Daftar Upah Tenaga Kerja dan Harga Satuan Material / Bahan

Serta Harga Sewa Peralatan


Wilayah I Kabupaten Kubu Raya
I. DAFTAR HARGA UPAH

No Jenis Tenaga Kerja Satuan Kode Harga Satuan (Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 65,000.00
2 Mekanik Org/hari L.071 65,000.00
3 Kepala Tukang Org/hari L.073 65,000.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik Org/hari L.079 60,000.00
5 Operator terlatih Org/hari L.081 55,000.00
6 Operator semi terlatih Org/hari L.082 50,000.00
7 Sopir Org/hari L.091 55,000.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 50,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 55,000.00

II. DAFTAR HARGA MATERIAL / BAHAN

No. Jenis Bahan / Material Satuan Kode Harga Satuan (Rp)

B. BAHAN PENGISI
1 Batu pecah 10/15 cm M³ M.020 282,750.00
2 Batu pecah 5/7 cm M³ M.022 337,300.00
3 Batu pecah 3/5 cm M³ M.023 411,150.00
4 Batu pecah 2/3 cm M³ M.024 448,000.00
5 Batu pecah 1/2 cm M³ M.025 520,450.00
6 Batu pecah 0,5 - 1 cm M³ M.026 586,400.00
7 Pasir Urug M³ M.040 94,000.00
8 Pasir Ayak ( camp. Spesi dan Mortar) M³ M.040 104,500.00
9 Semen PC Zak M.080 73,250.00
10 Semen PC Kg - 1,465.00
11 Bataco 15 x 30 x 7 cm ( cetak mesin ) Bh - 1,700.00
12 Bataco 20 x 40 x 9 cm ( cetak mesin ) Bh - 2,600.00
13 Bataco 18 x 40 x 7 cm (cetak mesin) Bh - 3,000.00
14 Keramik 20 x 20 cm Kotak - 40,950.00
15 Keramik 30 x 30 cm Kotak - 46,800.00

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 7/7-4 m s/d 9/9-4 m M³ M.181.a 9,945,000.00
2 Ky. Belian ketam Uk. 7/7-4 m M³ - 11,700,000.00
3 Ky. klas I uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 7,020,000.00
4 Ky. klas I uk. 8/8 - 4 M ( ketam ) M³ M.181.f 8,775,000.00
5 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 4,095,000.00
6 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 5,265,000.00
7 Papan belian ketam M³ M.181.e 14,040,000.00
8 Papan belian tdk ketam M³ M.181.d 12,870,000.00
9 Papan kayu klas I tdk ketam M³ - 8,190,000.00
10 Papan kayu klas I ketam M³ - 8,190,000.00
11 Papan kayu klas II (mabang) ketam M³ M.181.k 5,265,000.00
12 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 4,680,000.00
13 Papan mal klas III M³ M.181.l 1,096,000.00
14 Papan Simpiran M³ - 702,000.00
15 Renglat kayu klas I Btg - 7,700.00
16 Kayu cerucuk /dolken ø 6/7 - Pj. 4 M Btg - 4,000.00
17 Kayu cerucuk /dolken ø 8/10 - Pj. 4 M Btg - 5,500.00
18 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg 87,750.00
19 Alas kayu hutan Btg - 12,000.00
No. Jenis Bahan / Material Satuan Kode Harga Satuan (Rp)

D. BAHAN CAT
1 Amplas Lbr - 2,900.00
3 Cat dasar Kg - 22,400.00
5 Cat kilat Kg - 46,800.00
7 Plamur Kg - 35,100.00
9 Cat tembok Kg - 31,000.00
11 Dempul Kg - 46,800.00
13 Plitur Kg - 42,900.00
15 Thiner Ltr M.090.f 18,300.00
17 Melamic Ltr - 62,400.00
19 Meni Kg - 33,500.00
21 Oker Kg - 70,200.00
23 Lem Kayu Kg - 20,500.00
25 Soda Api Kg - 18,000.00
27 Sabun / cream pembersih kotoran Kg - 17,300.00
29 Teak Oil Ltr - 28,400.00
31 Ter / Residu Ltr - 10,500.00
33 Kuas 4" Bh - 14,400.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton (Polos) Kg M.167 19,800.00
2 Besi Tulangan Beton (Ulir) Kg M.167 21,200.00
3 Kawat baja/bendrat Kg M.168 18,900.00
4 Simpai roll Kg - 25,700.00
5 Kawat simpai Kg - 17,500.00
6 Baut dia 4/8 " pj = 20 cm Btg M.163 5,500.00
7 Beugel plat L. 3 cm bh - 20,000.00
8 Wiremesh M-5 M² - 21,500.00

F. BAHAN PENGANTUNG
1 Kait angin Bh - 7,020.00
2 Handle Jendela Bh - 25,520.00
3 Engsel jendela Ktk - 23,400.00
4 Engsel pintu Ktk - 29,250.00
5 Slot pintu Bh - 17,550.00
6 Slot jendela Bh - 8,700.00
7 Kunci tanam 2 slag besar Bh - 99,450.00
8 Kunci tanam 2 slag kecil Bh - 58,500.00
14 Paku Seng Kg M.166.a 19,800.00
15 Paku campuran 1" - 5 " Kg M.166.b 16,300.00
16 Paku beton Kg - 18,700.00
17 Paku Atap Seng Kg M.166.c 19,800.00
18 Paku triplek Kg - 29,250.00

G. BAHAN ATAP
1 Genteng Metal Type Prima 0.35 M² - 102,000.00
2 Genteng Metal Type Royal 0.35 M² - 94,800.00
3 Genteng Metal Type Classic 0.35 M² - 89,800.00
4 Genteng Metal Stone ( Type Classic 0.35 ) M² - 119,800.00
6 Nok bubungan genteng metal 1/2 lingkaran 0.35 Bh - 90,000.00
7 Nok bubungan genteng metal kotak 0.35 Bh - 18,000.00
8 Nok bubungan genteng metal stone kotak 0.35 Bh 21,600.00
9 Seng Gelombang Bjls 30 Lbr - 70,200.00
10 Seng Gelombang Bjls 20 Lbr - 43,200.00
11 Seng Plat Bjls 20 Lbr - 45,600.00
12 Seng Plat Bjls 30 Lbr - 73,700.00

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M² - 122,800.00
2 Kaca Polos, t = 12mm M² - 318,000.00
3 Kaca Rayben, t = 5 mm M² - 169,500.00
4 Kaca Cermin t = 3mm M² - 152,100.00
5 Kaca Patri M² - 882,000.00
6 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 126,100.00
7 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 154,600.00

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 49,500.00
2 Triplek t = 6 mm Lbr - 105,300.00
3 Triplek t =9 mm Lbr - 175,500.00
4 Multiplek t = 12 mm Lbr - 204,750.00
5 Plywood 4' x 8' x 4mm Lbr - 87,750.00
6 Panel GRC 120 x 240 x 4 mm Lbr - 64,350.00
DAFTAR ANALISA PEKERJAAN UTAMA

A. PEKERJAAN PERSIAPAN (P.Ps)

1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter (P.Ps. 01)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.200 12,000.00
2 Pekerja OH 50,000.00 0.400 20,000.00
3 Kepala Tukang OH 65,000.00 0.020 1,300.00
4 Mandor OH 65,000.00 0.020 1,300.00
Jumlah 34,600.00
B BAHAN
1 Kayu Pancang (Dolken) d = 10cm, p = 4m Btg 5,500.00 1.250 6,875.00
2 Seng Gelombang BJLS 0.20 Lbr 43,200.00 1.200 51,840.00
3 Kayu Kelas II uk. 4/6 M3 4,095,000.00 0.072 294,840.00
4 Paku Kg 16,300.00 0.060 978.00
Jumlah 354,533.00
C Jumlah A + B 389,133.00
D Harga Satuan 389,133.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

1 m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.100 6,000.00
2 Pekerja OH 50,000.00 0.100 5,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.005 325.00
Jumlah 11,975.00
B BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 4,000.00 1.000 4,000.00
2 Paku Kg 16,300.00 0.020 326.00
3 Papan Kayu Kelas III M3 1,096,000.00 0.007 7,672.00
Jumlah 11,998.00
C Jumlah A + B 23,973.00
D Harga Satuan 23,973.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Mandor OH 65,000.00 0.050 3,250.00
Jumlah 8,250.00
B BAHAN

Jumlah 0.00
C Jumlah A + B 8,250.00
D Harga Satuan 8,250.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
B. PEKERJAAN TANAH (P.T.)

1m3 Galian Tanah Biasa sedalam 1 meter (P.T. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.400 20,000.00
2 Mandor OH 65,000.00 0.040 2,600.00
Jumlah 22,600.00
B BAHAN

Jumlah 0.00
C Jumlah A + B 22,600.00
D Harga Satuan 22,600.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1m3 Urugan Kembali (P.T. 06)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.192 9,600.00
2 Mandor OH 65,000.00 0.019 1,235.00
Jumlah 10,835.00
B BAHAN

Jumlah 0.00
C Jumlah A + B 10,835.00
D Harga Satuan 10,835.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

1m3 Urugan Pasir (P.T. 10)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Mandor OH 65,000.00 0.010 650.00
Jumlah 15,650.00
B BAHAN
1 Pasir Urug M3 94,000.00 1.200 112,800.00
Jumlah 112,800.00
C Jumlah A + B 128,450.00
D Harga Satuan 128,450.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.11

1m3 Urugan Pasir Alas (P.T. 11)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Mandor OH 65,000.00 0.010 650.00
Jumlah 15,650.00
B BAHAN
1 Pasir Urug M3 94,000.00 1.250 117,500.00
Jumlah 117,500.00
C Jumlah A + B 133,150.00
D Harga Satuan 133,150.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W. 1
C. PEKERJAAN PONDASI BATU (P.PB.)

1m3 Pasang Pondasi Batu Belah 1Pc : 4Ps (P.PB. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.500 75,000.00
2 Tukang Batu OH 60,000.00 0.600 36,000.00
3 Kepala Tukang OH 65,000.00 0.060 3,900.00
4 Mandor OH 65,000.00 0.075 4,875.00
Jumlah 119,775.00
B BAHAN
1 Batu Belah 15-20 cm M3 165,000.00 1.100 181,500.00
2 Semen Portland Kg 1,465.00 163.000 238,795.00
3 Pasir M3 104,500.00 0.520 54,340.00
Jumlah 474,635.00
C Jumlah A + B 594,410.00
D Harga Satuan 594,410.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.5
D. PEKERJAAN BETON BERTULANG (P.BB.)

1m3 Membuat Beton Tumbuk 1Pc : 3Ps : 5Kr (P.BB. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.650 82,500.00
2 Tukang Batu OH 60,000.00 0.250 15,000.00
3 Kepala Tukang OH 65,000.00 0.025 1,625.00
4 Mandor OH 65,000.00 0.080 5,200.00
Jumlah 104,325.00
B BAHAN
1 Semen Portland Kg 1,465.00 218.000 319,370.00
2 Pasir M3 104,500.00 0.520 54,340.00
3 Batu Belah 0,5 - 1 (Kerikil) M3 586,400.00 0.870 510,168.00
Jumlah 883,878.00
C Jumlah A + B 988,203.00
D Harga Satuan 988,203.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1m3 Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr (P.BB. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 2.000 100,000.00
2 Tukang Besi OH 60,000.00 0.350 21,000.00
3 Kepala Tukang OH 65,000.00 0.035 2,275.00
4 Mandor OH 65,000.00 1.000 65,000.00
Jumlah 188,275.00
B BAHAN
1 Semen Portland Kg 1,465.00 336.000 492,240.00
2 Pasir M3 104,500.00 0.540 56,430.00
3 Batu Belah 0,5 - 1 (Kerikil) M3 586,400.00 0.810 474,984.00
Jumlah 1,023,654.00
C Jumlah A + B 1,211,929.00
D Harga Satuan 1,211,929.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.13

Memasang 10Kg Jaring Kawat Baja/Wire Mesh (P.BB. 08)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.0250 1,250.00
2 Tukang Besi OH 60,000.00 0.0250 1,500.00
3 Kepala Tukang OH 65,000.00 0.0250 1,625.00
4 Mandor OH 65,000.00 0.0010 65.00
Jumlah 4,440.00
B BAHAN
1 Besi Wire Mesh M 5 Kg 21,500.00 10.200 219,300.00
2 Kawat Ikat Beton (bendrat) Kg 18,900.00 0.050 945.00
Jumlah 220,245.00
C Jumlah A + B 224,685.00
D Harga Satuan 224,685.00
E Harga Satuan per 1 Kg 224,685.00
Acuan : SNI DT 91-0008-2007
1Kg Pembesian dengan Besi Polos atau Ulir (P.BB. 03)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.007 350.00
2 Tukang Besi OH 60,000.00 0.007 420.00
3 Kepala Tukang OH 65,000.00 0.0007 45.50
4 Mandor OH 65,000.00 0.0003 19.50
Jumlah 835.00
B BAHAN
1 Besi Beton (polos/ulir) Kg 19,800.00 1.050 20,790.00
2 Kawat Ikat Beton (bendrat) Kg 18,900.00 0.015 283.50
Jumlah 21,073.50
C Jumlah A + B 21,908.50
D Harga Satuan 21,908.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.25

