PAKET PEKERJAAN : PEMELIHARAAN GEDUNG RUSUNAWA DAN ASRAMA PUTRA

LOKASI : UNIVERSITAS UDAYANA

NO NAMA BARANG/SPESIFIKASI VOL SAT HARGA SATUAN TOTAL HARGA Rp.


Rp.

PERBAIKAN GENTENG BOCOR , PLAFON


A
RUSUNAWA DAN ASRAMA PUTRA

Pek. Atap dan Plafon


1 Perbaikan Genteng Bocor 50.00 M2 85,000 4,250,000
2 Bongkar Plafon Gypsum 160.00 m2 20,000 3,200,000
3 Pas. Plafon Gypsum 160.00 m2 130,000 20,800,000
4 Pengecatan Plafon 400.00 m2 46,000 18,400,000
5 Pengecatan Plafon Dak 25.00 m2 46,000 1,150,000
6 Pas. List Plafon Gypsum 100.00 m1 66,000 6,600,000
7 Sewa Scafolding 1.00 set 2,500,000 2,500,000
8 Pas. Steger Bambu 1.00 Set 1,750,000 1,750,000

B PERBAIKAN PINTU DAN JENDELA KAMAR


1 Bongkar Kusen Jendela Lt.3 1.00 Ls 453,000 453,000
2 Pas. Kusen kf uk 189x172 cm 0.18 m3 14,395,000 2,519,125
3 Pas. Daun Jendela Kaca 100x75 cm 0.09 m3 14,395,000 1,223,575
4 Pas. Kaca Bening 5mm 2.68 m2 145,000 389,151
5 Pas. Jaro Kayu Uk. 55 cm x 30 cm 3.00 Bh 219,000 657,000
6 Politur Kusen 7.20 m 65,000 468,000
7 Politur Jendela 18.00 m 65,000 1,170,000
8 Perbaikan Jendela Lepas karena Kayu Lapuk 15.00 bh 350,000 5,250,000
9 Servis Pintu Rusak (Tidak Bisa ditutup) 5.00 bh 450,000 2,250,000
10 Pas. Handle Pintu 11.00 Set 425,000 4,675,000
11 Pas. Grandel Pintu 3'' 18.00 bh 75,000 1,350,000
12 Pas. Kusen Pintu 6/15 0.14 m3 14,395,000 1,943,325
13 Pas. Fitting Tempel dan Lampu 10.00 ttk 256,000 2,560,000
14 Pas. Stop Kontak 20.00 ttk 171,000 3,420,000

C PEMELIHARAAN TOILET
1 Service Pintu Aluminium Rusak 5.00 bh 375,000 1,875,000
2 Pas. Kloset Duduk Km. Dalam Ø50 cm 4.00 bh 3,005,000 12,020,000
3 Pas. Kran Km 6.00 bh 73,000 438,000
4 Pas. Shower Mandi 36.00 bh 270,000 9,720,000
5 Pas. Gantungan Baju Km 36.00 Bh 80,000 2,880,000
6 Pas. Kran Leher Angsa Wastafel 12.00 bh 227,000 2,724,000
7 Ogrok Saluran Mampet 1.00 Ls 1,250,000 1,250,000

D Penataan Halaman
1 Penebangan Pohon Besar 5.00 Bh 2,249,000 11,245,000
2 Penebangan Pohon Sedang 8.00 bh 452,400 3,619,200

E PEMBUATAN SALURAN PEMBUANGAN


1 Pek. Galian Tanah 1.84 m3 145,000 266,438
2 Pas. Batako 15.00 m2 132,000 1,980,000
3 Pek. Plester 18.00 m2 89,000 1,602,000
3 Pek. Acian 18.00 m2 31,000 558,000

F PEMBUATAN WASTAFEL
1 Bobok Tembok Dudukan Wastafel 6.00 ttk 154,000 924,000
2 Bagesting dan Pembesian 8.64 m2 320,000 2,764,800
3 Cor Beton t=10 cm 0.50 m3 1,222,000 615,888
4 Plester Dudukan wastafel 6.48 m2 89,000 576,720
5 Pas. Keramik 30x30 cm 14.00 m2 254,000 3,556,000
6 Pas. Bak Cuci Piring Sayap 6.00 bh 883,000 5,298,000
7 Pas. Pipa 1/2'' 36.00 m 30,000 1,080,000
8 Pas. Sockdrat dalam kuningan 1/2'' 6.00 bh 36,000 216,000
9 Pas. Kran Wastafel 6.00 bh 227,000 1,362,000
10 Pas. Pipa Pembuangan 3'' D 12.00 m 176,000 2,112,000

