HARGA SATUAN
No URAIAN SATUAN
Rp.
A. UPAH
1 Pekerja 45,000.00 Orang/Hari
2 Tukang 55,000.00 Orang/Hari
3 Kepala Tukang 70,000.00 Orang/Hari
4 Mandor 58,000.00 Orang/Hari
B. BAHAN
Pasangan dan beton
1 Tanah urug 96,408.00 /M3
2 Timbunan pilihan 111,240.00 /M³
3 Pasir urug 74,160.00 /M³
4 Pasir pasang 108,000.00 /M³
5 Pasir beton 129,600.00 /M³
6 Kerikil beton 150,000.00 /M³
7 Batu kali/batu belah (sungai/gunung) 279,600.00 /M³
8 Bata merah 960.00 /Buah
9 Paving Block 2,100.00 /Buah
10 Semen PC @ 50 Kg 88,800.00 /Zak
11 Semen PC 1,480.00 /Kg
12 Semen warna 1,780.00 /Kg
13 Semen putih @ 50 Kg 106,800.00 /Zak
14 Semen putih 1,780.00 /Kg
15 Sirtu 240,000.00 /M³
16 Plywood 9 mm 162,000.00 /Lbr
17 Air 150.00 /Liter
18 Besi beton polos 11,280.00 /Kg
19 Besi beton ulir 12,480.00 /Kg
20 Kawat beton 14,400.00 /Kg
21 Paku kayu 14,160.00 /Kg
22 Minyak bekisting 12,000.00 /Liter
Kayu
1 Kayu kelas I 3,048,000.00 /M³
2 Kayu kelas II 2,916,000.00 /M³
3 Kayu kelas III 1,830,000.00 /M³
4 Kayu Perancah 2,440,800.00 /M³
5 Kayu/Papan Bekisting 2,440,800.00 /M³
6 Dolken kayu galam Ø (8-10) cm, panjang 4 m 24,720.00 /Btg
7 Lem Kayu 18,000.00 /Kg
Atap dan plafond
1 Konstruksi kuda-kuda baja ringan 150,000.00 /M2
2 Multiplek / plywood 4 mm 65,000.00 /Lbr
3 Eternit Uk. 120x240 cm t=3,5 mm (setara Kalsi Board) 102,000.00 /Lbr
4 Genteng metal 0,3 75,000.00 /M2
5 Rabung seng genteng metal 30,000.00 /M'
6 List Profil 12,000.00 /M'
7 Paku Skrup 300.00 /Bh
8 Seng Plat 108,000.00 /Lbr
Keramik
1 Keramik sisi kulit jeruk 20x20 cm 5,280.00 /Bh
2 Keramik 20 x 20 cm 5,280.00 /Bh
3 Keramik 20 x 25 6,240.00 /Bh
4 Keramik 30x30 cm Polished 7,200.00 /Bh
5 Keramik 30x30 cm Unpolished 7,560.00 /Bh
6 Keramik 40x40 cm (polished) 8,400.00 /Bh
7 Keramik 40x40 cm (unpolished) 8,760.00 /Bh
Cat dan Residu
1 Dempul kayu 29,700.00 /Kg
2 Plamur / dempul tembok 16,500.00 /Kg
3 Cat dasar 22,000.00 /Kg
4 Cat manie 17,561.50 /Kg
5 Cat synthetik enamel (cat kayu mengkilap) 34,650.00 /Kg
6 Cat acrylic emultion paint (cat tembok) / waterprofing 30,800.00 /Kg
7 Minyak cat 45,100.00 /Liter
8 Kertas amplas 3,690.00 /Lembar
Instalasi listrik
1 Instalasi Tititk lampu 120,000.00 /Ttk
2 Instalasi Stop kontak 108,000.00 /Ttk
3 Lampu Hemat Energi 24 watt 42,000.00 /Bh
4 Lampu Hemat Energi 12 watt 30,000.00 /Bh
5 Box Sekering + MCB 60,000.00 /Bh
6 Stop Kontak 18,000.00 /Bh
7 Schakelar tunggal 30,000.00 /Bh
8 Schakelar ganda 32,400.00 /Bh
9 Schakelar Triple 36,000.00 /Bh
Sanitair
1 Tempat sabun keramik 30,000.00 /Bh
2 Kran air biasa 24,000.00 /Bh
3 Kran air sink/leher angsa 60,000.00 /Bh
4 Bak air fiber kapasitas 0,3 M3 720,000.00 /Bh
5 Closet jongkok (setara TOTO) 390,000.00 /Bh
6 Floor drain 15,000.00 /Bh
7 Pembuangan bak air 21,600.00 /Bh
8 Wastafel + Accessories 861,000.00 /Unit