1m2 Pasang Bekesting untuk Pondasi (P.BB. 04)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Kayu OH 60,000.00 0.260 15,600.00
3 Kepala Tukang OH 65,000.00 0.026 1,690.00
4 Mandor OH 65,000.00 0.005 325.00
Jumlah 32,615.00
B BAHAN
1 Papan Mal (Kayu Kelas III) M3 1,096,000.00 0.040 43,840.00
2 Paku 2" - 5" Kg 16,300.00 0.300 4,890.00
3 Minyak Bekesting Lt 4,500.00 0.100 450.00
Jumlah 49,180.00
C Jumlah A + B 81,795.00
D Harga Satuan 81,795.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.28

1m2 Pasang Bekesting untuk Sloof (P.BB. 05)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Kayu OH 60,000.00 0.260 15,600.00
3 Kepala Tukang OH 65,000.00 0.026 1,690.00
4 Mandor OH 65,000.00 0.005 325.00
Jumlah 32,615.00
B BAHAN
1 Papan Mal (Kayu Kelas III) M3 1,096,000.00 0.045 49,320.00
2 Paku 2" - 5" Kg 16,300.00 0.300 4,890.00
3 Minyak Bekesting Lt 4,500.00 0.100 450.00
Jumlah 54,660.00
C Jumlah A + B 87,275.00
D Harga Satuan 87,275.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.29
1m2 Pasang Bekesting untuk Kolom (P.BB. 06.a)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Kayu OH 60,000.00 0.330 19,800.00
3 Kepala Tukang OH 65,000.00 0.033 2,145.00
4 Mandor OH 65,000.00 0.006 390.00
Jumlah 37,335.00
B BAHAN
1 Paku 2" - 5" Kg 16,300.00 0.200 3,260.00
2 Minyak Bekesting Lt 4,500.00 0.200 900.00
3 Papan Mal M3 1,096,000.00 0.040 43,840.00
4 Cerucuk Ǿ 6 - 8cm / 4m Btg 4,000.00 2.000 8,000.00
Jumlah 56,000.00
C Jumlah A + B 93,335.00
D Harga Satuan 93,335.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.30

1m2 Pasang Bekesting untuk Balok (P.BB. 07.a)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.320 16,000.00
2 Tukang Kayu OH 60,000.00 0.330 19,800.00
3 Kepala Tukang OH 65,000.00 0.033 2,145.00
4 Mandor OH 65,000.00 0.006 390.00
Jumlah 38,335.00
B BAHAN
1 Paku 2" - 5" Kg 16,300.00 0.200 3,260.00
2 Minyak Bekesting Lt 4,500.00 0.200 900.00
3 Balok Kayu Kelas III uk. 4/6 M3 1,096,000.00 0.018 19,728.00
4 Papan Mal M3 1,096,000.00 0.040 43,840.00
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 4,000.00 2.000 8,000.00
Jumlah 75,728.00
C Jumlah A + B 114,063.00
D Harga Satuan 114,063.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.31

1m2 Pasang Bekesting untuk Lantai (P.BB. 08.a)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.320 16,000.00
2 Tukang Kayu OH 60,000.00 0.330 19,800.00
3 Kepala Tukang OH 65,000.00 0.033 2,145.00
4 Mandor OH 65,000.00 0.006 390.00
Jumlah 38,335.00
B BAHAN
1 Paku 2" - 5" Kg 16,300.00 0.400 6,520.00
2 Minyak Bekesting Lt 4,500.00 0.200 900.00
3 Balok Kayu Kelas III uk. 4/6 M3 1,096,000.00 0.015 16,440.00
4 Papan Mal M3 1,096,000.00 0.040 43,840.00
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 4,000.00 6.000 24,000.00
Jumlah 91,700.00
C Jumlah A + B 130,035.00
D Harga Satuan 130,035.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m3 Pekerjaan Balok Sloof 20 x 30 cm (125 Kg)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Besi Beton Kg 21,908.50 125.000 2,738,562.50
2 Beton Camp. 1 : 2 : 3 M3 1,211,929.00 1.000 1,211,929.00
3 Bekisting / Cetakan / Mal Balok Sloof M2 87,275.00 4.000 349,100.00
Jumlah 4,299,591.50

1m3 Pekerjaan Balok Sloof 15 x 20 cm (163Kg)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Besi Beton Kg 21,908.50 163.000 3,571,085.50
2 Beton Camp. 1 : 2 : 3 M3 1,211,929.00 1.000 1,211,929.00
3 Bekisting / Cetakan / Mal Balok Sloof M2 87,275.00 5.000 436,375.00
Jumlah 5,219,389.50

1m3 Pekerjaan Balok Kolom 15 x 15 cm (205 Kg)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Besi Beton Kg 21,908.50 205.000 4,491,242.50
2 Beton Camp. 1 : 2 : 3 M3 1,211,929.00 1.000 1,211,929.00
3 Bekisting / Cetakan / Mal Balok Kolom M2 93,335.00 8.000 746,680.00
Jumlah 6,449,851.50

1m3 Pekerjaan Balok Kolom 10 x 15 cm (212 Kg)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Besi Beton Kg 21,908.50 212.000 4,644,602.00
2 Beton Camp. 1 : 2 : 3 M3 1,211,929.00 1.000 1,211,929.00
3 Bekisting / Cetakan / Mal Balok Kolom M2 93,335.00 11.000 1,026,685.00
Jumlah 6,883,216.00

1m3 Pekerjaan Ring Balok 15 x 20 cm (153 Kg)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Besi Beton Kg 21,908.50 153.000 3,352,000.50
2 Beton Camp. 1 : 2 : 3 M3 1,211,929.00 1.000 1,211,929.00
3 Bekisting / Cetakan / Mal Balok Kolom M2 93,335.00 5.000 466,675.00
Jumlah 5,030,604.50
E. PEKERJAAN DINDING (P.Dnd.)

1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.32 16,000.00
2 Tukang Batu OH 60,000.00 0.10 6,000.00
3 Kepala Tukang OH 65,000.00 0.01 650.00
4 Mandor OH 65,000.00 0.015 975.00
Jumlah 23,625.00
B BAHAN
1 Batako 15/30/7 (cetak mesin) Bh 1,700.00 22.000 37,400.00
2 Semen Portland Kg 1,465.00 7.500 10,987.50
3 Pasir Beton / Pasang M3 104,500.00 0.027 2,821.50
Jumlah 51,209.00
C Jumlah A + B 74,834.00
D Harga Satuan 74,834.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

1m2 Pasang Batako uk. 20/40/7(P.Dnd. 03)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.32 16,000.00
2 Tukang Batu OH 60,000.00 0.10 6,000.00
3 Kepala Tukang OH 65,000.00 0.01 650.00
4 Mandor OH 65,000.00 0.015 975.00
Jumlah 23,625.00
B BAHAN
1 Batako 20/40/7 (cetak mesin) Bh 3,000.00 12.5 37,500.00
2 Semen Portland Kg 1,465.00 7.500 10,987.50
3 Pasir Beton / Pasang M3 104,500.00 0.027 2,821.50
Jumlah 51,309.00
C Jumlah A + B 74,934.00
D Harga Satuan 74,934.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20
F. PEKERJAAN PLASTERAN (P.Pls)

1m2 Plasteran 1Pc : 2Ps tebal 1,5cm (P.Pls. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Batu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.010 650.00
Jumlah 20,625.00
B BAHAN
1 Semen Portland Kg 1,465.00 8.520 12,481.80
2 Pasir M3 104,500.00 0.017 1,776.50
Jumlah 14,258.30
C Jumlah A + B 34,883.30
D Harga Satuan 34,883.30
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

1m2 Plasteran 1Pc : 3Ps tebal 1,5cm (P.Pls. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Batu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.010 650.00
Jumlah 20,625.00
B BAHAN
1 Semen Portland Kg 1,465.00 6.480 9,493.20
2 Pasir M3 104,500.00 0.019 1,985.50
Jumlah 11,478.70
C Jumlah A + B 32,103.70
D Harga Satuan 32,103.70
Acuan : ABK Bangunan Gedung dan Perumahan - 6.3
1m2 Plasteran 1Pc : 4Ps tebal 1,5cm (P.Pls. 03)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Batu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.010 650.00
Jumlah 20,625.00
B BAHAN
1 Semen Portland Kg 1,465.00 5.200 7,618.00
2 Pasir M3 104,500.00 0.020 2,090.00
Jumlah 9,708.00
C Jumlah A + B 30,333.00
D Harga Satuan 30,333.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1m2 Plasteran dan Acian 1Pc : 4Ps tebal 1,5cm (P.Pls. 13)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.330 16,500.00
2 Tukang Batu OH 60,000.00 0.165 9,900.00
3 Kepala Tukang OH 65,000.00 0.0165 1,072.50
4 Mandor OH 65,000.00 0.0165 1,072.50
Jumlah 28,545.00
B BAHAN
1 Semen Portland Kg 1,465.00 0.230 336.95
2 Pasir M3 104,500.00 0.023 2,403.50
Jumlah 2,740.45
C Jumlah A + B 31,285.45
D Harga Satuan 31,285.45
Acuan : Buku Menghitung Anggaran Biaya Bangunan Zainal A. Z. terbitan PT Gramedia Pustaka Utama Jakarta
G. PEKERJAAN KAYU (P.K.)

1m3 Pasang Kusen Pintu dan Jendela Kayu Kelas I (P.K. 12)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 6.000 300,000.00
2 Tukang Kayu OH 60,000.00 18.000 1,080,000.00
3 Kepala Tukang OH 65,000.00 2.000 130,000.00
4 Mandor OH 65,000.00 0.300 19,500.00
Jumlah 1,529,500.00
B BAHAN
1 Kayu Kelas 1 (Ketam) M3 8,775,000.00 1.200 10,530,000.00
Jumlah 10,530,000.00
C Jumlah A + B 12,059,500.00
D Harga Satuan 12,059,500.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1m2 Pasang Pintu Panel Kayu Kelas I (P.K. 14)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 60,000.00 2.500 150,000.00
3 Kepala Tukang OH 65,000.00 0.250 16,250.00
4 Mandor OH 65,000.00 0.050 3,250.00
Jumlah 219,500.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 8,190,000.00 0.040 327,600.00
Jumlah 327,600.00
C Jumlah A + B 547,100.00
D Harga Satuan 547,100.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.7

1m2 Pasang Pintu dan Jendela Kaca Kayu Kelas I (P.K. 16)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.800 40,000.00
2 Tukang Kayu OH 60,000.00 2.000 120,000.00
3 Kepala Tukang OH 65,000.00 0.200 13,000.00
4 Mandor OH 65,000.00 0.040 2,600.00
Jumlah 175,600.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 8,190,000.00 0.035 286,650.00
Jumlah 286,650.00
C Jumlah A + B 462,250.00
D Harga Satuan 462,250.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
1m2 Pasang Pintu dan Jendela Jalusi Kayu Kelas I (P.K. 18)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 60,000.00 3.000 180,000.00
3 Kepala Tukang OH 65,000.00 0.300 19,500.00
4 Mandor OH 65,000.00 0.300 19,500.00
Jumlah 269,000.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 8,190,000.00 0.064 524,160.00
Jumlah 524,160.00
C Jumlah A + B 793,160.00
D Harga Satuan 793,160.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.12

1m2 Pemasangan Ventilasi Jalusie/Reng Lat Kayu Kelas I (P.K. 21)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.800 48,000.00
2 Pekerja OH 50,000.00 0.500 25,000.00
3 Kepala Tukang OH 65,000.00 0.080 5,200.00
4 Mandor OH 65,000.00 0.014 910.00
Jumlah 79,110.00
B BAHAN
1 Papan Reng Lat Kayu Kelas I (Ketam) M3 4,812,500.00 0.013 62,562.50
2 Paku Kg 16,300.00 0.100 1,630.00
Jumlah 64,192.50
C Jumlah A + B 143,302.50
D Harga Satuan 143,302.50
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.37.i

1m2 Pemasangan Ventilasi Kaca


Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m 2 (P.K. 22)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.800 48,000.00
2 Pekerja OH 50,000.00 0.280 14,000.00
3 Kepala Tukang OH 65,000.00 0.080 5,200.00
4 Mandor OH 65,000.00 0.014 910.00
Jumlah 68,110.00
B BAHAN
1 List Kayu M' 6,250.00 8.000 50,000.00
2 Kaca Polos tebal 5 mm M2 122,800.00 0.600 73,680.00
3 Paku triplek Kg 29,250.00 0.050 1,462.50
Jumlah 125,142.50
C Jumlah A + B 193,252.50
D Harga Satuan 193,252.50
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.37.c
1m3 Pasang Konstruksi Kuda-kuda Kayu Kelas II (P.K. 24)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 4.000 200,000.00
2 Tukang Kayu OH 60,000.00 12.000 720,000.00
3 Kepala Tukang OH 65,000.00 1.200 78,000.00
4 Mandor OH 65,000.00 0.200 13,000.00
Jumlah 1,011,000.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 4,095,000.00 1.100 4,504,500.00
2 Besi Strip Btg 20,000.00 15.000 300,000.00
3 Paku Kg 18,700.00 0.800 14,960.00
Jumlah 4,819,460.00
C Jumlah A + B 5,830,460.00
D Harga Satuan 5,830,460.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.27

