 0.0500 org

PK17 Tukang besi profil terampil 0.0200 org

PK18 Kepala tukang besi profil 0.0030 org

PK19 Mandor 0.0010 org

LL40 Alat bantu ( Mesin Bor Listrik ) 0.2500 lot

Jumlah

A044 1 M2 PEKERJAAN BONDEX

BP04 Bondek 1.0100 m²

BP22 Kawat las 0.1000 kg

PK03 Pekerja terampil 0.0500 org

PK19 Mandor 0.0100 org

LL41 Shear Connector 1.0000 ls

Jumlah

A045 1 M2 PEKERJAAN WIREMESH M8


BP23 Wiremesh M8 1.0100 m²

BP22 Kawat las 0.1000 kg

PK03 Pekerja terampil 0.1000 org

PK19 Mandor 0.0100 org

Jumlah

A046 1 M2 BEKISTING DENGAN PAPAN


BF05 Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³
BF19 Kayu Albasia ( 2 x pakai ) 75 % 0.0240 m³
BS02 Paku 0.4000 kg
PK01 Pekerja 0.1200 org
PK08 Tk. Kayu terampil 0.1500 org
PK09 Kepala Tukang Kayu 0.1500 org
PK19 Mandor 0.0500 org
PK07 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org
Jumlah
A047 1 M2 BEKISTING MULTIPLEX 9 MM

BF05 Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³

BJ11 Multiplek 9 mm ( 2 x pakai ) 75% 0.3470 lbr

BS02 Paku 0.4000 kg

PK01 Pekerja 0.1200 org

PK08 Tk. Kayu terampil 0.1500 org

PK09 Kepala Tukang Kayu 0.1500 org

PK19 Mandor 0.0500 org

PK07 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org

Jumlah

A048 1 M2 BEKISTING MULTIPLEX 12 MM

BF05 Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³

BJ12 Multiplek 12 mm ( 2 x pakai ) 75% 0.3470 lbr

BS02 Paku 0.4000 kg

PK01 Pekerja 0.1200 org

PK08 Tk. Kayu terampil 0.1500 org

PK09 Kepala Tukang Kayu 0.1500 org

PK19 Mandor 0.0500 org

PK07 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org


Jumlah

A049 1 M2 PASANGAN STOOT WERK

BF21 Kayu stoot ( dinding 2 x pakai ) 50% 9.0000 bt

BF19 Kayu Albasia ( 2 x pakai ) 0.0160 m³

BS02 Paku 0.5000 kg

PK01 Pekerja 0.1500 org

PK08 Tk. Kayu terampil 0.2000 org

PK09 Kepala tukang Kayu 0.2000 org

PK19 Mandor 0.0170 org

Jumlah

A050 1 M3 PASANGAN ANSTAMPING BATU BELAH

BA12 Batu Belah 1.2000 m³

BA01 Pasir Urug 0.1000 m³

PK01 Pekerja 0.5000 org

PK04 Tk.batu setengah terampil 0.5625 org

PK06 Kep.tukang batu 0.0750 org

PK19 Mandor 0.0563 org

Jumlah

A051 1 M3 PASANGAN BATU BRONJONG

BA13 Batu Kali ( Batu Bulat ) Bronjol 1.2000 m³

BP14 Kawat Bronjong 3.5000 kg

PK01 Pekerja 1.5000 org

PK03 Pekerja Terampil 0.2000 org

PK19 Mandor 0.0200 org

Jumlah

A052 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH

LL42 Lempengan Rumput Biasa (Teki) 1.2000 m²

PK02 Pekerja 0.0400 org

PK19 Mandor 0.0100 org

Jumlah

A053 1 M3 PASANGAN BATU BELAH 1 : 6

BA12 Batu Belah 1.2000 m³

BA34 PC (50 kg) 0.9440 zak


BA04 Pasir Pasang 0.4300 m³

PK01 Pekerja 1.2500 org

PK06 Kep.tukang batu 0.1125 org

PK19 Mandor 0.0169 org

Jumlah
A054 1 M3 PASANGAN BATU BELAH 1 : 5
BA12 Batu Belah 1.2000 m³
BA34 PC (50 kg) 1.0800 zak
BA04 Pasir Pasang 0.4400 m³
PK01 Pekerja 1.2500 org
PK04 Tk.batu setengah terampil 0.5000 org
PK06 Kep.tukang batu 0.1125 org
PK19 Mandor 0.0169 org
Jumlah
A055 1 M3 PASANGAN BATU BELAH 1 : 4
BA12 Batu Belah 1.2000 m³
BA34 PC (50 kg) 1.2500 zak
BA04 Pasir Pasang 0.4200 m³
PK01 Pekerja 1.2500 org
PK04 Tk.batu setengah terampil 0.5000 org
PK06 Kep.tukang batu 0.1125 org
PK19 Mandor 0.0169 org
Jumlah
A056 1 M3 PASANGAN BATU BELAH 1 : 3
BA12 Batu Belah 1.2000 m³
BA34 PC (50 kg) 1.4200 zak
BA04 Pasir Pasang 0.4000 m³
PK01 Pekerja 1.2500 org
PK06 Kep.tukang batu 0.1125 org
PK19 Mandor 0.0169 org
Jumlah
A057 1 M3 PASANGAN BATU BELAH 1 : 2,5
BA12 Batu Belah 1.2000 m³
BA34 PC (50 kg) 1.5900 zak
BA04 Pasir Pasang 0.3800 m³
PK01 Pekerja 1.2500 org
PK06 Kep.tukang batu 0.1125 org
PK19 Mandor 0.0169 org
Jumlah
A058 1 M3 PASANGAN BATU BELAH 1 : 2

BA12 Batu Belah 1.2000 m³

BA34 PC (50 kg) 1.7600 zak

BA04 Pasir Pasang 0.3600 m³

PK01 Pekerja 1.2500 org

PK06 Kep.tukang batu 0.1125 org

PK19 Mandor 0.0169 org

Jumlah

A059 1 M3 PASANGAN BATU BELAH 1 : 1

BA12 Batu Belah 1.2000 m³

BA34 PC (50 kg) 1.9300 zak

BA04 Pasir Pasang 0.3400 m³

PK01 Pekerja 1.2500 org

PK06 Kep.tukang batu 0.1125 org

PK19 Mandor 0.0169 org

Jumlah

A060 1 M3 PAS. BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARAN

BA12 Batu Belah 1.5000 m³

BA34 PC (50 kg) 1.2500 zak

BA04 Pasir Pasang 0.3480 m³

PK03 Pekerja Terampil 1.2500 org

PK05 Tk.batu terampil 1.1250 org

PK06 Kep.tukang batu 0.1125 org

PK19 Mandor 0.0169 org

Jumlah

A061 1 M2 PAS. BATU TEMPEL + SIARAN

BA15 Batu Tempel 1.1000 m2

BA34 PC (50 kg) 0.1200 kg

BA04 Pasir Pasang 0.0310 m³

PK03 Pekerja Terampil 0.1875 org


PK05 Tk.batu terampil 0.2250 org

PK06 Kep.tukang batu 0.0375 org

PK19 Mandor 0.0338 org

LL43 Peralatan 0.0250 lot

Jumlah

A062 1 M2 DINDING KERAMIK 10/20 DAN 20/20 DN PUTIH

BL14 Keramik KW 1 DN putih 1.0100 m²

BA34 PC (50 kg) 0.1600 zak

BA04 Pasir pasang 0.0300 m³

BA42 Semen warna 0.0130 kg

PK03 Pekerja trampil 0.1875 org

PK05 Tk. batu trampil 0.3750 org

PK06 Kep. Tukang batu 0.0750 org

PK19 Mandor 0.0188 org

Jumlah

A063 1 M2 DINDING KERAMIK 10/20 (20/20) DN BERCORAK

BL15 Keramik KW 1 DN bercorak berwarna 1.0100 m²

BA34 PC (50 kg) 0.1600 zak

BA04 Pasir pasang 0.0300 m³

BA42 Semen warna 0.0130 kg

PK03 Pekerja trampil 0.1875 org

PK05 Tk. batu trampil 0.3750 org

PK06 Kep. Tukang batu 0.0750 org

PK19 Mandor 0.0188 org

Jumlah

A064 1 M2 LANTAI KERAMIK 20/20 BERCORAK/ANTI SLIP KAMAR MANDI

BL16 Keramik KW 1 DN bercorak / anti slip 1.0100 m²

BA34 PC (50 kg) 0.2400 zak

BA04 Pasir pasang 0.0300 m³

BA42 Semen warna 0.0130 kg

PK03 Pekerja trampil 0.1875 org

PK05 Tk. batu trampil 0.3750 org

PK06 Kep. Tukang batu 0.1125 org


PK19 Mandor 0.0282 org

Jumlah

A064' 1 M2 LANTAI KERAMIK 10/20 DAN 20/20 KW1 DN PUTIH POLOS

BL17 Keramik 10/20 dan 20/20 KW 1 DN Putih Polos 1.0100 m²

BA34 PC (50 kg) 0.1600 zak

BA04 Pasir pasang 0.0300 m³

BA42 Semen warna 0.0130 kg

PK03 Pekerja trampil 0.1875 org

PK05 Tk. batu trampil 0.3750 org

PK06 Kep. Tukang batu 0.0750 org

PK19 Mandor 0.0188 org

Jumlah

A065 1 M2 LANTAI KERAMIK 30/30 DN PUTIH POLOS

BL19 Keramik KW 1 DN putih polos 1.0100 m²

BA34 PC (50 kg) 0.1600 zak

BA04 Pasir pasang 0.0300 m³

BA42 Semen warna 0.0130 kg

PK03 Pekerja trampil 0.1875 org

PK05 Tk. batu trampil 0.3750 org

PK06 Kep. Tukang batu 0.0750 org

PK19 Mandor 0.0188 org

Jumlah

A066 1 M2 LANTAI KERAMIK 30/30 DN BERCORAK/BERWARNA

BL20 Keramik KW 1 DN bercorak berwarna 1.0100 m²

BA34 PC (50 kg) 0.1600 zak

BA04 Pasir pasang 0.0300 m³

BA42 Semen warna 0.0130 kg

PK03 Pekerja trampil 0.1875 org

PK05 Tk. batu trampil 0.3750 org

PK06 Kep. Tukang batu 0.0750 org

PK19 Mandor 0.0188 org

Jumlah

A067 1 M2 LANTAI GRANIT UKURAN BESAR EX LUAR NEGERI


BL28 Granit Ex Italy (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL44 Alat bantu 0.0320 lot

Jumlah

A068 1 M2 DINDING GRANIT UKURAN BESAR EX LUAR NEGERI

BL28 Granit Ex LN (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.1000 org

LL45 Alat bantu 0.0480 lot

Jumlah

A069 1 M2 LANTAI GRANIT UKURAN BESAR EX DALAM NEGERI

BL30 Granit Ex DN (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL46 Alat bantu 0.0320 lot

Jumlah

A070 1 M2 DINDING GRANIT UKURAN BESAR EX DALAM NEGERI


BL30 Granit Ex DN (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 1.0000 org

LL47 Alat bantu 0.0480 lot

Jumlah

A070A 1 M2 LANTAI GRANIT UKURAN KECIL EX LUAR NEGERI

BL29 Granit Ex Italy (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.1000 org

PK19 Mandor 0.0250 org

LL48 Alat bantu 0.0320 lot

Jumlah

A070B 1 M2 DINDING GRANIT UKURAN KECIL EX LUAR NEGERI

BL29 Granit Ex LN (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.0500 org

LL49 Alat bantu 0.0480 lot

Jumlah

A070C 1 M2 LANTAI GRANIT UKURAN KECIL EX DALAM NEGERI


BL31 Granit Ex DN (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.1000 org

PK19 Mandor 0.0250 org

LL50 Alat bantu 0.0320 lot

Jumlah

A070D 1 M2 DINDING GRANIT UKURAN KECIL EX DALAM NEGERI

BL31 Granit Ex DN (setelah dipotong) 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.0500 org

LL51 Alat bantu 0.0480 lot

Jumlah

A070E 1 M2 LANTAI GRANITO TILE ESSENZA UKURAN 60 x 60 POLISHED

BL39 Granito Tile Essenza 60 x 60 Polished 1.0000 m²

BA34 PC (50 kg) 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.2500 org

PK05 Tk. batu trampil 0.6000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL52 Alat bantu 0.0240 lot

Jumlah

A070F 1 M2 DINDING GRANITO TILE ESSENZA UKURAN 60 x 60 POLISHED


BL39 Granito Tile Essenza 60 x 60 Polished 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air + Perekat lain 1.0000 lot

PK03 Pekerja trampil 0.2500 org

PK05 Tk. batu trampil 0.7000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL53 Alat bantu 0.0400 lot

Jumlah

A070G 1 M2 LANTAI GRANITO TILE ESSENZA UKURAN 40 x 40 POLISHED

BL32 Granito Tile Essenza 40 x 40 Polished 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.2500 org

PK05 Tk. batu trampil 0.6000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL54 Alat bantu 0.0240 lot

Jumlah

A070H 1 M2 DINDING GRANITO TILE ESSENZA UKURAN 40 x 40 POLISHED

BL32 Granito Tile Essenza 40 x 40 Polished 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air + Perekat lain 1.0000 lot

PK03 Pekerja trampil 0.2500 org

PK05 Tk. batu trampil 0.7000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL55 Alat bantu 0.0400 lot

Jumlah

A070I 1 M2 LANTAI MARMER EX LAMPUNG UKURAN BESAR


BL34 Marmer Ex Lampung 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL56 Alat bantu 0.0320 lot

Jumlah

A070J 1 M2 DINDING MARMER EX LAMPUNG UKURAN BESAR

BL34 Marmer Ex Lampung 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.0250 org

LL57 Alat bantu 0.0480 lot

Jumlah

A070K 1 M2 LANTAI MARMER EX LAMPUNG UKURAN KECIL

BL35 Marmer Ex Lampung Ukuran Kecil 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.1000 org

PK19 Mandor 0.0250 org

LL58 Alat bantu 0.0320 lot

Jumlah

A070L 1 M2 DINDING MARMER EX LAMPUNG UKURAN KECIL


BL35 Marmer Ex Lampung Ukuran Kecil 1.0000 m²

BA34 P E253C (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.0250 org

LL59 Alat bantu 0.0480 lot

Jumlah

A070M 1 M2 LANTAI MARMER EX CITATAH UKURAN BESAR

BL36 Marmer Ex Citatah Ukuran Besar 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.0500 org

PK19 Mandor 0.0250 org

LL60 Alat bantu 0.0320 lot

Jumlah

A070N 1 M2 DINDING MARMER EX CITATAH UKURAN BESAR

BL36 Marmer Ex Citatah Ukuran Besar 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.0250 org

LL61 Alat bantu 0.0480 lot

Jumlah

A070O 1 M2 LANTAI MARMER EX CITATAH UKURAN KECIL


BL37 Marmer Ex Citatah Ukuran Kecil 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 0.5000 org

PK05 Tk. batu trampil 1.5000 org

PK06 Kep. Tukang batu 0.1000 org

PK19 Mandor 0.0250 org

LL62 Alat bantu 0.0320 lot

Jumlah

A070P 1 M2 DINDING MARMER EX CITATAH UKURAN KECIL

BL37 Marmer Ex Citatah Ukuran Kecil 1.0000 m²

BA34 PC (50 kg) + Campuran khusus 0.2600 zak

BA04 Pasir pasang 0.0300 m³

BL42 Campuran kedap air 1.0000 lot

PK03 Pekerja trampil 1.0000 org

PK05 Tk. batu trampil 3.0000 org

PK06 Kep. Tukang batu 0.2000 org

PK19 Mandor 0.0250 org

LL63 Alat bantu 0.0480 lot

Jumlah
A071 1 M2 PASANGAN BATA MERAH 1 : 2
BA23 Bata merah 70.0000 bh
BA34 PC (50 kg) 0.5440 zak
BA04 Pasir pasang 0.0470 m³
PK02 Pekerja 0.4290 org
PK04 Tk. batu 0.2140 org
PK06 Kep. Tukang batu 0.0210 org
PK19 Mandor 0.0110 org
Jumlah
A072 1 M2 PASANGAN BATA MERAH 1 : 3
BA23 Bata merah 70.0000 bh
BA34 PC (50 kg) 0.4200 zak
BA04 Pasir pasang 0.0540 m³
PK02 Pekerja 0.4290 org
PK04 Tk. batu 0.2140 org
PK06 Kep. Tukang batu 0.0210 org
PK19 Mandor 0.0110 org
Jumlah
A073 1 M2 PASANGAN BATA MERAH 1 : 4
BA23 Bata merah 70.0000 bh
BA34 PC (50 kg) 0.3354 zak
BA04 Pasir pasang 0.0580 m³
PK02 Pekerja 0.3218 org
PK04 Tk. batu 0.1805 org
PK06 Kep. Tukang batu 0.0158 org
PK19 Mandor 0.0083 org
Jumlah
A074 1 M2 PASANGAN BATA MERAH 1 : 5
BA23 Bata merah 70.0000 bh
BA34 PC (50 kg) 0.2074 zak
BA04 Pasir pasang 0.0580 m³
PK02 Pekerja 0.3218 org
PK04 Tk. batu 0.1805 org
PK06 Kep. Tukang batu 0.0158 org
PK19 Mandor 0.0083 org
Jumlah
A075 1 M2 PLESTERAN DINDING 1 : 2 + ACIAN

BA34 PC (50 kg) 0.2368 zak

BA04 Pasir pasang 0.0190 m³

PK02 Pekerja 0.2860 org

PK04 Tk. batu 0.2140 org

PK06 Kep. Tukang batu 0.0210 org

PK19 Mandor 0.0200 org

Jumlah

A076 1 M2 PLESTERAN DINDING 1 : 3 + ACIAN

BA34 PC (50 kg) 0.1600 zak

BA04 Pasir pasang 0.0190 m³

PK02 Pekerja 0.2860 org


PK04 Tk. batu 0.2140 org

PK06 Kep. Tukang batu 0.0210 org

PK19 Mandor 0.0200 org

Jumlah

A077 1 M2 ACIAN PC

BA34 PC (50 kg) 0.0800 zak

PK02 Pekerja 0.1430 org

PK04 Tk. batu 0.1070 org

PK06 Kep. Tukang batu 0.0105 org

PK19 Mandor 0.0100 org

Jumlah

A078 1 M2 PLESTERAN DINDING 1 : 4 + ACIAN

BA34 PC (50 kg) 0.1404 zak

BA04 Pasir pasang 0.0190 m³

PK02 Pekerja 0.2860 org

PK04 Tk. batu 0.2140 org

PK06 Kep. Tukang batu 0.0210 org

PK19 Mandor 0.0200 org

Jumlah
A079 1 M2 PLESTERAN DINDING 1 : 5 + ACIAN
BA34 PC (50 kg) 0.1000 zak
BA04 Pasir pasang 0.0190 m³
PK02 Pekerja 0.2860 org
PK04 Tk. batu 0.2140 org
PK06 Kep. Tukang batu 0.0210 org
PK19 Mandor 0.0200 org
Jumlah
A080 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR )
Galian tanah 7.5000 m³
BA01 Pasir urug 0.3570 m³
Lantai kerja 3.7500 m³
Pas. bata 1 PC : 2 PS + Plesteran 25.0000 m²
LL64 Plat beton penutup & balok 0.5000 m³
BT64 Pipa PVC 4" jenis AW + sambungan 9.0000 m1
BT18 Pipa GIP 1 1/2" 2.0000 m1
Galian tanah untuk rembesan 5.6250 m³
LL65 Pas. injuk 9.0000 kg
LL66 Urugan kerikil 3,5 cm 1.7500 m³
BT67 Pipa PVC 4" berlobang jenis AW 6.0000 m1
Urugan kembali perataan tanah 1.8750 m³
LL67 Tambahan upah 0.0850 ls
Jumlah
A081 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL )
Galian tanah 4.5000 m³
BA01 Pasir urug 0.2142 m³
Lantai kerja 2.2500 m³
Pas. bata 1 PC : 2 PS + Plesteran 15.0000 m²
Plat beton penutup & balok 0.3000 m³
BT64 Pipa PVC 4" jenis AW + sambungan 5.4000 m1
BT18 Pipa GIP 1 1/2" 1.2000 btg
Galian tanah untuk rembesan 3.3750 m³
Pas. injuk 5.4000 kg
Urugan kerikil 3,5 cm 1.0500 m³
BT67 Pipa PVC 4" berlobang jenis AW 9.0000 m1
Urugan kembali perataan tanah 1.1250 m³
LL68 Tambahan upah 0.0920 ls
Jumlah
A082 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)
Galian tanah 2.2500 m³
BA01 Pasir urug 0.1071 m³
Lantai kerja 1.1250 m³
Pas. bata 1 PC : 2 PS + Plesteran 7.5000 m²
Plat beton penutup & balok 0.1500 m³
BT64 Pipa PVC 4" jenis AW + sambungan 9.0000 m1
BT18 Pipa GIP 1 1/2" 0.6000 btg
Galian tanah untuk rembesan 1.6875 m³
Pas. injuk 2.7000 kg
Urugan kerikil 3,5 cm 0.5250 m³
BT67 Pipa PVC 4" berlobang jenis AW 9.0000 m1
Urugan kembali perataan tanah 0.5625 m³
LL69 Tambahan upah 0.0650 ls
Jumlah
A083 1 M2 PENGECATAN BETON ICI ESKTERIOR
BD02 Cat tembok ICI 0.2500 lt
BD08 Alkali ICI sebelum pengecatan 0.1250 lt
BD12 Rol cat 0.0100 bh
BD35 Ampelas 0.5000 lbr
PK02 Pekerja 0.1600 org
PK10 Tk. Cat/Plitur 0.2800 org
PK12 Kep. tukang cat 0.0300 org
PK19 Mandor 0.0100 org
LL70 Steger Werk 0.0250 lot
Jumlah
A084 1 M2 PENGECATAN PLAFOND DAN DINDING INTERIOR ICI
BD03 Cat tembok ICI 0.2500 lt
BD05 Cat dasar sebelum pengecatan 0.1250 lt
BD12 Rol cat 0.0100 bh
BD35 Ampelas 0.5000 lbr
PK02 Pekerja 0.2000 org
PK10 Tk. Cat/Plitur 0.3000 org
PK12 Kep. tukang cat 0.0300 org
PK19 Mandor 0.0100 org
LL71 Steger Werk 0.0250 lot
Jumlah

A085 1 M2 PENGECATAN DINDING VINILEX (3x)

BD04 Cat tembok Vinilex 0.1750 kg

BD01 Plamir tembok 0.1600 kg

BD12 Rol cat 0.0100 bh

BD35 Ampelas 0.5000 lbr

PK02 Pekerja 0.1600 org

PK10 Tk. Cat/Plitur 0.2800 org

PK12 Kep. tukang cat 0.0300 org

PK19 Mandor 0.0100 org

LL72 Steger Werk 0.0450 lot

Jumlah
A086 1 M2 PENGECATAN PLAFOND VINILEX (3x)

BD04 Cat tembok Vinilex 0.2000 kg

BD01 Plamir tembok 0.1600 kg

BD12 Rol cat 0.0100 bh

BD35 Ampelas 0.5000 lbr

PK02 Pekerja 0.2000 org

PK10 Tk. Cat/Plitur 0.2800 org

PK12 Kep. tukang cat 0.0300 org

PK19 Mandor 0.0100 org

LL73 Steger Werk 0.0425 lot

Jumlah

A087 1 M2 PENGECATAN DINDING SANLEX (3x)

BD06 Cat tembok Sanlex 0.1750 kg

BD01 Plamir tembok 0.1600 kg

BD12 Rol cat 0.0100 bh

BD35 Ampelas 0.5000 lbr

PK02 Pekerja 0.1040 org

PK10 Tk. Cat/Plitur 0.1820 org

PK12 Kep. tukang cat 0.0195 org

PK19 Mandor 0.0100 org

LL74 Steger Werk 0.0450 lot

Jumlah

A088 1 M2 PENGECATAN PLAFOND SANLEX (3x)

BD06 Cat tembok Sanlex 0.2000 kg

BD01 Plamir tembok 0.1600 kg

BD12 Rol cat 0.0100 bh

LL75 Steger Werk 1.0000 lot

BD35 Ampelas 0.5000 lbr

PK02 Pekerja 0.1040 org

PK10 Tk. Cat/Plitur 0.1820 org

PK12 Kep. tukang cat 0.0195 org

PK19 Mandor 0.0100 org

Jumlah
A089 1 M2 PENGECATAN KAYU (3X) BERIKUT MENI

BD37 Meni kayu 0.1670 kg

BD36 Plamir kayu 0.0830 kg

BD39 Cat kayu merk SEIV 0.2000 kg

BD35 Amplas kayu 0.4000 lbr

BD28 Minyak cat terpentin 0.1500 ltr

BD19 Kwas 3" 0.0500 bh

PK02 Pekerja 0.2000 org

PK11 Tk. Cat/Plitur 0.3000 org

PK12 Kep. tukang cat 0.0300 org

PK19 Mandor 0.0100 org

Jumlah

A090 1 M2 PENGECATAN BESI (3X)

BD37 Meni besi 0.1670 kg

BD40 Cat besi merk Seiv 0.2000 kg

BD35 Amplas besi 0.4000 lbr

BD30 Minyak cat thiner B 0.1500 ltr

BD19 Kwas 3" 0.0500 bh

PK03 Pekerja terampil 0.2000 org

PK11 Tk. Cat terampil 0.3000 org

PK12 Kep. tukang cat 0.0300 org

PK19 Mandor 0.0100 org

Jumlah

A091 1 M2 PLITURAN BANGUNAN (BIASA)

BD26 Dempul plitur (dempul kasar) 0.0300 kg

BD27 Wood Filer (IMFRA) 0.2000 kg

BD20 Oker putih 0.0200 kg

BD20 Oker warna 0.0100 kg

BA07 Batu Apung (gosok) 0.1000 kg

BD24 Sirlak ex India 0.2000 kg

BD19 Kwas 3" 0.0100 bh

BD23 Spirtus 0.2000 ltr

BD35 Ampelas kayu 0.1000 lbr


PK02 Pekerja 0.2500 org

PK10 Tk. Cat/Plitur 0.2850 org

PK12 Kep. tukang cat/plitur 0.0400 org

PK19 Mandor 0.0200 org

Jumlah

A092 1 M2 PLITURAN MEUBULAIR

BD26 Dempul plitur (dempul kasar) 0.0300 kg

BD27 Wood Filer (IMFRA) 0.2000 kg

BD32 Melamik 0.3500 kg

BD20 Oker putih 0.0200 kg

BD20 Oker warna 0.0100 kg

BA07 Batu Apung (gosok) 0.1000 kg

BD24 Sirlak ex India 0.2000 kg

BD19 Kwas 3" 0.0100 bh

BD23 Spirtus 0.2000 ltr

BD35 Ampelas kayu 0.1000 lbr

PK03 Pekerja terampil 0.2500 org

PK11 Tk. Cat/Plitur terampil 0.2850 org

PK12 Kep. tukang cat/plitur 0.0400 org

PK19 Mandor 0.0200 org

Jumlah

A093 1 M2 PAS. PLAFOND TRIPLEK 6 MM BERIKUT RANGKA K-BANJAR

BJ04 Triplek 6 mm 0.3470 lbr

BF09 Kaso-kaso 5/7 banjar 0.0140 m³

BF09 Kayu 5/10 Banjar 0.0070 m³

BS02 Paku 0.2200 kg

PK02 Pekerja 0.2800 org

PK08 Tk. kayu terampil 0.4000 org

PK09 Kep. tukang kayu 0.0800 org

PK19 Mandor 0.0140 org

Jumlah

A094 1 M2 PAS. PLAFOND TRIPLEK 4 MM BERIKUT RANGKA BORNEO SUPER

BJ02 Triplek 4 mm 0.3472 lbr


BF05 Kaso-kaso 5/7 Borneo super 0.0140 m³

BF05 Kayu 5/10 Borneo super 0.0035 m³

BS02 Paku 0.2200 kg

PK02 Pekerja 0.2800 org

PK08 Tk. kayu terampil 0.4000 org

PK09 Kep. tukang kayu 0.0800 org

PK19 Mandor 0.0140 org

Jumlah

A095 1 M2 PAS. PLAFOND GYPSUM (9 MM) BERIKUT RANGKA K-BANJAR

BH04 Gypsum 0.3470 lbr

BF09 Kaso-kaso 5/7 banjar 0.0140 m³

BF09 Kayu 5/10 Banjar 0.0035 m³

BS02 Paku 0.2200 kg

PK02 Pekerja 0.2800 org

PK08 Tk. kayu terampil 0.4000 org

PK09 Kep. tukang kayu 0.0800 org

PK19 Mandor 0.0140 org

Jumlah

A096 1 M2 PAS. RANGKA PLAFOND KAYU KAMPER BANJAR DIMENI (HANYA RANGKA) DENGA

BF09 Kaso-kaso 5/7 kamper Banjar 0.0140 m³

BF09 Kayu 5/10 kamper Banjar 0.0035 m³

BS02 Paku 0.2200 kg

BD37 Meni kayu 0.1670 kg

PK02 Pekerja 0.2500 org

PK08 Tk. kayu terampil 0.1000 org

PK09 Kep. tukang kayu 0.0500 org

PK19 Mandor 0.0140 org

Jumlah

A097 1 M2 PAS. RANGKA PLAFOND KAYU BORNEO SUPER (HANYA RANGKA)

