RINCIAN ANGGARAN BIAYA
PEKERJAAN : INSTALASI GEDUNG SMU LOKASAI : WAWONI
NO URAIAN KEGIATAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
A MATERIAL 1 KABEL NYA 1 x 2,5 mm ROL 2 315,000.00 630,000 2 KABEL NYA 1 x 1,5 mm ROL 2 225,000.00 450,000 3 SAKLAR GANDA BH 1 18,000.00 18,000 4 SAKLAR TUNGGAL BH 1 16,000.00 16,000 5 LAMPU TL BH 11 - 6 PANEL SET BH 1 3,500,000 3,500,000 7 ISOLASI BH 3 10,000 30,000 8 ISOLATOR BH 200 1,000.00 200,000 9 PIPA BTG 10 10,000.00 100,000 JUMLAH A RP 4.944.000 B JASA
PEMASANGAN INSTALASI TITIK 11 80,000 880,000
PEMASANGAN PANEL BH 1 1,500,000 1,500,000 JUMLAH B RP 2.380.000 JUMLAH A DAN B RP 7.324.000 TERBILANG : RINCIAN ANGGARAN BIAYA PEKERJAAN : Penerangan jalan dan kompleks LOKASI PROYEK : Kab. Bombana PROV : SULAWESI TENGGARA NO JENIS PEKERJAAN QTY SATUAN HARGA SATUAN (RP) JUMLAH (RP) 1 Tiang Galvanis 9 meter 4 BH 3,510,000 14040000 2 Lampu HPIT 250 Watt 64 BH 3,500,000 224,000,000 3 semen tonasa 4 Sak 72,000 288000 4 Kabel NYY 2x6 mm 250 Meter 60,000 15000000 5 Kabel NYY 2x2,5 mm 150 Meter 25,000 3750000 6 Kabel NYY 4x10mm 30 Meter 135,000 4050000 7 Batang Arde 16mm 1 Batang 1,550,000 1550000 8 Terminal Kabel 16 mm 2 BH 52,000 104000 9 Isolasi 3M 3 BH 104,000 312000 10 Galian Kabel 250 Meter 30,000 7500000 11 Galian Titik Lampu 15 BH 150,000 2250000 12 Panel 40 x 50 cm 1 Set 5,000,000 5000000 JUMLAH 277,844,000 Total 277,844,000 TERBILANG : Seratus Lima Puluh Delapan Juta Tuju Ratus Tiga Puluh Dua Ribu Rupiah Keterangan : Sudah Termasuk PPH