1m3 Pekerjaan Gording + Balok Angin Kayu Kelas II (P.K. 26)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 6.000 300,000.00
2 Tukang Kayu OH 60,000.00 18.000 1,080,000.00
3 Kepala Tukang OH 65,000.00 1.800 117,000.00
4 Mandor OH 65,000.00 0.300 19,500.00
Jumlah 1,216,500.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 4,095,000.00 1.100 4,504,500.00
2 Paku Kg 16,300.00 3.000 48,900.00
Jumlah 4,553,400.00
C Jumlah A + B 5,769,900.00
D Harga Satuan 5,769,900.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.2

1m2 Pemasangan Rangka Atap Seng (P.K. 28)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.100 6,000.00
2 Pekerja OH 50,000.00 0.150 7,500.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.0080 520.00
Jumlah 14,670.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 4,095,000.00 0.0111 45,500.00
2 Paku Kg 16,300.00 0.075 1,222.50
Jumlah 46,722.50
C Jumlah A + B 61,392.50
D Harga Satuan 61,392.50
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.19
1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 32)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Kayu OH 60,000.00 0.300 18,000.00
3 Kepala Tukang OH 65,000.00 0.030 1,950.00
4 Mandor OH 65,000.00 0.010 650.00
Jumlah 30,600.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 4,095,000.00 0.023 94,185.00
2 Paku Kg 16,300.00 0.150 2,445.00
Jumlah 96,630.00
C Jumlah A + B 127,230.00
D Harga Satuan 127,230.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.41

1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 37)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.050 3,250.00
Jumlah 14,900.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 8,190,000.00 0.0088 72,072.00
2 Paku Kg 16,300.00 0.060 978.00
Jumlah 73,050.00
C Jumlah A + B 87,950.00
D Harga Satuan 87,950.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas II (P.K. 38)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.050 3,250.00
Jumlah 14,900.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,265,000.00 0.0088 46,332.00
2 Paku Kg 16,300.00 0.060 978.00
Jumlah 47,310.00
C Jumlah A + B 62,210.00
D Harga Satuan 62,210.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53
H. PEKERJAAN PENUTUP ATAP (P.PA.)

1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.001 65.00
Jumlah 16,715.00
B BAHAN
1 Genteng Metal Type PRIMA 0.35 Lbr 102,000.00 1.840 187,680.00
2 Paku Kg 16,300.00 0.200 3,260.00
Jumlah 190,940.00
C Jumlah A + B 207,655.00
D Harga Satuan 207,655.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.001 65.00
Jumlah 16,715.00
B BAHAN
1 Genteng Metal Type CLASSIC 0.35 Lbr 89,800.00 1.620 145,476.00
2 Paku Kg 16,300.00 0.200 3,260.00
Jumlah 148,736.00
C Jumlah A + B 165,451.00
D Harga Satuan 165,451.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 08)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang kayu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.013 845.00
Jumlah 23,320.00
B BAHAN
1 Nok / Bubungan Genteng Metal Kotak 0.35 Bh 18,000.00 1.000 18,000.00
2 Paku 1/2" - 1" Kg 16,300.00 0.050 815.00
Jumlah 18,815.00
C Jumlah A + B 42,135.00
D Harga Satuan 42,135.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36
1m2 Pasang Atap Seng Gelombang Super Soka BJLS 0,20 (P.PA. 11)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.120 6,000.00
2 Tukang kayu OH 60,000.00 0.060 3,600.00
3 Kepala Tukang OH 65,000.00 0.006 390.00
4 Mandor OH 65,000.00 0.006 390.00
Jumlah 10,380.00
B BAHAN
1 Seng Gelombang 3" x 6" Super Soka Lbr 65,000.00 0.700 45,500.00
2 Paku 1/2" - 1" ( paku atap seng ) Kg 19,800.00 0.020 396.00
Jumlah 45,896.00
C Jumlah A + B 56,276.00
D Harga Satuan 56,276.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m1 Pekerjaan Bubungan Atap Seng BJLS 20 / 10m 1 (P.PA. 12)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 60,000.00 0.250 15,000.00
2 Kepala Tukang Kayu OH 65,000.00 0.025 1,625.00
3 Pekerja OH 50,000.00 0.250 12,500.00
Jumlah 29,125.00
B BAHAN
1 Paku Kg 16,300.00 0.100 1,630.00
2 Seng Plat BJLS 0.20 Lbr 45,600.00 6.000 273,600.00
3 Papan Kayu Kelas II (Tidak Ketam) M3 4,680,000.00 0.072 336,960.00
Jumlah 612,190.00
C Jumlah A + B 641,315.00
D Harga Satuan 641,315.00
Jadi 1 M1 64,131.50
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
I. PEKERJAAN PLAFOND (P.Pf.)

1m2 Pekerjaan Plafond Renglat Kayu Kelas I (P.Pf. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.500 25,000.00
2 Mandor OH 65,000.00 0.025 1,625.00
Jumlah 26,625.00
B BAHAN
1 Renglat Btg 7,700.00 5.500 42,350.00
2 Paku Kg 16,300.00 0.200 3,260.00
3 Kayu Kelas 2 (Tidak Ketam) M3 4,095,000.00 0.006 24,570.00
Jumlah 70,180.00
C Jumlah A + B 96,805.00
D Harga Satuan 96,805.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - SUPL. VIII.a

1m2 Langit-langit Triplek (30 x60)cm, Tebal 3mm (P.Pf. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.070 3,500.00
2 Tukang Kayu OH 60,000.00 0.100 6,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.0035 227.50
Jumlah 10,377.50
B BAHAN
1 Triplek 3 mm Lbr 49,500.00 0.360 17,820.00
2 Paku Kg 16,300.00 0.030 489.00
Jumlah 18,309.00
C Jumlah A + B 28,686.50
D Harga Satuan 28,686.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

1m2 Langit-langit GRC (P.Pf. 04)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 60,000.00 0.050 3,000.00
3 Kepala Tukang OH 65,000.00 0.005 325.00
4 Mandor OH 65,000.00 0.005 325.00
Jumlah 8,650.00
B BAHAN
1 GRC Board (120 x 240 x 4) Lbr 64,350.00 0.364 23,423.40
2 Paku GRC Kg 16,300.00 0.110 1,793.00
Jumlah 25,216.40
C Jumlah A + B 33,866.40
D Harga Satuan 33,866.40
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24
L. PEKERJAAN KUNCI DAN KACA (P.KK.)

1 Buah Pemasangan Kunci Tanam Besar (P.KK. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.010 500.00
2 Tukang Kayu OH 60,000.00 0.600 36,000.00
3 Kepala Tukang OH 65,000.00 0.060 3,900.00
4 Mandor OH 65,000.00 0.003 195.00
Jumlah 40,595.00
B BAHAN
1 Kunci Tanam 2 slaag Besar Bh 99,450.00 1.000 99,450.00
Jumlah 99,450.00
C Jumlah A + B 140,045.00
D Harga Satuan 140,045.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1 Buah Pemasangan Kunci Tanam Biasa (P.KK. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.010 500.00
2 Tukang Kayu OH 60,000.00 0.500 30,000.00
3 Kepala Tukang OH 65,000.00 0.010 650.00
4 Mandor OH 65,000.00 0.005 325.00
Jumlah 31,475.00
B BAHAN
1 Kunci Tanam Biasa Bh 58,500.00 1.000 58,500.00
Jumlah 58,500.00
C Jumlah A + B 89,975.00
D Harga Satuan 89,975.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

1 Buah Pemasangan Engsel Pintu (P.KK. 04)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.00075 48.75
Jumlah 10,773.75
B BAHAN
1 Engsel Pintu Bh 14,625.00 1.000 14,625.00
Jumlah 14,625.00
C Jumlah A + B 25,398.75
D Harga Satuan 25,398.75
Acuan : ABK Bangunan Gedung dan Perumahan - 6.5
1 Buah Pemasangan Engsel Pintu (P.KK. 04a)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.00075 48.75
Jumlah 10,773.75
B BAHAN
1 Engsel Pintu Bh 11,700.00 1.000 11,700.00
Jumlah 11,700.00
C Jumlah A + B 22,473.75
D Harga Satuan 22,473.75
Acuan : ABK Bangunan Gedung dan Perumahan - 6.5

1 Buah Pemasangan Kait Angin (P.KK. 05)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 60,000.00 0.150 9,000.00
3 Kepala Tukang OH 65,000.00 0.015 975.00
4 Mandor OH 65,000.00 0.00075 48.75
Jumlah 10,773.75
B BAHAN
1 Kait Angin Bh 7,020.00 1.000 7,020.00
Jumlah 7,020.00
C Jumlah A + B 17,793.75
D Harga Satuan 17,793.75
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
M. PEKERJAAN LANTAI & DINDING (P.LD.)

1m2 Pasang Lantai Keramik 30 x 30cm Polos (P.LD. 01)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.620 31,000.00
2 Tukang Batu OH 60,000.00 0.350 21,000.00
3 Kepala Tukang OH 65,000.00 0.035 2,275.00
4 Mandor OH 65,000.00 0.030 1,950.00
Jumlah 56,225.00
B BAHAN
1 Ubin Keramik 30 x 30cm Polos Bh 5,200.00 11.870 61,724.00
2 Semen Portland Kg 1,465.00 10.000 14,650.00
3 Pasir Pasang M3 104,500.00 0.0215 2,246.75
4 Semen Pengisi Nat Keramik Kg 1,465.00 0.100 146.50
78,767.25
C Jumlah A + B 134,992.25
D Harga Satuan 134,992.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.10

1m2 Pasang Lantai Keramik 30 x 30cm Unpolished (P.LD. 02)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.620 31,000.00
2 Tukang Batu OH 60,000.00 0.350 21,000.00
3 Kepala Tukang OH 65,000.00 0.035 2,275.00
4 Mandor OH 65,000.00 0.030 1,950.00
Jumlah 56,225.00
B BAHAN
1 Ubin Keramik 30 x 30cm Unpolished Bh 4,000.00 11.870 47,480.00
2 Semen Portland Kg 1,465.00 10.000 14,650.00
3 Pasir Pasang M3 104,500.00 0.0215 2,246.75
4 Semen Pengisi Nat Keramik Kg 1,465.00 0.100 146.50
64,523.25
C Jumlah A + B 120,748.25
D Harga Satuan 120,748.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.10

1m2 Pasang Lantai Keramik 30 x 30cm Artistik (P.LD. 03)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.620 31,000.00
2 Tukang Batu OH 60,000.00 0.350 21,000.00
3 Kepala Tukang OH 65,000.00 0.035 2,275.00
4 Mandor OH 65,000.00 0.030 1,950.00
Jumlah 56,225.00
B BAHAN
1 Ubin Keramik 30 x 30cm Artistik Bh 6,000.00 12.000 72,000.00
2 Semen Portland Kg 1,465.00 14.150 20,729.75
3 Pasir Pasang M3 104,500.00 0.039 4,075.50
4 Oker Pengisi Nat Keramik Kg 70,200.00 0.100 7,020.00
103,825.25
C Jumlah A + B 160,050.25
D Harga Satuan 160,050.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.50
N. PEKERJAAN PENGECATAN (P.Ct.)