9 Tempat Cuci Stainless Stell 2 Sink 492,000.00 /Unit
10 Tempat Cuci Stainless Stell 1 Sink 344,400.00 /Unit
11 Septictank + Resapan + Bak Kontrol 3,690,000.00 /Pkt
12 Pipa PVC Ø 1/2" 3,478.44 /M'
13 Pipa PVC Ø 3/4" 5,150.01 /M'
14 Pipa PVC Ø 1 1/2" 20,677.53 /M'
15 Pipa PVC Ø 2" 23,370.00 /M'
16 Pipa PVC Ø 2 1/2" 35,670.00 /M'
17 Pipa PVC Ø 3" 69,955.02 /M'
18 Pipa PVC Ø 4" 86,100.00 /M'
19 Seal tape 9,225.00 /Bh
Kunci-Kunci dan Kaca
1 Kunci tanam 2 slaag 136,800.00 /Bh
2 Kunci tanam biasa 108,000.00 /Bh
3 Engsel pintu 30,000.00 /Psg
5 Engsel jendela / ventilasi 20,400.00 /Psg
6 Grendel jendela 12,000.00 /Bh
7 Hak angin jendela 10,800.00 /Bh
8 Pegengan jendela 13,200.00 /Bh
9 Pacok pintu (untuk pintu double) 48,000.00 /Bh
10 Kaca Bening, t = 3 mm 108,000.00 /M2
11 Kaca Bening, t = 5 mm 165,000.00 /M2
12 Kaca Rayband, t = 5 mm 201,600.00 /M2
Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris
DAFTAR ANALISA HARGA SATUAN
SNI 2835:2008.6.9 1 m³ Urugan kembali (dihitung 1/3 dari indeks pekerjaan galian)
Tenaga
Pekerja 0.250 OH x Rp.
Mandor 0.008 OH x Rp.
A Jumlah
B 10%
C Jumlah Harga (A
SNI 2836:2008.6.10 1 m³ Pasang pondasi Cyclope 60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Be
Bahan
Batu kali/belah/gunung 0.480 M³ x Rp.
Semen Pc 194.000 Kg x Rp.
Pasir beton 0.312 M³ x Rp.
Kerikil beton 0.468 M³ x Rp.
Jumlah (1)
Tenaga
Pekerja 3.400 OH x Rp.
Tukang batu 0.850 OH x Rp.
Kepala tukang 0.085 OH x Rp.
Mandor 0.170 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.150 OH x Rp.
Kepala tukang 0.015 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.150 OH x Rp.
Kepala tukang 0.015 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Tenaga
Pekerja 0.300 OH x Rp.
Tukang batu 0.150 OH x Rp.
Kepala tukang 0.015 OH x Rp.
Mandor 0.015 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
Tenaga
Pekerja 0.200 OH x Rp.
Tukang batu 0.100 OH x Rp.
Kepala tukang 0.010 OH x Rp.
Mandor 0.010 OH x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
SNI 91-0012-2007-6.66.a 1 m² Memasang Paving Block Baru
Bahan
Pasir Pasang 0.045 M³ x Rp.
Paving Block 40.000 Bh x Rp.
Jumlah (1)
Tenaga
Pekerja 0.620 Oh x Rp.
Tukang cat 0.350 Oh x Rp.
Kepala tukang 0.035 Oh x Rp.
Mandor 0.030 Oh x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
SNI 91-0012-2007-6.66.b 1 m² Memasang Paving Block Lama + 30% Paving Block Baru
Bahan
Pasir Pasang 0.045 M³ x Rp.
Paving Block 8.000 Bh x Rp.
Jumlah (1)
Tenaga
Pekerja 0.620 Oh x Rp.
Tukang cat 0.350 Oh x Rp.
Kepala tukang 0.035 Oh x Rp.
Mandor 0.030 Oh x Rp.
Jumlah (2)
A Jumlah (1) + (2)
B 10%
C Jumlah Harga (A
SNI 3434:2008.6.1 1 m3 Membuat dan memasang kusen pintu dan kusen jendela, Kayu kelas II
Bahan
Kayu kelas II 1.100 M³ x Rp.
Paku kayu 1.250 Kg x Rp.
Lem kayu 1.000 Kg x Rp.
