A. UPAH
1 Mandor Lapangan Org/hari L.061 65,000.00
2 Mekanik Org/hari L.071 65,000.00
3 Kepala Tukang Org/hari L.073 65,000.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik Org/hari L.079 60,000.00
5 Operator terlatih Org/hari L.081 55,000.00
6 Operator semi terlatih Org/hari L.082 50,000.00
7 Sopir Org/hari L.091 55,000.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 50,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 55,000.00
B. BAHAN PENGISI
1 Batu pecah 10/15 cm M³ M.020 282,750.00
2 Batu pecah 5/7 cm M³ M.022 337,300.00
3 Batu pecah 3/5 cm M³ M.023 411,150.00
4 Batu pecah 2/3 cm M³ M.024 448,000.00
5 Batu pecah 1/2 cm M³ M.025 520,450.00
6 Batu pecah 0,5 - 1 cm M³ M.026 586,400.00
7 Pasir Urug M³ M.040 94,000.00
8 Pasir Ayak ( camp. Spesi dan Mortar) M³ M.040 104,500.00
9 Semen PC Zak M.080 73,250.00
10 Semen PC Kg - 1,465.00
11 Bataco 15 x 30 x 7 cm ( cetak mesin ) Bh - 1,700.00
12 Bataco 20 x 40 x 9 cm ( cetak mesin ) Bh - 2,600.00
13 Bataco 18 x 40 x 7 cm (cetak mesin) Bh - 3,000.00
14 Keramik 20 x 20 cm Kotak - 40,950.00
15 Keramik 30 x 30 cm Kotak - 46,800.00
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 7/7-4 m s/d 9/9-4 m M³ M.181.a 9,945,000.00
2 Ky. Belian ketam Uk. 7/7-4 m M³ - 11,700,000.00
3 Ky. klas I uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 7,020,000.00
4 Ky. klas I uk. 8/8 - 4 M ( ketam ) M³ M.181.f 8,775,000.00
5 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 4,095,000.00
6 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 5,265,000.00
7 Papan belian ketam M³ M.181.e 14,040,000.00
8 Papan belian tdk ketam M³ M.181.d 12,870,000.00
9 Papan kayu klas I tdk ketam M³ - 8,190,000.00
10 Papan kayu klas I ketam M³ - 8,190,000.00
11 Papan kayu klas II (mabang) ketam M³ M.181.k 5,265,000.00
12 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 4,680,000.00
13 Papan mal klas III M³ M.181.l 1,096,000.00
14 Papan Simpiran M³ - 702,000.00
15 Renglat kayu klas I Btg - 7,700.00
16 Kayu cerucuk /dolken ø 6/7 - Pj. 4 M Btg - 4,000.00
17 Kayu cerucuk /dolken ø 8/10 - Pj. 4 M Btg - 5,500.00
18 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg 87,750.00
19 Alas kayu hutan Btg - 12,000.00
No. Jenis Bahan / Material Satuan Kode Harga Satuan (Rp)
D. BAHAN CAT
1 Amplas Lbr - 2,900.00
3 Cat dasar Kg - 22,400.00
5 Cat kilat Kg - 46,800.00
7 Plamur Kg - 35,100.00
9 Cat tembok Kg - 31,000.00
11 Dempul Kg - 46,800.00
13 Plitur Kg - 42,900.00
15 Thiner Ltr M.090.f 18,300.00
17 Melamic Ltr - 62,400.00
19 Meni Kg - 33,500.00
21 Oker Kg - 70,200.00
23 Lem Kayu Kg - 20,500.00
25 Soda Api Kg - 18,000.00
27 Sabun / cream pembersih kotoran Kg - 17,300.00
29 Teak Oil Ltr - 28,400.00
31 Ter / Residu Ltr - 10,500.00
33 Kuas 4" Bh - 14,400.00
F. BAHAN PENGANTUNG
1 Kait angin Bh - 7,020.00
2 Handle Jendela Bh - 25,520.00
3 Engsel jendela Ktk - 23,400.00
4 Engsel pintu Ktk - 29,250.00
5 Slot pintu Bh - 17,550.00
6 Slot jendela Bh - 8,700.00