1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 3Lapis Cat Penutup) (P.Ct. 05)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.070 3,500.00
2 Tukang Cat OH 60,000.00 0.105 6,300.00
3 Kepala Tukang OH 65,000.00 0.004 260.00
4 Mandor OH 65,000.00 0.0025 162.50
Jumlah 3,662.50
B BAHAN
1 Cat Meni Kg 33,500.00 0.200 6,700.00
2 Plamur Kg 35,100.00 0.150 5,265.00
3 Cat Dasar Kg 22,400.00 0.170 3,808.00
4 Cat Penutup 3 Kali Kg 46,800.00 0.350 16,380.00
32,153.00
C Jumlah A + B 35,815.50
D Harga Satuan 35,815.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

1m2 Pekerjaan Melamic (P.Ct. 08)


Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Politur OH 60,000.00 0.500 30,000.00
2 Kepala Tukang OH 65,000.00 0.050 3,250.00
Jumlah 33,250.00
B BAHAN
1 Melamic Ltr 62,400.00 0.399 24,897.60
24,897.60
C Jumlah A + B 58,147.60
D Harga Satuan 58,147.60
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - K.15.a

1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
Harga Biaya
No. Uraian Pekerjaan Unit /Satuan Satuan Kuantitas Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.020 1,000.00
2 Tukang Cat OH 60,000.00 0.063 3,780.00
3 Kepala Tukang OH 65,000.00 0.0063 409.50
4 Mandor OH 65,000.00 0.0025 162.50
Jumlah 5,352.00
B BAHAN
1 Plamur Kg 35,100.00 0.100 3,510.00
2 Cat Dasar Kg 22,400.00 0.120 2,688.00
3 Cat Penutup 2 x Kg 31,000.00 0.260 8,060.00
14,258.00
C Jumlah A + B 19,610.00
D Harga Satuan 19,610.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
RENCANA ANGGARAN BIAYA
Engineering's Estimate (EE)
56.00
Program : Program Pendidikan Dasar Sembilan Tahun
Kegiatan : Pembangunan Unit Sekolah Baru ( USB )
Pekerjaan : Pembangunan Unit Sekolah Baru ( USB ) SDN 18 Rasau Jaya
Lokasi : Rasau Jaya Kabupaten Kubu Raya
Tahun Anggaran : 2010

I. Jenis Pekerjaan : Pembangunan Unit Sekolah Baru ( USB )


Jumlah Pekerjaan : 3 ( Tiga ) Unit
Volume Pekerjaan : 7 x 8 M ( 56 M² ) + Selasar ( 2 x 24 M² )

KODE HARGA JUMLAH


NO URAIAN PEKERJAAN ANALISA VOLUME UNIT SATUAN BIAYA
( Rp. ) ( Rp. )
1 2 3 4 5 6 7

I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi P.PS.03 216.000 M² 8,250.00 1,782,000.00
2 Pengkuran dan Pemasangan Bauplank P.PS.02 66.000 M' 23,973.00 1,582,218.00
3 Pembuatan Direksi Keet Atau Gudang - 20.000 M² 850,000.00 17,000,000.00
4 Papan Nama Proyek - 1.000 Lsm 750,000.00 750,000.00

Sub Jumlah I 21,114,218.00

II. PEKERJAAN GALIAN TANAH DAN PONDASI


1 Galian tanah Pondasi + Timbun Kembali P.T.01+06 13.600 M³ 33,435.00 454,716.00
2 Cerucuk Ø 10/12-800 cm + Pemancangan - 125.000 Btg 87,750.00 10,968,750.00
3 Urug Pasir Bawah Pondasi t = 15 cm P.T.10 2.400 M³ 128,450.00 308,280.00
4 Lantai Kerja Camp. 1 : 3 : 5 t = 5 cm P.BB.01 0.800 Bh 988,203.00 790,562.40
5 Pondasi Pasangan Batu Kali Spesi 1 : 4 P.PB.02 8.213 M³ 594,410.00 4,881,592.13
6 Angkur Besi Ø 12 mm - 100.000 Bh 35,000.00 3,500,000.00

Sub Jumlah II 20,903,900.53

III. PEKERJAAN STRUKTUR BETON


1 Balok Sloof 20/30 cm (125 Kg/M³) - 4.560 M³ 4,299,591.50 19,606,137.24
2 Balok Sloof 15/20 cm (163 Kg/M³) - 0.960 M³ 5,219,389.50 5,010,613.92
3 Kolom Beton 15/15 cm (205 Kg/M³) - 0.473 Btg 6,449,851.50 3,047,554.83
4 Kolom Beton 10/15 cm (212 Kg/M³) - 0.060 Btg 6,883,216.00 412,992.96
5 Ring Balok 15/20 (153 Kg/M³) - 3.240 M³ 5,030,604.50 16,299,158.58

Sub Jumlah III 44,376,457.53

IV PEKERJAAN LANTAI
1 Cerucuk lantai Ø 8/10-200 cm + Pemancangan - 217.000 Btg 2,750.00 596,750.00
2 Urug Pasir bawah lantai PT.10 43.200 M³ 128,450.00 5,549,040.00
3 Cor Lantai Beton Tumbuk Camp. 1 : 2 : 3 t = 10 cm P.BB.02 21.600 M³ 1,211,929.00 26,177,666.40
4 Tulangan lantai Wiremesh M-5 - 216.000 M² 224,685.00 48,531,960.00

Sub Jumlah IV 80,855,416.40

V PEKERJAAN ATAP
1 Rangka Kuda-kuda kayu Klas II P.K.24 3.368 M³ 5,830,460.00 19,639,321.46
2 Balok Gording, Nook, Jurai, Ikatan Angin Kayu Klas II Uk. 5/10 P.K.26 3.888 M³ 5,769,900.00 22,433,371.20
3 Penutup Atap Metal 0.35 mm P.PA.01 216.000 M² 207,655.00 44,853,480.00
4 Listplank Kayu Klas II P.K.38 28.800 M² 62,210.00 1,791,648.00
5 Prabung Kayu Klas II lapis Seng Polos 0,30 P.PA.12 15.600 M' 64,131.50 1,000,451.40
7 Atap Selasar Dak Beton 6.400 M² 224,685.00 1,437,984.00

Sub Jumlah V 91,156,256.06

VI PEKERJAAN DINDING
1 Pasangan Dinding Bataco UK 7x18x40 cm P.Dnd.03 280.550 M² 74,934.00 21,022,733.70
2 Plesteran Dinding P.Pls.03 561.100 M² 30,333.00 17,019,846.30
3 Pagar Selasar P.Dnd.01 15.600 M² 74,834.00 1,167,410.40

Sub Jumlah VI 39,209,990.40

VII PEKERJAAN PLAFOND


1 Rangka Plafond Kayu Klas II P.K.32 216.000 M² 127,230.00 27,481,680.00
2 Plafond GRC 4 mm P.Pf.04 216.000 M² 33,866.40 7,315,142.40
3 Rangka Plafond Kayu Klas II (Kaki Atap) P.K.32 35.000 M² 127,230.00 4,453,050.00
4 Plafond GRC 4 mm (kaki Atap) P.Pf.04 35.000 M² 33,866.40 1,185,324.00

Sub Jumlah VII 40,435,196.40


KODE HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA VOLUME UNIT SATUAN BIAYA
( Rp. ) ( Rp. )
1 2 3 4 5 6 7

VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI


1 Kusen Pintu Klas I Uk. 5/10 P.K.12 0.063 M³ 12,059,500.00 759,748.50
2 Pintu Panil Kayu Klas I P.K.14 9.450 M² 547,100.00 5,170,095.00
3 Jendela kaca Junkit bingkai kayu Klas I P.K.16 16.380 M² 462,250.00 7,571,655.00
4 Jendela kaca P.K.16 7.644 M² 462,250.00 3,533,439.00
5 Ventilasi Kayu Ram P.Ct.11 16.875 M² 143,302.50 2,418,229.69

Sub Jumlah VIII 19,453,167.19

IX PEKERJAAN PENGUNCI DAN PENGGANTUNG


Engsel Pintu Nylon 4" P.KK.04 12.000 Buah 25,398.75 304,785.00
2 Engsel Jendela Nylon 2" P.KK.04a 24.000 Buah 22,473.75 539,370.00
3 kunci Pintu 2 Slaag P.KK.02 3.000 Buah 89,975.00 269,925.00
4 Slot Pintu - 6.000 Buah 17,550.00 105,300.00
5 Slot Jendela - 24.000 Buah 8,700.00 208,800.00
6 Handle Jendela - 12.000 Buah 25,520.00 306,240.00
7 Kait Angin P.KK.05 24.000 Buah 17,793.75 427,050.00

Sub Jumlah IX 2,161,470.00

X PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Kolom dengan Cat tembok P.Ct.11 561.646 M² 19,610.00 11,013,878.06
2 Pengecatan Plafond dengan cat Tembok P.Ct.11 251.000 M² 19,610.00 4,922,110.00
3 Pengecatan Kusen , Pintu Jendela dan ventilasi dengan Melamic P.CT.08 103.350 M² 58,147.60 6,009,554.46
4 Pengecatan Listplank dengan Cat kilat P.CT.05 57.600 M² 35,815.50 2,062,972.80
5 Pengecatan Rangka Kuda-kuda Dengan Meny Kayu - 1.000 Lsm 1,500,000.00 1,500,000.00

Sub Jumlah X 25,508,515.32

XI PEKERJAAN INSTALASI LISTRIK

1 Pemasangan Instalasi Listrik


a Instalasi Kabel Induk (NYM 2 x 4 mm2 Supreme + Konduit) - 89.00 M1 30,000.00 2,670,000.00
b Instalasi Penerangan (NYM 2 x 2,5 mm2 Supreme + Konduit) - 15.00 Titik 150,000.00 2,250,000.00
d Instalasi Stop Kontak (NYM 3 x 3 mm Supreme + Konduit) - 3.00 Titik 100,000.00 300,000.00
f Instalasi Saklar 2 Way (NYM 3 x 2,5 mm2 Supreme + Konduit) - 3.00 Titik 75,000.00 225,000.00

2 Pengadaan dan Pemasangan Instalasi


a Lampu Inbow 2x 18 Watt ( Armatur+TL 18w Philips + Capasitor) - 12.00 Titik 300,000.00 3,600,000.00
b Lampu SL 18 Watt (Lengkap Merk Philip) + Teralis lampu - 3.00 Titik 150,000.00 450,000.00
b Stop Kontak Clipsal - 3.00 Titik 25,000.00 75,000.00
c Saklar 2 Way Ex. Panasonic - 3.00 Titik 65,000.00 195,000.00

Sub Jumlah XI 9,765,000.00

XII PEKERJAAN PENGADAAN MEUBELAIR


1 Meubelair Siswa ( Meja / Kursi 40 Buah / Kelas ) - 120.000 Buah 300,000.00 36,000,000.00
2 Meubelair Guru Kelas ( Meja / Kursi 1 Buah / Kelas ) - 3.000 Buah 600,000.00 1,800,000.00
3 Papan Tulis 2 Buah ( Black / White ) - 6.000 Buah 1,500,000.00 9,000,000.00
4 Papan Absen - 3.000 Buah 100,000.00 300,000.00
5 Bak Sampah Fibre - 3.000 Buah 250,000.00 750,000.00

Sub Jumlah XII 47,850,000.00

XIII PEKERJAAN LAIN - LAIN


1 Pembersihan Lokasi Setelah Selesai Pekerjaan - 216.000 M² 3,000.00 648,000.00

Sub Jumlah XIII 648,000.00

REKAPITULASI

NO. URAIAN SUB PEKERJAAN HARGA SATUAN


I PEKERJAAN PENDAHULUAN 21,114,218.00
II PEKERJAAN GALIAN TANAH DAN PONDASI 20,903,900.53
III PEKERJAAN STRUKTUR BETON 44,376,457.53
IV PEKERJAAN LANTAI 80,855,416.40
V PEKERJAAN ATAP 91,156,256.06
VI PEKERJAAN DINDING 39,209,990.40
VII PEKERJAAN PLAFOND 40,435,196.40
VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI 19,453,167.19
IX PEKERJAAN PENGUNCI DAN PENGGANTUNG 2,161,470.00
X PEKERJAAN PENGECATAN 25,508,515.32
XI PEKERJAAN INSTALASI LISTRIK 9,765,000.00
XII PEKERJAAN PENGADAAN MEUBELAIR 47,850,000.00
XIII PEKERJAAN LAIN - LAIN 648,000.00

JUMLAH 443,437,587.83
PEMBULATAN 443,437,000.00
RENCANA ANGGARAN BIAYA
Engineering's Estimate (EE)

Program : Program Pendidikan Dasar Sembilan Tahun


Kegiatan : Pembangunan Ruang Kantor
Pekerjaan : Pembangunan Ruang Kantor SDN 18 Rasau Jaya
Lokasi : Rasau Jaya Kabupaten Kubu Raya
Tahun Anggaran : 2010

II. Jenis Pekerjaan : Pembangunan Ruang Kantor


Jumlah Pekerjaan : 1 ( Satu ) Unit
Volume Pekerjaan : 18 x 8 M ( 72 M² ) + Selasar ( 18 x 2 M² )

KODE HARGA
NO URAIAN PEKERJAAN ANALISA VOLUME UNIT SATUAN
( Rp. )
1 2 3 4 5 6

I. PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan Lahan (Pembersihan Lokasi) P.PS.03 180.000 M² 8,250.00
2 Pengkuran dan Pemasangan Bauplank P.PS.02 60.000 M' 26,423.00

II. PEKERJAAN GALIAN TANAH DAN PONDASI


1 Galian tanah Pondasi + Timbun Kembali P.T.01+06 18.960 M³ 39,125.00
2 Timbunan Tanah Kembali P.T.01+06 11.873 M³ 13,041.67
2 Cerucuk 10/12-400 cm (super) + Pemancangan - 202.000 Btg 25,000.00
3 Urug Pasir Bawah Pondasi P.T.13 2.160 M³ 80,618.76
4 Lantai Kerja Camp. 1 : 3 : 5 P.BB.02 0.720 Bh 736,186.24
5 Urug Pasir Bawah Bawah lantai Keseluruhan P.T.13 72.000 M³ 80,618.76

