Anda di halaman 1dari 8

DAFTAR HARGA BAHAN / MATERIAL BANGUN

DAN UPAH KERJA

A. UPAH KERJA

No. Jenis Pekerja / Tukang Satuan

1 Mandor Lapangan Org/hari


2 Kepala Tukang Org/hari
3 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari
4 Pekerja / Buruh Lapangan Tak terlatih Org/hari
5 Pekerja / Buruh Lapangan terlatih Org/hari

HARGA DI
LOKASI
NO Jenis Bahan / Material Bangunan KODE Satuan

B. BAHAN PASIR, BATU & TANAH DAN BAHAN KONSTRUKSI JALAN DAN JEMBATAN
1 Batu Kong M.101 255,000.00 M³
2 Batu Sap Pinang - 255,000.00 M³
3 Batu pecah 10/15 cm M.020 539,204.00 M³
4 Batu pecah 2/3 cm M.024 718,750.00 M³
5 Batu pecah 1/2 cm M.025 715,909.00 M³
6 Batu pecah 0,5 - 1 cm / Agregat Kasar M.026 727,272.00 M³
7 Pasir M.040 114,772.00 M³
8 Semen PC M.080 93,181.00 Zak
9 Semen PC - 1,863.62 Kg
10 Tanah Ex. Peniraman M.050.a 104,600.00 M³
11 Tanah EX. Peladis M.050 165,000.00 M³
12 Batu Bata 5 x 11 x 22cm - 2,200.00 Bh
13 Bataco 15 x 30 x 7 cm - 2,000.00 Bh
14 Bataco 20 x 40 x 9 cm ( cetak mesin ) - 3,500.00 Bh
15 Bataco 20 x 40 x 7 cm ( cetak mesin ) - 2,700.00 Bh
16 Terawang ( roster ) 30 x 30 cm - 73,863.00 Bh
17 Keramik 20 x 20 cm - 68,181.00 Kotak
18 Keramik 60 x 60 cm - 79,545.00 Kotak
19 Keramik dinding 20 x 20 cm - 39,800.00 M²
20 Keramik dinding 20 x 25 cm - 30,900.00 M²
21 Bahan Plastik Cor Beton - 3,500.00 M²
C. BAHAN KAYU
1 Balok Belian Ketam 8/8 - 13,116,992.19 M³
2 Balok Belian Tidak Ketam - 10,136,080.25 M³
3 Papan belian ketam (4m) M.181.e 14,204,537.04 M³
4 Papan belian tdk ketam (4m) M.181.d 7,171,000.00 M³
5 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M.181.f 6,054,700.00 M³
6 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M.181.g 10,270,200.00 M³
7 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) - 4,209,200.00 M³
8 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) - 5,484,700.00 M³
9 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) - 10,500,000.00 M³
5 Kusen Ky Kelas I Bangkirai uk. 5/10 - 95,000.00 M³
6 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M.181.h M³
7 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M.181.i M³
8 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) - M³
9 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) - M³
HARGA DI
LOKASI
NO Jenis Bahan / Material Bangunan KODE Satuan
(Rp)

