HARGA
No. MATERIAL/BAHAN VOLUME SAT. JUMLAH KETERANGAN
SATUAN
I. PEKERJAAN CAT
1 Q-Luc 18 Kg putih tulang/soft 1 Pail 330.000 330.000
2 Q-Luc 4,5 kg coklat 1 Pail 110.000 110.000
3 Cat Avian warna coklat putih kemasan 0.9 Liter 1 Pail 80.000 80.000
3 Cat Avian warna coklat muda kemasan 0.9 Liter 3 Pail 80.000 240.000
3 Cat Avian warna coklat tua kemasan 0.9 Liter 1 Pail 80.000 80.000
4 Lem Fox Putih 1 kg 18.000 18.000
6 Kuas 4" Merk eterna 2 Unit 25.000 50.000
7 Kuas 2" Merk eterna 1 Unit 12.000 12.000
8 Kuas Rol 1 Unit 20.000 20.000
9 Upah tukang cat 2 Hk 150.000 300.000
TOTAL I 1.240.000
II. PEKERJAAN COR PELANTARAN CUCI & DEPAN PINTU WC
1 Semen @ 50 Kg/Zak (Merk conch) 5 Zak 74.000 370.000
2 Upah Tukang 1,0 HK 150.000 150.000
TOTAL II 520.000
III. PEKERJAAN PIPA PEMBUNGAN & PIPA AIR BERSIH DARI KOLAM
1 Pipa 3/4" Rucika JIS AW P=4 Mtr (air bersih) 3 Btg 62.000 186.000
2 Kran 3/4" 2 Pc 15.000 30.000
3 Sok Drat Dalam (SDD) 3/4" 3 Pc 5.000 15.000
4 Sok Drat Luar (SDL) 3/4" 1 Pc 5.000 5.000
5 Socket 3/4" 2 Pc 3.000 6.000
6 TEE AW RUCIKA 3/4" 1 Pc 5.000 5.000
7 ELBOW 3/4" 8 Pc 5.000 40.000
9 Pipa Dia. 3" x 4 m ( C ) u/pembuangan air limbah 2 Btg 70.000 140.000
10 Elbow 3" 90derajat 5 Btg 22.000 110.000
11 Tee 3" 1 Btg 22.000 22.000
12 Upah Tukang 1,0 HK 150.000 150.000
TOTAL IV 422.000
IV. PEKERJAAN PERBAIKAN TERAS
1 Kayu 4/8 campuran 6 Btg 42.000,00 252.000
2 Semen @ 50 Kg/Zak (Merk conch) 3 Zak 74.000 222.000
3 Pasir 1 Kbk 150.000 150.000
4 Paku 3" 1 kg 25.000,00 25.000
5 Paku 2" 1 kg 25.000,00 25.000
TOTAL IV 674.000
TOTAL KESELURUHAN (I+II+III+IV) 3.565.000