JUMLAH TOTAL
NO URAIAN VOLUME SATUAN (RP)
(RP)
A BAHAN/MATERIAL
1 Pasir Pasang 228 m3 125,000 28,500,000
2 Batu Belah 260 m3 125,000 32,500,000
3 Semen Portland 486 Zak 65,000 31,590,000
4 Papan Bekisting 0.5 m3 1,250,000 625,000
Sub Total 1) 93,215,000
B PERALATAN
1 Benang 8 bh 5,000 40,000
2 Cangkul 5 bh 55,000 275,000
3 Ember 20 bh 8,000 160,000
4 Linggis 2 bh 70,000 140,000
5 Slang 30 Meter 4,500 135,000
6 Palu 3 bh 35,000 105,000
Sub Total 2) 855,000
C UPAH KERJA
1 Tukang 279 Hok 70,000 19,530,000
2 Pekerja 560 Hok 65,000 36,400,000
Sub Total 3) 55,930,000
JUMLAH TOTAL 150,000,000
EMPAT FATIMAH