Jumlah (1)
Tenaga
Pekerja 7.000 OH x Rp.
Tukang kayu 21.000 OH x Rp.
Kepala tukang 2.100 OH x Rp.
Mandor 0.350 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 3434:2008.6.29 1 m2 Membuat dan memasang daun pintu panel lapis seng plat, Kayu kelas II
Bahan
Kayu kelas II 0.040 M³ x Rp.
Lem kayu 0.500 Kg x Rp.
Seng plat 1.000 lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 1.000 OH x Rp.
Tukang kayu 3.000 OH x Rp.
Kepala tukang 0.300 OH x Rp.
Mandor 0.050 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
Pt T-30-2000-C.6.1.2 1 bh Memasang Kunci tanam 2 slaag
Bahan
Kunci tanam 2 slaag 1.000 BH x Rp.
Jumlah (1)
Tenaga
Tukang Kayu 0.500 OH x Rp.
Kepala Tukang 0.050 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
Tenaga
Pekerja 0.050 Oh x Rp.
Tukang kayu 0.050 Oh x Rp.
Kepala tukang 0.005 Oh x Rp.
Mandor 0.003 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 2839:2008.6.12 1 m² Memasang Plafond tripleks tebal 4 mm + rangka kayu
Bahan
Kayu kelas II 0.023 M³ x Rp.
Paku biasa 2" - 5" 0.060 Kg x Rp.
Paku Tripleks 0.030 Kg x Rp.
Tripleks tebal 4 mm 0.390 Lbr x Rp.
Tenaga
Pekerja 0.270 Oh x Rp.
Tukang kayu 0.400 Oh x Rp.
Kepala tukang 0.040 Oh x Rp.
Mandor 0.0135 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 7395:2008.6.36 1 m² Memasang Lantai Keramik 20 x 20 cm
Bahan
Keramik 20 x 20 cm 26.500 Bh x Rp.
Semen PC 10.400 Kg x Rp.
Pasir Pasang 0.045 M³ x Rp.
Semen warna 1.620 Kg x Rp.
Tenaga
Pekerja 0.700 OH x Rp.
Tukang batu 0.350 OH x Rp.
Kepala tukang 0.035 OH x Rp.
Mandor 0.035 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
Tenaga
Pekerja 0.900 OH x Rp.
Tukang batu 0.450 OH x Rp.
Kepala tukang 0.045 OH x Rp.
Mandor 0.045 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
Tenaga
Pekerja 0.700 OH x Rp.
Tukang batu 0.350 OH x Rp.
Kepala tukang 0.035 OH x Rp.
Mandor 0.035 OH x Rp.
Jumlah (2)
Jumlah (1) + (2)
Pt-T-38-2000-C.6.14 1 m² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir 0.100 Kg x Rp.
Cat dasar 0.120 Kg x Rp.
Cat Tembok 2 x 0.240 Kg x Rp.
Kertas Pasir 0.200 Lbr x Rp.
Jumlah (1)
Tenaga
Pekerja 0.020 Oh x Rp.
Tukang cat 0.063 Oh x Rp.
Kepala tukang 0.0063 Oh x Rp.
Mandor 0.0025 Oh x Rp.