G PEMELIHARAAN KANOPI MOTOR


1 Bongkar Atap Lama 90.00 m2 27,000 2,430,000
2 Pas. Baru Atap Spandek Gelobang Kecil 0,3 mm 90.00 m2 181,000 16,290,000
3 Penggantian Talang Seng 18.00 m 181,000 3,258,000
4 Pengecatan Tiang Kanopi 1.00 bh 2,540,000 2,540,000

Jumlah 180,179,222
PPN 11% 19,819,714
Total Harga 199,998,936
DAFTAR ANALISA SATUAN PEKERJAAN
TAHUN 2023
1 1 m2 Perbaikan Genteng Bocor
Tenaga
0.800 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.080 Oh Tukang Kayu @ Rp. 104,000.00 = Rp.
0.008 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.005 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
2 1 m2 Bongkar Plafon Gypsum
Alat
Tenaga
0.200 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.010 Oh Tukang Kayu @ Rp. 104,000.00 = Rp.
0.001 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.001 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
3 1 m2 Pasang Plafon Gypsum
Alat
1.200 m' Hollow 2/4 - 4 m @ Rp. 15,000.00 = Rp.
0.400 lbr Gypsum 9 mm @ Rp. 75,000.00 = Rp.
0.220 kg Paku Skrop @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.430 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.300 Oh Tukang @ Rp. 104,000.00 = Rp.
0.030 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.018 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
5 1 m2 Pengecatan Plafon
Alat
0.100 m' Plamur tembok @ Rp. 55,000.00 = Rp.
0.120 lbr Cat Dasar @ Rp. 85,000.00 = Rp.
0.250 kg Cat Dinding @ Rp. 85,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.020 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.063 Oh Tukang @ Rp. 104,000.00 = Rp.
0.006 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.003 Oh Mandor Lapangan @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
6 1 m2 Pas. List Plafon Gypsum
Alat
0.100 m' Plamur tembok @ Rp. 115,000.00 = Rp.
0.120 lbr Cat Dasar @ Rp. 85,000.00 = Rp.
0.250 kg Cat Dinding @ Rp. 20,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.020 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.063 Oh Tukang @ Rp. 104,000.00 = Rp.
0.006 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.003 Oh Mandor Lapangan @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
4 1 m2 Pasang Sekat Partisi Gypsum
Alat
1.200 m' Hollow 2/4 - 4 m @ Rp. 15,000.00 = Rp.
0.400 lbr Gypsum 9 mm @ Rp. 65,000.00 = Rp.
0.220 kg Paku Skrop @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.420 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.300 Oh Tukang @ Rp. 104,000.00 = Rp.
0.030 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.018 Oh Mandor Lapangan @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
5 1 m2 Pengecatan Dinding
Alat
0.150 m' Plamur tembok @ Rp. 35,000.00 = Rp.
0.120 lbr Cat Dasar @ Rp. 80,000.00 = Rp.
0.260 kg Cat Dinding @ Rp. 85,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.020 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.063 Oh Tukang @ Rp. 104,000.00 = Rp.
0.006 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.003 Oh Mandor Lapangan @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
6 1m List Plafon Gypsum 10 cm
Alat
1.050 m List Gypsum profil @ Rp. 33,500.00 = Rp.
0.150 kg Tepung Gypsum @ Rp. 5,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.250 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.058 Oh Tukang @ Rp. 104,000.00 = Rp.
0.006 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
7 1 m2 Bongkar Kusen Jendela Lt.3
Tenaga
2.000 Oh Pekerja @ Rp. 95,000.00 = Rp.
2.000 Oh Tukang @ Rp. 104,000.00 = Rp.
0.250 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.250 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
8 1m3 Pas. Kusen kf uk 189x172 cm
Alat
1.200 m Kayu Kamper @ Rp. 9,750,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
6.000 Oh Pekerja @ Rp. 95,000.00 = Rp.
18.000 Oh Tukang @ Rp. 104,000.00 = Rp.
2.000 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.300 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
9 1m2 Pas. Kaca Bening 5mm
Alat
1.100 m2 Kaca Bening 5mm @ Rp. 115,000.00 = Rp.
0.050 kg Sealant @ Rp. 45,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.150 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.015 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.001 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
10 1 bh Pas. Jaro Kayu Uk. 55 cm x 30 cm
Alat
1.100 m Jaro Kayu 55x30 cm @ Rp. 185,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.150 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.015 Oh Tukang @ Rp. 104,000.00 = Rp.
0.001 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
