DAFTAR HARGA UPAH DAN BAHAN

HARGA SATUAN
No URAIAN SATUAN
Rp.
A. UPAH
1 Pekerja 45,000.00 Orang/Hari
2 Tukang 55,000.00 Orang/Hari
3 Kepala Tukang 70,000.00 Orang/Hari
4 Mandor 58,000.00 Orang/Hari

B. BAHAN
Pasangan dan beton
1 Tanah urug 96,408.00 /M3
2 Timbunan pilihan 111,240.00 /M³
3 Pasir urug 74,160.00 /M³
4 Pasir pasang 108,000.00 /M³
5 Pasir beton 129,600.00 /M³
6 Kerikil beton 150,000.00 /M³
7 Batu kali/batu belah (sungai/gunung) 279,600.00 /M³
8 Bata merah 960.00 /Buah
9 Paving Block 2,100.00 /Buah
10 Semen PC @ 50 Kg 88,800.00 /Zak
11 Semen PC 1,480.00 /Kg
12 Semen warna 1,780.00 /Kg
13 Semen putih @ 50 Kg 106,800.00 /Zak
14 Semen putih 1,780.00 /Kg
15 Sirtu 240,000.00 /M³
16 Plywood 9 mm 162,000.00 /Lbr
17 Air 150.00 /Liter
18 Besi beton polos 11,280.00 /Kg
19 Besi beton ulir 12,480.00 /Kg
20 Kawat beton 14,400.00 /Kg
21 Paku kayu 14,160.00 /Kg
22 Minyak bekisting 12,000.00 /Liter
Kayu
1 Kayu kelas I 3,048,000.00 /M³
2 Kayu kelas II 2,916,000.00 /M³
3 Kayu kelas III 1,830,000.00 /M³
4 Kayu Perancah 2,440,800.00 /M³
5 Kayu/Papan Bekisting 2,440,800.00 /M³
6 Dolken kayu galam Ø (8-10) cm, panjang 4 m 24,720.00 /Btg
7 Lem Kayu 18,000.00 /Kg
Atap dan plafond
1 Konstruksi kuda-kuda baja ringan 150,000.00 /M2
2 Multiplek / plywood 4 mm 65,000.00 /Lbr
3 Eternit Uk. 120x240 cm t=3,5 mm (setara Kalsi Board) 102,000.00 /Lbr
4 Genteng metal 0,3 75,000.00 /M2
5 Rabung seng genteng metal 30,000.00 /M'
6 List Profil 12,000.00 /M'
7 Paku Skrup 300.00 /Bh
8 Seng Plat 108,000.00 /Lbr
Keramik
1 Keramik sisi kulit jeruk 20x20 cm 5,280.00 /Bh
2 Keramik 20 x 20 cm 5,280.00 /Bh
3 Keramik 20 x 25 6,240.00 /Bh
4 Keramik 30x30 cm Polished 7,200.00 /Bh
5 Keramik 30x30 cm Unpolished 7,560.00 /Bh
6 Keramik 40x40 cm (polished) 8,400.00 /Bh
7 Keramik 40x40 cm (unpolished) 8,760.00 /Bh
Cat dan Residu
1 Dempul kayu 29,700.00 /Kg
2 Plamur / dempul tembok 16,500.00 /Kg
3 Cat dasar 22,000.00 /Kg
4 Cat manie 17,561.50 /Kg
5 Cat synthetik enamel (cat kayu mengkilap) 34,650.00 /Kg
6 Cat acrylic emultion paint (cat tembok) / waterprofing 30,800.00 /Kg
7 Minyak cat 45,100.00 /Liter
8 Kertas amplas 3,690.00 /Lembar
Instalasi listrik
1 Instalasi Tititk lampu 120,000.00 /Ttk
2 Instalasi Stop kontak 108,000.00 /Ttk
3 Lampu Hemat Energi 24 watt 42,000.00 /Bh
4 Lampu Hemat Energi 12 watt 30,000.00 /Bh
5 Box Sekering + MCB 60,000.00 /Bh
6 Stop Kontak 18,000.00 /Bh
7 Schakelar tunggal 30,000.00 /Bh
8 Schakelar ganda 32,400.00 /Bh
9 Schakelar Triple 36,000.00 /Bh
Sanitair
1 Tempat sabun keramik 30,000.00 /Bh
2 Kran air biasa 24,000.00 /Bh
3 Kran air sink/leher angsa 60,000.00 /Bh
4 Bak air fiber kapasitas 0,3 M3 720,000.00 /Bh
5 Closet jongkok (setara TOTO) 390,000.00 /Bh
6 Floor drain 15,000.00 /Bh
7 Pembuangan bak air 21,600.00 /Bh
8 Wastafel + Accessories 861,000.00 /Unit
9 Tempat Cuci Stainless Stell 2 Sink 492,000.00 /Unit
10 Tempat Cuci Stainless Stell 1 Sink 344,400.00 /Unit
11 Septictank + Resapan + Bak Kontrol 3,690,000.00 /Pkt
12 Pipa PVC Ø 1/2" 3,478.44 /M'
13 Pipa PVC Ø 3/4" 5,150.01 /M'
14 Pipa PVC Ø 1 1/2" 20,677.53 /M'
15 Pipa PVC Ø 2" 23,370.00 /M'
16 Pipa PVC Ø 2 1/2" 35,670.00 /M'
17 Pipa PVC Ø 3" 69,955.02 /M'
18 Pipa PVC Ø 4" 86,100.00 /M'
19 Seal tape 9,225.00 /Bh
Kunci-Kunci dan Kaca
1 Kunci tanam 2 slaag 136,800.00 /Bh
2 Kunci tanam biasa 108,000.00 /Bh
3 Engsel pintu 30,000.00 /Psg
5 Engsel jendela / ventilasi 20,400.00 /Psg
6 Grendel jendela 12,000.00 /Bh
7 Hak angin jendela 10,800.00 /Bh
8 Pegengan jendela 13,200.00 /Bh
9 Pacok pintu (untuk pintu double) 48,000.00 /Bh
10 Kaca Bening, t = 3 mm 108,000.00 /M2
11 Kaca Bening, t = 5 mm 165,000.00 /M2
12 Kaca Rayband, t = 5 mm 201,600.00 /M2

Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris
DAFTAR ANALISA HARGA SATUAN

RSNI T-12-2002.6.4 1m' Pengukuran dan Pemasangan Bouwplank


Bahan
Kayu 5/7 Kelas III 0.012 M³ x Rp.
Paku biasa 2" - 5" 0.020 Kg x Rp.
Kayu papan 3/20 0.007 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.100 OH x Rp.
Tukang kayu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.005 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Diambil 1/2 dari Jumlah (1) + (2)

RSNI T-12-2002.6.8 1 m² Membersihkan lapangan dan perataan


Tenaga
Pekerja 0.100 OH x Rp.
Mandor 0.050 OH x Rp.
A Jumlah
B 10%
C Jumlah Harga (A

SNI 2835:2008.6.1 1 m³ Galian tanah biasa sedalam 1 meter


Tenaga
Pekerja 0.750 OH x Rp.
Mandor 0.025 OH x Rp.
A Jumlah
B 10%
C Jumlah Harga (A

SNI 2835:2008.6.9 1 m³ Urugan kembali (dihitung 1/3 dari indeks pekerjaan galian)
Tenaga
Pekerja 0.250 OH x Rp.
Mandor 0.008 OH x Rp.
A Jumlah
B 10%
C Jumlah Harga (A

SNI 2835:2008.6.10 1 m³ Memadatkan tanah (per 20 cm)


Tenaga
Pekerja 0.500 OH x Rp.
Mandor 0.050 OH x Rp.
A Jumlah
B 10%
C Jumlah Harga (A

SNI 2835:2008.6.11 1 m³ Urugan pasir


Bahan
Pasir urug 1.200 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.300 OH x Rp.
Mandor 0.010 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2835:2008.6.15 1 m² Mengurug sirtu padat


Bahan
Sirtu 1.200 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.250 Oh x Rp.
Mandor 0.025 Oh x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2835:2008.6.16 1 m³ Urugan tanah urug


Bahan
Tanah urug 1.200 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.300 OH x Rp.
Mandor 0.010 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
SNI 2835:2008.6.17 1 m³ Urugan timbunan pilihan
Bahan
Timbunan pilihan 1.200 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.300 OH x Rp.
Mandor 0.010 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2836:2008.6.2 1 m³ Pasang pondasi batu belah/gunung/kali, 1 Pc : 4 Pp


Bahan
Batu kali/batu belah (sungai/gunung) 1.200 M³ x Rp.
Semen portland 163.000 Kg x Rp.
Pasir pasang 0.520 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 1.500 OH x Rp.
Tukang batu 0.750 OH x Rp.
Kepala tukang 0.075 OH x Rp.
Mandor 0.075 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2836:2008.6.9 1 m³ Pasang pondasi batu kosong


Bahan
Batu kali 1.200 M³ x Rp.
Pasir urug 0.432 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.780 OH x Rp.
Tukang batu 0.390 OH x Rp.
Kepala tukang 0.039 OH x Rp.
Mandor 0.039 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2836:2008.6.10 1 m³ Pasang pondasi Cyclope 60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Be
Bahan
Batu kali/belah/gunung 0.480 M³ x Rp.
Semen Pc 194.000 Kg x Rp.
Pasir beton 0.312 M³ x Rp.
Kerikil beton 0.468 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 3.400 OH x Rp.
Tukang batu 0.850 OH x Rp.
Kepala tukang 0.085 OH x Rp.
Mandor 0.170 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 6897:2008.6.7 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps


Bahan
Bata merah 5 x 10 x 20 cm 70.000 Bh x Rp.
Semen portland 18.950 Kg x Rp.
Pasir pasang 0.038 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 6897:2008.6.8 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps


Bahan
Bata merah 5 x 10 x 20 cm 70.000 Bh x Rp.
Semen portland 14.370 Kg x Rp.
Pasir pasang 0.040 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
SNI 6897:2008.6.9 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps
Bahan
Bata merah 5 x 10 x 20 cm 70.000 Bh x Rp.
Semen portland 11.500 Kg x Rp.
Pasir pasang 0.043 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2837:2008.6.2 1 m² Plesteran 1 Pc : 2 Ps, tebal 15 mm


Bahan
Semen portland 10.224 Kg x Rp.
Pasir pasang 0.020 M³ x Rp.

Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.150 OH x Rp.
Kepala tukang 0.015 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2837:2008.6.3 1 m² Plesteran 1 Pc : 3 Ps, tebal 15 mm


Bahan
Semen portland 7.776 Kg x Rp.
Pasir pasang 0.023 M³ x Rp.

Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.150 OH x Rp.
Kepala tukang 0.015 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2837:2008.6.4 1 m² Plesteran 1 Pc : 4 Ps, tebal 15 mm


Bahan
Semen portland 6.240 Kg x Rp.
Pasir pasang 0.024 M³ x Rp.

Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.150 OH x Rp.
Kepala tukang 0.015 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2837:2008.6.23 1 m² Plesteran ciprat 1 Pc : 2 Ps


Bahan
Semen portland 4.320 Kg x Rp.
Pasir pasang 0.006 M³ x Rp.
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 2837:2008.6.27 1 m² Membuat acian


Bahan
Semen portland 3.325 Kg x Rp.

Tenaga
Pekerja 0.200 OH x Rp.
Tukang batu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.010 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
SNI 91-0012-2007-6.66.a 1 m² Memasang Paving Block Baru
Bahan
Pasir Pasang 0.045 M³ x Rp.
Paving Block 40.000 Bh x Rp.
Jumlah (1)
Tenaga
Pekerja 0.620 Oh x Rp.
Tukang cat 0.350 Oh x Rp.
Kepala tukang 0.035 Oh x Rp.
Mandor 0.030 Oh x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 91-0012-2007-6.66.b 1 m² Memasang Paving Block Lama + 30% Paving Block Baru
Bahan
Pasir Pasang 0.045 M³ x Rp.
Paving Block 8.000 Bh x Rp.
Jumlah (1)
Tenaga
Pekerja 0.620 Oh x Rp.
Tukang cat 0.350 Oh x Rp.
Kepala tukang 0.035 Oh x Rp.
Mandor 0.030 Oh x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 7394:2008.6.1 1 m³ Beton mutu f'c=7,4 Mpa (K100), slump(12 ± 2) cm,w/c=0,87


Bahan
Semen Portland 247.000 Kg x Rp.
Pasir Beton 0.621 M³ x Rp.
Kerikil beton (maksimum 30 mm) 0.740 M³ x Rp.
Air 215.000 ltr x Rp.
Jumlah (1)
Tenaga
Pekerja 1.650 OH x Rp.
Tukang batu 0.275 OH x Rp.
Kepala tukang 0.028 OH x Rp.
Mandor 0.083 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 7394:2008.6.3 1 m³ Beton mutu f'c=12,2 Mpa (K150), slump(12 ± 2) cm,w/c=0,72


Bahan
Semen Portland 299.000 Kg x Rp.
Pasir Beton 0.571 M³ x Rp.
Kerikil beton (maksimum 30 mm) 0.753 M³ x Rp.
Air 215.000 ltr x Rp.
Jumlah (1)
Tenaga
Pekerja 1.650 OH x Rp.
Tukang batu 0.275 OH x Rp.
Kepala tukang 0.028 OH x Rp.
Mandor 0.083 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 7394:2008.6.5 1 m³ Beton mutu f'c=14,5 Mpa (K175), slump(12 ± 2) cm,w/c=0,66


Bahan
Semen portland 326.000 Kg x Rp.
Pasir beton 0.543 M³ x Rp.
Kerikil beton (maksimum 30 mm) 0.762 M³ x Rp.
Air 215.000 ltr x Rp.
Jumlah (1)
Tenaga
Pekerja 1.650 OH x Rp.
Tukang batu 0.275 OH x Rp.
Kepala tukang 0.028 OH x Rp.
Mandor 0.083 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A

SNI 7394:2008.6.17 10 Kg Pembesian dengan besi polos


Bahan
Besi beton polos 10.500 Kg x Rp.
Kawat beton 0.150 Kg x Rp.
Jumlah (1)
Tenaga
Pekerja 0.070 OH x Rp.
Tukang besi 0.070 OH x Rp.
Kepala tukang 0.007 OH x Rp.
Mandor 0.004 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Untuk 1 Kg Pembesian dengan besi Beton Polos = 1/10 x Jumlah
SNI 7394:2008.6.20 1 m² Memasang bekisting untuk pondasi
Bahan
Papan/Kayu Klas III 0.040 M³ x Rp.
Paku kayu 0.300 Kg x Rp.
Minyak bekisting 0.100 Liter x Rp.
Jumlah (1)
Tenaga
Pekerja 0.520 OH x Rp.
Tukang kayu 0.260 OH x Rp.
Kepala tukang 0.026 OH x Rp.
Mandor 0.026 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Untuk 3x pakai Jumlah

SNI 7394:2008.6.21 1 m² Memasang bekisting untuk sloof


Bahan
Papan/Kayu Klas III 0.045 M³ x Rp.
Paku kayu 0.300 Kg x Rp.
Minyak bekisting 0.100 Liter x Rp.
Jumlah (1)
Tenaga
Pekerja 0.520 OH x Rp.
Tukang kayu 0.260 OH x Rp.
Kepala tukang 0.026 OH x Rp.
Mandor 0.026 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Untuk 3x pakai Jumlah

SNI 7394:2008.6.22 1 m² Memasang bekisting untuk kolom


Bahan
Papan/Kayu Klas III 0.040 M³ x Rp.
Paku kayu 0.400 Kg x Rp.
Minyak bekisting 0.200 Liter x Rp.
Balok kayu kelas III 0.015 M³ x Rp.
Plywood tebal 9 mm 0.350 Lbr x Rp.
Dolken kayu galam Ø (8-10) cm, panjang 4 m 2.000 Btg x Rp.
Jumlah (1)
Tenaga
Pekerja 0.660 OH x Rp.
Tukang kayu 0.330 OH x Rp.
Kepala tukang 0.033 OH x Rp.
Mandor 0.033 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Untuk 3x pakai Jumlah

SNI 7394:2008.6.23 1 m² Memasang bekisting untuk balok


Bahan
Papan/Kayu Klas III 0.040 M³ x Rp.
Paku kayu 0.400 Kg x Rp.
Minyak bekisting 0.200 Liter x Rp.
Balok kayu kelas III 0.018 M³ x Rp.
Plywood tebal 9 mm 0.350 Lbr x Rp.
Dolken kayu galam Ø (8-10) cm, panjang 4 m 2.000 Btg x Rp.
Jumlah (1)
Tenaga
Pekerja 0.660 OH x Rp.
Tukang kayu 0.330 OH x Rp.
Kepala tukang 0.033 OH x Rp.
Mandor 0.033 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Untuk 3x pakai Jumlah

SNI 7394:2008.6.24 1 m² Memasang bekisting untuk plat


Bahan
Papan/Kayu Klas III 0.040 M³ x Rp.
Paku kayu 0.400 Kg x Rp.
Minyak bekisting 0.200 Liter x Rp.
Balok kayu kelas III 0.015 M³ x Rp.
Plywood tebal 9 mm 0.350 Lbr x Rp.
Dolken kayu galam Ø (8-10) cm, panjang 4 m 6.000 Btg x Rp.
Jumlah (1)
Tenaga
Pekerja 0.660 OH x Rp.
Tukang kayu 0.330 OH x Rp.
Kepala tukang 0.033 OH x Rp.
Mandor 0.033 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Untuk 3x pakai Jumlah
Pekerjaan Lain-lain Untuk membongkar cetakan dan menyiram beton yang diperlukan
- Pekerja 2.000 OH x Rp.
A Jumlah
B 10%
C Jumlah Harga (A

Supl. SNI 7394:2008.2.a 1 m³ Beton bertulang Sloof 15/20 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 241.608 Kg x Rp.
SNI 7394:2008.6.21 - Cetakan Beton untuk Sloof 13.333 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.2.b 1 m³ Beton bertulang Sloof 18/25 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 176.613 Kg x Rp.
SNI 7394:2008.6.21 - Cetakan Beton untuk Sloof 11.667 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.3.a 1 m³ Beton bertulang kolom 18x18 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 209.363 Kg x Rp.
SNI 7394:2008.6.22 - Cetakan Beton untuk kolom 13.333 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.3.b 1 m³ Beton bertulang kolom praktis 13x13 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 181.065 Kg x Rp.
SNI 7394:2008.6.22 - Cetakan Beton untuk kolom 15.385 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.3.c 1 m³ Beton bertulang kolom 25x25 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 142.199 Kg x Rp.
SNI 7394:2008.6.22 - Cetakan Beton untuk kolom 16.000 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.4.a 1 m³ Beton bertulang ring balok 15/20 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 191.600 Kg x Rp.
SNI 7394:2008.6.23 - Cetakan Beton untuk balok 14.359 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.4.b 1 m³ Beton bertulang balok latei/top geuvel 13/15 cm


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 181.065 Kg x Rp.
SNI 7394:2008.6.23 - Cetakan Beton untuk balok 15.385 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

Supl. SNI 7394:2008.5 1 m³ Beton bertulang plat


SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp.
SNI 7394:2008.6.17 - Pekerjaan Besi 108.500 Kg x Rp.
SNI 7394:2008.6.24 - Cetakan Beton untuk plat 13.500 M² x Rp.
- Pekerjaan Lain-lain 1.000 x Rp.
Jumlah