7 Kunci tanam 2 slag besar Bh - 99,450.00
8 Kunci tanam 2 slag kecil Bh - 58,500.00
14 Paku Seng Kg M.166.a 19,800.00
15 Paku campuran 1" - 5 " Kg M.166.b 16,300.00
16 Paku beton Kg - 18,700.00
17 Paku Atap Seng Kg M.166.c 19,800.00
18 Paku triplek Kg - 29,250.00
G. BAHAN ATAP
1 Genteng Metal Type Prima 0.35 M² - 102,000.00
2 Genteng Metal Type Royal 0.35 M² - 94,800.00
3 Genteng Metal Type Classic 0.35 M² - 89,800.00
4 Genteng Metal Stone ( Type Classic 0.35 ) M² - 119,800.00
6 Nok bubungan genteng metal 1/2 lingkaran 0.35 Bh - 90,000.00
7 Nok bubungan genteng metal kotak 0.35 Bh - 18,000.00
8 Nok bubungan genteng metal stone kotak 0.35 Bh 21,600.00
9 Seng Gelombang Bjls 30 Lbr - 70,200.00
10 Seng Gelombang Bjls 20 Lbr - 43,200.00
11 Seng Plat Bjls 20 Lbr - 45,600.00
12 Seng Plat Bjls 30 Lbr - 73,700.00
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M² - 122,800.00
2 Kaca Polos, t = 12mm M² - 318,000.00
3 Kaca Rayben, t = 5 mm M² - 169,500.00
4 Kaca Cermin t = 3mm M² - 152,100.00
5 Kaca Patri M² - 882,000.00
6 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 126,100.00
7 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 154,600.00
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 49,500.00
2 Triplek t = 6 mm Lbr - 105,300.00
3 Triplek t =9 mm Lbr - 175,500.00
4 Multiplek t = 12 mm Lbr - 204,750.00
5 Plywood 4' x 8' x 4mm Lbr - 87,750.00
6 Panel GRC 120 x 240 x 4 mm Lbr - 64,350.00
DAFTAR ANALISA PEKERJAAN UTAMA
1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter (P.Ps. 01)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.200 12,000.00
2 Pekerja OH 50,000.00 0.400 20,000.00
3 Kepala Tukang OH 65,000.00 0.020 1,300.00
4 Mandor OH 65,000.00 0.020 1,300.00
Jumlah 34,600.00
B BAHAN
1 Kayu Pancang (Dolken) d = 10cm, p = 4m Btg 5,500.00 1.250 6,875.00
2 Seng Gelombang BJLS 0.20 Lbr 43,200.00 1.200 51,840.00
3 Kayu Kelas II uk. 4/6 M3 4,095,000.00 0.072 294,840.00
4 Paku Kg 16,300.00 0.060 978.00
Jumlah 354,533.00
C Jumlah A + B 389,133.00
D Harga Satuan 389,133.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2
Jumlah 0.00
C Jumlah A + B 8,250.00
D Harga Satuan 8,250.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
B. PEKERJAAN TANAH (P.T.)
Jumlah 0.00
C Jumlah A + B 22,600.00
D Harga Satuan 22,600.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1
Jumlah 0.00
C Jumlah A + B 10,835.00
D Harga Satuan 10,835.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
1m2 Plasteran dan Acian 1Pc : 4Ps tebal 1,5cm (P.Pls. 13)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.330 16,500.00
2 Tukang Batu OH 60,000.00 0.165 9,900.00
3 Kepala Tukang OH 65,000.00 0.0165 1,072.50
4 Mandor OH 65,000.00 0.0165 1,072.50
Jumlah 28,545.00
B BAHAN
1 Semen Portland Kg 1,465.00 0.230 336.95
2 Pasir M3 104,500.00 0.023 2,403.50
Jumlah 2,740.45
C Jumlah A + B 31,285.45
D Harga Satuan 31,285.45
Acuan : Buku Menghitung Anggaran Biaya Bangunan Zainal A. Z. terbitan PT Gramedia Pustaka Utama Jakarta