11 1 m2 Politur Kusen
Alat
0.045 Kg Wood Filler @ Rp. 75,000
0.075 Liter Mowilex @ Rp. 85,000
0.105 Liter Thinner @ Rp. 45,000
0.075 Liter Amplas @ Rp. 6,500
1 ls Alat bantu (alat semprot, dll) @ Rp. 15,000
Jumlah (I) = Rp.
Tenaga
0.175 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
12 1 bh Perbaikan Jendela Lepas karena Kayu Lapuk
Tenaga
3.000 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.620 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
13 1 bh Servis Pintu Rusak (Tidak Bisa ditutup)
Tenaga
3.500 Oh Pekerja @ Rp. 95,000.00 = Rp.
1.030 Oh Tukang @ Rp. 104,000.00 = Rp.
0.100 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.001 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
14 1 bh Pas. Handle Pintu
Alat
1.100 m Handle Pintu @ Rp. 275,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.950 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.310 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
15 1 bh Pas. Grandel Pintu 3''
Alat
1.100 m Handle Pintu @ Rp. 36,500.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.175 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
16 1 ttk Pas. Fitting Tempel dan Lampu
Alat
1.000 bh Fitting Tempel @ Rp. 45,000 = Rp.
1.000 bh Lampu 12 watt @ Rp. 85,000 = Rp.
6.000 m Kabel 3x1.5 mm @ Rp. 12,500 = Rp.
1.000 bh Tee Dos Clipsal 20 mm @ Rp. 8,500 = Rp.
10.000 bj Klem Kabel @ Rp. 250 = Rp.
Jumlah (I) = Rp.
Tenaga
0.230 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang Listrik @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala Tukang Listrik @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
17 1 ttk Pas. Stop Kontak
Alat
1.100 m Stop Kontak @ Rp. 45,000.00 = Rp.
6.000 m Kabel 3x1.5 mm @ Rp. 12,500 = Rp.
1.000 bh Tee Dos Clipsal 20 mm @ Rp. 8,500 = Rp.
10.000 bj Klem Kabel @ Rp. 250 = Rp.
Jumlah (I) = Rp.
Tenaga
0.175 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang Listrik @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala Tukang Listrik @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
18 1 bh Service Pintu Aluminium Rusak
Tenaga
2.520 Oh Pekerja @ Rp. 95,000.00 = Rp.
1.200 Oh Tukang @ Rp. 104,000.00 = Rp.
0.100 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.001 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
19 1 bh Pas. Kloset Duduk Km. Dalam Ø50 cm
Alat
1.000 bh Kloset Duduk diameter 50 cm @ Rp. 2,650,000.00 = Rp.
1.000 Ls Perlengkapan Bantu (3%) @ Rp. 79,500.00 = Rp.
Jumlah (I) = Rp.
Tenaga
1.500 Oh Pekerja @ Rp. 95,000.00 = Rp.
1.200 Oh Tukang @ Rp. 104,000.00 = Rp.
0.075 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
20 1 bh Pas. Kran Km
Alat
1.000 m Kran Kamar mandi @ Rp. 37,500.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.175 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
21 1 bh Pas. Shower Mandi
Alat
1.000 m Shower Mandi @ Rp. 235,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.175 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
21 1 bh Pas. Gantungan Baju Km
Alat
1.000 m Gantungan Baju @ Rp. 45,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.175 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
22 1 bh Keran Leher Angsa
Alat
1.000 m Keran Leher Angsa @ Rp. 185,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.250 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.175 Oh Tukang @ Rp. 104,000.00 = Rp.
0.004 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.002 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
23 1 m3 Galian Tanah
Tenaga
1.500 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.010 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.010 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
24 1 m2 Pas. Batako
Alat
12.500 bh Batako @ Rp. 4,500.00 = Rp.
12.000 kg Semen Pc @ Rp. 1,875.00 = Rp.
0.036 m3 Pasir @ Rp. 275,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.200 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.200 Oh Tukang @ Rp. 104,000.00 = Rp.
0.020 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.020 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
25 1 m2 Pek. Plester
Alat
0.333 kg Semen Pc @ Rp. 110,000.00 = Rp.
0.021 m3 Pasir @ Rp. 275,000.00 = Rp.
1.000 ls Alat Bantu @ Rp. 5,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.280 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.125 Oh Tukang @ Rp. 104,000.00 = Rp.
0.013 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.007 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
26 1 m2 Pek. Acian
Alat
1.500 kg Semen Pc @ Rp. 1,875.00 = Rp.