III. PEKERJAAN STRUKTUR BETON


1 Pek. Plat Pondasi Uk. 80 x 80 x 25 cm (90 Kg/M³) P.BB.PP.1 2.880 M³ 2,533,516.70
2 Pek. Plat Pondasi Uk. 60 x 60 x 25 cm (90 Kg/M³) P.BB.PP.1 0.720 M³ 2,533,516.70
3 Kolom Pondasi 15X15 CM (158 Kg/M³) P.BB.KP.1 0.608 M³ 5,563,129.11
4 Kolom Pondasi 10X15 CM (220 Kg/M³) P.BB.KP.2 0.216 M³ 6,757,143.56
5 Balok Sloof 12/45 cm (99 Kg/M³) P.BB.SF.1 4.560 M³ 4,118,726.56
6 Balok Sloof 12/35 cm (117 Kg/M³) P.BB.SF.2 1.260 M³ 4,939,806.84
7 Lantai Beton Tumbuk t=10 cm (30 Kg/m³ 1xWiremesh M-5) P.BB.L.1 18.000 M³ 1,484,351.06
8 Kolom Beton Betulang 15/15 cm (289 Kg/M³) P.BB.K.1 1.800 M³ 5,563,129.11
9 Kolom Beton Betulang 12/15 cm (289 Kg/M³) P.BB.K.2 0.480 M³ 6,757,143.56
10 Ring Balok Beton Betulang 12/25 cm (150 Kg/M³) 3.120 M³ 4,848,999.39
11 Kolom praktis dan balok praktis pada Kusen 68.240 M¹ 81,698.88
12 Balok Praktis Pagar Selasar 70.000 M¹ 81,698.88
13 Tangga Dari Halaman ke Lantai 1 0.750 M³ 1,484,351.06

IV. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Dinding Bataco UK 7x18x40 cm P.Dnd.03 253.948 M² 60,320.50
2 Pasangan Pagar Selasar UK 7x18x40 cm P.Dnd.03 19.080 M² 60,320.50
2 Pasangan Tebing Layar Bataco UK 7x18x40 cm P.Dnd.03 13.500 M² 60,320.50
3 Plesteran Dinding Camp. 1 : 4 t=1,5 cm P.Pls.03 507.896 M² 28,819.00
4 Plesteran Pagar dan tebing layar Camp. 1 : 4 t=1,5 cm P.Pls.03 51.660 M² 28,819.00
6 Roster/Terawang Kotak 20x20 (X) Diaci pada pagar selasar - 12.000 Unit 50,000.00
7 Plesteran Tutup Kolong P.Pls.03 46.000 M² 28,819.00

V. PEKERJAAN RANGKA ATAP DAN ATAP


1 Rangka Kuda-kuda kayu Klas II Uk. 8/12 P.K.25 2.753 M³ 5,753,715.00
2 Balok Gording Kayu Klas Uk II 6/12 cm P.K.27 1.728 M³ 5,300,175.00
3 Balok Nok Kayu Klas II Uk 8/12 P.K.27 0.192 M³ 5,300,175.00
4 Ikatan Angin Kayu Klas II Uk 4/8 P.K.27 0.128 M³ 5,300,175.00
5 Penutup atap Supersheed Colour 0,35 type kotak P.PA.11 274.800 M² 110,769.00
6 Listplank Kayu Klas II Ukuran 2x 2/18 cm P.K.43 60.610 M' 32,611.00
7 Prabung Papan Lapis Seng Gelombang BJL 0,20 P.PA.12 20.000 M' 61,187.50
VI. PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II Uk. 4/6 P.K.35 273.000 M² 66,030.13
2 Plafond GRC 4 mm (Dalam Ruang Kelas) P.Pf.05 144.000 M² 45,179.50
3 Plafond GRC 4 mm (Selasar) P.Pf.05 36.000 M² 45,179.50
4 Plafond GRC 4 mm (Kaki Atap) P.Pf.05 93.000 M² 45,179.50
5 Profil Gypsum Polos 6 cm - 140.000 M¹ 30,000.00

VII. FINISHING LANTAI


1 Pasangan Keramik Lantai 30x30 cm Polos P.LD.03 180.000 M² 127,809.03
2 Pasangan Keramik Lantai Tangga 30x30 cm P.LD.03 4.500 M² 127,809.03

VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI


1 Kusen Pintu Klas I Uk. 6/12 P.K.12 1.221 M³ 9,508,875.00
2 Pintu Panil Kayu Klas I Dua Daun (P1, 3 UNIT) P.K.14 13.020 M² 540,750.00
3 Jendela kaca Junkit bingkai kayu Klas I Uk. (65x105 cm) 0,4 P.K.22+23 17.745 M² 317,517.50
5 Ventilasi beton (lubang profil) upah pasang + Acian - 34.000 Bh 100,000.00

IX PEKERJAAN PENGUNCI DAN PENGGANTUNG


a. Lantai 1
1 Engsel Pintu Nylon 4" P.KK.04 36.000 Buah 29,148.75
2 Engsel Pintu Nylon 3" P.KK.04a 52.000 Buah 26,523.75
3 Kunci Pintu 2 Slaag P.KK.02 3.000 Set 188,975.00
5 Slot Pintu tanam - 3.000 Set 150,000.00
6 Slot Jendela - 52.000 Buah 26,250.00
7 Handle Jendela - 26.000 Buah 20,600.00
8 Kait Angin P.KK.05 52.000 Buah 23,373.75

X PEKERJAAN SANITAIR
1 Bak WC Bataco Finishing Keramik 70x60x75 - 1.000 - 450,000.00
2 Kloset Jongkak Unit 1.000 Unit 365,285.00
3 Pekerjaan Kran Air KM/WC Bh 1.000 Bh 44,465.00
4 Pekerjaan Kran Air Meja Dapur type angsa Bh 1.000 Bh 44,465.00
5 Pekerjaan Kran Air Luar Bh 1.000 Bh 75,000.00
6 Pasangan floor drain KM/WC Bh 1.000 Bh 25,000.00
7 Pasangan kichen zink meja dapur Set 1.000 Set 300,000.00

XI PEKERJAAN INSTALASI AIR


1 Pekerjaan Pipa Air Bersih PVC Ø 3/4 " - 25.000 M¹ 18,113.25
2 Pekerjaan Pipa Air Kotor PVC Ø 1" - 6.000 M¹ 19,740.75
3 Pekerjaan Pipa Air Kotor PVC Ø 2" - 25.000 M¹ 61,641.75
4 Pekerjaan Pipa Air Kotor PVC Ø 4" - 4.000 M¹ 110,944.00
5 Accessories Lain (Lem Pipa, Amplas, Sambungan, dll 10% pipa) - 1.000 Lsm 255,609.55
6 Pekerjaan Septic tank kayu belian / kayu besi - 1.000 Unit 2,500,000.00
7 Pengadaan Pompa air - 1.000 Unit 750,000.00

XII PEKERJAAN PENGECATAN


1 Pengecatan Dinding dan Kolom dengan Cat tembok P.Ct.11 559.556 M² 20,157.00
2 Pengecatan Plafond dengan Compond + cat Tembok P.Ct.11 273.000 M² 20,157.00
3 Pengecatan Kusen , Pintu Jendela dan ventilasi dengan Melamic P.CT.08 91.101 M² 50,008.00
4 Pengecatan Listplank dengan Cat kilat P.CT.05 19.395 M² 31,897.50
5 Residu (Teer) Konsul, Gording kasau dan reng - 1.000 Lsm 1,500,000.00

XIII PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik
a Instalasi Kabel Induk NYM 3 x 4 mm2 Supreme + Konduit - 148.00 M1 30,000.00
b Instalasi Penerangan (NYM 2 x 2,5 mm2 Supreme + Konduit) - 19.00 Titik 100,000.00
d Instalasi Stop Kontak (NYM 3 x 3 mm Supreme + Konduit) - 8.00 Titik 100,000.00
f Instalasi Saklar 2 Way (NYM 3 x 2,5 mm2 Supreme + Konduit) - 5.00 Titik 50,000.00
g Instalasi Saklar 3 Way (NYM M x 2,5 mm2 Supreme + Konduit) - 5.00 Titik 50,000.00
2 Pengadaan dan Pemasangan Instalasi
a Lampu Inbow 2x 36 Watt ( Armatur+TL 36w Philips + Capasitor) - 10.00 Titik 300,000.00
b Lampu SL 18 Watt (Lengkap Merk Philip) - 9.00 Titik 75,000.00
d Stop Kontak Clipsal - 8.00 Titik 25,000.00
f Saklar 2 Way Ex. Panasonic - 5.00 Titik 75,000.00
g Saklar 3 Way Ex Panasonik - 5.00 Titik 90,000.00
3 Penyambugan Daya Listrik 2.600 Watt 1.00 Lsm 6,000,000.00

XIV PEKERJAAN PENGADAAN MEUBELAIR


1 Meubelair Kepala Sekolah ( Meja 1 Biro / Kursi 1 / Kursi hadap 2) - 1.00 Set 2,500,000.00
2 Meubelair Wakil Kepala Sekolah ( Meja 1/2 Biro / Kursi 1 / Kursi hadap 2) - 1.00 Set 2,000,000.00
3 Meubelair Ruang Guru ( Meja 1/2 Biro / Kursi 1 ) - 10.00 Set 1,000,000.00
4 Meubelair Ruang Administrasi ( Meja 1/2 Biro / Kursi 1 ) - 3.00 Set 800,000.00
5 Meubelair Ruang Tamu ( Kursi Tamu 1 : 2 : 3 ) - 1.00 Set 2,500,000.00

XV PEKERJAAN LAIN-LAIN
1 Pembersihan setelah selesai pekerjaan - 180.00 M² 2,500.00
2 Pekerjaan Lemari Tanam - 4.00 Unit 500,000.00

REKAPITULASI
NO URAIAN SUB PEKERJAAN
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN GALIAN TANAH DAN PONDASI
III. PEKERJAAN STRUKTUR BETON
IV. PEKERJAAN PASANGAN DAN PLESTERAN
V. PEKERJAAN RANGKA ATAP DAN ATAP
VI. PEKERJAAN PLAFOND
VII. FINISHING LANTAI
VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI
IX PEKERJAAN PENGUNCI DAN PENGGANTUNG
X PEKERJAAN SANITAIR
XI PEKERJAAN INSTALASI AIR
XII PEKERJAAN PENGECATAN
XIII PEKERJAAN INSTALASI LISTRIK
XIV PEKERJAAN PENGADAAN MEUBELAIR
XV PEKERJAAN LAIN-LAIN
JUMLAH
PEMBULATAN
JUMLAH
BIAYA
( Rp. )
7

1,485,000.00
1,585,380.00

3,070,380.00

741,810.00
154,837.19
5,050,000.00
174,136.51
530,054.09
5,804,550.43

12,455,388.22

7,296,528.10
1,824,132.03
3,379,600.93
1,459,543.01
18,781,393.09
6,224,156.62
26,718,319.00
10,013,632.39
3,243,428.91
15,128,878.10
5,575,131.57
5,718,921.60
1,113,263.29

106,476,928.64

15,318,270.33
1,150,915.14
814,326.75
14,637,054.82
1,488,789.54
600,000.00
1,325,674.00
35,335,030.59

15,837,445.76
9,158,702.40
1,017,633.60
678,422.40
30,439,321.20
1,976,552.71
1,223,750.00
60,331,828.07

18,026,224.13
6,505,848.00
1,626,462.00
4,201,693.50
4,200,000.00
34,560,227.63

23,005,625.14
575,140.63

23,580,765.77

11,608,054.25
7,040,565.00
5,634,348.04
3,400,000.00

27,682,967.29

1,049,355.00
1,379,235.00
566,925.00
450,000.00
1,365,000.00
535,600.00
1,215,435.00

6,561,550.00

450,000.00
365,285.00
44,465.00
44,465.00
75,000.00
25,000.00
300,000.00

1,304,215.00

452,831.25
118,444.50
1,541,043.75
443,776.00
255,609.55
2,500,000.00
750,000.00

6,061,705.05

11,278,970.29
5,502,861.00
4,555,778.81
618,658.39
1,500,000.00

23,456,268.49

4,440,000.00
1,900,000.00
800,000.00
250,000.00
250,000.00

3,000,000.00
675,000.00
200,000.00
375,000.00
450,000.00
6,000,000.00

18,340,000.00

2,500,000.00
2,000,000.00
10,000,000.00
2,400,000.00
2,500,000.00

19,400,000.00

450,000.00
2,000,000.00

2,450,000.00

JUMLAH HARGA
3,070,380.00
12,455,388.22
106,476,928.64
35,335,030.59
60,331,828.07
34,560,227.63
23,580,765.77
27,682,967.29
6,561,550.00
1,304,215.00
6,061,705.05
23,456,268.49
18,340,000.00
19,400,000.00
2,450,000.00
381,067,254.75
381,067,000.00
RENCANA ANGGARAN BIAYA
Engineering's Estimate (EE)

Program : Program Pendidikan Dasar Sembilan Tahun


Kegiatan : Pembangunan Unit Sekolah Baru ( USB )
Pekerjaan : Pembangunan Unit Sekolah Baru ( USB ) SDN 18 Rasau Jaya
Lokasi : Rasau Jaya Kabupaten Kubu Raya
Tahun Anggaran : 2010

