SATUAN HARGA BARANG JASA

DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN


HASIL SURVEY DAN KESEPAKATAN
TAHUN 2017

HARGA SURVEY
HARGA JUKNIS KAB.
No Jenis Barang/Jasa Merk/Type/Spesifikasi/Ukuran Satuan KAB.
2017 KAB. LEBAK PANDEGLAN
SERANG
G

1 2 3 4 5 6 7 8

A BAHAN INFRASTRUKTUR

A.1 BAHAN BANGUNAN, BAHAN PEREKAT DAN BAHAN JADI LAINYA

1 Bata Merah 6 x 10 x 20 cm buah 500 550 550 453


2 Batako Ringan Beton ALC - Hebel, Uk. 60 x 20 x 7 m2 672,200
3 Batu Alam Batu Candi RTM, Ukuran : 10 cm x 20 cm m2 111,000
4 Batu Alam Batu Candi RTM, Ukuran : 15 cm x 30 cm m2 122,200
5 Batu Alam Andesif, ukuran : 10 cm x 20 cm m2 150,100
6 Batu Alam Andesif, ukuran : 15 cm x 30 cm 135,750
7 Batu Belah 15 - 20 cm m3 191,300 200,000 270,000 176,667
8 Batu Pecah Mesin (Split) ukuran 2/3 cm m3 263,800 253,333 193,333 176,667
9 Batu Pecah Mesin (Split) ukuran 3/5 cm m3 276,900
10 Batu Pecah Mesin (Split) ukuran 5/7 cm m3 220,600
11 Buis Beton (1/2) 20 x 100 cm buah 63,700
12 Buis Beton (1/2) 30 x 100 cm buah 78,200
13 Tiang Pancang / Mini Pile (Hidrolik) Jack Pile Segi Tiga 32.32 Beton K-450 + Alat m 423,000
14 Tiang Pancang / Mini Pile (Hidrolik) Jack Pile Segi Tiga 32.32 Beton K-450 + Alat m 500,000
15 Grass Block 40 x 40 x 8 cm m2 70,900
16 Pasir Pasir Beton m3 213,700 220,000 -
17 Pasir Pasir Pasang m3 174,000 153,333 270,000 185,000
18 Kerikil m3 230,000 225,000
19 Koral Beton m3 230,000 - - -
20 Paving Blok Natural 8 cm K250 8 cm (K-250) m2 61,600
21 U-Ditch ukuran 80 x 80 cm 80 x 80 cm m 140,000
22 U-Ditch ukuran 80 x 100 cm 80 x 100 cm m 1,100,000
23 Kanstin Beton uk. 5x15x30 cm 5 x 15 x 30 cm m 28,300
24 Kanstin Beton uk. 15x25x40 cm 15x25x40 cm m 36,600
25 Readymix Beton K-175, Slump 12+ 2 m3 855,400
26 Readymix Beton K-225, Slump 12+ 2 m3 895,000
27 Readymix Beton K-250, Slump 12+ 2 m3 910,000
28 Readymix Beton K-275, Slump 12+ 2 m3 982,300
29 Readymix Beton K-300, Slump 12+ 2 m3 949,600
30 Readymix Beton K-500, Slump 12+ 2 m3 1,115,100
31 Panel Pagar Precast 240 x 40 x 5 cm m 566,600
32 Tiang Pagar Precast 280 x 18 x 17 cm m 141,600
33 Semen Tiga Roda (Portland Cement) 50 kg zak 74,400 58,000 56,333 58,667
34 Semen Holcim 50 kg zak 70,400 53,000
35 Semen Instan MU-200 Acian Plester & Beton, 40 kg zak 141,900
36 Semen Instan MU-380 Perekat Bata Ringan, 40 kg zak 124,200
37 Semen Warna SNI kg 11,700 44,000
38 Tanah Timbunan / Urug Lokal m3 72,800
39 Tanah Subur Lokal m3 26,667 20,000