0.036 m3 Pasir @ Rp. 275,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.120 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.060 Oh Tukang @ Rp. 104,000.00 = Rp.
0.006 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.006 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
27 ttk Bobok Tembok Dudukan Wastafel
Tenaga
1.100 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.470 Oh Tukang @ Rp. 104,000.00 = Rp.
0.005 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.005 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
28 1 m2 Bagesting dan Pembesian
Alat
0.175 lbr Multiplex 12 mm @ Rp. 190,000.00 = Rp.
0.010 m3 Kayu Kaso 5/7 cm @ Rp. 3,000,000.00 = Rp.
0.036 m3 Paku 5-8 cm @ Rp. 25,000.00 = Rp.
0.135 Lbr Besi Wiremesh 0,6 mm @ Rp. 550,000.00 = Rp.
1.000 Ls Alat Bantu @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
1.000 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.500 Oh Tukang @ Rp. 104,000.00 = Rp.
0.060 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.030 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
29 1m3 Cor Beton t=10 cm
Alat
247.000 kg Semen Pc @ Rp. 1,875.00 = Rp.
869.000 kg Pasir @ Rp. 275.00 = Rp.
999.000 kg Kerikil @ Rp. 250.00 = Rp.
Jumlah (I) = Rp.
Tenaga
2.500 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.200 Oh Tukang @ Rp. 104,000.00 = Rp.
0.028 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.083 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
30 1m2 Pas. Keramik 30x30 cm
Alat
11.87 bh Keramik 30 x 30 @ Rp. 5,500.00 = Rp.
10.00 kg Semen @ Rp. 1,875.00 = Rp.
0.05 m3 Pasir Pasang @ Rp. 275,000.00 = Rp.
1.50 kg Semen warna/semen grouting @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.800 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.350 Oh Tukang @ Rp. 104,000.00 = Rp.
0.035 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.035 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
31 bh Pas. Bak Cuci Piring Sayap
Alat
1.00 bh Bak cuci piring sayap @ Rp. 750,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.800 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.500 Oh Tukang @ Rp. 104,000.00 = Rp.
0.030 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.020 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
32 m1 Pas. Pipa 1/2''
Alat
0.30 bh Pipa 1/2'' PVC Aw @ Rp. 40,000.00 = Rp.
1.00 ls Kelengkapan @ Rp. 5,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.100 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.010 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.020 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
33 m1 Pas. Sockdrat dalam kuningan 1/2''
Alat
1.00 bh Sock Drat Dalam Kuningan @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.100 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.010 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.001 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
34 m1 Pas. Pipa Pembuangan 3'' D
Alat
0.30 bh Pipa PVC 3'' D @ Rp. 320,000.00 = Rp.
1.00 ls Sambungan, Fitting acc @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.310 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.200 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.035 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
1 1 m2 Bongkar Atap Lama
Tenaga
0.250 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.020 Oh Tukang Kayu @ Rp. 104,000.00 = Rp.
0.008 Oh Kepala Tukang @ Rp. 110,000.00 = Rp.
0.005 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
34 m2 Pas. Baru Atap Spandek Gelobang Kecil 0,3 mm
Alat
0.29 Lbr Spandek Gelombang Kecil 0,3 @ Rp. 350,000.00 = Rp.
1.00 ls Sekrup @ Rp. 25,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
0.310 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.200 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.035 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
34 m1 Penggantian Talang Seng
Alat
1.00 m Talang Seng @ Rp. 125,000.00 = Rp.
@ Rp. Jumlah (I) = Rp.
Tenaga
0.310 Oh Pekerja @ Rp. 95,000.00 = Rp.
0.210 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.035 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
34 m1 Pengecatan Tiang Kanopi
Alat
10.00 kg Cat Dasar Alkali @ Rp. 65,000.00 = Rp.
15.00 kg Cat Finishing @ Rp. 85,000.00 = Rp.
Jumlah (I) = Rp.
Tenaga
15.000 Oh Pekerja @ Rp. 95,000.00 = Rp.
4.460 Oh Tukang @ Rp. 104,000.00 = Rp.
0.010 Oh Kepala tukang @ Rp. 110,000.00 = Rp.
0.001 Oh Mandor @ Rp. 110,000.00 = Rp.
Jumlah (II) = Rp.
Harga Satuan Pekerjaan = Rp.
Harga setelah dibulatkan = Rp.
N