G. PEKERJAAN KAYU (P.K.)
1m3 Pasang Kusen Pintu dan Jendela Kayu Kelas I (P.K. 12)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 6.000 300,000.00
2 Tukang Kayu OH 60,000.00 18.000 1,080,000.00
3 Kepala Tukang OH 65,000.00 2.000 130,000.00
4 Mandor OH 65,000.00 0.300 19,500.00
Jumlah 1,529,500.00
B BAHAN
1 Kayu Kelas 1 (Ketam) M3 8,775,000.00 1.200 10,530,000.00
Jumlah 10,530,000.00
C Jumlah A + B 12,059,500.00
D Harga Satuan 12,059,500.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1
1m2 Pasang Pintu dan Jendela Kaca Kayu Kelas I (P.K. 16)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.800 40,000.00
2 Tukang Kayu OH 60,000.00 2.000 120,000.00
3 Kepala Tukang OH 65,000.00 0.200 13,000.00
4 Mandor OH 65,000.00 0.040 2,600.00
Jumlah 175,600.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 8,190,000.00 0.035 286,650.00
Jumlah 286,650.00
C Jumlah A + B 462,250.00
D Harga Satuan 462,250.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
1m2 Pasang Pintu dan Jendela Jalusi Kayu Kelas I (P.K. 18)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 60,000.00 3.000 180,000.00
3 Kepala Tukang OH 65,000.00 0.300 19,500.00
4 Mandor OH 65,000.00 0.300 19,500.00
Jumlah 269,000.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 8,190,000.00 0.064 524,160.00
Jumlah 524,160.00
C Jumlah A + B 793,160.00
D Harga Satuan 793,160.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.12
1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.001 65.00
Jumlah 16,715.00
B BAHAN
1 Genteng Metal Type PRIMA 0.35 Lbr 102,000.00 1.840 187,680.00
2 Paku Kg 16,300.00 0.200 3,260.00
Jumlah 190,940.00
C Jumlah A + B 207,655.00
D Harga Satuan 207,655.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32
1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.001 65.00
Jumlah 16,715.00
B BAHAN
1 Genteng Metal Type CLASSIC 0.35 Lbr 89,800.00 1.620 145,476.00
2 Paku Kg 16,300.00 0.200 3,260.00
Jumlah 148,736.00
C Jumlah A + B 165,451.00
D Harga Satuan 165,451.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32
1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 08)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang kayu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.013 845.00
Jumlah 23,320.00
B BAHAN
1 Nok / Bubungan Genteng Metal Kotak 0.35 Bh 18,000.00 1.000 18,000.00
2 Paku 1/2" - 1" Kg 16,300.00 0.050 815.00
Jumlah 18,815.00
C Jumlah A + B 42,135.00
D Harga Satuan 42,135.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36
1m2 Pasang Atap Seng Gelombang Super Soka BJLS 0,20 (P.PA. 11)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.120 6,000.00
2 Tukang kayu OH 60,000.00 0.060 3,600.00