Jumlah (2)
Jumlah (1) + (2)
HILDA FAZLIANA
Direktris
PERHITUNGAN VOLUME BESI
SLOOF 15 X 20 CM
Tulangan Utama = 5 Ø 12 Polos BJ 0.89
Sengkang = Ø 8 - 150 Polos BJ 0.40
Luas Penampang = 0.030 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 33.33 m
Luas Bekisting dalam 1m3 = 11.67 m2 11.67
Jumlah Sengkang = 222 Buah
Panjang 1 Sengkang = 0.58 m
Berat Besi = 5 Ø 12 = 148.00 kg
Berat Besi = Ø 4 - 150 = 28.61 kg
Jumlah Berat = 176.61 kg
KOLOM 15 X 15 CM
Tulangan Utama = 4 Ø 12 Polos BJ 0.89
Sengkang = Ø 8 - 150 Polos BJ 0.40
Luas Penampang = 0.023 m2
Selimut Beton = 3 cm
Dalam 1 m3 Panjangnya = 44.44 m
Luas Bekisting dalam 1m3 = 13.33 m2 13.33
Jumlah Sengkang = 296 Buah
Panjang 1 Sengkang = 0.44 m
Berat Besi = 4 Ø 12 = 157.87 kg
Berat Besi = Ø 8 - 150 = 51.50 kg
Jumlah Berat = 209.36 kg
KOLOM PRAKTIS 13 X 13 CM
Tulangan Utama = 4 Ø 10 Polos BJ 0.62
Sengkang = Ø 6 - 150 Polos BJ 0.22
Luas Penampang = 0.017 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 59.17 m
Luas Bekisting dalam 1m3 = 15.38 m2 15.38
Jumlah Sengkang = 394 Buah
Panjang 1 Sengkang = 0.40 m
Berat Besi = 4 Ø 10 = 146.04 kg
Berat Besi = Ø 6 - 150 = 35.03 kg
Jumlah Berat = 181.07 kg
RING BALK 13 X 15 CM
Tulangan Utama = 5 Ø 10 Polos BJ 0.62
Sengkang = Ø 8 - 150 Polos BJ 0.22
Luas Penampang = 0.020 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 51.28 m
Luas Bekisting dalam 1m3 = 14.36 m2 14.36
Jumlah Sengkang = 342 Buah
Panjang 1 Sengkang = 0.44 m
Berat Besi = 5 Ø 10 = 158.21 kg
Berat Besi = Ø 8 - 150 = 33.39 kg
Jumlah Berat = 191.60 kg
BALOK LATAI 13 X 13 CM
Tulangan Utama = 4 Ø 10 Polos BJ 0.62
Sengkang = Ø 8 - 150 Polos BJ 0.22
Luas Penampang = 0.017 m2
Selimut Beton = 2.5 cm
Dalam 1 m3 Panjangnya = 59.17 m
Luas Bekisting dalam 1m3 = 15.38 m2 15.38
Jumlah Sengkang = 394 Buah
Panjang 1 Sengkang = 0.40 m
Berat Besi = 4 Ø 10 = 146.04 kg
Berat Besi = Ø 8 - 150 = 35.03 kg
Jumlah Berat = 181.07 kg
BERAT BESI BETON POLOS/M'
Diameter Nominal Luas Penampang Berat Nominal
No. Penamaan (d) Nominal (L) per Meter
(mm) (cm2) (kg/m)
1 P.6 6 0.2826 0.222
2 P.8 8 0.5024 0.395
3 P.10 10 0.785 0.617
4 P.12 12 1.1304 0.888
5 P.14 14 1.5386 1.12
6 P.16 16 2.0096 1.58
7 P.19 19 2.8339 2.23
8 P.22 22 3.7994 2.98
9 P.25 25 4.9063 3.85
10 P.28 28 6.1544 4.83
11 P.32 32 8.0384 6.32
Sumber SNI 07-2052-2002
4. Sloof 15/20 cm
B= 15 cm = 0.150 M'
H= 20 cm = 0.200 M'
Panjang Sloof/M3 Beton = 33.333 M'
Panjang Tulangan Utama = 33.333 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.1 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 334.000 Bh
Jumlah Beugel Lapangan = 223.000 Bh
Panjang Beugel = 0.56 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.150 0.200 33.333 13.333 M2
4. Sloof 18/25 cm
B= 18 cm = 0.180 M'
H= 25 cm = 0.250 M'
Panjang Sloof/M Beton =
3
22.222 M'
Panjang Tulangan Utama = 22.222 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.1 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 334.000 Bh
Jumlah Beugel Lapangan = 223.000 Bh
Panjang Beugel = 0.72 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.180 0.250 22.222 11.111 M2
5. Kolom 20x40 cm
B= 20 cm = 0.200 M'
H= 40 cm = 0.400 M'
Panjang Kolom/M3 Beton = 12.500 M'
Panjang Tulangan Utama = 12.500 M'
Jumlah Tulangan Utama = 8 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel = 0.15 M'