76,000.00
8,320.00
825.00
550.00
85,695.00
85,695.00
85,000.00

19,000.00
1,040.00
110.00
110.00
20,260.00
20,260.00
20,000.00

18,000.00
30,000.00
5,500.00
53,500.00

40,850.00
31,200.00
3,300.00
1,980.00
77,330.00
130,830.00
130,000.00

5,500.00
10,200.00
21,250.00
36,950.00
1,900.00
6,552.00
660.00
330.00
9,442.00
46,392.00
46,000.00

11,500.00
10,200.00
5,000.00
26,700.00

1,900.00
6,552.00
660.00
330.00
9,442.00
36,142.00
36,000.00

18,000.00
26,000.00
5,500.00
49,500.00

39,900.00
31,200.00
3,300.00
1,980.00
76,380.00
125,880.00
125,000.00

5,250.00
9,600.00
22,100.00
36,950.00

1,900.00
6,552.00
660.00
330.00
9,442.00
46,392.00
46,000.00

35,175.00
750.00
35,925.00

23,750.00
6,032.00
660.00
231.00
30,673.00
66,598.00
66,000.00

190,000.00
208,000.00
27,500.00
27,500.00
453,000.00
453,000.00
453,000.00

11,700,000.00
11,700,000.00

570,000.00
1,872,000.00
220,000.00
33,000.00
2,695,000.00
14,395,000.00
14,395,000.00

126,500.00
2,250.00
128,750.00

14,250.00
1,560.00
1,100.00
110.00
17,020.00
145,770.00
145,000.00

203,500.00
203,500.00

14,250.00
1,560.00
110.00
15,920.00
219,420.00
219,000.00

3,375.00
6,375.00
4,725.00
487.50
15,000.00
29,962.50

16,625.00
18,200.00
473.00
231.00
35,529.00
65,491.50
65,000.00

285,000.00
64,480.00
473.00
231.00
350,184.00
350,184.00
350,000.00

332,500.00
107,120.00
11,000.00
110.00
450,730.00
450,730.00
450,000.00

302,500.00
302,500.00

90,250.00
32,240.00
473.00
231.00
123,194.00
425,694.00
425,000.00

40,150.00
40,150.00

16,625.00
18,200.00
473.00
231.00
35,529.00
75,679.00
75,000.00

45,000.00
85,000.00
75,000.00
8,500.00
2,500.00
216,000.00

21,850.00
18,200.00
473.00
231.00
40,754.00
256,754.00
256,000.00

49,500.00
75,000.00
8,500.00
2,500.00
135,500.00

16,625.00
18,200.00
473.00
231.00
35,529.00
171,029.00
171,000.00

239,400.00
124,800.00
11,000.00
110.00
375,310.00
375,310.00
375,000.00

2,650,000.00
79,500.00
2,729,500.00

142,500.00
124,800.00
8,250.00
275,550.00
3,005,050.00
3,005,000.00

37,500.00
37,500.00

16,625.00
18,200.00
473.00
231.00
35,529.00
73,029.00
73,000.00

235,000.00
235,000.00

16,625.00
18,200.00
473.00
231.00
35,529.00
270,529.00
270,000.00

45,000.00
45,000.00

16,625.00
18,200.00
473.00
231.00
35,529.00
80,529.00
80,000.00

185,000.00
185,000.00
23,750.00
18,200.00
473.00
231.00
42,654.00
227,654.00
227,000.00

142,500.00
1,040.00
1,100.00
1,100.00
145,740.00
145,740.00
145,000.00

56,250.00
22,500.00
10,010.00
88,760.00

19,000.00
20,800.00
2,200.00
2,200.00
44,200.00
132,960.00
132,000.00

36,630.00
5,775.00
5,000.00
47,405.00

26,600.00
13,000.00
1,430.00
770.00
41,800.00
89,205.00
89,000.00

2,812.50
10,010.00
12,822.50

11,400.00
6,240.00
660.00
660.00
18,960.00
31,782.50
31,000.00

104,500.00
48,880.00
550.00
550.00
154,480.00
154,480.00
154,000.00

33,250.00
30,000.00
910.00
74,250.00
25,000.00
163,410.00

95,000.00
52,000.00
6,600.00
3,300.00
156,900.00
320,310.00
320,000.00

463,125.00
238,975.00
249,750.00
951,850.00

237,500.00
20,800.00
3,080.00
9,130.00
270,510.00
1,222,360.00
1,222,000.00

65,285.00
18,750.00
12,375.00
37,500.00
133,910.00

76,000.00
36,400.00
3,850.00
3,850.00
120,100.00
254,010.00
254,000.00

750,000.00
750,000.00

76,000.00
52,000.00
3,300.00
2,200.00
133,500.00
883,500.00
883,000.00

12,000.00
5,000.00
17,000.00
9,500.00
1,040.00
1,100.00
2,200.00
13,840.00
30,840.00
30,000.00

25,000.00
25,000.00

9,500.00
1,040.00
1,100.00
110.00
11,750.00
36,750.00
36,000.00

96,000.00
25,000.00
121,000.00

29,450.00
20,800.00
1,100.00
3,850.00
55,200.00
176,200.00
176,000.00

23,750.00
2,080.00
825.00
550.00
27,205.00
27,205.00
27,000.00
101,500.00
25,000.00
126,500.00

29,450.00
20,800.00
1,100.00
3,850.00
55,200.00
181,700.00
181,000.00

125,000.00
125,000.00

29,450.00
21,840.00
1,100.00
3,850.00
56,240.00
181,240.00
181,000.00

1 m2. Cat dasar ( meni )


650,000.00 0.0050 OH. Mandor
1,275,000.00
650,000.00 0.0075 OH. Kepala tukang cat
0.0300 OH. Pekerja / Buruh Tak Terampil
1,425,000.00 0.0750 OH. Tukang cat
463,840.00 0.0840 kg. Meni (besi / kayu)
1,100.00 0.0440 ltr. Minyak cat
110.00 Jumlah
1,890,050.00
2,540,050.00 1 m2. Cat dasar dinding luar (alkali killer)
2,540,000.00 0.0050 OH. Mandor
0.0075 OH. Kepala tukang cat
0.0300 OH. Pekerja / Buruh Tak Terampil
0.0750 OH. Tukang cat
0.0840 kg. Cat dasar alkali killer
0.0440 ltr. Minyak cat
Jumlah
M3 12,000 5,692,600.00 6,831,120.00
Oh 60,000 42,000.00 252,000.00
Oh 180,000 65,000.00 1,170,000.00
Oh 20,000 75,000.00 150,000.00
Oh 2 80,000.00 24,000.00
8,427,120.00
8,427,120.00
831,120.00