I. JENIS PEKERJAAN : PEMBANGUNAN PERPUSTAKAAN


JUMLAH PEKERJAAN : 1 (SATU) UNIT
VOLUME PEKERJAAN : 12 X 8 M (96 M²) + Selasar 12 X 2 M ( 24 M² )

NO URAIAN PEKERJAAN

1 2

I. PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan Lahan (Pembersihan Lokasi)
2 Pengkuran dan Pemasangan Bauplank

II. PEKERJAAN GALIAN TANAH DAN PONDASI


1 Galian tanah Pondasi + Timbun Kembali
2 Timbunan Tanah Kembali
2 Cerucuk 10/12-400 cm (super) + Pemancangan
3 Urug Pasir Bawah Pondasi
4 Lantai Kerja Camp. 1 : 3 : 5
5 Urug Pasir Bawah Bawah lantai Keseluruhan

III. PEKERJAAN STRUKTUR BETON


1 Pek. Plat Pondasi Uk. 80 x 80 x 25 cm (90 Kg/M³)
2 Pek. Plat Pondasi Uk. 60 x 60 x 25 cm (90 Kg/M³)
3 Kolom Pondasi 15X15 CM (158 Kg/M³)
4 Kolom Pondasi 10X15 CM (220 Kg/M³)
5 Balok Sloof 12/40 cm (99 Kg/M³)
6 Balok Sloof 12/30 cm (117 Kg/M³)
7 Lantai Beton Tumbuk t=10 cm (30 Kg/m³ 1xWiremesh M-5)
8 Kolom Beton Betulang 15/15 cm (289 Kg/M³)
9 Kolom Beton Betulang 10/15 cm (289 Kg/M³)
10 Ring Balok Beton Betulang 12/25 cm (150 Kg/M³)
11 Kolom praktis dan balok praktis pada Kusen
12 Tangga Dari Halaman ke Lantai 1

IV. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Dinding Bataco UK 7x18x40 cm
2 Pasangan Pagar Selasar UK 7x18x40 cm
2 Pasangan Tebing Layar Bataco UK 7x18x40 cm
3 Plesteran Dinding Camp. 1 : 4 t=1,5 cm
6 Roster/Terawang Kotak 20x20 (X) Diaci Belakang
7 Plesteran Tutup Kolong

V. PEKERJAAN RANGKA ATAP DAN ATAP


1 Rangka Kuda-kuda kayu Klas II Uk. 8/12
2 Balok Gording Kayu Klas Uk II 6/12 cm
3 Balok Nok Kayu Klas II Uk 8/12
4 Ikatan Angin Kayu Klas II Uk 4/8
5 Penutup atap Supersheed Colour 0,35 type kotak
6 Listplank Kayu Klas II Ukuran 2x 2/18 cm
7 Prabung Papan Lapis Seng Gelombang BJL 0,20

VI. PEKERJAAN PLAFOND


1 Rangka Plafond Kayu Klas II Uk. 4/6
2 Plafond GRC 4 mm (Dalam Ruang Kelas)
3 Plafond GRC 4 mm (Selasar)

VII. FINISHING LANTAI


1 Plesteran Lantai + Acian Ruangan Gudang
2 Pasangan Keramik Lantai WC 20x20 cm

VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI


1 Kusen Pintu Klas I Uk. 5/10
2 Pintu PVC Lengkap (Kusen, Daun, Engsel dan Kunci)
3 Ventilasi Jalusi
5 Ventilasi beton (lubang profil) upah pasang + Acian

IX PEKERJAAN PENGUNCI DAN PENGGANTUNG


a. Lantai 1
1 Engsel Pintu Nylon 4"
2 Kunci Pintu 2 Slaag
3 Slot Pintu tanam

X PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Kolom dengan Cat tembok
2 Pengecatan Plafond dengan Compond + cat Tembok
3 Pengecatan Kusen , Pintu Jendela dan ventilasi dengan Melamic
4 Pengecatan Listplank dengan Cat kilat
5 Residu (Teer) Konsul, Gording kasau dan reng

XI PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik
a Instalasi Kabel Induk NYM 3 x 4 mm2 Supreme + Konduit
b Instalasi Penerangan (NYM 2 x 2,5 mm2 Supreme + Konduit)
d Instalasi Stop Kontak (NYM 3 x 3 mm Supreme + Konduit)
f Instalasi Saklar 2 Way (NYM 3 x 2,5 mm2 Supreme + Konduit)
g Instalasi Saklar 3 Way (NYM M x 2,5 mm2 Supreme + Konduit)
2 Pengadaan dan Pemasangan Instalasi
a Lampu SL 18 Watt (Lengkap Merk Philip)
b Stop Kontak Clipsal
c Saklar 1 Way Ex. Panasonic
d Saklar 3 Way Ex Panasonik

XII PEKERJAAN SANITAIR


1 Bak WC Bataco Finishing Keramik 70x60x75
2 Kloset Jongkak
3 Pekerjaan Kran Air KM/WC
4 Pasangan floor drain KM/WC
XIII PEKERJAAN INSTALASI AIR
1 Pekerjaan Pipa Air Bersih PVC Ø 3/4 "
2 Pekerjaan Pipa Air Kotor PVC Ø 1"
3 Pekerjaan Pipa Air Kotor PVC Ø 2"
4 Pekerjaan Pipa Air Kotor PVC Ø 4"
5 Accessories Lain (Lem Pipa, Amplas, Sambungan, dll 10% pipa)
6 Pekerjaan Septic tank kayu belian / kayu besi

XIV PEKERJAAN LAIN-LAIN


1 Pembersihan setelah selesai pekerjaan

REKAPITULASI
NO URAIAN SUB PEKERJAAN
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN GALIAN TANAH DAN PONDASI
III. PEKERJAAN STRUKTUR BETON
IV. PEKERJAAN PASANGAN DAN PLESTERAN
V. PEKERJAAN RANGKA ATAP DAN ATAP
VI. PEKERJAAN PLAFOND
VII. FINISHING LANTAI
VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI
IX PEKERJAAN PENGUNCI DAN PENGGANTUNG
X PEKERJAAN PENGECATAN
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN SANITAIR
XIII PEKERJAAN INSTALASI AIR
XIV PEKERJAAN LAIN-LAIN
A ANGGARAN BIAYA
ering's Estimate (EE)

) SDN 18 Rasau Jaya

KODE HARGA JUMLAH


ANALISA VOLUME UNIT SATUAN BIAYA
( Rp. ) ( Rp. )
3 4 5 6 7

P.PS.03 60.250 M² 8,250.00 497,062.50


P.PS.02 46.000 M' 26,423.00 1,215,458.00

JUMLAH 1,712,520.50 #REF!

P.T.01+06 7.840 M³ 39,125.00 306,740.00


P.T.01+06 3.975 M³ 13,041.67 51,834.10
- 110.000 Btg 25,000.00 2,750,000.00
P.T.13 1.176 M³ 80,618.76 94,807.66
P.BB.02 0.392 Bh 736,186.24 288,585.01
P.T.13 18.075 M³ 80,618.76 1,457,184.01

JUMLAH 4,949,150.78

P.BB.PP.1 1.600 M³ 2,533,516.70 4,053,626.72


P.BB.PP.1 0.360 M³ 2,533,516.70 912,066.01
P.BB.KP.1 0.338 M³ 5,563,129.11 1,877,556.07
P.BB.KP.2 0.108 M³ 6,757,143.56 729,771.50
P.BB.SF.1 2.010 M³ 4,118,726.56 8,278,640.38
P.BB.SF.2 0.675 M³ 4,939,806.84 3,334,369.62
P.BB.L.1 6.025 M³ 1,484,351.06 8,943,215.11
P.BB.K.1 0.900 M³ 5,563,129.11 5,006,816.20
P.BB.K.2 0.240 M³ 6,757,143.56 1,621,714.45
1.953 M³ 4,848,999.39 9,470,095.81
58.300 M¹ 81,698.88 4,763,044.70
0.750 M³ 1,484,351.06 1,113,263.29

JUMLAH 50,104,179.87

P.Dnd.03 148.065 M² 60,320.50 8,931,354.83


P.Dnd.03 12.720 M² 60,320.50 767,276.76
P.Dnd.03 13.500 M² 60,320.50 814,326.75
P.Pls.03 296.130 M² 28,819.00 8,534,170.47
- 4.000 Unit 102,544.85 410,179.40
P.Pls.03 32.000 M² 28,819.00 922,208.00
JUMLAH 20,379,516.21

P.K.25 1.147 M³ 5,753,715.00 6,598,935.73


P.K.27 0.648 M³ 5,300,175.00 3,434,513.40
P.K.27 0.125 M³ 5,300,175.00 661,461.84
P.K.27 0.064 M³ 5,300,175.00 339,211.20
P.PA.11 162.620 M² 110,769.00 18,013,254.78
P.K.43 46.610 M' 32,611.00 1,519,998.71
P.PA.12 13.000 M' 61,187.50 795,437.50

JUMLAH 31,362,813.16

P.K.35 57.225 M² 66,030.13 3,778,573.90


P.Pf.05 42.225 M² 45,179.50 1,907,704.39
P.Pf.05 15.000 M² 45,179.50 677,692.50
JUMLAH 6,363,970.79

P.LD.03 39.000 M² 33,001.90 1,287,074.10


P.LD.03 16.200 M² 119,303.60 1,932,718.32

JUMLAH 3,219,792.42

P.K.12 0.193 M³ 9,508,875.00 1,835,212.88


- 6.000 M² 450,000.00 2,700,000.00 ###
- 5.500 M² 426,925.00 2,348,087.50
- 2.000 Bh 100,000.00 200,000.00

JUMLAH 7,083,300.38

P.KK.04 8.000 Buah 29,148.75 233,190.00


P.KK.02 1.000 Set 188,975.00 188,975.00
- 1.000 Set 150,000.00 150,000.00

JUMLAH 572,165.00

P.Ct.11 296.130 M² 20,157.00 5,969,092.41


P.Ct.11 57.225 M² 20,157.00 1,153,484.33
P.CT.08 33.042 M² 50,008.00 1,652,364.34
P.CT.05 15.555 M² 31,897.50 496,171.99
- 1.000 Lsm 500,000.00 500,000.00

JUMLAH 9,771,113.06

- 78.20 M1 30,000.00 2,346,000.00


- 13.00 Titik 100,000.00 1,300,000.00
- 7.00 Titik 100,000.00 700,000.00
- 6.00 Titik 50,000.00 300,000.00
- 1.00 Titik 50,000.00 50,000.00

- 13.00 Titik 75,000.00 975,000.00


- 7.00 Titik 25,000.00 175,000.00
- 6.00 Titik 75,000.00 450,000.00
- 1.00 Titik 90,000.00 90,000.00

JUMLAH 6,386,000.00

- 6.000 Unit 450,000.00 2,700,000.00


Unit 6.000 Unit 365,285.00 2,191,710.00
Bh 6.000 Bh 44,465.00 266,790.00
Bh 1.000 Bh 25,000.00 25,000.00

JUMLAH 5,183,500.00
- 25.000 M¹ 18,113.25 452,831.25
- 6.000 M¹ 19,740.75 118,444.50
- 25.000 M¹ 61,641.75 1,541,043.75
- 4.000 M¹ 110,944.00 443,776.00
- 1.000 Lsm 255,609.55 255,609.55
- 1.000 Unit 2,500,000.00 2,500,000.00

JUMLAH 5,311,705.05

- 57.23 M² 2,500.00 143,062.50 -

JUMLAH 143,062.50

PEKERJAAN JUMLAH HARGA


1,712,520.50
4,949,150.78
50,104,179.87
20,379,516.21
31,362,813.16
6,363,970.79
3,219,792.42
7,083,300.38
572,165.00
9,771,113.06
6,386,000.00
5,183,500.00
5,311,705.05
143,062.50
JUMLAH 152,542,789.72
PEMBULATAN 152,542,000.00
25 29 58.00
13 17 34.00
92.00
#REF!

162.00

#REF!

### ###

###
###
Rp 3.86

###
###
###
###
###
###

#REF!