Jumlah Beugel = 84.000 Bh
Panjang Beugel = 1.06 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.200 0.400 12.500 15.000 M2
5. Kolom 25x25 cm
B= 25 cm = 0.250 M'
H= 25 cm = 0.250 M'
Panjang Kolom/M Beton =
3
16.000 M'
Panjang Tulangan Utama = 16.000 M'
Jumlah Tulangan Utama = 8 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel = 0.15 M'
Jumlah Beugel = 84.000 Bh
Panjang Beugel = 0.86 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.250 0.250 16.000 16.000 M2
8. Kolom 13x15 cm
B= 13 cm = 0.130 M'
H= 15 cm = 0.150 M'
Panjang Kolom/M3 Beton = 51.282 M'
Panjang Tulangan Utama = 51.282 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel = 0.15 M'
Jumlah Beugel = 342.000 Bh
Panjang Beugel = 0.42 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.130 0.150 51.282 13.333 M2
9. Ring Balok 13/18 cm
B= 13 cm = 0.130 M'
H= 18 cm = 0.180 M'
Panjang Balok/M3 Beton = 42.735 M'
Panjang Tulangan Utama = 42.735 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.1 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 214.000 Bh
Jumlah Beugel Lapangan = 143.000 Bh
Panjang Beugel = 0.48 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.130 0.180 42.735 15.385 M2
12. Balok Praktis 13/15 cm
B= 13 cm = 0.130 M'
H= 15 cm = 0.150 M'
Panjang Balok/M3 Beton = 51.282 M'
Panjang Tulangan Utama = 51.282 M'
Jumlah Tulangan Utama = 4 Ptg
Diameter Tulangan Utama 12 mm
Berat Tulangan Utma/M' = 0.888 Kg/M'
Jarak Beugel Tumpuan = 0.15 M'
Jarak Beugel Lapangan = 0.15 M'
Jumlah Beugel Tumpuan = 171.000 Bh
Jumlah Beugel Lapangan = 171.000 Bh
Panjang Beugel = 0.42 M'
Diameter Beugel = 8 mm
Berat Tulangan Beugel/M' 0.395 Kg/M'
Bekisting
B H L Luas
0.130 0.150 51.282 15.385 M2
1 6.666667
13.33333
10.46667
0.08 12.5
130.8333
Panjang
No Uraian Pekerjaan Satuan (m) Lebar (m) Tinggi (m)
I. Pekerjaan Persiapan
1 Pembersihan Lapangan Ls
2 Pemasangan Bowplank Ls
3 Administrasi dan dokumentasi Ls
- Jendela Kaca J1
1 Kusen Jendela M3 0.13 0.05 4.6
0.13 0.05 1.04
- Jendela Kaca J2
1 Kusen Jendela M3 0.13 0.05 1.2
0.13 0.05 1.6
Penecatan Lisplank
Pembersihan Lapangan
Kuantitas Jumlah
1
1
1
5.25
1.75
5.04 1.6 0.8 16
8.26875 0.2625 0.13125 2.625
2.772 0.088 0.044 2.64
16.08075
1.9505
0.525
1.05
4.2
0.63
8 0.549
2 0.10309
0.4095 1.4
0.0702
1 0.154
1 0.3024 1.89
0.4564 213.35
0.97525
14.5924 3.82
2.0724
16.6648
3.72
0.0325
0.01157 1.6
0.04407 0.04407
1.056 0.2906
1 0.7654
0.0299 0.15
0.00676 1.35
0.03666 0.21996 4.05 4.71
6 1.4256
6 3.3744 8.76
350
0.0078
0.0104
0.0182
2 0.5232
2 1.7168
2 0.056 21.32
2 0.03066 17.92
2 0.00882 13.92
2 0.0133 9.92
1 0.01148 5.92
0.12026 0.36078 69
0.2415
4 35.84 13.76
12.8 22.8
22.4
16
2.625
16
2.625
18.625 17.69375
6.83
0.78944
3.9552
1.6059 0.104
1.3706 0.078
7.72114
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : -
KEGIATAN : -
PEKERJAAN : PEMBUATAN MUSHALLA KANTOR DINAS KESEHATAN
LOKASI : KECAMATAN SINGKIL KABUPATEN ACEH SINGKIL
INSTANSI : DINAS KESEHATAN KABUPATEN ACEH SINGKIL
SUMBER DANA : APBK
TAHUN ANGGARAN : 2013
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pemasangan Bowlpank 1.00 Ls Taksir
2 Papan Nama Proyek 1.00 Unit Taksir
3 Administrasi dan dokumentasi 1.00 Ls Taksir
1 2 3 4 5
- Kunci Tanam 1.00 Bh Pt T-30-2000-C.6.1.2