170,000.00

427,120.00
427,120.00
DAFTAR BAHAN DAN UPAH SATUAN PEKERJAAN
TAHUN 2023

NO JENIS PEKERJAAN URAIAN SATUAN HARGA


SATUAN
A. ONGKOS / UPAH KERJA
1 Pekerja - oh(7jam) 95,000
2 Tukang Batu - oh(7jam) 104,000
3 Kepala Tukang Batu - oh(7jam) 110,000
4 Tukang Pipa - oh(7jam) 104,000
5 Kepala Tukang Pipa - oh(7jam) 110,000
6 Tukang Kayu - oh(7jam) 104,000
7 Kepala Tukang Kayu - oh(7jam) 110,000
8 Tukang Listrik - oh(7jam) 104,000
9 Kepala Tukang Listrik - oh(7jam) 110,000
10 Tukang Cat - oh(7jam) 104,000
11 Kepala Tukang Cat - oh(7jam) 110,000
12 Mandor Lapangan - oh(7jam) 110,000
B. BAHAN PASANGAN
1 Kalsiboard Knauf/Sejenis lbr 110,000
2 Kusen Almunium 4'' - m' 88,000
3 Engsel - bh 35,000
4 Grendel - bh 35,000
5 Kayu lokal usuk 5/7 - m3 2,500,000
6 Paku usuk 4'' - kg 25,000
7 Bendrat - kg 15,000
8 Semen PC Gresik/Sejenis sak 75,000
9 Pasir Urug - m3 275,000
10 Kran kitchen sink flexible stainless Onda/Sejenis bh 325,000
11 Semen PC Gresik/Sejenis sak 1,875
12 Kaca Tempered 10mm - m2 2,350,000
13 Floohing Dekson Dekson set 1,950,000
14 Granite uk. 60x60 cm Roman/Sejenis bh 125,000
15 Semen warna - kg 25,000
16 Kerikil kg 250
17 Granit 15x60 cm warna Roman/Sejenis bh 106,500
18 Pasir Pasang - m3 275,000
19 Plamur tembok - kg 55,000
20 Cat Dasar Vinilex/Sejenis kg 85,000
21 Cat Dinding Vinilex/Sejenis kg 85,000
22 Lampu Downlight LED 12 watt Philips/Sejenis bh 65,000
23 Glass Block Clear - bh 26,000
24 Saklar Tunggal Broco/Sejenis bh 143,500
25 Loster Angin" 20x40cm - bh 100,000
26 Kloset Duduk + Jet Shower ex.Toto/Sejenis unit 2,650,000
27 Shower Kran Lengkap + Instalasi Onda/Sejenis unit 631,500
28 Kran Air Stainlis Onda/Sejenis bh 67,000
29 Wastafel persegi ex.toto ex.Toto/Sejenis bh 997,000
30 Kran Wastafel Onda/Sejenis bh 162,000
31 Tempat Sampah - bh 125,000
32 Cermin uk.35x65cm - bh 125,000
33 Multiplek - lbr 115,000
34 Kayu lokal usuk 5/7 - m3 2,500,000
35 Paku usuk 4'' - kg 20,000
36 Besi beton polos - kg 22,000
37 Bendrat - kg 15,000
38 Keramik 40x40 cm motif Roman/Sejenis bh 18,600
39 Keramik 20x40 cm motif Roman/Sejenis bh 11,900
40 Granite uk. 60x60 cm Roman/Sejenis bh 98,000
41 Granit 15x60 cm warna Roman/Sejenis bh 55,000
42 Hollow 2/4 - 4 m - m' 15,000
43 Gypsum 9 mm Knauf/Sejenis lbr 75,000
44 Paku Skrop - kg 25,000
45 Wastafel Batu - bh 950,000
46 Dudukan Wastafel - bh 700,000
47 Kran Wastafel Leher Angsa Onda/Sejenis bh 175,000
48 Penutup beton - bh 243,000
49 Ongkos Galian tanah - m3 650,000
50 Pasir Beton - kg 240
51 Batu Pecah - kg 250
52 Plamur Plafond - kg 35,000
53 Cat Plafond Vinilek (sejenis) Vinilex/Sejenis kg 80,000
54 Cat penutup 2x Vinilex/Sejenis kg 79,000
55 Cat dasar zinc-chromate Vinilex/Sejenis kg 175,000
56 Cat utama harco-gloss Vinilex/Sejenis kg 195,000