SNI 3434:2008.6.1 1 m3 Membuat dan memasang kusen pintu dan kusen jendela, Kayu kelas II
Bahan
Kayu kelas II 1.100 M³ x Rp.
Paku kayu 1.250 Kg x Rp.
Lem kayu 1.000 Kg x Rp.
Jumlah (1)
Tenaga
Pekerja 7.000 OH x Rp.
Tukang kayu 21.000 OH x Rp.
Kepala tukang 2.100 OH x Rp.
Mandor 0.350 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 3434:2008.6.29 1 m2 Membuat dan memasang daun pintu panel lapis seng plat, Kayu kelas II
Bahan
Kayu kelas II 0.040 M³ x Rp.
Lem kayu 0.500 Kg x Rp.
Seng plat 1.000 lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 1.000 OH x Rp.
Tukang kayu 3.000 OH x Rp.
Kepala tukang 0.300 OH x Rp.
Mandor 0.050 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
Pt T-30-2000-C.6.1.2 1 bh Memasang Kunci tanam 2 slaag
Bahan
Kunci tanam 2 slaag 1.000 BH x Rp.
Jumlah (1)
Tenaga
Tukang Kayu 0.500 OH x Rp.
Kepala Tukang 0.050 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt T-30-2000-C.6.1.5 1 bh Memasang engsel pintu


Bahan
Engsel pintu 1.000 PSG x Rp.
Jumlah (1)
Tenaga
Tukang Kayu 0.100 OH x Rp.
Kepala Tukang 0.010 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt T-30-2000-C.6.1.5 1 bh Memasang engsel Jendela


Bahan
Engsel Jendela 1.000 PSG x Rp.
Jumlah (1)
Tenaga
Tukang Kayu 0.100 OH x Rp.
Kepala Tukang 0.010 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt T-30-2000-C.6.2.3a 1 m2 Memasang kaca bening tebal 5 mm


Bahan
Kaca Tebal 5 mm 1.100 M2 x Rp.
Jumlah (1)
Tenaga
Pekerja 0.160 OH x Rp.
Tukang kayu 0.160 OH x Rp.
Kepala tukang 0.016 OH x Rp.
Mandor 0.008 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 03 -3436-1994 - 6.1 1 m² Memasang Atap seng Multiroof


Bahan
Seng Multiroof 1.000 M2 x Rp.
Screw/baut Seng Multi Roof 9.000 Bh x Rp.
Jumlah (1)
Tenaga
Pekerja 0.200 OH x Rp.
Tukang 0.100 OH x Rp.
Kepala Tukang 0.010 OH x Rp.
Mandor 0.001 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 03 -3436-1994 - 6.1 1 m1 Memasang Rabung seng Multiroof


Bahan
Rabung Seng Multiroof 1.020 M1 x Rp.
Screw/baut Seng Multi Roof 9.000 Bh x Rp.
Jumlah (1)
Tenaga
Pekerja 0.250 OH x Rp.
Tukang 0.150 OH x Rp.
Kepala Tukang 0.015 OH x Rp.
Mandor 0.013 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 3434:2008 (6.13) 1 M3 konstruksi kuda-kuda konvensional, kayu kelas I, II, III bentang 6 meter
Bahan
Balok Kayu 1.100 M3 x Rp.
Besi strip tebal 5 mm 15.00 Kg x Rp.
Paku 12 cm 5.600 Kg x Rp.
Jumlah (1)
Tenaga
Pekerja 4.000 OH x Rp.
Tukang 12.000 OH x Rp.
Kepala Tukang 1.200 OH x Rp.
Mandor 0.200 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 3434:2008 (6.15) 1 M3 konstruksi gordeng, kayu kelas II


Bahan
Balok Kayu 1.100 M3 x Rp.
Paku 12 cm 3.000 Kg x Rp.
Jumlah (1)
Tenaga
Pekerja 2.400 OH x Rp.
Tukang 7.200 OH x Rp.
Kepala Tukang 0.720 OH x Rp.
Mandor 0.120 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 3434:2008 (6.21) 1 M1 Lisplank Uk. 3 x 20 cm, kayu kelas II


Bahan
Papan Kayu 1.020 M1 x Rp.
Paku 12 cm 0.050 Kg x Rp.
Jumlah (1)
Tenaga
Pekerja 0.100 OH x Rp.
Tukang 0.200 OH x Rp.
Kepala Tukang 0.020 OH x Rp.
Mandor 0.005 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 2839:2008.6.10 1 m' List Langit - langit Kayu profil


Bahan
List kayu profil 1.100 M' x Rp.
Paku 0.010 Kg x Rp.

Tenaga
Pekerja 0.050 Oh x Rp.
Tukang kayu 0.050 Oh x Rp.
Kepala tukang 0.005 Oh x Rp.
Mandor 0.003 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 2839:2008.6.12 1 m² Memasang Plafond tripleks tebal 4 mm + rangka kayu
Bahan
Kayu kelas II 0.023 M³ x Rp.
Paku biasa 2" - 5" 0.060 Kg x Rp.
Paku Tripleks 0.030 Kg x Rp.
Tripleks tebal 4 mm 0.390 Lbr x Rp.

Tenaga
Pekerja 0.270 Oh x Rp.
Tukang kayu 0.400 Oh x Rp.
Kepala tukang 0.040 Oh x Rp.
Mandor 0.0135 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 7395:2008.6.36 1 m² Memasang Lantai Keramik 20 x 20 cm
Bahan
Keramik 20 x 20 cm 26.500 Bh x Rp.
Semen PC 10.400 Kg x Rp.
Pasir Pasang 0.045 M³ x Rp.
Semen warna 1.620 Kg x Rp.

Tenaga
Pekerja 0.700 OH x Rp.
Tukang batu 0.350 OH x Rp.
Kepala tukang 0.035 OH x Rp.
Mandor 0.035 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 7395:2008.6.65 1 m² Memasang Dinding Keramik 20 x 25 cm


Bahan
Keramik 20 x 25 cm 21.000 Bh x Rp.
Semen PC 9.300 Kg x Rp.
Pasir Pasang 0.018 M³ x Rp.
Semen warna 1.940 Kg x Rp.

Tenaga
Pekerja 0.900 OH x Rp.
Tukang batu 0.450 OH x Rp.
Kepala tukang 0.045 OH x Rp.
Mandor 0.045 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 7395:2008.6.64.a 1 m² Memasang Lantai Keramik 40 x 40 cm Polished


Bahan
Keramik 40 x 40 cm Polished 6.500 Bh x Rp.
Semen PC 10.000 Kg x Rp.
Pasir Pasang 0.045 M³ x Rp.
Semen warna 1.500 Kg x Rp.

Tenaga
Pekerja 0.700 OH x Rp.
Tukang batu 0.350 OH x Rp.
Kepala tukang 0.035 OH x Rp.
Mandor 0.035 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 7395:2008.6.64.b 1 m² Memasang Lantai Keramik 40 x 40 cm Unpolished


Bahan
Keramik 40 x 40 cm Unpolished 6.500 Bh x Rp.
Semen PC 10.000 Kg x Rp.
Pasir Pasang 0.045 M³ x Rp.
Semen warna 1.500 Kg x Rp.
Tenaga
Pekerja 0.700 OH x Rp.
Tukang batu 0.350 OH x Rp.
Kepala tukang 0.035 OH x Rp.
Mandor 0.035 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt-T-38-2000-C.6.2 1 m² Membersihkan/mencuci cat tembok lama cara manual


Tenaga
Pekerja 0.080 Oh x Rp.
Mandor 0.040 Oh x Rp.
Jumlah
Pt-T-38-2000-C.6.8 1 m² Pengecatan bidang kayu baru
Bahan
Cat Menie 0.200 Kg x Rp.
Plamir 0.150 Kg x Rp.
Cat dasar 0.170 Kg x Rp.
Cat Kayu 0.260 Kg x Rp.
Kertas Pasir 0.500 Lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 0.070 Oh x Rp.
Tukang cat 0.009 Oh x Rp.
Kepala tukang 0.0060 Oh x Rp.
Mandor 0.0025 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt-T-38-2000-C.6.14 1 m² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir 0.100 Kg x Rp.
Cat dasar 0.120 Kg x Rp.
Cat Tembok 2 x 0.240 Kg x Rp.
Kertas Pasir 0.200 Lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 0.020 Oh x Rp.
Tukang cat 0.063 Oh x Rp.
Kepala tukang 0.0063 Oh x Rp.
Mandor 0.0025 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt-T-38-2000-C.6.15 1 m² Pengecatan tembok lama (2 lapis cat penutup )


Bahan
Cat Tembok 2 x 0.240 Kg x Rp.
Kertas Pasir 0.200 Lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 0.020 Oh x Rp.
Tukang cat 0.063 Oh x Rp.
Kepala tukang 0.0063 Oh x Rp.
Mandor 0.0025 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt-T-38-2000-C.6.16 1 m² Pengecatan Plafond ( dempul + 2 lapis cat penutup )


Bahan
Plamir 0.100 Kg x Rp.
Cat Tembok 2 x 0.240 Kg x Rp.
Kertas Pasir 0.500 Lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 0.080 Oh x Rp.
Tukang cat 0.063 Oh x Rp.
Kepala tukang 0.0063 Oh x Rp.
Mandor 0.004 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)
ANALISA HARGA SATUAN

1,830,000.00 = Rp. 21,960.00


14,160.00 = Rp. 283.20
2,440,800.00 = Rp. 17,085.60
Jumlah (1) = Rp. 39,328.80

45,000.00 = Rp. 4,500.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 290.00
Jumlah (2) = Rp. 10,990.00
Jumlah (1) + (2) = Rp. 50,318.80
Overhead x A = Rp. 5,031.88
Jumlah Harga (A + B) = Rp. 55,350.68
= Rp. 27,675.34