- Kaca Tebal 5 mm 0.77 M2 Pt T-30-2000-C.6.2.3a
2 Jendela Kaca J1
- Kusen 0.02 M3 SNI 3434:2008.6.1
- Daun Jendela Kaca 0.52 M2 SNI 3434:2008.6.29
- Engsel 4.00 Bh Pt T-30-2000-C.6.1.5
- Pegangan Jendela 2.00 Bh Taksir
- Grendel 2.00 Bh Taksir
- Hak angin 4.00 Bh Taksir
- Kaca Tebal 5 mm 1.72 M2 Pt T-30-2000-C.6.2.3a
NO URAIAN PEKERJAAN VOL. SAT. ANALISA
1 2 3 4 5
3 Jendela Kaca J2
- Kusen 0.22 M3 SNI 3434:2008.6.1
- Daun Jendela Kaca 1.43 M2 SNI 3434:2008.6.29
- Engsel 12.00 Bh Pt T-30-2000-C.6.1.5
- Pegangan Jendela 6.00 Bh Taksir
- Grendel 6.00 Bh Taksir
- Hak angin 12.00 Bh Taksir
- Kaca Tebal 5 mm 3.37 M2 Pt T-30-2000-C.6.2.3a
Singkil, 201
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris
(RAB)
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7
300,000.00 300,000.00
250,000.00 250,000.00
422,500.00 422,500.00
JUMLAH 972,500.00
38,720.00 203,280.00
12,906.67 22,586.67
129,769.60 2,086,792.50
103,072.00 201,041.94
JUMLAH 2,513,701.10
103,072.00 54,112.80
429,099.12 450,554.08
751,270.00 3,155,334.00
JUMLAH 3,660,000.88
3,914,067.38 2,465,862.45
5,130,234.49 2,816,498.73
4,931,564.47 508,394.98
5,008,790.60 2,051,099.75
4,962,533.70 348,369.87
4,212,279.67 1,922,484.44
JUMLAH 10,112,710.22
109,434.00 4,865,435.64
35,497.20 2,770,964.68
670,344.60 653,753.57
132,160.00 2,202,419.97
218,285.60 812,022.43
JUMLAH 11,304,596.29
4,880,600.00 215,088.04
467,540.00 135,867.12
36,200.00 144,800.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7
167,800.00 167,800.00
199,084.00 152,378.89
4,880,600.00 88,826.92
467,540.00 244,616.93
26,600.00 106,400.00
13,200.00 26,400.00
12,000.00 24,000.00
10,800.00 43,200.00
199,084.00 341,787.41
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7
4,880,600.00 1,073,536.78
467,540.00 666,525.02
26,600.00 319,200.00
13,200.00 79,200.00
12,000.00 72,000.00
10,800.00 129,600.00
199,084.00 671,789.05
JUMLAH 4,703,016.17
4,645,196.00 1,675,893.81
2,616,840.00 631,966.86
92,958.00 3,331,614.72
54,604.00 698,931.20
33,198.00 743,635.20
106,447.40 1,883,453.68
1,800,000.00 1,800,000.00
JUMLAH 10,765,495.48
60,000.00 60,000.00
42,000.00 168,000.00
18,000.00 36,000.00
32,400.00 64,800.00
JUMLAH 328,800.00
17,371.00 1,356,006.32
24,791.30 191,417.10
24,791.30 111,065.02
200,000.00 200,000.00
JUMLAH 1,858,488.44
JUMLAH 46,219,308.57
PPN 10 % 4,621,930.86
TOTAL 50,841,239.42
DI BULATKAN 50,841,000.00
Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris
RENCANA ANGGARAN BIAYA (RAB)
(REKAPITULASI)
PROGRAM : -
KEGIATAN : -
PEKERJAAN : PEMBUATAN MUSHALLA KANTOR DINAS KESEHATAN
LOKASI : KECAMATAN SINGKIL KABUPATEN ACEH SINGKIL
INSTANSI : DINAS KESEHATAN KABUPATEN ACEH SINGKIL
SUMBER DANA : APBK
TAHUN ANGGARAN : 2013
TOTAL
NO URAIAN PEKERJAAN JUMLAH
(Rp)
JUMLAH Rp.
PPN 10 % Rp.
TOTAL Rp.
DIBULATKAN Rp.
Disetujui :
PPTK DINAS KESEHATAN CV. HIKMAH CONSULTANT
KABUPATEN ACEH SINGKIL
MUNAWARSYAH
NIP. 19731122 199503 1 004
Mengetahui / Menyetujui :
KEPALA DINAS KESEHATAN
KABUPATEN ACEH SINGKIL
S KESEHATAN
TOTAL
JUMLAH
(Rp)
972,500.00
2,513,701.10
3,660,000.88
10,112,710.22
11,304,596.29
4,703,016.17
10,765,495.48
328,800.00
1,858,488.44
46,219,308.57
4,621,930.86
50,841,239.42
50,841,000.00
Singkil, 2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris