Anda di halaman 1dari 3

PT.

AKILIKIWO TEKNIK NUSANTARA


JALAN : KELENGKENG KEL. ANDUONOHU KEC. POASIA KOTA KENDARI SULAWESI TENGGARA
EMAIL : akilikiwotekniknusantara@yahoo.com

Telp. 085394181915

RINCIAN ANGGARAN BIAYA


PEKERJAAN : INSTALASI GEDUNG SMU
LOKASAI : WAWONI

NO URAIAN KEGIATAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA


A MATERIAL
1 KABEL NYA 1 x 2,5 mm ROL 2 315,000.00 630,000
2 KABEL NYA 1 x 1,5 mm ROL 2 225,000.00 450,000
3 SAKLAR GANDA BH 1 18,000.00 18,000
4 SAKLAR TUNGGAL BH 1 16,000.00 16,000
5 LAMPU TL BH 11 -
6 PANEL SET BH 1 3,500,000 3,500,000
7 ISOLASI BH 3 10,000 30,000
8 ISOLATOR BH 200 1,000.00 200,000
9 PIPA BTG 10 10,000.00 100,000
JUMLAH A RP 4.944.000
B JASA

PEMASANGAN INSTALASI TITIK 11 80,000 880,000


PEMASANGAN PANEL BH 1 1,500,000 1,500,000
JUMLAH B RP 2.380.000
JUMLAH A DAN B RP 7.324.000
TERBILANG :
RINCIAN ANGGARAN BIAYA
PEKERJAAN : Penerangan jalan dan kompleks
LOKASI PROYEK : Kab. Bombana
PROV : SULAWESI TENGGARA
NO JENIS PEKERJAAN QTY SATUAN HARGA SATUAN (RP) JUMLAH (RP)
1 Tiang Galvanis 9 meter 4 BH 3,510,000 14040000
2 Lampu HPIT 250 Watt 64 BH 3,500,000 224,000,000
3 semen tonasa 4 Sak 72,000 288000
4 Kabel NYY 2x6 mm 250 Meter 60,000 15000000
5 Kabel NYY 2x2,5 mm 150 Meter 25,000 3750000
6 Kabel NYY 4x10mm 30 Meter 135,000 4050000
7 Batang Arde 16mm 1 Batang 1,550,000 1550000
8 Terminal Kabel 16 mm 2 BH 52,000 104000
9 Isolasi 3M 3 BH 104,000 312000
10 Galian Kabel 250 Meter 30,000 7500000
11 Galian Titik Lampu 15 BH 150,000 2250000
12 Panel 40 x 50 cm 1 Set 5,000,000 5000000
JUMLAH 277,844,000
Total 277,844,000
TERBILANG : Seratus Lima Puluh Delapan Juta Tuju Ratus Tiga Puluh Dua Ribu Rupiah
Keterangan : Sudah Termasuk PPH

KENDARI,10 November 2019

MUSTAFA,ST
DIREKTUR