57 Plat Galvanis & Akrilik 3 mm - m2 380,600
58 Lem G - bh 7,500
59 Lampu LED phillips 12 watt Philips/Sejenis m' 95,000
60 Kabel Listrik - m' 16,200
61 Besi Galvanis + Finishing - m' 250,000
62 Sewa Alat Laser Potong - 8 jm/hr 500,000
63 Batako - bh 4,500
64 Tiang Lampu 3 mtr bh 450,000
65 Kabel NYY 2x2,5 mm bh 24,000
66 Kabel NYY 3x2,5 mm bh 26,000
67 Kontaktor LC 12 M7 Schneider bh 350,000
68 Kayu 5x7 cm kruing m3 9,850,000
69 Reng 2x3 kf kf m3 9,850,000
70 Paku 5-10 cm kg 25,000
71 Papan Kayu m3 7,500,000
72 Handle Pintu set 275,000
73 Alumunium profil natural 4″ m 185,000
74 Profil alluminium T m 25,000
75 Sealant tube 35,000
76 Alumunium profil warna 4″ m 185,000
77 Skrup fixer bh 250
78 List Gypsum profil m 33,500
79 Tepung Gypsum kg 5,000
80 Sifon Wastafel Onda/Sejenis set 225,000
81 Sealtape bh 4,000
82 Gorden anti bacteria Proflex Hospitaly m2 495,000
83 Handle Bathub Stainless bh 225,000
84 Jet Washer Toilet Onda/Sejenis bh 175,000
85 Shower Mandi Onda/Sejenis bh 225,000
86 Lampu LED downlight 12 watt Phillips/sejenis bh 65,000
87 Handle Pintu Ex deksson bh 275,000
88 Limstone m3 195,000
89 Paving Block 10x20 teba 8cm k225 m2 98,000
90 Kanstein S 40x30x15 cm bh 50,000
91 Pipa PVC 2,5'' D btg 250,000
92 Lampu LED 18 Watt bh 85,000
93 Tiang Lampu 2'' Galvanis bh 950,000
94 Bubungan Plentong bh 20,000
95 Pipa Conduit m 12,500
96 Kabel NYY 2x2,5 mm m 24,000
97 Isolasi bh 7,500
98 Neon Box Klinik Uk. 4x1 meter Unit 25,750,000
99 Besi Hollow 4x4cm btg 175,000
100 Besi Hollow 4x2cm btg 165,000
101 Kawat Las rb 26 ktk 250,000
102 Plat ACP Lbr 650,000
103 Silent bh 45,000
104 Lampu TL 18 Watt bh 125,000
105 Kerikil kg 250
106 Cat Dasar Ltr 65,000
107 Cat Melamin Ltr 75,000
108 Change Over Switch Bh 1,650,000
109 Pemasangan Steger ls 2,500,000
110 Pemasangan Steger Bambu ls 1,750,000
111 Kayu Kamper M3 9,750,000
112 Kaca Bening m2 115,000
113 Jaro Kayu 55x30 cm bh 185,000
114 Wood Filler Kg 75,000
115 Mowilex Liter 85,000
116 Thinner Liter 45,000
117 Amplas Liter 6,500
118 Alat bantu (alat semprot, dll) ls 15,000
119 Handle Pintu bh 275,000
120 Grandel Pintu 3'' bh 36,500
121 Stop Kontak bh 45,000
122 Kloset Duduk diameter 50 cm bh 2,650,000
123 Kran Kamar mandi bh 37,500
124 Shower Mandi bh 235,000
125 Gantungan Baju bh 45,000
126 Keran Leher Angsa Ex/Onda bh 225,000
127 Ogrok Saluran Mampet ls 1,250,000
128 Multiplex 12 mm lbr 190,000
129 Kayu Kaso 5/7 cm m3 3,000,000
130 Paku 5-8 cm kg 25,000
131 Besi Wiremesh 0,6 mm lbr 550,000
132 Alat Bantu ls 25,000
133 Pasir kg 275
134 Keramik 30x30 cm bh 5,500
135 Bak Cuci Piring Sayap bh 750,000
136 Pipa 1/2'' PVC Aw btg 40,000
137 Pipa 3'' PVC Aw 320,000
138 Spandek Gelombang Kecil 0,3 mm 350,000
139 Sekrup 25,000
140 Talang Seng 125,000
141 Cat Dasar 65,000
142 Cat Finishing 85,000