MATERIAL LIST

TEMPORARY FACILITY PROJECT


PROJECT : SITE OFFICE PT.JEL
LOCATION : BENETE BAY - WEST SUMBAWA - WEST NUSA TENGGARA
YEAR : 2022
OWNER : PT. JURONG ENGINEERING LESTARI

HARGA SATUAN TOTALHARGA


NO NAMA MATERIAL VOLUME SAT
(RP) (Rp)

A.KEBUTUHAN BAHAN PEK.SIPIL


1 SEMEN 1,380 ZAK 85,000 117,300,000
2 PASIR 690 M3 120,000 82,800,000
3 BATU SPLIT 2/3 204 M3 420,000 85,680,000
4 PAPAN MAL 2 X 20CM 216 KPG 50,000 10,775,000
5 KAYU STEGER / GELAM / KAYU 5 X 5 72 BTG 70,000 5,028,333
6 PAKU 2 IN 30 KG 25,000 750,000
7 PAKU 3 IN 20 KG 25,000 500,000
8 PAKU 4 IN 15 KG 25,000 375,000
9 BESI ø 6 MM KS JI 36 BTG 65,000 2,334,583
10 BESI ø 10 MM KS JI POLOS 72 BTG 120,000 8,620,000
11 BESI ø 12 MM KS JI ULIR 46 BTG 176,000 8,174,222
12 KAWAT IKAT 60 KG 20,000 1,200,000
13 EMBER ADUK TUKANG 50 BH 10,000 500,000
14 KERAMIK UK. 40X40 CM MEREK KIA SETARA WARNA PUTIH ACC JEL 1,246 DUS 90,000 112,176,000
15 KERAMIK UK. 20X20 CM KASAR MEREK KIA SETARA WARNA PUTIH ACC JEL 94 DUS 60,000 5,616,000
16 NAT KERAMIK 134 BKS 15,000 2,010,000
17 BENANG TUKANG 20 BH 10,000 200,000
18 LOT TUKANG 10 BH 50,000 500,000
19 WATERPAS 10 BH 100,000 1,000,000

JUMLAH A. 445,539,139

B.KEBUTUHAN BAHAN PEK.ELEKTRIKAL


1 PIPA KONDUIT 5/8 MEREK CLIPSAL SETARA WARNA PUTIH 670 BTG 3,000 2,010,000
2 TDUS LISTRIK MEREK CLIPSAL SETARA WARNA PUTIH 335 BH 3,000 1,005,000
3 DAKTING KABELPUTIH UKURAN 5/8 335 BTG 10,500 3,517,500
4 KABEL TIS 30 CM 20 BKS 50,000 1,000,000
5 KLAM PIPA UK.5/8 40 BKS 20,000 800,000
6 KABEL NYM UK.3X2.5MM MEREK PRABA SETARA @100 M 20 ROL 1,580,000 31,600,000
7 KABEL NYM UK.2X2.5MM MEREK PRABA SETARA @ 100 M 20 ROL 1,300,000 26,000,000
8 STOP KONTAK OUTBOW KAKI 3 MEREK. PHILIP SETARA 168 SET 75,000 12,600,000
9 STOP KONTAK LANTAI TANAM KAKI 3 MEREK. PHILIP SETARA 30 SET 200,000 6,000,000
10 SAKELAR DOUBEL DAN TUNGGAL OUTBOW MERK PHILIP SETARA 52 SET 65,000 3,380,000
11 STOP KONTAK OUTBOW AC 37 SET 90,000 3,330,000
12 LAMPU LED DOWNLIGHT 4 INC + LENGKAP BOHLAMP MEREK PHILIP SETARA 27 BH 150,000 4,050,000
13 LAMPU RM 2 X 36 WATT + LENGKAP BOHLAMP MEREK PHILIP SETARA 121 SET 275,000 33,275,000
14 BOX PANEL 120X80X30 CM LENGKAP ISINYA ILCB 10 A 30 GROUP 1 SET 9,000,000 9,000,000
15 AC 2 PK MEREK SAMSUNG, PANASONIK SETARA 16 UNIT 5,000,000 80,000,000
16 AC 1.5 PK MEREK SAMSUNG, PANASONIK SETARA 5 UNIT 4,000,000 20,000,000
17 AC 1 PK MEREK SAMSUNG, PANASONIK SETARA 1 UNIT 2,900,000 2,900,000
18 AC 3/4 PK MEREK SAMSUNG, PANASONIK SETARA 15 UNIT 2,900,000 43,500,000
19 TIANG ARDE PENANGKAL PETIR / TOMBAK ARDE 60 CM 3 UNIT 150,000 450,000
20 TEMBAGA GROUNDING 5/8 MM 87 M 130,000 11,310,000
21 EXHAUSFAN 8 INCI PANASONIK 3 UNIT 450,000 1,350,000
22
23
24
25

JUMLAH B. 297,077,500
C. KEBUTUHAN BAHAN PEK.SANITASI & PLUMBING
1 CLOSED DUDUK MEREK TOTO SETARA + LENGKAP ACECORIES 10 SET 2,500,000 25,000,000
2 JET WASHER MEREK TOTO ATAU SETARA 10 SET 120,000 1,200,000
3 URINOIR MEREK TOTO SETARA 6 SET 1,250,000 7,500,000
4 WASTAFEL LENGKAP ACECORIES MEREK TOTO ATAU SETARA 6 SET 400,000 2,400,000
5 CERMIN WASTAFEL 6 SET 450,000 2,700,000
6 KRAN AIR 1/2 STENLESS TOTO SETARA 6 BH 150,000 900,000
7 FLOORDRAIN 11 BH 55,000 605,000
8 PIPA PVC ø 1/2 IN PUTIH MEREK WAVIN SETARA 42 BTG 35,000 1,470,000
9 PIPA PVC ø 3/4 IN PUTIH MEREK WAVIN SETARA 21 BTG 45,000 945,000
10 PIPA PVC ø 4 IN PUTIH MEREK WAVIN SETARA 63 BTG 205,000 12,915,000
11 LEM PIPA 30 KLG 65,000 1,950,000
12 ISOLTIP PIPA 50 BH 7,000 350,000
13 L BOW PIPA ø 1/2IN 60 BH 7,000 420,000
14 L BOW PIPA ø 3/4IN 30 BH 15,000 450,000
15 L BOW PIPA ø 4 IN WAVIN SETARA 40 BH 45,000 1,800,000
16 TEE PIPA ø 1/2IN 30 BH 7,000 210,000
17 TEE PIPA ø 3/4IN 20 BH 15,000 300,000
18 TEE PIPA ø4 IN MEREK WAVIN SETARA 20 BH 45,000 900,000
19 SOK TURUNAN PIPA 3/4 IN ø KE 1/2IN 10 BH 16,000 160,000
20 MESIN POMPA AIR JET PUMP MEREK PANASONIK SETARA 1 UNIT 1,500,000 1,500,000
21 TANDON AIR 5000 LTR MEREK TEDMOND SETARA 2 UNIT 5,500,000 11,000,000
22 SEPTITANK BIO 2000 LTR MEREK PINGUING SETARA 3 UNIT 3,500,000 10,500,000
23 PLAMPUNG OTOMATIS UNTUK TANDON AIR 2 BH 75,000 150,000
24 KLAM PIPA UKURAN 1/2 IN 10 BKS 50,000 500,000
25 PEMBUATAN TOWER TANDON AIR 4 M PABRIKASI UPAH + BAHAN 1 UNIT 3,000,000 3,000,000
26

JUMLAH C. 88,825,000

TOTAL JUMLAH A + B + C 831,441,639