10 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) - M³


11 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) - M³
12 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) - M³
13 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) - M³
14 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) - M³
15 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) - M³
16 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) - M³
17 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) - M³
6 Ky klas III uk. 3/5 - 4 M ( tdk ketam) - 875,000.00 M³
7 Ky klas III uk. 4/6 - 4 M ( tdk ketam) - 1,860,100.00 M³
8 Kasau uk. 4/6 28,000.00 Kpg
9 Papan Biasa 30,000.00 Kpg
10 Papan kayu klas I tdk ketam - M³
11 Papan kayu klas I ketam - M³
Papan Kayu Kls II 156,300.00 Kpg
11 Papan mal klas III M.181.l 3,030,222.22 M³
12 Papan Simpiran - M³
13 Renglat kayu klas I uk 1/8 cm - Btg
14 Kayu profil 10cm - Btg
12 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M - 9,431.00 Btg
13 Kayu cerucuk /dolken ø10 - Pj. 4 M - 10,795.00 Btg
D. BAHAN CAT
1 Amplas - 3,409.00 Lbr
2 Minyak cat - 28,409.00 Kg
3 Cat kilat - 70,454.40 Kg
4 Plamur - 34,090.90 Kg
5 Cat dasar - 45,454.00 Kg
6 Cat tembok - 29,545.40 Kg
7 Cat tembok type weather shield - 136,363.60 Kg
8 Cat seng - 34,090.00 Kg
9 Dempul - 18,939.00 Kg
10 Plitur - 79,545.00 Kg
11 Thiner M.090.f 28,409.00 Ltr
12 Thiner ND - 29,500.00 Ltr
13 Melamic - 85,227.00 Ltr
14 Vernis - 62,500.00 Ltr
15 Meni - 70,454.40 Kg
16 Lem Kayu - 17,045.00 Kg
17 Sealent - 135,000.00 Tube
18 Soda Api - 10,600.00 Kg
19 Kuas 4" - 28,100.00 Bh
E. BAHAN BESI DAN ALUMINIUM
1 Besi Tulangan Beton M.167 16,209.08 Kg
2 Besi wire mesh ø 5 - 15,769.75 Kg
3 Kawat baja/bendrat M.168 34,090.00 Kg
4 Simpai roll - 28,409.00 Kg
5 Kawat simpai - 24,200.00 Kg
6 Rangka Aluminium 1 1/2" x 3" - 75,000.00 Meter
7 Rangka Aluminium 1 3/4" x 4" - 96,000.00 Meter
8 Pintu Aluminium std IKP, lengkap 4" - 2,175,000.00 Unit
9 BRC Finishing Hot Drip 240 cm x 120 cm x 6 mm M2
10 Rangka Baja Ringan Zincalume (truss) - 130,000.00 M²
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC - 225,000.00 Bh
2 Kait angin - 11,363.00 Bh
3 Handle - 17,045.00 Bh
4 Engsel jendela - 17,045.00 Bh
5 Engsel pintu - 19,886.00 Bh
6 Slot pintu - 25,568.00 Bh
7 Slot jendela - 13,636.00 Bh
8 Kunci tanam antik - 90,909.00 Bh
9 Kunci tanam biasa - 79,545.00 Bh
10 Kunci silinder - 65,340.00 Bh
11 Paku Seng M.166.a 39,772.00 Kg
12 Paku 1''-5" M.166.b 22,500.00 Kg
13 Paku beton - 53,977.00 Kg
14 Paku Atap Seng M.166.c 39,772.00 Kg
15 Paku triplek - 31,250.00 Kg
16 Paku GRC - 51,136.00 Kg
17 Paku Zincallume - 51,136.00 Kg
18 Sekrup Gypsum - 11,363.00 Kg
19 Sekrup Fixer - 300.00 Bh
20 Engsel Angin - 11,363.00 Bh
G. BAHAN ATAP
1 Genteng Metal Type Prima 0.25 - 45,454.00 Lbr
2 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) - 84,090.00 Bh
3 Nok bubungan genteng metal kotak 0.35 - 77,600.00 Meter
4 Nok bubungan genteng metal stone kotak 0.35 - 92,000.00 Meter
5 Seng Gelombang Bjls 30 - 69,000.00 Lbr
6 Seng Gelombang Bjls 20 - 46,700.00 Lbr
7 Seng Plat Bjls 20 - 48,000.00 Lbr
8 Seng Plat Bjls 30 - 64,500.00 Lbr
9 Seng Plat Bjls 30 (lebar 45 cm) - 19,000.00 M'
10 Plat Datar Color 0.35 - 55,000.00 Lbr
11 Zincalume Gelombang Persegi 0.35 (polos) - 103,750.00 M²
12 Zincalume Gelombang Persegi 0.30 (polos) - 91,250.00 M²
13 Zincalume Gelombang Persegi 0.35 (color) - 116,250.00 M²
14 Zincalume 0.25 mm - 79,545.00 M²