3 Kepala Tukang OH 65,000.00 0.006 390.00
4 Mandor OH 65,000.00 0.006 390.00
Jumlah 10,380.00
B BAHAN
1 Seng Gelombang 3" x 6" Super Soka Lbr 65,000.00 0.700 45,500.00
2 Paku 1/2" - 1" ( paku atap seng ) Kg 19,800.00 0.020 396.00
Jumlah 45,896.00
C Jumlah A + B 56,276.00
D Harga Satuan 56,276.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 3Lapis Cat Penutup) (P.Ct. 05)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.070 3,500.00
2 Tukang Cat OH 60,000.00 0.105 6,300.00
3 Kepala Tukang OH 65,000.00 0.004 260.00
4 Mandor OH 65,000.00 0.0025 162.50
Jumlah 3,662.50
B BAHAN
1 Cat Meni Kg 33,500.00 0.200 6,700.00
2 Plamur Kg 35,100.00 0.150 5,265.00
3 Cat Dasar Kg 22,400.00 0.170 3,808.00
4 Cat Penutup 3 Kali Kg 46,800.00 0.350 16,380.00
32,153.00
C Jumlah A + B 35,815.50
D Harga Satuan 35,815.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.020 1,000.00
2 Tukang Cat OH 60,000.00 0.063 3,780.00
3 Kepala Tukang OH 65,000.00 0.0063 409.50
4 Mandor OH 65,000.00 0.0025 162.50
Jumlah 5,352.00
B BAHAN
1 Plamur Kg 35,100.00 0.100 3,510.00
2 Cat Dasar Kg 22,400.00 0.120 2,688.00
3 Cat Penutup 2 x Kg 31,000.00 0.260 8,060.00
14,258.00
C Jumlah A + B 19,610.00
D Harga Satuan 19,610.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
RENCANA ANGGARAN BIAYA
Engineering's Estimate (EE)
56.00
Program : Program Pendidikan Dasar Sembilan Tahun
Kegiatan : Pembangunan Unit Sekolah Baru ( USB )
Pekerjaan : Pembangunan Unit Sekolah Baru ( USB ) SDN 18 Rasau Jaya
Lokasi : Rasau Jaya Kabupaten Kubu Raya
Tahun Anggaran : 2010
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi P.PS.03 216.000 M² 8,250.00 1,782,000.00
2 Pengkuran dan Pemasangan Bauplank P.PS.02 66.000 M' 23,973.00 1,582,218.00
3 Pembuatan Direksi Keet Atau Gudang - 20.000 M² 850,000.00 17,000,000.00
4 Papan Nama Proyek - 1.000 Lsm 750,000.00 750,000.00
IV PEKERJAAN LANTAI
1 Cerucuk lantai Ø 8/10-200 cm + Pemancangan - 217.000 Btg 2,750.00 596,750.00
2 Urug Pasir bawah lantai PT.10 43.200 M³ 128,450.00 5,549,040.00
3 Cor Lantai Beton Tumbuk Camp. 1 : 2 : 3 t = 10 cm P.BB.02 21.600 M³ 1,211,929.00 26,177,666.40
4 Tulangan lantai Wiremesh M-5 - 216.000 M² 224,685.00 48,531,960.00
V PEKERJAAN ATAP
1 Rangka Kuda-kuda kayu Klas II P.K.24 3.368 M³ 5,830,460.00 19,639,321.46
2 Balok Gording, Nook, Jurai, Ikatan Angin Kayu Klas II Uk. 5/10 P.K.26 3.888 M³ 5,769,900.00 22,433,371.20
3 Penutup Atap Metal 0.35 mm P.PA.01 216.000 M² 207,655.00 44,853,480.00
4 Listplank Kayu Klas II P.K.38 28.800 M² 62,210.00 1,791,648.00
5 Prabung Kayu Klas II lapis Seng Polos 0,30 P.PA.12 15.600 M' 64,131.50 1,000,451.40
