1 2 3 4 5
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 50 m3 75,000 3,750,000
1,500,000
2 Pemasangan Pancang Bambu 100 batang 15,000
600,000
4 Urugan Pasir Dasar Pondasi 4 m3 150,000
Jumlah II 7,200,000
50,000
5 Benang Gulung 5 gl 10,000
5,000,000
2 Besi 10 FL SNI 50 batang 100,000
Jumlah IV 23,325,000
4,000,000
2 Batu Kerikil 20 m3 200,000
Jumlah V 7,700,000
VI PEKERJAAN KOLOM COR/CAKAR AYAM
1 Besi 12 FL SNI 40 batang 98,000 3,920,000
4,440,000
2 Besi 10 FL SNI 60 batang 74,000
1,400,000
6 Kayu Kaso 1 m3 1,400,000
2,940,000
8 Semen Tiga Roda 35 sak 84,000
Jumlah VI 15,860,000
6,720,000
3 Semen Tiga Roda 80 sak 84,000
300,000
5 Kusen Pintu 6 buah 50,000
3,000,000
6 Batu Kerikil 15 m3 200,000
2,940,000
8 Semen Tiga Roda 35 sak 84,000
288,000
10 Paku (7 cm, 10 cm, dan 5 cm) 16 kg 18,000
IX PEKERJAAN ATAP
Jumlah IX 87,800,000
Jumlah X 11,280,000
9,000,000
2 GRC 400 m2 22,500
5,250,000
4 Paku Jalosi 15 pak 350,000
Jumlah XI 29,510,000
8,640,000
2 Ram Kaca 48 buah 180,000
800,000
4 Kunci Pintu 8 buah 100,000
1,500,000
2 Cat Kayu Glotex 20 kg 75,000
500,000
4 Thinner/Minyak Cat 20 kg 25,000
5 Aksesoris Cat 1 paket 500,000 500,000
1,200,000
2 Lampu Neon 20 buah 60,000
600,000
4 Aksesoris Listrik 1 paket 600,000
Jumlah XV 4,500,000