A.2 BAHAN BAMBU, KAYU BERIKUT BAHAN JADINYA

1 Rumput Gajah Mini m2 26,033 25,000


2 Pohon Lengkeng tinggi 2 m batang 257,200 221,600
3 Pohon Kosambi tinggi 2 m batang 111,000
4 Pohon Kemang tinggi 2 m batang 200,000
5 Pohon Sawo Mentega tinggi 2 m batang 237,667 310,000
6 Pohon Palem Raja tinggi 2 m batang 345,667 490,000
7 Pohon Palem Merah tinggi 2 m batang 383,000 425,000
8 Pohon Palem Botol tinggi 2 m batang 314,233 342,700
9 Pohon Filicium tinggi 2 m batang 195,267 300,000
10 Pohon Pucuk Merah tinggi 2 m batang 202,050 185,000
11 Pohon Airis Kuning tinggi 2 m batang 29,033 15,000
12 Pohon Lily Putih tinggi 2 m batang 23,500 15,000
13 Pohon Tanjung tinggi 2 m batang 227,767 300,000

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY
HARGA JUKNIS KAB.
No Jenis Barang/Jasa Merk/Type/Spesifikasi/Ukuran Satuan KAB.
2017 KAB. LEBAK PANDEGLAN
SERANG
G

1 2 3 4 5 6 7 8

14 Pohon Mangga tinggi 2 m batang 212,200 265,000


15 Pohon Rambutan tinggi 2 m batang 277,667 325,000
16 Pohon Pandan Bali tinggi 2 m batang 416,667 275,000
17 Pohon Cendana tinggi 2 m batang 218,750
18 Pohon Kokosan tinggi 2 m batang 232,200 150,000
19 Pohon Namnam tinggi 2 m batang 112,500 100,000
20 Pohon Lengkeng tinggi 2 m batang 170,500 170,000
21 Pohon Kecapi tinggi 2 m batang 94,500 112,500
22 Pohon Sukun tinggi 2 m batang 79,067 100,000
23 Pohon Nangka tinggi 2 m batang 145,333 167,000
24 Pohon Cempedak tinggi 2 m batang 131,250
25 Pohon Gowok tinggi 2 m batang 118,000
26 Pohon Bambu Cina tinggi 2 m batang 16,250
27 Pohon Azalea tinggi 2 m batang 18,833 17,500
28 Pohon Lily Paris tinggi 2 m batang 10,067 17,500
29 Kayu Albasia Papan (kelas III) m3 640,000
30 Kayu Albasiah Kaso (kelas III) m3 642,500
31 Kayu Borneo Kaso (kelas II) m3 40,000
32 Kayu Borneo Papan (kelas II) m3 95,000
33 Kayu Kamper Papan (kelas I) m3 275,000
34 Kayu Kamper Kaso (kelas I) m3 73,600
35 Kayu Dolken Dolken Panjang ukuran 7-10 meter batang 60,000
A.3 BAHAN FINISHING, CAT, LABURAN PENGISI DAN ALATNYA
1 Cat Batu Alam Mowilex kaleng 64,300
2 Cat Kayu & Besi Avian, High Gloss @ 0.9 ltr kaleng 58,500
3 Cat Tembok Jotun Majestic Optima Premium Interior @ 20 kaleng 1,065,500
4 Cat Tembok ltr
Jotun Jotashield Extreme Eksterior @ 20 ltr kaleng 1,256,000
5 Kuas Aceodfields: Star, Ukuran : 4 buah 12,300
6 Kuas Roll Tembok Supra,: roller untuk mengecat tembok buah 21,800
7 Filler Jotun Jotashield Primer Alkali buah 509,100
8 Lem Kayu SNI kg 22,100
9 Thinner Impala @ 1 Ltr kaleng 17,500

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY
HARGA JUKNIS KAB.
No Jenis Barang/Jasa Merk/Type/Spesifikasi/Ukuran Satuan KAB.
2017 KAB. LEBAK PANDEGLAN
SERANG
G

