Harga
NO. Uraian Pekerjaan dan Bahan Quantity Satuan Rp JUMLAH
Satuan
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 200 m2 3,000 600,000
2 Pemasangan Bouwplank 60 m' 8,000 480,000
3 Pembelian Alat-alat Pekerjaan 1 paket 1,500,000 1,500,000
4 Pembelian Tempat Air 1 buah 800,000 800,000
Jumlah I 3,380,000
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 117 m3 40,000 4,680,000
2 Pemasangan Pancang Bambu 233 batang 7,000 1,631,000
3 Galian Tanah Cakar Ayam 42 m3 40,000 1,680,000
4 Urugan Pasir Dasar Pondasi 9 m3 130,000 1,170,000
Jumlah II 9,161,000
III PEKERJAAN PASANG PONDASI
1 Batu Kali 70 m3 140,000 9,800,000
2 Pasir Pasang 70 m3 160,000 11,200,000
3 Semen Tiga Roda 163 zak 80,000 13,040,000
4 Ember 47 buah 10,000 470,000
5 Benang Gulung 7 gl 10,000 70,000
Jumlah III 34,580,000
IV PEKERJAAN SLUP BAWAH
1 Besi 12 FL SNI 140 batang 113,000 15,820,000
2 Besi 10 FL SNI 117 batang 74,000 8,658,000
3 Besi 6 FL SNI 70 batang 32,000 2,240,000
4 Tali Kawat 19 kg 20,000 380,000
5 Papan Cor 1 m3 1,400,000 1,400,000
6 Paku 7/5 19 kg 15,000 285,000
7 Semen Tiga Roda 187 zak 65,000 12,155,000
Jumlah IV 40,938,000
V PEKERJAAN BAHAN COR PASIR BETON/BATU
1 Pasir Cor 47 m3 185,000 8,695,000
2 Batu Kerikil 47 m3 200,000 9,400,000
Jumlah V 18,095,000
VI PEKERJAAN KOLOM COR/CAKAR AYAM
1 Besi 12 FL SNI 93 batang 113,000 10,509,000
2 Besi 10 FL SNI 140 batang 74,000 10,360,000
3 Besi 6 FL SNI 93 batang 32,000 2,976,000
4 Tali Kawat 35 kg 20,000 700,000
5 Papan Cor 2 m3 1,400,000 2,800,000
6 Kayu Kaso 2 m3 1,400,000 2,800,000
7 Paku (7 cm, 10, cm dan 5 cm) 28 kg 15,000 420,000
8 Semen Tiga Roda 82 sak 84,000 6,888,000
Jumlah VI 37,453,000
VII PEKERJAAN PASANG BATA/KUSEN
1 Bata Merah 37,300 buah 700 26,110,000
2 Pasir Pasang 35 m3 135,000 4,725,000
3 Semen Tiga Roda 140 sak 84,000 11,760,000
4 Bambu Esteger 140 batang 7,000 980,000
5 Kusen Pintu 9 buah 250,000 2,250,000
6 Kusen Jendela 28 buah 200,000 5,600,000
Jumlah VII 51,425,000
VIII PEKERJAAN COR BALOK ATAS
1 Besi 12 FL SNI 93 batang 113,000 10,509,000
2 Besi 10 FL SNI 93 batang 74,000 6,882,000
3 Besi 6 FL SNI 70 batang 32,000 2,240,000
4 Papan 2 m3 1,400,000 2,800,000
5 Pasir Beton 12 m3 175,000 2,100,000
6 Batu Kerikil 26 m3 200,000 5,200,000
7 Bambu Penunjang 93 batang 7,000 651,000
8 Semen Tiga Roda 58 sak 84,000 4,872,000
9 Tali Kawat 12 kg 20,000 240,000
10 Paku (7 cm, 10 cm, dan 5 cm) 28 kg 18,000 504,000
Jumlah VIII 35,998,000
IX PEKERJAAN ATAP
1 Besi 8 FL SNI 1,167 batang 62,000 72,354,000
2 Besi 6 FL SNI 117 batang 32,000 3,744,000
3 Papan 12 m3 1,400,000 16,800,000
4 Bambu 1,167 batang 10,000 11,670,000
5 Kayu Kaso 6x6 5 m3 1,400,000 7,000,000
