KEGIATAN :TAMBAH DAYA INSTALASI LISTRIK DI RP I, RP II DAN RP III DI UNIT PELAYANAN PENINJOAN
LOKASI : PENINJOAN
TAHUN : 2018
HARGA SATUAN
NO. URAIAN PEKERJAAN VOL SAT. TOTAL HARGA (Rp.)
(Rp.)
A Lokasi : RP I
Seratus Satu Juta Tiga Ratus Tujuh Puluh Tujuh Ribu Rupiah
Terbilang :
Terbilang :
410400
533520
20,800,000
#REF!
31977000
#REF!
31977000
#REF!
31977000
ANALISA HARGA SATUAN BAHAN DAN UPAH
Harga
Harga Satuan Jumlah harga Jumlah Upah
NO. Uraian VOLUME/SAT Satuan Upah
bahan (Rp.) Bahan (Rp.) (Rp.)
(Rp.)
1 Servis Panel I
NFB 3 Phase 160 A 1 bh 2,704,000 2,704,000
Alat bantu 1 unit 25,000 25,000
Ongkos Rakit + Pemasangan Panel SDP 1 unit 150,000 150,000
Total 2,729,000
2 Servis Panel II
NFB 3 Phase 100 A 1 bh 2,253,680 2,253,680
Alat bantu 1 unit 25,000 25,000
Ongkos Rakit + Pemasangan Panel SDP 1 unit 150,000 150,000
Total 2,278,680
Spesifikasi Panel ATS-AMF 40-50 KVA Kontaktor
2,704,000 2. Magnetic contactor LS 80 A
25,000
150,000 10.Wiring Diagram
2,879,000
Spesifikasi Panel ATS-AMF 40-50 KVA Kontaktor
2,253,680 2. Magnetic contactor LS 80 A
25,000
150,000 10.Wiring Diagram
2,428,680
2,253,680
535,000
20,000
100,000
655,000
2,253,680
350,000
20,000
75,000
445,000
50,000
25,000
75,000
100,000
25,000
125,000
RA, SE
260,000.00
3,575.00 `
263,575.00
73,125.00
3,575.00 `
76,700.00
48,750.00
7,150.00
55,900.00
HARGA SATUAN BAHAN
1
1 bh NFB 3 Phase 160 A 2,704,000
2
1 bh MCB 3 Phase 100 A 2,253,680
3
1 m Kabel NYFGBY 4 x 50 mm 535,000
4
1 m Kabel NYFGBY 4 x 25 mm 350,000
5
1 ls Alat bantu 5,000
6
1 bh Scun 50 mm" 100,000
7
1 bh Scun 25 mm" 50,000