1 2 3 4 5 6 7 8

A.4 BAHAN KACA


1 Kaca Clear Tempered 10 mm m2 545,700
2 Kaca Polos/Bening t = 5mm m2 110,200 119,000
3 Kaca Rayband Darkgrey 5 mm m2 131,000 140,000
4 Kaca Es 5 mm 12 mm m2 187,333 225,000
5 Kaca Es 12 mm 12 mm m2 257,500
6 Kaca Panasap 8 mm m2 710,833 800,000
7 Floating Glass 6 mm m2 465,000
8 Karet Kaca / Gasket m1 16,250
9 Sealant tube 23,550 20,000
A.5 BAHAN KAYU LAPIS
1 Tripleks/Multipleks 6 mm, 122 x 244 cm lembar 76,000
2 Tripleks/Multipleks 9 mm, 122 x 244 cm lembar 109,700
3 Teakwood 4 mm 120x240 lembar 122,500
A.6 BAHAN KONSTRUKSI JALAN DAN JEMBATAN
1 Abu Batu m3 183,400 200,000 185,000
A.7 BAHAN LANTAI DAN PELAPIS DINDING
1 Keramik Lantai setara Roman KW1 20x20 cm m2 71,550
2 Keramik Lantai setara Roman KW1 30x30 cm m2 74,250
3 Keramik Lantai Roman , 40 x 40 m2 62,200
4 Keramik Lantai setara Essenza KW1 60x60 cm m2 260,500
5 Keramik Dinding 20x25 cm Warna setara Roman KW1 20x25 cm m2 106,750
6 Keramik Dinding 30x50 cm Warna setara Roman KW1 30x50 cm m2 125,500
7 Stepnosing Granite m 40,000
8 Stepnosing Karet m 23,300
9 Lantai Vinyl m2 141,000
10 Floor Hardener kg 23,000
11 Epoxy Nippe 2000 kg 60,000
12 Waterproofing Membrane Sika Polyester 3M (10 m x 1 m) m 101,000
13 Waterproofing Tipe Coating Sika Top 107 Seal 5 lt + 20 kg lt 65,000
14 Penutup Lantai Karpet m2 50,000
A.8 BAHAN LOGAM DAN BAHAN JADINYA
1 Atap Plat Spandek t=0.5 mm m² 38,800
2 Baja Siku Ukuran 40.40.4, Berat Kg/m1 = 1.83 m1 68,000
3 Baja Siku 50x50x5 mm m1 147,500
4 Baja Siku 60x60x6 mm m1 236,500
5 Baja WF SNI 175.35 kg 10,100
6 Baja T 200 200 mm kg 25,000
7 Baja Pipa 3 " Galvanis ty=1.8 mm m 577,500
8 Baja Pipa 6 " m 2,086,500
9 Baja C 200.75 m 75,000
10 Baja Pipa 8.5 " m 3,683,000
11 Plat Baja t=6mm lbr 3,489,000
12 Sincromate Baja Profil 1,170,000
13 Besi Beton Besi Beton SNI -6 mm (12m) batang 30,900
14 Besi Beton Besi Beton SNI -8 mm (12m) = 4,74 kg batang 32,300
15 Besi Beton Besi Beton SNI -10 mm (12m) = 7,40 kg batang 49,400
16 Besi Beton Besi Beton SNI -12 mm (12m) = 10,65 kg batang 70,600

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY
HARGA JUKNIS KAB.
No Jenis Barang/Jasa Merk/Type/Spesifikasi/Ukuran Satuan KAB.
2017 KAB. LEBAK PANDEGLAN
SERANG
G