#REF! 112,668
R E K A P I T U L A S I B I A Y A
Engineering's Estimate (EE)

Program : Program Pendidikan Dasar Sembilan Tahun


Kegiatan : Pembangunan Unit Sekolah Baru ( USB )
Pekerjaan : Pembangunan Unit Sekolah Baru ( USB ) SDN 18 Rasau Jaya
Lokasi : Rasau Jaya Kabupaten Kubu Raya
Tahun Anggaran : 2010

JUMLAH
NO URAIAN PEKERJAAN BIAYA
( Rp. )

I. PEKERJAAN PENDAHULUAN 21,114,218.00


II. PEKERJAAN TANAH DAN PONDASI 20,903,900.53
III. PEKERJAAN STRUKTUR BETON 44,376,457.53
IV PEKERJAAN LANTAI 80,855,416.40
V PEKERJAAN ATAP 91,156,256.06
VI PEKERJAAN DINDING 39,209,990.40
VII PEKERJAAN PLAFOND 40,435,196.40
VIII PEKERJAAN PINTU , JENDELA DAN VENTILASI 19,453,167.19
IX PEKERJAAN PENGUNCI DAN PENGGANTUNG 2,161,470.00
X PEKERJAAN PENGECATAN 25,508,515.32
XI PEKERJAAN INSTALASI LISTRIK 9,765,000.00

Jumlah Langsung ………………………………… 394,939,587.83


PPn 10% 39,493,958.78
Jumlah Keseluruhan 434,433,546.61
Pembulatan 434,433,000.00

Terbilang : EMPAT RATUS TIGA PULUH TIGA JUTA ENAM RATUS DELAPAN RIBU RUPIAH

Sungai Raya , 2010

Diperiksa Oleh : Dibuat Oleh :


Pelaksana Teknis Kegiatan (PTK) Konsultan Perencana
Dinas Pendidikan Kab. Kubu Raya CV. WARSYA PELANGI CONSULTANT
Tahun Anggaran 2010

A. BAKAT ISWANTO A.Ma.Pd SYAPARMAN, ST


NIP 19600104 1979 10 1 001 DIREKTUR

Mengetahui / Disetujui :
Pejabat Pembuat Komitmen
Dinas Pendidikan Kab. Kubu Raya
Tahun Anggaran 2010

ISKANDAR, S.Pd
NIP. 19621231 1982 11 1 004
24 9 0.5 216

Bauuplank
Pembersihan Lokasi

Pondasi Batu Kali 25 Titik 0.8 x 0.8 = 0.64


0.3 x 0.3 = 0.09
0.73

25 x 0.3285

Urug Pasir Bawah Pondasi 33 Titik x 1 x 1


Urug Pasir Bawah Pondasi 33 Titik x 1 x 1
Cerucuk 33 Titik x 5
Galian Tanah 33 Titik x 1 x 1

Balok Sloof 20/30 cm 24 x 2 = 48


7 x 4 = 28
4 x 1 = 4
7 x 2 = 14
76

Balok Sloof 15/20 cm 24 x 1 = 24


2 x 4 = 8
2 x 3 = 6
32

Kolom Beton 15x15 21 Titik x 0.15 x 0.15


Kolom Beton 10x15 4 Titik x 0.1 x 0.15
25

Crucuk lantai 9 / 0.5 + 19


9 / 0.5 + 19
361

Urug Pasir Bawah Lantai 7 x 9 x 0.4 25.2


2 x 22 x 0.35 15.4

7 x 9 x 3 = 189
2 x 22 x 1 = 44
233

Dinding Bataco Brutto 76 x 3.5 = 266

Lubang 12.8 x 3 = 38.4


1.68 x 2 = 3.36
3.56 x 3 = 10.68
4.85 x 3 = 14.55
2.47 x 6 = 14.82
81.81

Netto 184.19

Plasteran 368.38

Kuda-kuda K1
6/12 = 9 = 0.0648
8/10 = 26.4 = 0.2112
5/10 = 18 = 0.09
7 x 0.366 = 2.562
K2
8/12 = 4 = 0.0384
8/10 = 7.1 = 0.0568
5/10 = 4 = 0.02
7 x 0.1152 = 0.8064
3.3684

Gording
540 3.888

Atap 16.845 x 4.17 x 2 = 140.4873


2.7 x 13.4 x 2 = 72.36
7.175 x 4.17 x 4 = 119.679
7.695 x 4.17 x 2 = 64.1763
2.7 x 4.4 x 2 = 23.76
Luas Atap ……………………………………………………420.4626

420.4626
Kusen
J1 2.85 x 3 = 8.55
1.7 x 5 = 8.5
17.05
j2 1.2 x 3 = 3.6
1.7 x 3 = 5.1
8.7
J3 2.85 x 3 = 8.55
1.7 x 5 = 8.5
17.05
j4 1.2 x 3 = 3.6
1.7 x 3 = 5.1
8.7
PV1 2.7 x 2 = 5.4
2.3 x 2 = 4.6
1.2 x 1 = 1.2
0.5 x 1 = 0.5
0.7 x 1 = 0.7
12.4
0.05 0.1 X 209.1 = 1.0455

Pintu Panil 2.1 x 0.75 x 6 = 9.45

Jendela Jungkit 1.05 x 0.65 x 24 = 16.38


0.55 x 0.65 x 19 = 6.7925
43 23.1725

Ventilasi Ram 0.5 x 32.45 16.225


/ 2 = 0.365
0.9 = 0.3285

= 8.2125

x 0.2 = 6.6
x 0.1 = 3.3
= 165
x 1 = 33

= 0.4725
= 0.06

1083

75.6
15.4
91
X 3 51.15

X 6 52.2

X 3 51.15

X 2 17.4
X 3 37.2
41.82

9.45 18.9

9.269 18.538

24.3375 24.3375
43.0565
86.113 103.5955
123.313
PERHITUNGAN VOLUME

TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah

1. Plat Pondasi P1 18.900 4.73 - 7.40 165.14


P2 14.688 4.74 - 7.40 132.17
33.588

2. Kolom Pondasi 25 / 25 7.750 62.59 4.74 - 7.40 -


4.74 - 7.40 -

3 Balok Sloof 20 / 30 0.750 4.74 - 7.40 -


6.52 4.74 - 7.40 -
12.5

LANTAN I
4 Balok Lantai 15 / 40 1.000 4.74 7.40 8.70
- 4.74
9.66 4.74 - 7.40 -

4 Balok Lantai 15 / 35 1.000 4.74 7.40 9.94

9.94 4.74 - 7.40 -

5 Kolom Beton 15 / 15 1.000 10.60 4.74 - 7.40 -


4.74 7.40 15.63

5 Kolom Beton 10 / 15 1.000 12.01 4.74 - 7.40 -


4.74 23.36 7.40 -

4 Ring Balok 12 / 20 1.000 4.74 14.49 7.40 -

13.04 4.74 - 7.40 -

LANTAI 2 & 3
4 Balok Lantai 20 / 50 15.000 4.74 - 7.40 -
113.04 4.74 - 7.40 -
5 Balok Lantai 20 / 50 6.800 4.74 - 7.40 -
51.25 4.74 - 7.40 -

6 Balok Lantai 20 / 40 9.120 4.74 - 7.40 -


72.70 4.74 - 7.40 -

7 Balok Lantai 15 / 30 2.295 4.74 - 7.40 -


23.65 4.74 - 7.40 -

9 Kolom Beton 30 / 30 15.300 102.52 4.74 - 7.40 -


4.74 - 7.40 -

7 Ring Balok 15 / 30 7.470 4.74 - 7.40 -


76.99 4.74 - 7.40 -

7 Ring Balok 10 / 20 2.980 4.74 - 7.40 51.83


43.19 4.74 - 7.40 -

DINDING

LANTAN I
Panjang Tinggi Luas Bruto
171.49 M1 5 857.45

Lubang

PJ1 3.8 X 2.75 = 10.45 X


PJ2 5.5 X 2.75 = 15.125 X
PJ3 2.1 X 2.75 = 5.775 X
P1 1 X 2.75 = 2.75 X
P2 0.7 X 2.75 = 1.925 X
J1 2.45 X 2.5 = 6.125 X
J2 1.75 X 2.5 = 4.375 X
J3 1.35 X 2.5 = 3.375 X

Pasangan Dinding Bataco LUAS NETTO 857.45 - 160.875


Plesteran Dinding Bataco 696.575 x 2

Plesteran Kolom 0.4 / 0.4 5 = 8 x 0


0.3 / 0.3 5 = 6 x #REF!
Bulat 0.4 5 = 6.28 x 8

LANTAN II
Panjang Tinggi Luas Bruto
129.5 M1 5 647.5

Lubang
PJ3 2.1 X 2.75 = 5.775 X
P1 1 X 2.75 = 2.75 X
P2 0.7 X 2.75 = 1.925 X
J1 2.45 X 2.5 = 6.125 X
J2 1.75 X 2.5 = 4.375 X

Pasangan Dinding Bataco LUAS NETTO 647.5 - 158.325


Plesteran Dinding Bataco 489.175 x 2

Plesteran Kolom 0.4 / 0.4


0.3 / 0.3 5 = 6 x 34

PAGAR 3 m
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah

1. Plat Pondasi P1 10.080 4.73 116.93 7.40

10.080

2. Kolom Pondasi 20 / 20 10.080 92.45 4.74 - 7.40 -


4.74 100.80 7.40 -

3 Balok Sloof 12 / 50 9.780 4.74 85.04 7.40 -


107.72 4.74 - 7.40 -

4 Ring Balok 12 / 15 2.934 85.04 4.74 7.40 -


41.58 4.74 - 7.40 -

PAGAR 2 m
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah

1. Plat Pondasi P1 2.240 4.73 25.98 7.40

2.240

2. Kolom Pondasi 20 / 20 2.240 20.55 4.74 - 7.40 -


4.74 22.40 7.40 -

3 Balok Sloof 12 / 50 2.400 4.74 20.87 7.40 -


26.43 4.74 - 7.40 -

4 Ring Balok 12 / 15 0.720 20.87 4.74 7.40 -


10.20 4.74 - 7.40 -

PAGAR Depan
TULANGAN
VOLUME
NO. URAIAN Ø8 Ø 10 Ø 12
BETON
Jumlah Berat Jumlah Berat Jumlah

1. Plat Pondasi P1 1.280 4.73 14.85 7.40

1.280

2. Kolom Pondasi 40 / 40 1.920 10.18 4.74 - 7.40 -


4.74 7.20 7.40 -

3 Balok Sloof 12 / 50 1.320 4.74 11.48 7.40 -


14.54 4.74 - 7.40 -

4 Ring Balok 12 / 15 0.396 11.48 4.74 7.40 -


5.61 4.74 - 7.40 -
LANTAN I
4 Balok Lantai 20 / 50 16.300 4.74 - 7.40 -
122.84 4.74 - 7.40 -

5 Balok Lantai 20 / 50 14.800 4.74 - 7.40 -


111.54 4.74 - 7.40 -

6 Balok Lantai 20 / 40 8.880 4.74 - 7.40 -


70.78 4.74 - 7.40 -

7 Balok Lantai 15 / 30 3.785 4.74 - 7.40 -


39.00 4.74 - 7.40 -

8 Kolom Beton 40 / 40 30.400 159.96 4.74 - 7.40 -


4.74 - 7.40 -

9 Kolom Beton 30 / 30 1.800 12.06 4.74 - 7.40 -


4.74 - 7.40 -

10 Kolom Bulat 40 5.024 60.00 4.74 - 7.40 -


4.74 - 7.40 -

6 Balok Dak 20 / 40 3.840 4.74 - 7.40 -


30.61 4.74 - 7.40 -

7 Balok Lantai 15 / 30 0.270 4.74 - 7.40 -


2.78 4.74 - 7.40 -
LANTAI 2 & 3
4 Balok Lantai 25 / 60 5.400 4.74 - 7.40 -
33.39 4.74 - 7.40 -

5 Balok Lantai 20 / 50 6.800 4.74 - 7.40 -


51.25 4.74 - 7.40 -

6 Balok Lantai 20 / 40 9.120 4.74 - 7.40 -


72.70 4.74 - 7.40 -

7 Balok Lantai 15 / 30 2.295 4.74 - 7.40 -


23.65 4.74 - 7.40 -

9 Kolom Beton 30 / 30 15.300 102.52 4.74 - 7.40 -


4.74 - 7.40 -

7 Ring Balok 15 / 30 7.470 4.74 - 7.40 -


76.99 4.74 - 7.40 -

7 Ring Balok 10 / 20 2.980 4.74 - 7.40 51.83


43.19 4.74 - 7.40 -
TULANGAN Dimensi
BEKISTI
BERAT BESIBESI / M³
Ø 12 Ø 13 Ø 16 Ø 19 NG / M2 Panjan
g
Berat Jumlah Berat Jumlah Berat Jumlah Berat

10.65 12.50 - 18.94 - 26.71 1,759.221 25.20 1.50


10.66 12.48 - 18.96 - 26.71 1,408.915 19.58 1.20
3,168.136 94.323 1.33

10.66 - 12.48 18.96 26.76 296.691 16.000 0.25


10.66 112.14 12.48 18.96 26.76 1,399.496
1,696.187 218.863
10.66 12.48 18.96 6.52 26.76 174.522 13.333 12.5
10.66 - 12.48 18.96 26.76 30.913
205.435 273.913

10.66 12.48 18.96 26.76 92.696 15.833 16.667


0.000
10.66 - 12.48 18.96 26.76 45.797
138.493 138.493
10.66 12.48 18.96 26.76 105.934 16.190 19.047
0.000
10.66 - 12.48 18.96 26.76 47.104
153.039 153.043
10.66 - 12.48 18.96 26.76 50.240 13.356 0.15
10.66 12.48 18.96 26.76 166.646
216.887 216.887
10.66 - 12.48 18.96 26.76 56.916 13.348 0.1
10.66 12.48 18.96 26.76 172.881
229.797 229.797
10.66 12.48 18.96 26.76 107.246 21.667 41.667
0.000
10.66 - 12.48 18.96 26.76 61.826
169.072 169.072

10.66 - 12.48 104.35 18.96 26.76 1,978.435 180.000 150


10.66 - 12.48 18.96 26.76 535.826
2,514.261 167.617
10.66 - 12.48 29.57 18.96 26.76 560.557 81.600 68
10.66 - 12.48 18.96 26.76 242.908
803.464 118.157
10.66 - 12.48 18.96 79.30 26.76 2,122.184 114.000 114
10.66 - 12.48 18.96 26.76 344.577
2,466.762 270.478
10.66 - 12.48 17.74 18.96 26.76 336.334 38.250 51
10.66 - 12.48 18.96 26.76 112.111
448.445 195.401
10.66 - 12.48 18.96 26.76 485.956 105.060 0.3
10.66 - 12.48 18.96 137.18 26.76 3,671.007
4,156.962 271.697
10.66 - 12.48 57.74 18.96 26.76 1,094.734 124.500 166
10.66 - 12.48 18.96 26.76 364.911
1,459.645 195.401
10.66 - 12.48 18.96 26.76 552.466 74.500 149
10.66 - 12.48 18.96 26.76 204.713
757.179 254.087

Kusen
pjg jml pjg jml pjg jml pjg
1 = 10.45 2.5 2 2.75 2 3.75 2 0.85
1 = 15.125 2.5 4 2.75 2 5.45 2 1.7
4 = 23.1 2.75 2 2.05 2
6 = 16.5 2.75 2 0.95 2
4 = 7.7 2.75 2 0.8 2
6 = 36.75 2.5 5 2.4 3
4 = 17.5 2.5 3 1.7 3
10 = 33.75 2.15 3 1.3 3
160.88

= 696.575
= 1393.15

= -
= #REF!
= 50.24
#REF!

