STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PROVINSI SULAWESI SELATAN


MAKASSAR, GOWA, TAKALAR DAN JENEPONTO
TAHUN 2015
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
BAHAN DASAR
1 Batu Kali
Utuh M³ 184,000 142,000 147,000 157,000
Batu pecah 7 - 10 cm M³ 237,000 232,000 268,800 247,000
Batu pecah 5 - 7 cm M³ 256,000 247,000 268,800 267,000
Batu pecah 3 - 5 cm M³ 262,000 252,000 273,600 272,000
Batu pecah 2 - 3 cm M³ 267,000 257,000 262,000 277,000
Batu pecah 1 - 2 cm M³ 272,000 262,000 288,000 282,000
Batu pecah 0.51 - 1 cm M³ 317,000 267,000 297,600 287,000
2 Batu Merah Buah 550 500 575 600
3 Batu Gunung M³ 167,000 155,000 150,000 170,000
4 Batu Alam
Andesit Biasa M² 186,000 186,500 187,000 187,500
Andesit Susun Sirih M² 285,000 285,500 286,000 286,500
Andesit Halus M² 185,000 185,500 186,000 186,500
Andesit Gelombang M² 196,000 196,500 197,000 197,500
Batu Candi Permukaan Rata M² 175,000 175,500 176,000 176,500
Batu Palimanan Kuning M² 180,000 180,500 181,000 181,500
Batu Hijau Sukabumi M² 170,000 170,500 171,000 171,500
Batu Bali Green M² 166,000 166,500 167,000 167,500
Batu Bali Napoli M² 185,000 185,500 186,000 186,500
Paras Jokja Besar M² 180,000 180,500 181,000 181,500
Batu Cirebon Beraturan M² 170,000 170,500 171,000 171,500
Batu Cirebon Tidak Beraturan M² 125,000 125,500 126,000 126,500
5 Tanah Timbunan M³ 110,000 100,000 105,000 105,000
6 Pasir
Timbunan / Urug M³ 100,000 83,000 88,000 93,000
Pasangan M³ 135,000 100,000 110,000 112,000
Beton M³ 148,000 130,000 134,000 154,000
7 Kerikil M³ 277,000 272,000 282,000 287,000
8 Sirtu M³ 177,000 158,000 162,000 167,000
9 Kapur Pasangan Zak 60,000 63,000 64,000 66,000
10 Semen PC (40 kg) Zak 51,000 49,000 49,500 50,000
11 Semen Putih (50 Kg) Zak 53,000 53,500 54,000 54,500
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,200,000 1,205,000 1,210,000 1,215,000
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 75,000 75,500 76,000 76,500
PM 210 (50 Kg) Plesteran Zak 65,000 65,500 66,000 66,500
PM 310 (40 Kg) Acian Zak 65,000 65,500 66,000 66,500
14 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 55,000 56,000 57,000 58,000
Tebal 8 Cm M² 60,000 61,000 62,000 63,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20151
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
Berlian M² 51,000 52,000 53,000 54,000
15 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 59,000 60,000 61,000 62,000
Tabal 8 Cm M² 62,000 63,000 64,000 65,000
16 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 60,000 61,000 62,000 63,000
Tebal 8 cm M² 65,000 66,000 67,000 68,000
17 Paving Blok Mutu (K 400) M² 75,000 76,000 77,000 78,000
18 Topiuskup (K 225) biji 4,200 4,700 5,200 5,700
19 Kanstin 20x25x50 biji 37,000 38,000 39,000 40,000
20 Buis Beton
d=20 cm Biji 215,000 225,000 235,000 245,000
d=30 cm Biji 256,000 266,000 276,000 286,000
d=40 cm Biji 326,500 336,500 346,500 356,500
d=50 cm Biji 386,000 396,000 406,000 416,000
d=60 cm Biji 442,000 452,000 462,000 472,000

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 9,550,000 10,050,000 10,300,000 10,550,000
Papan Gergaji Sawmil M³ 10,050,000 10,550,000 10,550,000 10,750,000
Balok Gergaji Sansaw M³ 8,550,000 8,650,000 8,750,000 8,850,000
Papan Gergaji Sansaw M³ 8,650,000 8,850,000 8,800,000 8,850,000
2 Kayu Kelas II
Balok M³ 4,550,000 4,800,000 4,850,000 4,050,000
Papan M³ 4,850,000 4,650,000 4,700,000 4,850,000
3 Kayu Kelas III
Balok M³ 2,800,000 2,850,000 2,900,000 3,000,000
Papan M³ 3,275,000 3,425,000 3,475,000 3,625,000

BAHAN LANTAI
Tegel Keramik
Putih 10 X 20 cm Dos 45,000 45,500 46,000 46,500
Warna 10 X 20 cm Dos 47,000 47,500 48,000 48,500
Putih 20 X 20 cm Dos 60,000 60,500 61,000 61,500
Warna 20 X 20 cm Dos 65,000 65,500 66,000 66,500
Putih 20 X 25 cm Dos 60,000 60,500 61,000 61,500
Warna 20 X 25 cm Dos 65,000 65,500 66,000 66,500
Putih 30 X 30 cm Dos 50,000 50,500 51,000 51,500
Warna 30 X 30 cm Dos 60,000 60,500 61,000 61,500
Putih 40 X 40 cm Dos 55,000 55,500 56,000 56,500
Warna 40 X 40 cm Dos 65,000 65,500 66,000 66,500
Warna 50 x 50 cm Dos 135,000 135,500 136,000 136,500
Warna 60 x 60 cm Dos 175,000 175,500 176,000 176,500

BAHAN KACA
Kaca Bening 3 mm Mtr 100,000 100,500 105,000 105,500
Kaca Bening 5 mm Mtr 125,000 125,500 157,500 158,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20152
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
Kaca Buram 3 mm Mtr 100,000 100,500 157,500 158,000
Kaca Buram 5 mm Mtr 110,000 110,500 168,000 168,500
Kaca Ryben 3 mm Mtr 150,000 150,500 157,500 158,000
Kaca Ryben 5 mm Mtr 175,000 175,500 176,000 176,500
Rangka Nako Lengkap Terali 7 mata Set/daun 350,000 350,500 351,000 351,500

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 24,000 24,500 25,000 25,500
Ø 6 mm Btg 35,000 35,500 36,000 36,500
Ø 8 mm Btg 50,000 50,500 51,000 51,500
Ø 10 mm Btg 75,000 75,500 76,000 76,500
Ø 12 mm Btg 106,000 106,500 107,000 107,500
Ø 14 mm Btg 131,000 131,500 132,000 132,500
Ø 16 mm Btg 165,000 165,500 166,000 166,500
Ø 19 mm Btg 210,000 222,500 235,000 235,500
Ø 22 mm Btg 325,000 325,500 326,000 326,500
2 Besi Ulir
d = 13 mm Btg 110,000 110,500 111,000 111,500
d = 16 mm Btg 165,000 165,500 166,000 166,500
d = 19 mm Btg 227,000 227,500 228,000 228,500
3 Paku
Paku Biasa Kg 17,500 18,000 19,500 20,000
Paku Asbes Kg 45,000 45,500 46,000 46,500
Paku Seng (payung) RRT Dos 21,000 23,500 26,000 28,500
Paku skrup 3 ½ inci Dos 15,000 15,100 15,200 15,300
Paku Skrup 4 Inci Dos 15,000 15,100 15,600 15,700
Paku Payung Berulir 75 mm Kg 35,500 36,000 36,500 37,000
Paku Sirap Kg 20,000 20,500 21,000 21,500
Paku Beton Hitam Dos 43,500 44,000 44,500 45,000
Paku Beton Putih Dos 27,500 28,000 28,500 29,000
4 Kawat
Beton Kg 21,000 21,500 22,000 22,500
Nyamuk Mtr 30,000 30,500 31,000 31,500
Ayakan Kecil mtr 26,000 26,500 27,000 27,500
Duri roll 153,000 154,000 155,000 156,000
5 Besi Plat
2mm=120x240 mm Lbr 410,000 420,000 430,000 435,000
3 mm = 120 X 240 mm Lbr 520,000 530,000 540,000 545,000
Besi H 15 cm Panjang 12 m Btg 4,750,000 4,775,000 4,805,000 4,855,000
6 Besi Strep
30.3 mm Btg 34,000 34,500 35,000 35,500
35.4 mm Btg 55,000 55,500 56,000 56,500
46.4 mm Btg 105,000 105,500 106,000 106,500
40.6 mm Btg 75,000 75,500 76,000 76,500
50.6 mm Btg 130,000 130,500 131,000 131,500
7 Besi Siku
30.30.3 Btg 76,400 76,900 77,400 77,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20153
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
40.40.4 Btg 146,000 146,500 147,000 147,500
40.40.3 Btg 65,500 66,000 66,500 67,000
50.50.4 Btg 101,000 101,500 102,000 102,500
50.50.5 Btg 230,000 230,500 231,000 231,500
60.60.6 Btg 301,000 311,000 321,000 331,000
70.70.7 Btg 351,000 356,000 361,000 366,000
8 Besi 6 mm Mtr 20,000 20,500 21,000 21,500
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 138,000 139,000 140,000 141,000
Lebar 12,5, tebal 1,8 -2,00 mm Btg 165,000 166,000 167,000 168,000
Lebar 15,Tebal 1,8 – 2,00 mm Btg 220,000 221,000 222,000 223,000

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 128,500 129,500 130,500 131,500
Ø ¾ Inci – 6 m Btg 120,000 121,000 122,000 123,000
Ø 1Inci – 6 m Btg 252,500 253,500 254,500 255,500
Ø 2 Inci – 6 m Btg 550,000 555,000 565,000 575,000
Ø 2 ½ Inci – 6 m Btg 900,000 905,000 910,000 920,000
Ø 3 Inci – 6 m Btg 1,150,000 1,175,000 1,200,000 1,225,000
2 Pipa PVC Air Bersih
Ø ½ Inci – 6 m Btg 22,500 23,000 23,500 24,000
Ø ¾ Inci – 6 m Btg 32,000 32,500 33,000 33,500
Ø 1 Inci – 6 m Btg 44,000 44,500 45,000 45,500
Ø 1½ Inci – 6 m Btg 102,690 103,190 103,690 104,190
Ø 2 Inci – 6 m Btg 130,500 131,500 132,500 133,500
Ø 2 ½ Inci – 6 m Btg 186,800 187,800 188,800 189,800
Ø 3 Inci – 6 m Btg 135,400 136,400 137,400 138,400
Ø 4 Inci – 6 m Btg 400,000 405,000 410,000 420,000
Ø 6 Inci – 6 m Btg 855,700 864,700 884,700 904,700
Ø 8 Inci – 6 m Btg 1,405,000 1,445,000 1,495,000 1,545,000
Ø 10 Inci – 6 m Btg 2,232,250 2,248,250 2,298,250 2,348,250
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 22,500 23,000 23,500 24,000
Ø ¾ Inci – 4 m Btg 27,500 28,000 28,500 29,000
Ø 1 Inci – 4 m Btg 33,500 34,000 34,500 35,000
Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500 98,000
Ø 2 Inci – 4 m Btg 152,500 153,000 153,500 154,000
Ø 2 ½ Inci – 4 m Btg 220,000 220,500 221,000 221,500
Ø 3 Inci – 4 m Btg 315,000 316,000 317,000 318,000
Ø 4 Inci – 4 m Btg 473,000 476,000 481,000 491,000
Ø 5 Inci – 4 m Btg 764,500 767,500 777,500 782,500
Ø 6 Inci – 4 m Btg 1,011,000 1,105,000 1,205,000 1,305,000
Ø 10 Inci – 4 m Btg 2,461,000 2,505,000 2,555,000 2,605,000
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 15,500 16,000 16,500 17,000
Ø ¾ Inci – 4 m Btg 25,500 26,000 26,500 27,000
Ø 1 Inci – 4 m Btg 32,500 33,000 33,500 34,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20154
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500 98,000

BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 18,500 19,000 19,500 20,000
2 Tripleks
122 X 244 x 0.2 cm Lbr 52,500 53,000 53,500 54,000
122 X 244 x 0.3 cm Lbr 70,000 70,500 71,000 71,500
122 X 244 x 0.6 cm Lbr 98,000 100,000 100,500 101,000
122 X 244 x 0.9 cm Lbr 130,000 130,500 131,000 131,500
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 85,500 86,000 86,500 87,000
4 Accoustic 40 X 60 Lbr 55,500 56,000 56,500 57,000
5 Teakwood
80 X 244 x 0.3 cm Lbr 92,000 92,500 93,000 93,500
122 X 244 x 0.3 cm Lbr 96,500 97,000 97,500 98,000
Karsiboard Lbr 70,000 70,500 71,000 71,500
Gypsum Lbr 63,500 64,000 64,500 65,000
Les gipsum Lbr 29,500 30,000 30,500 31,000
6 Hard Board 122 X 244 cm Lbr 77,000 77,500 78,000 78,500
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 48,500 49,000 49,500 50,000
8 List Profil
2 x 3 cm / 4 m Btg 11,500 12,000 12,500 13,000
3 x 3 cm / 4 m Btg 15,500 16,000 16,500 17,000
4 x 4 cm / 4 m Btg 19,500 20,000 20,500 21,000
4 x 5 cm / 4 m Btg 25,500 26,000 26,500 27,000

BAHAN ATAP
1 Genteng
Beton Biji 33,500 34,000 34,500 35,000
Keramik Bh 16,000 16,500 17,000 17,500
Asbes gelombang 7 kaki Lbr 60,000 60,500 61,000 61,500
Harfles (115X85x0.5 cm) Lbr 63,000 63,500 64,000 64,500
2 Atap Metal lbr 87,000 87,500 88,000 88,500
3 Asbes Genteng Lbr 72,500 73,000 73,500 74,000
4 Sirap Ikat 305,000 310,000 315,000 320,000
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 7,000 7,500 8,000 8,500
BJLS 0.22 mm Kaki 7,500 8,000 8,500 9,000
BJLS 0.30 mm Lbr 54,000 54,500 55,000 55,500
BJLS 0.35 mm Lbr 70,500 71,000 71,500 72,000
6 Atap Bitumen
Bitumen Gel.Acrylic Base(200x95x0,23 cm) Lbr 173,800 174,300 174,800 175,300
Lisplank Acrylic Bace (104x34x023cm) Lbr 101,200 101,700 102,200 102,700
Nok Acrylic Base (50x104x0.23 Cm) Lbr 101,200 101,700 102,200 102,700
Sekrup Atap 6,5 cm Bh 1,200 1,200 1,300 1,400
Sekrup Nok 6,5 cm Bh 1,200 1,200 1,300 1,400
Talang Air Acrylic Bace (104x50x0.23cm) Lbr 101,200 101,700 102,200 102,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20155
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 1,350 1,450 1,550 1,650
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500
Fiber Glass Gel. (transparan) Lbr 343,000 343,500 344,000 344,500
7 200x95x0.23cm
Seng Plat
BJLS 0.30 mm 40x180 Lbr 65,000 65,500 66,000 66,500
BJLS 0.35 mm Lbr 75,000 75,500 76,000 76,500
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 13,000 13,500 14,000 14,500
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 9,500 10,000 10,500 11,000
SWG 30” 0.31 mm Kaki 12,000 12,500 13,000 13,500
SWG 28” 0.38 mm Kaki 13,000 13,500 14,000 14,500
10 Seng Plastik (Fiber) Kaki 13,500 14,000 14,500 15,000
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 79,000 79,500 80,000 80,500
Super 180 X 108 X 0.6 cm Lbr 65,000 65,500 66,000 66,500
Ekonomi 240 X 92 X 0.5 cm Lbr 69,500 70,000 70,500 71,000
Ekonomi 180 X 92 X 0.4 cm Lbr 63,000 63,500 64,000 64,500
Mini 240 X 105 X 0.4 cm Lbr 62,500 63,000 63,500 64,000
Mini 180 X 92 X 0.5 cm Lbr 71,000 71,500 72,000 72,500
Super 240 X 105 X 0.4 cm Lbr 66,500 67,000 67,500 68,000
Super 180 X 105 X 0.4 cm Lbr 69,000 69,500 70,000 70,500
12 Nok/Bubungan
Genteng Beton Bh 35,500 36,000 36,500 37,000
Genteng Asbes Bh 55,500 56,000 56,500 57,000
Genteng Keramik Bh 20,500 21,000 21,500 22,000
Alm. SWG 28” -180 cm Lbr 45,000 45,500 46,000 46,500
Alm. SWG 28” –105 cm Lbr 40,000 40,500 41,000 41,500
13 Nok Steel Gelombang
Super – 180 cm Bh 52,500 53,000 53,500 54,000
Mini – 105 cm Bh 41,500 42,000 42,500 43,000
Ekonomi – 95 cm Bh 19,000 19,500 20,000 20,500
14 Nok Steel Rata
Super – 108 cm Bh 30,000 30,500 31,000 31,500
Mini – 105 cm Bh 25,500 26,000 26,500 27,000
Ekonomi – 95 cm Bh 21,000 21,500 22,000 22,500
15 Nok ½ Lingkaran Bh 40,500 41,000 41,500 42,000
16 Karet Pelapis Genteng
Ukuran 55 mtr 9,500 10,000 10,500 11,000
Ukuran 90 Mtr 19,000 19,500 20,000 20,500

BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 173,000 173,500 174,000 174,500
Double Slag Bh 307,000 311,000 316,000 321,000
2 Penggantung
Hak Angin Kecil Bh 10,500 11,000 11,500 12,000
Hak Angin Besar Bh 15,500 16,000 16,500 17,000
Grendel Kecil Bh 13,500 14,000 14,500 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20156
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
Grendel Besar Bh 17,500 18,000 18,500 19,000
Engsel Pintu Bh 35,500 36,000 36,500 37,000
Engsel Jendela Bh 26,000 26,500 27,000 27,500
Expanyolet Bh 125,000 125,500 126,000 126,500

BAHAN SANITER
Kloset Jongkok Bh 230,000 235,000 240,000 245,000
Kloset Duduk Bh 2,000,000 2,005,000 2,010,000 2,015,000
Wasthafel warna Bh 475,000 480,000 485,000 490,000
Wasthafel cuci piring logam Bh 451,000 456,000 461,000 466,000
Pompa Mesin Bh 1,800,000 1,825,000 1,850,000 1,875,000
Urinoir lengkap Bh 1,500,000 1,525,000 1,550,000 1,555,000
Bak Mandi fiber Bh 755,000 760,000 765,000 770,000
Reservoir fiber = 1 m3 Bh 1,255,000 1,265,000 1,270,000 1,275,000
Reservoir Stainless stell = 1 m3 Bh 3,400,000 3,450,000 3,500,000 3,550,000
Stop Kran Bh 25,000 26,000 27,000 28,000
Kran Air Bh 20,000 20,500 21,000 21,500

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 60,000 61,000 62,000 63,000
Cat Kilap 5 Kg 90,000 91,000 92,000 158,000
2 Cat Kayu
Cat Dasar Kg 20,000 20,500 21,000 21,500
Cat Kilap Ltr 61,000 61,500 62,000 62,500
Palatone Ltr 50,500 51,000 51,500 52,000
ICI Kg 75,500 76,000 76,500 77,000
Politur Kg 51,000 51,500 52,000 52,500
Meni 4 Kg 65,500 66,000 66,500 67,000
Minyak Cat Ltr 10,000 10,500 11,000 11,500
3 Cat Atap
Cat Dasar Kg 30,000 30,500 31,000 31,500
Cat Kilap Ltr 90,000 90,500 91,000 91,500
Lem Seng Ltr 13,000 13,500 14,000 14,500
Amplas/Kertas Gosok M 12,000 12,500 13,000 13,500
Dempul Kg 31,000 31,500 32,000 32,500
Residu 10 ltr 64,000 64,500 65,000 65,500

BAHAN INSTALASI LISTRIK


Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 301,000 301,500 302,000 302,500
2 ½ mm Roll 386,000 391,000 396,000 401,000
2 Type NYY
2 X 1 ½ mm Roll 612,000 627,000 632,000 637,000
2 X 2 ½ mm Roll 762,000 772,000 777,000 782,000
2 X 4 mm Roll 652,000 657,000 662,000 667,000
3 Lampu TL

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20157
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
1 X 20 W Bh 94,000 94,500 95,000 95,500
2 X 20 W Bh 123,000 123,500 124,000 124,500
1 X 40 W Bh 117,000 117,500 118,000 118,500
2 X 40 W Bh 150,000 150,500 151,000 151,500
4 Lampu Pijar
25 W Bh 32,000 32,500 33,000 33,500
40 W Bh 56,000 56,500 57,000 57,500
60 W Bh 106,000 106,500 107,000 107,500
100 W Bh 188,000 188,500 189,000 189,500
Lampu Taman Mercury Bh 354,000 359,000 364,000 369,000
5 Saklar Phase
Tunggal Putih Bh 23,000 23,500 24,000 24,500
Tunggal Hitam Bh 18,000 18,500 19,000 19,500
Double Putih Bh 26,000 26,500 27,000 27,500
Double Hitam Bh 21,000 21,500 22,000 22,500
6 Stop Kontak
Hitam Bh 26,000 26,500 27,000 27,500
Putih Bh 28,000 28,500 29,000 29,500
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 83,000 83,500 84,000 84,500
Lokal 3 Group Biasa Bh 95,500 96,000 96,500 97,000
Fitting Bh 15,500 16,000 16,500 17,000

BAHAN JALAN
Aspal Kg 15,000 15,500 16,000 16,500
Minyak Tanah Ltr 10,000 10,500 11,000 11,500
Minyak Solar Ltr 4,500 5,000 5,500 6,000
Minyak Pelumas Ltr 28,000 28,500 29,000 29,500

UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20158
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR JENEPONTO
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 20159
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
MAROS, PANGKEP, BARRU DAN PARE-PARE
TAHUN 2015
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
BAHAN DASAR
1 Batu Kali
Utuh M³ 147,000 152,000 157,000 152,000
Batu pecah 7 - 10 cm M³ 227,000 222,000 229,000 227,000
Batu pecah 5 - 7 cm M³ 232,000 237,000 242,000 247,000
Batu pecah 3 - 5 cm M³ 237,000 242,000 247,000 252,000
Batu pecah 2 - 3 cm M³ 242,000 247,000 252,000 257,000
Batu pecah 1 - 2 cm M³ 247,000 252,000 257,000 262,000
Batu pecah 0.51 - 1 cm M³ 262,000 267,000 272,000 277,000
2 Batu Merah Buah 550 550 600 600
3 Batu Gunung M³ 175,000 177,000 161,000 163,000
4 Batu Alam
Andesit Biasa M² 186,500 187,000 187,500 188,000
Andesit Susun Sirih M² 285,500 286,000 286,500 287,000
Andesit Halus M² 185,500 186,000 186,500 187,000
Andesit Gelombang M² 196,500 197,000 197,500 198,000
Batu Candi Permukaan Rata M² 175,500 176,000 176,500 177,000
Batu Palimanan Kuning M² 180,500 181,000 181,500 182,000
Batu Hijau Sukabumi M² 170,500 171,000 171,500 172,000
Batu Bali Green M² 166,500 167,000 167,500 168,000
Batu Bali Napoli M² 185,500 186,000 186,500 187,000
Paras Jokja Besar M² 180,500 181,000 181,500 182,000
Batu Cirebon Beraturan M² 170,500 171,000 171,500 172,000
Batu Cirebon Tidak Beraturan M² 125,500 126,000 126,500 127,000
5 Tanah Timbunan M³ 132,500 134,000 132,000 132,000
6 Pasir
Timbunan / Urug M³ 124,000 109,000 119,000 124,000
Pasangan M³ 143,000 138,000 133,000 143,000
Beton M³ 142,000 144,000 147,000 152,000
7 Kerikil M³ 300,000 242,000 247,000 257,000
8 Sirtu M³ 155,000 150,000 150,000 160,000
9 Kapur Pasangan Zak 63,000 63,500 64,000 64,500
10 Semen PC (40 kg) Zak 50,000 44,500 45,000 45,500
11 Semen Putih (50 Kg) Zak 58,000 58,500 59,000 59,500
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,205,000 1,205,500 1,206,000 1,206,500
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 70,500 71,000 71,500 72,000
PM 210 (50 Kg) Plesteran Zak 60,500 61,000 61,500 62,000
PM 310 (40 Kg) Acian Zak 65,500 66,000 66,500 67,000
14 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 56,000 57,000 58,000 59,000
Tebal 8 Cm M² 63,000 64,000 64,000 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201510
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
Berlian M² 52,000 53,000 54,000 55,000
15 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 60,000 61,000 62,000 63,000
Tebal 8 Cm M² 63,000 64,000 65,000 66,000
16 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 61,000 62,000 63,000 64,000
Tebal 8 cm M² 66,000 67,000 68,000 69,000
17 Paving Blok Mutu (K 400) M² 76,000 77,000 78,000 79,000
18 Topiuskup (K 225) biji 4,200 4,700 5,200 5,700
19 Kanstin 20x25x50 biji 38,000 39,000 40,000 41,000
20 Buis Beton
d=20 cm Biji 225,000 235,000 245,000 255,000
d=30 cm Biji 266,000 276,000 286,000 296,000
d=40 cm Biji 336,500 346,500 356,500 366,500
d=50 cm Biji 396,000 406,000 416,000 426,000
d=60 cm Biji 452,000 462,000 472,000 482,000

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 10,250,000 9,850,000 9,800,000 9,550,000
Papan Gergaji Sawmil M³ 11,250,000 11,250,000 11,050,000 10,550,000
Balok Gergaji Sansaw M³ 7,350,000 7,350,000 7,450,000 7,350,000
Papan Gergaji Sansaw M³ 7,250,000 7,250,000 7,450,000 7,150,000
2 Kayu Kelas II
Balok M³ 4,250,000 4,250,000 4,350,000 4,250,000
Papan M³ 4,350,000 4,350,000 4,350,000 4,350,000
3 Kayu Kelas III
Balok M³ 2,800,000 2,850,000 2,900,000 3,000,000
Papan M³ 3,300,000 3,450,000 3,500,000 3,650,000

BAHAN LANTAI
1 Tegel Keramik
Putih 10 X 20 cm Dos 45,500 46,000 46,500 47,000
Warna 10 X 20 cm Dos 47,500 48,000 48,500 49,000
Putih 20 X 20 cm Dos 60,000 60,500 61,000 61,500
Warna 20 X 20 cm Dos 65,000 65,500 66,000 66,500
Putih 20 X 25 cm Dos 60,000 60,500 61,000 61,500
Warna 20 X 25 cm Dos 65,000 65,500 66,000 66,500
Putih 30 X 30 cm Dos 50,000 50,500 51,000 51,500
Warna 30 X 30 cm Dos 60,000 60,500 61,000 61,500
Putih 40 X 40 cm Dos 55,000 55,500 56,000 56,500
Warna 40 X 40 cm Dos 65,000 65,500 66,000 66,500
Warna 50 x50 cm Dos 135,500 136,000 136,500 137,000
Warna 60 x 60 cm Dos 175,500 176,000 176,500 177,000

BAHAN KACA
Kaca Bening 3 mm Mtr 100,500 101,000 101,500 102,000
Kaca Bening 5 mm Mtr 125,500 126,000 126,500 127,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201511
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
Kaca Buram 3 mm Mtr 100,500 101,000 101,500 102,000
Kaca Buram 5 mm Mtr 110,500 111,000 111,500 112,000
Kaca Ryben 3 mm Mtr 150,500 151,000 151,500 152,000
Kaca Ryben 5 mm Mtr 175,500 176,000 176,500 177,000
Rangka Nako Lengkap Terali 7 mata Set/daun 350,500 351,000 351,500 352,000

BAHAN BESI
1 Besi Beton Polos Kg 14,100
Ø 4 mm Btg 24,500 25,000 25,500 26,000
Ø 6 mm Btg 35,500 36,000 36,500 37,000
Ø 8 mm Btg 50,500 51,000 51,500 52,000
Ø 10 mm Btg 75,500 76,000 76,500 77,000
Ø 12 mm Btg 106,500 107,000 107,500 108,000
Ø 14 mm Btg 131,500 132,000 132,500 133,000
Ø 16 mm Btg 165,500 166,000 166,500 167,000
Ø 19 mm Btg 222,500 223,000 223,500 224,000
Ø 22 mm Btg 325,500 326,000 326,500 327,000
2 Besi Ulir Kg 15,100
d = 12 mm Btg 110,500 111,000 111,500 112,000
d = 16 mm Btg 165,500 166,000 166,500 167,000
d = 19 mm Btg 227,500 228,000 228,500 229,000
3 Paku
Paku Biasa Kg 18,000 18,500 19,000 19,500
Paku Asbes Kg 45,500 46,000 46,500 47,000
Paku Seng (payung) RRT Dos 23,500 24,000 24,500 25,000
Paku skrup 3 ½ inci Dos 15,100 15,200 15,300 15,400
Paku Skrup 4 Inci Dos 15,000 15,100 15,200 15,300
Paku Payung Berulir 75 mm Kg 36,000 36,500 37,000 37,500
Paku Sirap Kg 20,500 21,000 21,500 22,000
Paku Beton Hitam Dos 44,000 44,500 45,000 45,500
Paku Beton Putih Dos 28,000 28,500 29,000 29,500
4 Kawat
Beton Kg 21,500 22,000 22,500 23,000
Nyamuk Mtr 30,500 31,000 31,500 32,000
Ayakan Kecil mtr 26,500 27,000 27,500 28,000
Duri roll 154,000 154,500 155,000 155,500
5 Besi Plat
2mm=120x240 mm Lbr 420,000 430,000 440,000 440,500
3 mm = 120 X 240 mm Lbr 530,000 540,000 550,000 550,500
Besi H 15 cm Panjang 12 m Btg 4,775,000 4,800,000 4,830,000 4,880,000
6 Besi Strep
30.3 mm Btg 34,500 35,000 35,500 36,000
35.4 mm Btg 55,500 56,000 56,500 57,000
46.4 mm Btg 105,500 106,000 106,500 107,000
40.6 mm Btg 75,500 76,000 76,500 77,000
50.6 mm Btg 130,500 131,000 131,500 132,000
7 Besi Siku
30.30.3 Btg 76,900 77,400 77,900 78,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201512
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
40.40.4 Btg 146,500 147,000 147,500 148,000
40.40.3 Btg 66,000 66,500 67,000 67,500
50.50.4 Btg 101,500 102,000 102,500 103,000
50.50.5 Btg 230,500 231,000 231,500 232,000
60.60.6 Btg 311,000 321,000 331,000 341,000
70.70.7 Btg 356,000 361,000 366,000 371,000
8 Besi 6 mm Mtr 20,500 21,000 21,500 22,000
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 139,000 139,500 140,000 140,500
Lebar 12,5, tebal 1,8 -2,00 mm Btg 166,000 166,500 167,000 167,500
Lebar 15,Tebal 1,8 – 2,00 mm Btg 221,000 221,500 222,000 222,500

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 129,500 130,000 130,500 131,000
Ø ¾ Inci – 6 m Btg 121,000 121,500 122,000 122,500
Ø 1Inci – 6 m Btg 253,500 254,000 254,500 255,000
Ø 2 Inci – 6 m Btg 555,000 560,000 570,000 580,000
Ø 2 ½ Inci – 6 m Btg 901,000 908,000 913,000 923,000
Ø 3 Inci – 6 m Btg 1,151,000 1,176,000 1,201,000 1,226,000
2 Pipa PVC Air Bersih
Ø ½ Inci – 4 m Btg 23,000 23,500 24,000 24,500
Ø ¾ Inci – 6 m Btg 32,500 33,000 33,500 34,000
Ø 1 Inci – 6 m Btg 44,500 45,000 45,500 46,000
Ø 1½ Inci – 6 m Btg 103,190 103,690 104,190 104,690
Ø 2 Inci – 6 m Btg 131,500 132,000 132,500 133,000
Ø 2 ½ Inci – 6 m Btg 187,800 188,300 188,800 189,300
Ø 3 Inci – 6 m Btg 136,400 136,900 137,400 137,900
Ø 4 Inci – 6 m Btg 405,000 410,000 415,000 416,000
Ø 6 Inci – 6 m Btg 864,700 873,700 893,700 913,700
Ø 8 Inci – 6 m Btg 1,445,000 1,485,000 1,535,000 1,585,000
Ø 10 Inci – 6 m Btg 2,248,250 2,264,250 2,314,250 2,364,250
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 23,000 23,500 24,000 24,500
Ø ¾ Inci – 4 m Btg 28,000 28,500 29,000 29,500
Ø 1 Inci – 4 m Btg 34,000 34,500 35,000 35,500
Ø 1 ½ Inci – 4 m Btg 97,000 97,500 98,000 98,500
Ø 2 Inci – 4 m Btg 153,000 153,500 154,000 154,500
Ø 2 ½ Inci – 4 m Btg 220,500 221,000 221,500 222,000
Ø 3 Inci – 4 m Btg 316,000 316,500 317,000 317,500
Ø 4 Inci – 4 m Btg 476,000 479,000 484,000 494,000
Ø 5 Inci – 4 m Btg 767,500 770,500 780,500 785,500
Ø 6 Inci – 4 m Btg 1,105,000 1,199,000 1,299,000 1,399,000
Ø 10 Inci – 4 m Btg 2,505,000 2,549,000 2,599,000 2,649,000
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 16,000 16,500 17,000 17,500
Ø ¾ Inci – 4 m Btg 26,000 26,500 27,000 27,500
Ø 1 Inci – 4 m Btg 33,000 33,500 34,000 34,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201513
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
Ø 1 ½ Inci – 4 m Btg 97,000 97,500 98,000 98,500

BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 19,000 19,500 20,000 20,500
2 Tripleks
122 X 244 x 0.2 cm Lbr 53,000 53,500 54,000 54,500
122 X 244 x 0.3 cm Lbr 70,500 71,000 71,500 72,000
122 X 244 x 0.6 cm Lbr 98,500 99,000 99,500 100,000
122 X 244 x 0.9 cm Lbr 130,500 131,000 131,500 132,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 86,000 86,500 87,000 87,500
4 Accoustic 40 X 60 Lbr 56,000 56,500 57,000 57,500
5 Teakwood
80 X 244 x 0.3 cm Lbr 92,500 93,000 93,500 94,000
122 X 244 x 0.3 cm Lbr 97,000 97,500 98,000 98,500
Karsiboard Lbr 70,500 71,000 71,500 72,000
Gypsum Lbr 64,000 64,500 65,000 65,500
Les gipsum Lbr 30,000 30,500 31,000 31,500
6 Hard Board 122 X 244 cm Lbr 77,500 78,000 78,500 79,000
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 49,000 49,500 50,000 50,500
8 List Profil
2 x 3 cm / 4 m Btg 12,000 12,500 13,000 13,500
3 x 3 cm / 4 m Btg 16,000 16,500 17,000 17,500
4 x 4 cm / 4 m Btg 20,000 20,500 21,000 21,500
4 x 5 cm / 4 m Btg 26,000 26,500 27,000 27,500

BAHAN ATAP
1 Genteng
Beton Biji 34,000 34,500 35,000 35,500
Keramik Bh 16,500 17,000 17,500 18,000
Asbes gelombang 7 kaki Lbr 60,500 61,000 61,500 62,000
Harfles (115X85x0.5 cm) Lbr 63,500 64,000 64,500 65,000
2 Atap Metal lbr 87,500 88,000 88,500 89,000
3 Asbes Genteng Lbr 73,000 73,500 74,000 74,500
4 Sirap Ikat 310,000 315,000 320,000 325,000
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 7,000 7,500 8,000 8,500
BJLS 0.22 mm Kaki 7,500 8,000 8,500 9,000
BJLS 0.30 mm Lbr 54,000 54,500 55,000 55,500
BJLS 0.35 mm Lbr 70,500 71,000 71,500 72,000
6 Atap Bitumen
Bitumen Gel.Acrylic Base(200x95x0,23 cm) Lbr 173,800 176,800 180,300 184,300
Lisplank Acrylic Bace (104x34x023cm) Lbr 101,200 104,200 107,200 107,500
Nok Acrylic Base (50x104x0.23 Cm) Lbr 101,200 104,200 107,200 107,500
Sekrup Atap 6,5 cm Bh 1,200 1,200 1,300 1,400
Sekrup Nok 6,5 cm Bh 1,200 1,200 1,300 1,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201514
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
Talang Air Acrylic Bace (104x50x0.23cm) Lbr 101,200 104,200 107,200 107,500
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 1,350 1,500 1,650 1,800
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500
Fiber Glass Gel. (transparan) Lbr 343,000 346,000 349,000 353,500
7 200x95x0.23cm
Seng Plat
BJLS 0.30 mm 40x180 Lbr 65,500 66,000 66,500 67,000
BJLS 0.35 mm Lbr 75,500 76,000 76,500 77,000
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 13,500 14,000 14,500 15,000
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 10,000 10,500 11,000 11,500
SWG 30” 0.31 mm Kaki 12,500 13,000 13,500 14,000
SWG 28” 0.38 mm Kaki 13,500 14,000 14,500 15,000
10 Seng Plastik (Fiber) Kaki 14,000 14,500 15,000 15,500
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 79,500 80,000 80,500 81,000
Super 180 X 108 X 0.6 cm Lbr 65,500 66,000 66,500 67,000
Ekonomi 240 X 92 X 0.5 cm Lbr 70,000 70,500 71,000 71,500
Ekonomi 180 X 92 X 0.4 cm Lbr 63,500 64,000 64,500 65,000
Mini 240 X 105 X 0.4 cm Lbr 63,000 63,500 64,000 64,500
Mini 180 X 92 X 0.5 cm Lbr 71,500 72,000 72,500 73,000
Super 240 X 105 X 0.4 cm Lbr 67,000 67,500 68,000 68,500
Super 180 X 105 X 0.4 cm Lbr 69,500 70,000 70,500 71,000
12 Nok/Bubungan
Genteng Beton Bh 36,000 36,500 37,000 37,500
Genteng Asbes Bh 56,000 56,500 57,000 57,500
Genteng Keramik Bh 21,000 21,500 22,000 22,500
Alm. SWG 28” -180 cm Lbr 45,500 46,000 46,500 47,000
Alm. SWG 28” –105 cm Lbr 40,500 41,000 41,500 42,000
13 Nok Steel Gelombang
Super – 180 cm Bh 53,000 53,500 54,000 54,500
Mini – 105 cm Bh 42,000 42,500 43,000 43,500
Ekonomi – 95 cm Bh 19,500 20,000 20,500 21,000
14 Nok Steel Rata
Super – 108 cm Bh 30,500 31,000 31,500 32,000
Mini – 105 cm Bh 26,000 26,500 27,000 27,500
Ekonomi – 95 cm Bh 21,500 22,000 22,500 23,000
15 Nok ½ Lingkaran Bh 41,000 41,500 42,000 42,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 10,000 10,500 11,000 11,500
Ukuran 90 Mtr 19,500 20,000 20,500 21,000

BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 173,500 174,000 174,500 175,000
Double Slag Bh 307,500 311,500 316,500 321,500
2 Penggantung
Hak Angin Kecil Bh 11,000 11,500 12,000 12,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201515
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
Hak Angin Besar Bh 16,000 16,500 17,000 17,500
Grendel Kecil Bh 14,000 14,500 15,000 15,500
Grendel Besar Bh 18,000 18,500 19,000 19,500
Engsel Pintu Bh 36,000 36,500 37,000 37,500
Engsel Jendela Bh 26,500 27,000 27,500 28,000
Expanyolet Bh 125,500 126,000 126,500 127,000

BAHAN SANITER
Kloset Jongkok Bh 235,000 235,500 236,000 236,500
Kloset Duduk Bh 2,005,000 2,005,500 2,006,000 2,006,500
Wasthafel warna Bh 480,000 480,500 481,000 481,500
Wasthafel cuci piring logam Bh 456,000 456,500 457,000 457,500
Pompa Mesin Bh 1,825,000 1,850,000 1,875,000 1,900,000
Urinoir lengkap Bh 1,525,000 1,550,000 1,575,000 1,580,000
Bak Mandi fiber Bh 760,000 765,000 770,000 775,000
Reservoir fiber = 1 m3 Bh 1,265,000 1,275,000 1,280,000 1,285,000
Reservoir Stainless stell = 1 m3 Bh 3,450,000 3,500,000 3,550,000 3,600,000
Stop Kran Bh 26,000 26,500 27,000 27,500
Kran Air Bh 25,000 25,500 26,000 26,500

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 110,000 110,500 111,000 111,500
Cat Kilap 5 Kg 91,000 91,500 92,000 92,500
2 Cat Kayu
Cat Dasar Kg 25,000 25,500 26,000 26,500
Cat Kilap Ltr 61,500 62,000 62,500 63,000
Palatone Ltr 51,000 51,500 52,000 52,500
ICI Kg 76,000 76,500 77,000 77,500
Politur Kg 60,000 60,500 61,000 61,500
Meni 4 Kg 75,000 75,500 76,000 76,500
Minyak Cat Ltr 10,500 11,000 11,500 12,000
3 Cat Atap
Cat Dasar Kg 30,500 31,000 31,500 32,000
Cat Kilap Ltr 90,500 91,000 91,500 92,000
Lem Seng Ltr 13,500 14,000 14,500 15,000
Amplas/Kertas Gosok Lbr 12,500 13,000 13,500 14,000
Dempul Kg 31,500 32,000 32,500 33,000
Residu 10 ltr 64,500 65,000 65,500 66,000

BAHAN INSTALASI LISTRIK


Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 301,500 302,000 302,500 303,000
2 ½ mm Roll 386,500 391,500 396,500 401,500
2 Type NYY
2 X 1 ½ mm Roll 612,500 627,500 632,500 637,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201516
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
2 X 2 ½ mm Roll 772,000 782,000 787,000 797,000
2 X 4 mm Roll 657,000 662,000 667,000 672,000
3 Lampu TL
1 X 20 W Bh 94,500 95,000 95,500 96,000
2 X 20 W Bh 123,500 124,000 124,500 125,000
1 X 40 W Bh 117,500 118,000 118,500 119,000
2 X 40 W Bh 150,500 151,000 151,500 152,000
4 Lampu Pijar
25 W Bh 32,500 33,000 33,500 34,000
40 W Bh 56,500 57,000 57,500 58,000
60 W Bh 106,500 107,000 107,500 108,000
100 W Bh 188,500 189,000 189,500 190,000
Lampu Taman Mercury Bh 359,000 364,000 369,000 374,000
5 Saklar Phase
Tunggal Putih Bh 23,500 24,000 24,500 25,000
Tunggal Hitam Bh 20,000 20,500 21,000 21,500
Double Putih Bh 26,500 27,000 27,500 28,000
Double Hitam Bh 21,500 22,000 22,500 23,000
6 Stop Kontak
Hitam Bh 26,500 27,000 27,500 28,000
Putih Bh 28,500 29,000 29,500 30,000
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 83,500 84,000 84,500 85,000
Lokal 3 Group Biasa Bh 96,000 96,500 97,000 97,500
Fitting Bh 16,000 16,500 17,000 17,500

BAHAN JALAN
Aspal Kg 15,500 16,000 16,500 17,000
Minyak Tanah Ltr 10,500 11,000 11,500 12,000
Minyak Solar Ltr 5,000 5,500 6,000 6,500
Minyak Pelumas Ltr 28,500 29,000 29,500 30,000

UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201517
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAROS PANGKEP BARRU PARE-PARE
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201518
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
BONE, SOPPENG, WAJO DAN SIDRAP
TAHUN 2015
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
BAHAN DASAR
1 Batu Kali
Utuh M³ 227,500 230,500 251,370 198,000
Batu pecah 7 - 10 cm M³ 273,000 248,000 300,000 207,000
Batu pecah 5 - 7 cm M³ 318,500 276,000 330,300 272,000
Batu pecah 3 - 5 cm M³ 364,000 340,000 330,300 302,000
Batu pecah 2 - 3 cm M³ 351,000 388,300 411,200 327,000
Batu pecah 1 - 2 cm M³ 455,000 380,000 433,700 388,800
Batu pecah 0.51 - 1 cm M³ 500,500 480,000 433,700 458,000
2 Batu Merah Buah 800 700 700 750
3 Batu Gunung M³ 204,750 245,500 267,500 162,000
4 Batu Alam
Andesit Biasa M² 188,000 188,500 189,000 189,500
Andesit Susun Sirih M² 287,000 287,500 288,000 288,500
Andesit Halus M² 187,000 187,500 188,000 188,500
Andesit Gelombang M² 198,000 198,500 199,000 199,500
Batu Candi Permukaan Rata M² 177,000 177,500 178,000 178,500
Batu Palimanan Kuning M² 182,000 182,500 183,000 183,500
Batu Hijau Sukabumi M² 172,000 172,500 173,000 173,500
Batu Bali Green M² 168,000 168,500 169,000 169,500
Batu Bali Napoli M² 187,000 187,500 188,000 188,500
Paras Jokja Besar M² 182,000 182,500 183,000 183,500
Batu Cirebon Beraturan M² 148,000 148,500 149,000 149,500
Batu Cirebon Tidak Beraturan M² 127,000 127,500 128,000 128,500
5 Tanah Timbunan M³ 154,700 127,000 132,000 137,000
6 Pasir
Timbunan / Urug M³ 154,700 164,000 164,000 175,000
Pasangan M³ 159,250 164,000 167,500 173,000
Beton M³ 169,250 187,000 221,400 249,000
7 Kerikil M³ 285,000 274,000 282,000 292,000
8 Sirtu M³ 181,000 183,000 173,000 175,000
9 Kapur Pasangan Zak 64,500 65,000 65,500 66,000
10 Semen PC (40 kg) Zak 47,000 47,500 48,000 48,500
11 Semen Putih (50 Kg) Zak 55,000 95,000 56,000 56,500
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,206,500 1,207,000 1,207,500 1,208,000
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 72,000 72,500 73,000 73,500
PM 210 (50 Kg) Plesteran Zak 62,000 62,500 63,000 63,500
PM 310 (40 Kg) Acian Zak 67,000 67,500 68,000 68,500
14 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 59,000 59,500 60,000 60,500
Tebal 8 Cm M² 64,000 65,500 65,000 65,500
Berlian M² 55,000 65,500 56,000 56,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201519
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
15 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 53,000 57,500 54,000 54,500
Tebal 8 Cm M² 57,000 61,900 58,000 58,500
16 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 60,000 65,500 61,000 61,500
Tebal 8 cm M² 65,000 70,000 66,000 66,500
17 Paving Blok Mutu (K 400) M² 71,000 71,500 72,000 72,500
18 Topiuskup (K 225) biji 5,000 5,500 6,000 6,500
19 Kanstin 20x25x50 biji 41,000 41,500 42,000 42,500
20 Buis Beton
d=20 cm Biji 255,000 255,500 256,000 256,500
d=30 cm Biji 296,000 296,500 297,000 297,500
d=40 cm Biji 366,500 367,000 367,500 368,000
d=50 cm Biji 426,000 426,500 427,000 427,500
d=60 cm Biji 482,000 482,500 483,000 483,500

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 8,950,000 9,000,000 9,050,000 9,100,000
Papan Gergaji Sawmil M³ 9,150,000 9,200,000 9,050,000 9,200,000
Balok Gergaji Sansaw M³ 8,550,000 8,600,000 8,850,000 8,910,000
Papan Gergaji Sansaw M³ 8,850,000 8,900,000 8,950,000 9,000,000
2 Kayu Kelas II
Balok M³ 4,100,000 4,100,000 4,141,500 4,150,000
Papan M³ 3,850,000 3,900,000 3,950,000 4,000,000
3 Kayu Kelas III
Balok M³ 2,900,000 2,950,000 2,900,000 2,925,000
Papan M³ 2,875,000 2,925,000 2,875,000 2,925,000

BAHAN LANTAI
1 Tegel Keramik
Putih 10 X 20 cm Dos 47,000 47,500 48,000 48,500
Warna 10 X 20 cm Dos 49,000 49,500 50,000 50,500
Putih 20 X 20 cm Dos 52,000 54,500 57,400 59,500
Warna 20 X 20 cm Dos 54,000 56,500 59,000 59,500
Putih 20 X 25 cm Dos 57,200 60,500 58,300 58,000
Warna 20 X 25 cm Dos 58,000 70,500 59,000 58,000
Putih 30 X 30 cm Dos 54,100 55,900 55,500 55,000
Warna 30 X 30 cm Dos 67,600 75,300 57,000 57,500
Putih 40 X 40 cm Dos 58,000 58,500 59,000 59,500
Warna 40 X 40 cm Dos 67,600 67,800 68,000 68,500
Warna 50 x 50 Dos 137,000 137,500 138,000 138,500
Warna 60 x 60 Dos 177,000 177,500 178,000 178,500

BAHAN KACA
Kaca Bening 3 mm Mtr 102,000 102,500 103,000 103,500
Kaca Bening 5 mm Mtr 127,000 127,500 128,000 128,500
Kaca Buram 3 mm Mtr 124,800 142,500 153,000 162,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201520
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
Kaca Buram 5 mm Mtr 186,100 112,500 113,000 113,500
Kaca Ryben 3 mm Mtr 152,000 152,500 153,000 153,500
Kaca Ryben 5 mm Mtr 177,000 177,500 178,000 178,500
Rangka Nako Lengkap Terali 7 mata Set/daun 352,000 352,500 353,000 353,500

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 26,000 26,500 27,000 27,500
Ø 6 mm Btg 37,000 37,500 38,000 38,500
Ø 8 mm Btg 52,000 54,500 53,000 53,500
Ø 10 mm Btg 77,000 79,500 78,000 78,500
Ø 12 mm Btg 108,000 110,500 109,000 109,500
Ø 14 mm Btg 140,400 133,500 134,000 144,500
Ø 16 mm Btg 167,000 167,500 168,000 178,500
Ø 19 mm Btg 281,200 214,500 215,000 285,500
Ø 22 mm Btg 409,500 367,500 368,000 396,500
2 Besi Ulir
d = 12 mm Btg 112,000 112,500 113,000 113,500
d = 16 mm Btg 167,000 167,500 168,000 168,500
d = 19 mm Btg 279,000 229,500 230,000 230,500
3 Paku
Paku Biasa Kg 19,500 20,000 20,500 21,000
Paku Asbes Kg 47,000 47,500 48,000 48,500
Paku Seng (payung) RRT Dos 25,000 25,500 26,000 26,500
Paku skrup 3 ½ inci Dos 35,400 35,500 35,600 37,800
Paku Skrup 4 Inci Dos 30,000 31,200 31,800 32,400
Paku Payung Berulir 75 mm Kg 37,500 38,000 38,500 39,000
Paku Sirap Kg 22,000 25,500 23,000 23,500
Paku Beton Hitam Dos 45,500 46,000 46,500 47,000
Paku Beton Putih Dos 29,500 30,000 30,500 31,000
4 Kawat
Beton Kg 23,000 23,500 24,000 24,500
Nyamuk Mtr 32,000 32,500 33,000 33,500
Ayakan Kecil Mtr 28,000 28,500 29,000 29,500
Duri roll 155,500 156,000 156,500 157,000
5 Besi Plat
2mm=120x240 mm Lbr 440,500 450,500 460,500 465,500
3 mm = 120 X 240 mm Lbr 560,500 560,500 570,500 575,500
Besi H 15 cm Panjang 12 m Btg 4,880,000 4,905,000 4,935,000 4,985,000
6 Besi Strep
30.3 mm Btg 36,000 36,500 37,000 37,500
35.4 mm Btg 57,000 57,500 58,000 58,500
46.4 mm Btg 107,000 107,500 108,000 108,500
40.6 mm Btg 77,000 77,500 78,000 78,500
50.6 mm Btg 132,000 132,500 133,000 133,500
7 Besi Siku
30.30.3 Btg 78,400 78,900 79,400 79,900
40.40.4 Btg 148,000 148,500 149,000 149,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201521
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
40.40.3 Btg 67,500 68,000 68,500 69,000
50.50.4 Btg 103,000 103,500 104,000 104,500
50.50.5 Btg 232,000 232,500 233,000 233,500
60.60.6 Btg 341,000 351,000 361,000 371,000
70.70.7 Btg 371,000 376,000 381,000 386,000
8 Besi 6 mm Mtr 22,000 22,500 23,000 23,500
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 140,500 141,000 141,500 142,000
Lebar 12,5, tebal 1,8 -2,00 mm Btg 167,500 168,000 168,500 169,000
Lebar 15,Tebal 1,8 – 2,00 mm Btg 222,500 223,000 223,500 224,000

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 129,700 130,200 130,700 131,200
Ø ¾ Inci – 6 m Btg 121,200 151,700 122,200 122,700
Ø 1Inci – 6 m Btg 253,700 254,200 254,700 255,200
Ø 2 Inci – 6 m Btg 555,200 560,200 570,200 580,200
Ø 2 ½ Inci – 6 m Btg 901,000 908,000 913,000 923,000
Ø 3 Inci – 6 m Btg 1,151,000 1,176,000 1,201,000 1,226,000
2 Pipa PVC Air Bersih
Ø ½ Inci – 4 m Btg 23,000 23,500 24,000 24,500
Ø ¾ Inci – 6 m Btg 28,000 28,500 29,000 29,500
Ø 1 Inci – 6 m Btg 36,500 37,000 37,500 38,000
Ø 1½ Inci – 6 m Btg 80,500 81,000 81,500 82,000
Ø 2 Inci – 6 m Btg 116,000 116,500 117,000 117,500
Ø 2 ½ Inci – 6 m Btg 163,500 164,000 164,500 165,000
Ø 3 Inci – 6 m Btg 235,000 235,500 236,000 236,500
Ø 4 Inci – 6 m Btg 356,500 361,500 366,500 376,500
Ø 6 Inci – 6 m Btg 752,500 761,500 781,500 801,500
Ø 8 Inci – 6 m Btg 1,255,000 1,295,000 1,345,000 1,395,000
Ø 10 Inci – 6 m Btg 1,905,500 1,921,500 1,971,500 2,021,500
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 23,000 23,500 24,000 24,500
Ø ¾ Inci – 4 m Btg 28,000 28,500 29,000 29,500
Ø 1 Inci – 4 m Btg 34,000 34,500 35,000 35,500
Ø 1 ½ Inci – 4 m Btg 97,000 97,500 98,000 98,500
Ø 2 Inci – 4 m Btg 153,000 153,500 154,000 154,500
Ø 2 ½ Inci – 4 m Btg 220,500 221,000 221,500 222,000
Ø 3 Inci – 4 m Btg 316,000 316,500 317,000 317,500
Ø 4 Inci – 4 m Btg 476,000 479,000 484,000 494,000
Ø 5 Inci – 4 m Btg 767,500 770,500 780,500 785,500
Ø 6 Inci – 4 m Btg 1,105,000 1,199,000 1,305,000 1,405,000
Ø 10 Inci – 4 m Btg 2,505,000 2,549,000 2,599,000 2,649,000
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 16,000 16,500 17,000 17,500
Ø ¾ Inci – 4 m Btg 26,000 26,500 27,000 27,500
Ø 1 Inci – 4 m Btg 33,000 33,500 34,000 34,500
Ø 1 ½ Inci – 4 m Btg 97,000 97,500 98,000 98,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201522
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP

BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 190,000 201,500 202,000 205,000
2 Tripleks
122 X 244 x 0.2 cm Lbr 53,000 53,500 54,000 54,500
122 X 244 x 0.3 cm Lbr 70,500 71,000 71,500 72,000
122 X 244 x 0.6 cm Lbr 98,500 99,000 99,500 100,000
122 X 244 x 0.9 cm Lbr 130,500 131,000 131,500 132,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 86,000 86,500 87,000 87,500
4 Accoustic 40 X 60 Lbr 70,000 71,000 72,000 73,900
5 Teakwood
80 X 244 x 0.3 cm Lbr 122,000 126,000 132,000 140,000
122 X 244 x 0.3 cm Lbr 97,000 97,500 100,300 112,300
Karsiboard Lbr 70,500 71,000 71,500 72,000
Gypsum Lbr 100,000 105,000 111,000 113,400
Les gipsum Lbr 30,000 30,500 31,000 31,500
6 Hard Board 122 X 244 cm Lbr 125,000 135,000 140,000 143,500
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 49,000 49,500 50,000 50,500
8 List Profil
2 x 3 cm / 4 m Btg 12,000 12,500 13,000 13,500
3 x 3 cm / 4 m Btg 16,000 16,500 17,000 17,500
4 x 4 cm / 4 m Btg 20,000 20,500 21,000 21,500
4 x 5 cm / 4 m Btg 26,000 26,500 27,000 27,500

BAHAN ATAP
1 Genteng
Beton Biji 34,000 34,500 35,000 35,500
Keramik Bh 16,500 17,000 17,500 18,000
Asbes gelombang 7 kaki Lbr 60,500 61,000 61,500 62,000
Harfles (115X85x0.5 cm) Lbr 63,500 64,000 64,500 65,000
2 Atap Metal lbr 87,500 88,000 88,500 89,000
3 Asbes Genteng Lbr 73,000 73,500 74,000 74,500
4 Sirap Ikat 310,000 315,000 320,000 325,000
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 8,500 9,000 9,500 10,000
BJLS 0.22 mm Kaki 9,000 9,500 10,000 10,500
BJLS 0.30 mm Lbr 55,500 56,000 56,500 57,000
BJLS 0.35 mm Lbr 72,000 72,500 73,000 73,500
6 Atap Bitumen
Gelombang Acrylic Base( 200x95x0,3 Cm) Lbr 184,300 185,300 186,300 187,300
Lisplank Acrylic Bace (104x34x023cm) Lbr 111,700 112,700 113,700 114,700
Nok Acrylic Base (50x104x0.23 Cm) Lbr 111,700 112,700 113,700 114,700
Sekrup Atap 6,5 cm Bh 1,400 1,500 1,600 1,700
Sekrup Nok 6,5 cm Bh 1,400 1,500 1,600 1,700
Talang Air Acrylic Bace (104x50x0.23cm) Lbr 111,700 112,700 113,700 114,700
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 1,800 1,950 2,100 2,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201523
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500
Fiber Glass Gel. (transparan) Lbr 353,500 355,000 356,500 358,000
7 200x95x0.23cm
Seng Plat
BJLS 0.30 mm 40x180 Lbr 67,000 67,500 68,000 68,500
BJLS 0.35 mm Lbr 77,000 77,500 78,000 78,500
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 15,000 15,500 16,000 16,500
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 11,500 12,000 12,500 13,000
SWG 30” 0.31 mm Kaki 14,000 14,500 15,000 15,500
SWG 28” 0.38 mm Kaki 15,000 15,500 16,000 16,500
10 Seng Plastik (Fiber) Kaki 15,500 16,000 16,500 17,000
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 81,000 81,500 82,000 82,500
Super 180 X 108 X 0.6 cm Lbr 67,000 67,500 68,000 68,500
Ekonomi 240 X 92 X 0.5 cm Lbr 71,500 72,000 72,500 73,000
Ekonomi 180 X 92 X 0.4 cm Lbr 65,000 65,500 66,000 66,500
Mini 240 X 105 X 0.4 cm Lbr 64,500 65,000 65,500 66,000
Mini 180 X 92 X 0.5 cm Lbr 73,000 73,500 74,000 74,500
Super 240 X 105 X 0.4 cm Lbr 68,500 69,000 69,500 70,000
Super 180 X 105 X 0.4 cm Lbr 71,000 71,500 72,000 72,500
12 Nok/Bubungan
Genteng Beton Bh 37,500 38,000 38,500 39,000
Genteng Asbes Bh 57,500 58,000 58,500 59,000
Genteng Keramik Bh 22,500 23,000 23,500 24,000
Alm. SWG 28” -180 cm Lbr 72,000 74,000 76,000 78,800
Alm. SWG 28” –105 cm Lbr 42,000 42,500 43,000 43,500
13 Nok Steel Gelombang
Super – 180 cm Bh 54,500 55,000 55,500 56,000
Mini – 105 cm Bh 43,500 44,000 44,500 45,000
Ekonomi – 95 cm Bh 21,000 21,500 22,000 22,500
14 Nok Steel Rata
Super – 108 cm Bh 32,000 32,500 33,000 33,500
Mini – 105 cm Bh 27,500 28,000 28,500 29,000
Ekonomi – 95 cm Bh 23,000 23,500 24,000 24,500
15 Nok ½ Lingkaran Bh 42,500 43,000 43,500 44,000
16 Karet Pelapis Genteng
Ukuran 55 Mtr 11,500 12,000 12,500 13,000
Ukuran 90 Mtr 21,000 21,500 22,000 22,500

BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 175,000 175,500 176,000 176,500
Double Slag Bh 321,500 325,500 330,500 335,500
2 Penggantung
Hak Angin Kecil Bh 12,500 13,000 13,500 14,000
Hak Angin Besar Bh 17,500 18,000 18,500 19,000
Grendel Kecil Bh 15,500 16,000 16,500 17,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201524
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
Grendel Besar Bh 19,500 20,000 20,500 21,000
Engsel Pintu Bh 37,500 38,000 38,500 39,000
Engsel Jendela Bh 28,000 28,500 29,000 29,500
Expanyolet Bh 127,000 127,500 128,000 128,500

BAHAN SANITER
Kloset Jongkok Bh 236,500 237,000 237,500 238,000
Kloset Duduk Bh 2,106,500 2,007,500 2,008,500 2,009,500
Wasthafel warna Bh 481,500 482,500 483,500 484,500
Wasthafel cuci piring logam Bh 457,500 458,500 459,500 460,500
Pompa Mesin Bh 1,900,000 1,925,000 1,950,000 1,975,000
Urinoir lengkap Bh 1,580,000 1,605,000 1,630,000 1,635,000
Bak Mandi fiber Bh 775,000 780,000 785,000 790,000
Reservoir fiber = 1 m3 Bh 1,285,000 1,295,000 1,300,000 1,305,000
Reservoir Stainless stell = 1 m3 Bh 3,600,000 3,650,000 3,700,000 3,750,000
Stop Kran Bh 27,500 28,000 28,500 29,000
Kran Air Bh 39,000 24,500 23,000 23,500

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 62,500 63,000 63,500 64,000
Cat Kilap 5 Kg 92,500 93,000 93,500 97,000
2 Cat Kayu
Cat Dasar Kg 22,000 22,500 23,000 23,500
Cat Kilap Ltr 63,000 63,500 64,000 64,500
Palatone Ltr 52,500 53,000 53,500 54,000
ICI Kg 77,500 78,000 78,500 79,000
Politur Kg 53,000 53,500 54,000 54,500
Meni 4 Kg 67,500 68,000 68,500 69,000
Minyak Cat Ltr 12,000 12,500 13,000 13,500
3 Cat Atap
Cat Dasar Kg 32,000 32,500 33,000 33,500
Cat Kilap Ltr 94,000 95,500 98,000 102,600
Lem Seng Ltr 15,000 15,500 16,000 16,500
Amplas/Kertas Gosok Lbr 14,000 14,500 15,000 15,500
Dempul Kg 33,000 33,500 34,000 34,500
Residu 10 ltr 66,000 67,500 67,000 67,500

BAHAN INSTALASI LISTRIK


Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 303,000 303,500 304,000 304,500
2 ½ mm Roll 401,500 406,500 411,500 416,500
2 Type NYY
2 X 1 ½ mm Roll 637,500 652,500 657,500 662,500
2 X 2 ½ mm Roll 797,000 807,000 812,000 822,000
2 X 4 mm Roll 672,000 677,000 682,000 687,000
3 Lampu TL

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201525
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
1 X 20 W Bh 96,000 96,500 97,000 97,500
2 X 20 W Bh 125,000 125,500 126,000 126,500
1 X 40 W Bh 119,000 119,500 120,000 120,500
2 X 40 W Bh 152,000 152,500 153,000 153,500
4 Lampu Pijar
25 W Bh 34,000 34,500 35,000 35,500
40 W Bh 58,000 58,500 59,000 59,500
60 W Bh 108,000 108,500 109,000 109,500
100 W Bh 190,000 190,500 191,000 191,500
Lampu Taman Mercury Bh 374,000 379,000 384,000 389,000
5 Saklar Phase
Tunggal Putih Bh 25,000 25,500 26,000 26,500
Tunggal Hitam Bh 20,000 20,500 21,000 21,500
Double Putih Bh 28,000 28,500 29,000 29,500
Double Hitam Bh 23,000 23,500 24,000 24,500
6 Stop Kontak
Hitam Bh 28,000 28,500 29,000 29,500
Putih Bh 30,000 30,500 31,000 31,500
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 85,000 85,500 86,000 86,500
Lokal 3 Group Biasa Bh 97,500 98,000 98,500 99,000
Fitting Bh 17,500 18,000 18,500 19,000

BAHAN JALAN
Aspal Kg 17,000 17,500 18,000 18,500
Minyak Tanah Ltr 13,100 13,100 13,000 13,500
Minyak Solar Ltr 10,500 10,500 6,950 7,250
Minyak Pelumas Ltr 33,500 33,500 31,000 31,500

UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201526
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BONE SOPPENG WAJO SIDRAP
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201527
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
BANTAENG, BULUKUMBA, SINJAI DAN SELAYAR
TAHUN 2015
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
BAHAN DASAR
1 Batu Kali
Utuh M³ 174,000 177,000 191,000 201,000
Batu pecah 7 - 10 cm M³ 202,000 212,000 227,000 239,000
Batu pecah 5 - 7 cm M³ 239,000 257,000 277,000 282,000
Batu pecah 3 - 5 cm M³ 302,000 312,000 327,000 332,000
Batu pecah 2 - 3 cm M³ 317,000 327,000 342,000 347,000
Batu pecah 1 - 2 cm M³ 327,000 327,000 352,000 377,000
Batu pecah 0.51 - 1 cm M³ 342,000 372,000 392,000 397,000
2 Batu Merah Buah 600 650 700 800
3 Batu Gunung M³ 180,500 185,000 185,000 195,000
4 Batu Alam
Andesit Biasa M² 188,500 189,000 189,500 190,000
Andesit Susun Sirih M² 287,500 288,000 288,500 289,000
Andesit Halus M² 187,500 188,000 188,500 189,000
Andesit Gelombang M² 198,500 199,000 199,500 200,000
Batu Candi Permukaan Rata M² 177,500 178,000 178,500 179,000
Batu Palimanan Kuning M² 182,500 183,000 183,500 184,000
Batu Hijau Sukabumi M² 172,500 173,000 173,500 174,000
Batu Bali Green M² 168,500 169,000 169,500 170,000
Batu Bali Napoli M² 187,500 188,000 188,500 189,000
Paras Jokja Besar M² 182,500 183,000 183,500 184,000
Batu Cirebon Beraturan M² 148,500 149,000 149,500 150,000
Batu Cirebon Tidak Beraturan M² 127,500 128,000 128,500 129,000
5 Tanah Timbunan M³ 142,000 150,000 136,000 178,500
6 Pasir
Timbunan / Urug M³ 166,000 173,000 176,000 187,000
Pasangan M³ 193,000 197,000 207,000 212,000
Beton M³ 176,000 182,000 191,000 194,000
7 Kerikil M³ 247,000 252,000 257,000 262,000
8 Sirtu M³ 183,000 192,000 199,000 204,000
9 Kapur Pasangan Zak 77,900 78,400 78,900 79,400
10 Semen PC (40 kg) Zak 51,500 52,500 54,500 56,500
11 Semen Putih (50 Kg) Zak 74,000 74,500 76,500 78,500
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,215,000 1,215,500 1,216,000 1,216,500
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 76,500 77,000 77,500 78,000
PM 210 (50 Kg) Plesteran Zak 66,500 67,000 67,500 68,000
PM 310 (40 Kg) Acian Zak 66,500 67,000 67,500 68,000
14 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 58,000 58,500 59,000 59,500
Tebal 8 Cm M² 63,000 63,500 64,000 64,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201528
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
Berlian M² 54,000 54,500 55,000 55,500
15 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 53,500 54,000 54,500 55,000
Tabal 8 Cm M² 57,500 58,000 58,500 59,000
16 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 60,500 61,000 61,500 62,000
Tebal 8 cm M² 65,500 66,000 66,500 67,000
17 Paving Blok Mutu (K 400) M² 71,500 72,000 72,500 73,000
18 Topiuskup (K 225) biji 5,500 6,000 6,500 7,000
19 Kanstin 20x25x50 biji 41,500 42,000 42,500 43,000
20 Buis Beton
d=20 cm Biji 255,500 256,000 256,500 257,000
d=30 cm Biji 296,500 297,000 297,500 298,000
d=40 cm Biji 367,000 367,500 368,000 368,500
d=50 cm Biji 426,500 427,000 427,500 428,000
d=60 cm Biji 482,500 483,000 483,500 484,000

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 9,850,000 9,950,000 10,050,000 10,150,000
Papan Gergaji Sawmil M³ 10,250,000 10,350,000 10,450,000 10,550,000
Balok Gergaji Sansaw M³ 9,050,000 9,150,000 9,250,000 9,350,000
Papan Gergaji Sansaw M³ 8,250,000 8,350,000 8,450,000 8,550,000
2 Kayu Kelas II
Balok M³ 4,000,000 4,009,500 3,950,000 4,030,000
Papan M³ 3,978,000 3,934,540 3,850,000 3,950,000
3 Kayu Kelas III
Balok M³ 2,533,000 2,500,000 2,525,000 3,000,000
Papan M³ 2,375,000 2,425,000 2,525,000 2,775,000

BAHAN LANTAI
Tegel Keramik
Putih 10 X 20 cm Dos 46,500 47,000 47,500 48,000
Putih 10 X 20 cm Dos 48,500 49,000 49,500 50,000
Warna 10 X 20 cm Dos 48,500 49,000 49,500 50,000
Putih 20 X 20 cm Dos 49,500 50,000 50,500 51,000
Warna 20 X 20 cm Dos 53,500 54,000 54,500 55,000
Putih 20 X 25 cm Dos 49,500 50,000 50,500 51,000
Warna 20 X 25 cm Dos 58,500 59,000 59,500 60,000
Putih 30 X 30 cm Dos 51,500 52,000 52,500 53,000
Warna 30 X 30 cm Dos 56,500 57,000 57,500 58,000
Putih 40 X 40 cm Dos 58,500 59,000 59,500 60,000
Warna 40 X 40 cm Dos 60,500 61,000 61,500 62,000
Warna 50 x 50 Dos 137,500 138,000 138,500 139,000
Warna 60 x 60 Dos 177,500 178,000 178,500 179,000

BAHAN KACA
Kaca Bening 3 mm Mtr 102,500 103,000 103,500 104,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201529
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
Kaca Bening 5 mm Mtr 127,500 128,000 128,500 129,000
Kaca Buram 3 mm Mtr 102,500 103,000 103,500 104,000
Kaca Buram 5 mm Mtr 112,500 113,000 113,500 114,000
Kaca Ryben 3 mm Mtr 152,500 153,000 153,500 154,000
Kaca Ryben 5 mm Mtr 177,500 178,000 178,500 179,000
Rangka Nako Lengkap Terali 7 mata Set/daun 352,500 353,000 353,500 354,000

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 26,500 27,000 27,500 28,000
Ø 6 mm Btg 37,500 38,000 38,500 39,000
Ø 8 mm Btg 52,500 53,000 53,500 54,000
Ø 10 mm Btg 77,500 78,000 78,500 79,000
Ø 12 mm Btg 108,500 109,000 109,500 110,000
Ø 14 mm Btg 133,500 134,000 134,500 135,000
Ø 16 mm Btg 167,500 168,000 168,500 169,000
Ø 19 mm Btg 214,500 225,000 225,500 226,000
Ø 22 mm Btg 327,500 328,000 328,500 329,000
2 Besi Ulir
d = 12 mm Btg 111,500 112,000 112,500 113,000
d = 16 mm Btg 166,500 167,000 167,500 168,000
d = 19 mm Btg 228,500 229,000 229,500 230,000
3 Paku
Paku Biasa Kg 20,000 20,500 21,000 21,500
Paku Asbes Kg 46,500 47,000 47,500 48,000
Paku Seng (payung) RRT Dos 28,500 29,000 29,500 30,000
Paku skrup 3 ½ inci Dos 15,300 15,400 15,500 15,600
Paku Skrup 4 Inci Dos 15,700 15,800 15,900 16,000
Paku Payung Berulir 75 mm Kg 37,000 37,500 38,000 38,500
Paku Sirap Kg 21,500 22,000 22,500 23,000
Paku Beton Hitam Dos 45,000 45,500 46,000 46,500
Paku Beton Putih Dos 29,000 29,500 30,000 30,500
4 Kawat
Beton Kg 23,500 24,000 24,500 25,000
Nyamuk Mtr 32,500 33,000 33,500 34,000
Ayakan Kecil mtr 28,500 29,000 29,500 30,000
Duri roll 156,000 156,500 157,000 157,500
5 Besi Plat
2mm=120x240 mm Lbr 441,500 451,500 461,500 466,500
3 mm = 120 X 240 mm Lbr 551,500 561,500 571,500 576,500
Besi H 15 cm Panjang 12 m Btg 4,881,000 4,906,000 4,936,000 4,986,000
6 Besi Strep
30.3 mm Btg 36,500 37,000 37,500 38,000
35.4 mm Btg 57,500 58,000 58,500 59,000
46.4 mm Btg 107,500 108,000 108,500 109,000
40.6 mm Btg 77,500 78,000 78,500 79,000
50.6 mm Btg 132,500 133,000 133,500 134,000
7 Besi Siku
Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201530
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
30.30.3 Btg 78,900 79,400 79,900 80,400
40.40.4 Btg 148,500 149,000 149,500 150,000
40.40.3 Btg 68,000 68,500 69,000 69,500
50.50.4 Btg 103,500 104,000 104,500 105,000
50.50.5 Btg 232,500 233,000 233,500 234,000
60.60.6 Btg 341,500 351,500 361,500 371,500
70.70.7 Btg 371,500 376,500 381,500 386,500
8 Besi 6 mm Mtr 22,500 23,000 23,500 24,000
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 141,000 141,500 142,000 142,500
Lebar 12,5, tebal 1,8 -2,00 mm Btg 168,000 168,500 169,000 169,500
Lebar 15,Tebal 1,8 – 2,00 mm Btg 130,200 130,700 131,200 131,700

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 131,500 132,000 132,500 133,000
Ø ¾ Inci – 6 m Btg 123,000 123,500 124,000 124,500
Ø 1Inci – 6 m Btg 255,500 256,000 256,500 257,000
Ø 2 Inci – 6 m Btg 575,000 580,000 590,000 600,000
Ø 2 ½ Inci – 6 m Btg 920,000 927,000 932,000 942,000
Ø 3 Inci – 6 m Btg 1,225,000 1,250,000 1,275,000 1,300,000
2 Pipa PVC Air Bersih
Ø ½ Inci – 4 m Btg 23,500 24,000 24,500 25,000
Ø ¾ Inci – 6 m Btg 28,500 29,000 29,500 30,000
Ø 1 Inci – 6 m Btg 37,000 37,500 38,000 38,500
Ø 1½ Inci – 6 m Btg 81,000 81,500 82,000 82,500
Ø 2 Inci – 6 m Btg 116,500 117,000 117,500 118,000
Ø 2 ½ Inci – 6 m Btg 164,000 164,500 165,000 165,500
Ø 3 Inci – 6 m Btg 235,500 236,000 236,500 237,000
Ø 4 Inci – 6 m Btg 357,000 362,000 367,000 377,000
Ø 6 Inci – 6 m Btg 753,500 762,500 782,500 802,500
Ø 8 Inci – 6 m Btg 1,256,000 1,296,000 1,346,000 1,396,000
Ø 10 Inci – 6 m Btg 1,906,500 1,922,500 1,972,500 2,022,500
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 23,500 24,000 24,500 25,000
Ø ¾ Inci – 4 m Btg 28,500 29,000 29,500 30,000
Ø 1 Inci – 4 m Btg 34,500 35,000 35,500 36,000
Ø 1 ½ Inci – 4 m Btg 97,500 98,000 98,500 99,000
Ø 2 Inci – 4 m Btg 153,500 154,000 154,500 155,000
Ø 2 ½ Inci – 4 m Btg 221,000 221,500 222,000 222,500
Ø 3 Inci – 4 m Btg 316,500 317,000 317,500 318,000
Ø 4 Inci – 4 m Btg 476,500 479,500 484,500 494,500
Ø 5 Inci – 4 m Btg 767,550 770,550 780,550 785,550
Ø 6 Inci – 4 m Btg 1,106,000 1,200,000 1,300,000 1,400,000
Ø 10 Inci – 4 m Btg 2,506,000 2,550,000 2,600,000 2,650,000
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 16,500 17,000 17,500 18,000
Ø ¾ Inci – 4 m Btg 26,500 27,000 27,500 28,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201531
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
Ø 1 Inci – 4 m Btg 33,500 34,000 34,500 35,000
Ø 1 ½ Inci – 4 m Btg 97,500 98,000 98,500 99,000

BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 20,500 21,000 21,500 22,000
2 Tripleks
122 X 244 x 0.2 cm Lbr 54,500 55,000 55,500 56,000
122 X 244 x 0.3 cm Lbr 72,000 72,500 73,000 73,500
122 X 244 x 0.6 cm Lbr 100,000 100,500 101,000 101,500
122 X 244 x 0.9 cm Lbr 132,000 132,500 133,000 133,500
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 92,200 107,200 122,200 137,200
4 Accoustic 40 X 60 Lbr 56,500 57,000 57,500 58,000
5 Teakwood
80 X 244 x 0.3 cm Lbr 93,000 93,500 94,000 94,500
122 X 244 x 0.3 cm Lbr 97,500 98,000 98,500 99,000
Karsiboard Lbr 71,000 71,500 72,000 72,500
Gypsum Lbr 64,500 65,000 65,500 66,000
Les gipsum Lbr 30,500 31,000 31,500 32,000
6 Hard Board 122 X 244 cm Lbr 78,000 78,500 79,000 79,500
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 49,500 50,000 50,500 51,000
8 List Profil
2 x 3 cm / 4 m Btg 12,500 13,000 13,500 14,000
3 x 3 cm / 4 m Btg 16,500 17,000 17,500 18,000
4 x 4 cm / 4 m Btg 20,500 21,000 21,500 22,000
4 x 5 cm / 4 m Btg 26,500 27,000 27,500 28,000

BAHAN ATAP
1 Genteng
Beton Biji 34,500 35,000 35,500 36,000
Keramik Bh 17,000 17,500 18,000 18,500
Asbes gelombang 7 kaki Lbr 61,000 61,500 62,000 62,500
Harfles (115X85x0.5 cm) Lbr 64,000 64,500 65,000 65,500
2 Atap Metal lbr 88,000 88,500 89,000 89,500
3 Asbes Genteng Lbr 73,500 74,000 74,500 75,000
4 Sirap Ikat 310,500 315,500 320,500 325,500
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 9,000 9,500 10,000 10,500
BJLS 0.22 mm Kaki 9,500 10,000 10,500 11,000
BJLS 0.30 mm Lbr 56,000 56,500 57,000 57,500
BJLS 0.35 mm Lbr 72,500 73,000 73,500 74,000
6 Atap Bitumen
Gelombang Acrylic Base( 200x95x0,3 Cm) Lbr 185,800 186,800 187,800 195,300
Lisplank Acrylic Bace (104x34x023cm) Lbr 113,200 114,200 115,200 116,200
Nok Acrylic Base (50x104x0.23 Cm) Lbr 113,200 114,200 115,200 116,200
Sekrup Atap 6,5 cm Bh 1,400 1,500 1,600 1,700
Sekrup Nok 6,5 cm Bh 1,400 1,500 1,600 1,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201532
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
Talang Air Acrylic Bace (104x50x0.23cm) Lbr 113,200 114,200 115,200 116,200
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 1,950 2,100 2,250 2,400
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500
Fiber Glass Gel. (transparan) Lbr 355,000 356,000 357,000 358,000
7 200x95x0.23cm
Seng Plat
BJLS 0.30 mm 40x180 Lbr 67,500 68,000 68,500 69,000
BJLS 0.35 mm Lbr 77,500 78,000 78,500 79,000
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 16,000 16,500 17,000 17,500
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 12,000 12,500 13,000 13,500
SWG 30” 0.31 mm Kaki 14,500 15,000 15,500 16,000
SWG 28” 0.38 mm Kaki 15,500 16,000 16,500 17,000
10 Seng Plastik (Fiber) Kaki 16,000 16,500 17,000 17,500
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 81,500 82,000 82,500 83,000
Super 180 X 108 X 0.6 cm Lbr 67,500 68,000 68,500 69,000
Ekonomi 240 X 92 X 0.5 cm Lbr 72,000 72,500 73,000 73,500
Ekonomi 180 X 92 X 0.4 cm Lbr 65,500 66,000 66,500 67,000
Mini 240 X 105 X 0.4 cm Lbr 65,000 65,500 66,000 66,500
Mini 180 X 92 X 0.5 cm Lbr 73,500 74,000 74,500 75,000
Super 240 X 105 X 0.4 cm Lbr 69,000 69,500 70,000 70,500
Super 180 X 105 X 0.4 cm Lbr 71,500 72,000 72,500 73,000
12 Nok/Bubungan
Genteng Beton Bh 38,000 38,500 39,000 39,500
Genteng Asbes Bh 58,000 58,500 59,000 59,500
Genteng Keramik Bh 33,000 33,500 34,000 34,500
Alm. SWG 28” -180 cm Lbr 47,500 48,000 48,500 49,000
Alm. SWG 28” –105 cm Lbr 42,500 43,000 43,500 44,000
13 Nok Steel Gelombang
Super – 180 cm Bh 55,000 55,500 56,000 56,500
Mini – 105 cm Bh 44,000 44,500 45,000 45,500
Ekonomi – 95 cm Bh 21,500 22,000 22,500 23,000
14 Nok Steel Rata
Super – 108 cm Bh 32,500 33,000 33,500 34,000
Mini – 105 cm Bh 28,000 28,500 29,000 29,500
Ekonomi – 95 cm Bh 23,500 24,000 24,500 25,000
15 Nok ½ Lingkaran Bh 43,000 43,500 44,000 44,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 12,000 12,500 13,000 13,500
Ukuran 90 Mtr 21,500 22,000 22,500 23,000

BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 175,500 176,000 176,500 177,000
Double Slag Bh 321,000 326,000 331,000 336,000
2 Penggantung
Hak Angin Kecil Bh 12,500 13,000 13,500 14,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201533
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
Hak Angin Besar Bh 27,500 28,000 28,500 29,000
Grendel Kecil Bh 15,500 16,000 16,500 17,000
Grendel Besar Bh 20,000 20,500 21,000 21,500
Engsel Pintu Bh 38,000 38,500 39,000 39,500
Engsel Jendela Bh 28,500 29,000 29,500 30,000
Expanyolet Bh 127,500 128,000 128,500 129,000

BAHAN SANITER
Kloset Jongkok Bh 237,000 237,500 238,000 238,500
Kloset Duduk Bh 2,007,500 2,008,500 2,009,500 2,010,500
Wasthafel warna Bh 482,500 483,500 484,500 485,500
Wasthafel cuci piring logam Bh 458,500 459,500 460,500 461,500
Pompa Mesin Bh 1,901,000 1,926,000 1,951,000 1,976,000
Urinoir lengkap Bh 1,581,000 1,606,000 1,631,000 1,636,000
Bak Mandi fiber Bh 776,000 781,000 786,000 791,000
Reservoir fiber = 1 m3 Bh 1,286,000 1,296,000 1,301,000 1,306,000
Reservoir Stainless stell = 1 m3 Bh 3,601,000 3,651,000 3,701,000 3,751,000
Stop Kran Bh 28,000 28,500 29,000 29,500
Kran Air Bh 22,500 23,000 23,500 24,000

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 63,000 63,500 64,000 64,500
Cat Kilap 5 Kg 93,000 93,500 94,000 94,500
2 Cat Kayu
Cat Dasar Kg 22,500 23,000 23,500 24,000
Cat Kilap Ltr 63,500 64,000 64,500 65,000
Palatone Ltr 53,000 53,500 54,000 54,500
ICI Kg 78,000 78,500 79,000 79,500
Politur Kg 53,500 54,000 54,500 55,000
Meni 4 Kg 68,000 68,500 69,000 69,500
Minyak Cat Ltr 12,500 13,000 13,500 14,000
3 Cat Atap
Cat Dasar Kg 32,500 33,000 33,500 34,000
Cat Kilap Ltr 92,500 93,000 93,500 94,000
Lem Seng Ltr 15,500 16,000 16,500 17,000
Amplas/Kertas Gosok Lbr 14,500 15,000 15,500 16,000
Dempul Kg 33,000 33,500 34,000 34,500
Residu 10 ltr 66,000 66,500 67,000 67,500

BAHAN INSTALASI LISTRIK


Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 303,500 304,000 304,500 305,000
2 ½ mm Roll 402,000 407,000 412,000 417,000
2 Type NYY
2 X 1 ½ mm Roll 638,000 653,000 653,500 654,000
2 X 2 ½ mm Roll 797,500 807,500 812,500 822,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201534
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
2 X 4 mm Roll 672,500 677,500 682,500 687,500
3 Lampu TL
1 X 20 W Bh 96,500 97,000 97,500 98,000
2 X 20 W Bh 125,500 126,000 126,500 127,000
1 X 40 W Bh 119,500 120,000 120,500 121,000
2 X 40 W Bh 152,500 153,000 153,500 154,000
4 Lampu Pijar
25 W Bh 34,500 35,000 35,500 36,000
40 W Bh 58,500 59,000 59,500 60,000
60 W Bh 108,500 109,000 109,500 110,000
100 W Bh 190,500 191,000 191,500 192,000
Lampu Taman Mercury Bh 374,500 379,500 384,500 389,500
5 Saklar Phase
Tunggal Putih Bh 25,500 26,000 26,500 27,000
Tunggal Hitam Bh 20,500 21,000 21,500 22,000
Double Putih Bh 28,500 29,000 29,500 30,000
Double Hitam Bh 23,500 24,000 24,500 25,000
6 Stop Kontak
Hitam Bh 28,500 29,000 29,500 30,000
Putih Bh 30,500 31,000 31,500 32,000
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 85,500 86,000 86,500 87,000
Lokal 3 Group Biasa Bh 98,000 98,500 99,000 99,500
Fitting Bh 18,000 18,500 19,000 19,500

BAHAN JALAN
Aspal Kg 17,500 18,000 18,500 19,000
Minyak Tanah Ltr 12,500 13,000 13,500 14,000
Minyak Solar Ltr 7,000 7,500 8,000 8,500
Minyak Pelumas Ltr 30,500 31,000 31,500 32,000

UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201535
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN BANTAENG BULUKUMBA SINJAI SELAYAR
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201536
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
PINRANG, ENREKANG, TANA TORAJA DAN TORAJA UTARA
TAHUN 2015
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
BAHAN DASAR
1 Batu Kali
Utuh M³ 257,000 262,000 272,000 277,000
Batu pecah 7 - 10 cm M³ 239,000 297,650 247,000 247,000
Batu pecah 5 - 7 cm M³ 252,000 314,400 262,000 267,000
Batu pecah 3 - 5 cm M³ 287,000 297,650 297,000 350,000
Batu pecah 2 - 3 cm M³ 252,000 328,200 259,000 350,000
Batu pecah 1 - 2 cm M³ 327,000 333,500 311,000 375,000
Batu pecah 0.51 - 1 cm M³ 317,000 367,200 320,000 375,000
2 Batu Merah Buah 700 700 700 700
3 Batu Gunung M³ 260,000 267,550 270,000 275,000
4 Batu Alam
Andesit Biasa M² 188,500 189,000 189,500 190,000
Andesit Susun Sirih M² 287,500 288,000 288,500 289,000
Andesit Halus M² 187,500 188,000 188,500 189,000
Andesit Gelombang M² 198,500 199,000 199,500 200,000
Batu Candi Permukaan Rata M² 177,500 178,000 178,500 179,000
Batu Palimanan Kuning M² 182,500 183,000 183,500 184,000
Batu Hijau Sukabumi M² 172,500 173,000 173,500 174,000
Batu Bali Green M² 168,500 169,000 169,500 170,000
Batu Bali Napoli M² 187,500 188,000 188,500 189,000
Paras Jokja Besar M² 182,500 183,000 183,500 184,000
Batu Cirebon Beraturan M² 148,500 149,000 149,500 150,000
Batu Cirebon Tidak Beraturan M² 127,500 128,000 128,500 129,000
5 Tanah Timbunan M³ 172,000 174,000 182,000 191,000
6 Pasir
Timbunan / Urug M³ 197,000 192,500 187,500 150,000
Pasangan M³ 248,000 237,500 258,000 260,000
Beton M³ 257,000 265,000 260,000 262,000
7 Kerikil M³ 309,000 307,000 310,000 325,000
8 Sirtu M³ 217,000 221,000 223,000 225,000
9 Kapur Pasangan Zak 63,000 68,000 73,000 78,000
10 Semen PC (40 kg) Zak 55,500 55,500 60,500 60,500
11 Semen Putih (50 Kg) Zak 84,200 93,200 65,000 70,000
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,208,500 1,209,000 1,209,500 1,210,000
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 74,000 74,500 75,000 75,500
PM 210 (50 Kg) Plesteran Zak 64,000 64,500 65,000 65,500
PM 310 (40 Kg) Acian Zak 69,000 69,500 70,000 70,500
12 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 59,500 60,000 60,500 61,000
Tabal 8 Cm M² 64,500 65,000 65,500 66,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201537
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
Berlian M² 66,000 66,000 66,500 67,000
13 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 53,500 58,500 54,500 55,000
Tabal 8 Cm M² 57,500 62,400 58,500 59,000
14 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 60,500 66,300 61,500 62,000
Tebal 8 cm M² 65,500 70,200 66,500 67,000
15 Paving Blok Mutu (K 400) M² 71,500 75,000 72,500 73,000
16 Topiuskup (K 225) biji 5,500 6,000 6,500 7,000
16 Kanstin 20x25x50 biji 41,500 42,000 42,500 43,000
17 Buis Beton
d=20 cm Biji 255,500 256,000 256,500 257,000
d=30 cm Biji 296,500 297,000 297,500 298,000
d=40 cm Biji 367,000 367,500 368,000 368,500
d=50 cm Biji 426,500 427,000 427,500 428,000
d=60 cm Biji 482,500 483,000 483,500 484,000

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 13,750,000 13,950,000 13,950,000 13,950,000
Papan Gergaji Sawmil M³ 14,450,000 14,550,000 14,550,000 14,550,000
Balok Gergaji Sansaw M³ 12,350,000 12,450,000 12,600,000 12,700,000
Papan Gergaji Sansaw M³ 13,500,000 13,150,000 13,250,000 13,350,000
2 Kayu Kelas II
Balok M³ 5,350,000 5,400,000 5,450,000 5,500,000
Papan M³ 6,650,000 7,035,600 5,850,000 5,900,000
3 Kayu Kelas III
Balok M³ 2,900,000 3,581,500 3,150,000 3,200,000
Papan M³ 3,250,000 3,979,900 3,750,000 3,750,000

BAHAN LANTAI
1 Tegel Keramik
Putih 10 X 20 cm Dos 47,500 48,000 55,000 60,000
Warna 10 X 20 cm Dos 49,500 50,000 50,500 51,000
Putih 20 X 20 cm Dos 50,500 51,000 60,000 60,000
Warna 20 X 20 cm Dos 60,000 61,000 64,000 65,000
Putih 20 X 25 cm Dos 50,500 51,000 57,000 58,000
Warna 20 X 25 cm Dos 58,500 59,000 63,000 63,500
Putih 30 X 30 cm Dos 51,500 52,000 59,000 60,000
Warna 30 X 30 cm Dos 56,500 57,000 61,000 65,000
Putih 40 X 40 cm Dos 58,500 59,000 62,000 60,000
Warna 40 X 40 cm Dos 60,500 61,000 64,000 65,000
Warna 50 x 50 Dos 137,500 138,000 138,500 139,000
Warna 60 x 60 Dos 177,500 178,000 178,500 179,000

BAHAN KACA
Kaca Bening 3 mm Mtr 102,500 103,000 103,500 104,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201538
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
Kaca Bening 5 mm Mtr 127,500 128,000 128,500 129,000
Kaca Buram 3 mm Mtr 102,500 103,000 103,500 104,000
Kaca Buram 5 mm Mtr 112,500 113,000 113,500 114,000
Kaca Ryben 3 mm Mtr 152,500 153,000 153,500 154,000
Kaca Ryben 5 mm Mtr 177,500 178,000 178,500 179,000
Rangka Nako Lengkap Terali 7 mata Set/daun 352,500 353,000 353,500 354,000

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 26,500 27,000 27,500 28,000
Ø 6 mm Btg 37,500 38,000 38,500 39,000
Ø 8 mm Btg 52,500 57,000 54,500 54,000
Ø 10 mm Btg 77,500 78,000 78,500 79,000
Ø 12 mm Btg 108,500 109,000 109,500 110,000
Ø 14 mm Btg 133,500 159,700 138,500 135,000
Ø 16 mm Btg 167,500 168,000 168,500 169,000
Ø 19 mm Btg 244,500 251,400 255,000 256,000
Ø 22 mm Btg 327,500 328,000 328,500 329,000
2 Besi Ulir
d = 12 mm Btg 112,500 113,000 113,500 115,000
d = 16 mm Btg 167,500 168,000 168,500 169,000
d = 19 mm Btg 229,500 230,000 230,500 231,000
3 Paku
Paku Biasa Kg 20,000 20,500 21,000 21,500
Paku Asbes Kg 47,500 48,000 48,500 49,000
Paku Seng (payung) RRT Dos 25,500 26,000 26,500 27,000
Paku skrup 3 ½ inci Dos 15,400 25,000 25,100 25,200
Paku Skrup 4 Inci Dos 15,400 22,300 15,600 15,700
Paku Payung Berulir 75 mm Kg 40,000 40,500 41,000 41,500
Paku Sirap Kg 23,500 24,000 24,500 25,000
Paku Beton Hitam Dos 47,000 47,500 48,000 48,500
Paku Beton Putih Dos 31,000 31,500 32,000 32,500
4 Kawat
Beton Kg 23,500 26,600 24,500 25,000
Nyamuk Mtr 32,500 33,000 33,500 34,000
Ayakan Kecil mtr 28,500 29,000 29,500 30,000
Duri roll 156,000 164,500 180,000 190,000
5 Besi Plat
2mm=120x240 mm Lbr 601,000 621,000 750,000 766,000
3 mm = 120 X 240 mm Lbr 551,000 561,000 571,000 576,000
Besi H 15 cm Panjang 12 m Btg 4,880,500 4,905,500 4,935,500 4,960,500
6 Besi Strep
30.3 mm Btg 36,500 37,000 37,500 38,000
35.4 mm Btg 57,500 58,000 58,500 59,000
46.4 mm Btg 50,100 52,500 54,200 56,500
40.6 mm Btg 77,500 78,000 78,500 79,000
50.6 mm Btg 132,500 133,000 133,500 134,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201539
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
7 Besi Siku
30.30.3 Btg 78,900 79,400 79,900 80,400
40.40.4 Btg 148,500 149,000 149,500 150,000
40.40.3 Btg 68,000 68,500 69,000 69,500
50.50.4 Btg 103,500 104,000 104,500 105,000
50.50.5 Btg 232,500 233,000 233,500 234,000
60.60.6 Btg 341,500 351,500 361,500 371,500
70.70.7 Btg 371,500 376,500 381,500 386,500
8 Besi 6 mm Mtr 22,500 23,000 23,500 24,000
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 181,000 204,150 210,150 220,450
Lebar 12,5, tebal 1,8 -2,00 mm Btg 200,700 224,000 239,000 239,500
Lebar 15,Tebal 1,8 – 2,00 mm Btg 223,000 223,500 224,000 224,500

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 130,200 130,700 131,200 131,700
Ø ¾ Inci – 6 m Btg 121,700 122,200 122,700 123,200
Ø 1Inci – 6 m Btg 254,200 254,700 255,200 255,700
Ø 2 Inci – 6 m Btg 555,700 560,700 570,700 580,700
Ø 2 ½ Inci – 6 m Btg 116,500 123,500 128,500 138,500
Ø 3 Inci – 6 m Btg 164,000 189,000 214,000 239,000
2 Pipa PVC Air Bersih
Ø ½ Inci – 6 m Btg 25,500 30,000 30,500 31,000
Ø ¾ Inci – 6 m Btg 32,500 37,000 32,000 32,000
Ø 1 Inci – 6 m Btg 37,000 48,500 38,000 38,500
Ø 1½ Inci – 6 m Btg 47,000 48,500 82,000 82,500
Ø 2 Inci – 6 m Btg 116,500 117,000 117,500 118,000
Ø 2 ½ Inci – 6 m Btg 164,000 164,500 165,000 165,500
Ø 3 Inci – 6 m Btg 235,500 236,000 236,500 237,000
Ø 4 Inci – 6 m Btg 357,000 362,000 367,000 372,000
Ø 6 Inci – 6 m Btg 753,000 763,000 773,000 783,000
Ø 8 Inci – 6 m Btg 1,255,500 1,305,500 1,355,500 1,405,500
Ø 10 Inci – 6 m Btg 1,906,000 1,920,000 1,970,000 2,020,000
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 23,500 24,000 24,500 25,000
Ø ¾ Inci – 4 m Btg 28,500 29,000 29,500 30,000
Ø 1 Inci – 4 m Btg 34,500 35,000 38,500 36,000
Ø 1 ½ Inci – 4 m Btg 97,500 98,000 98,500 99,000
Ø 2 Inci – 4 m Btg 153,500 154,000 154,500 155,000
Ø 2 ½ Inci – 4 m Btg 221,000 221,500 222,000 222,500
Ø 3 Inci – 4 m Btg 316,500 317,000 317,500 318,000
Ø 4 Inci – 4 m Btg 476,500 479,500 484,500 489,500
Ø 5 Inci – 4 m Btg 767,550 770,550 780,550 785,550
Ø 6 Inci – 4 m Btg 1,106,000 1,200,000 1,300,000 1,400,000
Ø 10 Inci – 4 m Btg 2,506,000 2,550,000 2,600,000 2,650,000
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 18,000 18,500 19,000 19,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201540
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
Ø ¾ Inci – 4 m Btg 28,000 28,500 29,000 29,500
Ø 1 Inci – 4 m Btg 35,000 35,500 36,000 36,500
Ø 1 ½ Inci – 4 m Btg 99,000 99,500 100,000 100,500

BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 21,000 21,500 22,000 22,500
2 Tripleks
122 X 244 x 0.2 cm Lbr 55,000 55,500 56,000 56,500
122 X 244 x 0.3 cm Lbr 72,500 73,000 73,500 74,000
122 X 244 x 0.6 cm Lbr 100,500 101,000 101,500 102,000
122 X 244 x 0.9 cm Lbr 132,500 133,000 133,500 134,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 86,500 87,000 87,500 88,000
4 Accoustic 40 X 60 Lbr 56,500 57,000 57,500 58,000
5 Teakwood
80 X 244 x 0.3 cm Lbr 93,000 93,500 94,000 94,500
122 X 244 x 0.3 cm Lbr 97,500 98,000 98,500 99,000
Karsiboard Lbr 71,000 71,500 72,000 72,500
Gypsum Lbr 64,500 65,000 65,500 66,000
Les gipsum Lbr 30,500 31,000 31,500 32,000
6 Hard Board 122 X 244 cm Lbr 78,000 78,500 79,000 79,500
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 49,500 50,000 50,500 51,000
8 List Profil
2 x 3 cm / 4 m Btg 12,500 13,000 14,000 14,500
3 x 3 cm / 4 m Btg 16,500 17,000 17,500 18,000
4 x 4 cm / 4 m Btg 20,500 21,000 21,500 22,000
4 x 5 cm / 4 m Btg 26,500 27,000 27,500 28,000

BAHAN ATAP
1 Genteng
Beton Biji 34,500 35,000 35,500 36,000
Keramik Bh 17,000 17,500 18,000 18,500
Asbes gelombang 7 kaki Lbr 61,000 61,500 62,000 62,500
Harfles (115X85x0.5 cm) Lbr 64,000 64,500 65,000 65,500
2 Atap Metal lbr 88,000 88,500 89,000 89,500
3 Asbes Genteng Lbr 73,500 74,000 74,500 75,000
4 Sirap Ikat 310,500 315,500 320,500 325,500
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 9,000 9,500 10,000 10,500
BJLS 0.22 mm Kaki 9,500 10,000 10,500 11,000
BJLS 0.30 mm Lbr 56,000 56,500 57,000 57,500
BJLS 0.35 mm Kaki 9,000 9,500 10,000 10,500
6 Atap Bitumen
Gelombang Acrylic Base( 200x95x0,3 Cm) Lbr 186,800 188,300 189,800 191,300
Lisplank Acrylic Bace (104x34x023cm) Lbr 114,200 115,700 117,200 118,700
Nok Acrylic Base (50x104x0.23 Cm) Lbr 114,200 115,700 117,200 118,700
Sekrup Atap 6,5 cm Bh 1,500 1,600 1,700 1,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201541
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
Sekrup Nok 6,5 cm Bh 1,500 1,600 1,700 1,800
Talang Air Acrylic Bace (104x50x0.23cm) Lbr 114,200 115,700 117,200 118,700
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 2,100 2,250 2,400 2,550
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500
Fiber Glass Gel. (transparan) Lbr 356,000 357,500 359,000 360,500
7 200x95x0.23cm
Seng Plat
BJLS 0.30 mm 40x180 Lbr 67,500 68,000 68,500 69,000
BJLS 0.35 mm Lbr 77,500 78,000 78,500 79,000
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 15,500 16,000 16,500 17,000
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 12,000 12,500 13,000 13,500
SWG 30” 0.31 mm Kaki 14,500 15,000 15,500 16,000
SWG 28” 0.38 mm Kaki 15,500 16,000 16,500 17,000
10 Seng Plastik (Fiber) Kaki 16,000 16,500 17,000 17,500
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 81,500 82,000 82,500 83,000
Super 180 X 108 X 0.6 cm Lbr 67,500 68,000 68,500 69,000
Ekonomi 240 X 92 X 0.5 cm Lbr 72,000 72,500 73,000 73,500
Ekonomi 180 X 92 X 0.4 cm Lbr 65,500 66,000 66,500 67,000
Mini 240 X 105 X 0.4 cm Lbr 65,000 65,500 66,000 66,500
Mini 180 X 92 X 0.5 cm Lbr 73,500 74,000 74,500 75,000
Super 240 X 105 X 0.4 cm Lbr 69,000 69,500 70,000 70,500
Super 180 X 105 X 0.4 cm Lbr 71,500 72,000 72,500 73,000
12 Nok/Bubungan
Genteng Beton Bh 38,000 38,500 39,000 39,500
Genteng Asbes Bh 58,000 58,500 59,000 59,500
Genteng Keramik Bh 23,000 23,500 24,000 24,500
Alm. SWG 28” -180 cm Lbr 47,500 48,000 48,500 49,000
Alm. SWG 28” –105 cm Lbr 42,500 43,000 43,500 44,000
13 Nok Steel Gelombang
Super – 180 cm Bh 55,000 55,500 56,000 56,500
Mini – 105 cm Bh 44,000 44,500 45,000 45,500
Ekonomi – 95 cm Bh 21,500 22,000 22,500 23,000
14 Nok Steel Rata
Super – 108 cm Bh 32,500 33,000 33,500 34,000
Mini – 105 cm Bh 28,000 28,500 29,000 29,500
Ekonomi – 95 cm Bh 23,500 24,000 24,500 25,000
15 Nok ½ Lingkaran Bh 43,000 43,500 44,000 44,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 12,000 12,500 13,000 13,500
Ukuran 90 Mtr 21,500 22,000 22,500 23,000

BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 175,500 176,000 176,500 177,000
Double Slag Bh 322,000 326,000 331,000 336,000
2 Penggantung

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201542
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
Hak Angin Kecil Bh 13,000 13,500 14,000 14,500
Hak Angin Besar Bh 18,000 18,500 19,000 19,500
Grendel Kecil Bh 16,000 16,500 17,000 17,500
Grendel Besar Bh 20,000 20,500 21,000 21,500
Engsel Pintu Bh 38,000 38,500 39,000 39,500
Engsel Jendela Bh 28,500 29,000 29,500 30,000
Expanyolet Bh 127,500 128,000 128,500 129,000

BAHAN SANITER
Kloset Jongkok Bh 237,000 237,500 280,000 238,500
Kloset Duduk (lengkap) Bh 2,007,500 2,008,500 2,009,500 2,010,500
Wasthafel warna Bh 482,500 483,500 484,500 485,500
Wasthafel cuci piring logam Bh 458,500 459,500 460,500 461,500
Pompa Mesin Bh 1,901,000 1,926,000 1,951,000 1,976,000
Urinoir lengkap Bh 1,581,000 1,606,000 1,631,000 1,636,000
Bak Mandi fiber Bh 776,000 781,000 786,000 791,000
Reservoir fiber = 1 m3 Bh 1,286,000 1,296,000 1,301,000 1,306,000
Reservoir Stainless stell = 1 m3 Bh 3,601,000 3,651,000 3,701,000 3,751,000
Stop Kran Bh 28,000 28,500 29,000 29,500
Kran Air Bh 22,500 23,000 23,500 24,000

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 63,000 63,500 64,000 64,500
Cat Kilap 5 Kg 93,000 93,500 94,000 94,500
2 Cat Kayu
Cat Dasar Kg 22,500 23,000 23,500 24,000
Cat Kilap Ltr 63,500 64,000 64,500 65,000
Palatone Ltr 53,000 53,500 54,000 54,500
ICI Kg 78,000 78,500 79,000 79,500
Politur Kg 53,500 54,000 54,500 55,000
Meni 4 Kg 68,000 68,500 69,000 69,500
Minyak Cat Ltr 12,500 13,000 13,500 14,000
3 Cat Atap
Cat Dasar Kg 32,500 33,000 35,000 35,500
Cat Kilap Ltr 92,500 93,000 93,500 94,000
Lem Seng Ltr 15,500 16,000 16,500 17,000
Amplas/Kertas Gosok Lbr 14,500 15,000 15,500 16,000
Dempul Kg 33,500 34,000 34,500 35,000
Residu 10 ltr 66,500 67,000 67,500 68,000

BAHAN INSTALASI LISTRIK


Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 303,500 304,000 304,500 305,000
2 ½ mm Roll 402,000 407,000 412,000 417,000
2 Type NYY
2 X 1 ½ mm Roll 638,000 653,000 658,000 663,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201543
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
2 X 2 ½ mm Roll 797,500 807,500 812,500 822,500
2 X 4 mm Roll 672,500 677,500 682,500 687,500
3 Lampu TL
1 X 20 W Bh 96,500 97,000 97,500 98,000
2 X 20 W Bh 125,500 126,000 126,500 127,000
1 X 40 W Bh 119,500 120,000 120,500 121,000
2 X 40 W Bh 152,500 153,000 153,500 154,000
4 Lampu Pijar
25 W Bh 34,500 35,000 35,500 36,000
40 W Bh 58,500 59,000 59,500 60,000
60 W Bh 108,500 109,000 109,500 110,000
100 W Bh 190,500 191,000 191,500 192,000
Lampu Taman Mercury Bh 374,500 379,500 384,500 389,500
5 Saklar Phase
Tunggal Putih Bh 25,500 26,000 26,500 27,000
Tunggal Hitam Bh 20,500 21,000 21,500 22,000
Double Putih Bh 28,500 29,000 29,500 30,000
Double Hitam Bh 23,500 24,000 24,500 25,000
6 Stop Kontak
Hitam Bh 28,500 29,000 29,500 30,000
Putih Bh 30,500 31,000 31,500 32,000
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 85,500 86,000 86,500 87,000
Lokal 3 Group Biasa Bh 98,000 98,500 99,000 99,500
Fitting Bh 18,000 18,500 19,000 19,500

BAHAN JALAN
Aspal Kg 17,500 18,000 18,500 19,000
Minyak Tanah Ltr 12,500 13,000 13,500 14,000
Minyak Solar Ltr 12,000 12,000 12,000 12,000
Minyak Pelumas Ltr 30,500 31,000 31,500 32,000

UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201544
Dalam Rupiah (Rp)
TANA TORAJA
NO JENIS BAHAN SATUAN PINRANG ENREKANG
TORAJA UTARA
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201545
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
LUWU, PALOPO, LUWU UTARA DAN LUWU TIMUR
TAHUN 2015
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
BAHAN DASAR
1 Batu Kali
Utuh M³ 164,000 169,000 173,000 178,000
Batu pecah 7 - 10 cm M³ 202,000 217,000 222,000 232,000
Batu pecah 5 - 7 cm M³ 232,000 237,000 242,000 247,000
Batu pecah 3 - 5 cm M³ 254,000 259,000 263,000 267,000
Batu pecah 2 - 3 cm M³ 262,000 267,000 272,000 277,000
Batu pecah 1 - 2 cm M³ 302,000 312,000 317,000 322,000
Batu pecah 0.5 - 1 cm M³ 322,000 327,000 332,000 342,000
2 Batu Merah Buah 600 600 650 700
3 Batu Gunung M³ 170,000 173,000 195,000 200,000
4 Batu Alam
Andesit Biasa M² 190,000 190,500 191,000 191,500
Andesit Susun Sirih M² 289,000 289,500 290,000 290,500
Andesit Halus M² 189,000 189,500 190,000 190,500
Andesit Gelombang M² 200,000 200,500 201,000 201,500
Batu Candi Permukaan Rata M² 179,000 179,500 180,000 180,500
Batu Palimanan Kuning M² 184,000 184,500 185,000 185,500
Batu Hijau Sukabumi M² 174,000 174,500 175,000 175,500
Batu Bali Green M² 170,000 170,500 171,000 171,500
Batu Bali Napoli M² 189,000 189,500 190,000 190,500
Paras Jokja Besar M² 184,000 184,500 185,000 185,500
Batu Cirebon Beraturan M² 150,000 150,500 151,000 151,500
Batu Cirebon Tidak Beraturan M² 129,000 129,500 130,000 130,500
5 Tanah Timbunan M³ 157,000 158,000 160,000 162,000
6 Pasir
Timbunan / Urug M³ 153,000 155,000 156,000 159,000
Pasangan M³ 153,000 148,000 151,000 153,000
Beton M³ 147,000 149,000 152,000 154,000
7 Kerikil M³ 277,000 279,000 282,000 284,000
8 Sirtu M³ 154,000 157,000 159,000 167,000
9 Kapur Pasangan Zak 78,000 78,500 79,000 79,500
10 Semen PC (40 kg) Zak 55,500 56,500 57,500 58,500
11 Semen Putih (50 Kg) Zak 70,000 70,500 71,000 71,500
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,210,000 1,210,500 1,211,000 1,211,500
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 75,500 76,000 76,500 77,000
PM 210 (50 Kg) Plesteran Zak 65,500 66,000 66,500 67,000
PM 310 (40 Kg) Acian Zak 70,500 71,000 71,500 72,000
12 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 59,500 60,000 60,500 61,000
Tebal 8 Cm M² 66,000 66,500 67,000 67,500
Berlian M² 57,000 57,500 58,000 58,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201546
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
13 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 55,000 55,500 56,000 56,500
Tabal 8 Cm M² 59,000 59,500 60,000 60,500
14 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 62,000 62,500 63,000 63,500
Tebal 8 cm M² 67,000 67,500 68,000 68,500
15 Paving Blok Mutu (K 400) M² 73,000 73,500 74,000 74,500
16 Topiuskup (K 225) biji 7,000 7,500 8,000 8,500
16 Kanstin 20x25x50 biji 43,000 43,500 44,000 44,500
17 Buis Beton
d=20 cm Biji 257,000 257,500 258,000 258,500
d=30 cm Biji 298,000 298,500 299,000 299,500
d=40 cm Biji 368,500 369,000 369,500 370,000
d=50 cm Biji 428,000 428,500 429,000 429,500
d=60 cm Biji 484,000 484,500 485,000 485,500

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 9,750,000 9,850,000 9,950,000 9,850,000
Papan Gergaji Sawmil M³ 9,550,000 9,350,000 9,450,000 9,250,000
Balok Gergaji Sansaw M³ 6,650,000 6,850,000 6,900,000 6,950,000
Papan Gergaji Sansaw M³ 6,750,000 7,550,000 7,600,000 7,650,000
2 Kayu Kelas II
Balok M³ 4,450,000 5,225,000 5,200,000 4,300,000
Papan M³ 4,075,000 5,800,000 4,900,000 4,425,000
3 Kayu Kelas III
Balok M³ 3,850,000 3,875,000 4,350,000 3,850,000
Papan M³ 3,675,000 3,600,000 3,750,000 3,800,000
BAHAN LANTAI
1 Tegel Keramik
Putih 10 X 20 cm Dos 49,000 49,500 50,000 50,500
Warna 10 X 20 cm Dos 51,000 51,500 52,000 52,500
Putih 20 X 20 cm Dos 52,000 52,500 53,000 53,500
Warna 20 X 20 cm Dos 56,000 56,500 57,000 57,500
Putih 20 X 25 cm Dos 52,000 52,500 53,000 53,500
Warna 20 X 25 cm Dos 63,500 64,000 64,500 65,000
Putih 30 X 30 cm Dos 53,000 53,500 54,000 54,500
Warna 30 X 30 cm Dos 58,000 58,500 59,000 59,500
Putih 40 X 40 cm Dos 60,000 60,500 61,000 61,500
Warna 40 X 40 cm Dos 62,000 62,500 63,000 63,500
Warna 50 x 50 Dos 139,000 139,500 140,000 140,500
Warna 60 x 60 Dos 179,000 179,500 180,000 180,500

BAHAN KACA
Kaca Bening 3 mm Mtr 104,000 104,500 105,000 105,500
Kaca Bening 5 mm Mtr 129,000 129,500 130,000 130,500
Kaca Buram 3 mm Mtr 104,000 104,500 105,000 105,500
Kaca Buram 5 mm Mtr 114,000 114,500 115,000 115,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201547
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
Kaca Ryben 3 mm Mtr 154,000 154,500 155,000 155,500
Kaca Ryben 5 mm Mtr 179,000 179,500 180,000 180,500
Rangka Nako Lengkap Terali 7 mata Set/daun 354,000 354,500 355,000 355,500

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 28,000 28,500 29,000 29,500
Ø 6 mm Btg 39,000 39,500 40,000 40,500
Ø 8 mm Btg 54,000 54,500 55,000 55,500
Ø 10 mm Btg 79,000 79,500 80,000 80,500
Ø 12 mm Btg 110,000 110,500 111,000 111,500
Ø 14 mm Btg 135,000 135,500 136,000 136,500
Ø 16 mm Btg 169,000 169,500 170,000 170,500
Ø 19 mm Btg 216,000 216,500 217,000 217,500
Ø 22 mm Btg 329,000 329,500 330,000 330,500
2 Besi Ulir
d = 12 mm Btg 115,000 115,500 116,000 116,500
d = 16 mm Btg 169,000 169,500 170,000 170,500
d = 19 mm Btg 231,000 231,500 232,000 232,500
3 Paku
Paku Biasa Kg 21,500 22,000 22,500 23,000
Paku Asbes Kg 49,000 49,500 50,000 50,500
Paku Seng (payung) RRT Dos 27,000 27,500 28,000 28,500
Paku skrup 3 ½ inci Dos 25,200 25,300 25,400 25,500
Paku Skrup 4 Inci Dos 15,700 15,800 15,900 16,000
Paku Payung Berulir 75 mm Kg 41,500 42,000 42,500 43,000
Paku Sirap Kg 25,000 25,500 26,000 26,500
Paku Beton Hitam Dos 48,500 49,000 49,500 50,000
Paku Beton Putih Dos 32,500 33,000 33,500 34,000
4 Kawat
Beton Kg 25,000 25,500 26,000 26,500
Nyamuk Mtr 34,000 34,500 35,000 35,500
Ayakan Kecil mtr 30,000 30,500 31,000 31,500
Duri roll 157,500 158,000 158,500 159,000
5 Besi Plat
2mm=120x240 mm Lbr 466,000 476,000 486,000 491,000
3 mm = 120 X 240 mm Lbr 576,000 586,000 596,000 601,000
Besi H 15 cm Panjang 12 m Btg 4,960,500 4,985,500 5,015,500 5,035,500
6 Besi Strep
30.3 mm Btg 38,000 38,500 39,000 39,500
35.4 mm Btg 59,000 59,500 60,000 60,500
46.4 mm Btg 109,000 109,500 110,000 110,500
40.6 mm Btg 79,000 79,500 80,000 80,500
50.6 mm Btg 134,000 134,500 135,000 135,500
7 Besi Siku
30.30.3 Btg 80,400 80,900 81,400 81,900
40.40.4 Btg 150,000 150,500 151,000 151,500
40.40.3 Btg 69,500 70,000 70,500 71,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201548
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
50.50.4 Btg 105,000 105,500 106,000 106,500
50.50.5 Btg 234,000 234,500 235,000 235,500
60.60.6 Btg 371,500 381,500 391,500 401,500
70.70.7 Btg 386,500 391,500 396,500 401,500
8 Besi 6 mm Mtr 24,500 25,000 25,500 26,000
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 143,000 143,500 144,000 144,500
Lebar 12,5, tebal 1,8 -2,00 mm Btg 170,000 170,500 171,000 171,500
Lebar 15,Tebal 1,8 – 2,00 mm Btg 225,000 225,500 226,000 226,500

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 132,200 132,700 133,200 133,700
Ø ¾ Inci – 6 m Btg 123,700 124,200 124,700 125,200
Ø 1Inci – 6 m Btg 256,200 256,700 257,200 257,700
Ø 2 Inci – 6 m Btg 581,200 591,200 601,200 611,200
Ø 2 ½ Inci – 6 m Btg 139,000 146,000 151,000 156,000
Ø 3 Inci – 6 m Btg 239,500 264,500 289,500 314,500
2 Pipa PVC Air Bersih
Ø ½ Inci – 4 m Btg 25,500 26,000 26,500 27,000
Ø ¾ Inci – 6 m Btg 30,500 31,000 31,500 32,000
Ø 1 Inci – 6 m Btg 39,000 39,500 40,000 40,500
Ø 1½ Inci – 6 m Btg 83,000 83,500 84,000 84,500
Ø 2 Inci – 6 m Btg 118,500 119,000 119,500 120,000
Ø 2 ½ Inci – 6 m Btg 166,000 166,500 167,000 167,500
Ø 3 Inci – 6 m Btg 237,500 238,000 238,500 239,000
Ø 4 Inci – 6 m Btg 372,500 382,500 387,500 392,500
Ø 6 Inci – 6 m Btg 783,500 792,500 802,500 812,500
Ø 8 Inci – 6 m Btg 1,406,000 1,446,000 1,486,000 1,516,000
Ø 10 Inci – 6 m Btg 2,020,500 2,070,500 2,120,500 2,170,500
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 25,500 26,000 26,500 27,000
Ø ¾ Inci – 4 m Btg 30,500 31,000 31,500 32,000
Ø 1 Inci – 4 m Btg 36,500 37,000 37,500 38,000
Ø 1 ½ Inci – 4 m Btg 99,500 100,000 100,500 101,000
Ø 2 Inci – 4 m Btg 155,500 156,000 156,500 157,000
Ø 2 ½ Inci – 4 m Btg 223,000 223,500 224,000 224,500
Ø 3 Inci – 4 m Btg 318,500 319,000 319,500 320,000
Ø 4 Inci – 4 m Btg 490,000 495,000 500,000 505,000
Ø 5 Inci – 4 m Btg 786,050 791,050 801,050 806,050
Ø 6 Inci – 4 m Btg 1,400,500 1,494,500 1,594,500 1,694,500
Ø 10 Inci – 4 m Btg 2,650,500 2,700,500 2,750,500 2,800,500
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 20,000 20,500 21,000 21,500
Ø ¾ Inci – 4 m Btg 30,000 30,500 31,000 31,500
Ø 1 Inci – 4 m Btg 37,000 37,500 38,000 38,500
Ø 1 ½ Inci – 4 m Btg 101,000 101,500 102,000 102,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201549
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 23,000 23,500 24,000 24,500
2 Tripleks
122 X 244 x 0.2 cm Lbr 57,000 57,500 58,000 58,500
122 X 244 x 0.3 cm Lbr 74,500 75,000 75,500 76,000
122 X 244 x 0.6 cm Lbr 102,500 103,000 103,500 104,000
122 X 244 x 0.9 cm Lbr 134,500 135,000 135,500 136,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 88,500 89,000 89,500 90,000
4 Accoustic 40 X 60 Lbr 58,500 59,000 59,500 60,000
5 Teakwood
80 X 244 x 0.3 cm Lbr 95,000 95,500 96,000 96,500
122 X 244 x 0.3 cm Lbr 99,500 100,000 100,500 101,000
Karsiboard Lbr 73,000 73,500 74,000 74,500
Gypsum Lbr 66,500 67,000 67,500 68,000
Les gipsum Lbr 32,500 33,000 33,500 34,000
6 Hard Board 122 X 244 cm Lbr 80,000 80,500 81,000 81,500
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 51,500 52,000 52,500 53,000
8 List Profil
2 x 3 cm / 4 m Btg 15,000 15,500 16,000 16,500
3 x 3 cm / 4 m Btg 18,500 19,000 19,500 20,000
4 x 4 cm / 4 m Btg 22,500 23,000 23,500 24,000
4 x 5 cm / 4 m Btg 28,500 29,000 29,500 30,000

BAHAN ATAP
1 Genteng
Beton Biji 36,500 37,000 37,500 38,000
Keramik Bh 19,000 19,500 20,000 20,500
Asbes gelombang 7 kaki Lbr 63,000 63,500 64,000 64,500
Harfles (115X85x0.5 cm) Lbr 66,000 66,500 67,000 67,500
2 Atap Metal lbr 90,000 90,500 91,000 91,500
3 Asbes Genteng Lbr 75,500 76,000 76,500 77,000
4 Sirap Ikat 326,000 331,000 336,000 341,000
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 11,000 11,500 12,000 12,500
BJLS 0.22 mm Kaki 11,500 12,000 12,500 13,000
BJLS 0.30 mm Lbr 58,000 58,500 59,000 59,500
BJLS 0.35 mm Kaki 11,000 11,500 12,000 12,500
6 Atap Bitumen
Gelombang Acrylic Base( 200x95x0,3 Lbr 191,300 192,300 193,800 195,300
Cm)
Lisplank Acrylic Bace (104x34x023cm) Lbr 118,700 119,700 121,200 122,700
Nok Acrylic Base (50x104x0.23 Cm) Lbr 118,700 119,700 121,200 122,700
Sekrup Atap 6,5 cm Bh 1,700 1,800 1,900 2,000
Sekrup Nok 6,5 cm Bh 1,700 1,800 1,900 2,000
Talang Air Acrylic Bace Lbr 118,700 119,700 121,200 122,700
(104x50x0.23cm)
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 2,550 2,700 2,850 3,000
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000 71,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201550
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
Fiber Glass Gel. (transparan) Lbr 360,500 361,500 363,000 364,500
7 200x95x0.23cm
Seng Plat
BJLS 0.35 mm Lbr 69,500 70,000 70,500 71,000
BJLS 0.35 mm Lbr 79,500 80,000 80,500 81,000
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 17,500 18,000 18,500 19,000
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 13,500 14,000 14,500 15,000
SWG 30” 0.31 mm Kaki 16,000 16,500 17,000 17,500
SWG 28” 0.38 mm Kaki 17,000 17,500 18,000 18,500
10 Seng Plastik (Fiber) Kaki 17,500 18,000 18,500 19,000
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 83,000 83,500 84,000 84,500
Super 180 X 108 X 0.6 cm Lbr 69,000 69,500 70,000 70,500
Ekonomi 240 X 92 X 0.5 cm Lbr 73,500 74,000 74,500 75,000
Ekonomi 180 X 92 X 0.4 cm Lbr 67,000 67,500 68,000 68,500
Mini 240 X 105 X 0.4 cm Lbr 66,500 67,000 67,500 68,000
Mini 180 X 92 X 0.5 cm Lbr 75,000 75,500 76,000 76,500
Super 240 X 105 X 0.4 cm Lbr 70,500 71,000 71,500 72,000
Super 180 X 105 X 0.4 cm Lbr 73,000 73,500 74,000 74,500
12 Nok/Bubungan
Genteng Beton Bh 39,500 40,000 40,500 41,000
Genteng Asbes Bh 59,500 60,000 60,500 61,000
Genteng Keramik Bh 24,500 25,000 25,500 26,000
Alm. SWG 28” -180 cm Lbr 49,000 49,500 50,000 50,500
Alm. SWG 28” –105 cm Lbr 44,000 44,500 45,000 45,500
13 Nok Steel Gelombang
Super – 180 cm Bh 56,500 57,000 57,500 58,000
Mini – 105 cm Bh 45,500 46,000 46,500 47,000
Ekonomi – 95 cm Bh 23,000 23,500 24,000 24,500
14 Nok Steel Rata
Super – 108 cm Bh 34,000 34,500 35,000 35,500
Mini – 105 cm Bh 29,500 30,000 30,500 31,000
Ekonomi – 95 cm Bh 25,000 25,500 26,000 26,500
15 Nok ½ Lingkaran Bh 44,500 45,000 45,500 46,000
16 Karet Pelapis Genteng
Ukuran 55 mtr 13,500 14,000 14,500 15,000
Ukuran 90 Mtr 23,000 23,500 24,000 24,500

BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 177,000 177,500 178,000 178,500
Double Slag Bh 336,000 341,000 346,000 351,000
2 Penggantung
Hak Angin Kecil Bh 14,500 15,000 15,500 16,000
Hak Angin Besar Bh 19,500 20,000 20,500 21,000
Grendel Kecil Bh 17,500 18,000 18,500 19,000
Grendel Besar Bh 21,500 22,000 22,500 23,000
Engsel Pintu Bh 39,500 40,000 40,500 41,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201551
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
Engsel Jendela Bh 30,000 30,500 31,000 31,500
Expanyolet Bh 129,000 129,500 130,000 130,500

BAHAN SANITER
Kloset Jongkok Bh 238,500 239,000 239,500 240,000
Kloset Duduk Bh 2,010,500 2,011,500 2,012,500 2,013,500
Wasthafel warna Bh 485,500 486,500 487,500 488,500
Wasthafel cuci piring logam Bh 461,500 462,500 463,500 464,500
Pompa Mesin Bh 1,976,000 2,001,000 2,026,000 2,051,000
Urinoir lengkap Bh 1,636,000 1,661,000 1,686,000 1,691,000
Bak Mandi fiber Bh 791,000 796,000 801,000 806,000
Reservoir fiber = 1 m3 Bh 1,306,000 1,316,000 1,321,000 1,326,000
Reservoir Stainless stell = 1 m3 Bh 3,751,000 3,801,000 3,851,000 3,901,000
Stop Kran Bh 29,500 30,000 30,500 31,000
Kran Air Bh 24,000 24,500 25,000 25,500

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 64,500 65,000 65,500 66,000
Cat Kilap 5 Kg 94,500 95,000 95,500 96,000
2 Cat Kayu
Cat Dasar Kg 24,000 24,500 25,000 25,500
Cat Kilap Ltr 65,000 65,500 66,000 66,500
Palatone Ltr 54,500 55,000 55,500 56,000
ICI Kg 79,500 80,000 80,500 81,000
Politur Kg 55,000 55,500 56,000 56,500
Meni 4 Kg 69,500 70,000 70,500 71,000
Minyak Cat Ltr 14,000 14,500 15,000 15,500
3 Cat Atap
Cat Dasar Kg 35,500 36,000 36,500 37,000
Cat Kilap Ltr 94,000 94,500 95,000 95,500
Lem Seng Ltr 17,000 17,500 18,000 18,500
Amplas/Kertas Gosok Lbr 16,000 16,500 17,000 17,500
Dempul Kg 35,000 35,500 36,000 36,500
Residu 10 ltr 68,000 68,500 69,000 69,500

BAHAN INSTALASI LISTRIK


Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 305,000 305,500 306,000 306,500
2 ½ mm Roll 417,000 422,000 427,000 432,000
2 Type NYY
2 X 1 ½ mm Roll 663,000 678,000 683,000 688,000
2 X 2 ½ mm Roll 822,500 832,500 837,500 842,500
2 X 4 mm Roll 687,500 692,500 697,500 702,500
3 Lampu TL
1 X 20 W Bh 98,000 98,500 99,000 99,500
2 X 20 W Bh 127,000 127,500 128,000 128,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201552
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN LUWU PALOPO LUWU LUWU
UTARA TIMUR
1 X 40 W Bh 121,000 121,500 122,000 122,500
2 X 40 W Bh 154,000 154,500 155,000 155,500
4 Lampu Pijar
25 W Bh 36,000 36,500 37,000 37,500
40 W Bh 60,000 60,500 61,000 61,500
60 W Bh 110,000 110,500 111,000 111,500
100 W Bh 192,000 192,500 193,000 193,500
Lampu Taman Mercury Bh 389,500 394,500 399,500 404,500
5 Saklar Phase
Tunggal Putih Bh 27,000 27,500 28,000 28,500
Tunggal Hitam Bh 22,000 22,500 23,000 23,500
Double Putih Bh 30,000 30,500 31,000 31,500
Double Hitam Bh 25,000 25,500 26,000 26,500
6 Stop Kontak
Hitam Bh 30,000 30,500 31,000 31,500
Putih Bh 32,000 32,500 33,000 33,500
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 87,000 87,500 88,000 88,500
Lokal 3 Group Biasa Bh 99,500 100,000 100,500 101,000
Fitting Bh 19,500 20,000 20,500 21,000

BAHAN JALAN
Aspal Kg 19,000 19,500 20,000 20,500
Minyak Tanah Ltr 14,000 14,500 15,000 15,500
Minyak Solar Ltr 8,500 9,000 9,500 10,000
Minyak Pelumas Ltr 32,000 32,500 33,000 33,500

UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000 125,000
Kepala Tukang Besi Org/hr 125,000 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan I Tahun 201553