1 2 3 4 5 6 7 8

17 Besi Beton Besi Beton SNI -13 mm (12m) = 12,50 kg batang 88,100
18 Besi Beton Besi Beton SNI -16 mm (12m) = 19,00 kg batang 124,400
19 Besi Beton Besi Beton SNI -19 mm (12m) = 26,80 kg batang 184,700
20 Jendela Aluminium Natural, Cassement 1,3 mm m1 103,700
21 Kawat Beton standar kg 16,700 15,000
22 Kawat Harmonika 4 cm m2 20,000
23 Kusen Aluminium Warna, 1,3 mm m1 101,000 110,000
24 Main Truss C-75-75 Zincalum m1 90,000 58,000
25 Plat Bondeks t= 0,5 mm m2
26 Rangka Metal Furing m² 39,000
27 Rangka Alumunium Curtain Wall m 460,000 300,000
28 Roof Batten/Reng standar m1 67,300
29 Seng BJLS 2 m x 1 m tebal 0.20 lembar 49,100
30 Wiremesh M8 m2 510,500
31 Wiremesh M10 m2 774,500
A.9 BAHAN PAKU MUR DAN BAUT
1 Baut Angkur dia. 16 mm buah 10,750
2 Baut Angkur dia. 19 mm buah 12,250
3 Paku 4-7 cm kg 11,700 13,000
4 Paku 8-12 cm kg 12,600 12,000
5 Paku Dynabolt 5 cm buah 2,100
6 Screw 12-14 x 20 buah 1,200
7 Screw 10-16 x 16 buah 1,500
A.10 BAHAN PENGGANTUNG DAN KUNCI
1 Door Closer Kelas Rendah / Kelas Biasa buah 169,200
2 Door Closer Kelas Standar buah 284,900
3 Engsel Jendela: Top buah 18,600
4 Engsel Pintu: Unilon Standar Besar 5" pasang 24,700
5 Handle Alumunium Royal Alumunium 785-Besar buah 132,100
6 Kunci 2 Slaag Anchor Standar Asli buah 78,200
7 Kunci 2 Slaag Seis Standar 210 s/d 226 buah 330,800
8 Kunci Tanam 181,500
9 Sloot Pintu: Berikut Lantai pasang 52,000
A.11 BAHAN PENUTUP ATAP
1 Genteng Metal setara Sakura Roof m² 46,433 53,000
2 Nok Atas Metal setara Sakura Roof m' 25,400 20,000
A.12 BAHAN PERPIPAAN
1 Gate Valve Flanged 1 " buah 26,000
2 Gate Valve 2 " buah 35,600
3 Gate Valve 4 " buah 65,000
4 Pipa PVC Wavin: PVC, STD AW ukuran : 0 1/2 (4m) batang 18,700 19,000
5 Pipa PVC Wavin: PVC, STD AW ukuran : 0 3/4 (4m) batang 25,500 25,000
6 Pipa PVC Wavin: PVC, STD AW ukuran : 0 1 (4m) batang 34,600 35,000
7 Pipa PVC Wavin: PVC, STD AW ukuran : 0 1 1/4 (4m) batang 51,700 52,000
8 Pipa PVC Wavin: PVC, STD AW ukuran : 0 1.5 (4m) batang 59,800 59,000
9 Pipa PVC Wavin: PVC, STD AW ukuran : 0 2 (4m) batang 75,500 70,000
10 Pipa PVC Wavin: PVC, STD AW ukuran : 0 3 (4m) batang 147,100 141,000
11 Pipa PVC Wavin: PVC, STD AW ukuran : 0 4 (4m) batang 239,000 221,600

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY
HARGA JUKNIS KAB.
No Jenis Barang/Jasa Merk/Type/Spesifikasi/Ukuran Satuan KAB.
2017 KAB. LEBAK PANDEGLAN
SERANG
G