7 Atap Selasar Dak Beton 6.400 M² 224,685.00 1,437,984.00
VI PEKERJAAN DINDING
1 Pasangan Dinding Bataco UK 7x18x40 cm P.Dnd.03 280.550 M² 74,934.00 21,022,733.70
2 Plesteran Dinding P.Pls.03 561.100 M² 30,333.00 17,019,846.30
3 Pagar Selasar P.Dnd.01 15.600 M² 74,834.00 1,167,410.40
X PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Kolom dengan Cat tembok P.Ct.11 561.646 M² 19,610.00 11,013,878.06
2 Pengecatan Plafond dengan cat Tembok P.Ct.11 251.000 M² 19,610.00 4,922,110.00
3 Pengecatan Kusen , Pintu Jendela dan ventilasi dengan Melamic P.CT.08 103.350 M² 58,147.60 6,009,554.46
4 Pengecatan Listplank dengan Cat kilat P.CT.05 57.600 M² 35,815.50 2,062,972.80
5 Pengecatan Rangka Kuda-kuda Dengan Meny Kayu - 1.000 Lsm 1,500,000.00 1,500,000.00
REKAPITULASI
JUMLAH 443,437,587.83
PEMBULATAN 443,437,000.00
RENCANA ANGGARAN BIAYA
Engineering's Estimate (EE)
KODE HARGA
NO URAIAN PEKERJAAN ANALISA VOLUME UNIT SATUAN
( Rp. )
1 2 3 4 5 6
I. PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan Lahan (Pembersihan Lokasi) P.PS.03 180.000 M² 8,250.00
2 Pengkuran dan Pemasangan Bauplank P.PS.02 60.000 M' 26,423.00
X PEKERJAAN SANITAIR
1 Bak WC Bataco Finishing Keramik 70x60x75 - 1.000 - 450,000.00
2 Kloset Jongkak Unit 1.000 Unit 365,285.00
3 Pekerjaan Kran Air KM/WC Bh 1.000 Bh 44,465.00
4 Pekerjaan Kran Air Meja Dapur type angsa Bh 1.000 Bh 44,465.00
5 Pekerjaan Kran Air Luar Bh 1.000 Bh 75,000.00
6 Pasangan floor drain KM/WC Bh 1.000 Bh 25,000.00
7 Pasangan kichen zink meja dapur Set 1.000 Set 300,000.00
XV PEKERJAAN LAIN-LAIN
1 Pembersihan setelah selesai pekerjaan - 180.00 M² 2,500.00
2 Pekerjaan Lemari Tanam - 4.00 Unit 500,000.00
REKAPITULASI
NO URAIAN SUB PEKERJAAN
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN GALIAN TANAH DAN PONDASI
III. PEKERJAAN STRUKTUR BETON
IV. PEKERJAAN PASANGAN DAN PLESTERAN
V. PEKERJAAN RANGKA ATAP DAN ATAP
VI. PEKERJAAN PLAFOND
VII. FINISHING LANTAI
VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI
IX PEKERJAAN PENGUNCI DAN PENGGANTUNG
X PEKERJAAN SANITAIR
XI PEKERJAAN INSTALASI AIR
XII PEKERJAAN PENGECATAN
XIII PEKERJAAN INSTALASI LISTRIK
XIV PEKERJAAN PENGADAAN MEUBELAIR
XV PEKERJAAN LAIN-LAIN
JUMLAH
PEMBULATAN
JUMLAH
BIAYA
( Rp. )
7
1,485,000.00
1,585,380.00
3,070,380.00
741,810.00
154,837.19
5,050,000.00
174,136.51
530,054.09
5,804,550.43
12,455,388.22
7,296,528.10
1,824,132.03
3,379,600.93
1,459,543.01
18,781,393.09
6,224,156.62
26,718,319.00
10,013,632.39
3,243,428.91
15,128,878.10
5,575,131.57
5,718,921.60
1,113,263.29
106,476,928.64
15,318,270.33
1,150,915.14
814,326.75
14,637,054.82
1,488,789.54
600,000.00
1,325,674.00
35,335,030.59
15,837,445.76
9,158,702.40