45,000.00 = Rp. 4,500.00


58,000.00 = Rp. 2,900.00
Jumlah = Rp. 7,400.00
Overhead x A = Rp. 740.00
Jumlah Harga (A + B) = Rp. 8,140.00

45,000.00 = Rp. 33,750.00


58,000.00 = Rp. 1,450.00
Jumlah = Rp. 35,200.00
Overhead x A = Rp. 3,520.00
Jumlah Harga (A + B) = Rp. 38,720.00

45,000.00 = Rp. 11,250.00


58,000.00 = Rp. 483.33
Jumlah = Rp. 11,733.33
Overhead x A = Rp. 1,173.33
Jumlah Harga (A + B) = Rp. 12,906.67

45,000.00 = Rp. 22,500.00


58,000.00 = Rp. 2,900.00
Jumlah = Rp. 25,400.00
Overhead x A = Rp. 2,540.00
Jumlah Harga (A + B) = Rp. 27,940.00

74,160.00 = Rp. 88,992.00


Jumlah (1) = Rp. 88,992.00

45,000.00 = Rp. 13,500.00


58,000.00 = Rp. 580.00
Jumlah (2) = Rp. 14,080.00
Jumlah (1) + (2) = Rp. 103,072.00
Overhead x A = Rp. 10,307.20
Jumlah Harga (A + B) = Rp. 113,379.20

240,000.00 = Rp. 288,000.00


Jumlah (1) = Rp. 288,000.00

45,000.00 = Rp. 11,250.00


58,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 12,700.00
Jumlah (1) + (2) = Rp. 300,700.00
Overhead x A = Rp. 30,070.00
Jumlah Harga (A + B) = Rp. 330,770.00

96,408.00 = Rp. 115,689.60


Jumlah (1) = Rp. 115,689.60

45,000.00 = Rp. 13,500.00


58,000.00 = Rp. 580.00
Jumlah (2) = Rp. 14,080.00
Jumlah (1) + (2) = Rp. 129,769.60
Overhead x A = Rp. 12,976.96
Jumlah Harga (A + B) = Rp. 142,746.56
111,240.00 = Rp. 133,488.00
Jumlah (1) = Rp. 133,488.00

45,000.00 = Rp. 13,500.00


58,000.00 = Rp. 580.00
Jumlah (2) = Rp. 14,080.00
Jumlah (1) + (2) = Rp. 147,568.00
Overhead x A = Rp. 14,756.80
Jumlah Harga (A + B) = Rp. 162,324.80

279,600.00 = Rp. 335,520.00


1,480.00 = Rp. 241,240.00
108,000.00 = Rp. 56,160.00
Jumlah (1) = Rp. 632,920.00

45,000.00 = Rp. 67,500.00


55,000.00 = Rp. 41,250.00
70,000.00 = Rp. 5,250.00
58,000.00 = Rp. 4,350.00
Jumlah (2) = Rp. 118,350.00
Jumlah (1) + (2) = Rp. 751,270.00
Overhead x A = Rp. 75,127.00
Jumlah Harga (A + B) = Rp. 826,397.00

279,600.00 = Rp. 335,520.00


74,160.00 = Rp. 32,037.12
Jumlah (1) = Rp. 367,557.12

45,000.00 = Rp. 35,100.00


55,000.00 = Rp. 21,450.00
70,000.00 = Rp. 2,730.00
58,000.00 = Rp. 2,262.00
Jumlah (2) = Rp. 61,542.00
Jumlah (1) + (2) = Rp. 429,099.12
Overhead x A = Rp. 42,909.91
Jumlah Harga (A + B) = Rp. 472,009.03

60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Belah/Gunung

279,600.00 = Rp. 134,208.00


1,480.00 = Rp. 287,120.00
129,600.00 = Rp. 40,435.20
150,000.00 = Rp. 70,200.00
Jumlah (1) = Rp. 531,963.20

45,000.00 = Rp. 153,000.00


55,000.00 = Rp. 46,750.00
70,000.00 = Rp. 5,950.00
58,000.00 = Rp. 9,860.00
Jumlah (2) = Rp. 215,560.00
Jumlah (1) + (2) = Rp. 747,523.20
Overhead x A = Rp. 74,752.32
Jumlah Harga (A + B) = Rp. 822,275.52

960.00 = Rp. 67,200.00


1,480.00 = Rp. 28,046.00
108,000.00 = Rp. 4,104.00
Jumlah (1) = Rp. 99,350.00

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 20,570.00
Jumlah (1) + (2) = Rp. 119,920.00
Overhead x A = Rp. 11,992.00
Jumlah Harga (A + B) = Rp. 131,912.00

960.00 = Rp. 67,200.00


1,480.00 = Rp. 21,267.60
108,000.00 = Rp. 4,320.00
Jumlah (1) = Rp. 92,787.60

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 20,570.00
Jumlah (1) + (2) = Rp. 113,357.60
Overhead x A = Rp. 11,335.76
Jumlah Harga (A + B) = Rp. 124,693.36
960.00 = Rp. 67,200.00
1,480.00 = Rp. 17,020.00
108,000.00 = Rp. 4,644.00
Jumlah (1) = Rp. 88,864.00

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 20,570.00
Jumlah (1) + (2) = Rp. 109,434.00
Overhead x A = Rp. 10,943.40
Jumlah Harga (A + B) = Rp. 120,377.40

1,480.00 = Rp. 15,131.52


108,000.00 = Rp. 2,160.00
Jumlah (1) = Rp. 17,291.52

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 8,250.00
70,000.00 = Rp. 1,050.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 23,670.00
Jumlah (1) + (2) = Rp. 40,961.52
Overhead x A = Rp. 4,096.15
Jumlah Harga (A + B) = Rp. 45,057.67

1,480.00 = Rp. 11,508.48


108,000.00 = Rp. 2,484.00
Jumlah (1) = Rp. 13,992.48

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 8,250.00
70,000.00 = Rp. 1,050.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 23,670.00
Jumlah (1) + (2) = Rp. 37,662.48
Overhead x A = Rp. 3,766.25
Jumlah Harga (A + B) = Rp. 41,428.73

1,480.00 = Rp. 9,235.20


108,000.00 = Rp. 2,592.00
Jumlah (1) = Rp. 11,827.20

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 8,250.00
70,000.00 = Rp. 1,050.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 23,670.00
Jumlah (1) + (2) = Rp. 35,497.20
Overhead x A = Rp. 3,549.72
Jumlah Harga (A + B) = Rp. 39,046.92

1,480.00 = Rp. 6,393.60


108,000.00 = Rp. 648.00
Jumlah (1) = Rp. 7,041.60

45,000.00 = Rp. 13,500.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 870.00
Jumlah (2) = Rp. 20,570.00
Jumlah (1) + (2) = Rp. 27,611.60
Overhead x A = Rp. 2,761.16
Jumlah Harga (A + B) = Rp. 30,372.76

1,480.00 = Rp. 4,921.00


Jumlah (1) = Rp. 4,921.00

45,000.00 = Rp. 9,000.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 580.00
Jumlah (2) = Rp. 15,780.00
Jumlah (1) + (2) = Rp. 20,701.00
Overhead x A = Rp. 2,070.10
Jumlah Harga (A + B) = Rp. 22,771.10
108,000.00 = Rp. 4,860.00
2,100.00 = Rp. 84,000.00
Jumlah (1) = Rp. 88,860.00

45,000.00 = Rp. 27,900.00


55,000.00 = Rp. 19,250.00
70,000.00 = Rp. 2,450.00
58,000.00 = Rp. 1,740.00
Jumlah (2) = Rp. 51,340.00
Jumlah (1) + (2) = Rp. 140,200.00
Overhead x A = Rp. 14,020.00
Jumlah Harga (A + B) = Rp. 154,220.00

108,000.00 = Rp. 4,860.00


2,100.00 = Rp. 16,800.00
Jumlah (1) = Rp. 21,660.00

45,000.00 = Rp. 27,900.00


55,000.00 = Rp. 19,250.00
70,000.00 = Rp. 2,450.00
58,000.00 = Rp. 1,740.00
Jumlah (2) = Rp. 51,340.00
Jumlah (1) + (2) = Rp. 73,000.00
Overhead x A = Rp. 7,300.00
Jumlah Harga (A + B) = Rp. 80,300.00

1,480.00 = Rp. 365,560.00


129,600.00 = Rp. 80,481.60
129,600.00 = Rp. 95,904.00
150.00 = Rp. 32,250.00
Jumlah (1) = Rp. 574,195.60

45,000.00 = Rp. 74,250.00


55,000.00 = Rp. 15,125.00
70,000.00 = Rp. 1,960.00
58,000.00 = Rp. 4,814.00
Jumlah (2) = Rp. 96,149.00
Jumlah (1) + (2) = Rp. 670,344.60
Overhead x A = Rp. 67,034.46
Jumlah Harga (A + B) = Rp. 737,379.06

1,480.00 = Rp. 442,520.00


129,600.00 = Rp. 74,001.60
129,600.00 = Rp. 97,588.80
150.00 = Rp. 32,250.00
Jumlah (1) = Rp. 646,360.40

45,000.00 = Rp. 74,250.00


55,000.00 = Rp. 15,125.00
70,000.00 = Rp. 1,960.00
58,000.00 = Rp. 4,814.00
Jumlah (2) = Rp. 96,149.00
Jumlah (1) + (2) = Rp. 742,509.40
Overhead x A = Rp. 74,250.94
Jumlah Harga (A + B) = Rp. 816,760.34
1,480.00 = Rp. 482,480.00
129,600.00 = Rp. 70,372.80
129,600.00 = Rp. 98,755.20
150.00 = Rp. 32,250.00
Jumlah (1) = Rp. 683,858.00

45,000.00 = Rp. 74,250.00


55,000.00 = Rp. 15,125.00
70,000.00 = Rp. 1,960.00
58,000.00 = Rp. 4,814.00
Jumlah (2) = Rp. 96,149.00
Jumlah (1) + (2) = Rp. 780,007.00
Overhead x A = Rp. 78,000.70
Jumlah Harga (A + B) = Rp. 858,007.70

11,280.00 = Rp. 118,440.00


14,400.00 = Rp. 2,160.00
Jumlah (1) = Rp. 120,600.00

45,000.00 = Rp. 3,150.00


55,000.00 = Rp. 3,850.00
70,000.00 = Rp. 490.00
58,000.00 = Rp. 232.00
Jumlah (2) = Rp. 7,722.00
Jumlah (1) + (2) = Rp. 128,322.00
Overhead x A = Rp. 12,832.20
Jumlah Harga (A + B) = Rp. 141,154.20
Jumlah = Rp. 14,115.42
1,830,000.00 = Rp. 73,200.00
14,160.00 = Rp. 4,248.00
12,000.00 = Rp. 1,200.00
Jumlah (1) = Rp. 78,648.00

45,000.00 = Rp. 23,400.00


55,000.00 = Rp. 14,300.00
70,000.00 = Rp. 1,820.00
58,000.00 = Rp. 1,508.00
Jumlah (2) = Rp. 41,028.00
Jumlah (1) + (2) = Rp. 119,676.00
Overhead x A = Rp. 11,967.60
Jumlah Harga (A + B) = Rp. 131,643.60
Jumlah = Rp. 43,881.20

1,830,000.00 = Rp. 82,350.00


14,160.00 = Rp. 4,248.00
12,000.00 = Rp. 1,200.00
Jumlah (1) = Rp. 87,798.00

45,000.00 = Rp. 23,400.00


55,000.00 = Rp. 14,300.00
70,000.00 = Rp. 1,820.00
58,000.00 = Rp. 1,508.00
Jumlah (2) = Rp. 41,028.00
Jumlah (1) + (2) = Rp. 128,826.00
Overhead x A = Rp. 12,882.60
Jumlah Harga (A + B) = Rp. 141,708.60
Jumlah = Rp. 47,236.20

1,830,000.00 = Rp. 73,200.00


14,160.00 = Rp. 5,664.00
12,000.00 = Rp. 2,400.00
1,830,000.00 = Rp. 27,450.00
162,000.00 = Rp. 56,700.00
24,720.00 = Rp. 49,440.00
Jumlah (1) = Rp. 214,854.00

45,000.00 = Rp. 29,700.00


55,000.00 = Rp. 18,150.00
70,000.00 = Rp. 2,310.00
58,000.00 = Rp. 1,914.00
Jumlah (2) = Rp. 52,074.00
Jumlah (1) + (2) = Rp. 266,928.00
Overhead x A = Rp. 26,692.80
Jumlah Harga (A + B) = Rp. 293,620.80
Jumlah = Rp. 97,873.60

1,830,000.00 = Rp. 73,200.00


14,160.00 = Rp. 5,664.00
12,000.00 = Rp. 2,400.00
1,830,000.00 = Rp. 32,940.00
162,000.00 = Rp. 56,700.00
24,720.00 = Rp. 49,440.00
Jumlah (1) = Rp. 220,344.00

45,000.00 = Rp. 29,700.00


55,000.00 = Rp. 18,150.00
70,000.00 = Rp. 2,310.00
58,000.00 = Rp. 1,914.00
Jumlah (2) = Rp. 52,074.00
Jumlah (1) + (2) = Rp. 272,418.00
Overhead x A = Rp. 27,241.80
Jumlah Harga (A + B) = Rp. 299,659.80
Jumlah = Rp. 99,886.60

1,830,000.00 = Rp. 73,200.00


14,160.00 = Rp. 5,664.00
12,000.00 = Rp. 2,400.00
1,830,000.00 = Rp. 27,450.00
162,000.00 = Rp. 56,700.00
24,720.00 = Rp. 148,320.00
Jumlah (1) = Rp. 313,734.00

45,000.00 = Rp. 29,700.00


55,000.00 = Rp. 18,150.00
70,000.00 = Rp. 2,310.00
58,000.00 = Rp. 1,914.00
Jumlah (2) = Rp. 52,074.00
Jumlah (1) + (2) = Rp. 365,808.00
Overhead x A = Rp. 36,580.80
Jumlah Harga (A + B) = Rp. 402,388.80
Jumlah = Rp. 134,129.60
45,000.00 = Rp. 90,000.00
Jumlah = Rp. 90,000.00
Overhead x A = Rp. 9,000.00
Jumlah Harga (A + B) = Rp. 99,000.00

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 3,410,398.40
47,236.20 = Rp. 629,800.25
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 4,910,205.65

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 2,492,971.38
47,236.20 = Rp. 551,089.00
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 3,914,067.38

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 2,955,246.15
97,873.60 = Rp. 1,304,981.33
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 5,130,234.49

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 2,555,809.78
97,873.60 = Rp. 1,505,747.69
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 4,931,564.47

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 2,007,198.61
97,873.60 = Rp. 1,565,977.60
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 4,443,183.21

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 2,704,514.47
99,886.60 = Rp. 1,434,269.13
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 5,008,790.60

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 2,555,809.78
99,886.60 = Rp. 1,536,716.92
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 4,962,533.70

780,007.00 = Rp. 780,007.00


14,115.42 = Rp. 1,531,523.07
134,129.60 = Rp. 1,810,749.60
90,000.00 = Rp. 90,000.00
Jumlah = Rp. 4,212,279.67
2,916,000.00 = Rp. 3,207,600.00
14,160.00 = Rp. 17,700.00
18,000.00 = Rp. 18,000.00
Jumlah (1) = Rp. 3,243,300.00

45,000.00 = Rp. 315,000.00


55,000.00 = Rp. 1,155,000.00
70,000.00 = Rp. 147,000.00
58,000.00 = Rp. 20,300.00
Jumlah (2) = Rp. 1,637,300.00
Jumlah (1) + (2) = Rp. 4,880,600.00

2,916,000.00 = Rp. 116,640.00


18,000.00 = Rp. 9,000.00
108,000.00 = Rp. 108,000.00
Jumlah (1) = Rp. 233,640.00

45,000.00 = Rp. 45,000.00


55,000.00 = Rp. 165,000.00
70,000.00 = Rp. 21,000.00
58,000.00 = Rp. 2,900.00
Jumlah (2) = Rp. 233,900.00
Jumlah (1) + (2) = Rp. 467,540.00
136,800.00 = Rp. 136,800.00
Jumlah (1) = Rp. 136,800.00

55,000.00 = Rp. 27,500.00


70,000.00 = Rp. 3,500.00
Jumlah (2) = Rp. 31,000.00
Jumlah (1) + (2) = Rp. 167,800.00

30,000.00 = Rp. 30,000.00


Jumlah (1) = Rp. 30,000.00

55,000.00 = Rp. 5,500.00


70,000.00 = Rp. 700.00
Jumlah (2) = Rp. 6,200.00
Jumlah (1) + (2) = Rp. 36,200.00

20,400.00 = Rp. 20,400.00


Jumlah (1) = Rp. 20,400.00

55,000.00 = Rp. 5,500.00


70,000.00 = Rp. 700.00
Jumlah (2) = Rp. 6,200.00
Jumlah (1) + (2) = Rp. 26,600.00

165,000.00 = Rp. 181,500.00


Jumlah (1) = Rp. 181,500.00

45,000.00 = Rp. 7,200.00


55,000.00 = Rp. 8,800.00
70,000.00 = Rp. 1,120.00
58,000.00 = Rp. 464.00
Jumlah (2) = Rp. 17,584.00
Jumlah (1) + (2) = Rp. 199,084.00

75,000.00 = Rp. 75,000.00


300.00 = Rp. 2,700.00
Jumlah (1) = Rp. 77,700.00

45,000.00 = Rp. 9,000.00


55,000.00 = Rp. 5,500.00
70,000.00 = Rp. 700.00
58,000.00 = Rp. 58.00
Jumlah (2) = Rp. 15,258.00
Jumlah (1) + (2) = Rp. 92,958.00

30,000.00 = Rp. 30,600.00


300.00 = Rp. 2,700.00
Jumlah (1) = Rp. 33,300.00

45,000.00 = Rp. 11,250.00


55,000.00 = Rp. 8,250.00
70,000.00 = Rp. 1,050.00
58,000.00 = Rp. 754.00
Jumlah (2) = Rp. 21,304.00
Jumlah (1) + (2) = Rp. 54,604.00
vensional, kayu kelas I, II, III bentang 6 meter

3,048,000.00 = Rp. 3,352,800.00


18,500.00 = Rp. 277,500.00
14,160.00 = Rp. 79,296.00
Jumlah (1) = Rp. 3,709,596.00

45,000.00 = Rp. 180,000.00


55,000.00 = Rp. 660,000.00
70,000.00 = Rp. 84,000.00
58,000.00 = Rp. 11,600.00
Jumlah (2) = Rp. 935,600.00
Jumlah (1) + (2) = Rp. 4,645,196.00

1,830,000.00 = Rp. 2,013,000.00


14,160.00 = Rp. 42,480.00
Jumlah (1) = Rp. 2,055,480.00

45,000.00 = Rp. 108,000.00


55,000.00 = Rp. 396,000.00
70,000.00 = Rp. 50,400.00
58,000.00 = Rp. 6,960.00
Jumlah (2) = Rp. 561,360.00
Jumlah (1) + (2) = Rp. 2,616,840.00

15,000.00 = Rp. 15,300.00


14,160.00 = Rp. 708.00
Jumlah (1) = Rp. 16,008.00

45,000.00 = Rp. 4,500.00


55,000.00 = Rp. 11,000.00
70,000.00 = Rp. 1,400.00
58,000.00 = Rp. 290.00
Jumlah (2) = Rp. 17,190.00
Jumlah (1) + (2) = Rp. 33,198.00