1 2 3 4 5 6 7 8

A.13 BAHAN PLAFON


1 Casting Plaster Elephant, 20 kg zak 40,000
2 Gypsum Elephant: 120 x 240 cm, t = 9 mm lembar 68,200 73,000
3 List Profil Gypsum Siku 10 x 10 cm x 2 m batang 16,000 13,000
4 List Profil Gypsum Siku 15 x 15 cm x 2 m batang 20,500 22,000
5 Listplank GRC t= 8 mm 40 x 20 cm t= 8 mm m 33,667 28,000
6 Plafon GRC 1220 x 2440 mm, t = 4 mm lembar 68,533 85,000
7 Plafon PVC setara Shunda Plafond m² 91,600
8 Plafon Alumunium m² 334,000 334,000
9 Calsiboard 1220 x 2440 mm, t = 6 mm lembar 75,000
A.14 BAHAN SALURAN AIR KOTOR
1 Box Culvert 40 x 40 x100 cm m1 535,900
2 Box Culvert 80 x 80 x 100 cm m1 2,691,500
3 Box Culvert 100 x 100 x 100 cm m1 1,640,200
4 Box Culvert 200 x 200 x 120 cm m1 4,816,000
A.15 BAHAN SANITAIR
1 Cermin Gracia: MC-017B, 50x70 cm buah 251,000
2 Closet Duduk TOTO Dublo CW 421JW + TCW075 White set 2,245,000 2,000,000
3 Closet Duduk Setara Toto : CW 820J - White set 1,550,417 1,350,000 2,500,000 1,400,000
4 Closet Jongkok TOTO: CE7 - White buah 237,900 290,500 290,500 275,000
5 Partisi Toilet PVC 566,600
6 Floor drain San Ei: untuk lantai, Km Stainless Steel buah 89,900 75,000
7 Roof Drain buah 47,000 20,000
8 Kitchen Zink Stainless Standard Lokal: 1 Lubang buah 191,000
9 Kran Sansui / Tembok: 1/2 buah 155,500 75,000
10 Kran San Ei / Tembok ; 1/2 buah 28,900
11 Kran Washtafel Toto T205MCB buah 127,500
12 Shower Lengkap buah 664,150
13 Tempat Sabun Porselin TOTO: S11 N buah 54,600
14 Urinoir Lengkap TOTO: Warna Standard buah 1,855,500
15 Sekat Urinoir American Standard DVDER Ivory 72x33.5 cm buah 1,375,000
16 Gantungan Handuk buah 115,000
17 Tissue Holder setara TOTO buah 358,000
18 Jet Washer buah 230,000 132,000
19 Water Torn Fiber 2000 l Penguin 1000 liter buah 1,825,000
20 Handspray buah 75,000
21 Hydrant Pillar Lengkap Two Way Type Unit 750,000
22 Fire House Cabinet Lengkap Tipe Indoor Unit 1,375,000
23 Fire Extinguiser, dry powder lengkap dengan kotak kaca Unit 750,000
24 Wastafel TOTO (Setara) Lengkap buah 477,500
25 Kusen+pintu PVC Unit 816,600
A.16 HARDPLEKS
1 Hollow Elephant: Elephant, 20 x 40 x 4 (meni-meni) batang 12,800
2 Hollow Elephant: Elephant, 40 x 40 x 4 (meni-meni) batang 16,500
3 List Profile Gypsum Siku: 10 x 10 cm x 2 m batang 32,500

B MEKANIKAL DAN ELEKTRIKAL

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY
HARGA JUKNIS KAB.
No Jenis Barang/Jasa Merk/Type/Spesifikasi/Ukuran Satuan KAB.
2017 KAB. LEBAK PANDEGLAN
SERANG
G

1 2 3 4 5 6 7 8

B.1 KABEL
1 Kabel Roll NYY Eterna NYY 2"1.5: 2x1.5 mm2 (@ 50 m) roll 293,600 267,000
2 Kabel Roll NYY Eterna NYY 2"2.5: 2x2.5 mm2 (@ 50 m) roll 420,200 377,500
3 Kabel Roll NYY Eterna NYY 3"1.5: 3x1.5 mm2 (@ 50 m) roll 356,500 338,500
4 Kabel Roll NYY Eterna NYY 3"2.5: 3x2.5 mm2 (@ 50 m) roll 494,800 478,500
5 Kabel NYFGBY 4 x 70 sqmm setara Sutrado m 371,600
6 Kabel NYFGBY 4 x 35 sqmm setara Sutrado m 201,600
7 Kabel NYFGBY 4 x 25 sqmm setara Sutrado m 150,000
8 Kabel NYFGBY 4 x 10 sqmm setara Sutrado m 90,600
9 Kabel NYY 4 x 16 sqmm m 95,000
10 Kabel NYM 3 x 25 sqmm setara Sutrado m 14,300
11 Panel MDP 60 x 80 cm buah 951,000
12 Panel MDP 80 x 120 cm buah 1,750,000
13 Booster/Splitter 1 Input 8 Output buah 225,000
14 Antenna UHF buah 135,500
15 Outlet TV buah 38,500 32,000
16 Air Terminal Penangkal Petir buah 2,270,000 40,000
B.2 LAMPU
1 Lampu Baret setara Phillips PLE-1x22 W buah 305,500
2 Lampu Down Light setara Phillips 20 W buah 65,000
3 Lampu Down Light setara Phillips 13 W buah 50,800
4 Lampu Down Light Merkuri-1x160 W buah 82,200 45,000
5 Lampu Taman tinggi = 4m setara Phillips SL 25 W (tanpa buah 120,000 120,000
6 Lampu Taman Tiang)
tinggi = 4m setara Phillips SL 25 W (dengan batang 4,500,000
7 Lampu Taman Tiang)
Solar Sel t=3 m batang 15,016,000
8 Lampu TL Philips: 36 Watt buah 14,700
9 Lampu RM setara Phillips 2x15 W buah 278,300
10 Lampu RM setara Phillips 2x36 W + Armatur buah 340,250
11 Lampu Sorot PAR 38 20 Watt buah 140,833 75,000
B.3 MATERIAL GARDU TIANG
1 Sepatu Kabel Cu. 35 buah 51,100
B.4 MATERIAL PENDUKUNG ELEKTRIKAL LUAR RUANGAN
Single Ornamen Phillips Sodium 150n W tinggi
1 Lampu PJU buah 3,000,000
7m
2 Lampu PJU Solar Sel t=6 m buah 19,518,000
B.5 MATERIAL SUTM
1 Saklar Broco Plano (seri) buah 15,600 15,500
2 Saklar Tunggal Broco buah 12,000 18,000
3 Stop Kontak Broco: Plano buah 12,700 12,500
4 Stop Kontak Lantai setara Broco buah 331,250
5 Stop Kontak AC setara Broco buah 56,500 47,000
B.6 PERALATAN INTALASI AIR BERSIH
1 Pompa Air Grunfos 600 W buah 2,390,000
B.7 TEKNIK PENDINGIN
1 AC Split Panasonic Econavi 1/2 PK set 3,325,000
2 AC Split Panasonic Econavi 3/4 PK set 3,525,000
3 AC Split Panasonic Econavi 1 PK set 4,175,000
4 AC Split Panasonic Econavi 2 PK set 6,915,000
5 AC Ceiling Panasonic Econavi 1 PK set 10,200,000
6 AC Ceiling Panasonic Econavi 2 PK set 15,420,000

