B PEKERJAAN PEMASANGAN
1 Pas. Batu Belah 4m3 500,000 2,000,000
2 Kayu Uk. 3x5x4 100pcs 35,000 3,500,000
3 Paku Uk. 3" 5kg 20,000 100,000
D KUSEN
1 Kusen Jendela 175,000 3,500,000
2 Daun Jendela (rangka) 200,000 1,600,000
3 Kaca Jendela 500,000 2,000,000
4 Grendel 10bh 10,000 100,000
5 Engsel 16bh 15,000 240,000
E LANGIT - LANGIT
1 Plafon Internit rangka kayu tahun 392m2 40,000 15,680,000
F PENGECATAN
1 Tembok 448m2 15,000 6,720,000
2 Kayu 150m2 22,500 4,875,000
3 Langit - langit 196m2 10,500 2,058,000
G LISTRIK
1 Instalasi 8titik 100,000 800,000
2 Stop Kontak 4bh 20,000 80,000
3 Saklar 4bh 20,000 80,000
4 Lampu Pijar 25 watt 8 75,000 600,000
H ONGKOS TUKANG
1 Biaya Bongkar Pasang 5 Tukang 60 Hari 625,000 37,500,000
I LAIN - LAIN
1 Alat Kerja Taksiran 1,000,000
2 Pembersihan Taksiran 1,500,000
TOTAL 100,718,000
RANCANGAN ANGGARAN BIAYA
PEMBANGUNAN KANTOR Uk. 7x7 Meter
A PEKERJAAN TANAH
1 Galian Tanah Pondasi 120m3 20,000 2,400,000
2 Tanah Uruk 60m3 10,000 600,000
3 Uruk Pasir (bawah pondasi + lantai) 50m3 120,000 6,000,000
B PEKERJAAN PEMASANGAN
1 Pas. Pondasi Batu Belah 8m3 500,000 4,000,000
2 Batu Bata Merah 112m2 10,000 6,720,000
3 Plester 63m2 35,000 2,205,000
4 Pas. Keramik Lantai 63m2 125,000 7,875,000
D KUSEN
1 Kusen Jendela 175,000 3,500,000
2 Daun Jendela (rangka) 200,000 1,600,000
3 Kaca Jendela 500,000 2,000,000
4 Grendel 4bh 10,000 40,000
5 Engsel 4bh 15,000 60,000
6 Kusen Pintu 1bh 1,500,000 1,500,000
7 Daun Pintu 1bh 1,750,000 1,750,000
8 Engsel 2bh 12,500 25,000
9 Slot Kunci 1bh 125,000 125,000
E ATAP
1 Kuda-kuda 8/12 80m 40,000 3,200,000
2 Gording 8/12 290m 40,000 11,600,000
3 Kaso 6/6 1240m 20,000 24,800,000
4 Reng 2/3 320m 15,000 4,800,000
5 Paku (kaso+reng+dudur) 30kg 22,000 660,000
6 Genting press 2500bh 4,500 11,250,000
7 Wuwung 35 5,000 175,000
8 List Plang 15bh 30,000 450,000
F LANGIT - LANGIT
1 Plafon Internit rangka kayu tahun 158m2 40,000 6,320,000
G PENGECATAN
1 Tembok 224m2 15,000 3,360,000
2 Kayu 150m2 22,500 4,875,000
3 Langit - langit 196m2 10,500 2,058,000
G LISTRIK
1 Instalasi 4 titik 100,000 400,000
2 Stop Kontak 2bh 20,000 40,000
3 Saklar 2bh 20,000 40,000
4 Lampu Pijar 25 watt 4 75,000 300,000
H ONGKOS TUKANG
1 Biaya Bongkar Pasang 5 Tukang 30 Hari 625,000 18,750,000
I LAIN - LAIN
1 Alat Kerja Taksiran 1,000,000
2 Pembersihan Taksiran 1,500,000
TOTAL 158,173,000
RANCANGAN ANGGARAN BIAYA
3 KELAS RUSAK 75%
A PEKERJAAN TANAH
1 Galian Tanah Pondasi 270m3 20,000 5,400,000
2 Tanah Uruk 135m3 10,000 1,350,000
3 Uruk Pasir (bawah pondasi + lantai) 113m3 120,000 13,560,000
B PEKERJAAN PEMASANGAN
1 Pas. Pondasi Batu Belah 18m3 500,000 9,000,000
2 Batu Bata Merah 252m2 10,000 2,520,000
3 Plester 142m2 35,000 4,970,000
4 Pas. Keramik Lantai 142m2 125,000 17,750,000
D KUSEN
1 Kusen Jendela 175,000 3,500,000
2 Daun Jendela (rangka) 200,000 1,600,000
3 Kaca Jendela 500,000 2,000,000
4 Grendel 12bh 10,000 120,000
5 Engsel 12bh 15,000 180,000
6 Kusen Pintu 3bh 1,500,000 4,500,000
7 Daun Pintu 3bh 1,750,000 5,250,000
8 Engsel 6bh 12,500 75,000
9 Slot Kunci 3bh 125,000 375,000
E ATAP
1 Kuda-kuda 8/12 180m 40,000 7,200,000
2 Gording 8/12 653m 40,000 26,120,000
3 Kaso 6/6 2790m 20,000 55,800,000
4 Reng 2/3 720m 15,000 10,800,000
5 Paku (kaso+reng+dudur) 67kg 22,000 1,474,000
6 Genting press 5600bh 4,500 25,200,000
7 Wuwung 78bh 5,000 390,000
8 List Plang 33bh 30,000 990,000
F LANGIT - LANGIT
1 Plafon Internit rangka kayu tahun 355m2 40,000 14,200,000
G PENGECATAN
1 Tembok 500m2 15,000 7,560,000
2 Kayu 375m2 22,500 8,437,500
3 Langit - langit 441m2 10,500 4,630,500
G LISTRIK
1 Instalasi 12 titik 100,000 1,200,000
2 Stop Kontak 6bh 20,000 120,000
3 Saklar 6bh 20,000 120,000
4 Lampu Pijar 25 watt 12bh 75,000 900,000
H ONGKOS TUKANG
1 Biaya Bongkar Pasang 5 Tukang 60 Hari 625,000 37,500,000
I LAIN - LAIN
1 Alat Kerja Taksiran 1,000,000
2 Pembersihan Taksiran 1,500,000
TOTAL 327,497,000