BF05 Kaso-kaso 5/7 Borneo super 0.0140 m³

BF05 Kayu 5/10 borneo super 0.0035 m³

BS02 Paku 0.2200 kg

PK02 Pekerja 0.1875 org


PK08 Tk. kayu terampil 0.1000 org

PK09 Kep. tukang kayu 0.0375 org

PK19 Mandor 0.0105 org

Jumlah

A098 1 M2 PAS. BAHAN PLAFOND HARDPLEX 5 MM PENUTUP PADA RANGKANYA

BH02 Hardplex 5 mm 1.2 x 2.40 m 0.3470 lbr

BS02 Paku 0.0200 kg

PK02 Pekerja 0.0630 org

PK08 Tk. kayu terampil 0.1500 org

PK09 Kep. tukang kayu 0.0130 org

PK19 Mandor 0.0040 org

LL76 Alat Bantu 0.0450 lot

Jumlah

A099 1 M2 PAS. BAHAN PLAFOND ASBES SEMEN 5 MM PENUTUP PADA RANGKANYA


BH03 Asbes Semen 5 mm 1.1000 m²
BS02 Paku 0.0200 kg
PK02 Pekerja setengah terampil 0.0630 org
PK08 Tk. kayu terampil 0.1500 org
PK09 Kep. tukang kayu 0.0130 org
PK19 Mandor 0.0040 org
LL77 Alat Bantu 0.0500 lot
Jumlah
A100 1 M2 PAS. BAHAN PLAFOND ETERNIT 4 mm ( 1 X 1 ) PADA RANGKANYA
BH01 Eternit 4 mm ( 1 x 1 ) 1.1000 m²
BS02 Paku 0.0200 kg
PK02 Pekerja setengah terampil 0.0473 org
PK08 Tk. kayu terampil 0.1125 org
PK09 Kep. tukang kayu 0.0098 org
PK19 Mandor 0.0030 org
LL78 Alat Bantu 0.0850 lot
Jumlah
A101 1 M1 PEKERJAAN LISTPLANK KAYU BORNEO SUPER 3/30
BF10 Kayu Borneo Super 0.0100 m³
BS02 Paku 0.0100 kg
PK03 Pekerja terampil 0.0700 org
PK08 Tk. kayu setengah terampil 0.2000 org
PK09 Kep. tukang kayu 0.0200 org
PK19 Mandor 0.0040 org
Jumlah
A102 1 M1 PEKERJAAN LISTPLANK KAYU BORNEO SUPER 3/20
BF10 Kayu Borneo Super 0.0070 m³
BS02 Paku 0.0100 kg
PK03 Pekerja terampil 0.0700 org
PK08 Tk. kayu setengah terampil 0.2000 org
PK09 Kep. tukang kayu 0.0200 org
PK19 Mandor 0.0040 org
Jumlah
A103 1 M3 KUSEN KAYU KAMPER BANJARMASIN
BF09 Kayu kamper Banjar 1.1000 m³
BS02 Paku 1.2500 kg
BP53 Lem Putih (FOX) 1.0000 kg
PK03 Pekerja terampil 4.0000 org
PK08 Tk. kayu terampil 15.5000 org
PK09 Kep. tukang kayu 2.7000 org
PK19 Mandor 0.5000 org
Jumlah
A103' 1 M3 KUSEN KAYU BORNEO SUPER
BF05 Kayu Borneo Super 1.1000 m³
BS02 Paku 1.2500 kg
BP53 Lem Putih (FOX) 1.0000 kg
PK03 Pekerja terampil 4.0000 org
PK08 Tk. kayu terampil 15.5000 org
PK09 Kep. tukang kayu 2.7000 org
PK19 Mandor 0.5000 org
Jumlah
A104 1 M3 KUSEN KAYU KAMPER SAMARINDA
BF11 Kayu kamper Samarinda 1.1000 m³
BS02 Paku 1.2500 kg
BP53 Lem Putih (FOX) 1.0000 kg
PK03 Pekerja terampil 4.0000 org
PK08 Tk. kayu terampil 15.0000 org
PK09 Kep. tukang kayu 2.7000 org
PK19 Mandor 0.5000 org
Jumlah
A104A 1 M3 KUSEN KAYU JATI JABAR KELAS 2
BF17 Kayu Jati Jabar Kelas 2 1.1000 m³
BS02 Paku 1.2500 kg
BP53 Lem Putih (FOX) 1.0000 kg
PK03 Pekerja terampil 4.0000 org
PK08 Tk. kayu terampil 15.0000 org
PK09 Kep. tukang kayu 2.7000 org
PK19 Mandor 0.5000 org
Jumlah
A105 1 M2 DAUN PINTU PANIL KAYU SAMARINDA

BF12 Rangka + panil kayu kamper samarinda 0.0500 m³

BP53 Lem putih ( FOX ) 0.7500 kg

BF23 List kayu profil 4.0000 m1

PK03 Pekerja terampil 0.6000 org

PK07 Tk. kayu setengah terampil 2.6000 org

PK09 Kep. tukang kayu 0.2600 org

PK19 Mandor 0.0260 org

Jumlah

A105A 1 M2 DAUN PINTU PANIL KAYU JATI JABAR KELAS 2

BF17 Rangka + panil kayu Jati Jabar Kelas 2 0.0500 m³

BP53 Lem putih ( FOX ) 0.7500 kg

BF23 List kayu profil 4.0000 m1

PK03 Pekerja 0.6000 org

PK07 Tk. kayu 2.6000 org

PK09 Kep. tukang kayu 0.2600 org

PK19 Mandor 0.0260 org

Jumlah

A106 1 M2 DAUN PINTU DOUBLE TEAKWOOD

BF10 Rangka Kayu Banjar 0.0150 m³

BJ18 Teakwood untuk pintu uk. 4 mm 2.0000 lbr

BP53 Lem putih (FOX) 0.0050 kg


BS01 Paku triplek 0.2000 m1

PK03 Pekerja terampil 0.3000 org

PK07 Tk. kayu 1.5000 org

PK09 Kep. tukang kayu 0.2000 org

PK19 Mandor 0.0200 org

Jumlah

A107 1 M2 DAUN PINTU PANIL TEAKWOOD

BF10 Rangka Kayu Banjar + Panil 0.0500 m³

BJ16 Teakwood 4 mm uk. 120x240 1.0000 lbr

BP53 Lem Putih (FOX) 0.0050 kg

BS01 Paku triplek 0.2000 m1

PK03 Pekerja terampil 0.3000 org

PK08 Tk. kayu terampil 1.5000 org

PK09 Kep. tukang kayu 0.2000 org

PK19 Mandor 0.0200 org

Jumlah

A108 1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS ALUMUNIUM (KM/WC)

BF10 Rangka kayu kamper Banjar 0.0150 m³

BJ03 Tripelk 4 mm (ukuran pintu) 2.0000 lbr

BP31 Alumunium Sheet 0.3 mm 1.8000 m²

BS01 Paku triplek 0.2000 kg

BP53 Lem putih (FOX) 0.5000 kg

PK02 Tk. kayu terampil 0.3000 org

PK08 Tk. kayu terampil 1.3000 org

PK09 Kep. tukang kayu 0.1300 org

PK19 Mandor 0.0130 org

Jumlah

A109 1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS FORMIKA (KM/WC)

BF10 Rangka kayu kamper Banjar 0.0150 m³

BJ03 Triplek 4 mm (ukuran pintu) 2.0000 lbr

BJ24 Formika ukuran pintu 1.0000 lbr

BS01 Paku triplek 0.2000 kg

BP53 lem putih (FOX) 0.5000 kg


BP52 Lem kuning (Ica Aibon) 1.0000 kg

PK02 Pekerja terampil 0.3000 org

PK08 Tk. kayu terampil 1.3000 org

PK09 Kep. tukang kayu 0.1300 org

PK19 Mandor 0.0130 org

Jumlah

A110 1 M2 DAUN PINTU TRIPLEK LAPIS SENG PLAT (KM/WC)

BF10 Rangka kayu kamper Banjar 0.0150 m³

BJ03 Triplek 4 mm (ukuran pintu) 2.0000 lbr

CC31 Seng plat BJLS 30 1.8000 m2

BS01 Paku triplek 0.2000 kg

BP53 Lem putih (FOX) 0.5000 kg

BP52 Lem kuning (Aicabon) 1.0000 kg

PK02 Pekerja terampil 0.3000 org

PK08 Tk. kayu terampil 1.3000 org

PK09 Kep. tukang kayu 0.1300 org

PK19 Mandor 0.0130 org

Jumlah

A111 1 M2 DAUN JENDELA KACA (TANPA KACA)

BF12 Rangka kayu kamper Samarinda 0.0170 m³

BP53 Lem Putih (FOX) 0.3000 kg

BF23 List Kayu 4.0000 m1

PK02 Pekerja terampil 0.3000 org

PK08 Tk. kayu terampil 1.2000 org

PK09 Kep. tukang kayu 0.1200 org

PK19 Mandor 0.0200 org

Jumlah

A112 1 M2 DAUN PINTU KACA (TANPA KACA)

BF12 Rangka Kayu Kamper Samarinda 0.0200 m³

BP53 Lem putih (FOX) 0.6000 kg

BF23 List Kayu 4.0000 m1

PK02 Pekerja terampil 0.4000 org

PK08 Tk. kayu terampil 1.4000 org


PK09 Kep. tukang kayu 0.1400 org

PK19 Mandor 0.0140 org

Jumlah

A113 1 M2 DAUN PINTU / JENDELA JALUSI

BF12 Rangka Kayu Kamper Samarinda 0.0170 m³

BP53 Lem putih (FOX) 0.3000 kg

BF12 Jalusi kayu Samarinda ( 1 m2 = 15 m1 ) 0.0225 m³

BF23 List Kayu 4.0000 m1

PK02 Pekerja terampil 0.7000 org

PK08 Tk. kayu terampil 1.8000 org

PK09 Kep. tukang kayu 0.2600 org

PK19 Mandor 0.0150 org

Jumlah

A114 1 M3 KUDA-KUDA OVERSTEK/KONSOL KAYU BORNEO SUPER (EXSPOSE)

BF09 Kayu balok kamper Banjar 1.2000 m³

BS03 Paku 5.8000 kg

PK02 Pekerja terampil 3.0000 org

PK07 Tk. kayu terampil 9.0000 org

PK09 Kep. Tukang kayu 3.0000 org

PK19 Mandor 0.5000 org

Jumlah

A115 1 M3 KUDA-KUDA KAYU RASAMALA

BF05 Kayu balok Rasamala 1.1000 m³

BS03 Paku 8 s.d. 12 cm 5.8000 kg

PK02 Pekerja terampil 3.0000 org

PK07 Tk. kayu terampil 5.0000 org

PK09 Kep. Tukang kayu 2.0000 org

Jumlah
A116 1 M3 KUDA-KUDA BORNEO SUPER

BF07 Kayu Borneo Super 1.1000 m³

BS03 Paku 8 s.d. 12 cm 5.8000 kg

PK02 Pekerja terampil 3.0000 org

PK07 Tk. kayu terampil 5.0000 org

PK09 Kep. Tukang kayu 2.0000 org


PK19 Mandor 0.4000 org

Jumlah

A117 1 M3 KUDA-KUDA KAMPER BANJAR


BF09 Kayu balok kamper Banjar 1.1000 m³
BS03 Paku 8 s.d. 12 cm 5.8000 kg
PK02 Pekerja terampil 3.0000 org
PK07 Tk. kayu terampil 5.0000 org
PK09 Kep. Tukang kayu 2.0000 org
PK19 Mandor 0.4000 org
Jumlah
A118 1 M3 KUDA-KUDA KAMPER SAMARINDA

BF11 Kayu balok kamper Samarinda 1.1000 m³

BS03 Paku 8 s.d. 12 cm 5.8000 kg

PK02 Pekerja terampil 3.0000 org

PK07 Tk. kayu terampil 5.0000 org

PK09 Kep. Tukang kayu 2.0000 org

PK19 Mandor 0.4000 org

Jumlah

A119 1 M2 RANGKA ATAP GENTENG BETON/KERAMIK K-BANJAR (HANYA RANGKANYA)


BF09 Kayu kaso 5/7 kamper Banjar 0.0168 m³
BF29 Reng kayu 3/4 kamper Banjar 4.0000 m1
BS02 Paku 5 s.d. 7 cm 0.2500 kg
PK02 Pekerja terampil 0.1500 org
PK08 Tk. kayu terampil 0.1500 org
PK09 Kep. Tukang kayu 0.0100 org
PK19 Mandor 0.0050 org
Jumlah
A120 1 M2 RANGKA ATAP GENTENG PLENTONG KAMPER MEDAN (HANYA RANGKANYA)
BF07 Kayu kaso 5/7 kamper Medan 0.0168 m³
BF30 Reng kayu 2/3 kamper Medan 4.0000 m1
BS02 Paku 5 s.d. 7 cm 0.2500 kg
PK02 Pekerja terampil 0.1500 org
PK08 Tk. kayu terampil 0.1500 org
PK09 Kep. Tukang kayu 0.0100 org
PK19 Mandor 0.0050 org
Jumlah
A121 1 M2 RANGKA ATAP GENTENG PLENTONG BORNEO SUPER (HANYA RANGKANYA)

BF05 Kayu kaso 5/7 Borneo Super 0.0168 m³

BF29 Kayu kaso 2/3 Borneo Super 4.0000 m1

BS02 Paku 5 s.d. 7 cm 0.2500 kg

PK02 Pekerja terampil 0.1500 org

PK08 Tk. kayu terampil 0.1500 org

PK09 Kep. Tukang kayu 0.0100 org

PK19 Mandor 0.0050 org

Jumlah

A122 1 M2 RANGKA ATAP GENTENG PLENTONG KAMPER BANJAR (HANYA RANGKANYA)

BF09 Kayu kaso 5/7 kamper Banjar 0.0168 m³

BF30 Reng kayu 2/3 kamper Banjar 4.0000 m1

BS02 Paku 5 s.d. 7 cm 0.2500 kg

PK02 Pekerja terampil 0.1500 org

PK08 Tk. kayu terampil 0.1500 org

PK09 Kep. Tukang kayu 0.0100 org

PK19 Mandor 0.0050 org

Jumlah

A123 1 M2 PENUTUP ATAP SIRAP (4 LAPIS) + RANGKA ATAP

BF09 Kayu kaso 5/7 kamper Banjar 0.0110 m³

BF30 Reng kayu 2/3 kamper Banjar 4.0000 m1

LL80 Atap sirap 4 lapis 80.0000 bh

BS02 Paku 5 s.d. 7 cm 0.2500 kg

PK02 Pekerja terampil 0.1500 org

PK08 Tk. kayu terampil 0.1500 org

PK09 Kep. Tukang kayu 0.0100 org

PK19 Mandor 0.0050 org

Jumlah

A123.a 1 M2 PAS. ATAP GENTENG PALENTONG

Genteng palentong 25.0000 m2

Pekerja trampil 0.1600 org

Tukang kayu terampil 0.0800 org


Kepala tukang kayu 0.0800 org

Mandor 0.0100 org

Ongkos angkut 1.0000 ls


Jumlah

A123.b 1 M' BUBUNGAN ATAP GENTENG PALENTONG

Bubung genteng palentong 4.0000 Bh

PC. (50 KG ) 0.0350 Zak

Pasir Pasang 0.0330 m3

Pekerja terampil 0.3000 org

Tukang batu terampil 0.1500 org

Kepala tukang batu 0.0150 org

Mandor 0.0150 org

Ongkos angkut 1.0000 ls


Jumlah

A124 1 M1 PEK. BUBUNGAN ATAP GENTENG EX JATIWANGI

BX15 Genteng bubungan genteng ex Jatiwangi 4.0000 bh

BA34 PC (50 kg) 0.1304 zak

BA04 Pasir pasang 0.2100 lbr

PK02 Pekerja 0.1500 org

PK05 Tk. batu terampil 0.2000 org

PK06 Kep. Tukang batu 0.0100 org

PK19 Mandor 0.0050 org

LL81 Peralatan 0.0650 lot

Jumlah

A125 1 M1 PEK. BUBUNGAN ATAP GENTENG BETON

BX16 Genteng bubungan genteng beton 3.0000 bh

BA34 PC (50 kg) 0.1304 zak

BA04 Pasir pasang 0.2100 m³

PK02 Pekerja 0.1500 org

PK05 Tk. batu terampil 0.2000 org

PK06 Kep. Tukang batu 0.0100 org

PK19 Mandor 0.0050 org

LL82 Peralatan 0.0950 lot


Jumlah

A126 1 M1 PEK. BUBUNGAN ATAP GENTENG KERAMIK

BX36 Genteng bubungan genteng keramik 3.0000 bh

BA34 PC (50 kg) 0.1304 zak

BA04 Pasir pasang 0.2100 lbr

PK02 Pekerja 0.1500 org

PK05 Tk. batu terampil 0.2000 org

PK06 Kep. Tukang batu 0.0100 org

PK19 Mandor 0.0050 org

LL83 Peralatan 0.1090 lot

Jumlah

A127 1 M1 PEK.PAGAR DEPAN TRALIS STANDARD

Bouplank 1.0000 m1

Galian Tanah 0.4500 m³

Urugan Pasir 10 cm' 0.0800 m³

Pasang Aanstamping 0.1200 m³

Pas.Batu Belah 1 pc : 4 psr 0.2000 m³

Plesteran & Acian 1 pc : 4 psr 0.4100 m²

LL84 Beton Tulang ( 100 kg/m3 ) 0.0563 m³

LL85 Pagar Tralis 1.5000 m'

Pengecatan 1.0000 m²

Jumlah

A128 1 M1 PEK. PAGAR BELAKANG / SAMPING

Galian Tanah 0.4500 m³

Urugan Pasir 10 cm' 0.0800 m³

Pasang Aanstamping 0.1200 m³

Pas.Batu Belah 1 pc : 4 psr 0.2000 m³

Pas.bata + plesteran 1 : 4 1.8000 m²

Beton Tulang ( 100 kg/m3 ) 0.0563 m³

BP07 Besi Siku 1.0000 kg

BP12 Kawat Duri 3.0000 m1

Pengecatan 1.0000 m²

Jumlah

A129 1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM


BA04 Pasir pasang 0.1500 m³

BA12 Batu Belah 0.2500 m³

PK03 Pekerja Trampil (Gali + Urug + Ampar) 0.1500 org

LL86 Peralatan 0.1200 lot

Jumlah

A130 1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm

BA11 Batu Pecah Mesin 5/7 0.1200 m³

PK03 Pekerja Trampil (Gali + Urug + Ampar) 0.1100 org

LL87 Peralatan 0.3200 lot

Jumlah

A131 1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cm

BA09 Batu Pecah Mesin 2/3 0.0600 m³

PK03 Pekerja Trampil (Gali + Urug + Ampar) 0.0800 org

LL88 Peralatan 0.5000 lot

Jumlah

A132 1 M2 LAPISAN PENGISI /PENUTUP

BA08 Batu pecah mesin 1/2 0.0120 m³

BA05 Pasir Beton 0.0100 m³

PK03 Pekerja Trampil (Gali + Urug + Ampar) 0.0500 org

LL89 Peralatan 0.9500 lot

Jumlah

A133 1 M2 PENGASPALAN MANUAL

BA05 Batu abu /pasir beton 0.0050 m³

CE02 Aspal 4.0000 kg

CP02 Kayu Bakar 0.0300 m³

PK03 Pekerja Trampil (Mengaspal) 0.0600 org

LL90 Peralatan 0.1800 lot

Jumlah

A134 1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH

BA06 Abu batu 0.0360 m³

CE02 Aspal Panas 5.0000 kg

LL91 Kayu Bakar 0.0080 m³

PK02 Pekerja 0.0800 org


PK03 Tk. batu terampil 0.0300 org

PK19 Mandor 0.0100 org

LL92 Peralatan 0.0980 lot

Jumlah
A135 1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH
CE01 Hotmix jadi + alat besar, tenaga & bhn bakar 0.1110 ton
PK03 Pekerja Trampil 0.0300 org
PK19 Mandor 0.0150 org
Jumlah
A136 1 M2 KONSTRUKSI PENETRASI LENGKAP
LL93 Amparan 5/7 T = 10 cm, digilas 1.0000 m²
LL94 Amparan 2/3 T = 5 cm, digilas 1.0000 m²
LL95 Lapisan Pengisi 1.0000 m²
LL96 Lapisan Aspal 1.0000 m²
Jumlah
A137 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN
LL97 Galian Tanah 0.1500 m³
BN01 Grefel Beton 20 Cm 1.0000 bh
Pas . Bata + Plesteran 1 : 3 1.0000 m1
LL98 Upah kerja 0.3500 ls
Jumlah
A138 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN
LL99 Galian Tanah 0.2000 m³
BN02 Grefel Beton 30 Cm 1.0000 bh
Pas . Bata + Plesteran 1 : 3 1.0000 m1
LLL01 Upah Kerja 0.1500 ls
Jumlah
A139 1 M2 PASANGAN PAVING BLOCK WARNA 6 CM
BA32 Paving Block Warna 6 cm 1.0100 m³
BA05 Pasir Beton 0.1000 m³
PK02 Pekerja 0.2500 org
PK04 Tk. batu terampil 0.5000 org
PK06 Kepala Tukang Batu 0.0250 org
PK19 Mandor 0.0030 org
LLL02 Peralatan 1.0000 ls
Jumlah
A140 1 M2 PASANGAN PAVING BLOCK WARNA 8 CM

BA30 Paving Block Warna 8 cm 1.0100 m³

BA05 Pasir Beton 0.1000 m³

PK02 Pekerja 0.2500 org

PK04 Tk. batu terampil 0.5000 org

PK06 Kepala Tukang Batu 0.0250 org

PK19 Mandor 0.0030 org

LLL03 Peralatan 1.0000 lot

Jumlah

A141 1 M2 PASANGAN PAVING BLOCK NATURAL 6 CM

BA31 Paving Block Natural 6 cm 1.0100 m²

BA05 Pasir Beton 0.1000 m³

PK02 Pekerja 0.2500 org

PK04 Tk. batu terampil 0.5000 org

PK06 Kepala Tukang Batu 0.0250 org

PK19 Mandor 0.0030 org

LLL04 Peralatan 1.0000 lot

Jumlah

A142 1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM

BA29 Paving Block Natural 8 cm 1.0100 m²


BA05 Pasir Beton 0.1000 m³
PK02 Pekerja 0.2500 org
PK04 Tk. batu terampil 0.5000 org
PK06 Kepala Tukang Batu 0.0250 org
PK19 Mandor 0.0030 org
LLL05 Peralatan 1.0000 lot
Jumlah
A143 1 M3 MEMBONGKAR DINDING BATA

(Jika bongkaran di pakai lagi )

PK02 Pekerja Terampil 2.0000 org

PK19 Mandor 0.0900 org

Jumlah

A143' 1 M3 MEMBONGKAR DINDING BATA


(Jika bongkaran dtidak i pakai lagi )

PK02 Pekerja Setengah Terampil 1.0000 org

PK19 Mandor 0.0900 org

Jumlah

A144 1 M2 MEMBONGKAR PLESTERAN DINDING

PK02 Pekerja Terampil 0.0500 org

PK19 Mandor 0.0250 org

Jumlah

1 M2 MEMBONGKAR GENTENG / SIRAP


(Jika bongkaran tidak di pakai )
PK02 Pekerja Terampil 0.0200 org
PK19 Mandor 0.0100 org
Jumlah
A146 1 M2 MEMBONGKAR GENTENG / SIRAP
(Jika bongkaran di pakai )
PK02 Pekerja Terampil 0.4000 org
PK19 Mandor 0.1000 org
Jumlah
A147 1 M2 MEMBONGKAR RANGKA ATAP / RENG KASO

(Jika bongkaran tidak di pakai )

PK02 Pekerja Terampil 0.1000 org

PK07 Tk kayu terampil 0.0250 org

PK09 Kepala Tukang kayu 0.0025 org

PK19 Mandor 0.0050 org

Jumlah
A148 1 M2 MEMBONGKAR RANGKA ATAP / RENG KASO
(Jika bongkaran di pakai )
PK02 Pekerja Terampil 0.2000 org
PK07 Tk kayu setengah terampil 0.0500 org
PK09 Kepala Tukang kayu 0.0050 org
PK19 Mandor 0.0100 org
Jumlah
A149 1 M3 MEMBONGKAR KUDA-KUDA, GORDING / BALOK
(Jika bongkaran dipakai )
PK02 Pekerja Terampil 4.0000 org
PK07 Tk kayu terampil 6.0000 org
PK09 Kepala Tukang kayu 0.6000 org
PK19 Mandor 0.2000 org
Jumlah
A150 1 M3 MEMBONGKAR KUDA-KUDA, GORDING / BALOK
(Jika bongkaran tidak dipakai )
PK01 Pekerja 4.0000 org
PK07 Tk kayu setengah terampil 3.0000 org
PK19 Mandor 0.2000 org
Jumlah
A151 1 M2 MEMBONGKAR PLAFOND
(Jika bongkaran dipakai )
PK02 Pekerja 0.1000 org
PK07 Tk kayu terampil 0.2500 org
PK09 Kepala Tukang kayu 0.0025 org
PK19 Mandor 0.0050 org
Jumlah
A152 1 M2 MEMBONGKAR PLAFOND
(Jika bongkaran tidak dipakai )
PK01 Pekerja 0.1250 org
PK19 Mandor 0.0050 org
Jumlah

A1 1 M3 PEK. GALIAN TANAH BIASA BASAH ( BID.PENGAIRAN )

Pekerja 0.7500 org

Mandor 0.0250 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

ZZ99 A3 1 M3 PEK. GALIAN TANAH YANG BANYAK TERDAPAT BATU BUNDAR ( BID. PENGAIRAN )

Pekerja 1.5000 org

Mandor 0.0330 org

Jumlah

Keuntungan Max.

Jumlah
Dibulatkan

G. 43 b. BETON CYCLOOP 1 : 3 : 5 ( BID. PENGAIRAN )

Batu Belah 0.7690 m3

Kerikil Beton 0.5571 m3

Pasir Beton 0.3343 m3

P.C. (50 kg) 2.7855 zak

Tukang Batu Setengah Terampil 1.0000 org

Kepala Tukang Batu 0.1000 org

Pekerja 6.0000 org

Mandor 0.3000 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G. 41 1 M3 COR BETON BERTULANG 1 PC : 2 PASIR BETON : 3 KORAL BETON ( BID. PENGAIRAN

Batu Kerikil Beton 0.8200 m3

Pasir Beton 0.5400 m3

P.C. (50 kg) 6.8000 m3

Tukang Batu 1.0000 zak

Kepala Tukang Batu 0.1000 org

Pekerja 6.0000 org

Mandor 0.3000 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

F.8' 1 M2 CETAKAN BETON (BID. PENGAIRAN )

Tukang Kayu 0.5000 org

Kepala Tukang Kayu 0.0500 org

Pekerjan 0.2000 org

Mandor 0.0100 org

Paku 0.4000 kg
Kayu Gergajian 0.0400 m3

1 M3 BETON MEMERLUKAN 10 M2 CETAKAN 10 x f.8 = Rp. ……………………………………..

Membongkar dan menyiram beton :

Pekerja 4.0000 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

1 M3 BETON BERTULANG 1 PC : 2 PSR : 3 KR

G.41 + I.2 + F.8 = Rp. …………………………………………….