C JASA

C.1 SEWA ALAT BERAT


1 Concrete Pump 8.00 m3 unit/jam 280,800.00
2 Concrete Pump Long Boom Long Boom 28 m unit/jam
3 Vibrating 10 - 22 Ton unit/jam 376,480.0

Kepala Dinas Peruma

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
ATUAN HARGA BARANG JASA
HAN RAKYAT DAN KAWASAN PERMUKIMAN
SIL SURVEY DAN KESEPAKATAN
TAHUN 2017

HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

550 470 730 551 525


637,000 720,000 678,500 675,350
87,500 113,000 100,250 105,625
100,000 121,000 110,500 116,350
102,500 148,000 125,250 137,675
107,500 164,000 135,750 135,750
300,000 113,000 153,000 202,111 196,706
210,000 165,000 213,000 201,889 232,844
196,000 196,000 236,450
201,600 201,600 211,100
50,000 50,000 56,850
68,000 68,000 73,100
423,000 423,000 423,000
500,000 500,000 500,000
61,000 61,000 65,950
250,000 248,000 239,333 226,517
310,000 157,600 215,187 194,593
150,000 300,000 230,000 226,250 228,125
150,000 - 230,000 190,000 210,000
61,600 61,600 61,600
840,000 140,000 140,000
1,100,000 1,100,000 1,100,000
28,300 28,300 28,300
36,600 36,600 36,600
760,000 745,000 752,500 803,950
780,000 780,000 780,000 837,500
750,000 820,000 785,000 847,500
820,000 873,000 846,500 914,400
850,000 916,000 883,000 916,300
920,000 1,183,000 1,051,500 1,083,300
566,600 566,600 566,600
141,600 141,600 141,600
60,000 50,000 61,667 57,444 65,922
63,000 67,000 61,000 65,700
153,000 133,000 143,000 142,450
146,000 106,000 126,000 125,100
18,000 9,300 23,767 17,733
30,000 30,000 51,400
22,500 37,500 26,667 26,667

27,500 25,600 26,033 26,033


375,000 175,000 257,200 257,200
111,000 111,000 111,000
200,000 200,000 200,000
200,000 203,000 237,667 237,667
100,000 447,000 345,667 345,667
300,000 424,000 383,000 383,000
100,000 500,000 314,233 314,233
67,500 218,300 195,267 195,267
219,100 202,050 202,050
3,500 68,600 29,033 29,033
3,500 52,000 23,500 23,500
175,000 208,300 227,767 227,767