2 = 11.55 2.75 2 2.05 2


15 = 41.25 2.75 2 0.95 2
13 = 25.025 2.75 2 0.8 2
1 = 6.125 2.5 5 2.4 3
17 = 74.375 2.5 3 1.7 3
158.33

= 489.175
= 978.35

= 204.00

TULANGAN Dimensi
BEKISTI
BERAT BESIBESI / M³
Ø 12 Ø 13 Ø 16 Ø 19 NG / M2 Panjan
g
Berat Jumlah Berat Jumlah Berat Jumlah Berat

10.65 12.50 - 18.94 - 26.71 865.033 16.13 0.80


-
865.033 85.817 16.13

10.66 - 12.48 18.96 26.76 438.236 20.000 0.2


10.66 12.48 18.96 26.76 745.920
1,184.156 117.476
10.66 12.48 18.96 26.76 629.322 18.111 163
10.66 - 12.48 18.96 26.76 510.601
1,139.923 116.557
10.66 12.48 18.96 26.76 403.106 23.333 163
10.66 - 12.48 18.96 26.76 197.074
600.180 204.56
TULANGAN Dimensi
BEKISTI
BERAT BESIBESI / M³
Ø 12 Ø 13 Ø 16 Ø 19 NG / M2 Panjan
g
Berat Jumlah Berat Jumlah Berat Jumlah Berat

10.65 12.50 - 18.94 - 26.71 192.230 3.58 0.80


-
192.230 85.817 3.58

10.66 - 12.48 18.96 26.76 97.386 20.000 0.2


10.66 12.48 18.96 26.76 165.760
263.146 117.476
10.66 12.48 18.96 26.76 154.435 20.000 40
10.66 - 12.48 18.96 26.76 125.301
279.736 116.557
10.66 12.48 18.96 26.76 98.922 23.333 40
10.66 - 12.48 18.96 26.76 48.362
147.283 204.56

TULANGAN Dimensi
BEKISTI
BERAT BESIBESI / M³
Ø 12 Ø 13 Ø 16 Ø 19 NG / M2 Panjan
g
Berat Jumlah Berat Jumlah Berat Jumlah Berat

10.65 12.50 - 18.94 - 26.71 109.846 2.05 0.80


-
109.846 85.817 2.05

10.66 - 12.48 18.96 26.76 48.237 15.000 0.4


10.66 12.48 18.96 26.76 53.280
101.517 52.8733
10.66 12.48 18.96 26.76 84.939 12.833 22
10.66 - 12.48 18.96 26.76 68.915
153.855 116.557
10.66 12.48 18.96 26.76 54.407 23.333 22
10.66 - 12.48 18.96 26.76 26.599
81.006 204.56
10.66 113.39 12.48 18.96 26.76 1,415.123 195.600 163
10.66 - 12.48 18.96 26.76 582.264
1,997.388 122.539
10.66 - 12.48 64.35 18.96 26.76 1,220.035 177.600 148
10.66 - 12.48 18.96 26.76 528.682
1,748.717 118.157
10.66 - 12.48 38.61 18.96 26.76 732.021 111.000 111
10.66 - 12.48 18.96 26.76 335.510
1,067.530 120.217
10.66 - 12.48 29.25 18.96 26.76 554.621 63.075 84.1
10.66 - 12.48 18.96 26.76 184.874
739.495 195.401
10.66 - 12.48 18.96 26.76 758.227 158.080 0.4
10.66 - 12.48 18.96 153.32 26.76 4,102.890
4,861.117 159.905
10.66 - 12.48 18.96 26.76 57.171 12.360 0.3
10.66 - 12.48 18.96 12.10 26.76 323.912
381.084 211.713
10.66 - 12.48 18.96 26.76 284.385 100.480 0.4
10.66 - 12.48 18.96 27.83 26.76 744.626
1,029.011 204.819
10.66 - 12.48 16.70 18.96 26.76 316.550 48.000 6
10.66 - 12.48 18.96 26.76 145.085
461.635 120.217
10.66 - 12.48 2.09 18.96 26.76 39.569 4.500 6
10.66 - 12.48 18.96 26.76 13.190
52.758 195.401
10.66 - 12.48 25.04 18.96 26.76 474.824 52.200 9
10.66 - 12.48 18.96 26.76 158.275
633.099 117.241
10.66 - 12.48 29.57 18.96 26.76 560.557 81.600 68
10.66 - 12.48 18.96 26.76 242.908
803.464 118.157
10.66 - 12.48 39.65 18.96 26.76 751.805 114.000 114
10.66 - 12.48 18.96 26.76 344.577
1,096.383 120.217
10.66 - 12.48 17.74 18.96 26.76 336.334 38.250 51
10.66 - 12.48 18.96 26.76 112.111
448.445 195.401
10.66 - 12.48 18.96 26.76 485.956 105.060 0.3
10.66 - 12.48 18.96 137.18 26.76 3,671.007
4,156.962 271.697
10.66 - 12.48 57.74 18.96 26.76 1,094.734 124.500 166
10.66 - 12.48 18.96 26.76 364.911
1,459.645 195.401
10.66 - 12.48 18.96 26.76 552.466 74.500 149
10.66 - 12.48 18.96 26.76 204.713
757.179 254.087
V H D

Dimensi
Tinggi / Jumlah
Lebar
Tebal 45

1.50 0.30 28.00 1.42 1.42 10.47 10.47 1.62 1.62


1.20 0.30 34.00 1.12 1.12 8.47 8.47 1.32 1.32

0.25 2.00 62.00 0.19 0.19 0.81 14.33

0.2 0.3 1
0.15 0.25 0.9 83.33333

41.66667 19.04762
0.15 0.4 1

0.1 0.35 1 111.1113

0.15 0.35 1

0.1 0.3 0.9 126.98

0.15 44.44 1 0.09 0.09 0.41 297.30

0.15 66.67 1 0.04 0.09 0.31 445.44

0.12 0.2 1

0.07 0.15 0.54 277.7778

60 90
0.2 0.5 1
0.15 0.45 1.3 1000
0.2 0.5 1
0.15 0.45 1.3 453.3333

0.2 0.4 1
0.15 0.35 1.1 760

0.15 0.3 1
0.1 0.25 0.8 340

0.3 5.00 34 0.24 0.24 1.01 34.33

0.15 0.3 1
0.1 0.25 0.8 1106.667

0.1 0.2 1
0.05 0.15 0.5 993.3333

jml pjg
2 0.5 = 20.2 20.2
2 0.5 = 30.3 30.3
0.5 = 10.1 40.4
= 7.4 44.4
= 7.1 28.4
= 19.7 118.2
= 12.6 50.4
= 10.35 103.5
435.8
0.5 = 10.1 20.2
= 7.4 111
= 7.1 92.3
= 19.7 19.7
= 12.6 214.2
326.2 131.2

V H D

Dimensi
Tinggi / Jumlah
Lebar
Tebal 45

0.80 0.25 63.00 0.72 0.72 5.80 5.80 0.92 0.92


(0.08) (0.08) 0.47 0.47 0.12 0.12

0.2 4.00 63.00 0.14 0.14 0.61 27.67

0.12 0.5 1
0.07 0.45 1.14 1086.667

0.12 0.15 1
0.07 0.1 0.44 1086.667

V H D
Dimensi
Tinggi / Jumlah
Lebar
Tebal 45

0.80 0.25 14.00 0.72 0.72 5.80 5.80 0.92 0.92


(0.08) (0.08) 0.47 0.47 0.12 0.12

0.2 4.00 14.00 0.14 0.14 0.61 27.67

0.12 0.5 1
0.07 0.45 1.14 266.6667

0.12 0.15 1
0.07 0.1 0.44 266.6667

V H D

Dimensi
Tinggi / Jumlah
Lebar
Tebal 45 22 7.333333

0.80 0.25 8.00 0.72 0.72 5.80 5.80 0.92 0.92


(0.08) (0.08) 0.47 0.47 0.12 0.12

0.4 4.00 3.00 0.34 0.34 1.41 27.67

0.12 0.5 1
0.07 0.45 1.14 146.6667

0.12 0.15 1
0.07 0.1 0.44 146.6667
0.2 0.5 1
0.15 0.45 1.3 1086.667

0.2 0.5 1
0.15 0.45 1.3 986.6667

0.2 0.4 1
0.15 0.35 1.1 740

0.15 0.3 1
0.1 0.25 0.8 560.6667

0.4 5.00 38 0.34 0.34 1.41 34.33

0.3 5.00 4 0.24 0.24 1.01 34.33

5.00 8 2.51 274.67

0.2 0.4 8
0.15 0.35 1.1 320

0.15 0.3 1
0.1 0.25 0.8 40
0.25 0.6 4
0.2 0.55 1.6 240

0.2 0.5 1
0.15 0.45 1.3 453.3333

0.2 0.4 1
0.15 0.35 1.1 760

0.15 0.3 1
0.1 0.25 0.8 340

0.3 5.00 34 0.24 0.24 1.01 34.33

0.15 0.3 1
0.1 0.25 0.8 1106.667

0.1 0.2 1
0.05 0.15 0.5 993.3333
Galian Urug Pasir Lantai Kerja Cerucuk
1,899.07 165.14 2.00 126.00 0.2 12.60 0.05 3.15 4.00
1,519.94 132.17 2.00 97.92 0.2 9.79 0.05 2.45 3.00
223.92 22.39 5.60

719.82 62.59
1,289.60 112.14

75 6.52
75 6.52

100.0002 8.70

111.1113 9.66

114.282 9.94

114.282 9.94

121.89 10.60
179.78 15.63

138.09 12.01
268.67 23.36

166.6667 14.49

150 13.04

1200 104.35
1300 113.04
340 29.57
589.3333 51.25

912 79.30
836 72.70

204 17.74
272 23.65

1,179.01 102.52
1,577.60 137.18

664 57.74
885.3333 76.99

596 51.83
496.6667 43.19
Galian Urug Pasir Lantai Kerja Cerucuk
1,344.67 116.93 4.00 161.28 0.2 8.06 0.05 2.02 2.00
- -
161.28 8.06 2.02

1,063.23 92.45
1,159.20 100.80

978 85.04
1238.8 107.72

978 85.04
478.1333 41.58
Galian Urug Pasir Lantai Kerja Cerucuk
298.82 25.98 4.00 35.84 0.2 1.79 0.05 0.45 2.00
- -
35.84 1.79 0.45

236.27 20.55
257.60 22.40

240 20.87
304 26.43

240 20.87
117.3333 10.20

Galian Urug Pasir Lantai Kerja Cerucuk


170.75 14.85 4.00 20.48 0.2 1.02 0.05 0.26 2.00
- -
20.48 1.02 0.26

117.03 10.18
82.80 7.20

132 11.48
167.2 14.54

132 11.48
64.53333 5.61
1304 113.39
1412.667 122.84

740 64.35
1282.667 111.54

444 38.61
814 70.78

336.4 29.25
448.5333 39.00

1,839.58 159.96
1,763.20 153.32

138.71 12.06
139.20 12.10

689.96 60.00
320.00 27.83

192 16.70
352 30.61

24 2.09
32 2.78
288 25.04
384 33.39

340 29.57
589.3333 51.25

456 39.65
836 72.70

204 17.74
272 23.65

1,179.01 102.52
1,577.60 137.18

664 57.74
885.3333 76.99

596 51.83
496.6667 43.19
4.00 448.00
3.00 306.00
754.00
2.00 252.00

252.00
2.00 56.00

56.00

2.00 32.00

32.00