G. 32.K 1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 2 PSR ( BBID. PENGAIRAN )

Batu Candi/Pahat 37.0000 bh

P.C. (50 kg) 4.2320 zak

Pasir Pasang 0.4275 m3

Tukang Batu 1.2000 org

Kepala Tukang Batu 0.1200 org

Pekerja 0.3600 org

Mandor 0.0180 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G. 32.I 1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 3 PSR ( BID. PENGAIRAN )

Batu Candi/Pahat 37.0000 bh

P.C. (50 kg) 3.2000 zak

Pasir Pasang 0.4560 m3

Tukang Batu 1.2000 org

Kepala Tukang Batu 0.1200 org

Pekerja 0.3600 org

Mandor 0.0180 org


Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.5.a BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )

DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 3 M

Batu Kali 3.0000 m3

Kawat Bronjong 3 mm 28.5700 kg

Pekerja Penganyam 1.6000 org

Penganyam 2.0000 org

Mandor Penganyam 0.0800 org

Pekerjan Pengisi 4.5000 org

Mandor Pengisi 0.0750 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.5.b BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )

DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 4 M

Batu Kali 3.0000 m3

Kawat Bronjong 3 mm 42.3500 kg

Pekerja Penganyam 1.8000 org

Penganyam 2.2000 org

Mandor Penganyam 0.0800 org

Pekerjan Pengisi 4.5000 org

Mandor Pengisi 0.0750 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.5.a.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 7,5 M2) 1 SEKAT

Batu Kali 1.0000 m3


Kawat Bronjong 3 mm 13.3900 kg

Pekerja Penganyam 0.7500 org

Penganyam 0.9400 org

Mandor Penganyam 0.0400 org

Pekerjan Pengisi 2.1100 org

Mandor Pengisi 0.0400 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.5.b.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 4 MM ( 7,5 M2) 1 SEKAT

Batu Kali 1.0000 m3

Kawat Bronjong 3 mm 19.8500 kg

Pekerja Penganyam 0.7900 org

Penganyam 0.9700 org

Mandor Penganyam 0.0400 org

Pekerjan Pengisi 1.9900 org

Mandor Pengisi 0.0300 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.5.a.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT

Batu Kali 1.5000 m3

Kawat Bronjong 3 mm 19.6400 kg

Pekerja Penganyam 1.1000 org

Penganyam 1.3800 org

Mandor Penganyam 0.0600 org

Pekerjan Pengisi 3.0900 org

Mandor Pengisi 0.0500 org

Jumlah

Keuntungan Max.
Jumlah

Dibulatkan

G.5.b.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT

Batu Kali 1.5000 m3

Kawat Bronjong 3 mm 29.1200 kg

Pekerja Penganyam 1.2400 org

Penganyam 1.5100 org

Mandor Penganyam 0.0600 org

Pekerjan Pengisi 3.0900 org

Mandor Pengisi 0.0500 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

B2 ONGKOS ANGKUT 10 M2 LEMPENGEN TEMPEL ( BID. PENGAIRAN )

Angkutan 10 m2 lempengan = angkutan 1 m3 galian

Tidak lebih dari 30 m1 :

Pekerja 0.0330 org

Mandor 0.0010 org

Lebih dari 30 m' : a : Upah Pekerja Setempat ( rupiah )


L : Jarak angkut dalam m1
k : Harga angkutan per m3
( Termasuk harga bahan dan peralatan angkut: bambu, dll)

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

B5 MENANAM 1 M1 PAGAR HIDUP ( BID. PENGAIRAN )

Buah Stek 10.0000 bh

Pekerja 0.1000 org

Mandor 0.0050 org


Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA ( BID. PENGAIRAN )

Batang Tanaman 1.0000 bh

Bambu Tali 1.0000 bh

Pekerja 0.4000 org

Mandor 0.0050 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

E 13 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN )

Tukang Kayu 0.0400 bh

Kepala Tukang 0.0040 bh

Pekerja 1.8000 org

Mandor 0.0430 org

Untuk tanah biasa dihitung = 1, 25 x analis E. 13

Untuk tanah biasa dihitung = 1, 50x analis E. 13

Untuk tanah biasa dihitung = 2, 00 x analis E. 13

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

E 14 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN )

( Bila perancah dipancangkan diatas rakit )

Tukang Kayu 0.0600 bh

Kepala Tukang 0.0060 bh

Pekerja 3.0000 org

Mandor 0.0750 org

Jumlah
Keuntungan Max.

Jumlah

Dibulatkan

E 17' 1 M1 PAPAN PENAHAN DIPANCANGKAN KE DALAM TANAH LUNAK ( BID.PENGAIRAN )

Tukang Kayu 0.0800 bh

Kepala Tukang 0.0080 bh

Pekerja 1.0000 org

Mandor 0.0250 org

Untuk tanah biasa dihitung = 1, 25 x analis E. 13

Untuk tanah biasa dihitung = 1, 50x analis E. 13

Untuk tanah biasa dihitung = 2, 00 x analis E. 13

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

E17 MENCABUT TIANG PEMANCANG DARI DALAM TANAH ( BID. PENGAIRAN )

Tukang Kayu 0.3500 org

Kepala Tukang 0.0350 org

Pekerja 5.0000 org

Mandor 0.2500 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

F3 1 M1 MEMBUAT SENDERAN BALOK PEMIKUL & BALOK AIR ( BID. PENGAIRAN )

Tukang Kayu 24.0000 org

Kepala Tukang 2.4000 org

Pekerja 8.0000 org

Mandor 0.4000 org

Jumlah

Keuntungan Max.

Jumlah
Dibulatkan

F4 1 M1 MEMASANG BALOK PENGGANTUNG & PENARIK S.D 15 M1 ( BID. PENGAIRAN )

Tukang Kayu 36.0000 org

Kepala Tukang 3.6000 org

Pekerja 1.2000 org

Mandor 0.6000 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

F5 100 KG MEMASANG GELAGAR BESI ( BID. PENGAIRAN )

Tukang Kayu 0.1000 org

Kepala Tukang 0.0100 org

Pekerja 0.5000 org

Mandor 0.0250 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

F7 100 KG MENURUNKAN GELAGAR BESI ( BID. PENGAIRAN )

Pekerja 0.5000 org

Mandor 0.0250 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

F18 1 M2 MENGERJAKAN LANTAI JEMBATAN ( BID. PENGAIRAN )

Tukang Kayu 0.5000 org

Kepala Tukang 0.0500 org

Pekerja 0.2000 org

Mandor 0.0100 org

Upah menggergaji 1.2000 m2


Paku (Lantai Bawah ) atau 0.7500 kg

Paku 0.4000 kg

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G3 1 M2 PASANGAN BATU KOSONG TEBAL = 0,25 M SEBELAH LUAR DISIAR DENGAN PEREKA

Batu Kecil 0.2750 m3

PC. (50 kg ) 0.0760 zak

Pasir 0.0080 m3

Tukang Batu 0.0800 org

Kepala Tukang 0.0080 org

Pekerja 0.6150 org

Mandor 0.0310 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G4 1 M2 MEMASANG BATU PADA BENDUNG CURAHAN SALURAN MIRING DST. SETEBAL 0,23

Batu Kali 0.2500 m3

Kerikil 0.0200 m3

Pekerja 0.8000 org

Mandor 0.0400 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.50.I 1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 15 MM )

PC. (50 kg ) 0.1304 zak

Pasir Pasang 0.0194 m3

Tukang Batu 0.2000 org

Kepala Tukang Batu 0.0200 org


Pekerja 0.4000 org

Mandor 0.0200 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.50.J 1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 10 MM )

PC. (50 kg ) 0.0864 zak

Pasir Pasang 0.0130 m3

Tukang Batu 0.1500 org

Kepala Tukang Batu 0.0150 org

Pekerja 0.4000 org

Mandor 0.0200 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

G.50.C 1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN )

PC. (50 kg ) 0.1054 zak

Pasir Pasang 0.0085 m3

Tukang Batu 0.1200 org

Kepala Tukang Batu 0.0120 org

Pekerja 0.3600 org

Mandor 0.0180 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

L.3 1 M2 BONGKARAN PASANGAN ( BID. PENGAIRAN )

Pekerja 4.0000 org

Mandor 0.4000 org

Jumlah
Keuntungan Max.

Jumlah

Dibulatkan

L.4 1 M2 BONGKARAN PASANGAN (TEBAL 30 MM ) ( BID. PENGAIRAN )

Pekerja 2.0000 org

Mandor 0.1000 org

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

L.2 PEMBESIAN UNTUK SETIAP 100 KG

Besi Beton 110.0000 kg

Kawat beton 2.0000 kg

1 m3 Beton memerlukan = …………. (bb) ……………..kg (Hasil Perhitungan )

(bb) kg besi beton Rp. ……………………………………………..

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan

A7.R. UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )

1 zak PC = 50 kg = 40 liter = 0.04 m3 = 1/25 m3


maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a

L = 10 m1 = 0,01236 x a
L = 50 m1 = 0,01818 x a
L = 100 m1 = 0,02545 x a
L = 200 m1 = 0,04000 x a
L = 300 m1 = 0,05454 x a

Ket. : L = Jarak angkut dalam m1


a = Upah pekerja setempat ( Rupiah )

Jumlah

Keuntungan Max.
Jumlah

Dibulatkan

A6 ONGKOS ANGKUT 1 M3 TANAH ( BID. PENGAIRAN )


1 zak30
Sejauh PC = 50 kg = 40 liter = 0.04 m3 = 1/25 m3
meter
maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a
Pekerja 0.3300 org
L = 10 m1 = 0,01236 x a
L
Mandor = 50 m1 = 0,01818 x a 0.0100 org
L = 100 m1 = 0,02545 x a
L dari
Lebih = 30 200
meterm1 = 0,04000 x a
L = 300 m1 = 0,05454 x a

Ket. : L = Jarak angkut dalam m1


a = Upah pekerja setempat ( Rupiah )
a = Upah Pekerja Setempat (rupiah )
L = Jarak angkut dalam m1
k = a /275 (L + 75 ) k = Harga angkutan per m3
(termasuk harga bahan dan peralatan angkut, bam

Jumlah

Keuntungan Max.

Jumlah

Dibulatkan
N PEKERJAAN
UNG
AN 2015

HARGA SAT. JUMLAH

5 6=(3x5)

Err:508 600.00
Err:508 1,000.00
1,600.00 800.00
2,400.00

Err:508 34,000.00
Err:508 646.00
34,646.00 5,370.13
40,016.13

3,400,000.00 340,000.00
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
401,950.00 10,048.75
411,998.75 51,499.84
463,498.59

3,400,000.00 340,000.00
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
67,000.00 6,700.00
175,000.00 43,750.00
750.00 52,500.00
497,900.00 9,958.00
507,858.00 76,178.70
584,036.70

3,800,000.00 494,000.00

17,000.00 4,250.00

40,329.00 40,329.00

538,579.00 67,322.38

605,901.38 75,737.67

681,639.05

Err:508 38,610.00

2,898,600.00 104,349.60

Err:508 3,400.00

30,010.67 54,019.20

200,378.80 40,075.76

240,454.56

Err:508 20,000.00

200,000.00 8,000.00

28,000.00 1,400.00

29,400.00

Err:508 26,300.00

200,000.00 10,400.00

36,700.00 1,835.00

38,535.00

Err:508 36,750.00

200,000.00 14,600.00

51,350.00 2,567.50

53,917.50

Err:508 47,200.00

200,000.00 18,800.00
66,000.00 3,300.00

69,300.00

Err:508 57,650.00

200,000.00 23,000.00

80,650.00 4,032.50

84,682.50

AX KEDALAMAN 1 M

Err:508 31,250.00

200,000.00 25,000.00

56,250.00 14,062.50

70,312.50

Err:508 37,500.00

200,000.00 25,000.00

62,500.00 15,625.00

78,125.00

Err:508 26,250.00

200,000.00 25,000.00

51,250.00 12,812.50

64,062.50

Err:508 2,500.00

200,000.00 1,000.00

3,500.00 1,225.00

4,725.00

Err:508 12,500.00

200,000.00 10,000.00

22,500.00 2,250.00

24,750.00
Err:508 9,600.00

200,000.00 3,800.00

13,400.00 1,340.00

14,740.00

Err:508 25,000.00

200,000.00 10,000.00

35,000.00 4,375.00

39,375.00

Err:508 66,000.00

Err:508 8,500.00

Err:508 37,768.50

Err:508 41,650.00

200,000.00 1,660.00

155,578.50

Err:508 17,000.00

Err:508 49,500.00

Err:508 41,650.00

150,000.00 61,500.00

200,000.00 16,600.00

186,250.00

Err:508 200,000.00

Err:508 17,000.00

Err:508 41,650.00

150,000.00 6,150.00

200,000.00 16,600.00

281,400.00

Err:508 42,000.00

50,000.00 7,500.00
200,000.00 3,000.00

52,500.00

Err:508 114,000.00

130,000.00 32,500.00

200,000.00 5,000.00

151,500.00 15,150.00

166,650.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

130,000.00 65,000.00

200,000.00 20,000.00

123,150.00 7,389.00

130,539.00

Err:508 57,500.00
Err:508 1,400.00
58,900.00 11,780.00
70,680.00
IPADATKAN (5000M3)

38,535.00 11,560.50

70,312.50 21,093.75

7,875.00 19,687.50

4,000.00 4,800.00

57,141.75

Err:508 132,000.00

100,000.00 15,000.00

200,000.00 2,000.00

149,000.00

67,000.00 265,052.00
Err:508 Err:508
Err:508 Err:508
100,000.00 200,000.00
150,000.00 7,500.00
Err:508 Err:508
780,112.00 58,508.40
780,112.00

Err:508 48,000.00

1,009,973.00 605,983.80

653,983.80 26,159.35

680,143.15

67,000.00 455,600.00
240,000.00 199,200.00
240,000.00 129,600.00
100,000.00 150,000.00
150,000.00 7,500.00
200,000.00 2,000.00
943,900.00 66,073.00
1,009,973.00

67,000.00 529,032.00
240,000.00 194,400.00
240,000.00 117,600.00
100,000.00 150,000.00
150,000.00 7,500.00
200,000.00 2,000.00
1,000,532.00 70,037.24
1,070,569.24

67,000.00 582,632.00
240,000.00 194,400.00
240,000.00 117,600.00
100,000.00 150,000.00
150,000.00 7,500.00
200,000.00 2,000.00
1,054,132.00 737,892.40
1,792,024.40

900,000.00 900,000.00
Err:508 112,500.00
150,000.00 15,000.00
200,000.00 2,000.00
1,029,500.00 46,327.50
1,075,827.50

900,000.00 900,000.00
100,000.00 250,000.00
150,000.00 15,000.00
200,000.00 2,000.00
1,167,000.00 52,515.00
1,219,515.00

Err:508 900,000.00
100,000.00 250,000.00
150,000.00 15,000.00
200,000.00 2,000.00
1,167,000.00 52,515.00
1,219,515.00

7,500.00 7,875.00

10,800.00 108.00

Err:508 Err:508

150,000.00 1,500.00

150,000.00 750.00

11,133.00 222.66

11,355.66

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

150,000.00 1,650.00

200,000.00 1,000.00

14,032.50 280.65

14,313.15

Err:508 50.00

60,000.00 60.00

200,000.00 40.00

200,000.00 20.00

60,000.00 12.00

50,000.00 1,000.00

28,750.00 5.75

Err:508 Err:508

Err:508 Err:508

1,385.75 0.28

1,385.75

Err:508 Err:508
Err:508 Err:508
150,000.00 600.00
150,000.00 150.00
200,000.00 40.00
16,390.00 2,048.75
18,438.75

Err:508 Err:508

Err:508 Err:508

150,000.00 600.00

150,000.00 150.00

200,000.00 40.00

16,915.00 2,114.38
19,029.38

Err:508 Err:508
Err:508 Err:508
150,000.00 600.00
150,000.00 150.00
200,000.00 40.00
14,185.00 1,773.13
15,958.13
= KAWAT 4 MM
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
150,000.00 300.00
150,000.00 300.00
200,000.00 200.00
2,412.00 603.00
3,015.00

Err:508 2,500.00

150,000.00 3,000.00

150,000.00 450.00

200,000.00 200.00

6,150.00 1,537.50

7,687.50

Err:508 106,050.00

Err:508 2,000.00

150,000.00 7,500.00

200,000.00 2,000.00

14,313.15 14,313.15

131,863.15
Err:508 63,630.00

Err:508 2,000.00

150,000.00 15,000.00

200,000.00 2,000.00

82,630.00

Err:508 28,900.00
Err:508 9,000.00
Err:508 Err:508
100,000.00 12,000.00
150,000.00 22,500.00
150,000.00 22,500.00
200,000.00 10,000.00
Err:508 Err:508
117,700.00

Err:508 28,900.00

Err:508 28,627.50

Err:508 Err:508

100,000.00 12,000.00

150,000.00 22,500.00

150,000.00 22,500.00

200,000.00 10,000.00

Err:508 Err:508

137,327.50

Err:508 28,900.00

Err:508 37,736.25

Err:508 Err:508

100,000.00 12,000.00

150,000.00 22,500.00

150,000.00 22,500.00

200,000.00 10,000.00

Err:508 Err:508
146,436.25

Err:508 81,000.00

Err:508 Err:508

Err:508 Err:508

100,000.00 15,000.00

150,000.00 30,000.00

150,000.00 30,000.00

200,000.00 3,400.00

175,900.00

Err:508 Err:508

Err:508 Err:508

100,000.00 50,000.00

150,000.00 84,375.00

150,000.00 11,250.00

200,000.00 11,260.00

287,885.00

Err:508 120,000.00

Err:508 57,750.00

100,000.00 150,000.00

150,000.00 30,000.00

200,000.00 4,000.00

361,750.00

1,500.00 1,800.00

100,000.00 4,000.00

200,000.00 2,000.00

7,800.00

Err:508 Err:508

67,000.00 63,248.00
Err:508 Err:508

100,000.00 125,000.00

150,000.00 16,875.00

200,000.00 3,380.00

414,503.00 0K

Err:508 120,000.00
67,000.00 72,360.00
Err:508 Err:508
100,000.00 125,000.00
150,000.00 75,000.00
150,000.00 16,875.00
200,000.00 3,380.00
500,615.00

Err:508 120,000.00
67,000.00 83,750.00
Err:508 Err:508
100,000.00 125,000.00
150,000.00 75,000.00
150,000.00 16,875.00
200,000.00 3,380.00
508,005.00

Err:508 Err:508
67,000.00 95,140.00
Err:508 Err:508
100,000.00 125,000.00
150,000.00 16,875.00
200,000.00 3,380.00
440,395.00

Err:508 Err:508
67,000.00 106,530.00
Err:508 Err:508
100,000.00 125,000.00
150,000.00 16,875.00
200,000.00 3,380.00
447,785.00

Err:508 Err:508

67,000.00 117,920.00

Err:508 Err:508

100,000.00 125,000.00

150,000.00 16,875.00

200,000.00 3,380.00

455,175.00

Err:508 Err:508

67,000.00 129,310.00

Err:508 Err:508

100,000.00 125,000.00

150,000.00 16,875.00

200,000.00 3,380.00

462,565.00

AM + SIARAN

Err:508 Err:508

67,000.00 83,750.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 16,875.00

200,000.00 3,380.00

453,605.00

Err:508 Err:508

67,000.00 8,040.00

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

150,000.00 5,625.00

200,000.00 6,760.00

132,000.00 3,300.00

135,300.00

Err:508 Err:508

67,000.00 10,720.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 11,250.00

200,000.00 3,760.00

98,010.00

Err:508 Err:508

67,000.00 10,720.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 11,250.00

200,000.00 3,760.00

99,020.00

MAR MANDI

Err:508 Err:508

67,000.00 16,080.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 16,875.00
200,000.00 5,640.00

112,895.00

Err:508 Err:508

67,000.00 10,720.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 11,250.00

200,000.00 3,760.00

97,000.00

Err:508 Err:508

67,000.00 10,720.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 11,250.00

200,000.00 3,760.00

89,930.00

Err:508 Err:508

67,000.00 10,720.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 11,250.00

200,000.00 3,760.00

99,020.00
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

1,418,920.00 45,405.44

1,464,325.44

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 20,000.00

1,571,420.00 75,428.16

1,646,848.16

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

1,048,920.00 33,565.44

1,082,485.44
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 200,000.00

1,381,420.00 66,308.16

1,447,728.16

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 15,000.00

200,000.00 5,000.00

1,126,420.00 36,045.44

1,162,465.44

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 10,000.00

1,261,420.00 60,548.16

1,321,968.16
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 15,000.00

200,000.00 5,000.00

966,420.00 30,925.44

997,345.44

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 10,000.00

1,101,420.00 52,868.16

1,154,288.16

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

362,420.00 8,698.08

371,118.08
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

368,420.00 14,736.80

383,156.80

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

342,420.00 8,218.08

350,638.08

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

348,420.00 13,936.80

362,356.80
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

528,920.00 16,925.44

545,845.44

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 5,000.00

666,420.00 31,988.16

698,408.16

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 15,000.00

200,000.00 5,000.00

476,420.00 15,245.44

491,665.44
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 5,000.00

606,420.00 29,108.16

635,528.16

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 7,500.00

200,000.00 5,000.00

443,920.00 14,205.44

458,125.44

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

150,000.00 30,000.00

200,000.00 5,000.00

581,420.00 27,908.16

609,328.16
Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

130,000.00 195,000.00

150,000.00 15,000.00

200,000.00 5,000.00

431,420.00 13,805.44

445,225.44

Err:508 Err:508

67,000.00 17,420.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

130,000.00 390,000.00

150,000.00 30,000.00

200,000.00 5,000.00

666,420.00 31,988.16

698,408.16

750.00 52,500.00
67,000.00 36,448.00
Err:508 Err:508
100,000.00 42,900.00
130,000.00 27,820.00
150,000.00 3,150.00
200,000.00 2,200.00
174,418.00

750.00 52,500.00
67,000.00 28,140.00
Err:508 Err:508
100,000.00 42,900.00
130,000.00 27,820.00
150,000.00 3,150.00
200,000.00 2,200.00
167,510.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
108,328.50

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
99,368.50

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

45,571.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

40,195.00

Err:508 5,600.00

Err:508 6,435.00

Err:508 4,815.00

Err:508 787.50

Err:508 560.00

18,197.50

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

38,823.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
35,995.00
NTOR TYPE BESAR )
84,682.50 635,118.75
Err:508 Err:508
78,011.20 292,542.00
174,418.00 4,360,450.00
966,130.19 483,065.10
Err:508 Err:508
Err:508 Err:508
84,682.50 476,339.06
1,500.00 13,500.00
34,500.00 60,375.00
Err:508 Err:508
14,740.00 27,637.50
7,781,297.41 661,410.28
8,442,707.69
ANTOR TYPE KECIL )
84,682.50 381,071.25
Err:508 Err:508
78,011.20 175,525.20
174,418.00 2,616,270.00
966,130.19 289,839.06
Err:508 Err:508
Err:508 Err:508
84,682.50 285,803.44
1,500.00 8,100.00
34,500.00 36,225.00
Err:508 Err:508
14,740.00 16,582.50
4,981,978.44 458,342.02
5,440,320.46
UMAH KAPASITAS KECIL)
84,682.50 190,535.63
Err:508 Err:508
78,011.20 87,762.60
174,418.00 1,308,135.00
966,130.19 144,919.53
Err:508 Err:508
Err:508 Err:508
84,682.50 142,901.72
1,500.00 4,050.00
34,500.00 18,112.50
Err:508 Err:508
14,740.00 8,291.25
2,972,489.22 193,211.80
3,165,701.02

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
47,335.00 1,183.38
47,335.00

Err:508 Err:508
Err:508 4,375.00
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
44,635.00 1,115.88
44,635.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

29,995.00 1,349.78

29,995.00
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

32,120.00 1,365.10

32,120.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

21,175.00 952.88

21,175.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

862.50 862.50

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

22,275.00
-

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

40,329.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

45,016.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

53,475.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

70,175.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

191,049.00

ORNEO SUPER

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

127,078.40

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

165,900.00

IMENI (HANYA RANGKA) DENGAN MENI KAYU

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

125,530.00

NYA RANGKA)

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

81,765.50

PADA RANGKANYA

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

30,845.00 1,388.03

32,233.03

UP PADA RANGKANYA
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
27,389.00 1,369.45
28,758.45
RANGKANYA
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
18,983.00 1,613.56
20,596.56

3,800,000.00 38,000.00
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
56,494.00

3,800,000.00 26,600.00
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
45,094.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
7,555,250.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
5,245,250.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
11,372,750.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
10,272,750.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

728,631.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

628,631.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

344,782.50

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

553,782.50

MUNIUM (KM/WC)

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

338,278.00

MIKA (KM/WC)

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

413,878.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

377,478.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

303,970.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

362,484.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

596,890.00

UPER (EXSPOSE)

3,400,000.00 4,080,000.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

5,031,600.00

2,050,000.00 2,255,000.00

Err:508 98,600.00

Err:508 135,000.00

Err:508 250,000.00

Err:508 160,000.00

2,898,600.00

3,400,000.00 3,740,000.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508
Err:508 Err:508

4,406,000.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
6,716,000.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

10,566,000.00

JAR (HANYA RANGKANYA)


Err:508 92,400.00
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
122,630.00
DAN (HANYA RANGKANYA)
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
125,230.00
ER (HANYA RANGKANYA)

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

87,350.00

NJAR (HANYA RANGKANYA)

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

129,430.00

Err:508 Err:508

Err:508 Err:508

275.00 22,000.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

119,530.00

550.00 13,750.00

45,000.00 7,200.00

80,000.00 6,400.00
80,000.00 6,400.00

56,000.00 560.00

- -

34,310.00

1,150.00 4,600.00

70,000.00 2,450.00

200,000.00 6,600.00

45,000.00 13,500.00

80,000.00 12,000.00

80,000.00 1,200.00

56,000.00 840.00

34,140.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

84,908.00 5,519.02

84,908.00

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

87,408.00 8,303.76
95,711.76

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

Err:508 Err:508

112,908.00 12,306.97

125,214.97

40,016.13 40,016.13

29,400.00 13,230.00

149,000.00 11,920.00

287,885.00 34,546.20

508,005.00 101,601.00

38,823.00 15,917.43

1,250,000.00 70,312.50

35,000.00 52,500.00

45,016.00 45,016.00

385,059.26

29,400.00 13,230.00

149,000.00 11,920.00

287,885.00 34,546.20

508,005.00 101,601.00

147,151.50 264,872.70

1,250,000.00 70,312.50

Err:508 Err:508

Err:508 Err:508

22,275.00 22,275.00

539,157.40
Err:508 30,000.00

Err:508 25,000.00

Err:508 7,500.00

62,500.00 7,500.00

70,000.00

Err:508 19,200.00

Err:508 5,500.00

24,700.00 7,904.00

32,604.00

Err:508 12,000.00

Err:508 4,000.00

16,000.00 8,000.00

24,000.00

Err:508 3,000.00

Err:508 2,200.00

Err:508 2,500.00

7,700.00 7,315.00

15,015.00

Err:508 1,100.00

Err:508 32,000.00

Err:508 540.00

Err:508 3,000.00

36,640.00 6,595.20

43,235.20

LS 6 TON KE BAWAH

Err:508 Err:508

Err:508 Err:508

1,250.00 10.00

Err:508 Err:508
Err:508 Err:508

Err:508 Err:508

50,890.00 4,987.22

55,877.22

Err:508 94,350.00
Err:508 1,500.00
Err:508 840.00
96,690.00

5,509.50 5,509.50
3,736.00 3,736.00
2,322.50 2,322.50
5,747.00 5,747.00
17,315.00

29,400.00 4,410.00
Err:508 16,000.00
207,705.00 207,705.00
20,410.00 7,143.50
235,258.50

29,400.00 5,880.00
Err:508 24,000.00
207,705.00 207,705.00
237,585.00 35,637.75
273,222.75

Err:508 Err:508
Err:508 Err:508
45,000.00 11,250.00
50,000.00 25,000.00
75,000.00 1,875.00
56,000.00 168.00
2,750.00 2,750.00
100,413.00
Err:508 Err:508

Err:508 Err:508

45,000.00 11,250.00

50,000.00 25,000.00

75,000.00 1,875.00

56,000.00 168.00

3,000.00 3,000.00

103,693.00

Err:508 Err:508

Err:508 Err:508

45,000.00 11,250.00

50,000.00 25,000.00

75,000.00 1,875.00

56,000.00 168.00

2,750.00 2,750.00

93,343.00

Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
Err:508 Err:508
56,000.00 168.00
3,000.00 3,000.00
96,143.00

45,000.00 90,000.00

56,000.00 5,040.00

95,040.00
45,000.00 45,000.00

56,000.00 5,040.00

50,040.00

45,000.00 2,250.00

56,000.00 1,400.00

3,650.00

45,000.00 900.00
56,000.00 560.00
1,460.00

100,000.00 40,000.00
200,000.00 20,000.00
60,000.00

100,000.00 10,000.00

130,000.00 3,250.00

150,000.00 375.00

200,000.00 1,000.00

14,625.00

100,000.00 20,000.00
130,000.00 6,500.00
150,000.00 750.00
200,000.00 2,000.00
29,250.00

100,000.00 400,000.00
130,000.00 780,000.00
150,000.00 90,000.00
200,000.00 40,000.00
1,310,000.00

100,000.00 400,000.00
130,000.00 390,000.00
150,000.00 30,000.00
820,000.00

100,000.00 10,000.00
130,000.00 32,500.00
150,000.00 375.00
200,000.00 1,000.00
43,875.00

100,000.00 12,500.00
200,000.00 1,000.00
13,500.00

ATU BUNDAR ( BID. PENGAIRAN )


KORAL BETON ( BID. PENGAIRAN )
. ……………………………………..

PC : 2 PSR ( BBID. PENGAIRAN )

PC : 3 PSR ( BID. PENGAIRAN )


BATU (1 X 1 X 3 m )

AAN BRONJONG = 16 M3 ) DIA. 3 MM

BATU (1 X 1 X 3 m )

AAN BRONJONG = 16 M3 ) DIA. 4 MM

M2) 1 SEKAT
M2) 1 SEKAT

M2) 1 SEKAT
M2) 1 SEKAT

rupiah )

n peralatan angkut: bambu, dll)


NYA ( BID. PENGAIRAN )

( BID. PENGAIRAN )

( BID. PENGAIRAN )
AH LUNAK ( BID.PENGAIRAN )

BID. PENGAIRAN )

AIR ( BID. PENGAIRAN )


D 15 M1 ( BID. PENGAIRAN )
H LUAR DISIAR DENGAN PEREKAT

URAN MIRING DST. SETEBAL 0,23 M1


asil Perhitungan )

…..
pah Pekerja Setempat (rupiah )
rak angkut dalam m1
rga angkutan per m3
arga bahan dan peralatan angkut, bambu, dll)
Kode
DAERAH
Upah

2 5
Kode
bahan
1 2 3 4
KOTA
5 KOTA BEKASI KOTA BOGOR KOTA CIMAHI
BANDUNG
5 6 7 8 9
KABUPATEN KABUPATEN KABUPATEN KABUPATEN
KOTA DEPOK
SUMEDANG BANDUNG BEKASI KARAWANG
10 11 12 13 14
KABUPATEN KABUPATEN KOTA KOTA KABUPATEN
PURWAKARTA BOGOR CIREBON SUKABUMI INDRAMAYU
15 16 17 18 19
KABUPATEN KOTA KABUPATEN KABUPATEN KABUPATEN
CIREBON TASIKMALAYA CIANJUR SUKABUMI SUBANG
20 21 22 23 24

KABUPATEN KABUPATEN KABUPATEN KABUPATEN KABUPATEN


GARUT TASIKMALAYA CIAMIS KUNINGAN MAJALENGKA
ANALISA
NO. URAIAN KOEF SAT. HARGA SAT.

1 2 3 4 5
1 M3 Pek. Beton kolom Praktis 12 x 15, 4 dia 10, dia 6 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 24 181.778 kg 13,874.55
bekisting dg papan 33.333 m2 80,650.00
Jumlah

1 M3 Pek. Beton Sloof 15 x 20, 4 dia 12, dia 8 - 10


beton site mix K-225 1.050 m3 981,008.10
besi u 24 180.889 kg 17,757.00
bekisting dg papan 13.333 m2 80,650.00
Jumlah

1 M3 Pek. Beton kolom 25 x 30, 8 dia 16, dia 8 - 10


beton site mix K-225 1.050 m3 981,008.10
besi u 39 168.533 kg 14,573.25
besi u 24 39.111 kg 17,757.00
bekisting dg papan 14.667 m2 80,650.00
Jumlah

1 M3 Pek. Beton kolom 25 x 25, 8 dia 16, dia 8 - 10


beton site mix K-225 1.050 m3 981,008.10
besi u 39 202.240 kg 14,573.25
besi u 24 42.667 kg 17,757.00
bekisting dg papan 16.000 m2 80,650.00
Jumlah

1 M3 Pek. Beton Sloof 20 x 30, 6 dia 16, dia 8 - 10


beton site mix K-225 1.050 m3 981,008.10
besi u 39 158.000 kg 14,573.25
besi u 24 44.444 kg 17,757.00
bekisting dg papan 10.000 m2 80,650.00
Jumlah
1 M3 Pek. Beton Kolom 30 x 40, 10 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 131.667 kg 14,573.25
besi u 24 31.111 kg 17,757.00
bekisting dg papan 12.500 m2 80,650.00
Jumlah
1 M3 Pek. Fond setempat 100 x 100 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 164.320 kg 14,573.25
bekisting dg papan 5.600 m2 80,650.00
Jumlah

1 M3 Pek. Pelat Lantai 12 cm tul dia 8 - 15, 2 lapis


beton site mix K-225 1.050 m3 981,008.10
besi u 24 125.000 kg 17,757.00
Stoot Werk 8.333 m2 134,202.00
bekisting dg papan 8.333 m2 80,650.00
Jumlah

1 M3 Pek. Balok 30 x 65
beton site mix K-225 1.050 m3 981,008.10
besi u 39 122.791 kg 14,573.25
besi u 24 25.983 kg 17,757.00
Stoot Werk 1.538 m2 134,202.00
bekisting dg papan 8.205 m2 80,650.00
Jumlah

1 M3 Pek. Balok 25 x 40
beton site mix K-225 1.050 m3 981,008.10
besi u 39 116.723 kg 14,573.25
besi u 24 36.111 kg 17,757.00
Stoot Werk 2.604 m2 134,202.00
bekisting dg papan 10.938 m2 80,650.00
Jumlah

1 M3 Pek. Balok 20 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 133.563 kg 14,573.25
besi u 24 44.444 kg 17,757.00
Stoot Werk 3.333 m2 134,202.00
bekisting dg papan 13.333 m2 80,650.00
Jumlah

1 M3 Pek. Balok 15 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 177.452 kg 14,573.25
besi u 24 53.333 kg 17,757.00
Stoot Werk 3.333 m2 134,202.00
bekisting dg papan 16.667 m2 80,650.00
Jumlah

1 M3 Pek. Balok 15 x 20
beton site mix K-225 1.050 m3 981,008.10
besi u 24 211.268 kg 13,874.55
bekisting dg papan 18.333 m2 80,650.00
Jumlah

1 M3 Pek. Pelat Lantai 10 cm tul dia 8 - 20, 2 lapis


beton site mix K-225 1.050 m3 981,008.10
besi u 24 80.000 kg 17,757.00
Stoot Werk 11.000 m2 134,202.00
bekisting dg papan 11.000 m2 80,650.00
Jumlah

1 M3 Pek. Pelat Tangga Tul. Ø 12 - 15 dan Ø 8 - 20


beton site mix K-225 1.050 m3 981,008.10
besi u 24 132.222 kg 17,757.00
bekisting dg papan 12.107 m2 80,650.00
Stoot Werk 6.742 m2 134,202.00
Jumlah

1 M3 Pek. Pelat Luivel 8 cm Tul. Ø 6 - 15


beton site mix K-225 1.050 m3 981,008.10
besi u 24 73.333 kg 17,757.00
bekisting dg papan 12.500 m2 80,650.00
Jumlah

1 M3 Pek. Beton kolom 20 x 20, 4 dia 16, dia 8 - 10


beton site mix K-225 1.050 m3 981,008.10
besi u 39 158.000 kg 14,573.25
besi u 24 53.333 kg 17,757.00
bekisting dg papan 20.000 m2 80,650.00
Jumlah
1 m2 Pasang kaca polos tebal 5 mm
Kaca tebal 5 mm, Polos 1.1000 m2 65,000.00
Pekerja Setengah Terampil 0.0150 org 45,000.00
Tukang kayu Setengah Terampil 0.1500 org 50,000.00
Kepala tukang kayu 0.0150 org 80,000.00
Mandor 0.0008 org 56,000.00
Jumlah
1 Buah pasang engsel pintu.
Engsel pintu 1.0000 bh 12,500.00
Pekerja Setengah Terampil 0.0150 org 45,000.00
Tukang kayu Setengah Terampil 0.1500 org 50,000.00
Kepala tukang kayu 0.0150 org 80,000.00
Mandor 0.0008 org 56,000.00
Jumlah
1 Buah pasang engsel jendela kupu - kupu.
Engsel jendela 1.0000 bh 10,000.00
Pekerja Setengah Terampil 0.0100 org 45,000.00
Tukang kayu Setengah Terampil 0.1000 org 50,000.00
Kepala tukang kayu 0.0100 org 80,000.00
Mandor 0.0005 org 56,000.00
Jumlah
1 Buah pasang Grendel Jendela (spring knip)
Spring knip 1.0000 bh 8,500.00
Pekerja Setengah Terampil 0.0150 org 45,000.00
Tukang kayu Setengah Terampil 0.1500 org 50,000.00
Kepala tukang kayu 0.0150 org 80,000.00
Mandor 0.0008 org 56,000.00
Jumlah
1 Buah pasang kait angin.
Hak angin kait biasa 1.0000 bh 12,500.00
Pekerja Setengah Terampil 0.0150 org 45,000.00
Tukang kayu Setengah Terampil 0.1500 org 50,000.00
Kepala tukang kayu 0.0150 org 80,000.00
Mandor 0.0008 org 56,000.00
Jumlah
1 m' Pasang list langit-langit kayu 4 cm.
List kayu 4 cm 1.1000 m' 12,000.00
Paku uk. 1 - 3 cm 0.0100 kg 20,000.00
Pekerja Setengah Terampil 0.0500 org 45,000.00
Tukang kayu Setengah Terampil 0.0500 org 50,000.00
Kepala tukang kayu 0.0050 org 80,000.00
Mandor 0.0030 org 56,000.00
Jumlah
Pasangan 1 Buah Kloset Jongkok
Kloset Jongkok 1.0000 bh 145,000.00
Batu Bata 15.0000 bh 750.00
Semen 5.5000 kg 1,400.00
Pasir Pasang 0.0090 m3 200,000.00
Pekerja 1.0000 org 45,000.00
Tukang batu Terampil 1.0000 org 60,000.00
Kepala tukang batu 0.1000 org 75,000.00
Mandor 0.0500 org 56,000.00

Pasangan 1 Buah Bak Mandi Fibre


Bak Mandi Fibre 60 x 60 1.0000 bh 150,000.00
Batu Bata 35.0000 bh 750.00
Semen 10.0000 kg 1,400.00
Pasir Pasang 0.0230 m3 200,000.00
Pekerja 1.0000 org 45,000.00
Tukang batu Terampil 0.5000 org 60,000.00
Kepala tukang batu 0.0500 org 75,000.00
Mandor 0.0500 org 56,000.00
Memasang 1 buah floor drain.
Floor drain 1.0000 bh 30,000.00
Pekerja Setengah Terampil 0.0100 org 45,000.00
Tukang batu setengah terampil 0.1000 org 45,000.00
Kepala tukang batu 0.0100 org 75,000.00
Mandor 0.0050 org 56,000.00

Memasang 1 buah kran air, Ø ½" atau Ø ¾"


Kran air 1.0000 bh 50,000.00
Seal tape 0.0250 bh 2,000.00
Pekerja Setengah Terampil 0.0100 org 45,000.00
Tukang batu setengah terampil 0.1000 org 45,000.00
Kepala tukang batu 0.0100 org 75,000.00
Mandor 0.0050 org 56,000.00

1 m' Pasang talang datar, seng BJLS 25


Seng plat 7,5 cm x 15 cm, bjls. 25 0.5000 Lbr 42,000.00
Paku uk. 1 - 3 cm 0.0150 kg 20,000.00
Kayu borneo Super, papan 0.0096 m3 3,800,000.00
Flintcoat / meni besi 0.2500 kg 18,000.00
Pekerja Terampil 0.1500 org 50,000.00
Tukang kayu Setengah Terampil 0.4000 org 50,000.00
Kepala tukang kayu 0.0250 org 80,000.00
Mandor 0.0013 org 56,000.00

1 M2 PARTISI Gypsum 9 MM
Gypsum 9 mm 0.6944 lbr 65,000.00
Kaso-kaso 5/7 Borneo super 0.0140 m³ 3,400,000.00
Kayu 5/10 Borneo super 0.0035 m³ 3,400,000.00
Paku 0.2200 kg 17,000.00
Pekerja setengah terampil 0.2800 org 45,000.00
Tk. kayu terampil 0.4000 org 65,000.00
Kep. tukang kayu 0.0800 org 80,000.00
Mandor 0.0140 org 56,000.00

1 m2 water profing dak beton


Pekerja 0.5643 org 45,000.00
Tk Batu 0.304 org 60,000.00
Kepala Tukang batu 0.4 org 75,000.00
Mandor 0.026 org 56,000.00
wate prof. coating' 1.02 m2 13,750.00

A008 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2 M'


Tukang Gali 0.5260 org
Mandor 0.0520 org
Alat Bantu 0.0500 lot
Jumlah
A017 1 M3 URUGAN TANAH KEMBALI
Tukang Gali 0.1920 org
Mandor 0.0190 org
Alat Bantu 0.1000 lot
Jumlah
1 M3 Pek. Fond setempat 100 x 100 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 164.320 kg 14,573.25
bekisting dg papan 5.600 m2
Jumlah
1 M3 Pek. Beton Sloof 15 x 20, 4 dia 12, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 24 180.889 kg 17,757.00
bekisting dg papan 13.333 m2 80,650.00
Jumlah
1 M3 Pek. Beton kolom 25 x 25, 8 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 202.240 kg 14,573.25
besi u 24 42.667 kg 17,757.00
bekisting dg papan 16.000 m2 80,650.00
Jumlah
1 M3 Pek. Balok 15 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 177.452 kg 14,573.25
besi u 24 53.333 kg 17,757.00
Stoot Werk 3.333 m2 134,202.00
bekisting dg papan 16.667 m2 80,650.00
Jumlah
1 M3 Pek. Pelat Lantai 10 cm tul dia 8 - 20, 2 lapis
beton site mix K-225 1.050 m3 981,008.10
besi u 24 80.000 kg 17,757.00
Stoot Werk 11.000 m2 134,202.00
bekisting dg papan 11.000 m2 80,650.00
Jumlah
1 M3 Pek. Pelat Lantai 10 cm tul dia 8 - 20, 2 lapis
beton site mix K-225 1.050 m3 747,228.08
besi u 24 80.000 kg 13,869.45
Stoot Werk 11.000 m2 121,802.00
bekisting dg papan 11.000 m2 79,475.00
Jumlah

1 M3 Pek. Pelat Luivel 8 cm Tul. Ø 6 - 15


beton site mix K-225 1.050 m3 747,228.08
besi u 24 73.333 kg 13,869.45
bekisting dg papan 12.500 m2 79,475.00
Jumlah
HARGA SAT. JUMLAH

5 6=(3x5)

981,008.10 1,030,058.51 L 55.5555556


13,874.55 2,522,084.87 Tul Pokok 137.777778
80,650.00 2,688,333.33 Begel 44
6,240,476.71 181.777778

981,008.10 1,030,058.51 L 33.3333333


17,757.00 3,212,044.00 Tul Pokok 118.666667
80,650.00 1,075,333.33 Begel 62.2222222
5,317,435.84 180.888889

981,008.10 1,030,058.51 L 13.3333333


14,573.25 2,456,078.40 Tul Pokok 168.533333
17,757.00 694,496.00
80,650.00 1,182,866.67 Begel 39.1111111
5,363,499.57 207.644444

981,008.10 1,030,058.51 L 16
14,573.25 2,947,294.08 Tul Pokok 202.24
17,757.00 757,632.00
80,650.00 1,290,400.00 Begel 42.6666667
6,025,384.59 244.906667

981,008.10 1,030,058.51 L 16.6666667


14,573.25 2,302,573.50 Tul Pokok 158
17,757.00 789,200.00
80,650.00 806,500.00 Begel 44.4444444
4,928,332.01 202.444444

981,008.10 1,030,058.51 L 8.33333333


14,573.25 1,918,811.25 Tul Pokok 131.666667
17,757.00 552,440.00
80,650.00 1,008,125.00 Begel 31.1111111
4,509,434.76 162.777778

981,008.10 1,030,058.51 Q 3.33333333


14,573.25 2,394,676.44 Tul Pokok 164.32
80,650.00 451,640.00
3,876,374.95 164.32

981,008.10 1,030,058.51 Q 8.33333333


17,757.00 2,219,625.00 Tul Pokok 88.8888889
134,202.00 1,118,350.00
80,650.00 672,083.33
5,040,116.84 88.8888889

0.02 0.2 2 0.008

981,008.10 1,030,058.51 L 5.12820513


14,573.25 1,789,463.57 Tul Pokok 122.790974
17,757.00 461,378.46
134,202.00 206,464.62
80,650.00 661,743.59 Begel 25.982906
4,149,108.74 148.77388

981,008.10 1,030,058.51 L 10.4166667


14,573.25 1,701,028.60 Tul Pokok 116.722667
17,757.00 641,225.00
134,202.00 349,484.38
80,650.00 882,109.38 Begel 36.1111111
4,603,905.86 152.833778

981,008.10 1,030,058.51 L 16.6666667


14,573.25 1,946,442.13 Tul Pokok 133.562667
17,757.00 789,200.00
134,202.00 447,340.00
80,650.00 1,075,333.33 Begel 44.4444444
5,288,373.97 178.007111

981,008.10 1,030,058.51 L 22.2222222


14,573.25 2,586,045.88 Tul Pokok 177.451556
17,757.00 947,040.00
134,202.00 447,340.00
80,650.00 1,344,166.67 Begel 53.3333333
6,354,651.05 230.784889

981,008.10 1,030,058.51 L 33.3333333


13,874.55 2,931,242.26 Tul Pokok 149.045333
80,650.00 1,478,583.33 Begel 62.2222222
5,439,884.10 211.267556

981,008.10 1,030,058.51 Q 10
17,757.00 1,420,560.00 Tul Pokok 80
134,202.00 1,476,222.00
80,650.00 887,150.00
4,813,990.51 80

981,008.10 1,030,058.51 L 6.28930818


17,757.00 2,347,870.00 Tul Pokok 98.8888889
80,650.00 976,422.96 Tul Bagi 33.3333333
134,202.00 904,764.16
5,259,115.62 132.222222

981,008.10 1,030,058.51 L 12.5


17,757.00 1,302,180.00 Tul Pokok 73.3333333
80,650.00 1,008,125.00
3,340,363.51 73.3333333

981,008.10 1,030,058.51 L 25
14,573.25 2,302,573.50 Tul Pokok 158
17,757.00 947,040.00
80,650.00 1,613,000.00 Begel 53.3333333
5,892,672.01 211.333333

65,000.00 71,500.00
45,000.00 675.00
50,000.00 7,500.00
80,000.00 1,200.00
56,000.00 42.00
80,917.00

12,500.00 12,500.00
45,000.00 675.00
50,000.00 7,500.00
80,000.00 1,200.00
56,000.00 42.00
21,917.00

10,000.00 10,000.00
45,000.00 450.00
50,000.00 5,000.00
80,000.00 800.00
56,000.00 28.00
16,278.00

8,500.00 8,500.00
45,000.00 675.00
50,000.00 7,500.00
80,000.00 1,200.00
56,000.00 42.00
17,917.00

12,500.00 12,500.00
45,000.00 675.00
50,000.00 7,500.00
80,000.00 1,200.00
56,000.00 42.00
21,917.00

12,000.00 13,200.00
20,000.00 200.00
45,000.00 2,250.00
50,000.00 2,500.00
80,000.00 400.00
56,000.00 168.00
18,718.00

145,000.00 145,000.00
750.00 11,250.00
1,400.00 7,700.00
200,000.00 1,800.00
45,000.00 45,000.00
60,000.00 60,000.00
75,000.00 7,500.00
56,000.00 2,800.00
281,050.00

150,000.00 150,000.00
750.00 26,250.00
1,400.00 14,000.00
200,000.00 4,600.00
45,000.00 45,000.00
60,000.00 30,000.00
75,000.00 3,750.00
56,000.00 2,800.00
276,400.00

30,000.00 30,000.00
45,000.00 450.00
45,000.00 4,500.00
75,000.00 750.00
56,000.00 280.00
35,980.00

50,000.00 50,000.00
2,000.00 50.00
45,000.00 450.00
45,000.00 4,500.00
75,000.00 750.00
56,000.00 280.00
56,030.00

42,000.00 21,000.00
20,000.00 300.00
3,800,000.00 36,480.00
18,000.00 4,500.00
50,000.00 7,500.00
50,000.00 20,000.00
80,000.00 2,000.00
56,000.00 70.00
91,850.00

65,000.00 45,136.00
3,400,000.00 47,600.00
3,400,000.00 11,900.00
17,000.00 3,740.00
45,000.00 12,600.00
65,000.00 26,000.00
80,000.00 6,400.00
56,000.00 784.00

154,160.00
45,000.00 25,393.50
60,000.00 18,240.00
75,000.00 30,000.00
56,000.00 1,456.00
13,750.00 14,025.00
89,114.50

50,000.00 26,300.00
56,000.00 2,912.00
29,212.00 1,460.60
30,672.60

Err:508 3,456.00
56,000.00 1,064.00
10,664.00 1,066.40
5,586.40

981,008.10 1,030,058.51
14,573.25 2,394,676.44
80,650.00 451,640.00
3,876,374.95

981,008.10 1,030,058.51
17,757.00 3,212,044.00
80,650.00 1,075,333.33
5,317,435.84

981,008.10 1,030,058.51
14,573.25 2,947,294.08
17,757.00 757,632.00
80,650.00 1,290,400.00
6,025,384.59

981,008.10 1,030,058.51
14,573.25 2,586,045.88
17,757.00 947,040.00
134,202.00 447,340.00
80,650.00 1,344,166.67
6,354,651.05

981,008.10 1,030,058.51
17,757.00 1,420,560.00
134,202.00 1,476,222.00
80,650.00 887,150.00
4,813,990.51

747,228.08 784,589.48
13,869.45 1,109,556.00
121,802.00 1,339,822.00
79,475.00 874,225.00
4,108,192.48

747,228.08 784,589.48
13,869.45 1,017,093.00
79,475.00 993,437.50
2,795,119.98
-
2600000
1.000 125

20,800
ANALISA HARGA SATUAN PEKERJAAN
KOTA CIMAHI
TAHUN ANGGARAN 2015

HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
A. PEKERJAAN PERSIAPAN SNI 03-2835-2002
A.001 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank
Bahan
Kayu Kelas 2 Uk. 5/7 (ikat) 0.0100 m³ 3,400,000.00
Paku Biasa 2" - 5" 0.0150 kg 12,000.00
Kayu Papan Kelas 2 Uk. (2 x 20 x 400) 0.0060 m³ 1,600,000.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Kayu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A002 1 M2 MEMBONGKAR GENTENG / SIRAP
(Jika bongkaran tidak di pakai )
Pekerja Setengah Terampil 0.0200 org 45,000.00
Mandor 0.0100 org 56,000.00
Jumlah
Dibulatkan
A003 1 M2 MEMBONGKAR GENTENG / SIRAP
(Jika bongkaran di pakai )
Pekerja Setengah Terampil 0.3000 org 100,000.00
Mandor 0.1000 org 200,000.00
Jumlah
Jumlah
Dibulatkan
A004 1 M2 MEMBONGKAR RANGKA ATAP / RENG KASO
(Jika bongkaran tidak di pakai )
Pekerja Setengah Terampil 0.1000 org 100,000.00
Tk kayu setengah terampil 0.0250 org 130,000.00
Kepala Tukang kayu 0.0025 org 150,000.00
Mandor 0.0050 org 200,000.00
Jumlah
Dibulatkan
A005 1 M2 MEMBONGKAR RANGKA ATAP / RENG KASO
(Jika bongkaran di pakai )
Pekerja Setengah Terampil 0.2000 org 100,000.00
Tk kayu setengah terampil 0.0500 org 130,000.00
Kepala Tukang kayu 0.0050 org 150,000.00
Mandor 0.0100 org 200,000.00
Jumlah
Dibulatkan
A006 1 M3 MEMBONGKAR KUDA-KUDA, GORDING / BALOK
(Jika bongkaran dipakai )
Pekerja Setengah Terampil 4.0000 org 100,000.00
Tk kayu setengah terampil 6.0000 org 130,000.00
Kepala Tukang kayu 0.6000 org 150,000.00
Mandor 0.2000 org 200,000.00
Jumlah
Jumlah
Dibulatkan
A007 1 M3 MEMBONGKAR KUDA-KUDA, GORDING / BALOK
(Jika bongkaran tidak dipakai )
Pekerja 4.0000 org 100,000.00
Tk kayu setengah terampil 3.0000 org 130,000.00
Mandor 0.2000 org 200,000.00
Jumlah
Jumlah
Dibulatkan
A008 1 M2 MEMBONGKAR PLAFOND
(Jika bongkaran dipakai )
Pekerja 0.1000 org 100,000.00
Tk kayu setengah terampil 0.2500 org 130,000.00
Kepala Tukang kayu 0.0025 org 150,000.00
Mandor 0.0050 org 200,000.00
Jumlah
Jumlah
Dibulatkan
A009 1 M2 MEMBONGKAR PLAFOND
(Jika bongkaran tidak dipakai )
Pekerja 0.1250 org 100,000.00
Mandor 0.0050 org 200,000.00
Jumlah
A010 Membersihkan 1 m² lapangan dan perataan
Pekerja 0.1000 OH 100,000.00
Mandor 0.0500 OH 200,000.00
Jumlah (2)
Jumlah (2)
A.011 Membongkar 1 m³ beton bertulang
Pekerja 6.6670 OH 100,000.00
Mandor 0.3330 OH 200,000.00
Jumlah
A.012 Membongkar 1 m³ dinding tembok bata merah
Pekerja 5.6000 OH 100,000.00
Mandor 0.0330 OH 200,000.00
Jumlah
A.013 Mengerjakan1 m² pengukuran kembali (site)
Pekerja 0.0200 OH 100,000.00
Tukang Kayu 0.0100 OH 130,000.00
Peralatan 0.5000 OH 1,000.00
Jumlah
PEKERJAAN TANAH
A.014 Menggali 1 m³ tanah biasa sedalam 2 meter
Tenaga
Pekerja 0.5260 OH 100,000.00
Mandor 0.0526 OH 200,000.00
Jumlah
A.015 Menggali 1 m³ tanah keras sedalam 1 meter
Tenaga
Pekerja 0.6250 OH 100,000.00
Mandor 0.0625 OH 200,000.00
Jumlah
A.016 Mengurug kembali 1 m³ galian
Tenaga
Pekerja 0.2500 OH 100,000.00
Mandor 0.0083 OH 200,000.00
Jumlah
A.017 Memadatkan 1 m³ tanah (per 20 cm)
Tenaga
Pekerja 0.5000 OH 100,000.00
Mandor 0.0500 OH 200,000.00
Jumlah
A.018 Mengurug 1 m³ pasir urug
Bahan
Pasir Urug 1.2000 m³ 86,000.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 100,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.019 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunan
Bahan
Sirtu 1.2000 m³ 65,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Mandor 0.0250 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)

D. PEKERJAAN DINDING SNI 03-28


A.020 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 3 PP
Bahan
Bata Merah 70.0000 buah 750.00
Portland Cement (PC) 14.3700 kg 1,340.00
Pasir Pasang (PP) 0.0400 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 100,000.00
Tukang Batu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0150 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.021 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 5 PP
Bahan
Bata Merah 70.0000 buah 750.00
Portland Cement (PC) 9.6800 kg 1,340.00
Pasir Pasang (PP) 0.0450 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 100,000.00
Tukang Batu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0150 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.022 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP
Bahan
Bata Terawang / Roster 30.0000 buah 3,500.00
Portland Cement (PC) 14.0000 kg 1,340.00
Pasir Pasang (PP) 0.0320 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 100,000.00
Tukang Batu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0150 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN PLESTERAN SNI 03-28
A.023 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC) 7.7760 kg 1,340.00
Pasir Pasang (PP) 0.0230 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 100,000.00
Tukang Batu 0.1500 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.024 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm
Bahan
Portland Cement (PC) 5.1840 kg 1,340.00
Pasir Pasang (PP) 0.0260 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 100,000.00
Tukang Batu 0.1500 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.025 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC) 7.0700 kg 1,340.00
Pasir Pasang (PP) 0.0210 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.2600 OH 100,000.00
Tukang Batu 0.2000 OH 130,000.00
Kepala Tukang 0.0200 OH 150,000.00
Mandor 0.0130 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.026 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement (PC) 6.3400 kg 1,340.00
Pasir Pasang (PP) 0.0120 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 100,000.00
Tukang Batu 0.1400 OH 130,000.00
Kepala Tukang 0.0140 OH 150,000.00
Mandor 0.0150 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.027 Memasang 1 m² acian
Bahan
Portland Cement (PC) 3.2500 kg 1,340.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 100,000.00
Tukang Batu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0080 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
F. PEKERJAAN KAYU SNI 03-34
A.028 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu 1.2000 m³ 3,400,000.00
Paku 10 cm 1.2500 kg 12,000.00
Lem Kayu 1.0000 kg 22,000.00
Jumlah (1)
Tenaga
Pekerja 6.0000 OH 100,000.00
Tukang Kayu 18.0000 OH 130,000.00
Kepala Tukang 2.0000 OH 150,000.00
Mandor 0.3000 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.029 Membuat dan memasang 1 m² daun pintu panel; Kayu Kruing
Bahan
Papan Kayu Kruing 0.0400 m³ 3,400,000.00
Lem Kayu 0.5000 kg 22,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 100,000.00
Tukang Kayu 2.5000 OH 130,000.00
Kepala Tukang 0.2500 OH 150,000.00
Mandor 0.0500 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.030 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Kruing
Bahan
Papan Kayu Kruing 0.0240 m³ 3,400,000.00
Lem Kayu 0.3000 kg 22,000.00
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 100,000.00
Tukang Kayu 2.0000 OH 130,000.00
Kepala Tukang 0.2000 OH 150,000.00
Mandor 0.0400 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.031 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Kruing
Bahan
Papan Kayu Kruing 0.0640 m³ 3,400,000.00
Lem Kayu 0.5000 kg 22,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 100,000.00
Tukang Kayu 3.0000 OH 130,000.00
Kepala Tukang 0.3000 OH 150,000.00
Mandor 0.0500 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.032 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu 0.0600 m³ 3,400,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.5000 OH 100,000.00
Tukang Kayu 2.0000 OH 130,000.00
Kepala Tukang 0.2000 OH 150,000.00
Mandor 0.0250 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.033 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu 1.1000 m³ 3,400,000.00
Besi Strip 5 mm 15.0000 kg 14,000.00
Paku 12 cm 5.6000 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 4.0000 OH 100,000.00
Tukang Kayu 12.0000 OH 130,000.00
Kepala Tukang 1.2000 OH 150,000.00
Mandor 0.2000 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.034 Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu 1.1000 m³ 3,400,000.00
Besi Strip 5 mm 15.0000 kg 14,000.00
Paku 12 cm 3.0000 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 2.4000 OH 100,000.00
Tukang Kayu 7.2000 OH 130,000.00
Kepala Tukang 0.7200 OH 150,000.00
Mandor 0.1200 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.035 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm 0.0120 m³ 3,400,000.00
Reng (2 x 3) cm 0.0036 m³ 3,400,000.00
Paku 5 cm & 10 cm 0.2500 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Kayu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.036 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm 0.0163 m³ 3,400,000.00
Paku 7 cm - 10 cm 0.2500 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 100,000.00
Tukang Kayu 0.3000 OH 130,000.00
Kepala Tukang 0.0300 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.037 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu (2 x 20 x 400) 0.0110 m³ 3,400,000.00
Paku 5 cm - 7 cm 0.0500 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Kayu 0.2000 OH 130,000.00
Kepala Tukang 0.0250 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.038 Memasang 1 m' list plafond kayu profil
Bahan
List Kayu Profil 1.0500 m' 19,000.00
Jumlah (1)
Tenaga
Pekerja 0.0210 OH 100,000.00
Tukang Kayu 0.0210 OH 130,000.00
Kepala Tukang 0.0020 OH 150,000.00
Mandor 0.0010 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.039 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu (2 x 20 x 400) 0.0044 m³ 3,400,000.00
Paku 5 cm - 10 cm 0.0100 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 100,000.00
Tukang Kayu 0.2000 OH 130,000.00
Kepala Tukang 0.0200 OH 150,000.00
Mandor 0.0040 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN BETON RSNI-T-
A.040 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR
Bahan
Portland Cement (PC) 218.0000 kg 1,340.00
Pasir Beton (PB) 0.5200 m³ 240,000.00
Koral Beton (maksimum 30 mm) 0.8700 m³ 240,000.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 100,000.00
Tukang Batu 0.2500 OH 130,000.00
Kepala Tukang 0.0250 OH 150,000.00
Mandor 0.0800 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.041 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR
Bahan
Portland Cement (PC) 10.0000 kg 1,340.00
Pasir Beton (PB) 0.0260 m³ 240,000.00
Koral Beton (maksimum 30 mm) 0.0440 m³ 240,000.00
Jumlah (1)
Tenaga
Pekerja 1.1500 OH 100,000.00
Tukang Batu 0.0200 OH 130,000.00
Kepala Tukang 0.0020 OH 150,000.00
Mandor 0.0060 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.042 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58
Bahan
Portland Cement (PC) 371.0000 kg 1,340.00
Pasir Beton (PB) 0.4986 m³ 240,000.00
Koral Beton (maksimum 30 mm) 0.7756 m³ 240,000.00
Air 215.0000 liter 100.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 100,000.00
Tukang Batu 0.2750 OH 130,000.00
Kepala Tukang 0.0280 OH 150,000.00
Mandor 0.0830 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.043 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56
Bahan
Portland Cement (PC) 384.0000 kg 1,340.00
Pasir Beton (PB) 0.4943 m³ 240,000.00
Koral Beton (maksimum 30 mm) 0.7696 m³ 240,000.00
Air 215.0000 liter 100.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 100,000.00
Tukang Batu 0.2750 OH 130,000.00
Kepala Tukang 0.0280 OH 150,000.00
Mandor 0.0830 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A043a 1 M3 COR BETON SITE MIX K 225
Semen PC (50 kg) 7.8960 zak 67,000.00
Split pecah mesin 2/3 0.8100 m³ 240,000.00
Pasir beton 0.4900 m³ 240,000.00
Pekerja 1.5000 org 100,000.00
Kepala tk. batu 0.0500 org 150,000.00
Mandor 0.0100 org 200,000.00
Peralatan 0.0700 lot 1,000,532.00
Jumlah
A.044 1 M3 COR BETON K-175 READY MIX MIN 6 M3 BERIKUT SLANG
Adukan K-175 Readymix 1.0000 m³ 850,000.00
Pekerja 2.5000 OH 100,000.00
Tukang batu setengah terampil 0.2500 OH 130,000.00
Kep. tukang batu 0.1000 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Alat bantu ( Slang + Tes Lab ) 0.0450 lot 1,029,500.00
Jumlah
Jumlah
Dibulatkan
A.045 1 M3 COR BETON K-225 READY MIX MIN 6 M3 BERIKUT SLANG
Adukan K-225 Readymix 1.0000 m³ 900,000.00
Pekerja 2.5000 OH 100,000.00
Tukang batu setengah terampil 0.2500 OH 130,000.00
Kep. tukang batu 0.1000 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Alat bantu ( Slang + Tes Lab ) 0.0450 lot 1,029,500.00
Jumlah
Jumlah
Dibulatkan
A.046 1 M3 COR BETON K-300 READY MIX MIN 6 M3 BERIKUT SLANG
Adukan K-300 Readymix 1.0000 m³ 900,000.00
Pekerja 2.5000 OH 100,000.00
Tukang batu setengah terampil 0.2500 OH 130,000.00
Kep. tukang batu 0.1000 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Alat bantu ( Slang + Tes Lab ) 0.0450 lot 1,199,500.00
Jumlah
A.047 1 KG BESI BETON TERPASANG U - 24
Besi Beton rata - rata 1.0500 kg 7,500.00
Kawat Beton 0.0100 kg 10,800.00
Tk. Besi Beton setengah terampil 0.0250 OH 130,000.00
Tk. Besi Beton terampil 0.0150 OH 60,000.00
Kepala Tukang Besi terampil 0.0100 OH 130,000.00
Mandor 0.0050 OH 200,000.00
Peralatan, Spancer 0.0200 lot 11,133.00
Jumlah
Jumlah
Dibulatkan
A.048 1 KG BESI BETON TERPASANG U - 39
Besi Beton rata - rata 1.0500 kg 7,500.00
Kawat Beton 0.0100 kg 10,800.00
Tk. Besi Beton setengah terampil 0.0360 OH 130,000.00
Tk. Besi Beton terampil 0.0160 OH 60,000.00
Kepala Tukang Besi terampil 0.0110 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Peralatan, Spancer 0.0200 lot 11,133.00
Jumlah
Jumlah
Dibulatkan
A.049 Pembesian 1 kg dengan besi polos atau besi ulir
Bahan
Besi Beton (polos/ulir) 1.0500 kg 8,000.00
Kawat Beton 0.0150 kg 10,800.00
Jumlah (1)
Tenaga
Pekerja 0.0070 OH 100,000.00
Tukang Besi 0.0070 OH 130,000.00
Kepala Tukang 0.0007 OH 150,000.00
Mandor 0.0004 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.050 1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³ 3,400,000.00
Kayu Albasia ( 2 x pakai ) 75 % 0.0240 m³ 1,200,000.00
Paku 0.4000 kg Err:508
Pekerja 0.1200 OH 100,000.00
Tk. Kayu terampil 0.1500 OH 65,000.00
Kepala Tukang Kayu 0.1500 OH 150,000.00
Mandor 0.0500 OH 200,000.00
Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 lot 50,000.00
Jumlah
Jumlah
Dibulatkan
A.051 1 M2 BEKISTING MULTIPLEX 9 MM
Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³ 3,400,000.00
Multiplek 9 mm ( 2 x pakai ) 75% 0.3470 lbr 1,200,000.00
Paku 0.4000 kg 18,000.00
Pekerja 0.1200 OH 100,000.00
Tk. Kayu terampil 0.1500 OH 130,000.00
Kepala Tukang Kayu 0.1500 OH 150,000.00
Mandor 0.0500 OH 200,000.00
Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 50,000.00
Jumlah
Jumlah
Dibulatkan
A.052 1 M2 BEKISTING MULTIPLEX 12 MM
Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³ Err:508
Multiplek 12 mm ( 2 x pakai ) 75% 0.3470 lbr Err:508
Paku 0.4000 kg Err:508
Pekerja 0.1200 OH 100,000.00
Tk. Kayu terampil 0.1500 OH 130,000.00
Kepala Tukang Kayu 0.1500 OH 150,000.00
Mandor 0.0500 OH 200,000.00
Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 50,000.00
Jumlah
Jumlah
Dibulatkan
A.053 1 M2 PASANGAN STOOT WERK
Kayu stoot ( dinding 2 x pakai ) 50% 9.0000 bt Err:508
Kayu Albasia ( 2 x pakai ) 0.0160 m³ 1,200,000.00
Paku 0.5000 kg 100,000.00
Pekerja 0.1500 OH 130,000.00
Tk. Kayu terampil 0.2000 OH 150,000.00
Kepala tukang Kayu 0.2000 OH 200,000.00
Mandor 0.0170 org 50,000.00
Jumlah
A.054 Memasang 10 kg jaring kawat baja /wiremesh
Bahan
Jaring Kawat Baja dilas/wiremesh 10.2000 kg 57,000.00
Kawat Beton 0.0500 kg 10,800.00
Jumlah (1)
Tenaga
Pekerja 0.0250 OH 100,000.00
Tukang Besi 0.0250 OH 130,000.00
Kepala Tukang 0.0250 OH 150,000.00
Mandor 0.0010 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.055 Memasang 1 m² bekisting untuk pondasi
Bahan
Kayu Kelas 2 0.0400 m³ 3,400,000.00
Paku 5 cm - 10 cm 0.3000 kg 12,000.00
Minyak Bekisting 0.1000 liter 3,000.00
Jumlah (1)
Tenaga
Pekerja 0.5200 OH 100,000.00
Tukang Kayu 0.2600 OH 130,000.00
Kepala Tukang 0.0260 OH 150,000.00
Mandor 0.0260 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.056 Memasang 1 m² bekisting untuk sloof
Bahan
Kayu Kelas 2 0.0450 m³ 3,400,000.00
Paku 5 cm - 10 cm 0.3000 kg 12,000.00
Minyak Bekisting 0.1000 liter 3,000.00
Jumlah (1)
Tenaga
Pekerja 0.5200 OH 100,000.00
Tukang Kayu 0.2600 OH 130,000.00
Kepala Tukang 0.0260 OH 150,000.00
Mandor 0.0260 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.057 Memasang 1 m² bekisting untuk kolom
Bahan
Kayu Kelas 2 0.0400 m³ 3,400,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00
Minyak Bekisting 0.2000 liter 3,000.00
Balok Kayu Meranti Batu 5/7 0.0150 m³ 3,400,000.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00
Dolken Ø (8-10) cm 8.0000 m' 18,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 100,000.00
Tukang Kayu 0.3300 OH 130,000.00
Kepala Tukang 0.0330 OH 150,000.00
Mandor 0.0330 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.058 Memasang 1 m² bekisting untuk balok
Bahan
Kayu Kelas 2 0.0400 m³ 3,400,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00
Minyak Bekisting 0.2000 liter 3,000.00
Balok Kayu Meranti Batu 5/7 0.0180 m³ 3,400,000.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00
Dolken Ø (8-10) cm 8.0000 m' 18,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 100,000.00
Tukang Kayu 0.3300 OH 130,000.00
Kepala Tukang 0.0330 OH 150,000.00
Mandor 0.0330 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.059 Memasang 1 m² bekisting untuk lantai
Bahan
Kayu Pinus/Kayu Rawa 0.0400 m³ 3,400,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00
Minyak Bekisting 0.2000 liter 3,000.00
Balok Kayu Meranti Batu 5/7 0.0150 m³ 3,400,000.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00
Dolken Ø (8-10) cm 24.0000 m' 18,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 100,000.00
Tukang Kayu 0.3300 OH 130,000.00
Kepala Tukang 0.0330 OH 150,000.00
Mandor 0.0330 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.060 Memasang 1 m² bekisting untuk tangga
Bahan
Kayu Pinus/Kayu Rawa 0.0300 m³ 3,400,000.00
Paku 5 cm - 12 cm 0.4000 kg 12,000.00
Minyak Bekisting 0.1500 liter 3,000.00
Balok Kayu Meranti Batu 5/7 0.0150 m³ 3,400,000.00
Plywood tebal 9 mm 0.3500 lembar 100,000.00
Dolken Ø (8-10) cm 8.0000 m' 18,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 100,000.00
Tukang Kayu 0.3300 OH 130,000.00
Kepala Tukang 0.0330 OH 150,000.00
Mandor 0.0330 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.061 Memasang 1 m² plat beton "bondex"
Bahan
Bondex 1.0100 m2 130,000.00
Kawat Las 0.1000 kg 35,000.00
Jumlah (1)
Tenaga
Pekerja 0.0500 OH 100,000.00
Tukang Besi 0.0300 OH 130,000.00
Mandor 0.0100 OH 200,000.00
Shear Connector 1.0000 ls 1,200.00
Jumlah (2)
Jumlah (1) + (2)
A.062 Pembesian 1 kg dengan besi beton U-24
Bahan
Besi Beton U-24 1.0500 kg 7,500.00
Kawat Beton 0.0150 kg 10,800.00
Jumlah (1)
Tenaga
Pekerja 0.0400 OH 100,000.00
Tukang Besi 0.0150 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0075 OH 200,000.00
Peralatan, Spancer 0.0200 lot 1,000.00
Jumlah (2)
Jumlah (1) + (2)
A.063 Pembesian 1 kg dengan besi beton U-29
Bahan
Besi Beton U-29 1.0500 kg 7,500.00
Kawat Beton 0.0150 kg 10,800.00
Jumlah (1)
Tenaga
Pekerja 0.0400 OH 100,000.00
Tukang Besi 0.0150 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0075 OH 200,000.00
Peralatan, Spancer 0.0200 lot 1,000.00
Jumlah (2)
Jumlah (1) + (2)
A.064 Memasang 1 m² bekisting dengan papan
Bahan
Kayu Kelas 2 0.0240 m³ 3,400,000.00
Paku 5 cm - 12 cm 0.3000 kg 12,000.00
Minyak Bekisting 0.1000 liter 3,000.00
Balok Kayu Meranti Batu 5/7 0.0240 m³ 3,400,000.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 100,000.00
Tukang Kayu 0.1500 OH 130,000.00
Kepala Tukang 0.1500 OH 150,000.00
Mandor 0.0500 OH 200,000.00
Pekerja (bongkar cetakan) 0.1500 OH 100,000.00
Jumlah (2)
Jumlah (1) + (2)
A.065 Memasang 1 m² Pelat Beton Precast t. 12 cm
Bahan
Pelat Beton Ex. Hebel 1.0500 m2 324,000.00
Jumlah (1)
Tenaga
Upah Angkut 1.0000 m2 12,857.14
Upah Bongkar 1.0000 m2 15,000.00
Upah Pasang 1.0000 m2 35,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN PENUTUP ATAP SNI 03-34
A.066 Memasang 1 m² atap genteng palentong kecil
Bahan
Genteng Palentong 25.0000 bh 1,500.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 100,000.00
Tukang Kayu 0.0750 OH 130,000.00
Kepala Tukang 0.0080 OH 150,000.00
Mandor 0.0080 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.067 Memasang 1 m² rooflight fibreglass (180 x 90) cm
Bahan
Rooflight Fibreglass 0.6000 lbr 63,000.00
Paku Biasa 2" - 5" 0.0500 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.1400 OH 100,000.00
Tukang Kayu 0.0670 OH 130,000.00
Kepala Tukang 0.0070 OH 150,000.00
Mandor 0.0070 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.068 Memasang 1 m² atap genteng pres jatiwangi
Bahan
Genteng Pres Jatiwangi 25.0000 bh 1,700.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 100,000.00
Tukang Kayu 0.0750 OH 130,000.00
Kepala Tukang 0.0080 OH 150,000.00
Mandor 0.0080 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.069 Memasang 1 m' genteng bubung pres jatiwangi
Bahan
Genteng Bubung Jatiwangi 4.0000 bh 3,315.00
Portland Cement (PC) 8.0000 kg 1,340.00
Pasir Pasang 0.0320 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 100,000.00
Tukang Kayu 0.2000 OH 130,000.00
Kepala Tukang 0.0200 OH 150,000.00
Mandor 0.0020 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.070 Memasang 1 m' Pasangan Flasing seng
Bahan
Seng BJLS 30 0.5000 lbr 59,000.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 100,000.00
Tukang Kayu 0.2000 OH 65,000.00
Kepala Tukang 0.0200 OH 150,000.00
Mandor 0.0200 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.071 Memasang 1 m2 Pasangan Genteng Metal
Bahan
Genteng Metal 1.0200 m2 60,000.00
Paku 0.2000 Kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 100,000.00
Tukang Kayu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)

A.072 Memasang 1 m' Pasangan Bubungan Genteng Metal


Bahan
Genteng Metal 1.1000 m2 25,000.00
Paku 0.0500 Kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 100,000.00
Tukang Kayu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
I. PEKERJAAN LANGIT-LANGIT SNI 03-28
A.073 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
Bahan
Gypsum Board 0.3640 lembar 68,500.00
Paku Sekrup 0.1100 kg 20,200.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Kayu 0.0500 OH 130,000.00
Kepala Tukang 0.0050 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.074 Memasang 1 m² langit-langit GRC board uk. (120 x 240) cm, tebal 4 mm
Bahan
GRC Board 0.3640 lembar 68,500.00
Paku Sekrup 0.1100 kg 20,200.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Kayu 0.0500 OH 130,000.00
Kepala Tukang 0.0050 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.075 Memasang 1 m² Rangka langit-langit besi hollo 4x4 & 4x6 cm
Bahan
Hollo 4x4 cm 3.0000 m1 12,000.00
Hollo 4x6 cm 2.0000 m1 14,500.00
Paku Sekrup 0.1100 kg 20,200.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Kayu 0.0500 OH 130,000.00
Kepala Tukang 0.0050 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.076 Memasang 1 m' list kayu profil
Bahan
List Kayu Profil 1.0500 m' 19,000.00
Paku Triplek 0.0100 kg 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.0500 OH 100,000.00
Tukang Kayu 0.0500 OH 130,000.00
Kepala Tukang 0.0050 OH 150,000.00
Mandor 0.0030 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN SANITASI
A.077 Memasang 1 buah kloset duduk/monoblok
Bahan
Kolset Duduk/Monblok 1.0000 bh 306,000.00
Perlengkapan 6% harga kloset 18,360.00
Jumlah (1)
Tenaga
Pekerja 3.3000 OH 100,000.00
Tukang Batu 1.1000 OH 130,000.00
Kepala Tukang 0.0010 OH 150,000.00
Mandor 0.1600 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.078 Memasang 1 buah kloset jongkok porselen
Bahan
Kloset Jongkok Porselen 1.0000 bh 175,000.00
Portland Cement (PC) 6.0000 kg 1,340.00
Pasir Pasang 0.0100 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 100,000.00
Tukang Batu 1.5000 OH 130,000.00
Kepala Tukang 1.5000 OH 150,000.00
Mandor 0.1600 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.079 Memasang 1 buah wastafel
Bahan
Wastafel 1.0000 bh 350,000.00
Perlengkapan 12% harga wastafel 42,000.00
Portland Cement (PC) 6.0000 kg 1,340.00
Pasir Pasang 0.0100 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 1.2000 OH 100,000.00
Tukang Batu 1.4500 OH 130,000.00
Kepala Tukang 0.1500 OH 150,000.00
Mandor 0.1000 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.080 Memasang 1 buah bak mandi fibreglass volume 0,30 m³
Bahan
Bak Fibreglass 1.0000 bh 214,200.00
Perlengkapan 18% harga bak 38,556.00
Jumlah (1)
Tenaga
Pekerja 1.8000 OH 100,000.00
Tukang Batu 2.7000 OH 130,000.00
Kepala Tukang 0.5400 OH 150,000.00
Mandor 0.1100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.081 Memasang 1 buah bak mandi batu bata volume 0,30 m³
Bahan
Bata Merah 5 x 12 x 22 cm 303.0303 bh 750.00
Portland Cement (PC) 120.0000 kg 1,340.00
Pasir Pasang 0.3000 m³ 175,000.00
Keramik Dinding 10x20 cm 4.3560 m² 57,000.00
Semen Nat 6.0000 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 6.0000 OH 100,000.00
Tukang Batu 3.0000 OH 130,000.00
Kepala Tukang 0.3000 OH 150,000.00
Mandor 0.3000 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.082 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm
Bahan
Bata Merah 5 x 12 x 22 cm 109.8485 bh 750.00
Portland Cement (PC) 44.0000 kg 1,340.00
Pasir Pasang 0.0700 m³ 175,000.00
Batu Kerikil 0.0700 m³ 240,000.00
Besi Beton 1.6000 kg 8,000.00
Pasir Beton 0.0600 m³ 175,000.00
Jumlah (1)
Tenaga
Pekerja 3.2000 OH 100,000.00
Tukang Batu 1.0150 OH 130,000.00
Kepala Tukang 0.0015 OH 150,000.00
Mandor 0.0160 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.083 Memasang 1 m' pipa PVC tipe AW Ø ½"
Bahan
Pipa PVC 1.2000 m' 3,375.00
Perlengkapan 35% harga pipa 1,181.25
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 100,000.00
Tukang Batu 0.0600 OH 130,000.00
Kepala Tukang 0.0060 OH 150,000.00
Mandor 0.0018 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.084 Memasang 1 m' pipa PVC tipe AW Ø ¾"
Bahan
Pipa PVC 1.2000 m' 4,475.38
Perlengkapan 35% harga pipa 1,566.38
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 100,000.00
Tukang Batu 0.0600 OH 130,000.00
Kepala Tukang 0.0060 OH 150,000.00
Mandor 0.0018 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.085 Memasang 1 m' pipa PVC tipe AW Ø 1"
Bahan
Pipa PVC 1.2000 m' 5,499.85
Perlengkapan 35% harga pipa 1,924.95
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 100,000.00
Tukang Batu 0.0600 OH 130,000.00
Kepala Tukang 0.0060 OH 150,000.00
Mandor 0.0018 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.086 Memasang 1 m' pipa PVC tipe AW Ø 1½"
Bahan
Pipa PVC 1.2000 m' 13,240.38
Perlengkapan 35% harga pipa 4,634.13
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 100,000.00
Tukang Batu 0.0600 OH 130,000.00
Kepala Tukang 0.0060 OH 150,000.00
Mandor 0.0018 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.087 Memasang 1 m' pipa PVC tipe AW Ø 2"
Bahan
Pipa PVC 1.2000 m' 16,700.23
Perlengkapan 35% harga pipa 5,845.08
Jumlah (1)
Tenaga
Pekerja 0.0540 OH 100,000.00
Tukang Batu 0.0900 OH 130,000.00
Kepala Tukang 0.0090 OH 150,000.00
Mandor 0.0027 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.088 Memasang 1 m' pipa PVC tipe AW Ø 2½"
Bahan
Pipa PVC 1.2000 m' 26,499.77
Perlengkapan 35% harga pipa 9,274.92
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 100,000.00
Tukang Batu 0.0600 OH 130,000.00
Kepala Tukang 0.0060 OH 150,000.00
Mandor 0.0018 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.089 Memasang 1 m' pipa PVC tipe AW Ø 3"
Bahan
Pipa PVC 1.2000 m' 37,299.77
Perlengkapan 35% harga pipa 13,054.92
Jumlah (1)
Tenaga
Pekerja 0.0810 OH 100,000.00
Tukang Batu 0.1350 OH 130,000.00
Kepala Tukang 0.0135 OH 150,000.00
Mandor 0.0041 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.090 Memasang 1 m' pipa PVC tipe AW Ø 4"
Bahan
Pipa PVC 1.2000 m' 55,700.46
Perlengkapan 35% harga pipa 19,495.16
Jumlah (1)
Tenaga
Pekerja 0.0810 OH 100,000.00
Tukang Batu 0.1350 OH 130,000.00
Kepala Tukang 0.0135 OH 150,000.00
Mandor 0.0041 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.091 Memasang 1 buah kran Ø ¾" atau ½"
Bahan
Kran Air 1.0000 bh 33,000.00
Seal Tape 0.0250 bh 2,650.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 100,000.00
Tukang Batu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.092 Memasang 1 buah floordrain
Bahan
Floordrain 1.0000 bh 35,000.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 100,000.00
Tukang Batu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.093 Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor tipe kecil)
Galian Tanah 4.5000 m³ 48,000.00
Urugan Pasir urug 0.2142 m³ 135,200.00
Lantai kerja beton 2.2500 m² 149,300.00
Pas. Batu bata 1 PC : 3 PS + Plesteran 15.0000 m² 126,255.80
Plat beton penutup & balok 0.3375 m³ 5,085,737.99
Pipa PVC 4" jenis AW + sambungan 9.0000 m³ 114,830.72
Pipa PVC AW 1 1/2" 1.2000 m' 33,182.60
Galian tanah untuk rembesan 3.3750 m³ 48,000.00
Pasang Ijuk 5.4000 kg 108,000.00
Urugan kerikil 3-5 cm. 1.0500 m³ 108,000.00
Pipa PVC 4" berlobang jenis AW 5.0000 m' 114,830.72
Urugan kembali perataan tanah 1.1250 m³ 26,666.67
Tambahan upah 0.0920 ls 500,000.00
Jumlah
Dibulatkan
PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-
A.094 Mengerjakan 1 cm pengelasan dengan las listrik
Bahan
Kawat Las Listrik 0.04 kg 35,000.00
Solar 0.0300 ltr 7,100.00
Minyak Pelumas 0.0040 ltr 23,850.00
Jumlah (1)
Tenaga
Pekerja 0.0040 OH 100,000.00
Tukang Besi 0.0020 OH 130,000.00
Kepala Tukang 0.0002 OH 150,000.00
Mandor 0.0002 OH 200,000.00
Sewa Alat 0.0170 Jam 75,000.00
Jumlah (2)
Jumlah (1) + (2)
A.095 Memasang 1 m² pintu alumunium/ PVC
Bahan
Pintu Alumunium/ PVC 1.0000 m² 250,000.00
Jumlah (1)
Tenaga
Pekerja 1.0500 OH 100,000.00
Tukang Besi 1.0500 OH 130,000.00
Kepala Tukang 0.1050 OH 150,000.00
Mandor 0.0052 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.096 Memasang 1 m² terali besi
Bahan
Besi Strip 2 x 3 11.5000 m' 14,000.00
Pengelasan 27.0800 cm 3,713.40
Jumlah (1)
Tenaga
Pekerja 1.6700 OH 100,000.00
Tukang Las 1.6700 OH 130,000.00
Kepala Tukang 0.1670 OH 150,000.00
Mandor 0.0830 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.097 Memasang 1 m' talang datar seng BJLS 28
Bahan
Seng Plat 3' x 6 ' BJLS 28 0.5000 lbr 59,000.00
Paku Biasa ½" - 1" atau sekrup 0.0150 kg 12,000.00
Kayu Kalimantan Papan 0.0190 m³ 3,400,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 100,000.00
Tukang Kayu 0.4000 OH 130,000.00
Kepala Tukang 0.0250 OH 150,000.00
Mandor 0.0100 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN KUNCI DAN KACA
A.098 Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa 1.0000 bh 110,000.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 100,000.00
Tukang Kayu 0.5000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.099 Memasang 1 buah kunci tanam kamar mandi
Bahan
Kunci Tanam Kamar Mandi 1.0000 bh 110,000.00
Jumlah (1)
Tenaga
Pekerja 0.0050 OH 100,000.00
Tukang Kayu 0.5000 OH 130,000.00
Kepala Tukang 0.0050 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.100 Memasang 1 buah engsel pintu
Bahan
Engsel Pintu 1.0000 bh 14,000.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 100,000.00
Tukang Kayu 0.1500 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0008 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.101 Memasang 1 buah engsel jendela kupu-kupu
Bahan
Engsel Jendela Kupu-Kupu 1.0000 bh 12,000.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 100,000.00
Tukang Kayu 0.1000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0005 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.102 Memasang 1 buah kait angin
Bahan
Kait Angin 1.0000 bh 16,000.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 100,000.00
Tukang Kayu 0.1500 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0008 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.103 Memasang 1 buah kunci selot
Bahan
Kunci Selot / Gerendel 1.0000 bh 15,000.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 100,000.00
Tukang Kayu 0.2000 OH 130,000.00
Kepala Tukang 0.0200 OH 150,000.00
Mandor 0.0010 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.104 Memasang 1 buah pegangan pintu / door holder
Bahan
Pegangan Pintu 1.0000 bh 75,000.00
Jumlah (1)
Tenaga
Pekerja 0.0500 OH 100,000.00
Tukang Kayu 0.5000 OH 130,000.00
Kepala Tukang 0.0500 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.105 Memasang 1 buah Espagnolet
Bahan
Espagnolet 1.0000 bh 35,000.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 100,000.00
Tukang Kayu 0.5000 OH 130,000.00
Kepala Tukang 0.0100 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.106 Memasang 1 buah Grendel Jendela
Bahan
Grendel 1.0000 bh 15,000.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 100,000.00
Tukang Kayu 0.2000 OH 130,000.00
Kepala Tukang 0.0200 OH 150,000.00
Mandor 0.0010 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.107 Memasang 1 m² kaca; tebal 3 mm
Bahan
Kaca 1.1000 m² 69,000.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 100,000.00
Tukang Kayu 0.1500 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0008 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.108 Memasang 1 m² kaca; tebal 5 mm
Bahan
Kaca 1.1000 m² 83,000.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 100,000.00
Tukang Kayu 0.1500 OH 130,000.00
Kepala Tukang 0.0150 OH 150,000.00
Mandor 0.0008 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
M. PEKERJAAN PENUTUP LANTAI DAN DINDING SNI-Pt-T
A.109 Memasang 1 m² lantai keramik ukuran 30 x 30 cm
Bahan
Ubin Keramik 30 x 30 cm 1.0000 m² 60,000.00
Portland Cement (PC) 10.0000 kg 1,340.00
Pasir Pasang 0.0450 m³ 175,000.00
Semen Warna 1.5000 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Tukang Batu 0.1200 OH 130,000.00
Kepala Tukang 0.0120 OH 150,000.00
Mandor 0.0130 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.110 Memasang 1 m' plint keramik ukuran 10 x 20 cm
Bahan
Plint Keramik Artistik 5.3000 bh 9,750.00
Portland Cement (PC) 1.1400 kg 1,340.00
Pasir Pasang 0.0030 m³ 175,000.00
Semen Warna 0.0250 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 0.0900 OH 100,000.00
Tukang Batu 0.0900 OH 130,000.00
Kepala Tukang 0.0090 OH 150,000.00
Mandor 0.0050 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
A.111 Memasang 1 m² dinding keramik ukuran 20 x 20 cm
Bahan
Keramik 1.0000 m² 64,000.00
Portland Cement (PC) 9.3000 kg 1,340.00
Pasir Pasang 0.0180 m³ 175,000.00
Semen Warna 1.9400 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 100,000.00
Tukang Batu 0.4500 OH 130,000.00
Kepala Tukang 0.0450 OH 150,000.00
Mandor 0.0300 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.112 1 M2 DINDING KERAMIK 10/20 (20/20) DN BERCORAK
Keramik KW 1 DN bercorak berwarna 1.0100 m² 35,000.00
PC (50 kg) 0.1600 zak 70,000.00
Pasir pasang 0.0300 m³ 200,000.00
Semen warna 0.0130 kg 5,000.00
Jumlah (1)
Tenaga
Pekerja trampil 0.1875 OH 50,000.00
Tk. batu trampil 0.3750 OH 60,000.00
Kep. Tukang batu 0.0750 OH 67,500.00
Mandor 0.0188 OH 70,000.00
Jumlah (1)
Jumlah (1) + (2)
Dibulatkan
A.113 1 M2 LANTAI KERAMIK 20/20 BERCORAK/ANTI SLIP KAMAR MANDI
Keramik KW 1 DN bercorak / anti slip 1.0100 m² 36,000.00
PC (50 kg) 0.2400 zak 70,000.00
Pasir pasang 0.0300 m³ 200,000.00
Semen warna 0.0130 kg 5,000.00
Jumlah (1)
Tenaga
Pekerja trampil 0.1875 OH 50,000.00
Tk. batu trampil 0.3750 OH 60,000.00
Kep. Tukang batu 0.1125 OH 67,500.00
Mandor 0.0282 OH 70,000.00
Jumlah (1)
Jumlah (1) + (2)
Dibulatkan
A.114 1 M2 LANTAI KERAMIK 30/30 DN BERCORAK/BERWARNA
Keramik KW 1 DN bercorak berwarna 1.0100 m² 35,000.00
PC (50 kg) 0.1600 zak 70,000.00
Pasir pasang 0.0300 m³ 200,000.00
Semen warna 0.0130 kg 5,000.00
Jumlah (1)
Tenaga
Pekerja trampil 0.1875 OH 50,000.00
Tk. batu trampil 0.3750 OH 60,000.00
Kep. Tukang batu 0.0750 OH 67,500.00
Mandor 0.0188 OH 70,000.00
Jumlah (1)
Jumlah (1) + (2)
Dibulatkan
A.115 Memasang 1 m² lantai keramik ukuran 40 x 40 cm
Bahan
Ubin Keramik Motif 40 x 40 cm 1.0000 m² 70,000.00
Portland Cement (PC) 9.8000 kg 1,340.00
Pasir Pasang 0.0450 m³ 175,000.00
Semen Warna 1.3000 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Tukang Batu 0.1200 OH 130,000.00
Kepala Tukang 0.0120 OH 150,000.00
Mandor 0.0130 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah (1) + (2)
Dibulatkan
A.116 Memasang 1 m² lantai keramik ukuran 40 x 40 cm
Bahan
Ubin Keramik Motif 30 x 30 cm 1.0000 m² 65,000.00
Portland Cement (PC) 9.8000 kg 1,340.00
Pasir Pasang 0.0450 m³ 175,000.00
Semen Warna 1.3000 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Tukang Batu 0.1200 OH 130,000.00
Kepala Tukang 0.0120 OH 150,000.00
Mandor 0.0130 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.117 Memasang 1 m² dinding keramik ukuran 30 x 60 cm
Bahan
Ubin Keramik Motif 30 x 60 cm 1.0000 m² 70,000.00
Portland Cement (PC) 9.8000 kg 1,340.00
Pasir Pasang 0.0450 m³ 175,000.00
Semen Warna 1.3000 kg 3,500.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Tukang Batu 0.1200 OH 130,000.00
Kepala Tukang 0.0120 OH 150,000.00
Mandor 0.0130 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
PEKERJAAN PENGECATAN
A.118 Mendempul dan Menggosok 1 m² kayu
Bahan
Dempul Jadi 0.0800 kg 34,000.00
Minyak Cat 0.0200 kg 13,000.00
Batu Apung 0.0100 kg 16,000.00
Jumlah (1)
Tenaga
Pekerja 0.0400 OH 100,000.00
Tukang Cat 0.0400 OH 130,000.00
Kepala Tukang 0.0040 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.119 Mengecat 1 m² bidang kayu lama
Bahan
Plamir 0.1500 kg 15,000.00
Cat Dasar 0.1700 kg 34,000.00
Cat Penutup 0.1700 kg 49,000.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 100,000.00
Tukang Cat 0.0750 OH 130,000.00
Kepala Tukang 0.0075 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.120 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni 0.2000 kg 34,000.00
Plamir 0.1500 kg 15,000.00
Cat Dasar 0.1700 kg 34,000.00
Cat Penutup 0.2600 kg 49,000.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 100,000.00
Tukang Cat 0.0090 OH 130,000.00
Kepala Tukang 0.0060 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.121 Melabur 1 m² bidang kayu dengan politur
Bahan
Politur 0.2000 kg 35,000.00
Politur Jadi 0.1500 kg 45,000.00
Ampelas 2.0000 lbr 4,000.00
Jumlah (1)
Tenaga
Tukang Cat 0.0600 OH 130,000.00
Kepala Tukang 0.0160 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.122 Melabur 1 m² bidang kayu dengan cat residu
Bahan
Residu 0.3500 ltr 5,000.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 100,000.00
Tukang Cat 0.0000 OH 130,000.00
Kepala Tukang 0.0000 OH 150,000.00
Mandor 0.0060 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.123 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) Interior
Bahan
Plamir 0.1000 kg 16,000.00
Cat Dasar 0.1000 kg 26,000.00
Cat Penutup 0.2600 kg 34,400.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 100,000.00
Tukang Cat 0.0630 OH 130,000.00
Kepala Tukang 0.0063 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.124 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) Eksterior
Bahan
Plamir 0.1000 kg 16,000.00
Cat Dasar 0.1000 kg 26,000.00
Cat Penutup 0.2600 kg 39,000.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 100,000.00
Tukang Cat 0.0630 OH 130,000.00
Kepala Tukang 0.0063 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.125 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Dasar 0.1200 kg 26,000.00
Cat Penutup 0.1800 kg 26,000.00
Jumlah (1)
Tenaga
Pekerja 0.0280 OH 100,000.00
Tukang Cat 0.0420 OH 130,000.00
Kepala Tukang 0.0042 OH 150,000.00
Mandor 0.0025 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
PEKERJAAN PAVING, JALAN DAN LAIN-LAIN
A.126 Memasang 1 m² paving block warna segi empat; tebal 8 cm
Bahan
Paving Segi Empat Warna; tebal 8 cm 1.0100 m² 66,000.00
Pasir Urug 0.1000 m³ 86,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Tukang Batu 0.5000 OH 130,000.00
Kepala Tukang 0.0500 OH 150,000.00
Mandor 0.0250 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.127 Memasang 1 m² paving block warna segi enam; tebal 8 cm
Bahan
Paving Segi Enam Warna; tebal 8 cm 1.0100 m² 66,000.00
Pasir Urug 0.1000 m³ 86,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 100,000.00
Tukang Batu 0.5000 OH 130,000.00
Kepala Tukang 0.0500 OH 150,000.00
Mandor 0.0250 OH 200,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.128 Mengerjakan 1 m' saluran grefel beton 1/2 20 cm + pasangan
Bahan
Galian Tanah (B.001) 0.1500 m³ 48,000.00
Grefel Beton Ø 20 cm 1.0000 bh 47,500.00
Pas. Bata + Plesteran 1:3 (D.010 + E. 002) 0.5000 m² 184,450.64
Upah Kerja 0.1500 ls 7,500.00
Jumlah
Dibulatkan
A.129 Mengerjakan 1 m' saluran grefel beton 1/2 30 cm + pasangan
Bahan
Galian Tanah (B.001) 0.1500 m³ 48,000.00
Grefel Beton Ø 30 cm 1.0000 bh 65,500.00
Pas. Bata + Plesteran 1:3 (D.010 + E. 002) 0.5000 m² 184,450.64
Upah Kerja 0.1500 ls 7,500.00
Jumlah
Dibulatkan
A.130 Mengerjakan 1 Titik Pas. Titik Lampu/Daya
Bahan
Kabel NYM (3 x 2,5) 8.2440 m1 6,500.00
Solatif Kabel 0.3330 rol 10,000.00
Pipa Kabel 1.5000 m1 4,500.00
T.Dus 1.0000 bh 1,500.00
Inbouw - dus 1.0000 bh 2,000.00
Jumlah (1)
Tenaga
Upah Kerja 1.0000 ls 55,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
P. PEKERJAAN PERABOT/MEBEULAIR
A.131 Mengerjakan 1 bh Meja Siswa
Bahan
Kayu Kelas 1 uk. 4/6 0.0095 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.0210 m3 3,400,000.00
N.001 Mendempul bidang kayu 1.2938 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 1.2938 m2 32,450.00
Paku 0.0450 kg 12,000.00
Lem kayu 0.0450 kg 22,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 164,588.29
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.132 Mengerjakan 1 bh Kursi Siswa
Bahan
Kayu Kelas 1 uk. 4/6 0.0087 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.0082 m3 3,400,000.00
N.001 Mendempul bidang kayu 1.1341 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 1.1341 m2 32,450.00
Paku 0.0305 kg 12,000.00
Lem kayu 0.0305 kg 22,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 110,493.19
Jumlah (2)
Jumlah (1) + (2)

A.133 Mengerjakan 1 bh Meja Guru


Bahan
Kayu Kelas 1 uk. 4/6 0.0077 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.0257 m3 3,400,000.00
N.001 Mendempul bidang kayu 1.3338 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 1.3338 m2 32,450.00
L.004 Engsel 0.5500 bh 27,600.00
Paku 0.0550 kg 12,000.00
Lem kayu 0.0550 kg 22,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 191,521.69
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.134 Mengerjakan 1 bh Kursi Guru
Bahan
Kayu Kelas 1 uk. 4/6 0.0086 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.0090 m3 3,400,000.00
N.001 Mendempul bidang kayu 1.1628 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 1.1628 m2 32,450.00
Paku 0.0300 kg 12,000.00
Lem kayu 0.0300 kg 22,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 114,063.13
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.135 Mengerjakan 1 bh Papan Tulis Hitam 1.20 x 2.40 m
Bahan
Kayu Kelas 1 uk. 4/4 0.0127 m3 3,400,000.00
Plywood t. 9 mm 1.0000 lbr 100,000.00
N.001 Mendempul bidang kayu 4.1472 m2 13,440.00
N.004 Melabur bidang kayu dengan cat 4.1472 m2 32,450.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 338,199.81
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.136 Mengerjakan 1 bh Lemari Penyimpan Uk. 90x50x180
Bahan
Kayu Kelas 1 uk. 5/7 0.0441 m3 3,400,000.00
Kayu Kelas 1 uk. 4/6 0.0634 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.1224 m3 3,400,000.00
Plywood t. 18 mm 1.6200 m2 76,388.89
I.004 List kayu 4x4 4.0000 m1 32,920.00
N.001 Mendempul bidang kayu 7.5600 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 7.5600 m2 32,450.00
L.004 Engsel 2.0000 bh 27,600.00
Handle Lemari 2.0000 bh 5,000.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 1,453,882.40
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.137 Mengerjakan 1 bh Meja Kerja/Konter
Bahan
Kayu Kelas 1 uk. 4/6 0.0235 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.0720 m3 3,400,000.00
Plywood t. 18 mm 1.8100 m2 76,388.89
N.001 Mendempul bidang kayu 5.1900 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 5.1900 m2 32,450.00
L.004 Engsel 1.0000 bh 27,600.00
Handle Lemari 1.0000 bh 5,000.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 738,600.99
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.138 Mengerjakan 1 bh Meja Baca
Bahan
Kayu Kelas 1 uk. 4/6 0.0242 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.0114 m3 3,400,000.00
Plywood t. 18 mm 0.8800 m2 76,388.89
N.001 Mendempul bidang kayu 2.7750 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 2.7750 m2 32,450.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 319,142.97
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.139 Mengerjakan 1 bh Rak Penitipan Barang Uk. 40x120x180
Bahan
Kayu Kelas 1 uk. 4/6 0.0288 m3 3,400,000.00
Papan Kelas 1 uk. 2/30 0.0672 m3 3,400,000.00
Papan Kelas 1 uk. t. 5 cm, untuk alas lemari 0.0240 m3 3,400,000.00
Plywood t. 9 mm 2.1600 m2 34,722.22
I.004 List kayu 4x4 3.0000 m1 32,920.00
N.001 Mendempul bidang kayu 6.2000 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 6.2000 m2 32,450.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 871,078.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.140 Mengerjakan 1 bh Rak Majalah satu muka Uk. 40x120x180
Bahan
Kayu Kelas 1 uk. 4/6 0.0413 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.1044 m3 3,400,000.00
Papan Kelas 1 uk. t. 5 cm, untuk alas lemari 0.0240 m3 3,400,000.00
Plywood t. 9 mm 2.1600 m2 34,722.22
I.004 List kayu 4x4 4.8000 m1 32,920.00
N.001 Mendempul bidang kayu 7.6894 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 7.6894 m2 32,450.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 1,167,595.88
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.141 Mengerjakan 1 bh Rak Buku dua muka Uk. 2 x 40x120x180
Bahan
Kayu Kelas 1 uk. 4/6 0.0619 m3 3,400,000.00
Papan Kelas 1 uk. 3/30 0.1044 m3 3,400,000.00
Papan Kelas 1 uk. t. 5 cm, untuk alas lemari 0.0360 m3 3,400,000.00
I.004 List kayu 4x4 7.2000 m1 32,920.00
N.001 Mendempul bidang kayu 11.5341 m2 13,440.00
N.004 Melabur bidang kayu dengan Politur/Vernis 11.5341 m2 32,450.00
Paku 0.1000 kg 12,000.00
Lem kayu 0.1000 kg 22,000.00
Besi Strip ( tebal 5 mm, lebar 5 Cm ) 0.1000 kg 14,000.00
Jumlah (1)
Tenaga
Upah Kerja & Peralatan bantu 0.2000 lot 1,459,013.82
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
A.142 10 KG BESI BETON TERPASANG POLOS/ULIR
Besi beton polos/ulir 10.5000 kg 8,000.00
Kawat beton 0.1500 kg 10,800.00
Pekerja 0.0700 HO 100,000.00
Tukang Besi 0.0700 HO 130,000.00
Kepala Tukang Besi 0.0070 HO 130,000.00
Mandor 0.0040 HO 200,000.00
Jumlah
Dibulatkan
1KG BESI BETON TERPASANG POLOS/ULIR
A.143 1 M3 Pek. Beton kolom Praktis 12 x 15, 4 dia 10, dia 6 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 24 181.778 kg 11,355.66
bekisting dg papan 33.333 m2 80,650.00
Jumlah
Dibulatkan
A.144 1 M3 Pek. Beton Sloof 15 x 20, 4 dia 12, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 24 180.889 kg 11,355.66
bekisting dg papan 13.333 m2 80,650.00
Jumlah
Dibulatkan
A.145 1 M3 Pek. Beton kolom 25 x 30, 8 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 168.533 kg 14,313.15
besi u 24 39.111 kg 11,355.66
bekisting dg papan 14.667 m2 80,650.00
Jumlah
Dibulatkan
A.146 1 M3 Pek. Beton kolom 25 x 25, 8 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 202.240 kg 14,313.15
besi u 24 42.667 kg 11,355.66
bekisting dg papan 16.000 m2 80,650.00
Jumlah
Dibulatkan
A.147 1 M3 Pek. Beton Sloof 20 x 30, 6 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 158.000 kg 14,313.15
besi u 24 44.444 kg 11,355.66
bekisting dg papan 10.000 m2 80,650.00
Jumlah
Dibulatkan
A.148 1 M3 Pek. Beton Kolom 30 x 40, 10 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 131.667 kg 14,313.15
besi u 24 31.111 kg 11,355.66
bekisting dg papan 12.500 m2 80,650.00
Jumlah
Dibulatkan
A.149 1 M3 Pek. Fond setempat 100 x 100 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 164.320 kg 14,313.15
bekisting dg papan 5.600 m2 80,650.00
Jumlah

A.140 1 M3 Pek. Pelat Lantai 12 cm tul dia 8 - 15, 2 lapis


beton site mix K-225 1.050 m3 981,008.10
besi u 24 88.889 kg 11,355.66
Stoot Werk 8.333 m2 134,202.00
bekisting dg papan 8.333 m2 80,650.00
Jumlah
Dibulatkan
A.141 1 M3 Pek. Balok 30 x 65
beton site mix K-225 1.050 m3 981,008.10
besi u 39 122.791 kg 14,313.15
besi u 24 25.983 kg 11,355.66
Stoot Werk 1.538 m2 134,202.00
bekisting dg papan 8.205 m2 80,650.00
Jumlah
Dibulatkan
A.142 1 M3 Pek. Balok 25 x 40
beton site mix K-225 1.050 m3 981,008.10
besi u 39 116.723 kg 14,313.15
besi u 24 36.111 kg 11,355.66
Stoot Werk 2.604 m2 134,202.00
bekisting dg papan 10.938 m2 80,650.00
Jumlah
Dibulatkan
A.143 1 M3 Pek. Balok 20 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 133.563 kg 14,313.15
besi u 24 44.444 kg 11,355.66
Stoot Werk 3.333 m2 134,202.00
bekisting dg papan 13.333 m2 80,650.00
Jumlah
Dibulatkan
A.144 1 M3 Pek. Balok 15 x 30
beton site mix K-225 1.050 m3 981,008.10
besi u 39 177.452 kg 14,313.15
besi u 24 53.333 kg 11,355.66
Stoot Werk 3.333 m2 134,202.00
bekisting dg papan 16.667 m2 80,650.00
Jumlah
Dibulatkan
A.144 1 M3 Pek. Balok 15 x 20
beton site mix K-225 1.050 m3 981,008.10
besi u 24 211.268 kg 11,355.66
bekisting dg papan 18.333 m2 80,650.00
Jumlah
Dibulatkan
A.145 1 M3 Pek. Pelat Lantai 10 cm tul dia 8 - 20, 2 lapis
beton site mix K-225 1.050 m3 981,008.10
besi u 24 80.000 kg 11,355.66
Stoot Werk 11.000 m2 134,202.00
bekisting dg papan 11.000 m2 80,650.00
Jumlah
Dibulatkan
A.146 1 M3 Pek. Pelat Tangga Tul. Ø 12 - 15 dan Ø 8 - 20
beton site mix K-225 1.050 m3 981,008.10
besi u 24 132.222 kg 11,355.66
bekisting dg papan 12.107 m2 80,650.00
Stoot Werk 6.742 m2 134,202.00
Jumlah
Dibulatkan
A.147 1 M3 Pek. Pelat Luivel 8 cm Tul. Ø 6 - 15
beton site mix K-225 1.050 m3 981,008.10
besi u 24 73.333 kg 11,355.66
bekisting dg papan 12.500 m2 80,650.00
Jumlah
Dibulatkan
A.148 1 M3 Pek. Beton kolom 20 x 20, 4 dia 16, dia 8 - 10
beton site mix K-225 1.050 m3 981,008.10
besi u 39 158.000 kg 14,313.15
besi u 24 53.333 kg 11,355.66
bekisting dg papan 20.000 m2 80,650.00
Jumlah
Dibulatkan
A.149 1 m2 Pasang kaca polos tebal 5 mm
Kaca tebal 5 mm, Polos 1.1000 m2 65,000.00
Pekerja Setengah Terampil 0.0150 OH 45,000.00
Tukang kayu Setengah Terampil 0.1500 OH 50,000.00
Kepala tukang kayu 0.0150 OH 80,000.00
Mandor 0.0008 OH 56,000.00
Jumlah
Dibulatkan
A.150 1 Buah pasang engsel pintu.
Engsel pintu 1.0000 bh 12,500.00
Pekerja Setengah Terampil 0.0150 OH 45,000.00
Tukang kayu Setengah Terampil 0.1500 OH 50,000.00
Kepala tukang kayu 0.0150 OH 80,000.00
Mandor 0.0008 OH 56,000.00
Jumlah
Dibulatkan
A.151 1 Buah pasang engsel jendela kupu - kupu.
Engsel jendela 1.0000 bh 10,000.00
Pekerja Setengah Terampil 0.0100 OH 45,000.00
Tukang kayu Setengah Terampil 0.1000 OH 50,000.00
Kepala tukang kayu 0.0100 OH 80,000.00
Mandor 0.0005 OH 56,000.00
Jumlah
Dibulatkan
A.152 1 Buah pasang Grendel Jendela (spring knip)
Spring knip 1.0000 bh 8,500.00
Pekerja Setengah Terampil 0.0150 OH 45,000.00
Tukang kayu Setengah Terampil 0.1500 OH 50,000.00
Kepala tukang kayu 0.0150 OH 80,000.00
Mandor 0.0008 OH 56,000.00
Jumlah
Dibulatkan
A.153 1 Buah pasang kait angin.
Hak angin kait biasa 1.0000 bh 12,500.00
Pekerja Setengah Terampil 0.0150 OH 45,000.00
Tukang kayu Setengah Terampil 0.1500 OH 50,000.00
Kepala tukang kayu 0.0150 OH 80,000.00
Mandor 0.0008 OH 56,000.00
Jumlah
Dibulatkan
A.154 1 m' Pasang list langit-langit kayu 4 cm.
List kayu 4 cm 1.1000 m' 12,000.00
Paku uk. 1 - 3 cm 0.0100 kg 20,000.00
Pekerja Setengah Terampil 0.0500 OH 45,000.00
Tukang kayu Setengah Terampil 0.0500 OH 50,000.00
Kepala tukang kayu 0.0050 OH 80,000.00
Mandor 0.0030 OH 56,000.00
Jumlah
Dibulatkan
A.155 Pasangan 1 Buah Kloset Jongkok
Kloset Jongkok 1.0000 bh 145,000.00
Batu Bata 15.0000 bh 750.00
Semen 5.5000 kg 1,400.00
Pasir Pasang 0.0090 m3 200,000.00
Pekerja 1.0000 OH 45,000.00
Tukang batu Terampil 1.0000 OH 60,000.00
Kepala tukang batu 0.1000 OH 75,000.00
Mandor 0.0500 OH 56,000.00
Jumlah
Dibulatkan
A.156 Pasangan 1 Buah Bak Mandi Fibre
Bak Mandi Fibre 60 x 60 1.0000 bh 150,000.00
Batu Bata 35.0000 bh 750.00
Semen 10.0000 kg 1,400.00
Pasir Pasang 0.0230 m3 200,000.00
Pekerja 1.0000 OH 45,000.00
Tukang batu Terampil 0.5000 OH 60,000.00
Kepala tukang batu 0.0500 OH 75,000.00
Mandor 0.0500 OH 56,000.00
Jumlah
Dibulatkan
A.157 Memasang 1 buah floor drain.
Floor drain 1.0000 bh 30,000.00
Pekerja Setengah Terampil 0.0100 OH 45,000.00
Tukang batu setengah terampil 0.1000 OH 45,000.00
Kepala tukang batu 0.0100 OH 75,000.00
Mandor 0.0050 OH 56,000.00
Jumlah
Dibulatkan
A.158 Memasang 1 buah kran air, Ø ½" atau Ø ¾"
Kran air 1.0000 bh 50,000.00
Seal tape 0.0250 bh 2,000.00
Pekerja Setengah Terampil 0.0100 OH 45,000.00
Tukang batu setengah terampil 0.1000 OH 45,000.00
Kepala tukang batu 0.0100 OH 75,000.00
Mandor 0.0050 OH 56,000.00
Jumlah
Dibulatkan
A.159 1 m' Pasang talang datar, seng BJLS 25
Seng plat 7,5 cm x 15 cm, bjls. 25 0.5000 Lbr 42,000.00
Paku uk. 1 - 3 cm 0.0150 kg 20,000.00
Kayu borneo Super, papan 0.0096 m3 3,800,000.00
Flintcoat / meni besi 0.2500 kg 18,000.00
Pekerja Terampil 0.1500 OH 50,000.00
Tukang kayu Setengah Terampil 0.4000 OH 50,000.00
Kepala tukang kayu 0.0250 OH 80,000.00
Mandor 0.0013 OH 56,000.00
Jumlah
Dibulatkan
A.160 1 M2 PARTISI Gypsum 9 MM
Gypsum 9 mm 0.6944 lbr 65,000.00
Kaso-kaso 5/7 Borneo super 0.0140 m³ 3,400,000.00
Kayu 5/10 Borneo super 0.0035 m³ 3,400,000.00
Paku 0.2200 kg 17,000.00
Pekerja setengah terampil 0.2800 OH 45,000.00
Tk. kayu terampil 0.4000 OH 65,000.00
Kep. tukang kayu 0.0800 OH 80,000.00
Mandor 0.0140 OH 56,000.00
Jumlah
Dibulatkan
A.161 1 m2 water profing dak beton
Pekerja 0.5643 OH 45,000.00
Tk Batu 0.304 OH 60,000.00
Kepala Tukang batu 0.4 OH 75,000.00
Mandor 0.026 OH 56,000.00
wate prof. coating' 1.02 m2 13,750.00
Jumlah
Dibulatkan
A.162 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI
Pekerja 0.0010 OH 100,000.00
Tukang besi propil 0.0010 OH 130,000.00
Kepala tukang besi propil 0.0002 OH 150,000.00
Mandor 0.0001 OH 200,000.00
Oprator alat besar 0.0002 OH 78,000.00
Pembanto oprator 0.0200 OH 100,000.00
Sewa alat 0.0002 ls 17,000.00
Bahan bakar solar 0.0100 lt 4,300.00
Pelumas 0.0010 lt 25,000.00
Alat bantu 0.0002 ls 1,141.60
Jumlah
Dibulatkan
A.163 1 KG PEK. BAJA IWF ex DN
Besi baja IWF ex DN SNI 1.1500 kg 11,800.00
Pekerja 0.0600 OH 100,000.00
Tukang besi propil/Tukang las 0.0600 OH 130,000.00
Kepala tukang besi propil 0.0060 OH 150,000.00
Mandor 0.0030 OH 200,000.00
Jumlah
Dibulatkan
A.164 1 KG PEK. KONST. BESI SIKU/PROFIL ex DN
Besi baja IWF ex DN SNI 1.1500 kg 9,500.00
Pekerja 0.0600 OH 100,000.00
Tukang besi propil/Tukang las 0.0600 OH 130,000.00
Kepala tukang besi propil 0.0060 OH 150,000.00
Mandor 0.0030 OH 200,000.00
Jumlah
Dibulatkan
A.165 10 KG PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4MM
Kawat las listrik 0.4000 kg 20,000.00
Bahan bakar solar 0.3000 lt 4,300.00
Pelumas 0.0400 lt 25,000.00
Pekerja 0.0400 OH 100,000.00
Tukang besi propil/Tukang las 0.0200 OH 130,000.00
Kepala tukang besi propil 0.0020 OH 150,000.00
Mandor 0.0020 OH 200,000.00
Sewa alat (Mesin las listrik) 0.1700 Jam 22,500.00
Jumlah
Dibulatkan
A.166 1TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR
Pekerja 0.0500 OH 100,000.00
Tukang besi propil/Tukang las 0.0200 OH 130,000.00
Kepala tukang besi propil 0.0030 OH 150,000.00
Mandor 0.0010 OH 200,000.00
Alat bantu 0.2500 lot 3,366.00
Jumlah
Dibulatkan
A.167 1 M² PEKERJAAN BONDEX
Bondex 0.0100 m² 113,000.00
Kawat las 0.1000 kg 20,000.00
Pekerja terampil 0.0500 OH 100,000.00
Tukang besi propil 0.0300 OH 130,000.00
Mandor 0.0100 OH 200,000.00
Shear Connector 1.0000 ls 9,366.00
Jumlah
Dibulatkan
A.168 1 M² PEKERJAAN WIREMESH M8
Wiremesh M8 1.0100 m² 66,000.00
Kawat las 0.1000 OH 20,000.00
Pekerja 0.1000 OH 100,000.00
Tukang besi propil 0.0750 OH 130,000.00
Mandor 0.0100 OH 200,000.00
Jumlah
Dibulatkan
A.169 1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³ 3,400,000.00
Kayu Albasia ( 2 x pakai ) 75 % 0.0240 m³ 500,000.00
Paku 0.4000 kg 12,000.00
Pekerja 0.1200 org 100,000.00
Tk. Kayu terampil 0.1500 org 130,000.00
Kepala Tukang Kayu 0.1500 org 150,000.00
Mandor 0.0500 org 200,000.00
Jumlah
Jumlah
Dibulatkan
A.170 1 M2 BEKISTING MULTIPLEX 9 MM
Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³ 3,400,000.00
Multiplek 9 mm ( 2 x pakai ) 75% 0.3470 lbr 100,000.00
Paku 0.4000 kg 12,000.00
Pekerja 0.1200 org 100,000.00
Tk. Kayu terampil 0.1500 org 130,000.00
Kepala Tukang Kayu 0.1500 org 150,000.00
Mandor 0.0500 org 200,000.00
Jumlah
Dibulatkan
A.171 1 M2 BEKISTING MULTIPLEX 12 MM
Kaso 5/7 borneo sp ( 2 x pakai ) 50% 0.0170 m³ 3,400,000.00
Multiplek 12 mm ( 2 x pakai ) 75% 0.3470 lbr 140,000.00
Paku 0.4000 kg 12,000.00
Pekerja 0.1200 org 100,000.00
Tk. Kayu terampil 0.1500 org 130,000.00
Kepala Tukang Kayu 0.1500 org 150,000.00
Mandor 0.0500 org 200,000.00
Jumlah
Dibulatkan
A.172 1 M2 PASANGAN STOOT WERK
Kayu stoot ( dinding 2 x pakai ) 50% 9.0000 bt 25,000.00
Kayu Albasia ( 2 x pakai ) 0.0160 m³ 500,000.00
Paku 0.5000 kg 12,000.00
Pekerja 0.1500 org 100,000.00
Tk. Kayu terampil 0.2000 org 130,000.00
Kepala tukang Kayu 0.2000 org 150,000.00
Mandor 0.0170 org 200,000.00
Jumlah
Dibulatkan
JAAN

JUMLAH
Rp.
6=(3x5)
03-2835-2002

34,000.00
180.00
9,600.00
43,780.00

10,000.00
13,000.00
1,500.00
1,000.00
25,500.00
69,280.00
55,440.00

900.00
560.00
1,460.00
1,460.00

30,000.00
20,000.00
50,000.00
50,000.00
50,000.00

10,000.00
3,250.00
375.00
1,000.00
14,625.00
6,750.00

20,000.00
6,500.00
750.00
2,000.00
29,250.00
13,832.00

400,000.00
780,000.00
90,000.00
40,000.00
1,310,000.00
1,310,000.00
1,310,000.00
400,000.00
390,000.00
40,000.00
830,000.00
830,000.00
830,000.00

10,000.00
32,500.00
375.00
1,000.00
43,875.00
43,875.00
43,870.00

12,500.00
1,000.00
13,500.00

10,000.00
10,000.00
20,000.00
20,000.00

666,700.00
66,600.00
733,300.00

560,000.00
6,600.00
566,600.00

2,000.00
1,300.00
500.00
3,800.00
SNI

52,600.00
10,520.00
63,120.00

62,500.00
12,500.00
75,000.00

25,000.00
1,666.67
26,666.67

50,000.00
10,000.00
60,000.00

103,200.00
103,200.00

30,000.00
2,000.00
32,000.00
135,200.00

78,000.00
78,000.00

25,000.00
5,000.00
30,000.00
108,000.00

SNI 03-2837-2002

52,500.00
19,255.80
7,000.00
78,755.80

30,000.00
13,000.00
1,500.00
3,000.00
47,500.00
126,255.80

52,500.00
12,971.20
7,875.00
73,346.20

30,000.00
13,000.00
1,500.00
3,000.00
47,500.00
120,846.20
PP

105,000.00
18,760.00
5,600.00
129,360.00

30,000.00
13,000.00
1,500.00
3,000.00
47,500.00
176,860.00
SNI 03-2837-2002

10,419.84
4,025.00
14,444.84

20,000.00
19,500.00
2,250.00
2,000.00
43,750.00
58,194.84

6,946.56
4,550.00
11,496.56

20,000.00
19,500.00
2,250.00
2,000.00
43,750.00
55,246.56

9,473.80
3,675.00
13,148.80

26,000.00
26,000.00
3,000.00
2,600.00
57,600.00
70,748.80

8,495.60
2,100.00
10,595.60

30,000.00
18,200.00
2,100.00
3,000.00
53,300.00
63,895.60

4,355.00
4,355.00

15,000.00
13,000.00
1,500.00
1,600.00
31,100.00
35,455.00
SNI 03-3434-2002

4,080,000.00
15,000.00
22,000.00
4,117,000.00

600,000.00
2,340,000.00
300,000.00
60,000.00
3,300,000.00
7,417,000.00

136,000.00
11,000.00
147,000.00

100,000.00
325,000.00
37,500.00
10,000.00
472,500.00
619,500.00

81,600.00
6,600.00
88,200.00

80,000.00
260,000.00
30,000.00
8,000.00
378,000.00
466,200.00

217,600.00
11,000.00
228,600.00

100,000.00
390,000.00
45,000.00
10,000.00
545,000.00
773,600.00
204,000.00
1,800.00
205,800.00

50,000.00
260,000.00
30,000.00
5,000.00
345,000.00
550,800.00

3,740,000.00
210,000.00
67,200.00
4,017,200.00

400,000.00
1,560,000.00
180,000.00
40,000.00
2,180,000.00
6,197,200.00

3,740,000.00
210,000.00
36,000.00
3,986,000.00

240,000.00
936,000.00
108,000.00
24,000.00
1,308,000.00
5,294,000.00

40,800.00
12,240.00
3,000.00
56,040.00

10,000.00
13,000.00
1,500.00
1,000.00
25,500.00
81,540.00

55,420.00
3,000.00
58,420.00

20,000.00
39,000.00
4,500.00
2,000.00
65,500.00
123,920.00

37,400.00
600.00
38,000.00

10,000.00
26,000.00
3,750.00
1,000.00
40,750.00
78,750.00

19,950.00
19,950.00

2,100.00
2,730.00
300.00
200.00
5,330.00
25,280.00

14,960.00
120.00
15,080.00

7,000.00
26,000.00
3,000.00
800.00
36,800.00
51,880.00
RSNI-T-13-2002

292,120.00
124,800.00
208,800.00
625,720.00

165,000.00
32,500.00
3,750.00
16,000.00
217,250.00
842,970.00

13,400.00
6,240.00
10,560.00
30,200.00

115,000.00
2,600.00
300.00
1,200.00
119,100.00
149,300.00

497,140.00
119,657.14
186,133.33
21,500.00
824,430.48

165,000.00
35,750.00
4,200.00
16,600.00
221,550.00
1,045,980.48

514,560.00
118,628.57
184,711.11
21,500.00
839,399.68

165,000.00
35,750.00
4,200.00
16,600.00
221,550.00
1,060,949.68

529,032.00
194,400.00
117,600.00
150,000.00
7,500.00
2,000.00
70,037.24
1,070,569.24

850,000.00
250,000.00
32,500.00
15,000.00
2,000.00
46,327.50
1,195,827.50
1,195,827.50
1,195,820.00

900,000.00
250,000.00
32,500.00
15,000.00
2,000.00
46,327.50
1,245,827.50
1,245,827.50
1,245,820.00

900,000.00
250,000.00
32,500.00
15,000.00
2,000.00
53,977.50
1,253,477.50

7,875.00
108.00
3,250.00
900.00
1,300.00
1,000.00
222.66
14,655.66
14,655.66
14,650.00

7,875.00
108.00
4,680.00
960.00
1,650.00
1,000.00
222.66
16,495.66
16,495.66
16,490.00

8,400.00
162.00
8,562.00

700.00
910.00
105.00
80.00
1,795.00
10,357.00

28,900.00
21,600.00
Err:508
12,000.00
9,750.00
22,500.00
10,000.00
6,000.00
117,950.00
117,950.00
117,950.00

28,900.00
312,300.00
7,200.00
12,000.00
19,500.00
22,500.00
10,000.00
6,000.00
418,400.00
418,400.00
418,400.00

850.00
18,217.50
Err:508
12,000.00
19,500.00
22,500.00
10,000.00
6,000.00
169,067.50
169,067.50
169,060.00

315,000.00
19,200.00
50,000.00
19,500.00
30,000.00
40,000.00
850.00
474,550.00

581,400.00
540.00
581,940.00

2,500.00
3,250.00
3,750.00
200.00
9,700.00
591,640.00

136,000.00
3,600.00
300.00
139,900.00

52,000.00
33,800.00
3,900.00
5,200.00
94,900.00
234,800.00

153,000.00
3,600.00
300.00
156,900.00

52,000.00
33,800.00
3,900.00
5,200.00
94,900.00
251,800.00

136,000.00
4,800.00
600.00
51,000.00
35,000.00
144,000.00
371,400.00

66,000.00
42,900.00
4,950.00
6,600.00
120,450.00
491,850.00

136,000.00
4,800.00
600.00
61,200.00
35,000.00
144,000.00
381,600.00

66,000.00
42,900.00
4,950.00
6,600.00
120,450.00
502,050.00

136,000.00
4,800.00
600.00
51,000.00
35,000.00
432,000.00
659,400.00

66,000.00
42,900.00
4,950.00
6,600.00
120,450.00
779,850.00

102,000.00
4,800.00
450.00
51,000.00
35,000.00
144,000.00
337,250.00

66,000.00
42,900.00
4,950.00
6,600.00
120,450.00
457,700.00

131,300.00
3,500.00
134,800.00

5,000.00
3,900.00
2,000.00
1,200.00
12,100.00
146,900.00

7,875.00
162.00
8,037.00

4,000.00
1,950.00
2,250.00
1,500.00
20.00
9,720.00
17,757.00

7,875.00
162.00
8,037.00

4,000.00
1,950.00
2,250.00
1,500.00
20.00
9,720.00
17,757.00

81,600.00
3,600.00
300.00
81,600.00
167,100.00

30,000.00
19,500.00
22,500.00
10,000.00
15,000.00
97,000.00
264,100.00

340,200.00
340,200.00

12,857.14
15,000.00
35,000.00
62,857.14
403,057.14
SNI 03-3436-2002

37,500.00
37,500.00

15,000.00
9,750.00
1,200.00
1,600.00
27,550.00
65,050.00

37,800.00
600.00
38,400.00

14,000.00
8,710.00
1,050.00
1,400.00
25,160.00
63,560.00

42,500.00
42,500.00

15,000.00
9,750.00
1,200.00
1,600.00
27,550.00
70,050.00

13,260.00
10,720.00
5,600.00
29,580.00

40,000.00
26,000.00
3,000.00
400.00
69,400.00
98,980.00

29,500.00
29,500.00

40,000.00
13,000.00
3,000.00
4,000.00
60,000.00
89,500.00

61,200.00
2,400.00
63,600.00

20,000.00
13,000.00
1,500.00
2,000.00
36,500.00
100,100.00

27,500.00
600.00
28,100.00

20,000.00
13,000.00
1,500.00
2,000.00
36,500.00
64,600.00
SNI 03-2838-2002
24,934.00
2,222.00
27,156.00

10,000.00
6,500.00
750.00
1,000.00
18,250.00
45,406.00

24,934.00
2,222.00
27,156.00

10,000.00
6,500.00
750.00
1,000.00
18,250.00
45,406.00

36,000.00
29,000.00
2,222.00
67,222.00

10,000.00
6,500.00
750.00
1,000.00
18,250.00
85,472.00 130,878.00

19,950.00
120.00
20,070.00

5,000.00
6,500.00
750.00
600.00
12,850.00
32,920.00
SNI

306,000.00
18,360.00
306,000.00

330,000.00
143,000.00
150.00
32,000.00
505,150.00
811,150.00

175,000.00
8,040.00
1,750.00
184,790.00

100,000.00
195,000.00
225,000.00
32,000.00
552,000.00
736,790.00

350,000.00
42,000.00
8,040.00
1,750.00
401,790.00

120,000.00
188,500.00
22,500.00
20,000.00
351,000.00
752,790.00

214,200.00
38,556.00
252,756.00

180,000.00
351,000.00
81,000.00
22,000.00
634,000.00
886,756.00

227,272.73
160,800.00
52,500.00
248,292.00
21,000.00
709,864.73

600,000.00
390,000.00
45,000.00
60,000.00
1,095,000.00
1,804,864.73

82,386.36
58,960.00
12,250.00
16,800.00
12,800.00
10,500.00
193,696.36

320,000.00
131,950.00
225.00
3,200.00
455,375.00
649,071.36

4,050.00
1,181.25
5,231.25

3,600.00
7,800.00
900.00
360.00
12,660.00
17,891.25

5,370.46
1,566.38
6,936.85

3,600.00
7,800.00
900.00
360.00
12,660.00
19,596.85

6,599.82
1,924.95
8,524.76

3,600.00
7,800.00
900.00
360.00
12,660.00
21,184.76

15,888.46
4,634.13
20,522.60

3,600.00
7,800.00
900.00
360.00
12,660.00
33,182.60

20,040.28
5,845.08
25,885.36

5,400.00
11,700.00
1,350.00
540.00
18,990.00
44,875.36

31,799.72
9,274.92
41,074.64

3,600.00
7,800.00
900.00
360.00
12,660.00
53,734.64

44,759.72
13,054.92
57,814.64

8,100.00
17,550.00
2,025.00
820.00
28,495.00
86,309.64

66,840.55
19,495.16
86,335.72

8,100.00
17,550.00
2,025.00
820.00
28,495.00
114,830.72
33,000.00
2,650.00
35,650.00

1,000.00
13,000.00
1,500.00
1,000.00
16,500.00
52,150.00

35,000.00
35,000.00

1,000.00
13,000.00
1,500.00
1,000.00
16,500.00
51,500.00

216,000.00
28,959.84
335,925.00
1,893,837.00
1,716,436.57
1,033,476.44
39,819.12
162,000.00
583,200.00
113,400.00
574,153.58
30,000.00
46,000.00
6,773,207.54
5,738,526.00
Revisi SNI T-16-2002

1,400.00
213.00
95.40
1,708.40

400.00
260.00
30.00
40.00
1,275.00
2,005.00
3,713.40

250,000.00
250,000.00

105,000.00
136,500.00
15,750.00
1,040.00
258,290.00
508,290.00

161,000.00
100,558.87
261,558.87

167,000.00
217,100.00
25,050.00
16,600.00
425,750.00
687,308.87

29,500.00
180.00
64,600.00
94,280.00

20,000.00
52,000.00
3,750.00
2,000.00
77,750.00
172,030.00

110,000.00
110,000.00

1,000.00
65,000.00
1,500.00
1,000.00
68,500.00
178,500.00

110,000.00
110,000.00

500.00
65,000.00
750.00
500.00
66,750.00
176,750.00
14,000.00
14,000.00

1,500.00
19,500.00
2,250.00
150.00
23,400.00
37,400.00

12,000.00
12,000.00

1,000.00
13,000.00
1,500.00
100.00
15,600.00
27,600.00

16,000.00
16,000.00

1,500.00
19,500.00
2,250.00
150.00
23,400.00
39,400.00

15,000.00
15,000.00

2,000.00
26,000.00
3,000.00
200.00
31,200.00
46,200.00

75,000.00
75,000.00

5,000.00
65,000.00
7,500.00
500.00
78,000.00
153,000.00

35,000.00
35,000.00

1,000.00
65,000.00
1,500.00
1,000.00
68,500.00
103,500.00

15,000.00
15,000.00

2,000.00
26,000.00
3,000.00
200.00
31,200.00
46,200.00

75,900.00
75,900.00

1,500.00
19,500.00
2,250.00
150.00
23,400.00
99,300.00

91,300.00
91,300.00

1,500.00
19,500.00
2,250.00
150.00
23,400.00
114,700.00
SNI-Pt-T2000-C

60,000.00
13,400.00
7,875.00
5,250.00
86,525.00

25,000.00
15,600.00
1,800.00
2,600.00
45,000.00
131,525.00
51,675.00
1,527.60
525.00
87.50
53,815.10

9,000.00
11,700.00
1,350.00
1,000.00
23,050.00
76,865.10

64,000.00
12,462.00
3,150.00
6,790.00
86,402.00

60,000.00
58,500.00
6,750.00
6,000.00
131,250.00
217,652.00
145,750.00

35,350.00
11,200.00
6,000.00
65.00
52,615.00

9,375.00
22,500.00
5,062.50
1,316.00
38,253.50
90,868.50
99,950.00

36,360.00
16,800.00
6,000.00
65.00
59,225.00

9,375.00
22,500.00
7,593.75
1,974.00
41,442.75
100,667.75
100,700.00

35,350.00
11,200.00
6,000.00
65.00
52,615.00

9,375.00
22,500.00
5,062.50
1,316.00
38,253.50
90,868.50
90,900.00

70,000.00
13,132.00
7,875.00
4,550.00
95,557.00

25,000.00
15,600.00
1,800.00
2,600.00
45,000.00
140,557.00
140,557.00
115,050.00

65,000.00
13,132.00
7,875.00
4,550.00
90,557.00

25,000.00
15,600.00
1,800.00
2,600.00
45,000.00
135,557.00
110,050.00

70,000.00
13,132.00
7,875.00
4,550.00
95,557.00

25,000.00
15,600.00
1,800.00
2,600.00
45,000.00
140,557.00
115,050.00
SNI

2,720.00
260.00
160.00
3,140.00

4,000.00
5,200.00
600.00
500.00
10,300.00
13,440.00
7,850.00

2,250.00
5,780.00
8,330.00
16,360.00

7,000.00
9,750.00
1,125.00
500.00
18,375.00
34,735.00
24,760.00

6,800.00
2,250.00
5,780.00
12,740.00
27,570.00

7,000.00
1,170.00
900.00
500.00
9,570.00
37,140.00
32,150.00

7,000.00
6,750.00
8,000.00
21,750.00

7,800.00
2,400.00
500.00
10,700.00
32,450.00
26,300.00
1,750.00
1,750.00

10,000.00
-
-
1,200.00
11,200.00
12,950.00
7,175.00
or

1,600.00
2,600.00
8,944.00 975000 39000
13,144.00 25
975000
2,000.00
8,190.00
945.00
500.00
11,635.00
24,779.00
18,290.00
ior

1,600.00
2,600.00
10,140.00
14,340.00

2,000.00
8,190.00
945.00
500.00
11,635.00
25,975.00
19,477.00

3,120.00
4,680.00
7,800.00

2,800.00
5,460.00
630.00
500.00
9,390.00
17,190.00
12,050.00
HSPK

66,660.00
8,600.00
75,260.00

25,000.00
65,000.00
7,500.00
5,000.00
102,500.00
177,760.00
120,100.00

66,660.00
8,600.00
75,260.00

25,000.00
65,000.00
7,500.00
5,000.00
102,500.00
177,760.00
177,760.00

7,200.00
47,500.00
92,225.32
1,125.00
148,050.32
120,627.00

7,200.00
65,500.00
92,225.32
1,125.00
166,050.32
138,627.00

53,586.00
3,330.00
6,750.00
1,500.00
2,000.00
67,166.00

55,000.00
55,000.00
122,166.00
122,166.00

0.703677265
32,313.60 0.0211
71,374.50 0.0467
17,388.00 2.8750
41,982.19 2.8750
540.00 0.1000
990.00 0.1000
164,588.29

32,917.66
32,917.66
197,000.00
197,000.00

29,566.94
27,843.45
15,242.88
36,802.92
366.00
671.00
110,493.19

22,098.64
22,098.64
132,000.00
132,000.00

26,030.40
87,235.50
17,925.60
43,280.19
15,180.00
660.00
1,210.00
191,521.69

38,304.34
38,304.34
229,000.00
229,000.00

29,082.24
30,600.00
15,628.03
37,732.86
360.00
660.00
114,063.13

22,812.63
22,812.63
136,000.00
136,000.00

43,084.80
100,000.00
55,738.37
134,576.64
1,200.00
2,200.00
1,400.00
338,199.81

67,639.96
67,639.96
405,000.00
405,000.00

149,940.00
215,424.00
416,160.00
123,750.00
131,680.00
101,606.40
245,322.00
55,200.00
10,000.00
1,200.00
2,200.00
1,400.00
1,453,882.40

290,776.48
290,776.48
1,744,000.00
1,744,000.00

79,968.00
244,800.00
138,263.89
69,753.60
168,415.50
27,600.00
5,000.00
1,200.00
2,200.00
1,400.00
738,600.99

147,720.20
147,720.20
886,000.00
886,000.00

82,416.00
38,760.00
67,222.22
37,296.00
90,048.75
1,200.00
2,200.00
319,142.97

63,828.59
63,828.59
382,000.00
382,000.00

97,920.00
228,480.00
81,600.00
75,000.00
98,760.00
83,328.00
201,190.00
1,200.00
2,200.00
1,400.00
871,078.00

174,215.60
174,215.60
1,045,000.00
1,045,000.00

140,352.00
354,960.00
81,600.00
75,000.00
158,016.00
103,345.92
249,521.96
1,200.00
2,200.00
1,400.00
1,167,595.88

233,519.18
233,519.18
1,401,000.00
1,401,000.00

210,528.00
354,960.00
122,400.00
237,024.00
155,018.88
374,282.94
1,200.00
2,200.00
1,400.00
1,459,013.82

291,802.76
291,802.76
1,750,000.00
1,750,000.00 270000
25
84,000.00 10800
1,620.00
7,000.00
9,100.00
910.00
800.00
103,430.00 17,810.00 10,343.00
103,430.00
9,380.00

1,030,058.51
2,522,084.87
2,688,333.33
6,240,476.71
6,240,476.71

1,030,058.51
2,350,198.89
1,075,333.33
4,455,590.73
4,455,590.73

1,030,058.51
2,456,078.40
508,151.11
1,182,866.67
5,177,154.68
5,177,154.68

1,030,058.51
2,947,294.08
554,346.67
1,290,400.00
5,822,099.25
5,822,099.25

1,030,058.51
2,302,573.50
577,444.44
806,500.00
4,716,576.45
4,716,576.45

1,030,058.51
1,918,811.25
404,211.11
1,008,125.00
4,361,205.87
4,361,205.87
1,030,058.51
2,394,676.44
451,640.00
3,876,374.95
3,876,375.00

1,030,058.51
1,154,888.89
1,118,350.00
672,083.33
3,975,380.73
3,975,381.00

1,030,058.51
1,789,463.57
337,582.91
206,464.62
661,743.59
4,025,313.18
3,025,314.00

1,030,058.51
1,701,028.60
469,173.61
349,484.38
882,109.38
4,431,854.47
4,431,855.00

1,030,058.51
1,946,442.13
577,444.44
447,340.00
1,075,333.33
5,076,618.41
50,776,619.00

1,030,058.51
2,586,045.88
692,933.33
447,340.00
1,344,166.67
6,100,544.39
6,100,545.00

1,030,058.51
2,931,242.26
1,478,583.33
5,439,884.10
5,439,885.00

1,030,058.51
1,039,400.00
1,476,222.00
887,150.00
4,432,830.51
4,432,831.00

1,030,058.51
1,717,897.22
976,422.96
904,764.16
4,629,142.84
4,629,143.00

1,030,058.51
952,783.33
1,008,125.00
2,990,966.84
2,990,967.00

1,030,058.51
2,302,573.50
692,933.33
1,613,000.00
5,638,565.34
5,638,566.00

71,500.00
675.00
7,500.00
1,200.00
42.00
80,917.00
80,917.00

12,500.00
675.00
7,500.00
1,200.00
42.00
21,917.00
21,917.00

10,000.00
450.00
5,000.00
800.00
28.00
16,278.00
16,278.00

8,500.00
675.00
7,500.00
1,200.00
42.00
17,917.00
17,917.00

12,500.00
675.00
7,500.00
1,200.00
42.00
21,917.00
21,917.00

13,200.00
200.00
2,250.00
2,500.00
400.00
168.00
18,718.00
18,718.00

145,000.00
11,250.00
7,700.00
1,800.00
45,000.00
60,000.00
7,500.00
2,800.00
281,050.00
281,050.00

150,000.00
26,250.00
14,000.00
4,600.00
45,000.00
30,000.00
3,750.00
2,800.00
276,400.00
276,400.00

30,000.00
450.00
4,500.00
750.00
280.00
35,980.00
35,980.00

50,000.00
50.00
450.00
4,500.00
750.00
280.00
56,030.00
56,030.00

21,000.00
300.00
36,480.00
4,500.00
7,500.00
20,000.00
2,000.00
70.00
91,850.00
91,850.00

45,136.00
47,600.00
11,900.00
3,740.00
12,600.00
26,000.00
6,400.00
784.00
154,160.00
154,160.00

25,393.50
18,240.00
30,000.00
1,456.00
14,025.00
89,114.50
89,115.00

100.00
130.00
30.00
20.00
15.60
2,000.00
3.40
43.00
25.00
0.23
2,367.23
1,213.00

13,570.00
6,000.00
7,800.00
900.00
600.00
32,475.46
23,201.00

10,925.00
6,000.00
7,800.00
900.00
600.00
26,225.00
26,225.00

8,000.00
1,290.00
1,000.00
4,000.00
2,600.00
300.00
400.00
3,825.00
11,125.00
11,125.00

5,000.00
2,600.00
450.00
200.00
841.50
9,091.50
9,091.50

1,130.00
2,000.00
5,000.00
3,900.00
2,000.00
9,366.00
22,266.00
22,266.00

516,000.00
516,000.00

28,900.00
9,000.00
4,800.00
12,000.00
19,500.00
22,500.00
10,000.00
106,700.00
106,700.00
106,700.00

28,900.00
26,025.00
4,800.00
12,000.00
19,500.00
22,500.00
10,000.00
123,725.00
87,000.00

28,900.00
36,435.00
4,800.00
12,000.00
19,500.00
22,500.00
10,000.00
134,135.00
98,610.00

112,500.00
8,000.00
6,000.00
15,000.00
26,000.00
30,000.00
3,400.00
200,900.00
200,900.00
CONTOH PERHITUNGAN
BETON BERTULANG
TAHUN ANGGARAN 2015

NO. URAIAN HASIL ANALISA

1 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175


2 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225
3 Hasil Analisa Pekerjaan Cor Beton Site Mix K-300
4 Hasil Analisa Pekerjaan Cor Beton Ready Mix K. 175
5 Hasil Analisa Pekerjaan Cor Beton Ready Mix K. 225
6 Hasil Analisa Pekerjaan Cor Beton Ready Mix K. 300
7 Hasil Analisa Pekerjaan Besi Beton U. 24
8 Hasil Analisa Pekerjaan Besi Beton U. 39
9 Hasil Analisa Pekerjaan Bekisting Papan
10 Hasil Analisa Pekerjaan Bekisting Multiplek 9 MM
11 Hasil Analisa Pekerjaan Bekisting Multiplek 12 MM
12 Hasil Analisa Pekerjaan Stoot Werk

A. KOLOM
1 KOLOM 30X40 ( 250 KG/M3 U.24 ) K-225 READY MIX BEKISTING ALBASIAH
- Beton Readymix K-225 (A035)
- Besi beton U.24 ; 187 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM (A047)
Stootwerk
Jumlah
2 KOLOM 30X35 ( 228 KG/M3 U.39 ) K-300 READY MIX BEKISTING PAPAN
- Beton Readymix K-225 (A035)
- Besi beton U.39 ; 228 x Hasil Analisa (A037)
- Pekerjaan Bekisting Multiplek 9 MM
Stootwerk
Jumlah
3 KOLOM 30X30 ( 181.2 KG/M3 U.24 ) K.225 READY MIX BEKISTING MULTI 12 MM
- Beton Readymix K-225 (A034)
- Besi beton U.24 ; 173 xHasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
Stootwerk
Jumlah
4 KOLOM 20X20 ( 181.2 KG/M3 U.24 ) K.225 -SITE MIX BEKISTING MULTI 12 MM
- Beton Site Mix K-225 (A031)
- Besi beton U.24 ; 241.2 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
Stootwerk
Jumlah
5 KOLOM 15x30 ( 150 KG/M3 U.24 ) SITE MIX K-175 BEKISTING MULTI 12 MM
- Beton Site Mix K-175 (A030)
- Besi beton U.24 ; 150 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
Stootwerk
Jumlah
6 KOLOM 15x15 ( 150 KG/M3 U.24 ) SITE MIX K-175 BEKISTING PAPAN
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 250 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
Stootwerk
Jumlah
7 BALOK 30X75 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 112 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK 30X50 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 132 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK 25X40 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 125 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK25X35 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 125 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK 15x75 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 145 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
Stootwerk
Jumlah
8 BALOK 15x92 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 150 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK 20 X 30 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 180 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK 20 X 60 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 120 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
8 BALOK 20 X 50 ( 112 KG/M3 U.24 ) SITE MIX K-175 BEKISTING Multiplek 9 MM
- Beton Site Mix K-175(A030)
- Besi beton U.24 ; 132 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stootwerk
Jumlah
B. PLAT LANTAI
1 PLAT LANTAI T=12 CM ( 125 KG/M3 U.24 ) READY MIX K-225 BEKISTING MULTI 12 MM
- Beton Readymix K-225 (A034)
- Besi beton U.24 ; 125 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
- Stoot Werk
Jumlah
C. BETON TANGGA
1 TANGGA ( 218,1 kg/m3 U.39 ) READY MIX K-225 BEKISTING MULTI 12 MM
- Beton Readymix K-225 (A034)
- Besi beton U.39 ; 218,1 x Hasil Analisa (A036)
- Pekerjaan Bekisting Multiplek 9 MM
Jumlah
2 TANGGA ( 218,1 kg/m3 U.39 ) SITE MIX K-225 BEKISTING MULTI 12 MM
- Beton Site Mix K-225 (A031)
- Besi beton U.39 ; 218,1 x Hasil Analisa (A037)
Jumlah
ITUNGAN
ULANG
RAN 2015

NOMOR HASIL HARGA BERIKUT

ANALISA KEUNTUNGAN

A030 1,009,973.00
A031 1,070,569.24
A032 1,792,024.40
A033 1,075,827.50
A034 1,219,515.00
A035 1,219,515.00
A036 13,874.55
A037 14,573.25
A046 106,700.00
A047 123,725.00
A048 98,610.00
A049 200,900.00

NG ALBASIAH
1,219,515.00
1,754,060.00
1,443,499.58
418,474.70
4,835,549.28

1,219,515.00
1,416,380.00
1,531,839.23
418,474.70
4,586,208.93
TING MULTI 12 MM
1,219,515.00
1,622,740.00
1,531,839.23
418,474.70
4,792,568.93
NG MULTI 12 MM
1,070,569.24
2,260,580.00
1,531,839.23
418,474.70
5,281,463.17
MULTI 12 MM
1,009,973.00
2,081,182.50 150 13,874.55
1,531,839.23
418,474.70
3,091,155.50

1,009,973.00
2,345,000.00
1,531,839.23
418,474.70
5,305,286.93
Multiplek 9 MM
1,009,973.00
2,814,000.00 112
989,800.00
535,800.30
5,349,573.30
Multiplek 9 MM
1,009,973.00
1,831,440.60
1,072,324.58
803,600.00
4,717,338.18
Multiplek 9 MM
1,009,973.00
1,172,500.00
1,299,112.50
1,104,950.00
4,586,535.50
Multiplek 9 MM
1,009,973.00
1,172,500.00
2,183,180.30
775,508.30
5,141,161.60
Multiplek 9 MM
1,009,973.00
1,360,100.00
1,814,674.58
803,600.00
4,988,347.58
Multiplek 9 MM
1,009,973.00
1,407,000.00
1,299,112.50
1,104,950.00 10.500
4,821,035.50
Multiplek 9 MM
1,009,973.00
1,688,400.00
1,299,112.50
848,753.50
4,846,239.00
Multiplek 9 MM
1,009,973.00
1,125,600.00
1,299,112.50
837,753.00
4,272,438.50
Multiplek 9 MM
1,009,973.00
1,238,160.00 132
1,299,112.50
1,004,500.00
4,551,745.50

BEKISTING MULTI 12 MM
1,070,569.24
1,734,318.75
680,850.00
1,600,000.00
5,085,737.99

ULTI 12 MM
1,070,569.24
3,026,039.36
457,700.00
4,096,608.60

1,070,569.24
3,178,425.83
457,700.00
4,248,995.07
22

Poer 1 (140x80x40)
Poer 2 (80x80x40)
Poer 3 (320x80x40)
Poer 4 (180x100x40)
Poer 5( 210x100 x40+ 70x100x40 )
Sloof 1 (15x20) 13.333
Sloof 2 (20x30) 10.000
K1 ( Kolom 30x30) 13.333 0.250 8.333 2.083 173.037
K2 ( Kolom 30x40) 11.667 0.250 8.333 2.083 186.8889
K3 ( Kolom 30x35) 12.381 0.250 8.333 2.083 150.8571
K4 ( Kolom 20x24) 18.333 0.250 8.333 2.083 240.8333
K4A ( Kolom 24x40) 13.333 0.250 8.333 2.083 197.3611
K4B ( Kolom 24x50) 12.333 0.250 8.333 2.083 162.3333
K5 ( Kolom 15X30) 20.000 0.250 8.333 2.083 258.0741
K6 ( Kolom Siku 15X30) 26.694 0.250 8.333 2.083 210.4874
K7 ( Kolom Siku 24x54) 17.757 0.250 8.333 2.083 160.7453
B1 ( Balok 30x75 ) 8.000 0.300 0.300 2.667 23.7037
B2 ( Balok 30x50 ) 8.667 0.300 0.300 4.000 145.8667
B3 ( Balok 25x40 ) 10.500 0.250 0.300 5.500 147.6
B4 ( Balok 25x35 ) 10.857 0.250 0.300 6.286 165.6381
40.2963
B6 ( Balok 15x75 ) 14.667 0.150 0.300 4.000
KP (Rangka Kusen 12 x12) 33.333 0.250 8.333 2.083
BL (Rangka Kusen 12x17) 22.549 0.150 0.300 22.059
BL (Rangka Kusen 12x12) 25.000 0.250 8.333 2.083

Balok pakai Baja UNP 8


Balok pakai Baja UNP 10
Balok pakai Baja UNP 10

K1 ( Kolom 30x30)

K1 ( Kolom 20x30)
K5 ( Kolom 15X30)
KP (Kolom Praktis (12x15)

BALOK
1 0.2 0.3 0.06 16.66667 0.8 13.33333
1 0.3 0.4 0.12 8.333333 1.1 9.166667
1 0.15 0.75 0.1125 8.888889 1.65 14.66667
1 0.3 0.5 0.15 6.666667 1.3 8.666667
1 0.3 0.75 0.225 4.444444 1.8 8
1 0.2 0.3 0.06 16.66667 0.8 13.33333

25,125.00
0.250 0.300 5.500 147.6

9,380.00
HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2015

NOMOR HARGA SATUAN


NO. JENIS PEKERJAAN SATUAN
ANALISA ( Rp )
1 2 3 4 5

A. PEKERJAAN PERSIAPAN SNI 03-2835-2002


1 A.001 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank m1 70,940.00
2 A.002 Membersihkan 1 m² lapangan dan perataan m2 20,000.00
3 A.003 Membongkar 1 m³ beton bertulang m3 733,300.00
4 A.004 Membongkar 1 m³ dinding tembok bata merah m3 673,300.00
5 A.005 Mengerjakan1 m² pengukuran kembali (site) m2 3,800.00
6 A.006 Mengupas 1 m² plesteran m2 15,000.00
7 A.007 Membongkar 1 m² plesteran dinding/ siaran m2 15,000.00
8 A.008 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali) m2 60,000.00
9 A.009 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali) m2 12,000.00
10 A.010 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali) m2 38,500.00
11 A.011 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali) m2 28,875.00
12 A.012 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali) m3 1,350,000.00
13 A.013 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali) m3 830,000.00
14 A.014 Membongkar 1 m² plafond (bongkaran dipakai kembali) m2 55,500.00
15 A.015 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali) m2 18,000.00

B. PEKERJAAN TANAH SNI


16 B.001 Menggali 1 m³ tanah biasa sedalam 1 meter m3 48,000.00
17 B.002 Menggali 1 m³ tanah biasa sedalam 2 meter m3 63,120.00
18 B.003 Menggali 1 m³ tanah keras sedalam 1 meter m3 75,000.00
19 B.004 Membuang 1 m³ tanah sejauh 30 meter m3 35,000.00
20 B.005 Mengurug kembali 1 m³ galian m3 26,666.67
21 B.006 Memadatkan 1 m³ tanah (per 20 cm) m3 60,000.00
22 B.007 Mengurug 1 m³ pasir urug m3 135,200.00
23 B.008 Memasang 1 m² lapisan ijuk tebal 10 cm m2 108,000.00
24 B.009 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunan m3 108,000.00

C. PEKERJAAN PONDASI SNI 03-2836-2002


25 C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP m3 829,555.00
26 C.002 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP m3 751,440.00
27 C.003 Memasang 1 m³ batu kosong (aanstamping) m3 401,502.00

D. PEKERJAAN DINDING SNI 03-2837-2002


28 D.001 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 3 P m2 126,255.80

29 D.002 Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 5 P m2 120,846.20

30 D.003 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : m2 176,860.00

E. PEKERJAAN PLESTERAN SNI 03-2837-2002


31 E.001 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm m2 58,194.84
32 E.002 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm m2 55,246.56
33 E.003 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm m2 70,748.80
34 E.004 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 63,895.60
35 E.005 Memasang 1 m² acian m2 35,455.00

Harga Satuan Pekerjaan 284 dari 299


NOMOR HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN
ANALISA ( Rp )

F. PEKERJAAN KAYU SNI 03-3434-2002


36 F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Meranti Batu m3 7,417,000.00
37 F.002 Membuat dan memasang 1 m² daun pintu panel; Kayu Kruing m2 619,500.00
38 F.003 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Kruing m2 466,200.00
39 F.004 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Kruing m2 773,600.00
40 F.005 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti Batu m2 550,800.00
41 F.006 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti Batu m3 6,197,200.00
42 F.007 Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti Batu m3 5,294,000.00
43 F.008 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti Batu m2 81,540.00
44 F.009 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti Batu m2 123,920.00
45 F.010 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Meranti Batu m1 78,750.00
46 F.011 Memasang 1 m' list plafond kayu profil m1 25,280.00
47 F.012 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti Batu m1 51,880.00

G. PEKERJAAN BETON RSNI-T-13-2002


48 G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR m3 842,970.00
49 G.002 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR m2 149,300.00
50 G.003 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66 m3 993,109.05
51 G.004 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58 m3 1,045,980.48
52 G.005 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56 m3 1,060,949.68
53 G.006 Pembesian 1 kg dengan besi polos atau besi ulir kg 10,357.00
54 G.007 Memasang 10 kg jaring kawat baja /wiremesh kg 591,640.00
55 G.008 Memasang 1 m² bekisting untuk pondasi m2 234,800.00
56 G.009 Memasang 1 m² bekisting untuk sloof m2 251,800.00
57 G.010 Memasang 1 m² bekisting untuk kolom m2 491,850.00
58 G.011 Memasang 1 m² bekisting untuk balok m2 502,050.00
59 G.012 Memasang 1 m² bekisting untuk lantai m2 680,850.00
60 G.013 Memasang 1 m² bekisting untuk tangga m2 457,700.00
61 G.014 Memasang 1 m² plat beton "bondex" m2 146,900.00
62 G.015 Pembesian 1 kg dengan besi beton U-24 kg 17,757.00
63 G.016 Pembesian 1 kg dengan besi beton U-29 kg 17,757.00
64 G.017 Memasang 1 m² bekisting dengan papan m2 264,100.00
65 G.018 Memasang 1 m² Pelat Beton Precast t. 12 cm m2 403,057.14

H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002


65 H.001 Memasang 1 m² atap genteng palentong kecil m2 65,050.00
66 H.002 Memasang 1 m² rooflight fibreglass (180 x 90) cm m2 63,560.00
67 H.003 Memasang 1 m² atap genteng pres jatiwangi m2 70,050.00
68 H.004 Memasang 1 m' genteng bubung pres jatiwangi m1 98,980.00
69 H.005 Memasang 1 m' Pasangan Flasing seng m1 89,500.00
70 H.006 Memasang 1 m2 Pasangan Genteng Metal m2 100,100.00
71 H.007 Memasang 1 m' Pasangan Bubungan Genteng Metal m3 64,600.00

I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002


70 I.001 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm m2 45,406.00
71 I.002 Memasang 1 m² langit-langit GRC board uk. (120 x 240) cm, tebal 4 mm m2 45,406.00
72 I.003 Memasang 1 m² Rangka langit-langit besi hollo 4x4 & 4x6 cm m2 85,472.00
73 I.004 Memasang 1 m' list kayu profil m1 32,920.00

J. PEKERJAAN SANITASI SNI


74 J.001 Memasang 1 buah kloset duduk/monoblok bh 2,505,150.00
75 J.002 Memasang 1 buah kloset jongkok porselen bh 736,790.00
76 J.003 Memasang 1 buah wastafel bh 2,040,790.00
77 J.004 Memasang 1 buah bak mandi fibreglass volume 0,30 m³ bh 886,756.00

Harga Satuan Pekerjaan 285 dari 299


NOMOR HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN
ANALISA ( Rp )
78 J.005 Memasang 1 buah bak mandi batu bata volume 0,30 m³ bh 1,804,864.73

Harga Satuan Pekerjaan 286 dari 299


NOMOR HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN
ANALISA ( Rp )
79 J.006 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm bh 649,071.36
80 J.007 Memasang 1 m' pipa PVC tipe AW Ø ½" m1 17,891.25
81 J.008 Memasang 1 m' pipa PVC tipe AW Ø ¾" m1 19,596.85
82 J.009 Memasang 1 m' pipa PVC tipe AW Ø 1" m1 21,184.76
83 J.010 Memasang 1 m' pipa PVC tipe AW Ø 1½" m1 33,182.60
84 J.011 Memasang 1 m' pipa PVC tipe AW Ø 2" m1 44,875.36
85 J.012 Memasang 1 m' pipa PVC tipe AW Ø 2½" m1 53,734.64
86 J.013 Memasang 1 m' pipa PVC tipe AW Ø 3" m1 86,309.64
87 J.014 Memasang 1 m' pipa PVC tipe AW Ø 4" m1 114,830.72
88 J.015 Memasang 1 buah bak cuci piring satinless steel bh 391,050.00
89 J.016 Memasang 1 buah kran Ø ¾" atau ½" bh 169,150.00
90 J.017 Memasang 1 buah floordrain bh 116,500.00
91 J.018 Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor tipe kecil) unit 5,391,945.27

K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002


92 K.001 Mengerjakan 1 cm pengelasan dengan las listrik cm 3,713.40
93 K.002 Memasang 1 m² pintu alumunium/ PVC m2 508,290.00
94 K.003 Memasang 1 m² terali besi m2 687,308.87
95 K.004 Memasang 1 m' talang datar seng BJLS 28 m1 172,030.00

L. PEKERJAAN KUNCI DAN KACA


96 L.001 Memasang 1 buah kunci tanam biasa bh 178,500.00
97 L.002 Memasang 1 buah kunci tanam kamar mandi bh 176,750.00
98 L.003 Memasang 1 buah engsel pintu bh 37,400.00
99 L.004 Memasang 1 buah engsel jendela kupu-kupu bh 27,600.00
100 L.005 Memasang 1 buah kait angin bh 39,400.00
101 L.006 Memasang 1 buah kunci selot bh 46,200.00
102 L.007 Memasang 1 buah pegangan pintu / door holder bh 153,000.00
103 L.008 Memasang 1 buah Espagnolet bh 103,500.00
104 L.009 Memasang 1 buah Grendel Jendela bh 46,200.00
105 L.010 Memasang 1 m² kaca; tebal 3 mm m2 99,300.00
106 L.011 Memasang 1 m² kaca; tebal 5 mm m2 114,700.00

M. PEKERJAAN PENUTUP LANTAI DAN DINDING


107 M.001 Memasang 1 m² lantai keramik ukuran 30 x 30 cm m2 171,525.00
108 M.002 Memasang 1 m' plint keramik ukuran 10 x 20 cm m2 76,865.10
109 M.003 Memasang 1 m² dinding keramik ukuran 20 x 20 cm m2 217,652.00
110 M.004 Memasang 1 m² lantai keramik ukuran 40 x 40 cm m2 140,557.00

N. PEKERJAAN PENGECATAN
111 N.001 Mendempul dan Menggosok 1 m² kayu m2 13,440.00
112 N.002 Mengecat 1 m² bidang kayu lama m2 34,735.00
113 N.003 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) m2 37,140.00
114 N.004 Melabur 1 m² bidang kayu dengan politur m2 32,450.00
115 N.005 Melabur 1 m² bidang kayu dengan cat residu m2 12,950.00
116 N.006 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) m2 22,595.00
117 N.007 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup) m2 17,190.00

O. PEKERJAAN PAVING, JALAN DAN LAIN-LAIN HSPK


118 O.001 Memasang 1 m² paving block warna segi empat; tebal 8 cm m2 177,760.00
119 O.002 Memasang 1 m² paving block warna segi enam; tebal 8 cm m2 177,760.00
120 O.003 Mengerjakan 1 m' saluran grefel beton 1/2 20 cm + pasangan m1 148,050.32
121 O.004 Mengerjakan 1 m' saluran grefel beton 1/2 30 cm + pasangan m1 166,050.32
122 EL.001 Mengerjakan 1 Titik Pas. Titik Lampu/Daya ttk 189,332.00

Harga Satuan Pekerjaan 287 dari 299


NOMOR HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN
ANALISA ( Rp )
P. PEKERJAAN PERABOT/MEBEULAIR 100,000.00
123 M - 02 Mengerjakan 1 bh Meja Siswa bh 197,000.00
124 K - 02 Mengerjakan 1 bh Kursi Siswa bh 132,000.00
125 M - 01 Mengerjakan 1 bh Meja Guru bh 229,000.00
126 K - 01 Mengerjakan 1 bh Kursi Guru bh 136,000.00
127 P - 01 Mengerjakan 1 bh Papan Tulis Hitam 1.20 x 2.40 m bh 405,000.00
128 L - 01 Mengerjakan 1 bh Lemari Penyimpan Uk. 90x50x180 bh 1,744,000.00
129 M - 08 Mengerjakan 1 bh Meja Kerja/Konter bh 886,000.00
130 M - 10 Mengerjakan 1 bh Meja Baca bh 382,000.00
131 L - 03/04 Mengerjakan 1 bh Rak Penitipan Barang Uk. 40x120x180 bh 1,045,000.00
132 L - 05 Mengerjakan 1 bh Rak Majalah satu muka Uk. 40x120x180 bh 1,401,000.00
133 L - 06 Mengerjakan 1 bh Rak Buku dua muka Uk. 2 x 40x120x180 bh 1,750,000.00

Harga Satuan Pekerjaan 288 dari 299


PERHITUNGAN VOLUME
POS JAGA
ESTIMASI BIAYA KONSTRUKSI
2021-2022

Pekerjaan :POS JAGA


Lokasi :SMKN 5 BANDUNG
Nama :Ahmad Ismail
Kelas :DPIB 1

No. Nama Pekerjaan

A. PEKERJAAN PERSIAPAN
A.002 Membersihkan 1 m² lapangan dan perataan
A.001 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank

B. PEKERJAAN TANAH
B.001 Menggali 1 m³ tanah biasa sedalam 1 meter
B.007 Mengurug 1 m³ pasir urug
B.005 Mengurug kembali 1 m³ galian

C. PEKERJAAN PONDASI
C.003 Memasang 1 m³ batu kosong (aanstamping)
C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP

D. PEKERJAAN DINDING
Memasang
D.002 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 5 PP
Memasang
D.001 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 3 PP

E. PEKERJAAN PLESTERAN
E.002 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm
E.001 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm
E.005 Memasang 1 m² acian
F. PEKERJAAN KAYU

G. PEKERJAAN BETON

H. PEKERJAAN PENUTUP ATAP

I. PEKERJAAN LANGIT-LANGIT
J. PEKERJAAN SANITASI

K. PEKERJAAN BESI DAN ALUMUNIUM

L. PEKERJAAN KUNCI DAN KACA

M. PEKERJAAN PENUTUP LANTAI DAN DINDING

N. PEKERJAAN PENGECATAN

O. PEKERJAAN PAVING, JALAN DAN LAIN-LAIN

P. PEKERJAAN PERABOT/MEBEULAIR
PERHITUNGAN VOLUME
POS JAGA
ESTIMASI BIAYA KONSTRUKSI
2021-2022

dimensi
gambar Qty
panjang lebar (1) lebar (2) tinggi

8.5 8
4 4

24 1 1.1
24 1 0.05
24 1 1.1

24 1 0.1
24 0.3 0.8 0.95

a; campuran 1 PC : 5 PP 7 0.15 2.9


a; campuran 1 PC : 3 PP 15 0.15 1.3
Volume Satuan

68 m2
24 m1

26.4 m3
1.2 m3
10.26 m3

2.4 m3
12.54 m3

20.3 m2
m2
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
POS JAGA
ESTIMASI BIAYA KONSTRUKSI
2021-2022

Pekerjaan : POS JAGA


Lokasi : SMKN 5 BANDUNG
Nama : Ahmad Ismail
Kelas : DPIB 1

Harga Sat. Jumlah Sub-Jumlah Bobot


Uraian Pekerjaan Sat. Volume
Rp. Rp. Rp. %
A. PEKERJAAN PERSIAPAN
A.002 Membersihkan 1 m² lapangan dan perataan

JUMLAH PEKERJAAN PERSIAPAN . -


B. PEKERJAAN TANAH

JUMLAH PEKERJAAN TANAH . -

TOTAL - 0%

Mengetahui Dibuat Oleh


Guru Mata pelajaran

KIKI RIZKY DE BUDIMAN Ahmad Ismail


NIP. 19820502 2009 021 002 DPIB 1
REKAPITULASI RENCANA ANGGARAN BIAYA
POS JAGA
SMKN 5 BANDUNG
DPIB 1
JUMLAH JUMLAH HARGA
NO URAIAN PEKERJAAN BOBOT (%)
(Rp.) (Rp.)
A. PEKERJAAN PERSIAPAN 0.00% Rp -
B
C
D
E
F
G
H
I
J
K
L
M
O
P
JUMLAH #REF! Rp -

Dana Pekerjaan Konstruksi Rp -


Biaya Perencanaan 3% Rp -
Biaya Pengawasan 2% Rp -
Dana Pengelolaan 1% Rp -

TOTAL RENCANA ANGGARAN BIAYA Rp -


terbilang

Mengetahui Dibuat Oleh


Guru Mata pelajaran

KIKI RIZKY DE BUDIMAN Ahmad Ismail


NIP. 19820502 2009 021 002 DPIB 1
TIME SCHEDULE
POS JAGA
SMKN 5 BANDUNG
DPIB 1

MINGGU KE
NO URAIAN PEKERJAAN BIAYA BOBOT (%) KET.
1 2 3 4 5 6 7 8 9 10 11 12

1.2

0.8

0.6

0.4

0.2

RENCANA 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
RE IDR - 0%
KOMULATIF 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
REALISASI
REA
KOMULATIF

Mengetahui Dibuat Oleh


Guru Mata pelajaran

KIKI RIZKY DE BUDIMAN Ahmad Ismail


NIP. 19820502 2009 021 002 DPIB 1
SMKN 5 BANDUNG LAPORAN MINGGUAN KEMAJUAN PEKERJAAN
Minggu Ke : 1
POS JAGA
Tanggal :
PRESTASI FISIK PRESTASI
NO URAIAN PEKERJAAN JUMLAH (Rp) BOBOT MG. LALU MG. INI KESELURUHAN
% % PEKERJAAN
A B C D E F G

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000

0.00 0.000
JUMLAH - 0% 0.00 0.00 0.000
KESIMPULAN
PROSENTASE PRESTASI FISIK PADA MINGGU INI 0.000 %
PROSENTASE PRESTASI FISIK PADA MINGGU LALU 0.000 %
KEMAJUAN PRESTASI PADA MINGGU 0.000 %
PROSENTASE RENCANA FISIK (TimeSchedule) %
Lebih Cepat / Lebih Lambat ( % ) #DIV/0! %

Mengetahui Dibuat Oleh


Guru Mata pelajaran

KIKI RIZKY DE BUDIMAN Ahmad Ismail


NIP. 19820502 2009 021 002 DPIB 1
SMKN 5 BANDUNG LAPORAN BULANAN KEMAJUAN PEKERJAAN
Bulan Ke : 1
POS JAGA
Tanggal : 30 januari 2016
PRESTASI FISIK PRESTASI
NO URAIAN PEKERJAAN JUMLAH (Rp) BOBOT BULAN LALU BULAN INI KESELURUHAN
% % PEKERJAAN
A B C D E F G

JUMLAH - 0% 0.000 0.000


KESIMPULAN
PROSENTASE PRESTASI FISIK PADA BULAN INI 0.000 %
PROSENTASE PRESTASI FISIK PADA BULAN LALU 0.000 %
KEMAJUAN PRESTASI PADA MINGGU 0.000 %
PROSENTASE RENCANA FISIK (TimeSchedule) #REF! %
Lebih Cepat / Lebih Lambat ( % ) #REF! %

Mengetahui Dibuat Oleh


Guru Mata pelajaran

KIKI RIZKY DE BUDIMAN Ahmad Ismail


NIP. 19820502 2009 021 002 DPIB 1

Anda mungkin juga menyukai