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

150,000 221,600 212,200 212,200


300,000 208,000 277,667 277,667
500,000 475,000 416,667 416,667
175,000 262,500 218,750 218,750
175,000 139,400 232,200 232,200
125,000 112,500 112,500
171,000 170,500 170,500
60,000 111,000 94,500 94,500
50,000 87,200 79,067 79,067
130,000 139,000 145,333 145,333
130,000 132,500 131,250 131,250
118,000 118,000 118,000
10,000 22,500 16,250 16,250
10,000 29,000 18,833 18,833
3,500 9,200 10,067 10,067
1,200,000 80,000 640,000 640,000
1,250,000 35,000 642,500 642,500
40,000 40,000 40,000
95,000 95,000 95,000
275,000 275,000 275,000
73,600 73,600 73,600
60,000 60,000 60,000

64,300 64,300 64,300


54,000 52,300 53,150 55,825
956,000 1,175,000 1,065,500 1,065,500
1,756,000 756,000 1,256,000 1,256,000
18,600 12,300 15,450 13,875
25,000 24,300 24,650 23,225
626,600 391,600 509,100 509,100
16,300 27,300 21,800 21,950
15,000 20,000 17,500 17,500

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

637,500 616,600 627,050 586,375


111,600 86,600 105,733 107,967
120,000 120,000 126,667 128,833
155,000 182,000 187,333 187,333
165,000 350,000 257,500 257,500
732,500 600,000 710,833 710,833
780,000 150,000 465,000 465,000
3,500 29,000 16,250 16,250
5,500 21,600 23,550 23,550

78,000 75,000 76,500 76,250


120,000 115,000 117,500 113,600
122,500 122,500 122,500

150,000 162,000 220,000 183,400 183,400

47,500 95,600 71,550 71,550


46,500 102,000 74,250 74,250
63,000 117,000 90,000 76,100
278,000 243,000 260,500 260,500
51,500 162,000 106,750 106,750
64,000 187,000 125,500 125,500
40,000 40,000 40,000
23,300 23,300 23,300
141,000 141,000 141,000
23,000 23,000 23,000
60,000 60,000 60,000
137,000 65,000 101,000 101,000
65,000 65,000 65,000
50,000 50,000 50,000

33,300 44,300 38,800 38,800


47,500 115,000 81,250 74,625
113,000 182,000 147,500 147,500
213,000 260,000 236,500 236,500
9,700 9,700 9,900
25,000 25,000 25,000
285,000 870,000 577,500 577,500
1,750,000 2,423,000 2,086,500 2,086,500
75,000 75,000 75,000
3,683,000 3,683,000 3,683,000
1,358,000 5,620,000 3,489,000 3,489,000
1,170,000 1,170,000 1,170,000
260,000 260,000 30,900
30,500 30,500 31,400
47,000 47,000 48,200
68,500 68,500 69,550

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

85,500 95,100 90,300 89,200


125,000 147,600 136,300 130,350
185,000 210,000 197,500 191,100
175,000 175,000 139,350
14,500 13,300 14,267 15,483
21,000 19,000 20,000 20,000
95,000 291,600 165,533 133,267
44,000 63,000 55,000 72,500
72,500 82,000 77,250 38,625
39,000 39,000 39,000
897,000 183,000 460,000 460,000
19,300 42,600 30,950 49,125
46,000 55,000 50,500 49,800
488,000 533,000 510,500 510,500
744,000 805,000 774,500 774,500

10,750 10,750 10,750


12,250 12,250 12,250
12,000 16,000 13,667 12,683
11,500 20,000 14,500 13,550
1,000 250 625 1,363
1,200
700 2,300 1,500 1,500

53,000 53,000 111,100


177,500 177,500 231,200
46,000 46,000 32,300
62,750 62,750 43,725
158,300 158,300 145,200
78,300 78,300 78,250
327,500 327,500 329,150
258,000 105,000 181,500 181,500
75,000 50,000 62,500 57,250

49,000 37,300 46,433 46,433


29,600 26,600 25,400 25,400

26,000 26,000 26,000


35,600 35,600 35,600
65,000 65,000 65,000
18,100 18,600 18,567 18,633
27,600 24,600 25,733 25,617
33,300 32,600 33,633 34,117
48,300 47,600 49,300 50,500
55,600 55,600 56,733 58,267
76,000 79,000 75,000 75,250
139,000 150,000 143,333 145,217
228,300 235,000 228,300 233,650

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

11,000 65,000 38,000 39,000


41,600 64,300 59,633 63,917
19,000 16,000 16,000
19,000 20,500 20,500
50,000 23,000 33,667 33,667
57,300 63,300 68,533 68,533
91,600 91,600 91,600
600,000 68,000 334,000 334,000
75,000 75,000 75,000

- 535,900
1,300,000 1,300,000 1,995,750
2,400,000 2,400,000 2,020,100
4,816,000 4,816,000 4,816,000

350,000 300,000 325,000 288,000


2,000,000 2,000,000 2,980,000 2,245,000 2,245,000
1,902,500 950,000 1,200,000 1,550,417 1,550,417
249,000 206,000 214,000 254,167 246,033
566,600 566,600 566,600
75,000 82,450
56,000 65,000 47,000 47,000
230,000 191,600 210,800 200,900
105,000 53,000 77,667 116,583
51,500 51,500 40,200
127,500 127,500 127,500
1,200,000 128,300 664,150 664,150
111,600 111,600 83,100
2,500,000 2,500,000 2,177,750
1,375,000 1,375,000 1,375,000
155,000 75,000 115,000 115,000
70,000 646,000 358,000 358,000
142,000 416,000 230,000 230,000
1,890,000 1,760,000 1,825,000 1,825,000
75,000 75,000 75,000
750,000 750,000 750,000
1,375,000 1,375,000 1,375,000
750,000 750,000 750,000
- 477,500
816,600 816,600 816,600

13,750 13,750 13,275


18,000 18,000 17,250
19,000 19,000 25,750

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

266,000 266,500 280,050


600,000 366,000 447,833 434,017
450,000 316,000 368,167 362,333
700,000 475,000 551,167 522,983
371,600 371,600 371,600
201,600 201,600 201,600
150,000 150,000 150,000
90,600 90,600 90,600
95,000 95,000 95,000
14,300 14,300 14,300
951,000 951,000 951,000
1,750,000 1,750,000 1,750,000
100,000 350,000 225,000 225,000
120,000 151,000 135,500 135,500
45,000 38,500 38,500
4,500,000 2,270,000 2,270,000

225,000 386,000 305,500 305,500


34,000 96,000 65,000 65,000
30,000 71,600 50,800 50,800
76,600 125,000 82,200 82,200
120,000 120,000
4,500,000 4,500,000 4,500,000
15,016,000 15,016,000 15,016,000
62,500 62,500 38,600
255,000 301,600 278,300 278,300
277,500 403,000 340,250 340,250
97,500 250,000 140,833 140,833

5,000 5,000 28,050

3,000,000 3,000,000 3,000,000


19,518,000 19,518,000 19,518,000

21,500 22,600 19,867 17,733


21,500 19,600 19,700 15,850
23,000 21,500 19,000 15,850
97,500 565,000 331,250 331,250
57,500 65,000 56,500 56,500

1,750,000 3,030,000 2,390,000 2,390,000

2,350,000 4,300,000 3,325,000 3,325,000


3,500,000 3,550,000 3,525,000 3,525,000
4,750,000 3,600,000 4,175,000 4,175,000
5,430,000 8,400,000 6,915,000 6,915,000
10,200,000 10,200,000 10,200,000
15,420,000 15,420,000 15,420,000

291,667 283,000 287,333 284,067


550,000 575,000 562,500 281,250
437,500 266,000 351,750 364,115

Mengetahui,
Kepala Dinas Perumahan Rakyat Dan Kawasan Permukiman
Provinsi Banten

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B
HARGA SURVEY

KAB./KOTA HARGA USULAN


KOTA HARGA DINAS
KOTA SERANG TANGERANG &
CILEGON SURVEY PROV.
TANGSEL

(6+7+8+9+10+1
(5+12)/2 ATAU MAKS
1)/JUMLAH
HARGA JUKNIS
SURVEY
9 10 11 12 13

Ir. MOH YANUAR, MP


NIP. 19610101 198802 1 001

1. SEKRETARIS
2. KEPALA BIDANG PERUMAHAN
3.KEPALA BIDANG KAWASAN PERMUKIMAN
4.KEPALA BIDANG INFRASTRUKTUR PERMUKIMAN..
5.KEPALA UPT PENGELOLAAN KP3B