1,017,633.60
678,422.40
30,439,321.20
1,976,552.71
1,223,750.00
60,331,828.07
18,026,224.13
6,505,848.00
1,626,462.00
4,201,693.50
4,200,000.00
34,560,227.63
23,005,625.14
575,140.63
23,580,765.77
11,608,054.25
7,040,565.00
5,634,348.04
3,400,000.00
27,682,967.29
1,049,355.00
1,379,235.00
566,925.00
450,000.00
1,365,000.00
535,600.00
1,215,435.00
6,561,550.00
450,000.00
365,285.00
44,465.00
44,465.00
75,000.00
25,000.00
300,000.00
1,304,215.00
452,831.25
118,444.50
1,541,043.75
443,776.00
255,609.55
2,500,000.00
750,000.00
6,061,705.05
11,278,970.29
5,502,861.00
4,555,778.81
618,658.39
1,500,000.00
23,456,268.49
4,440,000.00
1,900,000.00
800,000.00
250,000.00
250,000.00
3,000,000.00
675,000.00
200,000.00
375,000.00
450,000.00
6,000,000.00
18,340,000.00
2,500,000.00
2,000,000.00
10,000,000.00
2,400,000.00
2,500,000.00
19,400,000.00
450,000.00
2,000,000.00
2,450,000.00
JUMLAH HARGA
3,070,380.00
12,455,388.22
106,476,928.64
35,335,030.59
60,331,828.07
34,560,227.63
23,580,765.77
27,682,967.29
6,561,550.00
1,304,215.00
6,061,705.05
23,456,268.49
18,340,000.00
19,400,000.00
2,450,000.00
381,067,254.75
381,067,000.00
RENCANA ANGGARAN BIAYA
Engineering's Estimate (EE)
NO URAIAN PEKERJAAN
1 2
I. PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan Lahan (Pembersihan Lokasi)
2 Pengkuran dan Pemasangan Bauplank
X PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Kolom dengan Cat tembok
2 Pengecatan Plafond dengan Compond + cat Tembok
3 Pengecatan Kusen , Pintu Jendela dan ventilasi dengan Melamic
4 Pengecatan Listplank dengan Cat kilat
5 Residu (Teer) Konsul, Gording kasau dan reng
REKAPITULASI
NO URAIAN SUB PEKERJAAN
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN GALIAN TANAH DAN PONDASI
III. PEKERJAAN STRUKTUR BETON
IV. PEKERJAAN PASANGAN DAN PLESTERAN
V. PEKERJAAN RANGKA ATAP DAN ATAP
VI. PEKERJAAN PLAFOND
VII. FINISHING LANTAI
VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI
IX PEKERJAAN PENGUNCI DAN PENGGANTUNG
X PEKERJAAN PENGECATAN
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN SANITAIR
XIII PEKERJAAN INSTALASI AIR
XIV PEKERJAAN LAIN-LAIN
A ANGGARAN BIAYA
ering's Estimate (EE)
JUMLAH 4,949,150.78
JUMLAH 50,104,179.87
JUMLAH 31,362,813.16
JUMLAH 3,219,792.42
JUMLAH 7,083,300.38
JUMLAH 572,165.00
JUMLAH 9,771,113.06
JUMLAH 6,386,000.00
JUMLAH 5,183,500.00
- 25.000 M¹ 18,113.25 452,831.25
- 6.000 M¹ 19,740.75 118,444.50
- 25.000 M¹ 61,641.75 1,541,043.75
- 4.000 M¹ 110,944.00 443,776.00
- 1.000 Lsm 255,609.55 255,609.55
- 1.000 Unit 2,500,000.00 2,500,000.00
JUMLAH 5,311,705.05
JUMLAH 143,062.50
162.00
#REF!
### ###
###
###
Rp 3.86
###
###
###
###
###
###
#REF!