12,000.00 = Rp. 13,200.00


14,160.00 = Rp. 141.60
Jumlah (1) = Rp. 13,341.60

45,000.00 = Rp. 2,250.00


55,000.00 = Rp. 2,750.00
70,000.00 = Rp. 350.00
58,000.00 = Rp. 174.00
Jumlah (2) = Rp. 5,524.00
Jumlah (1) + (2) = Rp. 18,865.60
1,830,000.00 = Rp. 42,090.00
14,160.00 = Rp. 849.60
14,160.00 = Rp. 424.80
65,000.00 = Rp. 25,350.00
Jumlah (1) = Rp. 68,714.40

45,000.00 = Rp. 12,150.00


55,000.00 = Rp. 22,000.00
70,000.00 = Rp. 2,800.00
58,000.00 = Rp. 783.00
Jumlah (2) = Rp. 37,733.00
Jumlah (1) + (2) = Rp. 106,447.40
5,280.00 = Rp. 139,920.00
1,480.00 = Rp. 15,392.00
108,000.00 = Rp. 4,860.00
1,780.00 = Rp. 2,883.60
= Rp. 163,055.60

45,000.00 = Rp. 31,500.00


55,000.00 = Rp. 19,250.00
70,000.00 = Rp. 2,450.00
58,000.00 = Rp. 2,030.00
Jumlah (2) = Rp. 55,230.00
Jumlah (1) + (2) = Rp. 218,285.60

6,240.00 = Rp. 131,040.00


1,480.00 = Rp. 13,764.00
108,000.00 = Rp. 1,944.00
1,780.00 = Rp. 3,453.20
= Rp. 150,201.20

45,000.00 = Rp. 40,500.00


55,000.00 = Rp. 24,750.00
70,000.00 = Rp. 3,150.00
58,000.00 = Rp. 2,610.00
Jumlah (2) = Rp. 71,010.00
Jumlah (1) + (2) = Rp. 221,211.20

8,400.00 = Rp. 54,600.00


1,480.00 = Rp. 14,800.00
108,000.00 = Rp. 4,860.00
1,780.00 = Rp. 2,670.00
= Rp. 76,930.00

45,000.00 = Rp. 31,500.00


55,000.00 = Rp. 19,250.00
70,000.00 = Rp. 2,450.00
58,000.00 = Rp. 2,030.00
Jumlah (2) = Rp. 55,230.00
Jumlah (1) + (2) = Rp. 132,160.00

8,760.00 = Rp. 56,940.00


1,480.00 = Rp. 14,800.00
108,000.00 = Rp. 4,860.00
1,780.00 = Rp. 2,670.00
= Rp. 79,270.00
45,000.00 = Rp. 31,500.00
55,000.00 = Rp. 19,250.00
70,000.00 = Rp. 2,450.00
58,000.00 = Rp. 2,030.00
Jumlah (2) = Rp. 55,230.00
Jumlah (1) + (2) = Rp. 134,500.00

45,000.00 = Rp. 3,600.00


58,000.00 = Rp. 2,320.00
Jumlah = Rp. 5,920.00
17,561.50 = Rp. 3,512.30
16,500.00 = Rp. 2,475.00
22,000.00 = Rp. 3,740.00
34,650.00 = Rp. 9,009.00
3,690.00 = Rp. 1,845.00
Jumlah (1) = Rp. 20,581.30

45,000.00 = Rp. 3,150.00


55,000.00 = Rp. 495.00
70,000.00 = Rp. 420.00
58,000.00 = Rp. 145.00
Jumlah (2) = Rp. 4,210.00
Jumlah (1) + (2) = Rp. 24,791.30

( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

16,500.00 = Rp. 1,650.00


22,000.00 = Rp. 2,640.00
30,800.00 = Rp. 7,392.00
3,690.00 = Rp. 738.00
Jumlah (1) = Rp. 12,420.00

45,000.00 = Rp. 900.00


55,000.00 = Rp. 3,465.00
70,000.00 = Rp. 441.00
58,000.00 = Rp. 145.00
Jumlah (2) = Rp. 4,951.00
Jumlah (1) + (2) = Rp. 17,371.00

30,800.00 = Rp. 7,392.00


3,690.00 = Rp. 738.00
Jumlah (1) = Rp. 8,130.00

45,000.00 = Rp. 900.00


55,000.00 = Rp. 3,465.00
70,000.00 = Rp. 441.00
58,000.00 = Rp. 145.00
Jumlah (2) = Rp. 4,951.00
Jumlah (1) + (2) = Rp. 13,081.00

16,500.00 = Rp. 1,650.00


30,800.00 = Rp. 7,392.00
3,690.00 = Rp. 1,845.00
Jumlah (1) = Rp. 10,887.00

45,000.00 = Rp. 3,600.00


55,000.00 = Rp. 3,465.00
70,000.00 = Rp. 441.00
58,000.00 = Rp. 232.00
Jumlah (2) = Rp. 7,738.00
Jumlah (1) + (2) = Rp. 18,625.00
Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris
PERHITUNGAN VOLUME BESI

Berat Jenis Besi


Tulangan Baja/Besi Luas Berat
Polos Ulir (cm2) (kg/m)
P6 U6 0.288 0.222
P8 U8 0.503 0.395
P9 U9 0.636 0.499
P 10 U 10 0.758 0.617
P 12 U 12 1.131 0.888
P 13 U 13 1.327 1.040
P 14 U 14 1.540 1.210
P 16 U 16 2.011 1.580
P 18 U 18 2.545 2.000
P 19 U 19 2.835 2.230
P 20 U 20 3.142 2.470
P 22 U 22 3.801 2.980
P 25 U 25 4.909 3.850
P 28 U 28 6.157 4.830
P 29 U 29 6.605 5.190

SLOOF 15 X 20 CM
Tulangan Utama = 5 Ø 12 Polos BJ 0.89
Sengkang = Ø 8 - 150 Polos BJ 0.40
Luas Penampang = 0.030 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 33.33 m
Luas Bekisting dalam 1m3 = 11.67 m2 11.67
Jumlah Sengkang = 222 Buah
Panjang 1 Sengkang = 0.58 m
Berat Besi = 5 Ø 12 = 148.00 kg
Berat Besi = Ø 4 - 150 = 28.61 kg
Jumlah Berat = 176.61 kg
KOLOM 15 X 15 CM
Tulangan Utama = 4 Ø 12 Polos BJ 0.89
Sengkang = Ø 8 - 150 Polos BJ 0.40
Luas Penampang = 0.023 m2
Selimut Beton = 3 cm
Dalam 1 m3 Panjangnya = 44.44 m
Luas Bekisting dalam 1m3 = 13.33 m2 13.33
Jumlah Sengkang = 296 Buah
Panjang 1 Sengkang = 0.44 m
Berat Besi = 4 Ø 12 = 157.87 kg
Berat Besi = Ø 8 - 150 = 51.50 kg
Jumlah Berat = 209.36 kg
KOLOM PRAKTIS 13 X 13 CM
Tulangan Utama = 4 Ø 10 Polos BJ 0.62
Sengkang = Ø 6 - 150 Polos BJ 0.22
Luas Penampang = 0.017 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 59.17 m
Luas Bekisting dalam 1m3 = 15.38 m2 15.38
Jumlah Sengkang = 394 Buah
Panjang 1 Sengkang = 0.40 m
Berat Besi = 4 Ø 10 = 146.04 kg
Berat Besi = Ø 6 - 150 = 35.03 kg
Jumlah Berat = 181.07 kg

RING BALK 13 X 15 CM
Tulangan Utama = 5 Ø 10 Polos BJ 0.62
Sengkang = Ø 8 - 150 Polos BJ 0.22
Luas Penampang = 0.020 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 51.28 m
Luas Bekisting dalam 1m3 = 14.36 m2 14.36
Jumlah Sengkang = 342 Buah
Panjang 1 Sengkang = 0.44 m
Berat Besi = 5 Ø 10 = 158.21 kg
Berat Besi = Ø 8 - 150 = 33.39 kg
Jumlah Berat = 191.60 kg

BALOK LATAI 13 X 13 CM
Tulangan Utama = 4 Ø 10 Polos BJ 0.62
Sengkang = Ø 8 - 150 Polos BJ 0.22
Luas Penampang = 0.017 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 59.17 m
Luas Bekisting dalam 1m3 = 15.38 m2 15.38
Jumlah Sengkang = 394 Buah
Panjang 1 Sengkang = 0.40 m
Berat Besi = 4 Ø 10 = 146.04 kg
Berat Besi = Ø 8 - 150 = 35.03 kg
Jumlah Berat = 181.07 kg
BERAT BESI BETON POLOS/M'
Diameter Nominal Luas Penampang Berat Nominal
No. Penamaan (d) Nominal (L) per Meter
(mm) (cm2) (kg/m)
1 P.6 6 0.2826 0.222
2 P.8 8 0.5024 0.395
3 P.10 10 0.785 0.617
4 P.12 12 1.1304 0.888
5 P.14 14 1.5386 1.12
6 P.16 16 2.0096 1.58
7 P.19 19 2.8339 2.23
8 P.22 22 3.7994 2.98
9 P.25 25 4.9063 3.85
10 P.28 28 6.1544 4.83
11 P.32 32 8.0384 6.32
Sumber SNI 07-2052-2002
4. Sloof 15/20 cm

B= 15 cm = 0.150 M'
H= 20 cm = 0.200 M'
Panjang Sloof/M3 Beton = 33.333 M'
Panjang Tulangan Utama = 33.333 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.1 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 334.000 Bh
Jumlah Beugel Lapangan = 223.000 Bh
Panjang Beugel = 0.56 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 33.333 4.000 0.888 118.400 Kg
Beugel Tumpuan 0.560 334.000 0.395 73.881 Kg
Beugel Lapangan 0.560 223.000 0.395 49.328 Kg
Berat Total Tulangan/M3 = 241.608 Kg/M3

Bekisting
B H L Luas
0.150 0.200 33.333 13.333 M2
4. Sloof 18/25 cm

B= 18 cm = 0.180 M'
H= 25 cm = 0.250 M'
Panjang Sloof/M Beton =
3
22.222 M'
Panjang Tulangan Utama = 22.222 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.1 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 334.000 Bh
Jumlah Beugel Lapangan = 223.000 Bh
Panjang Beugel = 0.72 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 22.222 4.000 0.888 78.933 Kg
Beugel Tumpuan 0.720 334.000 0.395 94.990 Kg
Beugel Lapangan 0.720 223.000 0.395 63.421 Kg
Berat Total Tulangan/M3 = 237.344 Kg/M3

Bekisting
B H L Luas
0.180 0.250 22.222 11.111 M2
5. Kolom 20x40 cm

B= 20 cm = 0.200 M'
H= 40 cm = 0.400 M'
Panjang Kolom/M3 Beton = 12.500 M'
Panjang Tulangan Utama = 12.500 M'
Jumlah Tulangan Utama = 8 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel = 0.15 M'
Jumlah Beugel = 84.000 Bh
Panjang Beugel = 1.06 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 12.500 8.000 0.888 88.800 Kg
Beugel 1.060 84.000 0.395 35.171 Kg
Berat Total Tulangan/M3 = 123.971 Kg/M3

Bekisting
B H L Luas
0.200 0.400 12.500 15.000 M2
5. Kolom 25x25 cm

B= 25 cm = 0.250 M'
H= 25 cm = 0.250 M'
Panjang Kolom/M Beton =
3
16.000 M'
Panjang Tulangan Utama = 16.000 M'
Jumlah Tulangan Utama = 8 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel = 0.15 M'
Jumlah Beugel = 84.000 Bh
Panjang Beugel = 0.86 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 16.000 8.000 0.888 113.664 Kg
Beugel 0.860 84.000 0.395 28.535 Kg
Berat Total Tulangan/M3 = 142.199 Kg/M3

Bekisting
B H L Luas
0.250 0.250 16.000 16.000 M2
8. Kolom 13x15 cm

B= 13 cm = 0.130 M'
H= 15 cm = 0.150 M'
Panjang Kolom/M3 Beton = 51.282 M'
Panjang Tulangan Utama = 51.282 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel = 0.15 M'
Jumlah Beugel = 342.000 Bh
Panjang Beugel = 0.42 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 51.282 4.000 0.888 182.154 Kg
Beugel 0.420 342.000 0.395 56.738 Kg
Berat Total Tulangan/M3 = 238.892 Kg/M3

Bekisting
B H L Luas
0.130 0.150 51.282 13.333 M2
9. Ring Balok 13/18 cm

B= 13 cm = 0.130 M'
H= 18 cm = 0.180 M'
Panjang Balok/M3 Beton = 42.735 M'
Panjang Tulangan Utama = 42.735 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.1 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 214.000 Bh
Jumlah Beugel Lapangan = 143.000 Bh
Panjang Beugel = 0.48 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 42.735 4.000 0.888 151.795 Kg
Beugel Tumpuan 0.480 214.000 0.395 40.574 Kg
Beugel Lapangan 0.480 143.000 0.395 27.113 Kg
Berat Total Tulangan/M3 = 219.482 Kg/M3

Bekisting
B H L Luas
0.130 0.180 42.735 15.385 M2
12. Balok Praktis 13/15 cm

B= 13 cm = 0.130 M'
H= 15 cm = 0.150 M'
Panjang Balok/M3 Beton = 51.282 M'
Panjang Tulangan Utama = 51.282 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.15 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 171.000 Bh
Jumlah Beugel Lapangan = 171.000 Bh
Panjang Beugel = 0.42 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat


Tulangan Utama 51.282 4.000 0.888 182.154 Kg
Beugel Tumpuan 0.420 171.000 0.395 28.369 Kg
Beugel Lapangan 0.420 171.000 0.395 28.369 Kg
Berat Total Tulangan/M3 = 238.892 Kg/M3

Bekisting
B H L Luas
0.130 0.150 51.282 15.385 M2
1 6.666667
13.33333
10.46667

0.08 12.5
130.8333
Panjang
No Uraian Pekerjaan Satuan (m) Lebar (m) Tinggi (m)
I. Pekerjaan Persiapan
1 Pembersihan Lapangan Ls
2 Pemasangan Bowplank Ls
3 Administrasi dan dokumentasi Ls

II. Pekerjaan Tanah dan Pondasi


1 Galian pondasi penerus M3 21 0.5 0.5
2 Urugan kembali bekas galian M3
3 Urugan tanah bawah lantai M3 4 4 0.35
1.5 1.75 0.35
0.8 1.1 0.35

4 Urugan Pasir bawah Lantai M3 4 4 0.15

III. Pekerjaan Ponadsi


1 Mengurug Pasir Urug bawah Pondasi M3 21 0.5 0.05
2 Pas Batu kosong M3 21 0.5 0.1
3 Pas Batu Gunung M3 21 0.4 0.5

IV. Pekerjaan Beton Bertulang


1 Sloof Uk. 15/20 M3 21 0.15 0.2
2 Kolom Uk. 15/15 M3 0.15 0.15 3.05
3 Kolom Praktis 13/13 M3 0.13 0.13 3.05
4 Ring Balok 13/15 M3 21 0.13 0.15
5 Balok Latai M3 3.6 0.13 0.15
5 Plat Dack M3 1.1 0.1 1.4
M3 1.89 0.1 1.6

V. Pekerjaan Lantai dan Dinding


1 Pasangan diding 1/2 Bata 1:4 M2 13.5 3.05
2.67 5
0.2 1.5

2 Pasangan diding 1/2 Bata 1:4 pada tangga M2


3 Plesteran 1:4 M2
4 Plesteran 1:2 M2
5 Beton Rabat M3 3.91 3.91 0.05
6 Pas. Keramik 40x40 cm M2 3.82 3.82
1.57 1.32

7 Pas. Keramik 30x30 cm 1.2 3.1

VI. Pekerjaan Kayu


- Pintu P1
1 Kusen Pintu M3 0.13 0.05 5
0.13 0.05 1.78
Daun Pintu M2 1.056 1
Kaca M2 0.43 1.78

- Jendela Kaca J1
1 Kusen Jendela M3 0.13 0.05 4.6
0.13 0.05 1.04

2 Daun Jendela Kaca 0.5 1.6


3 Kaca 0.38 1.48

- Jendela Kaca J2
1 Kusen Jendela M3 0.13 0.05 1.2
0.13 0.05 1.6

2 Daun Jendela Kaca 0.7 1.6


3 Kaca 0.58 1.48

VII. Pekerjaan Atap dan Plafond


1 Konstruksi Kuda-Kuda
- Balok Gapit bawah M3 4 0.1 0.07
- Balok Gapit atas M3 2.19 0.1 0.07
- Balok Skor M3 0.63 0.1 0.07
- Balok Sokong M3 0.95 0.1 0.07
- Balok Bint M3 1.64 0.1 0.07

2 Gordeng M3 69 0.07 0.05


3 Atap Genteng Metal Multiroof tebal 0,25 mm M2 3.2 2.8
4 Rabung Seng M1 12.8
5 Kayu Lisplank M1 5.6 4
6 Rangka Plafond M2 4 4
1.5 1.75
7 langit - Langit Tripleks tebal 4 mm M2 4 4
1.5 1.75

VIII. Pekerjaan Elektrikal


1 Pengadaan Listrik 4 Ampere
2 Box Zakering
3 Lampu Philips SL 18 Watt
4 Stop Kontak
6 Saklar Ganda

IX. Pekerjaan Lain - Lain


1 Septic Tank
2 Resapan
3 Biaya Instalasi Listrik
4 Biaya Instalasi Air Bersih dan Kotor
5 Pengadaan Sanyo
X. Pekerjaan Finishing
Pengecatan dinding Luar dalam
Pengecatan Kusen dan daun Pintu/jendela
- Daun Pintu M2 0.08 3.854 1.08
- Daun Jendela M2 0.08 3.16 0.96
- Kusen Pintu M2 0.23 6.53
- Kusen Jendela M2 0.23 5.62

Penecatan Lisplank
Pembersihan Lapangan
Kuantitas Jumlah

1
1
1

5.25
1.75
5.04 1.6 0.8 16
8.26875 0.2625 0.13125 2.625
2.772 0.088 0.044 2.64
16.08075
1.9505

0.525
1.05
4.2

0.63
8 0.549
2 0.10309
0.4095 1.4
0.0702
1 0.154
1 0.3024 1.89
0.4564 213.35

27.435 2.952 7.38 3.408


13.35
0.3
44.46
3.375 1.3 1.295 0.78
78.0615

0.97525
14.5924 3.82
2.0724
16.6648
3.72

0.0325
0.01157 1.6
0.04407 0.04407
1.056 0.2906
1 0.7654

0.0299 0.15
0.00676 1.35
0.03666 0.21996 4.05 4.71
6 1.4256
6 3.3744 8.76

350
0.0078
0.0104
0.0182
2 0.5232
2 1.7168

2 0.056 21.32
2 0.03066 17.92
2 0.00882 13.92
2 0.0133 9.92
1 0.01148 5.92
0.12026 0.36078 69

0.2415
4 35.84 13.76
12.8 22.8
22.4
16
2.625
16
2.625
18.625 17.69375
6.83

0.78944
3.9552
1.6059 0.104
1.3706 0.078
7.72114
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : -
KEGIATAN : -
PEKERJAAN : PEMBUATAN MUSHALLA KANTOR DINAS KESEHATAN
LOKASI : KECAMATAN SINGKIL KABUPATEN ACEH SINGKIL
INSTANSI : DINAS KESEHATAN KABUPATEN ACEH SINGKIL
SUMBER DANA : APBK
TAHUN ANGGARAN : 2013

NO URAIAN PEKERJAAN VOL. SAT. ANALISA

1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pemasangan Bowlpank 1.00 Ls Taksir
2 Papan Nama Proyek 1.00 Unit Taksir
3 Administrasi dan dokumentasi 1.00 Ls Taksir

II. PEKERJAAN TANAH DAN GALIAN


1 Galian pondasi penerus 5.25 M3 SNI 2835:2008.6.1
2 Urugan kembali bekas galian 1.75 M3 SNI 2835:2008.6.9
3 Urugan tanah bawah lantai 16.08 M3 SNI 2835:2008.6.16
4 Urugan pasir bawah lantai 1.95 M3 SNI 2835:2008.6.11

III. PEKERJAAN PONDASI


1 Urugan pasir bawah Pondasi 0.53 M3 SNI 2835:2008.6.11
2 Pas Batu kosong 1.05 M3 SNI 2836:2008.6.9
3 Pas Batu gunung 4.20 M3 SNI 2836:2008.6.2

IV. PEKERJAAN BETON BERTULANG


1 Sloof Uk. 15/20 0.63 M3 Supl. SNI 7394:2008.2.b
2 Kolom Uk. 15/15 0.55 M3 Supl. SNI 7394:2008.3.a
3 Kolom Praktis 13/13 0.10 M3 Supl. SNI 7394:2008.3.b
4 Ring Balok 13/15 0.41 M3 Supl. SNI 7394:2008.4.a
5 Balok Latai 13/13 0.07 M3 Supl. SNI 7394:2008.4.b
6 Plat Dack 0.46 M3 Supl. SNI 7394:2008.5

V. PEKERJAAN LANTAI DAN DINDING


1 Pasangan diding 1/2 Bata 1:4 44.46 M2 SNI 6897:2008.6.9
2 Plesteran 1:4 78.06 M2 SNI 2837:2008.6.4
3 Beton Rabat 0.98 M3 SNI 7394:2008.6.1
4 Pasangan Keramik 40x40 cm 16.66 M2 SNI 7395:2008.6.64.a
5 Pasangan Keramik 20x20 cm 3.72 M2 SNI 7395:2008.6.36

VI. PEKERJAAN KAYU


1 Pintu Kaca P1
- Kusen Pintu 0.04 M3 SNI 3434:2008.6.1
- Daun Pintu 0.29 M2 SNI 3434:2008.6.29
- Engsel 4.00 Bh Pt T-30-2000-C.6.1.5
NO URAIAN PEKERJAAN VOL. SAT. ANALISA

1 2 3 4 5
- Kunci Tanam 1.00 Bh Pt T-30-2000-C.6.1.2
- Kaca Tebal 5 mm 0.77 M2 Pt T-30-2000-C.6.2.3a

2 Jendela Kaca J1
- Kusen 0.02 M3 SNI 3434:2008.6.1
- Daun Jendela Kaca 0.52 M2 SNI 3434:2008.6.29
- Engsel 4.00 Bh Pt T-30-2000-C.6.1.5
- Pegangan Jendela 2.00 Bh Taksir
- Grendel 2.00 Bh Taksir
- Hak angin 4.00 Bh Taksir
- Kaca Tebal 5 mm 1.72 M2 Pt T-30-2000-C.6.2.3a
NO URAIAN PEKERJAAN VOL. SAT. ANALISA

1 2 3 4 5
3 Jendela Kaca J2
- Kusen 0.22 M3 SNI 3434:2008.6.1
- Daun Jendela Kaca 1.43 M2 SNI 3434:2008.6.29
- Engsel 12.00 Bh Pt T-30-2000-C.6.1.5
- Pegangan Jendela 6.00 Bh Taksir
- Grendel 6.00 Bh Taksir
- Hak angin 12.00 Bh Taksir
- Kaca Tebal 5 mm 3.37 M2 Pt T-30-2000-C.6.2.3a

VII. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


1 Konstruksi Kuda-Kuda 0.36 M3 SNI 3434:2008 (6.13)
2 Gordeng 0.24 M3 SNI 3434:2008 (6.15)
3 Atap Genteng Metal tebal 0,25 mm 35.84 M2 SNI 03 -3436-1994 - 6.1
4 Rabung Seng 12.80 M1 SNI 03 -3436-1994 - 6.1
5 Kayu Lisplank 22.40 M1 SNI 3434:2008 (6.21)
6 Rangka dan Plafond Tripleks 17.69 M2 SNI 2839:2008.6.12
7 Kubah 1.00 Bh Taksir

VIII. PEKERJAAN ELEKTRIKAL


1 Box Zakering 1.00 Bh Taksir
2 Lampu Hemat energi 24 Watt 4.00 Bh Taksir
3 Stop Kontak 2.00 Bh Taksir
4 Saklar Ganda 2.00 Bh Taksir

IX. PEKERJAAN PENGECATAN DAN FINISHING


1 Pengecatan dinding Luar dalam 78.06 M2 Pt-T-38-2000-C.6.14
2 Pengecatan Kusen dan daun Pintu/jendela 7.72 M2 Pt-T-38-2000-C.6.8
3 Pengecatan Lisplank 4.48 M2 Pt-T-38-2000-C.6.8
4 Pembersihan Lapangan 1.00 Ls Taksir

Singkil, 201
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris
(RAB)

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7

300,000.00 300,000.00
250,000.00 250,000.00
422,500.00 422,500.00
JUMLAH 972,500.00

38,720.00 203,280.00
12,906.67 22,586.67
129,769.60 2,086,792.50
103,072.00 201,041.94
JUMLAH 2,513,701.10

103,072.00 54,112.80
429,099.12 450,554.08
751,270.00 3,155,334.00
JUMLAH 3,660,000.88

3,914,067.38 2,465,862.45
5,130,234.49 2,816,498.73
4,931,564.47 508,394.98
5,008,790.60 2,051,099.75
4,962,533.70 348,369.87
4,212,279.67 1,922,484.44
JUMLAH 10,112,710.22

109,434.00 4,865,435.64
35,497.20 2,770,964.68
670,344.60 653,753.57
132,160.00 2,202,419.97
218,285.60 812,022.43
JUMLAH 11,304,596.29

4,880,600.00 215,088.04
467,540.00 135,867.12
36,200.00 144,800.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7
167,800.00 167,800.00
199,084.00 152,378.89

4,880,600.00 88,826.92
467,540.00 244,616.93
26,600.00 106,400.00
13,200.00 26,400.00
12,000.00 24,000.00
10,800.00 43,200.00
199,084.00 341,787.41
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7

4,880,600.00 1,073,536.78
467,540.00 666,525.02
26,600.00 319,200.00
13,200.00 79,200.00
12,000.00 72,000.00
10,800.00 129,600.00
199,084.00 671,789.05
JUMLAH 4,703,016.17

4,645,196.00 1,675,893.81
2,616,840.00 631,966.86
92,958.00 3,331,614.72
54,604.00 698,931.20
33,198.00 743,635.20
106,447.40 1,883,453.68
1,800,000.00 1,800,000.00
JUMLAH 10,765,495.48

60,000.00 60,000.00
42,000.00 168,000.00
18,000.00 36,000.00
32,400.00 64,800.00
JUMLAH 328,800.00

17,371.00 1,356,006.32
24,791.30 191,417.10
24,791.30 111,065.02
200,000.00 200,000.00
JUMLAH 1,858,488.44

JUMLAH 46,219,308.57
PPN 10 % 4,621,930.86
TOTAL 50,841,239.42
DI BULATKAN 50,841,000.00

Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris
RENCANA ANGGARAN BIAYA (RAB)
(REKAPITULASI)
PROGRAM : -
KEGIATAN : -
PEKERJAAN : PEMBUATAN MUSHALLA KANTOR DINAS KESEHATAN
LOKASI : KECAMATAN SINGKIL KABUPATEN ACEH SINGKIL
INSTANSI : DINAS KESEHATAN KABUPATEN ACEH SINGKIL
SUMBER DANA : APBK
TAHUN ANGGARAN : 2013

TOTAL
NO URAIAN PEKERJAAN JUMLAH
(Rp)

I. PEKERJAAN PERSIAPAN Rp.


II. PEKERJAAN TANAH DAN GALIAN Rp.
III. PEKERJAAN PONDASI Rp.
IV. PEKERJAAN BETON BERTULANG Rp.
V. PEKERJAAN LANTAI DAN DINDING Rp.
VI. PEKERJAAN KAYU Rp.
VII. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp.
VIII. PEKERJAAN ELEKTRIKAL Rp.
IX. PEKERJAAN PENGECATAN DAN FINISHING Rp.

JUMLAH Rp.
PPN 10 % Rp.
TOTAL Rp.
DIBULATKAN Rp.

Terbilang : Lima Puluh Juta Rupiah,-

Disetujui :
PPTK DINAS KESEHATAN CV. HIKMAH CONSULTANT
KABUPATEN ACEH SINGKIL

MUNAWARSYAH
NIP. 19731122 199503 1 004
Mengetahui / Menyetujui :
KEPALA DINAS KESEHATAN
KABUPATEN ACEH SINGKIL

EDY WIDODO, SKM, M.KES


NIP. 19670112 199103 1 004
N BIAYA (RAB)
ASI)

S KESEHATAN

TOTAL
JUMLAH
(Rp)

972,500.00
2,513,701.10
3,660,000.88
10,112,710.22
11,304,596.29
4,703,016.17
10,765,495.48
328,800.00
1,858,488.44

46,219,308.57
4,621,930.86
50,841,239.42
50,841,000.00

Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris