RENCANA ANGGARAN BIAYA

PEMBANGUNAN ASRAMA SANTRI

NAMA LEMBAGA : MA'HAD TAHFIZUL QUR'AN


KEGIATAN : PEMBANGUNAN ASRAMA SANTRI
PEKERJAAN : PEMBANGUNAN ASRAMA SANTRI DENGAN 2 PINTU
LOKASI : KECAMATAN GADUNG DESA MATINAN
KABUPATEN BUOL : BUOL
NO URAIAN / BAHAN VOLUME HARGA SATUAN JUMLAH
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
Pembersihan Lahan 72 m² 3,000 216,000
Pemasangan Bouwplank 120 m² 8,000 960,000
Pembelian alat - alat Pekerjaan 1 Paket 1,369,000 1,369,000
Pembelian Tempat Air 1 Buah 800,000 800,000
3,345,000
II. PEKERJAAN TANAH
Galian Tanah Pondasi 72 m³ 40,000 2,880,000
Pemasangan Pancang Bambu 20 Batang 7,000 140,000
Galian Tanah Cakar ayam 36 m³ 40,000 1,440,000
Urung Pasir Dasar Pondasi 8 m³ 130,000 1,040,000
5,500,000
III. PEKERJAAN PASANGAN PONDASI
Batu Kali 30 m³ 180,000 5,400,000
Pasir Pasang 20 m³ 160,000 3,200,000
Semen Tonasa 60 Zak 76,000 4,560,000
Ember 15 Buah 10,000 150,000
Benang Gulung 6 gl 10,000 60,000
13,370,000
IV. PEKERJAAN SLUP BAWAH
Besi 12 FL SNI 30 Batang 112,000 3,360,000
Besi 10 FL SNI 15 Batang 74,000 1,110,000
Besi 6 FL SNI 20 Batang 32,000 640,000
Tali Kawat 10 Kg 20,000 200,000
Papan Cor 1 m³ 1,400,000 1,400,000
Paku 7/5 5 Kg 15,000 75,000
Semen Tonasa 20 Zak 65,000 1,300,000
8,085,000
V. PEKERJAAN BAHAN COR PASIR BETON/ BATU
Pasir Cor 5 m³ 185,000 925,000
Batu kerikil 5 m³ 200,000 1,000,000
1,925,000
VI PEKERJAAN PASANG BATA / KUSEN
Bata Merah 13,000 1,000 13,000,000
Pasir pasang 10 135,000 1,350,000
Semen Tonasa 60 90,000 5,400,000
Kusen Pintu 1 1,200,000 1,200,000
Kusen Jendela 15 300,000 4,500,000
25,450,000
VII PEKERJAAN COR BALOK ATAS
Besi 12 FL SNI 30 112,000 3,360,000
Besi 10 FL SNI 15 100,000 1,500,000
Besi 6 FL SNI 20 75,000 1,500,000
Papan 2 100,000 200,000
Pasir Beton 5 100,000 500,000
Batu Kerikil 5 125,000 625,000
Semen Tonasa 30 90,000 2,700,000
Tali Kawat 10 25,000 250,000
Paku ( 7 cm, 10 cm dan 5 cm ) 10 18,000 180,000
10,815,000
VII PEKERJAAN ATAP
Seng 150 lbr 80,000 12,000,000
Reng 1 m3 1,250,000 1,250,000
Balok 3 m3 1,000,000 3,000,000
listplank 20 lbr 35,000 700,000
Paku Seng 10 kg 20,000 200,000
Seng Plat 15 mtr 25,000 375,000
17,525,000
VIII PEKERJAAN PELISTER ACI
Pasir Pasang 30 M2 100,000 3,000,000
Semen Tonasa 50 Zak 90,000 4,500,000
Kelasid 70 ball 25,000 1,750,000
9,250,000
IX PEKERJAAN PASANG PLAFOND
Tripleks 3 mm 100 lbr 50,000 5,000,000
Kayu 5 x 5 2 m3 1,000,000 2,000,000
Paku 7 cm 5 kg 20,000 100,000
Paku Trifleks 2 kg 25,000 50,000
7,150,000
XI PEKERJAAN PEMASANGAN KERAMIK
Keramik 40 x 40 110 Dos 60,000 6,600,000
Pasir Pasang 10 m3 100,000 1,000,000
Semen Tonasa 30 Zak 90,000 2,700,000
Oker Keramik 15 bks 8,500 127,500
Benang 2 gl 10,000 20,000
10,447,500
XII PEKERJAAN PASANG PINTU / JENDELA
Pemasangan Daun Pintu 3 Buah 50,000 150,000
Pemasangan Jendela 10 Buah 35,000 350,000
500,000
XIII PEKERJAAN PENGECETAN
Cat Tembok Avian 75 kg 375,000 28,125,000
Cat kayu 10 kg 45,000 450,000
Dempul 8 kg 35,000 280,000
Thinner/Minyak Cat 10 kg 17,000 170,000
Aksesoris Cat 2 paket 400,000 800,000
29,825,000
XIV PEKERJAAN PASANG LISTRIK
Kabel Interna isi 2 4 glg 300,000 1,200,000
Lampu /Balon Fhilips 5 buah 175,000 875,000
Saklar 4 buah 15,000 60,000
Aksesoris Listrik 1 paket 100,000 100,000
2,235,000
XV UPAH TENAGA KERJA
Upah Pekerja 60 HOK 75,000 4,500,000
Upah Tukang 60 HOK 100,000 6,000,000
Upah kepala Tukang 60 HOK 120,000 7,200,000
17,700,000
XVI PEKERJAAN MEUBELER
Lemari Santri 1 Unit 1,200,000 1,200,000
Meja Ustadz 1 Unit 250,000 250,000
Kursi Ustadz 1 Unit 150,000 150,000
Meja Santri 20 Unit 100,000 2,000,000
Kursi Santri 40 Unit 75,000 3,000,000
6,600,000
JUMLAH TOTAL = (I+II+III+IV+V+VI+VII+VIII+IX+X+XI+XII+XIII+XIV+XV+XVI) 169,722,500
Terbilang (Seratus Enam Puluh Srmbilan Juta Tuju Ratus Dua Puluh Dua Ribu Lima Ratus Rupiah)