#REF! 112,668
R E K A P I T U L A S I B I A Y A
Engineering's Estimate (EE)
JUMLAH
NO URAIAN PEKERJAAN BIAYA
( Rp. )
Terbilang : EMPAT RATUS TIGA PULUH TIGA JUTA ENAM RATUS DELAPAN RIBU RUPIAH
Mengetahui / Disetujui :
Pejabat Pembuat Komitmen
Dinas Pendidikan Kab. Kubu Raya
Tahun Anggaran 2010
ISKANDAR, S.Pd
NIP. 19621231 1982 11 1 004
24 9 0.5 216
Bauuplank
Pembersihan Lokasi
25 x 0.3285
7 x 9 x 3 = 189
2 x 22 x 1 = 44
233
Netto 184.19
Plasteran 368.38
Kuda-kuda K1
6/12 = 9 = 0.0648
8/10 = 26.4 = 0.2112
5/10 = 18 = 0.09
7 x 0.366 = 2.562
K2
8/12 = 4 = 0.0384
8/10 = 7.1 = 0.0568
5/10 = 4 = 0.02
7 x 0.1152 = 0.8064
3.3684
Gording
540 3.888
420.4626
Kusen
J1 2.85 x 3 = 8.55
1.7 x 5 = 8.5
17.05
j2 1.2 x 3 = 3.6
1.7 x 3 = 5.1
8.7
J3 2.85 x 3 = 8.55
1.7 x 5 = 8.5
17.05
j4 1.2 x 3 = 3.6
1.7 x 3 = 5.1
8.7
PV1 2.7 x 2 = 5.4
2.3 x 2 = 4.6
1.2 x 1 = 1.2
0.5 x 1 = 0.5
0.7 x 1 = 0.7
12.4
0.05 0.1 X 209.1 = 1.0455
= 8.2125
x 0.2 = 6.6
x 0.1 = 3.3
= 165
x 1 = 33
= 0.4725
= 0.06
1083
75.6
15.4
91
X 3 51.15
X 6 52.2
X 3 51.15
X 2 17.4
X 3 37.2
41.82
9.45 18.9
9.269 18.538
24.3375 24.3375
43.0565
86.113 103.5955
123.313
PERHITUNGAN VOLUME
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah
LANTAN I
4 Balok Lantai 15 / 40 1.000 4.74 7.40 8.70
- 4.74
9.66 4.74 - 7.40 -
LANTAI 2 & 3
4 Balok Lantai 20 / 50 15.000 4.74 - 7.40 -
113.04 4.74 - 7.40 -
5 Balok Lantai 20 / 50 6.800 4.74 - 7.40 -
51.25 4.74 - 7.40 -
DINDING
LANTAN I
Panjang Tinggi Luas Bruto
171.49 M1 5 857.45
Lubang
LANTAN II
Panjang Tinggi Luas Bruto
129.5 M1 5 647.5
Lubang
PJ3 2.1 X 2.75 = 5.775 X
P1 1 X 2.75 = 2.75 X
P2 0.7 X 2.75 = 1.925 X
J1 2.45 X 2.5 = 6.125 X
J2 1.75 X 2.5 = 4.375 X
PAGAR 3 m
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah
10.080
PAGAR 2 m
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah
2.240
PAGAR Depan
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah
1.280
Kusen
pjg jml pjg jml pjg jml pjg
1 = 10.45 2.5 2 2.75 2 3.75 2 0.85
1 = 15.125 2.5 4 2.75 2 5.45 2 1.7
4 = 23.1 2.75 2 2.05 2
6 = 16.5 2.75 2 0.95 2
4 = 7.7 2.75 2 0.8 2
6 = 36.75 2.5 5 2.4 3
4 = 17.5 2.5 3 1.7 3
10 = 33.75 2.15 3 1.3 3
160.88
= 696.575
= 1393.15
= -
= #REF!
= 50.24
#REF!
= 489.175
= 978.35
= 204.00
TULANGAN Dimensi
BEKISTI
BERAT BESIBESI / M³
Ø 12 Ø 13 Ø 16 Ø 19 NG / M2 Panjan
g
Berat Jumlah Berat Jumlah Berat Jumlah Berat
TULANGAN Dimensi
BEKISTI
BERAT BESIBESI / M³
Ø 12 Ø 13 Ø 16 Ø 19 NG / M2 Panjan
g
Berat Jumlah Berat Jumlah Berat Jumlah Berat
Dimensi
Tinggi / Jumlah
Lebar
Tebal 45
0.2 0.3 1
0.15 0.25 0.9 83.33333
41.66667 19.04762
0.15 0.4 1
0.15 0.35 1
0.12 0.2 1
60 90
0.2 0.5 1
0.15 0.45 1.3 1000
0.2 0.5 1
0.15 0.45 1.3 453.3333
0.2 0.4 1
0.15 0.35 1.1 760
0.15 0.3 1
0.1 0.25 0.8 340
0.15 0.3 1
0.1 0.25 0.8 1106.667
0.1 0.2 1
0.05 0.15 0.5 993.3333
jml pjg
2 0.5 = 20.2 20.2
2 0.5 = 30.3 30.3
0.5 = 10.1 40.4
= 7.4 44.4
= 7.1 28.4
= 19.7 118.2
= 12.6 50.4
= 10.35 103.5
435.8
0.5 = 10.1 20.2
= 7.4 111
= 7.1 92.3
= 19.7 19.7
= 12.6 214.2
326.2 131.2
V H D
Dimensi
Tinggi / Jumlah
Lebar
Tebal 45
0.12 0.5 1
0.07 0.45 1.14 1086.667
0.12 0.15 1
0.07 0.1 0.44 1086.667
V H D
Dimensi
Tinggi / Jumlah
Lebar
Tebal 45
0.12 0.5 1
0.07 0.45 1.14 266.6667
0.12 0.15 1
0.07 0.1 0.44 266.6667
V H D
Dimensi
Tinggi / Jumlah
Lebar
Tebal 45 22 7.333333
0.12 0.5 1
0.07 0.45 1.14 146.6667
0.12 0.15 1
0.07 0.1 0.44 146.6667
0.2 0.5 1
0.15 0.45 1.3 1086.667
0.2 0.5 1
0.15 0.45 1.3 986.6667
0.2 0.4 1
0.15 0.35 1.1 740
0.15 0.3 1
0.1 0.25 0.8 560.6667
0.2 0.4 8
0.15 0.35 1.1 320
0.15 0.3 1
0.1 0.25 0.8 40
0.25 0.6 4
0.2 0.55 1.6 240
0.2 0.5 1
0.15 0.45 1.3 453.3333
0.2 0.4 1
0.15 0.35 1.1 760
0.15 0.3 1
0.1 0.25 0.8 340
0.15 0.3 1
0.1 0.25 0.8 1106.667
0.1 0.2 1
0.05 0.15 0.5 993.3333
Galian Urug Pasir Lantai Kerja Cerucuk
1,899.07 165.14 2.00 126.00 0.2 12.60 0.05 3.15 4.00
1,519.94 132.17 2.00 97.92 0.2 9.79 0.05 2.45 3.00
223.92 22.39 5.60
719.82 62.59
1,289.60 112.14
75 6.52
75 6.52
100.0002 8.70
111.1113 9.66
114.282 9.94
114.282 9.94
121.89 10.60
179.78 15.63
138.09 12.01
268.67 23.36
166.6667 14.49
150 13.04
1200 104.35
1300 113.04
340 29.57
589.3333 51.25
912 79.30
836 72.70
204 17.74
272 23.65
1,179.01 102.52
1,577.60 137.18
664 57.74
885.3333 76.99
596 51.83
496.6667 43.19
Galian Urug Pasir Lantai Kerja Cerucuk
1,344.67 116.93 4.00 161.28 0.2 8.06 0.05 2.02 2.00
- -
161.28 8.06 2.02
1,063.23 92.45
1,159.20 100.80
978 85.04
1238.8 107.72
978 85.04
478.1333 41.58
Galian Urug Pasir Lantai Kerja Cerucuk
298.82 25.98 4.00 35.84 0.2 1.79 0.05 0.45 2.00
- -
35.84 1.79 0.45
236.27 20.55
257.60 22.40
240 20.87
304 26.43
240 20.87
117.3333 10.20
117.03 10.18
82.80 7.20
132 11.48
167.2 14.54
132 11.48
64.53333 5.61
1304 113.39
1412.667 122.84
740 64.35
1282.667 111.54
444 38.61
814 70.78
336.4 29.25
448.5333 39.00
1,839.58 159.96
1,763.20 153.32
138.71 12.06
139.20 12.10
689.96 60.00
320.00 27.83
192 16.70
352 30.61
24 2.09
32 2.78
288 25.04
384 33.39
340 29.57
589.3333 51.25
456 39.65
836 72.70
204 17.74
272 23.65
1,179.01 102.52
1,577.60 137.18
664 57.74
885.3333 76.99
596 51.83
496.6667 43.19
4.00 448.00
3.00 306.00
754.00
2.00 252.00
252.00
2.00 56.00
56.00
2.00 32.00
32.00