Anda di halaman 1dari 2

KEBUTUHAN BAHAN BANGUNAN

RENCANA YANG AKAN DIKERJAKAN TERAS SAMPING 3,5 M X 2,5 M


BAHAN BANYAKNYA HARGA SATUAN T. HARGA SATUAN ESTIMASI DIKERJAKAN
BESI 10 28 75,000 2,100,000 BATANG
BESI 8 5 55,000 275,000 BATANG
TRIPLEKS 5 90,000 450,000 LEMBAR
PAPAN 0 LEMBAR
KASO 0 BATANG
PAKU 2 18,000 36,000 KG
PASIR 1 300,000 300,000 RET
SEMEN 15 66,000 990,000 SAK
BATAKO 1 66,000 66,000 BUAH
LOSTER 7 25,000 175,000 BUAH
4,392,000
TERAS DEPAN 3,5 M X 2 M
BAHAN BANYAKNYA HARGA SATUAN T. HARGA SATUAN ESTIMASI DIKERJAKAN
BESI 10 10 75,000 750,000
BESI 8 5 55,000 275,000
LOSTER 7 25,000 175,000
SEMEN 5 66,000 330,000
1,530,000
SLOP ATAS
BAHAN BANYAKNYA HARGA SATUAN T. HARGA SATUAN ESTIMASI DIKERJAKAN
BESI 10 16 75,000 1,200,000 BATANG
BESI 8 7 55,000 385,000 BATANG
SEMEN 7 66,000 462,000 SAK
TOTAL 2,047,000
RANGKA RUMAH
BAHAN BANYAKNYA HARGA SATUAN TOTAL HARGA SATUAN ESTIMASI DIKERJAKAN
KAYU 1 700,000 700,000 KUBIK
TUKANG 1 4,000,000 4,000,000 RANGKA & PASANG ATAP
ATAP SPANDEK 128 70,000 8,960,000 M2
LAIN LAIN 0
TOTAL 13,660,000
FINISHING
JENIS FINISHING BAHAN BANYAKNYA HARGA SATUAN TOTAL HARGA SATUAN
PLASTER DINDING SEMEN 15 66,000 990,000 SAK
LANTAI SEMEN 6 66,000 396,000 SAK
METERAN LISTRIK PLN 1 1,500,000 1,500,000 PC
KABEL LISTRIK, LAMPU DLL PLN 1 1,000,000 1,000,000 PCS
PALFON GYPSUM 20 130,000 2,600,000 LEMBAR
KUSEN PINTU JATI PUTIH 6 500,000 3,000,000 DAUN
KUSEN JENDELA JATI PUTIH 14 300,000 4,200,000 DAUN
PLAMIR 20 100,000 2,000,000 PCS
FINISHING DINDING
CAT 10 100,000 1,000,000 PCS
TOWER/TANK AIR TOWER 1 900,000 900,000 PC
LANTAI GRANIT 25 300,000 7,500,000 DUS
0
25,086,000
64 20 BATANG UNTUK DAK
32

40 3 120 M
P 48 2,5 96 M
216 M

90

7
7
7
7
11
11
11
4
65 3 195 12
16.25

LUAS ATAP
DEPAN 1/2 ALAS X 1/2
T X 8 X 3,5
14 METER
BELAKANG 14 METER

(ATAS + BAWAH)/2 X TINGGI


5 M + 13 M/2 X 5
KIRI 45 METER
KANAN 45 METER

TERAS 10 METER

TOTAL LUAS 128 METER/SEGI