6 Tali Kawat 47 kg 20,000 940,000
7 Semen Tiga Roda 187 sak 84,000 15,708,000
8 Ember Aduk 70 buah 10,000 700,000
9 Pasir beton 42 m3 200,000 8,400,000
10 Batu Kerikil 35 m3 214,000 7,490,000
11 Paku (7 cm, 10 cm, dan 5 cm) 7 dus 350,000 2,450,000
Jumlah IX 147,256,000
X PEKERJAAN PELISTER ACI
1 Pasir Pasang 35 m3 200,000 7,000,000
2 Semen Tiga Roda 93 sak 84,000 7,812,000
3 Kelasid 82 bal 22,000 1,804,000
4 Benang 5 gl 10,000 50,000
Jumlah X 16,666,000
XI PEKERJAAN PASANG PLAFOND
1 Kaso Merah 6x6 7 m3 1,800,000 12,600,000
2 GRC 467 m2 22,000 10,274,000
3 Lis Kayu 3x3 583 m3 8,000 4,664,000
4 Paku Jalosi 12 pak 350,000 4,200,000
5 Paku7 cm dan 10 cm 70 kg 18,000 1,260,000
6 Benang 5 gl 10,000 50,000
Jumlah XI 33,048,000
XII PEKERJAAAN PASANG KERAMIK
1 Keramik 40/40 455 m2 60,000 27,300,000
2 Pasir Pasang 23 m3 200,000 4,600,000
3 Semen Tiga Roda 175 sak 84,000 14,700,000
4 Oker Keramik 35 bks 9,000 315,000
5 Benang 5 gl 10,000 50,000
6 Pemotong Keramik 2 buah 350,000 700,000
Jumlah XII 47,665,000
XIII PEKERJAAN PASANG PINTU/RAM KACA
1 Daun Pintu 9 buah 450,000 4,050,000
2 Ram Kaca 56 buah 150,000 8,400,000
3 Kaca Mati 23 buah 50,000 1,150,000
4 Kunci Pintu 5 buah 100,000 500,000
5 Engsel Pintu 14 buah 25,000 350,000
6 Engsel Jendela 56 set 17,500 980,000
7 Aksesoris Jendela 2 set 400,000 800,000
Jumlah XIII 16,230,000
XIV PEKERJAAN PENGECATAN
1 Cat Tembok Romatek 23 pail 280,000 6,440,000
2 Cat Kayu Glotex 23 kg 45,000 1,035,000
3 Dempul Kayu 9 kg 35,000 315,000
4 Thinner/Minyak Cat 23 kg 18,000 414,000
5 Aksesoris Cat 2 paket 300,000 600,000
Jumlah XIV 8,804,000
XV PEKERJAAN PASANG LISTRIK
1 Kabel Interna isi 2 9 gl 380,000 3,420,000
2 Lampu Neon 23 buah 60,000 1,380,000
3 Saklar 19 buah 20,000 380,000
4 Aksesoris Listrik 2 paket 70,000 140,000
Jumlah XV 5,320,000
XVI UPAH TENAGA KERJA
1 Pekerja 467 HOK 80,000 37,360,000
2 Tukang 467 HOK 120,000 56,040,000
3 Kepala Tukang 280 HOK 120,000 33,600,000
Jumlah XVI 127,000,000
XVI I PEKERJAAN MEUBELER
1 Lomari 9 Unit 1,500,000 13,500,000
2 Meja Guru 23 Unit 450,000 10,350,000
3 Kursi Guru 23 Unit 165,000 3,795,000
4 Meja Siswa 93 Unit 195,000 18,135,000
5 Kursi Siswa 187 Unit 120,000 22,440,000
Jumlah XVI 68,220,000
TOTAL 701,239,000
hi, S.Pd.I
PEMETAAN LAHAN BANGUNAN MA
SD Negeri 2 Penukal
ANGUNAN MADRASAH IBTIDA'IYAH NAHDLATUL ULAMA DESA
Pemetaan Bangunan
45 Meter
Teras 2 Meter
Wc Siswa 6 5 4 3 2 1
Teras 1 Meter
Teras 1 Meter
3x3
Wc Guru 6x6
3x3 Meter
Teras 2 Meter
23 Meter
Teras 1 Meter
Kantor
Halaman Madrasah
Teras 2 Meter
Teras 2 Meter
38 x 14 Meter
12x12
Meter
Teras 1 Meter
Masjid
Jalan Stapak
Jalan Raya Desa Air Itam Timur
Jalan Stapak Jalan Stapak