H. BAHAN KACA
1 Kaca Polos, t = 5 mm - 119,500.00 M²
I. BAHAN TRIPLEK
1 Triplek t = 3 mm - 55,000.00 Lbr
2 Triplek t = 6 mm - 125,000.00 Lbr
3 Triplek t =9 mm - 255,681.00 Lbr
4 Plywood 4' x 8' x 4mm - 120,500.00 Lbr
5 Panel GRC 120 x 240 x 40 - 88,636.00 Lbr
8 List Profil Gypsum - 30,000.00 M'
6 GypsumBoard t = 9mm - 79,545.00 Lbr
7 Lisplank GRC L : 20 cm - 35,700.00 m1
8 Pek. Pas. Rangka Plafond Hollow + Pemasangan m2
8 Pek. Pas. Railling Tangga Hollow + Pemasangan m2
J. BAHAN SANITASI
1 Kloset duduk monoblok - 1,136,363.00 Bh
2 Kloset jongkok - 426,136.00 bh
3 Bak Mandi Fibreglass - 1,988,636.00 bh
4 Urinal Lengkap - 1,988,636.00 Bh
5 Kran Air Lokal 3/4 " - 45,454.00 Bh
6 Wastafel Keramik - 767,045.00 Unit
7 Pipa paralon dia 3/4" - 38,636.00 Btg
8 Pipa paralon dia 2" - 107,954.00 Btg
9 Pipa paralon dia 3" - 210,227.00 Btg
10 Pipa paralon dia 4" - 340,909.00 Btg
K. BAHAN MINYAK (TANPA KEUNTUNGAN)
1 Sewa Molen - 150,000.00 Set
L. BAHAN ALAT-ALAT LISTRIK
1 Lampu Neon (TL) 20 Watt - 45,454.00 Bh
2 Armatur lampu Down Ligth 18 Watt - 125,000.00 Bh
3 Armatur lampu Baret 20 Watt - 115,000.00 Bh
4 Armatur lampu SL 15 Watt - 79,000.00 Bh
5 Instalasi kabel Listrik - 155,000.00 Titik
6 Box TL 20 Watt - 13,500.00 Buah
7 MCB 10 A - 122,000.00 Buah
8 MCB 16 A - 35,500.00 Buah
9 MCB 6 A - 35,500.00 Buah
12 MCB 32 A - 35,500.00 Buah
13 MCB Box - 206,000.00 Buah
14 Pipa Paralon 1/2" - 9,000.00 Batang
15 Pipa L 1/2" - 3,000.00 Batang
16 Pipa Paralon 1' - 10,000.00 Batang
A BAHAN / MATERIAL BANGUNAN,
DAN UPAH KERJA

Upah Kerja
Harga Upah (Rp.)
(RP.)
L.061 - 168,000.00
L.073 - 145,600.00
L.079 - 134,400.00
L.101 - 112,000.00
L.106 - 134,400.00

HARGA
ONGKOS
ANGKUT TANPA
Harga Bahan
PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (Rp) (Rp)

AN
- - 30,600.00 285,600.00
- - 30,600.00 285,600.00
- - 64,704.48 597,510.00
- - 86,250.00 711,540.00
- - 85,909.08 678,150.00
- - 87,272.64 720,000.00
- - 13,772.64 123,750.00
- - 11,181.72 95,670.00
- - 223.63 1,913.40
- - 12,552.00 117,152.00
- - 19,800.00 184,800.00
- - 264.00 3,960.00
- - 240.00 3,960.00
- - 420.00 3,960.00
- - 324.00 3,960.00
- - 8,863.56 73,170.00
- - 8,181.72 84,420.00
- - 9,545.40 208,170.00
- - 4,776.00 84,420.00
- - 3,708.00 90,000.00
420.00 28,170.00

- - 1,574,039.06 11,647,265.63
- - 1,216,329.63 9,027,777.78
- - 1,704,544.44 15,909,081.48
- - 860,520.00 5,208,333.33
- - 726,564.00 11,647,265.63
- - 1,232,424.00 5,494,921.88
- - 505,104.00 4,714,304.00
- - 658,164.00 6,142,864.00
- - 1,260,000.00 2,921,520.00
- - 11,400.00 106,400.00
- - - -
- - - -
- - - -
- - - -
HARGA
ONGKOS
ANGKUT TANPA
PER UNIT KEUNTUNGAN KEUNTUNGAN Harga Bahan
(Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 105,000.00 1,757,812.50
- - 223,212.00 2,083,312.00
3,360.00 31,360.00
3,600.00 33,600.00
- - - 8,494,565.22
- - - 10,753,676.47
18,756.00 175,056.00
- - 363,626.67 2,250,000.00
- - - -
- - - -
- - - -
- - 1,131.72 9,431.00
- - 1,295.40 10,730.00

- - 409.08 3,960.00
- - 3,409.08 95,670.00
- - 8,454.53 50,634.00
- - 4,090.91 73,170.00
- - 5,454.48 112,500.00
- - 3,545.45 112,500.00
- - 16,363.63 281,250.00
- - 4,090.80 38,180.80
- - 2,272.68 3,960.00
- - 9,545.40 213,750.00
- - 3,409.08 95,670.00
- - 3,540.00 95,670.00
- - 10,227.24 65,250.00
- - 7,500.00 95,670.00
- - 8,454.53 73,170.00
- - 2,045.40 11,250.00
- - 16,200.00 5,670.00
- - 1,272.00 11,872.00
- - 3,372.00 28,170.00

- - 1,945.09 15,210.00
- - 1,892.37 3,806,818.00
- - 4,090.80 28,170.00
- - 3,409.08 25,200.00
- - 2,904.00 31,200.00
- - 9,000.00 121,500.00
- - 11,520.00 121,500.00
- - 261,000.00 2,436,000.00
- - 380,000.00
- - 15,600.00 84,420.00
- - 27,000.00 309,420.00
- - 1,363.56 22,500.00
- - 2,045.40 11,250.00
- - 2,045.40 39,420.00
- - 2,386.32 53,460.00
- - 3,068.16 22,500.00
- - 1,636.32 11,250.00
- - 10,909.08 84,420.00
- - 9,545.40 89,090.40
- - 7,840.80 84,420.00
- - 4,772.64 39,420.00
- - 2,700.00 25,200.00
- - 6,477.24 53,460.00
- - 4,772.64 39,420.00
- - 3,750.00 22,500.00
- - 6,136.32 106,920.00
- - 6,136.32 57,272.32
- - 1,363.56 12,726.56
- - 36.00 336.00
- - 1,363.56 22,500.00

- - 5,454.48 126,000.00
- - 10,090.80 106,920.00
- - 9,312.00 86,912.00
- - 11,040.00 103,040.00
- - 8,280.00 77,280.00
- - 5,604.00 52,304.00
- - 5,760.00 53,760.00
- - 7,740.00 72,240.00
- - 2,280.00 21,280.00
- - 6,600.00 61,600.00
- - 12,450.00 116,200.00
- - 10,950.00 102,200.00
- - 13,950.00 130,200.00
- - 9,545.40 95,000.00

- - 14,340.00 309,420.00

- - 6,600.00 67,500.00
- - 15,000.00 140,670.00
- - 30,681.72 219,420.00
- - 14,460.00 121,500.00
- - 10,636.32 99,272.32
- 3,600.00 28,170.00
- - 9,545.40 84,420.00
- - 4,284.00 39,984.00
134,968.00
650,000.00

- - 136,363.56 2,756,250.00
- - 51,136.32 425,600.00
- - 238,636.32 731,250.00
- - 238,636.32 2,227,272.32
- - 5,454.48 112,500.00
- - 92,045.40 731,250.00
- - 4,636.32 39,420.00
- - 12,954.48 168,750.00
- - 25,227.24 225,000.00
- - 40,909.08 450,000.00
- - 18,000.00 168,000.00

- - 5,454.48 50,908.48
- - 15,000.00 140,000.00
- - 13,800.00 128,800.00
- - 9,480.00 88,480.00
- - 18,600.00 173,600.00
- - 1,620.00 15,120.00
- - 14,640.00 136,640.00
- - 4,260.00 39,760.00
- - 4,260.00 39,760.00
- - 4,260.00 39,760.00
- - 24,720.00 230,720.00
- - 1,080.00 33,750.00
- - 360.00 3,360.00
- - 1,200.00 54,000.00